Loading...
HomeMy WebLinkAboutSW8050547_Historical File_20210420ROY C OPElt cav-Mr EXONNE DELLI-CATi71 BRIAN CNN star April 20, 2021 RMTH CAROLINA. ambume"aQuamy New Hanover County Airport Authority Attn: Granseur Dick, Facilities Director 1740 Airport Boulevard. Wilmington, NC 28405 Subject: State Stermwater Management Permit No. SW8 050547 Wilmington International Airport EDDB High Density Project New Hanover County Dear Mr. Dick The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the subs project on April 15, 2021. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth. in Title 15A NCAC 02H.1000 (1995 Rules) as amended on January 1, 2017 (2017 Rules). We are hereby forwarding modified. Permit No. SW8 050547 dated April 20, 2021, for the construction of the built -upon areas (BETA) and stormwater control measures (SCMs) associated with the subject project. This permit shall be effective from the date of issuance until June 15, 2027 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. Please refer to Attachment C for a detailed description of the cr7ir vnt proposed major modification and a list of all the past modifications approved during the effective period of the permit. This cover letter, attachments, and all documents on Mee with DEMLR shall be considered part of this permit and is herein incorporated by reference. Please replace the previously approved plan sheets with the attached modified and approved versions. Please replace the previous application (SWU 101), slzpplemen4 operation and maintenance agreement with the attached modified versions. If any parts, requirements, or limitations contained m this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAR with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www-NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Garrett Zorda in the Wilmington Regional Office, at (910) 796-7215 or garrett.zorda@ncdenr.gov. Sincerely, 5�; Brian Wrenn, Direetar Division of Energy, Mineral and Land Resources Enclosures: Attwhmcnt A —Designees Certification Form Attwhment C — Permitting History Application Documents DESlgdz: %StarmwaterTermits & Projects120051050547 HD1202104 permit 050547 E North Carolina Departnnent of Ehvk=vnental Quality I Division of Energy. Mineral and Land Resources Wllrnington.Reponal Mee 1 127 Cardinal. Drive Extension ( W&ningtom North Carolina 284os .en�c�unar 910.7%.7M State Stormwater Permit No. SW& 050547 Page 2 of 2 cc: Rick Baker, PE Timmons Group New Hanover County Building Safety Department Wilmington Regional Office Stormwater File North Carolina Department of Env6-Ontrental Quality. I Dision of Energy, Mineral and Land Resources +�• Wgh* wn Regional Office 127 Cardinal Drive Extamsion I Wbnington, North Carolina.28405 nwRrrreapaunu: C` o�.ameeeeu+m.ser.00q 910:7%.e215 State Stormwater Management Systems Permit No. SM 050547 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO New Hanover County Airport Authority Wilmington International Airport Extended Dry Detention Basins (EDDB) 1740 Airport Boulevard, Wilmington, New Hanover County FOR THE construction, operation and maintenance of three (3) extended dry detention basin ("stormwater control measures" or "SCM") in compliance with the provisions of 15A NCAC 2H .1000 (1995 Rules) as amended on January 1, 2017 (2017 Rules) (collectively, the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until June 15, 2027, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. The drainage area identified as Phase I&II is subject to the 1995 Rules and as clarified in the 1995 specific conditions listed herein. The drainage areas identified as Phase IIIA, Phase IIIB and Phase IIIC are subject to the 1995 Rules and the 2017 Rules and as clarified in the 2017 Rules specific conditions listed herein_ 2. This project and SCMs have been approved based on the "Wilmington International Airport Stormwater Master Plan" document approved on November 24, 2004 as a variation to the stormwater rules and in accordance with G.S. 143-214.7(c3). All future major modifications to this permit must either meet the 2004 "Wilmington International Airport Stormwater Master Plan" in its entirety, meet the most current set of stormwater rules, or provide technical justification that the proposed modification is providing equal or better control and equal or better protection of waters of the State as a variation under the current set of stormwater rules. Approval of such variations that do not meet all of the requirements is done on a case -by -case basis. 3. FAA requirements prohibit standing water (i.e., permanent pools) and stipulate that the design storm must be fully drained within 48 hours. This is supported by G.S. 143-214.7(c3) where the Division does not require the use of an SCM with standing water. The approved SCM design for the 3 extended dry detention basins includes a low flow device but does not include a permanent pool at the low flow outlet or sediment storage. 4. The approved "Wilmington International Airport Stormwater Master Plan" document is not intended to limit or restrict the airport or its current or prospective tenants from pursuing alternative or modified stormwater management solutions in various locations than those listed in the document itself. Since the approval of the "Wilmington International Airport Stormwater Master Plan" document, other stormwater control measure (SCM) options that do not contain areas of standing water have been developed and should be evaluated for future projects. Page 1 of 5 State Stormwater Management Systems Permit No. SW8 050547 5. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. The maximum amount of built -upon area (BUA) allowed for the entire project is 9,304,059 square feet. 6. The three (3) SCMs identified as "Phase I and II" Extended Dry Detention Basin, Phase IIIA Extended Dry Detention Basin and Phase 11113 Extended Dry Detention Basin have been designed to handle the runoff from 8,520,835 square feet, 116,598 square feet, and 367,596 square feet of BUA, respectively, within the delineated drainage areas. The BUA for future development within the drainage areas to the SCMs identifies as "Phase I and I[" Extended Dry Detention Basin, Phase IIIA Extended Dry Detention Basin and Phase IIIB Extended Dry Detention Basin is limited to 2,223,812 square feet, 48,788 square feet, and 264,031 square feet, respectively. 7. Where an individual project within the drainage area is being leased or sold, the stormwater collection system for that project must be located in either dedicated common areas or easements and the final plats will be recorded showing all such required easements. 8. The drainage areas for the on -site stormwater systems will be limited to the amounts of built - upon area indicated in this permit and the approved plans and specifications. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control measures. 9. (2017 Rules) The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 10. (2017 Rules) A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. 11 The portion of the existing airport previously included in the drainage area of the permitted dry detention basin that is being removed, must be submitted in a future permit application as a modification or under G.S. 143-214.7(c4). 12. (1995 Rules) The following design criteria have been provided and must be maintained in the "Phase I and II" Extended Dry Detention Basin. Phase I & II a. Drainage Area, acres: 287.63 Onsite, ft2: 12,529,107 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 8,520,835 C. Design Storm, inches: 4,552,087 @1" 3,968,748 @1.5" d. Basin Bottom Elevation, feet: 7.0 e. TSS removal efficiency: 50% f. Storage Elevation, FMSL: 13.0 g. Storage Surface Area, ft2: 506,082 h. Permitted Detention Volume, ft3: 1,058,112 i. Seasonal High Water Table, FMSL: 6.0 j. Controlling Orifice: 12.0" O k. Drawdown Time for 12.0"0 orifice, hours: 57 I. Receiving Stream/River Basin: Smith Creek / Cape Fear M. Stream Index Number: 18-74-63 n. Classification of Water Body: C;Sw 13. (2017 Rules) The SCMs identified as Phase IIIA Extended Dry Detention Basin and Phase IIIB Extended Dry Detention are permitted based on the design criteria presented in the sealed, signed and dated supplements, the sealed and signed "Technical Justification" document dated April 13, 2021 justifying the variations from the Wilmington International Airport Stormwater Master Plans well as the 2017 minimum design criteria, and as shown in the approved plans and specifications. These SCMs must be provided and maintained at the design condition. The approved supplements are incorporated by reference into this permit. Page 2 of 5 State Stormwater Management Systems Permit No. SW8 050547 14. (2017 Rules) If the SCMs identified as Phase IIIA Extended Dry Detention Basin and Phase IIIB Extended Dry Detention are found to not meet the approved design criteria, a modification must be submitted to either meet the requirements or propose another variation from the rules. This is based on a case -by -case decision and should not be used as a precedent for future permitting actions. 15. Tributary projects outside of the drainage area of the previously approved "for -credit" grassed swales, but inside the drainage area of the approved SCMs, must provide an additional BMP with a sufficient TSS removal efficiency such that the total TSS removal, including the extended dry detention basin, is at least 85%. II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 3. The facilities shall be constructed, operated, and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 4. The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the maximum allowed by this permit. 5. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii_ A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 6. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 7. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 3 of 5 State Stormwater Management Systems Permit No. SV18 050547 8. (2017 Rules) The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. 9. (2017 Rules) The final plats for the project must be recorded with the Office of the Register of Deeds. The recorded plat must reference the Operation and Maintenance Agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. 10. Access to the permitted stormwater facilities shall be maintained via appropriate easements (as required) at all times. 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS 1. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or irk part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants- b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; c. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; Page 4 of 5 State Stormwater Management Systems Permit No. SW8 050547 3. Any individual or entity found to be in noncompliance with the provisions of this stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 4. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 9. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 10. The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee; 11 The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit modified, updated and reissued this the 201 day of April 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Unia '" IS .3;; Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 State Stormwater Management Systems Permit No. SW8 050547 Wilmington International Airport Stormwater Permit No. SW8 050547 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 1 of 2 State Stormwater Management Systems Permit No. SW8 050547 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All drainage within the permitted contributing drainage area is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. A trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown device is correctly located and sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as pretreatment devices, outlet structure and/or forebay. 15. The required system dimensions are provided per the approved plans. 16. The maximum drainage area and/or built -upon area have not been exceeded for the "Phase I & II" condition. cc: NCDEQ-DEMLR Regional Office New Hanover County Building Inspections Page 2 of 2 State Stormwater Management Systems Permit No. SW8 050547 Attachment C - Permitting History Wilmington International Airport EDDB Permit No. SW8 050547 Appwv#J Perm -it HEIRS >l� - aftfie Chanps L' Action Vey This original issuance approved the 150 acre area pocket of high density Phase I, in accordance with 6/15/2005 Original 1.0 SW8 040836, to be treated in an extended dry Approval detention basin (EDDB) #1 designed to handle the runoff from 4,247,100 square feet of impervious area. Approved the modification of the permit to include Phase 11, which brought the total project area to 10/28/2009 Modification 1.1 264 acres and increased the size of the EDDB # 1 to handle a total of 8,468,064 square feet of impervious area. Approved the modification to include Phase III, which brought the total project area to 321.35 acres and increased the size of the EDDB # 1 to handle a 10/26/2011 Modification 1.2 total of 8,468,064 square feet of impervious area. This permit also took into account the impervious area for SW8 060326 and SW8 060515, which both drain to EDDB # 1 and were permitted as Offsite permits to SW8 050547. Approved the modification to the overall drainage area to 3 22.3 8 acres and the increased size of EDDB #1 to handle a total of 9,751,185 square feet 11/29/2012 Modification 1.3 of impervious area. This modification included the addition of two grassed pre-treatment swales. This issuance left 3,177,214 square feet of Future allocation for the Phase I & II area. Approved the reallocation of 205,202 square feet of Plan Future allocation for the development of the Rental 2/8/2013 Revision 1.4 Car Facility within the Phase I & II drainage area. This issuance left 2,972.,012 square feet of Future allocation. Approved the reallocation of 32,453 square feet of Plan Future allocation for the expansion of the North 8/4/2015 Revision 1.5 General Aviation Apron draining to EDDB # 1. This issuance left 2,939,559 square feet of Future allocation for the Phase I & II area. Approved the reallocation of a total of 129,082 square feet of future allocation, 62,570 square feet Plan for the Business Park access road and 66,512 9/9/2015 Revision 1.6 square feet for Lot 9 of the Business Park, both draining to EDDB #1. This issuance left 2,810,477 square feet of Future allocation for the Phase I & 11 area. Page 1 of 2 State Stormwater Management Systems Permit No. SW8 050547 Approved the reallocation of 122,922 square feet of future allocation for the North General Aviation Hangar Taxiline and Corporate Hanger Complex. 6/29/2016 Plan 1 This also took into account the 24,190 square feet Revision '7 of impervious area allocated to SW8 150723, which drains to EDDB #1 and is permitted as an Offsite permit to SW8 050547. This issuance left 2,663,295 square feet of Future allocation. Approved the reallocation of 75,596 square feet of 8/22/2017 Plan 1'8 future allocation for the Avis Car Rental Facility Revision draining to EDDB #1. This issuance left 2,587,699 square feet of Future allocation. Approved the reallocation of 29,337 square feet of 4/18/2018 Minor 1.9 future allocation for the Social Bark Kennel Modification draining to EDDB #1. This issuance left 2,558,362 square feet of Future allocation. Approved the reallocation of 110,358 square feet of 10/5/2018 Minor 2.0 future allocation for the FBO #2 project draining to Modification EDDB #1. This issuance left 2,448,004 square feet of Future allocation. 10/3/2019 Renewal 3.0 This issuance renewed Permit No. SW8 050547 until June 15, 2027. Approved the reallocation of 224,194 square feet of future allocation for the Air Carrier Apron Expansion draining to EDDB # 1. This modification Major also adds Pre-treatment Swale #3 as pretreatment 10/6/2020 Modification 3.1 for EDDB #1. The submittal also included 9,268 square feet of impervious area that meets NCGS 143-214.7(c4) that does not drain to EDDB #1. This issuance left 2,223,812 square feet of Future allocation for the Phase I & II area. This issuance replaces the originally approved Phase III expansion (and "Overall" condition) of Extended Dry Detention Basin (EDDB) #1 with two new EDDB's. EDDB # I remains unmodified at the Phase I&II condition. The two new EDDB's, identified as Phase IIIA and Phase IIIB on the plans, are permitted as a variation to the rules based 4/20/2021 Major 3.2 on the 2004 "Wilmington International Airport Modification Stormwater Master Plan" document, signed and sealed "Technical Justification " document dated April 13, 2021, and supplements as shown in the approved plans and specifications. The Phase IIIA EDDB has been designed to handle the runoff from 116,598 square feet of BUA and he Phase IIIB EDDB has been designed to handle the runoff from 367,596 square feet of BUA. Page 2 of 2 DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WO Mamt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): CIRCLE K - NTI AIRPORT BLVD WILMINGTON - NC.115 2. Location of Project (street address): 0 AIRPORT BLVD City:WILMINGTON County:NEW HANOVER Zip:28405 3. Directions to project (from nearest major intersection): Southeast corner of the intersection of NC HWY 23 & AIRPORT BLVD 4. Latitude:34° 26' 7030" N Longitude:-77° 92' 1265" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 050547 , its issue date (if known)10/26/2011 and the status of construction: ®Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, NA and the previous name of the project, if different than currently proposed, NA 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater Z404/401 Permit: Proposed Impacts Wetlands b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:l`d , 5. Is the project located within 5 miles of a public airport? ❑No ®Yes If yes, see S.L. 2012-200, Part VI: htt}2://portal.ncdenr,=/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the projectl: Applicant/Organization:NEW HANOVER COUNTY AIRPORT AUTHORITY Signing Official & Title:DICK GRANSEUR, DIRECTOR b. Contact information for person listed in item 1a above: Street Address:1740 AIRPORT BLVD City: WILMINGTON State:NC Zip:28405 Mailing Address (if applicable):SAME AS ABOVE City: Phone: (910 ) 341-4333 Email:G DICK@FLYILM. COM State: Zip: Fax: (910 ) 341-3465 c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ® Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owners name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:New Hanover County Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable). City: Phone: f ) Email: State: Zip: Fax: ( 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:MEREDITH W. RICE. JR / CIRCLE K STORES, INC Signing Official & Title:VICE PRESIDENT b. Contact information for person listed in item 3a above: Mailing Address:1100 SITUS COURT, STE 100 City:RALEIGH State:NC Zip:27606 Phone: (919 ) 744-6700 Fax: (NONE ) NONE Email 7A'I.ICE®CIRCLEK. COM 4. Local jurisdiction for building permits: NEW HANOVER COUNTY Point of Contact:INSPECTIONS DEPT Phone #: (910 1 798-7308 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be treated via two pre-treatment vegetated grass swales which then discharge into W 2. a. If claiming vested rights, identify the supporting documents provided and the daey were a ro ❑ Approval of a Site Specific Development Plan or PUD Approval Date:NOV 2004 ❑ Valid Building Permit Issued Date: 26 OCT 2004 ® Other: ILM Stormwater Master Plan Date: 24 NOV 2004 b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ® Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 322.3 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':322.3 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water (NFIiM line or Mean High Water (MW line, and coastal wetlands landward from the NHW (or W line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHIM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 66.27 % 9. How many drainage areas does the project have?4 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drain.< ge Area 3A i Drainage Area 3B Drainage A. -Yea 3C Dramwve Area f&_ 2 Receiving Stream Name Smith Creek Smith Creek Smith Creek Smith Creek Stream Class * C, Sw C, Sw C, Sw C, Sw Stream Index Number * 18-74-63 18-74-63 18-74-63 18-74-63 Total Drainage Area (sf) 213,213 756,099 542,656 12,529,107 On -site Drainage Area (sf) 213,213i 756,099 542,656 12,529,107 Off -site Drainage Area (sf) 0 0 0 0 Proposed Impervious Area** s 116,598 367,596 299,030 8,520,835 Impious Area** total 54.70 48.60 1 55.10 1 68.0 Impervious" Sarface Aiea. Dmizwge Arrca Drainage -krea Draira a Area Drainage Area On -site Buildings/Lots (sf) 5,333 0 0 0 On -site Streets (sf) 13,746 103,565 0 0 On -site Parking (sf) 44,451 0 0 0 On -site Sidewalks (sf) 4,228 0 0 0 Other on -site (sf) 52 0 299,C60 0 Future (sf) 48,788 264,031 0 2,223,812 Off -site (sf) n/a n/a n/a n/a Existing BLJA*** (sf) n/a n/a n/a 6,297,023 Total (sf): 116,598 367,596 299,030 8,520,835 Stream Class and Index Number can be determined at: httpaortal.ncde,:;•.or !we? twg&s/csu/classificatio,zs Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. There is no offsite drainage area within the Phase 3A, Phase 3B, and Phase 3C areas. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 1 SA NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://Portal.ncdenr.orL,/web/wo/ws/su/bmi)-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.nedenr.org/web/wg/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map atft://g2EWmcdenr.org/web/wg/ws/su/maRs.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package fromho://Rortal.ncdenr.org/web/ffa/ws/­su/­statesw/fonns /Rortal.ncdenr.org;/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/1ages/onestopexl2ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/z mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 817 Page No: 868 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretarv.state.nc.us/Corvorations/CSearch.asDx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://Rortal.ncdenr.org/web/Ir/state- stArmwater-forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:RICK BAKER, PE Consulting Firm: TIMMONS GROUP Mailing Address:5410 ` RINITY ROAD, STE 102 City:RALEIGH State:NC Zip:27607 Phone: (919 ) 866-4939 Fax: (919 ) 859-5663 Email:RICK.BAKER@TIMMONS. COM IX PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) DICK GRANSEUR with (print or type name of organization listed in Contact Information, item 1a) NEW HANOVER COUNTY AIRPORT AUTHORITY to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: I, na'(DVi 1-leneC', L • Yl e sn i t,l . a Notary Public for the State of Dated '� " as 1 N G County of RU tin QVCC , do hereby certify that LI(0�11 S� Ulf" C �� personally appeared before me this A day of Ma h , r922 I and .�ackkn1ow�le a the due execution off the application for a stormwater permit. Witness my hand and official seal �,1 + ill R C.Gc 4 ,1�VI a SEAL My commission expires U--M- - a 0 a5 X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) GRANSEUR DICK certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC -.0 .r .211.1000 and any other applicable state stormwater requirements. w Signature:- Date: .3-2 -I;OZ1 0�SVI Ut a Notary Public for the State of N C, County of do ltereby certify that N. F r(l=l f- 1�)i Gi,• personally appeared before me this day of MG`f C: O c90a c and acknowledgcAla due execution of the application for a stormwater permit. Witness my hand and official seal, 1-i� J'. ,`,����1111gN�I�11 c� .. m ram,✓ " / e`. `% n`�`� "IfI1111%0% SEAL I IY commission expires D 1A- ^ (9 ©Q Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 DEMLR USE ONI:Y Date Received Fee Paid Permit Number to 1 -7 94 aD 15 osos-YgL Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources C STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans specifications, letters, operation and maintenance agreements, etc.): CIRCLE K - NTI AIRPORT BLVD WILMINGTON - NC.115 2. Location of Project (street address): 0 AIRPORT BLVD City:WILMINGTON County:NEW HANOVER Zip:28405 3. Directions to project (from nearest major intersection): Southeast corner of the intersection of NC HWY 23 & AIRPORT BLVD 4. Latitude:34° 26' 7030" N Longitude:-77* 92' 1265" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires S➢V IA 02 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 050547 , its issue date (if known)10/26/2011 , and the status of construction: ®Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, NA and the previous name of the project, if different than currently proposed, NA 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater E404/401 Permit: Proposed Impacts Wetlands b. If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:N 5. Is the project located within 5 miles of a public airport? ❑No ®Yes If yes, see S.L. 2012-200, Part VI. http://yortal.ncdenr.org/webAr/rules-and-re ations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:NEW HANOVER COUNTY AIRPORT AUTHORITY Signing Official & Title:DICK GRANSEUR, DIRECTOR b. Contact information for person listed in item 1a above: Street Address:1740 AIRPORT BLVD City: WILMINGTON State:NC Zip:28405 Mailing Address (if applicable):SAME AS ABOVE City: State: Zip: Phone: (910 ) 341-4333 Fax: (910 ) 341-3465 Emai1:GDICK QOFLYILM.COM c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ® Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owners name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:New Hanover County Signing Official & b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City: Phone: ( ) Email: State: Zip:, State: Zip: Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:MEREDITH W. RICE. JR / CIRCLE K STORES. INC Signing Official & Title:VICE PRESIDENT b. Contact information for person listed in item 3a above: Mailing Address:1100 SITUS COURT, STE 100 City:RALEIGH State:NC Zip:27606 Phone: L919 ) 744-6700 Fax: (NONE ) NONE Email:WRICE@CIRCL EK.COM 4. Local jurisdiction for building permits: NEW HANOVER COUNTY Point of Contact:INSPECTIONS DEPT Phone #: (910 ) 798-7308 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. 2. a. If claiming vested rights, identify the supporting documents provided and the date the ❑ Approval of a Site Specific Development Plan or PUD Approval Date: 24 NOV 2004 ❑ Valid Building Permit Issued Date: 26 OCT 2004 ® Other: ILM Stormwater Master Plan Date: 24 NOV 2004 b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ® Coastal SW -1995 ❑ Ph 11- Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 322.3 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:322.3 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHK9 line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHIline. The resultant project area is used to calculate overall percent built upon area (B ). Non -coastal wetlands landward of the NHW (or MHM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 66.27 % 9. How many drainage areas does the project have?4 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Dwthu:ge Area 3 Drainage nrea 3a 1 Drainage Area 3C DrahuflArm — Receiving Stream Name Stream Class * Smith Creek Smith Creek Smith Creek Smith Creek C, Sw C, Sw C, Sw C, Sw Stream Index Number * 18-74-63 18-74-63 18-74-63 18-74-63 Total Draina a Area (sf) 213,213 756,099 542,656 12,529,107 On -site Drainage Area (sf) 213,213 756,099 542,656 12,529,107 Off -site Drainage Area (sf) 0 0 0 0 Proposed Impervious Area** s 116,598 1367,596 299,030 8,520,835 % Im ervious Area** total 54.70 1 48.60 1 55.10 1 68.0 In ervlous" Surface Area Drainage Area Dranra,pe Area Dram ;e Area_ Draimp area On -site Buildings/Lots (sf) 5,333 0 0 0 On -site Streets A 13,746 103,565 0 0 On -site Parking (sf) 44,451 0 0 0 On -site Sidewalks (sf) 1 4,228 0 0 0 Other on -site (sf) 52 0 299,030 0 Future (sf) 48,788 264,031 0 2,223,812 Off -site (sf) n/a n/a n/a n/a Existing BUA*** (sf) n/a n/a n/a 6,297,023 Total (sf): 116,598 367,596 299,030 1 8,520,835 * Stream Class and Index Number can be determined at: http:/&ortal.izcdezzr.or /web/wq/ps/csu/c.assiftcations Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. There is no offsite drainage area within the Phase 3A, Phase 3B, and Phase 3C areas. Proiects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements aspen I5A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhttv://t)ortal.nedenr.org/web/wa/ws/su/bmiD-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from bM://12ortal.ncdenr.org/web/wq/ws/su/­statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at ha://Portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package fromht!p://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to h=://www.envheIg.org/pages/onestoRgxpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1h mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the barks of streams or rivers, and the MHW (or NHIAI) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 817 Page No: 868 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e) The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretarv.state.nc.us/Corvorations/CSearc-h.asDx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://2ortal.ncdenr.org/web/lr/state- stormwater-forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:RICK BAKER, PE Consulting Firm: TIMMONS GROUP Mailing Address:5410 TRINITY ROAD, STE 102 City:RALEIGH State:NC Zip:27607 Phone: (919 ) 866-4939 Fax: (919 ) 859-5663 Email:RICK.BAKER®TIMMONS.COM IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) DICK GRANSEUR with (print or type name of organization listed in Contact Information., item 1a) NEW HANOVER COUNTY AIRPORT AUTHORITY to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date. A " 02,1 I,trr=r i 1�; 1 1C C 1 �' `�: 's�� a Not Public for the State of ` ` �3' .County of V 1 G i ; `� , do hereby certify that . �� a" �:tn -s `. i personally appeared before me this 7� day of 4 �� i' �%i and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal; '01111111111" 0 t���//111111111�,, erg, X. APPLICANT'S CERTIFICATION SEAL ;�. My commission expires �. �': -- - 6)C; I, (print or type name of person listed in Contact Information, item 1a) GRANSELIR DICK certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCACI.1000 and any other applicable state stormwater requirements. Signature: Date: 3 - `� -.;o'z! Ly a Notary Public for the State of i ; County of do hereby certify that _ i.� , , - personally appeared before me this_ day of and acknowled" due execution of the application for a stormwater permit. Witness my hand and official seal, _Ji ii- ' ti __..:�_ 0 + ����11NO111i►�'�♦♦ SEAL My commission expires Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 TRANSMITTAL I -gil Srak: j 15, Cl rl,ez-ville Strcu Corae,ia. GI, J0531 .i V 7 ()ice: or 678-2( --"690 FiL-,.,: 6 I"() Attention: Georgette Scott NC Division of Environmental Quality Land Resources 127 Cardinal Drive Ext Wilmington, NC 28405 c4smith G"GINEE"ING, LLC DATE: NOVEMBER 20,2020 ITEM JOB NAME JOB NUMBER NCDEQ Minor Mod A.ero Center Wilmington 2020-274-01 DATE DESCRIPTION 11/13/2020 Stormwater Permitting Fottn 7: Minor Modification SW8 050547 11/13/2020 Narrative with Impervious Calculations 11/13/2020 Phase II Drainage Area Revised Boundary (from previous submit) 11/13/2020 Full Size Plan Sets (Aern FBO and Fuel Farm) APR 2 0 2021 lly-_____ - QUANTITY 2 2 2 2 155 C!afxesv4,le Stz-eet Post OfTce Box 331 Corne'ia, GA 3053: Main Lire: 706-894-233 '1 Cell: 706-244-8180 Atlanta Area Phone: 678-267-3690 Fax: 678-267-3731 Email:jmsmith@jmsmithenginecring.com C4SMith I November 20, 2020 NC Division of Environmental Quality Land Resources 127 Cardinal Drive Ext. Wilmington, NC 28405 RE: North GA Site Development for Aero Center Wilmington Minor Mod to SW8 050547 To whom it may concern: The Wilmington International Airport is preparing a lease site for a FBO for Aero Center Wilmington and associated hangars in the North General Aviation site north of Hall Drive/Customs facility, east of Trask Drive and south of the Airport Snow Maintenance Facility. This project will remove existing pavement and construct the new development. Currently, the site drains toward Acorn Branch. The new development will collect and direct stormwater runoff into an existing pipeline along the eastern edge of Trask Drive; the existing drainage system that conveys stormwater to Extended Dry Detention Basin #1 and the associated pre-treatment swales (Airport's existing Regional BMPs under Stormwater Permit No. SW8 050547). The basin and pre-treatment swales have been previously sized and permitted for future allocations. This development will utilize 48,658 square feet of that future BUA allocation. Based on the approved revision.to the permit SW8 050547, this project's proposed drainage area is within the 'overall basin map'. Sub -basin areas into the existing structures are being modified slightly to accommodate the new structures. Attached is a list of the project's drainage areas containing existing and proposed built -upon area. These areas are shown on Exhibit B. Exhibit Al from a previous revision is included that was revised to account for this development. Exhibit A is from the last permit revision approved 10/5/2018 showing the existing basins. We have also attached a copy of the previous permit revision for your reference. EC 155 Clarkesville Street APR 0 ZUZt Post Office Box 331 Cornelia, GA 30531 Main Line: 706-894-2331 BY Cell: 706-244-8180 Atlanta Area Phone: 678-267-3690 Fax:678-267-3731 Email.-jmsmith@jmsmithengineering.com November 20, 2020 NC Division of Environmental Quality North GA Site Development for Aero Center Wilmington Minor Mod to SW8 050547 Page 2 TBI No. 3301-1602 & 3301-1703 Built -Upon Area Total to be directed to the existing approved BMPs for future allocations Existing Previously Permitted Proposed Revisions to Previously Permitted Total Built Upon Area to be added to revision Structure Drainage Area s Built Upon Area s Drainage Area s Built -Upon Area s TL-1 37,631 29,011 37 631 29,011 0 TL-2 24,396 6,305 27,243 11,847 5,542 B-4 29,404 5,095 29,404 5,095 0 B-5 139,958 26 178 152,766 49,545 23,367 B-6 246,951 103,429 273,724 123 178 19,749 Total 478 340 170,018 478,340 218 676 48,658 Notes: Drainage Basins TL-1 & B-4 are unchanged from previous permits Drainage Basin B-6 for the fuel. farm has increased slightly in size, however proposed overall drainage area is unchanged Exhibit A1: Previous Revisions to Drainage and Built -Upon Areas for Approved Minor Modification — Addition of FBO #2 Area Exhibit A:Exhibit from previous permit revisions for Existing Drainage Basins Exhibit B: Proposed Revisions to Drainage and Built -Upon Areas Should you have any questions, please contact me at (678) 267-3690. Sincerely, (4 Z *7-1 �W Jason M. Smith, PE APR 2 0 2021 BY_- MA3301 (ILM)k1602 North GA Ste DevelopmadLDrainage CaIcS.Ewg, DA Map SW 8.Sx11 W W W ear Ln W O A m US rn 0000 v 1 0: � W� ,.. N m �o Y1 C1 F-� P. In N D W ID OR :Q In W V A i0 _ cm C" A 0000 A W 3 ? N 1--• W0 AAN O. I a, m 031• O N 00 OwD = a o m to 0) m ►~i 'aw \D O D O�� I or O Ln 3 c 3 E.a D1 W w e� d O (ND O v NJ O 30 S p W W V �i �. C C M .* !L. � d a O C. Z O Zll 2 m r m m 00 --I r OOZ c C = n D - O— zZ < r-� D V) m w 1Z C ZZ=1 pO OZ �uD No �C) m � Z =� O o0 z O N m z DD � X o� cDi�� x D < D0 r O O K 17-1 m X D = V I RELOCATED' S ANNAi PENNINGTON LANE' ► i-j �, --- Yam.. - `; ' i • !; m-0(nm O0MCY) C)K2 PQ ,f` i Z 'EC=i . APR 2 0 BY az� RELOCATED' S ANNAi PENNINGTON LANE' ► i-j �, --- Yam.. - `; ' i • !; m-0(nm O0MCY) C)K2 PQ ,f` i Z 'EC=i . APR 2 0 BY az� �� t:rr�.�_:_ APR 10 ZQU Sol or 9-2 4 - H--5 H--6 IAIPER1 SAREA 4 SCJc1Uv� , r' AREA RElR nl i r" i S7'S 01FURE it cowl IL -'I TL-2 9 5tm't= Efrainoge lmpmv[wes Area TL-1 137,257if 29A sf TL-2 22,02$0 5,414sf 1.1-1 11,932sf 11,786sf H-e 24,013sf 2.3,725sf H-5 40,1620 BC230sf fy.g 122,926.0 :.1,242'sf B-2 32,67Dsf 7,977sf B-3 37,507sf 10,+3255f g.4 13,456sf 4,766sf Total 251,96t]sf 135,798sf WILMINGTON INTERNAIONAL AIRPORT WILMINGTGN, NORTH CAROLINA NORTH GENERAL AVIATION HANGAR TAXILANE ` ALBE T &.13RiGHT AND 4810 SHELLEY DRIVE CORPORATE HANGAR COMPLEX WILMINGTON, NC 28405 PHONE: 910-763-5353 POST DRAINAGE AREAS NO LICENSE NO. 0-0713 AND IMPERVIOUS AREAS TL-1, TL-2, & XNE 20. 2U16 A - B-4 are to be From SW8 050547 Plan Revision revised dated June 29 2016 i.................. ......... Ic� � xW; E l tj o HL ILI -41 I'-�{IJx CrylSh ice: �:.. ��. •��-. , ' L' I.JiC,I- f po :zh u' I .41 Pal� w I.Ip . t o Y T �co p CD - S D Fz Z O Z mI� o n -uD pZ i ry y D r- �` f - � ` t O _.:.. o r , mM D cn O yn JJf ! z Zx D Ems, o ry nt v-nvm 10�cn ME z-vM m X co �00 m Nvo z� X m cn O z c- v-u -Zo 8>0 G) C) 00 0 C vcl) Dm �v WXN24GTGN WymaTbNAL AWPGRT NLWIGM NOM GKUNA NORTH GENERAL AVIATION SITE DEVELOPMENT AND PIPE DITCHES IN FED #2 AREA NCOOA 36244,36.19.1 / 46320.3.1 PROPOSED PHASE II DRAINAGE BOUNDARY REVISION FOR OUSTING BMP TALBERT & BRIGHT PNGINEEMO & PLANNING CONSULTANTS mN°�`rt ss x�e seLer oma ■u� s nx ON-lad<l nnc NG naw uS 2m�x euL 0-no m 40 M�Z-i z -umo mX03 O0 �rn N 0 z0 z < X m O z z 0 m o C.n m V 4 ;u L � � 0 _ u 0 00 O m c< z 0W Dm N e1 O i EayR� lV0 Nbyy �bT�3H 37,E M�1k 0 ® o 1 lei Iir, pff., WILWNGTON INTERNATIONAL AIRPORT WILNINGTON, NWM CARCIJNA NORTH GENERAL AVIATION SITE DEVELOPMENT AND PIPE DITCHES IN FBO #2 AREA NCDOA 36244,36.19.1 / 4632D.3.1 PROPOSED PHASE II DRAINAGE BOUNDARY REVISION FOR E)QSTING BMP s: a TALBERT & BRIGHT ENGINEERMO & PLANNING CONS .ANTS ff ims�sRAras WixwT �� ]�� TEIR WRIT Cd14Ni IS 9mltt NIM �• InC SIF] -qRl soesvnox Rna REVISIONS k wlwlr. w0 ,r ,.t.a �n Mn.. oua iowvnum. 0000 5410 Trinity Road TIMMivNS GRJOAaP Suite102 Tc 1�t,".SK :,•_ s. Raleigh, NC27607 TRANSMITTAL, NCDEQ — Christine Hail TO: Stormwater Department 127 Cardinal Drive Extension Wilmington, NC 28405 P 919.866.4951 F 919.859.5663 wMrw finrMwia�.aon JECIEIVI I APR 13 2021 Date: 419/21 Job#: 37630.054 Circle K — NTI Airport Blvd Wilmington — Project: NC.115 Reference: Submittal #3 Copies Sent To: Garrett Zorda COPIES I DATE I NUMBER DESCRIPTION 1 04/09/2021 1 1 1 Signed and sealed Technical Justification / Comment Response THESE ITEMS ARE TRANSMITTED: If enclosures are not as noted, please notify us at once. COMMENTS: Internal exhibits used during design also in CD for reference Thank You, Brian W. Downs Senior Project Manager Timmons Group CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING 1 GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES T echnical Justification Circle K — NTI Airport Blvd Wilmington — NC.115 Airport Boulevard Wilmington, NC 28405 (PID: R04200-001-025-F00) Prepared by: TIMMONS GROUP Weelve Project #: AIR i j 37630.054 AV, Date: 4/09/2021 eeeeeep°oN y TIMMONS GROUP YOUR VISION ACHIEVED THR04t'.r; s..".'�5. e0e000. % 5410 Trinity Road P 919.866.4951 T i M M O N S GROUP Suite 102 F 919.859.5663 �7 Raleigh, NC 27607 To: Garrett Zorda, Environmental Engineer NCDEQ, Wilmington Regional Office Date: March 29, 2021 Project Name: Circle K — NTI Airport Blvd Wilmington — NC115 Project number: 37630.054 Project Contact: Brian Downs Phone: 919-866-4504 E-Mail: Brian.downs@timmons.com Please see our response to your comments in red below each comment. Garrett Zorda, Environmental Engineer I email: Garrett.Zorda@ncdenr.gov 15A NCAC 02H.1003(6) and the 2004 approved Stormwater Master Plan document: The response to Items #1.b and 1.c of the previous request for additional information indicate that the dry detention basins and grassed swales are designed to provide the minimal separation to the seasonal high water table. The resulting design of the two dry detention basins and two grassed swales, however, still set these devices between 4.5 feet and 6.75 feet below the seasonal high water table. These two new dry detention basins and grassed swales must either meet the requirements in the previously approved agreement from 2004 or demonstrate they are an equal or better variation under the 2017 rules. Response: The approved 2004 Stormwater Master Plan provided a technical framework for processing future NCDENR Stormwater permits for individual development projects on airport property. The document provided two stormwater management concepts for the west side of the airport. A "centralized' and a "distributed" concept. Previous Master stormwater improvements to -date have relied upon the initial 2005 Centralized stormwater concept with the primary solution being the existing Extended Dry Detention basin which lies southwest of the main circular parking area. Through several updates, the ILM Master Planned stormwater orphaned the Phase 3 area for it to be inlcuded in a stormwater solution at a later date. After a deep dive into the site constrains, we understand why this area was not approached head-on until this time. Based upon site constraints, to be better detailed later, the "distributed" concept was selected to provide a permanent stormwater solution to as much of the 34.71-acre Phase 3 drainage area as possible. This solution was best suited for the remaining area because it can be more readily phased than the centralized concept. This "decentralized" approach required new SHWT tests which revealed an issue that is likely prevalent elsewhere on -site namely, a high SHWT which is between 8"-12" below existing grade. Ei-IGINEERING I DESIGN I TECHNOLOGY Additional consideration was given to current MDC regulations. We utilized the latest available version for each SCM type on the NCDEQ website for our analysis. Both originally and within this document. As all parties are aware, this is a unique site that has established its own set of requirements that does not necessarily follow the standard rules and guidelines of the DEQ Stormwater program. Knowing this and throughout our design, we have consulted with no less than 7 design professionals (6 with PE licensure in NC) within our company, all with extensive stormwater design experience in all regions of NC including the Coastal Plain to make sure we are providing stormwater treatment to meet the intent of the stormwater rules and follow closely the 2004 stormwater Master Plan for ILM. A concise general narrative is difficult due to the project complexity however, we are providing the necessary information to respond to your comments but in as concise manner as possible. 1) For reference, a concept "distributed" design was included in the 2004 Stormwater Master Plan as shown on sheet PR1.2. a) The "distributed" stormwater concept involves using multiple smaller extended dry detention basins throughout the drainage area. Based on the idea that stormwater is detained and treated locally at each project site and then conveyed off airport property. 2) Our site falls within the western portion of the airport property and retains much of the original infrastructure which dates back to World War II era construction. The approved 2004 Stormwater Master Plan categorized this area by stating: the system of open channels, culverts, and smaller closed systems which drain this area is generally in poor condition and of limited capacity. This area remains sparsely developed and requires significant stormwater infrastructure improvements to accommodate future development. 3) Our site currently contains 1.84 acres of impervious surface (roads) which is not currently being treated by any SCMs. 4) Our project area includes two offsite discharge points: a) Our project site falls entirely within an area specified for "Airport Business Park Development / Redevelopment" per 2004 sheet PR1.2. b) Drainage areas include part of Sub -Basin 1, all of Sub -Basin 2, and part of Sub -Basin 3 as outlined in Section 3 of the 2004 Stormwater Master Plan. These areas are illustrated on sheets EX1.0 and EX1.4 of the 2004 Stormwater Master Plan. c) This "decentralized" approach favors reintroducing runoff from impervious surfaces into the natural environment as close to the impervious surfaces as possible in line with recent trends in stormwater management. 5) "High Density" projects are projects involving more than 30 percent built -upon area. Stormwater controls need to be implemented as high density development occurs involving a net increase in built -upon area. a) Phase 3A will now exceed the 30% BUA upper limit for "Low Density" with the proposed C-Store project. b) However, Phase 3B will currently remain under the 30% BUA upper limit for "Low Density" and is being undertaken at this time to proactively provide a means of treating stormwater prior to future high density development. 6) Primary SCM selection criteria included: standing water near airport, maintaining Jurisdictional and isolated wetlands, stream channels, and riparian buffers. a) During development of the approved 2004 Stormwater Master Plan, the wildlife hazard issue (standing water near airport) was recognized as a key issue in development of the Plan. It was considered prudent to review wildlife concerns from a local, site specific perspective as well as in the nation-wide context of the FAA Wildlife Advisory Circular No. 150/5200-33. b) USACE Jurisdictional wetlands and riparian buffers occur immediately downstream of Phase 3B per our 2020 delineation. c) Downstream of Phase 3A is a culvert which is outside of our Environmental mapping scope since if falls off the ILM property. However, the National Wetlands Inventory map illustrates a 13.77 acres Freshwater Forested/Shrub wetland, classified as PFO1/2F, immediately downstream of the Phase 3A culvert. 7) Secondary SCM selection concerns included: maintenance and construction costs for ILM Airport which is a public entity. a) This selection criteria are supported by the 2004 Stormwater Master plan which includes funding resources as a criteria within Section XIII. 8) Our scope it is to "complete" Stormwater Treatment for as much of the Phase 3 drainage area as possible. Currently most of the drainage area is undeveloped. Our scope also includes the Circle K development. (a) Most of the remainder ILM Business Park land within the drainage areas will not be built -out at this time. (b) Future construction is expected to happen in a number of different phases because our drainage area includes at least 3 additional Master Planned parcels. (c) Before full build -out occurs, there will be an indefinite period of time of high sediment input into the SCMs during inactivity. Supplemented by times of even greater sediment input into the SCMs during the future phased construction. (d) SCM selection must factor in these periods of high sedimentation to reduce the risk of shortenina the functional lifespan of an SCM. 9) Our site contains topographic challenges due to its proximity to the coast. (a) For Phase 3A: (i) The Circle K will primarily drain by sheet flow across vegetated surfaces into the SCM. (ii) Stormwater will be conveyed under roadways by culvert pipes. 1. Required cover is needed to pass water under the roads. Roads are required for interconnectivity of the individual lots. (iii) The water then passes through the pre-treatment Grassed Swale at 0.10% and then through the Extended Dry Detention basin at 1.0%. (iv) Ultimately crossing under N. 231d Street via a 24" RCP culvert pipe with an upstream invert of 14.00'. (v) All told, the water for Phase 3A covers--1,000+ LF with a net 10' of elevation change for an average of 1 % slope in a perfect world without additional constraints. 1. This ideal 1 % slope is not possible and the real world constraints will be detailed later. (b) For Phase 3B: (i) The restricting elevation is the outlet of an 18" RCP pipe which crosses under Airport Blvd and outlets at 19.05'. (ii) The water will then be conveyed by a combination of ditches and pipes. 1. Culvert pipes with required cover is needed to pass water under the future loop road. Roads are required for interconnectivity of the individual lots. (iii) The water then passes through the pre-treatment Grassed Swale at 0.20% and then through the Extended Dry Detention basin. (iv) An ultimate outlet is to a buffered intermittent stream at 12.50'. (v) All told the water for Phase 3B covers —950+ LF, south of Airport Blvd, with a net 6.55' of elevation change for an average of 0.69% slope in a perfect world without additional constraints. 1. This ideal 0.69% slope is not possible and the real world constraints will be detailed later. (c) We evaluated connecting to the existing SCMs via a swale and/or pipes under the "Centralized" concept. However, this approach presented numerous challenges. Namely a concern about backwater issues, all the way to the Circle K leased parcel and dewatering Jurisdictional wetlands. (i) An abundance of INTERNAL exhibits are included with the submittal showing the various configuration we designed, to various levels, before submitting this design. More exist but the additional ones are largely redundant. 10) Our site has numerous physical constraints (topography and wetlands) and it has proven especially challenging to settle on an appropriate SCM type. In this case, we believe it is necessary to modify the standard SCM designs, due to site characteristics, to provide the required level of permanent stormwater treatment. More specifics on proposed modifications are provided below in #19, #20, and #21. a. The purpose of the 2004 "Stormwater Master Plan" alternative design document was to preserve water quality standards while also ensuring the constructed practice did not attract wildlife that could become a hazard to air traffic. This agreement was later supported by G.S. 143-214.7(c3), which was added by Session Law 2012-200, and confirms that the Division does not require the use of wet ponds or other SCMs that promote standing water on or near public airports. While the "Stormwater Master Plan" recommends the use of Extended Dry Detention Basins combined with grassed swales, it does not "limit or restrict the airport or its current or prospective tenants with respect to pursuing alternative or modified stormwater management solutions in various locations." Since the inception of the "Stormwater Master Plan", other primary SCM options that do not retain a permanent pool and/or promote standing water have become available and approved by the Division (i.e. sand filters, underground infiltration trenches, proprietary systems such as ADS BayFilters, etc.). Please confirm if any of the more recent SCM options were considered to treat the runoff from the proposed development. Please also provide additional justification that the current design of a combination of grassed swales and dry ponds meets all of the requirements of the "Stormwater Master Plan" or that they are an equal or better variation to these other primary SCMs. Response: In our evaluation of stormwater treatment, we reviewed all 2004 Stormwater Master Plan and current MDC options extensively to determine what SCM or combination of SCM's will provide treatment to meet the 2004 Master Plan or 2017 DEQ rules. Below is our evaluation of each SCM. 2004 and 2017 SCM devices were considered: 1) Bioretention with, or without, underdrain: a) Listed as "N" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. i) MDC #1: Minimum of 2' separation required above the SHWT. b) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. c) Listed as "High" under the Wildlife Habitat column within the 2017 MDC Guidance on SCM Selection. d) The 2004 Master Plan excluded "bioretention areas" from consideration at ILM based upon the expectation they would create conditions that attract wildlife species which are hazardous to aviation. e) Not Selected due to criteria listed above mainly HIGH wildlife habitat and 2004 plan excluding bioretention. 2) Stormwater Wetland: a) Listed as "High" under the Wildlife Habitat column within the 2017 MDC Guidance on SCM selection. b) The 2004 Master Plan excluded "extended detention wetlands" and "pocket wetlands" from consideration at ILM based upon the expectation they would create conditions that attract wildlife species which are hazardous to aviation. c) Not Selected due to criteria listed above - HIGH wildlife habitat and 2004 plan excluding constructed wetlands. 3) Wet pond: a) Listed as "High" under the Wildlife Habitat column within the 2017 MDC Guidance on SCM selection. b) The 2004 Master Plan strongly advocates avoidance of wet detention basins and recommends the use of extended dry detention basins for stormwater management. c) Not Selected due to criteria listed above - HIGH wildlife habitat and 2004 plan avoidance of wet ponds bioretention. 4) Permeable Pavement: a) Listed as "N" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. i) MDC #2: Minimum of 2' separation required above the SHWT for infiltration pavement systems; Minimum 1' for detention pavement systems. b) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. c) The 2017 MDC Section E-4 Airports Table 1 states: It is best implemented in areas that receive relatively infrequent traffic. i) However, the areas to be paved surround the primary Airport entrance and will receive frequent traffic. d) Not Selected due to minimal amount of pavement proposed and SHWT elevation. 5) Infiltration Device: a) Listed as "N" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. i) MDC #2: Minimum of 2' separation required above the SHWT. b) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. c) The 2004 Master Plan excluded infiltration devices" from consideration at ILM based upon the expectation they would create conditions that attract wildlife species which are hazardous to aviation. d) Not Selected - 2004 Master Plan excluding infiltration devices. 6) Dry Pond (standard): a) Listed as "Y" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. b) Listed as "N" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. i) MDC #1: Minimum of 6" separation required above the SHWT. ii) Utilizing a shallower, and wider, Dry Detention basin is not feasible due to the SHWT being 8" or 12" below existing surface. Such an approach would require raising the vast majority of the drainage areas with fill material. Which would have a substantial impact on the existing roadway network and would require a high cost for the needed amount of fill material. c) The 2017 MDC Section E-4 Airports Table 1 states: Dry Detention basins do pond water for more than 12 hours after storm events but still may be desired to treat a large drainage area. d) See Proposed SCM Solution below 7) Sand Filter (Open Bottom/Open Top): a) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. b) The 2017 Section C-6 Sand Filter MDC 1 states: The minimum separation between the lowest point of the sand filter system and the SHWT shall be two feet for open -bottom designs. c) The 2017 MDC Section E-4 Airports Table 1 states: Sand Filters are a comparatively expensive practice and do no mitigate the peak flow from a storm even. d) An open top device would require surface flow into the device. Sand Filters require 1.5' (18" of filter media). Presenting a ponding depth issue. i) Phase 3A: (1) Has —10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23'd at 14.00' elevation. (a) Effectively 1' of elevation would be left for treatment storage atop of the open top sand filter. Not accounting for a height reduction for emergency overland overflow. (b) Thus, expanding the footprint required for the device which drives up costs and reduces developable area. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. ii) Phase 313: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlet at 14.80' and EW200 outlets at 12.80' for an ultimate tie-in at 12.50'. (a) Effectively 0.8' of elevation would be left for treatment storage atop of the open top sand filter. Not accounting for a height reduction for overland overflow. (b) Thus, expanding the footprint required for the device which drives up costs and reduces developable area. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. iii) In areas of low relief, the hydraulic head necessary for some devices to function properly may not be available. Figure 1: Open Bottom Sand Filter Example: Cross -Section 1�`;,7o�MWAYERVJWAOE-7 ORMELMOM $MACE VO, e., r4=ff PROP ORWE 1=�S-i4AT /-O"C-33SA1W4M "KM Lwow r-OVEMOW EOMALOM ak" 31 PEAiEIS�TAN.w®�PyfPpE� tog SLOM f— WFLUM PERFURATE rl FVE —J a 9"Fff SEASONAL HM WAIMTAM V e) MDC Recommendation 1 (Drainage Area): i) It is recommended to grade pervious areas to drain away from sand filters and to limit the drainage area of a sand filter to five acres or less. (1) Phase 3A: (a) 4.89 acres in size (2) Phase 313: (a) Total of 17.36 acres of drainage area. (i) Exceeds 5 acres in size. (b) Sand filters with smaller drainage areas (less than five acres) usually have fewer maintenance issues. Sand Filters may only handle smaller flows and can become overwhelmed if sited at the outlet of a large drainage area. (c) Location of existing impervious within roads reduces our ability to provide multiple sand filters, sized for 5 ac or less, throughout the development to provide even more "decentralized' treatment. f) The 2017 MDC Section E-4 Airports Table 1 states: Sand Filters are a comparatively expensive practice and do not mitigate the peak flow from a storm event. Sand Filters require frequent maintenance: i) Requires quarterly inspections. ii) Skim the sand media at least once a year. iii) Replace the sand filter media whenever it fails to function properly after maintenance. g) Not Selected due to SHWT and possible saturation of sand media, drainage area size, elevation requirement from flow into SCM to invert out and costs of SCM and adding stormwater detention. 8) Sand Filter (Closed Bottom/Open Top): a) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. i) Phase 3A: (1) High sediment input can significantly reduce the longevity of sand filters. (2) Currently proposed as —32% impervious. (3) Phase 3A has 1.07 acres of allocated future impervious. With little, to no area, to add erosion control measures upstream of the SCM before sediment input would enter the sand filter. ii) Phase 3B: (1) Sand filters function much better when the drainage area is highly built -upon because this will greatly reduce the amount of fines that reach the sand filter and potentially cause clogging. (2) Currently proposed as —13.7% impervious. Pervious is upstream of SCM and cannot be graded away from SCM. (3) Phase 3B has 6.05 acres of allocated future impervious. With few areas to add erosion control measures upstream of the SCM before sediment input would enter the sand filter. b) The 2017 Section C-6 Sand Filter MDC 1 states: The minimum separation between the lowest point of the sand filter system and the SHWT shall be one foot for closed bottom designs. Exceptions to the one foot SHWT separation may be made if the applicant provides documentation that the design will neither float nor drain the water table. c) Culvert pipe under N. 23"d Street is currently undersized. Backwater into a Phase 3A sand filter would likely occur prior to water overtopping the road. Extending the period of time the filter media is surcharged. d) Sand Filters require 1.5' (18" of filter media). i) Phase 3A: (1) Has —10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23'd at 14.00' elevation. (a) Effectively 1' of elevation would be left for treatment storage atop of the open top sand filter. Not accounting for a height reduction for overland overflow. (b) Thus, expanding the footprint required for the device which drives up costs and reduces developable area. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. ii) Phase 3B: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlets at 14.80' and EW200 outlets at 12.80' for a tie-in at 12.50'. (a) Effectively 0.8' of elevation would be left for treatment storage atop of the open top sand filter. Not accounting for a height reduction for overland overflow. (b) Thus, expanding the footprint required for the device which drives up costs and reduces developable area. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. iii) In areas of low relief, the hydraulic head necessary for some devices to function properly may not be available. e) MDC Recommendation 1 (Drainage Area): i) It is recommended to grade pervious areas to drain away from sand filters and to limit the drainage area of a sand filter to five acres or less. (1) Phase 3A: (a) 4.89 acres in size (2) Phase 313: (a) Total of 17.36 acres of drainage area. Exceeds 5 acres in size. (b) Sand filters with smaller drainage areas (less than five acres) usually have fewer maintenance issues. Sand Filters may only handle smaller flows and can become overwhelmed if sited at the outlet of a large drainage area. (c) Location of existing impervious within roads reduces our ability to provide multiple sand filters, sized for 5 ac or less, throughout the development to provide even more "decentralized' treatment. f) The 2017 MDC Section E-4 Airports Table 1 states: Sand Filters are a comparatively expensive practice and do no mitigate the peak flow from a storm even. Closed Bottom Sand Filters require frequent maintenance: i) Requires quarterly inspections. ii) Skim the sand media at least once a year. iii) Replace the sand filter media whenever it fails to function properly after maintenance. g) Not Selected due to drainage area size, elevation requirement from flow into SCM to invert out and costs of SCM and adding stormwater detention. Costs rise further due to anti -floatation measures required. 9) Sand Filter (Closed Bottom/Closed Top): a) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. i) Phase 3A: (1) High sediment input can significantly reduce the longevity of sand filters. (2) Currently proposed as —32% impervious. (3) Phase 3A has 1.07 acres of allocated future impervious. With little, to no area, to add erosion control measures upstream of the SCM before sediment input would enter the sand filter. ii) Phase 313: (1) Sand filters function much better when the drainage area is highly built -upon because this will greatly reduce the amount of fines that reach the sand filter and potentially cause clogging. (2) Currently proposed as —13.7% impervious. Pervious is upstream of SCM and cannot be graded away from SCM. (3) Phase 3B has 6.05 acres of allocated future impervious. With few areas to add erosion control measures upstream of the SCM before sediment input would enter the sand filter. b) The 2017 Section C-6 Sand Filter MDC 1 states: The minimum separation between the lowest point of the sand filter system and the SHWT shall be one foot for closed bottom designs. Exceptions to the one foot SHWT separation may be made if the applicant provides documentation that the design will neither float nor drain the water table. c) Culvert pipe under N. 23rd Street is currently undersized. Backwater into the sand filter would likely occur prior to water overtopping the road. Extending the period of time the filter media is surcharged. d) Sand Filters require 1.5' (18" of filter media). MDC Recommendation #2 calls for access the inside of the box. Based on real life experience the inside of a closed bottom sand filter should be no less than 5' in height. (Preferrable 6.5% but we'll use 5' for this description.) The 5' height allows enough space, above the media, for an OSHA compliant confined space entry. Which is necessary to remove V or 2" of sand for remediation. This removal is a manual process. i) In areas of low relief, costly excavation is often required for basins. In addition, the hydraulic head necessary for some devices to function properly may not be available. ii) Phase 3A: (1) Has —10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23rd at 14.00' elevation. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. iii) Phase 3B: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlets at 14.80' and EW200 outlets at 12.80' for a tie-in at 12.50'. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. e) MDC Recommendation 1 (Drainage Area): i) It is recommended to grade pervious areas to drain away from sand filters and to limit the drainage area of a sand filter to five acres or less. (1) Phase 3A: (a) 4.89 acres in size (2) Phase 3B: (a) Total of 17.36 acres of drainage area. Exceeds 5 acres in size. (b) Sand filters with smaller drainage areas (less than five acres) usually have fewer maintenance issues. Sand Filters may only handle smaller flows and can become overwhelmed if sited at the outlet of a large drainage area. (c) Location of existing impervious within roads reduces our ability to provide multiple sand filters, sized for 5 ac or less, throughout the development to provide even more "decentralized' treatment. f) The 2017 MDC Section E-4 Airports Table 1 states: Sand Filters are a comparatively expensive practice and do no mitigate the peak flow from a storm even. Closed Bottom / Closed Top Sand Filters require frequent maintenance: i) Requires quarterly inspections. ii) Skim the sand media at least once a year. iii) Replace the sand filter media whenever it fails to function properly after maintenance. g) Not Selected due to drainage area size, elevation requirement from flow into SCM to invert out which is increased in a close top system to provide space for routine maintenance of the sand and costs of SCM and adding stormwater detention. Costs rise further due to anti -floatation measures required. 10) Rainwater Harvesting: a) Not Selected - Insufficient proposed rooftop area. The majority of impervious will be roadways or parking areas. 11 ) Green Roof: a) Not Selected - Insufficient proposed rooftop area. The majority of impervious will be roadways or parking areas. 12) Disconnected Impervious Surface: a) Not Selected - Insufficient proposed rooftop area. The majority of impervious will be roadways or parking areas. 13) Proprietary Underground Stormwater Control Measure (StormFilter by Contech): a) MDC 1 Volume Based sizing: Sizing for the StormFilter system is in conjunction with upstream closed detention based on designing the system to provide capture and treatment of 75% of the first 1.5" rainfall in coastal counties. No upstream open retention or upstream infiltration is permitted as treatment shall be directed to the cartridges. b) Contech supplies the upstream detention system which is corrugated metal. Metal pipes coupled with a high SHWT leads to rusting as the pipes are inevitably scratched during installation. Thus, reducing the lifespan of the systems and leads to high replacement costs. c) Proprietary Underground Stormwater Control Measures utilize proprietary filter cartridges to provide stormwater treatment. These filter cartridges are typically contained in pre -cast structures and require replacement after a variable amount of time. Due to the replacement needs, and based on real life experience, the inside of a precast structures are rarely shorter than 7' in height. This allows for enough space above the filter cartridges for an OSHA compliant confined space entry. i) Phase 3A: (1) Has —10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23rd at 14.00' elevation. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. ii) Phase 3B: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlets at 14.80' and EW200 outlets at 12.80' for a tie-in at 12.50'. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. oatttsat�ot�o�rtE �.sto��;� ias,sara�ttr � i s•:s ! t �• A i A ants Rawt ! t rccss o t t r • t- r�s� 9 l —m--------.. y FWWKff ELEVATION V EW )LIROWW WfAL ldlt�OYnET iael[n d) Placing proprietary underground stormwater control measures in areas of high sedimentation will reduce the lifespan of the filter cartridges. Devices cannot be used for sediment control during construction for erosion control. e) Proprietary Underground Stormwater Control Measures require frequent maintenance: i) Requires quarterly inspections. ii) Replace the filter media whenever it fails to function properly after maintenance. f) No separation required between bottom of SCM and SHWT. However, proprietary underground stormwater control measures placed in SHWT require anti -buoyancy measure which also drives up cost. g) Not Selected due to elevation requirement from flow into SCM to invert out which is increased further in a closed top system to provide space for routine maintenance of the filters and costs of SCM and adding stormwater detention. Costs rise further due to anti - floatation measures required. 14) Proprietary Underground Stormwater Control Measure (Silva Cell by DeepRoot): a) Small footprint was specifically developed for ultra -urban environments with highly impervious contributing drainage areas and limited area above ground for stormwater control and treatment. b) MDC criteria has a Built Upon Area of 75% or greater. c) The lowest point of the Silva Cell System shall be a minimum of two feet above the SHWT; otherwise one foot if supported by a hydrogeologic evaluation prepared by a licensed professional. d) Device is fed by surface drainage and has limited stormwater storage capacity. e) Not Selected due to criteria listed above, mainly BUA 75% or greater requirement. 15) Proprietary Underground Stormwater Control Measure (Filterrra by Contech): a) Small footprint is designed to work best within small mostly impervious drainage areas. Such as commercial parking lots, residential streets, parking lots and urban streetscapes. b) Device is fed by surface drainage and has limited stormwater storage capacity. c) Not Selected due to criteria listed above, mainly small drainage area with mostly impervious area. 16) Proprietary Underground Stormwater Control Measure (BayFilter by ADS): a) Proprietary Underground Stormwater Control Measures utilize proprietary filter cartridges to provide stormwater treatment. These filter cartridges are typically contained in pre -cast structures and require replacement after a variable amount of time. Due to the replacement needs, and based on real life experience, the inside of a precast structures are rarely shorter than 6' in height. This allows for enough space above the filter cartridges for an OSHA compliant confined space entry. i) Phase 3A: (1) Has —10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23rd at 14.00' elevation. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. ii) Phase 313: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlets at 14.80' and EW200 outlets at 12.80' for a tie-in at 12.50'. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. 4` :s^J'I D i p7 - 18' IM.ET PIPE -, I + 6 g s, fr4lt r E66MI t 2.61' 2—W i (0"11"'.T? -Ch M.72 TO BE i j 522 SAYFILTEa ' a I tJ CARTa nw) 7 r- 't STEPS (TV) f 42_4,5____ � r PVC OUTLET RlMWOLO W MLET PIPE -= J/ , i t6-oo7 ,- 7 PVC TEE VW FLOWDISK MP) F+COUPLER b� V VVLET ONFICE SECTION A A (3) SCALE: tu._V b) Proprietary Underground Stormwater Control measures require frequent maintenance: i) Requires quarterly inspections. ii) Replace the filter media whenever it fails to function properly after maintenance. c) Placing proprietary underground stormwater control measures in areas of high sedimentation will reduce the lifespan of the filter cartridges. Devices can not be used for sediment control during construction for erosion control. d) No separation required between bottom of SCM and SHWT. However, proprietary underground stormwater control measures placed in SHWT require anti -buoyancy measure which also drives up cost. e) Not Selected due to drainage area size, elevation requirement from flow into SCM to invert out which is increased in a closed top system to provide space for routine maintenance of the sand and costs of SCM and adding stormwater detention. Costs rise further due to anti -floatation measures required. 17) Filter Strip: a) Listed as "Med" under the Wildlife Habitat column within the 2017 MDC Guidance on SCM selection. b) The Level Spreader — Filter Strip is a Secondary SCM. Designed to work in conjunction with another SCM. c) See Proposed SCM Solution below 18) Treatment Swale (standard): a) The 2017 MDC Section E-4 Airports Table 1 states: A treatment swale is a secondary SCM; however, it may be used on an airport where a primary SCM is not feasible. b) Listed as "Y" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. However, the specific MDC #1 states: Swales shall not be excavated below the Seasonal High Water Table. i) Swales with bottoms intersecting the SHWT may remain inundated with groundwater during portions of the year and have insufficient volume available to treat runoff from the design flow. They are also more prone to developing soggy bottoms and wetland vegetation. c) See Proposed SCM Solution below Proposed SCM Solutions: 19) Overall items which apply to both proposed SCM types: a) A key objective of the Plan is to address the North Carolina Stormwater Management Rules (15A NCAC 02H.1000) administered by the North Carolina Department of Environment and Natural Resources, Division of Water quality. b) In the 2004 Stormwater Master Plan it was determined that stormwater management at the Wilmington International Airport should be accomplished primarily with a combination of extended dry detention basins and grassed swales needed to meet the required 85% pollutant removal efficiency stipulated under North Carolina Stormwater rules. i) The extended dry detention basins will also serve to meet the peak discharge attenuation requirements of the New Hanover County Storm Water Management Ordinance ii) Since this time BMP regulations have been updated to the current 2017 MDC requirements for SCMs. c) Extended dry detention basins and grasses swales are specifically called for in the 2004 Stormwater Master Plan which was created as a planning tool for providing stormwater management infrastructure in support of anticipated development activities on airport property. Final design, supported by topographic survey, wetlands delineation, and subsurface exploration efforts was left in the hand of the subsequent Engineers. i) The 2004 Stormwater Master Plan does not specifically list any means of dealing with SCM location which encounter flat topographic challenges. ii) The 2004 Stormwater Master Plan does not specifically list a means of best protecting Jurisdictional wetlands fed by existing drainage patterns. iii) The 2004 Stormwater Master Plan does not specifically list any means of dealing with SCM locations which encounter a high Seasonal High Water Table. (1) The 2004 Stormwater Master Plan included concept sections for an Extended Dry Detention Basin, on sheet D1.1, without listing a means of dealing with a shallow Seasonal High Water Table. d) Our SCMs were designed based upon the approved and existing SCMs from 2005, 2009, and 2012. e) Extended Dry Detention basins and Grassed Swales were selected and designed to minimize wildlife habitat and associated risks to aircraft safety. i) Are listed as "Love' under the Wildlife Habitat column within the 2017 MDC Guidance on SCM selection. ii) The 2004 Stormwater Master Plan highlights the need for wildlife hazard issues to be a primary design consideration. It included a careful review of FAA Advisory Circular 150/5200-33A, "Hazardous Wildlife Attractants On or Near Airports" and consulted the USDA Wildlife Services to interpret the FAA criteria for context of local conditions. Wildlife Services has advised that the Advisory Circular guidelines are appliable at the Wilmington International Airport and recommends the use of extended dry detention basins and grasses swales rather than wet detentions basins at the airport. f) Extended Dry Detention basins and Grassed Swales work in conjunction to provide treatment and detention for the necessary storm events. g) Low-cost SCMs selected based upon ILM Airport funding and used in conjunction with other low-cost SCMs in a manner that meets or exceeds performance standards while integrating them into the natural features of our site. h) Extended Dry Detention basin can be used as a sediment basin during construction of future impervious upon the ILM Business Park lots. i) Extended Dry Detention Basin 3A is proposed to be utilized as a sediment basin during Phase 1 of the erosion control plan. ii) Extended Dry Detention Basin 3B is proposed to be utilized as a sediment basin during Phase 2 of the erosion control plan. iii) Option exists for these to be re -used as sediment basins in the future. i) Ease of maintenance; no OSHA confined entry certification required to inspect or repair; limited specialized equipment needed to perform maintenance. j) NOTE: On the attached "Figure 6 — WTDM" delineation map, which was approved by USACE, there are currently Jurisdictional Wetlands present in the two existing Grassed Swales and the one Extended Dry Detention basin. Additionally, there are Jurisdictional Ephemeral Stream channels present within the Extended Dry Detention basin. The stream channel and wetlands likely extend further into the Extended Dry Detention basin than our map illustrates since it abuts our delineation scope area limits. i) One of the three criteria for wetlands is standing water being present at the surface. (along with soil conditions and established vegetation). (1) The placement of wetlands within the devices illustrates the SCMs were designed as compliant devices in 2005, 2009, and 2012. However, .through 2021 optics the SCMs appear to now be existing non -compliant devices which are in good standing. (a) Part of the Treatment Swale MDC description describes the current condition well: Swales with bottoms intersecting the SHWT may remain inundated with groundwater during portions of the year. They are also more prone to developing soggy bottoms and wetland vegetation. (2) With these existing devices being in good standing on the same parcel we believe they are a valid basis of our design. (3) Dry Detention basins, with outlet orifices set at the low point, will continue to drain any groundwater which seeps into the devices. Our design does not include any upstream splitters/weirs which would retain standing water. ii) Nearby, wetland "F" if located at approximately the same elevation as our site, yet is closer to the existing SCMs. Indicating the SHWT within the three existing devices is higher than the delineated elevation of approximately 13.50' within the grassed swales. iii) Additional surface wetlands are present surrounding the Extended Dry Detention on the 2009 Sheet P-2 "Existing Extended Dry Detention Basin No.1." k) NOTE: Phase 3B has —1,275 LF of grassed ditches will be indefinitely retained. The shortest is 235' of a continuous run. These grassed ditches provide some level of pre- treatment for the existing roadway impervious along Airport Blvd and Gardner Road. However, we have not tried to quantify or claim credit for these ditches. 20) Extended Dry Detention basin and Treatment Swale similar to 2004 Master Plan along with the 2005 and 2009 design: a) Listed as "Y' under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. b) 2004 Stormwater Master Plan criteria for Extended Dry Basins: (1) The basin should be steep -sided, narrow, and linearly -shaped. (a) Basins are steep -sided, narrow, and linearly shaped. (2) Capture the runoff from a 1" rainfall and release over a period of 48 hours. (a) Phase 3A captures the runoff from the 1.5" rainfall and releases over a period of 3.9 days (i) NOTE: This increased release rate is due to NCDOT Hydro requirement. (b) Phase 3B captures the runoff from the 1.5" rainfall and releases over a period of 3 days (3) Provide a minimum flow length -to -basin width ratio of 3:1. (a) Phase 3A provides between a 3:1 to a 5:1 length -to -basin width ratio. (b) Phase 3B provides approximately a 7:1 length -to -basin width ratio. (4) Provide side slopes in the range of 3:1 to 4:1 (horizontal:vertial). (a) Side slopes of 3:1 provided. (5) Install outlet orifice in an enclosed structure with a sump. Provide a trash rack on the inlet to the structure. Do not provide an open permanent pool. (a) Outlet orifice provided in an enclosed structure with a sump. Trash rack provided on inlet to riser structure. Open permanent pool not provided. (6) Provide a rip -rap or concrete lined low -flow channel from inlet to outlet with a minimum depth of one (1) foot. (a) A 9" thick Class A rip -rap channel with one (1) foot of depth provided. (7) Slope basin bottom at 2% preferred and 1 % minimum grade toward low flow channel. (a) Bottom of basins sloped at 1 % toward low flow channel. (8) Provide heavy equipment access for clean -out and maintenance. (a) Access provided for heavy equipment. (9) Provide excess storage in the lower levels of the basin amounting to 20% of the 1" rainfall event runoff volume. (a) Phase 3A and 3B provide storage to 25% of the 1.5" rainfall event runoff volume (10) Provide for peak flow attenuation above the V storm storage, in accordance with the New Hanover County Storm Water Management Ordinance. (a) Phase 3A and 3B provide peak flow reductions for the 1, 2, 10, 25, 50, and 100-year storm events above the 1.5" storm storage. (11) Provide for seeding the basin bottom side slopes and berms with common Bermuda grass or other appropriate mix. Seed mixture shall not contain any form of millet, rye grass or other large seed producing grasses. (a) Bermuda grass, Cynodon Dactylon, is to be installed within SCMs per Landscape Plans C6.0 and C6.1. (12) Stabilize the basin within 14 day of construction completion. (a) Basin to be stabilized within 14 days per note #6 of Erosion Control Construction Sequence found on Sheet C4.2. (13) To the extent possible, position the bottom of the basin above the seasonal high water table. (a) We acknowledge our proposed design elevation does go below the SHWT we provided but the 2004 permit states "to the extent possible" and we are meeting that requirement. The approved 2005 and 2009 Extended Dry Detention basin is located nearby, under the same Master permit, and was approved using a Seasonal High Water Table value of 6.0' which dates to the original Extended Dry Detention basin design. Current field conditions now include Jurisdictional wetlands within the Extended Dry Detention basin, showing the Seasonal High Water Table, at the upstream end of the SCM, exceeded the bottom elevation of the Extended Dry Detention basin (inlet pipe outlet @ 10.83' and 10.26' per field survey conducted by Paramounte Engineering Sheet dated 11/20/19). All evidence points to this device is in good working order and is functioning as designed. Providing evidence that our proposed alternate means of compliance in regard to the SHWT can also meet the intent of the NCDEQ treatment regulations. (b) The 2004 Stormwater Master Plan presents workable solutions for the long term storm water management needs of the airport. Implementation of the plan depends on the exact nature, magnitude, and sequence of development projects which move forward and on funding resources which become available for construction of stormwater solutions. (i) Nature: 1. To provide permanent stormwater treatment for forthcoming Commercial development within the ILM Business Park. 2. All told the permanent Phase 3A and 313 SCMs will allow —11.33 acres of development to proceed. The 11.33 acres include future internal road. After the Circle K parcel is developed approximately 8 acres will remain. 3. Meaning the majority of the drainage (16.66 ac of the 27.99 acres) will either be comprised of SCMs or existing right-of-way area along Airport Blvd and Garner Road. (ii) Magnitude: 1. Phase 3A and 313 drainage areas account for only —2.1 % of the overall 1,338.95 acre parent parcel. 2. Or only —8.7% of the overall drainage area covered by permit SW8 050547. 3. The Phase I & II drainage areas currently have in excess of 3 Million SF of impervious allocation for Future Development. Which is 2.4x larger than the Phase 3A and 313 drainage areas combined. (iii) Sequence: "Distributed" SCMs located near the outlet of the respective drainage area. No future upstream or downstream devised are expected to be placed in sequence with these devices. (iv) Funding: 1. ILM Airport is solely funding the construction of the stormwater devices. 2. ILM is cost -sensitive due existing budgets. 3. ILM is doing this construction in hopes of attracting additional developers to enter the ILM Business Park by offering pad -ready sites for development. 4. Current economic conditions, due to COVID, has greatly reduced flight traffic which has directly reduced their income derived from gate fees. 5. Long term maintenance costs must be factored into the front-end design to ensure ILM is not saddled with expensive repairs on an annual basis. (c) The 2004 Stormwater Master Plan also states that nothing in this plan is intended to limit or restrict the airport or its current or prospective tenants with respect to pursing alternate of modified stormwater management solutions in various locations. (14) Provide for safe conveyance of a 100-year storm event. (a) Extended Dry Detention basins designed to safely convey a 100-year storm event. c) NOTE: Draw down time for the Phase 3A Extended Dry Detention basin is limited by NCDOT Hydrology Department which will not allow an increase in Post -flows for the 10, 25, 50, and 100-yr storms under N. 23rd Street. 21) Treatment Swale similar to 2004 Master Plan along with the 2012 design: a) 2004 Stormwater Master Plan criteria for Grassed Swales: (1) Swales will typically be located upstream of extended dry detention basin. (a) Grassed swales placed directly upstream of extended dry detention basins. (2) Provide a 0.2% minimum to 4.0% maximum longitudinal slope. (a) Phase 3A longitudinal slope set at 0.10% due to elevation constraints. (i) Note the previously approved Phase I & II grassed swales are both designed at 0.03% (b) Phase 3A longitudinal slope set at 0.20% (3) Provide side slopes no steeper than 3:1 (horizontal:vertical) with 5:1 preferred. The swale cross section should be triangular or parabolic. (a) Side slopes of 3:1 provided and match the shape of the existing grassed swales. (4) Swale bottom should be located above the seasonal high water table (a) The approved 2012 Pre -Treatment swales are located nearby, under the same Master permit, and were approved using a Seasonal High Water Table value of 6.0' which dates to the original Extended Dry Detention basin design. This test was not completed with the devices. Current field conditions now include Jurisdictional wetlands within these two pre-treatment swales. Showing the Seasonal High Water Table exceeded the bottom elevation of the pre-treatment swales (bottom @ 11.47' and 11.14' per Paramounte Engineering Sheet C3.0 dated 10/9/12). These devices are in good working order and are functioning as designed. Providing evidence that our proposed alternate means of compliance in regards to the SHWT can also meet the intent of the NCDEQ treatment regulations. (b) The 2004 Stormwater Master Plan presents workable solutions for the long term storm water management needs of the airport. Implementation of the plan depends on the exact nature, magnitude, and sequence of development projects which move forward and on funding resources which become available for construction of stormwater solutions. (i) Nature: 1. To provide permanent stormwater treatment for forthcoming Commercial development within the ILM Business Park. 2. All told the permanent Phase 3A and 3B SCMs will allow -11.33 acres of development to proceed. The 11.33 acres include future internal road. After the Circle K parcel is developed approximately 8 acres will remain. 3. Meaning the majority of the drainage (16.66 ac of the 27.99 acres) will either be comprised of SCMs or existing right-of-way area along Airport Blvd and Garner Road. (ii) Magnitude: 1. Phase 3A and 3B drainage areas account for only —2.1 % of the overall 1,338.95 acre parent parcel. 2. Or only —8.7% of the overall drainage area covered by permit SW8 050547. 3. The Phase I & II drainage areas currently have in excess of 3 Million SF of impervious allocation for Future Development. Which is 2.4x larger than the Phase 3A and 3B drainage areas combined. (iii) Sequence: "Distributed" SCMs located near the outlet of the respective drainage area. No future upstream or downstream devised are expected to be placed in sequence with these devices. (iv) Funding: 1. ILM Airport is solely funding the construction of the stormwater devices. 2. ILM is cost -sensitive due existing budgets. 3. ILM is doing this construction in hopes of attracting additional developers to enter the ILM Business Park by offering pad -ready sites for development. 4. Current economic conditions, due to COVID, has greatly reduced flight traffic which has directly reduced their income derived from gate fees. 5. Long term maintenance costs must be factored into the front-end design to ensure ILM is not saddled with expensive repairs on an annual basis. (5) Swales should be designed for ready mowing with standard mowing equipment. (a) Designed for mowing with standard mowing equipment. (6) Flow velocity should be limited to 2 feet per second for the 2-year design flow and a non -erosive velocity for the 10-year design flow. (a) Phase 3A Grass Swale: 2-year velocity = 1.12fps; 10-year velocity = 1.22 fps (b) Phase 3B Grass Swale: 2-year velocity = 1.31fps; 10-year velocity = 1.42 fps (7) An attempt shall be made to provide 100 linear feet of swale per acre of drainage area. No less than 50 linear feet of swale per acre shall be provided. (a) The proposed Phase 3A swale is 150 LF in length and accounts for 4.89 acres of drainage area. Which equates to 30.67 LF per acre. The proposed 3B swale is 150 LF in length and accounts for 17.36 acres of drainage area. Which equates to 8.64 LF per acre. (i) By the 501f/ac criteria the Phase 3A swale should be no less than 244.5 LF in length. (ii) By the 501f1ac criteria the Phase 3B swale should be no less than 868 LF in length. (iii) However, when compared to the existing Phase I and II grass swales our proposed amount far exceeds what has been accepted in the past. Those two grassed swales total 300 LF in length and handle 287.63 acres. Which means they provide only 1.04 If/ac. (iv) Based on the "decentralized" SCM locations within the ILM business park, it is key to try and preserve as much developable area land as possible while also complying with regulations. A quick calculation shows that a 42' wide swale (top of bank to top of bank), which is 1,112 LF long, would encompass more than 1.07 acres of developable land. Thus eliminating 13% (1.07 ac / 8 ac) of the remaining developable land within Phase 3A and Phase 3B. (8) Provide for seeding the swale with common Bermuda grass or other appropriate mix. Seed mixture shall not contain any form of millet, rye grass or other large seed producing grasses. (a) Bermuda grass, Cynodon Dacty/on, is to be installed within SCMs per Landscape Plans C6.0 and C6.1. (9) Stabilize the swale with 14 days of construction completion. (a) Basin to be stabilized within 14 days per note 46 of Erosion Control Construction Sequence found on Sheet C4.2. It is our professional opinion that the stormwater solution proposed meets the 2004 Stormwater Master Plan based on the information provided above and the guidance provided by that permit. In addition, we have extensively evaluated, in detail, many other SCM alternatives and found the solution proposed to be the best alternative to provide stormwater treatment. b. The 2004 approved "Stormwater Master Plan" document for this alternative design indicates for grassed swales, that the "swale bottom should be located above the seasonal high water table". The proposed design, however, appears to position the bottom of the swales below the seasonal high water table. It is understood that a clay liner is proposed, however, it is my understanding that clay liners are more effective at keeping water in than keeping water out. The grassed swale requirements of the "Stormwater Master Plan" do not make the same "to the extent possible" distinction as the dry detention basin requirements. Please confirm the intended design and ensure this requirement for the alternative design is met. Response: Based upon further discussion with our Sr. Geotechnical Engineer we have removed the clay liner from our design. His experience has been that clay liners are equally effective in keeping water in a device as out of a device however, constructability concerns in this location and long term potential uplift have caused us to reevaluate and therefore remove clay liners from the design. Similarly, a synthetic liner has also not been chosen. This evaluation of the design also includes all available evidence pointing to the existing stormwater control system functioning properly and in good order and therefore our proposed design providing an equal level of treatment meeting the 2004 design criteria. 2. 15A NCAC 02H.1042(2)(a): The signatures provided on the submitted application, operation and maintenance agreements, and proposed deed restrictions and protective covenants were all copies. These documents must include an original signature. The response letter included with the January 21, 2021 resubmittal indicated that "We remain in the process of obtaining the original signed documents and will provide upon receipt." The originally signed documents, however, were never received. Please provide an original signature for all documents that require the applicant's signature. Response: Original Signatures on the O&M agreements have been provided under different cover letter. 3. 15A NCAC 02H.1042(2)(a)(iv): a. In order to ensure the SWU-101 form remains consistently updated and represents the entire permitted condition, Section IV.10 of the application must reflect all drainage areas covered in this permit, including the Phase I & II drainage areas. Please update Section IV.10 of the application to reflect all drainage areas permitted under SW8 050547. F%valiu gad: The p iaad 1 & � w ainage areas have now vuwn, a uiuuCu vi 1 U id SWU- 101 form. b. Drainage Area 3C in Section IV.10 of the submitted application indicates that there is 312,094 square feet of "other on -site" built -upon area (BUA) and 129,628 square feet of "future" BUA, however, there is no proposed SCM(s) to treat this proposed BUA. It is noted that there is some existing BUA. Please confirm one of the following, provide additional explanation and update the application package appropriately: is No SCM is proposed for Drainage Area 3C at this time and no BUA is proposed beyond the existing BUA; or ii. A new SCM is proposed to treat Drainage Area 3C and the application is being revised to include the SCM; or iii. Drainage Area 3C is an area of low density and the application package will be revised to include this area of low density; Response: Phase 3C drainage area numbers have been revised to remove "future impervious." No SCM is proposed for DA 3C at this and no BUA is proposed beyond the existing. c. Section IV.7 of the application indicates that the total project area covered under SW8 050547 is 27.99 acres. SW8 050547, however, currently has an approved total project area of 322.3 acres. Please confirm the correct total project area and ensure it is represented consistently throughout the entire application package. Response: Our application has been updated to reflect the entire 322.3 acres per the original permit. We are now showing on our application Phase I, Il, and III. 4. 15A NCAC 02H.1042(2)(g): The submitted drainage area plan sheet does not clearly show the proposed Drainage Area 3C. In order to support the entire previously approved Phase III area is covered by this modification, please include the entire area on the drainage area plan sheet and clarify the proposed Drainage Area 3A, Drainage Area 3B and Drainage Area 3C. Response: DA3.0 has been revised to now include Drainage Area 3C, now shown with a transparent hatch. 5. 15A NCAC 02H. 1 042(2)(f) and .1042(2)(a)(iv): The calculations for Extended Dry Detention Basin 3A indicates that the total impervious area draining to the basin is 1.67 acres (72,746 square feet). Section IV.10 of the application, however, indicates there is 116,598 square feet of BUA proposed in drainage area 3A. Please confirm the correct amount of BUA proposed in drainage area 3A and ensure it is represented consistently throughout the entire application package. Response: The impervious area draining to extended dry detention basin 3A is 2.67 Acres. The calculations have been updated and the impervious area is now consistent. Zorda, Garrett D From: Zorda, Garrett D Sent: Thursday, April 8, 2021 3:16 PM To: Brian Downs; Rick Baker Cc: Granseur Dick; Jacob Dooley, Andy Priolo - Couche Tard (APrioio@circiek.com); Hall, Christine Subject: RE: [External] RE: Wilmington International Airport EDDB - Circle K Modification (SW8 050547) Request for Additional Information Good Afternoon All, While going through the response package, it was noticed that the technical justification response provided was not signed and sealed by a licensed professional. In order to proceed with this variation, as proposed, we will need this technical justification document signed an sealed. Can you please provide a copy of the technical justification response that is signed and sealed by a licensed professional? Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct '"Please note the change to my direct phone number" aarrett.zordaO ncden r.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 e:!r5:0"f�D E ��Q � ;*am En-'Oi1 ct. ,rtespon7 sth`: t') and frfi ii i`?i a �'+e '� ' %t to the �dc: :�; ,:ah�e ;Vort:f� {-arc;{-na Pt;rlic i .!CIS Lativ find C: az be '-"iscloaed to l??i TY papti.es. From: Brian Downs <Brian.Downs@timmons.com> Sent: Friday, March 26, 20213:53 PM To: Zorda, Garrett D <garrett.zorda@ncdenr.gov>; Rick Baker <Rick.Bake r@timmons.com> Cc: Granseur Dick <gdick@flyilm.com>; Jacob Dooley <Jacob.Dooley@timmons.com>; Andy Priolo - Couche Tard (APriolo@circlek.com) <APriolo@circlek.com>; Hall, Christine <Christine. Hall@ ncdenr.gov> Subject: RE: [External] RE: Wilmington International Airport EDDB - Circle K Modification (SW8 050547) - Request for Additional Information 4AU T iGiY- Externai emaii. Oo not click iinks or opan atrarnmwnt:, umla s you verify. Send all spsoicious email as mn at"_ad'a-,,ert to Report Sparn. I CSC- k • 5410 Trinity Road TIMMONS GROUP Suite102 ,, YQVR v S: -N A -I.-SVED Raleigh, NC 27607 i TRANSMITTAL NCDEQ — Christine Hall TO: Stormwater Department 127 Cardinal Drive Extension Wilmington, NC 28405 P 919.866.4951 F 919.859.5663 www�,cwn Date: 3/29121 Job#: 37630.054 Circle K — NTI Airport Blvd Wilmington — Project: NCA 15 Reference: Submittal #3 Copies Sent To: COPIES DATE NUMBER DESCRIPTION 2 03/29/2021 1 Stormwater Management Permit Application (to be inserted into originals) 1 03/29/2021 2 SCM Supplements Forms 1 03/29/2021 3 Calculations Package included SHWT report) 2 03/29/2021 4 Rolled 24" x 36" plans 2 03/29/2021 5 Comment Response Letter 1 03/29/2021 6 Stormwater Feasibility Notes 1 03/29/2021 7 US Fish and Wildlife Services Request 1 03/29/2021 8 Preliminary Jurisdictional Waters of the US Ma 1 03/29/2021 9 NCDOT Hydro Email thread concerning re and post flows 1 03/29/2021 10 Preliminary Wetland Determination Exhibit 1 03/29/2021 11 Previously Approved Extended Detention Basin 1 03/29/2021 12 CD co-ntaining pdft of all documents THESE ITEMS ARE TRANSMITTED: If enclosures are not as noted, please notify us at once. COMMENTS: Internal exhibits used during design also in CD for reference Thank You, Brian Downs Project Manager Timmons Group CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES a 6 -1- 21' *49' I 5410 Trinity Road TIMMONS GROUP Suite102 YOUR VISION ACHIEVED THROUGH OURS. Raleigh, NC 27607 TRANSMITTAL NCDEQ - Christine Hall TO: Stormwater Department 127 Cardinal Drive Extension Wilmington, NC 28405 P 919.866.4951 F 919.859.5663 www hnM0ffs men Date: 3129121 Job#: 37630.054 Circle K - NTI Airport Blvd Wilmington - Project: NC.115 Reference: Submittal #3 Copies Sent To: COPIES DATE NUMBER DESCRIPTION 2 03/29/2021 1 Stormwater Management Permit Application (to be inserted into 6ri inals 1 03/29/2021 2 SCM Supplements Forms 1 03/29/2021 3 Calculations Package included SHWT report) 2 1 03/29/2021 4 Rolled 24" x 36" plans 2 03/29/2021 5 Comment Response Letter 1 03/29/2021 6 Stormwater Feasibility Notes 1 03/29/2021 7 US Fish and Wildlife Services Request -Preliminary 1 03/29/2021 8 Jurisdictional Waters of the US Ma 1 03/29/2021 9 NCDOT Hydro Email thread concerning re and post flows 1 03/29/2021 10 Preliminary Wetland Determination Exhibit 1 03/29/2021 11 Previously Approved Extended Detention Basin 1 03/29/2021 12 CD containing dfs of all documents THESE ITEMS ARE TRANSMITTED: If enclosures are not as noted, please notify us at once. COMMENTS: internal exhibits used during design also in CD for reference Thank You, Brian Downs Project Manager Timmons Group CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE CONSTRUCTION SERVICES a �• t 5410 Trinity Road P 919.866.4951 [� ` P Suite 102 F 919.859.5663 �t I G R Raleigh, NC 27607 www� To: Garrett Zorda, Environmental Engineer NCDEQ, Wilmington Regional Office Date: March 29, 2021 Project Name: Circle K — NTI Airport Blvd Wilmington — NC115 Project number: 37630.054 Project Contact: Brian Downs Phone: 919-866-4504 E-Mail: Brian.downs@timmons.com Please see our response to your comments in red below each comment. Garrett Zorda, Environmental Engineer I email: Garrett.Zorda@ncdenr.gov 15A NCAC 02H.1003(6) and the 2004 approved Stormwater Master Plan document: The response to Items #1.b and 1.c of the previous request for additional information indicate that the dry detention basins and grassed swales are designed to provide the minimal separation to the seasonal high water table. The resulting design of the two dry detention basins and two grassed swales, however, still set these devices between 4.5 feet and 6.75 feet below the seasonal high water table. These two new dry detention basins and grassed swales must either meet the requirements in the previously approved agreement from 2004 or demonstrate they are an equal or better variation under the 2017 rules. Response: The approved 2004 Stormwater Master Plan provided a technical framework for processing future NCDENR Stormwater permits for individual development projects on airport property. The document provided two stormwater management concepts for the west side of the airport. A "centralized' and a "distributed" concept. Previous Master stormwater improvements to -date have relied upon the initial 2005 Centralized stormwater concept with the primary solution being the existing Extended Dry Detention basin which lies southwest of the main circular parking area. Through several updates, the ILM Master Planned stormwater orphaned the Phase 3 area for it to be inlcuded in a stormwater solution at a later date. After a deep dive into the site constrains, we understand why this area was not approached head-on until this time. Based upon site constraints, to be better detailed later, the "distributed" concept was selected to provide a permanent stormwater solution to as much of the 34.71-acre Phase 3 drainage area as possible. This solution was best suited for the remaining area because it can be more readily phased than the centralized concept. This "decentralized" approach required new SHWT tests which revealed an issue that is likely prevalent elsewhere on -site namely, a high SHWT which is between 8"-12" below existing grade. ENGINEERING i DESIGN I TECHNOLOGY Additional consideration was given to current MDC regulations. We utilized the latest available version for each SCM type on the NCDEQ website for our analysis. Both originally and within this document. As all parties are aware, this is a unique site that has established its own set of requirements that does not necessarily follow the standard rules and guidelines of the DEQ Stormwater program. Knowing this and throughout our design, we have consulted with no less than 7 design professionals (6 with PE licensure in NC) within our company, all with extensive stormwater design experience in all regions of NC including the Coastal Plain to make sure we are providing stormwater treatment to meet the intent of the stormwater rules and follow closely the 2004 stormwater Master Plan for ILM. A concise general narrative is difficult due to the project complexity however, we are providing the necessary information to respond to your comments but in as concise manner as possible. 1) For reference, a concept "distributed" design was included in the 2004 Stormwater Master Plan as shown on sheet PR1.2. a) The "distributed" stormwater concept involves using multiple smaller extended dry detention basins throughout the drainage area. Based on the idea that stormwater is detained and treated locally at each project site and then conveyed off airport property. 2) Our site falls within the western portion of the airport property and retains much of the original infrastructure which dates back to World War II era construction. The approved 2004 Stormwater Master Plan categorized this area by stating: the system of open channels, culverts, and smaller closed systems which drain this area is generally in poor condition and of limited capacity. This area remains sparsely developed and requires significant stormwater infrastructure improvements to accommodate future development. 3) Our site currently contains 1.84 acres of impervious surface (roads) which is not currently being treated by any SCMs. 4) Our project area includes two offsite discharge points: a) Our project site falls entirely within an area specified for "Airport Business Park Development / Redevelopment" per 2004 sheet PR1.2. b) Drainage areas include part of Sub -Basin 1, all of Sub -Basin 2, and part of Sub -Basin 3 as outlined in Section 3 of the 2004 Stormwater Master Plan. These areas are illustrated on sheets EX1.0 and EX1.4 of the 2004 Stormwater Master Plan. c) This "decentralized" approach favors reintroducing runoff from impervious surfaces into the natural environment as close to the impervious surfaces as possible in line with recent trends in stormwater management. 5) "High Density" projects are projects involving more than 30 percent built -upon area. Stormwater controls need to be implemented as high density development occurs involving a net increase in built -upon area. a) Phase 3A will now exceed the 30% BUA upper limit for "Low Density" with the proposed C-Store project. b) However, Phase 3B will currently remain under the 30% BUA upper limit for "Low Density" and is being undertaken at this time to proactively provide a means of treating stormwater prior to future high density development. 6) Primary SCM selection criteria included: standing water near airport, maintaining Jurisdictional and isolated wetlands, stream channels, and riparian buffers. a) During development of the approved 2004 Stormwater Master Plan, the wildlife hazard issue (standing water near airport) was recognized as a key issue in development of the Plan. It was considered prudent to review wildlife concerns from a local, site specific perspective as well as in the nation-wide context of the FAA Wildlife Advisory Circular No. 150/5200-33. b) USACE Jurisdictional wetlands and riparian buffers occur immediately downstream of Phase 3B per our 2020 delineation. c) Downstream of Phase 3A is a culvert which is outside of our Environmental mapping scope since if falls off the ILM property. However, the National Wetlands Inventory map illustrates a 13.77 acres Freshwater Forested/Shrub wetland, classified as PFO1/2F, immediately downstream of the Phase 3A culvert. 7) Secondary SCM selection concerns included: maintenance and construction costs for ILM Airport which is a public entity. a) This selection criteria are supported by the 2004 Stormwater Master plan which includes funding resources as a criteria within Section XIII. 8) Our scope it is to "complete" Stormwater Treatment for as much of the Phase 3 drainage area as possible. Currently most of the drainage area is undeveloped. Our scope also includes the Circle K development. (a) Most of the remainder ILM Business Park land within the drainage areas will not be built -out at this time. (b) Future construction is expected to happen in a number of different phases because our drainage area includes at least 3 additional Master Planned parcels. (c) Before full build -out occurs, there will be an indefinite period of time of high sediment input into the SCMs during inactivity. Supplemented by times of even greater sediment input into the SCMs during the future phased construction. (d) SCM selection must factor in these periods of high sedimentation to reduce the risk of shortening the functional lifespan of an SCM. 9) Our site contains topographic challenges due to its proximity to the coast. (a) For Phase 3A: (i) The Circle K will primarily drain by sheet flow across vegetated surfaces into the SCM. (ii) Stormwater will be conveyed under roadways by culvert pipes. 1. Required cover is needed to pass water under the roads. Roads are required for interconnectivity of the individual lots. (iii) The water then passes through the pre-treatment Grassed Swale at 0.10% and then through the Extended Dry Detention basin at 1.0%. (iv) Ultimately crossing under N. 231d Street via a 24" RCP culvert pipe with an upstream invert of 14.00'. (v) All told, the water for Phase 3A covers—1,000+ LF with a net 10' of elevation change for an average of 1 % slope in a perfect world without additional constraints. 1. This ideal 1% slope is not possible and the real world constraints will be detailed later. (b) For Phase 3B: (i) The restricting elevation is the outlet of an 18" RCP pipe which crosses under Airport Blvd and outlets at 19.05'. (ii) The water will then be conveyed by a combination of ditches and pipes. 1. Culvert pipes with required cover is needed to pass water under the future loop road. Roads are required for interconnectivity of the individual lots. (iii) The water then passes through the pre-treatment Grassed Swale at 0.20% and then through the Extended Dry Detention basin. (iv) An ultimate outlet is to a buffered intermittent stream at 12.50'. (v) All told the water for Phase 3B covers —950+ LF, south of Airport Blvd, with a net 6.55' of elevation change for an average of 0.69% slope in a perfect world without additional constraints. 1. This ideal 0.69% slope is not possible and the real world constraints will be detailed later. (c) We evaluated connecting to the existing SCMs via a swale and/or pipes under the "Centralized" concept. However, this approach presented numerous challenges. Namely a concern about backwater issues, all the way to the Circle K leased parcel and dewatering Jurisdictional wetlands. (i) An abundance of INTERNAL exhibits are included with the submittal showing the various configuration we designed, to various levels, before submitting this design. More exist but the additional ones are largely redundant. 10) Our site has numerous physical constraints (topography and wetlands) and it has proven especially challenging to settle on an appropriate SCM type. In this case, we believe it is necessary to modify the standard SCM designs, due to site characteristics, to provide the required level of permanent stormwater treatment. More specifics on proposed modifications are provided below in #19, #20, and #21. a. The purpose of the 2004 "Stormwater Master Plan" alternative design document was to preserve water quality standards while also ensuring the constructed practice did not attract wildlife that could become a hazard to air traffic. This agreement was later supported by G.S. 143-214.7(c3), which was added by Session Law 2012-200, and confirms that the Division does not require the use of wet ponds or other SCMs that promote standing water on or near public airports. While the "Stormwater Master Plan" recommends the use of Extended Dry Detention Basins combined with grassed swales, it does not "limit or restrict the airport or its current or prospective tenants with respect to pursuing alternative or modified stormwater management solutions in various locations." Since the inception of the "Stormwater Master Plan", other primary SCM options that do not retain a permanent pool and/or promote standing water have become available and approved by the Division (i.e. sand filters, underground infiltration trenches, proprietary systems such as ADS BayFilters, etc.). Please confirm if any of the more recent SCM options were considered to treat the runoff from the proposed development. Please also provide additional justification that the current design of a combination of grassed swales and dry ponds meets all of the requirements of the "Stormwater Master Plan" or that they are an equal or better variation to these other primary SCMs. Response_ In our evaluation of stormwater treatment, we reviewed all 2004 Stormwater Master Plan and current MDC options extensively to determine what SCM or combination of SCM's will provide treatment to meet the 2004 Master Plan or 2017 DEQ rules. Below is our evaluation of each SCM. 2004 and 2017 SCM devices were considered: 1) Bioretention with, or without, underdrain: a) Listed as "N" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. i) MDC #1: Minimum of 2' separation required above the SHWT. b) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. c) Listed as "High" under the Wildlife Habitat column within the 2017 MDC Guidance on SCM Selection. d) The 2004 Master Plan excluded "bioretention areas" from consideration at ILM based upon the expectation they would create conditions that attract wildlife species which are hazardous to aviation. e) Not Selected due to criteria listed above mainly HIGH wildlife habitat and 2004 plan excluding bioretention. 2) Stormwater Wetland: a) Listed as "High" under the Wildlife Habitat column within the 2017 MDC Guidance on SCM selection. b) The 2004 Master Plan excluded "extended detention wetlands" and "pocket wetlands" from consideration at ILM based upon the expectation they would create conditions that attract wildlife species which are hazardous to aviation. c) Not Selected due to criteria listed above - HIGH wildlife habitat and 2004 plan excluding constructed wetlands. 3) Wet pond: a) Listed as "High" under the Wildlife Habitat column within the 2017 MDC Guidance on SCM selection. b) The 2004 Master Plan strongly advocates avoidance of wet detention basins and recommends the use of extended dry detention basins for stormwater management. c) Not Selected due to criteria listed above - HIGH wildlife habitat and 2004 plan avoidance of wet ponds bioretention. 4) Permeable Pavement: a) Listed as "N" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. i) MDC #2: Minimum of 2' separation required above the SHWT for infiltration pavement systems; Minimum 1' for detention pavement systems. b) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. c) The 2017 MDC Section E-4 Airports Table 1 states: It is best implemented in areas that receive relatively infrequent traffic. i) However, the areas to be paved surround the primary Airport entrance and will receive frequent traffic. d) Not Selected due to minimal amount of pavement proposed and SHWT elevation. 5) Infiltration Device: a) Listed as "N" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. i) MDC #2: Minimum of 2' separation required above the SHWT. b) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. c) The 2004 Master Plan excluded "infiltration devices" from consideration at ILM based upon the expectation they would create conditions that attract wildlife species which are hazardous to aviation. d) Not Selected - 2004 Master Plan excluding infiltration devices. 6) Dry Pond (standard): a) Listed as "Y" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. b) Listed as "N" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. i) MDC #1: Minimum of 6" separation required above the SHWT. ii) Utilizing a shallower, and wider, Dry Detention basin is not feasible due to the SHWT being 8" or 12" below existing surface. Such an approach would require raising the vast majority of the drainage areas with fill material. Which would have a substantial impact on the existing roadway network and would require a high cost for the needed amount of fill material. c) The 2017 MDC Section E-4 Airports Table 1 states: Dry Detention basins do pond water for more than 12 hours after storm events but still may be desired to treat a large drainage area. d) See Proposed SCM Solution below 7) Sand Filter (Open Bottom/Open Top): a) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. b) The 2017 Section C-6 Sand Filter MDC 1 states: The minimum separation between the lowest point of the sand filter system and the SHWT shall be two feet for open -bottom designs. c) The 2017 MDC Section E-4 Airports Table 1 states: Sand Filters are a comparatively expensive practice and do no mitigate the peak flow from a storm even. d) An open top device would require surface flow into the device. Sand Filters require 1.5' (18" of filter media). Presenting a ponding depth issue. i) Phase 3A: (1) Has -10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23rd at 14.00' elevation. (a) Effectively 1' of elevation would be left for treatment storage atop of the open top sand filter. Not accounting for a height reduction for emergency overland overflow. (b) Thus, expanding the footprint required for the device which drives up costs and reduces developable area. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. ii) Phase -313: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlet at 14.80' and EW200 outlets at 12.80' for an ultimate tie-in at 12.50'. (a) Effectively 0.8' of elevation would be left for treatment storage atop of the open top sand filter. Not accounting for a height reduction for overland overflow. (b) Thus, expanding the footprint required for the device which drives up costs and reduces developable area. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. iii) In areas of low relief, the hydraulic head necessary for some devices to function properly may not be available. Figure 1: Open Bottom Sand Filter Example: Cross -Section OPTKM FLOW DWERSM �Vy, F-A.'WATER smAm 7 ""Emom -.RFACE SMMq SM FILTER MEDIA MMPOM G"M AT 15-101"1-1,111 S:q Iftow Fik WAS LEASTOM) M-Ti;LB% OVERFLOW SLOPE ZEZ--HATED STANDPIPE a31 .B'--MnONSTRMTURE z —2 SLOPE M-SMSOL VUTFLOW PERFORATED FFE SOLO Pff SEASONALHM a WATER TAKE V 21 e) MDC Recommendation 1 (Drainage Area): i) It is recommended to grade pervious areas to drain away from sand filters and to limit the drainage area of a sand filter to five acres or less. (1) Phase 3A: (a) 4.89 acres in size (2) Phase 3B: (a) Total of 17.36 acres of drainage area. (i) Exceeds 5 acres in size. (b) Sand filters with smaller drainage areas (less than five acres) usually have fewer maintenance issues. Sand Filters may only handle smaller flows and can become overwhelmed if sited at the outlet of a large drainage area. (c) Location of existing impervious within roads reduces our ability to provide multiple sand filters, sized for 5 ac or less, throughout the development to provide even more "decentralized' treatment. f) The 2017 MDC Section E-4 Airports Table 1 states: Sand Filters are a comparatively expensive practice and do not mitigate the peak flow from a storm event. Sand Filters require frequent maintenance: i) Requires quarterly inspections. ii) Skim the sand media at least once a year. iii) Replace the sand filter media whenever it fails to function properly after maintenance. g) Not Selected due to SHWT and possible saturation of sand media, drainage area size, elevation requirement from flow into SCM to invert out and costs of SCM and adding stormwater detention. 