Loading...
HomeMy WebLinkAboutSW4220502_Supplement-EZ Form_20220514SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 1 Project Name Snow Camp Solar, LLC 2 Project Area (ac) 25.33 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? Low F Does this Droiect use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 15 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SC 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 lFilterra FORMS LOADED DESIGNER WTIFICATION 27 Name and Title: Mario T. Carreon, Civil Engineering Manager 28 Organization: Cypress Creek Renewables, LLC 29 Street address: 5310 S. Alston Ave Bldg 300 30 City, State, Zip: Durham, NC 27713 31 Phone number(s): (916) 802-6470 32 Email: mario.carreon@ccrenew.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ttt\Itlll/t�, �' �O�'oF "ss oti���9 SEAL 045182 0 r CAµ`��,, �"rr ttt -P,&Z, Signature of Designer _ z��zozz D— DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? I No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 4 Type of SCM DIS DIS 5 Total drainage area (sq ft) 1103375 6 Onsite drainage area (sq ft) 1103375 7 Offsite drainage area (sq ft) 0 8 Total BUA in project (sq ft) 48783 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 10 New BUA not on subdivided lots (subject to permitting) (so Offsite BUA (sq ft) 11 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 43758 sf 5025 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 4.42% 19 Design storm (inches) N/A 20 Design volume of SCM (cu ft) N/A 21 Calculation method for design volume N/A ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Inverter pads and steel piles supporting the fixed tilt solar PV system. LOW DENSITY UIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 oject below density thresholds set forth in the applicable stormwater rule? Yes r s project maximize dispersed flow and minimize channelization of flow? Yes the use of piping been minimized per.1003(2)(c)? Yes slopes of the vegetated conveyances (H:V) N/A 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (%) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Are variations to rule .1003 proposed? No 14 No ADDITIONAL 15 INFORMATION 1 Please use this space to provide any additional information about this low density project: Solar farm construction was completed in 2016 and all project disturbed areas are vegetated. There are no permanent SCMs for the project - all flow is considered dispersed sheet flow. Swale Drainage BUA Pervious Q Slope Vallow Vactual Flow depth # Are (ac) area C (cfs) (%) (fps) (fps) (ft) (ac1 25.33 1.12 24.21 0.40 2 3 4 5