HomeMy WebLinkAboutSW8140605_Historical File_20140911General Data: Impervious, Drainage Area and Volume PROJECT NUMBER: SWS 240605 Reviewer: K Johnson DRAINAGE BASIN: Cape Fear Current Date 11Sep-14 Original Run Date: DA Number 1 2 3 4 5 6 7 B 9 10 BMP Type wet Pond Wet Pond No BMP In DA No BMP In DA No BMP In No BMP In No BMP In A No BAP In DA No BMP In 11A No BMP In DA Receivin Stream Moira Creek Motra Croak Stream Index 18-82 10-82 Class C: SW C: SW Method used to determine reuired volume? Semple Simple Please Select Please Select Please Select Please Select Please Select Please Select Please Selec Please Select Simple Method, Design Storm, P1124k in: (Error it Project Is Subject to SA- NEEDED FOR BOTH SIMPLE AND SCS SA CALCa) Simple Method, Design Storm of Old Rule, in: Enter r Part of Pro sot is Permitted Under an Old Rule Such as 1.0', If not leave blank SCS Discrete (TR-55) Method, Design Storm, Value of Prep or 1w2" in: (Enter the Value of Pao if Non -SA or P„eor if SA) Project is Subject to SA? N N Pleasa Select Please Select Please Select Please Select Please Select Please Select Please Select Please Select Volume That Is Required, fe: (Volume from either the Simple Method or the SCS Method. If SCS Method for SA, compare 4,219 1,350 SCS at 1w24hrto Sim at 1 S' and oho !U the Simple Method Volume Summ Simple Method & SA 2008 Rule, Greater of 1.5" or 1 yr24hr ost + Old Rule at 1.5 Simple Method & non -SA 4.219 1,350 2008 Rule, 1.6' + Old Rule, 1. SCS Discrete (TR55) Volume Summary: If TR-W Is used, then this spreadsheet is not set up to accourd for adding thatwlume to an old rule calculated at a knrer (1.0•) storm. It( not make sense to combine the volume calculations that SCS Discrete (TR55) & SA 008 Rule, Greater of 1.5" or 1 yr24hr oat SCS Discrete R55 & non -SA Proposed Impervious (ALL IMPERVIOUS), Total,: 37,500 12,000 0 0 0 0 0 01 b1l 0 Onsite Buildings 31.5001 10.500 Onsits Streets 0 0 Onsite Parking 0 0 On Sidewalks 0 0 Onsits Other 0 0 Future 6.00 1,50 ORafte 0 0 Existing 0 0 Previous ermitted Impervious. Old Rule, ft; 0 0 0 0 0 0 0 0 0 0 Onslte Buildin s 01 0 Onsite Streets 0 0 Onafte Parkina 0 0 Onsite Sidewalks 0 0 Ons'Ite Other 0 0 Future 0 0 Of isile 0 0 EAsUnu 0 0 Proosed Impervious, Subject to 2008/Phil Rule, fe 37,500 12.0001 01 01 01 0 D 0 0 0 Drainage Area, Total, its: 114.483 40,986 Onsite, fe: 114,483 40,966 Offsfte, fe: 0 0 Prevlou -Permitted Drainage Area,Old Rule, tt D 0 0 0 0 0 0 0 0 0 Onsite, fe: D 0 Ofraite, fe: D 0 Proposed DA (Being Added BY Mod) , ie: 114.483 40,968 Drainage Area. Subject to Old Rule, ft : 0 01 01 01 01 01 01 0 0 0 Drainage Area, Subject to New Rule, fts: 114,483 40,968 Volume Required, Oki Rule, fP: D 0 D D 0 0 v u u Rvpaa pa yp,,p ant, Old Rule: Volume Required, 2008 Rule, fta 4,219 1,350 RvPrepa,.R,,,M, 2008 Rule: Enter 0.05 if no pre -development SUA) 0.06 0.05 Rvpcaape+ bww,a, 2008 Rule: 0.34 0.31 Volume Required,N, 8: 1 4,2191 1,350 0 0 0 0 0 0 0 0 Volume Required1w",,,, 01 01 01 01 01 01 01 01 01 = Volume Calculations - Page 1/1 Wet Ponds PROJECT NUMBER: SW8 140605 Reviewer: K Johnson DRAINAGE BASIN: Cape Fear Current Date 11-Se -14 Original Run Date: DA Number BMP Type Minimum Surface Area 1 Wet Pond 2 Wet Pond 3 No BMP In DA 4 No BMP in DA 5 No BMP in DA 6 No BMP In DA 7 No BMP In DA 8 No BMP in DA 6 No BMP in DA 1 to No BMP in DA % impervious 32.0% 29.29% Lower Impervious 30.0% 20.0% Upper Impervious 40.0% 30.0% TSS (85 or 90): 90 90 Lower SA/DA Upper SA/DA SA/DA ratio PP Surface Area req, ft2: Storage Calculations 2.5 3.1 2.7 3,051 2.0 3.0 2.9 1,200 #N/A #N/ #N/A #N/A #N/A #WA #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/Aj #N/A #N/Al #N/A #NIA #WA #NJAJ #N/A #N/A #N/A #NIA #N/A #N/A #N/A #N/A Elevation, Bottom of Sediment (excavated de ,fmsl: 28.001 25.00 Elevation, Top of Sediment (bottom pond/designed bottom),fmsl 27.001 26.00 Elevation, Bottom of shelf, fmsl: 32.501 30.50 Elevation, Permanent Pool frost 33.00 31.00 Elevation, Top of Shelf, fmsl: 33.50 31.50 Elevation Temp. Pool, fmsl: 33.50 31.50 Area, Top of Sediment (bottom pond/designed bottom), ft 2: 6,003 2,175 Area, Bottom of Shelf, ftz: 14,560 8,008 Area, Perm Pool, ft2: 17,581 10.021 Area, Top of Shelf, ft2: 16,381 9,368 Area, Temp.Pool, ft2: 20,812 12,255 Volume Provided (Temp Pool), DWQ Calculated, ft 3: 8,491 5,569 0 0 0 0 0 0 0 0 Volume Provided (Temp Pool), Provided per consultant, ft3: 8,150 5,569 Volume Required (romp Pool), DwQcalalated, ft3: 4,219 1,350 Consultant Provided Enough Volume? y y Average Depth Option 1 or Option 2 (Enter 1 or 2? 1 2 Average Depth Provided, ft 4.5 3.5 Average Depth - OPTION 1 -, DWQ Calculated, fl: 3.67 2.74 Average Depth - OPTION 2 -, DWQ Calculated, ft: Forebay Volume 4.5 3.50 Permanent Pool Volume, 0: 64,5841 27,419 0 0 0 0 01 0 0 0 Forebay Volume, Required, ft3: Forebay Volume, Provided, ft3: 12,917 12,550 5,484 5,226 0 0 0 0 01 0 0 0 Percent of Permanent Pool 18-22% is Target): 19% 19% Drawdown Aygerage Head, fl: Average Flow Q2, felsec: 0.15 0.024 0.16 0.008 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Flow Q5, ft3/sec: 0.010 0.003 Q2 Area, in2: 1.912 0.591 Q5 Area, in2: 0.765 0.236 No. of Orifices 1 1 Orifice Diameter, in: 1.50 0.75 Orifice Area, in2: Weir enter Y or N ? 1.767 0.442 0.000 0.000 0.0001 0.000 0.0001 0.000 0.000 0.000 Weir Height, in: Weir Length, in: Weir C: Weir L, Effective Length, fl: -0.029 -0.031 0.000 0.000 0.000 0.000 0.000 0,000 0.000 0.000 Average Orifice Flowrate, DWQ Calc (QDm) ft3/sea 0.023 0.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Average Orifice Flowrate, Reported (QRe oftJ ft3/sec: 0.020 0.013 Average Orifice Flowrate is Adequate? y y Runoff Coefficient Cc: 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 1 yr 24 hr rainfall depth, in: 3.80 3.80 1 yr 24 hr Intensity (1) in/hr: 0.158 0.158 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1 yr 24 hr Pre -Development (Q), ft3/sec: 0.104 0.037 Avg. Orifice flow<Pre Q? 11 OK OK Drawdown, days: Bolls Report Data 2.161 2.68 Ground Elevation at Boring in Soils Report, fmsl: NCDENR Soil Scientist Approved Soils. See emails on file. Distance Ground to SHWT per Soils Report, in: Distance Ground to SHWT per Soils Report, fl: SHWT Elevation, DWQ Calculated, fmsl: SHWT Elevation, Reported by Consultant, fmsl: Distance SHWT to PP, fi: Design OK ff., 0<= Value <= 0.5 Permanent Pool Elevation, fmsk Pum Max HP: 1/4 1 N/A 1 N/A 1 N/A N/A NIA N/A N/A �N�/A NIA Bottom Pond Bottom Shelf PP Top 5helf/1-12 Wet Pond #1 Basin Forebay Contour El (ft) SA (sfl Inc Vol (cf) Cum Vol (cf) Contour El (ft) SA (sf) Inc Vol (cf) Cum Vol (cf) 27.0 6,003 0 0 28.0 1,060 0 0 32.5 10,898 46,478 46,478 32.5 3..6621 10625 10,625. 33.01 13,540 6,1101 52 j 5871 33.0 4,041 1,926 12,550 33.51 16,3811 7,4801 60,0681 33.5 4,431 2,118 14,668 PP Volume: 65,138 d TP Volume: 9,598 cf Forebay Volume 12,550 cf Forebay %: 19.27% Bottom Pond Bottom Shelf PP Top Shelf/TP Wet Pond #2 Basin Forebay Contour El (ft) SA (sf) Inc Vol (cf) Cum Vol (cf) Contour El (ft) SA (SO Inc Vol (cf) Cum Vol (0 26.0 2,175 0 0 28.0 969 0 0 30.5 5,758 17,849 17,849 30.5 2,250 4,024 4,024 31.0 7,4611 3,3051 21,1541 31.0 2,5601 1,2031 5,226 31.51 9,3661 4,2071 25,3611 31.51 2,8891 1,3621 6,589 PP Volume: 26,380 cf TP Volume: 5,569 cf ForebayVolume 5,226 cf Forebay W 19.81% l irr;a,�.t:: �{„d�r-v{�,. � Gk f/ r� ,/�'5�,1•_ „J± f *' j��. �� �'i �a- .- --.°:� � .-•�'�'�"�`" :. ,�r}. .•� _ i^^• e.+I ..'.��. R J 7 .• ;.� - �..? • rf fit• !� 7. ♦+ I s y �•f� A�. r ' "t Jf . 'r < < ! � it < ♦ 7 .1_ r'� +. ,� .,-./ '_ . � + d� '[r'�<.. '� i �w- . � i• . t� . ?+4- ,ay t.� r I" VV * 6 i r rr ' ..w,�y. f '" r •� �.•�.��l *'. 4 1•�5� R,. �'ia':.71 V. �ilr �<d � may,^'.•/ �,'y qjJ � 1y r � r•+ ' �./r � s }�1�?•' a �f- � �/ i+ rrrl kt ��' .�:.'' ,-���7-� r� {•.sue i �•_' „�•.: J� � { {\r,., � •4 'y t.� .. i � I �y `�T' Y, s'�' 'fit � . a M- 007,3 a d,;. \Y ^ . �. 1 r _'"•A r -..,♦ L� I % fir' 'kyr jy ;�•{ f i ♦�1i-S! �"•�. 7lii � v''_;••-.- �,,, ,��`�,*1�yt:'} ( ikr"�7• � hs'=1�rr�,t' �',-�, .�i.._` -,!?k� �'JA'�.P.i'r(r�♦ir tM�' -t • `�^ v� i.' Y"♦ '•• , 4: Ffe� ! • { 1 } �'�'� 1 9 :.r f� „, ,r,. T c ' �' i ,<, t+ ,� G i fJ • `� '+isp` �, iy. /� �rj t�rr. k 4- _ ^�<� � ;••...:.� ,..• .'� �r i ,. `�Y` i ...y {�,.',."". !. ^L!'r „ iC 1 «1l\=...i � 7. '`t�swT757� ,riff •a .,/ � � •� 1` 1 r 11 � l r .."•"e ,� - -�; • ���,� Fr♦ ar . s -�`..r fr•^�.//"' .' h� � � Wx ' qI! �t f♦ _i. � � � v -� � ♦ t� pP� ,1 £ >"i w.1�\•. �s C•?:l7 �~ ^L. -4E 5 a ,•,1 » '-.i?- 7�� y.}I K i y tE • Hr { �-""/.n. f� .� .J ('�r1^� ✓ / r rj/'� '� rr ; � � ."� * - r w� "'"� _ v � � � • . � ♦� r �'•a 3�;F•:..3 � ' 1T1 Y• t 5 i. h,+f c it L �y (1I •�r,�f�ul' r, _ ,rf w +•'.r ;wr`�'y'ia, j.. • Y t "•.-. i i:Ii Z../ '�Y`�- '♦.r.•!y X'aY�r_ .4w (w Tr ,.p r,r • t y _ 1 L .. s Y #+ rf 3-r? -.r�►- ' ��-y4�j �`. ''�<z S�.eM..e!iy s! �,-. .-.a-� .. < y, ..,r.r •ct". OW HT ii/11-- rr t i rt, eessi�♦..rT • `� i ayTy, ;. Ilk OTT � �� � ,' ^,mow �� �' r (�... � � [- r - ' •iF,�= �••�0. ��',�`�� �+ c�`�'' wr ♦. 'fir !� � ,�► •�•� 4 i ri• f~� 5✓� >� l RA e�- F•w /+ •- y + � � , �v!' �' - � �F-"nt�r/" _ � •`�"i ,? r�`Ff`� '�"�d �`„"/t(' � art i� 1� "•T f E '�' � "' }"�.Y � • ,Jii "y t�- ' ; _'^ �•.� ^. r+�lr :sr° +�°Y''F%: /� r`' 6 �"♦, l' N i 5� ` 3 �, '� -��= _ "'1�` - fir/ •r' i �-=�..r, ` ,'�4 l ,m'' ! I%.► _ ,— � t Ff 1J i � Pr N - o o z000 0.5 Ml Map provided by MyTopo.com f if�i0j� ir�1 S LCcdlC�tt'?� E �G ''�i. ZA No w4 :tt3 1?.