8) Sand Filter (Closed Bottom/Open Top): a) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. i) Phase 3A: (1) High sediment input can significantly reduce the longevity of sand filters. (2) Currently proposed as —32% impervious. (3) Phase 3A has 1.07 acres of allocated future impervious. With little, to no area, to add erosion control measures upstream of the SCM before sediment input would enter the sand filter. ii) Phase 313: (1) Sand filters function much better when the drainage area is highly built -upon because this will greatly reduce the amount of fines that reach the sand filter and potentially cause clogging. (2) Currently proposed as —13.7% impervious. Pervious is upstream of SCM and cannot be graded away from SCM. (3) Phase 3B has 6.05 acres of allocated future impervious. With few areas to add erosion control measures upstream of the SCM before sediment input would enter the sand filter. b) The 2017 Section C-6 Sand Filter MDC 1 states: The minimum separation between the lowest point of the sand filter system and the SHWT shall be one foot for closed bottom designs. Exceptions to the one foot SHWT separation may be made if the applicant provides documentation that the design will neither float nor drain the water table. c) Culvert pipe under N. 23ro Street is currently undersized. Backwater into a Phase 3A sand filter would likely occur prior to water overtopping the road. Extending the period of time the filter media is surcharged. d) Sand Filters require 1.5' (18" of filter media). i) Phase 3A: (1) Has —10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23ro at 14.00' elevation. (a) Effectively 1' of elevation would be left for treatment storage atop of the open top sand filter. Not accounting for a height reduction for overland overflow. (b) Thus, expanding the footprint required for the device which drives up costs and reduces developable area. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. ii) Phase 313: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlets at 14.80' and EW200 outlets at 12.80' for a tie-in at 12.50'. (a) Effectively 0.8' of elevation would be left for treatment storage atop of the open top sand filter. Not accounting for a height reduction for overland overflow. (b) Thus, expanding the footprint required for the device which drives up costs and reduces developable area. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. iii) In areas of low relief, the hydraulic head necessary for some devices to function properly may not be available. e) MDC Recommendation 1 (Drainage Area): i) It is recommended to grade pervious areas to drain away from sand filters and to limit the drainage area of a sand filter to five acres or less. (1) Phase 3A: (a) 4.89 acres in size (2) Phase 313: (a) Total of 17.36 acres of drainage area. Exceeds 5 acres in size. (b) Sand filters with smaller drainage areas (less than five acres) usually have fewer maintenance issues. Sand Filters may only handle smaller flows and can become overwhelmed if sited at the outlet of a large drainage area. (c) Location of existing impervious within roads reduces our ability to provide multiple sand filters, sized for 5 ac or less, throughout the development to provide even more "decentralized' treatment. f) The 2017 MDC Section E-4 Airports Table 1 states: Sand Filters are a comparatively expensive practice and do no mitigate the peak flow from a storm even. Closed Bottom Sand Filters require frequent maintenance: i) Requires quarterly inspections. ii) Skim the sand media at least once a year. iii) Replace the sand filter media whenever it fails to function properly after maintenance. g) Not Selected due to drainage area size, elevation requirement from flow into SCM to invert out and costs of SCM and adding stormwater detention. Costs rise further due to anti -floatation measures required. 9) Sand Filter (Closed Bottom/Closed Top): a) Listed as "N" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. i) Phase 3A: (1) High sediment input can significantly reduce the longevity of sand filters. (2) Currently proposed as ^-32% impervious. (3) Phase 3A has 1.07 acres of allocated future impervious. With little, to no area, to add erosion control measures upstream- of the SCM before sediment input would enter the sand filter. ii) Phase 3B: (1) Sand filters function much better when the drainage area is highly built -upon because this will greatly reduce the amount of fines that reach the sand filter and potentially cause clogging. (2) Currently proposed as —13.7% impervious. Pervious is upstream of SCM and cannot be graded away from SCM. (3) Phase 313 has 6.05 acres of allocated future impervious. With few areas to add erosion control measures upstream of the SCM before sediment input would enter the sand filter. b) The 2017 Section C-6 Sand Filter MDC 1 states: The minimum separation between the lowest point of the sand filter system and the SHWT shall be one foot for closed bottom designs. Exceptions to the one foot SHWT separation may be made if the applicant provides documentation that the design will neither float nor drain the water table. c) Culvert pipe under N. 23rd Street is currently undersized. Backwater into the sand filter would likely occur prior to water overtopping the road. Extending the period of time the filter media is surcharged. d) Sand Filters require 1.5' (18" of filter media). MDC Recommendation #2 calls for access the inside of the box. Based on real life experience the inside of a closed bottom sand filter should be no less than 5' in height. (Preferrable 65, but we'll use 5' for this description.) The 5' height allows enough space, above the media, for an OSHA compliant confined space entry. Which is necessary to remove 1" or 2" of sand for remediation. This removal is a manual process. i) In areas of low relief, costly excavation is often required for basins. In addition, the hydraulic head necessary for some devices to function properly may not be available. ii) Phase 3A: (1) Has —10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23rd at 14.00' elevation. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. iii) Phase 313: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlets at 14.80' and EW200 outlets at 12.80' for a tie-in at 12.50'. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. e) MDC Recommendation 1 (Drainage Area): i) It is recommended to grade pervious areas to drain away from sand filters and to limit the drainage area of a sand filter to five acres or less. (1) Phase 3A: (a) 4.89 acres in size (2) Phase 313: (a) Total of 17.36 acres of drainage area. Exceeds 5 acres in size. (b) Sand filters with smaller drainage areas (less than five acres) usually have fewer maintenance issues. Sand Filters may only handle smaller flows and can become overwhelmed if sited at the outlet of a large drainage area. (c) Location of existing impervious within roads reduces our ability to provide multiple sand filters, sized for 5 ac or less, throughout the development to provide even more "decentralized' treatment. f) The 2017 MDC Section E-4 Airports Table 1 states: Sand Filters are a comparatively expensive practice and do no mitigate the peak flow from a storm even. Closed Bottom Closed Top Sand Filters require frequent maintenance: i) Requires quarterly inspections. ii) Skim the sand media at least once a year. iii) Replace the sand filter media whenever it fails to function properly after maintenance. g) Not Selected due to drainage area size, elevation requirement from flow into SCM to invert out which is increased in a close top system to provide space for routine maintenance of the sand and costs of SCM and adding stormwater detention. Costs rise further due to anti -floatation measures required. 10) Rainwater Harvesting: a) Not Selected - Insufficient proposed rooftop area. The majority of impervious will be roadways or parking areas. 11) Green Roof: a) Not Selected - Insufficient proposed rooftop area. The majority of impervious will be roadways or parking areas. 12) Disconnected Impervious Surface: a) Not Selected - Insufficient proposed rooftop area. The majority of impervious will be roadways or parking areas. 13) Proprietary Underground Stormwater Control Measure (StormFilter by Contech): a) MDC 1 Volume Based sizing: Sizing for the StormFilter system is in conjunction with upstream closed detention based on designing the system to provide capture and treatment of 75% of the first 1.5" rainfall in coastal counties. No upstream open retention or upstream infiltration is permitted as treatment shall be directed to the cartridges. b) Contech supplies the upstream detention system which is corrugated metal. Metal pipes coupled with a high SHWT leads to rusting as the pipes are inevitably scratched during installation. Thus, reducing the lifespan of the systems and leads to high replacement costs. c) Proprietary Underground Stormwater Control Measures utilize proprietary filter cartridges to provide stormwater treatment. These filter cartridges are typically contained in pre -cast structures and require replacement after a variable amount of time. Due to the replacement needs, and based on real life experience, the inside of a precast structures are rarely shorter than 7' in height. This allows for enough space above the filter cartridges for an OSHA compliant confined space entry. i) Phase 3A: (1) Has —10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23rd at 14.00' elevation. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. ii) Phase 3B: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlets at 14.80' and EW200 outlets at 12.80' for a tie-in at 12.50'. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. oowttCt,o�anollmoe � _ �t�€v.Ss,5a ►: t ! t2"D T----------------- EtEV-3atAt 1 i Flow ! .... 1 L....r---------- Na�,�YG1tt3V I flOWI(R WElEV.317a2 �f_0'0 ELEVATION VIEW mis°�'"^ d) Placing proprietary underground stormwater control measures in areas of high sedimentation will reduce the lifespan of the filter cartridges. Devices cannot be used for sediment control during construction for erosion control. e) Proprietary Underground Stormwater Control Measures require frequent maintenance: i) Requires quarterly inspections. ii) Replace the filter media whenever it fails to function properly after maintenance. f) No separation required between bottom of SCM and SHWT. However, proprietary underground stormwater control measures placed in SHWT require anti -buoyancy measure which also drives up cost. g) Not Selected due to elevation requirement from flow into SCM to invert out which is increased further in a closed top system to provide space for routine maintenance of the filters and costs of SCM and adding stormwater detention. Costs rise further due to anti - floatation measures required. 14) Proprietary Underground Stormwater Control Measure (Silva Cell by DeepRoot): a) Small footprint was specifically developed for ultra -urban environments with highly impervious contributing drainage areas and limited area above ground for stormwater control and treatment. b) MDC criteria has a Built Upon Area of 75% or greater. c) The lowest point of the Silva Cell System shall be a minimum of two feet above the SHWT; otherwise one foot if supported by a hydrogeologic evaluation prepared by a licensed professional. d) Device is fed by surface drainage and has limited stormwater storage capacity. e) Not Selected due to criteria listed above, mainly BUA 75% or greater requirement. 15) Proprietary Underground Stormwater Control Measure (Filterrra by Contech): a) Small footprint is designed to work best within small mostly impervious drainage areas. Such as commercial parking lots, residential streets, parking lots and urban streetscapes. b) Device is fed by surface drainage and has limited stormwater storage capacity. c) Not Selected due to criteria listed above, mainly small drainage area with mostly impervious area. 16) Proprietary Underground Stormwater Control Measure (BayFilter by ADS): a) Proprietary Underground Stormwater Control Measures utilize proprietary filter cartridges to provide stormwater treatment. These filter cartridges are typically contained in pre -cast structures and require replacement after a variable amount of time. Due to the replacement needs, and based on real life experience, the inside of a precast structures are rarely shorter than 6' in height. This allows for enough space above the filter cartridges for an OSHA compliant confined space entry. i) Phase 3A: (1) Has —10' of vertical relief from building to outlet point. However, this is reduced to 2.5' once the culvert pipe crosses under the new Private Street. EW104 outlets at 16.50' and EW100 conveys water under N. 23rd at 14.00' elevation. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3A drainage area. ii) Phase 3B: (1) Has 6.55' of vertical relief from the 18" RCP culvert pipe under Airport Blvd and the final discharge point. However, this is reduced to 2.3' once the culvert pipe crosses under the future loop road. EC207 and EW210 outlets at 14.80' and EW200 outlets at 12.80' for a tie-in at 12.50'. (2) Raising the site to provide additional elevation difference would become a costly and cumbersome process for the majority of the Phase 3B drainage area. Much of the upstream portion of this drainage area is already existing roadway networks which serve as the primary entrance to the International Airport. 2C SOLID LID — — CONTROL WEIP - : fi' 7.'-0 M (OUTLET CCNTROL-S TC BE PLACED ABOVE SOLM ELEVATION i TBD BY ENGMEER) r 71 98" INLET >9oPE —. " S''EPS (7YP) 522 BAYFILTER •, 8.1r 1,74 54W Y CARTRIDGE (TYP) c L• i u`r Y-� ... "y. __._ Ly Fj�j. ,.er {, 53.E y r PVC OUTLET MANIFOLD S' INLET r PVC ME W1 FLOWDISK (TYP) ,S' 4341T3.ET PIPE — r — 7 FLEXIBLE COUPLER SECTION A -A (3) SCE : V4' = T.. b) Proprietary Underground Stormwater Control measures require frequent maintenance: i) Requires quarterly inspections. ii) Replace the filter media whenever it fails to function properly after maintenance. c) Placing proprietary underground stormwater control measures in areas of high sedimentation will reduce the lifespan of the filter cartridges. Devices can not be used for sediment control during construction for erosion control. d) No separation required between bottom of SCM and SHWT. However, proprietary underground stormwater control measures placed in SHWT require anti -buoyancy measure which also drives up cost. e) Not Selected due to drainage area size, elevation requirement from flow into SCM to invert out which is increased in a closed top system to provide space for routine maintenance of the sand and costs of SCM and adding stormwater detention. Costs rise further due to anti -floatation measures required. 17) Filter Strip: a) Listed as "Med" under the Wildlife Habitat column within the 2017 MDC Guidance on SCM selection. b) The Level Spreader — Filter Strip is a Secondary SCM. Designed to work in conjunction with another SCM. c) See Proposed SCM Solution below 18) Treatment Swale (standard): a) The 2017 MDC Section E-4 Airports Table 1 states: A treatment swale is a secondary SCM; however, it may be used on an airport where a primary SCM is not feasible. b) Listed as "Y" under the Works with Shallow Water Table column within the 2017 MDC Guidance on SCM Selection. However, the specific MDC #1 states: Swales shall not be excavated below the Seasonal High Water Table. i) Swales with bottoms intersecting the SHWT may remain inundated with groundwater during portions of the year and have insufficient volume available to treat runoff from the design flow. They are also more prone to developing soggy bottoms a, vegetation. c) See Proposed SCM Solution below Proposed SCM Solutions: 19) Overall items which apply to both proposed SCM types: a) A key objective of the Plan is to address the North Carolina Stormwater Management Rules (15A NCAC 02H.1000) administered by the North Carolina Department of Environment and Natural Resources, Division of Water quality. b) In the 2004 Stormwater Master Plan it was determined that stormwater management at the Wilmington International Airport should be accomplished primarily with a combination of extended dry detention basins and grassed swales needed to meet the required 85% pollutant removal efficiency stipulated under North Carolina Stormwater rules. i) The extended dry detention basins will also serve to meet the peak discharge attenuation requirements of the New Hanover County Storm Water Management Ordinance ii) Since this time BMP regulations have been updated to the current 2017 MDC requirements for SCMs. c) Extended dry detention basins and grasses swales are specifically called for in the 2004 Stormwater Master Plan which was created as a planning tool for providing stormwater management infrastructure in support of anticipated development activities on airport property. Final design, supported by topographic survey, wetlands delineation, and subsurface exploration efforts was left in the hand of the subsequent Engineers. i) The 2004 Stormwater Master Plan does not specifically list any means of dealing with SCM location which encounter flat topographic challenges. ii) The 2004 Stormwater Master Plan does not specifically list a means of best protecting Jurisdictional wetlands fed by existing drainage patterns. iii) The 2004 Stormwater Master Plan does not specifically list any means of dealing with SCM locations which encounter a high Seasonal High Water Table. (1) The 2004 Stormwater Master Plan included concept sections for an Extended Dry Detention Basin, on sheet D1.1, without listing a means of dealing with a shallow Seasonal High Water Table. d) Our SCMs were designed based upon the approved and existing SCMs from 2005, 2009, and 2012. e) Extended Dry Detention basins and Grassed Swales were selected and designed to minimize wildlife habitat and associated risks to aircraft safety. i) Are listed as "Low" under the Wildlife Habitat column within the 2017 MDC Guidance on SCM selection. ii) The 2004 Stormwater Master Plan highlights the need for wildlife hazard issues to be a primary design consideration. It included a careful review of FAA Advisory Circular 150/5200-33A, "Hazardous Wildlife Attractants On or Near Airports" and consulted the USDA Wildlife Services to interpret the FAA criteria for context of local conditions. Wildlife Services has advised that the Advisory Circular guidelines are appliable at the Wilmington International Airport and recommends the use of extended dry detention basins and grasses swales rather than wet detentions basins at the airport. f) Extended Dry Detention basins and Grassed Swales work in conjunction to provide treatment and detention for the necessary storm events. g) Low-cost SCMs selected based upon ILM Airport funding and used in conjunction with other low-cost SCMs in a manner that meets or exceeds performance standards while integrating them into the natural features of our site. h) Extended Dry Detention basin can be used as a sediment basin during construction of future impervious upon the ILM Business Park lots. i) Extended Dry Detention Basin 3A is proposed to be utilized as a sediment basin during Phase 1 of the erosion control plan. ii) Extended Dry Detention Basin 3B is proposed to be utilized as a sediment basin during Phase 2 of the erosion control plan. iii) Option exists for these to be re -used as sediment basins in the future. i) Ease of maintenance; no OSHA confined entry certification required to inspect or repair; limited specialized equipment needed to perform maintenance. j) NOTE: On the attached "Figure 6 — WTDM" delineation map, which was approved by USACE, there are currently Jurisdictional Wetlands present in the two existing Grassed Swales and the one Extended Dry Detention basin. Additionally, there are Jurisdictional Ephemeral Stream channels present within the Extended Dry Detention basin. The stream channel and wetlands likely extend further into the Extended Dry Detention basin than our map illustrates since it abuts our delineation scope area limits. i) One of the three criteria for wetlands is standing water being present at the surface. (along with soil conditions and established vegetation). (1) The placement of wetlands within the devices illustrates the SCMs were designed as compliant devices in 2005, 2009, and 2012. However, through 2021 optics the SCMs appear to now be existing non -compliant devices which are in good standing. (a) Part of the Treatment Swale MDC description describes the current condition well: Swales with bottoms intersecting the SHWT may remain inundated with groundwater during portions of the year. They are also more prone to developing soggy bottoms and wetland vegetation. (2) With these existing devices being in good standing on the same parcel we believe they are a valid basis of our design. (3) Dry Detention basins, with outlet orifices set at the low point, will continue to drain any groundwater which seeps into the devices. Our design does not include any upstream splitters/weirs which would retain standing water. ii) Nearby, wetland "F" if located at approximately the same elevation as our site, yet is closer to the existing SCMs. Indicating the SHWT within the three existing devices is higher than the delineated elevation of approximately 13.50' within the grassed swales. iii) Additional surface wetlands are present surrounding the Extended Dry Detention on the 2009 Sheet P-2 "Existing Extended Dry Detention Basin No.1." k) NOTE: Phase 3B has —1,275 LF of grassed ditches will be indefinitely retained. The shortest is 235' of a continuous run. These grassed ditches provide some level of pre- treatment for the existing roadway impervious along Airport Blvd and Gardner Road. However, we have not tried to quantify or claim credit for these ditches. y. dt 1 345' I 20) Extended Dry Detention basin and Treatment Swale similar to 2004 Master Plan along with the 2005 and 2009 design: a) Listed as "Y" under the Works with High Sediment Input column within the 2017 MDC Guidance on SCM Selection. b) 2004 Stormwater Master Plan criteria for Extended Dry Basins: (1) The basin should be steep -sided, narrow, and linearly -shaped. (a) Basins are steep -sided, narrow, and linearly shaped. (2) Capture the runoff from a 1" rainfall and release over a period of 48 hours. (a) Phase 3A captures the runoff from the 1.5" rainfall and releases over a period of 3.9 days (i) NOTE: This increased release rate is due to NCDOT Hydro requirement. (b) Phase 3B captures the runoff from the 1.5" rainfall and releases over a period of 3 days (3) Provide a minimum flow length -to -basin width ratio of 3:1. (a) Phase 3A provides between a 3:1 to a 5:1 length -to -basin width ratio. (b) Phase 3B provides approximately a 7:1 length -to -basin width ratio. (4) Provide side slopes in the range of 3:1 to 4:1 (horizontal:vertial). (a) Side slopes of 3:1 provided. (5) Install outlet orifice in an enclosed structure with a sump. Provide a trash rack on the inlet to the structure. Do not provide an open permanent pool. (a) Outlet orifice provided in an enclosed structure with a sump. Trash rack provided on inlet to riser structure. Open permanent pool not provided. (6) Provide a rip -rap or concrete lined low -flow channel from inlet to outlet with a minimum depth of one (1) foot. (a) A 9" thick Class A rip -rap channel with one (1) foot of depth provided. (7) Slope basin bottom at 2% preferred and 1 % minimum grade toward low flow channel. (a) Bottom of basins sloped at 1 % toward low flow channel. (8) Provide heavy equipment access for clean -out and maintenance. (a) Access provided for heavy equipment. (9) Provide excess storage in the lower levels of the basin amounting to 20% of the 1" rainfall event runoff volume. (a) Phase 3A and 3B provide storage to 25% of the 1.5" rainfall event runoff volume (10) Provide for peak flow attenuation above the 1" storm storage, in accordance with the New Hanover County Storm Water Management Ordinance. (a) Phase 3A and 3B provide peak flow reductions for the 1, 2, 10, 25, 50, and 100-year storm events above the 1.5" storm storage. (11) Provide for seeding the basin bottom side slopes and berms with common Bermuda grass or other appropriate mix. Seed mixture shall not contain any form of millet, rye grass or other large seed producing grasses. (a) Bermuda grass, Cynodon Dacty/on, is to be installed within SCMs per Landscape Plans C6.0 and C6.1. (12) Stabilize the basin within 14 day of construction completion. (a) Basin to be stabilized within 14 days per note #6 of Erosion Control Construction Sequence found on Sheet C4.2. (13) To the extent possible, position the bottom of the basin above the seasonal high water table. (a) We acknowledge our proposed design elevation does go below the SHWT we provided but the 2004 permit states "to the extent possible" and we are meeting that requirement. The approved 2005 and 2009 Extended Dry Detention basin is located nearby, under the same Master permit, and was approved using a Seasonal High Water Table value of 6.0' which dates to the original Extended Dry Detention basin design. Current field conditions now include Jurisdictional wetlands within the Extended Dry Detention basin, showing the Seasonal High Water Table, at the upstream end of the SCM, exceeded the bottom elevation of the Extended Dry Detention basin (inlet pipe outlet @ 10.83' and 10.26' per field survey conducted by Paramounte Engineering Sheet dated 11/20/19). All evidence points to this device is in good working order and is functioning as designed. Providing evidence that our proposed alternate means of compliance in regard to the SHWT can also meet the intent of the NCDEQ treatment regulations. (b) The 2004 Stormwater Master Plan presents workable solutions for the long term storm water management needs of the airport. Implementation of the plan depends on the exact nature, magnitude, and sequence of development projects which move forward and on funding resources which become available for construction of stormwater solutions. (i) Nature: 1. To provide permanent stormwater treatment for forthcoming Commercial development within the ILM Business Park. 2. All told the permanent Phase 3A and 3B SCMs will allow -11.33 acres of development to proceed. The 11.33 acres include future internal road. After the Circle K parcel is developed approximately 8 acres will remain. 3. Meaning the majority of the drainage (16.66 ac of the 27.99 acres) will either be comprised of SCMs or existing right-of-way area along Airport Blvd and Garner Road. (ii) Magnitude: 1. Phase 3A and 3B drainage areas account for only -2.1 % of the overall 1,338.95 acre parent parcel. 2. Or only -8.7% of the overall drainage area covered by permit SW8 050547. 3. The Phase I & II drainage areas currently have in excess of 3 Million SF of impervious allocation for Future Development. Which is 2.4x larger than the Phase 3A and 3B drainage areas combined. (iii) Sequence: "Distributed" SCMs located near the outlet of the respective drainage area. No future upstream or downstream devised are expected to be placed in sequence with these devices. (iv) Funding: 1. ILM Airport is solely funding the construction of the stormwater devices. 2. ILM is cost -sensitive due existing budgets. 3. ILM is doing this construction in hopes of attracting additional developers to enter the ILM Business Park by offering pad -ready sites for development. 4. Current economic conditions, due to COVID, has greatly reduced flight traffic which has directly reduced their income derived from gate fees. 5. Long term maintenance costs must be factored into the front-end design to ensure ILM is not saddled with expensive repairs on an annual basis. (c) The 2004 Stormwater Master Plan also states that nothing in this plan is intended to limit or restrict the airport or its current or prospective tenants with respect to pursing alternate of modified stormwater management solutions in various locations. (14) Provide for safe conveyance of a 100-year storm event. (a) Extended Dry Detention basins designed to safely convey a 100-year storm event. c) NOTE: Draw down time for the Phase 3A Extended Dry Detention basin is limited by NCDOT Hydrology Department which will not allow an increase in Post -flows for the 10, 25, 50, and 100-yr storms under N. 23rd Street. 21) Treatment Swale similar to 2004 Master Plan along with the 2012 design: a) 2004 Stormwater Master Plan criteria for Grassed Swales: (1) Swales will typically be located upstream of extended dry detention basin. (a) Grassed swales placed directly upstream of extended dry detention basins. (2) Provide a 0.2% minimum to 4.0% maximum longitudinal slope. (a) Phase 3A longitudinal slope set at 0.10% due to elevation constraints. (i) Note the previously approved Phase I & II grassed swales are both designed at 0.03% (b) Phase 3A longitudinal slope set at 0.20% (3) Provide side slopes no steeper than 3:1 (horizontal:vertical) with 5:1 preferred. The swale cross section should be triangular or parabolic. (a) Side slopes of 3:1 provided and match the shape of the existing grassed swales. (4) Swale bottom should be located above the seasonal high water table (a) The approved 2012 Pre -Treatment swales are located nearby, under the same Master permit, and were approved using a Seasonal High Water Table value of 6.0' which dates to the original Extended Dry Detention basin design. This test was not completed with the devices. Current field conditions now include Jurisdictional wetlands within these two pre-treatment swales. Showing the Seasonal High Water Table exceeded the bottom elevation of the pre-treatment swales (bottom @ 11.47' and 11.14' per Paramounte Engineering Sheet C3.0 dated 1019/12). These devices are in good working order and are functioning as designed. Providing evidence that our proposed alternate means of compliance in regards to the SHWT can also meet the intent of the NCDEQ treatment regulations. (b) The 2004 Stormwater Master Plan presents workable solutions for the long term storm water management needs of the airport. Implementation of the plan depends on the exact nature, magnitude, and sequence of development projects which move forward and on funding resources which become available for construction of stormwater solutions. (i) Nature: 1. To provide permanent stormwater treatment for forthcoming Commercial development within the ILM Business Park. 2. All told the permanent Phase 3A and 3B SCMs will allow —11.33 acres of development to proceed. The 11.33 acres include future internal road. After the Circle K parcel is developed approximately 8 acres will remain. 3. Meaning the majority of the drainage (16.66 ac of the 27.99 acres) will either be comprised of SCMs or existing right-of-way area along Airport Blvd and Garner Road. (ii) Magnitude: 1. Phase 3A and 3B drainage areas account for only —2.1 % of the overall 1,338.95 acre parent parcel. 2. Or only —8.7% of the overall drainage area covered by permit SW8 050547. 3. The Phase I & II drainage areas currently have in excess of 3 Million SF of impervious allocation for Future Development. Which is 2.4x larger than the Phase 3A and 3B drainage areas combined. (iii) Sequence: "Distributed" SCMs located near the outlet of the respective drainage area. No future upstream or downstream devised are expected to be placed in sequence with these devices. (iv) Funding: 1. ILM Airport is solely funding the construction of the stormwater devices. 2. ILM is cost -sensitive due existing budgets. 3. ILM is doing this construction in hopes of attracting additional developers to enter the ILM Business Park by offering pad -ready sites for development. 4. Current economic conditions, due to COVID, has greatly reduced flight traffic which has directly reduced their income derived from gate fees. 5. Long term maintenance costs must be factored into the front-end design to ensure ILM is not saddled with expensive repairs on an annual basis. (5) Swales should be designed for ready mowing with standard mowing equipment. (a) Designed for mowing with standard mowing equipment. (6) Flow velocity should be limited to 2 feet per second for the 2-year design flow and a non -erosive velocity for the 10-year design flow. (a) Phase 3A Grass Swale: 2-year velocity = 1.12fps; 10-year velocity = 1.22 fps (b) Phase 3B Grass Swale: 2-year velocity = 1.31fps; 10-year velocity = 1.42 fps (7) An attempt shall be made to provide 100 linear feet of swale per acre of drainage area. No less than 50 linear feet of swale per acre shall be provided. (a) The proposed Phase 3A swale is 150 LF in length and accounts for 4.89 acres of drainage area. Which equates to 30.67 LF per acre. The proposed 3B swale is 150 LF in length and accounts for 17.36 acres of drainage area. Which equates to 8.64 LF per acre. (i) By the 501f/ac criteria the Phase 3A swale should be no less than 244.5 LF in length. (ii) By the 501f/ac criteria the Phase 3B swale should be no less than 868 LF in length. (iii) However, when compared to the existing Phase I and II grass swales our proposed amount far exceeds what has been accepted in the past. Those two grassed swales total 300 LF in length and handle 287.63 acres. Which means they provide only 1.04 If/ac. (iv) Based on the "decentralized" SCM locations within the ILM business park, it is key to try and preserve as much developable area land as possible while also complying with regulations. A quick calculation shows that a 42' wide swale (top of bank to top of bank), which is 1,112 LF long, would encompass more than 1.07 acres of developable land. Thus eliminating 13% (1.07 ac / 8 ac) of the remaining developable land within Phase 3A and Phase 3B. (8) Provide for seeding the swale with common Bermuda grass or other appropriate mix. Seed mixture shall not contain any form of millet, rye grass or other large seed producing grasses. (a) Bermuda grass, Cynodon Dactylon, is to be installed within SCMs per Landscape Plans C6.0 and C6.1. (9) Stabilize the swale with 14 days of construction completion. (a) Basin to be stabilized within 14 days per note #6 of Erosion Control Construction Sequence found on Sheet C4.2. It is our professional opinion that the stormwater solution proposed meets the 2004 Stormwater Master Plan based on the information provided above and the guidance provided by that permit. In addition, we have extensively evaluated, in detail, many other SCM alternatives and found the solution proposed to be the best alternative to provide stormwater treatment. b. The 2004 approved "Stormwater Master Plan" document for this alternative design indicates for grassed swales, that the "swale bottom should be located above the seasonal high water table". The proposed design, however, appears to position the bottom of the swales below the seasonal high water table. It is understood that a clay liner is proposed, however, it is my understanding that clay liners are more effective at keeping water in than keeping water out. The grassed swale requirements of the "Stormwater Master Plan" do not make the same "to the extent possible" distinction as the dry detention basin requirements. Please confirm the intended design and ensure this requirement for the alternative design is met. Response: Based upon further discussion with our Sr. Geotechnical Engineer we have removed the clay liner from our design. His experience has been that clay liners are equally effective in keeping water in a device as out of a device however, constructability concerns in this location and long term potential uplift have caused us to reevaluate and therefore remove clay liners from the design. Similarly, a synthetic liner has also not been chosen. This evaluation of the design also includes all available evidence pointing to the existing stormwater control system functioning properly and in good order and therefore our proposed design providing an equal level of treatment meeting the 2004 design criteria. 2. 15A NCAC 02H.1042(2)(a): The signatures provided on the submitted application, operation and maintenance agreements, and proposed deed restrictions and protective covenants were all copies. These documents must include an original signature. The response letter included with the January 21, 2021 resubmittal indicated that "We remain in the process of obtaining the original signed documents and will provide upon receipt." The originally signed documents, however, were never received. Please provide an original signature for all documents that require the applicant's signature. Response: Original Signatures on the O&M agreements have been provided under different cover letter. 3. 15A NCAC 02H.1042(2)(a)(iv): a. In order to ensure the SWU-101 form remains consistently updated and represents the entire permitted condition, Section IV.10 of the application must reflect all drainage areas covered in this permit, including the Phase I & II drainage areas. Please update Section IV.10 of the application to reflect all drainage areas permitted under SW8 050547. Response: The phase 1 & 2 drainage areas have now peen included on the SWU- 101 form. b. Drainage Area 3C in Section IV.10 of the submitted application indicates that there is 312,094 square feet of "other on -site" built -upon area (BUA) and 129,628 square feet of "future" BUA, however, there is no proposed SCM(s) to treat this proposed BUA. It is noted that there is some existing BUA. Please confirm one of the following, provide additional explanation and update the application package appropriately: i. No SCM is proposed for Drainage Area 3C at this time and no BUA is proposed beyond the existing BUA; or ii. A new SCM is proposed to treat Drainage Area 3C and the application is being revised to include the SCM; or iii. Drainage Area 3C is an area of low density and the application package will be revised to include this area of low density; Response: Phase 3C drainage area numbers have been revised to remove "future impervious." No SCM is proposed for DA 3C at this and no BUA is proposed beyond the existing. c. Section IV.7 of the application indicates that the total project area covered under SW8 050547 is 27.99 acres. SW8 050547, however, currently has an approved total project area of 322.3 acres. Please confirm the correct total project area and ensure it is represented consistently throughout the entire application package. Response: Our application has been updated to reflect the entire 322.3 acres per the original permit. We are now showing on our application Phase I, II, and III. 4. 15A NCAC 02H. 1 042(2)(g): The submitted drainage area plan sheet does not clearly show the proposed Drainage Area 3C. In order to support the entire previously approved Phase III area is covered by this modification, please include the entire area on the drainage area plan sheet and clarify the proposed Drainage Area 3A, Drainage Area 3B and Drainage Area 3C. Response: DA3.0 has been revised to now include Drainage Area 3C, now shown with a transparent hatch. 5. 15A NCAC 02H. 1 042(2)(f) and .1042(2)(a)(iv): The calculations for Extended Dry Detention Basin 3A indicates that the total impervious area draining to the basin is 1.67 acres (72,746 square feet). Section IV.10 of the application, however, indicates there is 116,598 square feet of BUA proposed in drainage area 3A. Please confirm the correct amount of BUA proposed in drainage area 3A and ensure it is represented consistently throughout the entire application package. Response: The impervious area draining to extended dry detention basin 3A is 2.67 Acres. The calculations have been updated and the impervious area is now consistent. Storm Water Impact Analysis Circle K — NTI Airport Blvd Wilmington — NC.115 Airport Boulevard Wilmington, NC 28405 (PID: R04200-001-025-F00) Prepared by: TIMMONS GROUP Project #: 37630.054 Date: 8/27/2020 Revised: 1 /19/2021, 03/26/20210 .1 4s�ESSIp �y9, a4 9f ' i f: I M ON S GROUP "eUP VISION ACHIEVE® TWIROUR"N G1J;k1 Table of Contents: 1. Cover Sheet 2. Table of Contents 3. Project Narrative 4. Reference Material: a. USGS Map b. Soil Survey Map c. FEMA FIRM Map d. NOAA Rainfall Data e. Pre -Development Drainage Area Map f. Post -Developed Drainage Area Map g. SHWT & Infiltration Test Report 5. Peak Flow Analysis a. Table of Subareas, Land Uses, Curve Numbers, & Time of Concentration b. Peak Flow Summary c. Hydraflow Report 6. Water Quality Calculations a. Stormwater Grass Swale Calculations b. Stormwater Extended Dry Detention Pond Calculations c. Stormwater Supplement Forms 7. Stormwater Operation & Maintenance Agreement 8. Miscellaneous Calculations a. Storm Pipe HGL Calculations b. Spillway Calculations c. Energy Dissipater Calculations PROJECT NARRATIVE L Project Data: Project Name: Circle K — NTI Airport Blvd Wilmington -- NC.115 PID: R04200-001-025-F00 Project Address: Airport Blvd, Wilmington, NC 28405 Stormwater Basin: Smith Creek River Basin: Cape Fear Water Classification: C;Sw Site History: The existing parcel is owned by New Hanover County and is controlled by Wilmington International Airport. This property is part of an overall airport stormwater master plan, and was previously permitted with NCDEQ under SW8 050547 — Phase III. The current Wilmington International Airport Stormwater Master Plan include a proposed Phase 3 expansion to the existing Extended Dry Detention Basin to the east of our proposed Circle K site, which was intended to accommodate future build -out of the undeveloped Phase 3 properties. The Phase 3 Extended Dry Detention Basin Expansion was never constructed. Many of the Phase 3 drainage areas remain undeveloped at this time, and they do not actually drain into the existing extended dry detention basin at this time. Project Description: The project proposes a gas station/convenience store, associated parking lot, canopy, driveways, and utilities. The project is proposing shared access roads connecting to both N. 23rd Street and Airport Blvd, as well as water/sewer extensions to serve future developmcnt in adjacent land. This project is a proposed modification to the current 2011 SW8 050547 — Phase III stormwater permit. Two extended dry detention basins are proposed. Refer to the proposed conditions section below for additional information. Existing Conditions: Refer to the pre -development drainage area map in this report. The study area represents a portion of the previously permitted Phase III drainage area. DA 1.1 consists of 4.53 acres of mostly undeveloped lawn and some woods. This drainage area also includes impervious surfaces from portions of Airport Blvd and N 23rd St. This drainage area runs through an existing roadside ditch, and into an existing 24"RCP culvert under N 23rd Street, and discharges to the southwest. DA 1.2 consists of 4.62 acres of undeveloped lawn and woods. This drainage area surface discharges, and enters another existing 24"RCP culvert under NC 23rd Street, and discharges to the southwest. L L DA 1.3 consists of 15.47 acres of mostly undeveloped lawn and woods. This drainage area includes impervious from portions of Airport Blvd, Gardner Road, and an old gravel service drive. This drainage area runs through existing roadside ditches, culverts, and wetlands channels before it surface discharges to the south. DA 1.4 consists of 1.85 acres of offsite undeveloped lawn. This drainage area runs through an existing roadside ditch and into an existing 24" RCP culvert under N 23rd St, which discharges to the southwest. All drainage from this area enters Smith Creek, which is roughly —0.42 miles south of our project area. Smith Creek flows east which eventually enters the Northeast Cape Fear River approximately —1 .62 miles to the west. The Soils Survey map shows that the soils on site are as follows: SOIL TYPES: SYMBOL RATING UNIT NAME JO D JOHNSTON SOILS Le B/D LEON SAND Pn B/D PANTEGO LOAM Se A/D SEAGATE FINE SAND *Soil rating are based on NCDEQ Erosion and Sediment Control Planning and Design Manual — Chapter 8 — Appendices A copy of FEMA FIRM map 3720312900K, effective date 08/28/2018, included confirms that there is no regulatory floodplain on the property. Post -Developed Conditions: Refer to the post -development drainage area map in this report. DA 2.1 (Bypass): This drainage area is 2.04 acres and predominantly consists of existing impervious from Airport Blvd and NC 23rd Street right-of-way, as well as a proposed NC 23`d Street widening required by NCDOT. A roadside ditch along Airport Blvd has been regraded to reduce drainage to Analysis Point A. This area has been redirected to our Phase IIIB pond. This drainage area also consists of lawn/shoulder areas in and adjacent to the public rights -of -way. This drainage area flows through an existing roadside ditch, and into an existing 24" RCP culvert under NC 23rd Street, which is consistent with the existing condition. DA 2.2 — Stormwater Phase IIIA: This drainage area is 4.89 acres and includes the following proposed improvements: Circle K development, portions of several common drives, one grass pre-treatment swale, and one extended dry detention basin. This Phase IIIA extended dry detention basin will be constructed by Circle K, simultaneous with the Circle K project, but it will be a regional stormwater SCM located on New Hanover County property but controlled and operated by Wilmington International Airport. Proposed impervious areas will be collected to the extent practical in the SCMs, and will discharge into an existing 24" RCP culvert under NC 23rd Street to the southwest, which is consistent with the existing condition. The Phase IIIA SCMs are designed to accommodate the below impervious allocation for Phase IIIA drainage area at buildout: Phase IIIA Circle K & Common Drives Proposed Impervious: 69,896 SF Phase IIIA Potential Future Development: 46,702 SF Phase IIIA Total Impervious Allocation: 116,598 SF (Includes potential future development) DA 2.3A & 2.3B — Stormwater Phase IIIB: This drainage area is 17.36 acres and includes impervious portions of existing Airport Blvd and Gardner Road rights -of -way, lawn/shoulder areas in and adjacent to the public rights -of -way, as well as currently undeveloped land on the south side of Airport Blvd. The following improvements will be constructed with the Circle K project, which are located in Phase IIIB: • A portion of a common internal drive. • A left turn lane on Airport Blvd (required by NCDOT). Phase IIIB includes one proposed grass pretreatment swale and one proposed extended dry detention basin. The stormwater will discharge to the south, which is consistent with the existing drainage pattern. The Phase IIIB SCMs are designed to accommodate the below impervious allocation for the Phase IIIB drainage area at buildout. • Phase IIIB Existing Road Impervious: 95,932 SF • Phase IIIB Road Improvements to be constructed with Circle K: 7,633 SF • Phase IIIB Potential Future Impervious Allocation: 264,031 SF • Phase IIIB Total Impervious Allocation: 367,596 SF (includes potential future development) DA 2.3C— (Bypass): This drainage area is 0.51 acres of lawn area to the southeast of the proposed dry pond, which discharges to the south. DA 2.4 — (Bypass): This drainage area is 2.02 acres and predominantly consists of existing NC 23rd Street public right-of- way and undeveloped lawn to the south. This drainage area flows through an existing roadside ditch, and into an existing 24" RCP culvert under NC 23rd Street, which is consistent with the existing condition. Stormwater Management Requirements: i . New Hanover County Stormwater Design Manual: • Detention: 2, 10, 25-yr storms • Retain the 1.5-inch volume and drawdown in 2 to 5 days 2. NCDEQ - 15A NCAC 02H .1005 Stormwater Requirements: Coastal Counties • High Density Option • Retain runoff from 1.5-inch rainfall, drawdown in 2 to 5 days • Design for ultimate buildout of the drainage area • Alternative Design Criteria: o 85% TSS removal o Detain 1-year, 24-hr storm Wilmington International Airport Stormwater Master Plan Approved Engineering Report, Dated 10/26/04 by Talbert & Bright): • Requires the use of "alternative stormwater management systems", which do not attract wildlife, which would be a hazard to aircraft. Intended SCMs include grass swales in series with extended dry detention basins. • SCMs, which generate a permanent pool are prohibited for reasons of airport safety. Proposed Stormwater Mana eg ment: ✓ Volume Control — The proposed stormwater extended dry detention basins will retain the 1.5- inch volume for the net increase of impervious surfaces and release it over a 2-5 day period. ✓ Peak Flow Detention (1, 2, 10, 25, 50, 100-yr) — The proposed stormwater extended dry detention basins will reduce peak flows for the 1, 2, 10, 25, 50, and 100-year, 24-hr storm events down to below pre -developed levels, except as mentioned below. Refer to the Peak Flow Summary Table for pre- and post- flows for all storm events ✓ Alternate Stormwater Management Systems — This project utilizes two pretreatment grass swales and two extended dry detention basins. These SCM types were selected for the following reasons: a. These SCM types are required by the Wilmington International Airport Stormwater Masterplan. b. Other SCM types, which have permanent pools of standing water, are prohibited by the airport and the FAA, because they attract wildlife, which would be a hazard to airplane safety. c. There is a precedent for selecting these SCM types, which exist just to the east of our project. Methodology: The SCS unit hydragaph method has been used for project hydrology, implemented using Hydraflow software. Time of concentration calculated using the TR-55 segmented approach. Rainfall data was input based on the NOAA rainfall data. The hydrologic soil groups for the various soil units on the airport were taken from the Appendix A listing of TR-55. The SCS soil map for New Hanover County was used to identify soil units. For soils with multiple hydraulic soil groups, the lowest (most well drained) group was used. The SCS type III 24-hour rainfall distribution was used. Pipeline hydraulic grade lines were computed using Hydraflow software as well. Summary of Results: Refer to the following tables in this report to view the results data: • Table of Subareas, Land Uses, & CN. • Peak Flow Summary Table • Stormwater Grass Swale and Extended Dry Detention Pond Calculations As shown in the aforementioned tables in this report and plans, NCDEQ, New Hanover County, and the Airport's Stormwater Master Plan requirements are satisfied. Conclusions: Through the use of two proposed stormwater pretreatment grass swales and two extended dry detention basins, this project meets or exceeds NCDEQ/New Hanover County/ILM Stormwater Master Plan requirements listed in the publications below: • New Hanover County Stormwater Design Manual: • NCDEQ - 15A NCAC 02H Stormwater Requirements: Coastal Counties • Wilmington International Airport Stormwater Master Plan Approved Engineering Report, Dated 10/26/04 by Talbert & Bright): Phases IIIA and IIIB were designed to incorporate proposed and future development and resulted in decreased flows for the 1, 2, 10, 25, 50, and 100-year, 24-hr storm events. L REFERENCE MATERIAL YORW VRZA DR' ville USGS MAP M AE 9i dL I 1 - iZ O :3 CL tD 2 �0 L) O co I cO T E o 7 .Lc U M.& Ss a z 1 us.� rr::.. CE.!,. 1 1i'du rv! � !t. •.• n;:..r f.Y<'. rt.• re r.'. - I; � • ry l��T�y � K f -. j RAF j1. - r E ' rr; x _ � G7• �7��1 - 4 tll:.. 11�`: II:;:L fl;!.. ft". 1{." I.I,i•.. 11'ti`-.♦ f Appendices Table 8.01d (continued) Name Depth pH K Hydrology Plasti- _ ._--Textural --------------- Classlflcation'--------- --------- Group city USDA Unified AASHTO JOHNSTON 0-30 4.5-5.5 0.17 L 2-14 MK-L OL, ML, CL-ML A-8, A-4,A-5 0-30 4.5-5.5 V.20 C NP-10 L, SL. FSL ML. SM A-2- A-4 30-34 4.5-5.5 0.17 11 JP SR-S-S SM, SP-SM A-2, A-3 34-60 4.5-5.5 0.17 D 'NP-10 SR-FSL-SL SM A-2. A-4 xl' 1':A 0-14 4.5-6.0 0.15 B 'NP LS, LFS SM, SM-SC, SC A-2 0-14 4.5-6.0 0.20 B NIP-10 SL. FSL SM. SM-SC, SC: A-2. A-4 14-32 4.5-5.5 0.24 B 4-15 SCL SC, SM-SC A-2, A-4. A-6 3^-60 4.5-5.5 0. i O B NP LS, S SM, SP-SM, SP A-2, A-3 KENANSVILLE 0-24 4.5-6.0 0.15 A NP LS, LFS SM, SP-SM A-1, A-2 0-24 4.5-6.0 015 A NP FS. S SM; SP-SM A-2; A-2 24-36 4.5-6.0 0.15 A NP-10 SL, FSL SM, SC, SM-SC A-2, A-4 36-80 4.5-6 0 010 A NP S. LS SP-SM, SM A-1; A-2, A-3 KERSHAW 0-80 4.5-6.0 0.10 A NP S, COS, FS SP, SP-SM, SW A-2, A-3 KINSTON 0-12 45-6.0 024 B/D NP-10 FSI. SM. SC SM-SC A-2. A-4 0-12 4.5-6.0 0.37 B/D 4-15 L, SIL ML, CL, CL-ML A-4, A-6 ] 2 60 4 5-5.5 0.32 B-D 8-22 L, CL, SCL CL A-4. A-6, A-7 60-72 B/D NP Var K1,R1- B 0-80 4.5-7.3 010 A NP S. COS. FS SP, SP-SM A-3 LAKELAND 0-43 4.5-6.0 0.10 A NP S, FS SP-SM A-3, A-2-4 43-80 4.5-6.0 0.10 A NP S; FS SP SP-SM A-3,A-2-4 LEAP 0-9 3.6-5.5 0.32 D 5-15 SIL, VFSL ML, CL A-4, A-6 0-9 3.6-5.5 028 D 5-12 FSI . I ML 1-4, A-6 9-72 3.6-55 0.32 D 20-38 SICL. SIC. C CL, CH A-7 LEAKSI'II LE 0-9 5.1-6.5 0,43 D 6-10 STL„ I:; SIFT, ML, 0-ML A-4. A-6 9-18 6.1-7.8 0.24 D 35-75 CL, C, SIC CH A-7 18-24 61-7 8 024 D 20-45 CI.; SICL 0- CH A-' 24-30 D WB 30 D CIWB LENO5P, 0-8 4.5-5.5 0.37 D 11-10 L, SIL, VFSL ML, CL, CL-ML A-4 8-75 4.5-5.5 032 D 11-35 C. Sic, CI. C`L. CH A-6,A-7 LEON 0-15 3.6-5.5 0.1f) B/D 'DTP S, FS SP, SP-SM A-3, A-2-4 15-30 3.6-5.5 0.15 B/D NP S. FS, LS SNf, SP-SM, 5P A-3: M24 30-80 3.6-5.5 0.14 B/D NP S, FS SP, SP-SM A-3. A-2-4 LIDDELL 0-8 4.5-5.5 0-0 BD 2-10 L, SIL. VFSL ML, CL-TVM A-4 8-65 4.5-5.5 0.43 B;D 2-10 L, SIL. VFSL ML, CL-ML A-4 LILLINGTON 0-16 4.5-6.0 0.15 B NP GR-LS, GR-SL firm, CiP-GM; SM, A -I A 2 SP-SM 16-44 4.5-5.5 0.15 B NP-10 GR-SCL, GR-CL GM, GC, SM, SC A-1, A-2, A-4 44-80 4.5-5.5 0.10 B NP SR-GRV-LS-GRV SCL GM. SM A-I,.A-2 LOCKIIART 0-6 5.1-6.5 0.15 B NP GR-LS, GR-SL GM, GP -GM, SM, A-1, A-2 SP-SM 6-54 5.1-6.5 0.17 B 5-15 GR-SCL; GR-L GC. GM -GC, SC, A2 A-4, A-6 SM-SC 54-72 B Var I.OUISA 04 4.5-6.0 0.17 B N-P GR-1- GR-SL, GR-FSL SM A-1. A-2..A-4 0-4 4.5-6.0 0.28 B NP L_ SL, FSL SM, ML A-2. A-4 4-15 4.5-6.0 024 B NTP GR-L; GR-SL SM A-2. A,4 15-60 B WB L01UISBLRCi 0-7 4.5-6.0 010 B NP LS. LCOS SM A-2. A-1-8 0-7 4.5-6.0 0.24 B NP-6 SL, FSL SM. SM-SC A-2 7-24 4.540 024 B ?qp-,7 SL SM, SM-SC A-2. A-4 24-60 B WB 'See Tables 8.01 b, 8.01 c and Figure 8.01 d for definition of symbols. 8.01.23 I Appendices Table 8.01d (continued) Name Depth pH K Hydrology Plasti- - —. Textural Classification Group city USDA Unified AASHTO R-Ac7L'LU 0-40 4.5-6.0 0. •;i AT NP 40-80 4.5-5.5 O R; A'( NP PAMLICO 0-30 3.6-4.4 D NP 30-60 3-6-5.5 0.m 0 NP PAN-TF(X) 0-18 3.6-5.5 0.;19 B D :YP-10 0-18 3.6-5.5 0.15 BiD I P-10 0-18 3.6-5.5 0,110 R'D NP 18-42 3.6-5.5 0.2* BiD 4-16 42-65 3.6-5.5 0.2'« BD '1-24 2'AWVJ0Tr'yNK 0-17 4.5-6.0 043 BD .NP-7 17-56 4.5-5.5 0.4" B D NP-7 56-80 4.5-5.5 032 BfD NP PELHAM 0-27 4.5-5.5 0.10 B/D NP 0-27 4 5-5 5 010 BrD NP 27-56 4.5-5.5 0.24 B/D 2-12 56-68 4 5-5.5 0.24 130 5-20 PENDER 0-13 4.5-6.5 0.24 C NP-14 0-13 4.5-6.5 0.15 C NIP-10 13-54 5.6-7.3 0.24 C 4-20 54-62 C PENN 0-8 3.6-5.5 0.32 C 0-8 3.6-5.5 028 C 8-21 3.6-6.0 0.24 C 1-10 21-34 5.1-6.5 024 C 3-10 34 C PE.RQUIMANS 0-8 - 4.5-6.5 0.37 D NP-7 8-50 4.5-6.0 0.43 D 8-30 50-62 4 5-6.0 0.37 D NP-7 PETTIGREW 0-15 3.6-5.5 B/D NP 15-26 3.6-55 017 130 11-25 26-50 3.6-5.5 0.32 B/D 20-40 50-74 5.6-7,8 BID PINKSTON 0-8 4.5-6.5 0.32 B NP-10 0-8 4.5-6.5 0.3= B NP-10 8-19 4.5-5.5 0.24 B NP-10 19-26 4.5-5.5 024 B 3-15 26 B PLl:MMER 0-50 3.6-55 010 BID NP 50-72 3.6-5.5 0.15 B/D NP-10 POCALLS 0-23 4.5-6.5 0.15 A IN 23-36 4.5-5.5 0.10 A NP-4 3& 46 4.5-5.5 O l n A NP 46-72 4.5-5.5 0.15 A 3-15 POCOMOKE (1-28 3.6-5.5 028 B'D 3-10 28-40 3.6-5.5 0.20 B/D NP-8 POMFLLO 0-42 4 5-61) 010 C' N'P 42-64 4.5-6.0 0.15 C NP 64-80 4.5-6.0 0.10 C INP PONZER 0-24 3.6-4.4 D NP 24-52 3.6-6.5 024 D NP-10 52-72 D 'See Tables 8.01 b, 8.01 c and Figure 8.01 d for definition of symbols LS, LFS, S S, LS, LFS MUCK I.S. S; I,F:S MK-L L, FSI.; SL LFS. LS SCL, SL; CL CL, SC, SCL SIL. L, VFSL L, VFSL, SIL LS, I.FS, FS LS S. FS SCL, SL SCL, SL, SC SL, FSL LS.LFS SL, SCL., CL Var SIL, L SH-SIL, SH-L SH-SIL, SH-L, SH-SICL SH-SIL, SI3VI UWB SIL, L, VFSL L, SICL, CL SIL, L, SL MUCK L; CL, SICL CL, C, SIC Var FSL, SL SIL, L. VFSL L, SL, SIL GR-SL. L. SIL WB S. FS LS SL, SCL, FSL S, LS SL S. LS SCL. SL SL. FSL, LS LS, S COS, S. FS COS. S, FS COS, S. FS MUCK L. SCL, STL Var SM A-2 SP-SM, sM A-2; .A-3 PT S11A, SP-SM A-2. A-3 CL, SM, ML, SM-SC A2, A-4 SM. SM-SC, at 111 A2; A-4 SM A-2 SC, C-L. SM SC. CL-hill A-4..A-6, A-2 CL, SC A-6, A-7 CL ML, ML A4 CL-ML, ML A-4 SM.. SP-SM A-2 SM A-2 SM A-2 SM. SC, SM-SC A-2, A-4, A-6 SC. SM-S(', ML. A-2. A-4, A-6, CL A-7 SM, SM-SC, SC A-2 SM SP-SM A 2 SC, SH-SC, CL, CL-ML A-2, A-4, A-4 ML A-4 ML; GM A-4 ML, SM, GM A-4, A-2 ML. CL, SM, GM A-4. A-2, A-1 ML, CL-ML A-4 CL A-4, A-6, A-7 ML. CL-ML A-4 PT CI. A-6, A-7 CL, CH A-7 CL, ML, SM, SC A-2, A-4 Cl.... ML: SM-SC A-4 SC, CL, ML, SM A-2, A-4, A -I (A., GM; C P-GM. . A-1, A-2: A4 ML A-6 SM. SP-SM A-2-4. A-3 SM, SC, SM-SC A-2-4, A-2-6, A-4 SP-SM, SM A-2, A-3 SM A-2 SP-SM, SM A-2, A-3 SM-SC, SC. SM A-2, A-4, A-6 SM; SC, CL-ML A-2, A-4 SM. SP-SM A-2, A-3 SP SP-SM A-3 SP- SM, SM A-3, A-2-4 SP, SP-SM 4-3 PT SM, ML. SC, CL. A-2, A-4. A-6 8.01.27 Table 8.01d (continued) Name Depth pH K Hydrology Plasti- Group city RUSTON 0-16 4.5-6.5 0.15 B NP-3 0-16 4.5-6.5 028 R NP-3 0-16 4.5-6.5 0.20 B NP-3 4147 4.5-6-1) 0.32 B NP-7 47-80 4.5-6.0 Orx B 1-20 SCRAN1, i"e 0-7 4.5-6.5 0.15 A v NP 0-7 4.5-6.5 O.Li' AID 'YP 7-41 4.5-5.5 0.33v LLD NIP 41-72 4.5-5.5 0.10 A`*D NP SEh k- !? f t K (1-4 4.5-6.5 0.Wc C" -NP 9-60 4.5-6.5 0.a4: C NP SLAG i ;Fl. 0-12 3 6-6V 0.11) AID NP 12-28 3.6-6.0 0.15 Ali? NP 28-36 3.6-6 0 0 w Alt) NP 36-40 3.6-6.0 02� A/D NP-7 40-64 3.6-6.0 0.32 A/D 116-27 SED3GEFIELD 0-13 4.5-6.5 0.17 C NP 0-13 4.5-6.5 0 C 5-20 13-33 4.5-6.5 0 ?k C 25-60 33-37 5.0r8.1 028 C 8-25 37-65 C S'LALLING5 0-12 3.6-5.5 010 C NP 0-12 3.6-5.5 0.20 C NP-3 12-42 3.6-5.5 0.17 C NP-3 42-80 3.6-5.5 0.17 C NP-4 ST.ARR 0-10 5.1-6.5 024 C NP-7 0-10 5.1-6.5 0.28 C 3-12 0-10 5.1-6.5 028 C 3-23 10-53 5.1-6.5 0.28 C 3-23 53-70 5.1-6.5 0.28 C NP-15 STATE 0-10 4.5-5.5 0.28 B NP-7 0-10 4.5-5.5 0.38 B NP-15 0-10 4.5-5.5 0.28 B NP-6 10-45 4.5-55 0.28 B 8-22 45-60 4.5-6.0 0.17 B NP-7 STONEWLI.E 0-5 4,5-6.0 032 B 6-16 5-13 4.5-6.0 0.32 B 11-25 1.3-38 4.5-6.0 028 B 20-50 38-48 4.5-6.0 0.24 B 11-31 48-72 B SUNCOOK 0-7 4.5-6.5 0.17 A NP 7-42 4.5-6.5 017 A. NP 42-60 4.5-6.5 0.10 A NP TALI ADEGA 0-9 4.5-55 028 C NP-111 0-9 4.5-5.5 0.32 C NP-10 9-22 4.5-5.5 028 C 8-15 22-26 C 26 C' 'See Tables 8.01 b, 8.01 c and Figure 8.01 d for definition of symbols. Appendices -------------------Textural Classification' --- USDA Unified ----------------- --- AASHTO GR-FSL, GR-SL, GR-L SM A-2, A-1-B F;SI., ST, SM, ML A-4, A-2-4 LFS SM A-2-4 FSL, SL, LS SM. ML, CL-NIL; A4..A-2-4 SM-SC SCL, L, CL SC, CL A-6 LS, LFS SM. Sp-SM A-2, A4 S, FS SP-SM, SM A-2, A-3 LS, S., FS SP-SM SM A-2, .A-3 S. FS SP-SM, SM A-2, A-3 IFS, L-S; FS SM, SP-SM A-2. A-3 LFS, FS, S SM. SP-SM A-2, A-3 FS.. 5 SM. Sp-SM A-2..A3 FS, LFS, S SM. SP-SM A-2 FS, S SM, Sp-SM A-2, A-3 SL, SCL SM- SM-SC A-2, A-4 Cl., SCL CL A-6, A-7 LS SM A-2 FSL, SL, SCL SM, SM-SC, CL A-2, A-4, A-6 SC, CL.. C CL, CH A-7 SL, SCL, CL SC, CL A-6. A-7, A-4 UWB LS, LFS. FS SM A-2 SL, FSL SM A-2, A4 SL•, FSL SM A-2, A-4 SL, LS, LFS SM, SP-SM, A-2, A-4 SM-SC SL; FSL SM. SM-SC A-4. A-2 L ML, CL-ML, CL A-4, A-6 SIL, SICL. Sft ML, CL-ML, CL A-4, A-6, A-7 CL, SCL, SICL ML, CL-ML, CL A-4, A-6, A-7 GR-ST., SCL, CL SM, SM-SC, SC A-2; A-4.. A-6 FSL, SL SM, ML CL-ML., A-2, A-4 SM-SC SIT,, L CL M. SC; ML, A-4, A-6 LS, LFS SM: SM-SC A-2. A-1 I, CL. SCL CL. SC A-4, .A-6 SR-S-FSL SM, SM-SC, A-1, A-2, A-3, SP-SM AA L., STT.:, C L SM-SC , CL. ML, A-4, A-6 CL-ML CL, SICL, L CL A-6, A-7-6 C, CL, SIC CL, CH. MH A-6, A-7 CL, SICL, L CL. MH, ML A-6, A-7 WB LFS, LS, SL SM A-2 SR-I.FS-C'OS SP sm A-2..A-3 SR-LFS-GR-COS SP, SM A-1_ A-2, A-3 CN-SIL, CN-1- Sm— SC, SM-SC, AA- A-1 A-1 Gm SIL, L SM, SC, ML, A-4 SM-SC. C's-CL; CN-SIL, CN-SIC I, (M: 0C, SC. SM A-4. A-6, A-2 Vat WB 8.01.29 co m a k � Q W G •' pF S � '. W mCC N L L E a •3 L W m J a ¢ T a a o E O 08.5 L y y� N G O %e �+ O C 6 m O rL W L O W C W Q f ldLd d Q L u c o 2 0 . a O m Z O Y4.o N W r N j _ 3 O � {Wa. O 'm W c W Q W U LL f! r: C Z Z Td oz.c DR _t.L L �•e�i S. W " d W W d W -3 ��� � a dd 'S a m LL aia w Wa p �a LL (a W U. O V JJ� NNC� 4 7¢ J� + aC LLL V JN W O xLL N O U- W` cu J N E c W E n m u Q to W v z o a0 m c E W E C7 W G O y G W TB W I a c'S Ln c m Q O W w=. W d R. C to U 'p ja y C G C ZE o a d d R N a O a e W w y E L.. 9 C O Q a w W a« L G O ,FO N a d a W d O O li0OW1I C a O C adl i Y j O W W '� m W d W W cdi W p a W T W LL W T W aL+ w W N LL d Sc w api d d Q a W d N r�•i 15=9 y� a w Vic¢ dr c E d Sao• EGE D T E W O aEac Gp E C O = V Y C V C w y m 0 G W a G W W G Q W W ay C d a aL. O. W d u�7 CaLL a r yOy o— j- N W N o vsW { E E U y o O —y c G W ~ O N H m W O) R 4. la d La aW. a yD a ,� d d d �' .W. W r N a 01 `a cn N D a N w y O O. H J2 y aS W a W �i adi a w$ d N ° ��a m E sa « p W ya E a�i' w 9 Nos ¢a0 NN �a c W c eEcvW pdo2a Q W Q ,GGE U pWp pWp S U m 3 C7 a S a Z Z, cF. Oa� $p oeW o m"wwc E.01 r- a`uay = po I aO CM C .j w 3 ai E c gN 9 c-W o `o waE _ W N ¢ w a ac W E E m G v=a Wa m W a mLL n a C. . E= W 7 W W paE'.9 °o w saa�GZ� Ea a N- W S Wc~i = a 2 aa a d a W O L d N *0 a ¢ W mod' � - E'Wm� N and {�i dr Cr= O C Eaci'Oa�Ts c � ELO2 E 0�a C � Q g r'v�W ��'e3�'aa �mdLLEd r r V D 2/12/2020 Precipitation Frequency Data Server 9eNOAA Atlas 14, Volume 2, Version 3 Location name: Wilmington, North Carolina, USA* Latitude: 34.2669", Longitude:-77.9209* Elevation: 24.99 ft** �� "source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, FA.