HomeMy WebLinkAboutSW4211202_Plansheet C7.2 - Misc. Detail_20220307do = PI La = AF W = APRON WIDTH do + La d = APRON DEPTH PLAN La SLOPE 0 % I I FLOW d SECTION A -A NOTES: 1. SEE SCHEDULE FOR DIMENSIONS. 2. INSTALL A FILTER BLANKET OR FILTER FABRIC BETWEEN THE RIPRAP AND SOIL FOUNDATION. 3. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUAL. FILTER FABRIC Outlet Pipe Diameter Discharge d50 La W dmax apron thickness NCDOT ri ra in) (cfs) (ft ft ft ft ft Class 100 24" 15 0.4 12 14 0.6 0.9 B PIPE OUTLET STABILIZATION NOT TO SCALE WITH LINER, NO GRAVEL APPROACH ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER 10'-0" MIN. A 0 0 SANDBAGS (TYP.) 0 0 OR STAPLES ? 10 MIL 1:1 PLASTIC Q o SANDBAGS (TYP.) SIDE SLOPE LINING OR STAPLES a 0 a 0 (TYP.) 0 0co 0 o OzX A CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3•CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE HIGH 10'-0" MIN. SANDBAGS (TYP.) COHESIVE & B OR STAPLES LOW FILTRATION HIGH SOIL BERM 10 MIL COHESIVE & 0 O O O PLASTIC LINING LOW FILTRATION 0 0 1:1 SIDE SLOPE SOIL BERM z (TYP.) CP o o 6CN M N - / O Z X O o - ZY) 0 2'-0" 6" SECTION B-B B SANDBAGSTP.) NOTES: OR STAPLE 1. ACTUAL LOCATION DETERMINED IN FIELD CLEARLY MARKFD SIGNAGF 2. THE CONCRETE WASHOUT STRUCTURES CONCRETE NOTING DEVICE (18"X24" MIN.) SHALL BE MAINTAINED WHEN THE LIQUID WASHOUT AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE PRELIMINARY DESIGN NOT FOR CONSTRUCTION OUTLET STRUCTURE -STRUCTURE FOR BASIN #2 AND #4. 31N #2 AND #4. SKIMMER BASIN SKIMMER SHALL BE TIED SHALL BE TIED INFLOW TO OUTLET STRUCTURE. _T STRUCTURE. PIPE BAFFLES (STD) (SEE DETAIL THIS SHEET) SKIM E� - CY Y BAFFLES PLAN VIEW (BASIN #2 & #4) SKIMMER SEDIMENT BASIN MAINTENANCE: 1. INSPECT SEDIMENT SKIMMER BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (ONE-HALF INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. 2. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. 3. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO REMOVE THE DEBRIS. 4. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. 5. CHECK THE FABRIS LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. 6. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. 2„-5„ 2„-5„ 2„-5„ ® 2„-5„ (5-12.5cm) (5-12.5cm) (5-12.5cm) (5-12.5cm) 3' 3' (0.9m) (0.9m) 6' 6' (1.8m) (1.8m) 3.3' 3.3' (lm) 1.6' (lm) (0.5m) _ STAPLE PATTERNS 0.7 Staples per SQ.YD. 12.5cm) (512.5c1 2' 4, (0.6m) (1.2m) (0.5m) 3.3' • (•) 1.7 Staples per SQ.YD. 2„-5„ (1.2m) 2„-5„ 4' (1.2m) 0 2' (0.6m) T O O O O �10"(25cm) O O O O O(lm)O (1 m) 1.15 Staples per SQ.YD. F 2' (0.6m) O 5 O 3.31 O O (0) O O O 3.4 Staples per SQ.YD. 2"-5" (5-12.5cm) -10 E, (25cm) 2„-5„ (5-12.5cm) DEWATERING ZONE INLET SHALL BE PROTECTED (AS NEEDED) FROM EROSION CMP OUTLET PIPE WITH RIPRAP, TARP, MATTING CROSS SECTION OR EQUIVALENT. (BASIN) REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50% CAPACITY. CONTRACTOR SHALL UTILIZE A SILT BAG FOR ALL DEWATERING OPERATIONS. V MIN FREEBOARD / TOP OF BERM EMERGENCY SPILLWAY ELEVATION DISSIPATER PAD RIP RAP THE INSIDE SLOPES OF THE