�sp - TRIPP ENGINEERING, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 September 10, 2014 NCDENR Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Kelly Johnson Re: Village at Motts Landing Phase 2A Stormwater Project No. SW8140605 TE 14004 Dear Kelly: In resvonse to vour auestions received via email on September 5.2014. we offer the following: 1. Supplements: Please fill out all of the data and re -submit the form. For instance we are missing the discharge rate through the orifice and the pre -development 1yi24hr rate. There may be other data missing. Also, I think that there are some typos between the supplement and the calculations. For instance, in DA2 the PP volume is 21,154+5,226--26,380, but the supplement says 26,448. There are several similar items. • Discharge rates and the pre- and post -development 1yr24hr rates are provided. All discrepancies between the supplements and calculations have been resolved. Enclosed are revised supplements and calculations. 2. Drawdown Rate: Are you drawing down the provided volume rather than the required volume? If so, please make the necessary adjustments to the package using the required volume to size the orifice. • The drawdown rates have been revised using the required volume in lieu of the provided volume. Enclosed are revised calculations as well as revised sheet C3 (Details and Notes). Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. I" C46V444- Monica Valsi, E.I. MLV:dcb Enc. ECIE SEp 10 20% BY: RECEIVED SEP 112014 9/10/2014 MLV Total Drainage Area sq. ft. acres 114,483 2.63 VAML Phase 2A %.'ON Lots 75-83 Stormwater Pond Calculations Impervious Area Land Use sq. ft. acres Lots 31,500 0.72 0.00 0.00 0.00 Future Total _ 6,000 0.14 37,500 0.86d v1V 1111 W G1QI 101L.UR}nU115. Time of Concentration: See attached calculations Flow for 1 year, 24 hour Storm (Q1) QPRE - (CPRE) x (11) x (Area) 1.54 cfs QPOST = (CPOST) X (11) X (Area) 4.20 cfs Detention Pond Design: Does Area Drain to SA Waters? n % impervious = 0.328 = 32.8% CPRE = 0.15 CPOST = (% imp.)(.95)+(1 % imp.)(.20) 0.41 11 = 3.90 in/hr 110 = 7.23 in/hr Flow for 10 year, 24 hour Storm (0110): QPRE _ (CPRE) X (110) X (Area) = 2.85 cfs QPosT = (CPosT) X (110) x (Area) 7.79 cfs State Surface Area Reauired at nnrmal nnnl- Pond side slopes = 3 :1 Depth b/w Bot. of V.S. & 5.50 Bot. Pool = SA/DA = 0.0268 for 4.6 ave. depth Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Re d SA = SA/DA x otal Draina a Area = 3,068 sq. ft. Provided SA = 17,581 sq. ft. Main Pond Size: Forebay Pond Size: Elevation Surface Area Incr. Vol Cuml. Vol. Elevation Surf. Area Incr. Vol. Cuml. Vol ft. (so. ft. ft./.fx Top of Bank 35.00 18,730 26,333 86,401 Top of Bank 35.00 5,444 7,406 22,075 Temp. Pool 33.50 16.381 0 60,068 Temp. Pool 3350 4,431 2,118 14,668 Top of V.S. 33.50 16,381 7,480 60,068 Perm. Pool 33.00 4,041 1,926 12,550 Perm. Pool 33.00 13,540 6,110 52,587 Bot. of V.S. , 32.50 3,662 10,625 10,625 Bot. of V.S. 32.60 10,898 46,478 46,478 113ot. Pool 28.00 1,060 0 0 Bot. of Pool 27.00 6.,003 0 0 Bottom SA = 6,003 sq. ft. Bottom of VS SA= 10,898 sq. ft. Permanent Pool SA = 13,540 sq. ft. Vol. = [((PP SA + Bottom VS SA)/2) x (PP el. - Bottom VS el.)] + [((Bottom VS SA + Bottom Pool SA)/2) x (Bottom VS el. Bottom Pool el.)] 52,587 cu. ft. Fore bay: 'rovided Normal Forebay Pond Volume Bottom of Pool SA= 1,060 sq. ft. Permanent Pool SA = 4,041 sq ft Vol. = [(P.P. SA + Bottom SA) / 2] x (P.P. el. - Bottom el.) 12,550 cu. ft. Depth= 5.00 ft Required Forebay Volume 18%-22% required) Vol. = 221A of Permanent Pool volume of Pond and Forebay 14,330 cu. ft. Volume required to contain from design storm(ft3)= 4,934 Therefore, maximum sta a is between stages and cumulative volumes (main pond plus forebay): Stage Cuml. Volume 33.00 0 35.00 43,338 SEA' % of Forebay Volume = 19.27 - Using Interpolation to determine stage at volume = 4,934 Maximum Stage (feet) = 33.23 Therefore set Temporary Pool Elevation at or higher than Maximum Stage 14004 0� Rp�%o''��i Oyyo � o SEAL 7374N _ 14004 Pond Calc_Lots 75-83 1 of 4 9/10/2014 VAML Phase 2A 14004 MLV Lots 75-83 Pond Size for Determining Storage Volume: Stormwater Pond Calculations Elev. SA Incr. Vol. Cum. Vol. (ft) (sq.ft.) (cu.ft.) (cu.ft.) Temp. Pool 33.50 17,752 0 8,150 Top of V.S. �3.50 17,752 8,150 8,150 Perm. Pool 33.00 14,847 0 0 Provided Storage Volume: Vol. _ [((PP SA + Top of VS SA)/2) x (Top of VS Elev. — PP Elev.)] + [((Top of VS SA+TP SA)/2) x (TP Elev. - Top of VS Elev.)] Vol. = 8,150 cu. ft. State Volume Req. for Storage of first 1.5" runoff: Rv = .05+ .009(% imp) 0.345 V= (Design rainfall)(Rv)(Drainage Area) 4,934 cu. ft. Outlet Structure Design: Flow for 2-day drawdown: for Min. Volume required of stormwater, Q = Min. Vol. Req. / 172,800 sec. (2-days) 0.029 afs Required Area of Pipe for 2-day drawdown: A= Q/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./s2 h = (T.P. elev.- N.P. Elev.) /3 = 0.17 ft. A = 0.0145 s . ft. Diameter of Pipe for 2-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.1360 ft. = 1.63 in. Drawdown Calculation Orifice Used= T T 1.5 Drawdown rate= 0.024 cfs Drawdown time= 2.37 days Outlet Structure Check: Using a 4' x 4' Basin, Perimeter L = 16 ft. Q = CIA C = (% imp.)(.95) + (1-% imp.)(.25) 0.41 1 = 7.23 in. for a 10 yr. Storm A 2.63 Acres = 7.79 cfs Flow for 5-day drawdown: for Min. Volume required of stormwater, Q = Temp. Pool Vol. / 432,000 sec. (5-days) = 0.011 GIs Required Area of Pipe for 5-day drawdown: A= Q/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./s2 h = (F.P. elev. - N.P. Elev.) 13 = 0.166667 ft. A = 0.0058 s . ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) ] pi] 0.0860 ft. = 1.03 in. Q= CwxLxH"5 H = [Q / (Cw x L)]M Cw = 3 0.30 ft. Peak elevation = flood pool elevation + H 33.80 ft. 14004 Pond Cam Lots 75-83 2 Of 4 9/10/2014 VAML Phase 2A MLV Lots 7"3 Stormwater Pond Calculations Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv = 0.05+0.0090A) Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (inches) iA = impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres IA= 32.8 % Rv = 0.345 Design Rainfall Depth = 1.50 in. Drainage Area = 2.63 acres Volume = 4,934 ft3 14004 14004 Pond Calc Lots 78 83 3 of 4 9/10/2014 VAML Phase 2A MLV Lots 75-83 Stormwater Pond Calculations Average Death Calculated Permanent Pool Volume (ft3) 65,137.5 Permanent Pool Area (if) 17,581.0 Option 1 - Average Depth (ft) 3.70 Bottom Vegetated Shelf Area (ft) 14560.0 Permanent Pool Area (ft) 17581.0 Bottom Pond Area (ft) 6003.0 Depth (ft) 5.5 Option 2 - Average Depth (ft) 4.34 Average Depth for use in Table (ft) 4.34 Round to nearest 0.5 for SA/DA (ft) 4.50 14004 14004 Pond Calc Lots 75-83 4 of 4 9/10/2014 MLV Total Drainage Area s . ft. acres 40,6 0.94 VAML Phase 2A ,�' Lots 84-86 Stormwater Pond Calculations Impervious Area Land Use sq. ft. acres Lots 10,500 0.24 0.00 _ 0.00 0.00 Future Total 1,500 0.03 12,000 0.28 ownnwater taicutanons: Time of Concentration: See attached calculations Flow for 1 year, 24 hour Storm (Q,): QPRE _ (CPRE) x (11) x (Area) 0.55 cfs QPosT = (CposT) x (11) x (Area) 1.43 cis Detention Pond Design: Does Area Drain to SA Waters? n impervious = 0.293 = 29.3% CPRE = 0.15 CposT = (% imp.)(.95)+(1 % imp.)(.20) = 0.39 I1 = 3.90 in/hr Ito = 7.23 in/hr Flow for 10 year, 24 hour Storm (Q,o): QPRE _ (CPRE) X (170) X (Area) 1.02 cis QPosT = (CposT) X (1,, 11) x (Area) 2.65 cfs State Surface Area Renulmd at nnrmal nnnl- Pond side slopes = 3 :1 Depth b/w Bot. of V.S. & 4.50 Bot. Pool = SA/DA = 0.0300 for 3 5' ave. depth Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Red SA = SA/DA x(Total Drainage Area Y = 1,229 sq. ft. Provided SA = 10,021 sq. ft. Main Pond Size: Forebay Pond Size: Elevation Surface Area Incr. Vol Cuml. Vol. Elevation Surf. Area Incr. Vol. Cuml. V ft. (sq. ft. ft. s c O Lcf)- Top of Bank 33.00 12,476 16,382 41,742 Top of Bank 33.00 5,019 5,931 12,520 Temp. Pool 31.50 9,366 0 25,361 Temp. Pool 3150 2,889 1,362 6,589 Top of V.S. 31.50 9,366 4,207 25,361 Perm. Pool 31.00 2,560 1,203 5,226 Perm. Pool 31.00 7,461 3,305 21,154 Hot. of V.S. 30.50 4,024 4,024 Hot. of V.S. 30.50 5,758 17,849 17,849 1 Hot. Pool 28.00 .2,250 969 0 0 Bot. of Pool 26.00 2.175 0 0 Provided Normal Main Pond Volume: Bottom SA = 2,175 sq. ft. Bottom of VS SA= 5,758 sq. ft. Permanent Pool SA = 7,461 sq. ft. Vol. = [((PP SA + Bottom VS SA)/2) x (PP el. - Bottom VS el.)] + [((Bottom VS SA + Bottom Pool SA)/2) x (Bottom VS el. - Bottom Pool el.)] 21,154 cu. ft. Fore bay: Provided Normal Forebay Pond Volume Bottom of Pool SA= 969 sq. ft. Permanent Pool SA = 2,560 sq. ft Vol. = [(P.P. SA + Bottom SA) / 2] x (P.P. el. - Bottom el.) _ = 5,226 cu. ft. Depth= 3.00 ft Required Forebay Volume (18%-22% required) Vol. = 22% of Permanent Pool volume of Pond and Forebay 1 = 5,804 cu. ft. Volume required to contain from design storm(fe)= 1,606 Therefore, maximum sta a is between stages and cumulative volumes (main pond pius forebay): Cuml. Sta a Volume 31.00 0 33.00 27,882 Total Provided PP Volume = 26,380 cu.ft. Actual % of Forebay Volume = 19.81 Using Interpolation to determine stage at volume = 1,606 Maximum Stage (feet) = 31.12 Therefore set Temporary Pool Elevation at or higher than Maximum Stage 14004 14004 Pond Celc_Lots 84-86 1 of 4 9/10/2014 VAML Phase 2A 14004 MLV Lots 84-86 Pond Size for Determining Storage Volume: Stormwater Pond Calculations Elev. SA Incr. Vol. Cum. Vol. R (sq.ft.) (cu.ft.) (cu.ft.) Temp. Pool 31.`2 12,255 0 5,569 Top of V.S. 31.&-' 12,25u 5,569 5,569 Perm. Pool 31.00 10.02 i 0 0 Provided Storage Volume: Vol. = [((PP SA + Top of VS SA)/2) x (Top of VS Elev. — PP Elev.)] + [((Top of VS SA+TP SA)/2) x (TP Elev. - Top of VS Elev.)] Vol. = 5,569 cu. ft. State Volume Req. for Storage of first 1.5" runoff: Rv = .05+ .009(% imp) 0.314 V= (Design rainfall)(Rv)(Drainage Area) 1,606 cu. ft. Outlet Structure Design: Flow for 2-day drawdown: for Min. Volume required of stormwater, Q = Min. Vol. Req. / 172,800 sec. (2-days) 0.009 cfs Required Area of Pipe for 2-day drawdown: A= Q/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./sZ h = (T.P. elev.