Loading...
HomeMy WebLinkAboutNCC221574_Site Plan or Location Map_20220504GI FI CI wall W"r 12 11 10 9 8 7 6 5 4 3 2 1 TECHNICAL REVIEW COMMITTEE (TRC) COVER SHEET (Revised July 1, 2020) City of Greensboro Mailing Address: PO Box 3136, Greensboro NC 27402-3136 Office Address: 300 W Washington Street, Room UG-10 Greensboro NC Questions? Please contact Rachel McCook at Rachel. McCook©greensboro-nc.gov or 336- 373- 7784 PLAN TYPE: REVIEW FEE: Site Plan Nonresidential $1400+$20 per 1000 sf gross floor area Site Plan Multifamily $1400+$25 per unit Preliminary Subdivision $1400+$40 per lot Revisions to Approved Plan $260+the per lot, square footage or unit fee applied to any increase "Site Specific Development Plan Approval to Obtain a Zoning Vested Right": Applicable review fee above + $1140 if site is < 1 acre; + $1335 if acre to > 5 acres; or $1525 if 5 acres or more. Landscape/Tree Conservation fees are payable prior to scheduling for TRC action. Landscape Plan if submitted separately: $40 Tree/Land Disturbance Permit: $40 Tree Protection/Landscaping Inspection or Reinspection: $70 each Please go to https://secure.greensboro-nc.Vov/planupload/ to submit a plan for review. Review turn -around target is 10 working days, for each cycle. Please use Design Review Checklist to ensure your plan is complete: http: //www.greensboro-nc.gov/home/showdocumen t.aspx?documentid=7661 Project Summary (Completed by Design Agent): A. Site Street Addresses (All) 7703 AIRPORT CENTER DR, GREENSBORO, NC 27102 B. Project Name: C . Project Description: TRUIST LEADERSHIP 2.0 PHASE 1 HOTEL AND CONFERENCE ADDITION D. Type(s) of Plan: Site Plan ^ Group Development Plan TRC Lite: Preliminary Subdivision Site Specific Plan(Zoning Vested Right) E. Owner/Applicant TRUIST Email kurt.ostrander@cbre.com Phone 952-607-6081 F. Design Agent Ken Binkley, Stimmel Associates, P.A. Email Kbinkley@stimmelpa.com Phone 336-723-1067 G. Also Report Comments to Robert Ross, Stimmel Associates, P.A. Email Rross@stimmelpa.com Phone H . Tract Acres 44.51 I Zoning District: BP J . Zoning Overlay N/A K. Watershed: GREENSBORO WS III L. Current Use: HOTEL AND CONFERENCE CENTER M. Proposed Use: HOTEL AND CONFERENCE CENTER N. Parking Required: 75 Spaces Proposed: 68 Spaces 0. # of Lots Now: 1 Proposed: P. Multifamily Development:N/A # of Units Totak By type: Apartments N/A Townhomes N/A Condominiums Q. Open Space (Reel Projects) Required`- N/A Proposed: N/A R . Non -Reel Gross Floor Area (GFA), by of: Existing 0 SQ. FT. -To Be Demolished N/A +Propose. 86,093 SF - tj_n, GFA 86,093 SF S. Buift-Upon Area (BUA), by sf/ac and X of lot: 22.98 AC (51.63%) 0.72 AC (1.62%) Existing -To Be Demolished +Proposed 2.20 AC (4.94%) = Total Resulting BUA 24.46 AC (54.95%) T. Will building(s) be sprnked? Yes X No 4 U . Building occupancy code under the Building Code: Stormwater Management/Watershed Information: Stormwater Control/Improvements(s): 2 BIO-CELLS, ADS BAYFILTERAND ADS UNDERGROUND DETENTION. Maximum Amount of BUA Allowed Per Stormwater Control Design: SEE ALLOCATION CHART Distance to Nearest Floodway: ONSITE CkB - HSG Rating "A` On -site soil types(s): CIB2, HdA, PoC, POD, PoE, PpB2, PpC2, PpD2, PpE2, ToB - HSG Rating "B" Hydrology groups(s): A, B -1 ­% r Amount of site to be disturbed: 4.62±ACRES 00 Check as Appropriate: LANDSCAPE, TREE CONSERVATION APPROVAL AND INSPECTION; To request an Inspection or a pre -construction meeting contact the City Arborist at 336-373-2150 A LANDSCAPE PLAN (which depicts the plant types and locations) must be submitted to the Planning Department for review and approval WITHIN 90 DAYS OF RECEIVING A BUILDING PERMIT. The Landscape Plan must be approved before installation of plant material. The required LANDSCAPE PLANT MATERIAL must be installed and inspected PRIOR to receiving a Certificate of Occupancy. The required TREE PROTECTION FENCING must be installed and inspected PRIOR to land disturbance. The required TREE CONSERVATION & REFORESTATION AREAS(s) must be inspected PRIOR to receiving a Certificate of Occupancy. WATERSHED APPROVAL AND INSPECTION (Questions? Contact Water Resources Engineering at 336-373-2055) A FINAL PLAT dedicating the DMUE and access easements must be recorded PRIOR to receiving a Certificate of Occupancy. Construction of the WATER QUALITY DEVICE (2 