Loading...
HomeMy WebLinkAboutSW8060608_Historical File_20071109WAIF 0.'.=°-•�,�9 Michael F. Easley, Governor C� N�� William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources Colleen H. Sullins, Director Division of Water Quality November 9, 2007 Mr. Brian D. Dilsheimer, Manager Dilsheimer Communities of North Carolina, LLC, Manager DCNC North Carolina I, LLC 2528 Independence Blvd., Suite 104 Wilmington, NC 28412 Subject: Stormwater Permit No. SW8 060608 Modification The Villages at Turtle Creek Phases I and II High Density Subdivision Project Pender County Dear Mr. Dilsheimer: The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for The Villages at Turtle Creek Phases I and II, on November 6, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 060608 Mod. dated November 9, 2007, for the construction of the subject project. This permit shall be effective from the date of issuance until November 30, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition., conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please con:6-1�v t Chr' Baker, or me at (910) 796-7215. Sin. Edward Beck Regional Supervisor Surface Water Protection Section ENB/csb: S:IWQSISTORMWATERIPERMIT1060608MOD.nov07 cc: Eric Tomczak, P.E., Cavanaugh a Associates Pender County Planning Department Chris Baker Wilmington Regional Office Non, Central Files Non, Naturally North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: www.ncwaterquality.or Location: N. 512 Salisbury St. Raleigh, NC 27604 Fax (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 060608 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Brian D. Dilsheimer, Dilsheimer Communities of North Carolina, LLC & DCNC North Carolina 1, LLC The Villages at Turtle Creek Phases l and 11 NC 210 & Lodge Hall Rd, Surf City - Pender County FOR THE construction, operation and maintenance of 7 infiltration basins in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 30, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 &1.7 on pages 3 & 4 of this permit. The subdivision is permitted for 71 lots; each allowed the maximum amount of built - upon area specified in Section 11.15 of this permit. The stormwater systems have been designed to handle the following amounts of impervious area: 1A-1 .q11,025 ft2; 1A-2 �6,875 ft2; 1A-3 @2,361 ft2; B @339,953 ft2; 1C @137,639 ft , 1 D-1 @20,771 ft ; and 1 D-2 @42,810 ft2. Basins #1 B and #1 C must be operated with a 50' vegetated filter. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The runoff from all built -upon area within each permitted drainage area of this project must be directed into the permitted stormwater control system. Perna 9 of Q State Stormwater Management Systems Permit No. SW8 060608 Modification 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The following design elements have been permitted for the infiltration basin stormwater facilities, and must be provided in the system at all times. Units Basin Basin Basin Basin Basin Basin Basin 1A 1 1A-2 1A-8 1 B 1 C 1 D-1 1 D-2 Drainage Area 29,988 16,454 7,072 752,249 283,381 38,878 90,306 Onsite ft2 29,988 16,454 7,072 752,249 283,381 38,878 90,306 Offsite 0 0 0 0 0 0 0 Total BUA 11,025 6,75 2,361 339,953 137,639 20,771 42,810 Lot BUA 0 0 0 188,569 84,875 1,066 12,382 Roads/Parking 2 ft 8,876 5,238 1,697 113,771 36,273 16,068 24,043 Sidewalks 2,149 1,637 664 37,613 22,809 3,637 6,385 Other . 0 0 0 0 4,682 0 0 Offsite 0 0 0 0 0 0 0 Basin Depth Feet 0.75 1.25 1.25 5.5 2.25 2.25 2.05 Design Storm Inches 4.5 4.5 4.5 1.5 1.5 4.5 4.5 SHWT FMSL 29.0 28.0 28.0 19.0 10.0 24.0 23.7 Bottom Elevation FMSL 31.0 30.0 30.0 21.0 12.0 27.0 25.70 Surface Area Bottom ft2 6,025 2,208 1,085 4,802 9,377 2,790 6,534 Storage Volume W 4,879 3,331 1,757 56,450 26,859 7,887 17,335 Storage/Bypass Elevation FMSL 31.75 31.25 31.25 26.5 14.25 29.25 27.75 Expected Infiltration Rate in/hr 0.52 0.52 0.52 4.0 3.0 2.6 2.6 Time to Draw Down Hours 16 28 20 27 7 13 12 Type of Soil Woodington Fine Sandy Onslow Sandy Loam Loam Receiving Stream Becky's Creek River Basin Cape Fear 18-87-8 Stream Index Number Classification of Water Body"SA;HQW" II. SCHEDULE OF COMPLIANCE No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. Panp 'A of 0 State Stormwater Management Systems Permit No. SW8 060608 Modification 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. The bioretention area may not be used as a sediment and erosion control device once the planting soil has been placed. 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 8. The Director may determine that other revisions to the project should require a modification to the permit. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control r ianning and Design Manual. 12. Prior transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Pnnc d of 0 State Stormwater Management Systems Permit No. SW8 060608 Modification 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity,.name of person performing the work and what actions were taken. 15. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 060608, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is as follows: Lot # Max BUA Lot # Max BUA Lot # Max BUA Lot # Max. BUA Lot # Max. BUA 1 4,152 16 3,731 31 3,659 46 4,176 61 4,187 2 4,152 17 3,695 32 3,633 47 4,165 62 4,189 3 1 4,152 18 3,676 33 1 3,602 48 4,149 63 4,187 4 4,152 19 4,211 34 3,601 49 4,226 64 4,195 5 4,300 20 4,269 35 3,599 50 4,145 65 4,187 6 4,186 21 4,350 36 3.551 51 4,152 66 4,187 7 3,668 22 4,161 37 4,480 52 4,151 67 4,187 8 3,608 23 4,165 38 3,849 53 4,151 68 4,187 9 3,607 24 4,162 39 3,828 54 4,151 69 4,183 10 3,607 25 ==za 40 4,022 55 4,147 70 4,186 11 3,517 26 41 4,255 56 1 4,166 71 4,186 12 4,156 27 3,681 42 4,087 57 4,165 72 1 4,232 13 3,692 28 3,672 43 3,829 58 4,213 73 4,289 14 3,776 29 4,186 44 4,128 59 4,253 15 3,691 30 3,664 45 1 4,425 60 4,189 Panes ri of Q State Stormwater Management Systems Permit No. SW8 060608 Modification This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built -upon area in excess of the permitted amount will require a permit modification. 16. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 17. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 18. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality, signed by the parties involved, along with the appropriate documentation as listed on page 2 of the form. The project must be in good standing with DWQ. T he approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations .contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) that have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Panes A of Q State Stormwater Management Systems Permit No. SW8 060608 Modification 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division in writing of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 10th day of July 2007. NORTH CARD A ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Pnna7nfQ State Stormwater Management Systems Permit No. SW8 060608 Modification The Villages at Turtle Creek Phases 1 & 2 Page 1 of 2 Stormwater Permit No. SW8 060608 Modification Pender County Designer's Certification , as a duly registered in the State of North. Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number_ ___ Date SEAL PanaRofQ State Stormwater Management Systems Permit No. SW8 060608 Modification Certification Requirements: Page 2 of 2 -1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. _10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Pender County Planning Department PnnaQofQ ......OFLICE USE ONLY :....:, :..:.:............. ...:...:..:... .::. �.............:....:..:::::.....:.:...:�::•:.....::......:...... Date Received t T Fee Paid Permit Number Doo S 0 0 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc, who owns the project): DCNC North Carolina I, LLC 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC 3. Mailing Address for person listed In item 2 above: 2528 Independence Blvd, Suite #104 City: Wilmin ton State: NC Zip: 28412 Telephone Number: ( 910 ) 790 - 9880 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): The Villages at Turtle Creek 5. Location of Project (street address): NC 210 and Lode Hall Road City: Surf City County: Pender 6. Directions to project (from nearest major intersection): From the intersection of US 17 and NC 210, travel east on NC 210 two (2) miles Turn left after Lodge Hall Road, 7. Latitude: 34 274 0.45" N Longitude; 77 32' 55.2411 w of project 8. Contact person who can answer questions about the project: Name: Tom Miner Telephone Number: ( 610 ) 617-9703 III, PERMIT INFORMA11ON: 1. Specify whether project is (check one); New Renewal x Modification Form SWU-101 Version 399 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8 060608 and its issue date (if known) JULY 20 , 2006 3. Specify the type of project (check one): Low Density x High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control x 404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater runno£f from the impervious and non -impervious areas will sheet flow to a valley curb for eventual discharge to seven (7) Proposed infiltration ponds by way of swales, curb inlets, yard inlets, valley curbs, and a piped stormwater conveyance system. 2. Stormwater runoff from this project drains to the cape Fear River basin. 3, Total Project Area: 27.73 acres 4. Project Built Upon Area. 46.9 % 5, How many drainage areas does the project have? 7 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information.: Drainage Area 1 (1A-1) Drainage Areal (lA-2) Receiving Stream Name Becky's Creek Becky's Creek Receiving Stream Class SA SA Drainage Area 29,988 Sq. Ft. 16,454 Sq. Ft. Existing Impervious* Area 0 Sq. Ft. 0 Sq. Ft. Proposed Impervious*Area 11,025 Sq. Ft. 6,875 Sq. Ft. %Impervious* Area (total) 36. 8% 41.8t Impervious* Surface Area ..Drainage Areal: � (1i�-i)..' ° .:';:: : `...:.:.Drainage Area 2 �1A-2.) . On -site Buildings 0 Sq. Ft, o Sq. Ft. On -site Streets 8 876 Sq. Ft. 5,238 Sq. Ft. On -site Parking 0 S Ft. O S Ft On -site Sidewalks2, 149 Sq. Ft. 1,637 Sq. Ft. Other on -site 0 Scr. Ft. 0 Sq. Ft. Off -site I 0 Sq. Ft. o Sq. Ft . Total; ll, o2s sq. Ft. Total: 6,875 Sg. Ft. impervious area is cietinea as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? Computer Generated IV. DEED:, RESTRICTIONS AND PROTECTIVE COVEI HINTS The following Italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. Z. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filed in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neu -se River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.94 Page 3 of 4 VI. SUBMITTAL. REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office, 1, Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form ET • One copy of the applicable Supplement Form(s) for each BMP ET • Permit application processing fee of $420 (payable to NCDENR) ET • Detailed narrative description of stormwater treatment/management ET • Two copies of plans and specifications, including: ET - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stormwater control measures Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): CAVANAUGH & ASSOCIATES P.A. Mailing Address: 130 NORTH FRONT STREET SUITE 202 T City: WILMINGTON State: NC Zip: 28401 Phone: ( 910 )392-4462 VIII. APPLICANT'S CERTIFICATION Fax: ( 910 ) 392-4612 I, (print or type name ofperson listed in General Information, item 2) .i B. &AXe iru ei certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants y�ijl be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. �// e: '✓ Date:_ /o/ac k O;elet- i'Esfdle t,'f j %�J@arc�izr o {OCAJC La�o/14 .I - Form SWU-101 Version 3,99 Page 4 of TV LL. V LZ it Et C� 6 1040 -; LL (0 & m CO it t & 6 C) 0 (1) a T'll Oci 1-� Clio (j) in 00 co 0 o a 0c) N CS LC X :< U- . cy (D cr a * r LL 6 L 00 CO CD(0 (D 0 U) U) o C) R co o o rl.L r.: 06 0 (D V- C'j 0 cr cr U- ci M fn 00 co 00 do fl- m CD co m a 0 C"L � co 0) m C6 00 m co 04 QU (0 co co U- co dr t t a 0 co Ln 9 am or co cr CD a 0 m LO CD -2 LOCD - r. - COCD CD ism M 00 co m P.: m 21d IV C-5 LL u ric• r Lt it U) vi er aU) w timed. 17 cn (U: CNC)- C (.0 Oi Cf) o 00 (D s coo 0 c1co r) N 10, .0 <izUla 0 Oi E w E ca 0 0 OL E m < a cow (LD < OL E U) a cc a) co IL CO > -6) ca r 0 CL ID Cl E �-M 0 d q) 0 (DI Cp W 0 WICLIn Q010101015 a -C Permit No. :5 8o6()%(�A>M ca (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original P DWQ Stormwater Management Plan Review: Q A complete stormwater management plan submittal includes a stormwater management permit app infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: The Villages at Turtle Creek Contact Person: DCNC North Carolina I, LLC Phone Number: L 910 ) 790- 9880 This worksheet applies to: Basin No. phase 1D-1 in Drainage Area 1D-1 (as fdenlrfred orr plains) (from Fbrni swu--101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Onslow Loamy Fine Sand 2.55 in/hr in/hr or ef/hr/sf (circle appropriate units) 24.0 finsl (Seasonal High Water Table elevation) 4.5 Inch (1.5 inch event for SA waters, I inch event for others) 7,739 C.f. 0.4 days Varies t. X Varies {} — 2, 790 sq. ft. (botfnr o 1 - � n dl�..nsions, 7,887 c.f. 27.00 fmsl 29.25 fmsl 30.25 fmsl Forin SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section; 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET e. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. IT h. Soils have a minimum hvdraulic conductivity of 0.52 inches ner hour and soils ren_ ort is attached. ET _ L System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). IT r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -dawn calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition, 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments, When the design depth reads 0.56 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina 2, LLC Blvd, Suite #104, Wilmington, NC 28412 Note: The legally esponsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident the subdivision has been named the p esident. I, a NotaryPublic for the State of County of �j� / do he�certify MP.�> personally appcarcd Wore inc thisso day o , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, COMM NWEALTH OF PENNSYLVANIA Qi L. Dronilsky, Notary Public SEAL Notarial Seal U l?'111 Robyn y commission expires e Lower' Merlon T"., Mon ornery County My Oommlsslon E)ires Aug. 8, 2011 Member, Pennsylvania Association of Notaries Form SWU-103 Rev 3.99 Page 3 of 3 Permit No. SW $66 0 (a 6 &k-OD (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMW ATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form Inay be photocopied for use as an original D)YQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: The Villages at Turtle Creek Contact Person: oCNC North Carolina 1, LLC Phone Number: (910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1D-2 (a? identified on plans) in Drainage Area 1D-2 (from Porn SW[-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Onslow Loamy Fine Sand 2.55 in/hr innlr or cf/hr/sf (circle appropriate units) 23.70 fmsl (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters,! inch event for others) 16,142 c.f. 0.4 days varies fi % Varies 6,534 sq. ft. (bottom dimensions) 17,335 C.f. 25.70 fmSl 27.75 fins]. 28.50 fmsl Form SWU-103 Rev 3.99 Page 1 of 3 I1I. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, Februaiy 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. R.epair eroded areas immediately, re -seed as neeessai-y t,^, maintain adequate vegetative cover, Arnow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.51 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. I£ the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H ,1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina r, LLC Blvd, Suite #104, Wilmington, NC 2 Date: Note: The le ly responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resf nt of the subdivision has been named the president. 1+ , a Notary Public for the State of a A 01 J 11 gounty of n , do hereby certify that - ,(,� �f personally appeared before me thaw day of ' and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, COMMONWEALTH OF PENNSYLVANIA Notarial Seats p► SEAL Robyn L. DronilskY, Notary Public y commission expires b 0 1 1 Lower Medw Twp., Montgomery CountY My Commission Expires Aug. 8, 2D11 Member, Pennsylvanla Asweiation of Notaries Form SWU-103 Rev 3.99 Page 3 of 3 Permit No. 6W $oG066g M 0O (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may he photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC North Carolina I, LLC Phone Number: ( 910 ) 790- 9880 1 his worksheet applies to: Basin No. Phase 1 - IA-1 (as tde alped on plans) in Drainage Area LA-1 From Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (find). Soils Report Summary Soil Type Woodington Sine Sandy Loam Infiltration Rate 0. 52 in/hr 1n/hr or cf/hrlsf (circle appropriate uniis) SHWT Elevation 29.0 fmsl (Seasonal High Water Table elevation) Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation 4.5 inch (1.5 inch event for SA waters, I inch event for others) 4,283 C f 0.7 days varies & X Varies = 6,025 sq. ft. (botta►n dimensions) 5,2e2 c,f. 31.00 fmsl 31.75 fmsl 32.75 fUsl Fonn SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements ,per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach j ustifleation if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at Ieast 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is Iocated in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. -Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. BT i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). FIT 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or ET sediment trap is provided. _ in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches .or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). HT o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET Runoff in excess of the design volume bypasses off-line systems ass detail provided). q• � yp y (bypass p )• ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed §ystem will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.1' feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.S. Dilsheimer, Vice President/Member of DCNC North Carolina r, LI,C Address: 2528 Independence Blvd, Suite #104, Wilmington, NC 28412 Note: Thele ally rrspunsible party should not be a homeowners association unless more than SO% of the lots have teen .sold and a red ent of the subdivision has been named the president 1, 72o m /iS 1A WC41AD ! -,a Notary Public for the State of & NSy4��unty of /Mg&T6V0f&^rW do hereby certify that T13 U 3i c-SrE t cam_ personally appeared before ma this day of 21tiG' , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEA' L My a ormniuion expires CO MMONWEALTm OF PENN AN1 Notarial Seal ift�rras M M00ji ly, Notary Public 6owerMatimTwp., mmkprmy0=* Form:'S WU-103 Rev 3.99 Page 3 of 3 My Mmttlssion BOW S" 1. 2WO Member. Pennsplvenle Assodathrp Of Nola es Permit No, r W po rooGo sm Oo (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The villages at Turtle Creek Contact Person: DCNC North Carolina r, LLC Phone Number: ( 910 ) 79o- 9aso This worksheet applies to: Basin No. Phase 1 - IA-2 in Drainage Area 1A-2 (as We1N$ed on plans) (from Form SW(-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions - Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Woodington Fine Sandy Loam 0.52 in/hr inft or ef/hr/sf (circle appropriate units) 28.0 fmSl (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA wafers, I inch event far others) 2,629 c.f. 1.2 days Varies ft. x varies ft. 2,208 sq. ft. (bottom dimensions) 3,331 c.f 30.00 fmsl 31.25 fm51 32.25 fmsl Form SWU-103 Rev 3.99 Page 1 of 3 IIL REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .100& Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials HT a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. Er f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). HT r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. m' s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum Height of six inches, and remove trash as needed 3. After every runoff producing rainfall event and at Ieast monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.31 feet irk the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 211 A000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Naive and Title: -T. B • Dilsheimer, Vice President/Member of DCNC North Carolina 1, LLC Address: 2528 Independence Blvd, suite #104, Wilmington, NC Note: The legally esponsible party homeownersm should not be a homeowners association unless ore than 50% of the lots have been sold and a resident f the subdivision has been named the president. l�1 I, ,0$406 1 a T ilNotary Public for the State of 4M Ads &AW t County of 8i3Z da hereby cc tify that r'f.S/t/Gen—'WiFf-f— personally appeared before me this day of 0_ . and acknowledge the due execution of the fbrgoing infiltration basin maintenance requirements. Witness my hand and official seal, SRAL My commission expires 44Z.-I COMMONWEALTH OF PENNSYLVAN1 NotEw saw Form SWU-103 Rev 3.99 Page 3 of 3 LowerMetlon Thmm M.� Noha ry pd* My ConwrjWm ExWe , � Member, Pennsvlvanle Aasorfa�lan Qi INotarfas Permit No. , 1 & 1 Re) G 0(0 d 40 {to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division. of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form maybe photocopied for Use as an original DYQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a'stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. 1. PROJECT INFORMATION Project Name : The villages at Turtle Creek Contact Person: DCNC North Carolina 1, LLC Phone Number: ( 910 ) 79o- 9eso This worksheet applies to: Basin No. Phase 1 - :LA-3 (as k4mldled ore plaits) in Drainage Area 1A-3 (from Form SWU--1 ci) 11. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Woodington Fine Sandy Loam 0. 52 in/hr in/hr or cf/hr/sf (circle appropriate units) 28.0 fmsl (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters, I inch event for others) 929 c.f. 1.2 days Varies f. x Varies . 1, 085 sq. ft. (bottom dimensions) 1,'15 r 01 30.00 f nsl 31.25 fmsl 32.25 fmsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2111 .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ST a. System is located 50 feet from class SA waters and 30 feet from other surface waters. $T b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is Iocated in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. HT i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. $T j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swaie or sediment trap is provided. ET m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. $T p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q• Runoff in excess of the design volume bypasses off -lines stems (bypass detail provided). � YP Y (YP p )• ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-10 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform. as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads o . 3i feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title- J.B. Dilsheimer, vice President:/Member of DCNC North Carolina I, LLC 2528 Independence Blvd, Suite #104, Wilmington, Ne Note: The le fty responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. f>t({ P6 1(,( CLJJ-') a Notary Public for the State of PEN t'U 5 unty of e�,}T6r�p1RL do hereby certify that ?; [aS ff pen,ona[ly appeared before me this day of ;60:) , and acknowledge the due execution of the forgoing infiltration basin riminimnm requirements. Witness my hand and official seal, SEAL My commission expires . // COMMONWEALTH flp t'ENNOUVAIJ Tlt nw M. McCurdy I Sect Notary F'ubI1C FormW ' U-103 Rev 3.99 Page 3 3 M� gg TwP.. MoMnery Gtu MY Cmubsion Area sag 1, 2WO ? Member i. ' 3}.C.Hgllnn 4t Notedeg Permit No. � 8 0 (0 G 0 940D (to be p► ovided by D WQ) State of North Carolina Department of Environment and Natural Resources Division oaf Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DM Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name ; The Villages at Turtle Creek Contact Person: DCNC North Carolina I, LLc Phone Number: (910 ) 790- 9e80 This worksheet applies to: Basin No. Phase 1 - S (as identified - plans) in Drainage Area 1s prom rorm un u-f v,F/ II, DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fins)). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation onslow Loamv Fine Sand 3 .96 in/hr in/hr or eghr/sf (circle appropriate units) 19 %msl (Seasonal High Water Table elevation) 1.5 inch (1.5 inch event for SA waters, I inch event far others) 42,946 C.E 0.7 days Varies f. X Varies 1^t. 4,802 sal. ft. (bottom dimensions) 56,450 C.f. 211.00 fmsl 26.50 fmsl 27.50 final Form SWU I03 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Hest Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: IS A NCAC 211 .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials S ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. RT b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. NA g. ' Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or ET sediment trap is provided. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or ET dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin, annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be. reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 1.38 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party, Print Name and Title: J . B • Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC 2528 Independence Blvd, Suite NC 28412 Note: The lellly responsible patty shouldnot be a homeowners association unless more than 50% of the lots have been sold and a resf�nI of the subdivls//ion has been named the president. 1 I, p '%/ a Notary Public forthe State of&A8 L-T4 County of Adwr&om do hereby c tify that d-8 L45-4 `PM a;)g— personally appeared before me this day of /b Q ~% and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal; /, /2 )+ram eve /J SEAL. My commission expires �� COMMONWF-ALTIi OF PENNS1/IAVANII Thomas M. �. NOTY Rda Fprni SWU403 Ttev 3.99 Page of �E�,2N8 MY Member. Panns+!lvanle gasa1900n Of Notsdss Permit No. 5w80(-o6 D&4uy to - State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Managme-n-1 Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. L PROJECT INFORMATION Project Name : The villages at Turtle Creek Contact Person: DCNC Nortb Carolina x, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - C in Drainage Area sc (as idenrjWan plans) (fro►n Fonn SWU•101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Vol -lime Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation onslow Loamy Fine Sand 2.99 in/hr inlhr or cf/hrlsf (circle appropriate units) 10 fmsl (Seasonal High Water Table elevation) 1.5 inch (I.S inch event for,SA waters,1 inch event for others) 17,256 C,l 0.4 days varies X varies = 9,377 sq. ft. (bottom dimensions) 26,859 c. f 12. ao fmsl 14.35 fmsl 15.75 fmsl Form SW-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section.: 15 A NCA.0 2H .1.008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. N' g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H: V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or ET sediment trap is provided. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or ET dense vegetative cover is provided n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum ET length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET 3. Plans ensure that the irs-Called system will meet design specifications (constriictcd or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 d 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. Z. Repair eroded areas immediately, re -seed as necessary to maintain adequate. vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit, The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.56 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina r, LLC Address: 2528 Independence Blvd, suite NC 28412 Note: The gaily responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a r ►dent ofthe subdivision has been named the president. I AwAftV� ` W+I� a Notary Public for the state of RiN /A-V County of YVi� do hertky certify that 'TCi 7xS i{ e iW cM— personally appeared before me this day of +' and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SPAL Porm SWU-103 Rev 3.99 My commission Notarm seat 7hornas M. MoCuidy, Woiery RA* Mower Merl 7wp., Mont =" county Page 3 of 3 * Conirksion e0w W 1. 2D08 Member. Pennsi.dvsnla OFFICE USE ONLY ate eceived Fee Paid Permit Number -11312 6 D � 6 6 D � mil State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): ncwr, *, r}ti - ^�- _* r R Brian P�Ish ei �► Hzga ►e-, Dd.5%-4nter G*ninvn i h,eS df K" Czry (AO, U-C, M1*7e94- Of OCNC N ii12 , LLG . 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC 3. Mailing Address for person listed in item 2 above: 2528 Independence Blvd, Suite #104 City: Wilmington State: NC Zip: 28412 Telephone Number: ( 910 ) 790 - 9880 4. Project Name (subdivision, facility, or establishment blame - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): The Villages at Turtle Creek Ph2525 -1 $.I 5. Location of Project (street address): NC 210 and Lodge Hall Road City: Surf City County: Pender 6. Directions to project (from nearest major intersection): From the intersection of US 17 and NC 210, left after Lodge Hall Road. travel east on NC 210 two (2) miles. Turn 7. Latitude: 34 27' 0.45" N Longitude: 71' 32' 55.24" w of project 8. Contact person who can answer questions about the project: Name: Tom Miner _ Telephone Number: ( 610 ) 617 - 9 7 0 3 II. PERMIT INFORMATION: 1. Specify whether project is (check one): New Renewal x Modification Form SWU-101 Version 3.99 Page 1 of 4 2. If this application Is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8 060608 and its issue date (if known) DULY 2 0, 2 0 0 6 3. Specify the type of project (check one); Low Density x High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): `CAMA Major X Sedimentation/Erosion Control x 404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater runnoff from the impervious and non -impervious areas will sheet flow to a valley curb for eventual discharge to six 16) proposed infiltration ponds by way of swales curb inlets, yard inlets, valley curbs, and a piped stormwater conveyance system. 2. Stormwater runoff from this project drains to the cape Fear River basin. 