- N.P. Elev.) /3 0.17 ft. A = 0.0047 s . ft. Diameter of Pipe for 2-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.0776 ft. 0.93 in. Drawdown Calculation Orifice Used= T 0.76 in. Drawdown rate= 0.006 cfs Drawdown time= 3.08 days Outlet Structure Check: Using a 4' x 4' Basin, Perimeter L = 16 ft. Q = CIA C = (% imp.)(.95) + (1 % imp.)(.25) = 0.39 1 = 7.23 in, for a 10 yr. Storm A = 0.94 Acres 2.65 cfs Flow for 5-day drawdown: for Min. Volume required of stormwater, Q = Temp. Pool Vol. / 432,000 sec. (5-days) = 0.004 cfs Required Area of Pipe for 5-day drawdown: A= Q/[Cd xSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./sZ h = (F.P. elev. - N.P. Elev.) / 3 = 0.166667 ft. A = 0.0019 sq. ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.0491 ft. 0.59 in. Q= CwxLxH'*5 H = [Q / (Cw x L)]2 3 Cw = 3 0.15 ft. Peak elevation = flood pool elevation + H 31.65 ft. 14004 Pond Cala Lots 84-86 2 of 4 9/10/2014 VAML Phase 2A 14004 MLV Lots 84-88 Stormwater Pond Calculations Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv= 0.05+0.009(IA) Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (inches) iA = Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres) IA= 29.3 % Rv= 0.314 Design Rainfall Depth = 1.50 in. Drainage Area = 0.94 acres Volume = 1,606 ft3 14004 Pond Calc_Lots 8"6 3 of 4 9/1012014 VAML Phase 2A MLV Lots 84-86 Stormwater Pond Calculations Average Depth Calculated Permanent Pool Volume (ft3) 26,380.3 Permanent Pool Area (ft) 10,021.0 Option 1 - Average Depth (ft) 2.63 Bottom Vegetated Shelf Area (ft2) 8008.0 Permanent Pool Area (ft) 10021.0 Bottom Pond Area (ft2) 2175.0 Depth (ft) 4.5 Option 2 - Average Depth (ft) 3.31 Average Depth for use in Table (ft) 3.31 Round to nearest 0.5 for SA/DA (ft) 3.50 14004 14004 Pond Calc Lots 84-86 4 of 4 8Y27/2014 VAML Phase 2A MLV Lots 75-83 Stormwater Pond Routing 25-year 24hr Storm WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 7.16 ACRES RUNOFF COEF. 'C' 0.15 TIME OF CONCENTR 20.00 MIN INTENSITY 25 YR 6.08 IN/HR Qa = 6.53 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = ; =. 8.05• INCHES 25yr, 24hr PRECIPITATION CN = 78 S = (1000/CN)-10 S = 2.82 Depth (D) = (P-0.2S)"2/(P+0.8S) D = 5.44 IN - 25yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 70.78 MINUTES Storage Volume Req'd = (Qp-Qa)'Tp'1.39"60 13,331 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 33.00 feet AFTER DEVELOPMENT PWATERSHED AREA 1 2.63 ACRES RUNOFF COEF. 'C' E5.00E� TIME OF CONCENTRE MIN INTENSITY 25 YR) 8.15 IN/HR Qp = 8.79 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 33.00 21,405 0 0 0 0 0 0.00 34.00 26,347 23,876 23,876 1.0 10.0806 0.0000 1.00 35.00 28,880 27,614 51,490 2.0 10.8491 0.6931 2.00 Regression Output: ==> Ks - 23876 b = 1.11 Constant 10.08 14004 GAJOBS12014114004-VAML Phase 2A%Calcs%14004 routing25y24hr Lots 75-83 8/27/2014 VAML Phase 2A MLV Lots 75-83 Stormwater Pond Routing 25-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 6.63 cfs Qp = 8.79 cis Tp = 70.8 min dT = 4 min BASIN DATA Ks = 23876 b = 1.11 Zo = 29.00 ft Normal water elev = 33.00 ft Peak Outflow = 6.23 cfs Box Weir Length = 16 ft Peak Stage = 34.04 ft Cw = 3.0 Maximum Storage = 24,996 cu ft Zcr = 33.90 ft Control Holes: State Orifice: Dia = 1.50 in Dd 18 in Inv = 33.00 It Cd 0.59 Weir: L = 36 in Zi 31.60 ft Inv = 33.50 ft Emergency Overflow Weir: L = 480.0 in Inv = 34.30 ft 14004 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (S) (cu ft) (ft) (ems) WS) (ds) (Cfs) (cfS) 0 0.0 0 33.00 0 0 0.00 0 0.00 4 0.1 0 33.00 0 0.00 0.00 0 0.00 8 0.3 17 33.00 0.00 0.00 0.00 0.00 0.00 12 0.6 82 33.01 0.00 0.00 0.00 0.00 0.00 16 1. i 228 33.02 0.00 0.00 0.00 0.00 0.00 20 1.6 483 33.03 0.00 0.00 0.00 0.00 0.00 24 2.3 872 33.05 0.00 0.00 0.00 0.00 0.00 28 3.0 1415 33.08 0.01 0.00 0.00 0.01 0.00 32 3.7 2128 33.11 0.01 0.00 0.00 0.01 0.00 36 4.5 3021 33.15 0.02 0.00 0.00 0.02 0.00 40 5.3 4100 33.20 0.02 0.00 0.00 0.02 0.00 44 6.0 5363 33.26 0.03 0.00 0.00 0.03 0.00 48 6.7 6805 33.32 0.03 0.00 0.00 0.03 0.00 52 7.3 8412 33.39 0.03 0.00 0.00 0.03 0.00 56 7.9 10168 33.46 0.04 0.00 0.00 0.04 0.00 60 8.3 12049 33.54 0.11 0.00 0.00 0.04 0.07 64 8.6 14013 33.62 0.41 0.00 0.00 0.04 0.37 68 8.8 15977 33.70 0.83 0.00 0.00 0.05 0.78 72 8.8 17879 33.77 1.31 0.00 0.00 0.05 1.27 76 8.7 19671 33.84 1.83 0.00 0.00 0.05 1.78 80 8.4 21312 33.90 2.36 0.01 0.00 0.05 2.30 84 8.1 22768 33.96 3.52 0.67 0.00 0.05 2.79 88 7.6 23857 34.00 4.73 1.50 0.00 0.06 3.18 92 7.0 24537 34.02 5.60 2.12 0.00 0.06 3.42 90 6.5 24883 34.04 6.07 2.46 0.00 0.06 3.55 100 6.1 24996 34.04 6.23 2.57 0.00 0.06 3.59 104 5.6 24961 34.04 6.18 2.54 0.00 0.06 3.68 108 5.2 24834 34.04 6.00 2.41 0.00 0.06 3.53 112 4.9 24653 34.03 5.76 2.23 0.00 0.06 3.47 116 4.5 24442 34.02 5.47 2.03 0.00 0.06 3.39 G:UOBS12014114004-VAML Phase 2A1Calcs114004 routing25yr24hr Lots 75-83 8/27/2014 VAML Phase 2A 14004 MLV Lots 75-83 Stormwater Pond Routing 25-year 24hr Storm 120 4.2 24216 34.01 5.16 1.82 0.00 0.06 3.31 124 3.9 23983 34.00 4.89 1.61 0.00 0.06 3.22 128 3.6 23748 34.00 4.60 1.41 0.00 0.06 3.14 132 3.4 23516 33.99 4.33 1.22 0.00 0.06 3.05 136 3.1 23288 33.98 4.07 1.04 0.00 0.06 2.97 140 2.9 23065 33.97 3.82 0.88 0.00 0.06 2.89 144 2.7 22847 33.96 3.60 0.72 0.00 0.05 2.82 148 2.5 22634 33.95 3.38 0.58 0.00 0.05 2.74 152 2.3 22426 33.95 3.19 0.46 0.00 0.05 2.67 156 2.2 22223 33.94 3.00 0.35 0.00 0.05 2.60 160 2.0 22023 33.93 2.84 0.25 0.00 0.05 2.54 164 1.9 21827 33.92 2.68 0.16 0.00 0.05 2.47 168 1.7 21634 33.91 2.55 0.09 0.00 0.05 2.41 172 1.6 21441 33.91 2.43 0.03 0.00 0.05 2.34 176 1.5 21248 33.90 2.33 0.00 0.00 0.05 2.28 180 1.4 21049 33.89 2.27 0.00 0.00 0.05 2.21 184 1.3 20841 33.88 2.20 0.00 0.00 0.05 2.15 188 1.2 20625 33.88 2.13 0.00 0.00 0.05 2-OR 192 1.1 20404 33.87 2.06 0.00 0.00 0.05 2.01 196 1.0 20178 33.86 1.99 0.00 0.00 0.05 1.94 200 1.0 19951 33.85 1.92 0.00 0.00 0.05 1.87 204 0.9 19723 33.84 1.85 0.00 0.00 0.05 1.80 208 0.8 19495 33.83 1.78 0.00 0.00 0.05 1.73 212 0.8 19269 33.82 1.71 0.00 0.00 0.05 1.66 216 0.7 19045 33.82 1.65 0.00 0.00 0.05 1.60 220 0.7 18823 33.81 1.58 0.00 0.00 0.05 1.53 224 0.6 18605 33.80 1.52 0.00 0.00 0.05 1.47 228 0.6 18390 33.79 1.46 0.00 0.00 0.05 1.41 232 0.5 18179 33.78 1.40 0.00 0.00 0.05 1.35 236 0.5 17973 33.77 1.34 0.00 0.00 0.05 1.29 240 0.5 17772 33.77 1.28 0.00 0.00 0.05 1.24 244 0.4 17575 33.76 1.23 0.00 0.00 0.05 1.18 248 0.4 17383 33.75 1.18 0.00 0.00 0.05 1.13 252 0.4 17196 33.74 1.13 0.00 0.00 0.05 1.08 256 0.3 17014 33.74 1.08 0.00 0.00 0.05 1.04 260 0.3 16837 33.73 1.04 0.00 0.00 0.05 0.99 264 0.3 16665 33.72 1.00 0.00 0.00 0.05 0.95 268 0.3 16498 33.72 0.95 0.00 0.00 0.05 0.91 272 0.3 16336 33.71 0.91 0.00 0.00 0.05 0.87 276 0.2 16178 33.70 0.88 0.00 0.00 0.05 0.83 280 0.2 16026 33.70 0.84 0.00 0.00 0.05 0.79 284 0.2 15878 33.69 0.80 0.00 0.00 0.05 0.76 288 0.2 15735 33.69 0.77 0.00 0.00 0.05 0.72 292 0.2 15506 33.68 0.74 0.00 0.00 0.05 0.69 296 0.2 15461 33.68 0.71 0.00 0.00 0.05 0.66 300 0.2 15331 33.67 0.68 0.00 0.00 0.05 0.63 304 0.1 15205 33.67 0.65 0.00 0.00 0.05 0.61 308 0.1 15083 33.66 0.63 0.00 0.00 0.04 0.58 312 0.1 14965 33.66 0.60 0.00 0.00 0.04 0.56 316 0.1 14851 33.65 0.58 0.00 0.00 0.04 0.53 320 0.1 14740 33.65 0.55 0.00 0.00 0.04 0.51 324 0.1 14633 33.64 0.53 0.00 0.00 0.04 0.49 328 0.1 14529 33.64 0.51 0.00 0.00 0.04 0.47 332 0.1 14429 33.63 0.49 0.00 0.00 0.04 0.45 336 0.1 14332 33.63 0.47 0.00 0.00 0.04 0.43 340 0.1 14238 33.63 0.45 0.00 0.00 0.04 0.41 344 0.1 14147 33.62 0.44 0.00 0.00 0.04 0.39 348 0.1 14059 33.62 0.42 0.00 0.00 0.04 0.38 352 0.1 13974 33.62 0.40 0.00 0.00 0.04 0.36 356 0.1 13892 33.61 0.39 0.00 0.00 0.04 0.34 360 0.1 13812 33.61 0.37 0.00 0.00 0.04 0.33 364 0.0 13735 33.61 0.36 0.00 0.00 0.04 0.32 368 0.0 13660 33.60 0.35 0.00 0.00 0.04 0.30 372 0.0 13588 33.60 0.33 0.00 0.00 0.04 0.29 376 0.0 13518 33.60 0.32 0.00 0.00 0.04 028 380 0.0 13450 33.60 0.31 0.00 0.00 0.04 0.27 384 0.0 13384 33.59 0.30 0.00 0.00 0.04 0.26 388 0.0 13320 33.59 0.29 0.00 0.00 0.04 0.25 392 0.0 13258 33.59 0.28 0.00 0.00 0.04 0.24 396 0.0 13198 33.59 0.27 0.00 0.00 0.04 0.23 400 0.0 13140 33.58 0.26 0.00 0.00 0.04 0.22 404 0.0 13084 33.58 0.25 0.00 0.00 0.04 0.21 408 0.0 13029 33.58 0.24 0.00 0.00 0.04 0.20 G:U08812014114004-VAML Phase 2A%Cales114004 routing25yr24hr Lots 75-83 8/2712014 VAML Phase 2A MLV Lots 84-86 Stormwater Pond Routing 25-year 24hr Storm WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 1 0.92 ACRES RUNOFF COEF. 