Loading...
HomeMy WebLinkAboutSW6211204_Plansheet S-4 - Grading_Drainage Plan_202202160001- WETLANDS DELINEATED BY "STRAW W NET" "JUTE NET" TEMP. "SYNTH MAT" ADAMS SOIL CONSULTING TEMP. SWALE SWALE LINER AS TEMP. SWALE LINER AS SHOWN SHOWN LINER AS SHOWN 1676 MITCHELL ROAD ANGIER, NC 27501 919-414-6761 ALEX ADAMS, SOIL SCIENTIST 2`'2� 1 3 3 3 3 3 SEED PER SEED PER SEED PER PROJECT PROJECT PROJECT SPECS SPECS SPECS PERMANENT SWALE "A" PERMANENT SWALE "B" PERMANENT SWALE "C" LK-SI LN.T.S1NTS ROADSIDE DITCH CALCULATION TABLE \ - - - TEMPORARY SI M€R-BASM* - #3-*4BAFfTES \ / -'TOTAL.BRA NAGE ARET=0.6AC/ J 1-5CFS ' OS t�y / jtOL-REQ_D=1,8QQCF�AC:(�AC1 080CF i 0-) --TOP-40 �P W=M', D� �.a2F i8�F ' 0 4SIDFcSL�PEss 7�AY STABILIZATI� TIM FRAME TV-) FAet AREA PROVIDED=800SF / - O ;\ \\�� j -'� VOVPROVIDED_1,163(jF i / o 9 /SKIMMER SIZE: 1.5" SKIWMER QwieE DiAM75F=0.75" / O U) g-n-hAIATE-DAi STREET STA C 125 Tc Q25(CFS) SWALE SLOPE n NORMAL DEPTH VELOCITY SHEAR STRESS SWALE TYPE SHEAR STRESS (IN/HR) (MIN) (%) (FT) (FT/S) REQUIRED (PSF) PROVIDED (PSF) LANE FARMS WAY 0+00 - 1+75(L) 0.5 8.4 5 1.6 1.54 0.03 0.52 2.4 0.50 A 1.45 LANE FARMS WAY 0+00 - 1+75(R) 0.5 8.4 5 0.5 1.54 0.03 0.34 1.7 0.33 A 1.45 LANE FARMS WAY 1+75 - 3+50(L) 0.5 8.4 5 5.4 3.43 0.03 0.71 4.3 1.51 C 2.00 LANE FARMS WAY 1+75 - 3+50(R) 0.5 8.4 5 0.9 3.43 0.03 0.37 2.6 0.79 A 1.45 LANE FARMS WAY 3+50 - 6+00(L) 0.5 8.4 5 1.3 1.20 0.03 0.51 2.0 0.38 B 0.45 LANE FARMS WAY 3+50 - 6+00(R) 0.5 8.4 5 0.5 1.20 0.03 0.36 1.5 0.27 B 0.45 LANE FARMS WAY 6+00 - 8+50(L) 0.5 8.4 5 0.5 1.20 0.03 0.36 1.5 0.27 B 0.45 LANE FARMS WAY 6+00 - 8+50(R) 0.5 8.4 5 0.5 1.20 0.03 0.36 1.5 0.27 B 0.45 LANE FARMS WAY 8+50 - 11+50(L) 0.5 8.4 5 0.5 1.33 0.03 0.35 1.6 0.29 B 0.45 LANE FARMS WAY 8+50 - 11+50(R) 0.5 8.4 5 0.5 I. 0.03 0.35 1.6 0.29 B 0.45 LANE FARMS WAY 11+50 - CDS(L) 0.5 8.4 5 1.3 6.98 0.03 0.37 3.8 1.61 C 2.00 LANE FARMS WAY 11+50 - CDS(R) 0.5 8.4 5 1.3 6.98 0.03 0.37 3.8 1.61 C 2.00 PURSUANT TO G.S. 143-215.1 ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. WATERSHED - WS HQW 12% MAX. IMPERVIOUS 12% X 912,320 SQ.FT. = 109,478 SQ.FT. PAVED AREA - 29,549 SQ.FT. 109,478 - 29,549 = 79,929 SQ.FT. 79,929 / 16 LOTS = 4,995 SQ.FT. IMPERVIOUS AREA PER LOT - 4,995 SQ.F 1 1) Ground Stabilization* r Site Area Stabilization Stabilization Time Description Time Frame Frame Exceptions • Perimeter dikes, swales, ditches 7 days None and slopes • High Quality Water (HQW) 7 days None Zones If slopes are 10' or • Slopes steeper 7 days less in length and are than 3:1 y not steeper than 2: 1, 14 days are allowed. • Slopes 3:1 or 7-days for slopes flatter 14 days greater than 50 feet in length • All other areas None with slopes flatter 14 days (except for than 4:1 perimeters and H W Zones * "Extensions of