HomeMy WebLinkAboutNCC222004_Site Plan or Location Map_20220527Issued for
Date Issued
Latest Issue
Construction Drawing Review
October 1, 2021
April 28, 2022
IN
No.
Drawing Title
Latest Issue
No.
Drawing Title
Latest Issue
CO.0 1
Legend and General Notes
2/4/2022
ALTA/NSPS Land Title Survey
September 23, 2021
C1.01
Demolition Plan
4/6/2022
21-0315A
Site Lighting Plan
January 13, 2022
C2.01
Site Layout Plan
2/4/2022
A1.1
Floor Plan
February 4, 2022
C3.01
Grading and Drainage Plan
2/4/2022
A1.2
Roof Plan
February 4, 2022
C3.02
Erosion and Sediment Control Plan
4/28/2022
A2.1
Exterior Elevations
February 4, 2022
C4.01
Utility Plan
2/4/2022
A3.1
Building Sections
February 4, 2022
C 5.01 - 5.04
Site Details
2/4/2022
C6.01
Fire Truck Access Plan
2/4/2022
1-1.01
Existing Tree Survey
2/4/2022
1-1.02
Tree Protection Plan
2/25/2022
1-1.03
Planting Plan
2/4/2022
1-1.04-1.05
Planting Notes and Details
2/4/2022
000
000
0
0
VHB Engineering NC, P.C.
940 Main Campus Drive
Suite 500
Raleigh, NC 27606
919.829.0328
Corp. # C-3705
rc i ec
Philips Architecture PA
6601 Six Forks Road
Suite 130
Raleigh, NC 27615
919.878.1660
Contractor
Partners in Construction, L.L.0
1510 Columbus Avenue
Portsmouth, VA 23704
757.533.9492
CARO///,
SEAL
047468
-I�G I N'�-'�
0/
4/28/22
r\J
00
0
0
0
C)
rn
0) 0
rn U
.60
" 4—
Q_-0
Town of Cary Water Permit Number:
WP2200007
Town of Morrisville Project Number:
COMBO-21-0023
> 1A