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 , Duration Average recurrence Interval (years) F7k7F 100 T 200 500 0000 0.521 (0.488-0.560)1(0.578-0.664)1(0.677-0.776) 0.618 0.724 0.808 (0.751-0.866)1(0.846-0.976)1(0.914-1.06) 0.913 0.991 1.07 (0.984-1.15) 1.15 1.05-1.24) 1.26 1.13-1.35) 1.34 (120-1.44) I�5-min 0.833 0.989 1.16 1.29 1.45 1.58 1.71 1.83 1.99 2.11 10-mtn 0.780-0.895) (0.925-1.06) 1 (1.08-1.24) 1.20-1.39) 1 (1.35-1.56) (1.46-1.69) (1.56-1.82) l(1.67-1.96) (1.79-2.14) (1.89-2.27 104 1.24 1.47 1.63 1.84 2.00 2.15 2.31 2.50 2.65 15-min (0.975-1.12) 1.16-1.34 (1.37-1.57) (1.52-1.75) 1.71-1.97 (1.84-2.14) (1.98-2.31) (2.10-2A7)1(2.26-2.69) 2.37-2.85) 30-min 1 344353) 1.61 1?84) (1. 5 2924 2.2 2754) 2.53 2392) 2.78-3 22) 3.03 3053 (3.27 3985) (3. 9-4 28) (3.84 4962 1.78 2.15 2.67 3.08 3.64 4.08 4.55 5.04 5.71 6.27 60-min (1.67-1.91) 2.02-2.31) 1 (2.50-2.87) 1 (2.87-3.31) 3.37-3.89) (3.764.37) (4.17-4.87) (4.59-5.40)1(5.15-6.14) (5.61-6.74) 2.10 (1.94-2.30) 2.56 (2.36-2.79) 3.27 (3.01-3.56) 3.86 ](3.55-4.21) 4.73 (4.33-5.14) 5.48 (4.99-5.95 6.30 (5.70-6.84) 7.2D (6.47-7.80) 8.54 9.69 8.55-10.6) IED2-hr 2.25 2.73 3.50 4.77 5.18 6.0B 7.05 8.15 (7.59-9.27) 9.84 11.3 i 3-hr (2.08 2.46 2.53-2.98) (3.24-3.81) (3.83-4.54 4.73-5.61) (5.51-6.58) (6.36-7.64) 7.29-8.81) (8.69-10.6) (9.88-12.3) 6-hr 2 59 3.04 3. 4 3869 4.014.73) 4.785863) (5. 0 B 98) 1(6.89-8.19) (7.99 9.55) (9.16-11.1) 3.4)1(12.5 5.6) 3.26 3.96 5.11 6.14 7.69 7 F 9.09 10.7 12.5 (11.0- 15.3 17.7 12-hr (3.00-3.58 3.644.33) 1 (4.70-5.59) (5.61-6.69) 1 (6.97-8.37) 1 (8.20-9.87) 9.55-11.6 11.0-13.5) (13.3-16.6) , 15.3-192 3 83 4.64 6.07 7.21 9.06 10.7 12.6 14.7 18.0 21.0 24-hr (3.494.27) (4.23-5.19 5.47-6.70) (6.54-8.03) 1 (8.13-10.1) 1(9.53-11.9) (11.1-14.0) (12.8-16.4)1(15.3-20.2) (17.5-23.5) 4.53 5.47 7.0-2 8.36 10.4 12.2 14.2 16.6 20.1 23.1 2-day 4.145.01) (5.01-6.06) 6.41-7.78) 7.61-9.26) (9.39-11.5) (10.9-13.6) (12.6-15.9 14.4-18.5) (17.1-22.6 (19.4-26.2 3-day 4.83 (4.42-5.34) 5.83 5.34-6.45 7.42 (6.78-8.22) 8.80 (8.01-9.74) 10.9 9.81-12.1 12.7 (11.3-14.1) 14.7 1(13.0-16.4) 17.0 20A 17.5-23.0) 23.4 19.7-26.5 i 5.13 6.18 7.83 9 24 11.3 13.2 15.2 (14.8-19.0 17.4 20.8 23.7 4�18 (4.70-5.67) (5.67-6.83) (7.15-8.65) (8.41-10.2) 1 (10.2-12.6) (11.8-14.6) [(13.5-16.9) (15.2-19.4) (17.9-23.3) (20,1-26.8) 7-da 5.91 7.11 8.94 10.5 12.7 14.6 16.6 18.9 22.1 24.9 (5.46-6.44) 8.26-9.76) (9.64-11.4) 1 (11.6-13.9) (13.3-15.9) (15.0-18.2) (16.8-20.7)1(19.4-24.5)1(21.5-27.7) � 6.67 7.98 9.89 11.5 13.8 15.7 17.8 20.1 23.4 26.1 10-day (6.18-7.24) 7.40 8.67 9.14-10.8) (10.6-12.5) 1 (12.7-15.0) 14.4-17.2) (16.1-19.5) (18.0-22.0) (20.7-25.8)[(22.B-29.0) 120-day 8.84 10.6 13.0 14.9 17.6 19.9 22.3 24.8 28.4 31.4 (8.33-9.62) (9.93-11.5) (12.1-14.0) 1 (13.8-16.0) 1 (16.3-19.0 (18.3-21.5) (20.3-24.1) 1(22.4-27.0) (25.4-31.1) (27.6-34.6 11.0 13.0 15.6 17.8 20.7 23.1 25.5 28.0 31.5 34.2 30-day (10.3-11.7) (12.3-13.9) (14.7-16.7) 1 (16.7-18.9) 1 (19.3-22.1) 1(21.4-24.6) (23.6-27.3) (25.7-30.1) 2B.5-34.1) (30.7-37.2) 13.7 16.2 19.2 21.6 25.D , 27.6 30.4 33.2 37.0 40.D a5-day 12.9-14.6) 1 (15.3-17.2) 18.1-20.4) 20.4-22.9) (23.5-26.5) JI (25.8-29.4) (28.2-32.3) 1(30.6-35.4) (33.7-39.7)1(36.2-43.2 60-day 16.5 19.4 22.7 25.3 28.8 31.5 34.3 37.0 40.6 43.3 (15.6-17.4) 18.3-20.5) (21.4-24.0) (23.8-26.8) 27.1-30.5 (29.5-33.5) (31.9-36.4 3437.3-43.5) (39.6-46.7) (.3-39.4 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Bads to Top PF graphical hftps://hdac.nws.noaa.gov/hdsctpfds/pfds_printpage.html?lat=34.2669&Ion=-77.9209&data=depth&units=englisi,&series=pds 1/4 2/12/2020 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Wilmington, North Carolina, USA* -� Latitude: 34.26691, Longitude:-77.9209* Elevation: 24.99 ft** source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF caphical j dos & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 10 25 501 100 200 500 1000 6.25 7.42 8.69 9.70 11.0 11.9 12.9 13.8 15.1 5-mtn (5.86-6.72) (6.94-7.97) (8.12-9.31) (9.01-10.4) (10.2-11.7) 1 (11.0-12.7) (11.8-13.8) 1 (12.6-14.8) L13.6-16.2) 16.1 (14.4-17.3) 5.00 5.93 6.96 7.75 8.72 9.47 10.2 11.0 11.9 10-mtn 12.7 4.68-5.37) (5.55-6.37) (6.50-7.46) 7.21-8.31) (8.09-9.33) (8.74-10.1) (9.38-10.9) (9.99-11.8) 1 (10.8-12.8) 11.3-13.6) 416 4.97 5.87 6.54 7.37 8.00 8.62 9.22 10.0 15-min (3.90-4.48) 4.65-5.34 (5.48-6.29) 1 (6.08-7.01) (6.83-7.88 7.37-8.56) (7.91-9.22) (8.40-9.88) [(9.03-10.8) 10.6 (9.48-11.4) 30-min 2 678507) 3.21 3369) 3. 0-447 4.41 5408) (5.06 5684) (5.55-6.45) 6. 5-67006 (6.547 .69) (7. 8 8656 7.68 9924) 1.78 2.15 2.67 3.08 3.64 4.08 4.55 5.04 5.71 60anin 6.27 (1.67-1.91) (2.02-2.31) (2.50-2.87) 2.87-3.31) 3.37-3.89 (3.76-4.37) (4.17-4.87) 4.59-5.40 (5.15-6.14) (5.61-6.74 1.05 1.28 1.63 1.93 2.36 2.74 3.15 3.60 F 2-hr 4.27 4.84 (0.972-1.15) (1.18-1.39) (1.51 1.78) (1.78-2.10) (2.16-2.57) (2.49-2.98) (2.85-3.42) (3.23-3.90) (3.79-4.63) (4.27-5.28) 0.750 0.909 1.17 1.39 1.72 2.02 2.35 2.71 3-hr 3.28 3.77 (0.694-0.818)1(0.841-0.992) (1.08-1.27) 1 (1.28-1.51) 1 (1.58-1.87) 1 (1.83-2.19) 1 (2.12-2.54) 2.43-2.93) (2.90-3.54) 1 (3.29-4.08 6-hr 0.466 (0.432-0.508)1(0.524 0.565 0.617)1(0.671-0.790) 0.725 0.865 (0.798-0.941) 1.08 0.986-1.17) 1.26 1.15-1.37 1.48 (1.33-1.59) 1.79 1.53-1.85) Y.08 1.83-2.25) 2.40 0 271 0.329 1 F 0.424 0.509 0.638 0.754 0.885 1.03 1.27 1 (2.09-2.60) 1.47 12-hr (0.249-0.297)1(0.302-0.359) (0.390-0.464) (0.466-0.555)1(0.579-0.695) 0.680-0.819) (0.793-0.961)1(0.916-1.12) 1 (1.11-1.38) 1.27-1.60 24-hr 0160 0.194 0.250 0.300 0.378 0.446 0.525 0.614 0.751 0.873 (0.145-0.178)1(0.176-0.216) (0.228-0.279) (0.273-0.335) (0_339-0.419)1(0.397-0.495) (0.461-0.582) (0.532-0.682)1(0.638-0.840) (0.729-0.981) 0 2-da 0.094 0.086-0.104) 0.114 (0.104-0.126) 0.146 0.134-0.162) 0.174 0.159-0.193) 0.217 (0.196-0.240) 0.254 (0.228-0.283) 0.297 (0.262-0.331) 0.345 1(0.300-0.386) 0.418 (0.356-0.470) 0.482 1(0.404-0.545) 0 3-day 0.067 0.081 0.103 0.122 0.151 0.176 0.204 0.236 0.2&4 0.325 (0.061-0.074) 0.074-0.090) (0.094-0.114) (0.111-0.135) 0.136-0.167 0.158-0_196 (0.181-0.227) (0.206-0.263 0.243-0.319) (0.274-0.368 0.053 0.064 0.082 0.096 0.118 0.137 0.158 0.181 0.216 0.247 4-da (0.049-0.059) 0.035 (0.059-0.071) 0.042 (0.074-0.090 0.053 (0.088-0.106) 0.062 (0.107-0.131) 0.076 (0.123-0.152) 0.087 0.140-0.176) 0.099 (0.159-0.202) 0.112 (0.186-0.243)1(0.209-0.279) 0.132 0.148 7-da (0.033-0.038)1(0.039-0.046) (0.049-0.058) (0.057-0.068)1(0.069-0.083) (0.079-0.095) (0.089-0.108) (0.100-0.123) (0.116-0.146) (0.128-0.165 0.028 0.033 0.041 0.048 0.058 0.066 0.074 0.084 0.098 0.109 10-da y (0.026-0.030) 0.031-0.036 0.038-0.045) (0.044-0.052) 0.053-0.063) (0.060-0.071 (0.067-0.081) (0.075-0.092) 0.086-0.108) (0.095-0.121) 0.019 0.022 0-27 0.031 0.037 0.041 0.046 7 F-O-.O52 0.059 0.065 20-da y (0.017-0.020) 1(0.021-0.024) (0.025-0.029) (0.029-0.033) 1(0.034-0.040) (0.038-0.045) (0.042-0.050) J(0.047-0.056) 0.053-0.065) (0.058-0.072 0.015 0.018 0.022 0.025 0.029 0.032 0.035 0.039 0.044 0.047 30-da y (0.014-0.016) (0.017-0.019) 1(0.020-0.023) (0.023-0.026) (0.027-0.031) 1(0.030-0.034) (0.033-0.038) 0.036-0.042 0.040-0.047) (0.043-0.052) 0.013 0.015 0.D18 0.020 7 F 0.023 0.026 0.028 0.031 0.034 -37 45-da y 0.012-0.013) (0.014-0.016) (0.017-0.019) 0.019-0.021) (0.022-0.025) (0.024-0.027) (0.026-0.030) 1(0.028-0.033) (0.031-0.037) 0.033-0.040) 0.011 0.013 0.016 0.018 0.020 0.022 0.024 0.026 0.028 0.030 60-day (0.011-0.012) 0.013-0.014) (0.015-0.017) (0.017-0.019) 0.019-0.021 0.021-0.023) (0.022-0.025) ( 0.024-0.027 (0.026-0.030) (0.027-0.032 t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probabie maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical hftps://hdsc.nws.noaa.gov/hdsclpfds/pfds_printpage.html?lat=34.2669&Ion=-77.9209&data=intensity&units=english&series-pds 1 /4 PIEDMONT ENVIRONMENTAL ASS 0 C I ATE S o P A 7/31/2020 Project # 1775 Timmons Group 5410 Trinity Rd., Suite 102 Raleigh, NC 27607 This report details the findings of a seasonally high-water table evaluation for the Wilmington Airport site in New Hanover County, NC. Your office gave the location of the proposed storm water control measures (SCM) and requested boring locations. G. Christopher Murray, Licensed Soil Scientist #1284, conducted the evaluation on July 27th, 2020. The results were as follows: Seasonally High -Water Table Soil Borings Soil boring were completed within the proposed stormwater control measure at the locations shown on the attached map. The depth to the seasonally high-water table (SHWT) was determined by observing soil indicators, also known as redoximorphic features. Boring 1: Signs of a seasonally high-water table were observed from 8 inches to 120 inches. The existing grade at this location was 19.5 ft +/-. Boring 2: Signs of a seasonally high-water table were observed from 10 inches to 120 inches. The existing grade at this location was 20.5 ft +/-. Boring ED SHWT Depth inches SHWT Elevation feet 1 8-120 18.8 +/- 2 10-120 19.6 +/- 216 S. Swing Rd., Suite 1 Greensboro, NC 27409 336-662-5487 Piedmont Environmental Associates, PA is pleased to perform this work for you. If you have any questions, please feel free to call (336) 662-5487. Sincerely, G. Christopher Murray N.C. Licensed Soil Scientist #1284 L Timmons Group - Wilmington Airport Project (TG 37630.054) PIEDMONT Job#:1775 E i!+l V i R O N i -i E I I A L 216 S. Swing Rd. Suite 1 Date: 7/31 /20 A s s o z; A- F VO s. a. A. Greensboro, NC 27409 Client: Timmons Group piedmontsoil.com County: New Hanover —` W, SOIL° ty ow ' OpHe# r _ Legend Boring Locations mod' ""�'■""'� '!" - - r-' �''� - ;�'� lk L w. inch = 200 feet a ML 6. ,f r � Tad; ." T. NOTE: DRAINAGE AREA MAP BASED ON: • SURVEY PROVIDED BY PARAMOUNT ENGINEERING, INC DATED 11/20/19 • NEW HANOVER COUNTY GIS AND NCONEMAP AERIAL DATED 02/13/2019. SOIL TYPES: SYMBOL RATING UNIT NAME JO D JOHNSTON SOILS Le BID LEON SAND Pn BID PANTEGO LOAM Se AID SEAGATE FINE SAND LEGEND 04 HYDRAULIC ANALYSIS POINT M DRAINAGE AREA LIMITS TC FLOW PATH SOIL TYPE BOUNDARIES <MD EXISTING IMPERVIOUS <; fir .,� ; ; E;� �, ;� ,; � EXISTING WOODS SCALE 1 "=100' 0 100' 200f �01oi 1 CARO' / tss SEAL 225 tN- !/<<it1111111�� }} z v F- 0 H � z U z I'D o NE O WO U U ''-' z �=: a! H >O ce _ w z z w d �� z � z Lu U ne Q u Q m _ Z = �Oo 6-4 O w �~mow a= '-' CO }-- z u- ac z z 6 a+ 0 U Lu � t� z W o, c� z w a. F- z _SJ NX W a d Z0 Q F- 1-. U Q 0 0 O O z Oz a u, z H Q LL z M m a U t0 0-4,� f— 00 > Q > C� tL O, p iu =a. w W U W v-10 LL O' U Ln M U z Lu z w O © ce a U)za z WWz vi O G= °- 0 V) z(n 0 > O > F oC D > 0 w F- Q ,-i ,-i r-i r-4 ,-4 W N N N N N 0 0 0 0 0 > W N N N N N I-- = Q V-+ *-4 d- 00 cD u O+-�00N N N M M M z 0 0 0 0 0 DATE 0910212020 0 } DRAWN BY A. MAY DESIGNED BY 0 B. DOWNS I CHECKED BY R. BAKER SCALE AS SHOWN z o c z Q4) O Q�ca N(D C) 0 I z2- O ° 0� Lu H < OC 0- ( j V = Q O • J w 0 cez z O i c cc (f) z p z C m w 0 u ��'' U oC j —.J 0 0 w Q © o L 3 z_ z Q v = W o0 0 oC0 z a (D o o2 O z j _ o uw E c ° oC < z UJ a o O '� 0 c m 3: W z ML. CL ce OL. Z�x C a) o °O �3 n. � cv c � Y L cc N O - U .� m c C U O O C O U -0 6 a 2 .0 m JOB NO. ° o 37630. 054 cc c co ° SHEET NO. a o a0 DA1.O 'D� L_ c E E �e. .ram Hq 14K I Wk 19- 200�1 ---------------- PREVIOUSLY PERMITTED PLAN REVISION (LOT #9 & ROADWAY) 7/16/15 BASIN INFORMATION PHASE I & 11 PHASE Ill RECEIVING STREAM NAME SMITH CREEK SMITH CREEK STREAM CLASS & INDEX NO. C, Sw 18-74-63. C, Sw 18-74-63 DRAINAGE AREA (SF) 12,529,107 1,511,968 ON -SITE DRAINAGE AREA (SF) 12,529,107 1,511,968 OFF -SITE DRAINAGE (SF) 0 0 PROPOSED IMPERVIOUS * AREA (SF) 8,520,835 1,230,351 % IMPERVIOUS * AREA (TOTAL) 68.00% 81.40% IMPERVIOUS* SURFACE AREA N/A ON -SITE BUILDINGS (SF) 10,377 N/A ON -SITE STREETS (SF) 52,520 N/A ON -SITE PARKING (SF) 51,985 N/A ON -SITE SIDEWALKS (SF) 14,200 N/A OTHER ON -SITE (SF) 0 N/A FUTURE DEVELOPMENT (SF) 3,012,132 899,275 OFF -SITE (SF) N/A 331,076 EXISTING BUA *** (SF) 5,379,621 N/A TOTAL (SF) 8,520,835 1,230,351 PLAN REVISION BASIN INFORMATION PHASE I & 11 PHASE IIIA PHASE IIIB PHASE IIIC (REMAINING) RECEIVING STREAM NAME SMITH CREEK SMITH CREEK SMITH CREEK SMITH CREEK STREAM CLASS & INDEX NO. C, Sw 18-74-63 C, Sw 18-74-63 C, Sw 18-74-63 C, Sw 18-74-63 DRAINAGE AREA (SF) 12,529,107 213,213 756,099 542,656 ON -SITE DRAINAGE AREA (SF) 12,529,107 213,213 756,099 542,656 OFF -SITE DRAINAGE (SF) 0 0 0 0 PROPOSED IMPERVIOUS * AREA (SF) 8,520,835 116,598 367,596 299,030 % IMPERVIOUS * AREA (TOTAL) 68.00% 54.70% 48.60% 55.10% IMPERVIOUS * SURFACE AREA ON -SITE BUILDINGS (SF) 10,377 5,333 0 N/A ON -SITE STREETS (SF) 52,520 13,746 103,565 N/A ON -SITE PARKING (SF) 51,985 44,451 0 N/A ON -SITE SIDEWALKS (SF) 14,200 4,228 0 N/A OTHER ON -SITE (SF) 0 52 0 299,030 FUTURE DEVELOPMENT (SF) 3,012,132 48,788 264,031 NIA OFF -SITE (SF) N/A N/A N/A N/A EXISTING BUA *** (SF) 5,379,621 N/A N/A N/A TOTAL (SF) 8,520,835 1 116,598 367,596 299,030 pi -23 rA < 23, X N 1,k� 1,s6 N IN % N A —7= Z7- A VA, nT 3- - z? 21- -20 JX _01 15 1,19 PRELIMINARY - NOT RELEASED FOR CONSTRUCTION1' ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, CAPE FEAR PUBLIC UTILITY AUTHORITY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS CO co z SCALE 111=100' 0 100, 2001 CARo�ll osio SEAL 225 IZ -Zl- w B millitO wu/:.:I r E z 0 u r 0 C) C= z u z 0 E 0 w UJ =) 0 r4 > Lu u z F- 0 w 1 C_ w > 0 z Lu 2:3: z < w > 0 .0 w a Lu 'E Lu U z 2: 0m 3: wIL z T zzU. u uj 0 m cn 0 w 2: w a- ()o z a U Lu z z a z tu CA x U Z < W Lu 0. Z W�0.za o 0 U) z t-4 a u z < =) 12" U)>1 Ln oN z 0 a U 0 " -i 1­4 =) , < 0LL- 144: " Z (j) co =) U to F- k0 U) 1­4 > < b-4 > W CL LL Cy C) oq ,-I ON w =) CL w w w 0- u w a q;r 1-4 Ln 011 U- u U) Z cy W U Z _j LLj ce o 0 w w b-4 u UJ 0- (n *_4 Z 0- > z o W w W cl- Z o6-4 vi ce- M 1-4 ul) (f) z (4 0 > 0 > LLJ ceLu D > 0 F_ a LLJ N 04 04 N N > w wN 00000 NN NN Ill Co to u < a C) N r-1 1_� C:>, I-- C) 1_� N 04 m m m1-1 z C) C) 00 C) 0 DATE D 0910212020 0 DRAWN BY A. MAY DESIGNED BY B. DOWNS CHECKED BY fill R. BAKER SCALE AS SHOWN V z I z O r m Z N 0 C) 'o z U u a cl. 0 0 gZ z LLJ z U) Z z v > 0 < P-4 .J J Wco z Z P-4 1.4 < i r LLJ C)� OZa < u CL r o Q z 0 Z P..4 _j z Lij .j U QC P-4 U JOB NO. 37630.054 SHEET NO. DA3.0 0 0 tlS rL c co :3 4) m 0 c to 0) V o. 4) 0 c L 0 0 a 0 0 N 0 N N CM a 0 0- 3 S z5 �aa „ 410 �a t ..i TC SEGMENT #1 SHEET FLOW 4 f 50 LF @ 0.50% rd i g t'y 2 4 Ep e f A ``' ....... it t �53�✓ � � n.. � 5_ TC SEGMENT #2 r - - - - - _ - DITCH FLOW 708 LF @ 0.90% L > i T ® o a -sp f L i _24 f i N VF .,,t ,� is , / DA 2.3A (TO PHASE 111B DRY POND FUTURE BUILDOUT IMPERV. (A) = 33,627 SF = 0.77 AC FUTURE BUILDOUT IMPERV. (B) = 112,570 SF = 2.58 AC » x FUTURE BUILDOUT LAWN A = 78,438 SF = 1.80 AC FUTURE BUILDOUT LAWN (B) = 115,225 SF = 2.65 AC 339,860 SF = 7.80 AC TOTAL >.000 _. doom 00, 0000 .... ... .... . -Iwo _ _.............. ..... ... .... ._ ........ .... .._ .. .... ... .... . .`` w `x' /•,. ✓ "�` „w ,,," �� „��pd•„�,.r•, .��..>.r .. , -a - .,,, ,w,,, -_.„ ,.,.,.,>,,,. •,.M„«„A,. -� � w.„,. w,.._ „n•,_ ...,.,. -,..„. BYPASS AREA k 9 �: -- _ u s3�3 /� ffi L ?,!i ;4 a „�� �i� _. „ . _ ,.r" ,.w• r"ii .,.,.,, ,,..a,s/'^ '�/'°'• .,. f�*�?i>Gk ai '47 `"• „"' yff l41:.:.1t3.,. '.�"' -.'„'- ... „,,... - ,,.,. „„„ .,...,, .,,..„ ...,.. „n. .„,,.. ,,.,„. ,n.,._ .,..,n ✓ / s t? s as ,`. .`/` .v^• .d' .»„° Nr^","^„."/�N/" s� , ..„.„ . ,� ........ ....... ,,,„n „,.„. ...„. ,.,.., ,,.�., .,,... ._.... ... .. .. .w t..�r.. .. ..... .„ .i; �..... /,, .... ..... _....y ... / s .._ ........ _ ...._......... _ -..... _ _ „. - kv ................ _ \ . a i i J'" d. ,.✓" „.,.,,. .,'w',,,�,,,, ...` w `a' _.... .-_ „'°^,� y s .n ........ __ ... ..;,,_"n,,.._.rv..... ,n ...,.. ,,.. .,.,.,., ..„, ..M..,. .,w,. ..,, C/� i "'".• ,„w. � .,."' °>°'" z>�"._�;..✓... w,,,4 _. ... .,, _ .„,w.. �a.3 � p . .d"«, .. ..., ...ten w, . ,.....n "'^^ ..,.._ .-n..,. ...,.,, ,,. ....., .,w,,. /„ .aca'>ss>`.. ......... ./+' ... ,.,-.,,,N.�m"u„�,,,,,...ii✓r..,.::c• !v.8:,:i . .�.,. cn>r.�; �, """',•" '"" "/ "' ,.,... '�� '.`.- ..... ..�,,.- } `a t 'i � ., ... ,a'�^.'._ �. -.. „..,n. .... _ _. _.,,,, - ..,, "..'• „,,,.. ,.,„,. ,,.,,. fin,. ,m...n.,,» z TC SEGMENT #2 ,"" ... � �.. _..... ... _.._...... �.„. _.... .�.:n . µ_ ` �„ ........_.......... � , �-' ✓'` ✓`" ,✓-•- q,6 JiK ,„.„....,' ._. .tea.-'e .....�.- m a SHALLOW CONCENTRATED FLOW / - -k''„ s. 4y, ' r �z i t� ' a ar , 24 LF -- -- - @ =ram � -�-- - /- t„' - _ r " » ft ` 5 "'a. �` \. ♦ `. a ✓d _ .st>,+� a�,.<��.�.-�' _ ,,,.�.......w„p„r,,.,. ,aucw,✓... .,w>n,.wa...... .a..s.;F...... eow'°e>w•' ....... ....... .,...,. "", "...n � «.�.,. ,F '>, ., , � N,^ . _ - .. � 'fr y '_`.: 'ac,"' `^ ^'tl.ewww aw»�" ae�new•' mw..wcm f W >.R,,,.�„ .w,.,. ..+,... '✓"'.....,.„, t, ^ d' - .r.e �>gyw.„y„ _ ++mea>m¢,am>aa N<> M'�"•r,. .,-,.„ ....,,, ..<.,. .w.... .,...,.. ...-.. ...„. £ .. `�' 'Y'.'/ -.«.n. �% ���,, , � TC SEGMENT #1 ,' � - . „,.,,. � w�. �' .. °,,° k,� �. .✓�. �.».... „„M ��. -� n �' �' _� SHEET FLOW w - n, _ . _ __ _ „ _ " _.■„� .,, . ,,:;�.� m 50 LF @ 0.26% i .... fa". ss », F i ,1;,( „,,,,. .�, �`'//C�sty, ky, f• .,&.a'. 'r' ;i a^g 951 %,`�i,�ti.. '„.y £0 r'>n............................................„,,.,„.....,.n-..,".�...,."'"...,„,.,,. sk".fii f ,. •,,,,..,..,.., , / L ,„.n,...,..,,. £.. ,,,... ..,..„ ..... ........... fey-1.,,„..,,„, x - / s, ,wr 5m %"%r i `'.kz� �,;7 ~'..,, "� n l° ,n,,,. `•;,,, ,„,...., k' %.r!'Zc ...,, 'si r" .>sc ,,...'"'•t 4 h .� •��, �,� °�� TC SEGMENT #3 a �.s�....,..� . ._._„ .,_ ;,,� „.��.-�Y �.....�..... _�..,..�. -,K' �.._.._.�„µ, „ f f DITCH FLOW / .„ f_ „ .._. �, ..„ _ ................� < _._ ......._ ...... �t k ' £' et ' `v .. �.a.,m..„..,...... _„_..,..,,.,,,.. _.,.'"". „.,,,,,,,,,,,,,„.. /" 3,"f ,„.,,, w„<,,,... r x"~-" µ„.,,,,,..,...,. .w.,.m,„,...n, i` ,i f"a Y'._.............. ....... ....... ...__........ f ...........:s' t w` O Q k � ° �, ,.�„ „� � „„„„n,„„.,,. �-�` ,.,, ,n., f °,�v�s .„.,..,. „�.,,.,,,._..� .„„��. � �•�' as �.-.�`-" ,�.�o,....�,_�.,V�„�,.„,,:.,�..�,,� �. `fir„' t,�> „ �^� ��,�� �""""':"_�'�,". .-. ._......... ...... _... ...�,.^.._ €,s�.� t �»:-��� x 490 LF @ 0 93 /o �� ` µ / d" k„,.. € ' _... _....._ _.... _......_ .._ '.�` ..........k r f 99 _ , 3 f v M � ,, } .. ....._ .._Z'_.... €f .. $ ......._._.../q�f�%i.......... ... �"......_.. .._... w,<,.. <.....w M 25' • ' ` 3 k, } .aa,t,`�'4xr� L� \ $. ,,.�'�• 'w., � 3 .. / �` .W,.. .d'. y.,y"••s i / i `*., x*, '^+w � ```` x'`>. ,/ '•e i " n,.,. ....„. L✓ xwr'. > -YVv r£�3 ,q �` `.,,. 't ``., .,.»,. ,w,,, .,.„<n ..'..' ✓,,,. ,� � �.n �„ •.� r}f�. A `a � � <� � � � o.P' ,,r �, ., '�,': "`" !' � / / yMy �" I�'�i�r•"� ��. �� j '�4 � ,��;�'� �"' � �.k w,,,. ✓", '� '•'� °""' '�` "tom '� a'k r3 ��`', � k� x ? „,a„r' •i . �,,.. ��'" ra'" ,,--.r; £ "� y,ww yf",., � � yy e 4, ` "*,.n ""• � ... ..,.. �k. 9y�/,g .�' ¢g / �./ ^w�a§\ *z `�,k �•� k© _ i!�:.' - 'l ,�,e'" i."ez g',°',.� S i '� Fri / f // L 6" 3 4 jx,,,`� //�^' 3• '`r;` w„» "�» .,✓^' .nd ¢,,, •`�' `'`' 'S x xka's*a\ °ia4ka�b�. `q'eX,4k @:w`��x \'* as �A„"'.iz'.�,/�• `�.,, i ('f� #»"LL..a3k �_ a,,,.,�,„",� w, 88 `"� �,! 'E '^w/'3Zi: �;° � @ i, / y/ ,{ /"�� F?' �,. `` w�.'^„»,``'�"w,�•w/ �j •� N ,,,,, ,;,�' .%.' ""' "''a, `k, `� �`# ,., i�'�.i /� a, / iy"'6�13/ ' �' >• ,y"�;�,'. � . !/y„a"" � / l ..,.,,,".:� ; I $ ^r«i.». 'c, �»w,... `'•• £ w � t ✓iiittc „gay �'r BUILDOUT TO PROPOSED ;^ BUILDOUT TO EXISTING 4z a p ,Nr f, DA 2.1(BYPASts)�k ,> H. an s 8' /� ar d aj /3 � � £, / �, DA 2.3B (TO PHASE {IIB DRY POND) , 4; j PHASE IIIB DRY POND •� �.� , �`� PHASE I/II DRY POND TC = 5 MIN�/d � #���„ � � '€d� rf � �y ,➢' � r, i w" S��S `� �•"�w' ,.,,, +nn "^'v»,,,, "''�w,.»'•^�.�.'" ' �f �' � ... � ,,,.. ✓ ,.,., IMPERV. (A) - 29 939 SF = 0.69 AC- 5 DA 2.2 (TO PHASE IIIA DRY POND) ,%E" i TC = 5 MIN =t 3 TC SEGMENT #3 _:.. IMPERV. (B)- 88 SF - 0.00 AC k , k5.a » » �.„ .... t DITCH FLOW OA �. . LAWN (A) - 58,711 SF - 1.35 AC\\�� ,y»0'� 1095 LF @ 0.73% " g ��. 3' \ ` '4 4 r/ .'0 z / °`r»•cy, V' S, h.y '', `. �"""">. a�b< "^.."'Mh `+\ F �j � € �i� � S �S �b ��iaS LAWN (B) = 105 SF = O.QO ACk 9 f'� 4 ya b� t,n££- ,` s, r°^w� 'C,,, fi3F �, tl _ `,>.'»'�`a, `*"•„ �rs ,.i' j € £ TOTAL - 88,843 SF 2.04 AC » _ ANALYSIS POINT A i` i _ } e f A� w DA 2.3B (TO PHASE 111B DRY POND �,..a�ry 84' OF 24" RCP a 0.47% SLOPE # »' „< 3. .,� INVERT IN:16.92' k � ``\. -V FUTURE BUILDOUT IMPERV. (B) 2217399 SF 5.08 AC = -' PROPOSED GRASS �� » i i•,t Z INVERT OUT:16.52' " » b t �` FUTURE BUILDOUT LAWN(A)9 701 SF - 0.22 AC" PRETREATMENT SWALE , = < � FUTURE BUILDOUT LAWN (B) - 1827650 SF - 4.20 AC `` fir, 'i ` .ek'' `�?' "'"'", .,.„.., ,.„,,. .,w.�»..ti .✓' / L M »a _ _ i $ FUTURE BUILDOUT LAWN D 2,489 SF 0.06 AC££ BUILDOUT TO PROPOSED BUILDOUT TO PROPOSED ( ) £; PHASE IIIA DRY POND PHASE IIIB DRY POND TOTAL - 416,239 SF - 9.56 AC �a»` PROPOSED GRASS �n t �� t PRETREATMENT SWALE ,a PROPOSED IIIA ' �1 .., DRY POND » t----#.. .F 55Il.I ti. t ' €� „�W DA 2.3C BYPASS1/ d F •`i"'yk ''�'.,'-wrr'. >S�'�°�,k'• Y i i 'i { 't i F as 3 dY R„ .,, FUTURE BUILDOUT LAWN (B) - 12,586 SF - 0.29 AC `F s� ,� M Y,.., i �"' a s;, i �, a � `^'. �• PO _'{_� _ ..... r�� �' „..,. » FUTURE BUILDOUT LAWN (D) 9,692 SF 0.22 AC ANALYSIS POINT B i ROp SOSO Ep PHASE �, ,5�, - _ 4 86° OF 24" RCP 0.46% SLOPE � x _- P µ » `°'} y w TOTAL - 2 78 S F - 0 51 .. Lal- a L ` a� T 2,2 AC DF INVERT IN: 13.97' / g ___} wh 'Nk.» ' w w " b i}X »»'» � / � � f �` % �, , � 5�2 a � ''42 c ;� tZ � ,�„ ��% ��p� Z;x.. ij€' .,••w"`" �$ ���'""''"'Fi s �4 " INVERT OUT: 13.57 r`Q "` \� » •`^e. � �'•t' � < � .. Sig �" ! "' �S� T k• �> �� ....t.., ,,,„.`�'rotY ....,.n .^'..... „� w,.'n .w..." .w.,. ,.,, .n,.... „M �n �AALYSIS POINT C if el �=w a , DA 2.4(BYPASS)�E_ � � � � � _�n � � DA 2.2(PHASE IIIA DRY POND)r _ _ „„ fs / IMPERV.(A)2 153 SF 0.05 AC { _ :4a,s IMPERV. (A) = 61,136 SF = 1.40AC / �\ IMPERV. B=3595SF=0.08AC IMPERV.(B)= 55 462 SF = 1.27 AC, - - -�► IMPERV. (D) - 1,545 SF - 0.04 AC g gg 201q 2x' ' 3 •" � a v e .�. �/ e^� g F { C f LAWN(A)56 967 SF 1.31 AC - - ;„ s .. a La LAWN (A) = 11,698 SF - 0.27 AC / z = A s }/ $ rn - - LAWN (B) - 36,932 SF 0.85 C 4e _ _ _ { LAWN(B)61,768 SF 1.42 AC _ 3 4a i LAWN D=2,716SF=0.06AC f k w D=7109SF-0.16AC ( )� x LAWN ( ) 4 _ µ TOTAL - 213,213 SF - 4.89 AC fE - " _ _ \ �i �, €,, PRELIMINARY NOT RELEASED FOR CONSTRUCTION i � TC SEGMENT �3 ,m TOTAL = 87,868 SF - 2.02 AC ». DITCH FLOW ,-,L-L. CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, CAPE FEAR 360 LF @ 2.35% E TC SEGMENT #2 TC SEGMENT #1 SHALLOW CONCENTRATED FLOW SHEET FLOW PUBLIC UTILITY AUTHORITY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS' AND DETAILS 240 LF @ 0.83% 50 LF @ 0.40% ® t f t 7a NOTE: 1. POST -DEVELOPMENT DRAINAGE AREA SHOWN IS CONSISTENT WITH SWB0505047 PHASE III OVERALL DRAINAGE MAP FOR ULTIMATE BUILDOUT. 2. DRAINAGE AREA MAP BASED ON: • SURVEY PROVIDED BY PARAMOUNT ENGINEERING, INC DATED 11/20/19. • NEW HANOVER COUNTY GIS AND NCONEMAP AERIAL DATED 02/13/2019. DA 2.2 (TO PHASE IIIA DRY POND) PROPOSED IMPERVIOUS WITH CIRCLE K PROJECT 69,896 SF = 1.60 AC (INCLUDES 0.05 AC IMPERVIOUS CONTINGENCY TOTAL PHASE IIIA IMPERVIOUS ALLOCATION = 116,598 SF = 2.67 AC PHASE IIIA FUTURE DEVELOPMENT IMPERVIOUS ALLOCATION REMAINING = 46,702 SF = 1.07 AC DA 2.3 (TO PHASE 111B DRY POND) EXISTING ROAD IMPERVIOUS = 95,932 SF = 2.20 AC 'PROPOSED IMPERVIOUS WITH CIRCLE K PROJECT ROAD = 7,633 SF = 0.18 AC �IEXISTING/PROPOSED ROADS IMPERVIOUS (SUBTOTAL = 103,565 SF = 2.38 AC TOTAL PHASE IIIB IMPERVIOUS ALLOCATION = 367,596 SF = 8.43 AC PHASE IIIB FUTURE DEVELOPMENT IMPERVIOUS ALLOCATION REMAINING = 264,031 SF = 6.05 AC ■ SOIL. TYPES: SYMBOL RATING UNIT NAME JO D JOHNSTON SOILS Le B/D L ON E SAND Pn B/D PANTEGO LOAM Se A/D ISEAGATE FINE SAND LEGEND HYDRAULIC ANALYSIS POINT M DRAINAGE AREA LIMITS SOIL TYPE BOUNDARIES <MD KNOWN IMPERVIOUS co 00 a Z SCALE 119=100' 0 100' 200' CARON/ .�•�`���o� t5 s/off SEAL 225 r ` ` GINEE� ���• C> o� coo o U N E O W O w E U U z � � 0C F- O 0� W Z Z w ~ 3.1 O ZmO oW Q x�Q GC M rl = 0 wU. = wpco z aM 0 w a ��pw s �-' co F- z�� Q z C7N+� p U w in Zug �O z �at-z J(X U Q t1!(j0Q L w z o ®a � o �oz= .L koko ` ORW w w U w 4- � oG a O, V 'r'°j U zwz w w OVw ~ a UZa z w w z O OC U) O O `w O `j C7 � M Wi w 0 0 0 0 0 > wui N N N N N O IT-4 O O IN < N N M M M zz 00000 U) DATE 0910212020 DRAWN BY A. MAY DESIGNED BY B. DOWNS CHECKED BY i R. BAKER • SCALE • AS SHOWN ® 'Ln l� ■ u 0 c z o Q0 (� O N z m Ln _j Q 0 z O W O V Q V O E--� z m z aC o � 0 w z V I� zpzQ� W p U V Q J oc o Juj ca > �_ o �r� O t \1` z z QW J = -0o O o0 w CL m u) � 0 m .� U J }. 2 02 = DC o W E° H > r_ W (aN n. o o o o� �m z z� g X z O 4) o CL oJZ 0 m o ° •3 N G � Y 0.0 0 w J4) U mN m_ c O m, N EC 0 6 "a ; m0 JOB NO. 'o c O 37630.054 L cc W w o SHEET NO. � o a ... DA2.0 PEAK FLOW ANALYSIS Circle K - NTI Airport Blvd Wimington Stormwater Summary Table 8-Mar-21 Pre-Dev Table of Subareas, Land Uses, & Curve Numbers Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Pre-DA 1.1 50 4.53 Impervious (A) 98 0.68 Impervious (B) 98 0.02 Woods (B) 55 0.01 Lawn (A) 39 3.47 Lawn (B) 61 0.35 Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Pre-DA 1.2 50 4.62 Woods (A) 30 0.68 Woods (B) 55 3.20 Woods (D) 70 0.14 Lawn (A) 39 0.47 Lawn (B) 61 0.10 Lawn (D) 74 0.03 Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Pre-DA 1.3 61 15.47 Impervious (A) 98 0.35 Impervious (B) 98 1.49 Woods (B) 55 5.71 Woods (D) 70 0.26 Lawn (A) 39 1.74 Lawn (B) 61 5.92 Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Pre-DA 1.4 60 1.85 Impervious (B) 98 0.08 Woods (A) 30 0.02 Woods (B) 55 0.06 Lawn (A) 39 0.24 Lawn (B) 61 1.36 Lawn D 74 0.09 Circle K - NTI Airport Blvd Wimington Stormwater Summary Table 8-Mar-21 Post- Dev Table of Subareas, Land Uses, & Curve Numbers Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Post-DA 2.2 (Phase IIIA) 76 4.89 Impervious (A) 98 1.40 PERCENT IMPERV. 54.7°% Impervious (B) 98 1.27 Lawn (A) 39 1.31 Lawn (B) 61 0.85 Lawn (D) 74 0.06 Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Post-DA 2.3A (Phase IIIB) 72 7.80 Future Impervious (A) 98 0.77 PERCENT IMPERV. 43.0% Future Impervious (B) 98 2.58 Future Lawn (A) 39 1.80 Future Lawn (B) 61 2.65 Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Post-DA 2.313 (Phase IIIB) 80 9.56 Future Impervious (B) 98 5.08 PERCENT IMPERV. 53.2% Future Lawn (A) 39 0.22 Future Lawn (B) 61 4.19 Future Lawn (D) 74 0.06 Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Post-DA 2.3C (Phase IIIB) 67 0.51 Future Lawn (B) 61 0.29 PERCENT IMPERV. 0.0°% Future Lawn (D) 74 0.22 Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Post-DA 2.1 59 2.04 Impervious (A) 98 0.69 Impervious (B) 98 0.00 Lawn (A) 39 1.35 lawn (B) 61 0.06 Subarea: Composite CN: Total Area (ac) Land Use: CN: Area (ac) Post-DA 2.4 62 2.02 Impervious (A) 98 0.05 Impervious (B) 98 0.08 Impervious (D) 98 0.04 Lawn (A) 39 0.27 Lawn (B) 61 1.42 Lawn(D) 74 0.16 C C1 C �E 3� v a m r t, E• E E Q E 1- M bJ Z 3 N b 0) W Y W U(0Do IL a N W L m � w 3 1 0 u v N 3 a A o a v m 0 5 V W fV C C E m a C a � Cr o c o i w O Z a � -. ❑ as L 1 C O O o o cc O O O O O o o c o o 0 0 cc n o r m a In O N N m P.-n O m 0 m w ovn+l. Om fcooinmlt� m� mm n too� o(o r C)mmN O)O w CwO t w)M Oi 3 N N O r M m in m T N m M o N r o LL } O O r O C O m O O R o c o c o V O O O o cc m 0 W m m O m m m N N n m m to m m m N O CD m m m m pl: m f� r M r 10 m m V 1 r N m N N m� 1f1 N N r N Lo coo) � m CI m 3 r r M N 0 0 m 000n oo m000Mln o 000 om nm mnno nm mmn�nm t In nNm mm n N m m v m r m m m r N m O RD m r N N m m� O� C7n O f[imNN� m mm OJ ISO OfLI r m N 0 M H O 7 r a n N r } N N GN OW mm mmm v (m Lq m0mOn0nP, MLLN7IN� NO cm O Nm MO 9q mmN V 3 rI,- aaOmNm ID w v m NMn C+1 Ma r o LL } O r V O o cc N 0 0 0 O O N M m O N H n t0 O N n m Co Lo n O l0 n n LO mNm n m W N N Nmn rN d'� M -tMr q- cgn N� N� r r M m r v r� r N C v N-qt L O r• M Cr) o 0 OV m C l!7 m n 0 m m m O N l0 m N a m M o m m V N NmmM n� my mat mN Mn�O mm N 'tV'mm m nmOp mN M MMm vn O O Co o r 0 O m M 0 O r o r r r N 00 r 3 r M 0 LL } o C QQ mm r N M q r N M M M 0 'O 0 0 0 0 'p 'p 'p OF NNOV NNN F as as Q Q Q Q N N Q Q Q Q Q Q C C N d 7 fa N AW ❑ 000000 ❑O �.❑❑❑ O❑m�wiwwdiwia�.am212122mm aaaa aao c cc aaaaaa ❑❑ aaQQw QQ I Watershed Model SchematicHydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v2019.2 1 2 3 4 9 10 11 12 13 14 116" II 7 Legend k)II, Origin Description 1 SCS Runoff Pre DA 1.1 (Outlet A) 2 SCS Runoff Pre DA 1.2 3 SCS Runoff Pre DA 1.3 (Outlet C) 4 SCS Runoff Pre DA 1.4 6 Combine Pre-Dev Outlet B 7 Combine Pre-Dev TOTAL OUT 9 SCS Runoff Post DA 2.1 (Outlet A) 10 SCS Runoff Post DA 2.2 11 SCS Runoff Post DA 2.3A 12 SCS Runoff Post DA 2.313 13 SCS Runoff Post DA 2.3C 14 SCS Runoff Post DA 2.4 16 Reservoir DRY POND - WEST 17 Combine Post Inflow to East Pond 18 Reservoir DRY POND - EAST 20 Combine Post-Dev Outlet B (Detained) 21 Combine Post-Dev Outlet C (Detained) 22 Combine Post Out Total (Detained) 20 22 21 Project: 37630.054 - Hydraflow - 2021.03.04.gpw I Sunday, 03 / 7 / 2021 Hydrograph Return Period RFTyd-raWydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v2019.2 Hyd. No. Hydrograph type Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description (origin) 1-yr 2-yr 3-yr T-Yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ---- 0.455 1.271 ------- 3.427 5.875 10.28 14.66 20.07 Pre DA 1.1 (Outlet A) 2 SCS Runoff ---- 0.490 1.564 ------ 4.704 8.264 14.57 20.75 28.40 Pre DA 1.2 3 SCS Runoff ------ 8.685 15.50 ---- 28.97 42.08 63.97 84.64 109.34 Pre DA 1.3 (Outlet C) 4 SCS Runoff ------ 0.938 1.720 ------ 3.293 4.834 7.407 9.856 12.79 Pre DA 1.4 6 Combine 2, 4, 1.377 3.170 ------ 7.674 12.43 20.67 28.88 39.04 Pre-Dev Outlet B 7 Combine 1, 3, 6 10.17 19.26 ---- 38.43 57.88 91.16 122.66 160.65 Pre-Dev TOTAL OUT 9 SCS Runoff •- 0.798 1.482 ------- 2.891 4.308 6.685 8.920 11.60 Post DA 2.1 (Outlet A) 10 SCS Runoff 8.846 12.45 ----- 18.86 24.64 33.68 41.72 51.02 Post DA 2.2 11 SCS Runoff ------ 9.816 14.37 ---- 22.76 30.53 42.87 53.97 66.91 Post DA 2.3A 12 SCS Runoff ---- 30.64 41.40 ------ 60.07 76.61 102.15 124.71 150.72 Post DA 2.3B 13 SCS Runoff ------ 0.892 1.350 ------- 2.196 2.987 4.293 5.480 6.871 Post DA 2.3C 14 SCS Runoff ----- 1.245 2.170 ----- 3.970 5.712 8.615 11.34 14.58 Post DA 2.4 16 Reservoir 10 0.199 0.872 ----- 4.031 6.352 9.034 15.16 25.57 DRY POND - WEST 17 Combine 11, 12, 34.29 46.85 ------- 68.89 88.65 119.75 147.41 179.43 Post Inflow to East Pond 18 Reservoir 17 1.352 4.553 ------ 17.14 30.75 46.57 64.45 99.84 DRY POND - EAST 20 Combine 14, 16, 1.334 2.266 ----- 6.225 11.02 16.97 24.39 39.90 Post-Dev Outlet B (Detained) 21 Combine 13, 18, 1.378 4.640 ------ 17.37 31:10 47.12 65.16 101.69 Post-Dev Outlet C (Detained) 22 Combine 9, 20, 21 2.553 5.781 ---- 26.06 45.98 70.29 98.41 144.99 Post Out Total (Detained) Proj. file: 37630.054 - Hydraflow - 2021.03.04.gpw Sunday, 03 / 7 / 2021 Hydrograph Summary Repo rlydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (efs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 0.455 2 750 4,650 --- ------ Pre DA 1.1 (Outlet A) 2 SCS Runoff 0.490 2 73.8 4,446 --- ------ Pre DA 1.2 3 SCS Runoff 8.685 2 732 42,141 --- ------ Pre DA 1.3 (Outlet C) 4 SCS Runoff 0.938 2 732 4,711 ----- ...... Pre DA 1.4 6 Combine 1.377 2 734 9,157 2, 4, ---- Pre-Dev Outlet B 7 Combine 10.17 2 732 55,948 ------ Pre-Dev TOTAL OUT 9 SCS Runoff 0.798 2 740 4,696 ------ ------ Post DA 2.1 (Outlet A) 10 SCS Runoff 8.846 2 724 26,783 — --- Post DA 2.2 11 SCS Runoff 9.816 2 730 39,189 ----- ----- --- Post DA 2.3A 12 SCS Runoff 30.64 2 716 61,881 ---- ---- --- Post DA2.3B 13 SCS Runoff 0.892 2 718 1,808 ---- ---- ----- Post DA 2.3C 14 SCS Runoff 1.245 2 732 5,872 ----- --- ----- Post DA 2.4 16 Reservoir 0.199 2 1110 26,781 10 17.72 20,631 DRY POND - WEST 17 Combine 34.29 2 718 101,070 11, 12, ----- ----- Past Inflow to East Pond 18 Reservoir 1.352 936 101,065 17 16.60 66,934 DRY POND - EAST 20 Combine 1.334 732 32,653 14, 16, ------ Post-Dev Outlet B (Detained) 21 Combine 1.378 2 934 102,873 13, 18, — Post-Dev Outlet C (Detained) 22 Combine 2.553 734 140,222 9, 20, 21 — - Post Out Total (Detained) i 37630.054 - Hydraflow - 2021.03.04.gpw Return Period: 1 Year Sunday, 03 / 7 / 2021 Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 1 Pre DA 1.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge = 0.455 cfs Storm frequency = 1 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 4,650 tuft Drainage area = 4.530 ac Curve number = 50* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 17.50 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530 Pre DA 1.1 (Outlet A) Q (cfs) Hyd. No. 1 -- 1 Year Q (ems) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - I I I 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) TR55 Tc Worksheet Hyd. No. 1 Pre DA 1.1 (Outlet A) Description Sheet Flow Manning's n-value Flow length (ft) Two-year 24-hr precip. (in) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sqft) Wetted perimeter (ft) Channel slope (%) Manning's n-value Velocity (ft/s) 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 A = 0.150 = 50.0 = 4.64 = 0.80 = 6.74 = 33.00 = 2.27 = Unpaved =2.43 = 0.23 = 0.83 = 6.80 = 0.93 = 0.026 =1.35 B 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 [�111111f, C 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.00 Flow length (ft) ({0})852.0 0.0 0.0 Travel Time (min) = 10.52 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. Totals 6.74 = 0.23 10.52 17.50 m i n Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 2 Pre DA 1.2 6 Sunday, 03 / 7 / 2021 Hydrograph type = SCS Runoff Peak discharge = 0.490 cfs Storm frequency = 1 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 4,446 cuft Drainage area = 4.620 ac Curve number = 50* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.40 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] 14.620 Pre DA 1.2 Q (cfs) Qcfs Hyd. No. 2 -- 1 Year ( ) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 I - 0.05 0.00 -1 1 ' I — I- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) TR55 Tc Worksheet Hyd. No. 2 Pre DA 1.2 Description Sheet Flow Manning's n-value Flow length (ft) Two-year 24-hr precip. (in) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sqft) Wetted perimeter (ft) Channel slope (%) Manning's n-value Velocity (ft/s) 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 A = 0.150 = 50.0 = 4.64 = 1.28 = 5.59 = 76.00 = 1.89 = Unpaved =2.22 = 0.57 = 13.56 = 1.00 = 1.94 = 0.026 =45.79 B 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.00 Flow length (ft) ({0))567.0 0.0 0.0 Travel Time (min) = 0.21 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. Totals 5.59 0.57 0.21 6.40 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 3 Pre DA 1.3 (Outlet C) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 15.470 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 3.83 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) _ [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470 MIX M 4.00 2.00 8 Sunday, 0317 / 2021 = 8.685 cfs = 732 min = 42,141 cuft = 61* = 0 ft = 12.90 min = Type III = 484 Pre DA 1.3 (Outlet C) Hyd. No. 3 -- 1 Year Q (cis) 10.00 6.00 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 F]yd No. 3 Time (min) TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 3 Pre DA 1.3 (Outlet C) Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.64 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 8.14 + 0.00 + 0.00 = 8.14 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area (sqft) = 1.50 12.44 0.00 Wetted perimeter (ft) = 2.40 4.00 0.00 Channel slope (%) = 0.90 0.51 0.00 Manning's n-value = 0.026 0.026 0.015 Velocity (ft/s) =3.97 8.75 0.00 Flow length (ft) Q0))708.0 920.0 0.0 Travel Time (min) = 2.97 + 1.75 + 0.00 = 4.73 TotalTravel Time, Tc.............................................................................. 12.90 min Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3106 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. IN 0. 4 Pre DA 1.4 Hydrograph type = SCS Runoff Peak discharge = 0.938 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 4,711 cuft Drainage area = 1.850 ac Curve number = 60* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.30 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850 Pre DA 1.4 Q cfs Hyd. No. 4 -- 1 Year Q ( cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 i 0.00 _L I I I I 1_ �. f I I �- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) TR55 Tc Worksheet Hyd. No. 4 Pre DA 1.4 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.64 0.00 0.00 Land slope (%) = 0.40 0.00 0.00 Travel Time (min) = 8.90 + 0.00 + 0.00 = 8.90 Shallow Concentrated Flow Flow length (ft) = 240.00 0.00 0.00 Watercourse slope (%) = 0.83 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.47 0.00 0.00 Travel Time (min) = 2.72 + 0.00 + 0.00 = 2.72 Channel Flow X sectional flow area (sqft) = 12.60 0.00 0.00 Wetted perimeter (ft) = 12.00 0.00 0.00 Channel slope (%) = 2.36 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) =9.10 0.00 0.00 Flow length (ft) ({0})360.0 0.0 0.0 Travel Time (min) = 0.66 + 0.00 + 0.00 = 0.66 Total Travel Time, Tc.............................................................................. 12.30 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 6 Pre-Dev Outlet B 12 Sunday, 0317 / 2021 Hydrograph type = Combine Peak discharge = 1.377 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 9,157 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 6.470 ac m M Pre-Dev Outlet B Hyd. No. 6 -- 1 Year Q (cfs) 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Hyd No. 2 - Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 7 Pre-Dev TOTAL OUT 13 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 10.17 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 55,948 cuft Inflow hyds. = 1, 3, 6 Contrib. drain. area = 20.000 ac 10.00 M 6.00 4.00 2.00 Pre-Dev TOTAL OUT Hyd. No. 7 -- 1 Year Q (cfs) 12.00 10.00 IM 4.00 2.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 1 Hyd No. 3 Hyd No. 6 Hydrograph Report 14 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 9 Post DA 2.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge = 0.798 cfs Storm frequency = 1 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 4,696 cuft Drainage area = 2.040 ac Curve number = 59* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.70 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(0.690 x 98) + (1.350 x 39)] / 2.040 Q (cfs 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 -� I I I �_ - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Post DA 2.1 (Outlet A) Hyd. No. 9 -- 1 Year TR55 Tc Worksheet Hyd. No. 9 Post DA 2.1 (Outlet A) 15 Hydraflow Hydrographs Extension for Autodesk® Civil 308 2019 by Autodesk, Inc. v2019.2 Descriotion A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.64 0.00 0.00 Land slope (%) = 0.26 0.00 0.00 Travel Time (min) = 10.57 + 0.00 + 0.00 = 10.57 Shallow Concentrated Flow Flow length (ft) = 24.00 0.00 0.00 Watercourse slope (%) = 3.90 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.19 0.00 0.00 Travel Time (min) = 0.13 + 0.00 + 0.00 = 0.13 Channel Flow X sectional flow area (sqft) = 0.83 0.00 0.00 Wetted perimeter (ft) = 6.80 0.00 0.00 Channel slope (%) = 0.93 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) =1.35 0.00 0.00 Flow length (ft) Q0))490.0 0.0 0.0 Travel Time (min) = 6.05 + 0.00 + 0.00 = 6.05 TotalTravel Time, Tc.............................................................................. 16.70 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 10 Post DA 2.2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.890 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.83 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890 Q (cfs) 10.00 8.00 6.00 4.00 2.00 Post DA 2.2 Hyd. No. 10 -- 1 Year 16 Sunday, 03 / 7 / 2021 = 8.846 cfs = 724 min = 26,783 cuft = 76* = Oft = 5.00 min = Type III = 484 Q (cfs) 10.00 IM 6.00 i M Ml 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 11 Post DA 2.3A Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 7.800 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.83 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(3.350 x 98) + (1.800 x 39) + (2.650 x 61)] / 7.800 Q (Cfs) 10.00 'A111: 6.00 4.00 2.00 Post DA 2.3A Hyd. No. 11 -- 1 Year 17 Sunday, 03 / 7 / 2021 = 9.816 cfs = 730 min = 39,189 cuft = 72* = 0 ft = 12.90 min = Type III = 484 Q (cfs) 10.00 MIX M 4.00 2,00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 2019 by Autodesk, Inc. v2019.2 Hyd. No. 12 Post DA 2.3B Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 9.560 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.83 in Distribution Storm duration = 24 hrs Shape factor 30.00 25.00 20.00 15.00 10.00 5.00 18 Sunday, 03 17 / 2021 = 30.64 cfs = 716 min = 61,881 cuft = 80 = Oft = 5.00 min = Type II = 484 Post DA 2.3113 Hyd. No. 12 -- 1 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 5.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 13 Post DA 2.3C Hydrograph type = SCS Runoff Peak discharge = 0.892 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,808 cuft Drainage area = 0.510 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA 2.3C Q (cfs) Hyd. No. 13 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 -I I I i I I L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2019.2 Hyd. No. 14 Post DA 2.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.020 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 3.83 in Distribution Storm duration = 24 hrs Shape factor *Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020 Q (cfs) Post DA 2.4 Hyd. No. 14 -- 1 Year 20 Sunday, 03 / 7 12021 = 1.245 cfs = 732 min = 5,872 cuft = 62* = 0 ft = 12.30 min = Type III = 484 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) TR55 Tc Worksheet Hyd. No. 14 Post DA 2.4 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.64 0.00 0.00 Land slope (%) = 0.40 0.00 0.00 Travel Time (min) = 8.90 + 0.00 + 0.00 = 8.90 Shallow Concentrated Flow Flow length (ft) = 240.00 0.00 0.00 Watercourse slope (%) = 0.83 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.47 0.00 0.00 Travel Time (min) = 2.72 + 0.00 + 0.00 2.72 Channel Flow X sectional flow area (sqft) = 12.60 0.00 0.00 Wetted perimeter (ft) = 12.00 0.00 0.00 Channel slope (%) = 2.36 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) =9.10 0.00 0.00 Flow length (ft) ((0))360.0 0.0 0.0 Travel Time (min) = 0.66 + 0.00 + 0.00 = 0.66 TotalTravel Time, Tc.............................................................................. 12.30 min Hydrocgraph Report Hydrafkrw Hydnxraphs Extension for Autodesk@ Civil 3E* 2019 by Autodesk. Inc. v2019.2 Hyd. No. 16 ` DRY POND - WEST Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Post DA 2.2 Max. Elevation Reservoir name = Dry Pond -WEST Max. Storage Storage Indication meffwd used. 8.00 6.00 4.00 2.00 0.00 0 600 Hyd No. 16 DRY POND - WEST Hyd. No. 16 —1 Year 22 Sunday. 031712021 = 0.199 cfs = 1110 min = 26,781 cult = 17.72 ft = 20,631 tuft Q (cfs) 10.00 t 6.00 f�1, 2.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Hyd No. 10 Total storage used = 20,631 cuf# Time (min) Pond Report 23 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Sunday, 03 17 / 2021 Pond No. 1 - Dry Pond - WEST Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 14.50 ft Stage i Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (tuft) Total storage (tuft) 0.00 14.50 00 0 0 0.50 15.00 238 60 60 1.50 16.00 4,173 2,206 2,265 2.50 17.00 12,673 8,423 10,688 3.50 18.00 15,040 13,857 24,545 4.50 19.00 17,922 16,481 41,026 5.50 20.00 20,792 19,357 50,383 6.25 20.75 23,021 16,430 76,812 l Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [Bl [C] [D] Rise (in) 15.00 1.50 4.00 0.00 Crest Len (ft) Inactive 15.00 Inactive 0.00 Span (in) = 15.00 1.50 30.00 0.00 Crest El. (ft) = 18.75 19.25 0.00 0.00 No. Barrels 1 1 2 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) 14.35 14.50 17.70 0.00 Weir Type 1 Broad Rect --- Length (ft) 60.00 5.00 5.00 0.00 Multi -Stage = Yes No No No Slope (%) 0.25 1.00 1.00 n/a N-Value .013 .013 .013 n/a Orifice Coeff. 0.60 0.60 0.60 0.60 Exfll.(in/hr) = 0.000 (by Contour) Multistage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (a). Stage ! Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 14.50 0.00 0.UU 0.00 --- 0.00 0.00 --- --- 0.000 0.05 6 14.55 0.10 oc 0.001C 0.00 --- 0.00 0.00 --- 0.004 0.10 12 14.60 0.10 oc 0.01 is 0.00 0.00 0.00 --- --- 0.011 0.15 18 14.65 0.10 oc 0.02 is 0.00 0.00 0.00 --- --- 0.017 0.20 24 14.70 0.10 oc 0.02 is 0.00 0.00 0.00 --- -- --- --- 0.022 0.25 30 14.75 0.10 oc 0.03 is 0.00 0.00 0.00 -- -- n roc 0.30 36 14.80 0.10 oc 0.03 is 0.00- 0.00 0.00 --- -- - 0.029 0.35 42 14.85 0.10 OC 0.03 is 0.00 0.00 0.00 --- -- - 0.032 0.40 48 14.90 0.10 oc 0.03 is 0.00 0.00 0.00 -- -- --- 0.034 0.45 54 14.95 0.10 oc 0.04 is 0.00 --- 0.00 0.00 -- --- --- 0.037 0.50 60 15.00 0.10 OC 0.04 is 0.00 -- 0.00 0.00 -- --- --- 0.039 0.60 280 15.10 0.10 OC 0.04 is 0.00 --- 0.00 0.00 - -- - --- 0.043 0.70 501 15.20 0.10 oc 0.05 is 0.00 --- 0.00 0.00 -- -- -- 0.047 0.80 721 15.30 0.10 oc 0.05 is 0.00 --- 0.00 0.00 --- -- --- --- 0.051 I 0.90 942 15.40 0.10 oc 0.05 is 0.00 0.00 0.00 -- - -- 0.054 1.00 1,162 15.50 0.10 oc 0.06 is 0.00 0.00 0.00 --- - --- 0.057 1.10 1,383 15.60 0.10 OC 0.06 is 0.00 0.00 0.00 - - -- 0.060 1.20 1,603 15.70 0.10 oc 0.06 is 0.00 -- 0.00 0.00 --- - --- --- 0.063 I 1.30 1,824 15.80 0.10 oc 0.07 is 0.00 - 0.00 0.00 --- - --- --- 0.066 1.40 2,044 15.90 0.10 oc 0.07 is 0.00 0.00 0.00 --- --- -- 0.068 1.50 2,265 16.00 0.10 oc 0.07 is 0.00 0.00 0.00 - --- --- 0.071 1.60 3,107 16.10 0.10 oc 0.07 is 0.00 0.00 0.00 -- --- --- --- 0.073 1.70 3,950 16.20 0.10 oc 0.08 is 0.00 -- 0.00 0.00 --- --- --- --- 0.076 1.80 4,792 16.30 0.10 OC 0.08 is 0.00 -- 0.00 0.00 --- - - -- --- 0.078 1.90 5,634 16.40 0.10 OC 0.08 is 0.00 0.00 0.00 --- -- --- 0.080 2.00 6,476 16.50 0.10 oc 0.08 is 0.00 --- 0.00 0.00 --- --- --- 0.082 2.10 7,319 i6.60 0.10 oc U.08 is U.UU --- 0.00 0.00 0.084 l 2.20 8,161 16.70 0.10 oc 0.09 is 0.00 --- 0.00 0.00 -- 0.086 2.30 9,003 16.80 0.10 oc 0.09 is 0.00 --- 0.00 0.00 --- -- --- 0.088 2.40 9,846 16.90 0.10 oc 0.09 is 0.00 --- 0.00 0.00 --- -- - 0.090 2.50 10,688 17.00 0.10 oc 0.09 is 0.00 --- 0.00 0.00 --- -- --- 0.092 2.60 12,074 17.10 0.10 oc 0.09 is 0.00 --- 0.00 0.00 --- - --- ... 0.094 2.70 13,459 17.20 0.10 OC 0.10 is 0.00 0.00 0.00 - --- 0.096 2.80 14,845 17.30 0.11 oc 0.10 is 0.00 0.00 ___ 0.00 --- 0.098 2.90 16,231 17.40 0.11 OC 0.10 is 0.00 0.00 0.00 --- --- - --- 0.100 LContinues on next page... 24 Dry Pond -WEST Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cis cfs efs cfs cfs cfs cis cfs cfs cfs cis 3.00 17,616 17.50 0.11 oc 0.10 is 0.00 -- 0.00 0.00 -- --- --- -- 0.101 3.10 19,002 17.60 0.11 oc 0.10 is 0.00 -- 0.00 0.00 -- --- --- -- 0.103 3.20 20,388 17.70 0.11 cc 0.10 is 0.00 is --- 0.00 0.00 -- --- --- -- 0.105 3.30 21,773 17.80 0.65 oc 0.10 is 0.54 is 0.00 0.00 --- -- --- 0.641 3.40 23,159 17.90 1.63 oc 0.10 is 1.52 is --- 0.00 0.00 --- -- --- 1.620 3.50 24,545 18.00 2.89 oc 0.09 is 2.80 is --- 0.00 0.00 --- --- - --- 2.887 3.60 26,193 18.10 3.96 oc 0.09 is 3.88 is --- 0.00 0.00 --- --- -- -- 3.964 3.70 27,841 18.20 4.72 oc 0.09 is 4.63 is -- 0.00 0.00 --- --- -- 4.719 3.80 29,489 18.30 5.37 oc 0.08 is 5.28 is 0.00 0.00 --- --- -- --- 5.366 3.90 31,137 18.40 5.94 oc 0.08 is 5.86 is -- 0.00 0.00 -- --- --- --- 5.942 4.00 32,785 18.50 6.47 oc 0.08 is 6.39 is -- 0.00 0.00 -- -- -- 6.466 4.10 34,433 18.60 6.95 oc 0.08 is 6.87 is 0.00 0.00 --- --- 6.950 4.20 36,081 18.70 7.40 oc 0.08 is 7.33 is --- 0.00 0.00 -- --- --- --- 7.401 4.30 37,729 18.80 7.83 oc 0.07 is 7.75 is 0.00 0.00 --- -- 7.826 4.40 39,377 18.90 8.23 oc 0.07 is 8.16 is --- 0.00 0.00 R 99R 4.50 41,026 19.00 8.61 oc 0.07 is 8.54 is --- 0.00 0.00 --- --- --- 8.612 4.60 42,961 19.10 8.98 oc 0.07 is 8.91 is --- 0.00 0.00 --- --- 8.978 4.70 44,897 19.20 9.13 oc 0.07 is 9.06 is 0.00 0.00 -- -- 9.126 4.80 46,833 19.30 9.25 oc 0.07 is 9.18 is --- 0.00 0.44 --- --- 9.683 4.90 48,768 19.40 9.37 oc 0.07 is 9.30 is -- 0.00 2.27 --- --- -- 11.63 5.00 50,704 19.50 9.48 oc 0.07 is 9.42 is -- 0.00 4.88 --- -- --- --- 14.36 5.10 52,640 19.60 9.60 oc 0.07 is 9.53 is --- 0.00 8.08 -- - 17.58 5.20 54,575 19.70 9.72 oc 0.07 is 9.64 is 0.00 11.77 --- -- - --- 21.49 5.30 56,511 19.80 9.83 oc 0.07 is 9.76 is --- 0.00 15.91 - --- --- 25.74 5.40 58,447 19.90 9.94 oc 0.07 is 9.87 is --- 0.00 20.44 --- -- --- 30.38 5.50 60,383 20.00 10.05 oc 0.07 is 9.98 is 0.00 25.33 --- --- 35.38 5.57 62,025 20.08 10.14 oc 0.07 is 10.06 is 0.00 29.22 --- --- -- --- 39.36 5.65 63,668 20.15 10.22 oc 0.07 is 10.14 is 0.00 33.30 --- --- 43,52 5.72 65,311 20.23 10.30 oc 0.08 is 10.22 is 0.00 37.55 - --- --- 47.85 5.80 66,954 20.30 10.38 oc 0.08 is 10.30 is -- 0.00 41.96 --- -- --- 52.34 5.87 68,597 20.38 10.46 oc 0.08 is 10.38 is --- 0.00 46.54 - 57.00 5.95 70,240 20.45 10.54 oc 0.08 is 10.46 is --- 0.00 51.27 - -- 61.81 6.02 71,883 20.53 10.62 oc 0.08 is 10.54 is --- 0.00 56.15 --- -- --- 66.76 6.10 73,526 20.60 10.70 oc 0.08 is 10.62 is --- 0.00 61.17 --- -- __ 71.87 6.17 75,169 20.68 10.77 oc 0.08 is 10.69 is --- 0.00 66.34 _-- 77.12 6.25 76,812 20.75 10.85 oc 0.08 is 10.77 is --- 0.00 71.65 - -- --- 82.50 ...End Hydrograph Report 25 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 12021 Hyd. No. 17 Post Inflow to East Pond Hydrograph type = Combine Peak discharge = 34.29 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 101,070 cuft Inflow hyds. = 11, 12 Contrib. drain. area = 17.360 ac Q (cfs) 35.00 30.00 25.00 i 20.00 I 15.00 10.00 5.00 Post Inflow to East Pond Hyd. No. 17 -- 1 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 11 - - Hyd No. 12 Time (min) Hydrograph Report 26 Hydra OW Hydr0gr8yhs Extension for Autode" Civil 3138 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 18 DRY POND - EAST Hydrograph type = Reservoir Peak discharge = 1.352 cfs Storm frequency = 1 yrs Time to peak = 936 min Time interval = 2 min Hyd. volume = 101,065 cult Inflow hyd. No. = 17 - Post Inflow to East Pond Max. Elevation = 16.60 fi Reservoir name = Dry Pond -EAST Max. Storage = 66,934 cuft Storage indication method used. DRY POND - EAST Q (S) Q (cis) Hyd. No. 18 —1 Year 36.00 35.E i 30.00 30.00 Y 1 j , 25.00 25.00 1 20.00 20.00 15.00 15.00 L 10.00 o.0a S.Oti 5.00 j 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) —Hyd No. 18 —Hyd No. 17 Total storage used = 66,934 cuff Pond Report 27 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Pond No. 2 - Dry Pond - EAST Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Beginina Elevation = 13.25 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 13.25 00 0 0 0.75 14.00 1,529 573 573 1.75 15.00 18,850 10,190 10,763 2.75 16.00 40,779 29,815 40,577 3.75 17.00 47,595 44,187 84,764 4.75 18.00 53,426 50,511 135,275 5.75 19.00 59,262 56,344 191,610 6.75 20.00 65,401 62,332 253,950 Culvert ! Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 3.00 12.00 0.00 Crest Len (ft) = 20.00 50.00 Inactive 0.00 Span (in) = 36.00 3.00 36.00 0.00 Crest El. (ft) = 18.00 18.50 0.00 0.00 No. Barrels 1 1 3 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) 13.05 13.25 16.50 0.00 Weir Type = 1 Broad Rect Length (ft) 30.00 5.00 5.00 0.00 Multi -Stage = Yes No No No Slope (%) 0.50 1.00 1.00 n/a N-Value .013 .013 .013 n/a Orifice Coeff. 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.00n thv r:nntnrrrl Multi -Stage - n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (uu) curdrul. Weir risers checked for orifice conditions (ic) and submergence (a). Stage / Storage / Discharge Table Stage Storage Elevation Civ A Clv B Clv C PrFRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cis cfs cfs cfs cfs i0.00 0 13.25 0.00 0.00 0.00 0.00 0.00 --- --- 0.000 0.08 57 13.32 0.33 is 0.01 is 0.00 --- 0.00 0.00 --- --- 0.012 0.15 115 13.40 0.33 is 0.04 is 0.00 - 0.00 0.00 --- --- --- 0.041 0.22 172 13.48 0.33 is 0.08 is 0.00 - 0.00 0.00 --- --- 0.075 0.30 229 13.55 0.33 is 0.10 is 0.00 0.00 0.00 0.099 0.38 287 13.63 0.33 is 0.12 is 0.00 0.00 0.00 --- n_1119 0.45 344 13.70 0.33 is 0.13 is 0.00 --- 0.00 0.00 --- --- 0.135 0.52 401 13.77 0.33 is 0.15 is 0.00 0.00 0.00 -- - --- 0.149 0.60 459 13.85 0.33 is 0.16 is 0.00 - 0.00 0.00 - -- 0.163 0.68 ,l 516 13.93 0.33 is 0.18 is 0.00 - 0.00 0.00 --- -- --- 0.175 0.75 573 14.00 0.33 is 0.19 ir. 0.00 -- 0.00 0.00 - -- --- --- 0.187 0.85 1,592 14.10 0.33 is 0.20 is 0.00 -- 0.00 0.00 -- --- --- 0.201 0.95 2,611 14.20 0.33 is 0.21 is 0,00 0.00 0.00 -_- 0.215 1.05 3,630 14.30 0.33 is 0.23 is 0.00 0.00 0.00 0.227 1.15 4,649 14.40 0.33 is 0.24 is 0.00 0.00 _-- 0.00 0.239 1.25 5,668 14.50 0.33 is 0.25 is 0.00 0.00 0.00 -- 0.251 1.35 6,687 14.60 0.33 is 0.26 is 0.00 --- 0.00 0.00 --- --- --- 0.262 1.45 7,706 14.70 0.33 is 0.27 is 0.00 0.00 0.00 --- - - 0.272 1.55 I 8,725 14.80 0.33 is 0.28 is 0.00 0.00 0.00 i -__0.282 1.65 9,744 14.90 0.33 is 0.29 is 0.00 0.00 0.00 0.292 1.75 10,763 15.00 0.33 is 0.30 is 0.00 -- 0.00 0.00 --- - -- --- 0.301 1.85 13,744 15.10 0.33 is 0.31 ir. 0.00 - 0.00 0.00 -- -- --- 0.310 1.95 16,726 15.20 0.33 is 0.32 is 0.00 0.00 0.00 0.319 2.05 19,707 15.30 0.33 is 0.33 is 0.00 0.00 ___ 0.00 ___ __ ___ 0.328 2.15 22,689 15.40 0.37 is 0.34 is 0.00 --- 0.00 0.00 --- --- --- --- 0.336 2.25 25,670 15.50 0.37 is 0.34 is 0.00 0.00 0.00 --- -- --- --- 0.345 2.35 28,652 15.60 0.37 Ic 0.35 is 0.00 0.00 0.00 - -- --- 0.353 2.45 31,633 15.70 0.37 is 0.36 is 0.00 0.00 0.00 --- --- --- 0.360 2.55 34,614 15.80 0.37 is 0.37 is 0.00 0.00 0.00 --- -- --- --- 0.368 2.65 37,596 15.90 0.41 is 0.38 is 0.00 --- 0.00 0.00 --- -- --- --- 0.376 2.75 40,577 16.00 0.41 is 0.38 is 0.00 0.00 0.00 --- -- --- --- 0.383 2.85 44,996 16.10 0.41 is 0.39 is 0.00 - 0.00 0.00 --- -- 0.390 2.95 49,415 16.20 0.41 is 0.40 is 0.00 --- 0.00 0.00 --- 0.397 t 3.05 53,833 16.30 0.41 is 0.40 is 0.00 - 0.00 0.00 --- -- --- 0.404 3.15 58,252 16.40 0.41 is 0.41 is 0.00 - 0.00 0.00 --- -- 0.411 Continues on next page... 28 Dry Pond - EAST Stage / Storage / Discharge Table Stage Storage Elevation Civ A Clv B Clv C PrFRSr Wr A Wr B Wr C Wr D EMI User Total ft cuft ft cis cfs cfs cis cis cfs cis cis cfs cfs cfs 3.25 62,671 16.50 0.42 is 0.42 is 0.00 0.00 0.00 -- -- -- 0.418 3.35 67,090 16.60 1.39 oc 0.42 is 0.97 is 0.00 0.00 --- -- -- 1.386 3.45 71,508 16.70 3.26 oc 0.40 is 2.74 is --- 0.00 0.00 --- - -- 3.143 3.55 75,927 16.80 5.49 oc 0.39 is 5.04 is --- 0.00 0.00 --- --- 5.421 3.65 80,346 16.90 8.21 oc 0.37 is 7.75 is --- 0.00 0.00 --- --- --- --- 8.118 3.75 84,764 17.00 11.28 oc 0.34 is 10.83 is --- 0.00 0.00 --- --- -- 11.17 3.85 89,815 17.10 14.60 oc 0.31 is 14.24 is --- 0.00 0.00 --- --- --- --- 14.55 3.95 94,866 17.20 18.20 oc 0.25 is 17.95 is -- 0.00 0.00 --- --- --- --- 18.20 4.05 99,918 17.30 22.18 oc 0.25 is 21.93 is -- 0.00 0.00 --- --- --- --- 22.18 4.15 104,969 17.40 26.41 oc 0.25 is 26.16 is 0.00 0.00 -- --- - --- 26.41 4.25 110,020 17.50 30.89 oc 0.25 is 30.64 is -- 0.00 0.00 -- -- -- --- 30.89 4.35 115,071 17.60 33.81 oc 0.25 is 33.57 is - 0.00 0.00 -- -- -- 33.81 4.45 120,122 17.70 36.51 oc 0.25 is 36.26 is - 0.00 0.00 -- --- -- 36.50 4.55 125,173 17.80 39.01 oc 0.25 is 38.76 is --- 0.00 0.00 --- -- -- -- 39.01 4.65 130,224 17.90 41.36 oc 0.25 is 41.11 is --- 0.00 0.00 -- --- --- --- 41.36 4.75 135,275 18.00 43.58 oc 0.25 is 43.33 is --- 0.00 0.00 --- --- -- -- 43.58 4.85 140,909 18.10 46.59 oc 0.24 is 44.24 is - 2.11 0.00 --- - -- -- 46.59 4.95 146,544 18.20 49.45 oc 0.24 is 43.25 is -- 5.96 0.00 -- --- --- 49.44 5.05 152,178 18.30 52.70 oc 0.23 is 41.53 is - 10.94 0.00 --- - -- 52.70 5.15 157,813 18.40 56.20 oc 0.21 is 39.14 is -- 16.85 0.00 --- -- --- --- 56.20 5.25 163,447 18.50 59.81 oc 0.20 is 36.06 is 23.55 0.00 --- --- -- --- 59.81 5.35 169,081 18.60 63.35 oc 0.18 is 32.42 is 30.75 s 4.11 -- -- 67.46 5.45 174,716 18.70 65.37 is 0.16 is 29.41 is 35.79 s 11.63 - -- -- - 76.99 5.55 180,350 18.80 66.90 is 0.15 is 26.92 is 39.83 s 21.36 - --- -- -- 88.25 5.65 185,985 18.90 68.25 is 0.14 is 24.81 is --- 43.31 s 32.89 - -- -- 101.14 5.75 191,619 19.00 69.48 is 0.13 is 22.98 is --- 46.38 s 45.96 -- --- --- 115.44 5.85 197,852 19.10 70.62 is 0.12 is 21.38 is --- 49.12 s 60.42 --- --- --- --- 131.03 5.95 204,085 19.20 71.69 is 0.11 is 19.97 is --- 51.61 s 76.14 --- --- -- --- 141.82 6.05 210,318 19.30 72.70 is 0.10 is 18.72 is --- 53.87 s 93.02 --- --- --- --- 165.71 6.15 216,552 19.40 73.66 is 0.10 is 17.60 is --- 55.95 s 111.00 --- - --- --- 184.65 6.25 222,785 19.50 74.58 is 0.09 is 16.60 ir. --- 57.89 s 130.00 --- --- --- 204.58 6.35 229,018 19.60 75.47 is 0.09 is 15.70 is --- 59.67 s 149.98 --- --- --- 225.43 6.45 235,251 19.70 76.34 is 0.08 is 14.89 is 61.37 s 170.89 - --- 247.22 6.55 241,484 19.80 77.18 is 0.08 is 14.14 is 62.94 s 192.69 --- 269.85 6.65 247,717 19.90 78.00 is 0.07 is 13.47 is 64.44 s 215.35 --- --- 293.32 6.75 253,950 20.00 78.80 is 0.07 is 12.86 is 65.87 s 238.83 --- --- -- - 317.62 ... End Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil MOD 2019 by Autodesk, Inc. v2019.2 Hyd. No. 20 Post-Dev Outlet B (Detained) Hydrograph type = Combine Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyds. = 14, 16 Contrib. drain. area 1.00 0.00 0 Post-Dev Outlet B (Detained) Hyd. No. 20 -- 1 Year 600 1200 1800 2400 3000 3600 Hyd No. 20 Hyd No. 14 Hyd No. 16 29 Sunday, 03 / 7 / 2021 = 1.334 cfs = 732 min = 32,653 cuft = 2.020 ac 4200 4800 5400 Q (cfs 1.00 0.00 6000 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 21 Post-Dev Outlet C (Detained) Hydrograph type = Combine Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyds. = 13, 18 Contrib. drain. area Q (cfs) 2.00 1.00 Post-Dev Outlet C (Detained) Hyd. No. 21 -- 1 Year 30 Sunday, 03 / 7 / 2021 = 1.378 cfs = 934 min = 102,873 cuft = 0.510 ac 480 960 1440 1920 2400 2880 3360 3840 4320 Hyd No. 21 Hyd No. 13 Hyd No. 18 Q (cfs) 2.00 1.00 0.00 4800 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk(D Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 22 Post Out Total (Detained) 31 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 2.553 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 140,222 cuft Inflow hyds. = 9, 20, 21 Contrib. drain. area = 2.040 ac 2.00 1.00 Post Out Total (Detained) Hyd. No. 22 -- 1 Year 600 1200 1800 2400 3000 3600 4200 4800 5400 — Hyd No. 22 — Hyd No. 9 , Hyd No. 20 — Hyd No. 21 Q (cfs) 3.00 i•-91I17 1.00 0.00 6000 Time (min) 32 Hydrograph Summary Report ydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.271 2 744 9,066 ---- ----- Pre DA 1.1 (Outlet A) 2 SCS Runoff 1.564 2 726 8,668 -- Pre DA 1.2 3 SCS Runoff 15.50 2 730 67,075 ---- ------ Pre DA 1.3 (Outlet C) 4 SCS Runoff 1.720 2 730 7,592 ----- ------ ---- Pre DA 1.4 6 Combine 3.170 2 728 16,261 2, 4, ------ --- Pre-Dev Outlet B 7 Combine 19.26 2 730 92,402 " " Pre-Dev TOTAL OUT 9 SCS Runoff 1.482 2 736 7,670 -- -- Post DA 2.1 (Outlet A) 10 SCS Runoff 12.45 2 724 37,311 ------ Post DA 2.2 11 SCS Runoff 14.37 2 730 56,192 — — ----- Post DA 2.3A 12 SCS Runoff 41.40 2 716 83,979 --- Post DA 2.3B 13 SCS Runoff 1.350 2 718 2,702 ----- --- Post DA 2.3C 14 SCS Runoff 2.170 2 730 9,236 -- Post DA 2.4 16 Reservoir 0.872 2 830 37,309 10 1 t.82 22,100 DRY POND - WEST 17 Combine 46.85 2 718 140,171 11, 12, ---- ----- Post Inflow to East Pond 18 Reservoir 4.553 2 776 140,166 17 16.76 74,244 DRY POND - EAST 20 Combine 2.266 2 730 46,546 14, 16, Post-Dev Outlet B (Detained) 21 Combine 4.640 2 774 142,868 13, 18, -- Post-Dev Outlet C (Detained) 22 Combine 5.781 2 780 197,083 9, 20, 21 Post Out Total (Detained) 37630.054 - Hydraflow - 2021.03.04.gpw Return Period: 2 Year Sunday, 03 1712021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil MOD 2019 by Autodesk, Inc. v2019.2 Hyd. No. 1 Pre DA 1.