3. Total Project Area: 27.73 acres 4. Project Built Upon Area: 46.9 % 5. How many drainage areas does the project have? _ 7 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided In the same format as below. sin Information' .._.........:....... ....:.::•:.::::;::::: Drain . e.Area is°::{ir,;:il : Drai a Area ...:' sA`... Receiving Stream Name Becky's Creek _ Becky a Creek Receiving Stream Class S.A. SA Drainage Area 29,988 Sq. Ft. 16,454 Sq. Ft. Existing Impervious* Area o Sq. Ft, 0 Sq. Ft. Proposed Impervious*Area 11,025 sq. Ft. 6,875 Sq. Ft. % Impervious* Area (total) 36.8t 41. 8% Im io Drains a Area 1::`: .....,..... .:.,..{1A�:.`.2'1;?i�i: Drai ''2:�'°'" - Area. On -site Buildings o Sq. Ft. 0 Sq. Ft. On -site Streets 8,876 Sq. Ft. 5,238 Sq. Ft. On -site Parking o Sq. Ft. 0 Sq. Ft. On -site Sidewalks 2,149 Sq. Ft. 1,637 3 . Ft. Other on -site 0 Sq. Ft. 0 Sq. Ft. Off -site 0 Sq. Ft. 0 Sq. Cat. Total: 11, 02 5 Sq. Ft. Total: 6,875 Sq. Ft. Impervious area is defined as the built upon area Including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 LL u u i , U U) co co (LL w LL w all- � w CO Lf 0 t- w 0) co Lr) co(fl �0cct_coOOco Ln co v LO N C6 r. Cy C� +r � rN tee + N LL LL o '" �: cr �-% LL �% LL L i'' LL N Q�LL U) �C CO &U) (1) er W COo��L) cow V OD M��U) V M O c LO O ca c O O CO m M C4,4 ��„ co rn tM N N LL LLdr LL LL NQ�L Cr ALL: L-U) a - (f1 M 0 O ,� O N O O O Lo m T Go t0) M N r N LL LL r LL ' _ LL Cr " LL . cr Q (n U)o (nLL Cl) (1)LLLLv) to U) CD N � cf)CM � L co is r Tl- (n � a3 O O to O O to m LO '0 M cM r r a) LL . -.P, it LL LL Cl)MA �: LL IT �:LL LL L,L LL M < U U) B Q N C U) M ch M (!1 O O m It co CD O (/) O r M O N (4 i? Q O H y 2)Q� R n R: �E Z � U a� to ¢*6 -i o w 0 OI o '�ps¢ ca tee �_ U— O () a) , E t9 C C > � to O t > 'aD a) w c C im 'X 2 "�.' to •�_+ W +�_� N W a) to (¢ mocLrowao 0I (D 000000 O N C" N d 7. How was the off -site impervious area listed above derived? computer Generated IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form ET • One copy of the applicable Supplement Form(s) for each BMP ET • Permit application processing fee of $420 (payable to NCDENR) ET • Detailed narrative description of stormwater treatment/management ET • Two copies of plans and specifications, including: ET - Development/Project name - Engineer and firm -Legend North arrow Scale Revision number & date Mean high water line Dimensioned property/project boundary - Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stormwater control measures Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm):CAVANAUGH & ASSOCIATES, P.A. Mailing Address:_ 130 NORTH FRONT STREET, SUITE 202 City: W I LM INGTON State: NC Zip: 28401 Phone: ( 910 ) 392-4462 Fax: ( 910 ) 392-4612 VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants0e recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Signature: Date: k AI Form SWU-101 Version 3.99 Page 4 of 4 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC North Carolina r, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - 1A-1 in Drainage Area 1A-1 (as identified on plans) (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Woodington Fine Sandy Loam 0.52 in/hr ln/hr or cf/hr/sf (circle appropriate units) 29.0 fmSI (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters, I inch event for others) 4,283 c.f. 0.7 days Basin Size Varies ft. X Basin Volume Provided Q 6794-"* c.f. r U Basin Elevations �fp/I Bottom Elevation G 31.00 fmsl Storage Elevation 31.75 fmsl Top Elevation 32.75 fiml Varies ft = 6,025 sq. ft. (bottom dimensions) Form S)&U-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.19 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice. President/Member of DCNC North Carolina I, LLC Address: 2528 Independence Blvd, Suite #104, Wilmington, NC 28412 Note. The l ally responsible party should not be a homeowners association unless more than SO% of the lots have been sold and a re ' ent of the subdivision has been named the president. r I, / /641� /tiS M 1�CW A, a Notary Public for the State of LIyS�IW�unty of o 6vw do hereby certify that X� L.S /4 e-VAyt ts-a— personally appeared before me this _Z day of AO-7 , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Notarial Seal w Thomas M. McCurdy, Notary pdgc Form SWU-103 Rev 3.99 Page 3 of 3 LLOWMe fanTWP'' Member, Pennsylvania Assodatlon Of Noted Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. L PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: nCNC .North Carolina 2, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - 1A-2 in Drainage Area 1A-2 (as identified on plans) (from Form SWU-101) 11. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Woodington Fine Sandy Loam 0.52 in/hr 1n/hr or cf/hr/sf (circle appropriate units) 28.0 finsl (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters, I inch event for others) 2,629 c.f. 1.2 days Varies ft. X Varies ft = 2,208 sq. ft. (bottom dimensions) 3,331 C.f 30.00 ffinsi 31.25 finsl 32.25 fmsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or ET sediment trap is provided. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.31 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 211 .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J•B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC Address: 2528 Independence Blvd, Suite #104, Wilmington, NC g8412 Phone: Note: The legally esponsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident f the subdivision has been named the president. I, 0OV 0 6 Iq gtW)Lla NotaryPublicfor the State of L�1 w_s U&Q 1ACounty of p�r�/yf do hereby ce tify that �' L l✓C45'Y&—'y ZI 6;/r- personally appeared before me this oZ day of Zvi 1,07 and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires 4a.,//' COMMONWEALTH OF VIEW YLVAM Notarial Seal Thomas M. McCurdyY County Form SW-103 Rev 3.99 Page 3 of 3 LowerMedonTwp., MY Commission EVIM Sept 1, 2= Member. Pennsylvania Association t)f Notaries /. , Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: nCNC North Carolina r, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - IA-3 in Drainage Area 1A-3 (as identified on plans) (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Woodington Fine Sandy Loam 0.52 in/hr in/hr or cf/hr/sf (circle appropriate units) 1) finsl (Seasonal High Water Table elevation) 4.5 Inch (1.5 inch event for SA waters, I inch event for others) 929 c.f. 1.2 days Varies ft. X Varies ft — 1,085 sal. ft. (bottom dimensions) 1,757 c.f 30.00 finsl 31.25 finsl 32.25 finsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). RT r. Systcm is dcsigned to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.31 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC 2528 Independence Blvd, Suite #104, Wilmington, NC Note: The l3g6ily responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. n r I, � o" Pf5 M M C6V A-b y , a Notary Public for the State of 1 &M 1U S �J L V/ unty of 0 6ti/IRL , do hereby certify that ?; (3, L��LS MLyN CYL personally appeared before me this! a day of doa:) , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires COMMONWEALTH OF PENNSMAM Notarial Seal Form SWU-103 I+ev 3.99 Page 3 o Thorned M. McCurdy,Ntb►SrPf�bNe g rower Marion Twp., Mor�py fly My Conxnission Express Sept 1, 2= Member o�,,�,,.,",-: Of Notaries 9 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The villages at Turtle Creek Contact Person: DCNC North Carolina I, LLC phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - B (as identified on plans) in Drainage Area 1B (from Form SWU-101) H. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Onslow Loamv Fine Sand 3.96 in/hr Whr or cf/hr/sf (circle appropriate units) 19 fmS1 (Seasonal High Water Table elevation) 1.5 inch (1.5 inch event for SA waters, I inch event for others) 42,946 c.f. 0.7 days Varies f R varies ft. — 4,802 —sq. ft. (bottom dimensions) 56,450 c.f 21.00 fmsl 26.50 fmsl 27.50 f nsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. RT b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. NA g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for ET areas draining to SA waters ). Design volume and infiltration calculations attached. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin ease trap, filter strip, p , grease p, p, grassed swale or ET sediment trap is provided. in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or ET dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within fve days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 1.38 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC Address: 2528 Indepgndence Blvd, Suite #104, Wilmington, NC 28412 Note: Ieally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a of the subdivision has been named the president. I, 1141/0 a Notary Public for the State ofLLOYLiA,--'� County of Nr61044 "" do hereby c rtify that A`� C�+ePyd 01 personally appeared before me this day of t�w 6 7 and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, .-y SEAL. My commission expires /!i` COMMONWEALTH OF PENNSYLVAN Thomas M. mcCu*. Notary P� Form SVVLT-103 Rev 3.99 Page 3 of L� Member, PennsNlvenie Association Of NOt8des Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC North Carolina I, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - C (as identified on plans) in Drainage Area 1C (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Onslow Loamy Fine Sand i n/hr in/hr or cf/hr/sf (circle appropriate units) 10 fmsl (Seasonal High Water Table elevation) 1.5 inch (1. S inch event for SA waters,1 inch event for others) 17,256 c.f. 0.4 days Varies ft x varies ft. — 9.377 sq. ft. (bottom dimensions) 26,859 e. f 12.00 finsl 14.25 fmsl 15.75 fmsl Form SWU-103 Rev 3.99 page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. NA g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or ET sediment trap is provided. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or ET dense vegetative cover is provided. A. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum ET length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of. 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.56 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC Address: 2528 Phone: Blvd, Suite #104 NC 28412 Note: The gaily responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a r tdent of the subdivision has been named the president. I, 1l� � , a Notary Public for the State of County of WlC0 do he y certify that HePWdYL_ personally appeared before me this day of iC ,Q.ti/ and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, _ SEAL My commission expires l7"T V Aff G� OF PE COMMONWEALTH LVANIA Notadal Seal Thomas M. McCurdy, Notary PubNc LOM MNW TwP., Mmwmery cm* Form SWU-103 Rev 3.99 Page 3 of 3 MyOom brim E)Ores Sept 1, 20M Member, PermstAvania Assochtion Of Notaries Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC North Carolina 2, LLC Phone Number: f10 ) 790- 9880 This worksheet applies to: Basin No. Phase 1D-1 (as identified on plans) in Drainage Area 1D-1 (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Onslow Loamy Fine Sand 2.55 in/hr in/hr or cf/hr/sf (circle appropriate units) 24.0 fmsl (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters, I inch event for others) 8,093 c.f 0.5 days Varies ft. X Varies ft = 2,790 sq. ft. (bottom dimensions) 9,450 c.f 27.00 finsl 29.25 fmsl 30.00 finsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils rcport and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.63 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC 2528 Independence Blvd, Suite #104, Wilmington, NC 28412 Date: Signature: Note: The leg lly responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resielpfit the subdivision has been named the president. P /��_� I, 0/t�[(� a Notary Public for the State of r[s7UNS�/LU!r4wounty of 0 do hereb certify that �3 IJVLS f/P jr personally appeared before me this day of and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and o icial sea!, SEAL My commission expires - - MUM Seal 1 Thomas M. McCwdY. Plotary Pubic Form SWiJ-103 Rfv 3.99 Page 3 of 3 1,20M Member, Pennsylvania Assoolatlon Of Notadss Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC north Carolina I, LLC Phone Number: ( 910 790- 9880 This worksheet applies to: Basin No. Phase 1D-2 (as identified on plans) in Drainage Area 1D-2 (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Onslow Loamy Fine Sand 2.55 in/hr in/br or cf/hr/sf (circle appropriate units) 23.70 fmSl (Seasonal High Water Table elevation) 4.5 inch (1. S inch event for SA waters, I inch event for others) 17,258 c.f. 0.4 days Varies ft. Varies — 6,534 sly. ft. (bottom dimensions) 17,335 c,f 25.70 fmsl 27.75 finsl 28.75 fmSl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.51 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC Phone: 2528 Indeperyt3ence Blvd, Suite #104, Wilmington, NC 28412 Date: Note: The leVfly responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resi nt of the subdivision has been named the president. I I, 7k cM i5 9 M &v t , a Notary Public for the State of kVAJI; LVP4-nt 1 County of AA w'r&w do hereby bertify that TB f-2.— ' personally appeared before me this 2- day of ?X- , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires 1'Z� COMMONWEALTH OF PENNSWANUk Notarial Seal Thanes M. McCurdy, Notary Pubic Form S`J U403 Rev 3.99 Page 3 of 3 Lmw Marion Twp., MmVmiwy On* My Cmvr"m E)Ores Sept 1, 2008 Member pnnr—,Av?n!a Assoc-In+inn Of Notaries CAVANAUGH Solutions through integrity and partnership November 5, 2007 Mr. Chris Baker Environmental Engineer North Carolina Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Re: The Villages at Turtle Creek - SW8 060608 Modification Dear Mr. Baker: Cavanaugh & Associates, P.A. (CA) on behalf of DCNC North Carolina I, LLC, hereby submits the following application to the NCDENR Division of Water Quality for review of the modification of Stormwater Permit SW8 060608. This existing permit was issued as a modification for the subject development identified as 'The Villages of Turtle Creek,' which is located in the Town of Surf City, Pender County, North Carolina. The current stormwater permit (SW8 060608) consists of Phases 1 and 2 of the development. Phase 2 is directly adjacent to Phase 1 and utilizes some of the same engineered stormwater controls in Phase 1 to mitigate the runoff from Phase 2. CA is applying for the modification of the permit based on changes that have been made to the Amenity Area located in Phase 1. Specifically, the parking area to the west of the Amenity Area Building has been modified which had residual affects to the drainage area for the basins within the Amenity Area. This modification will demonstrate sufficient capacity in the stormwater management system to accommodate the limited changes to the Amenity Area. Please note the modifications addressed in this submission include a modified drainage area for Basins 1 D- 1 and 1 D-2 only. To facilitate your review of the enclosed documentation, the following is a list of the items constituting the application: 1. A check made payable to NC DENR in the amount of $4,000.00 to satisfy the review fee for this application. 2. One (1) original copy of the executed 'Stormwater Management Permit Application Form.' 3. One (1) copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin 1A-1. 4. One (1) copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin 1A-2. 5. One (1) copy of the executed `Infiltration Basin Supplement' for Phase 1 Basin 1A-3. 6. One (1) copy of the executed `Infiltration Basin Supplement' for. Phase 1 Basin 1 B. 7. One (1) copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin 1 C. 8. One (1) original copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin iD- 1. 9. One (1) original copy of the executed `Infiltration Basin Supplement' for Phase 1 Basin 1 D- 2. 10. Two (2) copies of the `Stormwater Management Plans,' including sheets C.3.1, C.5.0, C.5.1, C.5.2, C.5.3, C.5.4, C.5.5 and, C.7.7-C.7.11. The Villages of Turtle Creek 041.05.043 02/13/07 Page 2 of 2 11. One (1) copy of the 'Stormwater Management High Density Permit Application Supplemental Report.' Please note that Phase 1 of the project was issued a Stormwater Management Permit on July 20, 2006, and an Erosion and Sedimentation Control Permit on June 13, 2006, through the express program. An Express Erosion and Sedimentation Control Permit was issued for Phase 2 on July 13, 2006. Please note the Phase 1 Stormwater Management Permit had been approved previously on November 30, 2006, for a modification to include Phase 2, which you. personally reviewed and approved, and again on July 10, 2007. Please do not hesitate to contact our office should you have any questions, comments, or require any additional information. Regards, CAVANAUGH & ASSOCIATES, P.A. 5;� Jason T. Rupert, E.I. Cc: Tom Miner, DCNC North Carolina I, LLC 041.05.043 Turtle Creek\Dots\Permits\Stormwater\Phasei\Phase1 Modification for 210 Entrance Re-alignment\PermitModCover Ietter.doc T�TRTLECREEK TOWN OF SURF CITY, PENDER COUNTY, NORTH CAROLINA MODIFICATION TO PHASE 1 AND 2 STORMWATER MANAGEMENT HIGH DENSITY PERMIT APPLICATION SUPPLEMENTAL REPORT I July 5, 2006 00 'ti Revised February 13, 2007 ast Revised October 31, 2007 _ • C AVA N A U G H SAMw throw WMAy and Aarmership 0 We provide superior client service and environmentally sound designs through integrity, communication and partnership. Consulting Engineers Land Surveyors Environmental Professionals Design Professionals 130 N. Front Street, Suite 202, Wilmington, North Carolina 28401, Phone 910/392-4462, Fax 910/392-4612 TABLE OF CONTENTS PAGE I. SITE DESCRIPTION 2 II. PROJECT DESCRIPTION 3 III. STORMWATER MANAGEMENT PLAN 3 IV. ABOVE -GROUND INFILTRATION BASIN MAINTENANCE AGREEMENT 5 V. CONSTRUCTION SCHEDULE 5 VI. VEGE T A 1 ION PLAN 6 APPENDIX ® Drainage Area Design Sheet Pre & Post Development Conditions Hydrographs and Summaries Pipe Area Weighted 'C' Value • Pipe Sizing Calculations • Conduit Outlet Protection • Geotechnical Report • Watershed Classification • Site Location Map Drainage Area Maps The Villages at Turtle Creek 1 of 6 Stormwater Management High Density Permit Application Narrative Site Description The subject development, formally identified as The Villages at Turtle Creek, is located in the Town of Surf City, Pender County, North Carolina. The 248.2 (+/-) acre property has frontage along NC 210 and US Highway 17. Please note that the site will be permitted and constructed in multiple phases, and the current application is for the modification of the stormwater permit for Phases 1 and 2 only. Phases 1 and 2 have a total limit of disturbance of approximately 37 acres and an updated assessed drainage area of approximately 27.7 acres. Please reference the attached site location map located in the Appendix of this report. The following narrative discusses the modifications that have been made to the stormwater management system contained in these two phases. The site is currently undeveloped and heavily forested with Army Corp of Engineer field -approved 404 wetlands located throughout the property, as identified on the accompanying plans. Currently, the site drains by way of overland flow through the wetlands for ultimate discharge to Becky's Creek. Becky's Creek has a watershed classification of SA:HQW, as confirmed by DENR-DWQ and shown within the Appendix of this report. The property can be described as mildly sloping, with an average slope of approximately 1.0%. The elevations throughout the property range from 9 ft. mean sea level (MSL) near the wetlands to 65 ft MSL towards US 17. It is important to note that the area proposed under Phases 1 and 2 ranges in elevation from 10 ft MSL to approximately 32 ft MSL. The geotechnical site review conducted by an independent soil scientist found seasonal high water table elevations (SHWTE) ranging between 24 to 34 inches below ground surface (BGS) at the site. The soil scientist's geotechnical report is included in the Appendix. An estimated infiltration rate between 0.52-in/hr and 4.82-in/hr was determined by the soils evaluation. Mr. Vincent Lewis from the North Carolina Department of Environment and Natural Resources, Division of Water Quality (NCDENR-DWQ) also tested the site for the SHWTE on May 26, 2006, and January 23, 2007, and found the average depth to SHWTE ranged from approximately 24 to 40 inches BGS on average, which is in accordance with the soil scientist's geotechnical report. One (1) area was found to have a SHWTE of less than 12 inches BGS. However, based on the previously approved stormwater permit for Phases 1 and 2, approval had been given for fill to ire brought to this area to achieve a 2 ft separation from the bottom of the proposed stormwater management device to the SHWTE. The Villages at Turtle Creek 2 of 6 Stormwater Management High Density Permit Application Project Description Phase 1 of this multi -phased development consists of the construction of a portion of the subdivision containing 43 single family homes. Phase 2 consists of the construction of 28 single family homes. The homes in these two phases will be serviced with one (1) sanitary sewer pump station. These two phases of the project will include approximately 286,892 ft2 of dwelling and driveway area, 63,895 ft2 of sidewalk area, 205,966 ft2 of street and gutter area, and 4,682 ft2 of pump station area. Pursuant to the watershed classification of the site, HQW:SA, the project will employ infiltration type best management practices (BMPs). Specifically, seven (7) infiltration basins are proposed. Stormwater from the tributary drainage areas, as identified within the submission documents, will travel by sheet and shallow concentrated flow to a series of flat grate curb and yard inlets for eventual discharge to the seven (7) proposed stormwater management basins. Stormwater will be collected and conveyed from these inlets through a series of HDPE (DR 32.5) pipe. * TOTAL DRAINAGE AREA: 1,218,328 ft2 = 27.97 acres Impervious Areas Dwellings and Driveways: 286,892 ft2 = 6.59 acres Sidewalk: 63,895 ft2 = 1.47 acres Street and Gutter: 205,966 ft2 = 4.73 acres PS Drive (Gravel Access) 4,682 ft2 = 0.11 acres Calculation 6.59 + 1.47 + 4.73 + 0.11 = 12.89 acres 12.89 acres (impervious)/27.97 (total) = 0.4608 4 46.1% Stormwater Management Plan Collection and Conveyance: The residential lots, roads and streets will be graded so that runoff enters the stormwater management system by way of sheet flow over the residential lots and roadway system and shallow concentrated flow within the valley curb to the curb and yard inlets. From these inlets, the stormwater will be conveyed by way of the aforementioned HDPE (DR 32.5) for discharge to the seven (7) strategically -placed stormwater management basins. Please note, runoff from the rooftops will be collected by down spouts and directed to the right-of-way, The Villages at Turtle Creek 3 of 6 Storrrrwater Management High Density Permit Application as specified within the notes, where the runoff will then enter the stormwater management system. Yard inlets will also be utilized where necessary to collect runoff in the grassed and landscaped areas. Treatment: The project site is located in a coastal county and within 1/2 mile of SA:HQW waters. Therefore, the project requires stormwater to be treated with an infiltration type system. After discussions with NCDENR-DWQ's staff, it has been determined that the best option for stormwater treatment for this project is infiltration basins. The SHWTE investigation confirmed that the proposed locations of the seven (7) infiltration basins are appropriate for this type of BMP. As mentioned previously, all but one of the proposed locations had a SHWTE between 24-33 inches BGS. The remaining proposed location had a SHWTE of less than 12 inches BGS. However, based on the previously approved stormwater permit for Phases 1 and 2, approval had been given for fill to be brought to this area to achieve a 2 ft separation from the bottom of the proposed stormwater management device to the SHWTE. Basins 1 A-1, 1 A-2, 1 A-3, 1 D-1, and 1 D-2 are infiltration basins designed to treat the first 4.5 inches of rainfall runoff, three (3) times the DENR requirement of 1.5 inches. Rip -rap will be used to dissipate the velocities of the incoming runoff, and level spreaders will be used to prevent channelized flow at the entry points to each basin. Spillways will divert excess runoff in large storm events from Basins 1A-1 and 1A-3 to the ditches along NC Highway 210, from Basin 1A-2 to the adjacent jurisdictional stream on the property, and from Basins 1 D-1 and 1 D- 2 to the adjacent wetlands. A small portion of Infiltration Basin 1A-1 will require approximately 12 inches or less of suitable fill to achieve the required two (2) feet of separation from the SHWT, which was allowed by DENR-DWQ under prior applications for this project. Basins 1 B and 1 C are each designed to treat the first 1.5 inches of rainfall runoff. "Off-line" bypass systems will divert excess runoff from large storm events to 50 ft vegetative filters. Rip -rap will be used to dissipate the velocity of the incoming runoff to the stormwater basins as well as at the bypass box discharges. In addition, level spreaders will be employed to prevent channelized flow prior to discharge to the infiltration basins and vegetative filters. The 50 ft vegetative filters will be used to treat runoff in excess of the 1.5 inch volume flowing to the existing 404 wetlands, as shown on the accompanying plans. Using the computer program Hydraflow, the runoff potentially generated for Phases 1 and 2 in their natural state (pre -development) during a 10-year storm was modeled and equals approximately 41.93 ft3/s. The runoff generated in the post -development scenario for Phases 1 and 2 that will be routed through stormwater basins was also modeled for a 10-year storm and equals The Villages at Turtle Creek 4 of 6 Stonnwater Management High Density Permit Application approximately 2.58 ftg/s. Therefore, the flow was reduced from the pre - development scenario to the post -development scenario by 39.35 W/s for a 10- year storm. The modeling results are shown in the Appendix. The proposed stormwater management system has been designed in accordance with NCDENR requirements and will not adversely affect any downstream drainage patterns. Above -Ground Infiltration Basin Maintenance Agreement 1. Stormwater management facilities shall be regularly maintained to ensure they function at design capacity and to prevent health hazards associated with debris build-up and stagnant water. The privately -owned portion of the system must be privately maintained. 2. Responsibility for operation and maintenance of stormwater facilities, including periodic removal and disposal of accumulated particulate material and debris, but not limited to the following: visual inspection of all system components at least twice each year; vacuuming of all storm sewer inlets once every six months (frequency of vacuuming may be adjusted to once a year if first year maintenance records indicate that sediment and debris accumulation is insignificant); reverse flushing and vacuuming if system inspections indicate significant accumulation of sediment in the pipes; and periodic removal and disposal of other material and debris shall remain with the owner or owners of the property, with permanent arrangements that shall pass to any successive owner, unless assumed by a governmental agency. 3. In the event that the facility becomes a danger to public safety or public health, or if it is in need of maintenance, the owner shall effect such maintenance and repair of the facility in a manner that is approved by the township engineer or his designee. If the owner fails or refuses to perform such maintenance and repair, the municipality may immediately proceed to do so in accordance with the maintenance bond. The Villages at Turtle Creek 5 of 6 Stormwater Management High Density Permit Application Additional Information Construction Schedule 1. Perform construction stake out. 2. Install temporary gravel construction entrance. 3. Clear site, but do not grub. 4. Install all erosion and sediment control measures. 5. Grub site. 6. Construct sediment basins. 7. Commence rough grading of site. 8. Install stormwater management devices. 9. Construct sewer collection system. 10. Construct water system. 11. Rough grade the site. 12. Shape shoulders and cut -and -fill slopes. 13. Scarify, seed, fertilize, and mulch all disturbed areas. 14. Install dry utilities (electrical, fiber-optic, cable, phone, etc.). 15. Re -scarify, re -seed, re -fertilize, and mulch all disturbed areas. 16. Construct roadbed base course and intermediate asphalt course. 17. Apply final asphalt course. 18. After disturbed areas are stabilized with vegetation, the contractor shall return to the site and remove all temporary erosion control measures. Vegetation Plan 1. The contractor shall provide seeding and mulching on all disturbed areas within fifteen (15) working days following the completion of any phase of grading. Seeding requirements shall include soil preparation, seed mixtures, and mulching in accordance with the approved Erosion and Sediment Control Permit. 2. Contractor shall provide sod cover on all areas or comply with permanent seeding schedule in accordance with the approved Erosion and Sediment Control Permit. The Villages at Turtle Creek 6 of 6 Stormwater Management High Density Permit Application APPENDIX • Drainage Area Design Sheet • Pre & Post Development Conditions Hydrographs and Summaries • Pipe Area Weighted `C' Value • Pipe Sizing Calculations • Conduit Outlet Protection • Geotechnical Report • Watershed Classification • Site Location Map • Drainage Area Maps The Villages at Turtle Creek Store water Management High Density Permit Application DRAINAGE AREA DESIGN SHEET The Villages at Turtle Creek Stomawater Management High Density Permit Application DRAINAGE AREA DESIGN SHEET DATE: October 31. 2007 SHEET 1 OF 7 PROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: D41.05.043 CHECKED BY: ET DESCRIPTION: Drainage Area Analysis - Basin 1A-1 DRAINAGE AREA 1A-1 Post Development C A 1:2 A ac 1 Dwelling &Drivewa Q.99 2 Sidewalk 0.95 2149 F,Qjka 3 Street & Gutter 0.