HomeMy WebLinkAboutSW4211201_Plansheet EC4.0 - Misc. Detail_20220113FILTER
FABRIC
24"
COMPACTED FILL OR
GRAVEL, EXTENSION '
OF FABRIC AND WIRE
INTO THE TRENCH
ISOMETRIC VIEW
FIL TER
FABRIC
BACKFILL
MINIMUM 8"
THICK LAYER \
OF GRAVEL \tea
8"MINIMUM
V TRENCH
14 "MINIMUM
SECTION
6 FTI� O vo
4,
EXTENSION OF
FABRIC AND WIRE
INTO THE TRENCH
Practice 6.62
SF
NTS
STEEL FENCE POST
WIRE FENCE -
HARDWARE CLOTH,
rw Tr-R nT- 1" DIAMETER
-ONE
BURY WIRE FENCE —
AND HARDWARE CLOTH
COMPACTED
FILL
8"MINIMUM
SECTION
FIL TER
FABRIC
STEEL POST
36" ABOVE
24" BELOW
4"MINIMUM
SECTION
FILTER FABRIC
ON GROUND
C:�D p C3 0 O o �0� 00 O C:?Doc O o 8 ovC7 o0o COp Op O
p 0 O OO p o
pp o O
000p op
alp O
O �O al
v 8 0 0 oO
�o 001
po� o� �
0 o c oo 00 0 0
PLAN
SILT FENCE
4' MIN.
MIN. 10 GA
LINE WIRES
Top of Silt Fence MustIII -
Be at Least 1' Above thej :
Top of the Washed Stone
STILL FENCE POST SET MAX. 2' APART
FRONT VIEW
0SILT FENCE OUTLET
NTS
MIN. 12-1 /2 GA. I
INTERMEDIATE
WIRES
071 BURY WIRE FENCE,
FILTER FABRIC
AND HARDWARE
CLOTH IN TRENCH
PUBLIC ROAD
6" MINIMUM
—
THICKNESS
2"-3" COARSE--'
AGGREGATE
GRAVEL CONSTRUCTION
ENTRANCE, WIDTH
12'MINIMUM AS REQUIRED
TEMPORARY GRA VEL CONSTRUCTION
ENTRANCE/EXIT DETAIL
Practice 6.06
cE NTS
EXCELSIOR WATTLE
m
z
N
�Cl)
N m
Z co
D
z
Z D
N x
1 o
ao
rD
r
-I z
�o
O n
zo
x
MATTING
5
BACK
SLOPE
ISOMETRIC VIEW
DOE OF PAVEMENT
2'(MAX.) 2' UPSLOPE
STAKE NATURAL GROUND
MATTING �•
2' DOWNSLOPE
CROSS SECTION STAKE
2 IN. 2' UPSLOPE
STAKE NATURAL GROUND
T
MATTING _2' DOWNSLOPE
CROSS SECTION STAKE
TRAPEZOIDAL DITCH
_/ fl1 -
i (ice \� �
�'i-i
��iiuiiii� 10�
MATTING IN DITCHES
FLOW
TOP ELEVATION OF STORMWATER
#5 WASHED
_ STONE —
EXIS171VG SLOPE
FRONT VIEW
NOTE. REMOVE SEDIMENT ACCUMULATION FROM BEHIND CHECK DAMS TO PREVENT
DAMAGE TO CHANNEL VEGETATION. FLOW SHOULD BE MAINTAINED THROUGH THE
DAM.
0
NOTES:
USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE.
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL
CROSS SECTION.
ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT
WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE
STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE
FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON
BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE
STANDARD SPECIFICATIONS.
`STAKES STAPLES
INSET A INSET B
TOP VIEW
EXISTING
(MIN.) GROUND
BACKFILL
6"
(mxN.r
STAPLES ON
V CENTERS
OQ IN TRENCH
5�
6" MIN
MATTING SHALL BE STAPLES ON
PLACED IN TRENCH V CENTERS
AND BACKFILLED IN TRENCH
NAGRAM �A
MATTING ON SLOPES DAG \AV \\Ej1
NOTES:
THIS DETAIL APPLIES TO STRAW, EXCELSIOR, AND PERMANENT SOIL REINFORCEMENT MAT (PSRM) INSTALLATION.
STAPLES SHALL BENO 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1
INCH AND NOT LESS THAN 6 INCHES IN LENGTH.