time may be approved by the permitting authority based on weather or other site -specific conditions that make compliance impracticable." (Section II.B(2)(b)) •;::;; ::;;;;:: � _ - � G TIME. 2.4 DAYS SEE, N6TE ® TSB# _ - /' "STRAW W NET" TEMP. SWALE LINER AS SHOWN \ 11 I I /// -��. �` S _ - - - - / / - TEMPORARY SKIMMER BASIN 1 W BAFFLES \ I Iv// �� _ _ - - / 1 1 D.A. *1.OAC. O ' - - - PERMANENT RIP TRANSITION "Ti TOTAL DRAINAGE AREA=I.9AC. R-GAIDSl DI H - 3 j............ 3 Q25=(0.3)(8.41N/HR)(1.9AC.)=4.8CFS (4' WIDE - 1 FACH-DIRECTION) _ _ _ 4' VOL. REQ'D=1,800CF/AC*(1.OAC)=1,800CF 09 D50=6- - - SEE PER SURFACE AREA REQ'D=325SF/CFS*(4.8CFS)=1,560SF Z �O 1 - DEPTH=18" �' _ J _ _ - - PERMANENT SWALE "D" PROJECT LI N DA L. SEARS TOP L=80', TOP W=20', D=2' Q �� 0 - - - - NTS SPECS D.B. 3 6 6 3 P G . 81 6 (2:1 SIDE SLOPES - 7 DAY STABILIZATION TIME FRAME TYP.) = o _ _ _ - _ - - '1 - - SWALE CALCULATION TABLE SURVOLFACE AREA PROVIDED=1,600SF o-' \\ -�� 39 LOT # C 125 Tc Q25(CFS) SWALE SLOPE n NORMAL DEPTH VELOCITY SHEAR STRESS SWALE TYPE SHEAR STRESS PIN # 0635-07-8809.000 WEIR WIDTHD�D=2,443CF 30 LANDSCAPE �a (IN/HR) (MIN) (%) (FT) (FT/S) REQUIRED (PSF) PROVIDED (PSF) ZONED RA- 20 M SKIMMER SIZE: 1.5" BUFFER & =z j SKIMMER ORIFICE DIAMETER=0.75" _ \_------- / p 595__----- 9 12/15 0.5 8.4 5 8.0 2.7 0.03 0.3 3.3 0.50 D 1.45 DEWATERINGTIME:3.9DAYS EASEMENT 14 2/3 0.5 8.4 5 1.7 1.1 0.03 0.2 1.5 0.14 D 1.45 NOTE: CLEAN BASIN WHEN 50% FULL DURING CONSTRUCTION. WHEN UPSTREAM AREAS ARE ><kD - - - - - -I� 15 8 9 0.5 8.4 5 2.5 5.0 0.03 0.2 3.1 0.62 D 1.45 STABLE AGAINST EROSION AND PERMISSION HAS BEEN OBTAINED FROM NCDEQ, REMOVE TEMP. - _ - _ _ O / BASIN, INSTALL PERMANENT GRADES, AND SEED ALL DISTURBED AREAS PER SEED SPECS. ___--_- ° 1007.99' D0 111�U N 89 10 55 E i 4OO TEMP. SILT/ / \ i'FENCE A9 -TEMPOPRYTOPSOIL -� \ \--------- - ��-------- �� \�/ SHOWN/ ( ) / \TOC_KPILE AREA sVRRObN0-WITH-aT- I - - -_ ' -�1 -3-•� jOUFENCE TLET (KRO/ /C 1-2 I UI I / II II , / I \ 25=4.6f t RESPREAD TOPSOIL SPOIL MATERIAL I I I J O I I I I I \ / *\+ \ \ \ _ - - - - - - - - - - - - - - _ PERMANENT RIP RAP TRANSITION "T� Qfull=7.4cf� / / / / / TO CREATE LANDSCAPE BD,RM MLONG I I 11C ROADSIDE DITCH Vfull=4. s `j - �\ I \ `�' (4' WIDE - 10' EACH DIRECTION) ^ / DO-1. � / / / / / 30' LANDSCAPU- BUFFER. SURROUND I\ D50=6" \ \ c i l :':':'':': I / ZONr =1CLAWITH Sy -PENCE I -,DEEPH=18" \p(-- \ \1 ® 4XD0=6ft / IJ \ USE ROADSIDE DITCHE AS TEMP. \ \ \ I 1 I �D50=3" I / O \ p / - - -BIV€RSI�N BERM TO S IMMER BASINS \ \ \ I I / DEPTH=12" / I / l fEMP.I SILT 406 DURING CO�TRUCRE) - _ \ I / I W1=3XDO=4.5' / I / /FENC AS 10 - 4 ��� 4 4 4 a may- -� -UTILITY EASEIWLRif SMIDIZATION TIME FRAM \ / / / / SHOWN (TYP.) _ E- YRQ \ I w W2=1.25XW "' O I \ \ \ \ O \ 406 ac. ` I 0. c D