$6 8,876 :. .U:20 4 Grass 0,25 `::. ' 1t,963 0.4 5 a 6 7 Weighted C 0.51 Total Area acres 29,9881 0.69 Impervious Area acres 11,0251 0.25 Percent Impervious 30.8% Volume Runoff to be Controlled From 3 Times a 1.5" Storm 1 Rv--0.05+0.009(1) (Simple Method, Scheuler) 1= 36.8 Percent Impervious Rv= 0.38 Runoff Coefficient V=P•Rv"Ad P= 4.5 in Design Rainfall V= 0_D98 ac-ft Volume To Be Treated V=F 4.283 ft3 Volume To Be Treated A= 6,025 fe Area of Treatment Device D= 0.75 ft Pool Depth V= 4,879 1:13 Volume of Treatment 29.00 It Seasonal High Water Table Elevation 31.00 ft Bottom of Treatment Device 31.75 It Water Suface Elevation Drawdown Calculation { V=4;288 ft3 Volume To Be Drawn Down A= 6,025 ff Area of Treatment Device k= 0.52 inlhr Most Restrictive Infiltration Rate t= 17 hrs Drawdown Time t= 0.7 days DRAINAGE AREA DESIGN SHEET DATE: October 31, 2007 SHEET 2 OF 7 PROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: 041.05.043 CHECKED BY: ET DESCRIPTION: Drainage Area Analysis -Basin 1A-2 DRAINAGE AREA 1A-2 Post Development C A(ft) A ac 1 Dwelling & Driveway 6.95' 0.00 : 2 Sidewalk 0.9S 1 3 Street & Gutter 0.95. 5 238 i'i 612 4 Grass 0 28 9'579 Q;:82 5 6 7 Wel hted C 0.54 Total Area acres 16,454 0.38 Impervious Area acres 6,875 0.16 Percent Impervious 41.8% Volume Runoff to be Controlled From 3 times a 1.V' Storm Rv=0.05+0.009(I) (Simple Method, Scheuler) 1= 4.1..8 ''' Percent Impervious Rv= 0.43--'' Runoff Coefficient V=P•RV•Ad P= 4.5 in Design Rainfall V= 0.060ao-ft Volume To Be Treated V= 2,629 fe Volume To Be Treated A= 2,208 ft Area of Treatment Device D= 1.25 ft Pod Depth V= 3,331 fe Volume of Treatment 28.0 ft Seasonal High Water Table Elevation 30.0 ft Bottom of Treatment Device 31.3 ft Water Suface Elevation Drawdown Calculation V= 2,626. ft3 Volume To Be Drawn Down A= 2,20B fe Area of Treatment Device k= 0.52 inmr Most Restrictive Infiltration Rate t= 29 hrs Drawdown Time t= 1.2 days DRAINAGE AREA DESIGN SHEET DATE: October 31, 2007 SHEET 3 OF 7 PROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: 041.05.043 CHECKED BY: ET DESCRIPTION: Drainage Area Analysis - Basin 1A-3 DRAINAGE AREA 1A3 Post Development C Aft A ac 1 Dwelling & Driveway d. 2 Sidewalk 664 2 3 Street & Gutter 095 Q..% 4 Grass 5 4 j7lj 0.31 5 6 7 Weighted C 0.48 Total Area acres 7,072 0.16 Impervious Area acres 2,361 0.05 Percent Impervious 33.4% Volume Runoff to be Controlled From 3 times a 1.5" Storm Rv--0.05+0.0090) (Simple Method, Scheuler) 1= 33.4Percent Impervious Rv= 0.35 Runoff Coefficient V=P•RV•Ad P= 4.5 in Design Rainfall V= . ..:.0 021 ac-ft Volume To Be Treated V= :,::j '' .s29 fe Volume To Be Treated A= 1,085 fe Area of Treatment Device D= 1.25 ft Pool Depth V= 1 757 a Volume of Treatment 28.0 ft Seasonal High Water Table Elevation 30.0 ft Bottom of Treatment Device 31.3 ft Water Suface Elevation Drawdown Calculation V='. 929 ft3 Volume To Be Drawn Down A= 1,085 ftz Area of Treatment Device k= 0.52 in/hr Most Restrictive Infiltration Rate t= 29 hrs Drawdown Time t= 1.2 days DRAINAGE AREA DESIGN SHEET DATE: October31, 2007 SHEET 4 OF 7 IROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: 041.05.043 CHECKED BY: ET DESCRIPTION: Drainage Area Analysis -Basin 1 B DRAINAGE AREA 1 B Post Development C A A ac 1 Dwelling & Driveway ': 0..96. 1.86,569. 43 2 Sidewalk 0M 37.613 Q88. 3 Street & Gutter 0 113 771 2.9t 4 Grass 5 ' 6 ........... 7 Weighted C 0.57 Total Area acres 7522491 17.27 Impervious Area acres 339,9531 7.80 Percent Impervious 45.2% Volume Runoff to be Controlled From 1.5" Storm Rv--0.05=0.009(1) (Simple Method, Scheuler) 1= 45.2 Percent Impervious Rv= 0.48 1 Runoff Coefficient V=PRW'Ad Drawdown Calculation P= 1.5 in Design Rainfall V= 0.986ac ft Volume To Be Treated V= 42,946 fe Volume To Be Treated A= 4,802 flz Area of Treatment Device D= 5.50 ft Pool Depth V=1 56,450 f13 Volume of Treatment Okay Capacity 19.0 ft Seasonal High Water Table Elevation 21.0 ft Bottom of Treatment Device 26.5 ft Water Suface Elevation V= 42 946 fO Volume To Be Drawn Down A= 4,802 fe Area of Treatment Device k= 3.96 inlhr Most Restrictive Infiltration Rate t= 17 hrs Drawdown Time t= 0.7 days DATE: 'ROJECT: PROJECT NO.: DESCRIPTION: October 31, 2007 Turtle Creek - Phase 1 041.05.043 Drainage Area Analysis -Basin 1 C DRAINAGE AREA DESIGN SHEET DRAINAGE AREA 1C Post Development C A ftz A ac 1 Dwelling & Driveway 0.95 .' ': 84,875 1 2 Sidewalk 0 .-.: 11,809 D 2)f 3 Street & Gutter 0.95 : ; 39 273 4 Grass 0..._ *' 45 74 3.35 5 Pump Station 0,615:.. 4,682 0.11' 6 7 Weighted C 0.58 Total Area acres 283,381 6.51 Impervious Area acres 137,6391 3.16 Percent Impervious 48.6% Volume Runoff to be Controlled From 1.5" Storm Rv=0.05+0.009(I) (Simple Method, Scheuler) ............. . 1= .:A9.6 Percent Impervious Rv= ::: 0.40. ::.Runoff Coefficient V=P*RV*Ad Drawdown Calculation P= 1.5 in Design Rainfall V= .::. 6.396 ao-ft Volume To Be Treated V=[ A4.-? 6 ft3 Volume To Be Treated A= 9,377 ft Area of Treatment Device D= 2.25 ft Pool Depth V= 26,859 ft3 Volume of Treatment Okay Capacity 10.00 ft Seasonal High Water Table Elevation 12.00 ft Bottom of Treatment Device 14.25 ft Water Suface Elevation V=, 17,256 ft' Volume To Be Drawn Down A= 9,377 fe Area of Treatment Device k= 2.99 inlhr Most Restrictive Infiltration Rate t= 9 hrs Drawdown Time t= 0.4 days SHEET 5 OF 7 DESIGN BY: EG CHECKED BY: ET DRAINAGE AREA DESIGN SHEET DATE: October 31, 2007 SHEET 1 OF 2 PROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: 041.05.043 CHECKED BY: ET DESCRIPTION: Drainage Area Analysis -Basin 1D-1 DRAINAGE AREA 1D-1 Post Development C A(ft) A ac 1 Dwelling & Driveway 5 1 066 : O.02 2 Sidewalk GIB 3.637 Q:D8. 3 Street & Gutter QVU 16,068 0.37 4 Grass 0.25 18.107 0.42 5 6 7 Weighted C 0.62 Total Area acres 38 878 0.89 Impervious Area acres 20,771 0.48 Percent Impervious 53.4°% Volume Runoff to be Controlled From 3 times a 1.5" Storm Rv=0.05+0.009(1) (Simple Method, Scheuler) 1= : 53A... Percent Impervious Rv= 0.53... Runoff Coefficient V=P*Rv*Ad P= 4.5 in Design Rainfall .............. V=0.178 ac ft Volume To Be Treated V= 7;739 ft3 Volume To Be Treated A= 2,790 le Area of Treatment Device D= 2.25 ft Pool Depth Drawdown Calculation V= 9 450 ft3 Volume of Treatment Okay Capacity 24.00 it Seasonal High Water Table Elevation 27.00 ft Bottom of Treatment Device 29.25 Water Suface Elevation V= 7,739, ft9 Volume To Be Drawn Down A= 2,790 fl? Area of Treatment Device k= 2.55 in/hr Most Restrictive Infiltration Rate t= 11 hrs Drawdown Time t= 0.4 days DRAINAGE AREA DESIGN SHEET DATE: October 31, 2007 SHEET 2 OF 2 PROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: 041.05.043 CHECKED BY: ET DESCRIPTION: Drainage Area Analysis - Basin 1 D-2 DRAINAGE AREA 1 D-2 Post Development C A A Car) 1 Dwelling & Driveway 095 12 382 ;. 0:28 2 Sidewalk as& 6,385 `' 0.15 3 Street & Gutter O.fr .: 24 043 0.6 4 Grass 025 41 : :1 Q:$. 5 6 7 Weighted C 0.58 Total Area acres 90,306 2.07 Impervious Area acres 42,8101 0.98 Percent Impervious 47.4% Volume Runoff to be Controlled From 3 times a 1.5" Storm Rv=0.05+0.009(1) (Simple Method, Scheuler) 1= 47.4 Percent Impervious Rv='. 0.48`= `' Runoff Coefficient V=P*Rv*Ad Drawdown Calculation P= 4.5 in Design Rainfall V= "' 0.371 ac-ft Volume To Be Treated V= [ti 142 a Volume To Be Treated A= 6,534 if Area cf Treatment Device D= 2.05 ft Pool Depth V=F 17,335 ft3 Volume of Treatment Okay Capacity 23.70 ft Seasonal High Water Table Elevation 25.70 ft Bottom of Treatment Device 27.75 ft Water Suface Elevation V= ; ','.I 16,142 ft3 Volume To Be Drawn Down A= 6,534 flz Area of Treatment Device k= 2.55 inlhr Most Restrictive Infiltration Rate t= 10 hrs Drawdown Time t= 0.4 days PRE & POSE' DEVELOPMENT CONDITIONS HYDROGRAPHS AND SUMMARIES The Villages at Turtle Creek Stormwater Management High Density Permit Application Table of Contents Phase 1.gpw Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hydrograph Return Period Recap...................................................................... 1 - Year SummaryReport ................................................................................................................. 3 HydrographReports ........................................................................................................... 5 Hydrograph No. 1, Rational, Pre Development Phase 1 Area .......................................... 5 Hydrograph No. 3, Rational, Pre Development Area 1A-1............................................... 6 Hydrograph No. 4, Rational, Post Development Area 1A-1.............................................. 7 Hydrograph No. 5, Reservoir, Area 1A-1 to Pond 1A-1.................................................... 8 PondReport ................................................................................................................. 9 Hydrograph No. 7, Rational, Pre Development Area 1A-2............................................. 10 Hydrograph No. 8, Rational, Post Development Area 1A-2............................................ 11 Hydrograph No. 9, Reservoir, Area 1A-2 to Pond 1A-2.................................................. 12 PondReport ............................................................................................................... 13 Hydrograph No. 11, Rational, Pre Development Area 1A-3........................................... 14 Hydrograph No. 12, Rational, Post Development Area 1A-3.......................................... 15 Hydrograph No. 13, Reservoir, Area 1A-3 to Pond 1A-3................................................ 16 PondReport ............................................................................................................... 17 Hydrograph No. 15, Rational, Pre Development Area 1 B.............................................. 18 Hydrograph No. 16, Rational, Post Development Area 1 B............................................. 19 Hydrograph No. 17, Reservoir, Area 1 B to Pond 1 B ...................................................... 20 PondReport ............................................................................................................... 21 Hydrograph No. 19, Rational, Pre Development Area 1 C.............................................. 22 Hydrograph No. 20, Rational, Post Development Area 1 C............................................. 23 Hydrograph No. 21, Reservoir, Area 1 C to Pond 1 C...................................................... 24 PondReport ............................................................................................................... 25 Hydrograph No. 23, Rational, Pre Development Area 1 D-1........................................... 26 Hydrograph No. 24, Rational, Post Development Area 1 D-1.......................................... 27 Hydrograph No. 25, Reservoir, Area 1 D-1 to Pond 1 D-1................................................ 28 PondReport ............................................................................................................... 29 Hydrograph No. 27, Rational, Pre Development Area 1 D-2........................................... 30 Hydrograph No. 28, Rational, Post Development Area 1 D-2.......................................... 31 Hydrograph No. 29, Reservoir, Area 1 D-2 to Pond 1 D-2................................................ 32 PondReport ............................................................................................................... 33 Hydrograph No. 31, Combine, Combined Area A ........................................................... 34 Hydrograph No. 32, Combine, Combined Area D.......................................................... 35 Hydrograph No. 33, Combine, Combined Phase 1 Post Development Routed .............. 36 10 -Year SummaryReport ............................................................................................................... 37 HydrographReports......................................................................................................... 39 Hydrograph No. 1, Rational, Pre Development Phase 1 Area. ........................................ 39 Hydrograph No. 3, Rational, Pre Development Area 1A-1............................................. 40 Hydrograph No. 4, Rational, Post Development Area 1A-1............................................ 41 Hydrograph No. 5, Reservoir, Area 1A-1 to Pond 1A-1.................................................. 42 PondReport ............................................................................................................... 43 Hydrograph No. 7, Rational, Pre Development Area 1A-2............................................. 44 Hydrograph No. 8, Rational, Post Development Area 1A-2............................................ 45 Contents Phase 1.gpw Hydrograph No. 9, Reservoir, Area 1A-2 to Pond 1A-2.................................................. 46 PondReport ............................................................................................................... 47 Hydrograph No. 11, Rational, Pre Development Area 1A-3........................................... 48 Hydrograph No. 12, Rational, Post Development Area 1A-3.......................................... 49 Hydrograph No. 13, Reservoir, Area 1A-3 to Pond 1A-3................................................ 50 PondReport ............................................................................................................... 51 Hydrograph No. 15, Rational, Pre Development Area 1 B.............................................. 52 Hydrograph No. 16, Rational, Post Development Area 1 B............................................. 53 Hydrograph No. 17, Reservoir, Area 1 B to Pond 1 B...................................................... 54 PondReport ............................................................................................................... 55 Hydrograph No. 19, Rational, Pre Development Area 1 C.............................................. 56 Hydrograph No. 20, Rational, Post Development Area 1 C............................................. 57 Hydrograph No. 21, Reservoir, Area 1 C to Pond 1 C...................................................... 58 PondReport............................................................................................................... 59 Hydrograph No. 23, Rational, Pre Development Area 1 D-1........................................... 60 Hydrograph No. 24, Rational, Post Development Area 1 D-1.......................................... 61 Hydrograph No. 25, Reservoir, Area 1 D-1 to Pond 1 D-1................................................ 62 PondReport ......................................................:........................................................ 63 Hydrograph No. 27, Rational, Pre Development Area 1 D-2........................................... 64 Hydrograph No. 28, Rational, Post Development Area 1 D-2.......................................... 65 Hydrograph No. 29, Reservoir, Area 1 D-2 to Pond 1 D-2................................................ 66 PondReport ............................................................................................................... 67 Hydrograph No. 31, Combine, Combined Area A ........................................................... 68 Hydrograph No. 32, Combine, Combined Area D.......................................................... 69 Hydrograph No. 33, Combine, Combined Phase 1 Post Development Routed .............. 70 25 - Year SummaryReport............................................................................................................... 71 HydrographReports......................................................................................................... 73 Hydrograph No. 1, Rational, Pre Development Phase 1 Area ........................................ 73 Hydrograph No. 3, Rational, Pre Development Area 1A-1............................................. 74 Hydrograph No. 4, Rational, Post Development Area 1A-1............................................ 75 Hydrograph No. 5, Reservoir, Area 1A-1 to Pond 1A-1.................................................. 76 PondReport ............................................................................................................... 77 Hydrograph No. 7, Rational, Pre Development Area 1A-2............................................. 78 Hydrograph No. 8, Rational, Post Development Area 1A-2............................................ 79 Hydrograph No. 9, Reservoir, Area 1A-2 to Pond 1A-2.................................................. 80 PondReport ............................................................................................................... 81 Hydrograph No. 11, Rational, Pre Development Area 1A-3........................................... 82 Hydrograph No. 12, Rational, Post Development Area 1A-3.......................................... 83 Hydrograph No. 13, Reservoir, Area 1A-3 to Pond 1A-3................................................ 84 PondReport ............................................................................................................... 85 Hydrograph No. 15, Rational, Pre Development Area 1 B.............................................. 86 Hydrograph No. 16, Rational, Post Development Area 1 B............................................. 81 Hydrograph No. 17, Reservoir, Area 1 B to Pond 1 B...................................................... 88 PondReport ................................................................................................................ 89 Hydrograph No. 19, Rational, Pre Development Area 1 C.............................................. 90 Hydrograph No. 20, Rational, Post Development Area 1 C............................................. 91 Hydrograph No. 21, Reservoir, Area 1 C to Pond 1 C...................................................... 92 PondReport ............................................................................................................... 93 Contents Phase i.gpw Hydrograph No. 23, Rational, Pre Development Area 1 D-1........................................... 94 Hydrograph No. 24, Rational, Post Development Area 1 D-1.......................................... 95 Hydrograph No. 25, Reservoir, Area 1 D-1 to Pond 1 D-1................................................ 96 PondReport ............................................................................................................... 97 Hydrograph No. 27, Rational, Pre Development Area 1 D-2........................................... 98 Hydrograph No. 28, Rational, Post Development Area 1 D-2.......................................... 99 Hydrograph No. 29, Reservoir, Area 1 D-2 to Pond 1 D-2.............................................. 100 PondReport ............................................................................................................. 101 Hydrograph No. 31, Combine, Combined Area A ......................................................... 102 Hydrograph No. 32, Combine, Combined Area D........................................................ 103 Hydrograph No. 33, Combine, Combined Phase 1 Post Development Routed ............ 104 100 - Year SummaryReport ............................................................................................................. 105 HydrographReports....................................................................................................... 107 Hydrograph No. 1, Rational, Pre Development Phase 1 Area ...................................... 107 Hydrograph No. 3, Rational, Pre Development Area 1A-1........................................... 108 Hydrograph No. 4, Rational, Post Development Area 1A-1.......................................... 109 Hydrograph No. 5, Reservoir, Area 1A-1 to Pond 1A-1................................................ 110 PondReport ............................................................................................................. 111 Hydrograph No. 7, Rational, Pre Development Area 1A-2........................................... 112 Hydrograph No. 8, Rational, Post Development Area 1A-2.......................................... 113 Hydrograph No. 9, Reservoir, Area 1A-2 to Pond 1A-2................................................ 114 PondReport ............................................................................................................. 115 Hydrograph No. 11, Rational, Pre Development Area 1A-3......................................... 116 Hydrograph No. 12, Rational, Post Development Area 1A-3........................................ 117 Hydrograph No. 13, Reservoir, Area 1A-3 to Pond 1A-3.............................................. 118 PondReport ............................................................................................................. 119 Hydrograph No. 15, Rational, Pre Development Area 1 B............................................ 120 Hydrograph No. 16, Rational, Post Dcvclopmcnt Area 1 B........................................... 121 Hydrograph No. 17, Reservoir, Area 1 B to Pond 1 B.................................................... 122 PondReport ............................................................................................................. 123 Hydrograph No. 19, Rational, Pre Development Area 1 C............................................ 124 Hydrograph No. 20, Rational, Post Development Area 1C........................................... 125 Hydrograph No. 21, Reservoir, Area 1C to Pond 1C.................................................... 126 PondReport ............................................................................................................. 127 Hydrograph No. 23, Rational, Pre Development Area 1 D-1......................................... 128 Hydrograph No. 24, Rational, Post Development Area 1 D-1........................................ 129 Hydrograph No. 25, Reservoir, Area 1 D-1 to Pond 1 D-1.............................................. 130 PondReport ............................................................................................................. 131 Hydrograph No. 27, Rational, Pre Development Area 1 D-2......................................... 132 Hydrograph No. 28, Rational, Post Development Area 1 D-2........................................ 133 Hydrograph No. 29, Reservoir, Area 1 D-2 to Pond 1 D-2.............................................. 134 PondRepo............................................................................................................. 135 Hydrograph No. 31, Combine, Combined Area A ......................................................... 136 Hydrograph No. 32, Combine, Combined Area D........................................................ 137 Hydrograph No. 33, Combine, Combined Phase 1 Post Development Routed ............ 138 Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cis) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3 Yr 5--Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational 0.00 32.35 41.93 48.01 ------- 57.97 Pre Development Phase 1 Area 3 Rational 0.00 1.04 - 1.30 1.48 - - - 1.77 Pre Development Area 1A-1 4 Rational 0.00 1.77 2.22 2.51 ----- 3.01 Post Development Area 1A-1 i5 Reservoir w 0.00 0.02 0.02 0.03 ----- 0.03 Area 1A-1 to Pond 1A-1 7 Rational - 0.00 0.67 0.82 0.92 ------ 1.10 Pre Development Area 1A-2 8 Rational - 0.00 1.03 1.29 1.47 1.75 Post Development Area 1A-2 9 Reservoir S 0.00 0.01 0.01 0.01 ------ 0.01 Area 1A-2 to Pond 1A-2 11 Rational - 0.00 0.28 - 0.35 0.39 ----- 0.46 Pre Development Area 1A-3 12 Rational 0.00 0.45 - 0.55 0.62 --- 0.74 Post Development Area 1A-3 13 Reservoir 0.00 0.00 - 0.00 0.00 ----- 0.00 Area 1A-3 to Pond 1A-3 15 Rational 0.00 20.15 - - 26.11 29.90 ---- 36.10 Pre Development Area 1 B 16 Rational 0.00 49.53 - 62.02 70.33 ---- 84.15 Post Development Area 1 B 17 Res 0.00 1.08 1.21 1.29 ---- 1.41 Area 1 B to Pond 1 B 19 Rational - 0.00 9.83 12.30 13.95 ----- 16.70 Pre Development Area 1C 20 Rational - 0.00 19.00 23.79 2t;.98 ------ 32.28 Post Development Area 1 C 21 Reservoir 20 0.00 0.80 0.84 0.87 ------ 0.92 Area 1 C to Pond 1 C 23 Rational - 0.00 1.33 1.66 1.89 ------ 2.26 Pre Development Area 1 D-1 24 Rational - 0.00 2.88 3.60 4.09 ------- 4.89 Post Development Area 1 D-1 25 Reservoir 24 0.00 0.12 0.14 0.16 ------- 0.20 Area 1D-1 to Pond 1D-1 27 Rational - 0.00 2.79 3.50 3.97 ------ 4.74 Pre Development Area iD-2 28 Rational 0.00 6.05 7.58 8.59 ------- 10.28 Post Development Area 1 D-2 29 I Reservoir 0.00 0.44 0.45 0.46 ------- 0.47 Area 1 D-2 to Pond 1 D-2 Proj. file: Phase 1.gpw Wednesday, Oct 312007, 2:25 PM Hydraflovr Hydrographs by Intelisolve Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. I type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 31 Combine 5, 9, 13, 0.00 0.03 0.04 i 0.04 ----- 0.05 Combined Area A 32 Combine 25, 29, 0.00 0.46 0.48 0.50 ----- 0.52 Combined Area D 33 Combine I 17, 21, 31 320.00 2.38 — 2.58 2.70 ---- 2.90 Combined Phase 1 Post Developmen Proj. file: Phase 1.gpw Wednesday, Oct 312007, 2:25 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 32.35 1 20 38,823 ---- — — -- Pre Development Phase 1 Area 3 Rational 1.04 1 10 625 --- Pre Development Area 1A-1 4 Rational 1.77 1 10 1,062 --- Post Development Area 1A-1 5 Reservoir 0.02 1 20 1,004 4 31.16 1,051 Area 1A-1 to Pond 1A-1 7 Rational 0.67 1 5 202 --- -- Pre Development Area 1A-2 8 Rational 1.03 1 10 619 ---- ------ Post Development Area 1A-2 9 Reservoir 0.01 1 20 547 8 30.24 614 Area 1A-2 to Pond 1A-2 11 Rational 0.28 1 5 85 --- - --- Pre Development Area 1A-3 12 Rational 0.45 1 5 136 --- ------ Post Development Area 1A-3 13 Reservoir 0.00 1 10 66 12 135 Area 1A-3 to Pond 1A-3 15 20.15 1 20 24,179 --- Pre Development Area 1 B 16 R; 49.53 1 10 29,716 --- Post Development Area 1 B 17 R 1.08 1 20 29,706 16 24.53 Area 1 B to Pond 1 B 19 Rational i 9.83 1 10 5,896 --- Pre Development Area 1C 20 Rational 19.00 1 10 11,398 ---- ------ ------ Post Development Area I 21 Reservoir 0.80 1 20 11,385 20 13.04 Area 1C to Pond 1C 23 Rational 1.33 1 10 797 --- ----- Pre Development Area 1 D-1 24 Rational 2.88 1 10 1,727 ---- ----- ---- Post Development Area 1 D-1 25 Reservoir 0.12 1 20 1,712 24 27.48 1,656 Area 1 D-1 to Pond 1 D-1 27 Rational 2.79 1 10 1,675 -- ------ ------ Pre Development Area 1 D-2 28 Rational 6.05 1 10 3,630 ---- ----- Post Development Area 1 D-2 29 Reservoir 0.44 1 19 3,625 28 26.16 3,310 Area 1D-2 to Pond 1 D-2 Phase 1.gpw Return Period: 2 Year Wednesday, Oct 31 2007, 2:25 PM Hydraflo•,v Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow ON Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 31 Combine 0.03 1 20 1,617 5, 9, 13, ------ Combined Area A 32 Combine 0.46 I 1 I 20 5,263 25, 29, — — Combined Area D 33 Combine 2.38 1 20 47,971 17, 21, 31, 32 ------ ------ Combined Phase 1 Post Developmen i Phase 1.gpw I Return Period: 2 Year I Wednesday, Oct 31 2007, 2:25 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Phase 1 Area Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 27.730 ac Intensity = 3.889 in/hr i OF Curve I = WILMINGTON-IDF.IDF I Q (cfs) 35.00 30.00 25.00 20.00 t 15.00 i I. . 10.00 i. 5.00 0 00 �._ 0.0 0.1 j Hyd No. 1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 32.35 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 20.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 38,823 cult Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.2 0.3 0.3 0.4 0.5 0.6 0.7 Time (hrs) Pre Development Phase 1 Area Hyd. No. 1 -- 2 Yr 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Hyd. No. 3 Pre Development Area 1A-1 Hydrograph type = Rational Peak discharge = 1.04 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.690 ac Runoff coeff. = 0.3 Intensity = 5.031 in/hr Tc by User = 10.00 min OF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Hydrograph Volume = 625 cuft I Q (cfs) 2.00 1 1.00 0.00 '" 0.0 Hyd No. 3 0.1 Pre Development Area 1A-1 Hyd. No. 3 -- 2 Yr 0.2 0.3 Q (cfs) 2.00 1.00 "'1L 0.00 0.3 Time (hrs) 6 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Post Development Area 1A-1 Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 0.690 ac Intensity = 5.031 in/hr IN Curve = WILMINGTON-IDF.IDF Q (cis) 2.00 1.00 Hyd No. 4 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.77 cfs Time interval = 1 min Runoff coeff. = 0.51 Tc by User = 10.00 min Asc/Rec limb fact = 1 /1 Post Development Area 1A-1 Hyd. No. 4 -- 2 Yr 0.2 0.3 Hydrograph Volume = 1,062 cult Q (cfs) 2.00 1.00 0.00 0.3 Time (hrs) 7 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Area 1A-1 to Pond 1A-1 Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 4 Reservoir name = Basin 1A-1 Storage Indication method used. Q (cfs) 191111 0.00 0 5 Hyd No. 5 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.02 cfs Time interval = 1 min Max. Elevation = 31.16 ft Max. Storage = 1,051 cult Hydrograph Volume =1,004 cult Area 1A-1 to Pond 1A-1 Hyd. No. 5 -- 2 Yr 9 14 19 23 28 33 37 42 47 Hyd No. 4 8 Q (cf: 2.00 1.00 0.00 51 Time (hrs) Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 1 - Basin 1A-1 Pond Data I Pond storage is based on known contour areas. I Average end area method used. Stage i Storage Tabie Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 31.00 6,025 0 0 0.75 31.75 6,985 4,879 4,879 1.25 32.25 7,642 3,657 8,536 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.75 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0�00 0�00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Exfiltration = 0.520 in/hr (Contour) Tailwater Elev. = 0.00 It Note: CulverIfOrifice outflows have been analyzed under inlet and outlet control. Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 000-- Stage / Discharge Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0 00 0.00 2.00 4.00 6.00 Totai Q 8.00 10.00 12.00 14.00 16.00 18.00 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intellsolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 7 Pre Development Area 1A-2 Hydrograph type = Rational Peak discharge = 0.67 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.380 ac Runoff coeff. = 0.3 Intensity = 5.898 in/hr Tc by User = 5.00 min OF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (cfs) 1.OQ 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.0 Hyd No. 7 Pre Development Area 1A-2 Hyd. No. 7 -- 2 Yr 0.1 Hydrograph Volume = 202 cult Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.2 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Post Development Area 1A-2 Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 0.380 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) X 1.00 Hyd No. 8 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.03 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1A-2 Hyd. No. 8 — 2 Yr 0.2 0.3 Hydrograph Volume = 619 cult Q (cfs) 2.00 1.00 0.00 0.3 Time (hrs) L i Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Area 1A-2 to Pond 1A-2 Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 8 Reservoir name = Basin 1A-2 Storage Indication method used. Q (cfs) 2.00 1.00 Area 1A-2 to Pond 1A-2 Hyd. No. 9 -- 2 Yr Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.01 cfs Time interval = 1 min Max. Elevation = 30.24 ft Max. Storage = 614 cuft Hydrograph Volume = 547 cult Q (cfs) 2.00 1.00 0 4 9 13 17 22 26 30 35 39 43 48 Time (hrs} Hyd No. 9 Hyd No. 8 12 Pond Report 13 Hydratlow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 2 - Basin 1A-2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage f Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 30.00 2,208 0 0 1.00 31.00 2,938 2,573 2,573 1.25 31.25 3,123 758 3,331 2.25 32.25 3,898 3,511 6,841 Culvert ! Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.25 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%u) 0.00 0.00 0.00 0.00 N-Value .000 .000 .000 .000 OrIE Coeff. 0.00 0.00 0.00 0.00 Multi -Stage n/a No No No Exfiltration = 0.520 in/hr (Contour) Tailwater Elev. = 0.00 ft I I Stage (ft) I 3.00 I I 2.00 i. I 1.00 000 Stage ! Discharge Note: Culvert/Orifioe outflows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 0 00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Toiai Q Discharge (ds) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Hyd. No. 11 Pre Development Area 1A-3 Hydrograph type = Rational Peak discharge = 0.28 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.160 ac Runoff coeff. = 0.3 Intensity = 5.898 in/hr Tc by User = 5.00 min OF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (cfs) Pre Development Area 1A-3 Hyd. No. 11 -- 2 Yr Hydrograph Volume = 85 cult Q (cfs) 0.50 0.45 0.50 0.40 0.45 0.35 0.40 0.30 0.35 0.25 0.30 0.20 0.25 0.15 0.20 0.10 0.15 0.05 0.10 000 z 0.05 0 00 0.0 0.1 0.2 Hyd No. 11 Time (hrs) 14 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 12 Post Development Area 1 A-3 Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 0.160 ac Intensity = 5.898 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.0 Hyd No. 12 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.45 cfs Time interval = 1 min Runoff coeff. = 0.48 Tc by User = 5.00 min Asc/Rec limb fact = 1/1 Post Development Area 1A-3 Hyd. No. 12 -- 2 Yr 0.1 Hydrograph Volume =136 cult Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 o.00 0.2 Time (hrs) 15 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 13 Area 1A-3 to Pond 1A-3 Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 12 Reservoir name = Basin 1A-3 Storage Indication method used Area 1A-3 to Pond 1A-3 Q (cam) Hyd. No. 13 - 2 Yr 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 TI 0 00 li- L. Wednesday, Oct 31 2007, 2.25 PM Peak discharge = 0.00 cfs Time interval = 1 min Max. Elevation = 30.10 ft Max. Storage = 135 cuft Hydrograph Volume = 66 cult 0.0 1.3 2.7 4.0 5.3 6.7 8.0 9.3 10.7 12.0 Hyd No. 13 Hyd No. 12 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 13.3 Time (nrs) 16 Pond Report 17 i Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM j Pond No. 3 - Basin 1A-3 Pond Data ' Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 30.00 1,085 0 0 1.00 31.00 1,596 1,341 1,341 1.25 31.25 1,732 416 1,757 2.25 32.25 2,314 2,023 3,780 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.25 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect -- --- -- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No f Slope (%) = 0.00 0.00 0.00 0.00 I! N-Value = .000 .000 .000 .000 Orif. Coeff. 0.00 0.00 0.00 0.00 Multi -Stage n/a No No No Exfiltration = 0.520 inlhr (Contour) Tailwater Elev. = 0.00 It Stage (ft) 3.00 2.00 1.00 -• 000 Stage I Discharge Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 0.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Totai i1 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 15 Pre Development Area 1 B Hydrograph type = Rational Peak discharge = 20.15 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 17.270 ac Runoff coeff. = 0.3 Intensity = 3.889 in/hr Tc by User = 20.00 min OF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (cfs) 21 I 18.00 15.00 12.00 I 9.00 6.00 3.00 0 00 0.0 0.1 Hyd No. 15 I I L.. Pre Development Area 1 B Hyd. No. 15 — 2 Yr Hydrograph Volume = 24,179 cult Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 0.2 0.3 0.3 0.4 0.5 0.6 0.7 Time (hrs) 18 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 16 Post Development Area 1 B Hydrograph type = Rational Peak discharge = 49.53 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 17.270 ac Runoff coeff. = 0.57 Intensity = 5.031 in/hr Tc by User = 10.00 min IDF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 111 Q (cfs) 50.00 40.00 30.00 l 20.00 10.00 Hyd No. 16 0.1 Post Development Area 1 B Hyd. No. 16 -- 2 Yr 0.2 0.3 Hydrograph Volume = 29,716 cult Q (cfs) 50.00 40.00 30.00 f 111111] 10.00 --- 0.00 0.3 Time (hrs) 19 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 17 Area 1 B to Pond 1 B Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 16 Reservoir name = Basin 1 B Storage Indication method used. Area 1 B to Pond 1 B Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.08 cfs Time interval = 1 min Max. Elevation = 24.53 ft Max. Storage = 28,885 cuft Hydrograph Volume = 29,706 cult 20 Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 4 - Basin 1 B Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 21.00 4,802 0 0 1.00 22.00 6,515 5,659 5,659 2.00 23.00 8,457 7,486 13,145 3.00 24.00 10,590 9,524 22,668 4.00 25.00 12,925 11,758 34,426 4.69 25.69 15,331 9,748 44,174 5.00 26.00 15,331 4,753 48,926 f 5.50 26.50 16,252 7,896 56,822 6.00 27.00 18,136 8,597 65,419 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) 0.00 0.00 0.00 0.00 Length (ft) 0.00 0.00 0.00 0.00 Slope (0/0) 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff, = 0.00 0.00 0.00 0.00 Multistage = n/a No No No Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 000 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 26.&0 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type Rect --- Multistage = No No No No ExriItration = 3.960 inthr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage / Discharge Stage (ft) 6.00 ..................... ........ 5.00 .................I........................ _............ -- ......... ................ 4.00 3.00 ................................�.............__..._............... _............. _.... .................................._................. _...................... ... ... _..... .. ..... ............ 2.00 ...... _._..................................... .. ................. ................................... . . _............................ .... 1.00 n 00 21 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 19 Pre Development Area 1 C Hydrograph type = Rational Storm frequency = 2 yrs ' Drainage area = 6.510 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 10.00 _ _......... ......... _... _._. ......... I 8.00 6.00 I 4.00 2.00 0 00 0.0 0.1 f Hyd No. 19 !t L._ 22 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 9.83 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1 /1 Hydrograph Volume = 5,896 cuft Pre Development Area 1 C Hyd. No. 19 — 2 Yr v.vv 0.2 0.3 0.3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 20 Post Development Area 1 C Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 6.510 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 21.00 18.00 15.00 12.00 t 9.00 f 6.00 L_ L 3.00 0 00 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 19.00 cfs Time interval = 1 min Runoff coeff. = 0.58 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1 C Hyd. No. 20 -- 2 Yr Hydrograph Volume = 11,398 cult Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 0.0 0.1 0.2 0.3 0.3 Hyd No. 20 Time (hrs) 23 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 21 Area 1 C to Pond 1 C Hydrograph type = Reservoir ` Storm frequency = 2 yrs Inflow hyd. No. = 20 Reservoir name = Basin 1 C i Storage Indication method used. Q (Cfs) 21 1 18.00 15.00 12.00 • m 3.00 Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.80 cfs Time interval = 1 min Max. Elevation = 13.04 ft Max. Storage = 10,895 cuft Hydrograph Volume = 11,385 cult Q (Cfs) 21.00 S1411I17 15.00 12.00 �8 3.00 0 00 U i I I I -.1- I 1 I I I 0.00 lJ lJ 0.0 1.7 3.3 5.0 6.7 8.3 10.0 11.7 13.3 15.0 16.7 18.3 Time (hrs) Hyd No. 21 Hyd No. 20 24 Pond Report 25 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No 5 - Basin 1 C Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 12.00 8,751 0 0 1.00 13.00 10,393 9,572 9,572 2.00 14.00 12,735 11,564 21,136 2.25 14.25. 13,251 3,248 24,384 2.75 14.75 14,294 6,886 31,270 3.75 15.75 16,423 15,358 46,629 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 14.75 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect --- -- -- Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N Value = .000 .000 .000 .000 Orif. Coeff. 0.00 0.00 0.00 0.00 Multi -Stage n/a No No No EAItration = 2.990 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Untice outflows have been analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.00 0.00 1 0.00 Stage I Discharge Stage (ft) 4.00 3.00 2.00 1.00 I I I I I I I I 1 I r 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 23 Pre Development Area 1 D-1 Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 0.880 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 2.00 1.00 000 0.1 Hyd No. 23 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.33 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 D-1 Hyd. No. 23 -- 2 Yr 0.2 0.3 Hydrograph Volume = 797 cult Q (cfs) 2.00 1.00 2 0.00 0.3 Time (hrs) 26 Hydrograph Plot iHydraflow Hydrographs by Intelisolve Hyd. No. 24 Post Development Area 1 D-1 Hydrograph type = Rational CStorm frequency = 2 yrs Drainage area = 0.880 ac Intensity = 5.031 in/hr IDF Curve I I = WILMINGTON-IDF.IDF Wednesday, Oct 312007, 2:25 PM Peak discharge = 2.88 cfs Time interval = 1 min Runoff coeff. = 0.65 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1 D-1 Q () Hyd. No. 24 -- 2 Yr j 3.00 I I 2.00 1.00 Hydrograph Volume = 1,727 cult ........ .. . ... ... . . . . .. . . ..... ... . .. .................. ........ ... .. . ............. . . . . ........ ... ... .... . ................. ........... . . . . ... ..... . .... . .. ...... . ..... . . . . ..... ...... . . ... . . .. .. ............... . .. ..... ... ....... . ..... ..... . .. . ....... . ............................ ...... . .. ..... . . . .... ...... . .... .. .. . . . . .. .. . . .............. ... . ............ .. - . ..... .... .. .. . . .......... .. . . . .. .. . ........... ...... . . . . . - - - /-- - . . ...... . . . ............ ....... . Hyd No. 24 0.1 0.2 0.3 Q (cfs) 3.00 MX 1.00 N_ 0.00 0.3 Time (hrs) 27 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 25 Area 1 D-1 to Pond 1 D-1 Hydrograph type = Reservoir Peak discharge = 0.12 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 24 Max. Elevation = 27.48 ft Reservoir name = Basin 1 D-1 Max. Storage = 1,656 cuft Storage Indication method used. I IQ (CfS) I 3.00 I f 2.00 I 1.00 Area 1 D-1 to Pond 1 D-1 Hyd. No. 25 -- 2 Yr Hydrograph Volume = 1,712 cult -I_-- 71 . .... 7. 1 Q (cfs) 3.00 2.00 f TIC 0.00 0.0 1.8 3.7 5.5 7.3 9.2 11.0 12.8 14.7 16.5 18.3 20.2 Time (hrs) r Hyd No. 25 Hyd No. 24 i 28 Pond Report 29 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 6 - Basin 1 D-1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 27.00 2,790 0 0 1.00 28.00 4,049 3,420 3,420 2.00 29.00 5,293 4,671 8,091 2.25 29.25 5,587 1,360 9,450 3.00 30.00 6,575 4,561 14,011 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 26.50 0.00 0.00 0.00 Length (ft) = 50.00 0.00 0.00 0.00 Slope [%) = 1.00 0.00 0.00 0.00 N Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multistage = n/a No No No l I Stage (ft) I 3.00 2.00 1.00 00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 5.00 0.00 0.00 0.00 Crest El. (ft) = 29.25 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Riser -- --- --- Multistage = Yes No No No Exfiltration = 2.550 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: CulvertfOrifioe outflows have been analyzed under inlet and outlet control. Stage 1 Discharge Stage (ft) 3.00 2.00 1.00 o.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 Total Q Discharge (cls) V I I I I J I I I I 1 1. ............ . . Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 27 Pre Development Area 1 D-2 Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 1.850 ac Intensity = 5.031 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) ! 3.00 2.00 1.00 v.vv Hyd No. 27 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 2.79 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 D-2 Hyd. No. 27 -- 2 Yr 0.2 0.3 Hydrograph Volume = 1,675 cult Q (cfs) 3.00 wx1If 1.00 — U.uu 0.3 Time (hrs) 30 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 28 Post Development Area 1 D-2 Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 1.850 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 6.05 cfs Time interval = 1 min Runoff coeff. = 0.65 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1 D-2 Q () Hyd. No. 28 -- 2 Yr 7.00 .... .... ... ......... ..... _....... .... .... ... .._......_._.... ............. ........... .......................... .......... - - - -_ --- .......... ......... ......... 6.00 _ ......... . .. ......... --._ ..... ...... 5.00 ............ - ........ _ ......... - 4.00 .... ....... .... ............... 3.00 - - - ....... ...... _.... ... -_... ........ -. ........ _........ _._. _ ...... ....... 2.00 71 ................. -- — — -- ....... ._... 1.00 ( .... .----_. __.-........ .... .. 0.00 0.0 Hydrograph Volume = 3,630 cuR Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.1 0.2 0.3 0.3 Hyd No. 28 Time (hrs) 31 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 29 Area 1 D-2 to Pond 1 D-2 Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 28 Reservoir name = Basin 1 D-2 Storage Indication method used. Q (Cfs) 7.00 . 11 5.00 4.00 K 11 2.00 I. 1.00 Area 1 D-2 to Pond 1 D-2 Hyd. No. 29 -- 2 Yr Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.44 cfs Time interval = 1 min Max. Elevation = 26.16 ft Max. Storage = 3,310 cuft Hydrograph Volume = 3,625 cult. Q (cfs) 7.00 FX1I11 4.00 3.00 Willi] 1.00 0.00 I 1 I 1 0.00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 6.0 6.7 73 8.0 Hyd No. 29 Hyd No. 28 Time (hrs) L 32 Pond Report 33 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No 7 - Basin 1 D-2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 25.70 6,534 0 0 0.30 26.00 7,077 2,042 2,042 1.30 27.00 8,964 8,021 10,062 1.55 27.25 9,451 2,302 12,364 1.80 27.50 9,941 2,424 14,788 2.05 27.75 10,434 2,547 17,335 3.05 28.75 12,443 11,439 28,774 Culvert I Orifice Structures Weir Structures [A] [B] [C] ID] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 27.75 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect --- -- --- Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 OriE Coeff. = 0.00 0.00 0.00 0.00 Multistage = n/a No No No Stage (ft) 4.00 3.00 2.00 1.00 000 Exfiltration = 2.550 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage 1 Discharge Note: CulvertlOrifice outflows have been analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.00 0.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 31 Combined Area A Hydrograph type = Combine Peak discharge = 0.03 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 5, 9, 13 Q (cfs) Combined Area A Hyd. No. 31 — 2 Yr Hydrograph Volume =1,617 cult 34 U. lu 0.09 0.10 0.08 0.09 0.07 0.08 0.06 0.07 0.05 0.06 0.04 0.05 0.03 0.04 0.02 0.03 0.01 0.02 000 0.01 000 0 5 9 14 19 23 28 33 37 42 47 51 Time (hrs) Hyd No. 31 Hyd No. 5 — Hyd No. 9 Hyd No. 13 ` Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 32 Combined Area D Hydrograph type = Combine Storm frequency = 2 yrs Inflow hyds. = 25, 29 Q (cfs) Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.46 cfs Time interval = 1 min Hydrograph Volume = 5,263 cult Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 -� 0.05 0.00 0 00 0 3 6 — Hyd No. 32 Combined Area D Hyd. No. 32 -- 2 Yr 9 12 Hyd No. 25 15 18 21 Hyd No. 29 24 27 30 33 Time (hrs) 35 Hydrograph Plot riyuranow nyurugrapns i)y iniensoive Hyd. No. 33 Combined Phase 1 Post Development Routed Hydrograph type = Combine Storm frequency = 2 yrs Inflow hyds. = 17, 21, 31, 32 Q (Cfs) 3.00 2.00 1.00 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 2.38 cfs Time interval = 1 min Hydrograph Volume = 47,971 cuft Combined Phase 1 Post Development Routed Hyd. No. 33 -- 2 Yr .... . .................... 11 . ........... .... . . ... I . . . . . . ........................ ....... . I . . .......... ..... . ........... . . ........................ I ................. 1. .. ........... I ........... ........ ............ ------- --- — .. . ................... — I . . . . ............ . . ........ . ..................... . ....... . ....... . ..... .. .................. ............................. . . . . . .. .. . ................ ...................... . . ... ................. 11 1 .... .................................... .... -.-. - . . .. ...... ..... . ........... . ...... . . . . . .... ............. .. . ..... . . - ....... . ......... ......... ... .. . . ............................... ........ . . . . . . ................ ................. ..................... . . ... .... ............ . ................... . .......... . ............ . . ....... .............. - . N ... ... - .. ......... . . . ............. - . ......... . . ....... . ....... ............. .... . ..... ... .... . . . . . ... .. ..... ... .. ........ . ..... . ...... . ........ ... . .. . .. ............ .. ... . . ......... . ...... .. ............ .. . .... ...... .. ......... . . . - ............. . . . . . . ... ........ . ... . ....... . . . . ..... .... . ... . ... .... . ...... ...... ... .... . ........ .. ...... .......... . . .......... ..... ...... . ............ ... .......... k-- ....... ....... . Q (Cfs) 3.00 2.00 1.00 0.00 .4 0.00 0.0 2.2 4.3 6.5 8.7 10.8 13.0 15.2 17.3 19.5 21.7 - Hyd No. 33 - Hyd No. 17 - Hyd No. 21 - Hyd No. 31 Time (hrs) - Hyd No. 32 36 37 L Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 Rational 41.93 1 20 50,313 ---- ----- Pre Development Phase 1 Area 3 Rational 1.30 1 10 782 ---- ----- ----- I Pre Development Area 1A-1 4 I Rational 2.22 1 10 1,330 ---- ------ ----- ' Post Development Area 1A-1 5 Reservoir 0.02 1 20 1,262 4 31.20 1,317 Area 1A-1 to Pond 1A-1 7 Rational 0.82 1 5 246 ---- ---- ----- Pre Development Area 1A-2 8 Rational 1.29 1 10 776 ---- ----- ----- Post Development Area 1 A-2 9 Reservoir 0.01 1 20 703 8 30.30 769 Area 1A-2 to Pond 1A-2 11 Rational 0.35 1 5 104 ---- ----- ------ Pre Development Area 1A-3 12 Rational 0.55 1 5 166 ---- ------ ------ Post Development Area 1A-3 13 Reservoir 0.00 1 10 96 12 30.12 165 Area 1A-3 to Pond 1A-3 15 Rational 26.11 1 20 31,335 ---- -- ----- Pre Development Area 1 B 16 Rational 62.02 1 10 37,210 ---- ---- ---- Post Development Area 1 B 17 1.21 1 20 37,200 16 25.13 36,283 Area 1 B to Pond 1 B 19 Rational 12.30 1 10 7,382 --- --- ------ Pre Development Area 1C 20 Rational 23.79 1 10 14,273 -- ---- --- Post Development Area 1 C 21 Reservoir 0.84 1 20 14,259 20 13.26 13,696 Area 1C to Pond 1C 23 Rational 1.66 1 10 998 --- Pra Development Area 1 D-1 24 Rational 3.60 1 10 2,162 --- ----- ----- Post Development Area 1 D-1 25 Reservoir 0.14 1 20 2,148 24 27.61 2,074 Area 1D-1 to Pond 1D-1 27 Rational 3.50 1 10 2,098 --- Pre Development Area 1 D-2 28 Rational 7.58 1 10 4,545 --- ------ Post Development Area 1 D-2 29 Reservoir 0.45 1 19 4,541 28 26.27 4,196 Area 1D-2 to Pond 1D-2 i Phase 1.gpw I Return Period: 10 Year I Wednesday, Oct 312007, 2:25 PM Hydrevlow Hydrographs by intelisolve 38 Hydrograph Summary Report Hyd. ! No. i E Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 31 Combine 0.04 1 20 2,061 5, 9, 13, ------ ---- Combined Area A 32 Combine 0.48 1 20 6,592 25, 29, ----- ------ Combined Area D 33 Combine 2.58 1 20 60,112 17, 21, 31, 32 ------ ------ Combined Phase 1 Post Developmen I i I Phase 1.gpw Return Period: 10 Year Wednesday, Oct 31 2007, 2:25 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Phase 1 Area Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 27.730 ac Intensity = 5.040 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 41.93 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 20.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 50,313 cult Pre Development Phase 1 Area Hyd. No. 1 --10 Yr 0.1 0.2 0.3 0.3 0.4 0.5 0.6 Hyd No. 1 Q (cfs) 50.00 40.00 30.00 20.00 10.00 3_ 0.00 0.7 Time (hrs) 39 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Hyd. No. 3 Pre Development Area 1A-1 Hydrograph type = Rational Peak discharge = 1.30 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.690 ac Runoff coeff. = 0.3 Intensity = 6.300 in/hr Tc by User = 10.00 min IDF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q MS) 1.00 Hyd No. 3 0.1 Pre Development Area 1A-1 Hyd. No. 3 --10 Yr 0.2 0.3 Hydrograph Volume = 782 cult Q (cfs) 2.00 1.00 n.on 0.3 Time (hrs) 40 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Post Development Area 1 A-1 Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 0.690 ac Intensity = 6.300 in/hr IDF Curve = WILMINGTON-IDF.IDF I I Q (C%) ( 3.00 ` 2.00 I i 1.00 Hyd No. 4 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 2.22 cfs Time interval = 1 min Runoff coeff. = 0.51 Tc by User = 10.00 min ASc/Rec limb fact = 1/1 Post Development Area 1A-1 Hyd. No. 4 —10 Yr 0.2 - - - ------ - --------- . . ...... . . . ..... . 0.3 Hydrograph Volume = 1,330 cult Q (cfs) 3.00 2.00 1.00 N 0.00 0.3 Time (hrs) 41 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Area 1A-1 to Pond 1A-1 Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 4 Reservoir name = Basin 1A-1 Storage Indication method used. Q (cfs) 3.00 2.00 1.00 M Area IA-1 to Pond 1 A-1 Hyd. No. 5 --10 Yr 5 10 15 19 Hyd No. 5 Hyd No. 4 Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.02 cfs Time interval = 1 min Max. Elevation = 31.20 ft Max. Storage = 1,317 cuft Hydrograph Volume = 1,262 cult 24 29 34 39 44 Q (cfs) 3.00 2.00 510IR 0.00 48 Time (hrs) 42 Pond Report 43 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 1 - Basin 1A-1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 31.00 6,025 0 0 0.75 31.75 6,985 4,879 4,879 1.25 32.25 7,642 3,657 8,536 Culvert f Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.75 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect -- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage n/a No No Stage (ft) Exfiltration = 0.520 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifioe outflows have been analyzed under inlet and outlet control. Stage 1 Discharge Stage (ft) 2.00 1.80 2.00 1.60 1.80 1.40 1.60 1.20 1.40 1.00 1.20 0.80 1.00 0.60 0.80 0.60 0.40 0.20 0.40 0 00 0.20 0 00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Total Q 18.00 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Pre Development Area 1A-2 Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 0.380 ac Intensity = 7.200 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.0 Hyd No. 7 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.82 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 5.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1A-2 Hyd. No. 7 —10 Yr 0.1 Hydrograph Volume = 246 cult Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.2 Time (hrs) 44 L Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 8 Post Development Area 1A-2 Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 0.380 ac Intensity = 6.300 in/hr OF Curve = WILMINGTON-IDF.IDF 1.00 n Hyd No. 8 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.29 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1A-2 Hyd. No. 8 --10 Yr 11M low Hydrograph Volume = 776 cult Q (cfs) 2.00 1.00 0.00 0.3 Time (hrs) 45 46 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Area 1A-2 to Pond 1A-2 Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. 8 Reservoir name Basin 1A-2 Storage Indication method used. Q (cfs) 2.00 1.00 0.00 -u 0 Area 1A-2 to Pond 1A-2 Hyd. No. 9 --10 Yr Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.01 cfs Time interval = 1 min Max. Elevation = 30.30 ft Max. Storage = 769 cuft Hydrograph Volume = 703 cult Q (cfs) 2.00 1.00 I I I I 1 0.00 5 10 15 19 24 29 34 39 44 48 Hyd No. 9 Hyd No. 8 Time (hrs) Pond Report 47 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Pond No. 2 - Basin 1A-2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage `fable Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuts) 0.00 30.00 2,208 0 0 1.00 31.00 2,938 2,573 2,573 1.25 31.25 3,123 758 3,331 2.25 32.25 3,898 3,511 6,841 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orit Coeff. 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) f 3.00 2.00 ( 1.00 t- 000 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 31.25 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Rect --- -- --- Multi-Stage = No No No No ExrIItration = 0.520 inthr (Contour) Tailwater Elev. = 0.00 ft Stage / Discharge Note: Culvert/Oriflos outNows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 0.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 11 Pre Development Area 1A-3 Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 0.160 ac Intensity = 7.200 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.0 Hyd No. 11 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.35 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 5.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1A-3 Hyd. No. 11 -- 10 Yr 0.1 Hydrograph Volume =104 cult Q (c%) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.2 Time (hrs) 48 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 12 Post Development Area 1A-3 Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 0.160 ac Intensity = 7.200 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.0 Hyd No. 12 Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.55 cfs Time interval = 1 min Runoff coeff. = 0.48 Tc by User = 5.00 min Asc/Rec limb fact = 1/1 Post Development Area 1A-3 Hyd. No. 12 -- 10 Yr 0.1 Hydrograph Volume = 166 cult Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.2 Time (hrs) 49 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 13 Area 1A-3 to Pond 1A-3 Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 12 Reservoir name = Basin 1A-3 Storage Indication method used. Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.00 cfs- Time interval = 1 min Max. Elevation = 30.12 ft Max. Storage = 165 cuft Hydrograph Volume = 96 cult Area 1A-3 to Pond 1A-3 Q (ds) Hyd. No. 13 -- 10 Yr Q (ofs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00a--� 0.0 1.7 3.3 Hyd No. 13 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 5.0 6.7 8.3 10.0 11.7 13.3 15.0 16.7 18.3 Hyd No. 12 Time (hrs) 50 Pond Report 51 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 3 - Basin 1A-3 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 30.00 1,085 0 0 1.00 31.00 1,596 1,341 1,341 1.25 31.25 1,732 416 1,757 2.25 32.25 2,314 2,023 3,780 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.25 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect --- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orit Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Exflltration = 0.520 in/hr (Contour) Tailwater Elev. = 0.00 ft C Stage (ft) 3.00 I 2.00 1. . 1.00 Stage / Discharge Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage R 3.00 2.00 1.00 V y V 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Total Q Discharge (cls) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 15 Pre Development Area 1 B Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 17.270 ac Intensity = 5.040 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 28.Oo 24.00 20.00 16.00 C I 12.00 I 8.00 4.00 000 0.0 0.1 IHyd No. 15 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 26.11 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 20.00 min Asc/Rpc limb fact = 1/1 Pre Development Area 1 B Hyd. No. 15 --10 Yr Hydrograph Volume = 31,335 cult Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0.2 0.3 0.3 0.4 0.5 0.6 0.7 Time (hrs) 52 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 16 Post Development Area 1 B Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 17.270 ac Intensity = 6.300 in/hr OF Curve = WILMINGTON-IDF.IDF I Q (Cfs) I 70.00 50.00 1 40.00 30.00 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 62.02 cfs Time interval = 1 min Runoff coeff. = 0.57 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1 B Hyd. No. 16 —10 Yr Hydrograph Volume = 37,210 cult Q (cfs) 70.00 50.00 40.00 W11111( 20.00 10.00 I o.00 I I I I V 0 00 0.0 Hyd No. 16 l 0.1 0.2 0.3 0.3 Time (hrs) 53 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 17 Area 1 B to Pond 1 B Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 16 Reservoir name = E Basin 1 B Storage Indication method used. I i Q (c%) I 70.00 60.00 50.00 40.00 30.00 t.. 20.00 10.00 Area 1 B to Pond 1 B Hyd. No. 17 -- 10 Yr Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.21 cfs Time interval = 1 min Max. Elevation = 25.13 ft Max. Storage = 36,283 cuft Hydrograph Volume = 37,200 cult Q WS) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 W , I I--�I I I ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs} Hyd No. 17 Hyd No. 16 54 Pond Report 55 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 4 - Basin 1 B Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 21.00 4,802 0 0 1.00 22.00 6,515 5,659 5,659 2.00 23.00 8,457 7,486 13,145 3.00 24.00 10,590 9,524 22,668 4.00 25.00 12,925 11,758 34,426 4.69 25.69 15,331 9,748 44,174 5.00 26.00 15,331 4,753 48,926 5.50 26.50 16,252 7,896 56,822 6.00 27.00 18,136 8,597 65,419 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) 0.00 0.00 0.00 0.00 Length (ft) 0.00 0.00 0.00 0.00 Slope (%) 0.00 0.00 0.00 0.00 N-Value .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multistage = n1a No No No Stage (ft) Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) 26.50 0.00 0.00 0.00 Weir Coelf. = 3.33 0.00 0.00 0.00 Weir Type = Rect -- -- Multi-Stage = No No No No Exfiltration = 3.960 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage / Discharge Stage (ft) 6.00 ......... ......... .... ... ........., - ......... ......... .... .... 6.00 5.00 ) --- _ _..... _ ......... .. ........... ...._.. . ......... ..- - . ............. .-- 5.00 4.00 . 1 4.00 3.00 1. 3.00 2.00 _.....-._......-..........__...._...._. ... .... .................. .._......._.. _...._-.___.......-.___...._.......................--- ..............---.......__..........._-........__...................................... _ -----.........._....._..._.................... __.. ........__ ......... _ _ _ .................. ......... ......... ...... ... ....... ......... -. ........ ......... _ _ . ......... _ ......... _. -- ....... 