'C' 0.15 TIME OF CONCENTR 5.00 MIN INTENSITY (25 YR) 8.15 IN/HR Oa = 1.12 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 8.05 INCHES 25yr, 24hr PRECIPITATION CN = 76 S = (1000/CN)-10 S = 2.82 Depth (D) = (P-0.2S)"2/(P+0.8S) D = 5.44 IN - 25yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 74.41 MINUTES Storage Volume Req'd = (Qp-Qa)" Tp*1.39*60 11,562 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 31.00 feet AFTER DEVELOPMENT WATERSHED AREA 0.94 ACRES RUNOFF COEF.'C' 0.39 TIME OF CONCENTR 5.00 MIN INTENSITY (25 YR) 8.15 IN/HR Qp = 2.99 CFS Op = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE Ins In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 31.00 10,021 0 0 0 0 0 0.00 32.00 13,078 11,550 11,550 1.0 9.3544 0.0000 1.00 33.00 14,608 13,843 25,393 2.0 10.1422 0.6931 2.00 Regression Output: Ks = 11660 b = 1.14 Constant 9.35 14004 G:UOBS12014114004-VAML Phase 2AkGs1cs\140G4 routing25yr24hr_L0ts 84-86 8/27/2014 VAML Phase 2A MLV Lots 84-86 Stormwater Pond Routing 25-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 1.12 cfs Qp = 2.99 cis Tp = 74.4 min dT = 4 min BASIN DATA Ks = 11550 b = 1.14 Zo = 26.00 ft Normal water elev = 31.00 ft Peak Outflow = 1.12 cfs Box Weir Length = 16 ft Peak Stage = 32.01 It Cw = 3.0 Maximum Storage = 11,676 cu It Zcr = 32.05 ft Control Holes: State Orifice: Dia = 1.10 in Dd m 18 in Inv = 31.00 ft Cd = 0.59 Weir: L = 12 in Zi = 30.30 ft Inv = 31.50 ft Emergency Overflow Weir: L = 480.0 in Inv = 32.25 ft 14004 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cfs) (cu ft) (ft) (cfs) (cfs) (cfs) (cis) cfs 0 0.0 0 31.00 0 0 0.00 0 0.00 4 0.0 0 31.00 0 0.00 0.00 0 0.00 8 0.1 5 31.00 0.00 0.00 0.00 0.00 0.00 12 0.2 25 31.00 0.00 0.00 0.00 0.00 0.00 16 0.3 70 31.01 0.00 0.00 0.00 0.00 0.00 20 0.5 149 31.02 0.00 0.00 0.00 0.00 0.00 24 0.7 269 31.04 0.00 0.00 0.00 0.00 0.00 28 0.9 438 31.06 0.00 0.00 0.00 0.00 0.00 32 1.2 660 31.08 0.01 0.00 0.00 0.01 0.00 36 1.4 939 31.11 0.01 0.00 0.00 0.01 0.00 40 1.7 1277 31.14 0.01 0.00 0.00 0.01 0.00 44 1.9 1675 31.18 0.01 0.00 0.00 0.01 0.00 48 2.2 2133 31.23 0.01 0.00 0.00 0.01 0.00 52 2.4 2646 31.27 0.01 0.00 0.00 0.01 0.00 56 2.6 3210 31.32 0.02 0.00 0.00 0.02 0.00 60 2.7 3820 31.38 0.02 0.00 0.00 0.02 0.00 64 2.8 4469 31.43 0.02 0.00 0.00 0.02 0.00 68 2.9 5147 31.49 0.02 0.00 0.00 0.02 0.00 72 3.0 5846 31.55 0.06 0.00 0.00 0.02 n nA 76 3.0 6548 31.61 0.13 0.00 0.00 0.02 0.10 80 2.9 7234 31.66 0.22 0.00 0.00 0.02 0.20 84 2.9 7888 31.71 0.32 0.00 0.00 0.03 0.30 88 2.7 8498 31.76 0.43 0.00 0.00 0.03 0.41 92 2.6 9054 31.81 0.54 0.00 0.00 0.03 0.51 96 2.4 9548 31.85 0.64 0.00 0.00 0.03 0.51 100 2.3 9976 31.88 0.73 0.00 0.00 0.03 0.70 104 2.1 10344 31.91 0.81 0.00 0.00 0.03 0.78 108 2.0 10655 31.93 0.88 0.00 0.00 0.03 0.85 112 1.8 10916 31.95 0.94 0.00 0.00 0.03 0.91 116 1.7 11130 31.97 0.99 0.00 0.00 0.03 0.96 G:W0BS12014114004-VAML Phase 2A1Ca1cs114004 routing25y24hr_Lots 84-86 8/27/2014 VAML Phase 2A 14004 MLV Lots 84-86 Stormwater Pond Routing 25-year 24hr Storm 120 1.6 11302 31.98 1.03 0.00 0.00 0.03 1.00 124 1.5 11437 31.99 1.06 0.00 0.00 0.03 1.03 128 1.4 11539 32.00 1.09 0.00 0.00 0.03 1.06 132 1.3 11610 32.00 1.11 0.00 0.00 0.03 1.08 136 1.2 11655 32.01 1.12 0.00 0.00 0.03 1.09 140 1.1 11676 32.01 1.12 0.00 0.00 0.03 1.09 14A 1.0 11676 32.01 1.12 0.00 0.00 0.03 1.09 148 1.0 11658 32.01 1.12 0.00 0.00 0.03 1.09 152 0.9 11625 32.01 1.11 0.00 0.00 0.03 1.08 156 0.8 11577 32.00 1.10 0.00 0.00 0.03 1.07 160 0.8 11517 32.00 1.08 0.00 0.00 0.03 1.05 164 0.7 11448 31.99 1.07 0.00 0.00 0.03 1.04 168 0.7 11369 31.99 1.05 0.00 0.00 0.03 1.02 172 0.6 11283 31.98 1.03 0.00 0.00 0.03 1.00 176 0.6 11191 31.97 1.00 0.00 0.00 0.03 0.97 180 0.6 11093 31.97 0.98 0.00 0.00 0.03 0.95 184 0.5 10992 31.96 0.96 0.00 0.00 0.03 0.93 188 0.5 10887 31.95 0.93 0.00 0.00 0.03 0.90 192 0.5 10780 31.94 0.91 0.00 0.00 0.03 0.88 196 0.4 10670 31.93 0.88 0.00 0.00 0.03 0.85 200 0.4 10560 31.92 0.86 0.00 0.00 0.03 0.83 204 0.4 10448 31.92 0.83 0.00 0.00 0.03 0.80 208 0.3 10337 31.91 0.81 0.00 0.00 0.03 0.78 212 0.3 10225 31.90 0.78 0.00 0.00 0.03 0.75 216 0.3 10114 31.89 0.76 0.00 0.00 0.03 0.73 220 0.3 10003 31.88 0.73 0.00 0.00 0.03 0.71 224 0.3 9893 31.87 0.71 0.00 0.00 0.03 0.68 228 0.2 9785 31.86 0.69 0.00 0.00 0.03 0.66 232 0.2 9678 31.86 0.67 0.00 0.00 0.03 0.64 236 0.2 9572 31.85 0.64 0.00 0.00 0.03 0.62 240 0.2 9468 31.84 0.62 0.00 0.00 0.03 0.59 244 0.2 9366 31.83 0.60 0.00 0.00 0.03 0.57 248 0.2 9266 31.82 0.68 0.00 0.00 0.03 0.55 252 0.2 9167 31.82 0.56 0.00 0.00 0.03 0.53 256 0.1 9071 31.81 0.54 0.00 0.00 0.03 0.51 260 0.1 8977 31.80 0.52 0.00 0.00 0.03 0.50 264 0.1 8884 31.79 0.50 0.00 0.00 0.03 0.48 268 0.1 8794 31.79 0.49 0.00 0.00 0.03 0.46 272 0.1 8706 31.78 0.47 0.00 0.00 0.03 0.44 276 0.1 8620 31.77 0.45 0.00 0.00 0.03 0.43 280 0.1 8536 31.77 0.44 0.00 0.00 0.03 0.41 284 0.1 8454 31.76 0.42 0.00 0.00 0.03 0.40 288 0.1 8374 31.75 0.41 0.00 0.00 0.03 0.38 292 0.1 8296 31.75 0.40 0.00 0.00 0.03 0.37 296 0.1 8220 31.74 0.38 0.00 0.00 0.03 0.36 300 0.1 8146 31.74 0.37 0.00 0.00 0.03 0.34 304 0.1 8074 31.73 0.36 0.00 0.00 0.03 0.33 308 0.1 8004 31.72 0.34 0.00 0.00 0.03 0.32 312 0.1 7935 31.72 0.33 0.00 0.00 0.03 0.31 316 0.1 7869 31.11 0.32 0.00 0.00 0.03 0.30 320 0.0 7804 31.71 0.31 0.00 0.00 0.03 0.29 324 0.0 7741 31.70 0.30 0.00 0.00 0.03 0.27 328 0.0 7680 31.70 0.29 0.00 0.00 0.03 0.27 332 0.0 7621 31.69 0.28 0.00 0.00 0.03 0.26 336 0.0 7563 31.69 0.27 0.00 0.00 0.03 0.25 340 0.0 7506 31.68 0.26 0.00 0.00 0.02 0.24 344 0.0 7451 31.68 0.25 0.00 0.00 0.02 0.23 348 0.0 7398 31.68 0.25 0.00 0.00 0.02 0.22 352 0.0 7346 31.67 0.24 0.00 0.00 0.02 0.21 356 0.0 7296 31.67 0.23 0.00 0.00 0.02 0.21 360 0.0 7247 31.66 0.22 0.00 0.00 0.02 0.20 364 0.0 7199 31.66 0.22 0.00 0.00 0.02 0.19 368 0.0 7152 31.66 0.21 0.00 0.00 0.02 0.18 372 0.0 7107 31.65 0.20 0.00 0.00 0.02 0.18 376 0.0 7063 31.65 0.20 0.00 0.00 0.02 0.17 380 0.0 7021 31.65 0.19 0.00 0.00 0.02 0.17 384 0.0 6979 31.64 0.18 0.00 0.00 0.02 0.16 388 0.0 6938 31.64 0.18 0.00 0.00 0.02 0.15 392 0.0 6899 31.64 0.17 0.00 0.00 0.02 0.15 396 0.0 6861 31.63 0.17 0.00 0.00 0.02 0.14 400 0.0 6823 31.63 0.16 0.00 0.00 0.02 0.14 404 0.0 6787 31.63 0.16 0.00 0.00 0.02 0.13 408 0.0 6752 31.62 0.15 0.00 0.00 0.02 0.13 G:WOBS12014114004-VAML Phase 2A1Calcs114004 routing25y(24hr Lots 84-86 From: Johnson, Kelly Sent: Friday, September 05, 2014 2:05 PM To: 'Monica Valsi' Subject: The Village at Mott's Landing Monica, I have been going through this today. I have a couple of questions for you: 1.) Supplements: Please fill out all of the data and re -submit the form. For instance we are missing the discharge rate through the orifice and the pre -development 1yr24hr rate. There may be other data missing. Also, I think that there are some typos between the supplement and the calculations. For instance, in DA2 the PP volume is 21,154+5,226=26,380, but the supplement says 26,448. There are several similar items. 2.) Drawdown Rate: Are you drawing down the provided volume rather than the required volume? If so, please make the necessary adjustments to the package using the required volume to size the orifice. I know that it is late on a Friday afternoon. But, since this is the 3rd round I am technically supposed to return the project. I talked to Georgette and she approved a 3`d add -info if we can get this done quickly. I would much rather get this out than return it and start over (and I am sure you would, too!) Can this be done within the next few week? Thanks, KJ f-,'6L[�Jokwsov, Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office: 910.796.7331 Fax: 910.350.2004 ,)DIL:5 OR - Johnson, Kelly From: Johnson, Kelly Sent: Friday, September 05, 201410:41 AM To: 'Edward. Stephens@ncagr.gov' Subject: Village at Mott's Landing Edward, I got the engineer's re -design in, and I want to check the revised SHWT elevations with you. I know they went "up", but how far up did they go? Does this seem reasonable to you? She changed from infil basins to wet ponds as expected, but for wet ponds she has to set her permanent pool (the part of the pond that always has water even when it hasn't rained) within 6" of the SHWT. Pond 1 went up 4ft. So, I just wanted to check.... (I tried to find you at your desk, but you were out..) Pond 1 (Biggest/Eastern): SHWT Originally: 29.Omsl SHWT Now: 33.Omsl Pond 2 (Smallest/Western): SHWT Originally: 29.Omsl SHWT Now: 31.Omsl Thanks, KJ K.CU oY vksow Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office: 910.796.7331 Fax: 910.350.2004 R FrS Soils Engineering and Testing Services Tipp Engineering, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Attention: Mr. Phil Tripp, F.E. April 10, 2013 f #. I� JUN 0 5 201 e e:__ ar Reference: Infiltration Testing and Seasonal High Watertable Estimates Stormwater Systems The Village at Mott's Landing Phase II Wilmington, North Carolina RFTS Job No. 901-13 Dear Mr. Tripp: C NcA 1.) ® Ejol ILI ; Q 501C_ 51T(-- Vl5 t 7 1, (-f-MtN60 —FW 7 6ft-jl 'WtL-L MC9 kc,.1( j)k7) A-1 & —TA Ft RFTS is pleased to provide testing services during the design phase of the Village at Mott's Landing residential development located off River Road in Wilmington, North Carolina. Specific site grading plans had not been provided to us at the time this report was prepared. DESCRIPTION OF ACTIVITIES AND FINDINGS dq 1611L(: �� �O �dw►+� t) 6-00" ( NCM (L), 5 NO (An) -*A7! 