TRCDr 0 C. I l \ USE ROADSIDE DI S AS TEMPS' 0.1 ac. / �� / _ Ap)\ c \ 0 ac DIVERSION BERM SKIMMER BASINS �� \ DURING CONSTR TION �� c / / \ \ 1 - / \ \ 11 (7 DAY STABI ATION TIME FRAME TYP.) \_ I \\ \\ \ D p��D��D��D�� TRCD TRCD I \ -+ - - - - - D ��` D D \ 5 % --P�MANENT RIP RAP TRAI�SITfON- C' D D �. - \ IN ROADSIDE WIDE IDE1DITEACH DIRECTION \ S L \ UTILI'I`Y� E��EMEPI� /'f / - \ \ - - - L j- /- / - NOr - ___ /b.4a. PEA SPAC / D50=6" � / ll' / / // � / \ \ DEPTH=18" �- \ \ \ \ �� /------ 3 I � \ / / I ® \ \ / 1.3 ac. 1.4 fs / 4\ \ \ / / OU ECTON 2 TEMPO RY IMMER SIN 2 W B FLES \ \ - 1 / / / /I'd DA=O. c �p N \ \ D.A.=0.4 \ \ \ \ ` J I\ Q =0. cfs - h,-L- I I \ TOTAL DR=0 4 C. Q2 cfs � I Z Q25=(0.3) Ni.8. HR (0. AC� 1 OCFS \ \ \ / / / // // // / � oI14 'VOL. REQ'D- OCF C*(0.4� )=720CF / Vfull=4.2fps � / / b SU%FACE AREA Q'D=325SF/ S*(1.00FS)=h5SF DZONE=51 _ -Q ■ TOP\L=30', TOP *,7-20', D=2' \ \ \ \ \ ` f / \ ✓ / / / S 8 ° 2' 1 1 "W CLASS=A _ - - (2:1 SIDE SLOPES �7 DAY STABNZATION TIME XRAME TYP.)\ 2 3 7. 7 7 5.45' I �S1�RFACE A&FA PROVIDE'6=600SF \ \ \ \ - _ - - \ D50=3" V0 . PROVIDE �43CF \ \ \ \ DEPTH=12" _ - - - \ WEIR TH=4' \ \ \ \ \ - / \ - :=.;: _ SKIMMER ZE: 1.5" \ \ "1 STANDARD LEGEND \ / / / // // W1= 1.25XW1 =6.0' (IMMER ORRICE DIAMETI=R=0.50" \ \ \ / / , / / - - \ D \ DRATERING TIME,. 3.5 DAYS` - WV -a 0�_----_ - I -- // / / �� \ SEE NOTE ® TSBi� / 1 / 924.42 001 �O i I I CS I �v 2 0 1 B U C K H 0 R N PARTNERS L LC SEEDING SPECIFICATIONS MAP # 2020 - 366 SEEDBED PREPARATION THOROUGHLY CULTIVATE LAWN AREAS BY DISCING TO A DEPTH OF 6" AND ZONED RA-40 RAKING THE SURFACE SMOOTH TO REQUIRED GRADES. APPLY 4,000 LBS. OF AGRICULTURAL LIME PER ACRE AND 1 000 LBS OF 10-10-10 OR EQUIVALENT PURSUANT TO G.S. 143-215.1 ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. WATERSHED - WS HQW 12% MAX. IMPERVIOUS 12% X 912,320 SQ.FT. = 109,478 SQ.FT. PAVED AREA - 29,549 SQ.FT. 109,478 - 29,549 = 79,929 SQ.FT. 79,929 / 16 LOTS = 4,995 SQ.FT. IMPERVIOUS AREA PER LOT - 4,995 SQ.F 1 1) Ground Stabilization* r Site Area Stabilization Stabilization Time Description Time Frame Frame Exceptions • Perimeter dikes, swales, ditches 7 days None and slopes • High Quality Water (HQW) 7 days None Zones If slopes are 10' or • Slopes steeper 7 days less in length and are than 3:1 y not steeper than 2: 1, 14 days are allowed. • Slopes 3:1 or 7-days for slopes flatter 14 days greater than 50 feet in length • All other areas None with slopes flatter 14 days (except for than 4:1 perimeters and H W Zones * "Extensions of time may be approved by the permitting authority based on weather or other site -specific conditions that make compliance impracticable." (Section II.B(2)(b)) •;::;; ::;;;;:: � _ - � G TIME. 2.4 DAYS SEE, N6TE ® TSB# _ - /' "STRAW W NET" TEMP. SWALE LINER AS SHOWN \ 11 I I /// -��. �` S _ - - - - / / - TEMPORARY SKIMMER BASIN 1 W BAFFLES \ I Iv// �� _ _ - - / 1 1 D.A. *1.OAC. O ' - - - PERMANENT RIP TRANSITION "Ti TOTAL DRAINAGE AREA=I.9AC. R-GAIDSl DI H - 3 j............ 3 Q25=(0.3)(8.41N/HR)(1.9AC.)