Loading...
HomeMy WebLinkAboutNCC221223_FRO Submitted_20220331JOHNSTON COUNTY FINANCIAL RESPONSIBILITYIOWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Johnston County Department of Public Utilities, (Please type or print and, if the question is not applicable or the e-mail and/or fax information unavailable, place NIA in the blank.) Part A. 1. Project Name WAKE EMC - HARES SUBSTATION 2. Location of land -disturbing activity: City or Township ONEALS TOWNSHIP Highway/Street FEED MILL ROAD Latitude 35.6653190 Longitude-78.249239' 3. Approximate date land -disturbing activity will commence: July 1, 2021 4. Purpose of development (residential, commercial, industrial, institutional, etc.): ELECTRICAL SUBSTATION 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 4.630 6. Amount of fee enclosed: $ 1650,00 . The application fee of $330.00 per acre (rounded up to the next acre) is assessed for the first 10 acres and an additional $110 per acre for each additional acre (rounded up to the next acre). 7. Has an erosion and sediment control plan been filed? Yes No X Enclosed 8. Person to contact should erosion and sediment control issues arise during land -disturbing activity: Name WAKE EIVIC _ G R15 WRIGHT E-mail Address chris.wright@wome.com Telephone (9 19) 863-6385 Cell # Fax # 9, Landowner(s) of Record (attach accompanied page to list additional owners): JERRY and HUEL W. MASSENGILL (919) 934-3401 Name Telephone Fax Number 204 PACE STREET ____ FEED MILL, ROAD ^_ Current Mailing Address Current Street Address L.D NC 27577-3218 KENLY, NC 27542-0000 City State Zip City State Zip 10. Deed Book No. 01110 Page No.0111 Part B. 1. Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet): WAKE EMC - CHRIS WRIGHT chris.wright@wemc.com Name E-mail Address 228 Park Ave Current Mailing Address Youngsville NC 27596 City 228 Park Ave Current Street Address Youngsville NC 27596 State Zip City Telephone i(919) 863-6385 Fax Number. State Zip 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name E-mail Address Current Mailing Address City State Zip Current Street Address City Telephone Fax Number State Zip (b) if the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: Name of Registered Agent Current Mailing Address E-mail Address Current Street Address City State Zip City State Zip Telephone Fax Number The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attorney -in -fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there be any change in the information provided herein. CHRIS WRIGHT MANAGER OF ENGINEERING Type or print name Title or Authority 44Mhi 1.U2 Signature Date ------------------------------------------------------------------------------------------------------------------------------------ !, J 4l` S a Notary Public of the County of WrA ke State of North Carolina, hereby certify that �`��` appeared personally before me this day and being duly sworn ack.nb Wedged that the above form was executed by him. Witness my hand and notarial seal, this day of in , 20� ('�_ .hack D Sapp � ota Public Nota Wa ounty, NC My Commission Explres6-f7-2024 My commission expires JOHNSTON COUNTY EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST The following items shall be incorporated with respect to specific site conditions, in an erosion & sedimentation control plan: NPDES Construction Stormwater General Permit NCG010000 e6.01 Designation on the plans where the 7 or 14 day ground stabilization requirements apply per Section II.B.2 of the permit. NA Design of basins with one acre or more of drainage area for surface withdrawal as per Section II.B.4 of the permit. LOCATION INFORMATION NrA Name and classification of receiving water course or name of municipal operator (only where stormwater discharges are to Ci oo Project location & labeled vicinity map (roads, streets, landmarks) occur) C1.00 North arrow and scale CAi_cs Provide a copy of site located on applicable USGS quadrangle and STORMWATER CALCULATIONS NRCS Soils maps GENERAL SITE FEATURES (Plan elements) ei.po Property lines & ownership ID for adjoining properties c1.00 Existing contours (topographic lines) 04.00 Proposed contours C4.o0 Limits of disturbed area (provide acreage total, delineate limits, and label). Be sure to include all access to measures, lots that will be disturbed, and utilities that may extend offsite. c1.00 Planned and existing building locations and elevations c1.00Planned & existing road locations & elevations, including temporary access roads NIA Lot and/or buiiding numbers 01.00 Hydrogeologic features: rock outcrops, seeps, springs, wetland and their