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.530 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 4.64 in Distribution Storm duration = 24 hrs Shape factor ' Composite (Area/CN) = [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530 1.00 Pre DA 1.1 (Outlet A) Hyd. No. 1 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 1 33 Sunday, 03 / 7 / 2021 = 1.271 cfs = 744 min = 9,066 cuft = 50* = 0 ft = 17.50 min = Type III = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 300 2019 by Autodesk, Inc. v2019.2 Hyd. No. 2 Pre DA 1.2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.620 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 4.64 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74))/4.620 Q (cfs) 1.00 Pre DA 1.2 Hyd. No. 2 -- 2 Year 120 240 360 480 600 720 840 Hyd No. 2 34 Sunday, 03 17 / 2021 = 1.564 cfs = 726 min = 8,668 cult = 50* = Oft = 6.40 min = Type III = 484 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 3 Pre DA 1.3 (Outlet C) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 15.470 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 4.64 in Distribution Storm duration = 24 hrs Shape factor ' Composite (Area/CN) = [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470 Q (cfs) 15.00 12.00 9.00 6.00 3.00 Pre DA 1.3 (Outlet C) Hyd. No. 3 -- 2 Year 35 Sunday, 03/7/2021 = 15.50 cfs = 730 min = 67,075 cuft = 61* = Oft = 12.90 min = Type III = 484 Q (cfs) 18.00 15.00 12.00 AM M 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) L L Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 4 Pre DA 1.4 Hydrograph type SCS Runoff Peak discharge Storm frequency 2 yrs Time to peak Time interval 2 min Hyd. volume Drainage area 1.850 ac Curve number Basin Slope 0.0 % Hydraulic length Tc method TR55 Time of conc. (Tc) Total precip. 4.64 in Distribution Storm duration 24 hrs Shape factor ' Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850 Q (cfs) 1.00 Pre DA 1.4 Hyd. No. 4 -- 2 Year 36 Sunday, 03 17 12021 = 1.720 cfs = 730 min = 7,592 cuft = 60* = Oft = 12.30 min = Type III = 484 Q (cfs) 2.00 1.00 0.00 -' 1 1 1 1 1 J 1 1—. _ I i_ L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 6 Pre-Dev Outlet B 37 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 3.170 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 16,261 cuff Inflow hyds. = 2, 4 Contrib. drain. area = 6.470 ac 3.00 2.00 1.00 Pre-Dev Outlet B Hyd. No. 6 -- 2 Year Q (cfs) 4.00 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 2 Hyd No. 4 Hydrograph Report 38 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 0317 / 2021 Hyd. No. 7 Pre-Dev TOTAL OUT Hydrograph type = Combine Peak discharge = 19.26 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 92,402 cuft Inflow hyds. = 1, 3, 6 Contrib. drain. area = 20.000 ac Q (cfs) 21.00 I i 18.00 I 15.00 12.00 9.00 6.00 3.00 Pre-Dev TOTAL OUT Hyd. No. 7 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 1 i I I », �.� L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 1 Hyd No. 3 � Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 9 Post DA 2.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.040 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 4.64 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) - [(0.690 x 98) + (1.350 x 39)] / 2.040 1.00 Post DA 2.1 (Outlet A) Hyd. No. 9 -- 2 Year 120 240 360 480 600 720 840 Hyd No. 9 39 Sunday, 03 / 7 / 2021 = 1.482 cfs = 736 min = 7,670 cuft = 59* = 0 ft = 16.70 min = Type III = 484 Q (cfs) 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 10 Post DA 2.2 40 Sunday, 03 / 7 / 2021 Hydrograph type = SCS Runoff Peak discharge = 12.45 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 37,311 cuft Drainage area = 4.890 ac Curve number = 76* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.64 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890 Post DA 2.2 Q WS) Hyd. No. 10 -- 2 Year 14.00 - 12.00 10.00 6.00 4.00 WE Q (cfs) 14.00 12.00 10.00 8.00 MM 4.00 2.00 0.00 -1 1 1 1 1 1 1 1 1- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 11 Post DA 2.3A Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 7.800 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.64 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(3.350 x 98) + (1.800 x 39) + (2.650 x 61)] 17.800 Q (cfs) 15.00 12.00 I 9.00 I I 6.00 I I 3.00 0.00 0 I Post DA 2.3A Hyd. No. 11 -- 2 Year 41 Sunday, 03 17 / 2021 = 14.37 cfs = 730 min = 56,192 cuft = 72* = 0 ft = 12.90 min = Type III = 484 Q (cfs) 15.00 12.00 We' . Me 3.00 - 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 31382019 by Autodesk, Inc. v2019.2 Hyd. No. 12 Post DA 2.3B Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 9.560 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.64 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 Post DA 2.3113 Hyd. No. 12 -- 2 Year 42 Sunday, 03 1712021 = 41.40 cfs = 716 min = 83,979 cuft = 80 = Oft = 5.00 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 12 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 2019 by Autodesk, Inc. v2019.2 Hyd. No. 13 Post DA 2.3C Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.510 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.64 in Distribution Storm duration = 24 hrs Shape factor Q WS) 2.00 1.0( Post DA 2.3C Hyd. No. 13 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 13 43 Sunday, 03 / 7 / 2021 = 1.350 cfs = 718 min = 2,702 tuft = 67 = 0 ft = 5.00 min = Type II = 484 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 44 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 14 Post DA 2.4 Hydrograph type = SCS Runoff Peak discharge = 2.170 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 9,236 cuft Drainage area = 2.020 ac Curve number = 62* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.30 min Total precip. = 4.64 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020 2.00 1.00 Post DA 2.4 Hyd. No. 14 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 14 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report HY hlydFKVaPhs Extension for AuWdwk@ Chit 3 2919 by Autodesk. Inc. vM19.2 Hyd. No. 16 DRY POND - WEST Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Wow hyd. No. = 10 - Post DA 2.2 Max. Elevation Reservoir name = Dry Pond - W EST Max. Storage Storage Indication medal used. Q (cfs) 14.00 12.00 10.00 8.00 M. 4.00 2.00 600 Hyd No. 16 DRY POND - WEST Hyd. No. 16 — 2 Year 45 Sunday, 0317 12021 = 0.872 cis = 830 min = 37,309 cult _ '17.82 ft = 22,100 tuft Q (Cfs) 14.00 12.00 10.00 ME( 6.00 4.00 U L.0® 1200 1800 2400 3000 3600 4200 4800 5400 6000 -- Hyd No. 10 Total storage used = 22,100 cuR Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 2019 by Autodesk, Inc. v2019.2 Hyd. No. 17 Post Inflow to East Pond Hydrograph type = Combine Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyds. = 11, 12 Contrib. drain. area 40.00 30.00 20.00 10.00 Post Inflow to East Pond Hyd. No. 17 -- 2 Year 120 240 360 480 600 720 Hyd No. 17 Hyd No. 11 46 Sunday, 03 / 7 / 2021 = 46.85 cfs = 718 min = 140,171 cuft = 17.360 ac Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 840 960 1080 1200 1320 1440 1560 - Hyd No. 12 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodeskl9 Civic 3DV 2019 by Autodesk, Inc. v2019.2 Hyd. No. 18 DRY POND - EAST Hydrograph type = Reservoir Peale discharge Storm frequency = 2 yrs Time to peals Time interval = 2 min Hyd. volume Inflow hyd. No. = 17 - Post Inflow to ,East Pond Max. Elevation Reservoir name = Dry Pond -EAST Max. Storage storage Indication method used. Q WS) 50.00 40.00 20.00 10.00 0.Od 0 DRY POND - EAST Hyd. No. 18 — 2 Year 47 Sunday. 0317 f 2021 = 4.553 cfs = 776 min = 140,166 cult = 16.7£ ft = 74,244 cult r f i � � 1 ! 1 e I 1r 480 960 1440 1920 2400 Hyd No. 18 Hyd No. 17 Q (cfs) 50.00 40.00 30.00 20.00 10.00 �- 0.00 2880 3360 3840 4320 4800 Time (min) Total storage used = 74,244 cuff Hydrograph Report 48 Hydreflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 20 Post-Dev Outlet B (Detained) Hydrograph type = Combine Peak discharge = 2.266 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 46,546 cuft Inflow hyds. = 14, 16 Contrib. drain. area = 2.020 ac 2.00 1.00 1. L Post-Dev Outlet B (Detained) Hyd. No. 20 -- 2 Year 600 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 20 Hyd No. 14 Hyd No. 16 Q (cfs) 3.00 rW 1.00 0.00 6000 Time (min) Hydrograph Report 49 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 21 Post-Dev Outlet C (Detained) Hydrograph type = Combine Peak discharge = 4.640 cfs Storm frequency = 2 yrs Time to peak = 774 min Time interval = 2 min Hyd. volume = 142,868 cuft Inflow hyds. = 13, 18 Contrib. drain. area = 0.510 ac Q (cfs) 5.00 4.00 3.00 2.00 1.00 Post-Dev Outlet C (Detained) Hyd. No. 21 -- 2 Year 480 960 1440 1920 2400 2880 3360 3840 432( Hyd No. 21 Hyd No. 13 Hyd No. 18 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 4800 Time (min) Hydrograph Report 50 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 22 Post Out Total (Detained) Hydrograph type = Combine Peak discharge = 5.781 cfs Storm frequency = 2 yrs Time to peak = 780 min Time interval = 2 min Hyd. volume = 197,083 cuft Inflow hyds. = 9, 20, 21 Contrib. drain. area = 2.040 ac Q (cfs) 5.00 4.00 3.00 WC 1.00 480 960 Hyd No. 22 Post Out Total (Detained) Hyd. No. 22 -- 2 Year Q (cfs) 6.00 5.00 4.00 3.00 r M 1.00 0.00 1440 1920 2400 2880 3360 3840 4320 4800 5280 Hyd No. 9 Hyd No. 20 Hyd No. 21 Time (min) 51 Hydrograph Summary Repo rlydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 3.427 2 738 18,873 ---- ------ Pre DA 1.1 (Outlet A) 2 SCS Runoff 4.704 2 726 18,045 ---- Pre DA 1.2 3 SCS Runoff 28.97 2 730 116,529 -- --- Pre DA 1.3 (Outlet C) 4 SCS Runoff 3.293 2 730 13,353 ----- ------ ---- Pre DA 1.4 6 Combine 7.674 2 726 31,398 2, 4, ----- Pre-Dev Outlet B 7 Combine 38.43 2 730 166,800 -- Pre-Dev TOTAL OUT 9 SCS Runoff 2.891 2 734 13,663 ----- Post DA 2.1 (Outlet A) 10 SCS Runoff 18.86 2 724 56,393 ------ Post DA 2.2 11 SCS Runoff 22.76 2 728 87,637 ---- Post DA 2.3A 12 SCS Runoff 60.07 2 716 123,312 -- Post DA 2.3B 13 SCS Runoff 2.196 2 718 4,404 --- ------ Post DA 2.3C 14 SCS Runoff 3.970 2 730 15,859 ---- ---- Post DA 2.4 16 Reservoir 4.031 2 750 56,391 10 26,339 DRY POND - WEST 17 Combine 68.89 2 718 210,950 11, 12, -- Post Inflow to East Pond 18 Reservoir 17.14 : 744 210,945 17 17.11 93,398 DRY POND - EAST 20 Combine 6.225 i 3 72,251 14, 16, ---- ------ Post-Dev Outlet B (Detained) 21 Combine 17.37 t - 215,349 13, 18, ---- Post-Dev Outlet C (Detained) 22 Combine 26.06 2 301,262 9, 20, 21 — Post Out Total (Detained) 37630.054 - Hydraflow - 2021.03.04.gpw Return Period: 5 Year Sunday, 03 / 7 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 I Hyd. No. 1 Pre DA 1.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.530 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 6.01 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530 Q (cfs) 4.00 — 3.00 2.00 1.00 Pre DA 1.1 (Outlet A) Hyd. No. 1 -- 5 Year 52 Sunday, 03 / 7 / 2021 = 3.427 cfs = 738 min = 18,873 cuft = 50* = 0 ft = 17.50 min = Type III = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 2 Pre DA 1.2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.620 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 6.01 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] 14.620 Q (cfs) 5.00 4.00 3.00 2.00 1.00 Pre DA 1.2 Hyd. No. 2 -- 5 Year 53 Sunday, 03 / 7 / 2021 = 4.704 cfs = 726 min = 18,045 cuft = 50* = 0 ft = 6.40 min = Type III = 484 Q (cfs) 5.00 4.00 3.00 99 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 3 Pre DA 1.3 (Outlet C) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 15.470 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 6.01 in Distribution Storm duration = 24 hrs Shape factor *Composite (Area/CN) = [(1.840 x 98) + (5.710 x 55) + (0.260x70) + (1.740 x 39) + (5.920 x 61)] / 15.470 25.00 20.00 15.00 10.00 5.00 54 Sunday, 03 / 7 / 2021 = 28.97 cfs = 730 min = 116,529 cult = 61* = 0 ft = 12.90 min = Type III = 484 Pre DA 1.3 (Outlet C) Hyd. No. 3 -- 5 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 4 Pre DA 1.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.850 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 6.01 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850 Q (cfs) 4.00 3.00 t I 2.00 1.00 Pre DA 1.4 Hyd. No. 4 -- 5 Year 55 Sunday, 03 / 7 / 2021 = 3.293 cfs = 730 min = 13,353 cuft = 60* = Oft = 12.30 min = Type III = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 6 Pre-Dev Outlet B 56 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 7.674 cfs Storm frequency = 5 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 31,398 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 6.470 ac Q (cfs) 8.00 6.00 4.00 2.00 Pre-Dev Outlet B Hyd. No. 6 -- 5 Year Q (cfs) 8.00 6.00 4.00 2.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Hyd No. 2 , Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 7 Pre-Dev TOTAL OUT Hydrograph type = Combine Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyds. = 1, 3,6 Contrib. drain. area Q (cfs) 40.00 30.00 10.00 Pre-Dev TOTAL OUT Hyd. No. 7 -- 5 Year 120 240 360 480 600 720 840 Hyd No. 7 Hyd No. 1 57 Sunday, 03 / 7 / 2021 = 38.43 cfs = 730 min = 166,800 cuft = 20.000 ac 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 6 Hydrograph Report 58 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 9 Post DA 2.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge = 2.891 cfs Storm frequency = 5 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 13,663 cuft Drainage area = 2.040 ac Curve number = 59* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.70 min Total precip. = 6.01 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(0.690 x 98) + (1.350 x 39)] / 2.040 2.00 1.00 Post DA 2.1 (Outlet A) Hyd. No. 9 -- 5 Year Q (cfs) 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) i Hydrograph Report 59 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 10 Post DA 2.2 Hydrograph type = SCS Runoff Peak discharge = 18.86 cfs Storm frequency = 5 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 56,393 cuft Drainage area = 4.890 ac Curve number = 76* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.01 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890 Post DA 2.2 Hyd. No. 10 -- 5 Year 15.00 i 12.00 9.00 6.00 f i 3.00 Q (cfs) 21.00 18.00 15.00 12.00 WE 1M. 0.00 1 1 1 1_ I i i i I I I L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph i Report 60 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 11 Post DA 2.3A i Hydrograph type = SCS Runoff Peak discharge = 22.76 cfs Storm frequency = 5 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 87,637 cuft Drainage area = 7.800 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 6.01 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(3.350 x 98) + (1.800 x 39) + (2.650 x 61)] 17.800 Q (cfs) 24.00 — I 20.00 16:00 12.00 8.00 4.00 Post DA 2.3A Hyd. No. 11 -- 5 Year Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 1 1 1 1 _1r" i i 1 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 12 Post DA 2.3B i 61 Sunday, 03 / 7 12021 i Hydrograph type = SCS Runoff Peak discharge = 60.07 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 123,312 cuft Drainage area = 9.560 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA 2.313 Q (cfs) Hyd. No. 12 -- 5 Year Q (Cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 - — 20.00 10.00 10.00 I 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 12 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 13 Post DA 2.3C Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.510 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.01 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 3.00 T- 2.00 1.00 M Post DA 2.3C Hyd. No. 13 -- 5 Year I 62 Sunday, 03 / 7 / 2021 = 2.196 cfs = 718 min = 4,404 tuft = 67 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Hyd. No. 14 Post DA 2.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.020 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 6.01 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020 3.00 1.00 63 Sunday, 03 / 7 / 2021 = 3.970 cfs = 730 min = 15,859 cuft = 62* = Oft = 12.30 min = Type III = 484 Post DA 2.4 Hyd. No. 14 -- 5 Year Q (cfs) 4.00 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) L Hydrograph Report 64 Hydraflow Hydmgraphs Extension for AutodeskV Civil 3130 2019 by Autodesk, Inc. v2019.2 Sunday. 03 / 7 / 2021 I Hyd. No. 16 DRY POND - WEST I Hydrograph type = Reservoir Pear discharge = 4.031 cfs Storm frequency = 5 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 56,391 cult Inflow hyd. No. = 10 -Post DA 2.2 Max. Elevation = 18.11 ft Reservoir name = Dry Pond -WEST Max. Storage = 26,339 tuft Storage Indicabw method used. I i I DRY POND - WEST �c) Hyd. No. 16 — 5 Year 21.00 18.00 15.00 12.00 I 9.00 6.00 3.00 I i i 1 � I � I i � 1 1 1 I � i i s ii Q (cts) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 5760 Time (min) --- Hyd No. 16 -- Hyd No. 10 Total storage used = 26,339 cult Hydrograph Report 65 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 17 / 2021 Hyd. No. 17 Post Inflow to East Pond Hydrograph type = Combine Peak discharge = 68.89 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 210,950 tuft Inflow hyds. = 11, 12 Contrib. drain. area = 17.360 ac 60.00 50.00 40.00 30.00 20.00 10.00 Post Inflow to East Pond Hyd. No. 17 -- 5 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 11 Hyd No. 12 Time (min) Hydr©graph Report tS Hydraflnw Hydm9whs Extension for AutodesM Civil 3138 2019 by Autodesk, Inc. v2019.2 Sunday, 03 17 ! 2021 Hyd. No. 18 DRY POND - EAST Hydrograph tyke =Reservoir Peak discharge = 17.14 cis Storm frequency = 5 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 210,945 cuff Inflow hyd. No. = 17 - Post Inflow to East Pond Max. Elevation = 17.17 ft Reservoir name = Dry Pond -EAST Max. Storage = 93,398 cult Stomp Indicabon metiwd used. DRY POND - EAST Q (ds) Hyd. No. 18 — 5 Year Q (S) 70.00 70.00 1 60.00 60.00 I � i 50.00 50.00 a a 1 y 40.00 40.00 d P � I I 30.00 30.00 20.00 � —__. 20.00 1 10.00 10.00 0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) --- Hyd No. 18 -- Hyd No. 17 Total storage used = 93,398 cuff Hydrograph Report 67 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 20 Post-Dev Outlet B (Detained) Hydrograph type = Combine Peak discharge = 6.225 cfs Storm frequency = 5 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 72,251 cuft Inflow hyds. = 14, 16 Contrib. drain. area = 2.020 ac Q (cfs) r .00 6.00 5.00 4.00 3.00 2.00 1.00 Post-Dev Outlet B (Detained) Hyd. No. 20 -- 5 Year Q (Cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Hyd No. 20 — Hyd No. 14 , Hyd No. 16 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 21 Post-Dev Outlet C (Detained) 68 Sunday, 03 17 / 2021 Hydrograph type = Combine Peak discharge = 17.37 cfs Storm frequency = 5 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 215,349 cuft Inflow hyds. = 13, 18 Contrib. drain. area = 0.510 ac 15.00 12.00 'M M 3.00 480 960 — Hyd No. 21 Post-Dev Outlet C (Detained) Hyd. No. 21 -- 5 Year Q (cfs) 18.00 15.00 12.00 MM M 3.00 0.00 1440 1920 2400 2880 3360 3840 4320 4800 Hyd No. 13 Hyd No. 18 Time (min) Hydrograph Report 69 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 12021 Hyd. No. 22 Post Out Total (Detained) Hydrograph type = Combine Peak discharge = 26.06 cfs Storm frequency = 5 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 301,262 cuft Inflow hyds. = 9, 20, 21 Contrib. drain. area = 2.040 ac 24.00 20.00 16.00 12.00 8.00 4.00 480 960 Hyd No. 22 Post Out Total (Detained) Hyd. No. 22 -- 5 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 1440 1920 2400 2880 3360 3840 4320 4800 Hyd No. 9 Hyd No. 20 Hyd No. 21 Time (min) 70 Hydrograph Summary Repo rlydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 5.875 2 736 29,346 ----- ------ Pre DA 1.1 (Outlet A) 2 SCS Runoff 8.264 2 724 28,058 ---- ------ ---- Pre DA 1.2 3 SCS Runoff 42.08 2 730 165,304 --- ------ ------ Pre DA 1.3 (Outlet C) 4 SCS Runoff 4.834 2 730 19,067 ---- ---- ---- Pre DA 1.4 6 Combine 12.43 2 726 47,126 2, 4, -- --- Pre-Dev Outlet B 7 Combine 57.88 2 728 241,776 1, 3, 6 - ---- Pre-Dev TOTAL OUT 9 SCS Runoff 4.308 2 734 19,644 --- ----- Post DA 2.1 (Outlet A) 10 SCS Runoff 24.64 2 724 73,967 ---- ----- Post DA 2.2 11 SCS Runoff 30.53 2 728 117,047 ------ Post DA 2.3A 12 SCS Runoff 76.61 2 716 159,046 ---- --- Post DA 2.313 13 SCS Runoff 2.987 2 716 6,032 --- ---- Post DA 2.3C 14 SCS Runoff 5.712 730 22,355 --- ------ Post DA 2.4 16 Reservoir 6.352 746 73,965 10 18.48 32,427 DRY POND - WEST 17 Combine 88.65 716 276,093 11, 12, Post Inflow to East Pond 18 Reservoir 30.75 738 276,088 17 1 109,859 DRY POND - EAST 20 Combine 11.02 732 96,320 14, 16, ----- Post-Dev Outlet B (Detained) 21 Combine 31.10 738 282,119 13, 18, ------ Post-Dev Outlet C (Detained) 22 Combine 45.98 736 398,084 9, 20, 21 Post Out Total (Detained) 37630.054 - Hydraflow - 2021.03.04.gpw Return Period: 10 Year Sunday, 03 / 7 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 1 Pre DA 1.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.530 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 7.21 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) _ [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530 Q (cfs) 5.00 4.00 3.00 1.00 Pre DA 1.1 (Outlet A) Hyd. No. 1 -- 10 Year 71 Sunday, 03 / 7 / 2021 = 5.875 cfs = 736 min = 29,346 cuft = 50* = 0 ft = 17.50 min = Type III = 484 Q (cfs) 6.00 Me 4.00 c 1t 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 2019 by Autodesk, Inc. v2019.2 Hyd. No. 2 Pre DA 1.2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.620 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 7.21 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) [(0.680 x 30) + (3.200 x 55) + (0.l40 x 70) + (0.470 x 39) + (0.100 x 6l) + (0.030 x 74)] / 4.620 Q (cfs) QI 6.00 4.00 2.00 Pre DA 1.2 Hyd. No. 2 -- 10 Year 72 Sunday, 03 / 7 / 2021 = 8.264 cfs = 724 min = 28,058 cuft = 50* = Oft = 6.40 min = Type III = 484 Q (cfs) 10.00 M 6.00 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No 2 Time (min) Hydrograph Report 73 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 12021 Hyd. No. 3 Pre DA 1.3 (Outlet C) Hydrograph type = SCS Runoff Peak discharge = 42.08 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 165,304 cuft Drainage area = 15.470 ac Curve number = 61* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 7.21 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470 i Pre DA 1.3 (Outlet C) (S) Hyd. No. 3 -- 10 Year Q (afS) 50.00 �— 50.00 40.00 30.00 20.00 10.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2019.2 Hyd. No. 4 Pre DA 1.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.850 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 7.21 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)]11.850 Q (cfs) 4.00 3.00 2.00 1.00 Pre DA 1.4 Hyd. No. 4 -- 10 Year 74 Sunday, 03 17 / 2021 = 4.834 cfs = 730 min = 19,067 cuft = 60* = 0 ft = 12.30 min = Type III = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report 75 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 6 Pre-Dev Outlet B Hydrograph type = Combine Peak discharge = 12.43 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 47,126 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 6.470 ac E Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 Pre-Dev Outlet B Hyd. No. 6 -- 10 Year Q (cfs) 14.00 12.00 10.00 KI 6.00 4.00 f• i 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 2 Hyd No. 4 Hydrograph Report 76 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 7 Pre-Dev TOTAL OUT Hydrograph type = Combine Peak discharge = 57.88 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 241,776 cuft Inflow hyds. = 1, 3, 6 Contrib. drain. area = 20.000 ac Q (cfs) 50.00 40.00 30.00 20.00 10.00 l L M Pre-Dev TOTAL OUT Hyd. No. 7 -- 10 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 1 Hyd No. 3 Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 9 Post DA 2.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.040 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 7.21 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) _ [(0.690 x 98) + (1.350 x 39)] / 2.040 Q (cfs) 4.00 3.00 2.00 1.00 Post DA 2.1 (Outlet A) Hyd. No. 9 -- 10 Year 120 240 360 480 600 720 Hyd No. 9 77 Sunday, 03 / 7 / 2021 = 4.308 cfs = 734 min = 19,644 cuft = 59* = 0 ft = 16.70 min = Type III = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 10 Post DA 2.2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.890 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.21 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890 24.00 20.00 16.00 12.00 8.00 4.00 78 Sunday, 03 / 7 / 2021 = 24.64 cfs = 724 min = 73,967 cuft = 76* = Oft = 5.00 min = Type III = 484 Post DA 2.2 Hyd. No. 10 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 11 Post DA 2.3A 79 Sunday, 03 17 / 2021 Hydrograph type = SCS Runoff Peak discharge = 30.53 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 117,047 cuft Drainage area = 7.800 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 7.21 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3.350 x 98) + (1.800 x 39) + (2.650 x 61)] / 7.800 Q (cfs) 35.00 30.00 25.00 20.00 ,I 15.00 10.00 5.00 Post DA 2.3A Hyd. No. 11 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 -I 1 1 1 1 1 i .. i i i I i L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Report 80 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 12021 Hyd. No. 12 Post DA 2.3B Hydrograph type = SCS Runoff Peak discharge = 76.61 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 159,046 cuft Drainage area = 9.560 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 Post DA 2.313 Hyd. No. 12 -- 10 Year Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 12 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 2019 by Autodesk, Inc. v2019.2 Hyd. No. 13 Post DA 2.3C Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.510 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.21 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 3.00 2.00 1.00 Post DA 2.3C Hyd. No. 13 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 13 81 Sunday, 03 / 7 / 2021 = 2.987 cfs = 716 min = 6,032 cuft = 67 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 14 Post DA 2.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.020 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 7.21 in Distribution Storm duration = 24 hrs Shape factor *Composite (Area/CN) [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020 5.00 4.00 3.00 2.00 1.00 82 Sunday, 03 / 7 / 2021 = 5.712 cfs = 730 min = 22,355 cuft = 62* = Oft = 12.30 min = Type III = 484 Post DA 2.4 Hyd. No. 14 -- 10 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) Hydrog� aph Report $3 E Hydraffaw Hydrographs Extension for AutodeskJ Civil 3M 2019 by Autmdesk, Inc. v2019.2 Sunday. 0317 / 2021 Hyd. No. 1 6 DRY POND - WEST Hydrograph type = Reservoir Peak discharge = 6.352 cfs Storm frequency = 10 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 73,965 cult Inflow hyd. No. = 10 - Post DA 2.2 Max. Elevation = 18.48 ft Reservoir name = Dry Pond -WEST Max. Storage = 32,427 tuft Storage Indication mettW used. DRY POND - !NEST Q WS) Hyd. No. 16 —10 Year a (ds) 28A0 24.00 20.00 16.00 12.00 8.00 4.00 0.00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (train) Hyd No. 16 Hyd No. 10 Total storage used = 32,427 cult Hydrograph Report 84 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 17 Post Inflow to East Pond Hydrograph type = Combine Peak discharge = 88.65 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 276,093 cuft Inflow hyds. = 11, 12 Contrib. drain. area = 17.360 ac Post Inflow to East Pond Hyd. No. 17 -- 10 Year 80.00 70.00 '60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 -f 1 1 1 1— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 11 Hyd No. 12 Time (min) Hydrograph Report $5 HydraBow Hydrographs Extension for Autodesk3) Civil 3D@ 2019 by Autodesk, Inc. VM19.2 Sunday. 031712W I Hyd. No. 18 DRY POND - EAST Hydrograph type = Reservoir Peak discharge = 30.75 cfs Storm frequency = 10 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 276,088 cult Inflow hyd. No. = 17 - Post Inflow to East Pond Max. Elevation = 17.50 ft Reservoir name = Dry Pond - EAST Max. Storage = 109,859 tuft Storage Indication anethod used. Q {cis; 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 DRY POND - EAST Hyd. No. 18 --10 Year a f i E i 1 , r 9 � A qq a 1 � 3 i Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 --- - - 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 18 -- Hyd No. 17 Total storage used=109,869 cuff Hydrograph Report 86 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Sunday, 03 17 / 2021 Hyd. No. 20 Post-Dev Outlet B (Detained) Hydrograph type = Combine Peak discharge = 11.02 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 96,320 cuft Inflow hyds. = 14, 16 Contrib. drain. area = 2.020 ac 10.00 8.00 WC 4.00 2.00 Post-Dev Outlet B (Detained) Hyd. No. 20 -- 10 Year Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Hyd No. 14 ,Hyd No. 16 Time (min) Hydrograph Report 87 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 21 Post-Dev Outlet C (Detained) Hydrograph type = Combine Peak discharge = 31.10 cfs Storm frequency = 10 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 282,119 cuft Inflow hyds. = 13, 18 Contrib. drain. area = 0.510 ac Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 360 720 Hyd No. 21 Post-Dev Outlet C (Detained) Hyd. No. 21 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1080 1440 1800 2160 2520 2880 3240 3600 3960 Hyd No. 13 Hyd No. 18 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 22 Post Out Total (Detained) Hydrograph type = Combine Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyds. = 9, 20, 21 Contrib. drain. area Q (cfs) 50.00 — 40.00 30.00 9MM 10.00 0.00 0 240 480 Hyd No. 22 Post Out Total (Detained) Hyd. No. 22 -- 10 Year 88 Sunday, 03 17 / 2021 n = 45.98 cfs = 736 min = 398,084 cuft = 2.040 ac Q (cfs) 50.00 40.00 30.00 20.00 10.00 -- 0.00 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Hyd No. 9 Hyd No. 20 Hyd No. 21 Time (min) 89 Hydrograph Summary Repo rlydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 10.28 2 734 48,044 -- ----- Pre DA 1.1 (Outlet A) 2 SCS Runoff 14.57 2 724 45,936 ---- ------ Pre DA 1.2 3 SCS Runoff 63.97 2 728 247,372 ----- --- Pre DA 1.3 (Outlet C) 4 SCS Runoff 7.407 2 728 28,725 ----- --- Pre DA 1.4 6 Combine 20.67 2 726 74,661 2, 4, ----- Pre-Dev Outlet B 7 Combine 91.16 2 728 370,077 4 C ------ Pre-Dev TOTAL OUT 9 SCS Runoff 6.685 2 734 29,800 ------ Post DA 2.1 (Outlet A) 10 SCS Runoff 33.68 2 724 102,031 --- --- Post DA 2.2 11 SCS Runoff 42.87 2 728 164,562 --- ----- Post DA 2.3A 12 SCS Runoff 102.15 2 716 215,540 ----- ---- Post DA 2.3B 13 SCS Runoff 4.293 2 716 8,705 ----- ---- Post DA 2.3C 14 SCS Runoff 8.615 1 728 33,237 ---- Post DA 2.4 16 Reservoir 9.034 2 744 102,030 10 43,686 DRY POND - WEST 17 Combine 119.75 2 716 380,102 11, 12, ----- Post Inflow to East Pond 18 Reservoir 46.57 2 734 380,097 17 18.1u 140,880 DRY POND - EAST 20 Combine 16.97 2 730 135,267 14, 16, Post-Dev Outlet B (Detained) 21 Combine 47.12 2 734 388,803 13, 18, -- Post-Dev Outlet C (Detained) 22 Combine 70.29 2 732 553,869 9, 20, 21 ---- Post Out Total (Detained) 37630.054 - Hydraflow - 2021.03.04.gpw Return Period: 25 Year Sunday, 03 / 7 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 1 Pre DA 1.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.530 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 9.06 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) _ [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)) / 4.530 Q (cfs) 12.00 10.00 " Me] 4.00 r 1i Pre DA 1.1 (Outlet A) Hyd. No. 1 -- 25 Year 90 Sunday, 03 17 / 2021 = 10.28 cfs = 734 min = 48,044 cuft = 50* = Oft = 17.50 min = Type III = 484 Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3170 2019 by Autodesk, Inc. v2019.2 Hyd. No. 2 Pre DA 1.2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.620 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of cons. (Tc) Total precip. = 9.06 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] / 4.620 Q (cfs) 15.00 — 12.00 6.00 i 11 Pre DA 1.2 Hyd. No. 2 -- 25 Year 91 Sunday, 03 / 7 / 2021 = 14.57 cfs = 724 min = 45,936 cuft = 50" = Oft = 6.40 min = Type III = 484 Q (cfs) 15.00 12.00 6.00 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 3 Pre DA 1.3 (Outlet C) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 15.470 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 9.06 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 6l )] / l5.470 Q (Cfs) 60.00 50.00 40.00 30.00 1 11 10.00 0.00 0 Pre DA 1.3 (Outlet C) Hyd. No. 3 -- 25 Year 92 Sunday, 03 / 7 / 2021 = 63.97 cfs = 728 min = 247,372 cuft = 61* = Oft = 12.90 min = Type III = 484 Q (cfs) 70.00 50.00 40.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 4 Pre DA 1.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.850 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 9.06 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = ((0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850 Q (cfs) a nr% MM 4.00 YX 0.00 0 Pre DA 1.4 Hyd. No. 4 -- 25 Year 93 Sunday, 03 / 7 / 2021 = 7.407 cfs = 728 min = 28,725 cuft = 60* = Oft = 12.30 min = Type III = 484 Q (cfs) 8.00 . 11 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report 94 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 6 Pre-Dev Outlet B Hydrograph type = Combine Peak discharge = 20.67 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 74,661 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 6.470 ac Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 Pre-Dev Outlet B Hyd. No. 6 -- 25 Year Q (cfs) 21.00 18.00 15.00 12.00 M 6.00 3.00 0.00 -I 1 1 1 1 _- 1 - L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 2 ' Hyd No. 4 Hydrograph Report 95 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 7 Pre-Dev TOTAL OUT Hydrograph type = Combine Peak discharge = 91.16 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 370,077 cuft Inflow hyds. = 1, 3, 6 Contrib. drain. area = 20.000 ac Pre-Dev TOTAL OUT Q (Cfs) Hyd. No. 7 -- 25 Year Q (Cfs) 100.00 100.00 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 { 10.00 �i 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 1 I Hyd No. 3 Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2019.2 Hyd. No. 9 Post DA 2.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.040 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 9.06 in Distribution Storm duration = 24 hrs Shape factor *Composite (Area/CN) _ [(0.690 x 98) + (1.350 x39)]12.040 6.00 5.00 4.00 3.00 2.00 1.00 96 Sunday, 03 / 7 / 2021 = 6.685 cfs = 734 min = 29,800 cuft = 59* = Oft = 16.70 min = Type III = 484 Post DA 2.1 (Outlet A) Hyd. No. 9 -- 25 Year Q (cis) 7.00 Am 5.00 4.00 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report 97 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 10 Post DA 2.2 Hydrograph type = SCS Runoff Peak discharge = 33.68 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 102,031 cuft Drainage area = 4.890 ac Curve number = 76* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.06 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890 Post DA 2.2 Hyd. No. 10 -- 25 Year 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 4 11 0.00 - I I I I I I _L i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 11 Post DA 2.3A Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 7.800 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 9.06 in Distribution Storm duration = 24 hrs Shape factor ` Composite (Area/CN) = [(3.350 x 98) + (1.800 x 39) + (2.650 x 61)] / 7.800 Q (cfs) 50.00 40.00 30.00 20.00 10.00 Post DA 2.3A Hyd. No. 11 -- 25 Year 98 Sunday, 03 / 7 12021 = 42.87 cfs = 728 min = 164,562 cuft = 72* = 0 ft = 12.90 min = Type III = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) r Hydrograph Report 99 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 12 I Post DA 2.3B Hydrograph type = SCS Runoff Peak discharge = 102.15 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 215,540 cuft Drainage area = 9.560 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.06 in Distribution = Type II j Storm duration = 24 hrs Shape factor = 484 Q (cfs) 120.00 100.00 -80.00 60.00 40.00 20.00 Post DA 2.3113 Hyd. No. 12 -- 25 Year Q (cfs) 120.00 100.00 80.00 40.00 0.00 120 240 360 480 600 720 840 960 1080 1200 Hyd No 12 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 13 Post DA 2.3C 100 Sunday, 03 / 7 / 2021 Hydrograph type = SCS Runoff Peak discharge = 4.293 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 8,705 cuft Drainage area = 0.510 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.06 in Distribution = Type ll Storm duration = 24 hrs Shape factor = 484 Q (cfs) 4.00 3.00 l j 2.00 1.00 Post DA 2.3C Hyd. No. 13 -- 25 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 13 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 14 Post DA 2.4 101 Sunday, 03 / 7 / 2021 Hydrograph type = SCS Runoff Peak discharge = 8.615 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 33,237 cuft Drainage area = 2.020 ac Curve number = 62* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.30 min Total precip. = 9.06 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020 Q (cfs) 10.00 - 8.00 6.00 4.00 2.00 Post DA 2.4 Hyd. No. 14 -- 25 Year Q (cfs) 10.00 8.00 M 4.00 2.00 0.00 -I 1 1 1 1 - I i i i 1- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) Hydrograph Report 102 Hydrallow Hydrographs Extension for AutodeskV Civil 3130 2019 by Autodesk, Inc. v2019.2 Sunday, 0317 J 2MI Hyd, No. 16 DRY POND - WEST Hydrograph type = Reservoir Peak discharge = 9.034 cfs Storm frequency = 25 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 102,030 tuft Inflow hyd. No. = 10 - Post DA 2.2 Max. Elevation = 19.14 ft Reservoir name = Dry Pond -WEST Max. Storage = 43,686 cult Storage Indication Tnethod used. Q {cfs; 35.00 30.00 25.00 20.00 15.00 MCA DRY POND - WEST Hyd. No. 16 — 25 Year I Y s i } 1 4 1 d s 4 1 4 1 I � � I I Q (cis) 35.00 30.00 25.00 t 15.00 10.00 5.00 0.00 -L— . ' 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 Time (min) Hyd No. 16 Hyd No. 10 Total storage used = 43,686 cult Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 l Hyd. No. 17 Post Inflow to East Pond 103 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 119.75 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 380,102 cuft Inflow hyds. = 11, 12 Contrib. drain. area = 17.360 ac Post Inflow to East Pond Hyd. No. 17 -- 25 Year 100.00 80.00 I 60.00 4 I 40.00 20.00 I Q (Cfs) 120.00 100.00 40.00 20.00 0.00 1 1 1 i i L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 11 Hyd No. 12 Time (min) Hydrograph Report 1 104 Hydras = Hydrographs E4wsion for Autodeskg Civil 3D@ 2019 by Autodesk. Inc. Y2019.2 Sunday. 03 / 7 / 2021 Hyd. No. 18 DRY POND - EAST Hydrograph type = Reservoir Peak discharge = 46.57 cls Storm frequency = 25 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 380,097 cult Inflow hyd. No. = 17 - Post Inflow to East Pond Max. Elevation = 18.10 ft Reservoir name = Dry Pond -EAST Max. Storage = 140,880 cult storage Indicabon inethod used. DRY POND - EAST Q (`s) Hyd. No. 18 — 25 Year Q (ds) i 120.00 � 120.00 100.00 a 100.00 J I 80.00 - ' 1 i 80.00 ` � J{ V { 60.00 1 60.00 I 40.00 9 40.00 7 i 20.00 20.00 0.00 - l I __ i._- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 i Hyd No. 18 —Hyd No. 17 Total storage used=140,880 cult Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Hyd. No. 20 Post-Dev Outlet B (Detained) 105 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 16.97 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 135,267 cult Inflow hyds. = 14, 16 Contrib. drain. area = 2.020 ac Q (cfs) ' 18.00 - 15.00 12.00 9.00 6.00 3.00 Post-Dev Outlet B (Detained) Hyd. No. 20 -- 25 Year Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 1 1 1 ' -- — ...� i I I- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Hyd No. 14 Hyd No. 16 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 21 Post-Dev Outlet C (Detained) Hydrograph type = Combine Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyds. = 13, 18 Contrib. drain. area 40.00 30.00 20.00 10.00 Post-Dev Outlet C (Detained) Hyd. No. 21 -- 25 Year 120 240 360 480 600 Hyd No. 21 Hyd No. 13 106 Sunday, 03 / 7 / 2021 = 47.12 cfs = 734 min = 388,803 cuft = 0.510 ac Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 720 840 960 1080 1200 1320 1440 1560 , Hyd No. 18 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 22 Post Out Total (Detained) 107 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 70.29 cfs Storm frequency = 25 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 553,869 tuft Inflow hyds. = 9, 20, 21 Contrib. drain. area = 2.040 ac Q (cfs 80.00 - 80.00 70.00 70.00 60.00 - 60.00 50.00 — 50.00 40.00 - 40.00 30.00 30.00 20.00 20.00 { i 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 22 Hyd No. 9 - Hyd No. 20 Hyd No. 21 Time (min) Post Out Total (Detained) Hyd. No. 22 -- 25 Year 108 jI L Hydrograph Summary Report ydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 14.66 2 734 66,558 ----- - Pre DA 1.1 (Outlet A) 2 SCS Runoff 20.75 2 724 63,638 --- ------ ----- Pre DA 1.2 3 SCS Runoff 84.64 2 728 325,029 ----- --- ------ Pre DA 1.3 (Outlet C) 4 SCS Runoff 9.856 2 728 37,896 ---- ------ ------ Pre DA 1.4 6 Combine 28.88 2 724 101,534 2, 4, ---- ------ Pre-Dev Outlet B 7 Combine 122.66 2 728 493,120 1, ' ------ ---- Pre-Dev TOTAL OUT 9 SCS Runoff 8.920 2 734 39,477 ----- ---- Post DA 2.1 (Outlet A) 10 SCS Runoff 41.72 2 724 127,547 ---- ----- Past DA 2.2 11 SCS Runoff 53.97 2 728 208,139 ---- ------ Post DA 2.3A 12 SCS Runoff 124.71 2 716 266,522 -- ---- Post DA 2.313 13 SCS Runoff 5.480 2 716 11,189 --- ------ Post DA 2.3C 14 SCS Runoff 11.34 ' 728 43,500 --- ---- Post DA 2.4 16 Reservoir 15.16 2 738 127,545 10 19.52 51,171 DRY POND - WEST 17 Combine 147.41 2 716 474,661 11, 12, ---- ----- Post Inflow to East Pond 18 Reservoir 64.45 ' 732 474,656 17 18.56 166,868 DRY POND - EAST 20 Combine 24.39 2 732 171,046 14, 16, Post-Dev Outlet B (Detained) 21 Combine 65.16 2 732 485,845 13, 18, ----- Past-Dev Outlet C (Detained) 22 Combine 98.41 732 696,368 9, 20, 21 Post Out Total (Detained) 37630.054 - Hydraflow - 2021.03.04.gpw Return Period: 50 Year Sunday, 03 17 12021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 1 Pre DA 1.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.530 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 10.70 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) _ [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530 Q (cfs) 15.00 12.00 9.00 6.00 3.00 Pre DA 1.1 (Outlet A) Hyd. No. 1 -- 50 Year 109 Sunday, 03 / 7 / 2021 = 14.66 cfs = 734 min = 66,558 cuft = 50* = Oft = 17.50 min = Type III = 484 Q (cfs) 15.00 12.00 M . 11 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 110 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 2 Pre DA 1.2 Hydrograph type = SCS Runoff Peak discharge = 20.75 cfs Storm frequency = 50 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 63,638 cuft Drainage area = 4.620 ac Curve number = 50* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.40 min Total precip. = 10.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ` Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] / 4.620 Q (cfs) 21 18.00 15.00 12.00 WE 6.00 3.00 Pre DA 1.2 Hyd. No. 2 -- 50 Year Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 -' 1 1 1 I I I I -_ i I i L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 3 Pre DA 1.3 (Outlet C) 111 Sunday, 03 / 7 / 2021 Hydrograph type = SCS Runoff Peak discharge = 84.64 cfs Storm frequency = 50 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 325,029 cuft Drainage area = 15.470 ac Curve number = 61 * Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 10.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) = [(1.840 x 98) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470 Pre DA 1.3 (Outlet C) Hyd. No. 3 -- 50 Year 80.00 70.00 60.00 50.00 40.00 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 31W2019 by Autodesk, Inc. v2019.2 Hyd. No. 4 Pre DA 1.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.850 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 10.70 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850 Q (cfs) 10.00 M . 1X 4.00 2.00 Pre DA 1.4 Hyd. No. 4 -- 50 Year 112 Sunday, 03 17 / 2021 = 9.856 cfs = 728 min = 37,896 cuft = 60* = Oft = 12.30 min = Type III = 484 Q (Cfs) 10.00 KI 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 6 Pre-Dev Outlet B 113 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 28.88 cfs Storm frequency = 50 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 101,534 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 6.470 ac 25.00 20.00 15.00 10.00 5.00 t ' 0.00 0 Pre-Dev Outlet B Hyd. No. 6 -- 50 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 2 Hyd No. 4 Hydrograph Report 114 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 7 Pre-Dev TOTAL OUT Hydrograph type = Combine Peak discharge = 122.66 cfs Storm frequency = 50 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 493,120 cuft Inflow hyds. = 1, 3, 6 Contrib. drain. area = 20.000 ac 120.00 100.00 80.00 60.00 40.00 20.00 Pre-Dev TOTAL OUT Hyd. No. 7 -- 60 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 1 Hyd No. 3 Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 9 Post DA 2.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.040 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 10.70 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(0.690 x 98) + (1.350 x 39)] / 2.040 Q (cfs) 10.00 — 8.00 6.00 4.00 2.00 Post DA 2.1 (Outlet A) Hyd. No. 9 -- 50 Year 115 Sunday, 03 17 / 2021 = 8.920 cfs = 734 min = 39,477 tuft = 59* = 0 ft = 16.70 min = Type III = 484 Q (cfs) 10.00 8.00 Ace 4.00 WC 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 10 Post DA 2.2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.890 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 10.70 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890 Q (cfs) 50.00 30.00 20.00 10.00 Post DA 2.2 Hyd. No. 10 -- 50 Year 120 240 360 480 600 720 840 Hyd No. 10 116 Sunday, 03 / 7 / 2021 = 41.72 cfs = 724 min = 127,547 cuft = 76* = Oft = 5.00 min = Type III = 484 Q (cfs) 50.00 40.00 20.00 10.00 0.00 960 1080 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 11 Post DA 2.3A Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 7.800 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 10.70 in Distribution Storm duration = 24 hrs Shape factor ' Composite (Area/CN) = [(3.350 x 98) + (1.800 x 39) + (2.650 x 61)] / 7.800 Q (cfs) 50.00 40.00 30.00 20.00 10.00 Post DA 2.3A Hyd. No. 11 -- 50 Year 117 Sunday, 03 / 7 12021 = 53.97 cfs = 728 min = 208,139 tuft = 72* = Oft = 12.90 min = Type III = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Report 118 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 0317 12021 Hyd. No. 12 Post DA 2.3B Hydrograph type = SCS Runoff Peak discharge = 124.71 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 266,522 cuft Drainage area = 9.560 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 10.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 120.00 100.00 80.00 60.00 40.00 20.00 Post DA 2.31B Hyd. No. 12 -- 50 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 12 Time (min) Hydrograph Report 119 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 13 Post DA 2.3C Hydrograph type = SCS Runoff Peak discharge = 5.480 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 11,189 cuft Drainage area = 0.510 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 10.70 in Distribution = Type II l l Storm duration = 24 hrs Shape factor = 484 5.00 4.00 3.00 2.00 1.00 0.00 0 Post DA 2.3C Hyd. No. 13 -- 50 Year 120 240 360 480 600 720 840 Hyd No. 13 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 14 Post DA 2.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.020 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 10.70 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020 Q (cfs) 12.00 — 10.00 6.00 4.00 2.00 Post DA 2.4 Hyd. No. 14 -- 50 Year 120 Sunday, 03 / 7 / 2021 = 11.34 cfs = 728 min = 43,500 tuft = 62* = 0 ft = 12.30 min = Type III = 484 Q (cfs) 12.00 10.00 w 6.00 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) Hydrograph Report Hydmllio r WWmWaphs Extension for Autode" cirri 3D& 2019 by Autodesk. Inc. M192 Hyd. No. 1 G DRY POND - WEST Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Post DA 2.2 Max. Elevation Reservoir name = Dry Pond -WEST Max. Storage Storage lndicafaon method used. DRY POND - WEST Hyd. No. 16 — 50 Year 40.00 30.00 20.00 10.00 121 Sunday, 031712021 = 15.16 cfs = 738 min = 127,545 c uft _ 19.52 ft = 51,171 cuft Q (ds) 50.00 40.00 d t� 20.00 10.00 0.00 1 1 1 -- - . i_ O.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 Hyd No. 10 Total storage used = 51,171 cult Time (min) Hydrograph Report 122 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 17 Post Inflow to East Pond Hydrograph type = Combine Peak discharge = 147.41 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 474,661 cuft Inflow hyds. = 11, 12 Contrib. drain. area = 17.360 ac Post Inflow to East Pond Hyd. No. 17 -- 50 Year 140.00 120.00 100.00 80.00 .M 40.00 20.00 Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 -I --r - - - I i- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 11 Hyd No. 12 Time (min) Hydrograph Report 123 Hydraflow Hydrographs Extension for AutodeskV OW 3D@ 2019 by Autodesk, Inc, v2019.2 DRY POND - EAST Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 17 - Post Inflow to East Pond Max. Elevation Reservoir name = Dry Pond - EAST Max. Storage Storage Indication rnedW used. DRY POND - EAST Sunday, 031712021 = 64.45 cfs = 732 mitt = 474,656 cult = 18.56 ft = 166,868 cult Q (cfs) Hyd. No. 18 -- 50 Year Q (cfs) 160.00 160.00 a 140.00 , 140.00 120.00 120.00 i j J --....-.— __ 1 100.00 100.00 80.00 80.00 60.00 I �, 60.00 i 40.00 I 40.00 � l t 20.00 20.00 0.00 - i - 0.00 L 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 17 Total storage used=166,868 cuff Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Hyd. No. 20 Post-Dev Outlet B (Detained) 124 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 24.39 cfs Storm frequency = 50 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 171,046 cuft Inflow hyds. = 14, 16 Contrib. drain. area = 2.020 ac 24.00 20.00 16.00 12.00 8.00 4.00 Post-Dev Outlet B (Detained) Hyd. No. 20 -- 50 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 - 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Hyd No. 14 Hyd No. 16 Time (min) Hydrograph Report 125 Hydraflow Hydrographs Extension for Autodesk® Civil 3139) 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 21 Post-Dev Outlet C (Detained) Hydrograph type = Combine Peak discharge = 65.16 cfs Storm frequency = 50 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 485,845 cuft Inflow hyds. = 13, 18 Contrib. drain. area = 0.510 ac 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 Post-Dev Outlet C (Detained) Hyd. No. 21 -- 50 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 Hyd No. 13 Hyd No. 18 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 22 Post Out Total (Detained) Hydrograph type = Combine Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyds. = 9, 20, 21 Contrib. drain. area 60.00 40.00 20.00 Post Out Total (Detained) Hyd. No. 22 -- 50 Year 120 240 360 480 600 720 840 Hyd No. 22 Hyd No. 9 126 Sunday, 03 / 7 / 2021 = 98.41 cfs = 732 min = 696,368 cuft = 2.040 ac Q (cfs) 100.00 60.00 40.00 20.00 0.00 960 1080 1200 1320 1440 1560 Hyd No. 20 Hyd No. 21 Time (min) 127 Hydrograph Summary Report ydraflow Hydrographs Extension for Autodesk0 Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 20.07 2 734 89,691 ---- ------ Pre DA 1.1 (Outlet A) 2 SCS Runoff 28.40 2 724 85,756 ----- ----- Pre DA 1.2 3 SCS Runoff 109.34 2 728 419,006 ----- ------ Pre DA 1.3 (Outlet C) 4 SCS Runoff 12.79 2 728 49,020 --- ------ --- Pre DA 1.4 6 Combine 39.04 2 724 134,776 2, 4, ------ ----- Pre-Dev Outlet B 7 Combine 160.65 2 728 643,472 ' ' ---- Pre-Dev TOTAL OUT 9 SCS Runoff 11.60 2 734 51,246 -- Post DA 2.1 (Outlet A) 10 SCS Runoff 51.02 2 724 157,590 ------ Post DA 2.2 11 SCS Runoff 66.91 2 728 269,751 --- Post DA 2.3A 12 SCS Runoff 150.72 2 716 326,252 -- ---- Post DA 2.313 13 SCS Runoff 6.871 2 716 14,156 --• ----- Post DA 2.3C 14 SCS Runoff 14.58 7 728 55,891 - -- — Post DA 2.4 16 Reservoir 5.57 2 32 157,588 10 19.80 56,436 DRY POND - WEST 17 Combine 79.43 2 16 586,003 11, 12, -- Post Inflow to East Pond 18 Reservoir 19.84 r24 585,998 17 1f 185,415 DRY POND- EAST 20 Combine 39.90 2 730 213,479 14, 16, -- ------ Post-Dev Outlet B (Detained) 21 Combine 101.69 2 724 600,154 - 13, 18, -- Post-Dev Outlet C (Detained) 22 Combine 144.99 730 864,879 9, 20, 21 --- Post Out Total (Detained) 37630.054 - Hydraflow - 2021.03.04.gpw Return Period: 100 Year Sunday, 03 / 7 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 2019 by Autodesk, Inc. v2019.2 Hyd. No. 1 Pre DA 1.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.530 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 12.60 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) _ [(0.700 x 98) + (0.010 x 55) + (3.470 x 39) + (0.350 x 61)] / 4.530 Q (cfs) 21.00 — 18.00 15.00 12.00 9.00 . �� 3.00 Pre DA 1.1 (Outlet A) Hyd. No. 1 -- 100 Year 128 Sunday, 03 / 7 / 2021 = 20.07 cfs = 734 min = 89,691 cuft = 50* = 0 ft = 17.50 min = Type III = 484 Q (cfs) 21.00 18.00 15.00 12.00 M 6.00 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Hyd. No. 2 Pre DA 1.2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.620 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 12.60 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(0.680 x 30) + (3.200 x 55) + (0.140 x 70) + (0.470 x 39) + (0.100 x 61) + (0.030 x 74)] / 4.620 25.00 20:00 15.00 10.00 5.00 0.00 0 Pre DA 1.2 Hyd. No. 2 -- 100 Year 129 Sunday, 03 / 7 / 2021 = 28.40 cfs = 724 min = 85,756 cuft = 50* = Oft = 6.40 min = Type III = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 4 YX 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 3 Pre DA 1.3 (Outlet C) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 15.470 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 12.60 in Distribution Storm duration = 24 hrs Shape factor *Composite (Area/CN) [(1.B40 x 9B) + (5.710 x 55) + (0.260 x 70) + (1.740 x 39) + (5.920 x 61)] / 15.470 100.00 60.00 40.00 20.00 130 Sunday, 03 / 7 / 2021 = 109.34 cfs = 728 min = 419,006 cuft = 61* = 0 ft = 12.90 min = Type III = 484 Pre DA 1.3 (Outlet C) Hyd. No. 3 -- 100 Year Q (Cfs) 120.00 100.00 60.00 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 4 Pre DA 1.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.850 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 12.60 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(0.020 x 30) + (0.060 x 55) + (0.240 x 39) + (1.360 x 61) + (0.090 x 74) + (0.080 x 98)] / 1.850 Q (cfs) 14.00 12.00 10.00 6.00 4.00 2.00 Pre DA 1.4 Hyd. No. 4 -- 100 Year 131 Sunday, 03 / 7 / 2021 = 12.79 cfs = 728 min = 49,020 cuft = 60* = 0 ft = 12.30 min = Type III = 484 Q (cfs) 14.00 12.00 10.00 M * KI 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 6 Pre-Dev Outlet B 132 Sunday, 03 / 7 / 2021 Hydrograph type =Combine Peak discharge = 39.04 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 134,776 cult Inflow hyds. = 2, 4 Contrib. drain. area = 6.470 ac Q (cfs) 40.00 30.00 20.00 10.00 Pre-Dev Outlet B Hyd. No. 6 -- 100 Year 120 240 360 480 600 720 840 Hyd No. 6 Hyd No. Q (cfs) 40.00 30.00 20.00 10.00 - 0.00 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report 133 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 7 Pre-Dev TOTAL OUT Hydrograph type = Combine Peak discharge = 160.65 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 643,472 cuft Inflow hyds. = 1, 3, 6 Contrib. drain. area = 20.000 ac Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 Pre-Dev TOTAL OUT Hyd. No. 7 -- 100 Year Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 60.00 40.00 40.00 I 20.00 ; 20.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 1 � Hyd No. 3 Hyd No. 6 Hydrograph Report Hydreflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 9 Post DA 2.1 (Outlet A) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.040 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 12.60 in Distribution Storm duration = 24 hrs Shape factor 'Composite (Area/CN) _ [(0.690 x 98) + (1.350 x 39)] / 2.040 Q (cfs) 12.00 10.00 8.00 .M 4.00 2.00 0.00 0 Post DA 2.1 (Outlet A) Hyd. No. 9 -- 100 Year 134 Sunday, 03 / 7 / 2021 = 11.60 cfs = 734 min = 51,246 tuft = 59* = 0 ft = 16.70 min = Type III = 484 Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report 135 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 10 Post DA 2.2 Hydrograph type = SCS Runoff Peak discharge = 51.02 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 157,590 cuft Drainage area = 4.890 ac Curve number = 76* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.600 x 98) + (1.280 x 39) + (0.580 x 61) + (0.060 x 74)] / 4.890 50.00 40.00 30.00 20.00 10.00 we Post DA 2.2 Hyd. No. 10 -- 100 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 2019 by Autodesk, Inc. v2019.2 Hyd. No. 11 Post DA 2.3A Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 7.800 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 12.60 in Distribution Storm duration = 24 hrs Shape factor * Composite (Area/CN) = [(3.350 x 98) + (1.800 x 39) + (2.650 x 61)] 17.800 60.00 50.00 40.00 30.00 20.00 10.00 136 Sunday, 03 / 7 / 2021 = 66.91 cfs = 728 min = 259,751 cuft = 72* = Oft = 12.90 min = Type III = 484 Post DA 2.3A Hyd. No. 11 -- 100 Year Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Report 137 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 12 Post DA 2.3B Hydrograph type = SCS Runoff Peak discharge = 150.72 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 326,252 cuft Drainage area = 9.560 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 Post DA 2.31B Hyd. No. 12 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 12 Time (min) Hydrograph Report 138 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Sunday, 0317 / 2021 Hyd. No. 13 Post DA 2.3C Hydrograph type = SCS Runoff Peak discharge = 6.871 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 14,156 cuft Drainage area = 0.510 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA 2.3C Q (cfs) Hyd. No. 13 -- 100 Year Q (Cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 - - 2.00 1.00 1.00 0.00 - — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 13 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Hyd. No. 14 Post DA 2.4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.020 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 12.60 in Distribution Storm duration = 24 hrs Shaoe factor * Composite (Area/CN) = [(0.170 x 98) + (0.270 x 39) + (1.420 x 61) + (0.160 x 74)] / 2.020 Q (cfs) 15.00 — 12.00 • 11 6.00 3.00 0.00 0 Post DA 2.4 Hyd. No. 14 -- 100 Year 139 Sunday, 03 / 7 / 2021 = 14.58 cfs = 728 min = 55,891 cuft = 62* = Oft = 12.30 min = Type III = 484 Q (cfs) 15.00 12.00 M M 3.00 0.-no 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) Hydrograph Report Hydra#1ow Hydrographs Extension for AuiodesW Civil 3D@ 2019 by Autodesk, Inc. v2019.2 Hyd. No. 16 DRY POND - WEST Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 -Post DA 2.2 Max. Elevation Reservoir name = Dry Pond -WEST Max. Storage Skorage Indication meUmd used. 0 (cfs 60.00 40.00 30.00 20.00 10.00 DRY POND - WEST Hyd. No. 16 —100 Year 140 Sunday. 03 J 712021 = 25.57 cfs = 732 min = 157,588 cult = 19.80 ft = 56,436 cult i I i d lilt .... ..:.......... .. , .. 0 (+CPS) 60.00 50.00 i $A 20.00 10.00 0.00 - I i _ - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 16 -- Hyd No. 10 Total storage used = 56,436 CA Hydrograph Report 141 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 17 Post Inflow to East Pond Hydrograph type = Combine Peak discharge = 179.43 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 586,003 tuft Inflow hyds. = 11, 12 Contrib. drain. area = 17.360 ac Q (cfs) 150.00 120.00 90.00 60.00 30.00 Post Inflow to East Pond Hyd. No. 17 — 100 Year Q (cfs) 180.00 150.00 120.00 90.00 60.00 30.