=4.8CFS (4' WIDE - 1 FACH-DIRECTION) _ _ _ 4' VOL. REQ'D=1,800CF/AC*(1.OAC)=1,800CF 09 D50=6- - - SEE PER SURFACE AREA REQ'D=325SF/CFS*(4.8CFS)=1,560SF Z �O 1 - DEPTH=18" �' _ J _ _ - - PERMANENT SWALE "D" PROJECT LI N DA L. SEARS TOP L=80', TOP W=20', D=2' Q �� 0 - - - - NTS SPECS D.B. 3 6 6 3 P G . 81 6 (2:1 SIDE SLOPES - 7 DAY STABILIZATION TIME FRAME TYP.) = o _ _ _ - _ - - '1 - - SWALE CALCULATION TABLE SURVOLFACE AREA PROVIDED=1,600SF o-' \\ -�� 39 LOT # C 125 Tc Q25(CFS) SWALE SLOPE n NORMAL DEPTH VELOCITY SHEAR STRESS SWALE TYPE SHEAR STRESS PIN # 0635-07-8809.000 WEIR WIDTHD�D=2,443CF 30 LANDSCAPE �a (IN/HR) (MIN) (%) (FT) (FT/S) REQUIRED (PSF) PROVIDED (PSF) ZONED RA- 20 M SKIMMER SIZE: 1.5" BUFFER & =z j SKIMMER ORIFICE DIAMETER=0.75" _ \_------- / p 595__----- 9 12/15 0.5 8.4 5 8.0 2.7 0.03 0.3 3.3 0.50 D 1.45 DEWATERINGTIME:3.9DAYS EASEMENT 14 2/3 0.5 8.4 5 1.7 1.1 0.03 0.2 1.5 0.14 D 1.45 NOTE: CLEAN BASIN WHEN 50% FULL DURING CONSTRUCTION. WHEN UPSTREAM AREAS ARE ><kD - - - - - -I� 15 8 9 0.5 8.4 5 2.5 5.0 0.03 0.2 3.1 0.62 D 1.45 STABLE AGAINST EROSION AND PERMISSION HAS BEEN OBTAINED FROM NCDEQ, REMOVE TEMP. - _ - _ _ O / BASIN, INSTALL PERMANENT GRADES, AND SEED ALL DISTURBED AREAS PER SEED SPECS. ___--_- ° 1007.99' D0 111�U N 89 10 55 E i 4OO TEMP. SILT/ / \ i'FENCE A9 -TEMPOPRYTOPSOIL -� \ \--------- - ��-------- �� \�/ SHOWN/ ( ) / \TOC_KPILE AREA sVRRObN0-WITH-aT- I - - -_ ' -�1 -3-•� jOUFENCE TLET (KRO/ /C 1-2 I UI I / II II , / I \ 25=4.6f t RESPREAD TOPSOIL SPOIL MATERIAL I I I J O I I I I I \ / *\+ \ \ \ _ - - - - - - - - - - - - - - _ PERMANENT RIP RAP TRANSITION "T� Qfull=7.4cf� / / / / / TO CREATE LANDSCAPE BD,RM MLONG I I 11C ROADSIDE DITCH Vfull=4. s `j - �\ I \ `�' (4' WIDE - 10' EACH DIRECTION) ^ / DO-1. � / / / / / 30' LANDSCAPU- BUFFER. SURROUND I\ D50=6" \ \ c i l :':':'':': I / ZONr =1CLAWITH Sy -PENCE I -,DEEPH=18" \p(-- \ \1 ® 4XD0=6ft / IJ \ USE ROADSIDE DITCHE AS TEMP. \ \ \ I 1 I �D50=3" I / O \ p / - - -BIV€RSI�N BERM TO S IMMER BASINS \ \ \ I I / DEPTH=12" / I / l fEMP.I SILT 406 DURING CO�TRUCRE) - _ \ I / I W1=3XDO=4.5' / I / /FENC AS 10 - 4 ��� 4 4 4 a may- -� -UTILITY EASEIWLRif SMIDIZATION TIME FRAM \ / / / / SHOWN (TYP.) _ E- YRQ \ I w W2=1.25XW "' O I \ \ \ \ O \ 406 ac. ` I 0. c D TRCDr 0 C. I l \ USE ROADSIDE DI S AS TEMPS' 0.1 ac. / �� / _ Ap)\ c \ 0 ac DIVERSION BERM SKIMMER BASINS �� \ DURING CONSTR TION �� c / / \ \ 1 - / \ \ 11 (7 DAY STABI ATION TIME FRAME TYP.) \_ I \\ \\ \ D p��D��D��D�� TRCD TRCD I \ -+ - - - - - D ��` D D \ 5 % --P�MANENT RIP RAP TRAI�SITfON- C' D D �. - \ IN ROADSIDE WIDE IDE1DITEACH DIRECTION \ S L \ UTILI'I`Y� E��EMEPI� /'f / - \ \ - - - L j- /- / - NOr - ___ /b.4a. PEA SPAC / D50=6" � / ll' / / // � / \ \ DEPTH=18" �- \ \ \ \ �� /------ 3 I � \ / / I ® \ \ / 1.3 ac. 1.4 fs / 4\ \ \ / / OU ECTON 2 TEMPO RY IMMER SIN 2 W B FLES \ \ - 1 / / / /I'd DA=O. c �p N \ \ D.A.