2.00 1.00 _.. ......... - -_ _... - - ......... ...... 1.00 00 ......................__............... .._._............................ -----....................... _........ ............................................................. ........... ..-_....__......................................... .... __-.............................. _.................._............_._....._....... -..................._..-_.............................- - 0 00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total Q 20.00 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 19 Pre Development Area 1 C Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 6.510 ac Intensity = 6.300 in/hr IDF Curve = WILMINGTON-IDF.IDF 12.00 f 10.00 s.0a 6.0c I 4.00 L + 2.00 Hyd No. 19 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 12.30 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 C Hyd. No. 19 -- 10 Yr 0.2 0.3 Hydrograph Volume = 7,382 cult Q (cfs) 14.00 12.00 10.00 N. 16 AM 4.00 Mile] 0.00 0.3 Time (hrs) 56 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 20 Post Development Area 1 C Hydrograph type = Rational Peak discharge = 23.79 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 6.510 ac Runoff coeff. = 0.58 Intensity = 6.300 in/hr Tc by User = 10.00 min IDF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 1 Q(S) 24.00 I 20.00 16.00 12.00 M Hyd No. 20 0.1 Post Development Area I Hyd. No. 20 -- 10 Yr 0.2 0.3 Hydrograph Volume = 14,273 cult Q (cfs) 24.00 16.00 12.00 [11I6 4.00 "L 0.00 0.3 Time (hrs) 57 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 21 I Area 1 C to Pond 1 C Hydrograph type = Reservoir IStorm frequency = 10 yrs Inflow hyd. No. = 20 Reservoir name = Basin 1 C Storage Indication method used. Area 1 C to Pond 1 C Hyd. No. 21 -- 10 Yr 16.00 12.00 �- - 8.00 4.00 Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.84 cfs Time interval = 1 min Max. Elevation = 13.26 ft Max. Storage = 13,696 tuft Hydrograph Volume = 14,259 cult Q (cfs) 24.00 20.00 12.00 4.00 0.00 -U '--I 1 11' 0.00 0.0 1.8 3.7 5.5 7.3 9.2 11.0 12.8 14.7 16.5 18.3 Time (hrs) Hyd No. 21 Hyd No. 20 58 Pond Report 59 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond Mn 5 - Basin 1 C Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 12.00 8,751 0 0 1.00 13.00 10,393 9,572 9,572 2.00 14.00 12,735 11,564 21,136 2.25 14.25 13,251 3,248 24,384 2.75 14.75 14,294 6,886 31,270 3.75 15.75 16,423 15,358 46,629 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 14.75 0.00 0.00 0.00 No. Barrels 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) 0.00 0.00 0.00 0.00 Weir Type = Rect -- --- --- Length (ft) 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) 0.00 0.00 0.00 0.00 N-Value .000 .000 .000 .000 Orit'. Coaff. 0.00 0.00 0.00 0.00 Multi -Stage n/a No No No EAltration = 2.990 inthr (Contour) Tailwater Elev. = 0.00 It Stage (ft) 4.00 3.00 2.00 1.00 0 00 Stage / Discharge Note: CulvertlOriflce outflows have been analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.00 0 00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 Total Q Discharge (ds) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 23 Pre Development Area 1 D-1 Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 0.880 ac Intensity = 6.300 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 2.00 1.00 Hyd No. 23 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.66 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 D-1 Hyd. No. 23 --10 Yr 0.2 0.3 Hydrograph Volume = 998 cult Q (cfs) 2.00 1.00 OAO 0.3 Time (hrs) 60 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 24 Post Development Area 1 D-1 Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 0.880 ac Intensity = 6.300 in/hr OF Curve = WILMINGTON-IDF.IDF t Q(S) ( 4.00 3.00 2.00 1. 1.00 000 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 3.60 cfs Time interval = 1 min Runoff coeff. = 0.65 Tc by User = 10.00 min Asc/Rec limb fact = 111 Post Development Area 1 D-1 Hyd. No. 24 -- 10 Yr Hydrograph Volume = 2,162 cult Q (cfs) 4.00 941111 2.00 1.00 I I I '' 0.00 0.1 0.2 0.3 0.3 Hyd No. 24 Time (hrs) 61 62 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM { Hyd. No. 25 I Area 1 D-1 to Pond 1 D-1 Hydrograph type = Reservoir Peak discharge = 0.14 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 24 Max. Elevation = 27.61 ft Reservoir name = Basin 1 D-1 Max. Storage = 2,074 cuft Storage Indication method used. Hydrograph Volume = 2,148 cult l ! Area 1 D-1 to Pond 1 D-1 Q (cfs) Hyd. No. 25 -- 10 Yr Q (cfs) 4.00 ....... 4.00 ....... _ .... ... .. .. 6 3.00 ........ ... ........ ............. ........ .......... _.... ....... ......... ................ .- ............ -- —.... ......... — _...-- 3.00 __.....—.. ............ - — ... .................... ........ ... _ ......... _ ......... .... ... ..... ..... ..._ _................ ...... ......... ..... ......... ......... ...._ .... _..... ..... 2.00 _ ..... _ 2.00 _ 1.00 _. ......... ... ..... --. _.- ..... _ - - - --- - -- 1.00 ........ ..... _ .. - __ ........ ... j...-- l_. 0.00 - .. ...._ 0.00 - 0.0 1.8 3.7 5.5 7.3 9.2 11.0 12.8 14.7 16.5 18.3 20.2 Time (hrs) Hyd No. 25 Hyd No..24 Pond Report 63 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 6 - Basin 1 D-1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 27.00 2,790 0 0 1.00 28.00 4,049 3,420 3,420 2.00 29.00 5,293 4,671 8,091 2.25 29.25 5,587 1,360 9,450 3.00 30.00 6,575 4,561 14,011 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Crest Len (ft) = 5.00 0.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 Crest El. (ft) = 29.25 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 26.50 0.00 0.00 0.00 Weir Type = Riser --- --- --- Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 0.00 N Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No ExfiItration = 2.550 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 3.00 2.00 I 1.00 l 0 00 Stage / Discharge Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control Stage (ft) 3.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 Vv Discharge (cfs) �� Total Q 64 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 27 Pre Development Area 1 D-2 Hydrograph type = Rational fStorm frequency = 10 yrs Drainage area = 1.850 ac Intensity = 6.300 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 4.00 I 3.00 2.00 1.00 l_ Wednesday, Oct 312007, 2:25 PM Peak discharge = 3.50 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 D-2 Hyd. No. 27 -- 10 Yr Hydrograph Volume = 2,098 cult Q (cfs) 4.00 3.00 2.00 1.00 0.0 0.1 0.2 0.3 0.3 Hyd No. 27 Time (hrs) 65 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 28 Post Development Area 1 D-2 Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 1.850 ac Intensity = 6.300 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 8.00 0.00 4.00 Hyd No. 28 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 7.58 cfs Time interval = 1 min Runoff coeff. = 0.65 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1 D-2 Hyd. No. 28 — 10 Yr Le i [M Hydrograph Volume = 4,545 cult Q (cfs) 8.00 6.00 4.00 2.00 0.00 0.3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 29 Area 1 D-2 to Pond 1 D-2 Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 28 Reservoir name = Basin 1 D-2 t Storage Indication method used. Area 1 D-2 to Pond 1 D-2 Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.45 cfs Time interval = 1 min Max. Elevation = 26.27 ft Max. Storage = 4,196 cuft Hydrograph Volume = 4,541 cult 66 Pond Report 67 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Pond No. 7 - Basin 1 D-2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage f Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) " 0.00 25.70 6,534 0 0 0.30 26.00 7,077 2,042 2,042 1.30 27.00 8,964 8,021 10,062 1.55 27.25 9,451 2,302 12,364 1.80 27.50 9,941 2,424 14,788 2.05 27.75 10,434 2,547 17,335 3.05 28.75 12,443 11,439 28,774 I Culvert / Orifice Structures [A] [B] [C] [D] [ Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 ' Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 0.00 N-Value .000 .000 .000 .000 Orif. Coeff. I 0.00 0.00 0.00 0.00 Multl-Stage = n/a No No No I Stage (ft) 4.00 3.00 2.00 _. 1.00 000 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 27.75 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type Rect --- --- Multi-Stage = No No No No ExHItration = 2.550 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: CulvertfOrifice outflows have been analyzed under inlet and outlet control. Stage J Discharge Stage (ft) 4.00 3.00 2.00 1.00 0 00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 LTotal Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 31 Combined Area A Hydrograph type = Combine Storm frequency = 10 yrs Inflow hyds. = 5, 9, 13 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 V.V1 0 00 Combined Area A Hyd. No. 31 --10 Yr Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.04 cfs Time interval = 1 min Hydrograph Volume = 2,061 cuft Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 0 5 10 15 19 24 29 34 39 44 48 Time (hrs) Hyd No. 31 Hyd No. 5 Hyd No. 9 Hyd No. 13 68 Hydrograph Plot HydraFlow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 32 Combined Area D Hydrograph type = Combine Peak discharge = 0.48 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 25, 29 Hydrograph Volume = 6,592 cult Combined Area D Hyd. No. 32 — 10 Yr 0.50 0.45 0.50 0.40 0.45 0.35 0.40 0.30 0.35 0.30 0.25 0.25 0.20 0.15 0.20 0.10 0.15 G.GS f 000 0.10 0.05 000 0 3 7 10 13 17 20 23 27 30 33 Hyd No. 32 Hyd No. 25 Hyd No. 29 Time (hrs) 69 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Hyd. No. 33 Combined Phase 1 Post Development Routed Hydrograph type = Combine Peak discharge = 2.58 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 17, 21, 31, 32 Q (cfs) 3.00 2.00 M 1.00 I 000 Combined Phase 1 Post Development Routed Hyd. No. 33 --10 Yr Hydrograph Volume = 60,112 cult Q (cfs) 3.00 2.00 i I1 i 0.00 I 0.0 2.3 4.7 7.0 9.3 11.7 14.0 16.3 18.7 21.0 23.3 L Hyd No. 33 Hyd No. 17 Hyd No. 21 Hyd No. 31 Time (hrs) Hyd No. 32 70 71 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation M Maximum storage (cuft) Hydrograph description 1 Rational 48.01 1 20 57,614 --- ------ I Pre Development Phase 1 Area 3 Rational 1.48 1 10 887 --- ------ I Pre Development Area 1A-1 4 Rational 2.51 1 10 1,509 -- ---- ----- Post Development Area 1A-1 5 Reservoir 0.03 1 20 1,431 4 31.23 1,493 Area 1A-1 to Pond 1A-1 7 Rational 0.92 1 5 277 --- --- Pre Development Area 1A-2 8 Rational 1.47 40 880 --- --- Post Development Area 1A-2 9 Reservoir 0.01 20 797 8 30.34 873 Area 1A-2 to Pond 1A-2 11 Rational 0.39 117 --- Pre Development Area 1A-3 12 Rational 0.62 , 187 --- Post Development Area 1A-3 13 Reservoir 0.00 ) 117 12 30.14 186 Area 1A-3 to Pond 1A-3 15 Rational 29.90 20 35,881 --- ----- Pre Development Area 1 B 16 Rational 70.33 10 42,201 ---- ---- ----- Post Development Area 1 B 17 Reservoir 1.29 20 42,191 16 2` 41,214 Area 1B to Pond I 19 Rational 13.95 10 8,372 ---- ------ ------ Pre Development Area 1C 20 Rational 26.98 10 16,187 -- - ------ Post Development Area 1 C 21 Reservoir 0.87 20 16,174 20 1. 15,573 Area 1C to Pond I 23 Ra+'- 1.89 1 10 1,132 -- Pre Development Area 1 D-1 24 4.09 1 10 2,452 --- Post Development Area 1 D-1 25 Re-- 0.16 1 -Po 2,438 24 2,352 Area 1 D-1 to Pond 1 D-1 27 Rational 3.97 1 10 2,379 -- ------ ---- Pre Development Area 1 D-2 28 Rational 8.59 1 10 5,155 --- -- Post Development Area 1 D-2 29 Reservoir 0.46 1 I 19 5,150 28 4,789 Area 1 D-2 to Pond 1 D-2 Phase 1.gpw Return Period: 25 Year Wednesday, Oct 312007, 2:25 PM Hydraflow Hydrographs by Intelisolve 72 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak (min) Volume (cuff) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 31 Combine 0.04 i 1 20 2,345 5, 9, 13, --- Combined Area A 32 Combine 0.50 1 20 7,476 25, 29, ---- ----- Combined Area D 33 Combine 2.70 I 1 20 68,187 17, 21, 31, 32 Combined Phase 1 Post Developmen ` Phase 1.gpw Return Period: 25 Year Wednesdav, Oct 312007, 2:25 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Phase 1 Area Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 27.730 ac Intensity = 5.771 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 50.00 40.00 30.00 20.00 E 10.00 0.00 —" ' 0.0 0.1 Hyd No. 1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 48.01 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 20.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 57,614 cult Pre Development Phase 1 Area Hyd. No. 1 -- 25 Yr 0.2 0.3 0.3 0.4 0.5 0.6 Q (cfs) 50.00 wMelf 30.00 20.00 i1111A7 — N 0.00 0.7 Time (hrs) 73 i Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Pre Development Area 1A-1 Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 0.690 ac Intensity = 7.145 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 2.00 1.00 Hyd No. 3 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.48 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1 /1 Pre Development Area 1A-1 Hyd. No. 3 -- 25 Yr 0.2 0.3 Hydrograph Volume = 887 cult Q (cfs) 2.00 1.00 0.00 0.3 Time (hrs) 74 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Post Development Area 1A-1 Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 0.690 ac Intensity = 7.145 in/hr OF Curve = WILMINGTON-IDF.IDF 2.00 1.00 Hyd No. 4 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 2.51 cfs Time interval = 1 min Runoff coeff. = 0.51 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1A-1 Hyd. No. 4 -- 25 Yr M ICK Hydrograph Volume = 1,509 cult Q (cfs) 3.00 2.00 1.00 0.00 0.3 Time (hrs) 75 Hydrograph Plot Hydraflow Hydrographs by Intelisohre Wednesday, Oct 312007, 2:25 PM Hyd. No. 5 Area 1A-1 to Pond 1A-1 Hydrograph type = Reservoir Peak discharge = 0.03 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 4 Max. Elevation = 31.23 ft Reservoir name = Basin 1A-1 Max. Storage = 1,493 cuft Storage Indication method used. Q (Cfs) 3.00 MIA 1.00 Hydrograph Volume = 1,431 cult Q (Cfs) 3.00 2.00 1.00 r.T.TO 5 10 15 19 24 29 34 39 44 48 Hyd No. 5 Hyd No. 4 Time (hrs) 76 Pond Report 77 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 1 - Basin 1A-1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage i Storage Tabie Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 31.00 6,025 0 0 0.75 31.75 6,985 4,879 4,879 1.25 32.25 7,642 3,657 8,536 Culvert I Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 0.00 N-Value .000 .000 .000 .000 Orit Coeff. = 0.00 0.00 0.00 0.00 Multistage = n/a No No No Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 31.75 0.00 0.00 0.00 Weir Coalf. = 3.33 0.00 0.00 0.00 Weir Type = Rect -- --- Multi-Stage = No No No No Exflltration = 0.520 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) Stage / Discharge 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 000 Note: Culvert/Orifioe outflows have been analyzed under inlet and outlet control. Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total O Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 7 Pre Development Area 1A-2 Hydrograph type = Rational Peak discharge = 0.92 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 0.380 ac Runoff coeff. = 0.3 Intensity = 8.109 in/hr Tc by User = 5.00 min OF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.0 Hyd No. 7 Pre Development Area 1A-2 Hyd. No. 7 — 25 Yr 0.1 Hydrograph Volume = 277 cuft Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.i0 OAO 0.2 Time (hrs) 78 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Post Development Area 1A-2 Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 0.380 ac Intensity = 7.145 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 2.00 1.00 Hyd No. 8 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.47 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1A-2 Hyd. No. 8 — 25 Yr 0.2 0.3 Hydrograph Volume = 880 cult Q (cfs) 2.00 1.00 0.00 0.3 Time (hrs) 79 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Area 1A-2 to Pond 1A-2 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 8 Reservoir name = Basin 1A-2 Storage Indication method used. Q (cfs) 1.00 0.00 0 5 Hyd No. 9 10 Area 1A-2 to Pond 1A-2 Hyd. No. 9 -- 25 Yr 15 19 - Hyd No. 8 Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.01 cfs Time interval = 1 min Max. Elevation = 30.34 ft Max. Storage = 873 cuft Hydrograph Volume = 797 cult 24 29 34 39 44 Q (C%) 2.00 H11111 0.00 48 Time (hrs) 80 Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Pond No. 2 - Basin 1A-2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuff) 0.00 30.00 2,208 0 0 1.00 31.00 2,938 2,573 2,573 1.25 31.25 3,123 758 3,331 2.25 32.25 3,898 3,511 6,841 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.25 000 0.00 0.00 No. Barrels = 0 I 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Exi'lItration = 0.520 in/hr (Contour) Tailwater Elev. = 0.00 It Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 000 Stage I Discharge Stage (ft) 3.00 2.00 1.00 0.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Total Q Discharge (cfs) .. .... .. . ...... -1 .. . ...... .. . .. ...... . ...... . . . . . . . . .................... . . . . . . ......... ............. .......... . ..... . ...... . - ............ . ........ - ...... .............. . . . .................. .. . rIIIIIII-1=1 81 Hydrograph Plot i Hydraflow Hydrographs by Intelisolve Hyd. No. 11 Pre Development Area 1A-3 Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 0.160 ac Intensity = 8.109 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.0 Hyd No. 11 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.39 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 5.00 min Asc/Rec limb fact = 1 /1 Pre Development Area 1A-3 Hyd. No. 11 — 25 Yr 0.1 Hydrograph Volume = 117 cuft Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.2 Time (hrs) 82 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 12 Post Development Area 1A-3 Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 0.160 ac Intensity = 8.109 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.62 cfs Time interval = 1 min Runoff coeff. = 0.48 Tc by User = 5.00 min Asc/Rec limb fact = 1/1 Post Development Area 1A-3 Hyd. No. 12 -- 25 Yr Hydrograph Volume =187 cult Q (C%) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0.0 0.1 0.2 Time (hrs) Hyd No. 12 83 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 13 Area 1A-3 to Pond 1A-3 Hydrograph type = Reservoir Peak discharge = 0.00 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 12 Max. Elevation = 30.14 ft Reservoir name = Basin 1A-3 Max. Storage = 186 cuft Storage Indication method used. Hydrograph Volume = 117 cult Area IA-3 to Pond 1 A-3 Q (S) Hyd. No. 13 -- 25 Yr 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 - 0.0 2.0 4.0 6.0 8.0 Hyd No. 13 Hyd No. 12 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) 84 Pond Report 85 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 3 - Basin 1A-3 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuff) 0.00 30.00 1,085 0 0 1.00 31.00 1,596 1,341 1,341 1.25 31.25 1,732 416 1,757 2.25 32.25 2,314 2,023 3,780 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.25 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir CoefT. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 _000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 3.00 2.00 1.00 000 ExriItration = 0.520 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage / Discharge ... ... .... . . . ....... .. . ........ . . . . . .. . ... . . . ............. .... . . ... . ..... . .. ....... . . ..... .. .. .... .. ... - - I - 11 1.1111.1 ........ ....... ...... ...... . ... . . .. ...... . ... . . . .. . ...... .......... . . . . ... .... . ........... ... . ............ . .. . . .. ........... .. ......... . ........ .................... ......... ................. ............ . .. ...... .. .. ............................. .................. ..... . ....... ... . ................ .. ...... . .................... -- . ...................... .... ............ .... . . .... . . ... ...... ..... . . - ............ ........... . ....... ... ............. . . ............... . . . . . . ... . . ....... Stage (ft) 3.00 2.00 1.00 0 00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Total Q Discharge (aft) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 15 IPre Development Area 1 B Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 17.270 ac Intensity = 5.771 in/hr OF Curve I = WILMINGTON-IDF.IDF Wednesday, Oct 312007, 2:25 PM Peak discharge = 29.90 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 20.00 min Asc/Rec limb fact = 111 Pre Development Area 1 B Q () Hyd. No. 15 -- 25 Yr I 30.00 25.00 1 20.00 Hydrograph Volume = 35,881 cult Q (cfs) 30.00 25.00 M1111+] 15.00 10.00 IM111 n.OV , I I I I I I I -x 0 00 0.0 0.1. I Hyd No. 15 l_. l_ 0.2 0.3 0.3 0.4 0.5 0.6 0.7 Time (hrs) ss Hydrograph Plot Hydraflow Hydrographs by Intellsolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 16 Post Development Area 1 B Hydrograph type = Rational Peak discharge = 70.33 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 17.270 ac Runoff coeff. = 0.57 Intensity = 7.145 in/hr Tc by User = 10.00 min IDF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (cfs) 80.00 70.00 ( 60.00 I 50.00 i i 40.00 30.00 20.00 I 10.00 0.00 0.0 i Hyd No. 16 0.1 Post Development Area 1 B Hyd. No. 16 -- 25 Yr 0.2 0.3 Hydrograph Volume = 42,201 cult Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 1L 0.00 0.3 Time (hrs) 87 Hydrograph Plot ' Hydraflow Hydrographs by Intelisolne Wednesday, Oct 31 2007, 2.25 PM Hyd. No. 17 Area 1 B to Pond 1 B Hydrograph type = Reservoir Peak discharge = 1.29 cfs Storm frequency = I 25 yrs Time interval = 1 min Inflow hyd. No. = 16 Max. Elevation = 25.48 ft Reservoir name = Basin 113 Max. Storage = 41,21.4 cuft Storage Indication method used. Hydrograph Volume = 42,191 cult Q (cfs) ( 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 -6" 1 1 0.0 2.2 4.3 Hyd No. 17 Area 1 B to Pond 1 B Hyd. No. 17 -- 25 Yr Q (cfs) 80.00 IM0111( 50.00 E911181 30.00 20.00 10.00 6.5 8.7 10.8 13.0 15.2 17.3 19.5 21.7 — Hyd No. 16 Time (hrs) 88 I Pond Report 89 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 4 - Basin 1 B Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 21.00 4,802 0 0 1.00 22.00 6,515 5,659 5,659 2.00 23.00 8,457 7,486 13,145 3.00 24.00 10,590 9,524 22,668 4.00 25.00 12,925 11,758 34,426 4.69 25.69 15,331 9,748 44,174 5.00 26.00 15,331 4,753 48,926 5.50 26.50 16,252 7,896 56,822 6.00 27.00 18,136 8,597 65,419 Culvert / Orifice Structures Weir Structures [A►] [B] [C] [D] [A►] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 26.50 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type Rect -- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multistage = n/a No No No Exfiltration = 3.960 in/hr (Contour) Tailwater Elev. = 0.00 It Stage (ft) 6.00 5.00 4.00 3.00 2.00 Stage / Discharge Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 ---- 1.00 .... ... .... ... ..... . . . .... ... .. .. . .... . .. . .. ....... . . . . ... . .. .. ........ .. . .. .. . .... .. . . . . . . . - /-- ....I. ...... .. . -... ..................... ..........---..--..................................._....._._......_.._.. __........ - ...._............................._....................................---....... _.--........................._ 0.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total Q 0.00 20.00 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 19 Pre Development Area 1 C Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 6.510 ac Intensity = 7.145 in/hr OF Curare = WILMINGTON-IDF.IDF Q(afs) 12.00 10.00 8.00 r 6.00 I 4.00 1 i 2.00 0.00 0.0 Hyd No. 19 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 13.95 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc.by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 C Hyd. No. 19 — 25 Yr 161K 0.3 Hydrograph Volume = 8,372 cult Q (cfs) 14.00 12.00 10.00 M 4.00 2.00 o.00 0.3 Time (hrs) 90 Hydrograph Plot i Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Hyd. No. 20 IPost Development Area 1 C Hydrograph type = Rational Peak discharge = 26.98 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 6.510 ac Runoff coeff. = 0.58 Intensity = 7.145 in/hr Tc by User = 10.00 min I OF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (ofs) I 28.00 24.00 20.00 16.00 12.00 l 8.00 4.00 L. 0 00 Post Development Area 1 C Hyd. No. 20 -- 25 Yr Hydrograph Volume = 16,187 cuft Q (cfs) 28.00 EKU1I11 20.00 16.00 12.00 M 4.00 ' ' ' N 0.00 0.1 0.2 0.3 0.3 Hyd No. 20 Time (hrs) 91 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 21 Area 1 C to Pond 1 C Hydrograph type = Reservoir Storm frequency = 25 yrs I Inflow hyd. No. = 20 Reservoir name = Basin 1 C Storage Indication method used. i Q (dS) l 28.00 24.00 20.00 16.00 f t 12.00 I 8.00 I I 4.00 000 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.87 cfs Time interval = 1 min Max. Elevation = 13.40 ft Max. Storage = 15,573 cuft Hydrograph Volume = 16,174 cult Area 1 C to Pond 1 C Hyd. No. 21 -- 25 Yr li I I I I I I I 1 I J_I Q (cis) 28.00 24.00 20.00 I R-4118] 12.00 4.00 0.00 0.0 1.8 3.7 5.5 7.3 9.2 11.0 12.8 14.7 16.5 18.3 20.2 ( Hyd No. 21 Hyd No. 20 Time (hrs) 92 Pond Report 93 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Pond No. 5 - Basin 1 C Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 12.00 8,751 0 0 1.00 13.00 10,393 9,572 9,572 2.00 14.00 12,735 11,564 21,136 2.25 14.25 13,251 3,248 24,384 2.75 14.75 14,294 6,886 31,270 3.75 15.75 16,423 ? 5,358 46,629 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) 0.00 0.00 0.00 0.00 Crest El. (ft) = 14.75 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect -- --- -- Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) 0.00 0.00 0.00 0.00 N-Value - .000 .000 .000 .000 Orif. Coeff. 0.00 0.00 0.00 0.00 Multistage - n/a No No No ExHItration = 2.990 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 4.00 3.00 2.00 1.00 000 Stage J Discharge Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.00 0 00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 23 Pre Development Area 1 D-1 Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 0.880 ac Intensity = 7.145 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) TIC Hyd No. 23 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.89 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 D-1 Hyd. No. 23 -- 25 Yr 0.2 0.3 Hydrograph Volume = 1,132 cult Q (cfs) 2.00 1.00 0.00 0.3 Time (hrs) 94 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 24 Post Development Area 1 D-1 Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 0.880 ac Intensity = 7.145 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 1., 0.0 L 0.1 Hyd No. 24 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 4.09 cfs Time interval = 1 min Runoff coeff. = 0.65 Tc by User = 10.00 min Asc/Rec limb fact = 111 Post Development Area 1 D-1 Hyd. No. 24 -- 25 Yr 0.2 0.3 Hydrograph Volume = 2,452 cuft Q (cfs) 5.00 4.00 94I0 2.00 1.00 N 0.00 0.3 Time (hrs) 95 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 25 Area 1 D-1 to Pond 1 D-1 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 24 Reservoir name = Basin 1 D-1 Storage Indication method used. Q (cfs) 5.00 4.00 3.00 2.00 1.00 1.8 3.7 Hyd No. 25 Area 1 D-1 to Pond 1 D-1 Hyd. No. 25 -- 25 Yr 5.5 7.3 Hyd No. 24 Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.16 cfs Time interval = 1 min. Max. Elevation = 27.69 ft Max. Storage = 2,352 cuft Hydrograph Volume = 2,438 cult Q (cfs) 5.00 4.00 3.00 2.00 1.00 __ �____ 0.00 9.2 11.0 12.8 14.7 16.5 18.3 20.2 Time (hrs) 96 Pond Report 97 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 6 - Basin 1 D-1 Pond Data ! Pond storage is based on known contour areas. i Average end area method used. Stage / Storage Table { Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 27.00 2,790 0 0 1.00 28.00 4,049 3,420 3,420 2.00 29.00 5,293 4,671 8,091 2.25 29.25 5,587 1,360 9,450 3.00 30.00 6,575 4,561 14,011 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Crest Len (ft) = 5.00 0.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 Crest El. (ft) = 29.25 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 26.50 0.00 0.00 0.00 Weir Type = Riser --- --- Length (ft) = 50.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 1.00 0.00 0.00 0.00 I N Value = .009 _000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No EAltration = 2.550 in/hr (Contour) Tailwater Elev. - 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 000 Stage / Discharge Stage (ft) 3.00 2.00 1.00 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 Total Q Discharge (cfs) 98 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 27 Pre Development Area 1 D-2 Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 1.850 ac Intensity = 7.145 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 4.00 3.00 2.00 i 1 1.00 L Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 3.97 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 D-2 Hyd. No. 27 -- 25 Yr ............. .......... . ............ ......... . .......................... .......... ... . . . . . . . . . . .............. I .......... .................. ..................... . . ......... ... .... Hydrograph Volume .= 2,379 cult Q (cfs) 4.00 3.00 2.00 1.00 0.0 0.1 0.2 0.3 0.3 E Hyd No. 27 Time (hrs) Hydrograph Plot 99 Hydraflow Hydrographs by Intellsolve Hyd. No. 28 E Post Development Area 1 D-2 Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 1.850 ac Intensity = 7.145 in/hr OF Curve = WILMINGTON-IDF.IDF Q(Cfs) j 10.00 8.00 i 6.00 A 4.00 I 2.00 ! I_ 000 0.0 0.1 Hyd No. 28 Wednesday, Oct 312007, 2:25 PM Peak discharge = 8.59 cfs Time interval = 1 min Runoff coeff. = 0.65 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1 D-2 Hyd. No. 28 -- 25 Yr Hydrograph Volume = 5,155 cuR Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 0.2 0.3 0.3 Time (hrs) 100 Hydrograph Plot i Hydraflow Hydrographs by Intelisolve Hyd. No. 29 Area 1 D-2 to Pond 1 D-2 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 28 Reservoir name = Basin 1 D-2 Storage Indication method used. Q (Cfs) 10.00 m AITIJ 4.00 wo Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.46 cfs Time interval = 1 min Max. Elevation = 26.34 ft Max. Storage = 4,789 cuft Hydrograph Volume = 5,150 cuft Q (Cfs) 10.00 8.00 � E91161 2.00 0.0 0.8 1.7 2.5 3.3 4.2 5.0 5.8 6.7 7.5 8.3 Time (hrs) Hyd No. 29 Hyd No. 28 i Pond Report 101 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 7 - Basin 1 D-2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 25.70 6,534 0 0 0.30 26.00 7,077 2,042 2,042 1.30 27.00 8,964 8,021 10,062 1.55 27.25 9,451 2,302 12,364 1.80 27.50 9,941 2,424 14,788 2.05 27.75 10,434 2,547 17,335 3.05 28.75 12,443 11,439 28,774 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) 0.00 0.00 0.00 0.00 Slope (%) 0.00 0.00 0.00 0.00 N-Value .000 .000 .000 .000 Orit Coeff. = 0.00 0.00 0.00 0.00 Multi-Staae - n/a No No No Stage (ft) 4.00 3.00 2.00 1.00 0.00 . 