limits, streams, takes, ponds, dams, etc. (include all required local or state buffer zones and any Riparian Buffer determinations) NA Easements and drainageways, particularly required for offsite affected areas. Include copies of any recorded easements and/or agreements with adjoining property owners. NIA Profiles of streets, utilities, ditch lines, etc. N/A Stockpiled topsoil or subsoil locations N/A If the same person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. NIA Location and details associated with any onsite stone crushing or other processing of material excavated. If the affected area associated with excavation, processing, stockpiles and transport of such materials will comprise 1 or more acres, and materials will be leaving the development tract, a mining permit will be required. NIA Required Army Corps 404 permit and Water Quality 401 certification (e.g. stream disturbances over 150 linear feet) EROSION & SEDIMENT CONTROL MEASURES fon Alan) c5.00 Legend (provide appropriate symbols for all measures and reference them to the construction details) c5.00 Location of temporary measures c5.0a Location of permanent measures C5.00 Construction drawings and details for temporary and permanent measures. Show measures to scale on plan and include proposed contours where necessary. Ensure design storage requirements are maintained through all phases of construction. Csoo Maintenance requirements for measures C5.00 Contact person responsible for maintenance NIA Pre -construction runoff calculations for each outlet from the site (at peak discharge points). Be sure to provide all supporting data for the computation methods used (rainfall data for required storm events, time of concentration/storm duration, and runoff coefficients). NIA Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients for the site) CALcs Design talcs for culverts and storm sewers (include HW, TW and outlet velocities) NIA Discharge and velocity calculations for open channel and ditch flows (easement & rights -of -way) NIA Design talcs for cross sections and method of stabilization for existing and planned channels (include temporary linings). Include appropriate permissible velocity and/or shear stress data. c6.01 Design talcs and construction details for energy dissipaters below culvert and storm sewer outlets (include stonelmaterial specs & apron dimensions). Avoid discharges on fill slopes. NIA Design calcs and dimension of sediment basins (note current surface area and dewatering standards as well as diversion of runoff to the basins). Be sure that all surface drains, including ditches and berms, will have positive drainage to the basins. VEGETATIVE STABILIZATION cs.00 Area & acreage to be stabilized with vegetation 06.111 Method of soil preparation c6.01 Seed type & rates (temporary & permanent) c6.01 Fertilizer type and rates 06.01 Mulch type and rates (include mulch anchoring methods to be used) NOTE: Plan should include provisions for groundcover in accordance with NPDES Construction Stormwater General Permit NCGO10000 and permanent groundcover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. FINANCIAL RESPONSIBILITYIOWNERSHIP FORM PRoy, Completed, signed & notarized FRIO Form PRov. Accurate application fee payable to Johnston County Public Utilities NIA Certificate of assumed name, if the owner is a partnership NIA Name of Registered Agent (if applicable) PROV. Copy of the most current Deed for the site. Please make sure the deed(s) and ownership information are consistent between the plan sheets, local records and this form. ci.00 Provide latitude & longitude (in decimal degrees) at the project entrance. NARRATIVE AND CONSTRUCTION SEQUENCE CALLS SITE DRAINAGE FEATURES cs.00 DA1.00 Existing and planned drainage patterns (include off -site areas that drain through project and address temporary and permanent conveyance of stormwater over graded slopes) C5.01) Method used to determine acreage of land being disturbed and drainage areas to all proposed measures (e.g. delineation map) 04.00Size, pipe material and location of culverts and sewers NIA cs.00 Soil information: type, special characteristics C5.00 Soil information beiow culvert storm outlets Narrative describing the nature & purpose of the construction activity Construction sequence related to erosion and sediment control (including installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized). Address all phases or construction and necessary practices associated with temporary stream bypasses and/or crossings. Bid specifications related only to erosion control JCPU ESC August 2013