Loading...
HomeMy WebLinkAboutSW8150905_Historical File_20160219Energy, Mineral and LandResources ENVIRONMENTAL QUALITY February 19, 2016 Dr. Arnold L. Sobol, Manager Aftew Properties, LLC 2020 S. Churchill Drive Wilmington, NC 28403 Subject: State Stormwater Management Permit No. SW8150905 The Village at Motts Landing Phase 2C High Density Subdivision Wet Pond Project New Hanover County Dear Mr. Sobol: PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary TRACY DAVIS Director The Wilmington Regional Office received a complete, State Stormwater Management Permit Application for The Village at Motts Landing Phase 2C on February 18, 2016. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008- 211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8150905 dated February 19, 2016, for the construction, operation and maintenance of the BMP's and built -upon area associated with the subject project. This permit shall be effective from the date of issuance until February 19, 2024, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Kelly Johnson in the Wilmington Regional Office, at (910) 796-7215. ZSin rely, Tracy Da is, P.E.; Director Division of Energy, Mineral and Land Resources GDS/kpj: 111Stormwater\Permits & Projects120151150905 HD12016 02 permit 150905 cc: Phil Tripp, PE, Tripp Engineering Inspector, New Hanover County Inspections New Hanover County Engineering Division of Coastal Management Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 T 1910 350 2004 F I htfir//n—tal nrdenrIwet+Qr/ State Stormwater Management Systems Permit No. SW8 150905 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Aftew Properties, LLC The Village at Motts Landing Phase 2C 5625 River Road, Wilmington, New Hanover County FOR THE construction, operation and maintenance of two (2) wet detention pond(s) in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater ruiesl and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (hereafter referred to as the Division or DEMLR) and considered a part of this permit. This permit shall be effective from the date of issuance until February 19, 2024 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The subdivision is permitted for 61 lots, each allowed a maximum of 5,000 square feet of built -upon area. 3. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control systems. The wet ponds designated as Pond 1 and Pond 2, have been designed to treat the runoff from 300,515 square feet (including 0 square feet of future impervious area) for Pond 1, and 285,050 square feet of impervious area (including 10,000 square feet of future impervious area) for Pond 2. The maximum built -upon area allowed for the entire subdivision is 585,565 square feet. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 150905 6. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. a. Drainage Area, Acres: Onsite, ft2: Offsite, ft2: b. Total Impervious Surfaces, ft2: Lot Impervious, ft2: Roads/Parking, ft2: Other, ft2: future, ft2: Offsite, ft2: c. Average Pond Design Depth, ft: d. TSS Removal Efficiency, %: e. Design Storm, in: f. Permanent Pool Elevation, fmsl: g. Permitted Surface Area at PP, ft2: h. Temporary Storage Elevation, fmsl: Predevelopment 1 yr-24 hr. discharge rate, i. cfs: j. Controlling Orifice Diameter, in: k. Orifice Flowrate, cfs: I. Permanent Pool Volume, ft3: m. Forebay Volume, ft3: n. Maximum Fountain Horsepower, hp: o. Receiving Stream/ River Basin p. Classification of Water Body II. SCHEDULE OF COMPLIANCE Pond 1 Pond 2 16.04 15.28 698,627 665,808 0 0 300,515 285,050 120,000 185,000 56,825 56,105 7,865 33,945 0 10,000 115,825 0 6.00 4.50 90 90 1.5 1.5 8.00 8.50 16,905 24,927 10.00 10.00 0.63 0.61 2.50 2.50 0.13 0.12 79,498 99,937 15,987 21,431 1/4 1/3 Motts Creek / Cape Fear C; SW No person or entity, including the permittee, shall alter any component of the approved stormwater system shown on the approved plans. 2. The permittee shall review all lot plans for new construction and any subsequent modifications and additions, for compliance with the conditions of this permit. The permittee shall not approve any lot plans where the maximum allowed built -upon area has been exceeded, or where revisions to the grading or to the storm drainage system are proposed unless and until a permit modification has been approved by the Division. 3. The permittee is responsible for the routine monitoring of the project for compliance with the built -upon area limits, grading, and the storm drainage system established by this permit, the permit documents, the approved plans, and the recorded deed restrictions. The permittee shall notify any lot owner that is found to be in noncompliance with the conditions of this permit in writing, and shall require timely resolution. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 150905 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 6. All stormwater collection and treatment systems must be located in public rights -of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 7. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed'in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. 10. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 11. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 12. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8150905, as issued by the Division of Energy, Mineral and Land Resources under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the Division. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. f. The maximum built -upon area per lot is 5,000 square feet. This allotted amount includes any built - upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 150905 All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the pond or street, grading the lot to drain toward the street or directly into the pond, or grading perimeter swales and directing them into the pond or street. Built -upon area in excess of the permitted amount will require a permit modification. All affected lots shall maintain a 50' wide vegetative buffer adjacent to surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of each side of streams and rivers and the mean high water line of tidal waters. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the Stormwater Rules is subject to enforcement procedures as set forth in G.S.143, Article 21. 13. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 14. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 15. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 16. If the permanent pool volume is greater than 30,000 cubic feet, a decorative spray fountain will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in this pond is 1/4hp for Pond 1 and 1/3hp for Pond 2. 17. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications. and other su000rtina data. 18. If permeable pavement BUA credit is desired, the permittee must submit a request to modify this permit to incorporate such language as required by the Division. The request to modify must include a proposed amendment to the deed restrictions and protective covenants for the subdivision, and a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. Upon the successful completion of a permit modification, the individual lot owners that request to utilize permeable pavements shall submit the necessary forms and documentation to the permittee, or a designated agent, and receive approval prior to construction of the permeable pavement. III. GENERAL CONDITIONS Any person or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules is subject to enforcement action as set forth in NCGS 143, Article 21. 2. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 3. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Additional or replacement stormwater management systems shall receive a permit from the Division prior to construction. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 150905 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 5. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 6. The permittee grants DEMLR Staff permission to enter the property during normal business hours for the purpose of inspecting the permitted stormwater management facility. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans, specifications, supplement forms, 0&M Agreements and calculations for this project are incorporated by reference and are enforceable parts of the permit. The permittee shall maintain a copy of these documents on file at all times. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in SL 2006-246, Title 15A NCAC 2H.1000, SL 2008-211 and NCGS 143-215.1 et.al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 19th day of February 2016. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION '�4 . lz'e� Tracy DaA, P.E., Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 150905 The Village at Motts Landing Phase 2C Stormwater Permit No. SW8150907 New Hanover County Designer's Certification Page 1 of 2 as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 Certification Requirements: State Stormwater Management Systems Permit No. SW8 150905 Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDEQ-DEMLR Regional Office Inspector, New Hanover County Building Inspections Page 8 of 8 Permit Number:'-��/-5� (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BUT elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maxunum extent practical. ECEIVE - Once a year, a dam safety expert should inspect the embankment. SEP 3 0 2''m4 After the wet detention pond is established, it should be inspected once a mZ and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inchelbff in 2 Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash/debris. The perimeter of the wet detention basin Areas of bare soil and/or I erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a { ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at a height of approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or swale The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra mi . The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or. other Remove the plants by wiping them invasive plants cover 50 % of i with pesticide (do not spray). the basin surface. EC 1V $EP 3 0 NO Form SW401-Wet Detention Basin O&M-Rev.4 Page 2U 4 BY: Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential roblem: How I will remediate theproblem: The embankment Shrubs have started to grow on the embankment. Remove shrubs immediately. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on the embankment. Consult a dam safety specialist to remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 6.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 8.2 6_0 Pe !!enPool - - - - - - - -------- - Volume Sediment Removal Elevation 1_5 Volum, 5-0 -ft Min. -------------------------------------------- ------ Sediment Bottom Elevation 0_5 1-ft Storage Sedime FOREBAY Storage MAIN POND ECEIVE BY: Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:The Village at iviotts Landing Phase 2C PMP drainage area number:I Print name:Arnold L. Sobol Title:.Member Manager Address:2020 S. Churchill Drive, Wilmington NC 28403 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. �I, ".�� A C �Q )tt� , a Notary Public for the State of Cd(.,CClo, ., County of P&d , do hereby certify that Y"trl pina personally appeared before me this Z.1 day ofuquTa- 1 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires /( Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be m;n;m;zed to the maximum extent practical. , � � � �� - Once a year, a dam safety expert should inspect the embankmen ��p After the wet detention pond is established, it should be inspected once o' i`th aIR 2Qi5J within 24 hours after every storm event greater than 1.0 inches (or 1.51 es if in a Coastal County). Records of operation and maintenance should be kept iri a o location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a I ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too I Maintain vegetation at a height of long. I approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page, I of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or swale The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Swale. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of I with pes ' ' the basin surface. UMV SEP302015 BY: Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate the roblem: The embankment Shrubs have started to grow on the embankment. Remove shrubs immediately. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove f beavers. A tree has started to grow on Consult a dam safety specialist to i the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.5 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM ill in the blanks) Permanent Pool Elevation 8.5 6_0 Pe anen Pool - - - - - - - - - - - - - - - - - Volume Sediment Removal Elevation 4_5 Volume 5_0 -ft Min. ------- ---------------------- --------------- L-ft aluSediment Bottom Elevation 3.5 Storage Sedimej FOREBAY MAIN I V Storage SEP 3 0 205 Sly: - Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:The Village at Motts Landing Phase 2C BMP drainage area number:2 Print name:Arnold L. Sobol Title:Member Manager Address:2020 S. Churchill Drive, Wilmington NC 28403 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I,Al Sa-� , a Notary Public for the State of NOIAJ aj ( Wk , County of C,�f , do hereby certify that — A s-�i L , sue) personally appeared before me this ZJ day of , ZO)5S- , and acknowledge the due execution of the forgoing wet etention basin maintenance requirements. Witness my hand and official seal, &t4A , C qa� _ " �OTAR1' .' USUNP. SEAL My commission expires IQ i5'-/ GENE SEP302015 1V, [��jYiy� ti l . Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Co uction (selecf all that applly) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM i nis form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): The Village at Motts Landing Phase 2C 2. Location of Project (street address): 5625 River Road City:Wilmington County:New Hanover 3. Directions to project (from nearest major intersection): Zip:28412 From the intersection of Sanders Road (5R1187) and Motts Village Road (SR 2427) travel approx. 01 mile north. Turn right onto Motts Forest Road and travel 0.2 mile east to Grand Champion Road 4. Latitude:34° 07' 36" N Longitude:77° 54' 00" W of the main entrance to the project. H. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known)------------, and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): []Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: _ ❑NPDES Industrial Stormwater Z404/401 Permit: Proposed Impacts ac of Disturbed Area b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the tamp of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: http://l2ortal.ncdenr.org/web/Ir/rules-and-regulations 3 Q 20b M. Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 Ill.' CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Aftew Properties, LLC Signing Official & Title:Arnold L. Sobol, Member Manager b. Contact information for person listed in item 1a above: Street Address:2020 S. Chruchill Drive City _Wilmin&ton State:NC Zip:28403 Mailing Address (if applicable): City: Phone: (910 ) 763-2629 Email:lobos251@aol.com State: Zip: Fax: (910 ) 763-4742 Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Phone: ( 1 Fax: Email: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & b. Contact information for person listed in item 3a above: Mailing Address: City:_ Phone: Email: 4. Local jurisdiction for building permits: Point of Contact: State: Phone #: Form SW- 101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. two 2) wet detention basins 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. if claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 28.58 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:28.58 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water (NHK9 line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or ZA line. The resultant project area is used to calculate overall percent built upon area (BLIA). Non -coastal wetlands landward of the NHW (orMHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 47 % 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Receiving Stream Name Drains a Area 1 ns MoCreek Drama Area 2 Motts Creek Draina a Area _ Drainage Area Stream Class * C;Sw C;Sw Stream Index Number * 18-82 18-82 Total Drainage Area (so 698,627 665,808 On -site Drainage Area (so 441,715 665,808 Off -site Drainage Area (so 256,912 0 Proposed Impervious Area** (so 300,515 285,050 Impervious Area** total 43 42.8 Impervious" Surface Area On -site Buildings/Lots (so Drainage Area 1 120,000 Drama a Area 2 185,000 Drainage Area _ Drainage Area _ On -site Streets (so 56,825 56,105 On -site Parking (so 0 0 On -site Sidewalks (so 7,865 8,345 Other on -site (so 0 25 600 Future (so 0 i0,000 Off -site (so115,825 0 Existing BUA*** (so 0 0 Total (so: 300,515 285,050 —So µi"K 1-L- -umber can ne aetermined at: htW,r. : &ortal.ncdenor /wg eb/wg s/csu/dassif cations Impervi, ous area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. "** Report only that amount of existing B UA that will remain after development. Do not report any existing B UA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 11. ' How was the off -site impervious area listed above determined? Provide documentation. NA Proiects in Union County: Contact DEMLR Central Ojfice staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 1 SA NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhgp://12ortal.ncdenr.org/web/wg/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http:/ /Portal.ncdenr org web/wq/ws/su/nia�s.) Please indicate that the following required information have been pirvided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. 1. Original and one copy of the Stormwater Management Permit Application Form. I. 'tia ls 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to (� http://www.envheIR.org/pages/onestogexpress html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/ managementfor�_ the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1h mile radius on the map. 7. Sealed, signed and dated calculations (one copy). Aug 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:_ a. Development/Project name. 12 b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line d2i AV waters, and any coastal wetlands landward of the MHW or NHW lines. G E I V IE Delineate the vegetated buffer landward from the normal pool elevation of ' ounded structures, the banks of streams or rivers, and the MHW (or NHIA.7) of tidal rsIn Z i. Dimensioned property/project boundary with bearings & distances. 04-45 j. Site Layout with all B UA identified and dimensioned. k. ExistL g contours, proposed contours, spot elevations, finished floor elevations. BY' 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SH1NT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 3497 Page No: 0245 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC MA_ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation, in good stan.aiig with the NC Secretary of State, otherwise the application will be returned. h!W://www.secretary.state.nc.us/Corl2orations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httl2://portal.ncdenr ore/web/lr/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Phillip G. Tripp, P.E. Consulting Firm: Tripp Engineering Mailing Address:419 Chestnut Street City: Wilmington State:NC Zip:28401 Phone: (910 763-5100 Fax: (910 ) 763-5631 Email:trippeng®ec.rr.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with. (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submi the party responsible for the operation and maintenance of the stormwater system. BY: Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As*the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of do hereby certify that County of personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Arnold L. Sobol certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protectiv venants will be recorded, and that the proposed project complies with the requirements of the applicable s rm ater rules and r 15A CAC 2H .1000 and any other applicable state r water requirements. Signature: Da I, , i1a r a Notary Public for the State of . County of 'M-rr do hereby certify that rrlcti� �, �o bob personally appeared before me this 2i day of ZSJISJ and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires_ / 0 )s-I�o EGEVE {; SEP 3 0 BY: Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 Permit No. 7 CA 05 (to be rovided by DWQ) ' OF W.ATF9 HCDENR y - STORMWATER MANAGEMENT PERMIT APPLICATION FORM' 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out; printed and submitted. The Required Hems Checklist (Part in) must be printed, filled out and submitted along with all of the required information. Project name Village at Motts Landing Phase 2C Contact person Phillip G. Tripp; PE Phone number 910-7D5100 Date 23-Sep-15 Drainage area number 1 II, DE61GN INFORMATION Site Characteristics -- Drainage area 698,627 fe Impervious area, post -development 300,515 fe % impervious 43.02 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24-hrstonn Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 38,174 ft3 40,530 ft3 OK, volume provided is equal to or in excess of volume required. ft3 Y (Y or N) 3.8 in 020 (unitless) 0.52 (unitless) 3.90 inthr OK 12.51 fe/sec 32.69 a3/sec 20.18 fe/sec 10.00 fmsl 8.00 fmsl 7 69 fmsl 8.50 fmsl 7.50 hall 0.50 fmsl -0.50 fmsl a E C E I V Er. Y (Y or N) 10.0 fmsl OK 11112 2011 BY: Form SW401Met Detention Basin-Rev.9.4/18/12 Parts i. & ii. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) AL DESIGN INFOP NIAMON - — -- Surface Areas — Area, temporary pool 22,672 le Area REQUIRED, permanent pool 15,929 fe SAIDA ratio 2.28 (unitess) Area PROVIDED, permanent pod, A ._P, 16,135 ft OK Area, bottom of 10ft vegetated shelf, AbOL_dw 12,933 ft` Area, sediment ceanout, top elevation (bottom of pond), Aid 7,604 f? Volumes Volume, temporary pool 40,530 f? Volume, permanent pool, 1lP— -Pw 73,817 fP Volume, forebay (sum of forebays if more than one forebay) 15,987 fe Forebay % of permanent pool volume 21.7% % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vp,,,,_,, Area provided, permanent pool, Ap.„_P, Average depth calculated Average depth used in SAIDA, d81,, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A,, _pw Area, bottom of 1Oft vegetated shelf, Ab„ Lw 90 % Y (Y or N) N (Y or N) 2.28 (unitess) N (Y or N) 73,817 ft 16,135 ft ft It Y (Y or N) 16,135 if 12,933 fe OK OK Need 3 ft min. Area, sediment cleanout, top elevation (bottom of pond), Ab0,P d 7,604 fe "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 7.00 ft Average depth calculated 6.01 ft OK Average depth used in SAIDA, d,,,, (Round to down to nearest 0.511) 6.0 ft OK Drawdown Calculations Drawdown through orifice? Diameter of orifice (d circular) Area of orifice (if -non -circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C,x) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated finer provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: pump Y (Y or N) 2.50 in in 0.60 (unitless) 1.17 ft N (Y or N) (unitless) (unitess) ft It 12.51 f?/sec 32.69 ft3/sec 0.13 If/sec 3.30 days 3 :1 10 :1 10.0 It 3.0 A Y (Y or N) 1.0 ft N (Y or N) Y (Y or N) Y (Y or N) OK, draws down in 2-5 days. OK OK OK OK OK OK OK OK OK OK ECEIVE FEB 0 2 2016 BY: - Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & 11. Design Summary, Page 2 of 2 Permit No II REQUIRED ITEMS CNECKLIST (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request,for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial 'below. if a requirement has not been met, attach justification. Pagel Plan I itiais Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 1 f / _ 3. Section view of the wet detention basin (1" 20' or larger) showing: Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. d If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. AM 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 9L V_ 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 'vim— 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. 0"'ECEIVOM RY. Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Requirprl Items Checklist, Page 1 of 1 Permit No. fro be provided by D WQ) Aft 743YIA O� W A Tg9 14C EMIR � Q STORMWATER MANAGEMENT PERMIT APPLICATION FORMS} 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 1l1) must be printed, filled out and submitted along with all of the required information. ^. PROJECT 4NFORMq't ION ^� Project name Village at Motts Landing Phase 2C Contact person Phillip G. Tripp, PE Phone number 910-763-5100 Date 23-Sep-15 Drainage area number 2 ff, DESIGN VNFORKATION Site Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak now Calculations Is the prelpost control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment deanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of hie additional volume 665,808 fe 285,050 fe 42.81 % 1.5 in 36,229 ft3 42,810 ft3 OK, volume provided is equal to or in excess of volume required. to ft3 ft3 ft3 Y (Y or N) 38 in 0.20 (unitless) 0.52 (unitless) 3.90 inthr OK 11.92 ifisec 31.06 ft3/sec 19.14 ft"Isec 10.00 fmsl 8.50 fmsl Ro sl 9.00 fmsl 8.00 fmsl 3 50 fmsl 2 50 fmsl �O 1.00ft ECEI V E Y (Y or N) in fmsl OK SEp3 0 Nj'tJ By: — Form SW401-Wet Detention Basin-Rev.9-4/16/12 Parts !. & 11. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) 1 Ql N INF� INFORMA.TIt +Y Surface Areas Area, temporary pool 30,568 fe Area REQUIRED, permanent pool 22,238 if SAIDA ratio 3.34 (unitless) Area PROVIDED, permanent pool, AP�,� 24,927 a OK Area, bottom of 1 Oft vegetated shelf, Ab�Lo dj 21,661 if Area, sediment cleanout, top elevation (bottom of pond), Abol,.w 15,538 ft' Volumes Volume, temporary pool Volume, permanent pool, VP,.,m Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SA/DA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, VPWMyoa Area provided, permanent pool, A,f11,_P, Average depth calculated Average depth used in SAIDA, d. (Round to nearest 0.511) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, APL--PW Area, bottom of 1 Oft vegetated shelf, Ab. S,a, Area, sediment oleanout, top elevation (bottom of pond), A "Depth" (distance b/w bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d. (Round to down to nearest 0.511) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (Hj Drawdown through weir? Weir type Coefficient of discharge (Q Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow W of ifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: 42,810 ft3 OK 99,936 fe 21,431 fe 21.4% % OK 90 % Y (Y or N) N (Y or N) 3.34 (unitless) N (Y or N) 99,936 ft3 24,927 fe it Need 3 It min. it Y (Y or N) _ 24,927 ft 21,661 f 15,538 fe 4.50 ft 4.33 it OK 4.5 It OK Y (Y or N) 2.50 in in (unitless) 0.60 ft 0.5 (Y or N) N (unitless) (unitless) it It 11.92 ft/sec 31.06 ft3/sec 0.12 ft3/sec 3.61 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3 0 :1 OK Y (Y or N) OK 1.0 it OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK pump ECEIV SEP 3 0 C_., BY: Form SW401-Wet Detention Basin-Rev.9-4H8112 Parts I. A It. Design Summary. Page 2 of 2 Permit No. (to be provided by DWQ) 11. REQUIRE.) ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initiais Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, - High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and Mai(_ - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. M1 At_ 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 'fix 7. The supporting calculations. Ly _ 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. la�ll 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. IECEVVE SEP302 5 BY: Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 1 of 1 Johnson, Kel From: Johnson, Kelly Sent: Monday, February 15, 2016 1:17 PM To: Monica Valsi (monica-trippeng@ec.rr.com) Subject: FW: SW8150905, Village at Motts Landing Phase 2C I forgot to also ask you my second question.... Sorry, moving too fast. Do sheets DA1 & DA3 come over from the September submittal? I haven't seen revisions for those since September so I wanted to check. Thanks, KJ From: Johnson, Kelly Sent: Monday, February 15, 2016 1:12 PM To:'Monica Valsi' <monica-trippeng@ec.rr.com> Subject: RE: SW8150905, Village at Motts Landing Phase 2C Monica, Is there a revised supplement for Pond #2? It looks like the bottom elevation changed from the previous submittal. (I don't know if other data changed or not, I just saw this one number.) Thanks, Kelly From: Monica Valsi [mailto:monica-trippeng@ec.rr.com] Sent: Monday, January 25, 201610:01 AM To: Johnson, Kelly <kelly.pJohnson ncdenr.gov> Subject: RE: SW8150905, Village at Motts Landing Phase 2C Kelly, We would like to request an extension with a re -submittal date of Tuesday, February 2. Please confirm this is acceptable or direct otherwise. Thank you, Monica From: Johnson, Kelly [mailto:kelly.p.iohnsonCcDncdenr.gov] Sent: Tuesday, January 12, 2016 12:22 PM To: Monica Valsi (monica-trippeng ec.rr.com) <monica-trippeng@ec.rr.com> Subject: SW8150905, Village at Motts Landing Phase 2C Monica, Please see attached. Thanks, KJ General Data: Impervious, Drainage Area and Volume PROJECT NUMBER: 5W8 1156905 Reviewer: Kklmson ... DRAINAGEBASIN: lCepaFear Current Date 15-Feb-16 Original Run Date: trf oT 25 BMP Type afigpow - watpow Nd BNPdr Noompin NOWN11a w4ampt. DAL W.Salpin n. N.91INPIR a in nu Ro Receiving Stream rAbtN:E Nue ey..k Stream Index 1962 tars Class C. SW C SW Method used to determine required volume? Strap sfawl. Farsalm J9rreekct DlrrBaba PI. —Mad iarrSekat Wrr salsa der Bahr; Pier a. Simple Method, Design Storm, P,y2Ne, in: (Enter ePmj.at Y Subject to SA- NEEDED FOR BOTH BNPLE AND SCS SA CALC.) Simple Method, Design Storm of Old Rule, In: Ener B Padaf Pm'ad la Parmtredbralaren ON Rua eirdl r i.0- r mat Mr btanN SCS Dittaete (TR-55) Method, Design Storm, Value of Ppwwjwmk, In: (Enter are Vabe of Pm N Non -SA or Pry -If W Pmict B Subect to SA? N N 'Rrriwpct:Plrr 0 BaYct 0 plaees 6ebct:PJreaa:5aper:Pta— D 0 SOFMI 0 Plrr lsetra9Yre 0 5.W ::p*.r Select 0 D Volume That is Required, fta: (Vu: ime er'.i ether:he &.. pre Afi ihoa r-thc SCC Melhad. "-C3 tterhud b: SA, nmpem c r: ro al 1 - sae. - arwro Simple Method Volume Summary: Simple Method & SA (2004 Rule, Greater of 1.5' or 1 y24hr pmJpos0+ Old Rule at 1.5� Simple Method & non -SA 008 Rule, 1.5*)+(Old Rule, 1.W SCS Discrete (IR-55) Volume Summery: mTRse la used, than the spreadahaatb rot ad up to=braddba thatwtrmeb m old mY ntorbtee at a lomr(1.0-)sh [ doe. nd rrka rme b combine the vobma nkubtbn. M— . SCS Discrete (rR-W) & SA 08 Rule, Greater of 1.5' or 1 yr24hr pmlpoeQ SCS Discrete (rR55 & non -SA Proposed Impervious (ALL IMPERVIOUS), Total, R': A174 3074 300.5151 36,229 36.228 285.050 Onske Buiklin s 10 115000 Onsite Streets Was B&I05 Onside Parking 0 0 Onsite Sidewalks 7 Onsite Other - 0 25-800 Future 115,825 10 Of its 0 0 Existing 0 Rujit, P 01 0 D 0 0 0 0 0 0 0 Onske Buildings - - Onsite Streets - Onske Parkin Onshe Sidewalks Onake Other - Future Offske Existing 300.515 265,050 g 0 0 g 0 01 0 g Drainage Area, Total, R': 898.6271 885,808 Onake, R : MAVI 845 8p8 Offsjte, fit: 0 IrtevRo "'.sAMLGW ltv 0 _ 0 0 0 01 0 0 0 0 0 Onsite, itt: OfWde, R2: P(9p*M DA (b"W Added , ti72 608.5271 865,808 Drainage Area, Subject to Oki Rule, 112: 01 0 0 0 0 0 0 0 0 0 Drainede Area. Subtect to New Ruts, f12: Data 898,627 665.808 volume Required, Old Rule, fr: D 0 Di 0 0 G 0 0 0 0 Rvp,a Dmjw au. Oki Rule: Volume Required, 2008 Rule, Rs: 38,174 36.229 Rvne c..,,,,d, 2008 Rule: (Enter 0.06 r to pr&dmbpm nt 9UA) Rv,,,... _ 2008 Rule: - 0.44 0." Volume Requiredl, its: 38.174 36.229 0 0 0 O 0 0 0 0 Volume Requiredly hn it: 0 0 0 0 0 0 01 01 0 0 Volume Calculations - Page 1/3 Wet Ponds PROJECT NUMBER: SW8 150905 Reviewer: K Johnson DRAINAGE BASIN: Cape Fear Current Date 15-Feb-16 Original Run Date: 16-Nov-15 DA Number 1 1 2 3 4 5 1 6 1 7 8 9 10 BMP Type Minimum Surface Area Wet Pond Wet Pond No BMP in D No BMP in DA No BMP in DA No BMP In No BMP in pA No BMP in No BMP in pp No BMP in % impervious 43.0% 42.81 % Lower Impervious 40.0% 40.-- Upper Impervious 50.0% 50.0% TSS 85 or 90 : B0 g0 Lower SAIDA 2.1 3.1 #N/ #N/A #N/A #N/A #N/A #N/AI #NIA #WA Upper SAIDA 2.7 3.9 #N/A #NIA #N/ #N/ #N/A #N/A #N/AI #NIA SAIDA ratio 2.3 3.3 #NIA #N/A #N/A #N/A #N/ #N/A #WA #N/A #N/A PP Surface Area req, ft : Storage Calculations 15,935 22,138 #N/A #N/A #WA #N/A #N/A #N/A #N/A Elevation, Bottom of Sediment excavated depth),fmsl: ©50 2.50' Elevation, Top of Sediment (bottom pond/deal ned bottom),fmsl: 0. 3.50 Elevation, Bottom of shelf, fmsl: 7,01 8.00 Elevation, Permanent Pool, fmsl: 8.50 Elevation, Top of Shelf, fmsl: 9.00 Elevation, Temp. Pool, fmsl: t0,00 Area, Top of Sediment (bottom pond/designed bottom), ft : P12 21,661 Area, Bottom of Shelf, ft2: 21,661 Area, Perm Pool, ft: 24,927 Area, Top of Shelf, ft : 10,492 28.392 Area, Temp.Pool, fe: 22;S72 30 5W Volume Provided (Temp Pool), DWQ Calculated, ft': 40,5301 42.810 0 0 0 0 0 0 01 0 Volume Provided (Temp Pool), Pmvided per consultant, ft3: 42,193, 42.810 Volume Required (Temp Pool), DWQ calculated, fe: 38,174 36,229 Consultanf Provided Enough Volume? y y Average Depth Option 1 or Option 2 Enter 1 or 2? 2 2 Average Depth Provided, ft: 6.0 4,5 Average Depth - OPTION 1 -, DWQ Calculated, ft: 4.57 4.01 Average Depth - OPTION 2 -, DWQ Calculated, ft: Forebay Volume 6.0 4.50 Permanent Pool Volume, ft3: 73,8181 99,937 0. 0 0 0 01 0 01 0 Forebay Volume, Required, ft3: 14,764 19,987 0 0 0 0 01 0 0 0 Forebay Volume, Provided, ft3: 15,967 21.,431 Percent of Permanent Pool (18-22% is Target): Drawdown 22% 21 % Aygerage Head, ft: 0.63 0.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Flow Q2, ft3/sec: 0.221 0.210 Average Flow Q5, ft3/sec: 0.088 0.084 Q2 Area, In 2: 8.311 9.192 Q5 Area, in 2: 3.3241 3.677 No. of Orifices 1 1 Orifice Diameter, in: 2.50 2.60 Orifice Area, in 2: Weir enter Y or N ? 4.909 4.909 0.000 0.000 0.000 0.000 0.000 0,000 0.000 0.000 Weir Height, in: Weir Length, in: Weir C: Weir L, Effective Length, ft: -0.126 -0.093 0.0001 0.000 0.0001 0.000 0.0001 0.000 0.000 0.000 Average Orifice Flowrate, DWQ Calc (QDwQ) ft'/sec: 0.130 0.112 0.0001 0.000 0.0001 0.000 0.0001 0.000 0.000 0.000 Average Orifice Flowrate, Reported (Qft ,,,d) ft3/aec: 0130 0120 Average Orifice Flowrate, is Adequate? y y Runoff Coefficient Cc: 0.250 0.250 0.2501 0.250 0.2501 0.250 0.2501 0.250 0.250 0.250 1 yr 24 hr rainfall depth, in: 0,801 3.80 1 yr 24 hr Intensity (1) inthr.. 0.1581 0.158 0.0001 o.000 0.6001 0.000 0.0001 0.000 0.000 0.000 1 yr 24 hr Pre -Development (Q), ft3/sec: D.635 0.605 Avg. Orifice flow<Pre Q? OK OK Drawdown, days: Soils Report Data 3.391 3.75 Ground Elevation at Boring in Soils Report, fmsl: 13.71 Distance Ground to SHWT per Soils Report, In: 73.00 %-GG Distance Uround to SHWT per Soils Report, ft: 6.08 3.25 0.00 0.00 0.00 0.00 0.001 0.00 0.00 0.00 SHWT Elevation, DWQ Calculated, fmsl: SHWT Elevation, Reported by Consultant, fmal: 7.69 7.6{) 8.84 9,75 0.00 0.00 0.00 0.00 0.00 0.00 0.00i 0.00 Distance SHWT to PP, ft: Design OK if.• 0- Value- 0.5 0.31 0.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Permanent Pool Elevation, fmsl: Pump 8.001 8.501 0.001 0.00 0.00 0.00j 0.001 0.00 0.001 0.00 Max HP: 1/4 11/3 N/A NIA N/A I WA WA N/A NIA N/A vated Depth om Pond/Top Sediment om Shelf Shelf P Volume: PP Volume: PP Area: Forebay #1 Volume: % Forebay #1: Average Depth (Option 1): Average Depth (Option 2): A,­wr A _P.a Ammo.d depth Bottom Shelf ivated Depth DM Pond/Top Sediment DM Shelf Shelf TP Volume: PP Volume: PP Area: Forebay #1 Volume: % Forebay #1: Average Depth (Option 1): Average Depth (Option 2): Aa.w.t AP.,.,Pw AWkP..d depth Bottom Shelf Bottom Pond/Top Sediment Basin Forebay Total Contour I Co our Contour El SA I Inc Vol I Cum Vol EI SA Ine Vol Cum Vol EI SA Inc Vol Cum Vol 01) I (s€ I (el I i�l (ft) I (s4j i�fi (�) I (ft) I (l 1) 1�+) 40,530 = - -4.3 , - 73,81B 73,818 = F7, •5'. + 15,987 15,987 22% 4.6-->Round 4.5 6.0 —>Round 6.0 12,933ft2 Main Pond +Forebay 16,135ft2 Main Pond +Forebay 7,604 ftr Main Pond Only 7.D0 ft Bottom Shelf to Bottom Pond 7.56 msl ©.SD msl El I SA I Inc Vol I Cum Vol EI SA I Inc Vol I Cum Vol I El SA Inc Vol Cum Vol ft) (50 (cf) (� (ft) Isf) (�1 (cf) (ft) I6111 (cf) (cl) 42,810 = t•.'�,7^7 99,937 99,937 = .. 