Loading...
HomeMy WebLinkAboutNCC222004_Site Plan or Location Map_20220527Issued for Date Issued Latest Issue Construction Drawing Review October 1, 2021 April 28, 2022 IN No. Drawing Title Latest Issue No. Drawing Title Latest Issue CO.0 1 Legend and General Notes 2/4/2022 ALTA/NSPS Land Title Survey September 23, 2021 C1.01 Demolition Plan 4/6/2022 21-0315A Site Lighting Plan January 13, 2022 C2.01 Site Layout Plan 2/4/2022 A1.1 Floor Plan February 4, 2022 C3.01 Grading and Drainage Plan 2/4/2022 A1.2 Roof Plan February 4, 2022 C3.02 Erosion and Sediment Control Plan 4/28/2022 A2.1 Exterior Elevations February 4, 2022 C4.01 Utility Plan 2/4/2022 A3.1 Building Sections February 4, 2022 C 5.01 - 5.04 Site Details 2/4/2022 C6.01 Fire Truck Access Plan 2/4/2022 1-1.01 Existing Tree Survey 2/4/2022 1-1.02 Tree Protection Plan 2/25/2022 1-1.03 Planting Plan 2/4/2022 1-1.04-1.05 Planting Notes and Details 2/4/2022 000 000 0 0 VHB Engineering NC, P.C. 940 Main Campus Drive Suite 500 Raleigh, NC 27606 919.829.0328 Corp. # C-3705 rc i ec Philips Architecture PA 6601 Six Forks Road Suite 130 Raleigh, NC 27615 919.878.1660 Contractor Partners in Construction, L.L.0 1510 Columbus Avenue Portsmouth, VA 23704 757.533.9492 CARO///, SEAL 047468 -I�G I N'�-'� 0/ 4/28/22 r\J 00 0 0 0 C) rn 0) 0 rn U .60 " 4— Q_-0 Town of Cary Water Permit Number: WP2200007 Town of Morrisville Project Number: COMBO-21-0023 > 1A