SKIMMER SEDIMENT BASIN SHALL BE STABILIZED WITH NORTH AMERICAN GREEN S75 (STAPLE PATTERN D) EROSION CONTROL MATTING UPON COMPLETION OF CONSTRUCTION NOTES: 1. BASIN SHOULD BE CLEANED OUT WHEN CAPACITY REACHES AN ELEVATION REPRESENTING THAT THE BASIN IS HALF -FULL. 2. THE TARP USED TO PROTECT THE WEIR SHALL BE THE WIDTH SPECIFIED. THE LENGTH OF THE TARP SHALL BE ACCORDING TO AVAILABLE SUPPLY. IF MULTIPLE TARPS ARE TO BE USED, THEN TARPS SHALL BE OVERLAPPED AT LEAST 12". THE UPSTREAM 12" TARP SHALL OVERLAP THE DOWNSTREAM TARP. THE TARP SHALL BE 50 MIL. HEAVY DUTY SILVER TARPAULINS OR EQUIVALENT FOR U.V. RESISTANCE. 3. PROVIDE A MINIMUM OF THREE POROUS BAFFLES TO EVENLY DISTRIBUTE FLOW ACROSS THE BASIN, REDUCING TURBULENCE. 4. BAFFLE MATERIAL MUST BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR A SILT FENCE. 5. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE FIRST BAY, SO THIS SHOULD BE READILY AVAILABLE FOR MAINTENANCE. 6. DURING THE CONSTRUCTION PHASE OF THE PROJECT, PERMANENT STORMWATER RISER SHALL ONLY DEWATER FROM THE TOP OF PIPE. 7. POND SHALL NOT BE CONVERTED FOR STORMWATER USE UNTIL APPROVED BY ENVIRONMENTAL ENGINEER. TEMPORARY SKIMMER SEDIMENT BASIN NORTH AMERICAN GREEN 5401 St. Wendel - Cyathiaua Rd. PH: NO- PomyvMe, IN 47633 W W W.1I O O ---------------------------------------------------------------------------------------------------------------------------------------------- cM NDTM 21. ALL JOINTS OF THE FLOATATION SECTION SHALL BE SOLVENT WELDED. JOINTS OF SKINNER SECTION NEED NOT BE WATER -TIC T. 31. IOO _ HOPE FLEABLE DRAW PIPE IS TO BE ATTACHED TO THE POW OUTLET STRUCTURE WITH WATER -TIGHT CONNECTIONS. FWD 4L OW IS TO BE SIZED ACCORDING TO STORAGE FOR AT LEAST 24-HOURS. PLAN VEW .; _ ATTACH NOSCREWS POE PVC WITH TWO N0.8 WOOD SCREWS ORFI E DRILLED IN ENO CAP (SEE NOTE D- scuE i (TYP.) FLOATATION FLANGE WITH RUBBER GASKET CONCRETE !ATTACH TO STRUCTURE WITH CONCRETE SCREWS OR OTTER SUITABLE ATTACHMENT AS APPROVED BY TIE ENGINEER) FRONT VEW SIDE VIEW DELAWARE SKMM It DEWATMMG DEVICE APPROVED DEPARTMENT OF TRANSPORTATION STANDARD Na B!4 (9s) slW 1 of 1 EBCOMMENDED NE.E GNEER "=SIGN ENGWEER "R1E -------------- --------- -- ----------- ------------ ---------- --- ---------- - ---------- ----------- -- --------- -------------- ------------ ----------- ----------------------- --- ---------- - ---------- --- ---- SEDIMENT BASIN SKIMMER/DEWATERING OUTLET DEVICE NOT TO SCALE CONSTRUCTION SPECIFICATION: 1. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. 2. INSTALL POSTS ACROSS THE WIDTH OF THE SEDIMENT TRAP. 3. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES, SPACED A MAXIMUM OF 4 FEET APART, AND INSTALLED UP THE SIDES OF THE BASIN AS WELL. THE TOP OF THE FABIC SHOULD BE 6 INCHES HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS. 4. WHEN USING POSTS, ADD A SUPPORT WIRE OR ROPE ACROSS THE TOP OF THE MEASURE TO PREVENT SAGGING. 5. WRAP POROUS MATERIAL, LIKE JUTE BACKED BY COIR MATERIAL, OVER THE TOP WIRE. THE FABRIC SHOULD HAVE FIVE TO TEN PERCENT OPENINGS IN THE WEAVE. ATTACH FABRIC TO A ROPE AND A SUPPORT STRUCTURE WITH ZIP TIES, WIRE, OR STAPLES. 