0.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 27.75 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Rect --- Multi-Stage = No No No No Exi'lItration = 2.550 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage / Discharge Stage (ft) 4.00 3.00 2.00 1.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 Totai Q Discharge (cls) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 31 Combined Area A Hydrograph type = Combine Storm frequency = 25 yrs Inflow hyds. = 5, 9, 13 Combined Area A Q (cfs) Hyd. Na. 31 -- 25 Yr 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 000 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.04 cfs Time interval = 1 min Hydrograph Volume = 2,345 tuft Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 0 5 10 15 19 24 29 34 39 44 48 Time (hrs) Hyd No. 31 Hyd No. 5 Hyd No. 9 Hyd No. 13 102 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Hyd. No. 32 Combined Area D Hydrograph type = Combine Peak discharge = 0.50 cfs Storm frequency = 25.yrs Time interval = 1 min Inflow hyds. = 25, 29 Combined Area D Hyd. No. 32 -- 25 Yr Hydrograph Volume = 7,476 cult Q (ds) 0.50 0.45 0.50 0.40 0.45 0.35 0.40 0.30 0.35 0.30 0.25 0.20 0.25 0.15 0.20 0.10 - 0.15 0.05 - 0.10 000 0.05 ooa 0 4 7 11 14 18 21 25 28 32 35 Hyd No. 32 Hyd No. 25 Hyd No. 29 Time (hrs) 103 Hydrograph Plot Hydraflow Hydrographs by Intellsolve I Hyd. No. 33 ICombined Phase 1 Post Development Routed Hydrograph type = Combine Storm frequency = 25 yrs Inflow hyds. = 17, 21, 31, 32 2.00 1.00 2 5 Hyd No. 33 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 2.70 cfs Time interval = 1 min Combined Phase 1 Post Development Routed Hyd. No. 33 -- 25 Yr 7 9 Hyd No. 17 Hyd No. 32 12 14 16 Hyd No. 21 Hydrograph Volume = 68,187 cult Q (cfs) 3.00 welt, 1.00 0.00 19 21 23 26 Hyd No. 31 Time (hrs) 104 105 L Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow I (cfs) Time interval (min) Time to peak (min) Volume (cuff) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description � 1 Rational I 57.97 1 20 69,567 i ---- ------ Pre Development Phase 1 Area 3 Rational 1.77 1 10 1,062 -- ----- Pre Development Area1A-1 4 Rational 3.01 1 10 1,805 --- ------ ----- Post Development Area 1A-1 5 Reservoir 0.03 1 20 1,712 4 31.27 1,786 Area 1A-1 to Pond 1A-1 7 Rational 1.10 1 5 330 --- Pre Development Area 1A-2 8 Rational 1.75 1 10 1,052 ---- Post Development Area 1A-2 9 Reservoir 0.01 20 954 8 30.41 1,044 Area 1A-2 to Pond 1A-2 11 Rational 0.4( 5 139 --- Pre Development Area 1A-3 12 Rational 0.74 5 222 --- ------ Post Development Area 1A-3 13 Reservoir 0.00 1 10 152 12 30.17 221 Area 1A-3 to Pond 1A-3 15 Rational 36.10 20 43,326 --- --- Pre Development Area 1 B 16 Rational 84.15 10 50,490 --- ----- ---- Post Development Area 1 B 17 Reservoir 1.41 1 20 50,480 16 26.05 49,410 Area 1 B to Pond 1 B 19 Rational 16.70 1 10 10,017 --- ------ ------ Pre Development Area 1C 20 Rational 32.28 10 19,366 --- --- Post Development Area 1 C 21 Reservoir 0.92 1 20 19,353 20 13.65 18,699 Area I to Pond I 23 Rational 2.26 1 10 1,354 --- ----- Pre Development Area 1 D-1 24 Rational 4.89 10 2,934 --- ----- Post Development Area 1 D-1 25 Reservoir 0.20 1 20 2,920 24 27.82 2,814 Area 1 D-1 to Pond 1 D-1 27 Rational 4.74 1 10 2,847 --- ---- Pre Development Area 1 D-2 28 Rational 10.28 1 10 6,168 --- Post Development Area 1 D-2 29 Reservoir 0.47 1 20 6,163 28 26.47 5,780 Area 1D-2 to Pond 1D-2 Phase 1.gpw Return Period: 100 Year Wednesday, Oct 31 2007, 2:25 PM Hydraflow Hydrographs by Intelisolve 106 L Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 31 Combine 0.05 1 20 2,818 5, 9, 13, ------ -- Combined Area A 32 Combine 0.52 1 20 8,946 25, 29, ------ Combined Area D 33 Combine 2.90 1 20 81,598 17, 21, 31, 32 ----- --- Combined Phase 1 Post Developmen Phase 1.gpw Return Period: 100 Year Wednesday, Oct 312007, 2:25 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 1 Pre Development Phase 1 Area Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 27.730 ac Intensity = 6.969 in/hr OF Curve = WILMINGTON-IDF.IDF 1 Q (Cfs) f 60.00 50.00 II 40.00 1. 30.00 20.00 Wednesday, Oct 312007, 2:25 PM Peak discharge = 57.97 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 20.00 min Asc/Rec limb fact = 1/1 Pre Development Phase 1 Area Hyd. No. 1 --100 Yr 10.00, .. ......... . . . . . . ...... . . ..... ..... .... ..... . . .... . . . . . .. . . .... ........ . . ............ ... . ............. ... . 0.00 0.0 0.1 I Hyd No. 1 0.2 0.3 Hydrograph Volume = 69,567 cult Q (Cfs) 60.00 50.00 40.00 [C1111I47 20.00 10.00 o.00 0.3 0.4 0.5 0.6 0.7 Time (hrs) 107 Hydrograph Plot Hydraflow Hydmgraphs by Intelisolve Hyd. No. 3 Pre Development Area 1A-1 Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 0.690 ac Intensity = 8.548 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 1.00 Hyd No. 3 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.77 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1A-1 Hyd. No. 3 --100 Yr 0.2 0.3 Hydrograph Volume = 1,062 cult Q (cfs) 2.00 1.00 0.00 0.3 Time (hrs) 108 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 4 Post Development Area 1A-1 Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 0.690 ac Intensity = 8.548 in/hr 1 IDF Curve = WILMINGTON-IDF.IDF Q (Cfs) 4.00 3.00 j 2.00 1.00 12WATar Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 3.01 cfs Time interval = 1 min Runoff coeff. = 0.51 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1A-1 Hyd. No. 4 --100 Yr Hydrograph Volume = 1,805 cult Q (cfs) 4.00 3.00 2.00 1.00 MWAS'l 0.0 0.1 0.2 0.3 0.3 Hyd No. 4 Time (hrs) 109 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Area 1A-1 to Pond 1A-1 Hydrograph type = Reservoir Storm frequency = 100 yrs I Inflow hyd. No. = 4 Reservoir name = Basin 1A-1 I Storage Indication method used. Q (cfs) 4.00 3.00 1 2.00 j 1.00 0 00 Area 1A-1 to Pond 1A-1 Hyd. No. 5 —100 Yr 5 10 15 19 24 29 Hyd No. 5 Hyd No. 4 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.03 cfs Time interval = 1 min Max. Elevation = 31.27 ft Max. Storage = 1,786 cuft Hydrograph Volume =1,712 cuft Q (cfs) 4.00 3.00 2.00 1.00 0.00 34 39 44 48 Time (hrs) 110 Pond Report ill Hydraflow Hydrographs by Intelisolve Wednesday, Oct 312007, 2:25 PM Pond No. 1 - Basin 1A-1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 31.00 6,025 0 0 0.75 31.75 6,985 4,879 4,879 1.25 32.25 7,642 3,657 8,536 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.75 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0�00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect Length (ft) 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) 0.00 0.00 0.00 0.00 ( N-Value .000 .000 .000 .000 I Orif. Coeff. 0.00 0.00 0.00 0.00 Multi -Stage n/a No No No ExHItration = 0.520 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culverl/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) Stage / Discharge Stage (ft) 2.00 1.80 2.00 1.60 1.80 1.40 1.60 1.20 1.40 1.00 1.20 0.80 1.00 0.60 0.80 0.40 0.60 0.20 0.40 0.00 0.20 000 0.00 L 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Total Q 18.00 Discharge (cfs) 112 I Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 7 Pre Development Area 1A-2 Hydrograph type = Rational Peak discharge = 1.10 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.380 ac Runoff coeff. = 0.3 Intensity = 9.639 in/hr Tc by User = 5.00 min OF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (cfs) 2.00 M1111 n.no 0.0 Hyd No. 7 Pre Development Area 1A-2 Hyd. No. 7 --100 Yr 0.1 Hydrograph Volume = 330 cuft Q (cfs) 2.00 1.00 0.00 0.2 Time (hrs) 113 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 8 Post Development Area 1A-2 Hydrograph type = Rational Peak discharge = 1.75 cfs I Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.380 ac Runoff coeff. = 0.54 Intensity = 8.548 inlhr Tc by User = 10.00 min OF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (Cfs) 2.00 0.0 0.1 Hyd No. 8 Post Development Area 1A-2 Hyd. No. 8 --100 Yr 0.2 0.3 Hydrograph Volume = 1,052 cult Q (cfs) 2.00 M11I11 - N 0.00 0.3 Time (hrs). Hydrograph Plot 114 Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Area 1 A-2 to Pond 1 A-2 Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 8 Reservoir name = Basin 1A-2 Storage Indication method used. Q (cfs) 2.00 1.00 Area 1 A-2 to Pond 1 A-2 Hyd. No. 9 —100 Yr 5 10 15 19 Hyd No. 9 Hyd No. 8 Wednesday, Oct 312007, 2:25 PM Peak discharge = 0.01 cfs Time interval = 1 min Max. Elevation = 30.41 ft Max. Storage = 1,044 cuft Hydrograph Volume = 954 cult 24 29 34 39 44 Q (cfs) 2.00 1.00 0.00 48 Time (hrs) Pond Report 115 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 2 - Basin 1A-2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage i Storage Ti anie Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 30.00 2,208 0 0 1.00 31.00 2,938 2,573 2,573 1.25 31.25 3,123 758 3,331 2.25 32.25 3,898 3.511 6.841 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coelf. = 0.00 0.00 0.00 0.00 Multi -Stage n/a No No Stage (ft) j 3.00 1 i 2.00 i 1.00 0.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 31.25 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Rect -- --- --- Multi-Stage = No No No No ExHItration = 0.520 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage / Discharge Note: Culvert/Oririce outflows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 0 00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Total Q Discharge (cfs) Hydrograph Plot 116 Hydraflow Hydrographs by Intellsolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 11 Pre Development Area 1A-3 Hydrograph type = Rational Peak discharge = 0.46 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.160 ac Runoff coeff. = 0.3 Intensity = 9.639 in/hr Tc by User = 5.00 min OF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q WS) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.0 Hyd No. 11 Pre Development Area 1A-3 Hyd. No. 11 -- 100 Yr 0.1 Hydrograph Volume = 139 cult Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.0.5 0.00 0.2 Time (hrs) Hydrograph Plot 117 Hydraflow Hydrographs by Intelisolve Hyd. No. 12 Post Development Area 1A-3 Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 0.160 ac Intensity = 9.639 in/hr OF Curare = WILMINGTON-IDF.IDF Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.74 cfs Time interval = 1 min Runoff coeff. = 0.48 Tc by User = 5.00 min Asc/Rec limb fact = 1 /1 Post Development Area 1A-3 Q MS) Hyd. No. 12 -- 100 Yr 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 Hydrograph Volume = 222 cult Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 CIAO 0 00 0.0 0.1 0.2 Hyd No. 12 Time (hrs) Hydrograph Plot 118 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 13 Area 1A-3 to Pond 1A-3 Hydrograph type = Reservoir Peak discharge = 0.00 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 12 Max. Elevation = 30.17 ft Reservoir name = Basin 1A-3 Max. Storage = 221 cuft Storage Indication method used. Hydrograph Volume =152 cult Area 1A-3 to Pond 1A-3 Q (CfS) Hyd. No. 13 - 100 Yr 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 1 0.00 0.0 2.3 4.7 7.0 9.3 11.7 14.0 16.3 18.7 Hyd No. 13 Hyd No. 12 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 21.0 23.3 Time (hrs) Pond Report 119 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 3 - Basin 1A-3 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 30.00 1,085 0 0 1.00 31.00 1,596 1,341 1,341 1.25 31.25 1,732 416 1,757 2.25 32.25 2,314 2,023 3,780 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.25 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect -- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff. 0.00 0.00 0.00 0.00 Multi -Stage = rda No No No ExfiItration = 0.520 in/hr (Contour) T ailwater Elev_ = o_oo ft t Stage (ft) f 3.00 { 2.00 1.00 Stage / Discharge Note: Culvert/Orifice ouffkms have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 0.00 ' ' ' ' 1 1 1 1 1 1 1 0.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Total Q Discharge (eft) Hydrograph Plot 120 Hydraflow Hydrographs by Intelisolve Hyd. No. 15 Pre Development Area 1 B Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 17.270 ac Intensity = 6.969 in/hr OF Curve = WILMINGTON-IDF.IDF Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 36.10 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 20.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 B Q (off) Hyd. No. 15 -- 100 Yr 40.00 30.00 20.00 Hydrograph Volume = 43,326 cult Q (cfs) 40.00 30.00 20.00 M111I+7 `0.00 0.2 0.3 0.3 0.4 0.5 0.6 0.7 Time (hrs) Hydrograph Plot 121 Hydraflow Hydrographs by Intelisolve Hyd. No. 16 Post Development Area 1 B Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 17.270 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF Q (Cfs) 90.00 - 80.00 70.00 60.00 I 50.00 40.00 30.00 20.00 10.00 0.00 0.0 fI Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 84.15 cfs Time interval = 1 min Runoff coeff. = 0.57 Tc by User = 10.00 min Asc/Rec limb fact = 111 Post Development Area 1 B Hyd. No. 16 -- 100 Yr Hydrograph Volume = 50,490 cult Q (Cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0.1 0.2 0.3 0.3 Hyd No. 16 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisohre Hyd. No. 17 Area 1 B to Pond 1 B Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 16 Reservoir name = Basin 113 Storage Indication method used. Q (cfs) 90.00 _ . _............................ _ ......................... 80.00 ........... ....__..........................._.._ ...... 70.00 60.00 50.00 f I 40.00 30.00 20.00 - 10.00 0.00 Lo.o 2.3 4.7 LHyd No. 17 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 1.41 cfs Time interval = 1 min Max. Elevation = 26.05 ft Max. Storage = 49,410 cuft Hydrograph Volume = 50,480 cult Area 1 B to Pond 1 B Hyd_ No. 17 -- 100 Yr Q (cfs) 90.00 - ... _ .... 80.00 70.00 ... - ..... .... ....... ......... ... _ 60.00 ........ - ....... - _ _._ _- .... _.... ... ... 50.00 .... ............. - ...... 40.00 ......................... .......... _ ... --- 30.00 20.00 ......... ..... - ..... _ .. _. . -_... _ 10.00 0.00 7.0 9.3 11.7 14.0 16.3 18.7 21.0 23.3 - Hyd No. 16 Time (hrs) 122 Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 4 - Basin 1 B Pond Data Pond storage is based on known contour areas. Average end area method used. Stage; Storage 1 abie Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 21.00 4,802 0 0 1.00 22.00 6,515 5,659 5,659 2.00 23.00 8,457 7,486 13,145 3.00 24.00 10,590 9,524 22,668 4.00 25.00 12,925 11,758 34,426 4.69 25.69 15,331 9,748 44,174 5.00 26.00 15,331 4,753 48,926 5.50 26.50 16,252 7,896 56,822 6.00 27.00 18,136 8,597 65,419 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) 0.00 0.00 0.00 0.00 Length (ft) 0.00 0.00 0.00 0.00 Slope (%) 0.00 0.00 0.00 0.00 N-Value .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multistage = n/a No No No Stage (ft) 6.00 5.00 4.00-- 3.00-- 2.00-- 1.00-- 0.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 26.50 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Rect --- --- -- Multistage = No No No No ExfiItration = 3.960 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 Total Q Discharge (cfs) Stage / Discharge 123 Hydrograph Plot 124 Hydraflow Hydrographs by Intelisolve Hyd. No. 19 Pre Development Area 1 C Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 6.510 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF Wednesday, Oct 31 2007, 2.25 PM Peak discharge = 16.70 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 C Hyd. No. 19 -- 100 Yr Hydrograph Volume = 10,017 cult Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0.0 0.1 0.2 0.3 0.3 Hyd No. 19 Time (hrs) L I Hydrograph Plot 125 Hydraflow Hydrographs by Intelisolve Hyd. No. 20 Post Development Area 1 C Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 6.510 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF 4 IQ (Cfs) 35.00 30.00 25.00 II l 20.00 15.00 10.00 ` 5.00 0.00 i 0.0 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 32.28 cfs Time interval = 1 min Runoff coeff. = 0.58 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1 C Hyd. No. 20 -- 100 Yr Hydrograph Volume = 19,366 cuft Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 0.1 0.2 0.3 0.3 Hyd No. 20 Time (hrs) Hydrograph Plot 126 Hydraflow Hydrographs by Intelisolve Hyd. No. 21 Area 1 C to Pond 1 C Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 20 Reservoir name = Basin 1 C Storage Indication method used. Q (ds) 35.00 25.00 20.00 15.00 10.00 5.00 Area 1 C to Pond 1 C Hyd. No. 21 -- 100 Yr Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.92 cfs Time interval = 1 min Max. Elevation = 13.65 ft Max. Storage = 18,699 cuft Hydrograph Volume = 19,353 cult Q (cfs) 35.00 W1111I11 25.00 20.00 15.00 10.00 5.00 0.00 "1 1 1 - -- I i 1 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 21 Hyd No. 20 Time (hrs) Pond Report 127 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 5 - Basin 1 C Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 12.00 8,751 0 0 1.00 13.00 10,393 9,572 9,572 2.00 14.00 12,735 11,564 21,136 2.25 14.25 13,251 3,248 24,384 2.75 14.75 14,294 6,886 31,270 3.75 15.75 16,423 15,358 46,629 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 14.75 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect -- --- --- Length (ft) 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Exi'lltration = 2.990 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 4.00 3.00 2.00 1.00 Stage 1 Discharge Note: Culverl/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.00 0.00 ' 1 ' ' ' 1 1 1- I I I 1 0.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 Total Q Discharge (cis) Hydrograph Plot 128 Hydraflow Hydrographs by Intelisolve Hyd. No. 23 Pre Development Area 1 D-1 Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 0.880 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF 2.00 1.00 Hyd No. 23 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 2.26 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Pre Development Area 1 D-1 Hyd. No. 23 -- 100 Yr 0.2 0.3 Hydrograph Volume = 1,354 cult Q MS) 3.00 2.00 1.00 0.00 0.3 Time (hrs) I Hydrograph Plot 129 Hydraflow Hydrographs by Intelisolve Hyd. No. 24 Post Development Area 1 D-1 Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 0.880 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 5.00 4.00 3.00 0411111 1.00 Hyd No. 24 0.1 Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 4.89 cfs Time interval = 1 min Runoff coeff. = 0.65 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Post Development Area 1 D-1 Hyd. No. 24 --100 Yr 0.2 0.3 Hydrograph Volume = 2,934 cuft Q (cfs) 5.00 4.00 3.00 2.00 1.00 " 0.00 0.3 Time (hrs) Hydrograph Plot 130 Hydraflow Hydrographs by Intelisolve Hyd. No. 25 Area 1 D-1 to Pond 1 D-1 Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 24 Reservoir name = Basin 1 D-1 Storage Indication method used. Q (cfs) 5.00 4.00 2.00 1.00 0.00 - 0.0 1.8 3.7 Hyd No. 25 Area 1 D-1 to Pond 1 D-1 Hyd. No. 25 -- 100 Yr Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.20 cfs Time interval = 1 min Max. Elevation = 27.82 ft Max. Storage = 2,814 cuft Hydrograph Volume = 2,920 cult Q (cfs) 5.00 4.00 3.00 WX111] 1.00 0.00 5.5 7.3 9.2 11.0 12.8 14.7 16.5 1.8.3 20.2 Hyd No. 24 Time (hrs) Pond Report 131 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 200712:25 PM Pond No. 6 - Basin 1 D-1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage ► Storage Table Stage (ft) Elevation (R) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 27.00 2,790 0 0 1.00 28.00 4,049 3,420 3,420 2.00 29.00 5,293 4,671 8,091 2.25 29.25 5,587 1,360 9,450 3.00 30.00 6,575 4,561 14,011 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Crest Len (ft) = 5.00 0.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 Crest El. (ft) = 29.25 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 26.50 0.00 0.00 0.00 Weir Type = Riser --- --- --- Length (ft) = 50.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value .009 .000 .000 .000 Orif. Coeff. 0.60 0.00 0.00 0.00 Multi -Stage n/a No No No Exi'lItration = 2.550 in/hr (Contour) Tailwater Elev. 0.00 ft Note: Culvert/Orifios outflows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 I 1.00 0.00 Stage / Discharge Stage (ft) 3.00 2.00 1.00 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 Total Q Discharge (cfs) 1 Hydrograph Plot 132 Hydraflow Hydrographs by Intellsolve Hyd. No. 27 . Pre Development Area 1 D-2 Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 1.850 ac Intensity = 8.548 in/hr OF Cure = WILMINGTON-IDF.IDF Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 4.74 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 IPre Development Area 1 D-2 Q (off) Hyd. No. 27 -- 100 Yr 5.00 4.00 3.00 2.00 1.00 r I B 1 1, 0.1 Hyd No. 27 0.2 0.3 Hydrograph Volume = 2,847 cult Q (cis) 5.00 4.00 3.00 2.00 1.00 0.3 Time (hrs) Hydrograph Plot 133 Hydraflow Hydrographs by Intelisolve Hyd. No. 28 Post Development Area 1 D-2 Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 1.850 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF l Q (cfs) ( 12.00 E 10.00 8.00 - - - 6.00 I........................................... - - 4.00 2.00 0.00 -/ Wednesday, Oct 312007, 2:25 PM Peak discharge = 10.28 cfs Time interval = 1 min Runoff coeff. = 0.65 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 6,168 cult Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0.0 0.1 0.2 0.3 0.3 Hyd No. 28 Time (hrs) f Post Development Area 1 D-2 Hyd. No. 28 — 100 Yr Hydrograph Plot 134 Hydraflow Hydrographs by Intelisolve Hyd. No. 29 I Area 1 D-2 to Pond 1 D-2 Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 28 Reservoir name = Basin 1 D-2 Storage Indication method used. Wednesday, Oct 31 2007, 2.25 PM Peak discharge = 0.47 cfs Time interval = 1 min Max. Elevation = 26.47 ft Max. Storage = 5,780 cuft Hydrograph Volume = 6,163 cuft Area 1 D-2 to Pond 1 D-2 Q (cfs) Hyd. No. 29 -- 100 Yr Q (ofs) 12.00 10.00 8.00 6.00 4.00 f 2.00 0.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 L 0.0 0.8 1.7 2.5 3.3 4.2 5.0 5.8 6.7 7.5 8.3 9.2 Hyd No. 29 Hyd No. 28 Time (hrs) Pond Report 135 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Pond No. 7 - Basin 1 D-2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage i Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 25.70 6,534 0 0 0.30 26.00 7,077 2,042 2,042 1.30 27.00 8,964 8,021 10,062 1.55 27.25 9,451 2,302 12,364 1.80 27.50 9,941 2,424 14,788 2.05 27.75 10,434 2,547 17,335 3.05 28.75 12,443 11,439 28,774 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (°%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orit Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 4.00 3.00 2.00 1.00 0.00 1 0.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 27.75 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Rect --- --- --- Multi-Stage = No No No No Ex1riftration = 2.550 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage / Discharge Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.00 ' 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 Total Q Discharge (dis) Hydrograph Plot 136 Hydraflow Hydrographs by Intelisolve Hyd. No. 31 Combined Area A Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 5, 9,13 Q (cfs) Combined Area A Hyd. No. 31 — 100 Yr Wednesday, Oct 31 2007, 2:25 PM Peak discharge = 0.05 cfs Time interval = 1 min Hydrograph Volume = 2,818 cult Q (cfs) 0.10 0.09 0.10 0.08 0.09 0.07 0.08 0.06 0.07 0.05 0.06 0.04 0.05 0.03 0.04 0.02 0.03 r 0.01 I 0.02 0.00 0.01 0 00 0 5 10 15 19 24 29 34 39 44 48 Hyd No. 31 Hyd No. 5 Hyd No. 9 Hyd No. 13 Time (hrs) Hydrograph Plot 137 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 32 Combined Area D Hydrograph type = Combine Peak discharge = 0.52 cfs Storm frequency = 100 yrs i ime interval = 1 min Inflow hyds. = 25, 29 Q (cfs) Combined Area D Hyd. No. 32 -- 100 Yr Hydrograph Volume = 8,946 cult 1.00 0.90 1.00 0.80 0.90 0.70 0.80 0.60 0.70 0.50 0.60 0.40 0.50 0.30 0.40 0.20 0.30 0.10 -f 0.00 0.20 0.10 0 00 0 4 7 11 15 18 22 26 29 33 37 40 Hyd No. 32 Hyd No. 25 — Hyd No. 29 Time (hrs) Hydrograph Plot 138 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 31 2007, 2:25 PM Hyd. No. 33 Combined Phase 1 Post Development Routed Hydrograph type = Combine Peak discharge = 2.90 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyds. = 17, 21, 31, 32 Q (cfs) 3.00 2.00 1.00 3 5 Hyd No. 33 Combined Phase 1 Post Development Routed Hyd. No. 33 --100 Yr 8 10 Hyd No. 17 Hyd No. 32 13 15 18 Hyd No. 21 Hydrograph Volume = 81,598 cult Q (cfs) 3.00 2.00 1.00 0.00 20 23 25 28 Hyd No. 31 Time (hrs) PIPE AREA WEIGHTED `C' VALUES The Villages at Tuttle Creek &ormwater Management High Density Permit Application DATE: October 31, 2007 PROJECT: Turtle Creek - Phase 1 PROJECT NO.: 041.05.043 DESCRIPTION: Inlet Drainage Area Analysis - Basin 1A-1, 1A-2 and 1A-3 CURB OUTLET 1 Post Development C Aft= A (ac 1 Dwelling & Driveway .D_95. -: 2 Sidewalk 4,95 1836 0.IM 3 Street & Gutter 0-25 7.077 ILIS; 4 Grass J.25 5 6 7 Wei hied C 1 0.85 Total Area acres 1D,348 0.24 Impervious Area acres 8,9121 0.24 Percent Impervious 100.0% CURB OUTLET 2 Post Development C A fe A ac 1 Dwelling & Driveway om - : 0.09 2 Sidewalk OW 313 0.01: •.... 3 Street & Gutter 0.95 1 800 0.04 4 Gress 0.25 $ ':. 0.91 6 7 .... Weighted C 1 0.88 Total Area acres 2,3621 0.05 .Impervious Area acres 2,113 0.05 Percent Impervious 100.0% CURB OUTLET 3 Post Development C A ftz A NO 1 Dwelling & Driveway 0.95 BAD 2 Sidewalk 0 $5 1 637 0.04 3 Street & Gutter 4.95. 5 238 . .. 0.12 4 Gress 5 6 7 Wei hfed C 0.84 Total Area acres 8.184 0.19 Impervious Area acres 6,875 0.19 Percent Impervious 100.0% CURB OUTLET 4 Post Development C Aft= A ac 1 Dwelling & Driveway 0.$5 .'•:. too, 2 Sidewalk fl:$$' .:: 664 0.92 3 Street & Gutter 0.q. 1,697 0.04 4 Grass 0. 017' 011 5 6 7 Welghted C 0.82 Total Area acres 2 i 0.07 Impervious Area acres 2,361 0.07 Percent Impervious 100.0% SHEET 1 OF 1 DESIGN BY: LM CHECKED BY: ET Q=CiA i = 7.2 in/hr Q = 0.00 cfs Q=CiA i = 7.2 in/hr Q = 0.00 c1s Q = CIA i = 7.2 in/hr Q = 0.00 cfs Q = CIA i = 72 inlhr Q = 0.00 Cfe DRAINAGE AREA DESIGN SHEET DATE: 111=007 SHEET 1 OF 7 PROJECT: Turtle Creak - Phase 3 DESIGN BY: ECG PROJECT NO.: 041.05.043 CHECKED BY: EST DESCRIPTION: Basin I Inlet Drainage Areas DRAINAGE AREA CI-1 I Pod Development C A 041 A ac 1 I Dwelling & DrivewayMA 2 Sidewalk 1 mi • ::: .04 . 3 Street & Gutter 0. 5.332 ". -12 4 Grass 0:25 6 7 8 Nei hied C 0.74 Total Area 0.23 1. rvlousArea ow 1 0.16 Fenced IMIDGIVIOLIS 70.3% DRAINAGE AREA CI-2 Port Dsvelo merit C A (11) p ac 1 Dwoft & Driveway 05 2 Sidewalk . 1i 1,903 3 Street & Gutter S OBs 0. 4 Grass 6 7 8 hied C1 0.74 Total Area 11475 0.28 IMYArvloue Ares 7 g86 0.18 Pemerd hmervious 69.6% DRAINAGE AREA CI-3 Post Development C A A ae 1 Dwelling & Drivewayp pp . 2 Sidewalk iy:95 953 M02 3 SUW &Gutter 95, 3 S64 yu6" 4 Grass 0 25" 04. 6 7 - �s 8 hted C 0.50 Total Area 9tA1 0.30 Impervious Area 4,6181 0.11 PsrcedImpervious 35.6% DRAINAGE AREA CI-4 Pod Development C A A ae 1 DmOm &Drivewa QOSi.;• , -;".:DOD 2 Sidewalk 1 17 3 Street & Gutter 4 48g t1. p 4 Grass 6 7 6 _ Net bled C 0.57 Total Am 12 873 0.30 buiervious Area 1 5 806 0.13 Pment ImpervIoLms 45.1% Q - CIA i-7.2inlhr C = Weighted C A = Total area in acres Q - CIA i = 7.2 Inlhr C = Weighted C A= Total area in acres Q - CIA i = 72 inihr C = Weighted C A = Total area In agree Q� 1.07 Q = CIA i = 7.2 in/hr C - Weighted C A = Total area in acres Q= 1.20 SHEET 2 OF-7 DESIGN BY: ECG DRAINAGE AREA CI-8 CHECKED BY: EST Post Development C A fe A ac 1 Dwelling & Driveway 0.95 11 350 0.28 . 2 Sidewalk 0.95 1122 0.03 3 Street & Gutter 0.96 2.927 007 4 Grass 0.25 10' S9& 0 2 6 7 8 kited C 0.66 Total Area 25.995 0.60 Impervious Area 1 15,398 0.35 Percent Impervious 592% DRAINAGE AREA CI-6 Post Development C A (fel Alac) 1 Dwelling & Driveway 0.95:_ 12.087 028.. 2 Sidewalk 0.95 :_-- 1100 Ee03 3 Street & Gutter US 3 2,923 deli? 4 Grass 0:25-- 1IP328. _ _ 23 6 r 7 8 jIfileighted C j0.86 Total Ares 27 437 0.83 ImpervIoLm Area 16111 1 0.37 PemeM Impervious 58.7% DRAINAGE AREA CI-7 Post Develo ment C A 1ta A ac 1 Dwelling & Driveway 0:95 3.601 010 2 Sidewalk 1 0.95 .': 676 0.02' 3 Street & Gutter -- 0.95 ." 1,826 0.K 4 Grass I d 25 S 0.15 6 7 8 Weighted C 0.58 Total Area I 12 W1 0.30 ImperviousAma 6104 1 0.14 Percent Impervious 47.1 % DRAINAGE AREA CI-s Post Develo runt C A I A (ac) 1 Dwelling & Driveway 8.818 0.20- 2 Sidewalk 768 002 .- 3 Street & Gutter 1 872 1k64 4 Grass 05 T:227 6 - ... _. 7 8 Wel kited C 0.68 TofalArea 18685 0.43 Impervious Area 11%71 0.26 Percent Impervious 61.3% DRAINAGE AREA CF9 Post Development C A Ift= A ac 1 Dwelling & Driveway 0 5 .; 8 329 ..... d t9........ 2 Sidewalk 0.9s :. 1.052 1 1102 3 Street & Gutter 099'.. 3,560 4 Grass D25 5H39 n.22' 5 6 7 8 Wet kited C 1 0.65 Total Area 22.5901 0.52 Impervious Area 1 12.951 1 0.30 Percent Imoervious 57.3% Q = CIA i = 7.2 inlly C = Weighted C A = Total area In acres Q = CIA I = 7.2 in/hr C = Weighted C A = Tote: area in acres Q - CIA 1= 7.2 inlhr C = Weighted C A = Total area in acres FQ_ Q = CIA i = 7.2 inlhr C = Weighted C A = Total area in acres Q = 2.10 Q = CiA t = 7.2 Infhr C = Weighted C A = Total area in acres Q = 2.43 DRAINAGE AREA CI-10 Pod Development C A I A (ac 1 Dwellikio & Ddvewav 0, 2 Sidewalk. _ D 00 3 Street & Gutter i ' S O47 - -0.07 4 Grass _ 6 7 YYe hMd C 0.51 Total Area . 8 7.72 0.19 Immamfous Area 3,0471 0.07 Percent Impervlous 37.3% DRAINAGE AREA CI-11 Post Development C A A NO 1 Dwelling & Driveway 0 00 2 Sidewalk 0.95 561 ..:41.01 3 Street & Gutter e Grass 11 fl. 7 hted C Weig8 0.44 Total Area 15194 0.35 Im rvious Area 111 0.09 Percent lm rvious 27.1% DRAINAGE AREA CI-12 Pod Develo meM C A A ac 1 DweVn & Driveway- - 0. 2 Sidewalk fLu .0 0D 3 Street & Gutter 818 e Grass 7 6 _ _ d C 0.48 A� p '13944Mil lousArea 4618nt rvioos DRAINAGE AREA CI-13 Pod Development C A A ac 1 & Dflveway 0.95 D . 2 -Dwelling Sidewalk 0;95 41.00 3 Street &Gutter 4 Grass t3, B 7 hied C 0.50 Tole) Area 499 j 0.08 Impeniotte Area 12M 1 0.03 Percent Im rvicus 35.9% DRAINAGE AREA CI44 Pod Developynent C A A ac _ 1 2 Dwelling & Drivewa 341 Sidewalk 759 3 Sheet & Gutter 1i t128 9H 4 Grass 0. 