'ar + 21,f?1 24,927 = + 6,1:._ 21,431 21% 4.0 -->Round 4.0 4.3-->RDund 4.5 2201fe Main Pond +Forebay, 24,927ft' Main Pond +Forebay 15,53E fe Main Pond Only 4.5D ft Bottom Shelf to Bottom Pond 8.00 msl 3.5D msl TRIPP ENGINEERING, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 February 1, 2016 NCDENR Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Kelly Johnson Re: Village at Motts Landing Phase 2C Stormwater Project No. SW8150905 TE 14026 Dear Kelly: ECE IVWE FEB 0 2 2016 BY: RECEIVED FED U t 2816 In response to your Request for Additional Information dated January 12, 2016, we offer the following: ""' Streams [15A NCAC 02H. I 003(g)(5) and 02h. I 005(D)]: ,/a. 1/12/16 Stream Location: David Syster of SEGI and Chad Coburn of DWR/401 have indicated that the origin should be below Lot 324 rather than Lot 327. Please revise the plans accordingly. • The stream location has been revised. Vi i. Pond in a Buffer: 15A NCAC 02H.1005(e) prohibits wet ponds from being located in the buffer. The proposed plans show that the permanent pool is located outside of the buffer but that a portion of the embankment of the pond is inside the buffer. This issue has come up on other projects, and we have received direction from our Central Office on how to proceed. Please remove the full embankment on the pond -side of the berm from the buffer. • The entire embankment has been removed from the buffer. Seasonal High Water Table [15A NCAC 02H.1003(g)(5) and 02H.1005(d)]: %/a. 1/12/16 v%f. Both Ponds/Borings: • Please submit the data provided in your letter under seal. �-► Attached please find the previously submitted data under seal. • Please specify the wetlands elevation adjacent to each pond in your summary in order to establish that the pond will not drain the wetlands. (The elevations are difficult to read on the plans because other data is on top of them). • Me wetland elevation adjacent to each pond is specified in the attached sealed data. \ii. Pond 2/Boring 4: There is a typo on the supplement which says that the SHWT is at 9.75 msl. I will revise it to show that it is 8.84 msl. • Chank you 3. Drainage Area 1 [15A NCAC 02H.1008(c)(1)]: a. 1/12/16: Perhaps this is an issue of clarification of the project area and the drainage area. Project Area: Where is the project area on the plan? Originally I thought that Sheet CO showed that area, but now I see that it excludes the wetlands. Please denote the full 28.58 ac. area to be covered by this permit on the plans with bearing/distance lines. • The P1UJVA A aroci with oearing/distatims is proviaea on 3neet CO. Some of the wetlands are omitted as those areas are bypassed with culverts under the roadways from the proposed RW-. ii. Drainage Area: There are two drainage areas on the plans, one for each pond shown on Sheet DAl, DA2, and DA3. DAl shows the drainage divides for a large area. DA3 shows many sub -drainage areas. DA2 shows what may be the two ponds' drainage areas. Are sheets DA 1 and DA3 needed for the full permitted set, or does DA2 show the full area draining to the ponds? Without the project area I am not sure where the drainage area extends beyond the project area. But, please account for any potential impervious area that could be constructed offsite (outside the project area but draining to the permitted ponds) at ultimate build out potential. For instance, if there is 20,000 sf of offsite drainage area to a pond what amount of that 20,000 sf could be built out in the future? If Zoning or others requirements limit development to 60%, then ultimate buildout is 12,000 sf which should be accounted for in the pond. • DA2 only applies to the State Stormwater permit. The drainage area for DA 1 has been revised to include Onsite and Offsite drainage areas. I hope this clarifies your concern. ECEIVE FEB 0 2 2016 BY: We have provided a complete revised set of calculations for simplicity. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. IM d�� & J� Monica Valsi, E.L MLV:dcb Enc. ECEI`. FEB 0 2 2016 13Y: VAML Phase 2C Ponds/Borings 1. Pond 1/13oring 3: The existing ground elevation at boring 3 is 13.77, the distance to the SHWT is 73" or 6.083' and the resultant SHWT elevation is 7.69. The permanent pool elevation is at elevation 8.00. The adjacent wetland elevation is 8.00. 2. Pond 2/Boring 4: The existing ground elevation at boring 4 is 12.09, the distance to the SHWT is 39" or 3.25' and the resultant SHWT elevation is 8.84. The permanent pool elevation is at elevation 8.50. The adjacent wetland elevation is 7.00. `````Iglll CA 10%i p�� °ESS R�X ��✓ ® SEAL 17374 IECEiVE� FEB 0 2 2016 BY: 01 /26/2016 MLV 14026 Total Drainage Area ft. acres . " 16.04 VAML Phase 2C DA #1 Wet Detention Basin Calculation Impervious Area Land Use sq. ft. acres Lots :,;.1`�tQO 2.75 Roads .' 1.30 Sidewalks ;7t 0.18 `: 0.00 Future (Offsite) Total '41 * ' _, 2.66 300,515 6.90 Stormwater Calculations: Time of Concentration: Hydraulic Length (L) = h; °-e 2; &;: ft. change in Height (H) _ Tc = (L3 /H).3e1 / 128 20.89 min. Flow for 1 year, 24 hour Storm (Q7): QPRE _ (CPRE) x (11) x (Area) 12.61 cis QPosT = (CPosT) x (11) x (Area) = 32.69 efs Detention Pond Design: Main Pond Size: Does Area Drain to SA Waters? n % impervious = 0.430 = 43.0% CPRE = 0.2 CPosT = (% imp.)(.95)+(1% imp.)(.20) 0.52 11 = 3.90 in/hr 110 = 7.23 in/hr Flow for 10 year, 24 hour Storm (Q10): QPRE ' (C•PRE) x (110) X (Area) = 23.19 cfs QPosT = (CPosT) x (170) x (Area) 60.60 cfs State Surface Area Required at normal pool: Pond side slopes = 3 :1 Depth b/w Bot. of V.S. & 7.00 Bot. Pool = SA/DA = 0.0228;fcordepth Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Red SA = SAIDA x(Total Drainage Area = 15,929 sq. ft. Provided SA = 16,135 sq. ft. Pond Size: �•�-•. ••�• .auua.c ni as 111u. VOI kluml. Vol. Elevation Surf. Area Incr. Vo ft(sq. ftft s of Bank 14,Vd� 87,906 175,608 Top of Bank 14�1010 '532q 21,316 P. Pool 23,630 87,702 Temp. Pool 1911 5591W 10,658 of V.S. 5' :" �11 �.:` 6,242 64,073 Perm. Pool ,8:0p '..;� 2,665 I. Pool i8tQ/ 4,603 57,831 Bot. of V.S.Kr ; T,716©•59" 13,323 Of V.S. i 5 1 �+ � r r �i 53,228 53,228 Bot. Pool 5 00 Of Pool r�_ 0 0 0 Bottom SA = 7,604 sq. ft. Bottom of VS SA= 7,604 sq. ft. Permanent Pool SA = 10,806 sq. ft. Vol. = [((PP SA + Bottom VS SA)/2) x (PP el. - Bottom VS el.)] + [((Bottom VS SA + Bottom Pool SA)/2) x (Bottom VS el. - Bottom Pool el.)] 57,831 cu. ft. Fore bay: Provided Normal Forebay Pond Volume Bottom of Pool SA= 5,329 sq. ft. Permanent Pool SA = 5,329 sq. ft. Vol. = [(P.P. SA + Bottom SA) / 2] x (P.P. el. - Bottom el.) 15,987 cu_ ft. Depth= 3.00 ft Required Forebay Volume 18%-22% required) Vol. = 22% of Permanent Pool volume of Pond and Forebay 16,240 cu. ft. Volume required to contain from design storm(ft')= 38,174 Therefore, maximum sta a is between stages and cumulative volumes (main pond plus forebay): Stage Cum[. Volume 8.00 0 14.00 149,752 26,645 15,987 13,323 U Total Provided PP Volume = 73,817 cu.ft. Actual % of Forebay Volume t '7/^•' (p 21.66 aye ,�N CA R p +ems p�;•OFE.SS/pti9!9�' Using Interpolation to determine stage at volume = 38,174 Maximum Stage (feet) = 9.53 SEAL w Therefore set Temporary Pool Elevation at or higher than Maximum Stage -0 ; 17374 t CL 14026 Pond CalesAu 1 of 4 01/26/2016 VAML Phase 2C 14026 MLV DA #1 Pond Size for Determining Storage Volume: Wet Detention Basin Calculation Elev. SA Incr. Vol. Cum. Vol. (ft) (sq.ft.) (cu.ft.) (cu.ft.) Temp. Pool 10.00 22,672 31,623 40,530 Top of V.S. 8.50 ? :; 8,907 8,907 Penn. Pool 8.00 16,135 0 0 Provided Storage Volume: Vol. _ [((PP SA + Top of VS SA)/2) x (Top of VS Elev. — PP Elev.)] + [((Top of VS SA+TP SA)/2) x (TP Elev. - Top of VS Elev.)] Vol. = 40,530 cu. ft. State Volume Req. for Storage of first 1.5" runoff: Rv = .05+ .009(% imp) 0.437 V= (Design rainfall)(Rv)(Drainage Area) 38,174 cu.ft. Outlet Structure Design: Flow for 2-day drawdown: for Min. Volume required of stormwater, Q = Min. Vol. Req. / 172,800 sec. (2-days) 0.221 rife Required Area of Pipe for 2-day drawdown: A= Q I [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft./sz h = (T.P. elev.- N.P. Elev.)/3 = 0.67 ft. A = 0.0562 s . ft. Diameter of Pipe for 2-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.2675 ft. 3.21 in. Drawdown Calculation Orifice Used= Drawdown rate= 0.134 cfs Drawdown time= 3.30 days Outlet Structure Check: Using a 4' x 4' Basin, Perimeter L = 16 ft. Q = CIA C = (% imp.)(.95) + (1-% imp.)(.25) = 0.52 1= 7.23 in. for a 10 yr. Storm A = 16.04 Acres 60.60 cfs Flow for 5-day drawdown: for Min. Volume required of stormwater, Q = Temp. Pool Vol. / 432,000 sec. (5-days) = 0.088 cfs Required Area of Pipe for 5-day drawdown: A= Q/ [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft./sz h = (F.P. elev. - N.P. Elev.) / 3 = 0.666667 ft. A = 0.0225 s . ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.1692 ft. 2.03 in. Q= CwxLxH"5 H= [Q/(CwxQ1213 Cw = 3 1.17 ft. Peak elevation = flood pool elevation + H = 11.17 ft. 14026 Pond Calcsxlsx 2 of 4 01/26/2016 VAML Phase 2C MLV DA #1 Wet Detention Basin Calculation Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv= 0.05+0.009(IA) Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (inches) IA = Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (arrps) IA= 43.0 % Rv= 0.437 Design Rainfall Depth = 1.50 in. Drainage Area = 16.04 acres Volume = 38,174 ft3 14026 14026 Pond CaIcsAu 3 Of 4 01/26/2016 VAML Phase 2C MLV DA #1 Wet Detention Basin Calculation 14026 Average Depth Calculated Permanent Pool Volume (ft') 73,816.5 Permanent Pool Area (ft) 16,135.0 Option 1 - Average Depth (ft) 4.57 Bottom Vegetated Shelf Area (ft) 12933.0 Permanent Pool Area (ft2) 16135.0 Bottom Pond Area (i) 7604.0 Depth (ft) 7.0 Option 2 Average Depth (ft) 6.01 Average Depth for use in Table (ft) 6.01 Round to nearest 0.5 for SA/DA (ft) 6.00 14026 Pond Calcsxlsx 4 of 4 01/26/2016 MLV 14026 Total Drainage Area sq. ft. acres 15.28 VAML Phase 2C DA #2 Wet Detention Basin Calculation Impervious Area Land Use sq. ft. acres Lots 4.25 Roads 1.29 Sidewalks 0.19 Amenity Area 0.59 Future Total 0.23 285,050 6.54 btormwater galculanons: Time of Concentration: Hydraulic Length (L) _ change in Height (H) = Tc = (L3 /H).3e5 / 128 = 10.28 min. Flow for 1 year, 24 hour Storm (Q,): QPRE _ (CPRE) x (I,) x (Area) 11.92 cfs QPosT = (CPosT) x (11) x (Area) 31.06 cfs Detention Pond Desion: Does Area Drain to SA Waters? n % impervious = 0.428 = 42.8°% CPRE = 0.2 CPosT = (°% imp.)(.95)+(1-% imp.)(20) 0.62 I, = 3.90 in/hr 110 = 7.23 in/hr Flow for 10 year, 24 hour Storm (Q10): QPRE _ (CPRE) x (Ito) x (Area) = 22.10 cfs QPOST = (CPOST) x (110) x (Area) 57.59 cis State Surface Area Reauired at normal pool: Pond side slopes = 3 :1 Depth b/w Bot. of V.S. & 4.50 Bot. Pool = .. SA/DA = 0.0334 ; or.4•, ' Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Red SA = SA/DA x(Total Drainage Area 22,238 sq. ft. Provided SA = 24.927 sq. ft. Main Pond Size: Forebay Pond Size: Elevation Surface Area Incr. Vol CurnL Vol. Elevation Surf. Area Incr. Vol. Cuml. Vol ft.) (sq. ft.ft. s Top of Bank ,t¢ 0 ' ', , 116,598 228,730 Top of Bank ` ,1_ Old 6, a 24,492 55,107 Temp. Pool IOU, Z ,, r + : h s 4 / 23,357 112,132 Temp. Pool aAA { { ft ( 9,185 30,615 Top of V.S. 10,268 88,775 Perm. Pool Ali 3,062 21,431 Perm. Pool �S Y It 8,586 78,507 Bot. of V.S h'0Q tt ''. 18,369 18,369 Bot. of V.S iY $ 69,921 69,921 Bot. Pool ' ti0, . r.,$�f2V 0 0 wc- Bot. of Pool ,8w 0 0 'rovided Normal Main Pond Volume: Bottom SA = 15,538 sq. ft. Bottom of VS SA= 15,538 sq. ft. Permanent Pool SA = 18,804 sq. ft. Vol. = [((PP SA + Bottom VS SA)/2) x (PP el. - Bottom VS el.)] + [((Bottom VS SA + Bottom Pool SA)/2) x (Bottom VS el. - Bottom Pool el.)] = 78,507 cu. ft. Fore bay: 2rovided Normal Forebav Pond Volume Bottom of Pool SA= 6,123 sq. ft. Permanent Pool SA = 6,123 sq. ft. Vol. = [(P.P. SA + Bottom SA) / 2] x (P.P. el. - Bottom el.) 21,431 cu. ft. Depth= 3.50 ft. Required Foreba Volume 18%-22% required) Vol. = 22°% of Permanent Pool volume of Pond and Forebay 21,986 cu. ft. Volume required to contain from design storm(ft3)= 36,229 Therefore, maximum sta a is between stages and cumulative volumes (main pond plus forebay): Stage Cuml. Volume 8.50 0 14.00 183,900 Total Provided PP Volume 9 1,936 cu.ft. Actual % of Forebay Volume = 21.44 Using Interpolation to determine stage at volume = 36,229 Maximum Stage (feet) = 9.58 Therefore set Temporary Pool Elevation at or higher than Maximum Stage 14026 Pond Calcs.xim 1 of 4 01/26/2016 VAML Phase 2C 14026 MLV DA #2 Pond Size for Determining Storage Volume: Wet Detention Basin Calculation Elev. SA Incr. Vol. Cum. Vol. (ft) (sq.ft.) (cu.ft.) (cu.ft.) Temp. Pool 10.00 30,568 29,480 42,810 Top of V.S. 9.00 13,330 13,330 Perm. Pool 8.50 24,927 0 0 F vided Stora a Volume: V01. _ [((PP SA + Top of VS SA)/2) x (Top of VS Elev. — PP Elev.)] + [((Top of VS SA+TP SA)/2) x (TP Elev. - Top of VS Elev.)] Vol. = 42,810 cu. ft. State Volume Req. for Storage of first 1.5" runoff: Rv = .05+ .009(% imp) 0.435 V= (Design rainfall)(Rv)(Drainage Area) 36,229 cu. ft. Outlet Structure Design: Flow for 2-day drawdown: for Min. Volume required of stormwater, Q = Min. Vol. Req. / 172,800 sec. (2-days) 0.210 cis Re uired Area of Pipe for 2-day drawdown: A= Q/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./s2 h = (T.P. elev.