45 GPWA V 3 3, Fb" � : 31) As requested, our staff visited the site during the period of March 19, 2014, through April 4, 2014, to perform infiltration testing and estimate the seasonal high watertable at 4 locations identified by vK' you. The purpose of this testing was to provide soil parameters for stormwater infiltration design. Seasonal High Watertable Estimate Hand auger borings were advanced at two locations to depths ranging from approximately 3 to 10 feet below the existing ground surface in areas proposed by the civil designer for infiltration structures. The encountered soils were logged and visually classified by depth and a Munsell Soil Color Chart was used to determine the hue, value, and chroma of the visually distinct soil layers. Our soil logs are presented in Table 1. Locations 1 D. 6 7 and 8 Soils encountered in these borings consisted entirely of interbedded clean fine sands with distinct zones of soil cementation in the profiles of test locations 1 D and 6. Based on our experience with similar soils and comparisons of the soil coloration to the Munsell Chart, it is our opinion that seasonal high water table level at these locations occurs approximately 37 inches at location 1D, 13 inches at location 6, 20 inches at locatiorx 7; and 36 inches at location 8. All depths are referenced from the existing ground surface at the time of our testing. Measurements made 30 minutes after augering indicate depths to standing water in the boreholes of 48 inches at location 1D, 28 inches at location 6, 32 inches at location 7, and 47 inches at location 8. Again, all depths 3U5 SA Carolira Beach Ave N Committed to Responsive Service Of':c<.: 910-458•SGi 7 Carolina Be,:cn Norfh Carr. ..c 2EI28 1t,tO1(,.rftSP11t.c0m Fax: 910.45:;-57,E Tripp Engineering, P.C. April 10, 2014 RFTS Job No. 901-13 Page Two are referenced from the existing ground surface at the time of our testing. Additional details of the soil classifications for these locations are presented as Table 1. Infiltration Testina Infiltration testing was performed using a model 2800 Guelph Permeameter which is a constant -head device which operates on the Mariotte siphon principle and is referenced in ASTM D-5126. The permeameter is used to determine field saturated hydraulic conductivity in centimeters per second for soil at a specified depth. This testing involves advancing a borehole to the desired infiltration depth and introducing water at a constant head to determine the steady state flow rate from which the hydraulic conductivity can be calculated. The rates obtained during our testing ranges from 10.3 to 17.3 inches per hour. The results of our permeameter testing are presented in. Table 2. RECOMMENDATIONS Based on the results of our .field testing and soil classifications at the test location, we offer the following recommendations for stormwater infiltration design: At the test locations 1D and 8 it is our opinion that in order to achieve the steady state flow rate obtained during our testing; the areas of infiltration galleries or other infiltration structure should introduce stormwater at approximately 12 and 13 inches below the existing ground surface elevation, respectively. For purposes of sizing the structures we recommend ultimate application rates of 4.6 and 20.5 inches per hour, respectively. No infiltration testing was performed at locations 6 and 7 due to shallow season high water elevations. These recommendations should be reviewed by appropriate regulatory authorities before finalizing the details of any civil design. CLOSURE Please find attached our field data and a sketch showing the approximate test locations. If you have any questions after reviewing this letter, please do not hesitate to contact us at your convenience. Sincerely, TS, PLLC David L. Winstead. Field Operations Manager DLW:SDK/dhv Attachments i.d-_t41 a s 7C33 r 08-15 tits. Steven D- Kelly' b. Senior Engineer NC Registrationio"17638 Table 1 Munsell Soil Classifications The Village at Mott's Landing Phase Il Wilmington, North Carolina RFTS Job No. 901-13 Loc ID Soil Description Topsoil Hue _ Value Chroma Depth (in.) 0-4 Comments Very dark Gray fine to medium SAND 1.0YR 3 1 4-13 fine medium SAND I OYR 4 3 13-18 n fine to medium SAND 10YR 5 3 18_28 tBrown Brownish Gray fine to SAND 1 OYR 6 2m eryDark Brown fine to medium SAND, trace of Silt 7.5YR 2.5 2 37-70 SHWT@37" H2O(a�48" 6 Topsoil _ _ _ 0-8 Brown fine to medium SAND 10YR 5 3 8-13 Very Dark Brown fine to medium SAND, trace of Silt Dark Yellowish Brown fne to medium SAND 2.5YR 10YR 2.5 3 1 6 13-17 1.7-30 Cemented/ SHWT, H2O@28" Dark brown fine to medium SAND SAND 7.5YR 3 -3- - - 0-7 fineto medium SAND 1 OYR 5 3 7-15 Ml- ellowish Brown fine to m SAND 1 OYR 4 4 15-20 ark Brown into medium SAND 2.5YR 2.5 1 20-25 SHWT Dark Yellowish Brown fine to medium SAND 1 OYR 3 6 25-36 H2O@32" Dark Yellowish Brown fine to medium SAND 1 OYR 4 4 36-40 8 Topsoil Light Olive Brown fine to medium SAND - 2.5Y 5 6 0-10 10-1.6 Light Yellowish Brown fine to medium medium SAND 2.5Y I 6 4 -6 Pale Yellow fine to medium SAND 2.5Y 7 3 36-44 SHWT White fine to medium SAND 2.5Y 8 I 44-60 H2O(a�47" Table 2 Guelph Permeameter Test Results The Village at Mott's Landing Phase II Wilmington, North Carolina RFTS Job No. 901-13 Location ID 8 Depth (in.) 13 12 Hl (cm) 5 5 Ri cm/min) 4.2 5.4 Rps cm/sec 0.07 0.09 H2 (cm) 10 10 R2 (cm/min) 6.9 11.0 R2S (cm/sec) 0.115 0.183 Kfs (cm/sec) 3.29x1.0--' 1.44x10- K& (in/hr) 4.6 20.5 Definition of Terms R1_2 — Established 3 or more constant rate of water level change (cm/min) RiS. 2S — Calculated steady state flow rates (cm/sec) Hi,2 — Maintained Head of H2O (cm) Kf, — Calculated field saturated hydraulic conductivity (cm/sec) (D. — Matric flux potential (cm/sec) a — Alpha parameter Depth — Depth of well hole (in.) Location — Test location identification number Note: Diameter of well is 3.0 cm. '= i® 9fl-L iI��'ID[1Cz, 71 Liter 11 Tf r'tLgT :; T + IAMI'M {[ck'� J�. 0.1m .J U) w F- d F- CO w Z ocU Z. H� w(�0 ~ZZM Za.Z� 0Zp� Qg�0) rr-cnZ(:j J �z LL O J Z -m§ M TRIPP ENGINEERING, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 August 29, 2014 NCDENR Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Kelly Johnson Re: Village at Motts Landing Phase 2A Stormwater Project No. SW8140605 TE 14004 Dear Kelly: In response to your request for additional information dated August 5, 2014, we offer the following: 1. We are proposing to bypass the offsite drainage area through an adequately sized swale and closed pipe conduit system. 2. As a result of a field investigation of the seasonal high water table (SHWT) conducted by Edward Stephens, soil scientist with NCDACS, on Friday, A»gust 15, 2014; infiltration is not suitable for the site. It was determined that the SHWT is less than 24 inches. Two (2) wet detention basins have been designed for the site. I Bearings and distances delineating the entire project area to be permitted are provided. There are no "open" decking areas proposed within the building footprint. 4. Full sets of revised calculations and plans are enclosed. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. Monica Valsi, E.Y. MLV:dcb Enc. nECE1VED ' I AUG 2 9 2014 BY: 08/29/14 Stormwater & Erosion Control Narrative The Village at Motts Landing Phase 2A New Hanover County, NC TE 14004 The Village at Motts Landing (VAML) Phase 2A is a 12-unit residential duplex site in New Hanover County, Parcel ID# R07600-006-001-000 and R07600-006-181-000, owned by Arnold L. and Florence S. Sobol and contains approximately 4.0 acres. The project area is approximately 4.8 acres located between Sanders Road and Motts Village Road. Wetlands exist on the site. VAML Phase 2A is proposing to construct six (6) residential duplexes for a total of twelve (12) units, utility services, and two (2) wet detention basins. The site has two (2) drainage areas. Drainage Area 1 (Lots 75-83) is approximately 2.63 acres. The total impervious area for DA I is 0.86 acres. Drainage Area 2 (Lots 84-86) is approximately 0.94 acres. The total impervious area for DA 2 is 0.28 acres. The offsite drainage area consisting of 4.41 acres will bypass the two (2) drainage areas with an adequately sized swale and closed pipe conduit system. The project will be treated by erosion control measures such as drop inlets with inlet protection, grassed conveyance swales, temporary silt fence, and two sediment basins. Two (2) wet detention basins provides sufficient storm water management to meet the State's 1.5" requirement and alternately sized for the 2-, 10-, and 25-yr storm events and analyzed for the 100-yr storm event. An emergency spillway has been designed for the 100-year storm assuming the principal spillway is obstructed or not operating properly. ECEI'' E AUG 2 9 20% BY: NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor August 5, 2014 Dr Amold Sobol, Manager Aftew Properties, LLC 2020 S. Churchill Dr. Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8140605 The Village at Motts Landing Phase 2A New Hanover County Dear Mr. Sobol: John E. Skvada, III Secretary The Wilmington Regional Office received and accepted a State Stormwater Management Permit Application for The Village at Motts Landing Phase 2A on June 5, 2014. A request for additional information was mailed on July 1, 2014 and a response was received on August 1, 2014. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Offsite Drainage Area: I see that the offsite drainage area in Drainage Area 3 has been removed from the original desiggn, and that that area is now included in Drainage Area 1. Offsite area that the permittee does not own/control has to either be considered at full build out (100% impervious or the maximum percentage allowed by local requirements) or routed around such that the ofisite area doesn't drain to the BMPs. How has the offsite impervious area in DA1(9,000sf) been determined? 2. Soils: a. Soil Boring: It appears from the soil borings map that the two infiltration basins (which are adjacent) are designed based on data from Boring 1 D which has a SHWr at 37" below grade. From other data submitted I see that the SHWr elevation is at 29.0ms1 and that the bottom of the basin is set at 31.0ms1. Please verify that the existing grade where the boring was done is-32.Omsl. (Please see Section VI #9 of the application.) b. Infiltration Rath: The KFs at Boring 1 D is 4.61n/hr. From the narrative I see that the basins are intended to be designed to provide 2.5 times the required volume using an infiltration rate of one-half of the rate reported in the soils report (Option #3 on page 16-9 of the BMP Manual). Please verify that half of the rate is used in the drawdown calculations. It appears that the full rate was used for at least one of the basins. Infiltration Site Visit: I understand that you are in the process of contacting Edward Stephens to conduct the infiltration site visit which is needed for permitting. Please complete the site visit prior to your resubmittal so that that data can be included in the review. 