Biocells, ADS BoyFilter AND ADS UNDERGROUND DETENTION) must be complete and the "Engineer's Certification of Completion" sent to the Water Resources Department PRIOR to receiving a Certificate of Occupancy. Any sediment that enters the Pond during the construction must be removed PRIOR to issuance of a Certification of Occupancy. FLOODPLAIN APPROVAL (Questions? Contact Water Resources Engineering at 336-373-2055) V Elevation Certification Required Floodplain Development Permit Required AIRPORT AIR OPERATION AREA ALTERNATIVE STORMWATER CONTROL: (Questions? Contact Water Resources Engineering at 336-373-2055) 400 This development is within 5 statute miles of Piedmont Triad International Airport air operation area. For such projects, according to Session Law 2012-200, the NCDEQ North Carolina Best Management Practice Manual provides acceptable alternative Stormwater control measures other than wet ponds or those that promote standing water. The design engineer has reviewed these alternatives. SOIL EROSION CONTROL: (Questions? Contact Erosion Control Officer at 336-373-2030) _+ Watershed Pond Construction or Surety/ Improvement Guarantee Required WATER RESOURCES CONSTRUCTION APPROVAL: (Questions? Contact Water Resources Engineering at 336-373-2055) *Permit application fees required before construction plans are released. Water System* State Water Permit Required Outside City - Utility Agreement and Annexation Petition Required Sanitary Sewer System* State Water Sewer System Permit Required Outside City - Utility Agreement and Annexation Petition Required ENGINEERING CONSTRUCTION APPROVAL: (Questions? Contact Development Services/Engineering at 336-373-2052) *Engineering Inspection Fees required before construction plans are released. Utility Construction Plan Approval Required* Pavement Cut Permit May be Required* Roadway Construction Plans Required* Storm Sewer System - Permit Required to tie into Storm Sewer System - Driveway Culvert Inspection Required TRANSPORTATION APPROVAL: (Questions? Contact GDOT at 336-373-GDOT) Driveway permit issued? Number *Do Not Issue Building Permit until any required Driveway Permit has been issued. X City of Greensboro Driveway Permit Required N.C. Department of Transportation Driveway Permit Required SUBDIVISION APPROVAL A Final Plat Must Be Recorded Prior to TRC Approval of this Submittal or Prior to Issuance of e Building Permit (PB: Pg. ) 12 11 10 9 7 City of Greensboro Water Resources Department COLLECTION SYSTEM EXTENSION PERMIT APPROVAL Project Origin: City Private Type of Project: City Owned Privately Owned Portions Public and Privately Owned Per Article 21 of Chapter 143 of the North Carolina General Statues, as Amended, and Other Laws, Rules and Regulations, Permission is hereby granted by the City of Greensboro, a delegated permitting authority approved by the North Carolina Environmental Management Commission, for the construction and operation of the collection system depicted on these plans and throughout the permitting process. City of Greensboro and its staff are not responsible for errors in designs, calculations, drawings or statements, or finding and correcting any errors or deficiencies submitted by applicants or their consultants, and disclaim any liability for errors, in accordance with North Carolina General Statute 130A-26.2. Any person who knowingly makes any false statement, representation, or certification in any application or design documents shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 per violation. Permittee shall be responsible for adherence to all conditions of the City of Greensboro Water Resources Department as Checked. Wastewater Collection System Extension Master Permit (Public) Individual Wastewater Collection System Extension Permit (Private) Any significant changes (size, type, connections, length, alignment, etc) to that approved on the these plans or permitting documents shall be reviewed and approved by the City of Greensboro prior to Construction. Approved by: COG Permit # WRCS00: ;City of Greensboro Approval Date: Completion of this Statement is required with submittal of Engineering r Construction Drawings FINANCIAL RESPONSIBILITY ACKNOWLEDGMENT (Engineering Construction) TRUIST LEADERSHIP 2.0 is to a provide one-year warrant r P Y to guarantee the public improvement