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd Na. 17 Hyd No. 11 Hyd No. 12 Time (min) e Hydrograph Report 142 Hydraflow Hydrographs Extension for Autodesk@) civil 3131D 2019 by Autodesk, Inc, v2019.2 Sunday, 031712021 Hyd. No. 18 f DRY POND - EAST Hydrograph type = Reservoir Peak discharge = 99.84 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 585,998 cult Inflow hyd. No. = 17 - Post Inflow to East Pond Max. Elevation = 18.89 ft Reservoir name = Dry Pond - EAST Max. Storage = 185,415 cuff Storage Indication meftaod used. i 1 DRY POND - EAST Q (ds) Q (ds) ' Hyd- No. 18 —100 Year 180.00 180.00 j I 1 I 1 1 1 150.00 150.00 120.00 120.00 90.00 j' 90.00 1 x a � i a 60.00 60.00 i I 30.00 +— — 30.00 1 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 18 Hyd No. 17 Total storage used = 185,415 cult Hydrograph Report 143 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 2019 by Autodesk, Inc. v2019.2 Sunday, 03 17 / 2021 Hyd. No. 20 Post-Dev Outlet B (Detained) Hydrograph type = Combine Peak discharge = 39.90 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 213,479 cuft Inflow hyds. = 14, 16 Contrib. drain. area = 2.020 ac Q (cfs) 30.00 20.00 10.00 Post-Dev Outlet B (Detained) Hyd. No. 20 -- 100 Year Q (cfs) 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Hyd No. 14 Hyd No. 16 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 21 Post-Dev Outlet C (Detained) 144 Sunday, 03 / 7 / 2021 Hydrograph type = Combine Peak discharge = 101.69 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 600,154 cuft Inflow hyds. = 13, 18 Contrib. drain. area = 0.510 ac f Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 Post-Dev Outlet C (Detained) Hyd. No. 21 -- 100 Year Q (cfs) 120.00 100.00 80.00 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 -Hyd No. 13 Hyd No. 18 Time (min) Hydrograph Report 145 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 / 2021 Hyd. No. 22 Post Out Total (Detained) Hydrograph type = Combine Peak discharge = 144.99 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 864,879 cuft Inflow hyds. = 9, 20, 21 Contrib. drain. area = 2.040 ac 140.00 120.00 100.00 80.00 60.00 40.00 Post Out Total (Detained) Hyd. No. 22 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 22 Hyd No. 9 - Hyd No. 20 Hyd No. 21 Time (min) Hydraflow Rainfall Report 146 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Sunday, 03 / 7 12021 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 76.3783 12.3000 0.8781 ----- 2 93.3058 12.8000 0.8794 -- 3 0.0000 0.0000 0.0000 -------- 5 0.0000 0.0000 0.0000 ---- 10 98.4973 12.6000 0.8087 --- 25 82.9919 10.7000 0.7342 ----- 50 78.7190 10.1000 0.6964 - 100 71.4527 8.9000 0.6506 ---- File name: WILMINGTON IDF 2020-08-24 SJB.IDF Intensity = B / (Tc + D)"E Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 6.25 5.00 4.19 3.61 3.18 2.85 2.58 2.37 2.18 2.03 1.90 1.78 2 7.42 5.97 5.01 4.33 3.83 3.43 3.11 2.85 2.63 2.45 2.29 2.15 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 9.69 7.91 6.73 5.88 5.24 4.74 4.33 4.00 3.71 3.47 3.26 3.08 25 10A9 8.97 7.65 6.72 6.01 5.46 5.01 4:65 4.34 4.07 3.84 3.64 50 11.89 9.74 8.34 7.35 6.61 6.02 5.55 5.16 4.82 4.54 4.30 4.08 100 12.89 10.56 9.06 8.01 7.22 6.60 6.10 5.69 5.34 5.04 4.78 4.55 Tc = time in minutes. Values may exceed 60. PreciD. file name: R:1332141352-Durham Marrintt1nn1-339-rlurh=m iw=rri. ff%r1n1Acrm%errni n �;-%r%110UARA ___ Storm Distribution Rainfall Precipitation Table (in) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24--hour 3.83 4.64 0.00 6.01 7.21 9.06 10.70 12.60 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraflow Table of Contents Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 37630.054 - Hydraflow - 2021.03.04.gpw Sunday, 03 17 / 2021 Watershed Model Schematic...................................................................................... 1 HydrographReturn Period Recap............................................................................. 2 1 -Year SummaryReport ......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Pre DA 1.1 (Outlet A�........................................................... 4 TR-55 Tc Worksheet........................................................................................................... 5 Hydrograph No. 2, SCS Runoff, Pre DA 1.2............................................................................. 6 TR-55 Tc Worksheet........................................................................................................... 7 Hydrograph No. 3, SCS Runoff, Pre DA 1.3 (Outlet C)............................................................ 8 TR-55 Tc Worksheet........................................................................................................... 9 Hydrograph No. 4, SCS Runoff, Pre DA 1.4........................................................................... 10 TR-55 Tc Worksheet......................................................................................................... 11 Hydrograph No. 6, Combine, Pre-Dev Outlet B..................................................................... 12 Hydrograph No. 7, Combine, Pre-Dev TOTAL OUT............................................................... 13 Hydrograph No. 9, SCS Runoff, Post DA 2.1 (Outlet A) ........................................................ 14 TR-55 Tc Worksheet......................................................................................................... 15 Hydrograph No. 10, SCS Runoff, Post DA 2.2....................................................................... 16 Hydrograph No. 11, SCS Runoff, Post DA 2.3A.................................................................... 17 Hydrograph No. 12, SCS Runoff, Post DA 2.313 ..................................................................... 18 Hydrograph No. 13, SCS Runoff, Post DA 2.3C.................................................................... 19 Hydrograph No. 14, SCS Runoff, Post DA 2.4....................................................................... 20 TR-55 Tc Worksheet......................................................................................................... 21 Hydrograph No. 16, Reservoir, DRY POND - WEST............................................................. 22 PondReport - Dry Pond - WEST...................................................................................... 23 Hydrograph No. 17, Combine, Post Inflow to East Pond ....................................................... 25 Hydrograph No. 18, Reservoir, DRY POND - EAST ............................ :................................ 26. PondReport - Dry Pond - EAST........................................................................................ 27 Hydrograph No. 20, Combine, Post-Dev Outlet B (Detained) ................................................ 29 Hydrograph No. 21, Combine, Post-Dev Outlet C (Detained) ................................................ 30 Hydrograph No. 22, Combine, Post Out Total (Detained..................................................... 31 2 - Year SummaryReport....................................................................................................................... 32 HydrographReports................................................................................................................. Hydrograph No. 1, SCS Runoff, Pre DA 1.1 (Outlet A) ......................................................... 33 33 Hydrograph No. 2, SCS Runoff, Pre DA 1.2........................................................................... 34 Hydrograph No. 3, SCS Runoff, Pre DA 1.3 (Outlet C).......................................................... 35 Hydrograph No. 4, SCS Runoff, Pre DA 1.4........................................................................... 36 Hydrograph No. 6, Combine, Pre-Dev Outlet B..................................................................... 37 Hydrograph No. 7, Combine, Pre-Dev TOTAL OUT............................................................... 38 Hydrograph No. 9, SCS Runoff, Post DA 2.1 (Outlet A) ........................................................ 39 Hydrograph No. 10, SCS Runoff, Post DA 2.2....................................................................... 40 Hydrograph No. 11, SCS Runoff, Post DA 2.3A.................................................................... 41 Hydrograph No. 12, SCS Runoff, Post DA 2.313 ..................................................................... 42 Hydrograph No. 13, SCS Runoff, Post DA 2.3C.................................................................... 43 Contents continued... 37630.054 - Hydraflow - 2021.03.04.gpw Hydrograph No. 14, SCS Runoff, Post DA 2.4....................................................................... 44 f Hydrograph No. 16, Reservoir, DRY POND - WEST............................................................. 45 I Hydrograph No. 17, Combine, Post Inflow to East Pond ....................................................... 46 Hydrograph No. 18, Reservoir, DRY POND - EAST.............................................................. 47 Hydrograph No. 20, Combine, Post-Dev Outlet B (Detained) ................................................ 48 f Hydrograph No. 21, Combine, Post-Dev Outlet C (Detained) ................................................ 49 Hydrograph No. 22, Combine, Post Out Total (Detained..................................................... 50 5 - Year SummaryReport ....................................................................................................................... 51 HydrographReports................................................................................................................. Hydrograph No. 1, SCS Runoff, Pre DA 1.1(Outlet A) ......................................................... 52 52 Hydrograph No. 2, SCS Runoff, Pre DA 1.2........................................................................... 53 Hydrograph No. 3, SCS Runoff, Pre DA 1.3 (Outlet C).......................................................... 54 Hydrograph No. 4, SCS Runoff, Pre DA 1.4........................................................................... 55 Hydrograph No. 6, Combine, Pre-Dev Outlet B..................................................................... 56 Hydrograph No. 7, Combine, Pre-Dev TOTAL OUT............................................................... 57 Hydrograph No. 9, SCS Runoff, Post DA 2.1 (Outlet Al ........................................................ 58 Hydrograph No. 10, SCS Runoff, Post DA 2.2....................................................................... 59 Hydrograph No. 11, SCS Runoff, Post DA 2.3A.................................................................... 60 Hydrograph No. 12, SCS Runoff, Post DA 2.313 ..................................................................... 61 Hydrograph No. 13, SCS Runoff, Post DA 2.3C.................................................................... 62 Hydrograph No. 14, SCS Runoff, Post DA 2.4....................................................................... 63 Hydrograph No. 16, Reservoir, DRY POND - WEST............................................................. 64 Hydrograph No. 17, Combine, Post Inflow to East Pond ....................................................... 65 Hydrograph No. 18, Reservoir, DRY POND - EAST............................................................. 66 Hydrograph No. 20, Combine, Post-Dev Outlet B (Detained) ................................................ 67 Hydrograph No. 21, Combine, Post-Dev Outlet C (Detained) ................................................ 68 Hydrograph No. 22, Combine, Post Out Total (Detained...................................................... 69 10 -Year SummaryReport....................................................................................................................... 70 HydrographReports................................................................................................................. Hydrograph No. 1, SCS Runoff, Pre DA 1.1 (Outlet Al ......................................................... 71 71 Hydrograph No. 2, SCS Runoff, Pre DA 1.2........................................................................... 72 Hydrograph No. 3, SCS Runoff, Pre DA 1.3 (Outlet C).......................................................... 73 Hydrograph No. 4, SCS Runoff, Pre DA 1.4........................................................................... 74 Hydrograph No. 6, Combine, Pre-Dev Outlet B..................................................................... 75 Hydrograph No. 7, Combine, Pre-Dev TOTAL OUT............................................................... 76 Hydrograph No. 9, SCS Runoff, Post DA 2.1 (Outlet A�........................................................ 77 Hydrograph No. 10, SCS Runoff, Post DA 2.2....................................................................... 78 Hydrograph No. 11, SCS Runoff, Post DA 2.3A.................................................................... 79 Hydrograph No. 12, SCS Runoff, Post DA 2.313 ..................................................................... 80 Hydrograph No. 13, SCS Runoff, Post DA 2.3C.................................................................... 81 Hydrograph No. 14, SCS Runoff, Post DA 2.4....................................................................... 82 Hydrograph No. 16, Reservoir, DRY POND - WEST............................................................ 83 Hydrograph No. 17, Combine, Post Inflow to East Pond ....................................................... 84 Hydrograph No. 18, Reservoir, DRY POND - EAST.............................................................. 85 Hydrograph No. 20, Combine, Post-Dev Outlet B (Detained) ................................................ 86 Hydrograph No. 21, Combine, Post-Dev Outlet C (Detained) ................................................ 87 Contents continued... 37630.054 - Hydraflow - 2021.03.04.gpw Hydrograph No. 22, Combine, Post Out Total (Detained ................................................. 88 25 - Year SummaryReport ....................................................................................................................... 89 HydrographReports................................................................................................................. 90 Hydrograph No. 1, SCS Runoff, Pre DA 1.1 (Outlet A) ......................................................... 90 Hydrograph No. 2, SCS Runoff, Pre DA 1.2........................................................................... 91 Hydrograph No. 3, SCS Runoff, Pre DA 1.3 (Outlet C).......................................................... 92 Hydrograph No. 4, SCS Runoff, Pre DA 1.4........................................................................... 93 Hydrograph No. 6, Combine, Pre-Dev Outlet B..................................................................... 94 Hydrograph No. 7, Combine, Pre-Dev TOTAL OUT............................................................... 95 Hydrograph No. 9, SCS Runoff, Post DA 2.1 (Outlet A) ........................................................ 96 Hydrograph No. 10, SCS Runoff, Post DA 2.2....................................................................... 97 Hydrograph No. 11, SCS Runoff, Post DA 2.3A.................................................................... 98 Hydrograph No. 12, SCS Runoff, Post DA 2.36..................................................................... 99 Hydrograph No. 13, SCS Runoff, Post DA 2.3C.................................................................. 100 Hydrograph No. 14, SCS Runoff, Post DA 2.4..................................................................... 101 Hydrograph No. 16, Reservoir, DRY POND - WEST.......................................................... 102 Hydrograph No. 17, Combine, Post Inflow to East Pond ..................................................... 103 Hydrograph No. 18, Reservoir, DRY POND - EAST............................................................ 104 Hydrograph No. 20, Combine, Post-Dev Outlet B (Detained) .............................................. 105 Hydrograph No. 21, Combine, Post-Dev Outlet C (Detained) .............................................. 106 Hydrograph No. 22, Combine, Post Out Total (Detained) ................................................... 107 50 - Year SummaryReport ..................................................................................................................... 108 HydrographReports............................................................................................................... 109 Hydrograph No. 1, SCS Runoff, Pre DA 1.1(OutletA�....................................................... 109 Hydrograph No. 2, SCS Runoff, Pre DA 1.2......................................................................... 110 Hydrograph No. 3, SCS Runoff, Pre DA 1.3 (Outlet C)........................................................ 111 Hydrograph No. 4, SCS Runoff, Pre DA 1.4......................................................................... 112 Hydrograph No. 6, Combine, Pre-Dev Outlet B................................................................... 113 Hydrograph No. 7, Combine, Pre-Dev TOTAL OUT............................................................. 114 Hydrograph No. 9, SCS Runoff, Post DA 2.1 (Outlet A�...................................................... 115 Hydrograph No. 10, SCS Runoff, Post DA 2.2..................................................................... 116 Hydrograph No. 11, SCS Runoff, Post DA 2.3A.................................................................. 117 Hydrograph No. 12, SCS Runoff, Post DA 2.313 ................................................................... 118 Hydrograph No. 13, SCS Runoff, Post DA 2.3C.................................................................. 119 Hydrograph No. 14, SCS Runoff, Post DA 2.4..................................................................... 120 Hydrograph No. 16, Reservoir, DRY POND - WEST.......................................................... 121 Hydrograph No. 17, Combine, Post Inflow to East Pond ..................................................... 122 Hydrograph No. 18, Reservoir, DRY POND - EAST........................................................... 123 Hydrograph No. 20, Combine, Post-Dev Outlet B (Detained) .............................................. 124 Hydrograph No. 21, Combine, Post-Dev Outlet C (Detained) .............................................. 125 Hydrograph No. 22, Combine, Post Out Total (Detained) ................................................... 126 100 -Year jSummary Report ..................................................................................................................... 127 LHydrograph Reports............................................................................................................... 128 Hydrograph No. 1, SCS Runoff, Pre DA 1.1 (Outlet A�....................................................... 128 Contents continued... 37630.054 - Hydraflow - 2021.03.04.gpw Hydrograph No. 2, SCS Runoff, Pre DA 1.2......................................................................... 129 Hydrograph No. 3, SCS Runoff, Pre DA 1.3 (Outlet C)........................................................ 130 Hydrograph No. 4, SCS Runoff, Pre DA 1.4......................................................................... 131 Hydrograph No. 6, Combine, Pre-Dev Outlet B................................................................... 132 Hydrograph No. 7, Combine, Pre-Dev TOTAL OUT............................................................. 133 Hydrograph No. 9, SCS Runoff, Post DA 2.1 (Outlet A�...................................................... 134 Hydrograph No. 10, SCS Runoff, Post DA 2.2..................................................................... 135 Hydrograph No. 11, SCS Runoff, Post DA 2.3A.................................................................. 136 Hydrograph No. 12, SCS Runoff, Post DA 2.313 ................................................................... 137 Hydrograph No. 13, SCS Runoff, Post DA 2.3C.................................................................. 138 Hydrograph No. 14, SCS Runoff, Post DA 2.4..................................................................... 139 Hydrograph No. 16, Reservoir, DRY POND - WEST.......................................................... 140 Hydrograph No. 17, Combine, Post Inflow to East Pond ..................................................... 141 Hydrograph No. 18, Reservoir, DRY POND - EAST............................................................ 142 Hydrograph No. 20, Combine, Post-Dev Outlet B (Detained) .............................................. 143 Hydrograph No. 21, Combine, Post-Dev Outlet C (Detained) .............................................. 144 Hydrograph No. 22, Combine, Post Out Total(Detainedl................................................... 145 OFReport................................................................................................................ 146 L WATER QUALITY CALCULATIONS Project: Circle K - Wilmington Airport Project No.: 37630.054 Calculated By: JCD Date: 03/05/2021 Dry Extended Detention Basin Design Area Aria to Offsite Impervious Area 0.00 Onsite Impervious Area 2.67 Total Impervious Are 2.67 Total Drainage Area To BMP 1 4.89 A_ 2.A) Water Quality Runoff Volume Calculation (Required Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(I) Where: Rv = Runoff Coefficient, in/in I I = Percent Impervious 1= 55% j Rv = 0.541 Yttatra Ruutaf!`'1o(u► ". Runoff volume, S= Desi n rainfall Rv (Drainage Area Design Rainfall inch Drainage Area = 4.89 acres Storage R utred = 1. 416 .cu. ft. r must nave Toreoay it storage required is over 10 acre -inches (36,300 c.f.) i Detention Volume Required 14,416 cu ft 25% Additonal Sed. Storage 18,020 cu ft 2.113) Water Quality Runoff Volume Calculation (Provided) cantow contow etevadon Area 'V61um 1.0Cfatrre. " 1b a , 2 ft .. cap it 14.50 0 0 0 0.00 15.00 238 60 60 0.50 16.00 4,173 2,206 2,265 1.50 17.00 12,673 8,423 10,688 2.50 8,419 20,107 3.20 18.00 15,040 4,392 24,499 3.50 18.75 17,302 12,128 36,627 4.25 19.25 18,515 8,954 45,581 4.75 20.00 20,792 14,740 60,321 5.50 20.75 23,021 16,430 76,751 6.25 - I . =u,',y ,a W-1 yuau,y aiovauun, iviaalmwn anuweu ueptn of ary pony = IU Tt Provided Volume of Dry Basin 45,581 cu ft (to bottom of spillway) 3) Size Water Quality Orifice for (2-5) Day Drawdown for Runoff Volume Q= CdA(2gh)T2 (Orifice Equation; Cd=0.60 & h=h/3; Pg 3-13 BMP Manual) 3.20 Water Quality Stage (ft) 1.50 Orfice Diameter (inches) 1.05 Driving Head (h/3) to Centroid of Orifice (ft) 0.06 Drawdown Rate (cfs) 20,107 Water Quality Volume (1(,o) Vwo/(Q x 86,400) Drawdown Time (days) 3.9 Drawdown Time (days) (2 - 5 days) Bottom of Basin/Outlet Orifice for Water Quality Fop of Control Structure Spillway Crest fop of Basin L Project: Circle K -1 Calculated By: JCD Dry Extended Detention Basin Design f _ tous- Offsite Impervious Area 0.00 Onsite Impervious Area 8.43 Total Impervious Area 8.43 Total Drainage Area To BMP 17.36 :t No.: 37630.054 Date: 03/05/2021 2.A) Water Quality Runoff Volume Calculation (Required Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) Where: Rv = Runoff Coefficient, in/in I = Percent Impervious 1= 49% Rv = 0.487 Runoff volume, S=(Desigin rainfall Rv (Drainage Area Design Rainfall inch Drainage Area =1 17.36 acres Stomge Required x 4f407 cu. ft. ' Must have forebay if storage required is over 10 acre -inches (36,300 c.f.) Detention Volume Required 46,037 cu ft 25% Additonal Sed. Storage 57,547 cu ft 2.113) Water Quality Runoff Volume Calculation (Provided) C IFrtavaito>4# Arad " fd�ttttne V,13 t 6 Sta Z ft ft;. t9tft ft 13.25 0 0 0 0.00 14.00 1529 573 573 0.75 15.00 13,850 10,190 10,763 1.75 16.00 An 779 29,815 40,577 2.75 21,271 .61 848 3.25 17.00 47,595 22,975 84,822 3.75 18.00 53,426 50,511 135,333 4.75 18.50 56,235 27,415 162,748 5.25 20.00 65,401 91,227 253,975 6.75 Green shading is water quality elevation; Maximum allowed depth of dry pond = 10 ft Provided Volume of Dry Basin 162,748 cu ft (to bottom of spillway) 3) Size Water Quality Orifice for (2-5) Day Drawdown for Runoff Volumi Q = CdA(2gh)" (Orifice Equation; Cd=0.60 & h=h/3; Pg 3-13 BMP Manual) ' 3.25 Water Quality Stage (ft) ` 3.00 Orfice Diameter (inches) 1.04 Driving Head (11/3) to Centroid of Orifice (ft) 0.24 Drawdown Rate (cfs) 61,848 Water Quality Volume (moo) Vwo/(Q x 86,400) Drawdown Time (days) 3.0 Drawdown Time (days) (2 - 5 days) Bottom of Basin/Outlet WQE Top of Control Structure Spillway Crest Top of Basin Pre Treatment Grass Swale - IIIA Circle K - Airport Blvd TIMMOMS GROUP ■ -«t Jacob Dooley 37630.054 Drainage Ditch Design (Velocity Constraint) This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) = 4.36 (Acres) Coef. (C) = 0.77 (Dimensionless) Inte. (1) = 0.75 (in/hr) Flow (Q10) = 2.5 (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.040 (Dimensionless) Ditch Length = 150 LF Slope = 0.001 (ft/ft) Highest Elevation = 16.5 Z Required = 2.14 Ratio Lowest Elevation = 16.35 Side Slope (M) = :1 • - r A,_•." -- Flow Depth (Y) = •0.5o ft 6.0 in Bottom Width (B) = 6.00 ft 72.0 in Freeboard = 0.50 ft 6.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.03 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) Jute Net 1 0.45 i... Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18'7HK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 P300 8.00 New A = 4.50 SF Hydraulic Residence Time New P = 12.08 Wetted perimeter L=240V New R = 0.37 Hydraulic radius V< 0.625 Z Actual = 2-33 Must be greater than z required=> 2.14 Okay New V = 0.61 fps HRT = 4.1 min Liner: Grass #N/A LB/SF > 0.04 LB/SF #NIA --------------------------------------------- Top Width = 18 ft Min. Ditch Depth = 1 ft ------------- 6 Flow Depth (Y) = 0.5 ft 1 Bottom Width (B) = 6 ft Min. Ditch Depth ft Bottom Width ft Flow Depth (ft) , Top Width (ft) Side Slope 1.00 6.00 0,150 18 1 6:1 Ditch Liner `RED IS USER INPUT LATEST REVISION: 8/27/2020 4:03 PM Pre Treatment Grass Swale - IIIB ' C TIMMOMS GROW Jacob Dooley +«.11c=_n NI oe'lc•4 atc- r a '. Circle K - Airport Blvd 37630.054 Drainage Ditch Design (Velocity Constraint) This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) = 15.61 (Acres) Coef. (C) = 0.75 (Dimensionless) Inte. (1) = 0.75 (in/hr) Flow (Q10) = 8.8 (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.060 (Dimensionless) Ditch Length = 150 LF Slope = 0.002 (ft/ft) Highest Elevation = 14.8 Z Required = 8.66 Ratio Lowest Elevation = 14.55 Side Slope (M) = :1 • ■ Flow Depth (Y) = 0.50 ft . , 6.0 in Bottom Width (B) = 27.00 ft 324.0 in Freeboard = 0.25 ft 3.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.05 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) Jute Net 0.45 Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 P300 8.00 Determine If Z Actual Is Greater Thar, Z Recuired - - - - ------------ New A = 14.75 SF Hydraulic Residence Time New P = 32.10 Wetted perimeter L=240V New R = 0.46 Hydraulic radius V- 0.625 Z Actual = 8.78 Must be greater than z required=> 8.66 Okay New V = 0.60 fps HRT = 4.1 min Minimum E Liner: North American Green, S75 1.55 LB/SF > 0-06 LB/SF Okay F----------- ------------------------------- ---i Top Width = 34.5 ft Min. Ditch Depth = 0.75 \ r' Flow Depth (Y) = 0.5 It i1 Bottom Width (B) = 27 ft Min. Ditch Depth ft Bottom Width ft ; Flow Depth (ft) Top Width (ft) Side Slope 0,75 27-00 i 0.50 1 34-5 1 5.1 North American Green, S75 1 *RED IS USER INPUT ii LATEST REVISION: 1/14/2021 10:34 AM IL :Ir f s . ■ gar '� Pre Treatment Grass Swale - IIIB .2 YEAR" Circle KC Airport Blvd Jacob Dooley .-.::ibis t 7--k q oft•N.,..at:;r._ 37630.654 Drainage Ditch Design (Velocity Constraint) This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) = 15.61 (Acres) Coef. (C) = CI-75 (Dimensionless) Inte. (1) = 7.42 (inlhr) Flow (Q10) = 86.9 (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = (Dimensionless) Ditch Length = 150 LF Slope = 0.002 (ft/ft) Highest Elevation = 14.8 Z Required = 85.69 Ratio Lowest Elevation = 14.55 Side Slope (M) _ :1 Flow Depth (Y) = 1-85 It 22.2 in Bottom Width (B) = 27.00 it 324-0 in Freeboard = 0.25 ft 3.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.19 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) -- Jute Net 0.45 c•. r_ Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12" @22"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 P300 8.00 Determine New A = 67.06 SF Hydraulic Residence Time New P = 46.87 Wetted perimeter L=240V New R = 1.46 Hydraulic radius V- 0.625 Z Actual = 86.40 Must be greater than z required=> 85.69 Okay New V = 1.31 fps HRT= 1.9 min Minimum Desigeornetrj n North American Green, S75 1.55 LB/SF > 0.2 LB/SF Okay F------------------- ---------------------------- i N Top Width = 48 ft Min. Ditch Depth = 2.1 5 Flow Depth (Y) = 1.85 ft 1 Bottom Width (B) = 27 ft j Min. Ditch Depth ft Bottom Wldth ft Flow Depth (ft) Top Width (ft) Side SI, 2-10 27.00 1,Ei5 48 5:1 North American Green, S75 "ED IS' I t- LLATEST REVISION: 3/25/2021 10:25 AM Pre Treatment Grass Swale - IIIB -10 YEA'R 0 % Circle K - Airport Blvd TWIIIooleye TIMMONSGR©UPJacob _,rr uos- 9 vu _ YIr•; ,y.. ., 37630.054 Drainage Ditch Design (Velocity Constraint) tA This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0-03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) _- r 15.61 (Acres) Coef. (C) = 0.75 (Dimensionless) Inte. (1) = 9.70 (in/hr) Flow (Q10) = 113.6 (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.060 (Dimensionless) Ditch Length - 150 LF Slope = 0.002 (ft/It) Highest Elevation = 14.8 Z Required = 112.02 Ratio Lowest Elevation = 14.55 Side Slope (M) = :1 Flow Depth (Y) = 2.15 ft - 25.8 in Bottom Width (B) = 27.00 ft 324.0 in Freeboard =_ _ 0.25 ft 3.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.22 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) Jute Net 0.45 M _ Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@1871-11K) 3.50 SC150 2.10 Class I (12" A22"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 P300 8.00 1�.:+i•: if,, ,'P• i l :`�''°i'-',f L. t.�r,.: � 1 icy -- _... New A = 81.16 SF Hydraulic Residence Time New P = 48.93 Wetted perimeter L=240V New R = 1.66 Hydraulic radius V- 0.625 Z Actual = 113.76 Must be greater than z required=> 112-02 Okay New V = 1.42 fps HRT = 1.8 min Liner: North American Green, S75 1.55 LB/SF > 0.23 LB/SF Okay ----------------------------------------------- �N Top Width = 51 ft Min. Ditch Depth '= 2.4 \1,11 Flow Depth (Y) = 2.15 ft Bottom Width (B) = 27 ft Min. Ditch Depth ft Bottom Width ft Flow Depth ftTop Width ftSide Slope 2.40 27.00 2.15 51 1 5:1 s North American Green, S75 *RED IS USER INPUT LATEST REVISION: 3/25/2021 10:24 AM Pre Treatment Graass Swale - IIIA - 2 YEAR, circle K -Airport Blvd Jacob ' 1131yTajIMMdNs GaRkJuF' - • 37630054 _. Drainage Ditch Design (Velocity Constraint) l a This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Watershed Data Area (A) = 4.36 (Acres) Coef. (C) = 0.77 (Dimensionless) Inte. (1) = 7.42 (in/hr) Flow (Q10) = 24.9 (cfs) Iuua,`rt ■ Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = (Dimensionless) Ditch Length = 150 LF Slope = 0.001 (ft/ft) Highest Elevation = 16.5 Z Required = 21.15 Ratio Lowest Elevation = 16.35 Side Slope (M) _ :1 Flow Depth (Y) = 1.50 It 18.0 in Bottom Width (B)= 6.00 ft 72.0 in Freeboard = 0.50 ft 6-0 in . T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.09 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) Jute Net 0.45 tr, a•..: Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"022"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 P300 8.00 New A = 22.50 SF Hydraulic Residence Time New P = 24.25 Wetted perimeter L=240V New R = 0.93 Hydraulic radius V< 0.625 Z Actual = 21.40 Must be greater than z required=> 21.15 Okay New V = 1.12 fps HRT= _ 2.2' tii lii•Ifi ii'1.� D-::; i"'• C. r'.NI Liner: Grass #NIA LB/SF> 0 1 LB/SF #NIA t------ --------- -------------------- ----------i Top Width = 30 ft Min. Ditch Depth = 2 ft _--___-_____�_____ B Flow Depth (Y) = 1.5 ft �1 Bottom Width (B) = 6 ft IIIIJINMAUQU Min. Ditch Depth ft Bottom Width ft Flow De th ft Top Width ft Side Slope 2.00 6-00 1.50 30 1 6:1 _ Ditch Liner i *RED IS USER INPUT II LATEST REVISION: 3/25/2021 10:26 AM L.. r / I y• a o% J;tfal"� Pre Treatment Grass, � wale - IIIA -10 YEAR E Circle K - Airport Blvd Jacob Dooley Tfl�'it+ ONS GROUP � E 3 _. as. I TL'e•la'lO :?" 37630.054 Drainage Ditch Design (Velocity Constraint) trassed r YEAR This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) = 4-36 (Acres) Coef. (C) = 0.77 (Dimensionless) Inte. (1) = 9.70 (in/hr) Flow (Q,a) = 32.6 (cfs) 211 -wom a Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = (Dimensionless) Ditch Length = 150 LF Slope = 0.001 (ftlft) Highest Elevation = 16.5 Z Required = 27.65 Ratio Lowest Elevation = 16.35 Side Slope (M) _ :1 Flow Depth (Y) = 1.75 ft 21-0 in Bottom Width (B) = 6.00 ft 72.0 in Freeboard = 0,.50 ft 6.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.11 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) Jute Net 0.45 A. Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12" 922"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 IP300 8.00 New A = 28.88 SF Hydraulic Residence Time New P = 27.29 Wetted perimeter L=240V New R = 1.06 Hydraulic radius V- 0.625 Z Actual = 29.98 Must be greater than z required=> 27.65 Okay New V = 1.22 fps HRT= 2.0' Liner: Grass #NIA LB/SF > 0.11 LB/SF #NIA Top Width 33 ft = Min. Ditch Depth = 2.25 ft r------------- _____ Flow Depth (Y) = 1.75 ft 1 Bottom Width (B) = 6 ft I Min. Ditch De th ft Bottom Width ft Flow Depth ft Top Width ft Side Slorm 2.25 6.00 1.75 1 33 1 6:1 a Grass I "RED IS USER INPUT LATEST REVISION: 3/25/2021 10:27 AM I-� _ a s14 C$•4r .•• OBEM VEGETATIVE SWA: E IIIA ' CIRCLE K - AIRPORT IRIII T1MMOMS GRQUu' •-• Jacob Dooley 37630.054 Drainage Ditch Design (Velocity Constraint) This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Watershed Data Area (A) _ (Acres) Coef. (C) _ (Dimensionless) Inte. (1) _ (inlhr) Flow (Q10) = 7.5 (cfs) 'F ) Line channel with: a " rip -rap (Assume 6" even if using grass) Manning n = (Dimensionless) Ditch Length = LF Slope = 0.003 (ft/ft) Highest Elevation = Z Required = 2.62 Ratio Lowest Elevation = Side Slope (M) _ :1 Flow Depth (Y) _ ,0.85 ft 7.8 in U1111111111111mi Bottom Width (B) = 5.00 ft 60.0 in T = 0.14 LB/SF Jute Net 0.45 Curled Mat 1.55 Class A (4"@9"THK) 2.00 Class B (8"@18"THK) 3.50 Class 1 (12"@22"THK) 6.00 Class II 18" 30"THK 7.50 NewA= 4.52 SF 0.35 ft 4.2 in Y = Weight of water (62.4 LBX D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) r. S75 - 1.55 S150 1.75 SC150 2.10 C125 2.25 P300 8.00 New P = 9.11 Wetted perimeter New R = 0.50 Hydraulic radius Z Actual = 2.83 Must be greater than z required=> 2.62 Okay New V = 1.80 fps DesignMinimum ry Liner: North American Green, S75 1.55 LB/SF > 0.14 LB/SF Okay h----------------------------------------------- Top Width = 11 ft Min. Ditch Depth, = 1 ft ______________ 3 Flow Depth (Y) = 0.65 ft 1 Bottom Width (B) = 5 ft r Min. Ditch Depth ft Bottom Width ft Flow Depth ftTop Width (ft) Side Slope 1.00 5.00 0.65 11 1 3:1 r North American Green, S75 'RED IS USER INPUT LATEST REVISION: 1/14/2021 10:40 AM s �4 VEGETATIVE SWALE: 11113 f e' •�t�s�� 0 CIRCLE K-AJRPORT TIMMOMS GROUP -• �' Jacob Dooley x - 37630.054 Drainage Ditch Design (Velocity Constraint) This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) _ (Acres) Coef. (C) _ (Dimensionless) Inte. (1) = (in/hr) Flow (Q10) _._ (cfs) IT Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.030 (Dimensionless) Ditch Length = 60 LF Slope = 0.003 (ft/ft) Highest Elevation = 12.8 Z Required = 9.05 Ratio Lowest Elevation = 12.61 Side Slope (M) _ :1 P Quintiti et IbitchWidth Dept Flow Depth (Y) = 1.15 ft 13.8 in Bottom Width (B) = 6.00 ft 72.0 in Freeboard = 0-10 ft 1.2 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.23 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) 'I i-e1..� _ Jute Net 0.45 �::,- ; Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 P300 8.00 bete nn i ne If Z- New A = 10.87 SF New P = 13.27 Wetted perimeter New R = 0.82 Hydraulic radius Z Actual = 9.51 Must be greater than z required=> 9.05 Okay New V = 2.45 fps ■. . Liner: North American Green, S75 1.55 LB/SF > 0,23 LB/SF Okay t-------------------------------------- ------ -� Top Width = 13.5 ft Min. Ditch Depth = 1.25 X ------------------- 3 Flow Depth (Y) = 1.15 ft 1 Bottom Width (B) = 6 ft Min. Ditch Depth ft Bottom Width ftFlow Depth (ft) , Top Width (ft) 'Side Slope i 1.25 6,00 IIA5 13.5 1 3:1 North American Green, S75 *RED IS USER INPUT LATEST REVISION: 1/14/2021 10:42 AM PeMI NG, 00 be Poo tyVW Q) **4r4 7pM � ■ S r ORMWATER MANAGEMENT PERM 7 A.PPL ICATIO � FORM f� a_ a►EWR �� 4' 1 GE.i3TIFiCAMON APFLICATtGa FORM }yT ■✓1N`t MTERMN EV QI,l This form mint be %d ctd, prj5d and su m iVed. +he Rei, red Marra Chaddi.t (Pout 111) mvzf Je primed, Red (;ft and submitted &n &M a7 #m rpked jnfomtatfon. L FIRDAWNFONAMil I PmAcenarne CIRCLE K-YnAiRF_GRTBIVD7j'1Lf71NG'Tt'j-,m.115 cvw pn= RICK w5o FE Pt= nLmber Date 3MMI DalTop area rur1w PHASE 3A Site Chwavbristics Dro-m3e am 213,2'&00 1rperft s area 110,59&00 D a &n 4rWl 1 ED 'n Pear Ffm Catdati ills 1-7, `vlati dep1h 3..83 n Ratmi 0, p%4ws1i*nwd 50.0E fulTem) Rewal G, 76M (im llow) P,G- %i! irl n tf l-} , 24,4-r storm 016 arts Pre -se imf 1-i'r, 244upew Em 1.38 *%. P0514 etap+aeent 1-j, 24-tmr L"ealt C= 1.34 I last Ffw?=1 yr. 244 r ,et cer,:ml -0,04 `ttm Stange Vdvmr. Noma -SA 1 asm 1tir m regii� vclunre 14,416,10 fe FM ded veltore 20.107.30 fe �'m+�iai ram P� 5�91.00 ,1a Songs voknow sAwabm 1.5'r mmof -ma m ftv cm4kvei*mffl yT 20'r=0vdum Qcst4evdcpmmt 1-w 24-1rr nmA wiLme vTlatta^e rmdmd voluifle fe Pis i&d vtlwr'e fe . SefmW shrdge Ytr1wm pvAded fp Basin Design Paramebrs Dmvdwm Ome 3.90 days SHWT elevation 19.00 isrsl Basin bob" elevation 14.50 fmsl Slorage elevation 17.70 fr e1 Bashi side son 3.0 :1 Top elevation 20.75 >rr A Frees oraidded 1.50 ft Basil Boftm Dartensions ' Basin IWO 220.30 R L_ Basin wkldi 27.PO ft LerO b oath ratio 800 :1 OK Raise basin b3tter*:, VLi-it o� a least 2-ft above SF:JVT OK OK OK OK F— O"401-Dry EAMAed Del eagm Bm:w%v 3 Paris 1. 611, Design Summary, Page 1 of 3 Additional Information Total runoff volume captured by basin Forebay provided Is basin in a recorded drainage easement? Does basin capture all runoff at ultimate build -out? 1s a sediment depth indicator included? Does the basin include a drain? 12.55 ac-in Forebay is required N (Y or N) Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Permit (to be provided by DWQ) Form SW401-Dry Extended Detention Basin-Rev.3 Parts I. & H. Design Summary, Page 2 of 3 L Permit l#l, WORED.f117115111l5 CF 0411S'T : (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. _RB 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. RB_ 2. Plan details (1" = 30' or larger) for the bioretention cell showing: - Basin dimensions - Pretreatment system, Maintenance access, - Outlet structure, - Overflow device, Flow distribution detail for basin inflow, and Vegetation specifications. _RB 3. Section view of the basin 0" - 20' or larger) showing: - Side slopes, 3:1 or lower, Pretreatment and treatment areas, and - Inlet and outlet structures. _RB 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. _RB 7. The supporting calculations. _RB _ 8. A copy of the signed and notarized operation and maintenance (0$M) agreement. _R8 9. A copy of the deed restrictions (if required). _RB _ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Dry Extended Detention Basin-Rev.3 Part III. Required Items Checklist, Page 3 of 3 Peatiit 0- (10 beWmgdigd by DM) 870R 1b"LATER PAMAGEADF PEPIAIT APPLJCA,T40N 'FORE, 401 COMFiCATION AMICA71ON FORM 1�� fcrm rrsrs3 to f'�'ed rxit, yrira#erl and s�mQl>?d. Tfe Required Gems CheckV fPeo fib; rrW be pMed, %. d flu# and a&rrft-d afar rrdh aR the required inbmatior. "L PRQ,IECT#�ORMRi�OM Ptied nacre ORaE K- Nn A1;0KW. 3Oy D ill I1. 111.1Gr^.;1- a � 116 FIiCT.e 77L'IrT.]ur 9194664939 Late 3162321 vra'nape a malt be, PHAS 30 W. Mm NVINIO 1—M Sft Characbrisdos Dr*.age ara 7=59 co ie 3rrp it cw as v67, :i;0 e % ms OAD zfttr :i'de;h 11-9 in tts Flow C"loons 1 yr,24-Jirrainfall 3M fttm 3 C,1 "Oprzem 50.00 {w,vv+�ms) WCnal C, noo wiseg) idama8 zAnsity 1yr, 24-hralorm 0.16 inAsr Pna-isatis 3 3 y , 24'n;zh Raga 8A9 ielsoc Fast developrwd 1yr 24-a rr pe* fj= 1.37 lelwc Preftait1y1,24-}Tpeak 722 R?,WC '�%k CAijG-. StorageWm ; Norr-tiAWaha ;nrim aeg:lmd vclma 46,037.00 l? 4 $1,i;4&g-u ##' OK g' t Sedivwtat slo mp Valm provided 15P 1 SD f? OK a � r > a 17olame: SA Waters y� 1.5° r.MV Mucus Prs-d€vel tl-yr,244uT4mcfiwiy7re * W. & ` PedAeudopmelt'-Yr,24-tirroe-ic'u%e P3 /iN1NM #Yz4n era rmitke d vz!um 1? POovided vd UM Se&W4 sisrege vDtume prfl`r'dJ Basin Design paramours OtaltkAM time 3.00 says OK SHWreleva6an MOD fnw Bay bum ekwayGn 13.25 brA Raise basin bottom, klust be at ieast 2-ft above SHWT Swrapekvalim 16.50 faw Basin side slopes 3.0 :1 OK Top ohrre m 20.00 hTW OK Fm*wM pied 1.5c tt OK Basin Bottom 011monsilorts Basin 160 MOM A Be* width 51.00 is Length to WWth ratio 13.00 :1 OK Fcrm SW401-Ory Ex�srdW 5e! ndw flasin-Rov.3 Parts ! & V aeear. Summary Page ' d 2 Additional Information Total runoff volume raptured by basin Forebay provided Is basin in a recorded drainage easement? Does basin capture all runoff at ultimate build -out? Is a sediment depth indicator included? Does the basin include a drain? 44.83 ac-in Forebay is required N (Y or N) Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Permit (to be provided by DWQ) Form SW401-Dry Extended Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 a12 Permit No . ITEMS 01FECKLI.Sl1' (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. _RB 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. _RB 2. Plan details (1" = 30' or larger) for the bioretention cell showing: - Basin dimensions - Pretreatment system, Maintenance access, Outlet structure, Overflow device, Flow distribution detail for basin inflow, and Vegetation specifications. 3. Section view of the basin (1" 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. _RB 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. _RB 7. The supporting calculations. _RB 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. _RB 9. A copy of the deed restrictions (if required). _RB _ _ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. LForm SW401-Dry Extended Detention Basin-Rev.3 Part III. Required Items Checklist, Page 3 of 3 Permit Number (to be provided by OWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required information. #" IN . _,lye , . Project name CIRCLE K - NTI AIRPORT BLVD WILMINGTON - NC.115 Contact name RICK BAKER, PE Phone number 919-066-4939 Date January 14, 2021 Drainage area number Phase 3B Site Characteristics Drainage area 680,076.00 ft Impervious area 367,596.00 ft2 Percent impervious 54.1 % % Design rainfall depth 0.75 inch Peak Flow Calculations 10-yr storm runoff depth NIA in 10-yr storm intensity 0.75 inlhr Post -development 10-yr storm peak flow 8.80 ft3lsec Velocity Maximum non -erosive velocity (peak 10-year storm) 5.00 ft/sec Soil characteristics (enter "x" below) Sand/silt (easily erodible) x Clay mix (erosion resistant) Grass Type (enter "x" below) Bermuda x. Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Ootion 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length R Option 2: Swale Seeking Pollutant Credit ("For -Credit' Swalel: Y (Y or N) Maximum velocity for 10-yr storm 0.60 ftlsec OK Side slopes 5.00 :1 OK Swale length 150.00 ft OK Ql i114tJZ# Form SW401-Grassed Swale-Rev.4 Parts I and H. Project Design Summary, Page 1 e 3 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an Y' in the appropriate cell below: Trapezoidal x Parabolic V-shaped Width of the bottom of the swale 27.00 ft Width of the top of the swale 34.50 ft Additional Information Is the Swale sized for all runoff from ultimate build -Out? Y, or N) OK Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? Y (Y or N) OK What is the distance from the bottom of the Swale to the SHWT? -5.45 ft Insufficient distance to SHWT, unless conveyance swale only. What is the ground level elevation? 20.67 fmsl What is the elevation of the bottom of the swale? 14.55 fmsl What is the SHWT elevation? 20.00 fmsl What is the longitudinal slope of the swale? 0.20 % OK What is the depth of freeboard? 0.26 ft OK Form SW401-Grassed Swale-Rev.4 Pa,'s I and II. Protect Design Summary, Page 2 of 3 Permit No: (to be assigned by DWQ) n. gpqwkw tru Q KKUST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. RB 1: Plans 0" = 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), Grass species, and Boundaries of drainage easement. _RB 2. Plan details (1" = 50' or larger) for the grassed Swale showing: Swale dimensions (width, length, depth), Maintenance access, - Proposed drainage easement and public right of way (ROW), Design at ultimate build -out, - Grass species, - Off -site drainage (if applicable),and Boundaries of drainage easement. _RB 3. Section view of the grassed swale (1" = 20' or larger) showing: Side slopes, Longitudinal slope, - Freeboard Swale dimensions, and - SHWT level(s) _RB 4. Supporting calculations (including maximum velocity calculations for applicable storms) _RB _ 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. _RB _ 6. A copy of the deed restrictions (if required). SW401-Grassed Swale. Rev.3 Part III, Page 3 of 3 STORMWATER OPERATION AND MAINTENANCE AGREEMENT Permit Number: (to be provided by DWQ) Drainage Area Number: Dry Extended Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ® does ❑ does not incorporate pretreatment other than a forebay. Important maintenance procedures: - The drainage area will be managed to reduce the sediment load to the dry extended detention basin. - Immediately after the dry extended detention basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. - I will maintain the vegetation in and around the basin at a height of approximately six inches. - Once a year, a dam safety expert will inspect the embankment. After the dry extended detention basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential roblem: How I will remediate the roblem: The entire BMP Trash debris is present. Remove the trash/debris. The perimeter of the dry Areas of bare soil and/or Regrade the soil if necessary to extended detention erosive gullies have formed. remove the gully, and then plant a basin ground cover and water until it is established. Provide lime and a one-time fertilizer application. Form SW401-Dry Detention O&M-Rev.3 Page I of 4 B,I[F element: The inlet device: pipe or swale main treatment area Potential problem: Tiv pipe is clogged f'd The pipe is cracked or otherwise damaged (if Erosion is occurring in the Swale (if applicable)_ Sediment has accumulated and reduced the depth to 75-� of the original design depth (see diagram below) - Erosion has occurred or riprap is displaced. Weeds are present. Sediment has accumulated and reduced the depth to 75% of the original design depth (%-,ee diagram below) - Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. How i will remediate theyrobl Unclog the pipe. Dispose of the sediment off -site. Replace the pipe. Regrade the Swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if pole. Remove the sediment and dispose of it in a location, where it will not cause impacts to streams or the BW. Phn-ide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problem. Remove the weeds, preferably by hand. 7f pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location rdwte it will not cause impacts to streams or the B-N4P. Revegetate disturbed areas immediately with sod (preferred) or seed protected with securely staked erosion mat. Check outlet structure for clogging. If it is a design issue, consult an Remove the plants by hand or by wiping them with pesticide (do not Form SW401-Dry Detention O&M-Rev-3 Page 2 of 4 BMP element: Potentialproblem: How I will remediate theproblem: The embankment I Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. Grass cover is unhealthy or Restore the health of the grass cover eroding, - consult a professional if necessary. Signs of seepage on the Consult a professional. downstream face. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged_Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads 15.50 feet in the main pond, the sediment shall be removed. When the basin depth reads NA feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 'temporary Pool Elevalion Sediment Removal Ek NA T pora Pool olume Sediment Removal Elevation 13.50 ---------------------------I--------- Bottom Etevatio NA 25°to "--"'- Sediment Bottom Elevation 14.50 Storage FOREBAY MAIN POND Form SW401-Dry Detention O&M-Rev3 Page 3 of 4 25% L Permit Number: (to be provided byDWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify D WQ of any problems with the system or prior to any changes to the system or responsible party. Project name:CIRCLE K - iVTI AIRPORT BLVD WILiVllNGTON - NC 1 i 5 BMP drainage area number -PHASE 3A Print natne:GRANSEUR DICK TitleXACILITIES DIRECTOR - NEW HANOVER COUNTY AIRPORT AUTHORITY Address:1740 AIRPORT BLVD. WILIdINGTON, NC 28405 Signature: Date: t/917.0 z 0 Note: The legally responsible party should not be a homamrers assomat en uaiess more than 5w,� of the lots have been sold and a resident of the subdivision has been named die president. I, Ram (". -avu , a Notary Public for the State of �trrt& , County of Nu N-alrodfe- , do hereby certify that personally appeared before me this day of ,240Q0, and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, P40 M - lNoaMt� '° M N � a NOTARY PUBLIC i ti' �I,IER COS-5) SEAL My commission expires 124 9 Form SW401-Dry Detention O&M-Rev.3 Page 4 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: Dry Extended Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ® does ❑ does not incorporate pretreatment other than a forebay. Important maintenance procedures: - The drainage area will be managed to reduce the sediment load to the dry extended detention basin. - Immediately after the dry extended detention basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. -- I will maintain the vegetation in and around the basin at a height of approximately six inches. - Once a year, a dam safety expert will inspect the embankment. After the dry extended detention basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash/debris. The Perimeter of the dry Areas of bare soil and/or Regrade the soil if necessary to extended detention erosive gullies have formed. remove the gully, and then plant a basin ground cover and water until it is established. Provide lime and a one-time fertilizer application. Form SW401-Dry Detention O&M-Rev.3 Page 1 of 4 N The inlet devices pipe or The pipe is clogged (If Swale applicable) - The pipe is cracked or vdmwise damaged f of The main treatment area Erosion is occurring in the Swale (if apph;able)- Sediment has accumulated and reduced the depth to 75 % of the original design depth {see diagram below). Eresicm has occurred or dPmP is displaced - Weeds are present Sediment has arr•mudated and reduced the depth to 75,,: of the original design depth (seQ diagram below). Water is standing more than 5 days after a storm event. Weeds and aoxious plants are growing in the main treatment area. How I will remediate the probl Unclog the pipe- Dispose of the sediment off -site Replace the P4v- Regrade the ssvale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to a - mid future problems with erosion. Search for die source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause imparts to streams or the BW. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erasion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BW Revegetate disturbed areas immediately with sod (preferred) or seed protected with securely staked erosion mat. Check outlet structure for clogging. If it is a design issue, consult an Remove the plants by hand or by wiping them with pesticide (do not Foam SW401-Dry Detention O&M-Rev.3 page 2 of 4 BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. Grass cover is unhealthy or eroding, Restore the health of the grass cover - consult a professional if necessarV. Signs of seepage on the Consult a professional. downstream face. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads 15.00 feet in the main pond, the sediment shall be removed. When the basin depth reads NA feet in the forebay, the sediment shall be removed. Sediment Removal Bottom FOREBAY BASIN DIAGRAM 011 in the blanks) Sediment Storage Temporary Ppal Elevation 1 00 Pool -----Sediment Removal_ - Elevation15.00-- Bottom Elevation MAIN.POND Form SW401-Dry Detention O&M-Rev.3 Page 3 of 4 25% Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: —CIRCLE K - NTI AIRPORT BLVD WILMINGTON - NC.115 BMP drainage area numberTHASE 3B Print name:GRANSEUR DICK Title:FACILITIES DIRECTOR - NEW HANOVER COUNTY AIRPORT AUTHORITY Address: 1740 AIRPORT BLVD_ WILMLNGTON NC 28405 Signature: Date: 90 20 X O NOW: The legally responsible party should not be a homeowners association unless more than 59% of the lots have been sold and a resWent of the subdivision has been named the president. 'Rase- M • IbAit S , a Notary Public for the State of A&- "I tYL. , County of &Q„J HPvtmwr , do hereby certify that tAtr1�GK r tGk.• Personally appeared before me this day of t' , and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand ands oiiicial seal,. i 1 NOTARY PU13LIC a y9y SEAL My commission expires qt I a I zY Form SW401-Dry Detention O&M-Rev.3 Page 4 of 4 Permit Name: (to be provided by DWQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the problem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one -titre fertilizer application. Sediment covers the grass at the bottom of the swale. Remove sediment and dispose in an area that will not impact streams or BMPs. , R—sod i? n&ess Vegetation is too short or too Mairtain vegetatiorLat,a height of long. approximatelyappr6ximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit;at 919- 1 outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 Permit ',Niunber: (to bs provided ly MQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: IRCLE K - N I AIRPORT BLVD WILMINGTON - NC. 1 i BMP drainage area nismber.PHASE 3A Print name:+GRANSEUR .DICK TitleXACILiTIES DIRECTOR - NEW HANOVER COC�'TY AIRPORT AUTHORITY Address:1740 AIRPORT BLVD. WILMINGTON NC 28405 Note: The legally responsible patty should not be a homeowners association unless more than 501'm of the lots have been sold and a resident of the subdivision has been named the presiders. 1, M . i�)QAi V� a rotary Public for the State of Nkwi ' "1(W% , County of Kko3 +6nawe t , do hereby certify that i VML&►Vur —D1(.,Lc_ personally appeared before me this IP" day of , aC00, and acknowledge the due execution of the forgoing grassed Swale maintenance requirements. Witness my hand d official seal, p W 44 z NOTARY t PUBLIC z 4 ,tit Cd* SEAL fax M. 1'3au+*--J My commission expires_ o�t"i Fottr SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 Permit Name: (to be provided by DWQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. After the first-time fertilization to establish the grass in the Swale, fertilizer will not be applied to the grassed swale. The grassed Swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: PoEential �roblem: How I will rentediate the roblem: The entire length of the swale Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then resod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at the bottom of the Swale. Remove sediment and dispose in an area that will not impact streams or BMPs.. Re=sod,if necessary. Vegetation is too short or too Maiptai vegetatfon at "a,�eight of _ long. a ioximatel six inches. The receiving water Erosion or other signs of Contact the.NC Division of --Water damage have occurred at the outlet. Quality 401'. Oye�rsight Unit -at 919- 733-1786. " ` Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 L Permit Number: MP be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:CIRCLE K - NTI AIRPORT BLVD WILMINGTON - NC 115 BMP drainage area number:PHASE 3B Print name:GRANSEUR DICK _ Title:FACILITIES DIRECTOR - NEW HANOVER COUNTY AIRPORT AUTHORITY Address:1740 AIRPORT BLVD. WIL UNGTON NC 28405 Signature: Date: yd2-O Note: lire legally responsible pang► should not be a homeowner association unless mom than We of the lots ime been sold and a resident of fire mtbd3viston has been natured the pn ssdens. I, & M� a Notary Public for the State of KINIL"t t w^3�%l, County of kkoz Hw"JR e— , do hereby certify that S—CPA4.e-- ick- personally appeared before me this day of —• ?OZO , and aciknOwledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, OP M a- I P-fq; (:D SEAL Kwm.-,)ruAJ My commission expires qkiy Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 MISCELLANEOUS CALCULATIONS f L c t�f ■wig Y M to i� O 3 Q L O i O ti! c 0 *+ x ui L E L O O L V m sx d c O 3 co r- L D O w O ' M U'1 N a co to+ .r O W a W o a cn -co aD D e N, 0 sav W coea cv cv na o c o o ao sit r !: ao sn v ao cm " u! M N w N N na sV a o o M O a N 14 a o O O f- O D a O !O a a v O A P1 N O W O W N W _ U7 a7 0 O ad O a CD tV Ci C7 6 U) O I6 N a O O O N M M N N N N O N 13 O a NCDM W i C 0 0 N iG O O !+ ^ O a O . C') a0 O O N aD Cb N n aD O C9 W w W m O O M In (' A N N Co O 0 a N N N N O N a v n W w W W !+ C7 W W M W id3 or w v '19 W n n r M 4WD v W j am„ Nv 0 w 16 w W n n N N n 6 vi iOV N N m Mu J m aD a0 M m of W w aD m n aD _ aWo N r ra- C9 to +t It 60 It W e0 W ►l- t+ t{1 N aD -0O M 10 i' J n qC W n W 91 W O COD O V� IP b N a M Li O/ — � 1!! N t[7 w O N O CD O O O O O v s £ G N O N W N v N r N v N O w U3 W Of W a0 N W aD r ih is N W w W of aD W N Z C � i+9 M C9 It M O O aD n 00 O O O r r 0 C7 O O r CV r O O O aD w W v to N a a o O w W w W v v W 0. N r M M N r sF N N M 4" M V) r r N N r aD aD cp V c' o v m en wi v r in w M aD A aD &. v v in W W m aD v 0) 'fl M m 0 ra Ui o ui M v x 9 n NW m t0 v 10 M N M I-'D m m W f- aD m 0+ w 0 0 r r v in - ri o ® n v v m me46 o 'r u 91) a a_ o v v N n r. M ti I- W n m v 0 al C C7 r r CD iD r � v n c+f v O O O C/ Y 4r ao to do CD tV W Yl in N @9 w W c'i n in �(> m !+ a o r. a a 0 a f+ o 0 0 o n v o n n n w = Of a O W O O D O to O O O O .W W W of aCi Cf � O r 00 W o o a o a o a Ca o o w W o o � F An D O Uf a O O D » O 0 O O Uf Yf o b sn } m 0 a 0 0 a a o 0 0 0 0 0 0 0 0 0 0 0 0 L E wO O w O O O O W O O O O of 6 O w w — m Q A vO O O O O D W O O O a W W N !h V o0 0 0 0 0 0 0 .- o 0 0 0 c 0 0 0 0 v 0 0 O 0 O 0 W O O O O W O M ch CD ao a a a+ a a o a " 0 0 0 0 1n av o aD W 0 i O a O a O O O O O G O O O O O G o 'O'a w o O a w ci $ O O O N g O O W O a N O O W C 0 0 o c 0 a 0 0 0 o 0 w 0 0 o 0 o 0 0 v 0 w 0 o c aD o w 0 ni + m a0 y coo w O O O N O O O O a O a O O ® v O O O O O O W W W O W w T C } m, 0 0 O N O O O O N O O O Cl O O 10 O r r .- r co !0 0 O N O O O O ao O O O O W t- O O W r ...- c 0 0 Co N O O O 0 CY O 0 0 C. o O 0 r r O 9 O O O O W [9 w v W M W W W eo W W W n a ,t W a D m M W v N m t9 W It In N c N M o M rcf a o m ti o W w n N o n r m cm w 0 4M ru O 0 N » AN m ai 1ri Ni 0 0 i J W M M W v C1 V) fr of U9 N w cm aD W v lw w LJ ® v a a v a v v a a a w C w- W w UJ ! w W LU i u1 w W w IL !°- � w ! w a co 0 w y _ !A .000 J 1�- 00 +t 02 M r W o, n to rn .t th N r Z L. r C d cc Q W { c 0 75 CO) E L ���A Y! 1Y{ UJ n !L Q$ a M 3 0� ab �_ w A a w ao N tV Id1 N 0 tY 0 uj 0 N 0 N N _ N 0 0 00 C7 a O > OO O a M Cw^� a o m 0 O O to O O a O d a O of O O N N O a a O RV N N IN rMv cm cm O CM L7 a 00 N N M N O SO O O M w i S a 0 N O ® O o Ltl a cti ui CD O tV w M 7A O to O N N N ra O N CSI m r7 rO a N 0N w to 1�9 t"1 49 i7J Of ip r9 N N DD d It O M w ICL�? �C tfi YD it3 il9 i� N ~ 'N1i N 1 D C3 N ,rCld sMv � d d ty O i9 YA sA f- N tin w a +n N sS) d _ t3! �tf MN r ':t a0 �t O ui tD a {O VD N � LO !` q h 1:9f u1 N d !� N M- Y+ t+ O st r .-- r r r r r tON tMV 17 O m O �t.pp- N O N pr r 'm �. tai t7 tl1 4 cM'9 sf t7 Y�f�I Q i9 t0 m t7i uD C u) PN. t'A m m f. tV — > O � N r r r r r .- r r r r r .- ty r r r N O O L! m '�'' O CO O T. a u, da O N O O O O o O O a{ C ® N a C11 9D iW an 47 N d N ' N d O f0 u3 it) w Q! N OR d Cl C N m 9n m a +O E Z to cv f M C9 M 'a?- t� D O CR O A O Nl- O It h N Oa O O O r r O gi a r O r 611 r O O O t9 RL mO O d w N N d @ O O 0 w O Q d d O N C r M M N r d d N N M C9 t+f M r N N N r m to M d M �t3 O O of n w O a 0 O a M N tp w ft1 d w a M 00 w N w d to � w i+ in N d m �S ri V >n ki d 37 CIf Mf RO 4) ti> fl N�f tD !tf off d 0 co o � 10 °0 cm a A - X a_ r0o M 40q tj �p tri N N N r ui 0 a 0 t$ d c 03 4V {: d M T 0 '� {{ L7 +r N ,� fD ro N a � W ° N G1 a o ui ui cti t� r+ sa v tri ni o to m = z o 0 0 0 +• to C2 o o 0 a a o o o o a o o {U �= T a C r C C7 a s C C O 0 rLO o �. Lcm a s N o a a o 0 0 o N o r o � a o 0 pD ui o 0 ui a a a o ui o 0 o a to ui ui ui in } } m s ao 0 o a CD o 0 0 0 0 0 0 0 o a o o 0 ui 0 o ui o 0 0 o ui O a 0 0 ui ui a ui ui _ n d o 0 o a o o w 0 0 o a w w N M 3 M O n C7 O a !