6. THE BOTTOM AND SIDES OF THE FABRIC SHOULD BE ANCHORED IN A TRENCH OR PINNED WITH 8-INCH EROSION CONTROL MATTING STAPLES. 7. DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN. MAINTENANCE: 1. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED SLOPE INSTALLATION DETAIL 1. Prepare soil before Installing rolled erosion control products (RECPs). Including any necessary application of lime. fertilizer, and seed. 2. Begin at the top of the elope by anclNNirrg the RECPs in a 6"(15cm) deep X 6"(15cm) wide 1rerrEth with approDdmately 12" {36cm) of RECPs aDdended beyond the up -slope portion of the trench. Anchor the RECPs with a row of stapleslslakes apprmdmately 12" (30am) apart in the bottom of the trench. Backtlll and compact the :he after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back aver the seed and compacted soil. Secure RECPs over compacted soil with a row of stepleslstakes spaced approximately 12"(30cm) apart across the width of the RECPs. 3. Roll the RECPs (A) down or (B) horizontally across the slope. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing stapleslslakes in appropriate locations as shown in the staple pattern guide. 4. The edges of parallel RECPs must be stapled with apprmdmatey 2" - 5" (5-12.5cm) overlap depending on the RECPs typo. 5. Consecutive RECPe spliced down the slope must be and over and (Shingle style) with an approximate 3"(7.5cm) overlap. Staple through overlapped area, approAmately 12"(30cm) apart across entire RECPs width. )Iahselaimeer: In loose soil conditions, the use of The Information presented herein Is general design Information only. For specific appllcaDons, staple or steke lengths greater than consult an Independent professional far further design guidance. 6"(15crn) may be necessary to property sewre the RECP's. Drawn on: 5-4-17 PLAN RIPRAP HEADWALL, V MIN. HEIGHT FROM ROAD SHOULDER 1' 3' TORAGE ZONE FLOOD STOPAGE ZONE 1.5' INVERT PIPE A FLOW NC DOT #5 OR #57 J '- CLASS B RIPRAP WASHED STONE NOTE STRUCTURAL STONE SHALL BE CLASS B STONE AND SHALL BE PAID FOR AT THE CONTRACT UNIT PRICE PER TON "STONE FOR EROSION CONTROL (CLASS "B")." SEDIMENT CONTROL STONE SHALL BE NO. 5 STONE AND SHALL BE PAID FOR AT THE CONTRACT UNIT PRICE PER TON "SEDIMENT CONTROL STONE". DIMENSIONS ARE MINIMUM ACCEPTABLE UNLESS OTHERWISE SPECIFIED BY THE ENGINEER. O (D Z N W Z_ > U Z J ° U E J 0 0 � IY . (n Z J N co c (D LLIW W J O N � Q = Z Wcf)r9F_ ca 0 U) Z co CO 3: Z W WO"M 3 YH aj�3 J j O U) C N Z 0 x U 20 FIRM LICENSE C-1891 CA NATURAL GROUND PIPE INVERT r FLOW 7011, _ T `. NE.. rff ftlil EkEl LH4 z Z J 'O O VJ Q Q � O U 2 LLI ry m (2 O H Z 0 Z U O =0 N Z m N O Z U CD U) N N O 0 O z U m W z m 0 uj Y � W 2 Q 0- 0 U 0 Z Lu 5; z Lu z Lu z Lu d Lu Z 2 0 2 0 2 0 O U LU CJ t- C3 W x w 0- U Z C) Z U Z O LL = IL = IL = IL 0 w 0 cn 0 cn 0 cn W Q N N N CD N N CD N O � N O O CO N o 0 0 Z Q m U o SITE EROSION CONTROL DETAILS SHEET C7.2 3.75 Staples per SQ.YD. ROCK PIPE INLET PROTECTION NOT TO SCALE