3. Plans: a. Bearing and Distance Lines: Please show bearing and distance lines delineating the entire project area to be permitted. Typical Building Footprint: Please show areas that are intended to be decking (pervious) areas of the building footprints. Division of Energy, Mineral, and Land Resources Land Quality Section -Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 - (910) 796-7215 / Fax: (910) 350-2004 Dr. Sobol August 5, 2014 Latest Documents: a. Calculations: In order to make sure we keep all of the applicable calculations on file once this design i permitted, please let me know if the calculations that are submitted in your upcoming resubmittal are a full set of calculations of if any portions of the calculations received on June 5th or August 1 st need to remain on file. I will discard the calculations that are no longer needed. b. Plans: Similarly, please let me know which sheets and revisions will constitute a full set of plans for permitting. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms to ensure that the numbers are consistent throughout. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to September 5, 2014, or the application will be returned as incomplete. The return of a project will necessitate resubmission of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at kelly.p.johnson@ncdenr.gov. SincerAly, ly Joh on En ' entaI Engineer GDS/kpj: G:IWQ1Shared\Stormwater\Permits & Projects120141140605 HD12014 08 addinfo 140605 cc: Phil Tripp, PE Wilmington Regional Office Stormwater File Page 2 of 2 TRIPP ENGINEERING, F.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 August 1, 2014 NCDENR Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Kelly Johnson Re: Village at Motts Landing Phase 2A Stormwater Project No. SW8140605 TE 14004 Dear Kelly: In response to your request for additional information dated July 1, 2014, we offer the following: L The simple method has been used to determine the design storm, 1.5", volume calculations. Revised calculations and Infiltration Basin supplements for drainage areas 1 and 2 are provided. 2. DA 3 has been removed. Offsite drainage area has been included in DA 1. A revised narrative is provided. 3. We are in the process of requesting an Infiltration System Investigation with Edward Stephens. 4. Acknowledged. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. ZM4 C4 V 4A� Monica Valsi, E.I. MLV:dcb Enc. ECENED ll VIA sv:� NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor July 1, 2014 Mr Amold Sobol, Manager Aftew Properties, LLC 2020 S. Churchill Dr. Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8140605 The Village at Motts Landing Phase 2A New Hanover County Dear Mr. Sobol: John E. Skvarla, III Secretary The Wilmington Regional Office received and accepted a State Stormwater Management Permit Application for The Village at Motts Landing Phase 2A on June 5, 2014. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Volume Determination: The TR-55 Discrete Curve Number Method for determining volume (http://www.cpesc.org/refemnce/tr55.pdf) allows for compositing pervious areas' curve numbers with unconnected impervious areas when the total impervious area is less than 30% impervious. This project has two drainage areas that are 26.33% (Basin #1) and 33.86% (Basin #2), respectively. A discussion of each basin is provided below. Additional information on the TR-55 Discrete Method is also available on page 3-9 of the BMP Manual. Additional information about disconnected surfaces is available on our website, http://DortEil.ncdenr.omtweb/INbma-manual, under Draft Chapter 24: a. Basin #1: Since this basin's drainage area is below 30%, you have the option to corn site the disconnected impervious area's curve number with the pervious area's curve number. i. Compositing Curve Numbers: The first subcatchment, the connected impervious area, will be calculated at CN=98. The second subcatchment will be a composite of the disconnected impervious area (CN=98) with the pervious area(s) [CN(s)=a lower value]. If you composite disconnected impervious area, please provide a summary in your resubmittal as to how the disconnected impervious area meets the disconnected surfaces requirements in Draft Chapter 24. ii. Not Compositing Curve Numbers: You do not have to composite the disconnected curve number with the pervious curve numbers). You have the option to treat all impervious area as connected (CN=98) as one subcatchment and have the second subcatchment made up of pervious area (CN=a lower value). b. Basin #2: Since this basin's drainage area is above 30%, its subcatchments are set up without compositing the disconnected impervious area's curve number with the pervious area's curve number as discussed above. General: i. Composite CNs are area -weighted per the square footage of area in each subcatchment. For all curve numbers, please show all cemposited CN values as well as the hydrologic soil group (A, B, C, or D) since that data affects CN selection. ii. Please calculate the difference in the pre -development volume (a sum of the pre -development volumes from both subcatchments) and the post -development volume (a sum of the post - development volumes from both subcatchments). The difference in the pre and post volumes is the required treatment volume. The drainage areas can change as you have proposed, but please ensure that the sum of the 'pre" drainage areas equals the sum of the'posC drainage areas. Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 - (910) 796-7215 / Fax: (910) 350-2004 Mr. Sobol July 1, 2014 iii. You have used a design storm of 3.8inches. Since this is project is not subject to SA, you can use the No storm value as shown in the "Voluntary Options to Use the SCS Method" on our website, .. .. — __-__u_AIAA enf%0--L:-I-IA-4n')n'JA44 The value for Wilmington is 1.141n. d. Simple Method: Please note that the TR-55 Discrete Method is only an option. It is currently still at public comment, and the Simple Method can still be used. 2. Offsite Drainage Area: The narrative refers to an offsite drainage area as drainage area 3. It appears that this drainage area contains existing homes. Please show this drainage area in the table on page 3 of the application. Please also provide a discussion in your resubmittal as to why the impervious area in drainage area 3 is not treated. 3. Infiltration Site Visit: Vince Lewis retired a few months ago, but we have a new Soil Scientist who has resumed his site visit responsibilities for infiltration projects. Please contact Edward Stephens at 910.796.7215 or Edward.Stephens@ncagr.gov to set up a site visit to verify the SHWT elevations for the two basins. 4. Plans and Infiltration Basin Design: I have not reviewed the plans or the infiltration basin's design because the treatment volume will likely change based on my volume estimates. I will review the infiltration basin's design on the next submittal. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms to ensure that the numbers are consistent throughout. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to August 1, 2014, or the application will be returned as incomplete. The return of a project will necessitate resubmission of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at kelly.p.johnson@ncdenr.gov. Sin ly, Celly J n on nvi mental Engineer GDSlkpj: G:IWQIShared\Stormwater\Permits & Projects120141140605 HD12014 07 addinfo 140605 cc: Phil Tripp, PE Wilmington Regional Office Stormwater File Page 2 of 2 Casmer, Jo From: Casmer, Jo Sent: Wednesday, June 18, 2014 9:24 AM To: 'lobos251@aol.com'; 'Tripp Engineering Subject: The Village at Motts Landing Phase 2A The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Permit Application and $505.00 fee on June 5, 2014. Your project will be assigned to a staff member and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. jo Casmer Administrative Assistant for DEMLR/Stormwater Section NC Department of Environment & Natural Resources Division of Environmental Assistance & Customer Service 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7336 Fax: (910) 350-2004 Email com-sponeience to and from this address may be subject to the North Carolina Public Records Law and may be disdosed to third parties Project Name: Project Location: d / ( OJ- A- mpttel' A'+ . � ,� ` Received Date: ,, z-a Accepted Date: r Rule(s) ®loos Coastal ®1995 Coastal ®Phase II (WIRO) ®Universal 1-11988 Coastal Type of Permi . Ne 1 or or PR Existing Permit # (Mod or PR): �PE Cert on File? Density; - HD- :..or...:.-.:..LO- %: _](% OK?) Subdivided?: Subdivision :Type:.:--Com.me.rciaJ:�—o r.._.__Resid.ential.,__-.. Stream Class: ®SA Map or Single Lot IMORW Map -_._ _ �1CG.�_:....