� a O O C a O O O 0 111 r O O O C O a O 0 M a to o b O m O u3 C] N K v 0 a o a o o w 0 0 0 a ao o N co n v M a a >; o a o a ca o 0 0 0 � N 0 to us 0 a_ s 00 a o 0 0 0 0 o a o 0 a s 0 0 0 qr 0 0 co 0 0 o a a o 0 0 v 0 a ® 0 tj 0 0 0 0 0 0 a a uNi o 0 0 o a 0 0 0 0 in 0 o r MO O N O O O O m O O O O a m 0 O a m m 0 0 0 o O o 0 0 0 'Ito a 0 a to m I [] a O M a M 0 0 N C C a n C Q M c =i m 0 O N O O O O aD O O O 0 a 11 O O w N r - u v wo o a o a o a q o 0 a a to v a 0 o w as o N O a a C N C C C C C a a r G. o V O O a O 0M t0 d m N a O a a !+ O v w O CD to N O N M M w d m of in {{ t9 N N N a O O N C9 0 W a 0 O O co N u) P A vi N w of co n N O N w ' J to CI Pf a d t+7 M d a u) N m iV to w d d to 4i G �o v -g a v ter za a v v v v a ai � ctp ui c w L! c lli c w c c c c c c c iz FC r ItJ {il u3 ao LL! w {tl d m ui u! u! yj � � W H o ° o w J w O J�- a +n d V) N r iL Z S O O S O O eci l to N O 4� O O N in O N Cl)� tI•Ld"l O c i h O d9 O at O In N m % :U a� CD O N W ileon off 0 $ S O S S O S v !•f N N r 9 LU m III 'u S`(I�ZZ Idle l - flip'©£+U MS i I Hili I i O' 00'00+0 E'3$ ( i i E L r a f 6 s;- d s f 1 I I I rr F W N 0 CL d s E Q 7 , 1 m c�a m w I ` I �I I I i AU I I i I 1 � � I��Ig�% I s � SL• iZ "I� 'P�J � p a p o 0 o p cm o iao oZ•sr. 13 •hul � I N IN,!Z "II "ptas W s :ul - LO"£8+0 e3S I 4 Gil a O40 L I_ ,o U� I I I f co 8� �AUK i O In $0"S& '13 'AUJ M N LL-1Z 73 uqS.:...: m $ :ul - "9'LZ+O OIS O J �IO ui 08'i'L 73 -AUI I Wllepno '- OO,00+0 Ms I CD o 0 0 0 o a M M N lV E ` U3o ' I i ZI•ZZ ZJ£• YS+fl �iS — - — ! I I I i O t'fl"S 6 •i3 "nub i 4Z•ZZ 13 ui!2! :1 a ! `Z£L'£Z+fl �3S I I m� l o — J U>I os"ti� •�� •,u;l I I I 9t•8! •I� Wi � - fl0"ofl+fl eiS I a a o 0 0 0 ra P � M w AM a m 4 0 to N w J F— D o O Z p u U I X mogn I w fl o 0 0 0 0 v M M r LU 12 .I I I�� �I 3 m 0 3 m 0 o 8 o o rmi n cm cv nr C7 N O ui (Y) L11 LL 8L :v 0 0 m 0 umi w o s n t7 SI9 3L' 0 v 0 0 ,ta � J _ U C) W Il LL $ o ® o 0 o a ✓ im�1 03 loo N N iV liJ u r= .f ELIJ !Lb I N s Q CL E � �A 1 V L I O o O O C7 O c9 Sv cm Al ib m Q i 0 m 0 an m o s U a CDw z -Ul )° M i M 0 CM LL! lies LL o a GDo v i+1 N N il�lf � I I I ! ! IIi L3��."6L73'nu� -ss�•�v+o ��s vl Wet o • Qo•a4+o ��s O 00"4L '93 �! �'t7z "I� "P� I I �i ii � I I I I 9 i I E � I•{ � ;�I,11 ; I� III �I I I) I t 1 flfl"00+p e�S E U L a W '' ^1 L J N E O 0m CL CO) E 0 a o 0 o O i i 0 m 0 f, 0 en Q T O MEMO Q M � J n w � J i r O it W11epno O o a o o o v cm IN N N A3 w a o a ® o to N N t7f tG C! 0 o, c m 0 c to o s n v m _o in w 0 r3 n W O J 2 N O It- llegn w $ o {o(yy C3 a N N N w M a o 0 o a o co N ri u O In w g :Ul tNa 0 a N o In N � O In T m E :Ul U7 � J N S O W pepn o -_- a o O S g v M N 03 Go co 7 pl W UI UI UI O r i a�zL.��p� � �9� 5Z4Z eIS �i N - I 0£"� L '13 'nub O vZ"S L "i3 •AU, OA'£Z "13 �!21 � I -ti•£"9E+L gIS I I 1 Ii i 1 �ii i � OZ"8L "13'AW "!3 'Auk I - � I O UL•9L fl9"5Z "13 �!23 `sti�"z�+o �s I I ` Y i OS"9L 13 hUl 1 - vv"vo+v eIs L LL W , ^1 L N PD1 CIRCLE K - AIRPORT JacobDoole 0 � YIMMONS GROUP R' Y :1P . , 37630.054 Drainage Ditch Design (Velocity Constraint) 129-"T MOW "' e a -e This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) = 1.81 (Acres) Coef. (C) = 0.55 (Dimensionless) Inte. (1) = 7.75 (in/hr) Flow (Q10) = 7.7 (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.030 (Dimensionless) Ditch Length LF Slope = 0.016 (ft/ft) Highest Elevation Z Required = 1.24 Ratio Lowest Elevation = Side Slope (M) = :1 Variable Quantities (Oiteh WdVIA Depth) Flow Depth (Y) = 0.35 ft 4.2 in Bottom Width (B) = 7.75 ft 93.0 in Freeboard = 0.65 ft 7.8 in Com,pute Tractive Force T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.34 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) Jute Net 0.45 Curled Mat 1.55 Class A (4"@9"THK) 2.00 Class B (8'@18"THK) 3.50 Class I (12"@22"THK) 5.00 Class II 18" 30"THK 7.50 S75 1.55 S 150 1.75 SC150 2.10 C125 2.25 P300 8.00 New A = 3.08 SF New P = 9.96 Wetted perimeter New R = 0.31 Hydraulic radius Z Actual = 1.41 Must be greater than z required=> 1.24 Okay New V = 2.83 fps Minimum Design Geometry Liner: North American Green, S75 C55 LB/SF > 0.34 LB/SF Okay h---------- ---------------------------- - --- --1 jTopidth = 13.75 ft Min. Ditch Depth= 1 ft Flow Depth (Y) = 0.35 ft Bottom Width (B) = 7.75 ft r - Min. Ditch IDe th ft Bottom Width ft Flow Depth ft Top Width ftSide Slo i 1.00 7,75 1 0.35 1 13.75 1 3:1 North American Green, S75 7 *RED IS USER INPUT LATEST REVISION: Ill1/2021 9:44 AM r w191aa0�r -s PD4 0 % CIRCLE K -AIRPORT r- MONS GaGV, Nummmmomm Jacob Dooley rnrs I aT3101h I vtr w vs 37630 054 Drainage Ditch Design (Velocity Constraint) This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) = 1.06 (Acres) Coef. (C) = 0.81 (Dimensioinle�;s) Inte. (1) = 9.70 (in/hr) Flow (Q10) = 8.3 (cfs) lur"MR4,71M. Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.030 (Dimensionless) Ditch Length = LF Slope = 0.011 (ft/ft) Highest Elevation Z Required = 1.58 Ratio Lowest Elevation Side Slope (M) = :1 Flow Depth (Y) = 1.00 ft 12.0 in Bottom Width (B) = 0.00 ft 0.0 in Freeboard = 0.00 ft 0.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.70 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) Jute Net 0.45 Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 IP300 8.00 (Dowmigne W7 Adual 6e &1aWeiftk g New P = 6.32 Wetted perimeter New R = 0.47 Hydraulic radius Z Actual = 1.82 Must be greater than z required=> 1.58 Okay New V = 3.20 fps ■: Liner: North American Green, S75 1.55 LB/SF> 0.71 LB/SF Okay Top Width = 6 ft Min. Ditch Depth '= 1 ft 3 Flow Depth (Y) = 1 ft 1 Bottom Width (B) = 0 It Min. Ditch Depth ftBottom Width ft Flow Depth (ft) I Top Width (ft) iSide Slopeq 1.00 0,00 1 1.00 i 6 1 3:1 ■ North American Green, S75 *RED IS USER INPUT LATEST REVISION: 3/7/2021 2:21 PM P05 A CIRCLE K -AIRPORT Jacob DooleyE 1. 37630 054 Drainage Ditch Design (Velocity Constraint) Rim This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) EEMM= Area (A) = 1.53 (Acres) Coef. (C) = 0.79 (Dimensionless) Inte. (1) = 9.70 (in/hr) Flow (010) = 11.7 (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = (Dimensionless) Ditch Length = 130 LF Slope = 0.003 (ft/ft) Highest Elevation = 22.51 Z Required = 4.10 Ratio Lowest Elevation = 22.08 Side Slope (M) _ :1 MIT Flow Depth (Y) = 1.50 ft 18.0 in Bottom Width (B) = 0.00 ft 0.0 in Freeboard = 0.00 ft 0.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.31 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) Jute Net 0.45 Curled Mat 1.55 S75 1.55 Class A (4" @9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 P300 8.00 New A = �6.75 SF New P = 9.49 Wetted perimeter New R = - 0.71 Hydraulic radius Z Actual = 5.38 Must be greater than z required=> 4.10 Okay New V = 2.28 fps Design Liner: North American Green, S75 1.55 LB/SF> 0.31 LB/SF Okay N Top Width = 9ft Min. Ditch Depth= 1.5 ------------------ Xl Flow Depth (Y) = 1.5 ft Bottom Width (B) = 0 ft Min. Ditch Depth ft Bottom Width ft Flow Depth (ft) I Top Width (ft) I Side Slopel 1.50 0.00 1.50 1 9 I Ili North American Green, S75 *RED IS USER INPUT LLATEST REVISION: 3/7/2021 2:22 PM K. aI-E�� *••d - . PD6 ` W * % CIRCLE K -AIRPORT • - T1MMa_IS GROUP Jacob Dooley ..�.... �._.. 1 37630.054 Drainage Ditch Design (Velocity Constraint) This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) = 1.22 (Acres) Coef. (C) = 0.45 (Dimensionless) Inte. (1) = 9.70 (in/hr) Flow (Q10) = 5.3 (cfs) Known Quantities Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.030 (Dimensionless) Ditch Length = 685 LF Slope = 0.007 (ft/ft) Highest Elevation = 23.1 Z Required = 1.33 Ratio Lowest Elevation = 18.64 Side Slope (M) _ :1 Flow Depth (Y) _ " 0.75 ft 9.0 in Bottom Width (B) = 1.00 It 12.0 in Freeboard = 0.50 It 6.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.30 LB/SF D=Depth of flow in channel (ft) Jute Net 0.45 Curled Mat 1.55 Class A (4" a@9"THK) 2.00 Class B (8"@18"THK) 3.50 Class I (12"A22"THK) 5.00 Class II 18" 30"THK 7.50 S=Slope of channel (ft/ft) S75 1.55 S150 1.75 SC150 2.10 C125 2.25 P300 8.00 i NewA= 2.44£SF New P = 5.74 Wetted perimeter New R = 0.42 Hydraulic radius Z Actual = 1.38 Must be greater than z required=> 1.33 Okay New V = 2.26 fps Liner: North American Green, S75 1.55 LB/SF > 0.31 LB/SF Okay Top Width = 8.5 ft Min. Ditch Depth '= 1.25 ft - _ ___ I 3 Flow Depth (Y) = 0.75 ft i1 Bottom Width (B) = 1 ft Min. Ditch Depth ft Bottom Width (ft) Flow Depth (ft) f Top Width (ft) Side Slope 1.25 1 1.00 0.75 8.5 1 3.1 Ditch North American Green, S75 "RED IS USER INPUT LATEST REVISION: 3/7/2021 2:22 PM PD7 CIRCLE K - AIRPORT TIMMONIS GROUP Jacob Dooley _ 37630.054 Drainage Ditch Design (Velocity Constraint) -■ This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) = 0.50 (Acres) Coef. (C) = 0.50 (Dimensionless) Inte. (1) = 9.70 in/hr ( ) Flow (Q,o) = 2.4 (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.030 (Dimensionless) Ditch Length = LF Slope = 0.046 (ft/ft) Highest Elevation = Z Required = 0.23 Ratio Lowest Elevation = Side Slope (M) = 3 :1 Flow Depth (Y) = 0.50 ft &0 in Bottom Width (B) = 2.00 ft 24.0 in Freeboard = 0.50 ft 6.0 in Compute Tractive ForceL�-- T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 1.43 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) RTITATIIII�-_1 Jute Net 0.45 Curled Mat 1.55 Class A (4"@9'7HK) 2.00 Class B (8"@18"THK) 3.50 Class I (12"@22"THK) 5.00 Class II 18" 30"THK 7.50 S75 1.55 S150 1.75 SC150 2.10 C125 2.25 P300 8.00 AM M7 .. _ New A= 1.75 SF New P = 5.16 Wetted perimeter New R = 0.34 Hydraulic radius Z Actual = 0.85 Must be greater than z required=> 0.23 Okay New V = 5.18 fps Liner: North American Green, S75 1.55 LB/SF > ; 44 LB/SF Okay h--------------------------------------------- -", Top Width = 8 ft Min. Ditch Depth = 1 ft 3 Flow Depth (Y) = 0.5 ft 11 Bottom Width (B) = 2 ft a Min. Ditch Depth(ft) Bottom Width ft Flow Depth ftTop Width ft Side Slope 1.00 2.00 1 0.fi0 8 3:1 e North American Green, S75 *RED IS USER INPUT LATEST REVISION: 9/1/2020 2:01 PM PD8 CIRCLE K - AIRPORT EA 1'IE�T�iEi`"� TIMMONS GROUP Jacob Dooley , 37630.054 Drainage Ditch Design (Velocity Constraint) PERMANIENT DIVERSION DlTr7L.-�D8 This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) _ ' "" (Acres) '* Coef. (C) _ (Dimensionless) Inte. (1) _ (in/hr) Flow (il = 7.2 (cfs) Line channel with: f " rip -rap (Assume 6" even if using grass) Manning n = 0.0,ar (Dimensionless) Ditch Length = 50 LF Slope = 0.006 (ftfft) Highest Elevation = 19.16 Z Required = 1.85 Ratio Lowest Elevation = 18.85 Side Slope (M) _ , :1 offirauraffm 51-- Flow Depth (Y) = 0.75 ft 9.0 in Bottom Width (B) = 2.00 ft 24.0 in Freeboard = 0.25 ft 3.0 in I Compute Tractive Fo T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.29 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) Jute Net 0.45 , , ; Curled Mat 1.55 S75 1.55 Class A (4" Q9"THK) 2.00 S150 1.75 Class B (8" @18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II 18" 30"THK 7.50 1 P300 8.00 a, M.Mml New A = 3.19 SF New P = 6.74 Wetted perimeter New R = 0.47 Hydraulic radius Z Actual = 1.93 Must be greater than z required=> 1.85 Okay New V = 2.37 fps Minimum Design Geometry Liner: North American Green, S75 1.55 LB/SF > 0.3 LB/SF Okay ---------------------------- ------------------ - Top Width = 8 ft Min. Ditch Depth1 ft 3 Flow Depth (Y) = 0.75 ft 1 Bottom Width (B) = 2 ft Min. Ditch Depth ft Bottom Width ftFlow Dt: th ftTop Width ft Side Slope 1.00 2.00 n 775 I R Iz•, e North American Green, S75 *RED IS USER INPUT L. LATEST REVISION: 9/1/2020 2:03 PM PD9 *. mil' CIRCLE K - AIRPORT LITY, TIMMOMS GROUP mcm r: Jacob Dooley _ 37630.054 Drainage Ditch Design (Velocity Constraint) ',PERMANENT DIVERSION DITCH[ -,• This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) = 0.74 (Acres) Coef. (C) = 0.65 (Dimensionless) Inte. (1) = 9.70 (in/hr) Flow (Q10) = 4.7 (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.030 (Dimensionless) Ditch Length = 432 LF Slope = 0.004 (ft/ft) Highest Elevation = 24.71 Z Required = 1.49 Ratio Lowest Elevation = 23 Side Slope (M) = 3 :1 FlowDepth(Y) = e 0-78 ft 9.4 in Bottom Width (B) = 1.00 ft 12.0 in Freeboard = 0 00 ft 0.0 in 1. N �I•+fr `I : a �t . t.:: -- ---- - -- T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.19 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (f 1ft) Jute Net 0.45 Curled Mat 1.55 Class A (4"@9"THK) 2.00 Class B (8"@18"THK) 3.50 Class I (12"@227HK) 5.00 Class II 18" 30"THK 7.50 _.. S75 1.55 S150 1.75 SC150 2.10 C125 2.25 P300 8.00 Determine If Z Actual Is Greater than Z Requiredr New P = 5.93 Wetted perimeter New R = 0.44 Hydraulic radius Z Actual = 1.50 Must be greater than z required=> 1.49 Okay New V = 1.81 fps Minimum Design Geometry Liner: North American Green, S75 1.55 LB/SF > 0.2 LB/SF Okay t____ Top Width = 5.68 ft Min. Ditch Depth= 0.78 ft _____________r____. 3 Flow Depth (Y) = 0.78 ft �1 Bottom Width (B) = 1 ft Min. Ditch Depth ft Bottom Width ft j Flow Depth (ft) I Top Width (ft) Side Slope 0.78 1.00 0.78 5.68 3.1 NEIRIMM North American Green, S75 *RED IS USER INPUT LATEST REVISION: 1/11/2021 11:37 AM 'c�¢� --• VEGETATIVE SWALE IIIA * CIRCLE K -AIRPORT Jacob y TIMMONS GROUP •-• = ,Rrh ::�c - . 37630.054 Drainage Ditch Design (Velocity Constraint) DIVERSIONPERM ENT • This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) _ (Acres) Coef. (C) - (Dimensionless) Inte. (1) = (in/hr) Flow (Q10) _ (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.030 (Dimensionless) Ditch Length = " LF Slope = 0.003 (f tft) Highest Elevation = Z Required = 2.62 Ratio Lowest Elevation = Side Slope (M) = 3 :1 Flow Depth (Y) = 0.65 ft 7.8 in Bottom Width (B) = 5.00 ft 60.0 in Freeboard = 0.35 ft 4.2 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.14 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) si d.,• Jute Net 0.45 Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class 11 18" 30"THK 7.50 1 1 P300 8.00 Determine ;f Z Actual Is Greater Thar, Z Required - y New P = 9.11 Wetted perimeter New R = 0.50 Hydraulic radius Z Actual = 2.83 Must be greater than z required=> 2.62 Okay New V = 1.80 fps Liner: North American Green, S75 1-55 LB/SF > 0-14 LB/SF Okay t------------ - ------------- —--- ------ ------� Top Width = 11 ft Min. Ditch Depth = 1 ft 3 Flow Depth (Y) = 0.65 ft '1 Bottom Width (B) = 5 ft Min. Ditch Depth ft Bottom Width ftFlow Depth ftTop Width ftSide Slope 1.00 5.00 0.65 11 3:1 North American Green, S75 , *RED IS USER INPUT LATEST REVISION: 1/14/2021 10:40 AM 0 R LAL 01 --dLr-.,tetzi VEGETATIVE SWALE IIIB "tip CIRCLE K - AIRPORT 1150"T TNMMONS GROUP Jacob Dooley -•,-s.c;+ti ;.:'r 37630.054 Drainage Ditch Design (Velocity Constraint) r lip - This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Area (A) _ • (Acres) Coef. (C) _ (Dimensionless) Inte. (1) = (in/hr) Flow (Q10) = 25.3 (cfs) Line channel with: 6 " rip -rap (Assume 6" even if using grass) Manning n = 0.030 (Dimensionless) Ditch Length = LF Slope = 0.003 (M) Highest Elevation = Z Required = 9.05 Ratio Lowest Elevation = Side Slope (M) = 3 :1 (Ditchrjable Quantities : Depth) -- - Flow Depth (Y) = 1.15 ft 13.8 in Bottom Width (B) = 6.00 ft 72.0 in Freeboard = 0.10 ft _ 1.2 in T=YxDxS Y =Weight of water (62.4 LB/CUFT) T = 0.23 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) FEWi' Jute Net 0.45 Curled Mat 1.55 Class A (4" @9"THK) 2.00 Class B (8" @18" THK) 3.50 Class I (12" @22°THK) 5.00 Class II 18" 30"THK 7.50 S75 1.55 S150 1.75 SC150 2.10 C125 2.25 P300 8.00 A New A = 10.87 SF New P = 13.27 Wetted perimeter New R = 0.82 Hydraulic radius Z Actual = 9.51 Must be greater than z required=> 9.05 Okay New V = 2.45 fps DesignMinimum Liner: North American Green, S75 1.55 LB/SF > 0.23 LB/SF Okay ----------------------------------------------- Top Width = 13.5 ft /�- Min. Ditch Depth,= 1.25X [___------ _- ---_ i 3 Flow Depth (Y) = 1.15 ft -------------- Bottom Width (B) = 6 ft Min. Ditch Depth ft Bottom Width ftFlow Depth (ft) i Top Width (ft) I Side Slope 1.25 6.00 1.15 13.5 1 3:1 North American Green, S75 *RED IS USER INPUT LATEST REVISION: 1/14/2021 10:42 AM r x i d.tTj lur'lL 11¢M {� Circkle K - Wilmington Airport TIMMONS GROUP Jacob Dooley d . T, 37630.054 Pipe Outlet Protection (NYDOT Method) Structure Name: 0. Pipe Diameter = in From Fig. 8.06.c: ZONE = 2 Pipe Slope = ft/ft Mannings n = o_' Rip Rap Class = B Velocity Flowing Full = 5.11 fps Apron Thickness = 18 in Apron Length = 12.0 ft Apron Width = 3xDia.= 6.0 ft From Fig. 8.06.e: Pipe Diameter = 18 in From Fig. 8.06.c: ZONE = 1 f Pipe Slope = 0.003 ft/ft Mannings n = 0.013 Rip Rap Class = A Velocity Flowing Full = 3.26 fps Apron Thickness = 12 in Apron Length = 6.0 ft Apron Width = 3xDia.= 4.5 ft From Fig. 8.06.e: Structure Narne: EW200 -- J Pipe Diameter = 30 in Pipe Slope _ 0.003 ft/ft Mannings n = 0.013 Velocity Flowing Full = 4.59 fps From Fig. 8.06.c: ZONE = Rip Rap Class = B Apron Thickness = 18 in Apron Length = 15.0 ft Apron Width = 3xDia.= 7.5 ft •;M'•�i�:�:� From Fig. 8.06.e: LLATEST REVISION: 317/2021 2:25 PM IStructure Name: M01 Pipe Diameter = 18 in From Fig. 8.06.c: ZONE = 1 Pipe Slope = I 0.0035 ft/ft Mannings In = 0.013 Rip Rap Class = A Velocity Flowing Full = 3.53 fps Apron Thickness = 12 in Apron Length = 6.0 ft Apron Width = 3xDia.= 4.5 ft From Fig. 8.06.e: Structure Name: FE303 Pipe Diameter = 24 in From Fig. 8.06.c: ZONE _ Pipe Slope = 0.005 fttft Mannings n = 0.013 Rip Rap Class = A I Velocity Flowing Full = 5.11 fps Apron Thickness = 12 in Apron Length = 8.0 ft f Apron Width = 3xDia.= 6.0 ft From Fig. 8.06.e: Structure Name: EW1 02 Pipe Diameter = 24 in From Fig. 8.06.c: ZONE = 2 Pipe Slope = 0.0085 ft/ft Mannings In = 0.013 Rip Rap Class = B Velocity Flowing Full = 6.66 fps Apron Thickness = 18 in Apron Length = 12.0 ft Apron Width = 3xDia.= 6.0 ft From Fig. 8.06.e: LATEST REVISION: 3/7/2021 2:25 PM St ure Name: EW1011 f Pipe Diameter= in From Fig. 8.06.c: ZONE IPipe Slope = ft/ft Mannings n = Rip Rap Class = A Velocity Flowing Full = 3.37 fps Apron Thickness = 12 in Apron Length = 6.0 ft Apron Width = 3xDia.= 4.5 ft From Fig. 8.06.e: Structwe Name: e l Pipe Diameter = 30 in From Fig. 8.06.c: ZONE _ Pipe Slope = 0.01 ft/ft Mannings n = 0.013 Rip Rap Class = B Velocity Flowing Full = 8.38 fps Apron Thickness = 18 in Apron Length = 15.0 ft ' Apron Width = 3xDia.= 7.5 ft From Fig. 8.06.e: Structure Name: EW21 0 Pipe Diameter = 36 in From Fig. 8.06.c: ZONE _ ^ Pipe Slope = 0.01 ft/ft Mannings n = 0.013 Rip Rap Class = B Velocity Flowing Full = 9.46 fps Apron Thickness = 18 in Apron Length = 18.0 ft Apron Width = 3xDia.= 9.0 ft From Fig. 8.06.e: LATEST REVISION: 3/7/2021 2:25 PM I IStructure Name: kr - r Pipe Diameter = 42 in From Fig. 8.06.c: ZONE I{ Pipe Slope = 0.01 ft/ft Mannings n = 0.013 Rip Rap Class = 1 Velocity Flowing Full = 10.49 fps Apron Thickness = 24 in I Apron Length = 28.0 ft Apron Width = 3xDia.= 10.5 ft From Fig. 8.06.e: Name:Structure a Pipe Diameter = 42 in From Fig. 8.06.c: ZONE = 3 Pipe Slope = 0.01 ft/ft Mannings n = 0.013 Rip Rap Class = 1 Velocity Flowing Full = 10.49 fps Apron Thickness = 24 in Apron Length = 28.0 ft Apron Width = 3xDia.= 10.5 ft From Fig. 8.06.e: I Pipe Diameter = 18 in From Fig. 8.06.c: ZONE _ Pipe Slope = 0.003 f ift Mannings n = 0.013 Rip Rap Class = A Velocity Flowing Full = 3.26 fps Apron Thickness = 12 in Apron Length = 6.0 ft IApron Width = 3xDia.= 4.5 ft From Fig. 8.06.e: LLATEST REVISION: 3/7/2021 2:25 PM CIRCLE K - AIRPORT Jacob Dooley ifMMONS GROUP --,_5,�; ,IEl4a,l ,•;I mAvi.6iitvs<�� � i �:aa•,-�,ta •isa:;'igra,=x- 37630.054 Ditch Outlet Protection (NYDOT Method) DName:D Velocity = 1.81 fps From Fig. 8.06.c: ZONE _ Top Width = 5.68 ft Ditch Area = 2.6052 sf Rip Rap Class = A Equivalent Pipe Diameter = 21.86 in Apron Thickness = 12 in Equivalent Pipe Diameter = 18 in Apron Length = 6.0 ft Apron Width = Top Width.= 5.7 ft From Fig. 8.06.e: LLATEST REVISION: 3/7/2021 2:27 PM Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3138 by Autodesk, Inc. ILIA - 50 YEAR Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 15.00 Total Depth (ft) = 1.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Q vs Depth No. Increments = 30 Depth (ft) 2.00 I 1.50 1.00 0.50 !- 0.00 L -0.50 ❑ 5 10 Weir W.S. IIIA - 50 YEAR Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) 15 20 25 30 35 Sunday, Mar 7 2021 = 0.85 = 43.05 = 15.64 = 2.75 = 21.80 Depth (ft) 2.00 1.50 1.00 0.50 MY -0.50 40 Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. (� IIIA -100 YEAR I Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 15.00 Total Depth (ft) = 1.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Q vs Depth No. Increments = 30 Depth (ft) 2.00 1.50 1.00 0.50 OO -0.50 U 5 10 15 Weir W.S. IIIA -100 YEAR Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) 20 25 30 Sunday, Mar 7 2021 = 0.95 = 51.78 = 17.86 = 2.90 = 22.60 Depth (ft) 2.00 1.50 1.00 0.50 M -0.50 35 40 Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. 111 B - 50 YEAR Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 50.00 Total Depth (ft) = 1.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Q vs Depth No. Increments = 50 Depth (ft) 2.00 1.50 1.00 0.50 ,Q 1 1 -0.50 0 5 10 15 20 25 Weir 11113- 50 YEAR Highlighted Depth (ft) Q (Cfs) Area (sqft) Velocity (fUs) Top Width (ft) Sunday, Mar 7 2021 = 1.05 = 177.98 = 56.91 = 3.13 = 58.40 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 35 40 45 50 55 60 65 70 75 Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. IIIB - 100 YEAR Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 50.00 Total Depth (ft) = 1.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Q vs Depth No. Increments = 50 Depth (ft) 2.00 1:50 1.00 0.50 0.00 -0.50 IIIB -100 YEAR Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fUs) Top Width (ft) Sunday, Mar 7 2021 = 1.20 = 219.40 = 65.76 = 3.34 = 59.60 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 U b 1U 1b 2U 25 30 35 40 45 50 55 60 65 70 75 Weir W.S. Length (ft) Zorda, Garrett D From: Zorda, Garrett D Sent: Thursday, April 15, 2021 1:49 PM To: Brian Downs; Rick Baker Cc: Granseur Dick; Jacob Dooley; Andy Priolo - Couche Tard (APriolo@circlek.com); Hall, Christine Subject: RE: [External] RE: Wilmington International Airport EDDB - Circle K Modification (SW8 050547) - Request for Additional Information Good Afternoon All, I have completed my review of the subject project and everything is almost good to go, there is just one minor thing that I need revised before I am able to issue this modification. Section IV.10 of the application was updated to reflect the drainage area for the Phase I&II drainage area, as requested previously, however, the BUA allocations do not appearto match the most recent modification to SW8 050547. For example, the submitted table indicates that the "Future" allocation for the Phase I&II area is 3,012,132 square feet. The most recent issuance, however, lists the "Future" allocation for the Phase I&II drainage area as 2,223,812 square feet. In order to ensure consistency, can you please provide an updated Section IV.10 of the application that includes the correct BUA allocations for the Phase I&II drainage area per the most recent issuance approved on October 6, 2020? That updated page can be emailed to me and I would be happy to print and slip sheet it into the application package. Once I receive that updated page, I should have a complete package and be able to issue the modification. With that in mind, I will go ahead and begin drafting the permit so that it will be ready to go when I receive the update application page. In the meantime, please let me know if you have any questions. Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct —Please note the change to my direct phone number" garreft.zorda(M ncden r.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 _._...;'ar"�:�'1?%i.1"it:C:'iC,a'`.is,''�:_-otp t�1:-,�;1`,dres is;a.il];; if7i'�1r r, `1 „7 7111�c`9 t tll: iC..:CC7?[ S Lail. aV �k: disi;ilaf C© [%71E�� �xr'i . Zorda, Garrett D From: Zorda, Garrett D Sent: Thursday, March 11, 2021 1:06 PM To: Rick Baker, Granseur Dick (gdick@flyilm.com); Jacob Dooley; Priolo, Andy Cc: Hall, Christine Subject: RE: [External] RE: Wilmington International Airport EDDB - Circle K Modification (SW8 050547) - Request for Additional Information Good Afternoon Mr. Baker, That proposed two week extension is acceptable from our end as long as that timeline is acceptable with the airport and other parties involved. With that said, please ensure all of the requested information is received by March 29, 2021. In the meantime, if you have any additional questions or concerns, please let me know. Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct ' Please note the change to my direct phone number** garrett.zordancdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Owl Er,l7 rorresNendence to and from th.fs address is subject to hia h t:, Car��iina ?ubii Lati., and rna;, to to ti iti► f� From: Rick Baker [mailto:Rick.Baker@timmons.com] Sent: Thursday, March 11, 20218:45 AM To: Zorda, Garrett D <garrett.zorda@ncdenr.gov>; Granseur Dick (gdick@flyilm.com) <gdick@flyilm.com>; Jacob Dooley <Jacob.Dooley@timmons.com>; Priolo, Andy <APriolo@circlek.com> Cc: Hall, Christine <Christine.Hall@ncdenr.gov> Subject: RE: [External] RE: Wilmington International Airport EDDB Circle K Modification (SW8 050547) Request for Additional Information CAUTION: External erra3. Co not cock links or open attach-fnents unless. you �,-Ltrify..Send all sus�iclotus emaol as an at�act'iment to Report Spam. Garrett, Again, we think you and Christine for your time on the call earlier this week. We are requesting an extension of 14 calendar days for submittal of additional information as requested in your letter dated February 26, 2021. That would make the deadline for submittal March 29, 2021. We appreciate your consideration of this request. Thanks, Rick Baker, PE Principal/Group Leader TlNiMONS GROUP I www.timmons.com 5410 Trinity Rd, Suite 102 1 Raleigh, NC 27607 Office:919.866.4939 1 Mobile:919-417-3484 Linkedin: www.linkedin/in/rick-baker/ Engineering j Design I Technology Your Vision Achieved Through Ours To send me files greater than 20MB click here From: Zorda, Garrett D <garrett.zorda@ncdenr.gov> Sent: Friday, March 5, 20218:51 AM To: Rick Baker <Rick.Baker@timmons.com>; Granseur Dick (gdick@flvilm.com) <gdick@flvilm.com>; Jacob Dooley <Jacob.Dooley@timmons.com>; Priolo, Andy <APriolo@circlek.com> Cc: Hall, Christine <Christine.HaII@ncdenr.eov> Subject: RE: [External] RE: Wilmington International Airport EDDB - Circle K Modification (SW8 050547) - Request for Additional Information Good Morning Mr. Baker, We are available for a teleconference meeting on Tuesday March 9, 2021 at 10:00am to discuss any questions you may have. If this date/time works for you, please send us the meeting request so that we may join. In the meantime, if you have any additional questions, please let me know. Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct **Please note the change to my direct phone number" garrett.zordaa ncden r.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 J� D_ E Q u�ll�f w pr�gRal q��Fry raa corresprv'.: 1 moo ! 7 -mic tf ;'s : ddres's !$ ka the PV0!T i C>!'rleOO, i idw+lC Re 3orcis Lis_%v fir.,d r31ay t- .t��ci�� -e 'A � t i; �- „a r, third 4_�:'tia. From: Rick Baker <Rick.Baker@timmons.corn> Sent: Thursday, March 4, 20215:35 PM To: Zorda, Garrett D <garrett.zorda@ncdenr.gov>; Granseur Dick (gdic;;@flyiim.com) <gdick@flyilm.com>; Jacob Dooley <Jacob.Dooley@timmons.com>; Priolo, Andy <APriolo@circlek.com> Cc: Hall, Christine <Christine.Hall@ncdenr.eov> Subject: [External] RE: Wilmington International Airport EDDB - Circle K Modification (SW8 050547) - Request for Additional Information CAiI TO N: External Lmcl Do rvtclick ks or open atta&ments unlass you verify. Send aN sL4picious email as an attachment to Garrett, We have reviewed your request for additional information and are requesting a meeting (in person or via ZOOM) to review your comments and ask for some clarification so we can respond with the information necessary to keep this project moving forward. We also have a question about the turn lane in the public right of way inside the airport. Please let us know some available dates and times so we can schedule. Thanks, Rick Baker, PEE Principal/Group Leader TII!!liMONS GROUP I www.timmons.com 5410 Trinity Rd, Suite 102 I Raleigh, NC 27607 Office: 919.866.4939 I Mobile: 919-417-3484 Linkedin: www.linkedin/in/rick-baker/ Engineering I Design I Technology Your Vision Achieved Through Ours To send me files greater than 20iiiiB click here From: Zorda, Garrett D <garrett.zorda@ncdenr.gcv> Sent: Friday, February 26, 20214:00 PM To: Granseur Dick (gdick@flyilm.com) <gdi::k@flyilm.com>; Rick Baker <Rick.Baker(@timmojis.ccm>; Jacob Dooley <Jacob.Dooley@timmons.com>; wrice rircle!r <.com Cc: Hall, Christine <Christine.Hall@ncdenr.eo> Subject: Wilmington International Airport EDDB Circle K Modification (SW8 050547) Request for Additional Information CAliTIC3N: This email originated frc1h outside of the oa ization. too nrl, c'ick itnks or open attachments unless you recognize the sender and know the content is safe. All, Attached is a pdf of the request for additional information for the subject project. There are just a few items that need to be addressed. Please let me know if you have any questions or concerns. Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct **Please note the change to my direct phone number** garrett.zorda(aZncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Ema ,' ccrrespondenc ,� to aad from, this address is subject to Z he North Caro nna %blic Records i_a!v and may be -disclosed to third part,as. Brian Downs From: Jacob Dooley Sent: Wednesday, March 3, 2021 9:01 AM To: Brian Downs Subject: FW: [External] RE: D-065-20-041 Circle K NTI Airport FTI Confirmation from DOT hydro for todays discussion. Post -Flows must be less than Pre -Flows for the 10,25,50, and 100 year storms. As discussed, it seems diverting more drainage to basin IIIB is the best option. Jacob From: Wurzel, Joseph P<jpwurzel@ncdot.gov> Sent: Monday, March 1, 20219:08 AM To: Jacob Dooley <Jacob.Dooley@timmons.com> Subject: RE: [External] RE: D-065-20-041 Circle K NTI Airport That is correct. Once we get the revised plans I will forward it to our hydro department for their review on it again. Thank you, Patrick Wurzel Engineering Technician North Carolina Department of Transportation Division 3 District 3 910 398 9100 Office 910 398 9118 Direct *PwurzelCa)ncdot.4ov 300 Division Drive Wilmington, NC 28401 Email correspondence to and from this addresz is sui)ject to the Horth Carolina Public. Records taw and may be disclo3cd to third parties. From: Jacob Dooley <Jacob.Dooley@timmons.com> Sent: Monday, March 1, 20218:23 AM To: Wurzel, Joseph P <ipwurzel@ncdot.eov> Subject: RE: [External] RE: D-065-20-041 Circle K NTI Airport LHu i ON: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Snar. Good Morning Mr. Wurzel, We are working on revising our plans to reduce the discharges to the NCDOT right of way. lust to confirm (I know this may seem obvious), but for DOT hydro approval we just need to reduce post condition discharges to equaVunder the current predevelopment rates for the below storms? Thanks, Jacob Dooley, PE Project Engineer III TIMMONS GROUP I www.timmons.com 5410 Trinity Rd, Suite 102 1 Raleigh, NC 27607 Office:919.866.4937 1 Fax: 919.859.5663 Your Vision Achieved Through Ours To send me files greater than 20MB click here From: Wurzel, Joseph P <ipwurzel@ncdot.eov> Sent: Monday, February 15, 20218:39 AM To: [man Downs <Brian.Downs @timmons.com> Cc: Drees, Nick K <nkdrees@ncdot.eov> Subject: RE: [External] RE: D-065-20-041 Circle K NTI Airport Good Morning, The comments from hydro are: -Water is still being diverted to NCDOT right of way, thus there should not be an increase in discharges in the 10,25,50, and 100 year storms. Thank you, Patrick Wurzel Engineering Technician North Carolina Department of Transportation Division 3 District 3 910 398 9100 Office 910 398 9118 Direct Emurzel(a)_ncdot.gov 300 Division Drive Wilmington, NC 28401 Pir,oil correspondence to end from this address is subject to the North Carolina Public Records Law and may he disclosed to ihird parties. From: Wurzel, Joseph P Sent: Wednesday, December 30, 2020 9:24 AM To: Brian Downs <Brian.Downs @timmons.com> Subject: RE: [External] RE: D-065-20-041 Circle K NTI Airport Good Morning, Below are the revised hydro comments. • Based on the proposed drainage and calculations there are diversions to the two 24" pipes under 23rd Street. Drainage patterns need to be maintained or the post discharge at the inlet of the two 24" pipes should be equal or less than the pre. This should be the case for the 10,25,50, and 100-year storms. • Based on the proposed contours it would seem that the geometry of the ditch along 23'd Street is being reduced. Please maintain existing ditch geometry with slopes 3:1 or flatter. Thank you, Patrick Wurzel Engineering Technician North Carolina Department of Transportation Division 3 District 3 910 398 9100 Office 910 398 9118 Direct imurzeKcbncdot.aov 300 Division Drive Wilmington, NC 28401 Email corresnondcncs to and from this address is suhjert to the North Carolina Pubic Rero: ds Law and maybe disclosed io third parties. From: Brian Downs <Brian.Downs @timmons.com> Sent: Thursday, December 10, 2020 2:22 PM To: Wurzel, Joseph P <ipwurzel@ncdot.eov> Subject: [External] RE: D-065-20-041 Circle K NTI Airport CAUTION- External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spa, _. Patrick, I'm sending our revised plans, the DA maps, comment response, and talc information to you via the DOT FTS system. Let me know if you have any questions, Brian From: Wurzel, Joseph P <ipwurzel(d)ncdot.eov> Sent: Monday, November 16, 2020 2:45 PM To: Brian Downs <Brian.Downs @timmons.com> Subject: D-065-20-041 Circle K NTI Airport FCCAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Afternoon, Below are our comments. I will also be sending the file through our FTS system. (with red line comments) Provide a simple Pre vs Post chart showing the drainage areas and discharges approaching the right of way at the two cross pipes under 23rd Street. It seems that due to the development some of the existing drainage patterns/drainage areas have changed in the proposed condition for these two cross pipes. If there is a diversion, then the Post should not exceed the Pre in the 10, 25, 50, and 100-year storms. a Providing a drainage area map would be helpful. Thank you, Patrick Wurzel Engineering Technician North Carolina Department of Transportation Division 3 District 3 910 398 9100 Office 910 398 9118 Direct 0pwurzelic0cdot.gov 300 Division Drive Wilmington, NC 28401 Email rorresocndence to and from rhis address is subject if) the 'orth Carolina PuLlic Reco,-ds Law and moy be disclosed to third par&_-s. RECEIVED ILM MAR 0 2 2021 NCDEQ WILMINGTON RO March-2, 2021 Airport Authority Garrett Zorda Environmental Engineer Donna Girardot Division of Energy, Mineral and Land Resources Chairman Stormwater Program, NC DEQ Harry W. Stovall 127 Cardinal Drive Ext. Vice Chairman Wilmington, NC 28405 F. Spruill Thompson Secretary Julia Olson-Boseman Ref: Stormwater Applicant Original Documents Stormwater Project No. SW8 050547 Nick Rhodes W. Lee Williams Thomas Wolfe Dear Mr. Zorda-, Airport Director In accordance with your preliminary comment letter dated Feb. 2611, 2021, requesting original documents, please find attached one original copy each of the Julie A. Wilsey, AAE application, maintenance agreement and deed restrictions & protective covenants. Other items indicated in your letter will be addressed at a later date by the engineer of record for this project. If you have any comments for further requests, please do not hesitate to contact me. Respectfully, Granseur Dick, PE, CM ILM Facilities Director Cc: Brian- Downs, PE, Tian- mons Group - Wilmington Intemational Airport 1740 Airport Blvd., Ste. 12 Wilmington, NC 28405 910.341.4333 flyilm.com e 5410 Trinity Road P 919.866.4951 Suite F 919.859.5663 '�' 1M M O N S GROUP Raleigh, NC 27607 www.liUnansoo�n Project Name: Circle K — NTI Airport Blvd Wilmington — NC.115 Project Number: 37630.054 Project Contact: Brian Downs Phone: 919.866.4504 Email: brian.downs(cD-timmons.com • Responses to review comments have been added below comment and are in bold. Garrett Zorda, Environmental Engineer I email: Garrett.Zorda@ncdenr.gov 1. 15A NCAC 02H.1003(6) and the 2004 approved Stormwater Master Plan document: This modification is proposing to add two dry detention basins in the area previously approved under Phase III of the Master Plan and was to be treated in an expansion of the existing dry detention basin. These two new dry detention basins must either meet the requirements in the previously approved agreement from 2004 or demonstrate they are an equal or better variation under the 2017 rules. Response: • This submittal is an improvement upon the previously permitted Phase III basin expansion for the following reasons: o The proposed design is consistent with the pre-existing drainage patterns, and releases stormwater at discharge points, which are consistent with the existing conditions. o It is not practical to direct all stormwater to the previously permitted Phase III basin expansion to.the east, due to conflicts with existing topography, wetlands, and existing critical Airport utilities. o The previously permitted Phase III basin expansion did not propose new vegetated pre-treatment swaies. Our design does provide proposed vegetated pre-treatment swaies. o The location of the previously permitting Phase III basin expansion now contains a jurisdictional wetland. Illustrating the SWHT levels at that location are as high, if not higher, than our proposed SCM locations. This submittal will provide an equivalent stormwater treatment as the previously permitted Phase III basin expansion, in that we are providing equivalent stormwater SCM(s), which are extended dry detention basins. a. The inlet and outlet of the Phase IIIB extended dry detention pond appear to be located in a manner that promotes short circuiting and does not appear to support the minimum flow length- to -basin width ratio as required in the 2004 approved Stormwater Master Plan document for this alternative design. Please ENGINEERING I DESIGN I TECHNOLOGY reconsider the design such that the system will meet the minimum length to width ratio required by the 2004 approved Stormwater Master Plan document or demonstrate the Phase I I I B system provides equal or better treatment under the 2017 rules. Response: We revised the low flow channel in the Phase IIIB extended dry detention pond in order to meet the requirement of the minimum flow length to width ratio provided in the Stormwater Master Plan document. We are also proposing a permanent water -tight diversion dam at the same height of the berm to further ensure no short-circuiting of inlet to out in large storm events. b. The 2004 approved Stormwater Master Plan document for this alternative design indicates that the extended dry detention basins should "to the extent possible, position the bottom of the basin above the seasonal high water table." The proposed design appears to position the bottom of the basins below the season high water table and provide a clay liner, however, no technical justification/explanation was provided to support that this requirement was considered. Please provide technical justification supporting that the position of the bottom of the basins are above the seasonal high water table to the greatest extent possible. Response: We have located the basins to better maintain the existing drainage patterns. The basin type and the limited upstream to downstream topography difference worked in conjunction to set the basin depths. It is not possible to raise the proposed extended dry detention basins to a higher elevation, due to the flat topography. We already raised the basins as high as feasible. Compared to the nearby existing basin to the east, both proposed basins are significantly higher in elevation and are likely an improvement as far as the SHWT. The 2004 approved Stormwater Master Plan indicates that the basins should be above the SHWT "to the extent possible", and we have complied with this requirement "to the extent possible". c. The 2004 approved Stormwater Master Plan document for this alternative design indicates for grassed swales, that the "swale bottom should be located above the seasonal high water table". The proposed design, however, appears to position the bottom of the swales below the seasonal high water table. Please confirm the intended design and ensure this requirement for the alternative design is met. Response: Our response is the same as above. Our proposed grass swales are significantly higher in elevation compared to the existing grass swales to the Phase III basin to the east. Therefore, we believe we are providing an improved SCIiiS design. Due to the shallow SHWT and the fiat topography, we cannot raise the proposed grass swales any higher. We are complying with this requirement "to the extent possible". d. The 2004 approved Stormwater Master Plan document for this alternative design indicates for grassed swales, "an attempt shall be made to provide 100 linear feet of swale per acre of drainage area. No less than 50 linear feet of Swale per acre shall be provided.". The provided calculations for the swales indicate that drainage area for the Phase IIIA and Phase IIIB grassed swales are both 150 linear feet, which is less than the minimum 50 linear feet per acre. Please confirm the intended design and ensure this requirement for the alternative design is met. Response: One of our challenges is to retain as much developable area for ILM as possible while improving stormwater treatment. In the available area, coupled with the previously described SWHT challenges, it was not possible to provide 50 LF of grassed swale per acre. Therefore, we are providing grass swales of similar length to the approved Master Plan while treating a much smaller drainage area. The previously approved Phase III extended Dry Detention Basin had two 150' grassed swales treating approximately 190 acres. We matched the length and width for approximately 15 acres. Comparatively, we are improving proposed pre- treatment conditions by a 12x factor. 2. 15A NCAC 02H.1003(7) and .1042(2)(k): Proposed deed restrictions and protective covenances were provided for this project, however, offsite lots/subdivision of property does not appear to be proposed as part of this project. Please confirm if it is intended to subdivide this property into offsite lots and ensure it is represented consistently throughout the entire application package. Please note, subdivided offsite lots would be required to apply and receive approval for their own separate offsite permit. Response: Circle K, and subsequent buildings, will utilize a land lease and we are not proposing to subdivide any offsite lots. It is acknowledged that future offsite developments would need to obtain their own separate permit(s) with separate deed restrictions and protective covenants in the future (by others) if that changes. 3. 3. 15A NCAC 02H.1042(2)(a): a. The signatures provided on the submitted application, operation and maintenance agreements, and proposed deed restrictions and protective covenances were all copies. These documents must include an original signature. Please provide an original signature for all documents that require the applicants signature. Response: We remain in the process of obtaining the original signed documents and will provide upon receipt. b. Section 111.1 and Section 111.2 lists New Hanover County Airport Authority as lessee and property owner, respectively. As the current permittee and the entity responsible for this modification, New Hanover County Airport Authority should be listed in Section 111.1 as the property owner. Please update Section 111.1 and 111.2 of the application and ensure it is represented consistently throughout the entire application package. Response: The New Hanover County attorney instructed ILM to sign on their behalf due to th;�� .nature of their long term lease. ILM is in the process of obtaining a letter from the NHC to support this claim. We will provide the letter upon receipt. 4. 15A NCAC 021-1.1042(2)(a)(iv): In order to ensure the SWU-101 form remains consistently updated and represents the entire permitted condition, Section IV.10 of the application must reflect all drainage areas covered in this permit. Please update Section IV.10 of the application to reflect all drainage areas permitted under SW8 050547. Response: Section IV.10 has been updated to reflect all drainage areas permitted under SW8 050547. 5. 15A NCAC 02H.1042(2)(a)(iv), .1003(3)(b), and 1050(1): a. The built -upon area (BUA) listed in Section IV.10 of the application, supplements and calculations are not consistent. Please confirm the correct BUA amounts for each of the two extended dry detention basins and ensure they are represented consistently throughout the entire application package. Response: The BUA listed in Section IV.10 is now consistent throughout supplements and calculations package. b. The two drainage areas for the Phase IIIA and Phase IIIB dry detention basins proposed as part of this modification do not match the previously approved Phase III drainage area. Please confirm one of the following and update the application package appropriately: Response: See below. If the previously approved Phase III drainage area is proposed to now be treated by the proposed Phase IIIA and Phase IIIB dry detention basin, the application package will need to be updated to include the entire previously approved Phase III area; Response: Not applicable. Our proposed basins IIIA and IIIB are proposing to treat the Phase IIIA and Phase IIIB drainage areas only, as depicted on our maps. We are not proposing to treat other previously permitted offsite drainage areas in our basins IIIA and IIIB. If the previously approved Phase III modification to EDDB #1 is still proposed to treat the remaining Phase III area that will not drain to the proposed Phase IIIA and Phase IIIB extended dry detention basins, the application package will need to be revised to include this modification to the EDDB #1 drainage area; Response: The application has been edited to show a Phase 3C, which is the remaining area of Phase III outside of our project limits. We have separated impervious into existing and future, with the future impervious being the amount allotted for future development outside of our project limits. The impervious number was acquired by maintaining the approved percentage (81.4%) with the remaining Phase 3C area. The Phase 3C area was not able to be captured due to the existing depth of critical Airport utility infrastructure paralleling Airport Blvd. iii. If an additional low density drainage area is proposed for the previously approved Phase III area that is not being collected and treated by the proposed Phase IIIA and Phase IIIB extended dry detention basins and will no longer drain to EDDB #1, the application package will need to be updated to reflect the additional drainage area; Response: No low density drainage areas are proposed. iv. if the previousiy approved Phase I II area that is not being collected and treated by the proposed Phase IIIA and Phase I I I B extended dry detention basins is being removed from permit number SW8 050547, a separate, new permit application will be submitted to cover this area. In this case, the separate permit application must be submitted with the response to this request. Response: A separate permit application, by others, will be submitted in the future to treat the Phase 3C drainage area. We were not able to capture this drainage area due to the existing depth of critical Airport utility infrastructure paralleling Airport Blvd. and the needed stormwater conveyance pipe depth. � 5410 Trinity Road T■ I M M 0 N S RCow"v�A SuitelOZ ` YOUR VISMN ACaM%ifio T ;,,J7 S. Raleigh, NC 27607 TRANSMITTAL NCDEQ - Christine Hall TO: Stormwater Department 127 Cardinal Drive Extension Wilmington, NC 28405 P 919.866.4951 F 919.859.5663 w+Nw�immons.aam Date: 1/20/21 Job#: 37630.054 Circle K - NTI Airport Blvd Wilmington - Project: NC.115 Reference: Submittal #2 Copies Sent To: COPIES . DATE NUMBER DESCRIPTION 2 01/2U/2021 1 Stormwater Management Permit Application 2 01/22021.., 2 Deed Restrictions and Protective Covenants Form 1 171./Zi0021 . ` 3 SCM Supplements Forms 1 01 /20/2021 4 Detailed Narrative 1 _ .... _.01/20/2021, .. 5- . USGS Map- ... 1 01/20/2021 6 Calculations Package included SHWT report) 2 01/20/2021 7 Folded 24" x 36" plans 1 01/20/2021 8 Copy of Property Deed 1 01/20/2021 9 NC Secretary of State Registration - Circle K Meredith W Rice 1 01/20/2021 10 New Hanover County Authorization 1 01/20/2021 11 Agent Owner Authorization Letter 1 01/20/2021 12 O&M Agreements 1 01/20/2021 13 ILM Stormwater Master Plan 1 01/20/2021 14 Wetlands Documentation 1 01/20/2021 15 USACE 401 Permit Approval 2 01/20/2021 16 Comment Response Letter 01/20/2021 17 CD containing dfs of all documents THESE ITEMS ARE TRANSMITTED: !f enclosures are not as noted, please notify us at once. COMMENTS: RECEIVED Thank You, JAN 21 2021 J., Brian Downs Project Manager. Timmons Group CIVIL EVGINEERIi,IG I ENVIRO:11-404TAL I S1JPVEYI'1G I 1-4IS I LAODSCAPE ARCHITECTURE I COs`13-iRIJCTIGr, SE:"V7' .ES Zorda. Garrett D From: Zorda, Garrett D Sent: Monday, January 4, 2021 12:36 PM To: Stephen Ballentine; Granseur Dick (gdick@flyilm.com) Cc: wrice@circiek.com; hall, Christine; Brian Downs Subject: RE: [External] RE: Wilmington International Airport EDDB/ Circle K Modification (SW8 050547) - Request for Additional Information - Extension Request Good Afternoon Mr. Ballentine, The 15 day extension you mentioned is 15 calendar days, not business days, which add up to the maximum of 30 days. As stated in the December 18, 2020 letter "Please note that only two letters requesting additional information is allowed in the State Stormwater Program for a total of 30 days to submit the requested additional information. !f the information is not satisfactorily provided after either the second request or 30 days, the project will be returned." Additionally, there is another proposed modification to SW8 050547 that cannot be submitted until this modification is issued/returned/withdrawn/etc., so it is important that the appropriate timelines are followed. With that said, I am only able to approve an extension of 15 calendar days, with a due date of January 21, 2021. Please ensure all of the requested information is received by this office by January 21, 2021. If additional information or time is needed beyond this extension, this project will need to be returned to allow for the additional time necessary to provide a complete application package. Regarding any follow-up over the next few days, email would likely be most efficient. Due to the complex history of SW8 050547, 1 will likely need to discuss some of the details of any proposed solutions with my supervisor and/or coworkers before being able to provide a complete response. With the Wilmington Regional Office being closed to the public and much of the staff working partly remote, email would be the quickest way to facilitate any discussion. Of course, if a phone call is ultimately needed, I should also be able to facilitate that. In the meantime, please let me know if you have any additional questions or concerns. Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct "Please note the change to my direct phone number"" oarrett.zorda(ftoden r.aov 127 Cardinal Drive Ext. Wilmington, NC 28405 �V ti •. �r� 101* �w•�*•a � �.�aarwrr: orb Fear; oor espo, �d .rc;.. tc and' it oin Ujis c dc.,,ress is subjq�' the r; 1. 4..� ., n Y r H - t -F r'i�,-t: ..a.Fv;.:'!: ? u. � C , .....,J�iI;: Law and r; t3 2 d+�'C/0S's: Cr ?i� slli;;,' �:a, �r?s. From: Stephen Ballentine[mailto:Stephen.Ballentine@timmons.com] Sent: Monday, January 4, 2021 10:31 AM To: Zorda, Garrett D <garrett.zorda@ncdenr.gov>; Granseur Dick (gdick@flyilm.com) <gdick@flyilm.com> Cc: wrice@circlek.com; Hall, Christine <Christine. Hall@ ncdenr.gov>; Brian Downs <Brian.Downs@timmons.com> Subject: [External] RE: Wilmington International Airport EDDB/ Circle K Modification (SW8 050547) - Request for Additional Information - Extension Request CAUTION: Ec err-4 emaii. Coo not click finks or open att,I�hn� ,j,ents oni-ess you verify. Send all suspicious emaii as an attactr7rrien to Report Spam. Zorda Thank you for your comments. Due to the Christmas holiday, we will need additional time in order to respond to your comments. With the understanding that the 15 day extension is 15 business days, we request an extension to resubmit no later than Tuesday, January 26, 2021. (If possible, we will resubmit prior to this date.) Please reply to this email to approve the extension request. We will need to follow up with you via phone and/or email over the next few days to discuss solutions to your comments. Please include Brian Downs on all future correspondence with this job. Brian is copied on this email. Regards, Stephen Ballentine, PE Project Manager TIMMONS GROUP I www.timmons.com 5410 Trinity Rd, Suite 102 1 Raleigh, NC 27607 Office: 984.255.23671 Fax: 919.859.5663 Cell: 919.812.8887 stephen. ballentineCa.timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here From: Zorda, Garrett D <garrett.zorda@ncdenr.gov> Sent: Friday, December 18, 2020 1:50 PM To: Granseur Dick (gdick@flvilm.com) <gdick@flyilm.com>; Stephen Ballentine<Stephen.Ba1lentine@timmons.com> Cc: wrice@circlek.com; Hall, Christine <Christine.Hall@ncdenr.gov> Subject: Wilmington International Airport EDDB/ Circle K Modification (SW8 050547) - Request for Additional Information AUi,Liv: This emaii originated from outside of the organization. Do not click links or open attachrner'ft+ unless you recognize the I serrder ;irJ known the content n safe. All, Attached is a pdf of the request for additional information for the subject project. There are just a few items that need to be addressed. Please let me know if you have any questions or concerns. Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct ""Please note the change to my direct phone number** oarrett.zordaD-ncdenr.aov 127 Cardinal Drive Ext. Wilmington, NC 28405 — C+wnon.i w vw�wwwww �1yr Email correspondence to and fro-n this address is sub;ect to the North Caroline. Public Records Law and may be disclosed to third paities. RiDY COOPER, Gammor M[CHM S. REGAN BRIAN WR£NK LknTW December 18, 2020 Via email only: edickdOlyilAcom New Hanover County Airport Authority Attn: Granseur Dick, Facilities Director 1740 Airport Blvd. Wilmington, NC 28405 NORTH CAROUNA Subject: Request for Additional Information Stormwater Project No. SW8 050547 Wilmington International Airport EDDB New Hanover County Dear Mr. Dick: The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for the subject project on October 6, 2020. A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed. To continue the review, please provide the following additional information in a single, hard cony submittal package: 15A NCAC 02H.1003(6) and the 2004 approved Stormwater Master Plan document: This modification is proposing to add two dry detention basins in the area previously approved under Phase III of the Master Plan and was to be treated in an expansion of the existing dry detention basin. These two new dry detention basins must either meet the requirements in the previously approved agreement from 2004 or demonstrate they are an equal or better variation under the 2017 rules. ry a� The inlet and outlet of the Phase IIIB extended dry detention pond appear to be located in a manner that promotes short circuiting and does not appear to support the minimum flow length - to -basin width ratio as required in the 2004 approved Stormwater Master Plan document for this alternative design. Please reconsider the design such that the system will meet the minimum length to width ratio required by the 2004 approved Stormwater Master Plan document or demonstrate the Phase IIIB system provides equal or better treatment under the 2017 rules. The 2004 approved Stormwater Master Plan document for this alternative design indicates that the extended dry detention basins should "to the extent possible, position the bottom of the basin above the seasonal high water table." The proposed design appears to position the bottom of the basins below the season high water table and provide a clay liner, however, no technical justification/explanation was provided to support that this requirement was considered. Please provide technical justification supporting that the position of the bottom of the basins are above the seasonal high water table to the greatest extent possible. The 2004 approved Stormwater Master Plan document for this alternative design indicates for grassed swales, that the "swale bottom should be located above the seasonal high water table". The proposed design, however, appears to position the bottom of the swales below the seasonal high water table. Please confirm the intended design and ensure this requirement for the alternative design is met. �. `I. The 2004 approved Stormwater Master Plan document for this alternative design indicates for grassed swales, "an attempt shall be made to provide 100 linear feet of swale per acre of drainage area. No less than 50 linear feet of swale per acre shall be provided.". The provided calculations for the swales indicate that drainage area for the Phase IIIA and Phase IIIB grassed swales are 4.36 acres and 15.17 acres, respectively. The provided calculations also indicate that the length of the Phase IIIA and Phase 111E grassed swales are both 150 linear feet, which is less than the minimum 50 linear feet per acre. Please confirm the intended design and ensure this requirement for the alternative design is met. awNorth CArokm CtwrUism offimtormeritW Quaby '. Division o<` oergy. hHo[rs[and t .Resc>om �. Wfrn1np 1ryianal0ffkc i WCmi*wlDrive Enension I WfimbVtoaNwtht'$aikra 45 910-11%7zl State Stormwater Permit No. SW8 050547 Page 2 of 3 1, . 15A NCAC 02H.1003(7) and .1042(2)(k): Proposed deed restrictions and protective covenances were provided for this project, however, offsite lots/subdivision of property does not appear to be proposed as part of this project. Please confirm if it is intended to subdivide this property into offsite lots and ensure it is represented consistently throughout the entire application package. Please note, subdivided offsite lots would be required to apply and receive approval for their own separate offsite permit. 3. 15? CAC 02H.1042(2)(a): The signatures provided on the submitted application, operation and maintenance agreements, and proposed deed restrictions and protective covenances were all copies. These documents must include an original signature. Please provide an original signature for all documents that require the applicants signature. Section III.1 and Section 11I.2 lists New Hanover County Airport Authority as lessee and property owner, respectively. As the current permittee and the entity responsible for this modification, New Hanover County Airport Authority should be listed in Section III.1 as the property owner. Please update Section III.1 and III.2 of the application and ensure it is represented consistently throughout the entire application package. 15A NCAC 02H. I 042(2)(a)(iv): In order to ensure the SWU-101 form remains consistently updated and represents the entire permitted condition, Section IV.10 of the application must reflect all drainage areas 'Cl 4 covered in this permit. Please update Section IV.10 of the application to reflect all drainage areas '. ,c permitted under SW8 050547. r 5. 