- N.P. Elev.) /3 0.50 ft. A= 0.0616sq. ft. Diameter of Pipe far 2-day drawdown: DIA. = SQRT[(A x 4) / pi] = 0.2800 ft. = 3.36 in. Drawdown Calculation Orifice Used= Drawdown rate= 0.116 cfs Drawdown time= 3.61 days Outlet Structure Check: Using a 4' x 4' Basin, Perimeter L = 16 ft. Q = CIA C = (% imp.)(.95) + (1% imp.)(.25) 0.52 1 = 7.23 in. for a 10 yr. Storm A = 15.28 Acres 57.59 cfs Flow for 5-day drawdown: for Min. Volume required of stonmwater, Q = Temp. Pool Vol. / 432,000 sec. (5-days) 0.084 cis Required Area of Pipe for 5-day drawdown: A= Q/ [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft./s2 h = (F.P. elev. - N_P. Elev.) 13 0.5 ft. A = 0.0246 s . ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.1771 ft. 2.13 in. Q= CwxLxH"5 H = [Q / (Cw x L)]213 Cw = 3 1.13 ft. Peak elevation = flood pool elevation + H 11.13 ft. 14026 Pond Calcs.xlsx 2 of 4 01/26/2016 VAML Phase 2C MLV DA #2 Wet Detention Basin Calculation Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv= 0.05+0.009(IA) Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (inches) IA - Impervious Fraction = Impervious portion of the drainage area (acres) / nrainnge area (acres) IA= 42.8 % Rv = 0.435 Design Rainfall Depth = 1.50 in. Drainage Area = 15.28 acres Volume = 36,229 ft3 14026 14026 Pond Cales.xlsx 3 of 4 01/26/2016 VAML Phase 2C MLV DA #2 Wet Detention Basin Calculation 14026 Average Depth Calculated Permanent Pool Volume (ft) 99,936.0 Permanent Pool Area (ft) 24,927.0 Option 1 - Average Depth (ft) 4.01 Bottom Vegetated Shelf Area (ft?) 21661.0 Permanent Pool Area (ft) 24927.0 Bottom Pond Area (ft) 15638.0 Depth (ft) 4.5 Option 2 - Average Depth (ft) 4.33 Average Depth for use in Table (ft) 4.33 Round to nearest 0.5 for SA/DA (ft) 450 14026 Pond Calcs.)dsx 4 of 4 Q1/26/2016 MLV VAML Phase 2C Pond #1 Stormwater Pond Routing 2-year 24hr Storm 14026 WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2800 FT CHANGE IN HEIGHT 34.5 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 19.15 MIN INTENSITY 2 YR 4.14 IN/HR Qa = 41.97 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P 4.5 INCHES 2yr, 24hr PRECIPITATION CN = 64 ((98*0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) = (P-0.2S)112/(P+0.8S) D = 1.29 IN - 2yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 26.05 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 (16,168) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.00 feet AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANGE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 2 YR 4.14 IN/HR Qp = 34.63 CFS Qp = POST -DEVELOPED PEAK DISCHARGE s Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE Ins (sq ft) (cu ft) (cu ft) (ft) 8.00 16,135 0 0 0 0 9.00 20,540 18,338 18,338 1.0 9.8167 10.00 22,672 21,606 39,944 2.0 10.5952 11.00 24,889 23,781 63,724 3.0 11.0623 12.00 27,175 26,032 89,756 4.0 11.4049 13.00 29,522 28,349 118,105 5.0 11.6793 14.00 31,939 30,731 148,835 6.0 11.9106 Regression Output: Ks = 18028 b = 1.17 Constant 9.80 In Z Z est 0 0.00 0.0000 1.01 0.6931 1.98 1.0986 2.95 1.3863 3.96 1.6094 5.01 1.7918 6.11 G:UOBS12014114026-VAML Phase 2C%CaIcs114026 routing2y24hr Pond 1.xlsx 04/26/2016 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 2-year 24hr Storm 14026 CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 41.97 cfs Qp = 34.53 ofs Tp = 26.1 min dT = 4 min BASIN DATA Ks = 18028 b= 1.17 Zo = 8.00 ft Normal water elev = 8.00 ft Peak Outflow = 5.29 cfs Box Weir Length = 16 It Peak Stage = 10.89 It Cw = 3.0 Maximum Storage = 62,092 cu ft Zcr = 12.75 ft Control Holes: State Orifice: Dia = 2.50 in Dd = 36 in Inv = 8.00 It Cd = 0.59 Weir: L = 24 in Zi = 8.00 It Inv = 10.00 ft Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (ofs) (cu ft) (ft) (cfs) (cfs) (ofs) (cfs) (cfs) 0 0.0 0 8.00 0 0 0.00 0 0.00 4 2.0 0 8.00 0 0.00 0.00 0 0.00 8 7.4 473 8.04 0.01 0.00 0.00 0.01 0.00 12 15.1 2254 8.17 0.04 0.00 0.00 0.04 0.00 16 23.3 5877 8.38 0.08 0.00 0.00 0.08 0.00 20 30.1 11454 8.68 0.12 0.00 0.00 0.12 0.00 24 34.0 18656 9.03 0.16 0.00 0.00 0.16 0.00 28 34.1 26780 9.40 0.18 0.00 0.00 0.18 0.00 32 30.3 34910 9.76 0.21 0.00 0.00 0.21 0.00 36 24.9 42127 10.07 0.34 0.00 0.00 0.23 0.11 40 20.4 48014 10.32 1.31 0.00 0.00 0.24 1.07 44 16.7 52588 10.50 2.40 0.00 0.00 0.25 2.15 48 13.7 56015 10.64 3.36 0.00 0.00 0.26 3.10 52 11.2 58488 10.74 4.11 0.00 0.00 0.26 3.85 56 9.2 60187 10.81 4.66 0.00 0.00 0.27 4.39 60 7.5 61270 10.86 5.02 0.00 0.00 0.27 4.75 64 6.1 61868 10.88 5.22 0.00 0.00 0.27 4.95 68 5.0 62092 10.89 5.29 0.00 0.00 0.27 5.02 72 4.1 62030 10.89 5.27 0.00 0.00 0.27 5.00 76 3.4 61755 10.87 5.18 0.00 0.00 0.27 4.91 80 2.8 61324 10.86 5.03 0.00 0.00 0.27 4.77 84 2.3 60780 10.84 4.85 0.00 0.00 0.27 4.59 88 1.9 60159 10.81 4.65 0.00 0.00 0.27 4.38 92 1.5 59490 10.78 4.43 0.00 0.00 0.26 4.17 96 1.2 58791 10.76 4.21 0.00 0.00 0.26 3.95 100 1.0 58080 10.73 3.98 0.00 0.00 0.26 3.72 104 0.8 57369 10.70 3.77 0.00 0.00 0.26 3.51 108 0.7 56666 10.67 3.55 0.00 0.00 0.26 3.29 112 0.6 55978 10.64 3.35 0.00 0.00 0.26 3.09 116 0.5 56309 10.62 3.15 0.00 0.00 0.26 2.90 G:UOBS12014114026-VAML Phase 2C%Ca1cs114026 routing2y24hr Pond 1.xlsx 01/26/2016 VAML Phase 2C MLV Pond #1 14026 Stormwater Pond Routing 2-year 24hr Storm 120 0.4 54662 10.59 2.97 0.00 0.00 0.25 2.71 124 0.3 54040 10.56 2.79 0.00 0.00 0.25 2.54 128 0.3 53444 10.54 2.63 0.00 0.00 0.25 2.38 132 0.2 52873 10.52 2.48 0.00 0.00 0.25 2.23 136 0.2 52328 10.49 2.33 0.00 0.00 0.25 2.08 140 0.1 51809 10.47 2.20 0.00 0.00 0.25 1.95 144 0.1 51314 10.45 2.07 0.00 0.00 0.25 1.83 148 O. i 50843 10.43 1.96 0.00 0.00 0.25 1.71 152 0.1 50396 10.41 1.85 0.00 0.00 0.24 1.60 156 0.1 49971 10.40 1.75 0.00 0.00 0.24 1.50 160 0.1 49566 10.38 1.65 0.00 0.00 0.24 1.41 164 0.0 49182 10.36 1.57 0.00 0.00 0.24 1.32 168 0.0 48816 10.35 1.48 0.00 0.00 0.24 1.24 172 0.0 48468 10.34 1.41 0.00 0.00 0.24 1.17 176 0.0 48137 10.32 1.34 0.00 0.00 0.24 1.10 180 0.0 47822 10.31 1.27 0.00 0.00 0.24 1.03 184 0.0 47522 10.30 1.21 0.00 0.00 0.24 0.97 188 0.0 47236 10.28 1.15 0.00 0.00 0.24 0.91 192 0.0 46964 10.27 1.09 0.00 0.00 0.24 0.86 196 0.0 46704 10.26 1.04 0.00 0.00 0.24 0.81 200 0.0 46455 10.25 1.00 0.00 0.00 0.24 0.76 204 0.0 46218 10.24 0.95 0.00 0.00 0.24 0.72 208 0.0 45991 10.23 0.91 0.00 0.00 0.24 0.67 212 0.0 45774 10.22 0.87 0.00 0.00 0.23 0.63 216 0.0 45566 10.22 0.83 0.00 0.00 0.23 0.60 220 0.0 45367 10.21 0.80 0.00 0.00 0.23 0.56 224 0.0 45177 10.20 0.77 0.00 0.00 0.23 0.53 228 0.0 44993 10.19 0.73 0.00 0.00 0.23 0.50 232 0.0 44818 10.18 0.71 0.00 0.00 0.23 0.47 236 0.0 44649 10.18 0.68 0.00 0.00 0.23 0.45 240 0.0 44486 10.17 0.65 0.00 0.00 0.23 0.42 244 0.0 44330 10.16 0.63 0.00 0.00 0.23 0.40 248 0.0 44180 10.16 0.60 0.00 0.00 0.23 0.37 252 0.0 44035 10.15 0.58 0.00 0.00 0.23 0.35 256 0.0 43895 10.15 0.56 0.00 0.00 0.23 0.33 260 0.0 43760 10.14 0.54 0.00 0.00 0.23 0.31 264 0.0 43630 10.13 0.52 0.00 0.00 0.23 0.29 268 0.0 43504 10.13 0.51 0.00 0.00 0.23 0.28 272 0.0 43383 10.12 0.49 0.00 0.00 0.23 0.26 276 0.0 43265 10.12 0.47 0.00 0.00 0.23 0.25 280 0.0 43151 10.11 0.46 0.00 0.00 0.23 0.23 284 0.0 43041 10.11 0.45 0.00 0.00 0.23 0.22 288 0.0 42934 10.10 0.43 0.00 0.00 0.23 0.20 292 0.0 42831 10.10 0.42 0.00 0.00 0.23 0.19 296 0.0 42730 10.10 0.41 0.00 0.00 0.23 0.18 300 0.0 42633 10.09 0.40 0.00 0.00 0.23 0.17 304 0.0 42538 10.09 0.38 0.00 0.00 0.23 0.16 308 0.0 42446 10.08 0.37 0.00 0.00 0.23 0.15 312 0.0 42356 10.08 0.36 0.00 0.00 0.23 0.14 316 0.0 42269 10.08 0.35 0.00 0.00 0.23 0.13 320 0.0 42184 10.07 0.35 0.00 0.00 0.23 0.12 324 0.0 42101 10.07 0.34 0.00 0.00 0.23 0.11 328 0.0 42020 10.07 0.33 0.00 0.00 0.23 0.10 332 0.0 41941 10.06 0.32 0.00 0.00 0.23 0.09 336 0.0 41864 10.06 0.31 0.00 0.00 0.23 0.09 340 0.0 41789 10.06 0.31 0.00 0.00 0.23 0.08 344 0.0 41716 10.05 0.30 0.00 0.00 0.22 0.07 348 0.0 41644 10.06 0.29 0.00 0.00 0.22 0.07 352 0.0 41574 10.06 0.29 0.00 0.00 0.22 0.06 356 0.0 41505 10.04 0.28 0.00 0.00 0.22 0.06 360 0.0 41437 10.04 0.28 0.00 0.00 0.22 0.05 364 0.0 41371 10.04 0.27 0.00 0.00 0.22 0.05 368 0.0 41307 10.04 0.27 0.00 0.00 0.22 0.04 372 0.0 41243 10.03 0.26 0.00 0.00 0.22 0.04 376 0.0 41180 10.03 0.26 0.00 0.00 0.22 0.03 380 0.0 41119 10.03 0.25 0.00 0.00 0.22 0.03 384 0.0 41058 10.03 0.25 0.00 0.00 0.22 0.02 388 0.0 40999 10.02 0.24 0.00 0.00 0.22 0.02 392 0.0 40940 10.02 0.24 0.00 0.00 0.22 0.02 396 0.0 40882 10.02 0.24 0.00 0.00 0.22 0.01 400 0.0 40825 10.02 0.23 0.00 0.00 0.22 0.01 404 0.0 40769 10.01 0.23 0.00 0.00 0.22 0.01 408 0.0 40713 10.01 0.23 0.00 0.00 0.22 0.01 G:%JOBS12014114026-VAML Phase 2C\Calcs114026 routing2yrMr Pond 1.xlsx 01 /2612016 MLV VAML Phase 2C Pond #1 Stormwater Pond Routing 10-year 24hr Storm 14026 WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2800 FT CHANGE IN HEIGHT 34.5 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 19.15 MIN INTENSITY 10 YR 5.15 IN/HR Qa = 52.21 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 7, INCHES 10yr, 24hr PRECIPITATION CN = 64 ((98*0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) = (P-0.2S)"2/(P+0.8S) D = 3.04 IN -10yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)) / Qp Tp = 49.36 MINUTES Storage Volume Req'd = (Qp-Qa) Tp*1.39*60 (38,101) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.00 feet AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANGE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 10 YR 5.15 IN/HR Qp = 42.98 CFS Op = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.00 16,135 0 0 0 0 0 0.00 9.00 20,540 18,338 18,338 1.0 9.8167 0.0000 1.01 10.00 22,672 21,606 39,944 2.0 10.5952 0.6931 1.98 11.00 24,889 23,781 63,724 3.0 11.0623 1.0986 2.95 12.00 27,175 26,032 89,756 4.0 11.4049 1.3863 3.96 13.00 29,522 28,349 118,105 5.0 11.6793 1.6094 5.01 14.00 31,939 30,731 148,835 6.0 11.9106 1.7918 6.11 Regression Output: => Ks = 18028 b = 1.17 Constant 9.80 G:W0B812014114026-VAML Phase 2C\Calcs114026 routing10yr24hr Pond 1.xlsx G1/26/2016 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 10-year 24hr Storm 14026 CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 52.21 cis Qp = 42.96 Cis Tp = 49.4 min dT = 4 min BASIN DATA Ks = 18028 b = 1.17 Zo = 8.00 ft Normal water elev = 8.00 ft Peak Outflow = 21.05 cis Box Weir Length = 16 ft Peak Stage = 12.28 It Cw = 3.0 Maximum Storage = 98,332 cu ft Zcr = 12.75 ft Control Holes: State Orifice: Dia = 2.50 in Dd = 36 in Inv = 8.00 ft Cd = 0.59 Weir: L = 24 in Zi = 8.00 ft Inv = 10.00 ft Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cls) (cu ft) (ft) (cfs) (cfs) (Cfs) (S) (cfs) 0 0.0 0 8.00 0 0 0.00 0 0.00 4 0.7 0 8.00 0 0.00 0.00 0 0.00 8 2.7 166 8.02 0.00 0.00 0.00 0.00 0.00 12 6.0 820 8.07 0.01 0.00 0.00 0.01 0.00 16 10.2 2249 8.17 0.04 0.00 0.00 0.04 0.00 20 15.2 4690 8.32 0.07 0.00 0.00 0.07 0.00 24 20.5 8314 8.51 0.10 0.00 0.00 0.10 0.00 28 26.0 13221 8.77 0.13 0.00 0.00 0.13 0.00 32 31.1 19425 9.07 0.16 0.00 0.00 0.16 0.00 36 35.6 26857 9.41 0.18 0.00 0.00 0.18 0.00 40 39.3 35369 9.78 0.21 0.00 0.00 0.21 0.00 44 41.7 44740 10.18 0.69 0.00 0.00 0.23 0.46 48 42.9 54586 10.59 2.95 0.00 0.00 0.25 2.69 52 42.7 64169 10.97 6.01 0.00 0.00 0.27 5.74 56 41.1 72962 11.32 9.36 0.00 0.00 0.29 9.07 60 38.2 80572 11.61 12.58 0.00 0.00 0.30 12.28 64 34.6 86725 11.85 15.37 0.00 0.00 0.31 15.06 68 31.1 91328 12.02 17.56 0.00 0.00 0.32 17.24 72 28.0 94576 12.14 19.16 0.00 0.00 0.32 18.83 76 25.2 96695 12.22 20.22 0.00 0.00 0.33 19.89 80 22.7 97888 12.27 20.82 0.00 0.00 0.33 20.49 84 20.4 98332 12.28 21.05 0.00 0.00 0.33 20.72 88 18.4 98178 12.28 20.97 0.00 0.00 0.33 20.64 92 16.5 97552 12.26 20.65 0.00 0.00 0.33 20.32 96 14.9 96563 12.22 20.15 0.00 0.00 0.33 19.82 100 13.4 95296 12.17 19.52 0.00 0.00 0.32 19.19 104 12.0 93826 12.12 18.78 0.00 0.00 0.32 18.46 108 10.8 92209 12.05 17.99 0.00 0.00 0.32 17.67 112 9.8 90493 11.99 17.16 0.00 0.00 0.32 16.84 116 8.8 88718 11.92 16.31 0.00 0.00 0.31 16.00 G:UOBS12014114026-VAML Phase 2C%Calcs114026 routing10y24hr Pond 1.xlsx 61/26/2016 VAML Phase 2C 14026 MLV Pond #1 Stormwater Pond Routing 10-year 24hr Storm 120 7.9 88911 11.85 15.46 0.00 0.00 0.31 15.15 124 7.1 85098 11.78 14.62 0.00 0.00 0.31 14.31 128 6.4 83298 11.72 13.80 0.00 0.00 0.31 13.49 132 5.8 81524 11.65 13.00 0.00 0.00 0.30 12.70 136 5.2 79787 11.58 12.23 0.00 0.00 0.30 11.93 140 4.7 78096 11.52 11.50 0.00 0.00 0.30 11.20 144 4.2 76467 11.45 10.80 0.00 0.00 0.29 10.51 148 3.8 74873 11.39 10.14 0.00 0.00 0.29 9.85 152 3.4 73347 11.33 9.51 0.00 0.00 0.29 9.22 156 3.1 71880 11.27 8.92 0.00 0.00 0.29 8.64 160 2.8 70474 11.22 8.37 0.00 0.00 0.28 8.08 164 2.5 69128 11.17 7.85 0.00 0.00 0.28 7.56 168 2.2 67840 11.12 7.36 0.00 