Staple Check Pc:iier
99
staple
m(GHAM �c)
STANDARD CHECK DAM
0NTS
z
o�
Q
Q
I.L.J�HZ
oo�=
w QQL.L=
Q O N
H
cnH-w0�
O�CAQ
CC
wo
o
00
Z ~
Q J
CC J
0 Q
0 F-
cr N
Q z
0
z
Q
00z
N
co F-
J
CD �
w
PM
TM
SHEET 1 OF 1 SHEET 1 OF 1
NOT TO SCALE
11 1631"01
3XDo
O�,,
�i�:� a
CL B RIP -RAP
VARIES
SIDE VIEW
CONSTRUCTION NOTES.
HEIGHT & WIDTH DETERMINED BY
EXISTING TOPOGRAPHY AND
SEDIMENT STORAGE REQUIRED.
KEY RIP RAP INTO THE DAM
FOR STABILIZATION.
EXISTING GROUND
STEP SEQUENCE
Lo
000000C W
O ° o ° o C) C SEE CHART FOR DIMENSIONS
0 (DO) 00000(
DOD
OUTLET PIPE DIAMETER
d50 = 8" TO 9"
dMAX = 12"
La = LENGTH OF APRON
MIN. APRON THICKNESS = 1.5"
NOTE GEOTEX NONWOVEN FILTER FABRIC TO
BE PLACED UNDER ALL STONE
OUTLET PROTECTION.
RIP RAP
DIMENSIONS
PIPE ID
Lo X W X TH
CLASS
QUANTITY
0+34
10' X 11. 5' X IS
B
11 TONS
6+93
9' X 10.3' X 1.5'
B
9 TONS
OUTLET PROTECTION DETAIL
0NOT TO SCALE
MA T TI NG SPECI FI CA TIONS:
TEMPORARY MATTING TM
WOVEN BIODEGRADABLE JUTE NET ONG
• 100% STRAW FIBER MATRIX
• NORTH AMERICAN GREEN S15OBN OR EQUIVALENT
PERMANENT SOIL REINFORCEMENT MATTING PM
UV STABLE POLYPROPYLENE TOP & BOTTOM NETTING W11H UV —STABLE
POLYPROPYLENE CRIMPED CENTER NET
• 70% STRAW AND 30% COCONUT FIBER MATRIX
• NORTH AMERICAN GREEN SC250 OR EQUIVALENT
CONSTRUCTION
GRADE SURFACE OF INSTALLATION AREA SO THAT GROUND IS SMOOTH AND
LOOSE. SEED PRIOR TO INSTALLATION FOLLOWING THE SOIL STABILIZATION
GUIDELINES REMOVE LARGE ROCKS, DIRT CLODS, STUMPS, ROOTS, GRASS
CLUMPS, TRASH, AND OTHER OBSTRUCTIONS FROM SOIL SURFACE BEFORE
INSTALLA 11ON.
TERMINAL ANCHOR TRENCHES ARE REQUIRED AT ENDS AND INTERMEDIATE
TRENCHES MUST BE CONSTRUCTED AT 25—FOOT INTERVALS TERMINAL AND
INTERMEDIATE ANCHOR TRENCHES SHOULD BE MIN. 6 INCHES IN DEPTH AND 6
INCHES IN WIDTH. ANCHORING DEVICES SHALL BE 11 GAUGE, MIN. 6 INCH BY 1
INCH STAPLES OR 12 INCH MIN. WOODEN STAKES
SPLICE ROLL ENDS BY OVERLAPPING UPSIREAM ROLL AT LEAST 12 INCHES
ON TOP OF DOWNSTREAM ROLL.
SOIL STABILIZATION GUIDELINES
SEEDBED PREPARATION
1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL
CONDITIONS IF AVAILABLE
2. RIP THE ENTIRE AREA TO SIX INCHES DEEP.
J. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACE
REASONABLY SMOOTH AND UNIFORM
4. APPLY AGRICULTURAL LIME, FEI IILIZERR AND SUPER-HPHOSPHATE UNIFORMLY AND MIX WITH
SOIL (SEE MIXTURE BELOW.
5 CONTINUE DLLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS
PREPARED FOUR TO SIX INCHES DEEP.
6 SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING
EQUIPMENT OR CULTI-PACK AFTER SEEDING.
7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH.
IL INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE
PLANTING SEASON, IF POSSIBLE IF STAND SHOULD BE MORE THAN 60% DAMAGED,
RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES
9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND
FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED
1O CONSULT S&EC ENVIRONMENTAL ENGINEERS FOR ADDITIONAL INFORMATION CONCERNING
OTHER ALTERNATIVES FOR WG ETA71ON OF DENUDED AREAS THE BELWO WGETA71ON RATES
ARE THOSE THAT DO WELL UNDER LOCAL CONDIDONSy OTHER SEEDING RATE COMBINATIONS
ARE POSSIBLE.