=0.4 \ \ \ \ ` J I\ Q =0. cfs - h,-L- I I \ TOTAL DR=0 4 C. Q2 cfs � I Z Q25=(0.3) Ni.8. HR (0. AC� 1 OCFS \ \ \ / / / // // // / � oI14 'VOL. REQ'D- OCF C*(0.4� )=720CF / Vfull=4.2fps � / / b SU%FACE AREA Q'D=325SF/ S*(1.00FS)=h5SF DZONE=51 _ -Q ■ TOP\L=30', TOP *,7-20', D=2' \ \ \ \ \ ` f / \ ✓ / / / S 8 ° 2' 1 1 "W CLASS=A _ - - (2:1 SIDE SLOPES �7 DAY STABNZATION TIME XRAME TYP.)\ 2 3 7. 7 7 5.45' I �S1�RFACE A&FA PROVIDE'6=600SF \ \ \ \ - _ - - \ D50=3" V0 . PROVIDE �43CF \ \ \ \ DEPTH=12" _ - - - \ WEIR TH=4' \ \ \ \ \ - / \ - :=.;: _ SKIMMER ZE: 1.5" \ \ "1 STANDARD LEGEND \ / / / // // W1= 1.25XW1 =6.0' (IMMER ORRICE DIAMETI=R=0.50" \ \ \ / / , / / - - \ D \ DRATERING TIME,. 3.5 DAYS` - WV -a 0�_----_ - I -- // / / �� \ SEE NOTE ® TSBi� / 1 / 924.42 001 �O i I I CS I �v 2 0 1 B U C K H 0 R N PARTNERS L LC SEEDING SPECIFICATIONS MAP # 2020 - 366 SEEDBED PREPARATION THOROUGHLY CULTIVATE LAWN AREAS BY DISCING TO A DEPTH OF 6" AND ZONED RA-40 RAKING THE SURFACE SMOOTH TO REQUIRED GRADES. APPLY 4,000 LBS. OF AGRICULTURAL LIME PER ACRE AND 1 000 LBS OF 10-10-10 OR EQUIVALENT * "Extensions of time may be approved by the permitting authority based on weather or other site -specific conditions that make compliance impracticable." (Section II.B(2)(b)) •;::;; ::;;;;:: � _ - � G TIME. 2.4 DAYS SEE, N6TE ® TSB# _ - /' "STRAW W NET" TEMP. SWALE LINER AS SHOWN \ 11 I I /// -��. �` S _ - - - - / / - TEMPORARY SKIMMER BASIN 1 W BAFFLES \ I Iv// �� _ _ - - / 1 1 D.A. *1.OAC. O ' - - - PERMANENT RIP TRANSITION "Ti TOTAL DRAINAGE AREA=I.9AC. R-GAIDSl DI H - 3 j............ 3 Q25=(0.3)(8.41N/HR)(1.9AC.)=4.8CFS (4' WIDE - 1 FACH-DIRECTION) _ _ _ 4' VOL. REQ'D=1,800CF/AC*(1.OAC)=1,800CF 09 D50=6- - - SEE PER SURFACE AREA REQ'D=325SF/CFS*(4.8CFS)=1,560SF Z �O 1 - DEPTH=18" �' _ J _ _ - - PERMANENT SWALE "D" PROJECT LI N DA L. SEARS TOP L=80', TOP W=20', D=2' Q �� 0 - - - - NTS SPECS D.B. 3 6 6 3 P G . 81 6 (2:1 SIDE SLOPES - 7 DAY STABILIZATION TIME FRAME TYP.) = o _ _ _ - _ - - '1 - - SWALE CALCULATION TABLE SURVOLFACE AREA PROVIDED=1,600SF o-' \\ -�� 39 LOT # C 125 Tc Q25(CFS) SWALE SLOPE n NORMAL DEPTH VELOCITY SHEAR STRESS SWALE TYPE SHEAR STRESS PIN # 0635-07-8809.000 WEIR WIDTHD�D=2,443CF 30 LANDSCAPE �a (IN/HR) (MIN) (%) (FT) (FT/S) REQUIRED (PSF) PROVIDED (PSF) ZONED RA- 20 M SKIMMER SIZE: 1.5" BUFFER & =z j SKIMMER ORIFICE DIAMETER=0.75" _ \_------- / p 