0.00 0.28 7.08 172 2.0 66611 11.07 6.90 0.00 0.00 0.28 6.62 176 1.8 65438 11.02 6.47 0.00 0.00 0.28 6.19 180 1.6 64319 10.98 6.07 0.00 0.00 0.27 5.79 184 1.5 63254 10.93 5.69 0.00 0.00 0.27 5.42 188 1.3 62239 10.89 5.34 0.00 0.00 0.27 5.07 192 1.2 61273 10.86 5.02 0.00 0.00 0.27 4.75 196 1.1 60354 10.82 4.71 0.00 0.00 0.27 4.45 200 1.0 59480 10.78 4.43 0.00 0.00 0.26 4.16 204 0.9 58648 10.75 4.16 0.00 0.00 0.26 3.90 208 0.8 57857 10.72 3.92 0.00 0.00 0.26 3.65 212 0.7 57104 10.69 3.68 0.00 0.00 0.26 3.43 216 0.6 56388 10.66 3.47 0.00 0.00 0.26 3.21 220 0.6 55707 10.63 3.27 0.00 0.00 0.26 3.01 224 0.5 55058 10.61 3.08 0.00 0.00 0.25 2.83 228 0.5 54442 10.58 2.91 0.00 0.00 0.25 2.65 232 0.4 53854 10.56 2.74 0.00 0.00 0.26 2.49 236 0.4 53295 10.53 2.59 0.00 0.00 0.25 2.34 240 0.3 52763 10.51 2.45 0.00 0.00 0.25 2.20 244 0.3 52256 10.49 2.31 0.00 0.00 0.25 2.07 248 0.3 51773 10.47 2.19 0.00 0.00 0.25 1.94 252 0.2 51313 10.45 2.07 0.00 0.00 0.25 1.83 256 0.2 50873 10.43 1.96 0.00 0.00 0.25 1.72 260 0.2 50455 10.42 1.86 0.00 0.00 0.25 1.62 264 0.2 50055 10.40 1.77 0.00 0.00 0.24 1.52 268 0.2 49674 10.39 1.68 0.00 0.00 0.24 1.43 272 0.1 49309 10.37 1.59 0.00 0.00 0.24 1.35 276 0.1 48961 10.36 1.52 0.00 0.00 0.24 1.27 280 0.1 48629 10.34 1.44 0.00 0.00 0.24 1.20 284 0.1 48311 10.33 1.37 0.00 0.00 0.24 1.13 288 0.1 48007 10.32 1.31 0.00 0.00 0.24 1.07 292 0.1 47715 10.30 1.25 0.00 0.00 0.24 1.01 296 0.1 47437 10.29 1.19 0.00 0.00 0.24 0.95 300 0.1 47170 10.28 1.14 0.00 0.00 0.24 0.90 304 0.1 46914 10.27 1.08 0.00 0.00 0.24 0.85 308 0.1 46669 10.26 1.04 0.00 0.00 0.24 0.80 312 0.1 46433 10.25 0.99 0.00 0.00 0.24 0.76 316 0.0 46207 10.24 0.95 0.00 0.00 0.24 0.71 320 0.0 45991 10.23 0.91 0.00 0.00 0.24 0.67 324 0.0 45782 10.22 0.87 0.00 0.00 0.23 0.64 328 0.0 45582 10.22 0.84 0.00 0.00 0.23 0.60 332 0.0 45389 10.21 0.80 0.00 0.00 0.23 0.57 336 0.0 45204 10.20 0.77 0.00 0.00 0.23 0.54 340 0.0 45026 10.19 0.74 0.00 0.00 0.23 0.51 344 0.0 44854 10.19 0.71 0.00 0.00 0.23 0.48 348 0.0 44689 10.18 0.68 0.00 0.00 0.23 0.45 352 0.0 44529 10.17 0.66 0.00 0.00 0.23 0.43 356 0.0 44375 10.17 0.63 0.00 0.00 0.23 0.40 360 0.0 44227 10.16 0.61 0.00 0.00 0.23 0.38 364 0.0 44083 10.16 0.59 0.00 0.00 0.23 0.36 368 0.0 43945 10.15 0.57 0.00 0.00 0.23 0.34 372 0.0 43811 10.14 0.55 0.00 0.00 0.23 0.32 376 0.0 43681 10.14 0.53 0.00 0.00 0.23 0.30 380 0.0 43556 10.13 0.51 0.00 0.00 0.23 0.28 384 0.0 43435 10.13 0.50 0.00 0.00 0.23 0.27 388 0.0 43317 10.12 0.48 0.00 0.00 0.23 0.25 392 0.0 43203 10.12 0.47 0.00 0.00 0.23 0.24 396 0.0 43093 10.11 0.45 0.00 0.00 0.23 0.22 400 0.0 42986 10.11 0.44 0.00 0.00 0.23 0.21 404 o_n 42882 in in 0.43 0.00 0.00 0.23 0.20 408 0.0 42781 10.10 0.41 0.00 0.00 0.23 0.19 G:WOBS%2014114026 VAML Phase 2C%Calcs114026 rcuting10yr24hr Pond 1.xlsx O,1/26/2016 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 25-year 24hr Storm 14026 WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2800 FT CHANGE IN HEIGHT 34.5 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 19.16 MIN INTENSITY 25 YR 5.83 IN/HR Qa = 59.10 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = ;84 INCHES 25yr, 24hr PRECIPITATION CN = 64 ((98*0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) _ (P-0.2S)"2/(P+0.8S) D = 3.86 IN - 25yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 55.43 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 (48,438) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.00 feet AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANGE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 25 YR 5.83 IN/HR Qp = 48.63 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.00 16,135 0 0 0 0 0 0.00 9.00 20,540 18,338 18,338 1.0 9.8167 0.0000 1.01 10.00 22,672 21,606 39,944 2.0 10.5952 0.6931 1.98 11.00 24,889 23,781 63,724 3.0 11.0623 1.0986 2.95 12.00 27,175 26,032 89,756 4.0 11.4049 1.3863 3.96 13.00 29,522 28,349 118,105 5.0 11.6793 1.6094 5.01 14.00 31,939 30,731 148,835 6.0 11.9106 1.7918 6.11 Regression Output: Ks = 18028 b = 1.17 Constant 9.80 G:WOBS12014114026-VAML Phase 2C%Calcs114026 routing25yr24hr_Pond 1.x1sx 01/26/2016 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 25-year 24hr Storm 14026 CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 59.10 cfs Qp = 48.63 cfs Tp = 55.4 min dT = 4 min BASIN DATA Ks = 18028 b = 1.17 Zo = 8.00 it Normal water elev = 8.00 ft Peak Outflow = 28.03 cfs Box Weir Length = 16 ft Peak Stage - 12.77 It Cw = 3.0 Maximum Storage = 111,309 cu ft Zcr = 12.75 It Control Holes: State Orifice: Dia = 2.50 in Dd = 36 in Inv = 8.00 It Cd = 0.59 Weir. L = 24 in Zi = 8.00 It Inv = 10.00 ft Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cfs) (cu ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) 0 0.0 0 8.00 0 0 0.00 0 0.00 4 0.6 0 8.00 0 0.00 0.00 0 0.00 8 2.5 149 8.02 0.00 0.00 0.00 0.00 0.00 12 5.4 739 8.06 0.01 0.00 0.00 0.01 0.00 16 9.3 2035 8.15 0.03 0.00 0.00 0.03 0.00 20 14.0 4266 A2.4 n n7 0.00 0.00 0.07 0.00 24 19.2 7613 8.48 0.10 0.00 0.00 0.10 0.00 28 24.7 12205 8.72 0.13 0.00 0.00 0.13 0.00 32 30.2 18104 9.00 0.15 0.00 0.00 0.15 0.00 36 35.3 25306 9.34 0.18 0.00 0.00 0.18 0.00 40 39.9 33738 9.71 0.20 0.00 0.00 0.20 0.00 44 43.7 43266 10.12 0.47 0.00 0.00 0.23 0.25 48 46.5 53641 10.55 2.68 0.00 0.00 0.25 2.43 52 48.2 64157 10.97 6.01 0.00 0.00 0.27 5.74 56 48.6 74275 11.37 9.89 0.00 0.00 0.29 9.60 60 47.8 83568 11.73 13.92 0.00 0.00 0.31 13.61 64 45.8 91704 12.04 17.74 0.00 0.00 0.32 17.43 68 42.7 98441 12.29 21.10 0.00 0.00 0.33 20.77 72 39.0 103628 12.48 23.79 0.00 0.00 0.34 23.46 76 35.5 107276 12.62 25.74 0.00 0.00 0.34 25.40 80 32.3 109620 12.70 27.01 0.00 0.00 0.35 26.66 84 29.4 110896 12.75 27.71 0.00 0.00 0.35 27.36 88 26.8 111309 12.77 28.03 0.09 0.00 0.35 27.59 92 24.4 111014 12.75 27.79 0.01 0.00 0.35 27.43 96 22.2 110200 12.72 27.33 0.00 0.00 0.35 26.98 100 20.2 108973 12.68 26.66 0.00 0.00 0.34 26.31 104 18.4 107428 12.62 26.82 0.00 0.00 0.34 25.48 108 16.8 105650 12.56 24.87 0.00 0.00 0.34 24.53 112 15.3 103705 12.48 23.83 0.00 0.00 0.34 23.50 116 13.9 101648 12.41 22.76 0.00 0.00 0.33 22.42 G:WOBSQ014114026-VAML Phase 2C%CaIcs114026 routingMyrMr Pond 1.xlsx 0,1/26/2016 VAML Phase 2C 14026 MLV Pond#1 Stormwater Pond Routing 25-year 24hr Storm 120 12.7 99521 12.33 21.66 0.00 0.00 0.33 21.32 124 11.5 97360 12.25 20.55 0.00 0.00 0.33 20.23 128 10.5 95192 12.17 19.46 0.00 0.00 0.32 19.14 132 9.5 93038 12.09 18.40 0.00 0.00 0.32 18.08 136 8.7 90914 12.01 17.36 0.00 0.00 0.32 17.04 140 7.9 88833 11.93 16.36 n nn 0.00 0.32 16.05 144 7.2 86805 11.86 15.41 0.00 0.00 0.31 15.10 148 6.6 84837 11.77 14.50 0.00 0.00 0.31 14.19 152 6.0 82932 11.70 13.63 0.00 0.00 0.31 13.32 156 5.4 81094 11.63 12.81 0.00 0.00 0.30 12.51 160 5.0 79325 11.56 12.03 0.00 0.00 0.30 11.73 164 4.5 77626 11.50 11.30 0.00 0.00 0.30 11.00 168 4.1 75997 11.43 10.61 0.00 0.00 0.29 10.31 172 3.7 74436 11.37 9.96 0.00 0.00 0.29 9.67 176 3.4 72943 11.32 9.35 0.00 0.00 0.29 9.06 180 3.1 71515 11.26 8.78 0.00 0.00 0.29 8.49 184 2.8 70152 11.21 8.24 0.00 0.00 0.28 7.96 188 2.6 68651 11.16 7.74 0.00 0.00 0.28 7.46 192 2.3 67610 11.11 7.27 0.00 0.00 0.28 6.99 196 2.1 66426 11.06 6.83 0.00 0.00 0.28 6.55 200 1.9 65298 11.02 6.42 0.00 0.00 0.27 6.14 204 1.8 64223 10.97 6.03 0.00 0.00 0.27 5.76 208 1.6 63198 10.93 5.67 0.00 0.00 0.27 5.40 212 1.5 62222 10.89 5.34 0.00 0.00 0.27 5.07 216 1.3 61292 10.86 5.02 0.00 0.00 0.27 4.76 220 1.2 60406 10.82 4.73 0.00 0.00 0.27 4.46 224 1.1 59562 10.79 4.45 0.00 0.00 0.26 4.19 228 1.0 58758 10.75 4.20 0.00 0.00 0.26 3.93 232 0.9 57992 10.72 3.96 0.00 0.00 0.26 3.70 236 0.8 57262 10.69 3.73 0.00 0.00 0.26 3.47 240 0.8 56566 10.67 3.52 0.00 0.00 0.26 3.26 244 0.7 55903 10.64 3.33 0.00 0.00 0.26 3.07 248 0.6 55270 10.61 3.14 0.00 0.00 0.26 2.89 252 0.6 54667 10.59 2.97 0.00 0.00 0.25 2.72 256 0.5 54092 10.57 2.81 0.00 0.00 0.25 2.56 260 0.5 53543 10.54 2.66 0.00 0.00 0.25 2.41 264 0.4 53019 10.52 2.52 0.00 0.00 0.25 2.27 268 0.4 52519 10.50 2.38 0.00 0.00 0.25 2.13 272 0.4 52041 10.48 2.26 0.00 0.00 0.26 2.01 276 0.3 51585 10.46 2.14 0.00 0.00 0.25 1.89 280 0.3 51149 10.45 2.03 0.00 0.00 0.25 1.79 284 0.3 50732 10.43 1.93 0.00 0.00 0.25 1.68 288 0.2 50334 10.41 1.83 0.00 0.00 0.24 1.59 292 0.2 49953 10.40 1.74 0.00 0.00 0.24 1.50 296 0.2 49588 10.38 1.66 0.00 0.00 0.24 1.42 300 0.2 49239 10.37 1.58 0.00 0.00 0.24 1.34 304 0.2 48905 10.35 1.50 0.00 0.00 0.24 1.26 308 0.2 48585 10.34 1.43 0.00 0.00 0.24 1.19 312 0.1 48278 10.33 1.37 0.00 0.00 0.24 1.13 316 0.1 47984 10.32 1.30 0.00 0.00 0.24 1.06 320 0.1 47702 10.30 1.24 0.00 0.00 0.24 1.00 324 0.1 47431 10.29 1.19 0.00 0.00 0.24 0.95 328 0.1 47171 10.28 1.14 0.00 0.00 0.24 0.90 332 0.1 46922 10.27 1.09 0.00 0.00 0.24 0.85 336 0.1 46682 10.26 1.04 0.00 0.00 0.24 0.80 340 0.1 46452 10.25 0.99 0.00 0.00 0.24 0.76 344 0.1 46231 10.24 0.95 0.00 0.00 0.24 0.72 348 0.1 46018 10.23 0.91 0.00 0.00 0.24 0.68 352 0.1 45813 10.23 0.88 0.00 0.00 0.23 0.64 356 0.0 45616 10.22 0.84 0.00 0.00 0.23 0.61 360 0.0 45426 10.21 0.81 0.00 0.00 0.23 0.57 364 0.0 45243 10.20 0.78 0.00 0.00 0.23 0.54 368 0.0 45067 10.19 0.75 0.00 0.00 0,23 0.51 372 0.0 44896 10.19 0.72 0.00 0.00 0.23 0.49 376 0.0 44732 10.18 0.69 0.00 0.00 0.23 0.46 380 0.0 44574 10.17 0.67 0.00 0.00 0.23 0.43 384 0.0 44421 10.17 0.64 0.00 0.00 0.23 0.41 388 0.0 44273 10.16 0.62 0.00 0.00 0.23 0.39 392 0.0 44130 10.16 0.60 0.00 0.00 0.23 0.37 396 0.0 43992 10.15 0.58 0.00 0.00 0.23 0.35 400 0.0 43858 10.14 0.56 0.00 0.00 0.23 0.33 404 0.0 43729 10.14 0.54 0_00 0.00 U.23 0.31 408 0.0 43604 10.13 0.52 0.00 0.00 0.23 0.29 GAJOBSUD74114026-VAML Phase 2CXCalcs114026 routing25y24hr Pond t.xlsx 01/26/2016 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 100-year 24hr Storm 14026 WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2800 FT CHANGE IN HEIGHT 34.5 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 19.15 MIN INTENSITY 100 YR 6.89 IN/HR Qa = 69.85 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P= .INCHES 100yr, 24hr PRECIPITATION CN = 64 ((98*0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) = (P-0.2S)^2/(P+0.8S) D = 5.48 IN-100yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 66.55 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 (68,728) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.00 feet AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANGE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 100 YR 6.89 IN/HR Qp = 57.47 CFS Qp = POST -DEVELOPED PEAK DISCHARGE s Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE Ins In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.00 16,135 0 0 0 0 0 0.00 9.00 20,540 18,338 18,338 1.0 9.8167 0.0000 1.01 10.00 22,672 21,606 39,944 2.0 10.5962 0.6931 1.98 11.00 24,889 23,781 63,724 3.0 11.0623 1.0986 2.95 12.00 27,175 26,032 89,756 4.0 11.4049 1.3863 3.96 13.00 29,522 28,349 118,105 5.0 11.6793 1.6094 5.01 14.00 31,939 30,731 148,835 6.0 11.9106 1.7918 6.11 Regression Output: Ks = 18028 b = 1.17 Constant 9.80 GAJOBS12014114026-VAML Phase 2C%Calcs114026 routing100yr24hr Pond 1.x1sx 0,1/26/2016 VAML Phase 2C 14026 MLV Pond #1 Stormwater Pond Routing 100-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 69.85 cfs Qp = 57.47 Cis Tp = 66.6 min dT = 4 min BASIN DATA Ks = b= Zo = Normal water elev = Box Weir Length = Cw = Zcr = 18028 1.17 8.00 ft 8.00 ft Peak Outflow = 48.76 cfs 16 ft Peak Stage = 13.19 ft 3.0 Maximum Storage = 123,049 cu It 12.75 ft Control Holes: State Orifice: Dia = 2 50 it Dd = 36 in Cd = 0.59 Zi = 8.00 ft Inv = 8.00 ft Weir: L = 24 in Inv = 10.00 ft Emergency Overflow Weir: L = 480.0 in Inv = 13.50 ft Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cis) (cu ft) (ft) (ems) (�) (ds) (S) 0 0.0 0 8.00 0 0 0.00 0 0.00 4 0.5 0 8.00 0 0.00 0.00 0 0.00 8 2.0 123 8.01 0.00 0.00 0.00 0.00 0.00 12 4.5 608 8.05 0.01 0.00 0.00 0.01 0.00 16 7.8 1684 8.13 0.03 0.00 0.00 0.03 0.00 20 11.9 3553 8.25 0.06 0.00 0.00 0.06 0.00 24 16.6 6390 8.41 0.09 0.00 0.00 0.09 0.00 28 21.7 10341 8.62 0.12 0.00 0.00 0.12 0.00 32 27.0 15510 8.88 0.14 0.00 0.00 0.14 0.00 36 32.4 21957 9.18 0.17 0.00 0.00 0.17 0.00 40 37.7 29698 9.53 0.19 0.00 0.00 0.19 0.00 44 42.7 38700 9.93 0.22 0.00 0.00 0.22 0.00 48 47.1 48888 10.35 1.50 0.00 0.00 0.24 1.26 52 51.0 59842 10.80 4.54 0.00 0.00 0.26 4.28 56 54.0 70979 11.24 8.57 0.00 0.00 0.29 8.28 60 56.1 81878 11.66 13.16 0.00 0.00 0.30 12.85 64 57.3 92186 12.05 17.98 0.00 0.00 0.32 17.66 68 57.4 101613 12.41 22.74 0.00 0.00 0.33 22.40 72 56.5 109932 12.71 27.18 0.00 0.00 0.35 26.83 76 54.7 116974 