MIXTURE
AGRICULTURAL LIMESTONE 2 TONS/ACRE (3 TONS/ACRE IN CLAY SOILS)
FERTILIZER 1,000 LBS/ACRE - 10-10-10
SUPERPHOSPHATE 500 LBS/ACRE - 20% ANALYSIS
MULCH 2 TONS/ACRE - SMALL GRAIN STRAW
ANCHOR ASPHALT EMULSION AT 300 GALS/ACRE
SEEDING SCHEDULE
FOR SHOULDERS: SIDE DITCHES. SLOPES (11 MAX):
DATE TYPE PLANTING RATE
AUG 15-NOV 1 TALL FESCUE 300 LBS/ACRE
NOV 1-MAR 1 TALL FESCUE & ABRUZZI RYE 300 LBS/ACRE
MAR 1-APR 15 TALL FESCUE 00 LBS/ACRE
APR 15-M 30 HULLED COMMON BERMUDAGRASS 25 LBS/ACRE
JIL 1-AUG 15 TALL FESCUE AND 125 LBS/ACHE
BROWNTOP MILLET OR 35 LBS/ACRE
SORGHUM-SUDAN HYBRIDS*** 30 LBS/ACRE
FOR SHOULDERS: SIDE DITCHES, SLOPES (11 TO -9. 1).
DATE TYPE PLANTING RATE
MAR 1-JJN 1 SERICEA LESPEDEZA (SCARIFIED) 50 LBS/ACRE
AND USE THE FOLLOWING
COMBINATIONS:
MAR 1-APR 15 ADD TALL FESCUE 120 LBS/ACRE
MAR 1-JJN 30 OR ADD WEEPING LOVE GRASS 10 LBS/ACRE
MAR 1-a/N 30 OR ADD HULLED COMMON
BERMUDAGIRAS 25 LBS/ACRE
AIN 1-SEPT 1 TALL FESCUE AND 120 LBS/ACRE
BROWNTOP MULLET OR 35 Les/ACRE
SORGHUM-SUDAN HYBRIDS*** 30 LBS/ACRE
SEPT 1-MAR 1 SERICEAA LESPEDEZA
(UNHULLED - UNSCAINED) AND 70 LBS/ACRE
TALL FESCUE 120 LBS/ACRE
NOV 1-MAR 1 AND ABRUZZI RYE 25 LBS/ACRE
***TEMPORARY: RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT
VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW MORE THAN 12m IN HEIGHT
BEFORE MOWING; OTHERWISE; FESCUE MAY BE SHADED OUT.
FOR WELL -KEPT HIGH-VISIBIUTY AREAS (INCLUDING BUT NOT LIMITED TO DRY
OEI 17ON BASIINSy LAWN$ AND/OR SIDEWALK BERMS -
DATE TYPE PLANTING RATE
AUG 15-NOV 1 CEWTIPEDEG BASS 10-20 LBS/ACRE
APR 15-&W 30 HULLED COMMON BERMUDAGRASS 25 LBS/ACRE
SPRIGGING PLANT SPRIGS IN FURROWS WITH A TRACIOR-DRAWN TRANSPLANTOR, OR
BROADCAST BY HAND. FURROWS SHOULD BE 4-6 INCHES DEEP AND 2 FEET APART.
PLACE SPRIGS ABOUT 2 FEET APART IN THE ROW WITH ONE END AT OR ABOVE GROUND
LEVEL. BROADCAST AT RATES SHOWN ABOVE; AND PRESS SPRIGS INTO THE TOP
ONE-HALF TO 2 INCHES OF SOIL WITH A DISK SET STRAIGHT SO THAT SPRIGS ARE NOT
BROUGHT BACK TOWARD SURFACE DO NOT MULL. FERTILIZE VERY SPARINGLY WITH
20 LBS/ACRE NITROGEN IN SPRING WITH NO PHOSPHORUS SODDING IS ANOTHER
OPTION.
TEMPORARY SEEDING
1. COMPLETE GRADING BEFORE PREPARING SEEMS AND INSTALL ALL NECESSARY
EROSION CONTROL PRACII= SUCH AS DIKES, WATERWAYS AND BASINS
2 MINIMIZE STEEP SLOPES BECAUSE THEY MAKE SEEDBED PREPARATION DIFFICULT
AND INCREASE THE EROSION HAZARD.