6 7 Mad C Weig8 0.61 Trial Area 22 820 0.53 Immirvious Area 11 9261 0.27 Percent Imperviom 52.0% SHEET 3 OF 7 DESIGN BY: ECG CHECKED BY: EST Q=aA i = 72 irVhr C = Weighted C A - Total area in saes Q = CIA i = 7.2 irVhr C = Weighted C Q = CIA 1= 7.2 inft C = Weighted C Q - CIA i = 7.2 inlhr C - Weighted C A = Total area In acres 9-CIA i = 7.2 Infir C - Weighted C A = Total area In saes = 2.33 DRAINAGE AREA CI-1 Post Develo merd C A ift) I A ac Dwelling& Driveway0.95: --' 11.021 . 025 Sidewalk 0.95 1332 0.03 Street & Gutter 0.95 2 967 OR? M72 Grass 0.2514 709 0.34 Wei kited C 0.61 Total Area 3D 026 0.88 Impervious Area 15,320 0.35 Percent Impervious 51.0% DRAINAGE AREA CI-24 Post Development C At A Lac) 1 Dwelling & Driveway k 0.95 2 Sidewalk -- :0?J6..::;;::: 1602 1 0.04 3 Street & Gutter 0,15 5474 '''' 1:73`:'. 4 Grass 6,: 7 8 Weighted C 0.60 Total Area 29,965 0.89 Impervious Area 14 925 0.34 Percent Impervious 49.8% DRAINAGE AREA CI-7 Post Development C A fP A ac 1 Dwelling & Driveway 0.85 Mou 2 Sidewalk .a..0.95 2.180 0,05 3 Street & Gutter 0.95 -.. &762 D.10 4 Grass 0.25 ? , %I 7_ 0.08 6 7 8 Weighted C 0.75 Total Area T 1 81'8 g29 Impervious Area 8, 942 Percent rvious DRAINAGE AREA CI-28 Post Development C A fla A ac 1 Dwellina & Driveway 895 - 0.00 2 Sidewalk 0.96 2,445 0:06 3 Street & Gutter_ 0.95 3.683 0.1... , 4 Grass Q2G . 3,085 0.08 6..:. 7 6 Weighted C 0.75 Total Area 12 ti1 1 0.29 Impervious Area 1 9128 0.21 Percent Impervious 712% DRAINAGE AREA CI-29 Post Development C A ffell A ae 1 Dwelling & Driveway 8331 019 2 Sidewalk 775 0. 3 Street & Gutter 0.95 1.768 0.0.4 4 Grass 6 7 8 Weighted C 0.53 Total Area Z7 287 0.83 Impervious Area 1 10.874 0.25 Percent Impervious 39.9% SHEET 4 OF 7 DESIGN BY: ECG CHECKED BY: EST Q=Cm i = 72 inlhr C = Weighted C A = Total area in acres Q - CIA 1= 7.2 in/hr C = Weighted C A = Total area in acres Q - CIA 1=7.2inIM C = Weighted C A = Total area in acres Q - CiA i = 7.2 inft C = Weighted C A = Total area in acres Q-QA 1= 7.2 infhr C = Weighted C A = Total area in acres DRAINAGE AREA CI30 Post Developmat C A A ac 1 Dwelling & Driveway '_ 0.85 : - .....O.tl'0 . 2 Sidewalk 1296 : f ON .'::0.fO` , 3 Street & Gutter ': 0 85.. 1.888 ....�1. • . 4 Grass.25 _ 7 8 Weighted C 0.74 Total Area 1 3,M 0.08 Impervious Area 0.05 Percent rvious 702% DRAINAGE AREA CI31 Post Development C A A ac 1 DwaFM & Drivewa p 95 ^° 2 Sidewalk 0.85 1.247 103 3 Street & Gutter 156 D.07 4 Grass 12 &1.89 B a: 7 8 Wei kited C 0.43 Trial Area 17 0.40 rvious Area 1 4,4031 0.10 Percent Im .rvious 25.5% DRAINAGE AREA C132 Post Development C A M A NO 1 Dwelilino & Driveway -. 0.95 ,:. 122H.. 0.28..,. Sidewalk 3 Street & Gutter .13.951 ,, :. 0: 4 Grass 6 _ 7 8 _ Weighted C 1 1 0.67 Total Area 0.68 linvorviousAme 17.7991 0.41 Percent Invervious 60.1% DRAINAGE AREA CI-33 Post Development C A M ALac) 1 Dwelling & Driveway 16774 -'•..30 Sidewalk 1,479 3 Street & Gutter 324. .-30. . 4 Crass p: 8.TC3$ D.22 6 7 6 _ Iflieftkited C 0.73 Told Ama 31,2551 0.72 Im rvious Area 1 21.5771 0.50 Pem "It Im sMaus 69.0% DRAINAGE AREA CI34 Post Develo mend C A A ac 1 Dwelling & DrIvewa 2 Skiswalk 3 Street & Gutter ti5 5t9 A: 4 Grass = 0.25: 6 a° Y 7 8 , 1Ne1 hied C1 0.72 Total Area1 32.7 5 0.T5 rvious Area 1 21,901 1 0.50 Percent Impervious 66.9% SHEET 5 OF 7 DESIGN BY: ECO CHECKED W. EST Q = CiA 1= 7.2 irvhr C = Weighted C A = Total area in saes O = CIA 1= 7.2 inAv C = Weighted C A • Total area in acres Q = CIA I = 72 inlhr C = Weighted C A - Total was In saes O - CIA 1- 7.2 inAY C = Weighted C A _ Total area in acres Q - CIA 1- 7.2 irVhr C = Weighted C A = Total area in acres DRAINAGE AREA CI-35 SHEET 6 OF 7 DESIGNN BY: ECG CHECKED BY: EST Post Development C A Rz A ac 1 Dwelling & Driveway 0.95 - 0,00 2 Sidewalk 0.95. 1685 0 3 Street & Gutter 0.95 4,234 0.10 -. 4 Grass 0:25 _ 394 0.05 6 7 8 We[ kited C 0.75 Total Area 1 8,292 0.19 Impervious Area 5,898 1 0.14 Percent lm ervious 71.1% DRAINAGE AREA CI-39 Poet Development C A fe A ac 1 Dwelling & Dri 095 ... 16,515 0.38 2 Sidewalk 0.95 1567 Q04 3 Streel & Gutter ° D:95 3.993 D.IfB 4 Gress 025 21,384 049 6 7 8 Wel Irted C 0.61 Total Ares1 43.4 1.00 Impervious Area 22,075 1 0.51 Percent Impervious 50.8% DRAINAGE AREA CI-37 Post Development C A 1t2) A ac 1 Dwelling & Driveway 0_ - 16 T86 039 __- 2 Sidewalk .. 1.489 0.05 3 Street & Gutter 95 3.319 fl.08 4 Grass Q5 9.997 0.22.... 6 7 8 Wei hied C 0.73 Total Area 31 592 0.73 Impervious Area 1 21:2941 0.50 Percent limmmlous 68.4% DRAINAGE AREA CI-M Post Developmot C A (fl= A ac 1 Dwelling & Driveway _ 0 9$_::: 16,849 030 2 Sidewalk 0il5 1471 0.08 3 Street & Gutter 0.95 4 Grass 025 9.949 0 6 7 B Wei kited C 0.73 Total And 31 549 0.72 Impervious Area 21 600 1 0.50 1percentimoomfous, 68.5% DRAINAGE AREA CI-39 Post Develo rd C Aft A ac 1 Dwelling& Driveway-0_ 98 0.00 2 Sidewalk 0.95 1494 53 3 Street & Gutter 0 95. 3.894 0:09 4 Grass 025.;• ;.... 2001 '. 0.05 6 7 8 Wef tiled C 0.76 Total Area 1 7.488 0.17 limperviousAma 5,487 1 0.13 Percent ImDervious Q = CIA 1= 7.2 inlhr C = Weighted C A = Total area in acres Q = CIA i = 72 iNhr C = Weighted C A = Total area In acres Q = CIA i = 7-2inmr C = Weighted C A = Total area In acres Q = CiA i = 72 in8ir C = Weighted C A - Total area In acres C SHEET 8 OF 8 DESIGN BY: ECG CHECKED BY: EST Q - CIA i = 72 iNhr C = Weighted C A = Total area in acres DRAINAGE AREA CI-4D Post Develo ment C A ( A ac 1 & DrivewayA... 2 —Dwelling Sidewalk !: d. ...' 1.30B (1.03 . 3 Street & Gutter 4 Grass 6 7 Villelighted C 0.43 Total Area 1 f162 0.42 rvious Area 4,701 0.11 Percent Impervious 26.0% DRAINAGE AREA CI-41 Post Development C A A(sic) 1 DweRm & Driveway "' 0-05 12,762 0 29 . 2 Sidewalk 1 886 ' 0.64 3 Street & Gutter 4 347 0.1:0 4 Gress 6 !- 7 8 Mhfthted C 0.53 Tool Area 47 427 1.09 1 rvious Area 18=996 0.44 Percent Impervious 40.1% DRAINAGE AREAYI-1 Post Dmiopnwd C A A (ac 1 Dwelling & Driveway Sidewalk 3 Street & Gutter 4 Grass 6 7 a hbd C 025 Trial Area1 45 1.04 Impemlous Ana 0.00 Psresnt Impervious 0.0% DRAINAGE AREA YI-2 Pod Development C A ( A ac 1 Dwelling & Drivewa 2 Sidewalk- 3 Shed & Gutter 4 Gmss C.25 1. 78 : OF 6 7 i 6 _ t Waighbd Ci 0.25 Trial Ana 15AM 0.38 Impervious Area 1 0.00 Percent Impervious 0.0% DRAINAGE AREA YIJ Post Development C A A me 1 Dwaffirm & Driveway p.:. 2 Sidewalk 7 3 Street & Gutter 110 4 Grass 6 { 7 8 hbd Ci 025 Total Anra1 17 M8' 0.39 Impervious Area 1 0.00 Percent Impervious 0.0% SHEET 7 OF 7 DESIGN BY: ECG CHECKED BY: EST Q = CIA i = 7.2 inft C = Weighted C A = Total area in acres Q = CIA 1= 7.2 inlltr C = Weighted C A = Total area In saes Q - CIA 1= 7.2 inmr C - Weighted C A = Total area In acres Q=CSA I = 72 Inlhr C = Weighted C A = Total area in acres Q ■ CIA i = 7.2 inlhr C = Weighted C A = Total area in acres 0.71 fll DRAINAGE AREA DESIGN SHEET DATE: 1/18/2007 SHEET t OF 2 PROJECT: Turtle Creek- Phase 3 DESIGN BY: ECG PROJECT NO.: 041.05.043 CHECKED BY: EST DESCRIPTION: Basin 1c Inlet Drainage Areas DRAINAGE AREA CI-1 Ppk Dove' went G I A Mac 1 Dwelling & Drivewe a 10 Sidewalk 2 794 0. 3 Street & Gutter 8 0. ; 4 Grass 0.25 : _ �. DAG 6 7 8 Villialighted C 0.51 Total Area 1.38 I rvlous Area 081 0.50 Percent ImpervIoLm 36.9% DRAINAGE AREA CIA Past Dairefolarnent C A A ao 1 Dweirrp & Driveway DtA, 12A47 0. 2 Sidewalk =095 1,777 164 3 Street & Gutter 0.95 1112 4 Grass 0.25 %M -..� 2124 6 _ ... .. 7 ;- VftM8 Mad C 0.71 Trial Area 166 0.68 I rvious Area 19AN 0.45 Percent Impervious 65.3% DRAINAGE AREA GLIB Post Develo ment C A ffel A ae 1 & Driveway [I: S 190 0.51. r 2 Sidewalk 0. 469 0.08 3 Street & Gutter 6.743 01S" 4 Gress 0.30 6 7 8 liYeigfrted C 0.74 Total Area 44,649 1 1.03 Im lous Area 31,401 0.72 1112ementhWervicLes 70.3% DRAINAGE AREA CI-19 Poet Development C A A ac 1 Dwelling &Drivewa '0.95 1.47M .0.4 2 Sidewalk -- '095 ! 1 .0 3 Street & Gutter D 95 9 1 4 Grass D. 6 7 8 IMIghted C 1 0.68 Total Area 37 0.85 1 rvlous Area1 21,7021 0.50 Percent Im envious 58.3% Q - CIA I=7.2iMv C = Weighted C A = Total area in acres Q - CIA t = 7.2 inmr C = Weighted C A = Total area in apes Q - CIA i = 7.2 inlhr C = Weighted C A = Total area In acres Q=QA 1= 7.2 inlhr C = Weighted C A - Total area In acres SHEET 2 OF 2 DESIGN BY: ECG DRAINAGE AREA CI-2 0 CHECKED BY: EST Post Develo rt C A (fel A lac 1 Dwelling& Driveway0.85 15.969 b.S'/ 2 Sidewalk 0.95 1.453 0IM 3 Street & Gutter 0.95 5.583 .13 4 Grass 0.26 16744 nM 6 7 8 Wel hied C 0.66 Total Area 39.749 0.91 llmpwvioLmAma 1 23,005.1 0.53 Percent Impervious 57.9% DRAINAGE AREA CI - Post Development C Aft A ac) 1 Dwelling & Driveway 0.95 4158 010 2 Sidewalk - 0.95 939 .0.02 3 Street & Gutter 0.95:. 2 508 tS.08 4 Grass 0.25.. 6 7 8 - .. .: ............ ...... Wel Iced C 0.74 Ta41 Area 14611 1 0.25 Impervious Area 7.6021 0.17 Percent Impemious 70.3% DRAINAGE AREA CI-25 Post Develo meat C A A lac 1 Dwelling & Driveway 0.10 I 4,350 0 t0 2 Sidewalk 005 928 1IL49.. 3 Street & Gutter 0'IM 2.472 .0 06 4 Grass 625 1' 957 _ 025 6 Wef bled Cj 6.54 Total Area 18 707 0.43 Impervious Area 7,7501 0.18 Percentknpervious 41.4% Q = CIA i = 7.2 in/hr C = Weighted C A = Total area In acres Q = ClA i = 7.2 in/hr C = Weighted C A = Total area in acres Q= 1.33 Q = CIA i = 72 in/hr C = Weighted C A = Total area in acres C DRAINAGE AREA DESIGN SHEET DATE: November 1, 2007 SHEET 1 OF 3 PROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: 041.05.043 CHECKED BY: ET DESCRIPTION: Inlet Drainage Area Analysis - Basin 1 D-1 and 1 D-2 I CI-21 Post Development C A ftz A ac 1 Dwelling 0.95 9.075 .: ' P.21 2 Driveway 0.95.,':.. 1350 . D.03.' 3 Sidewalk fl,95 ' 1,577 0.04 4 Street & Gutter • D.9S 4A83 .. ; 040 5 Grass 16494 6 7 8 Weighted C 1 0.60 Total Area acres 32,979 0.76 Impervious Area acres 16,485 0.38 Percent Impervious 50.0% CI-22 Post Development C A ft2 A ac 1 Dwellin 0.95 : Ib0 2 Driveway 0. UOI• 3 Sidewalk :00 4 Street & Gutter ,: (1,06 41.'80 fl. m 5 Grass 0.25 _ 1:80$ "" 6 a; 7 _. 8 Weighted C 0.74 Total Area acres 5 988 0.14 lm rvious Area acres 4,180 0.10 Percent impervious 69.8% CI-AA7 Post Development C A ftz A ac 1 Dwelling0.05 0 . 2 Driveway 0.95 {D. 3 Sidewalk 0 `.:: p, U.. 4 Street & Gutter G.95 4 289 5 Grass 0.25 - 090 6 7 8 Weighted C 0.95 Total Area acres 4,2891 0.10 Im rvious Area acres 4,289 0.10 Percent Im rvious 100.0% Q = CA i = 7.2 in/hr Q = 3.27 cis Q = CIA i=7.2inmr Q = 0.73 cis Q = CIA i=7.2inlhr Q = 0.67 cfs L L L L Cl Post Development C A ft4 A ac 1 Dwellin 47 5 OAO. 2 Driveway 3 Sidewalk 0.95`.: - 4 Street & Gutter 0,r5 . t 2,183 a4J9 5 Grass 5 0.00 ;. 6 7 8 Weighted C 0.95 Total Area acres 213 .8 0.05 Im rvious Area acres 2,183 1 0.05 Percent Impervious 100.0% CI-AA3 Post Develo ment C A ft2 A ac 1 Dwellin 0.-96 i ' 2 Drivewa 0.95 0:0 3 Sidewalk 4 Street & Gutter Grass 0.25 g 7 ::. 8 Weighted C 0.95 Total Area acres 3.144 0.07 Impervious Area acres 3,1441 0.07 Percent Impervious 100.0% CI-AA4 Post Develo ment C A W A ac 1 Dwellin 0:95. 000 .: 2 Drivewa 95 . ,. _.. 0,ot�`:.. -' Sidewalk 0.95 .;. QOQ: 4 Street &Gutter t9-95 7.306 tf'" I'7 5 Grass 0;:: _. 0.00 6 y. 7 8 - Weighted C 0.95 Total Area acres 7,306 0.17 Impervious Area acres 7,306 0.17 Percent Impervious 100.0% CI-AA5 Post Develo ment C A ftz A ac 1 Dwellin 0.9 2 Driveway 95: - 3 Sidewalk D.95; 4 Street & Gutter f1.9S "' '.3 596 '.O.B. 5 Grass #7.25 .. 6 7 s. 8 Weighted C 0.95 Total Area acres 3.596 0.08 im rvious Area acres 3,596 0.08 Percent Impervious 100.0% Q = CIA i = 7.2 in/hr Q = 0.34 cfs Q = CiA i = 7.2 in/hr Q = 0.49 cfs Q = CA i = 7.2 in/hr Q = 1.15 cfs Q = CA i = 7.2 in/hr Q = 0.56 cfs L CI-AA6 Post Development C A ftY A ac 2 Drivewa O.: 0,IRV,° 3 1 Sidewalk q, 4 Street & Gutter a © - 2.472 tx.0i' 5 Grass 6 7 r 8:: Wei kited C 0.95 Total Area acres Z472: 0.06 Impervious Area acres 2 472 0.06 Percent Impervious 100.0% Clubhouse Post Development C A ftz A ac 1 Dwelling 0151.:l. 4414 ...0,1,0:7 2 Driveway 0.95'', ' . . - d 0.00 3 Sidewalk 0.95 - 9:4_ 4 Street & Gutter WK.... - .. .0.0O 5 Grass :4.25 .. <. .. d`'r "O r1O 6 's - 7 8 Weighted C 0.95 Total Area acres 4A14 0.10 Im rvious Area acres 4.4141 0.10 Percent Im ervious 100.0% Pool Area Post Development C A A ac 1 DwellEn Drivewayp.. 2 3 Sidewalk fl.. 4 Street & Gutter 5 Grass O.dQ. 6: 7. 8 Weighted C 0.95 Total Area acres 8,566 0.20 Impervious Area acres 8 565 0.20 Percent Impervious 100.0% Deck Post Development C Aft= A ac 1 Dwelling Q9Ei. 2975 2 Driveway00 3 Sidewalk t1.95. 00 4 Street & Gutter 0 96 Q 00'::•. 5 Grass 0"itSr... - 0.O0 6 :. 7 - 8 Weighted C 0.95 Total Area acres 2.975 0.07 'Impervious Area acres 2,9751 0.07 Percent Im rvious 100.0% Q = CEA i = 7.2 in/hr Q = 0.39 cfs Q = CEA i = 7.2 in/hr Q = 0.69 cfs Q=CEA i = 7.2 in/hr Q = 1.34 Cfs Q = CEA E=7.2inthr Q = 0.47 cfs I DRAINAGE AREA DESIGN SHEET DATE: November 1, 2007 SHEET 1 OF 3 PROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: 041.05.043 CHECKED BY: ET DESCRIPTION: Inlet Drainage Area Analysis - Basin 1 D-1 and 1 D-2 CI-21 Post Development C A ftz A ac 1 Dwelling 0..95: 9,075 .0.2 2 Drivewa 0.95 1350 3 Sidewalk 0.98 1.577 4A _ 4 Street & Gutter 0.95 _ 4.483 • .. 010 5 Grass 0:25 '. ':. 16 494 ": . 8 6 7 8 Weighted C 0.60 Total Area acres 32,979 0.76 Impervious Area acres 16,485 0.38 Percent Impervious 50.0% CI-22 Post Development C A ftz A ac 1 Dwellin a 95 : 0.00 2 Drivewa 0.95:;. = 0.00 3 Sidewalk 0.95 Mae 4 Street & Gutter 5 Grass 0.25 ,' i .11p8 :::.004 6 7 8 Weighted C 0.74 Total Area acres 5.988 0.14 Impervious Area acres 4,180 0.10 Percent Impervious 69.8% CI-AA1 Post Development C A fts A NO 1 Dwelling 13.E p0 2 Driveway 0.95: 9.QIi 3 Sidewalk 95 ` tag 4 Street & Gutter Q 95 :: 4.289 Q1nt 5 Grass 6 7 8 Weighted C 0.95 Total Area acres 4,289 0.10 Impervious Area acres 4,289 1 0.10 Percent Impervious 100.0% I Q=CiA i = 7.2 in/hr Q = 3.27 Cfs Q = CiA i=7.2in/hr Q = 0.73 cfs Q = CIA i = 7.2 in/hr Q = 0.67 cfs CI-AA2 Post Development C A ftz A ac 1 Dwelling ll'.s0. 0.00 . 2 Driveway 3 SidewalkJ,95 4 Street & Gutter 0;95 2,163 0.05' 5 Grass 0,25 6 ;. 7 8 Wei kited C 0.95 Total Area acres 2183 0.05 Im rvious Area acres 2,183 0.05 Percent Impervious 100.0% CI-AA3 Post Development I C A fe A ac 1 Dwelling 1.@ 000. 2 Driveway 0,00 3 Sidewalk ®..95 0.00'. 4 Street & Gutter 0.99°_ 3,144 0.07 5 Grass 0.25 6 7 8 Weighted C 0.95 Total Area acres 3.144 0.07 Impervious Area acres 3,1441 0.07 Percent Impervious 100.0% CI-AA4 Post Development C A fe A ac 1 Dwelling1).s5 0 2 Driveway0.9a 3 Sidewalk 4 Street & Gutter tl95 .7.306 5 Grass : O, 0 W 6 7 8 Weighted C 0.95 Total Area (acres)7,306 0.17 Impervious Area acres 7.306 0.17 Percent Impervious 100.0% CI-AA5 Post Development C A A ac 1 Dwelling 95 ' 0.00 2 Driveway 0.p0 3 Sidewalk O,,..,.. - On 4 Street & Gutter 5.. 3.596 5 Grass 0: O wt0 6 7 8 Weighted C 0.951 Total Area acres 3,596 OM Im rvious Area acres 3,596 0.08 Percent I mpervlou3 100.0% Q=CiA i = 7.2 in/hr Q = 0.34 afs Q=CiA i = 7.2 in/hr Q = 0.49 cis Q=CiA i = 72 in/hr Q = 1.15 ofs Q = CIA i = 7.2 in/hr Q = 0.56 cfs CI-AA6 Post Development C A ftz A ac 1 Dwelling .95 000 2 Driveway0.,00 3 Sidewalk 4 Street & Gutter 6.9a : 2 472 O.06 5 Grass 6 7 8 Weighted C 0.95 Total Area acres 2,472 0.06 Impervious Area acres 2,472 0.06 Percent Impervious 100.0% Clubhouse Post Development C A ftz A ac 1 Dwelling 0 9a 4,414 OAQ 2 Driveway t7,95;b 3 Sidewalk 4 Street & Gutter U.95 0.00 5 Grass .0.25 0.00 6 7 8 Weighted C 0.95 Total Area acres 4,414 0.10 Impervious Area acres 4,414 0.10 Percent Impervious 100.0% Pool Area Post Development C A its A ac 1 Dwelling _ Driveway ::1 0 96 _ 856 0.20 2 0.00 3 Sidewalk . WStS .. 0:60 . 4 Street & Gutter Olt; - ; 0:00: . 5 Grass 0.25 ; - .&20 6 7 8 Weighted C 0.95 Total Area acres 8 565 0.20 Impervious Area acres _ 8,565 0.20 Percent Impervious 100.0% Deck Post Development C A fe A ac 1 Dwelling t1:95'r 2.975 61:. 2 Driveway 0.95 0:00 3 Sidewalk 0.95 .; 0.00 4 Street & Gutter 0.96 0.00 5 Grass - 025 6 7 8 Weighted C 0.95 Total Area acres 2,975 0.07 Impervious Area acres 2,9751 0.07 Percent Impervious 100.0% Q=CiA i = 7.2 in/hr Q = 0.39 cfs Q = CiA i=7.2in/hr Q = 0.69 cfs Q = CiA i = 7.2 in/hr Q = I. cfs Q = CiA i = 7.2 in/hr Ed --= 0.47 Cfs L I PIPE SIZING CALCULATIONS The Villages at Turtle Creek Stormwater Management High Density Permit Application Pipe Calculations NOTES Project: Turtle Creek - Phase 1: B Computed By: ECG 1) Design method used is Rational Method 5) Velocity percent (%V) from hydraulic elements table Jab #: 041.05.043 Checked By: EST 2) "X" denotes wdsting structure 6) All pipe shall be HDPE unless otherwise noted Location: Surf City, NC Date: 2/8/2007 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows PIPE SECTION AREA (Acres) INC. TOTAL AREA SUM p I R�pF TIME OF CONCEN. PIPING INPUT PIPING DATA INVERT ELEVATION GRATE/RIM ELEVATION GRATE/RIM TO INVERT FROM TO Inc. Ac Total Ac INC. „C„ A x C Ac A x C Ac Year In/Hr. Qa (CFS) To Inlet (�) To Upper End Min Thru Pipe (Min) Dia. (In) Length (Ft) Man. "n" Slope ° (/n) Qf Full (CFS) Vf FullL"Q (FIS) %V (Va/Vf x100) Vactual (F/5) Upper End Lower End Upper End Lower End Upper End(Ft) Lower End(Ft)FROM TO 'N CI-41 CI-40 1.089 1 089 0.53 0577 0 577 10 72 4 159 10.00 10 00 010 15 25.0 0.009 024 4 569 372 91 114 425 27.230 27.170 30.000 30 000 2.770 2.830 CI-41 CI-40 CI-40 YI-2 0.415 1 504 0.43 0179 0,757 10 72 5 449 10.00 1010 075 18 209.0 0.009 025 7 564 428 72 1085 465 27.170 26.650 30.000 29 900 2.830 3.250 040 iJ 2 CI-39 CI-38 0.172 0.172 0.76 0 131 0131 10 72 0.944 10.00 10.00 014 12 25.0 0.009 024 2 520 3.21 37 93 299 27.700 27.640 30.000 30.000 2.300 2 360 CI-39 CI 38 CI-38 YI-2 0.724 0.896 0.73 0528 0659 10 72 4747 10.00 10.14 047 18 127.0 0.009 0,25 7.612 431 62 1055 455 27.640 27,320 30.000 29.900 2,360 2.580 0-38 Y'I-2 CI-36 CI-37 0.998 0.998 0.61 0 604 0.604 10 72 4 350 10.00 1000 010 15 25.0 0.009 024 4.569 3.72 95 114 425 27.750 27.690 30.000 30. L'00 2.250 2,310 CI-36 CI 37 CI 37 YI-2 0.725 1 723 0.73 0 528 1 112 10 72 8 154 10.00 1010 042 18 115.0 0.009 025 7 615 431 107 112 5 462 1 27.690 27.400 30.000 29 000 2.310 2 500 CI-37 11 2 YI-2 YI-3 0.355 4.478 0.25 0 089 2 637 10 72 18 989 10.00 1085 078 30 297.0 0.009 025 29.558 602 64 106 639 26.650 1 25.910 1 29.900 29 900 3.250 3 990 Y1-2 Yl a CI 35 CI-34 0.190 0.190 0.75 0142 0142 10 72 1 025 10.00 1000 008 12 25.0 0.009 100 5.143 655 20 78 511 27.330 27.080 30.000 30.000 2.670 2.920 CI 35 CI-34 CI-34 YI-3 0.751 0 941 0.72 0 540 0 692 10 72 4.911 10.00 1008 050 18 136.0 0.009 025 1 7 582 429 1 65 106 455 27.080 26.740 30.000 1 29 900 2 920 3 160 CI-34 17-3 CI-32 CI-33 0.680 0.680 0.67 0.456 0.456 10 72 3,283 10.00 10 00 0,06 15 25.0 0.009 0.88 8.748 7.13 38 93.5 667 1 27.310 27.090 30.000 30.000 2 690 2.910 CI 32 C -M CI 33 YI-3 0.718 1.398 0.73 0 526 0 982 10 72 7 072 10.00 10 06 0 39 18 114.0 0.009 025 7 516 426 94 114 485 27.090 26.810 30.000 29.900 2.910 3.090 CI 33 YT3 YI-3 CI-31 0.395 1 7 212 0.25 0 099 4 400 10 72 31 683 10.00 1162 048 1 36 208.0 0.009 0.25 49146 681 66 1065 726 25.910 1 25.390 29.900 30.000 3.990 4.610 Y1-3 CI-31 CI 29 CI-31 0.626 0.626 0.53 0 331 0.331 10 7.2 2.386 10.00 10.00 0.10 15 37.9 0.009 1.01 9.355 763 26 1 84 1 6.41 26.890 26.510 30.000 30 000 3 110 3.496 CI 29 C1ti31 CI-31 CI-30 0.397 8.236 0.43 0 170 4 902 10 7.2 35.292 10.00 1210 009 36 41.0 0.009 024 47 555 673 74 1095 7.37 25.390 25.290 30.000 30 000 4 610 4.710 CI 31 CI-30 CI-30 CI-27 0.077 8,313 0.74 0057 4959 10 7.2 35.705 10.00 12,19 063 36 280.0 0.009 0,24 47.103 667 76 110.5 7,37 25.290 24.620 30,000 30-500 4710 1 5.880 0-30 CI-27 CI-27 CI-28 0.290 860 0.75 0.216 5175 10 7.2 37.261 10.00 12,93 0.03 36 26.0 0.009 100 96292 13,63 39 94 1281 24.620 24.360 30.500 1 30,500 5 880 6.140 CI27 0�28 CI-28 CI-2. 0.294 8.897 0.75 022.0 5395 10 72 38.847 10.00 12,86 0,76 36 364.0 0.009 0.29 51.470 7,29 75 110 801 24.360 23.320 30'00 6140 6.980 CI-18 Ci-2. CI-1. CI-2. 0.228 0 28 0.74 0169 0.169 10 7.2 1,219 10.00 10 00 0.18 15 35.0 0.009 0.26 4.729 3.86 26 84 3 24 27.000 26.910 :!0..500 300 30.�00 3 300 3.390 CI-1 CI 2 CI-2. C1-4. 0.263 9388 0.74 0194 5,759 10 7.2 41.463 10.00 13.62 0.11 1 36 1 49.0 0.009 0,24 1 47.652 6.74 87 113.5 1 766 23.320 23.200 30.300 30.300 16.980 1 7100 CI-2 I CIA. Pipe Calcs Basins 1B.xls.xls Page 1 Pipe Calculations Project: Turtle Creek - Phase 1: B Computed By: ECG 1) Design method used is Rational Method 5) Velocity percent (°AV) from hydraulic elements table Job #: 041.05.043 Checked By: EST 2) "X" denotes existing structure 6) All pipe shall be HDPE unless otherwise noted Location: Surf City, NC Date: 2/8t2007 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows PIPE SECTION AREA (Acres) INC. TOTAL AREA SUM p F. I RUNOFF TIME OF CONCEN. PIPING INPUT PIPING DATA INV ERT VERT ELEVATION GRATE/RIM ELEVATION GRATE/RIM TO INVERT FROM TO Inc. Ac Total Ac INC. A x C Ac A x C Ac Year In/Hr. Qa (CFS) To Inlet (Min) To Upper End in Thnt Pipe (Min) Dia. (In) Length (Ft) Man. "n" Slope (%) Qf Full (CFS) Vf Full (F/S) a/ (Q�Qf x100) %V (Va/Vf x100) Vactual (F/S) Upper End Lower End Upper End Lower End Upper End (Ft) Lower End (Ft) FROM TO CI-3. CI-4. 0.298 0.29E 0.50 0.149 0.149 10 72 l n71 10.00 1000 021 15 39.0 0.009 026 4122 185 23 815 3 14 27.000 26.900 30.300 30.300 3 300 3 400 CI-3 CI-4 CI-4. CI-6. 0.296 9.9.82 0.57 0.167 6.075 10 72 43 738 10.00 1372 062 36 289.0 0.009 025 48 063 680 91 114 776 23.200 22.480 30.300 28 700 7 100 6 220 C14 CI-5 CI-5. CI-6. 0.597 0 597 0.66 0.391 0.397 10 72 2.856 1 10.00 1000 1 Oil 15 1 25.0 0.009 024 4 569 372 63 1055 393 26.500 26.440 28.700 1 28 700 2200 2 260 CI-5 CI-6 CI-6. CI-8. 0.630 1120E 0.66 0 416 1 6.888 10 1 22 49 591 10.00 1435 031 36 145.0 0.009 026 48 642 688 102 114 7 85 22.480 22.110 28.700 NA 6 220 N 9 CI-6 C1-8. CI-24 CI-9. 0.688 0 688 0.60 0 412 0 412 10 7.2 2.965 10.00 1000 012 15 37.0 0.009 0.49 6 505 530 46 975 517 27.600 27.420 1 30.400 29 800 2 800 2 380 CI-24 CI-9 CI-9. CI-11 0.519 1207 0.65 0 339 0.750 10 7.2 5.397 10.00 1012 1 0 26 15 1 142.0 0.009 1.39 1 11 012 898 49 995 993 27.420 1 25.440 29.800 28 060 2 380 2 620 1 CI-9 CI-11 CI-14 CI-13 0.526 0.526 0.61 0 323 0.323 1 10 7.2 2 327 10.00 1000 019 15 56.0 0.009 050 6 594 538 35 91 489 27.600 27.320 30.400 30 000 2 800 2 680 CI-14 CI 13 CI-13 CI-12 0.080 0 606 0.50 0.040 0.363 10 7.2 2 617 10.00 10.19 0.41 15 164.0 0.009 1.05 9.550 7,79 27 85 6.62 27.320 25.600 30.000 27 900 1 2 680 2 300 CI-13 CI-12 CI-12 CI-11 0.320 0.927 0.48 0154 0 518 10 72 3 727 10.00 10.60 010 15 33.0 0.009 0.48 6 494 529 57 103.3 549 25.600 25.440 27.900 28.060 2 300 2 620 CI-12 CM I CI 11 CI-15 0.349 2 482 0.44 0.153 1421 10 7.2 10 228 10.00 10.70 0.41 1 18 230.0 0.009 1.05 15.523 8.79 66 106.5 9.36 25.440 1 23.030 28.060 25 690 2 620 2 660 CI-11 CI-i5 CI-10 CI-15 0.188 0.188 0.51 0096 0096 1 10 7.2 0.690 10.00 10.00 015 15 24.0 0.009 0.25 4 663 3.80 I5 72 274 23.090 23.030 25.690 25 690 2 600 2 660 CI-10 CI-15 CI-15 YI-1 0.689 3.359 0.61 0 419 1935 10 72 13.931 10.00 1 11.11 054 24 189.0 0.009 025 16 286 519 86 1135 589 23.030 22.560 25.690 27 500 2 660 4 940 CI-15 YI-1 YI-1 JB-2 1.040 1 4.399 0.25 0.260 2.195 10 7.2 15.903 10.00 11.65 0.06 24 20.0 0.009 0.25 16.330 520 97 114 593 22.560 22.510 27.500 29A00 4 940 6.490 YI-1 JB-2 JB-2 JB-1 0.001 4.400 0.95 0.001 2.196 10 7.2 15,810 10.00 11.70 019 24 66.0 0.009 0,24 1 16.080 5.12 J 98 114 1 5.84 22.510 1 22.350 29.000 1 29 000 6 490 6 650 JB-2 JB-1 JB-1 CI-7 0.001 4.401 0.95 0.001 2.197 1 10 7.2 15.817 10.00 11.89 02.1 24 74.0 0.009 0.24 16.108 5.13 98 114 585 22.350 22.170 29.000 27 o70 6 650 5 500 JB-1 C1-7 CI-7 CI-8 0.297 4.698 0.58 0.172 2.369 10 7.2 1 17.058 10.00 12.10 0.07 36 25.0 0.009 0.24 47.173 6.68 M 92 6.14 22.170 22.110 27.670 27 610 5 500 5 560 CI-7 CI-8 CI-8 BP-1 1 0.429 1 16.3.35 0.68 0.291 9.548 10 22 68.747 10.00 14.65 0.22 42 117.0 0.009 0.26 73.5...51 7.65 93 114 8.72 22.110 21.810 27.670 56 000 5 560 34.190 CI-8 BP-1 BP-1 Basin 113 0.001 16.336 0.95 0 001 1 9.549 10 7.2 68.754 10.00 148.8 0.07 1 42 1 67.0 0.009 121 159.707 1.6.6:1 43 1 .965 1603 21.810 1 21.000 1 28.000 21.000 6 190 0.000 BP-1 Basin 1B BP-1 Swale 0.001 16'36 0.95 OOOI >^54S 10 7.2 68.754 10.00 14.8E C.11 42 66.0 0.009 0.33 83.861 8.72 82 1',2 4',7 23.220 2�.000 28.000 23.000 1 1780 0.000 BP-1 SwalelB Pipe Calm Basins 1B.xls.xls Page 2 Pipe Calculations, NOTES Project. Turtle Creek -Phase 1: 1C Computed By: . ECG 1) Design method uscd is RationalP,Fethod Job #: 041.05.043 Checked By: EST 2) "X" denotes existing structure Location: Surf City, NC Date: 2/8/2007 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows 5) Velocity percewnt (OK j uom hydraulic elements table 6) All pipe shall be HDPE pipe unless otherwise noted TOTAL PEAK INVERT GRATE/RIM GRATE/RIM TO PIPE SECTION AREA (Acres) INC. AREA 0 1 TIME OF CONCEN. PIPING INPUT PIPING DATA RUNOFF ELEVATION ELEVATION INVERT SUM V) TO Thru o Q /o o !oVactual INC. A x C To Inlet Upper Dia. Length Man.EloeQf Full Vf Full Upper Lower Upper Lower Upper LowerFROM TO Inc. Ac Total Ac A x C Ac Year In/Iir. Qa (CFS) Pipe (Qa/Qf (Va/Vf FROM TO "C"Ac (Min) End (In) (Ft) „ „ n (CFS) (F/S) (FPS) End End End End End (Ft) End (Ft) (Min) x100) x100) i ASIAi C CI-16 CI-18 1.356 1.356 0.51 0.690 0.690 10 7.2 4.965 10.00 10.00 030 15 137.0 0.009 0.91 8.908 7.26 56 103.5 7.52 20.510 19.260 23.200 21.950 2.690 2.690 CI-16 CI-18 CI-17 CI-18 0.693 0.693 0.71 0.490 0.490 10 7.2 3.525 10.00 10.00 0.06 15 25.0 0.009 1.12 9.869 8.05 36 92 7.40 19.260 18.980 21.950 21.950 2:690 2.970 CI-17 CI-18 CI-18 CI-23 1.025 3.074 0.74 0..761 1.940 10 7.2 13.967 10.00 10.30 0.35 18 191.0 0.009 0.88 14.222 8.05 98 114 9.18 18.980 17.300 21.950 19.750 2.970 2.450 CI-18 CI-23 CI-20 CI-25 0.913 0.913 0.66 0.598 0 598 10 7.2 4 304 10.00 1000 0.36 15 117.0 0.009 043 6 096 497 71 109 5.37 16.060 15.560 18.750 19 750 2.690 4.190 CI 20 CI-25 CI-25 CI-23 0.429 1.342 0.54 0.232 0.930 10 7.2 5.974 10.00 10.36 0.12 18 33.0 0.009 0.24 7.467 4.23 80 112 4.73 15.560 15.480 19.750 19.750 4.190 4.270 CI 25 CI-23 CI-23 CI-19 0.248 4.664 0.74 0.184 2..954 10 7.2 21368 10.00 10.65 0.24 30 111.0 0.009 0.36 35.547 7.25 60 104.5 7.57 12.900 12.500 19.750 18.500 6.850 6.000 CI-23 CI-19 CI-19 BP-2 0.854 5 518 0.66 0.562 3 516 10 7.2 25.316 25320 10.00 10.00 10.89 0.22 30 104.0 0.009 0.38 36262 7.39 70 108 7.98 12.500 12.110 18.500 32 000 6.000 3.890 CI-19 BP-2 BP-2 Basin 1C 0.001 5.519 0.50 0.001 3517 10 72 11 11 005 30 24.0 0.009 0.46 40.089 8.17 63 105.5 8.62 12.110 12.000 16.000 12.000 3.890 0.000 BP-2 Basin 1C BP-2 Swale 1C 0.001 5.519 10.50 0.001 3 517 10 7.2 25.320 10.00 11.11 0.27 30 112.0 0.009 0.25 1 29.608 6.03 86 113.5 6.85 13.400 13.120 16.000 13.120 2.600 0.000 BP-2 Swale 1C Pipe Cates Basins 1C.xls xls Page 1 �opc� C�2 -c�a0��oo�� Proiect: Turtle Creek - Phase 1: 1D-1 Computed Bv: ECG 1) Design method used is Rational Method Job #: 041.05.043 Checked By: EST 2) "X" denotes existing structure Location: Surf City, NC Date: 2/8/2007 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows 5) Velocity percent (O/AV) from hydraulic elements table 6) All pipe shall be BDPE unless otherwise noted TOTAL PIPE SECTION AREA (Acres) INC. AREA g I PEAK TIME OF CONCEN. PIPING INPUT PIPING DATA INVERT GRATE/RIM GRATE/RIM TO RUNOFF ELEVATION ELEVATION INVERT SUM TO Thru o Q /o o /oV INC. A x C To Inlet Upper Dia. Length Man. Slope Qf Full Vf Full Vactual Upper Lower Upper Lower Upper Lower FROM TO Inc. Ac Total Ac A x C Ac Year In/Hr. Qa (CFS) Pipe (Qa/Qf {Va/Vf FROM TO "C" Ac (Min) End (In) (Ft) „ „ n n (/o) (CFS) (F/S) (F/S) End End End End End (Ft) End (Ft) (Min) x100) x100) BASIN 1D-1 CI-AAI Basin 1D-1 0.098 0.098 0.95 0.094 0.094 10 7.2 0.673 5.00 5.00 0.13 15 26.0 0.009 0.50 6.594 5.38 10 64 3.44 27.730 27.600 30.500 NA 2.770 NA CI-AAI Basin 1D-1 CI-AA3 CI-AA2 0.072 0.072 0.95 0.069 0.069 10 7.2 0.494 5.00 5.00 0.17 15 33.0 0.009 0.48 6.494 5.29 8 61 3.23 27.890 27.730 30.600 30.750 2.710 3.020 CI-AA3 CI-AA2 CI-AA2 Basin 1D-1 0.050 0.122 10.951 0.048 1 0.116 110 7.2 1 0.836 1 5.00 1 5.17 0.11 1 15 1 25.0 0.0091 0.52 1 6.725 5.48 12 68 3.73 27.730 27.600 30.750 25.700 3.020 1 -1.900 1 CI-AA2 Basin 1D-1 Pipe talcs Basins 1D-1.x1s.x1s Page 1 D 0 � o 0 0 NOTES: Project Turtle Creek -Phase 1.: ID-2 Computed By. ECG 1) Design method used is Rational Method Job #: 041.05.043 Checked By: EST 2) "X" denotes existing structure Location: Surf City, NC Date: 2/8/2007 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows 51 Velocity percent (%V) from hydraulic elements table 6) All pipe shall be HDPE unless otherwise noted TOTAL PIPE SECTION AREA (Acres) INC. AREA O I PEAK TIME OF CONCEN. PIPING INPUT PIPING DATA INVERT GRATE/RIM GRATE/RIM TO SUM RUNOFF ELEVATION ELEVATION INVERT un To INC. A x C To Inlet Upper Thru Dia. Length Man. Slope QfFull VfFull °a/ dQ %V Vactual Upper Lower Upper Lower Upper Lower FROM TO Inc. Ac Total Ac „C„ A x C Ac Year In/Hr. Qa (CFS) Pipe (Qa/ (VaNf FROM TO Ac (Min) End (Min) (1n) (Ft) „ „ n ° (/o) (CFS) (F/S) (F/S) End End End End End (Ft) End (Ft) Min x100) x100) BASIN ID-2 CI-AA4 CI-AA5 0.168 0.168 0.95 0.159 0.159 10 7.2 1.147 5.00 5.00 0.26 15 63.0 0.009 0.49 6.542 5.33 18 76 4.05 26.120 25.810 29.000 28.000 2.880 2.190 CI-AA4 CI-AA5 CI-AA5 CI-AA6 0.083 0.250 0.95 0.078 0.238 10 7.2 1.712 5.00 5.26 0.10 15 26.0 0.009 0.50 6.594 5.38 26 84 4.52 25.810 25.680 28.000 28.000 2.190 2.320 CI-AA5 CI-AA6 CI-AA6 Basin 1D-2 0.057 0.307 0.95 0.054 0.292 10 7.2 1 2.100 5.00 5.35 1 0.05 1 15 1 15.0 0.0091 0.47 6.371 1 5.19 1 33 1 89.5 4.65 25.680 25.610 28.000 25.700 2.320 0.090 CI-AA6 Basin 1D-2 Pipe Calm Basins 1D-2.x1s.x1s Page 1 Project: Turtle Creek - Phase 1: 1D Computed By: ECG 1) Design method used is Rational Method 5) Velocity percent (%V) from hydraulic elements table Job #: 041.05.043 Checked By: EST 2) "X" denotes existing structure 6) All pipe shall be HDPE unless otherwise noted Location: Surf City, NC Date: 2/8/2007 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows TOTAL PIPE SECTION AREA (Acres) INC. AREA 0 I PEAK TIME OF CONCEN. PIPING INPUT PIPING DATA INVERT GRATE/RIM GRATE/RIM TO SUM on RUNOFF ELEVATION ELEVATION INVERT To FROM TO Inc. Ac Total Ac INC. A x C Ac A x C Year In/Hr. Qa (CFS) To Inlet Upper Thru Pipe Dia. Length Man. Slope QfFull VfFull °�� %V Vactual Upper PP Lower U peer Lower Upper Lower "C" Ac (Min) End (Min) (In) (Ft) "n" (%) (CFS) (F/S) �aNf (F/S) End End End End End (Ft) End (Ft) FROM TO (Min X10 x100) x100) BASIN 1D-2 CI-21 CI-22 0.757 0.757 0.60 0.454 0.454 10 7.2 3.270 5.00 5.00 0.12 12 29.0 0.009 0.24 2.527 3.22 129 Qa>107% 4.17 27.040 26.970 31.040 31.070 4.000 4.100 CI-21 CI-22 CI-22 J13-4 0.137 0.895 0.74 0.102 0.556 10 7.2 4.001 5.00 5.12 0.34 15 132.0 0.009 0.70 7.786 6.35 51 101 6AI 26.970 26.050 31.070 30.600 4.100 4.550 CI-22 J13-4 JB-4 Basin ID-2 0.001 0.896 0.50 0.001 0.556 10 7.2 4.005 5.00 5.46 1 0.51 1 15 134.0 0.009 0.26 4.766 3.89 1 84 112.5 4.37 26.050 25.700 30.600 1 25.700 4.550 0.000 1 JIB-4 Basin 1D-2 Pipe Cales Basins 1D.xls.xls Page 1 CONDUIT OUTLET PROTECTION The Villages at Turtle Creek Stormwater Management High Density Permit Application RIP RAP APRON DESIGN SHEET DATE: October 31, 2007 03:39 PM SHEET ----2- OF -4 PROJECT: Tulle Creek I.D. NO.: V Curb OiifietC0.2 in de5u17A-7 DESIGNSY'. LAM PROJECT NO.: D41.05.043 FILE: Siff —star CHECKED BY: EST DESCRIPTION: Rip Rap Design LOCATION: Torn of3urfCky, Pander County, NC Rip Rap Zone Delineation 25 20 15 0 10 0 41 0 1 1 1 l I'I 11 1 1 I 1 11 11 1 1 1 I I 0 5 10 15 20 25 Do, Depth of Flow (ft) Notes: 1. Use nerd highermw for grades>10%. 