Loading...
HomeMy WebLinkAboutSW5211202_Supplement-EZ Form_20220203SUPPLEMENT-EZ COVER PAGE FORMS LOADED PR'OdEC'C (f (FORMATION 1 Pro Name —_ �..�_ _. _ Nnh 07 2 _._ Project Area�ac�_^ _ _� 23.3 3 Coastal wetland Area 4 Surface Water Area (ac) _— _ 0 �5 6 Is this High or Low Density? F_— _ w_. _ Does this project use an off -Site SCM? Lam`' No )MPLIANGE WITH 82N A003(4) 7 Wktth of d_!It_baCksyrovldad�feet� _ _» 8 Will the vegetated setback remain veld? _ Yes 9 If BUA Is proposed in the setback does it meet NCAC 02H.1003(4} )? _w NIA __ µ 10 Is streambank stabilization proposed on this project? _ No NUMBER AND TYPE OF SCMs�^ 11 Infiltration stem ____ 12 Bioretention Call 13 _ _Wet Pond___ .._._..._..__v..__.�..._—.. �._.......—__....._____._..-.._ --..._.�___-._�„ 14 3tormwaterWetland�—__.__ - 15 Permeable Pavement _.._ 16 �_. _. Sand Filter 17 Rainwater Harvesting (RWH)_Ay.^ —� _ _.._._...------ 18 G_reen Roof 19 Level Spreader -Filter Strip (LS-FS)�M_T 20 Disconnected Impervious Surface DIS 1— Treatment Swale _21 23 24 StonnFilter Silva Cell 26 Flltarra FORMS L A E 7 Name and Title: f Mario T. Cartoon, Civil Enpineering Manager 8 _ Or9anizafion. _ _ _ _ _ . _ l dress Creek Renewabtes LLC I _ [29 Street address 6310S. Noton Ave Bldg 3000 Cit�r, SDurham, NC 27713 1 Phone number ap (816) 905 15402 marlo.carraon®ccrenew.com Emeil: Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the Information provided in the form Is, to the beat of my knowledge and befief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. '11111111r1 r,/ �� CAP? ''�' - o?' •ass •, k : i SEAL 045182 CAA�.•'� Signature of Designer Date r DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? I No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 4 Type of SCM DIS DIS 5 Total drainage area (sq ft) 1014948 6 Onsite drainage area (sq ft) 1014948 7 Offsite drainage area (sq ft) 0 8 Total BUA in project (sq ft) 47514 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 10 New BUA not on subdivided lots (subject to permitting) (so Offsite BUA (sq ft) 11 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 44297 sf 3217 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 4.68% 19 Design storm (inches) N/A 20 Design volume of SCM (cu ft) N/A 21 Calculation method for design volume N/A ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Inverter pads and steel piles supporting the fixed tilt solar panel system. LOW DENSITY UIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 oject below density thresholds set forth in the applicable stormwater rule? Yes r s project maximize dispersed flow and minimize channelization of flow? Yes the use of piping been minimized per.1003(2)(c)? Yes slopes of the vegetated conveyances (H:V) N/A 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (%) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Are variations to rule .1003 proposed? No 14 No ADDITIONAL 15 INFORMATION 1 Please use this space to provide any additional information about this low density project: Solar farm construction was completed in 2015 and all project disturbed areas are vegetated. There are no permanent SCMs for the project - all flow is considered dispersed sheet flow. Swale Drainage BUA Pervious Q Slope Vallow Vactual Flow depth # Are (ac) area C (cfs) (%) (fps) (fps) (ft) (ac1 23.30 1.10 22.20 0.40 2 3 4 5