595__----- 9 12/15 0.5 8.4 5 8.0 2.7 0.03 0.3 3.3 0.50 D 1.45 DEWATERINGTIME:3.9DAYS EASEMENT 14 2/3 0.5 8.4 5 1.7 1.1 0.03 0.2 1.5 0.14 D 1.45 NOTE: CLEAN BASIN WHEN 50% FULL DURING CONSTRUCTION. WHEN UPSTREAM AREAS ARE ><kD - - - - - -I� 15 8 9 0.5 8.4 5 2.5 5.0 0.03 0.2 3.1 0.62 D 1.45 STABLE AGAINST EROSION AND PERMISSION HAS BEEN OBTAINED FROM NCDEQ, REMOVE TEMP. - _ - _ _ O / BASIN, INSTALL PERMANENT GRADES, AND SEED ALL DISTURBED AREAS PER SEED SPECS. ___--_- ° 1007.99' D0 111�U N 89 10 55 E i 4OO TEMP. SILT/ / \ i'FENCE A9 -TEMPOPRYTOPSOIL -� \ \--------- - ��-------- �� \�/ SHOWN/ ( ) / \TOC_KPILE AREA sVRRObN0-WITH-aT- I - - -_ ' -�1 -3-•� jOUFENCE TLET (KRO/ /C 1-2 I UI I / II II , / I \ 25=4.6f t RESPREAD TOPSOIL SPOIL MATERIAL I I I J O I I I I I \ / *\+ \ \ \ _ - - - - - - - - - - - - - - _ PERMANENT RIP RAP TRANSITION "T� Qfull=7.4cf� / / / / / TO CREATE LANDSCAPE BD,RM MLONG I I 11C ROADSIDE DITCH Vfull=4. s `j - �\ I \ `�' (4' WIDE - 10' EACH DIRECTION) ^ / DO-1. � / / / / / 30' LANDSCAPU- BUFFER. SURROUND I\ D50=6" \ \ c i l :':':'':': I / ZONr =1CLAWITH Sy -PENCE I -,DEEPH=18" \p(-- \ \1 ® 4XD0=6ft / IJ \ USE ROADSIDE DITCHE AS TEMP. \ \ \ I 1 I �D50=3" I / O \ p / - - -BIV€RSI�N BERM TO S IMMER BASINS \ \ \ I I / DEPTH=12" / I / l fEMP.I SILT 406 DURING CO�TRUCRE) - _ \ I / I W1=3XDO=4.5' / I / /FENC AS 10 - 4 ��� 4 4 4 a may- -� -UTILITY EASEIWLRif SMIDIZATION TIME FRAM \ / / / / SHOWN (TYP.) _ E- YRQ \ I w W2=1.25XW "' O I \ \ \ \ O \ 406 ac. ` I 0. c D TRCDr 0 C. I l \ USE ROADSIDE DI S AS TEMPS' 0.1 ac. / �� / _ Ap)\ c \ 0 ac DIVERSION BERM SKIMMER BASINS �� \ DURING CONSTR TION �� c / / \ \ 1 - / \ \ 11 (7 DAY STABI ATION TIME FRAME TYP.) \_ I \\ \\ \ D p��D��D��D�� TRCD TRCD I \ -+ - - - - - D ��` D D \ 5 % --P�MANENT RIP RAP TRAI�SITfON- C' D D �. - \ IN ROADSIDE WIDE IDE1DITEACH DIRECTION \ S L \ UTILI'I`Y� E��EMEPI� /'f / - \ \ - - - L j- /- / - NOr - ___ /b.4a. PEA SPAC / D50=6" � / ll' / / // � / \ \ DEPTH=18" �- \ \ \ \ �� /------ 3 I � \ / / I ® \ \ / 1.3 ac. 1.4 fs / 4\ \ \ / / OU ECTON 2 TEMPO RY IMMER SIN 2 W B FLES \ \ - 1 / / / /I'd DA=O. c �p N \ \ D.A.=0.4 \ \ \ \ ` J I\ Q =0. cfs - h,-L- I I \ TOTAL DR=0 4 C. Q2 cfs � I Z Q25=(0.3) Ni.8. HR (0. AC� 1 OCFS \ \ \ / / / // // // / � oI14 'VOL. REQ'D- OCF C*(0.4� )=720CF / Vfull=4.2fps � / / b SU%FACE AREA Q'D=325SF/ S*(1.00FS)=h5SF DZONE=51 _ -Q ■ TOP\L=30', TOP *,7-20', D=2' \ \ \ \ \ ` f / \ ✓ / / / S 8 ° 2' 1 1 "W CLASS=A _ - - (2:1 SIDE SLOPES �7 DAY STABNZATION TIME XRAME TYP.)\ 2 3 7. 7 7 5.45' I �S1�RFACE A&FA PROVIDE'6=600SF \ \ \ \ - _ - - \ D50=3" V0 . PROVIDE �43CF \ \ \ \ DEPTH=12" _ - - - \ WEIR TH=4' \ \ \ \ \ - / \ - :=.;: _ SKIMMER ZE: 1.5" \ \ "1 STANDARD LEGEND \ / / / // // W1= 1.25XW1 =6.0' (IMMER ORRICE DIAMETI=R=0.50" \ \ \ / / , / / - - \ D \ DRATERING TIME,. 