12.97 36.14 5.03 0.00 0.36 30.75 80 51.9 121419 13.13 45.07 11.42 0.00 0.36 33.29 84 48.3 123049 13.19 48.76 14.16 0.00 0.36 34.24 88 44.7 122949 13.19 48.52 13.98 0.00 0.36 34.18 92 41.3 122033 13.16 46.44 12.43 0.00 0.36 33.64 96 38.2 120811 13.11 43.75 10.45 0.00 0.36 32.94 100 35.4 119487 13.06 40.98 8.44 0.00 0.36 32.18 104 32.7 118140 13.01 38.31 6.54 0.00 0.36 31.41 108 30.2 116795 12.97 35.82 4.81 0.00 0.36 30.65 112 28.0 115458 12.92 33.53 3.28 0.00 0.35 29.89 116 25.9 114126 12.87 31.45 1.96 0.00 0.35 29.15 G:UOBS12014114026-VAML Phase 2C%Celcs114026 routing100yr24hr Pond 1.xlsx 01/26/2016 VAML Phase 2C 14026 MLV Pond #1 Stormwater Pond Routing 100-year 24hr Storm 120 23.9 112786 12.82 29.63 0.88 0.00 0.35 28.40 124 22.1 111418 12.77 28.12 0.13 0.00 0.35 27.65 128 20.5 109979 12.72 27.21 0.00 0.00 0.35 26.86 132 18.9 108361 12.66 26.33 0.00 0.00 0.34 25.98 136 17.5 106586 12.59 25.37 0.00 0.00 0.34 25.03 140 16.2 104698 12.52 24.36 0.00 0.00 0.34 24.02 144 15.0 102737 12.45 23.33 0.00 0.00 0.34 22.99 148 13.8 100732 12.37 22.28 0.00 0.00 0.33 21.95 152 12.8 98708 12.30 21.24 0.00 0.00 0.33 20.91 156 11.8 96684 12.22 20.21 0.00 0.00 0.33 19.88 160 11.0 94676 12.15 19.21 0.00 0.00 0.32 18.88 164 10.1 92695 12.07 18.23 0.00 0.00 0.32 17.91 168 9.4 90752 12.00 17.28 0.00 0.00 0.32 16.97 172 8.7 88852 11.93 16.37 0.00 0.00 0.32 16.06 176 8.0 87002 11.86 15.50 0.00 0.00 0.31 15.19 180 7.4 85205 11.79 14.67 0.00 0.00 0.31 14.36 184 6.9 83463 11.72 13.87 0.00 0.00 0.31 13.56 188 6.3 81779 11.66 13.11 0.00 0.00 0.30 12.81 192 5.9 80154 11.60 12.39 0.00 0.00 0.30 12.09 196 5.4 78586 11.54 11.71 0.00 0.00 0.30 11.41 200 5.0 77077 11.48 11.06 0.00 0.00 0.30 10.77 204 4.6 75625 11.42 10.45 0.00 0.00 0.29 10.16 208 4.3 74229 11.37 9.87 0.00 0.00 0.29 9.58 212 4.0 72889 11.31 9.33 0.00 0.00 0.29 9.04 216 3.7 71602 11.26 8.81 0.00 0.00 0.29 8.53 220 3.4 70368 11.22 8.33 0.00 0.00 0.28 8.04 224 3.1 69184 11.17 7.87 0.00 0.00 0.28 7.58 228 2.9 68049 11.12 7.43 0.00 0.00 0.28 7.15 232 2.7 66961 11.08 7.03 0.00 0.00 0.28 6.75 236 2.5 65919 11.04 6.64 0.00 0.00 0.28 6.37 240 2.3 64920 11.00 6.28 0.00 0.00 0.27 6.01 244 2.1 63963 10.96 5.94 0.00 0.00 0.27 5.67 248 2.0 63047 10.93 5.62 0.00 0.00 0.27 5.35 252 1.8 62169 10.89 5.32 0.00 0.00 0.27 5.05 256 1.7 61328 10.86 5.03 0.00 0.00 0.27 4.77 260 1.6 60523 10.83 4.77 0.00 0.00 0.27 4.50 264 1.4 59751 10.79 4.52 0.00 0.00 0.26 4.25 268 1.3 59012 10.77 4.28 0.00 0.00 0.26 4.02 272 1.2 58304 10.74 4.05 0.00 0.00 0.26 3.79 276 1.1 57626 10.71 3.84 0.00 0.00 0.26 3.58 280 1.1 56976 10.68 3.65 0.00 0.00 0.26 3.39 284 1.0 56354 10.66 3.46 0.00 0.00 0.26 3.20 288 0.9 55757 10.63 3.28 0.00 0.00 0.26 3.03 292 0.8 55184 10.61 3.12 0.00 0.00 0.26 2.86 296 0.8 54636 10.59 2.96 0.00 0.00 0.25 2.71 300 0.7 54110 10.57 2.81 0.00 0.00 0.25 2.56 304 0.7 53605 10.55 2.67 0.00 0.00 0.25 2.42 308 0.6 53121 10.53 2.54 0.00 0.00 0.25 2.29 312 0.6 52657 10.51 2.42 0.00 0.00 0.25 2.17 316 0.5 52211 10.49 2.30 0.00 0.00 0.25 2.05 320 0.5 51783 10.47 2.19 0.00 0.00 0.25 1.94 324 0.4 51372 10.46 2.09 0.00 0.00 0.25 1.84 328 0.4 50978 10.44 1.99 0.00 0.00 0.25 1.74 332 0.4 50599 10.42 1.90 0.00 0.00 0.25 1.65 336 0.4 50234 10.41 1.81 0.00 0.00 0.24 1.57 340 0.3 49885 10.39 1.73 0.00 0.00 0.24 1.48 344 0.3 49548 10.38 1.65 0.00 0.00 0.24 1.41 348 0.3 49225 10.37 1.57 0.00 0.00 0.24 1.33 352 0.3 48913 10.35 1.50 0.00 0.00 0.24 1.26 356 0.2 48614 10.34 1.44 0.00 0.00 0.24 1.20 360 0.2 48326 10.33 1.38 0.00 0.00 0.24 1.14 364 0.2 48048 10.32 1.32 0.00 0.00 0.24 1.08 368 0.2 47781 10.31 1.26 0.00 0.00 0.24 1.02 372 0.2 47524 10.30 1.21 0.00 0.00 0.24 0.97 376 0.2 47276 10.29 1.16 0.00 0.00 0.24 0.92 380 0.1 47037 10.28 1.11 0.00 0.00 0.24 0.87 384 0.1 46807 10.27 1.06 0.00 0.00 0.24 0.83 388 0.1 46585 10.26 1.02 0.00 0.00 0.24 0.78 392 0.1 46371 10.25 0.98 0.00 0.00 0.24 0.74 396 0.1 46164 10.24 0.94 0.00 0.00 0.24 0.71 400 0.1 45964 10.23 0.90 0.00 0.00 0.24 0.67 404 0.1 45771 10.22 0.87 o_no n an 0.23 0.63 408 0.1 45585 10.22 0.84 0.00 0.00 0.23 0.60 G:IJOBS12014114026-VAML Phase 2C%Calcs114026 routing100yr24hr Pond 1.xlsx 0.1/26/2016 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 100-year 24hr Storm Clogged WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2800 FT CHANGE IN HEIGHT 34.5 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 19.15 MIN INTENSITY 100 YR 6.89 IN/HR Qa = 69.85 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 40 INCHES 100yr, 24hr PRECIPITATION CN = 64 ((98*0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) = (P-0.2S)A2/(P+O.BS) D = 5.48 IN-100yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 66.55 MINUTES Storage Volume Req'd = (Qp-Qa)"Tp*1.39*60 (68,728) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.00 feet AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANGE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 100 YR 6.89 1N/HR Qp = 57.47 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) -(ft) 8.00 16,135 0 0 0 0 0 0.00 9.00 20,540 18,338 18,338 1.0 9.8167 0.0000 1.01 10.00 22,672 21,606 39,944 2.0 10.5952 0.6931 1.98 11.00 24,889 23,781 63,724 3.0 11.0623 1.0986 2.95 12.00 27,175 26,032 89,756 4.0 11.4049 1.3863 3.96 13.00 29,522 28,349 118,105 5.0 11.6793 1.6094 5.01 14.00 31,939 30,731 148,835 6.0 11.9106 1.7918 6.11 Regression Output: => Ks = 18028 b = 1.17 Constant 9.80 14026 GNOBW014114026-VAML Phase 2C%Calcs114026 routing100yr24hr clogged_Pond 1.xlsx Orl/26/2016 VAML Phase 2C MLV Pond 91 Stormwater Pond Routing 100-year 24hr Storm Clogged CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 69.85 cis Qp = 57.47 cis Tp = 66.6 min dT = 4 min BASIN DATA Ks = 18028 b = 1.17 Zo = 8.00 ft Normal water elev = 8.00 ft Peak Outflow = 59.40 cfs Box Weir Length = ft Peak Stage = 13.53 ft Cw = 3.0 Maximum Storage = 132,288 cu ft Zcr = ft Control Holes: State Orifice: Dia = in Dd = in Inv = ft Cd = 0.59 Emergency Overflow Weir: L = 480 in Zi = ft Inv = 12.90 ft 14026 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (S) (cu ft) (ft) (cfs) (cls) (cfs) (ds) (cis) 0 0.0 0 8.00 0 0 0.00 0 0.00 4 0.5 0 8.00 0 0.00 0.00 0 0.00 8 2.0 123 8.01 0.00 0.00 0.00 0.00 0.00 12 4.5 609 8.05 0.00 0.00 0.00 0.00 0.00 16 7.8 1686 8.13 0.00 0.00 0.00 0.00 0.00 20 11.9 3561 8.25 0.00 0.00 0.00 0.00 0.00 24 16.6 6413 8.41 0.00 0.00 0.00 0.00 0.00 28 21.7 10385 8.62 0.00 0.00 0.00 0.00 0.00 32 27.0 15582 8.88 0.00 0.00 0.00 0.00 0.00 36 32.4 22063 9.19 0.00 0.00 0.00 0.00 0.00 40 37.7 29844 9.54 0.00 0.00 0.00 0.00 0.00 44 42.7 38893 9.93 0.00 0.00 0.00 0.00 0.00 48 47.1 49133 10.36 0.00 0.00 0.00 0.00 0.00 52 51.0 60446 10.82 0.00 0.00 0.00 0.00 0.00 56 54.0 72675 11.31 0.00 0.00 0.00 0.00 0.00 60 56.1 85629 11.81 0.00 0.00 0.00 0.00 0.00 64 57.3 99095 12.31 0.00 0.00 0.00 0.00 0.00 68 57.4 112837 12.82 0.00 0.00 0.00 0.00 0.00 72 56.5 126613 13.32 32.88 0.00 0.00 0.00 32.88 76 54.7 132288 13.53 59.40 0.00 0.00 0.00 59.40 80 51.9 131148 13.48 53.68 0.00 0.00 0.00 53.68 84 48.3 130713 13.47 51.55 0.00 0.00 0.00 51.55 88 44.7 129943 13.44 47.84 0.00 0.00 0.00 47.84 92 41.3 129191 13.41 44.30 0.00 0.00 0.00 44.30 96 38.2 128481 13.39 41.05 0.00 0.00 0.00 41.05 100 35.4 127807 13.36 38.03 0.00 0.00 0.00 38.03 104 32.7 127167 13.34 35.24 0.00 0.00 0.00 35.24 108 30.2 126559 13.32 32.65 0.00 0.00 0.00 32.65 112 28.0 125982 13.30 30.25 0.00 0.00 0.00 30.25 116 25.9 125435 13.28 28.04 0.00 0.00 0.00 28.04 G:W0BS12014114026-VAML Phase 2C%CaIcs114026 rout1ng100yr24hr clogged_Pand 1.xlsx 01/26/2016 VAML Phase 2C 14026 MLV Pond 01 Stormwater Pond Routing 100-year 24hr Storm Clogged 120 23.9 124915 13.26 25.98 0.00 0.00 0.00 25.98 124 22.1 124422 13.24 24.08 0.00 0.00 0.00 24.08 128 20.5 123954 13.23 22.32 0.00 0.00 0.00 22.32 132 18.9 123509 13.21 20.69 0.00 0.00 0.00 20.69 136 17.5 123087 13.19 19.17 0.00 0.00 0.00 19.17 140 16.2 122686 13.18 17.77 0.00 0.00 0.00 17.77 144 15.0 122305 13.17 16.48 0.00 0.00 0.00 16.48 148 13.8 121944 13.15 15.28 U.00 0.00 0.00 15.28 152 12.8 121601 13.14 14.16 0.00 0.00 0.00 14.16 156 11.8 121275 13.13 13.13 0.00 0.00 0.00 13.13 160 11.0 120965 13.12 12.18 0.00 0.00 0.00 12.18 164 10.1 120671 13.11 11.29 0.00 0.00 0.00 11.29 168 9.4 120392 13.10 10.47 0.00 0.00 0.00 10.47 172 8.7 120127 13.09 9.71 0.00 0.00 0.00 9.71 176 8.0 119875 13.08 9.01 0.00 0.00 0.00 9.01 180 7.4 119636 13.07 8.36 0.00 0.00 0.00 8.36 184 6.9 119408 13.06 7.75 0.00 0.00 0.00 7.75 188 6.3 119192 13.05 7.19 0.00 0.00 0.00 7.19 192 5.9 118987 13.05 6.67 0.00 0.00 0.00 6.67 196 5.4 118792 13.04 6.19 0.00 0.00 0.00 6.19 200 5.0 118607 13.03 5.75 0.00 0.00 0.00 5.75 204 4.6 118431 13.03 5.33 0.00 0.00 0.00 5.33 208 4.3 118264 13.02 4.95 0.00 0.00 0.00 4.95 212 4.0 118105 13.01 4.60 0.00 0.00 0.00 4.60 216 3.7 117954 13.01 4.27 0.00 0.00 0.00 4.27 220 3.4 117811 13.00 3.96 0.00 0.00 0.00 3.96 224 3.1 117674 13.00 3.68 0.00 0.00 0.00 3.68 228 2.9 117545 12.99 3.41 0.00 0.00 0.00 3.41 232 2.7 117422 12.99 3.17 0.00 0.00 0.00 3.17 236 2.5 117305 12.98 2.95 0.00 0.00 0.00 2.95 240 2.3 117193 12.98 2.74 0.00 0.00 0.00 2.74 244 2.1 117088 12.98 2.54 0.00 0.00 0.00 2.54 248 2.0 116987 12.97 2.36 0.00 0.00 0.00 2.36 252 1.8 116892 12.97 2.19 0.00 0.00 0.00 2.19 256 1.7 116801 12.97 2.04 0.00 0.00 0.00 2.04 260 1.6 116715 12.96 1.90 0.00 0.00 0.00 1.90 264 1.4 116633 12.96 1.76 0.00 0.00 0.00 1.76 268 1.3 116555 12.96 1.64 0.00 0.00 0.00 1.64 272 1.2 116480 12.95 1.52 0.00 0.00 0.00 1.52 276 1.1 116410 12.95 1.42 0.00 0.00 0.00 1.42 280 1.1 116343 12.95 1.32 0.00 0.00 0.00 1.32 284 1.0 116279 12.95 1.22 0.00 0.00 0.00 1.22 288 0.9 116218 12.94 1.14 0.00 0.00 0.00 1.14 292 0.8 116161 12.94 1.06 0.00 0.00 0.00 1.06 296 0.8 116106 12.94 0.99 0.00 0.00 0.00 0.99 300 0.7 11RORa 12.94 0.92 0.00 0.00 0.00 0.92 304 0.7 116004 12.94 0.85 0.00 0.00 0.00 0.85 308 0.6 115957 12.94 0.80 0.00 0.00 0.00 0.80 312 0.6 115912 12.93 0.74 0.00 0.00 0.00 0.74 316 0.5 115869 12.93 0.69 0.00 0.00 0.00 0.69 320 0.5 115828 12.93 0.64 0.00 0.00 0.00 0.64 324 0.4 115790 12.93 0.60 0.00 0.00 0.00 0.60 328 0.4 115753 12.93 0.56 0.00 0.00 0.00 0.56 332 0.4 115718 12.93 0.52 0.00 0.00 0.00 0.52 336 0.4 115684 12.93 0.48 0.00 0.00 0.00 0.48 340 0.3 115653 12.92 0.45 0.00 0.00 0.00 0.45 344 0.3 115622 12.92 0.42 0.00 0.00 0.00 0.42 348 0.3 115594 12.92 0.39 0.00 0.00 0.00 0.39 352 0.3 115566 12.92 0.37 0.00 0.00 0.00 0.37 356 0.2 115540 12.92 0.34 0.00 0.00 0.00 0.34 360 0.2 115515 12.92 0.32 0.00 0.00 0.00 0.32 364 0.2 115492 12.92 0.30 0.00 0.00 0.00 0.30 368 0.2 115469 12.92 0.28 0.00 0.00 0.00 0.28 372 0.2 115448 12.92 0.26 0.00 0.00 0.00 0.26 376 0.2 115427 12.92 0.24 0.00 0.00 0.00 0.24 380 0.1 115408 12.92 0.23 0.00 0.00 0.00 0.23 384 0.1 115390 12.91 0.21 0.00 0.00 0.00 0.21 388 0.1 115372 12.91 0.20 0.00 0.00 0.00 0.20 392 0.1 115355 12.91 0.18 0.00 0.00 0.00 0.18 396 0.1 115339 12.91 0.17 0.00 0.00 0.00 0.17 400 0.1 115324 12.91 0.16 0.00 0.00 0.00 0.16 404 0.1 116309 12.91 0.15 0.00 0.00 0.00 0.15 408 0.1 115296 12.91 0.14 0.00 0.00 0.00 0.14 G:UOBS12o14N4O26-VAML Phase 2C1Calcs114o26 routing100yr24hr Gogged_Pond 1.xlsx 04/26/2016 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 2-year 24hr Storm WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CHANGE IN HEIGHT 23 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 2 YR 5.28 IN/HR Qa = 16.14 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = • " .44 INCHES 2yr, 24hr PRECIPITATION CN = 63 ((98*0.40)+(39*0.60)) = 63 S = (1000/CN)-10 S = 5.97 Depth (D) = (P-0.2S)"2/(P+0.8S) D = 1.18 IN - 2yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 19.40 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 39,154 cu. ft. AFTER DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 FT RUNOFF COEF. 'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 2 YR 5.28 IN/HR Qp = 40.34 CFS Qp = POST -DEVELOPED PEAK DISCHARGE CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.50 feet S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30,568 29,480 42,810 1.5 10.6645 0.4055 1.48 11.00 32,816 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33,968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183,511 5.5 12.1200 1.7047 5.62 Regression Output: Ks = 27939 b = 1.09 Constant 10.24 G:U0BS12014114026-VAML Phase 2C%Calcs114026 routing2yf24hr Pond 2.x1sx 0d/26/2016 VAML Phase 2C MLV Pond 92 Stormwater Pond Routing 2-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 16.14 cis Qp = 40.34 cis Tp 19.4 min dT 4 min BASIN DATA Ks = 27939 b = 1.09 Zo = 8.50 ft Normal water elev = 8.50 