from failure due to faulty workmanshipy( or materials. Once the project is complete, this individual or corporation will be required to sign a notarized agreement. Upon completion and return of this agreement, they will receive a final acceptance letter and the year warranty will begin. The City of Greensboro will not release bonds or accept public infrastructure for maintenance without a final inspection. Signature of Financial Re onsibility (Individual or Corporation) Address:. BO0(�CJ-W�L Telephone: , : 04 - 15+1 ipi J�j WATER L.F. X $1.50 = $ SEWER L.F. X $1.50 = $ ROADWAY L.F. X $1.50 = $ TOTAL = $ ❑ ROADWAY TO BE PRIVATELY INSPECTED DATE FEES RECEIVED BY CITY OF GREENSBORO Revision to Plan in Process: Revision Summary Revision Date Revised by Revision to Approved Plan (Tracking #) Revision Summary Revision Date Approved by/Date 5 0 Nbnity n rth to o o Q SITE o is Q u CORNFRSTONF 4t*v 6 O I 67 off (Construction Plans Review Stamps) �l1 ��-�����wv�r����� a ` BUILT UPON AREA (BUA) ALLOCATION CHART EXISTING BUA EXISTING BUA PROPOSED TOTAL BUA NET NEW SITE (ACRES) REMOVED (ACRES) BUA (ACRES) (ACRES) BUA (ACRES) TRUIST 22.98 (51.63%) 0.72 (1.62%) 2.20 (4.94%) 24.46 (54.95%) 1.48 (3.33%) CITY OF GREENSBORO REQUIREMENTS FOR ISSUANCE OF "FINAL CO" 1. SUBMIT A COPY OF RECORDED OPERATION & MAINTENANCE AGREEMENT. "AGREEMENT MUST REFERENCE OPERATION & MAINTENANCE PLAN FOR SCM" 2. SUBMIT COPY OF RECORDED EASEMENT PLAT. "PLAT MUST REFERENCE OPERATION & MAINTENANCE PLAN FOR SCM" 3. SUBMIT SIGNED & SEALED ENGINEERS CERTIFICATION 4. SUBMIT SURVEYED "AS -BUILT" OF SCM. 5. FINAL INSPECTION TO BE PERFORMED BY CITY OF GREENSBORO WATER RESOURCES DEPARTMENT. A SCM BUILT UPON AREA (BUA) ALLOCATION CHART ONSITE OFFSITE TOTAL ONSITE OFFSITE TOTAL MAX BUA SYSTEM DRAINGE DRAINAGE DRAINAGE BUA BUA BUA ALLOWED (ACRES) (ACRES) (ACRES) (ACRES) (ACRES) (ACRES) (ACRES) B I O 1 1.39 0.00 1.39 0.59 0.00 0.59 0.59 (1.33%) (1.33%) BIO 2 1.23 0.00 1.23 0.60 0.00 0.60 0.60 (1.35/0) (1.35/0) ADS 0.64 0.00 0.64 0.56 0.00 0.560.56 (1.26%) (1.26%) TOTAL 3.26 0.00 3.26 1.75 0.00 1.75 1.75 (3.93%) (3.93%) This Watershed Plan and /o r Site Plan, Preiminary Subdivision, Group Development w a s APPROVED b y t h e Technical Review Committee on TRC approval represents the maximum possible development of the site. Other opprovds (including Construction Ptians Review) could reduce the amount of development possible on this site. Conformance with this Approved Plan is your responsibility. Any change in land use, lot lines, building location, parking, drives, utility lines, landscaping, etc. must be resubmitted for review and approval PRIOR to such change being made. Per Land Development Ordinance Sections 30-4-15.8 and 3 0 - 4 -17.5 , in general this Approval expires in 2 years. Site Plans: Approval also expires if construction or development activity is begun and then discontinued for a period greater than 180 days. Preliminary Subdivision: Approval also expires if a final plat is not recorded within 2 years, or if there is a lapse of more than 2 years between the recordings of phases or section. This Approval covers site design only. Separate application, review, approval and/or permits are required for signs, construction plans, building plans, final plats or anything otherthan site design. �)���'FA�.'ta�� �'t�' 1"!E� (--A& 2/0 (Cl�k of the TRC) (bate) (Tracking #*� *Agent: Add Case # Prior to Resubmittal (Clerk of the TRC) 3 (Date of Approval of Minor Revision or Re-approvai) ARCHITECTURE 119 Brookstown Ave. Suite 100 Winston-Salem NC 27101 p 336-724-1503 www.cjmw.com LANDSCAPE ARCHITECTURE CIVIL ENGINEERING LAND PLANNING 601 N. TRADE STREET, SUITE 200 stimmel WINSTON-SALEM, NC 27101 www.stimmelpa.com 336.723.1067 F CONSTRUCTION DOCUMENTS Version Issue Name Date E 00 CONSTRUCTION DOCUMENTS 11/15/21 01 ADDENDUM # 1 12/13/21 02 ADDENDUM # 3; TRC ROUND 1 12/22121 03 ADDENDUM # 4; TRC ROUND 2 02/10/22 04 ADDENDUM # 5; TRC ROUND 3 03/10/22 Truist Financial Corporation 214 N Tyron Street Charlotte, North Carolina, 28202 Truist Leadership Institute 2.0 7703 Airport Center Drive Greensboro, NC Copyright 2021 CJMW Architecture, P.A. sheet TRC COVER SHEET date: NOVEMBER 15, 2021 commission: 19.0370 STIMMEL PROJECT NO. 19-329 drawn by: RBR KAB SUBMITTED FOR CITY OF GREENSBORO TRC APPROVAL 2 1 A