Loading...
HomeMy WebLinkAboutSW4211202_Plansheet C7.3 - Misc. Detail_20220307 (2)DITCH SCHEDULE IVY BROOK SUBDIVISION DAVIDSON COUNTY, NORTH CAROLINA February 28, 2022 Go Z 2 W z I— LU Of U) < U) 0 of J_ _ Z 0 Q O H LU fY Q ? U) 2 Q LU Q W Q - Z Q �'O 0 4 >_ ~ W Z - U) Z Q D O p Q F- WOOU a_J Q Q U_ O Z Z W Z U of E: J WO Z U W (D 0_ 2 0 0_ O CO 2 Q � 0 O 00 W a OJ W O U_ ILL O H W Q H O LU > J ¢ Of W Q � O Z J W H W G_ U) (AC) (AC) (SF) (CFS) (FT/FT) (IN) ("X": 1) (FT) (FPS) 1 Hickory Tree Road Widening 0.30 0.30 6.95 5,250 0.59 1.23 2.50% 2 3 0.26 1.66 SC150 D 2 Vine Ridge Drive 0+25, RT 4+17, RT 0.66 0.96 6.95 20,396 0.64 4.29 4.48% 2 3 0.39 3.52 SC150 D 3 Vine Ridge Drive 4+17, RT 6+50, RT 0.50 1.46 6.95 33,634 0.67 6.77 1 .59% 2 3 0.68 2.44 SC150 D 4 Vine Ridge Drive 6+50, RT 10+12, RT 0.42 1.88 6.95 42,778 0.66 8.67 5.01% 2 3 0.51 4.78 SC150 D 5 Vine Ridge Drive 0+25, LT 2+72, LT 0.27 0.27 6.95 2,964 0.50 0.94 4.48% 2 3 0.19 1.98 SC150 D 6 Owl Lane 0+48, LT 3+74, LT 1.40 1.67 6.95 24,160 0.55 6.38 5.00% 2 3 0.45 4.29 SC150 D 7 Owl Lane 0+48, RT 3+74, RT 0.53 0.53 6.95 13,154 0.69 2.55 5.00% 2 3 0.29 3.07 SC150 D 8 Vine Ridge Drive 3+25, LT 4+17, LT 0.19 0.19 6.95 1,104 0.43 0.57 1.59% 2 3 0.22 0.99 SC150 D 9 Vine Ridge Drive 4+17, LT 6+50, LT 0.16 0.35 6.95 6,300 0.60 1.45 1 .59% 2 3 0.34 1.41 SC150 D 10 Vine Ridge Drive 6+50, LT 10+54, LT 0.61 0.96 6.95 12,348 0.53 3.52 5.01% 2 3 0.34 3.46 SC150 D 11 0.40 2.60 6.95 37,314 0.55 9.90 24.50% 4 3 0.25 8.24 RI PRAP CLASS 1 12 T 7 6.95 48,252 0.44 23.28 6.70% 4 3 0.57 7.18 SC250 E 6" (15cm) o \ 0 6" (15cm) 2 6" (15cm) -�T] 7\',"� 6" (15cm) CHANNEL rNORTH AMERICAN GREEN DEPTH I CHANNEL LINER X X "WIDTH ROADWAY DITCH SECTION NOT TO SCALE 4"(10cm) fi�f►If►Q►��►Q►Q►��►�`� �> CONCRETE BLOCKING -------------------- ----------------- UNDISTURBED -- - - - - - - - - - - - -- ----- - - - - - - - - ---=-=-SOIL ------------- - ---- ------ CONCRETE ------------------ ------------ BLOCKING T YPI CAS 1L, TEE WITH CCCC CC0CCCCC CONCRETE UNDISTURBED - - - - - BLOCKING - - - - - SOIL TYPICAL TEE OL0CCCCC --------------- --------------- ------------------------------ CONCRETE - -- -- -- -- -- -- -- -- -- -- -- -- --- -- BLOCKING - - - - - - - - - - -_ - - - - UNDISTURBED ---------- SOIL - --- -- -- -- ------- � _ - _- _-_-_-_- - - - - - - - - - Z -- --- - - - - CCCCC1L, 450 BEND OL0C ING ------------------- -------------------- ------------------- -------------------- ------------------- -------------------- ------------------- -------------------- ------------------- -_--_--_--_--_--_--_--_--_--_--_--_--_--_--_--_--_----- UNDISTURBED _-SOIL CONCRETE BLOCKING CCCCCCC 900 CCCC CCCCCCCC cM O (D ZLU N � Q Z_ U � Z) J ° 0 U E Qf Z J N co C W LU 2 LU W O a)0 0' Q (0 = Z U7 Cp r-(� IW YajC3 JLLl C:)co U) Z o x Q U 4 ��dli2 FIRM LICENSE C-1891 It It I,,,I CA RO� *�a � ff 701/� �� .fr',fill EkEtli{ Q Z z 'O O ry vJ Q Q � O U w ry m O z U) y 0 Z U ° O = 0. N Z m N O > Q ZCD C?U) U N N O O Oz CHANNEL 00 INSTALLATION U Z UJ DETAIL W Q w W O 1. Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, LD_ � = Q fertilizer, and seed. 0 U 0 2. Begin at the top of the channel by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12"(30cm) of RECPs extended beyond the up -slope portion of the trench. Use ShoreMax mat at the channel/culvert outlet as supplemental scour protection as needed. Anchor the RECPs with a row of staples/stakes approximately 12"(30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12" apart across the width of the RECPs. 3. Roll center RECPs in direction of water Flow in bottom of channel. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4. Place consecutive RECPs end -over -end (Shingle style) with a 4%6" overlap. Use a double row of staples staggered 4" apart and 4" on center to secure RECPs. fn fn W fn 5. Full length edge of RECPs at top of side slopes must be anchored with a row of staples/stakes approximately Z W_ � � � � 12"(30cm) apart in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. > Lu Lu LU Lu 6. Adjacent RECPs must be overlapped approximately 2"-5" (5-12.5cm) (Depending on RECPs type) and stapled. H LU 2 2 2 2 7. In high Flow channel applications a staple check slot is recommended at 30 to 40 foot (9 -12m) intervals. Use a double d row of staples staggered 4"(10cm) apart and 4"(10cm) on center over entire width of the channel. Z Z O O O O 8. The terminal end of the RECPs must be anchored with a row of staples/stakes approximately 12" (30cm) apart in a C 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. U 0 0 ~ 0 111 O X U U U 2„-5" ® 2"-5" LU LU w- Z Z w C) Z w Z w .12.5c m) (512.Scm) (512.Scm) (5-12.Scm) orw O a a a a LL 0 0 0 3 3 o (0.9m) (0.9m) w w w w 66' (1.8m) (1.8m 3.3' 3.3' N N (Im) 1.6' (11n) CD N CD N CD N CD N CD N (O.Sm) � O O O N 3.3' o 0 O (1 m) Z=m6 Q m U o W STAPLE =mi PATTERNS SITE EROSION 0.7 Staples per SQ.YD. 1.15 Staples per SQ.YD. ® III -III -III -III -III -III -III -III -III -III -III -III -III -III -III -III CRITICAL POINTS NOTES: 2„-5" © 2"-5" 2"-5" A. Overlaps and Seams *Horizontal staple spacing should be (5-12.5cm) (5-12.5cm) (5-12.5cm) B. Projected Water Line altered if necessary to allow staples to 2' 2' C. Channel Bottom/Side Slope Vertices secure the critical points along the channel 4' (0.6m) 4' (0.6m) 4' A A surface. (1.2m) (1.2m) (1.2m) B $ 1.6 20"(0.5m) C C '"In loose soil conditions, the use of staple (O.Sm) or stake lengths greater than 6"(15cm) mayif O be necessary to properly secure the 3.3' 3.3' - Drawing Not To Scale RECP's. • ():) I O O (ImO) I NORTH Disclaimer: AMERICAN The information presented herein is general design information only. For specific applications, GREEN' consult an independent professional for further design guidance. 401 St. Wendel - Cynthiana Rd. PH: 800-722-2040 'oseyville, IN 47633 www.nagreen.com Drawn on: 5-4-17 1.7 Staples per SQ.YD. O O O 3.4 Staples per SQ.YD. 0 2„-5„ ,—, , , (5-12.5cm) 2' 10" (0.6m) (25cm) 0-1-6 20"(0.5m) O O O O t10"(25cm) OO 3.3' O O O(lm)O 3.75 Staples per SQ.YD. CONTROL AND UTILITY DETAILS SHEET C7.3