__. E]Offsite to SW8 MExempt Paperwor Emailed Engineer on: up ement(s) (1 original per BMP) BMP Type(s): with correct/original signatures (1 original per BMP except LS/VFS and swales) (g Application withcorrect/original si natures ®ed orp or LLC: Sig. Auth. r SoS or letter nKaii—I�Address: Design Engineer ® 05 (within 6mo) [3fmail Address: Owner of eport with SHWT mote to Reviewer: IS alculations (signed/sealed) J�� ���� 1�� ►µ-�-� # `'d" ®No obvious errors P� Density includes common areas, etc Restrictions, if subdivided: & Notarized Plans Sets etails (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) rading etlands: Delineated or No Wetlands if inity Map rilf6yout (proposed BUA dimensions) Legend ®Maps ElProject Boundaries tration Wet Pond Mite oils Report ®Soils Report EDPE Cert for Master Lot #: SHWT: SHWT: ®Deed Rest for Master ®Lot # Matches Master Bottom: PP: BUA Permitted (Master): sf Visited: BUA Proposed (Offsite): sf Additional information: Permitted Proposed: Proposed: Proposed: BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) TRIPP ENGINEERING P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 June 5, 2014 NCDENR Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Kelly Johnson Re: Village at Motts Landing Phase 2A TE 14004 Dear Kelly: F-CEI JUN 0 5 2014 We are requesting a high density stormwater permit for the Village at Motts Landing Phase 2A. Enclosed please find the following items for review: • 2 sets of plans • $505 check • Narrative • Stormwater application — one original and one copy • Infiltration Basin Supplements • Operation and Maintenance Agreement • Deed Restrictions • Calculations • USGS map • Soils Reports • Copy of the Deed Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. Vl• '• 4uk. Y r Monica Valsi E.I. MLV:dcb Enc. JUN SWe l 4cXebS �� INYNflNIIINIYIflNII�flIIIIIINIIINIINYINNIIII 2014008957 FOR REGISTRATION REGISTER OF DEEDS TA_THEUSCH BEASLEY NEW HRNOVER COUNTY, NC 2014 APR 14 03 42 53 PM BK 5808 PG 699-702 FEE S26 00 K REV STAMP $798 00 I6iRI EE 110OW NO TITLE SEARCH HAS BEEN REQUESTED OR PERFORMED IN THE PREPARATION OF THIS INSTRUMENT. THE PROPERTY IS NOT THE PRIMARY RESIDENCE OF THE GRANTORS (Excise Tax) $798 00 Recording time, Book and Page Tax Parcel No. R07600-006-001-000 & R07600-006-181-000 17 E Prepared By: James A MacDonald, Attorney Ir Return To: The MacDonald Law Firm PLLC J U N 0 5 20% 1508 Military Cutoff Road, Suite 102 Wilmington, North Carolina 28402 li BY: Grantors: Grantee: Arnold L & Florence S Sobol AFTEW Properties, LLC 2020 S. Churchill Drive 2020 S Churchill Drive Wilmington, NC 28403 Wilmington, NC 28403 **************************************************************************** STATE OF NORTH CAROLINA WARRANTY DEED COUNTY OF NEW HANOVER THIS DEED, made this A-!n day of April, 2014, by and between ARNOLD L. SOBOL and wife, FLORENCE S. SOBOL, Grantors, and AFTEW PROPERTIES, LLC, a North Carolina limited liability company, Grantee. The designation Grantors and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, fenimme or neuter as required by context WITNESSETH THAT the Grantors, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has granted, bargained, sold and conveyed and by these presents do hereby grant, bargain. sell and convey unto the said Grantee, its successor and assigns, in fee simple, all that certain lot or parcel of land situated in the County of New Hanover, and State of North Carolina, and more particularly described as follows SEE EXHIBIT "A" ATTACHED HERETO AND INCORPORATED AS IF FULLY SET FORTH HEREIN. Together with all and singular the tenements: hereditaments and appurtenance the-reunto belonging, or in anywise appertaining TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple And the Grantors covenants with the Grantee that Grantors are seized of the premises in fee simple and have the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, except unpaid ad valorem taxes not currently due, any easements or restrictions of record applicable to the property, any governmental or ordinances or budding codes applicable to the property, if any, and that Grantors will WARRANT and DEFEND the title against the lawful claims of all persons whomsoever except for exceptions herem stated IN WITNESS WHEREOF, the Grantors have hereunto set their hands and seals, the day and year first above written __Aq— (SEAL) ARNOLD L SOBOL qMM4z_dA_4'0 (SEAL) FLORENCE S SOBOL STATE OF NORTH CAROLINA COUNTY OF IV'( IJ 14", e ✓t r I, Mn 1, 1 1,, , vA , I „e r , a Notary Public in and for the State and County aforesaid, do hereby certify that Arnold L Sobol and wife, Florence S Sobol, personally appeared before me this date, and acknowledged the due execution of the foregoing instrument WITNESS my hand and Notarial Seal, this the q day of April, 2014 My Commission Expires• try- 3 1.1 (SEAL) N W G q 9,L OT �" Rq1- �? AUD00 4? � OVER Claq, `�� "'JI111110 ' max ra Z AW"'L, tl Notary Public EXHIBIT "A" DESCRIPTION FOR TRACT 1R 1.11141 ACRES +/- BEGINNING at the intersection of the Southwest comer of Tract 1 of the Sanders Division, as recorded in Map Book 44 at Page 232 of the New Hanover County Registry, and the Northern right of way of S R #1187 (100 foot right of way- Sanders Road) running thence from said begummg with the Northern right of way of S R #1187 North 84 degrees 02 minutes 03 seconds East 200 0 feet to a point, running thence North 5 degrees 46 minutes 06 seconds West 24126 feet to a point, running thence South 84 degrees 11 minutes 06 seconds West 20134 feet to the Northwest comer of the aforementioned Tract 1, running thence with the Western line of Tract 1 South 5 degrees 49 minutes 41 seconds East 120 08 feet to a existing concrete monument. running thence with the Western line of Tract 1 South 6 degrees 20 minutes 20 seconds East 12171 feet to the POINT OF BEGINNING Contammg 11141 acres more or less and being all of Tract 1 and a portion of Tract 2 of the Sanders Division as recorded in Map Book 44 at Page 232 of the New Hanover County Registry Subject to a 20 foot utility easement along the Northern right of way of S R #1187 (Sanders Road) DESCRIPTION FOR TRACT 2R 2.9782 ACRES+/ - BEGINNING at the intersection of the Southeast comer of Tract 2 of the Sanders Division, as recorded in Map Book 44 at Page 232 of the New Hanover County Registry, and the Northern right of way of S R #1187 (100 foot right of way- Sanders Road), running thence from said beginning with the Northern right of way of S R #1187 South 84 degrees 02 minutes 03 seconds West 533 35 feet to a point; running thence North 5 degrees 46 minutes 06 seconds West 24126 feet to a point, running thence North 84 degrees 11 minutes 06 seconds West 24126 feet to a point, running thence North 84 degrees 11 minutes 06 seconds East 26131 feet to a existing concrete monument, running thence North 81 degrees 58 minutes 48 seconds East 272 25 feet to the Northeast corner of Tract 2 Sanders Division, running thence with the Eastern line of Tract 2 South 5 degrees 46 minutes 06 seconds East 250.34 feet to the POINT OF BEGINNING. Containing 2 9782 acres more or less and being a portion of Tract 2 of the Sanders Division as recorded in Map Book 44 at Page 232 of the New Hanover County Registry Subject to a 20 foot utility casement along the Northern tight of way of S R #1187 (Sanders Road) The above tracts are further described on a survey prepared by Lignell W Hood III dated January 28, 2005, entitled "Recombination Tract 1 and Tract 2, Sanders Division, as recorded in Map Book 44 at Page 232 of the New Hanover County Registry for Brad Dunker", reference to which is made for a more particular description 8 TAMMY THEUSCH BEASLEY REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET WILMINGTON, NC 28401 Rfttffttf tRtftMtRthlttfffRRRRRfRRfttlfftPllfl4#tfltlyAMlkA#}#}A3#}i#ftp#Q}#####q#}p4CCt#}q}y.y#}}4f###}#i#####i#}##}######}!###### Filed For Registration 04114/2014 03:42:63 PM Book* RE 5808 Page 699-702 Document No. 2014006957 4 PGS $26.00 NC REAL ESTATE EXCISE TAX $798.00 Recorder: CRESWELL, ANDREA State of North Carolina, County of New Hanover PLEASE RETAIN YELLOW TRAILER PAGE WITH ORIGINAL DOCUMENT. *2014008957* 2014008957 CA201310004723 LIMITED LIABILITY COMPANY ANNUAL IU p6yl-b NAME OF LIMITED LIABILITY COMPANY: Aftew Properties, LLC SECRETARY OF STATE ID NUMBER: 0637949 STATE OF FORMATION: NC REPORT FOR THE YEAR: 2013 SECTION A: REGISTERED AGENT'S INFORMATION 1. NAME OF REGISTERED AGENT: ARNOLD SOBOL 2. SIGNATURE OF THE NEW REGISTERED AGENT: 3. REGISTERED OFFICE STREET ADDRESS & COUNTY 2020 South Churchill Drive SOSID: 0637949 Date Filed: 4/10/2013 11:51:00 AM Elaine F. Marshall North Carolina Secretary of State Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 4. REGISTERED OFFICE MAILING ADDRESS 2020 South Churchill Drive Wilmington, NC 28403 New Hanover Wilmington, NC 28403 SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Real Estate. 2. PRINCIPAL OFFICE PHONE NUMBER: (910) 763-2629 3. PRINCIPAL OFFICE EMAIL: 4. PRINCIPAL OFFICE STREET ADDRESS & COUNTY 5. PRINCIPAL OFFICE MAILING ADDRESS 2020 South Churchill Drive 2020 South Churchill Drive Wilmington, NC 28403 New Hanover Wilmington, NC 28403 SECTION C: MANAGERSIMIF-MBERNORGANIZERS (Enter additional Mlanagers/Membem/Organizem In Section E.) NAME: Arnold L Sobol NAME: Florence S Sobol NAME: TITLE: Manager TITLE: Manager TITLE: ADDRESS: 2020 South Churchill Drive Wilmington, NC 28403 ADDRESS: 2020 South Churchill Drive Wilmington, NC 28403 ADDRESS: SECTION D: CERTIFICATION OF ANNUAL DEPORT, Section D must be completed in its entirety by a person/business; entity. , SA613 SI NATURE DATE Fuiin must be signed by a Managerf Aamber flafied unaer Section C of this form. Print or Type Name of ManagedMember TITLE SUBMIT THIS ANNUAL REPORT NTH THE REQUIRED FILING FEE OF 820n MAIL TO: Secretary of state, Corporations Division, Post otnos Box 2asss. Raleigh, NC 27626.0625 NEW HANOVER COUNTY PLANNING & INSPECTIONS DEPARTMENT AGENCY CHECKLIST 4oW5, nW �(�JN Sam Burgess Senior Planner 230 Government Center Dr, Suite 110 Wilmington, NC 28403 910-798-7441 phone 910-798-7053 fax sburgess@nhcgov.com www.nhcgov.com Project Name: �t �g�,,5� n h Date: kL.. 1-01L4 Preliminary Plan (Conventional, <erforman High Density, EDZD) • Engineering/ Jim Iannucci/Jason Clark • Soil & Water Conservation District/ Dru Harrison • Emergency Services/ Warren Lee • Fire Services/ Ray Griswold / Tom Sosebee / Josh Smith nECEIVE • E911/ Andy Whitley MAY 2 2 2014 • Environmental Health/ Cathy Timpy (only if plan proposes well or septic tank) • Cape Fear Public Utility Authority/ Bernice Johnson / Kent Harrell By - Additional Agencies: • Corps of Engineers/ Emily Hughes • School System/ Marion Brill / Eddie Anderson • NCDOT/ Allen Hancock / Anthony Law / Ben Hughes • MPO/ Bill McDow / Mike Kozlosky • Division of Coastal Management/ Robb Mairs (plan sent if land is adjacent to coastal water) • Linda Lewis • City of Wilmington Development Services /Ron Satterfield / Jim Diepenbrock ,Minor Subdivisions are sent to the following agencies for additional comments. • Engineering/ Jim Iannucci/Jason Clark • Environmental Health/ Cathy Timpy • CFPUA/ Bernice Johnson / Kent Harrell _ Final subdivisions are sent to the following agencies for additional comments. • Fire Services/ Ray Griswold / Tom Sosebee / Josh Smith • Engineering/ Jim Iannucci/Jason Clark • CFPUA/ Bernice Johnson / Kent Harrell Upon receipt, please send yoear written comments on the attached site plan back to Planning & Inspections and the applicant within (3) three weeks. Sender Comments: ;�outi�..,j n�� og A Updated 4/2014 NEW HANOVER COUNTY PLANNING & INSPECTIONS DEPARTMENT PERFORMANCE RESIDENTIAL DEVELOPMENT 230 Government Center Drive Suite 110 Wilmington, NC 28403 910-798-7165 phone 910-798-7053 fax vvvs.v.nhcgov.com Name of Applicant or Owner Date of Application Arnold Sobol & Florence Sobol (Aftew Properties) Address City, State, Zip 2020 S. Churchill Drive Wilmington, NC 28409 Email Address Telephone Number of Owner lObOs251@aol.com 910-762-2020 Name of Surveyor (if different than Owner) Telephone Number of Surveyor (if different than Owner) Sherwin D. Cribb Land Surveying 910-791-0080 Address of Surveyor (if different than Owner) City, State, Zip 1144 Shipyard Blvd. Wilmington, NC 28412 Email Address (if different than Owner) Parcel ID Number cribbsurv@bizec.rr.com R07600-006-001-000 and R07600-006-181-000 Location of Property Square Feet/Acres on Plat Motts Village Road (at Sanders Rd. & River Rd.) 4.8 qL Project Name Land Classification The Village at Mott's Landing - Phase 2A R-15 SUBMISSION REQUIREMENTS The application will be regarded as incomplete until the following items are received by Planning & Zoning. Your application must include a $300.00 fee and 15 folded maps of the proposed Performance Residential Development. This fee should be payable to New Hanover County and must accompany this application. Applications for Performance Residential Development are received and acted upon by the County's Technical Review Committee. Planning & Zoning staff will send a copy to each appropriate agency. Written agency comments must be received three (3) weeks prior to the meeting before being placed on the TRC agenda. 1. Streets - Written comments from the North Carolina Department of Transportation approving the design of all public streets or a letter from the County Engineer approving the design of all private streets. 2. Water and Sewer- A letter from the appropriate State or local health agency approving the design of such systems and commitment allocation to serve the project. 3. Drainage- The location of all marshes, watercourses, ditches, drainage channels, with proposed drainage and utility easements water and sewer for the proposed subdivision. 4. A letter from the Soil Conservation Service indicating any acreage from Class IV soils on the property. 5. A letter from County Fire Services approving fire hydrant location and street design. 6. You are encouraged to arrange an informal conference with planning staff at least two (2) weeks prior to submitting an application. By attending this conference, you will improve your chances of submitting a complete and acceptable application. You should bring a rough sketch of your proposal to this conference. Planning & Zoning staff will proceed to advise you of environmental problems, point out significant design problems, describe the required improvements, and advise you regarding the required approvai letters for water and sewer. A checklist outlining these requirements is available to help you through this process. I ce that all information pral- Signaturented in this application - �" 4' of Property Ownbr and/or Developer is accurate to the best of my knowledge. Arnold Sobol Print Name Page 1 of 1 PRD 05110 REVISIONS Dafe I Description I By 3:1 SLOPE � 3:1 SLOPE 1 /4"/FT 1 4" FT a 5' SIDEWALK 8" ABC STONE BASE 2% MAX SLOPE —1/2" 9.5A NCDOT ASPHALT PROPOSED PROPOSED SEE DETAIL SAN. SEWER WATER MAIN TYPICAL 50' ROAD CROSS-SECTION_ NTS Certificate of Disclosure: PRIVATE ROADS I (we) the developers of VILLAGE AT MOTTS LANDING PHASE 2A subdivision located in the unincorporated area of New Hanover County understand that the roads in said subdivision are designated private. I understand that ownership and maintenance of the roads will be the responsibility of the developer until such time that the developer designates the responsibility to the property owners' association. Responsibilities must be accepted by the homeowners association as specified in the homeowner covenants for said subdivision. The private roads in said subdivision are to be constructed in accordance with Section 52-4 of the New Hanover County Subdivision Ordinance and all applicable County Codes which includes the design, installation, inspection, and approval by a recognized in the State of Engineer PE licensed Professionaln 9 ( ) North Carolina prior to final plat approval for all or a portion of the subdivision. If all or a portion of the road infrastructure system within the subdivision is bonded through a surety, Performance bond, or cash escrow, no bond shall be released until all road construction improvements are complete and certified by the Professional Engineer. It shall be disclosed to the prospective buyer of a lot or lots within the subdivision that road maintenance shall run through the property owners association in perpetuity after acceptance from the developer until such time that the roads are re —platted as publically designated roads and taken over for maintenance through the North Carolina Department of Transportation (NCDOT) or appropriate governing authority. Developer's Name Date -------- Designer's Plan Certification: "I hereby certify that this plan has been prepared in accordance with the latest New Hanover County Ordinances and Storm Water Design Manual." Signature: Printed Name and Title: _Phillip G. Tripp, P.E. Date: Registration Number: 17374 SEAL Property Owner Certification: "I (We) hereby certify that I (we) am (are) the current owner of the property and that upon receipt of "Authorization -To -Construct" any clearing, grading, construction or development, will be performed in accordance with this plan and that the applicable ordinances and rules of New Hanover County, the State of North Carolina and the Federal Government and its agencies which are hereby made part of this plan. As the owner, I (we) accept full responsibility for the construction and operation and maintenance of the proposed facilities. I (We) will not attempt to transfer of this responsibility without the written authorization of New Hanover County." Signature: Printed Name and Title: Date: NOTES: 1) PHASE 2A IS NOT LOCATED WITHIN 100—YR FLOOD ZONE. 2) CONSERVATION RESOURCES DO NOT EXIST WITHIN PHASE 2A. 3) TOPOGRAPHY AND TREE SURVEY COMPLETED BY SHERWIN CRIBB LAND SURVEYING. 4) STREET LIGHTS TO BE INSTALLED 5) ALL IMPERVIOUS AREAS ARE TO DRAIN TO THE ENGINEERED STORM DRAINAGE SYSTEM. 6) CONTRACTOR SHALL FIELD VERIFY SIZE, MATERIAL, INVERTS AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO INSTALLATION OF PROPOSED CONNECTIONS. 7) 10'. UTILITY EASEMENT ALONG ALL STREET FRONTAGE. 8) THIS SECTION SHALL NOT BE A GATED COMMUNITY. �� W W W W W W W W W i �\1 \ •� W W� W W W W � W W �' .\ 4, I \ \ L I _ __. L 41 \� T \\ W W W { W W W W W W W$I W W W W W W W W W W j W Y 41 41 I/ W W H*A, W W W W W W � W �. W W W W .� W W W W� W W W W V* �Y V� Y Y W W W W W W W IV W J� ` W 1Y W 4V \ �._ W W W `i --_.y W W W W W W W W W\ �. \ W W W W W W W W W W W W W W W W W � 9*9 W S*�\*W W4\A4T4G+AT10*N W E�QU* W W W W W W W I W WW\W W W F—* 5 T \W W } W! l - aim...__ `►. �. _ W . f �\ W / � `1W ,W/ W W 1 f l � 1 � \ 1 SS \ 1 l R E\ 8" \ \\ N// \ X41.6 \ \ \ 1 N/ \ KATI E MAY CANTY _ \ f X„ .5 , •i ,73 / X40. \ 3 � 4 61 \ZV J W d' \ EX: SDDI4 2 ,, TOP thELIN=3 64. W W W W W \W W W w •r w W l\ �t � \. W W W w `�V / W .v � W W W W W 1 \W W W- — } PH t g — t ! ! 1 ' SITE DATA: OWNER: h SITE ADDRESS: NHCo. PARCEL I� ZONING 1 , X39.33 LATITUDE & LON b5 USE X, O! TRACT AREA: MAIN TRACT (WEST SIDE RIVER TRACT (EAST SIDE 42 CONSERVATION 37. ' (BRACKISH TOTAL z , t PROPOSED STRUT 12 ® 3,200 TOTAL 12 1 3.. X 37�6 , 1 C3�8 ---1 `� ZONING: SPM UMIT U 1 , TAX MAP NO. AREA LOCATED W 100 YEAi `78 F � ss.3 PHASE 2A DAT ` S(::) , PROJECT ARE \ IMH �.. ' PROPOSED �\ 'INFILTRATION TOTAL No. 01 9 , ` BASIN No. OF BEDF X35.8 7.3� TOP: 35.0 CBOT: 31.0 *PARKING TO BE I 12 j X37.4 / 1 t i� Owl' -- -- —! PP/17CE # , AFT DR. 202 {{I ' WILT X35.4— � 5.3 \ 38.1 X37.1 PHC I X37.8X37.1 ' 5.0 LOCATION ■ NTS 1 —ss PROPOSED SEWER X 34.X38.0 \ X36.4 —fit ' ——— PROPOSED WATER L._......._ � 4.2 PROPOSED STORM WATER i---- -, ! PROPOSED FM ffn IM LIMITS OF DISTURBANCE ! INFILTRATION !PP BASIN — TSF TEMPORARY SILT FENCE %X38,X36X X.3 , TOP: 33.0 340 BOT: 31.0 _ PHASE LINE . \ \ \ I X32�z W W W 35. , EXISTING WETS \ tS� t 3?`4 \ , / / n, \ \ 1 PHASE 2A % /' ,�: 1 � W .. •y W `3 �� W \---ice � i 1 ,` ,,}t7, J �_ _... v/\f ` W y _� W W i W �— X35.4 — — i 1 ss// �`' W `K�W � �W Y W W \ PP 280 34 I/ EXISTING PHAS '1' /\ P 1 r�J� - W W \ W W \ \ W W .V \ J S ✓3SSMH J PLC' \f : ` J f ��3BITE�� \ W f . /f % \ J \ �/ 4 �35.0 t i' \ i W 35.835 _ BAR SCALE 1 "= 50' A A _ - / A i, \ ? \ 1 50' 25' O' 50' 100' 150' PRINTEDDATE Y 1 5 20% CARO S E A L — 17374 Q OREGU vv _ -DATE 05-15-14 DESIGN PGT SO DRAWN EJW C1 SHEET 1 OF 1 14004