,L IF SOILS BECOME COMPACTED DURING GRADING LOOSEN THEM TO A DEPTH OF
6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW. SEEDBED PREPARATION
GOOD SEEDBED PREPARATION IS ESSENTIAL TO SUCGESnL PLANT
ESTABLISHMENT. A GOOD SEEDBED IS WELL -PULVERIZED, LOOSE AND UNIFORM.
WHERE HYDROSEEDING METHODS ARE USED, THE SURFACE MAY BE LEFT WITH A
MORE IRREGULAR SURFACE OF LARGE CLODS AND STOVES
4. LIMING - APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS IF THE PH
(ACIDITY) OF THE SOL IS NOT KNOW, AN APPLICATION OF GROUND
AGRICULTURAL LIMESTONE AT THE RATE OF 1 TO 1 1/2 TONS/ACRE ON
COARSE -TEXTURED SOILS AND 2-3 TONS/ACRES ON FINE -TEXTURED SOILS IS
USUALLY SUFFICIENT. APPLY UMESTONE UNIFORMLY AND INCORPORATE INTO THE
TOP 4-6 INCHES OF SOIL SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE
LIMED.
S FERTIUZER- BASE APPUCA71ON RATES ON SOIL TESTS WHEN THESE ARE NOT
POSSIBLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-4000 La/ACRE BOTH
FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF
SOIL IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE
THAN 30 MINUTES BEFORE APPLIC4710V.
6. SURFACE ROUGHENING- IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A
LOOSE SURFACE ADDITIONAL ROUGHENING MAY NOT BE REQUIRED EXCEPT TO
BREAK UP LARGE CLODS IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED
OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISIONG RAKING, HARROWING
OR OTHER SUITABLE METHODS GROOVE OR FURROW SLOPES STEEPER THAN .11
ON THE CONTOUR BDIORE SEEDING (PRACTICE 6.04 SURFACE ROUGHENING).
Z SEED: RYE (GRAIN) AUG 15 - MAY 1
GERMAN MILLET MAY 1 - AUG 15
8. SEEDING - EVENLY APPLY SEED USING A CYCLONE SEEDER (B ROADCASI), DRILL.
CUUIPACKER SEEDER, OR HYDROSEEDER USE SEEDING RATES GIVEN IN TABLE
6.10A-6.10I BROADCAST SEEDING AND HYROSEEDING ARE APPROPRIATE FOR
STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS
NOT RECOMMENDED BECAUSE OF THE DIFFICULTY IN ACHIEVING A UNIFORM
DISTRIBUTION. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN 1 INCH DEEP,
AND GRASSES AND LEGUMES NO MORE THAN 1/2 INCH. BROADCAST SEED MUST
BE COVERED BY RAKING OR CHAIN DRAGGING AND THEN LIGHTLY FIRMED WITH A
ROLLER OR CULTIPACKER. HYDROSEEDED MIXTURES SHOULD INCLUDE A WfI
FIBER (CELLULOSE) MULCH.
9. MULCHING - THE USE OF APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT
UNDER NORMAL CONDITIONS AND IS ESSENTIAL TO SEEDING SUCH UNDER
HARSH SITE CONDITION (PRACTICE 6.14, MULCHING HARSH SITE CONDITIONS
INCLUDE: SEEDING IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT
CONSIDERED ADEQUATE FOR THIS USE), SLOPES STEEPER THAN 3:1,
EXCESSIVELY HOT OR DRY WEATHER; ADVERSE SOILS (SHALLOW, ROCKY, OR (HIGH
IN CLAY OR SAND), AND AREAS RECEIVING CONCENTRATED FLOW. IF THE AREA
TD BE MULCHED IS SUBJECT TO CONCENTRATED WATERFLOW, AS IN CHANNELS,
ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING).
Cmo*SD
ENGINEERING
LICENSE # C-2710
ENGINEERING
LAND PLANNING
COMMERCIAL / RESIDENTIAL
P.O. BOX 1250
WENDELL, NC 27591
(910) 791-4441
eo
W
0
m
Q
J
Q
0
W
o V
Q =Q
o �
W �
Z a
o
co
.+ J cn
Z 3
W W z
Z
QLmn
m
zo
Ad
o C7
W
as
00
NI
C A RO ii�1
41 ofESS%' =
E
032721
A111I111111%
PLAN NOT RELEASED
FOR CONSTRUCTION
DA TE: 1012612021
HORZ. SCALE: 1" = 20'
VERT. SCALE: 1" = 2'
DRA WN B K SHA
CHECKED BY- JFO
PROJECT NO.: 21-0577
Sheet EC4.0
Sheet No. 6 OF 7