3.5 DAYS` - WV -a 0�_----_ - I -- // / / �� \ SEE NOTE ® TSBi� / 1 / 924.42 001 �O i I I CS I �v 2 0 1 B U C K H 0 R N PARTNERS L LC SEEDING SPECIFICATIONS MAP # 2020 - 366 SEEDBED PREPARATION THOROUGHLY CULTIVATE LAWN AREAS BY DISCING TO A DEPTH OF 6" AND ZONED RA-40 RAKING THE SURFACE SMOOTH TO REQUIRED GRADES. APPLY 4,000 LBS. OF AGRICULTURAL LIME PER ACRE AND 1 000 LBS OF 10-10-10 OR EQUIVALENT FERTILIZER PER ACRE. NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: CONSTRUCTION SEQUENCE TEMPORARY SEEDING WHERE TEMPORARY SEEDING IS REQUIRED PRIOR TO SEEDING OF PERMANENT THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS 1) INSTALL THE TEMPORARY CONSTRUCTION ENTRANCE. LAWNS OR FILL SLOPES, PROCEED AS FOLLOWS: MUST S% RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE 2 INSTALL EROSION CONTROL MEASURES AS SHOWN ON PLANS. `\00 \L I TY G PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 3) COMPLETE INSTALLATION OF SITE DRAINAGE NETWORKS AND SITE SWALES WITH AUG. 15TH-MAR. 1ST SOW RYE GRAIN AT THE RATE OF 120 LBS. PER ACRE. ��\)G \�� p�0'��� 4) ASSOCIATRIP TEDEROSION CONTROL PROTECTION BEFORE BEGINNING SITE GRADING. L. . . \O T� 5) GRADE SITE. OF 40 LBS. PER ACRE. \i O O o �j` TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM 6) GRASS AREAS THAT WILL NOT BE DISTURBED. PERMANENT SEEDING U 7 O 7) INSTALL UTILITIES. Cj i THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION SEASON VARIETY RATE(LBS /ACRE) _1 IJ z -1 ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF 7) PLACE BASE -COURSE. AUG 15 - NOV 1ST KOREAN LESPEDEZA 50 -1 W = EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE 8) SEED AND MULCH ALL AREAS TO PROVIDE PERMANENT GROUNDCOVER WITHIN 14 OR KOBE LESPEDEZA 50 Q C) D M INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL WORKING DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING, AND WITHIN 14 AND TALL FESCUE 60 Z n PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER PERIOD IS SHORTER, FOLLOWING ~ HTTP: PORTAL.NCDENR.0RG WEB LR EROSION // / / / COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOV 15 - MARCH 1ST TALL FESCUE 120 9) MAINTAIN ALL TEMPORARY MEASURES UNTIL PERMANENT GROUND COVER IS AND ABRUZZI RYE 25 ESTABLISHED. IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL 10) NO SEDIMENT OR EROSION CONTROL MEASURES ARE TO BE REMOVED WITHOUT MARCH 1 - APRIL 15 TALL FESCUE 120 OFFICE AT (910) 433-3300. THE APPROVAL OF AN NCDEQ INSPECTOR. APRIL 15 - JUNE 30 HULLED COMMON BERMUDA 12 BEFORE YOU DIG! JUNE 30 - AUG 15 TALL FESCUE 60 NOTE: A SEPARATE EROSION CONTROL PERMIT WILL BE REQUIRED FOR EACH INDIVIDUAL LOT PRIOR TO AND BROWNTOP MILLET 25 CONTACT ONE -CALL CENTER LAND DISTURBANCE. 