Loading...
HomeMy WebLinkAboutNCC213197_MODIFICATION Supporting Documents_20220510Georgoulias, Bethany From: Clyde Lambert <CLambert@gokeystone.com> Sent: Thursday, May 12, 2022 10:16 AM To: Georgoulias, Bethany Cc: Scott Wallace Subject: [External] FW: Approval Email for Sullivan Reserve Phase 1 & 2 (EN2100049) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Please see below the approval email for Sullivans Reserve Phase 1 and 2. Thank you, Clyde Lambert From: Matthew Osborne <matthewo@cityofws.org> Sent: Thursday, May 12, 2022 10:03 AM To: Clyde Lambert <CLambert@gokeystone.com> Cc: David Evans <davide@cityofws.org> Subject: Approval Email for Sullivan Reserve Phase 1 & 2 (EN2100049) Clyde, Below is the approval email for the revisions to the Erosion Control Plan for this project. Use this email when submitting for the modification to existing NCGOl COC # NCC213197 for the project at the following link: https:Hedocs.deq.nc.gov/Forms/NCGOI-Modification Number of Recipients: Sent: Sent by: To: Cc: Bee: 05/04/2022 3:42:43 PM Matthew Osborne johnb cpten ing eering com Subject: Review Completed - Sullivans Reserve Phase I & 2 Attachments: Application Type: 04.02) Grading/Erosion Control Permit Workflow: 04.02) Grading & Erosion Control Project: Sullivans Reserve Phase 1 & 2 A/P #: EN2100049 Acreage to be Disturbed: 35.54 https://winston-salem.idtplans.com/secure/project/?projectid=519664 Hello Keystone Homes, Inc., Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been completed. The design is adequate to meet the ordinance standards and the plans have been approved. If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership (FRO) form as applicable. This document is required prior to the issuance of the Grading/Erosion Control Permit. If this has already been provided, then please disregard this statement. Reminder that a completed FRO form is not required in the instance where a project qualifies to use the BB 489 Sketch Erosion Control Plan document. If this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the NCGO1 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website (https:Hedocs.deci.nc.eov/Forms/NCGOI-NOI). Once coverage is obtained please upload a copy to the project documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO1 is provided. As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of Clemmons, Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control Plan. No person shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the Erosion Control Division while that person is inspecting or attempting to inspect a land disturbing activity under the ordinance. Should you have any questions as you move forward please feel free to contact Matthew Osborne at 336-462-7480 or matthewo(a.citvofws.ora. Let me know if you need anything additional from Erosion Control staff at this time. Matthew Osborne, CFM, CPESC Erosion Control/Floodplain Program Manager City Of Winston-Salem Field Operations Department Erosion Control Division PO Box 2511 (Mailing) 100 E. First Street, Suite 328 (Physical) Winston-Salem, NC 27101 Office: 336-747-7453 Mobile: 336-462-7480 Fax: 336-727-2792 Electronic Plan Review Application Portal: https://winston-salem.idtplans.com/secure/ Electronic Plan Review Application Instructions: https://winston-salem.idtplans.com/secure/training/manual/ NOTICE: Beginning May 1, 2018, all Grading/Erosion Control, Floodplain Development, and Watershed Protection Permit Submittals MUST be submitted electronically. City of Winston-Salem ONE TEAM Committed to Excellence All a -mails including attachments sent to and from this address are subject to being released to the media and the public in accordance with the North Carolina Public Records Law. EC1 SEAL C 14984 H ENGI SEFO E NARAO LI REEN LA N OISNROP AHC T R R BURTL S P YJR.,. EC2 EROSION CONTROL DRAINAGE AREA MAP TS PS SEAL C 14984 H ENGI SEFO E NARAO LI REEN LAN OISNROP AHC T R R BURT L S P YJR.,. NEW DISTURBED AREA 12.13 ACRES NOTE: ADDITIONAL REVISED PLAN SUBMITTALS WILL BE REQUIRED PRIOR TO MOVING TO ADDITIONAL WORK IN PHASE 2 THAT IS OUTSIDE THE DISTURBED LIMITS SHOWN ON THIS PLAN. EC3 SUPPLEMENTAL EROSION CONTROL PLAN SEAL C 14984 H ENGI SEFO E NARAO LI REEN LAN OISNROP AHC T R R BURT L S P YJR.,. TS PS NOTE: ADDITIONAL REVISED PLAN SUBMITTALS WILL BE REQUIRED PRIOR TO MOVING TO ADDITIONAL WORK IN PHASE 2 THAT IS OUTSIDE THE DISTURBED LIMITS SHOWN ON THIS PLAN. EC4 SEAL C 14984 H ENGI SEFO E NARAO LI REEN LAN OISNROP AHC T RR BURT L S P YJR.,. SUPPLEMENTAL EROSION CONTROL PLAN TS PS NOTE: ADDITIONAL REVISED PLAN SUBMITTALS WILL BE REQUIRED PRIOR TO MOVING TO ADDITIONAL WORK IN PHASE 2 THAT IS OUTSIDE THE DISTURBED LIMITS SHOWN ON THIS PLAN. SEAL C 14984 H ENG I SEFO E NARAO LI REEN LA N OISNROP AHC T R R BURTL S P YJR.,. SEAL C 14984 H ENGI