2 For pipe Inch, arch, box divert, paved rhennal outlet% use Do=Craw sec5orad area of outletim. Number of Culverts: 1,; Design Velocity, Vd : 4:12 mre Flow. Q: 0:84-.rds (of —stashed) Pipe Diameter, Do : troe33 it Slope, s r,or,= 0.02 rt4L Using NCDOT Rip Rap Apron Design: Use: Zone 1 L1: 0.2499 ft. 1-2: 0.3332 ft. W: 6.0 ft. W: 6.0 ft. CLASS'N RIP RAP USE MINIMUM 12" STONE THICKNESS TOTAL STONE VOLUME= 1.5 ft3 2.0 ft ■ Design Point 'Based upon L1 `Based upon L2 MINIMUM CLASS L1 L2 STONE NCDOT RIP OF Coefficierd Coefficient THICKNESS ZONE RAP CLASS STONE R R in. 1 'A' FINE 3 4 12 2 .1 UGHT 3 B 18 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 8 36 5 2 HEAVY 10 38 6 2 HEAW 5 10 36 7 D b Beyond the Scopeof Thin Method L1 =Lmo to Protoot Culvert L2=Lwo to Prevent Scour Hole NAME I WEIGHT SIZE SPECIFICATIONS LG RIP -RAP CLASS 1 5200 30%SHALL WEIGH AT LEAST 60 LB3. EACH NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25 250 80%SHALL WEIGH AT LEAST 60 LBS. EACH NO MORE THAN 5% SHALL WEIGH LESS THAN 50 LBS. EACH EROS OLSTONE CLASSA 2-0" 10%TOP1B BOTTOM SIZES. NO GRADATON SPECFlED CLASS a I 1520D Ii1S NO GRADATION SPECIFIED I 03:40 PM Odoper 31.2007 I.D. NO.: DATE: - TuNeCreek .'. FILE: PROJECT. 041.05.043 LOCATION: pROJECTNO.:Re pest RI DESCRIPTION: Rlp Rai) Zone Dellneation w 25 20 1! .5 . Design Point STONE CLASS �' Coeifiraed THICKNE OF NCDOT COeificieM in. 12 Is STONE ZONE FINE 3 a s 24 P: 1 LIGHT 2 B MEDMM 4 335 S 3e 3 HFAW 4 1 HEAW 5 10 10 36 5e z HFAVY ndMe dThl. mem d 7 Hde L1 =L.0 m Pra t Sir L2 =Lsn0 Les. EAc 30%sHALLWEIGI'I ATS y604LESS DIASS 1 5-20d NO MORE nc�EpCH- CIp.SS2 25-250 CLASS A _ 0 5 lu of Flow ( ) Do, DePth to Grades pej d6 hannd eullata, ass Do=Criss sectional area o<cutle171w�. Notes: 1.11ca nmdh� h bmtdMatC Pa'r°d 2. For P" Number of Gtdllrtsl- 13.154 nt6 pesignVelacl►Y.Vd de lotramW"-hedl Flow, O: o. . 0833 n Pipe Diameter, Da � nm Slope. sew NCDOT Rip Rap Apron Design: Using Use: "Lone 2 L1: 0.2499 ft. La: 0.4996 fL W: 6.0 fL W: 6.0 ft. CLASS -B' RIP RAP THICKNESS .Based upon L1 USE MINIMUM i STONE 22 yt3 n I.a VOLUME,— tP "Based upon TOTAL STONE 4.5 RIP RAP APRON DESIGN SHEET DATE Oeftw31,2007 03:40 PM SHEET 4 OF - 4:-� � PROJECT: Turtle Creek I.D. NO.: Valley Curb Outlet CO-4 In Basin SA-3'-- DESIGN BY: LAM PROJECT NO.: 041.05.043 FILE: Stommxefer CHECKED BY: EST DESCRIPTION: Rip Rap Design LOCATION: Town of Surf City, Pender County, NC Rip Rap Zone Delineation 25 20 15 O 10 �9 2. For pipearoh,arch. boxcuWrL pwAd channelcutlem, use Dd=Crces aedwW areaaroumfl". Number of Culverts: i" Design Velocity, Vd : 4AB nr. Flow, Q: " 0.3e ore IQ from watershed) Pipe Diameter, Do: „ 0.0833 It Slope. 3= '' 0;02 RAL Using NCDOT Rip Rap Apron Design: Use: Zone 1 L1: 0.2499 ft. L2: 0.3332 ft. W: 6.0 ft. W: 6.0 ft. GLASS W RIP RAP USE MINIMUM 12" STONE THICKNESS TOTAL STONE VOLUME- 1.5 ft "Based upon L1 2.0 ft3 'Based upon L2 MINIMUM CLASS I L1 L2 STONE NCDOT RIP OF Coefficient Coefficient THICKNESS ZONE RAP CLASS STONE fL in. 1 'A' FINE 3 4 12 2 'B' LIGHT 3 a 16 3 1 MEDIUM 4 e 24 4 1 HEAVY 4 e 36 5 2 HEAVY 5 10 36 8 2 HEAVY' 5 36 7 nis nd the Sco eafThIs6 Metlrod L1 =Ler O to Protect Culred h 10 L2 =Lwat Prevent Scour Hole NAME I WEIGHT SIZE SPECIFICATIONS LBS RIP -RAP CLASS 1 5-200 30%SHALL WEIGH AT LEAST e0 Lee. EACH. NO MORE THAN 10%SHALL WEIGH LESS THAN 15LBS. EACH CLASS2 25-250 Go% SHALL WEIGH AT LEAST BO LBS.EACH. NO MORE THAN 5% SHALL WEIGH LESS THAN50LBS. EACH EROSION LSTONt CLASS 24r' 10%TOP 3 BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B 15-300 15_16. NO GRADATION SPECIFIED RIP RAP APRON DESIGN SHEET DATE: October 31. 2007 03:40 PM SHEET 1 OF 1 PROJECT: 'rurde Creek I.D. NO.: Sesint1B-42-HDPE --Basin DESIGN BY: ET PROJECT NO.: 041.05.043 FILE: Slormwater CHECKED BY: WGS DESCRIPTION: Rip Rap Design LOCATION: Town of SurfCsy, Pander Courdy, NC Rip Rap Zone Delineation 25 20 15 0 10 �9 5 0 1 1 1 1 I' I I 1 1 1 1 11 111 1 1 1 11 -1 I 0 5 10 15 20 25 Do, Depth of Flow (ft) Notes 1. Use nWitfohermne for Amin>1D16 2. For pipe arch, arch, box oulimt paved channel outieta, use De -Cross sectional arm of out dhow. ■ Design Point MINIMUM CLASS L1 STONE NCDOT RIP OF Coefficient LiCOeffiderd THICKNESS ZONE RAPCLASS STONE ft fL m. 1 'A FINE 3 4 12 2 .1 LIGHT 3 8 18 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 8 38 5 2 HEAVY 5 10 38 B 2 HEAW 5 10 36 7 Deign I. Beyond the Sco .of Thi Method Ll =LmIM to Protect Culvert L2=Lenpel to Prevent Scour Hole NAME I WEIGHT SIZE SPECIFICATIONS LBS RIP -RAP CLASS 1 5-200 30% SHALLWEIGH AT LEAST 80 LBS. EACH NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS EACH CLASS 2 25-25D 00% SHALLWEIGH AT LEAST 80 LBS. EACH NO MORE THAN 5% SHALL WEIGH LESS THAN 50 LBS EACH EROSION CONTROL STONE CLASSA 1 aB" 10% TOP& BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B 15J0D 5.15' NO GRADATION SPECIFIED Number of Culverts: - 1 Q = 68,75 _ CFS (From Pipe Caculetiom Wodmhad) Design Velocity, Vd : 16.52 Re Flow, Q: 68:75. cle (Q-CxixA) Poe Diameter, Da : as It Slope, sap,er,- C. 0.013', RBL Using NCDOT Rip Rap Apron Design: Use: Zone 5 L1: 17.5 ft. L2: 35 ft. W: 10.5 ft. W: 17.5 ft. CLASS 2 RIP RAP USE MINIMUM 38" STONE THICKNESS TOTAL STONE VOLUME= 551.3 83 'Based upon L1 1837.5 ft3 'Based upon L2 L RIP RAP APRON DESIGN SHEET DATE: October31,2007 03:40 PM SHEET 1 OF 1 PROJECT: Turtle Creek I.D. NO.: Benin lB-42-HOPE BypassDESIGN BY: ET. PROJECTNO.: 041.05.043 FILE Stomlweter CHECKEDBY: WGS DESCRIPTION: Rip Rap Design LOCATION: Town of Surf Cily, Perder Couft NC Rip Rap Zane Delineation 25 20 ZOI E M Z 7 15 Z N 5 ■ Design Point O 10 ZONE 5 ZO E 4t + N 2 O E 0 0 5 10 15 20 25 Do, Depth of Flow (ft.) MINIMUM CLASS L1 STONE NCDOT RIP OF CoafRcieM L1COOffici@nl THICKNESS ZONE RAP CLASS STONE TL fL in. 1 'A' FINE 3 4 12 2 .1 LIGHT 3 6 1a 3 1 MEDIUM 4 e 24 4 1 HEAVY 4 8 38 5 2 HEAVY 5 10 38 6 2 HEAVY 5 10 36 7 Design In nd the Sm of Thfs Method L1=Lenpai to Prater*Cuhrert L2 =Length In Prevard Scour Hde NAME WEIGHT I SIZE I SPECIFICATIONS RIP -RAP CLASS 1 5-200 30%SHALL WEIGH AT LEAST 50 LBS. EACH, NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 00%SHALL WEIGH AT LEAST Bo LBS. EACH. NO MORE THAN 5%SHALL WEIGH LESS THAN 50 LBS. EACH ROSION CONTROL STONE CLASS A I 24r 1-TOP & BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B 1 15-300 5-15' NO GRADATION SPECIFIED Wine: 1. Use rreld higher —for grades a10%. 2. For pipe arch, arch, bm culvert paved channel oule■, use Dc=Cross saawrial area oloLW1 w. Number of Culverts: 1.:. o= _; ee.7 CFSIF— Pip. Calcdafio-Wod■heet) Design Velocity, Vd ::. :..::::::.:: gii rtro Flow, Q::-.'':':` :68311c■ (0=CXI.XA) Pipe Diameter, De 3.5' It Slope s,= :.: AD033 WE Using NCDOT Rip Rap Apron Design: Use: Zone 3 LI: 14 ft. L2: 28 ft. W: 9.1 ft. W: 14.7 ft. (:IASS 1 RIP RAP USE MINIMUM 24" STONE THICKNESS TOTAL STONE VOLUME= 254.8 if 823.2 ft 'Based upon L1 *Based upon L2 RIP RAP APRON DESIGN SHEET DATE: October 31.2007 03'.40 PM PROJECT: Taiide Creek I.D. NO.: PROJECT NO.: 041.05.043 FIB DESCRIPTION Rip Rap Design LOCATION: Rip Rap Zone Delineation 25 20 5 0!11111il III ill III ill 111-41L� 0 5 10 15 20 25 D6, Depth of Flow (fL) Nobw 1.Usenexthlghermneforgradesa10%. 2. For pipe amh arch, hox wWrt Paved channeloutlets, 11Be Dy-Croaa wdanel area or oullettlaw. ..... ........... ... . ... .... Swan-JC---36° HDPEto BASIN Stormweter Town or SurfCdy, Pender County, NC ■ Design Poirrt SHEET 1 OF 1 DESIGN BY: ET CHECKEDBY: WGS MINIMUM CLASS IL, STONE NCDOT RIP OF Coefficient LCoefffciard THICKNESS ZONE RAPCLASS STONE R 1L in. 1 FINE 3 1 4 12 2 .1 UGHT 3 6 18 3 1 MEDIUM 4 B 24 4 1 HEAVY 4 B 38 5 2 HEAVY 5 10 36 B 2 HEAVY 5 1D 38 7 1 D ' nts Ind tha Sco ofThie McMod L7 =Length to Protect Cdved L2 =Leni to Prevent Smur Hole NAME WEIGHT SIZE SPECIFICATIONS Les RIP -RAP CLASS 1 5-200 30%SHALL WEIGH AT LEAST 60 LBS. EACH NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 25-250 50% SHALLWEIGH AT LEAST 60 LBS. EACH NO MORE THAN 5%SHALL WEIGH LESS THAN 50 LBS EACH EROSION CON STONE CLASS A 26" 10%TOP 3 BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B 15J00 5-14' NO GRADATION SPECIFIED Number of Culverts: :-.-1 Q= 252-- CFS(Fmm Pipe Caiculatlorre Worlrsheeq Design Velocity, Vd : sdz ma, Flow, Q: 26. crs (Q=CxlxA) Pipe Diameter, Da : 2.6. ft Slope, se = 4Xo04e talc Using NCDOT Rip Rap Apron Design: Use: Zone 2 L1: 7.5 ft. L2: 15 ft. W: 6.0 fl. W: 8.5 ft. CLASS'S' RIP RAP USE MINIMUM 1S' STONE THICKNESS TOTAL STONE VOLUME= 67.5 le `Based upon L1 191.3 ft3 *Based upon L2 RIP RAP APRON DESIGN SHEET DATE October31,2007 03'.40 PM SHEET 1 OF 1 PROJECT: Turtle Creak I.D. NO.: Main 1C'-30'HDPE Bvliass DESIGN BY: ET PROJECT NO, 041.05.043 FILE: Sbrmweter CHECKED Sr. WOS DESCRIPTION: Rip Rap Design LOCATION: Town or Surf CWy, Pender county, NC Rip Rap Zone Delineation 25 20 ■ Design Point �9 5 0 5 10 15 20 25 Do, Depth of Flow (ft.) Notes: 1. Use nmd Ngher zone for grades>10%. 2. For pipe arch, arch, box Merl, pored channel outlet, use Do-Cmea sarbonA area of outlatlbw. MINIMUM CLASS Ll STONE NCDOT RIP OF Cou ficierlt LiCOeffici@rd THICKNESS ZONE RAP CLASS STONE R in. 1 'A' FINE 3 4 12 2 8 LIGHT 3 8 18 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 8 38 5 2 HEAVY 5 10 38 8 2 HEAVY 5 10 38 7 DoWnb Beyondthe Scope of This Method L1-Length io P"""CuNarl L2= Length to Froward Seaur Halo NAME I WEIGHT SIZE ILERIP-RAP SPECIFICATIONS CLASS 1 5-200 30%SHALL WEIGH AT LEAST 50 Las. EACH. NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25250 80%SHALL WEIGH AT LEAST 80 LBS. EACH. NO MORE THAN 5% SHALL WEIGH LESS THAN 50 LBS. EACH EROSION CONTROL STONE CLASS A 2-5' 10%TOP & BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B ,.c 5-15' NO GRADATION SPECIFIED NumberofCuNerts: y Q= 25.2 CFs(From PlpsCAoubtloneWorbheaU Design Velocity, Vd : ' 6.82 mh Flow, Q: 25.20 cfe (Q-C xi xA) Pipe Diameter, Do: zs It Slope, e.—= ato25 rtm. Using NCDOT Rip Rap Apron Design: Use: Zone 2 L1: 7.5 fL L2: 15 R. W: 6.0 ft. W: 8.5 fL CLASS W RIP RAP USE MINIMUM 18- STONE THICKNESS TOTAL STONE VOLUME= 67.5 ft3 *Based upon L1 191.3 1? "Based upon L2 RIP RAP APRON DESIGN SHEET DATE: Octobx31.2007 03:41 PM PROJECT: Turtle Credo I.D. NO.: PROJECT NO.: 041.05,043 FILE: DESCRIPTION: Rip Rap Design LOCATION: Rip Rap Zone Delineation 25 20 41 0 II I� I I I I i I I I I I I I 1 I 1 1 1 0 5 10 15 20 25 Do, Depth of Flow (ft) Notes 1. use read Npher zone for wed.-10% 2. For pipe arch. arch. box culvert paved channel outle■, use Dd=Croea aecfonal area of outlet flow. .... .......... ...... . .. ... Basin 1C. TSWALE RIPRAP Stor—ter Town ofSudcigt. PandercountV. NC ■ Design Point SHEET 1 OF 1 DESIGN BY: ET CHECKED BY: WGS MINIMUM CLASS L1 STONE NCDOT RIP OF Coefficient LiCoeffiden THICKNESS ZONE RAP CLASS STONE (fL) (fl. In. i 1 'A' FINE 3 4 12 i 2 .1 LIGHT 3 6 1e 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 8 36 5 2 HEAVY 5 10 36 6 2 HEAVY 5 10 36 7 Deelanis Bmnd th eofThI.M.1had L14-t th to P"dW Culvert L2 �eMth lc PreventSccur Hub NAME WEIGHT SIZE SPECIFICATIONS RIP -RAP CLASS 1 5-200 30% SHALLWEIGH AT LEAST 60 LBS. EACH. NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 80%SHALL WEIGH AT LEAST 60 LBS, EACH, NO MORE THAN 5% SHALL WEIGH LESS THAN 50 LBS. EACH ERO CONTROLSTONE CLASSA 23" 10%TOP 8 BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B 1 15300 5-15' NO GRADATION SPECIFIED Number of Culverts: ' ai a= 2.05 CFS (From Pipe Calcuhtore Worksheeq Design Velocity, Vd SAO ILe Flow, Q:205' ch (Q=CxIxA) Pipe Diameter, De : 0,017 ft Slope, Saman=...... '.'. .' ' ' 0,032 fldL Using NCDOT Rip Rap Apron Design: Use: Zone I L1: 2.451 ft. 1-2: 3.268 ft. W: 6.0 ft. W: 6.0 ft. CLASS'A RIP RAP USE MINIMUM 12" STONE THICKNESS TOTAL STONE VOLUME= 14.7 ft3 *Based upon L1 19.6 ft3 `Based upon L2 RIP RAP APRON DESIGN SHEET DATE: November 1, 2007 0228 PM SHEET 1 OF 1 PROJECT: Turita Creel: ;..-. NO.: B88iii9C-1 IV HOPE UESIGN BY: JTR PRQJECTNO.: 041.05.043 FILE Sbmrweter CHECKED BY: EST DESCRIPTION: Rip Rap Design LOCATION: Town ofSud Cihr, Pender Coumy, NC Rip Rap Zone Delineation 25 20 10 ,v 5 0 0 5 10 15 20 25 Do, Depth of Flow (ft.) Notea: 1. Lim next Maher zone for grades>10%. -` 2 For pipe arch, arch, bu cuhrert pared channel ouflels, use Do=Cmas eedwal arm of outliltf— NumberofCulverts: a: '' Q= Design Velocity, Vd : 3.73 R!e Flow. Q: ::.:: 0.84 cre (Q=CxixA) Pipe Diameter. Do 1.25 It Slope, Ste= :: ,�::... - _0.0062 Rat Using NCDOT Rip Rap Apron Design: Use: Zone 1 L1: 3.75 fl. L2: 5 fL W: 6.0 ft. W: 6.0 ft. CLASS W RIP RAP USE MINIMUM 12" STONE THICKNESS TOTAL STONE VOLUME= 22.5 ft 30.0 ft ■ Design Point MINIMUM CLASS L1 STONE NCDOT RIP OF Coefficient LCOeffiderd THICKNESS ZONE RAPCLASS STONE ffL1 tfL) (in.) 1 'A' FINE 3 4 12 2 .1 LIGHT 3 a 18 3 1 MEDIUM 4 B 24 4 1 HEAVY 4 S 38 5 2 HEAVY 5 10 38 6 2 HEAVY 5 10 35 7 1 Deemis Beyond the Swm of This Method L1 =LengM to Protect CuWrt L2 =Lamm 10 Pravmrt Soour Hole NAME I WEIGHT SIZE SPECIFICATIONS LBS RIP -RAP CLASS 5-200 30% SHALL WEIGH AT LEAST SO LBS EACH NO MORE THAN 10% SHALL WEIGH LESS THAN 15 LBS EACH CLASS 25-250 00% SHALLWEIGH AT LEAST BD LBS EACH NO MORE THAN 5%SHALL WEIGH LESS THAN THAN 50 LBS EACH EROSION CLASS A 248' 10%TOP & BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B 15-300 5.15' NO GRADATION SPECIFIED 0.836 � CFS (From Pipe Calculellors Wodaheet) `Based upon L1 "Based upon LZ RIP RAP APRON DESIGN SHEET DATE: November 1, 2007 0227 PM PROJECT. Turtle Creek I.D. NO.: PROJECT NO.: 041.06.043 FILE: DESCRIPTION: Rip Rap Design LOCATION: Rip Rap Zone Delineation 25 20 4i 0T 1 1 1 11I 1 1 1 1 ill Ili ill I III I I 0 5 10 15 20 25 Do, Depth of Flow (fL) Notes: 1. Use nod higher mne ror wades >10%. 2. For pipe och, arch, bear cuNmt paved channel outleh, use De=Crow wctonal area of a" flow. Basin 110-2-15" HDPE Smrrnwater Town of Surf City, Ponder Covey, NC ■ Design Point SHEET 1 OF 1 DESIGN BY: JTR CHECKED BY: EST MINIMUM CLASS STONE NCDOT RIP OF CoeffieieM Li CoffffrIeni THICKNESS ZONE RAP CLASS STONE R in. 1 w FINE 3 4 12 2 .1 LIGHT 3 6 10 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 e 35 5 2 HEAVY 5 10 36 e 2 HEAVY s 10 36 7 DesianisB nd the Scene of ThN McMotl L7 =LenoM to Protect Cufm L2 =Lenprh to PreventSoour Hole NAME I WEKaTiT S� SPECIFICATIONS LBS RIP-FIAP CLASS 1 &200 30%SHALL WEIGH AT LEAST 60 LSS. EACH. NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 00%SHALL WEIGH AT LEAST 60 LBS. EACH NO MORE THAN 5% SHLLAWEIGH LESS THAN 50 LBS. EACH EROSION CON CLASS A 2.B' I 10%TOP 6 BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B 15300 5-15 NO GRADATION SPECIFIED Number of Culverts. 1 Q = at CFS (From Pipe Calculatlom Woduhwq Design Velocity, Vd : ass tta Flow, Q: 21O L16 (Q=C.i.A) Pipe Diameter, Do: 125 ft Slope, a_= 0A047 em Using NCDOT Rip Rap Apron Design: Use: Zone 1 L1: 3.75 ft. L2: 5 ft. W: 6.0 ft. W: 6.0 ft. CLASS W RIP RAP USE MINIMUM 12" STONE THICKNESS TOTAL STONE VOLUME= 22.5 ft3 30.0 ft 'Based upon Lt "Based upon L2 GE®TECHNICAL REPORT The Villages at Turtle Creek Stormwater Management High Density Permit Application EIVIRONWNTAL SEVIChS, INC• AD 524 5.13EW HCARp�NA 21610 MLEIGI-L 14orm 919212.1760 # PAX 919-212,1701 wwvaesi3►c.:�' 30 May 2006 Mr. Rob Walker, E•1. Cavanaugh & AssociatesS,1P a 202 13014061 Fro1rt Street, ESIP1ect # ER©6-04.Q1 Wilmington,NC 28401 Res Tarile Creels Phase 1 Soil Evaluation► North Carolina Pander County, lDsed Dear Mr. Walker: (ESI) conducted soil evaluationu C ty de Inc., k ro ect located near throughout the d 11 May 2006, Environmental Servicesthe Turtle Cent of hand -auger borings On 10 an disposal within Phase 1 of mining areas for stortnwater lisp n included the advancem conducting North Carolina. This evaluated urisdictional areas. These evaluations included con County, as well as a determining infiltration rates by raucously determined td be non j site in areas previously high water cable (SHW r) the depth to seas tests. anelTt of d hydraulic conductivity (9-d) included the U.S. Dep in -situ saturatetrio field investigation United Status Geological Survey information reviewed Prior to of the site evaluated are Available Fender County, North CaratirraN�,Che areas uadrangle (Holly Ridge based on the Soil Survey of Agriculture Soit Survey o plfic q ry n and Craven soils (NicC) Uv 7-.5-minute topogra On and 1Na y ( flue sand (on) ) mapped as Onslow loamy ponder County. North CarodinA' (BGS) across and surface ('B soil neater than 60 inches below the gromre. color; structure; Soil I-Voly atior* to a depth of g sent) of a SIiWTI and Soil borings were advancedwere characterized for the following depth (if 1 till and thickness of any restrlctive horixdn(s) if present; ep the p%I�t ate. The borings . d��' depth landscape position. fine sand series. 'chase areas through 5 Similar to the Onslow loamy contain inclusions of E.raluation Are 5 are generall n soil series and may with textures y Soils within the areas 1 �' een the Onslow and 1blarvY from 8 � 10 inches >3GS nemlly Weak are generally at the transition betty nd to depths ranging horizons exte Soil structure within the surface horizons is ge marvyn soils. The surface fine sand. xtend from depths ranging from 8 to 10 inches BGS to 15 ro generally consisting of loamy ions a Soil structure within the subsurface consisting of loamy fine sand. within the subsurface medium granular' The subsurfacee ally n 60 inches BGS with 28 inches BGS with textwes granular. Scattered concretions were the nemlly weak medium f thin these horizons horizons is ge loam to sandy clay loam. Soil structure wi ns. The subsoil horizons errand from 15 to 28 inches to p horizo from fine lar blocky textures generally rouging granular to weak fine subangu renges from weak medium . IOH ' CIiARLdfTR • pEHEViId.1s ]ACRSGNV[LLE 0 5r. ApGUSTINY ■ COCOA • ]UPIUR • t)EST[N 0 SAVAN"AH • Nn ANrA �� ENVIRONMENTAL SERVICES, INC. Turtle Creek Phase I Soil Evaluation 30 ivsay 2006 Page 2 of 3 Restrictive horizons were not observed within 60 inches of the soil surface within the areas evaluated. Evidence of a SHWT was observed at depths ranging from 24 to 33 inches BGS. Topography within these areas is generally flat to moderately sloping with slopes ranging from 0 to 5%. Evaluation Area 6 Soils within area 6 are generally similar to the Woodington fine sandy loam series. The surface horizons extend to a depth of 12 inches BGS with textures generally consisting of fine sandy loam. Soil structure within the surface horizons is generally weak medium granular. The subsurface horizons extend from depths ranging from' I2 inches to greater than 60 inches BGS with textures generally consisting of fine sandy loath. Soil structure within the subsurface horizons is generally weak medium granular. Restrictive horizons were not observed within 60 inches of the soil surface within the areas evaluated. Evidence of a SHWT was observed within 12 inches of the soil surface. Topography within these areas is generally flat with slopes ranging from 0 to 2%. An on -site soil evaluation was conducted on 25 May 2006 with Mr. Vincent Lewis of the N.C. Department of Environment and Natural Resources (NCDENR) — Division of Soil and Water Conservation. The SHWT depths, as approved by Mr. Lewis, are listed below in Table 1. Table 1. Seasonal High Water Table Depths Soil Boring at Kt Test Location Seasonal High Water Table De the inches BGS ic.t 30 Knt 2 29 3 28 I�„ 4 33 s.r S 24 <12 Soil Borin 7* 24 *Soil boring and SHWT determination conducted during field visit with Mr. Vincent Lewis of the NCDMgR Division of Soil and Water Conservation Iln%ltration Rates Infiltration rates were treasured at six locations on the project site. Y,. measurements were conducted with a compact constant head permeameter (cchp). These measurements were conducted at soil depths ranging from 17 inches to 28 inches BGS. The measurement locations were areas that may be potentially used for wastewater infiltration basins and/or stonnwater infiltration devices. A detailed soil profile description was completed at each test location. The in -situ K., values were calculated based on field measurements using. the Glover Equation. Km measurements ranged fiem 7.75 gallons/day/square-foot (gpd/f?) to 72.I5 gpd/ft (0.52 inches/hour (in/hi) to 4.82 in/hrj. Table 2 summarizes the in -situ Ks,, measurements for each location and includes, location; depth and horizon; hydraulic conductivity test method used; and conductivity measurement at each Iocation. WATERSHED CLASSIFICATION The Villages at Turtle Creek Stormwater Management High Density Permit Application State of North Carolina Department of Environment and Natural Resources division of Wa*r [duality WAT.ERSgED CLASSIFICATION AT A ACEM, NT Ate*-ol<alages mane to this form will result in the application Wag returned. busFczBMnoraEPxrozacOPMDFOX MEASANORNGIMAP INSTRUCTIONS., To determine the olugflcatiou of the watarabed(s) in which the subject project w111 be located, you are required to subrak this form, with Items 1 tbrough 8 completod, to the appropriate Divisien of Water Quality Regloual Office Watex Quality Supervisor (see Page 2 of Z) prior to submittal bf the application for review. At a minimum, you nmK include an 8.5" by 1 V copy oS• ttse portion of a 15-minute U809 Topograpbio Map ft shows the surfhoa waters i awadiately downslops of the project, You must ident* the location of the project arA the oiosest dermmWe sur&ce waters (waters for which you are requesting the classification) on the submitted map oopy. If the fieellity is located in tM Neuse River 2 adn, also include a copy of the soil stoney map for the prQjea location. TAW, Corresponding nou-discharge application may not be submitted sotto this form le cvxnplet ad by the appropriate regionaloffice and incladed 1iitlt the submittal. . 1. Applioanfs n oxnb (rlAMO of 01e,00nioipallty, eearpo:latio% individuial, eta): Dflabalmer 00tntg1 . h . 2, Name and complete addre: s of appiloant: Dflsheimrx Comma itias Inc (Tom Minim) - 401 City AW bite 71 Q CSty: Bala Cs:ntvyi —. state: PA— Zip.- 19004 Telephone number, ( 610 ) 617. 9700 -- ' Paesitnil6==ter. (610) 617,2233 3. Project mane (nauae of the subdivision, faollity or establia mett, etc.): TheMe¢e t , 3L8 Creek. 4. Cutmly where project is lo:.ated: Pander Cosy 5. Nmw(s) of closest Rw*e waters. BI Cree 6. River basins) in which th.- project is located; Pape ge Ram 'ver Basin 7. Topograpbic map name said data: U - C• A � 27' %.-T /]N 77 35' 35" `°°�°sEo160aRr g. North Carolina Profession ai Faugineer's seal, sipat m. and slate: ,� ' O TO'. REGIONAL OFFICEWAXER QUALrry SUPERVISOR Please provide me with the d3wifiii4ation,(s) of the :uudaoe waters, 'wa (s), end appropriate river basins) where these nodvitWo. will occur, as I dWified on the attached map segme,at: . Names) of surface waters anti ricer basia(s)t , LKV S LEM& OIL r �Al� Classi£ioation(s) (as established by the BMC): 2-Aft m Proposed classification($), if applicable: -- �— River bash buffer tales, if hir*ceb[o: Ak 96 w►It& Signahlre pf rogioritll office persannasl•Affim FORM: WSCA 10199 . Page 1 of zoo rlr-- SITE LOCATION MAP The Villages at Turtle Creek Stormwater Management High Density Permit Application , ;. r Ora �� •. Zr t ml 70 0— vA sit;. r� L4 h�_ . _ •: dry : 4 1� a e_ 10 1 � •F•Y •�"• •li. - Y •� ti5. [/l ell• fin_ �[}q� � ' }�'i;.' y:' � A . . .�. ti: - - fit•' a� 7�'•. `,F � �X:-•,7 _---- ...------- - - _ . • . ,err.• � t�� ~�- � � � ✓�.'i � � _ ' ... LYiI Lu .r�U Na I 1-3j In uj Lo Lnu 0 J J ? LU I DRAINAGE AREAS "I I co , C0 4 CO 2 ,4F?EA 1 D-2 AREA 1 D-1 Z s AREA 1 D-2 i t QC � r 3 AREA 1C oI o y e AREA 1B W w �L Z AREA 1 B � o N o W LU AREA 1A-2 AREA 1 A-3 DRAINAGE !I AREAS pppnpp AREA 1 A-1 r L Re: The Villages at Turtle Creek SW8 060608 Subject: Re: The Villages at Turtle Creek SW8 060608 From: Linda Lewis <linda.lewis@ncmail.net> Date: Wed, 17 Oct 2007 09:06:02 -0400 To: Eric Tomczak<eric.tmczak@cavanaughsolutions.com> CC: Janet Russell <Janet.Russell@ncmail.net> Eric: If timing is a concern, please schedule the review of the project modification through Janet Russell in Express. We accepted your word back in August that this was a plan revision, so you did yourself a disservice by not submitting as a modification. Please keep in mind that if ANYTHING changes in regard to drainage area, BUA, BMP sizing, BMP layout, elevations, number of lots, road width, etc, such that the permit has to be rewritten to account for these changes, a MODIFICATION is required. If you're ever in doubt the best thing is to submit a permit modification. If, after it is reviewed, we decide later on that a mod isn't required, you don't lose anything. If you submit as a plan revision first, and then we determine that a modification is needed, you lose that place in line because technically, we have not received a permit modification yet. Linda Eric Tomczak wrote: Linda, My concern is timing. Would I loose my spot in the queue...? If I got the submission to you early next week, could I keep this spot..? Thanks Eric T -----Original message ----- From: Linda Lewis [mailto:linda.lewis@ncmail.net] Sent: Wednesday, October 17, 2007 8:51 AM To: Eric Tomczak Subject: Re: The Villages at Turtle Creek SW8 060608 Eric: There's nothing to discuss. This is a permit modification. Linda Eric Tomczak wrote: Linda, The areas are increasing acres to 0.89 acres (871 sf) for Basin 1D-1 acres (9,583) for Basin 1D-2. The overall for this area has not albeit slightly from 0.87 and from 1.85 acres to 2.07 stormwater plan and intent 1 of 3 10/17/2007 9:06 AM Re: The Villages at Turtle Creek SW8 060608 been changed and the proposed basins volumes as shown can accommodate this. We are not trying to circumvent any regulations. The changes are minimal to the plans the basin are in the same general location. There was some adjustment to the numbers changed what was originally proposed. Can I come down to discuss detail..? Sincerely, Eric Tomczak but nothing that greatly this with you in greater -----Original Message ----- From: Linda Lewis [mailto:linda.lewis@ncmail.net] Sent: Friday, October 12, 2007 2:57 PM To: Eric Tomczak Subject: The Villages at Turtle Creek SW8 060608 Eric: On August 10, 2007, the Division received a request to approve a plan revision regarding the subject project. After comparing the revised plans to the approved plans, I note that the drainage area for Basins 1D-1 and 1D-2 are both increasing. This type of change will require a permit modification and cannot be approved as a plan revision. Please submit a full permit modification to account for the increased drainage areas, to include revised calculations, completed application 10/17/2007 9:06 AM Re: The Villages at Turtle Creek SW8 060608 and supplements, Linda and the required fee of $505.00. 10/1.7/7.007 9:06 AM August 27, 2007 Mrs. Linda Lewis Environmental Engineer NC Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stormwater Permit No. SW8 060608 Modification The Villages at Turtle Creek - Phase 1 and 2 High Density Subdivision Project Pender County Dear Mrs. Lewis: G� CAVANAU G H Solutions through integrity and partnership Via Hand Delivery Enclosed with this correspondence, please find one (1) copy of the `Partial Designer's Certification' for the aforementioned project, specifically the stormwater appurtences located within Phase 1A as identified on the attached Final Plat and Phase 1 — Overall Stormwater Plan which is the partial tributary area to Stormwater Basin 1 B. This certification identifies compliance with the approved permit for this area only in order to obtain 'Certificate of Occupancies' for the lots located within Phase 1A as indicated within Item #9 of the 'Schedule of Compliance' of the approved Stormwater Management Permit. It is important to note that due to the large scale nature of this project, the project was phased through the construction process in order to obtain Certificate of Occupancies prior to the completion of the entire project. Should you require any further information in regards to the matter, please don't hesitate to contact the undersigned. Sincerely, CAVANAUGH & ASSOCIATES, P.A. Eric S_ Tomczak, P.E. AUG 27 2007 ?0, CAVANAUGH AUG ] Solutions through integrity and partnership August 10, 2007 Mrs. Linda Lewis Environmental Engineer NC Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Via Hand Delivery Re: The Villages at Turtle Creek — Phase 1 & 2 SW8 060608 Modification Dear Mrs. Lewis: Enclosed with this correspondence, please find two (2) sets of the revised DWQ Stormwater Permit plans for the above referenced project, specifically for the Amenity Area within Phase 1. These plans are being submitted for a revision to the Amenity Area in order to relocate parking across the drive aisle, southwest of the main entrance to the Clubhouse, so that pedestrians will not have to cross the drive aisle. Based on the limited changes to the permitted plans, our office is submitting this as a revision and is requesting acceptance documentation for the change. Should you have any questions or require additional information during your review, please do not hesitate to contact the undersigned. Sincerely, CAVANAUGH & ASSOCIATES, P.A. Eric S. Tomczak, P.E. Cc: J.B. Dilsheimer Tom Miner The Villages at Turtle Creek SW8 060608 Subject: The Villages at Turtle Creek SW8 060608 From: Linda Lewis <linda.lewis@ncmail.net> Date: Fri, 12 Oct 2007 14:57:19 -0400 To: Eric Tomczak<eric.tmczak@cavanaughsolutions.com> Eric: On August 10, 2007, the Division received a request to approve a plan revision regarding the subject project. After comparing the revised plans to the approved plans, I note that the drainage area for Basins 1D-1 and 1D-2 are both increasing. This type of change will require a permit modification and cannot be approved as a plan revision. Please submit a full permit modification to account for the increased drainage areas, to include revised calculations, completed application and supplements, and the required fee of $505.00. Linda 1 of 1 10/12/2007 2:58 PM