15A NCAC 02H.1042(2)(a)(iv), .1003(3)(b), and 1050(1): xwt - *M (a) The built -upon area (BUA) listed in Section IV.10 of the application, supplements and calculations are not consistent. Please confirm the correct BUA amounts for each of the two 9 QC �a�yG extended dry detention basins and ensure they are represented consistently throughout the entire •.Gh `� ll,� application package. Ga nA \ ` The two drainage areas for the Phase IIIA and Phase IIIB dry detention basins proposed as part of h this modification do not match the previously approved Phase III drainage area. Please confirm one of the following and update the application package appropriately: Nk If the previously approved Phase III drainage area is proposed to now be treated by the proposed Phase IIIA and Phase IIIB dry detention basin, the application package will need to be updated to include the entire previously approved Phase III area•, If the previously approved Phase III modification to EDDB #1 is still proposed to treat the remaining Phase III area that will not drain to the proposed Phase IIIA and Phase IIIB extended dry detention basins, the application package will need to be revised to include �%. .. this modification to the EDDB #1 drainage area; \= ,� ' y•`v If an additional low density drainage area is proposed for the previously approved Phase < 1; III area that is not being collected and treated by the proposed Phase IIIA and Phase IIIB E extended dry detention basins and will no longer drain to EDDB #1, the application package will need to be updated to reflect the additional drainage area; If the previously approved Phase III area that is not being collected and treated by the proposed Phase IIIA and Phase IIIB extended dry detention basins is being removed from permit number SW8 050547, a separate, new permit application will be submitted to cover this area. In this case, the separate permit application must be submitted with the response to this request. Please remember to confirm that any revised information is presented consistently throughout the application documents including calculations, supplements, narrative, and plans. Please also remember to provide two hard copies of any updated documents per 15A NCAC 02H.1042(2). All of the requested information listed above should be received in this Office by January 5, 2021, or the application will be returned as incomplete. If additional time is needed to submit the requested information, please email your extension request prior to this due date to the email address provided below with a justification and a date of when the requested information will be submitted, which shall be no later than 15 days past the original due date. Please note that only two letters requesting additional information is allowed in the State Stormwater Program for a total of 30 days to submit the requested additional information. If the information is not satisfactorily provided after either the second request or 30 days, the project will be returned. If the project is returned and you wish to re -submit later, you will need to resubmit all required items at that time, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. State Stormwater Permit No. SW8 050547 Page 3 of 3 Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter, please feel free to call me at (910) 796-7215 or email me at garrett.zorda@ncdenr.gov. Sincerely, q Garrett Zorda Environmental Engineer DES/gdz: \\\Stormwater\Permits & Projects\2005\050547 HD\2020 12 addinfo 050547 cc: Meredith W. Rice, Jr., Vice President, Circle K Stores, Inc.; via email: wrice@circlek.com Stephen Ballentine, PE, Timmons Group; via email: Stephen.ballentine@timmons.com Wilmington Regional Office Stormwater File Zorda, Garrett D From: Zorda, Garrett D Sent: Friday, December 18, 2020 1:50 PM To: Granseur Dick (gdick@flyilm.com); Stephen Ballentine Cc: wrice@circlek.com; Christine Hall (Christine.tiall@ncdenr.gov) Subject: Wilmington International Airport EDDB/ Circle K Modification (SW8 050547) - Request for Additional Information Attachments: 2020 12 addinfo 050547.pdf All, Attached is a pdf of the request for additional information for the subject proiect. There are just a few items that need to be addressed. Please let me know if you have any questions or concerns. Thanks, Garrett Zorda Environmental Engineer Division of Energy, Mineral and Land Resources State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7343 direct 'Please note the change to my direct phone number** Qarrett.zorda(& ncden r.Qov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correz-mndence to and from this add: ess is subtect to the No: ,Fl, Carolina Public Peco, ds Lavv and rn y be disclosed to thi!"d parties. TIMINAMONS GROUP YOUR VISION AC141EVED `( C#atOUCrH OURS. From: 5410 Trinity Road, Suite 102 Raleigh, NC 27607 lauren.norris-heflinAtimmons.com (919) 866-4943 To: U.S. Fish and Wildlife Service Raleigh Field Office P.O. Box 33726 Raleigh, NC 27636-3726 October 15, 2020 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 Raleigh. NC 27607 www.timmons.com Re: Online Project Review Request, Circle K NTI Wilmington, New Hanover County, North Carolina. Dear Mr. Benjamin, We have reviewed the referenced project using the North Carolina Field Office's online project review process and have followed all guidance and instructions in completing the review. We completed our review on October 12, 2020 and are submitting our project review package in accordance with the instructions for further review. Our proposed action consists of a gas station and convenience store with associated amenities and connections to public utilities. Development is anticipated to include the construction of an access road across a jurisdictional relatively permanent water feature (does not constitute a wetland or stream). At this time, no other impacts are anticipated. The location of the project and the action area are identified on the enclosed maps (Figures 1 and 2 in Appendix C, including a USGS topographic map and aerial imagery). The project is expected to be completed over 1 to 2-years. Construction is anticipated to take place around mid-2021 and continue for approximately 5 to 8-months. This project review is needed as supplement to U.S. Army Corps of Engineers consultation for use of a Nationwide Permit due to impacts to jurisdictional waters anticipated with the proposed road crossing. The Site and future development do not have any other federal or state involvement. The USFWS IPaC search for the Site (Consultation Code 04EN2000-2020-SLI-1886, Event Code 04EN2000-2020-E-04204) identified six federally listed endangered species and eight federally listed threatened species as potentially occurring in the vicinity of the Site: red - cockaded woodpecker (Picoides borealis), Kemp's Ridley sea turtle (Lepidochelys kempii), leatherback sea turtle (Dermochelys coriacea), Cooley's meadowrue (Thalictrum cooleyi), golden sedge (Carex lutea), rough -leaved loosestrife (Lysimachia asperulaefolia), northern long- eared bat (Myotis septentrionalis), West Indian manatee (Trichechus manatus), piping plover (Charadrius melodus), red knot (Calidris canutus rufa), American alligator (Alligator mississippiensis), green sea turtle (Chelonia mydas), loggerhead sea turtle (Caretta caretta), and seabeach amaranth (Amaranthus pumilus) respectively. Additionally, the IPaC identified one federally proposed threatened and one candidate species: Eastern black rail (Laterallus jamaicensis ssp. jamaicensis) and magnificent ramshorn (Planorbella magnifica), respectively. No critical habitat was identified within the project area. Additionally, per the instructions of the Raleigh Field Office's Project Review Steps, Timmons personnel assessed the potential for impacts to the bald eagle (Haliaeetus leucocephalus). Furthermore, a search of the North Carolina Natural Heritage Program's (NC NHP) online database (report ID: NCNHDE-12886) revealed a sighting of the federally endangered Atlantic sturgeon (Acipenser oxyrinchus oxyrinchus) from September 2019 within the vicinity of the project area. This species is not identified on the IPaC report. The project area lacks water bodies suitable to sustain the following species: Kemp's Ridley sea turtle, leatherback sea turtle, Atlantic sturgeon, green sea turtle or loggerhead sea turtle. Therefore, it is the opinion of Timmons that the proposed project will have no effect on these species and they will not be described further. Effects to critical habitat No critical habitat is present within the project area or a 1-mile radius Effects to federally endangered species The project area consists of a mixed hardwood and pine forest that is largely undisturbed and could serve as potential foraging habitat for the red -cockaded woodpecker. However, the stand has limited connectivity to other natural areas and is not of a sufficient size to support red - cockaded woodpecker populations. Further, no occurrences of red -cockaded woodpecker were observed at the time of the on -site inspection or noted in the NCNHP report as occurring in the vicinity of the site. Therefore,. it is the opinion of Timmons Group that the project may affect, but is not likely to adversely affect the red -cockaded woodpecker. While the project area contains regularly maintained areas, these areas could not sustain Cooley's meadowrue due to the extent of maintenance. Other portions of the site consist of mature mixed hardwood -pine forests not capable of supporting Cooley's meadowrue. Further, no occurrences of Cooley's meadowrue were noted in the NCNHP report as occurring in the vicinity of the site. Therefore, it is the opinion of Timmons Group that the proposed project will have no effect on Cooley's meadowrue. A majority of the project area is intensively managed, with the rest consisting of mature mixed hardwood -pine forest and disturbed plant communities. As a result, the project area lacks diverse plant communities and the ecotones between them that are preferred by the golden sedge. Further, no occurrences of golden sedge were noted in the NC NHP report as occurring in the vicinity of the site. Therefore, it is the opinion of Timmons Group that the proposed project will have no effect on golden sedge. •araf��� „�' � � � � � GROUP � � � 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 YOUR VISION ACHIEVED THROUGH OURS. Raleigh. NC 27607 www.timmons.com Following an on -site inspection, the project area was observed have sandy to loamy/clayey soils, lacking the peaty, poorly drained soils preferred by rough -leaved loosestrife. Further, no occurrences of rough -leaved loosestrife were noted in the NC NHP report as occurring in the vicinity of the site. Therefore, it is the opinion of Timmons Group that the proposed project will have no effect on rough -leaved loosestrife. Effects to federally threatened species The project area contains mature mixed hardwood -pine forest with suitable roosting and foraging habitat for the northern long-eared bat (NLEB). Additionally, the NC NHP report lists a 1994 sighting of the NLEB within a 1-mile radius of the project area. However, the project is not located within a county with known roost trees, no occurrences were observed at the time of inspection, and no hibernacula are anticipated to be located in the surrounding area to due existing landscape characteristics. Relying upon the findings of the 1/5/2016 Programmatic Biological Opinion for the Final 4(d) Rule on the Northern Long -Eared Bat and Activities Exempted from Take Prohibitions to fulfil our project -specific section 7 responsibilities, it is the opinion of Timmons Group that the proposed project may affect, but is not likely to adversely affect NLEB. While the NC NHP report lists a documented sighting of the West Indian manatee within 1-mile of the project area in 2019, there are no bodies of water within the project area that could provide suitable habitat or support the species. Therefore, it is the opinion of Timmons Group that the project will have no effect on the West Indian manatee. The project lacks open, sandy beaches required for the piping plover, red knot, and seabeach amaranth species. Further, no occurrences of piping plover, red knot, or seabeach amaranth were noted in the NC NHP report as occurring in the vicinity of the site or at the time of inspection. Therefore, it is the opinion of Timmons Group that the project will have no effect on piping plover, red knot, and seabeach amaranth. The project area contains limited aquatic features, all of small size and primarily consisting of small wetland areas, with the largest wetland area totaling 0.14 acres. Additionally, the two 0.07 acre stormwater ponds within the southeastern portion of the site represent low -quality habitat. Due to the absence of occurrences observed and the low quality and disconnected nature of the aquatic features identified on -site, the proposed project is not anticipated to have an adverse impact on the American alligator. Further, no occurrences of American alligator were noted in the NC NHP report as occurring in the vicinity of the site. Therefore, it is the opinion of Timmons Group that the project may affect the American alligator. Effects to proposed federally protected and -candidate species While wetlands were identified during an on -site inspection, the largest wetland is a 0.14 acre forested wetland. Smaller wetlands identified featured emergent vegetation but were not the dense marshes required by the Eastern black rail and were of relatively low -quality. Further, no occurrences of Eastern black rail were noted in the NC NHP report as occurring in the vicinity of the site. Therefore, it is the opinion of Timmons Group that the project will have no effect on Eastern black rail. A freshwater stream with slow moving and submerged vegetation is located in the southeastern portion of the project that could serve as potential habitat for the magnificent ramshorn. However, the project area is not located near one of the known populations of the magnificent ramshorn, which is largely believed to be extinct in the wild. Further, aquatic on -site lack the diverse aquatic vegetation required by the species. Therefore, it is the opinion of Timmons Group that the project will have no effect on the magnificent ramshom. Effects to federally protected species not identified through IPae The Raleigh Field Office Project Review steps request that reviewers assess their projects for the potential to impact bald eagle nests. Per the NCNHP Report, there are no occurrences of the bald eagle or their nests at or within 1-mile of the project Site. Further, no occurrences of nests or bald eagles were observed during the Site inspection. Therefore, any disturbance of the Site is unlikely to disturb nesting bald eagles and no Eagle Act Permit is required. The enclosed project review package provides the information about the species and critical habitat considered in our review, and includes a species conclusions table identifying the determinations. For additional information, please contact Lauren Norris -Heflin at the email address listed above. Sincerely, Timmons Group e---- LA4.-.> Sydni Law Environmental Technician Lauren Norris -Heflin �_ Senior Environmental Scientist Enclosures: 1) ENTIRE PROJECT REVIEW PACKAGE_. APPENDICES APPENDIX A — Self Certification :Letter Self -Certification Letter Project Review Checklist Species Conclusion Table APPENDIX B — Species Reports Official IPaC Species Report NCNHP Species Report APPENDIX C - Figures Figure 1 USGS Topographic Map Figure 2 Aerial Map with Contours Figure 3 Environmental Inventory Map Figure 4 Wetlands and waters of the U.S. Delineation Map APPENDIX A United States Department of the Interior FISH AND WRDL-TE SERVICE Raleigh Field Office P.O. Box 33726 Raleigh, NC 27636-3726 Date:10/15/2020 Self -Certification Letter Project Name Circle K NTI/Wilmington Airport Dear Applicant: Thank you for using the U.S. Fish and Wildlife Service (Service) Raleigh Ecological Services online project review process. By printing this letter in conjunction with your project review package, you are certifying that you have completed the online project review process for the project named above in accordance with all instructions provided, using the best available information to reach your conclusions. This letter, and the enclosed project review package, completes the review of your project in accordance with the Endangered Species Act of 1973 (16 U.S.C. 1531-1544, 87 Stat. 884), as amended (ESA), and the Bald and Golden Eagle Protection Act (16 U.S.C. 668-668c, 54 Stat. 250), as amended (Eagle Act). This letter also provides information for your project review under the National Environmental Policy Act of 1969 (P.L. 91-190, 42 U.S.C. 4321-4347, 83 Stat. 852), as amended. A copy of this letter and the project review package must be submitted to this office for this certification to be valid. This letter and the project review package will be maintained in our records. The species conclusions table in the enclosed project review package summarizes your ESA and Eagle Act conclusions. Based on your analysis, mark all the determinations that apply: "no effect" determinations for proposed/listed species and/or ❑✓ proposed/designated critical habitat; and/or " z "may affect, not likely to adversely affect" determinations for proposed/listed species and/or proposed/designated critical habitat; and/or "may affect, likely to adversely affect" determination for the Northern long- eared bat (Myotis septentrionalis) and relying on the findings of the January 5, 2016, Programmatic Biological Opinion for the Final 4(d) Rule on the Northern long-eared bat; ❑� "no Eagle Act permit required" determinations for eagles. Applicant Page 2 We certify that use of the online project review process in strict accordance with the instructions provided as documented in the enclosed project review package results in reaching the appropriate determinations. Therefore, we concur with the "no effect" or "not likely to adversely affect" determinations for proposed and listed species and proposed and designated critical habitat; the "may affect" determination for Northern long-eared bat; and/or the "no Eagle Act permit required" determinations for eagles. Additional coordination with this office is not needed. Candidate species are not legally protected pursuant to the ESA. However, the Service encourages consideration of these species by avoiding adverse impacts to them. Please contact this office for additional coordination if your project action area contains candidate species. Should project plans change or if additional information on the distribution of proposed or listed species, proposed or designated critical habitat, or bald eagles becomes available, this determination may be reconsidered. This certification letter is valid for 1 year. Information about the online project review process including instructions, species information, and other information regarding project reviews within North Carolina is available at our website http://www.fws.gov/raleigh/pp.htmi. If you have any questions, you can write to us at RaIeigbCafyys.goy or please contact Leigh Mann of this office at 919-856-4520, ext. 10. Sincerely, /s/Pete Benjamin Pete Benjamin Field Supervisor Raleigh Ecological Services Enclosures - project review package Project Review Checklist Step Item Required Date completed/ Notes 1 and Official Species List from IPaC 09/16/2020 2 (will include map showing the Yes action area) NCDENER-Heritage Program 09/16/2020 3 database results or correspon- If Applicable dence. 4 Habitat Assessments or Species If Applicable 10/12/2020 Surveys 6 Bald Eagle Conclusion Table Yes 09/17/2020 7 NLEB Yes 09/17/2020 8 Species Conclusion Table Yes 10/12/2020 Online project review request 10/12/2020 9 letter or Online project review Yes certification letter 10 Other documentation to support If Applicable 10/12/2020 your conclusions Instructions Submit project review packages electronically to Raleigh@fws. gov. Please indicate in your email subject title if you are submit- ting a "Review Request Letter" or a "Self -Certification Letter." All project reviews will receive a return receipt to inform you that your project has been successfully submitted to this office. Please note that any single email, including attachments, must be smaller than 25 MB. If a single email would be larger than 25 MB, please spread out multiple attachments among several emails (use the same subject name and project reference in all emails related to an individual project). If this is not practical, please mail a hard copy or DVD containing the project review package to our office: Raleigh Field Office P.O. Box 33726 Raleigh, NC 27636-3726 Maintain a complete copy of the project review package in your files since it will become an integral part of your official record of compliance. Contact its If you have qucstions or comments concerning this process, please contact Leigh Mann at (919) 856-4520 extension 10 or via email at Raleigh@fws.gov. http://Ralaigh.fws.gov Federal Relay Service for the deaf and hard -of -hearing 1 800/877 8339 U.S. Fish and Wildlife Service http://www.fws.gov 1800/344 WILD January 2017 H 4) Z .0 Nj� H m H � U o o cli O 7 CV C1 CCN c ai E cn Z !A V N U) a_ 0 O E Z a� m - -0N m U N _ m M -0T O O O 'O .O o ai 'N -� to >, L N -o N> 3 N (C d 0 O o O O C O J 7 r_ L O" d o V "O 7 O m R 7� N L tOi7 -« 3 a 3 co E O 3 0 o O c _N O a�i cca w E Q E- O L m$ •y ca met-_ 3¢ Y m N '� y c c � g.� o d w- O o 4 S m L $o a� `Ov 0 a7 O N - L C �p l= O ,� m� m y y 7 w > E '?� c rn N G c> m s A m '3 -5 c m w y m 3 co a`3 ao'i o o � n m .o o :_ :F..2 3 0v m d� G E a? Y U c Z m O y ai rn3 m e a o G c p c .o c m y y ami ' m G$ d Z O a`� ai m cn c a c-o v o 0s coy E y 0 c �� �� c 3 yv 0, o U d O C O N y c c y m w w G> `° y N 0 G@ m O O C O y �' c 3 c E m d N m w w W 7 v 'rn v C O m O a] 7— >' m cn _N 0 m m m a0i _aO c m o 3• m Gov M M c o o- 3 Ds 3 o m a� 3€ m m E _ 0 W y ) c G~ G .L-. O f6 d N m d N Y w m w O L U O y 3 3 x c m O c� d� o Z U i o m c m V L G t G in -0 O -0 m O- O c L o �$ m °� N 0 D m G Z y O 7 E O O _O 0 07 L a1 c h Y O C O Y -O O 5 L 0 O - m N O O'v i m N y CO i N N C G N y t N L .O d d "O 0 0 s a1 .m. -O w M •0 M 2 o cx n M h o o c 0 'ID N � _ p m S m o �.V� m m "Gm-' -0 3 d N VJ N NZ-O �+ m m m E OO �U.L... c O 7_VJ E+m.. Of ... N'O� O_ x.2 O UJ 'O �.� •L... CO a .L--'L w O C C [U C m fn A?. N V C mL� 3 dam- O N of a� a� > o O �' cis -0 N L W N 0 m a7 m d� N aGi > M N d y G m c m m c�,m c rn d c� v� •- cn E °c; :� a> o> E_ -o > c� m a> �' m 0 Y o c c>; 0 .S E 3 g� O o m (D L 3 m H �' io E m L m d> U N cc m� o of o c fO O• v 'v O m 0$ 3 0�� y o= m y m 0) ai .o � N_ aGi _o O m Q c tL 0 -O CD N CC N Q N ,�0., y C O O O O N E O fn O V m O j U m -c -V C O O N 5 L 'O m m O N m CO Q 0 G O m f0 m c C C07 .3 d> m U y Y a`3 O y N O �" .L... m �L.. - LO C �- = C M �pd�(p� E m 0 a 'ri7 � a7 .L-. O d p C 'p "� y� C O a� in -O C C O L 0 cc �-:�= Vj E w v�`= Z N'-' z ` C aO7 O-v O_w y=.r p� U d.rn-� O N i O L L ? m N 0 O O a C O y L U y .- m a U .� m •L O d L. N y L d O O O UU L C O y U y Z C N m N c L 0 0 m Z ? L F- E z m .. L w w z o m 3 I- n H H O 3 m o .S Z t H c� ¢ d 3 c rn W c0 ._ C7 E U 2 Z U N C�J Cal C�7 U d N Q - N m '•C to ZK N tR N cn U O >, O a7 O N O N O N O >, O N O N LU z m z z a z z So � 3 a� E E m c 'E c c O. O_ d` G Q. 2 s d d L o m c G m h � cc a C13 m -0 L L '7 C R m L�p O o w a y C) L N L N a) d N w 7 CS G O-' '0 y E 07 U "m' A _.�_ 17 _� N .m. N l6 A fO 07 O O _ p- M m m co O O O O a? u0i O d f=q O O v O 2 U z cnLEE z z z z ad z ad N Z C y y O C A z J y M m 1b -_ •� I,y O in ¢ 0 O [� CM y D E E Y to k 01 C m p G y @ R h al V "O O � O co� b m cA _ - O O y C O— w CL G vCD C 5 m E(D O rn-9 Y 0 -E D `� c' C C c O� a��e .2 coE c O aa� m a�i`= cA E`��' cA UJ a QE �U V y c 00 y � C y a) .0 •O � p .2 U O N n > � E2 a3 vi (D w N cc a) a) � O_ Q; c6 [p a) k - ccE E L O] O (a0a i 40) m L a) •' rn � � rn cc w O °� �+ L 0 N p a) p a) > E y 0 a) a) 0 a) a) a) ci O a) L0, N to O_ N = 3 a) ca [ a7 ai O L C fA a) .O o a w N v3i w cii =3 0 IDS c t ayi o v E� m O O p N a) '� .0 L... CO C a) Q) Y 0 -O a) a) O a) C U 5 a7 •y d U D) v -a (D co `o m 'CD n •c c -0 cr O •N •N N •p p O C p a) L" O pcu C p p _0 N L p� h N w a) w a) N a) 3L... pL j �J w U z o-2 N aa)- O >, `p y L O C) v v o C O o O y v O) c rn �y c m CD a�i E o � CD p a) x E w v a� mCD n to 0 2 � m 3 as 3 cv 3 a1 3 0 CD m y w E c c m L m y >_ a) Z. m L c c_ "pO -0 O n, a) c 0 a) L -2=) cCD u U) O) -o 3 U a) cc E C w c i n Y C �0 u c •O c c E af°i c E m cE O U aNi C O O O O v N 2 O p L U') m N y N N a7 cc = -Op ap.. C C C C w cc _U m y o N O .� 4" a3 N i a7 `I N a) n w o ca 0 w 0 (n o �, y L O s '= C n V cc j Co 4) y w 7 m w c `o o 0 i 0 ii -o a) N a) U a) rn m w t -o o 2 vi 'w a) y n n y o O '�O L L L L N '� U E L �O L �p L p L ai F- F- 0 .0 N n Q 16 �U Lam) U C) N - tp iG 2C QG - 2pK CM w -Q-) a) a) a) a) a) a) a) O a) W •3 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 Cr z C v m cn � U) a n U 0 0_ n a n. c m m m w m m m m =_ L L L t L L L L L y 0 a m c+g cy m m m >, h l9 VJ Cq G] L9 N GO fA Q) Z Z Z Z Z Z Z Z Z M a0) ro N cb m N CD'� _ ca v --• C i enC E p 0 ca Cr en 01 O O C) Q Q. — I6 N ,ffl y �. Y (Dp "' �° E as c0i m rn y y c° E y 2 m v t ca -� v aa)) coo ac) 'a) E ra m m m z as L Cy' co a� c N y N O O i a7 !� 'y, V en C O O N C a7 a) m o= 'o �+ E m C7 E Y ac°i .1 a - M 4 U~ o C7 w - m cn Q 75 m f� O N N L 7 O N o LO N Q O 04 O O N 0 N co N 0 CI L C N Co CD N w y CL cm Q _D Q U E 0 O N E ca o c cc o } a? > w � o •c N E E > O O L �+ m C 0 Y Co Q L E N O u 105 r_O coEO Ecu C 1OC" Q .S APPENDIX B United States Department of the Interior FISH AND WILDLIFE SERVICE �d Raleigh Ecological Services Field Office�.� Post Office Box 33726 Raleigh, NC 27636-3726 Phone: (919) 856-4520 Fax: (919) 856-4556 In Reply Refer To: September 16, 2020 Consultation Code: 04EN2000-2020-SLI-1886 Event Code: 04EN2000-2020-E-04204 Project Name: Circle K ILM Subject: List of threatened and endangered species that may occur in your proposed project location, and/or may be affected by your proposed project To Whom It May Concern: The species list generated pursuant to the information you provided identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. Section 7 of the Act requires that all federal agencies (or their designated non-federal representative), in consultation with the Service, insure that any action federally authorized, funded, or carried out by such agencies is not likely to jeopardize the continued existence of any federally -listed endangered or threatened species. A biological assessment or evaluation may be prepared to fulfill that requirement and in determining whether additional consultation with the Service is necessary. In addition to the federally -protected species list, information on the species' life histories and habitats and information on completing a biological assessment or 09116/2020 Event Code: CAPA2000-2020-E-04204 evaluation and can be found on our web page at http://www.fws.gov/raleigh. Please check the web site often for updated information or changes If your project contains suitable habitat for any of the federally -listed species known to be present within the county where your project occurs, the proposed action has the potential to adversely affect those species. As such, we recommend that surveys be conducted to determine the species' presence or absence within the project area. The use of North Carolina Natural Heritage program data should not be substituted for actual field surveys. If you determine that the proposed action may affect (i.e., likely to adversely affect or not likely to adversely affect) a federally -protected species, you should notify this office with your determination, the results of your surveys, survey methodologies, and an analysis of the effects of the action on listed species, including consideration of direct, indirect, and cumulative effects, before conducting any activities that might affect the species. If you determine that the proposed action will have no effect (i.e., no beneficial or adverse, direct or indirect effect) on federally listed species, then you are not required to contact our office for concurrence (unless an Environmental Impact Statement is prepared). However, you should maintain a complete record of the assessment, including steps leading to your determination of effect, the qualified personnel conducting the assessment, habitat conditions, site photographs, and any other related articles. Please be aware that bald and golden eagles are protected under the Bald and Golden Eagle Protection Act (16 U.S.C. 668 et seq.), and projects affecting these species may require development of an eagle conservation plan (http://www.fws.gov/windenergy/ eagle_guidance.html). Additionally, wind energy projects should follow the wind energy guidelines (http://www.fws.gov/windenergyn for minimizing impacts to migratory birds and bats. Guidance for minimizing impacts to migratory birds for projects including communications towers (e.g., cellular, digital television, radio, and emergency broadcast) can be found at: http:// www.fws.gov/migratorybirds/`CurrentBirdlssues/Hazards/towers/towers.htm; http:// www.towerkill.com; and http://www.fws.gov/migrat=birds/CurrentBirdlssues/Hazards/towers/ comtow.html. Not all Threatened and Endangered Species that occur in North Carolina are subject to section 7 consultation with the U.S Fish and Wildlife Service. Atlantic and shortnose sturgeon, sea turtles,when in the water, and certain marine mammals are under purview of the National Marine Fisheries Service. If your project occurs in marine, estuarine, or coastal river systems you should also contact the National Marine Fisheries Service, http://www.nmfs.noaa.gov/ We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Tracking Number in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. If you have any questions or comments, please contact John Ellis of this office at john_ellis@fws.gov. 0911ut2020 Event Code: 04EN200C-2020-E-04,204 Attachment(s): ■ Official Species List 09t1.612020 Event Code: 04EN2600-2020-E-04204 Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 (919) 856-4520 09/1E?2020 Even. Cr) 04EN2000-2020-E-04204 2 Project Summary Consultation Code: 04EN2000-2020-SLI-1886 Event Code: 04EN2000-2020-E-04204 Project Name: Circle K ILM Project Type: DEVELOPMENT Project Description: New Circle K location. Project Location: Approximate location of the project can be viewed in Google Maps: https: www.google.com/maps/Tlace/34.26665991900006N77.91823489443709W c•Yre:�!t t:• r'f97,. Counties: New Hanover, NC 09;A6/2020 Evert Code: 04EW2000-2020-E-04204 Endangered Species Act Species There is a total of 16 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries!, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Mammals NAML STATUS Northern Long-eared Bat Myotis septentrionalis Threatened No critical habitat has been designated for this species. Species profile: htWs://ecos.fws.govov/ecp/s/species/9045 West Indian Manatee Trichechus manatus Threatened There is final critical habitat for this species. Your location is outside the critical habitat. This species is also protected by the Marine Mammal Protection Act, and may have additional consultation requirements. Species profile: htWs://ecos.fws.gov/ecp/Species/4469 09116/2020 Event Code: 04Ei 2000-2020-E-04204 Birds NAME Eastern Black Rail Laterallus jamaicensis ssp. jamaicensis No critical habitat has been designated for this species. Species profile: has://ecos.fws.gov/ecp/snecies/10477 Piping Plover Charadrius melodus Population: [Atlantic Coast and Northern Great Plains populations] - Wherever found, except those areas where listed as endangered. There is final critical habitat for this species. Your location is outside the critical habitat. Species profile: htWs://ecos.fws.gov/ecp/species/6039 Red Knot Calidris canutus rufa No critical habitat has been designated for this species. Species profile: hUs://ecos.fws.gov/ecp/species/1864 Red -cockaded Woodpecker Picoides borealis No critical habitat has been designated for this species. Species profile: https://ecas.fws. ov/ecp/species/7614 Reptiles NAME American Alligator Alligator mississippiensis No critical habitat has been designated for this species. Species profile: htWs://ecos.fws.gov/ecp/sl2ecies/776 Green Sea Turtle Chelonia mydas Population: North Atlantic DPS There is final critical habitat for this species. Your location is outside the critical habitat. Species profile: htWs://ecos.fws.p-ov/eo/speci.es/6199 Kemp's Ridley Sea Turtle Lepidochelys kempii There is proposed critical habitat for this species. The location of the critical habitat is not available. Species profile: hgps://ecos.fws.gov/ecp/species/5523 Leatherback Sea Turtle Dermochelys coriacea `There is final critical habitat for this species. Your location is outside the critical habitat. Species profile: https://ecos.fws.pov/ecp/Species/1493 Loggerhead Sea Turtle Caretta caretta Population: Northwest Atlantic Ocean DPS i here is final critical habitat for this species. Your location is outside the critical habitat. Species profile: haps://ecos.fws.gov/ecp/species/1110 STATUS Proposed Threatened Threatened Threatened Endangered STATUS Similarity of Appearance (Threatened) Threatened Endangered Endangered Threatened 4 09/16/2020 Event Code: 0 ?EM2000-2020-E-04204 5 Snails NAME STATUS Magnificent Ramshorn Planorbella magnifica Candidate No critical habitat has been designated for this species. Species profile: https://ecos.fws. ov/ecp/species/6216 Flowering Plants NAME STATUS Cooley's Meadowrue Thalictrum cooleyi Endangered No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/3281 Golden Sedge Carex iutea Endangered There is final critical habitat for this species. Your location is outside the critical habitat. Species profile: https://ecos.fws.gov/ecp/sl2ecies/6025 Rough -leaved Loosestrife Lysimachia asperulaefolia Endangered No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/2747 Seabeach Amaranth Amaranthus pumilus Threatened No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/Species/8549 Critical habitats THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. a � 0 k \ � N k § § cz 0: b2 2 ®Q $c \� �k q/ \7 MOORE ■ r wands evi■ .n \ ƒ 41 \ / o I a g \ f $� z 2 �} k- ® �. a #� m ri k\ ƒ} o m Z 2 7, ` C G ( f .° (D C) y c . > E \ o &\ Q. %[ \ CN E .k [ a a/ 27 £ U® Dc �/ 2± ( 3 CU , §I ƒ D � > / § 2 .[ u 0 \ ° _0 £E a� %.1 a # ƒ § 2 m — 0 2 0 = r M $ #2 e$ / u ro \} 3/ .ge Ec \§\� 4 0\ &a 21aJ f e= JE o3UZ Z \ . \ £ .g 3[ e .( -J0-C � bo E� 7— 'E E U 2 ( 2 = a E :; g ) / 2 @ � m@m[if [if O e2 3- Natural Heritage Element OccurrE Element Occurrences Documented Within a One -mile F Group Freshwater Fish38937 Acipenser oxyrinchus Atlantic oxyrinchus Mammal 24390 Corynorhinus Easterr rafinesquii macrotis Mammal 32126 Myotis septentrionalis Northe Bat Mammal 17664 Trichechus manatus West Ir Vascular Plant 30852 Baccharis Silverlir glomeruliflora Vascular Plant 22454 Dichanthelium Hidden cryptanthum Witchg Vascular Plant 19327 Ptilimnium ahlesii Carolin Natural Areas Documented Within a One -mile Radius o aFM Northeast Cape Fear River Floodplain R1 Managed Areas Documented Within a One -mile Radius .. r. NC Department of Transportation Mitigation Site NC NC Department of Transportation Mitigation Site NC NC Department of Transportation Mitigation Site INC NC Department of Transportation Mitigation Site NC Definitions and an explanation of status designations and codes can k Please resubmit your information request if more than one year elaps September 16. 2020 ❑ Project Boundary Buffered Project Boundary NHP Natural Area (NHNA) Managed Area (MAREA) APPENDIX C v. V 01-15,3 7?000'c t - is 7� Shared ExhbiI&37630.054-1AC-rn%d 14 E IN, go ".4 rj W, so# N, 4 �10 --- Site Limits it . A S�W N" S -Am-, 10, v .0 '1 I I v Site limits are approximate. Topographic imagery. om USGS. 0 1,000 2,000 3,000 4,000 Feet CIRCLE K NTI AIRPORT WZ101 HANOVER COW TY, NORTH CAROLIN'A TIMMONS GROUP FIGURE 1: VICINITY MAP YOUR VISION ACHIEVED THROUCH OUks. a JQ;1: - 51j:) y ILAWUDE:34.266784 WATERSHED(SYNORTHEAST CAPE FEAR (CAPE FEAR RIVER BASIN) LONGITUDE:-77.916195 HYDROLOGIC UNIT CODE(S)-03030007 These plans ap.! -sodlated doc:tirnants M the ekdusive P'P'rty ofTIMMONS GROUP and may not be reprodumd inw.oleormn pan and Shall not bo used fm any purpose whatsoever, indwl. but not I.,;:,d , —U-tionz bidd,g, and M const—Wo -tald.t .1 wthout the exp— wtiton ounsent of TIMMONI-i GROUP, 1 '� � ,'�I r �•f Y 1 ` ��r wll �i L eo1■ f`� .. .may l,�r;"y ■��, t�`-,`•. � `��{' � ! ' 04. Nk to r r It� ■a I r1.� vi i ty{ ,Y l atir w�'� r Jr• '�ily�! _t � J(� PPP A. FI `t ■` `��+{�, f � r f J'f r � • _ • i'ii1 Y IZ} 'Y�r�l7l iA�.r ! • •• t r.y �s I, k.� ` tiI ,.` •� I1t lllj� �1-____. I\•',• ` It mot'. LY• r{ • �\ �, ■■ ��►' y` / r1f 45Y1 } '' f v. ♦ ` e r1i 1 L 5y,5 .' y II{Ar - lie rl' - -fr fir_ a 5ti 1`,�' •� ■ ., JfV i �`t`\C1 ,,r L7 ► �r� �ti, �r� ;. ! 1 I tl � L • Y S r f / L 1 rr 1.+~- ` yy 1 yeti r - .. �� r r{.. u.t•., �• 11u■ ` �r � • 1 � ••.� ! ! r rn I [�rrr j1 I � i . t / 4 {q '' •.y+', '.f'• J+ r,•.`'`t �rr�r`! r►y� +.,��y.il "1�l loila ui '� J' I tl,� r `=_;vr r% i� N '��T[.'r 1 ►� Jr ti 1�t1 , I •I •C7 fh �4f 'it fl r` �� + r • �_f�. -: r 3 .. ^ ,]Ni1 r . r�31 r��l ' Y t �a ■ Y • rf sr y' y Legend r { 5 ProjectA - l r r { `�L Topographic • • Major - 10 Feet F ' ► ,1 Minor - 1 Foot r r i l r1 Il• NOTES:Proje.c.t Limits are approximate, . �)� ■ ! fi'vi'ilU nt►r •*punit Name Bp Borrow pits JO Johnston soils Le Leon sand Pn Pantego loam Se Seagate fine sand Ur Urban land Legend Project Study Limits - 37.8 Acres •• National Hydrography Dateset ® National Wetlands Inventory Zone A: 1 % Annual Chance Flood Hazard Hydric Soil Classification t� Hydric CPartially Hydric r� Non Hydric 0 zoo 400 ILI 4 t W El J r �3 o��: S -_I W - -- YIW �b gr� 6 � y Zy i%1 Q �an'o a rm n 126 3,4 '0 m a ¢ S c c � p � c j S � DATE m r ai 0911912019 ias DRAWN by i A. MEHFOUD m UL's: ,NED 9Y a A. MEHFOUD a a CHECKED BY m S LAW SCALE ` 9 "=200' a 0 IL o L 0 O 'rc Z ®Z O Q V �o �= Z _ ao z J a m m I— a o ~ Z0. C 0. Z Y0 G Z 0 3 O J O �® > V > £ 0 Z W o' 2 It Q i 1 v a I & c W O m 10 w C m .g O V r 2 m W LL `a ' U a m a �!' NOTES: Project Limits are approximate. NWI from US Fish and Wildlife Service. �l m Soils data from SSURGO. National Hydrography Detaset from USGS. Ipa I JDB Mlr.•BER 37630.054 � o m " Aerial imagery from NC OneMap. j t;l tail i OF 1 AawaeF' " a+. 'aNl?a • wu .. ,. ;tA1e yl , 1lsulpa j _ A is WOW • .\ M1 � a O K WN ' C 0 IM Sr WN Wry W C E x E ;11p Wry F ; F G 1,SBa 1,W9 Wry f Q q H np NTN NTN W 152 V �� O= I 6,191 NTN dLL Q J 2.155 W/M1Y O ei K 416 W/NY 6 f G Kra L t.am WMV ToLI 6,tn Np 2,m e,1M ],TB p 1 67 1W 1m -�-. - 24 k 3� 4 6V y �IWapanCNea- a1,WpagR DAB as NlpWam LanpN� ]0111 T�1WI; NF-NsttAtlel; V=VCp WW; `XM—Vape W; PFO=Pel: Wm Fae We ; PSS=PaJ.iA Sumo O lb W""" PENI=Palwtrime Emrgnl WalleW; POW= PelaNmme open Water, EM= EaWaine lltw al Wet R Upper PemnnW Sims; 8 ; Ra=i,lam;ttant Shama; RS = Ephw" streanp m - =yr'• r_v Olmvtyy DATE 09123/2019 Legend 3 OHAW^i BY A. MEHFOUD ;)Project Study Limits - 37.8 Acres © Stream Identifier os i q 1NEHFOUD a CHSEC��Y ® Wetland Identifier •E 1'=200' d Wetland Flag a a -0 Field Data Station o —�- Ditch t m { r Culvert 1 `f6S¢39E1-: L a n � u Intermittent Stream (R4) � Z DS- E11 c Ephemeral Stream R6 P ( ) a Stormwater Ponds E'� `' -J -- o_ Wetlands ,Y UJ W a a o oZ mZ 39i1.1 Palustrine Open Water (POW) - O W a � 0 Relatively Permanent Water 39A4 8 L M m a IFL ! 6 U. O m c Z �3 1. Waters of the U.S. within the project study limits have been located luz using submeter, Bluetooth GPS antennas by Timmons Group. t ra oY 2. The eastern half of this site was delineated by Timmons Group as an ! to the '_ W 0 c m _ addendum wetland area previously delineated by WithersRavenel = I and approved by the U.S. Anny Corps of Engineers on 12/21/2010 ■K L J am Z `a s (SAW-2010-01904). - y j 3. Waters of the U.S. delineated by S. Thebert and S. Law on 09118/2019 f 1 Vim/ a N ['I and 10/04/2019.- LL Z 2 a 3 4. Waters of the U.S. have not been confirmed by the U.S. Army Corps of _ Engineers until stamped. 5. Project limits are approximate. o 6. Topography based on USGS LiDAR.; 3 m _ u 7. Cowardin Stream ClessiFiralinns are based on NC DWQ Stream q " 2 Identification forth version 4.11. o u ri I IL m V A S v V =� m 2 .`u 2 - JCGS NUI:,,SER 37630.054 m p a Q � ee 1 OF 1 t E Frorn: Granseur Dick <gdick@flyilm.com> Sent: Friday, September 18, 2020 3:21 PM To: Brian Downs <Brian.Downs@timmons.com> Cc: Andy Priolo - Couche Tard (APriolo@circlek.com) <APriolo@circlek.com>; Stephen Ballentine <Stephen.Ballentine@timmons.com>; Carol LeTellier <cLeTellier@flyilm.com> Subject: RE: CK airport - layout & stockpile Brian, See attached for ali forms. After the County Manager reviewed, they felt that it was more appropriate to authorize ILM, as a long term lease holder, to execute these forms. Essentially, the County has entrusted the Authority/ Airport to manage the property as a "perpetual" lease holder, where development more directly affects operations to the airport than the County itself. I have attached a letter of authorization signed by the Deputy County Manager for your use if required by any of the permitting agencies. Thanks, Granseur Dick, P.E., C.1/i Irf'I L o: 910-341-4333 x1016 e: gdick@flvilm.com 1 Facilities Director We.4 awn o ~ Cw'kn t 3 C'^ $ a,rc, n s Jry nti C: �I�x �C nU-ALA. n OCT 0 7 2020 By. STATE OF NORTH CAROLINA AUTHORIZATION AND DELEGATION NEW HANOVER COUNTY The undersigned property owner, New Hanover County, acting through its Deputy County Manager, hereby authorizes and delegates the New Hanover County Airport Director of her designee to execute permits, authorizations, and covenants, and other instruments necessary for site development specific to the premises designed as Airport Boulevard under sublease for a Circle K rental facility, including, but not limited to, New Hanover County and State DENR stormwater permits, U.S. Corps of Engineer permits, and covenants. This the 10 . day of Sc�6.� 2020. NEW HANOVER COUNTY By: OCT 0 % 2020 BY.--__ E. o U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2010-01904 County: New Hanover U.S.G.S. Quad: Wilmington NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner/Agent: Wilmington Airport Authority C/o Mr. Jon RosboroV& Airport Director Address: 1740 Airport Boulevard, Suite 12 Wilmineton. North Carolina 28405 Telephone No.: (910)341-4333 Property description: Size (acres) 447 Nearest Waterway Smith Creek USGS HUC 03030007 Nearest Town Wilmington River Basin Cape Fear Coordinates N 34-273142, W .77.916436 Location description The area being verified is the west portion of the Wilmington International Airport. located along, 23rd Street and Blue Clay Road, Wilmington New Hanover County North Carolina Indicate Which of the Following Alp&: A. Preliminary Determination Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). B. Approved Determination X There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. regulations, this determination may be retied upon for a period not to exceed five Years from the date of this notification We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps, _ The waters of the U.S. including wetland on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. ' Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regnhitory Official identified below on 12/21/2010 Unless there is a change in the law or our published regulations. this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section.404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification, X The property is located in one of the 20 Coastal Counties sablect to regulation under the Coastal Area Management Act (CAMA), You should contact the Division of Coastal Management in Wilmington NC at (910) M:7-2-15 to determine, their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Emily Hughes at 910-251-4635. C. Basis For Determination This site exhibits wetland criteria as described in the 1987 Corps Wetland Delineation Manual and is adiacent to an unnamed tributaa to Smith Creek. This site also contains a waterbody that exhibits an ordinary high water mark and is an unnamed tributary to Smith Creek. This determination is based on information submitted by Withers and Ravenel and a site visit by Emily Hughes on 11/10/2010. D. Remarks E. Appeals Informattion (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Division Attn: Emily Hughes, Project Manager, Wilmington Regulatory Field Office 69 Darlington Ave. Wilmington, North Carolina 28403-1398 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Z/21/2011. **It is not necessary to submRFA form to th District Office if you do not object to the determination in this correspondence.** h Corps Regulatory Official: Date December 11, 2010 0 Expiration Date December 21, 2015 Action Id. SA•*/-2010-01904 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, Please complete the Customer Satisfaction Survey located at our website at httu:1/reaulatorv.usacesurvev com/ to complete the survey online. Copy furnished: Withers & Ravenel Attn: Troy Beasley, 1410 Commonwealth Dr Ste 101 Wilmington NC 28403 F-0 (£B GVN) nlHD O'N W M99M PME MM ME 09@E M: 0 MEMEM MISS A H a ra N. IMEMEMME 99�9 ET E, i 2 oeMIM MEMMOOM l£8 GYN) OWO ON IEEE I 'q1 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-01981 County: New Hanover U.S.G.S. Quad: NC- Castle Havne NOTIFICATION OF JURISDICTIONAL DETERMINATION Requestor: New Hanover County Airport Authority Agent: Timmons Group Granseur Dick Robin Perez 1740 Airport Blvd 5410 Trinity Road Suite 12 Suite 102 Wilmington, NC 28405 Raleigh, NC 27607 Size (acres) 37.8 Nearest Waterway Smith Creek USGS HUC 03030007 Nearest Town Wilmington River Basin Cape Fear Coordinates Latitude:34.266784 Longitude:-77.916195 Location description: Proiect area is located southeast of the intersection of Airport Boulevard and N 23rd Street in Wilmington, New .Hanover County, North Carolina Indicate Which of the Following Apply: A. Preliminary Determination ® There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 9/23/2019. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action undcr the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waters, including wetlandson the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. ❑ The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly SAW-2019-01981 suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in in Wilmington, NC, at (9.10) 796-7215 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Rachel Cayito at (910)-251-4487 or Rachel.A.Cayito(a,usace.armv.mil. C. Basis For Determination: Basis For Determination: See the preliminary Jurisdictional determination form dated 1/31/2020. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Phillip Shannin, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA fora_, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** CAPITOXACHEL.ANN, moanysionedny Corps Regulatory Official: 1536276790 fMROAACHELANN.1536276790Date 2020.01.3111-36:11-05'00' Date of JD: 1/31/2020 Expiration Date of JD: Not applicable NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: New Hanover County Airport Authority, File Number: SAW-2019-01981 Date: 1/31/2020 Granseur Dick Attached is: See Section below ❑ INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT Standard Permit or Letter ofpermission) B PERMIT DENIAL C Li APPROVED JURISDICTIONAL DETERMINATION D ZI PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION 1- The following identities your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or htlo://www-usacc-army.mi1.!NFissi.ons,'CiviItiVorksiRrp-ulatoPrL)PramandPcrmiis,aspx or the Corps regulations at 33 CFP fact 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. ECTtON II. - RFQUFST FOR APPEAL or OBJEC'NOWS TO AN. INITIAL PROFFERED_ PERMIT_ REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. FOF1 "i' OI= C0INTAC: i' FOR < LEI STIONS OR, INFOW 1ATIUN- If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Phillip Shannin, Administrative Appeal Review Officer Attn: Rachel Capito CESAD-PDO Wilmington Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1OM15 69 Darlington Avenue Atlanta, Georgia 30303-8801 Wilmington, North Carolina 28403 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportuni to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Rachel Capito, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 1/31/2020 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: New Hanover County Airport Authority, Granseur Dick, 1740 Airport Blvd, Wilmington, NC 28405 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Circle K ILM Airport, SAW-2019- 01981 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Project area is located southeast of the intersection of Airport Boulevard and N 23rd Street in Wilmington, New Hanover County, North Carolina. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: New Hanover City: Wilmington Center coordinates of site (lat/long in degree decimal format): Latitude: 34.266784 Longitude:-77.916195 Universal Transverse Mercator: Name of nearest waterbody: Smith Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): 11/6/2019 TABLE OF AQUATIC RESOURCES INREVIEWAREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Estimated amount of Geographic authority to Type of aquatic latitude (decimal Longitude (decimal aquatic aquatic resources in (i.2., which the aquatic resource Site Number degrees} degrees] review area (acreage wetland vs. non- "may be" subject (i.e., and linear feet, if wetland waters) Section 404 or Section applicable 10 4f}4 A 34.266927 -77.914764 150 linear feet Non -wetland Section 404 waters B 34.265820 -77.915060, 94 linear feet Non -wetland Section 404 waters C 34.265891 -77.917786 57 linear feet Non -wetland Section 404 waters D 34.266361 -77.914830 0.07 acre Wetland Section 404 E 34.265821 -77.914965 0.05 acre Wetland Section 404 F 34.266060 -77.916802 0.04 acre Wetland Section 404 G 34.266520 -77.915190 0.07 acre Wetland Section 404 H 34.267425 -77.918440 0.02 acre Wetland Section 404 Estimated amount of Type of aquatic Geographic authority to Latitude (decimal Longitude (decimal aquatic resources in resources (Le., which the aquatic resource Site Number degrees) degrees) review area (acreage Wand vs. non- Wmay be" subject (i.e., and linear feet, if wetland waters) Section 404 or Secb,: ,n applicable 10/404 1 34.267131 -77.918522 0.14 acre Wetland Section 404 J 34.266817 -77.918280 0.05 acre Wetland Section 404 K 34.266038 -77.917733 0.01 acre Non -wetland Section 404 waters L 34.266178 -77.918108 0.04 acre Non -wetland Section 404 waters 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requester of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary, (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: Z Maps, plans, plots or plat submitted by or on behalf of the PJD requester: ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ® U.S. Geological Survey Hydrologic Atlas: 030300070808 ❑ USGS NHD data. ® USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: Wilmington ® Natural Resources Conservation Service Soil Survey. Citation: NRCS New Hanover County Soil Survey ® National wetlands inventory map(s). Cite name: USFWS NWI Manner ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): NC One Man Orthoima¢ery 2017 or ®Other (Name & Date): Landscape ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. CAPITO.RACHEL. DI91tallysl9nedb' CAKIWACHELANN.1531276790 ANN.153627679,0 D3te'2020.013112:36:3S_0'W Signature and date of Regulatory staff member completing PJD 1 /31 /2020 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. _�� 9`G({ i�•�y?S Yd p �i Z4Y J Z g� J North Carolina Secretary of State Search Results Page 1 of 1 Search ResuLts 4 Records Found: 1 Search Type: All Search Criteria: Circle K Stores, Search Time: 8/27/2020 11:05 AM Search Again BV,_ Entity Name Sos Id Date Formed Circle K Stores Inc. Prev Legal Name(s) The Circle K Corporation Circle K Convenience Stores, Inc. 0176043 110/25/1985 Status i Current - Active O Type i I Business Corporation https://www.sosnc.gov/online services/searchBusiness Registration_Results 8/27/2020 rf= Mi- is. 61 ow This instrument, a Deed of Release, made by the United States of A"Irtoa, Ing by., and through Na Direetoe, Southow Region, of:the Federal Aviatloft Administration, . Departsient of 'lticsnmporMien under and' pur4vant to, the powers and +6 horny cbatait�ed ' to the provisione of yablit Law all Slat . s Congreas,.(63 Stat' 700),.as amended, to the County of New Hanover, a body Politio under the laws -of the state of North Carolina, Witnesseth � NI�REAg, The United States of America acting by and.through the filar Assets Administrator and the ceneral Services Administrator under and pursuant to the powers and authority contained in the provisions of the Surplus Property Act of 19", as mended, and applicable rules, regulations and orders, did by Instruments of Transfer dated December 8, 1947, May 7, 1948'and September to, 1961, realise, release and forever quitclaim to the County of New Hanover, North Carolina, a body politic under the ` lava of the State of North Carolina, its successor$ and assigns, sll rights, title f and interest of the United States of America in and to certain property know as gluethenthal Field, also known as New Nanovar County Airport, subject to certain terse, conditions, reservations, and restrictions and, i WIMRFAS, The County of New Hanover has requested the United States of America to release the hereinafter described property from all terms, conditions, reservations, and restrictions of said Instruments of Transfer and, MIERUSS :he Directors, Southern Region of the Federal Aviation g 1Wmitaistration has dots, nod �! that the release of the property hereinafter described will not prevent a � P cconplishi»g i the purpose for which the property was made subject to the terms, conditions, reset- ; vations, or restrictions, and to necessary to protect or ad vasiee the Interests of t° tee United States in civil aviation._ NOW THER270R6 S: Por and in consideration of the above -expressed recitals and of the benefite to r accrue to the United States and to civil aviation, the U%nited States of America, upon inclusion by the County of New Hanover in the Instruments of Transfer eomraying Ititle to the hereinafter described real property of provisions as followet (1) lhat the County of New Hanover reserve unto itself its successors and aseians for the g144 and 'OT :.:z .,..a. •.. ... . tof4x . Soo property hereinafter deeortbod• together with the right to aausa 1q said ;. airspace such ii6i5e as wY be laberent in the operetica of 4ivil.,,and ailitary airerift, natr lsnowa or hereafter used, for navigat oa of .or flight ip the !� said airspace, and for usa of sold..&";apacd for lauding t&i !' • ng•�off frow ; 4 or operating non the a" Hanovett County Airport, (2) That the County of N6V Nanover reserves for itaeif its ouocessors.&A assigns I for the use and banefit of the Department of Defense the right to operate an New Hanover County Airport any electromagnetici radiating device without i• restriction. i (3) That the craotes expressly agrees for itself, its successors and assigns to restrict the height of structures, objects of natural growth and other obstructions on the hereinafter described real property to a height of not more than 160 feet above.sea level, I (4) That the Grantee expressly agrees for itself, its successors and assigns to prevent any use of the hereinafter described real property which would inter-• i fere with landing or taking off of civil at military aircraft at tha New Hanover Airport, including electronic interference and ! • control Of ei@CtrO. magnetic spectrum radiation that might inhibit airport operations, or other. 1# visa constitute an airport hazard, i hereby releases the said real property from the term, conditions, reservations and 1! restrictions as contained is the abova-mentioaod lastruments of Transfer from the ' i United States of America to the County of New Hanover dated December S. 1947= pay 7, t 194E and September 18, 1961, which real property is described as _ollav-at' All of that certain tract or parcel of land lying and being in the Cava gear Township. New Hanover County North Carolina and being a part of Raw Hanover County Airport: BEGINNING at a concrete monument, a common corner of New Hanover County f Airport and Electric Bottling Company, said Bomsnent being North 79 degrees I; 38 minutes East along a common line of the above owners 1000.0 feet from on old concrete monument, mother common corner of said owners, said old I monument,being North 33 degrees 19 minutes East along another easmoa line of said owners 687.36 feet from another old- concrete mongu nt, a cosmos corner of said owners, this old ==mosmt being 6outh 39 degrees 30 minutes - i . • boot PACE $76 3 H. i Bast rloag anothes ceiiaoli line Of said owners 592.02 feet from 40 old t °0l t0 isoauaisnt is t6to Esate" "via of the A.C.16R.R, right -of -nay . k (130:0 fast +fide still boirig the Kit ington and Veldon Braach) fuanirig thence from said Eegigagag point North 3 degrees ainutes.Bdst along i commoh line of said owners 208.71 faces ehenee ltoreh.79 degrees 37-3/4 minutes best 97.28 feet to a concrete Moewaeat,in the western line of State Road No. 1311 (60-foot r ight-of-vay)= thence South 2 degrees 8% minutes Rest along said line of said Road 210.0 feet to a concrete monument; thence South 80 degrees 53 minutes Nest 101.18 feet to the point. of Beginning, the sane containing 0."S acres ad being a portion of the Now Nanorer County k Airport tract. t By its acceptance of this Deed of Release the County of Nov Naaover covenants and '• agrees for itself, its successors and assigns, to comply with and observe all of the conditions and limitations hereof, Alch aaa exprassYy 1im;fed to the above• described real property. IN WITMIS SE , TBB WXTBD STATES OF ICA has caused this Instrument to be executed .. of We--r,UA day of . � 19 �. UNIT® STATES OF AMBRICA The Administrator of the Federal Aviation Administration SEAL ector, Southern egion Federal Aviation Administration Department of Transportation * • AT ' IlNlfi . 87, . $SAT$ OF GEORGIA) 7 COUNTY OF FULTON) op this ,day 'of �9 before ma, y a Notatry Public iq and ttlr tla County of V State of peesonaily appeared kntown to :ate to ba the Director. Southmcn Region, ; Federal Aviation Administration, and knesn to me to be the person whose Asps is } subscribed to the within Inetr Unt and acknowledged that he executed the-saee on behalf of the Administrator of the Federal Aviation Administration and the United j States of America. WITNESS spy hand and official seal. M' ' ix 1 New Hanover County, north Carolina SEAL) By a/ Titl t.Jw,e trn.� ws YI1s 19..��r My Commission Binpirnt WAYS UP NORTH CAROLINA New IleeoitF ewunty The Fonegoint QriitleW � •; Notarjr'A�i�ltcof New�l�r Caaeb. is adiedked to be eonvel. Iwt the inure- Mont with IM Qeell&do be Ift"dI& . Drews bs to Application Completeness Review Checklist {Non -Transfers} - Short Version N Project Nar*le: i M [ 4C,76� (L WL - A r,_4 r 5 _ Date Delivered to W I R0 %f] p Project County/Location: Location: i`'��)' n y J tl'ir 71 + H o d RIMS Received/Accented Date: 1 o Rule(s): F-120 L7 Coastal F-12008 Coastal P1995 Coastal SIMS Acknowledged Date': Phase 11 ❑Universal M1988 Coastal Permit Action: New New Permit #z: Minor Mod / Renewal Existing Permit #: _5;.3�j D •I Permit Type: �D LD 0,eraii / HD &i_D Combo r-xpriatlon Date3. Genera Perin! i OffsrtE / Exempt / Rescission �[fsiteto SW>3: DLot is in Master Perrnit' FiPE Cert on File? Development Type: Commercial / Residential / Othe° 406 Subdivided?: Subdivision or Single Lot Permittee Type & Documents Needed: E]PropeM, Owner(s) Purchaser Di_essee _]Viabie? �Viaaie? �1'iable? Deed EPur&iase Agmt Lease MNot Subdividad: Deed Subdivision: Common Area Deed 0 11 0A ❑Developer FiViable' OViabie? Election Minutes ®$505 (within 6mo) Check#(s): f3lf513 (T new form or for older forms. 1 orpnol per SCM) El Soils Report (lnfil or PP) ®Calculations (signed/sealed) Deed Restrictions, if subdivided lProject Narrative jj'�gUSGS Map (or on file?) Subject to SA?: Y / N Plans (2 Sets) PE Certification Electronic Copies Easements, Recorded (2017 Rules) Subject to ORW_�• 'Enter B1MS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Suppiements & Deed Restiction Templates. =i w; irl f months and thev are requesting a mod: STOP Needs a renewal first_ EMAILED ENGINEER DATE: REVIEWER NAME: Comments: 3 :wUIV,Reference Lioran..FrocedureslC°.ecFc!isrs'.Comp-e.eness Review Checkl ist_2020 0131 [--]No Fee Y / N