SEFO E NARAO LI REEN LA N OISNROP AHC T R R BURTL S P YJR.,. SEAL C 14984 H ENGI SEFO E NARAO LI REEN LA N OISNROP AHC T R R BURT L S P YJR.,. NCG01 GROUND STABILIZATION AND MATERIALS HANDLINGEFFECTIVE: 04/01/19GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITHTHE NCG01 CONSTRUCTION GENERAL PERMITImplementing the details and specifications on this plan sheet will result in the constructionactivity being considered compliant with the Ground Stabilization and Materials Handlingsections of the NCG01 Construction General Permit (Sections E and F, respectively). Thepermittee shall comply with the Erosion and Sediment Control plan approved by thedelegated authority having jurisdiction. All details and specifications shown on this sheetmay not apply depending on site conditions and the delegated authority having jurisdiction.GROUND STABILIZATION SPECIFICATIONStabilize the ground sufficiently so that rain will not dislodge the soil. Use one of thetechniques in the table below:POLYACRYLAMIDES (PAMS) AND FLOCCULANTS1.Select flocculants that are appropriate for the soils being exposed duringconstruction, selecting from the NC DWR List of Approved PAMS/Flocculants.2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.3.Apply flocculants at the concentrations specified in the NC DWR List of ApprovedPAMS/Flocculants and in accordance with the manufacturer's instructions.4.Provide ponding area for containment of treated Stormwater before dischargingoffsite.5.Store flocculants in leak-proof containers that are kept under storm-resistant coveror surrounded by secondary containment structures.HAZARDOUS AND TOXIC WASTE1.Create designated hazardous waste collection areas on-site.2.Place hazardous waste containers under cover or in secondary containment.3.Do not store hazardous chemicals, drums or bagged materials directly on the ground.EQUIPMENT AND VEHICLE MAINTENANCE1.Maintain vehicles and equipment to prevent discharge of fluids.2.Provide drip pans under any stored equipment.3.Identify leaks and repair as soon as feasible, or remove leaking equipment from theproject.4.Collect all spent fluids, store in separate containers and properly dispose ashazardous waste (recycle when possible).5.Remove leaking vehicles and construction equipment from service until the problemhas been corrected.6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum productsto a recycling or disposal center that handles these materials.LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE1.Never bury or burn waste. Place litter and debris in approved waste containers.2.Provide a sufficient number and size of waste containers (e.g dumpster, trashreceptacle) on site to contain construction and domestic wastes.3.Locate waste containers at least 50 feet away from storm drain inlets and surfacewaters unless no other alternatives are reasonably available.4.Locate waste containers on areas that do not receive substantial amounts of runofffrom upland areas and does not drain directly to a storm drain, stream or wetland.5.Cover waste containers at the end of each workday and before storm events orprovide secondary containment. Repair or replace damaged waste containers.6.Anchor all lightweight items in waste containers during times of high winds.7.Empty waste containers as needed to prevent overflow. Clean up immediately ifcontainers overflow.8.Dispose waste off-site at an approved disposal facility.9.On business days, clean up and dispose of waste in designated waste containers.PAINT AND OTHER LIQUID WASTE1.Do not dump paint and other liquid waste into storm drains, streams or wetlands.2.Locate paint washouts at least 50 feet away from storm drain inlets and surfacewaters unless no other alternatives are reasonably available.3.Contain liquid wastes in a controlled area.4.Containment must be labeled, sized and placed appropriately for the needs of site.5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes fromconstruction sites.PORTABLE TOILETS1.Install portable toilets on level ground, at least 50 feet away from storm drains,streams or wetlands unless there is no alternative reasonably available. If 50 footoffset is not attainable, provide relocation of portable toilet behind silt fence or placeon a gravel pad and surround with sand bags.2.Provide staking or anchoring of portable toilets during periods of high winds or in highfoot traffic areas.3.Monitor portable toilets for leaking and properly dispose of any leaked material.Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replacewith properly operating unit.HERBICIDES, PESTICIDES AND RODENTICIDES1.Store and apply herbicides, pesticides and rodenticides in accordance with labelrestrictions.2.Store herbicides, pesticides and rodenticides in their original containers with thelabel, which lists directions for use, ingredients and first aid steps in case ofaccidental poisoning.3.Do not store herbicides, pesticides and rodenticides in areas where flooding ispossible or where they may spill or leak into wells, stormwater drains, ground wateror surface water. If a spill occurs, clean area immediately.4.Do not stockpile these materials onsite.CONCRETE WASHOUTS1.Do not discharge concrete or cement slurry from the site.2.Dispose of, or recycle settled, hardened concrete residue in accordance with localand state solid waste regulations and at an approved facility.3.Manage washout from mortar mixers in accordance with the above item and inaddition place the mixer and associated materials on impervious barrier and withinlot perimeter silt fence.4.Install temporary concrete washouts per local requirements, where applicable. If analternate method or product is to be used, contact your approval authority forreview and approval. If local standard details are not available, use one of the twotypes of temporary concrete washouts provided on this detail.5.Do not use concrete washouts for dewatering or storing defective curb or sidewalksections. Stormwater accumulated within the washout may not be pumped into ordischarged to the storm drain system or receiving surface waters. Liquid waste mustbe pumped out and removed from project.6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless itcan be shown that no other alternatives are reasonably available. At a minimum,install protection of storm drain inlet(s) closest to the washout which could receivespills or overflow.7.Locate washouts in an easily accessible area, on level ground and install a stoneentrance pad in front of the washout. Additional controls may be required by theapproving authority.8.Install at least one sign directing concrete trucks to the washout within the projectlimits. Post signage on the washout itself to identify this location.9.Remove leavings from the washout when at approximately 75% capacity to limitoverflow events. Replace the tarp, sand bags or other temporary structuralcomponents when no longer functional. When utilizing alternative or proprietaryproducts, follow manufacturer's instructions.10.At the completion of the concrete work, remove remaining leavings and dispose ofin an approved disposal facility. Fill pit, if applicable, and stabilize any disturbancecaused by removal of washout.EARTHEN STOCKPILE MANAGEMENT1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least50 feet away from storm drain inlets, sediment basins, perimeter sediment controlsand surface waters unless it can be shown no other alternatives are reasonablyavailable.2.Protect stockpile with silt fence installed along toe of slope with a minimum offset offive feet from the toe of stockpile.3.Provide stable stone access point when feasible.4.Stabilize stockpile within the timeframes provided on this sheet and in accordancewith the approved plan and any additional requirements. Soil stabilization is definedas vegetative, physical or chemical coverage techniques that will restrain acceleratederosion on disturbed soils for temporary or permanent control needs.SECTION E: GROUND STABILIZATIONRequired Ground Stabilization TimeframesNote: After the permanent cessation of construction activities, any areas with temporaryground stabilization shall be converted to permanent ground stabilization as soon aspracticable but in no case longer than 90 calendar days after the last land disturbingactivity. Temporary ground stabilization shall be maintained in a manner to render thesurface stable against accelerated erosion until permanent ground stabilization is achieved.Site Area DescriptionTimeframe variations-7 days for perimeter dikes, swales,ditches, perimeter slopes and HQW Zones-10 days for Falls Lake Watershed unlessthere is zero slopeStabilize within thismany calendardays after ceasingland disturbance77714NoneNone(a)Perimeter dikes,swales, ditches, andperimeter slopes(b)High Quality Water(HQW) Zones(c)Slopes steeper than3:1If slopes are 10' or less in length and arenot steeper than 2:1, 14 days areallowed(d)Slopes 3:1 to 4:1(e)Areas with slopesflatter than 4:114-7 days for slopes greater than 50' inlength and with slopes steeper than 4:1-7 days for perimeter dikes, swales,ditches, perimeter slopes and HQWZones-10 days for Falls Lake Watershed PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDCs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-N01 and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a . Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill cr release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendardays, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. I NORTH CAROLINA 5-1 Environmental Quality I NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING � EFFECTIVE: 04/01/19 1