1- 800- 632- 4949 NOTE: NO SURFACE WATERS, WETLANDS, OR FLOOD ZONES EXIST ON THE SUBJECT PROPERTY. O N 86047'32 "W S 02008' 18"W 63.12' MULCHING IMMEDIATELY AFTER SEED AREA SOWN, MULCH THE ENTIRE AREA EVENLY WITH A LAYER OF WHEAT STRAW TO PROTECT AREA FROM EROSION. MULCH TO BE APPLIED AT A RATE OF 75-100 LBS. PER 1000 SQUARE FEET. SECURING MULCH: THE MULCH SHALL BE HELD IN PLACE BY EMULSIFIED ASPHALT BINDER ON SLOPES 2 TO 1 OR STEEPER, OR AS REQUIRED. APPLY ASPHALT AT 0.10 GALLON PER SQUARE YARD. IN HEAVY TRAFFIC AREAS, USE TYPE "RS" OR "CRS" TO MINIMIZE REMOVAL OF TACK COAT. SYNTHETIC BINDERS MAY BE USED AS RECOMMENDED BY THE MANUFACTURER TO ANCHOR THE MULCH. TEMPORARY CHANNEL LININGS IF REQUIRED SHALL BE INSTALLED IN AREAS AS SHOWN ON PLANS, OR AS REQUIRED TO PREVENT EROSION. LININGS AREA TO BE LEFT IN PLACE THROUGHOUT PERMANENT SEEDING PROCEDURE. MAINTENANCE I. TEMPORARY SEEDING: RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. II. PERMANENT SEEDING: GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. RESEEDING --IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. 50 S 00033'53"W 83.41 ' \1 Q �z� o �# W ac cu00 W 00 O r~ � a� W U u �z o w z�a U� Lu C) LL1 U) _CDU No W N z U Z Ucv ON Lu 0 O o 145� z �Zz o tJEL��E OA� w TR' PUBLIC R/ � w z � CO o o 60 0 (D a w 1_j z z w w w o = w Z 0 U > U) O Q w J (�n O CD W EP - CL EP NOTE: Pursuant to G.S. 113A-57(2), the angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion -control devices or structures. In any event, slopes left exposed will, within 14 calendar days of completion of any phase of grading be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. Pursuant to G.S. 113A-57(3), provisions for permanent ground cover sufficient to restrain erosion must be accomplished for all disturbed areas within 14 working days or 90 calendar days (whichever is shorter) following completion of construction or development. VEGETATION MANTAINANCE: IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF THE YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. > > > > > TEMPORARY DIVERSION BERM (TDB (7 DAY STABILIZATION TIME FRAME -•-_-_-_-•-_-_-_- TEMPORARY SILT FENCE (TSF) _ D _ _ D _ _ D _ _ D _ _ LIMITS OF DISTURBED AREA TOTAL DISTURBED AREA=2.99 ACRES - - - - - - Loo- - - - - - EXISTING CONTOUR too FINISH GRADE CONTOUR SKIMMER BASIN DRAINAGE AREA om TEMP. ROCK CHECK DAM (TRCD) GRAPHIC SCALE 0 25 50 100 200 ( IN FEET ) 1 incli = 50 ft. Cn F_ Z Li o z z w w U L�J C) o z U U O w co �p Q w cD o 0 CO I I C3 w C3 C3 w w w w U U U Z � Z Z N N N N O O O O N N N N I I I I N CIA CD7 I I I I w z 0- O w � J w F- o z > o w z C)z Q w U) U U= O U) Z ZJULO J LLJ N _ C)o U Q:� O >_ CT O Ld -< H w Zw�Z � cnC)� w Z= �� z� LLJ w U Y O Q�<ao a- r C)Ooo CD �m=Z a f Cna_ Q Z W a'I Cn O O r�I V EE PROJECT: 5086 S=4 OF 9