ft Peak Outflow = 1.98 cis Box Weir Length = 16 ft Peak Stage = 10.53 ft Cw = 3.0 Maximum Storage = 60,610 cu ft Zcr = 12.60 ft Control Holes: State Orifice: Dia = 2.50 in Dd = 36 in Inv = 8.50 It Cd = 0.59 Weir: L = 18 in Zi = 8.00 ft Inv = 10.00 ft Emergency Overflow Weir: L = 480.0 in Inv = 13.50 ft Time Inflow Storage Stage Outflow (min) (Cis) (cu ft) (ft) (cfs) 0 0.0 0 8.50 0 4 4.1 0 8.50 0 8 14.7 981 8.55 0.01 12 27.5 4505 8.69 0.04 16 37.4 11098 8.93 0.09 20 40.2 20043 9.24 0.13 24 35.0 29671 9.56 0.16 28 26.8 38030 9.83 0.18 32 20.5 44421 10.03 0.22 36 15.7 49290 10.18 0.55 40 12.0 52920 10.30 0.94 44 9.2 55574 10.38 1.26 48 7.0 57472 10.44 1.52 52 5.4 58791 10.48 1.71 56 4.1 59669 10.51 1.84 60 3.1 60213 10.52 1.92 64 2.4 60505 10.53 1.96 68 1.8 60610 10.53 1.98 72 1.4 60575 10.53 1.98 76 1.1 60438 10.53 1.95 80 0.8 60227 10.52 1.92 84 0.6 59963 10.51 1.88 88 0.5 59662 10.51 1.84 92 0.4 59336 10.49 1.79 96 0.3 58995 10.48 1.74 100 0.2 58646 10.47 1.69 104 0.2 58292 10.46 1.64 108 0.1 57939 10.45 1.59 112 0.1 57589 10.44 1.54 116 0.1 57243 10.43 1.49 14026 W Riser (cfs) Weir (Emergency Overflow) (cfs) Orifice (Cft) Weir (dS) 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.09 0.00 0.00 0.00 0.13 0.00 0.00 0.00 0.16 0.00 0.00 0.00 0.18 0.00 0.00 0.00 0.19 0.02 0.00 0.00 0.20 0.35 0.00 0.00 0.21 0.73 0.00 0.00 0.21 1.05 0.00 0.00 0.22 1.30 0.00 0.00 0.22 1.49 0.00 0.00 0.22 1.62 0.00 0.00 0.22 1.70 0.00 0.00 0.22 1.74 0.00 0.00 0.22 1.76 0.00 0.00 0.22 1.75 0.00 0.00 0.22 1.73 0.00 0.00 0.22 1.70 0.00 0.00 0.22 1.66 0.00 0.00 0.22 1.61 0.00 0.00 0.22 1.57 0.00 0.00 0.22 1.52 0.00 0.00 0.22 1.47 0.00 0.00 0.22 1.42 0.00 0.00 0.22 1.37 0.00 0.00 0.22 1.32 0.00 0.00 0.22 1.27 G:UOBS12014114026-VAML Phase 2C1Calcs114026 rouling2y24hr_Pond 2.xlsx 0.1/26/2016 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 2-year 24hr Storrs 120 0.1 56904 10.42 1.44 0.00 0.00 0.22 1.22 124 0.0 56571 10.41 1.40 0.00 0.00 0.22 1.18 128 0.0 56246 10.40 1.35 0.00 0.00 0.22 1.14 132 0.0 55930 10.39 1.31 0.00 0.00 0.22 1.09 136 0.0 56622 10.38 1.27 0.00 0.00 0.21 1.05 140 0.0 55321 10.37 1.23 0.00 0.00 0.21 1.02 144 0.0 55030 10.36 1.19 0.00 0.00 0.21 0.98 148 0.0 54746 10.35 1.16 0.00 0.00 0.21 0.94 152 0.0 54471 10.34 1.12 0.00 0.00 0.21 0.91 156 0.0 54203 10.34 1.09 0.00 0.00 0.21 0.88 160 0.0 53943 10.33 1.06 0.00 0.00 0.21 0.85 164 0.0 53690 10.32 1.03 0.00 0.00 0.21 0.82 168 0.0 53444 10.31 1.00 0.00 0.00 0.21 0.79 172 0.0 53206 10.31 0.97 0.00 0.00 0.21 0.76 176 0.0 52974 10.30 0.94 0.00 0.00 0.21 0.73 180 0.0 52748 10.29 0.92 0.00 0.00 0.21 0.71 184 0.0 52528 10.28 0.89 0.00 0.00 0.21 0.68 188 0.0 52315 10.28 0.87 0.00 0.00 0.21 0.66 192 0.0 52107 10.27 0.84 0.00 0.00 0.21 0.63 196 0.0 51905 10.26 0.82 0.00 0.00 0.21 0.61 200 0.0 51708 10.26 0.80 0.00 0.00 0.21 0.59 204 0.0 51517 10.25 0.78 0.00 0.00 0.21 0.57 208 0.0 51330 10.25 0.76 0.00 0.00 0.21 0.55 212 0.0 51148 10.24 0.74 0.00 0.00 0.21 0.53 216 0.0 50971 10.24 0.72 0.00 0.00 0.21 0.51 220 0.0 50798 10.23 0.70 0.00 0.00 0.21 0.50 224 0.0 50630 10.22 0.68 0.00 0.00 0.21 0.48 228 0.0 50465 10.22 0.67 0.00 0.00 0.20 0.46 232 0.0 50305 10.21 0.65 0.00 0.00 0.20 0.45 236 0.0 50149 10.21 0.64 0.00 0.00 0.20 0.43 240 0.0 49996 10.21 0.62 0.00 0.00 0.20 0.42. 244 0.0 49847 10.20 0.61 0.00 0.00 0.20 0.40 248 0.0 49701 10.20 0.59 0.00 0.00 0.20 0.39 252 0.0 49559 10.19 0.58 0.00 0.00 0.20 0.38 256 0.0 49420 10.19 0.57 0.00 0.00 0.20 0.36 260 0.0 49284 10.18 0.55 0.00 0.00 0.20 0.35 264 0.0 49151 10.18 0.54 0.00 0.00 0.20 0.34 268 0.0 49021 10.17 0.53 0.00 0.00 0.20 0.33 272 0.0 48893 10.17 0.52 0.00 0.00 0.20 0.32 276 0.0 48769 10.17 0.51 0.00 0.00 0.20 0.31 280 0.0 48647 10.16 0.50 0.00 0.00 0.20 0.30 284 0.0 48528 10.16 0.49 0.00 0.00 0.20 0.29 288 0.0 48411 10.16 0.48 0.00 0.00 0.20 0.28 292 0.0 48297 10.15 0.47 0.00 0.00 0.20 0.27 296 0.0 48185 10.15 0.46 0.00 0.00 0.20 0.26 300 0.0 48075 10.14 0.45 0.00 0.00 0.20 0.25 304 0.0 47968 10.14 0.44 0.00 0.00 0.20 0.24 308 0.0 47862 10.14 0.43 0.00 0.00 0.20 0.23 312 0.0 47759 10.13 0.42 0.00 0.00 0.20 0.22 316 0.0 47657 10.13 0.41 0.00 0.00 0.20 0.22 320 0.0 47558 10.13 0.41 0.00 0.00 0.20 0.21 324 0.0 47460 10.13 0.40 0.00 0.00 0.20 0.20 328 0.0 47365 10.12 0.39 0.00 0.00 0.20 0.19 332 0.0 47271 10.12 0.38 0.00 0.00 0.20 0.19 336 0.0 47178 10.12 0.38 0.00 0.00 0.20 0.18 340 0.0 47088 10.11 0.37 0.00 0.00 0.20 0.17 344 0.0 46999 10.11 0.36 0.00 0.00 0.20 0.17 348 0.0 46911 10.11 0.36 0.00 0.00 0.20 0.16 352 0.0 46825 10.11 0.35 o nn 0.00 0.20 0.15 356 0.0 46741 10.10 0.35 0.00 0.00 0.20 0.15 360 0.0 46658 10.10 0.34 0.00 0.00 0.20 0.14 364 0.0 46576 10.10 0.33 0.00 0.00 0.20 0.14 368 0.0 46496 10.10 0.33 0.00 0.00 0.20 0.13 372 0.0 46417 10.09 0.32 0.00 0.00 0.20 0.13 376 0.0 46339 10.09 0.32 0.00 0.00 0.20 0.12 380 0.0 46263 10.09 0.31 0.00 0.00 0.20 0.12 384 0.0 46188 10.09 0.31 0.00 0.00 0.20 0.11 388 0.0 46114 10.08 0.30 0.00 0.00 0.20 0.11 392 0.0 46041 10.08 0.30 0.00 0.00 0.20 0.10 396 0.0 45969 10.08 0.29 0.00 0.00 0.20 0.10 400 0.0 45898 10.08 0.29 0.00 0.00 0.20 0.10 404 0.0 45828 10.07 0.29 0.00 0.00 0.20 0.09 408 0.0 45759 10.07 0.28 0.00 0.00 0.20 0.09 GAJOBS12014\14026-VAML Phase 2C%Calcs114026 routing2y24hr Pond 2.xlsx 01;/26/2016 VAML Phase 2C 14026 MLV Pond 02 Stormwater Pond Routing 10-year 24hr Storm WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CHANGE IN HEIGHT 23 FT RUNOFF COEF.'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 10 YR 6.43 IN/HR Qa = 19.65 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P=;.-'•,a., a•_ T:INCHES 10yr, 24hr PRECIPITATION CN = 63 ((98*0.40)+(39*0.60)) = 63 S = (1000/CN)-10 S = 5.97 Depth (D) = (P-0.2S)^2/(P+0.8S) D = 2.86 IN -10yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)) / Qp Tp = 38.71 MINUTES Storage Volume Req'd = (Qp-Qa)'Tp*1.39*60 = 95,153 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.50 feet AFTER DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 FT RUNOFF COEF. 'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 10 YR 6.43 IN/HR Qp = 49.13 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) {ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30,568 29,480 42,810 1.5 10.6645 0.4055 1.48 11.00 32,816 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33,968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183,511 5.5 12.1200 1.7047 5.62 Regression Output: Ks = 27939 b = 1.09 Constant 10.24 GNOBS12014114026-VAML Phase 2C%Caics114026 routing10yr24hr Pond 2.x1sx 05/26/2016 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 10-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 19.65 cis Qp = 49.13 cis Tp = 38.7 min dT = 4 min BASIN DATA Ks = 27939 b = 1.09 Zo = 8.50 It Normal water elev = 8.50 ft Box Weir Length = 16 ft Cw = 3.0 Zcr = 12.60 ft Dd - 36 in Cd 0.59 Zi 8.00 ft Peak Outflow = 13.52 cfs Peak Stage = 12.05 ft Maximum Storage = 111,305 cu ft Control Holes: State Orifice: Dia = 2.50 in Inv = 8.50 ft Weir: L = 18 in Inv = 10.00 ft Emergency Overflow Weir: L = 480.0 in Inv = 13.60 ft Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cis) (cu ft) (ft) (cfs) (cfs) (cls) (cfs) (cfs) 0 0.0 0 8.50 0 0 0.00 0 0.00 4 1.3 0 8.50 0 0.00 0.00 0 0.00 8 5.0 308 8.52 0.00 0.00 0.00 0.00 0.00 12 10.8 1507 8.57 0.01 0.00 0.00 0.01 0.00 16 18.0 4087 8.67 0.04 0.00 0.00 0.04 0.00 20 25.8 8387 8.83 0.08 0.00 0.00 0.08 0.00 24 33.6 14573 9.05 0.11 0.00 0.00 0.11 0.00 28 40.4 22613 9.32 0.14 0.00 0.00 0.14 0.00 32 45.6 32280 9.64 0.16 0.00 0.00 0.16 0.00 36 48.5 43179 9.99 0.19 0.00 0.00 0.19 0.00 40 49.0 54781 10.35 1.16 0.00 0.00 0.21 0.95 44 46.9 66260 10.71 2.91 0.00 0.00 0.23 2.68 48 42.5 76816 11.03 4.94 0.00 0.00 0.25 4.69 52 37.2 85822 11.30 6.92 0.00 0.00 0.26 6.66 56 32.5 93085 11.51 8.66 0.00 0.00 0.27 8.39 60 28.4 98807 11.68 10.12 0.00 0.00 0.28 9.84 64 24.8 103200 11.81 11.28 0.00 0.00 0.29 10.99 68 21.7 106456 11.91 12.17 0.00 0.00 0.29 11.87 72 19.0 108750 11.98 12.80 0.00 0.00 0.30 12.51 76 16.6 110236 12.02 13.22 0.00 0.00 0.30 12.92 80 14.5 111049 12.04 13.45 0.00 0.00 0.30 13.15 84 12.7 111305 12.05 13.52 0.00 0.00 0.30 13.22 88 11.1 111106 12.05 13.47 0.00 0.00 0.30 13.17 92 9.7 110537 12.03 13.31 0.00 0.00 0.30 13.01 96 8.5 109673 12.00 13.06 0.00 0.00 0.30 12.77 100 7.4 108574 11.97 12.75 0.00 0.00 0.30 12.46 104 6.5 107293 11.93 12.40 0.00 0.00 0.29 12.10 108 5.7 105873 11.89 12.01 0.00 0.00 0.29 11.72 112 5.0 104352 11.85 11.59 0.00 0.00 0.29 11.30 116 4.3 102760 11.80 11.16 0.00 0.00 0.29 10.87 G:W0BS12014114026-VAML Phase 2C%Calcs114026 r0ut1ng10yr24hr_P0nd 2.xlsx 03/26/2016 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 10-year 24hr Storm 120 3.8 101121 11.75 10.73 0.00 0.00 0.29 10.44 124 3.3 99456 11.70 10.29 0.00 0.00 0.28 10.00 128 2.9 97782 11.65 9.85 0.00 0.00 0.28 9.57 132 2.5 96112 11.60 9.42 0.00 0.00 0.28 9.15 136 2.2 94458 11.56 9.01 0.00 0.00 0.28 8.73 140 1.9 92827 11.61 S_Bn 0.00 0.00 0.27 8.33 144 1.7 91228 11.46 8.21 0.00 0.00 0.27 7.93 148 1.5 89664 11.41 7.83 0.00 0.00 0.27 7.56 152 1.3 88141 11.37 7.46 0.00 0.00 0.27 7.20 156 1.1 86659 11.32 7.12 0.00 0.00 0.27 6.85 160 1.0 85223 11.28 6.78 0.00 0.00 0.26 6.52 164 0.9 83832 11.24 6.47 0.00 0.00 0.26 6.20 168 0.8 82488 11.20 6.16 0.00 0.00 0.26 5.90 172 0.7 81190 11.16 5.88 0.00 0.00 0.26 5.62 176 0.6 79938 11.12 5.60 0.00 0.00 0.26 5.35 180 0.5 78732 11.09 5.34 0.00 0.00 0.25 5.09 184 0.4 77571 11.05 5.10 0.00 0.00 0.25 4.85 188 0.4 76453 11.02 4.86 0.00 0.00 0.25 4.61 192 0.3 75378 10.98 4.64 0.00 0.00 0.25 4.40 196 0.3 74345 10.95 4.43 0.00 0.00 0.25 4.19 200 0.3 73351 10.92 4.24 0.00 0.00 0.25 3.99 204 0.2 72396 10.89 4.05 0.00 0.00 0.24 3.80 208 0.2 71479 10.87 3.87 0.00 0.00 0.24 3.63 212 0.2 70597 10.84 3.70 0.00 0.00 0.24 3.46 216 0.2 69750 10.81 3.54 0.00 0.00 0.24 3.30 220 0.1 68936 10.79 3.39 0.00 0.00 0.24 3.15 224 0.1 68153 10.77 3.25 0.00 0.00 0.24 3.01 228 0.1 67401 10.74 3.11 0.00 0.00 0.24 2.88 232 0.1 66678 10.72 2.98 0.00 0.00 0.23 2.75 236 0.1 65983 10.70 2.86 0.00 0.00 0.23 2.63 240 0.1 65314 10.68 2.75 0.00 0.00 0.23 2.52 244 0.1 64671 10.66 2.64 0.00 0.00 0.23 2.41 248 0.1 64052 10.64 2.53 0.00 0.00 0.23 2.30 252 0.0 63457 10.62 2.43 0.00 0.00 0.23 2.21 256 0.0 62883 10.60 2.34 0.00 0.00 0.23 2.11 260 0.0 62331 10.59 2.25 0.00 0.00 0.23 2.02 264 0.0 61799 10.57 2.17 0.00 0.00 0.23 1.94 268 0.0 61286 10.55 2.09 0.00 0.00 0.23 1.86 272 0.0 60792 10.54 2.01 0.00 0.00 0.22 1.78 276 0.0 60315 10.53 1.94 0.00 0.00 0.22 1.71 280 0.0 59856 10.51 1.87 0.00 0.00 0.22 1.64 284 0.0 59412 10.50 1.80 0.00 0.00 0.22 1.58 288 0.0 58984 10.48 1.74 0.00 0.00 0.22 1.52 292 0.0 58570 10.47 1.68 0.00 0.00 0.22 1.46 296 0.0 58171 10.46 1.62 0.00 0.00 0.22 1.40 300 0.0 57785 10.45 1.56 0.00 0.00 0.22 1.35 304 0.0 57411 10.44 1.51 0.00 0.00 0.22 1.29 308 0.0 57051 10.42 1.46 0.00 0.00 0.22 1.24 312 0.0 56701 10.41 1.41 0.00 0.00 0.22 1.20 316 0.0 56364 10.40 1.37 0.00 0.00 0.22 1.15 320 0.0 56037 10.39 1.32 0.00 0.00 0.22 1.11 324 0.0 55720 10.38 1.28 0.00 0.00 0.21 1.07 328 0.0 55413 10.37 1.24 0.00 0.00 0.21 1.03 332 0.0 55116 10.36 1.20 0.00 0.00 0.21 0.99 336 0.0 54828 10.36 1.17 0.00 0.00 0.21 0.95 340 0.0 54548 10.35 1.13 0.00 0.00 0.21 0.92 344 0.0 54277 10.34 1.10 0.00 0.00 0.21 0.89 348 0.0 54014 10.33 1.07 0.00 0.00 0.21 0.85 352 n n 53759 10.32 1.03 0.00 0.00 0.21 0.82 356 0.0 53511 10.31 1.00 0.00 0.00 0.21 0.79 360 0.0 53270 10.31 0.98 0.00 0.00 0.21 0.77 364 0.0 53036 10.30 0.95 0.00 0.00 0.21 0.74 368 0.0 52808 10.29 0.92 0.00 0.00 0.21 0.71 372 0.0 52587 10.29 0.90 0.00 0.00 0.21 0.69 376 0.0 52372 10.28 0.87 0.00 0.00 0.21 0.66 380 0.0 52163 10.27 0.85 0.00 0.00 0.21 0.64 384 0.0 51959 10.27 0.83 0.00 0.00 0.21 0.62 388 0.0 51761 10.26 0.80 0.00 0.00 0.21 0.60 392 0.0 51568 10.25 0.78 0.00 0.00 0.21 0.58 396 0.0 51380 10.25 0.76 0.00 0.00 0.21 0.56 400 0.0 51197 10.24 0.74 0.00 0.00 0.21 0.54 404 0.0 51019 10.24 0.73 0.00 0.00 0.21 0.52 408 0.0 50845 10.23 0.71 0.00 0.00 0.21 0.50 G:UOBM014114026 VAML Phase 2G%Calcs114026 routing10yr24hr Pond 2.xlsx 01,126/2016 MLV VAML Phase 2C Pond #2 Stormwater Pond Routing 25-year 24hr Storm 14026 WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CHANGE IN HEIGHT 23 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 25 YR 7.22 IN/HR Qa = 22.06 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P =; ` 8.fl§; INCHES 25yr, 24hr PRECIPITATION CN = 63 ((98*0.40)+(39*0.60)) = 63 S = (1000/CN)-10 S = 5.97 Depth (D) = (P-0.2Sr2/(P+0.8S) D = 3.66 IN - 25yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)) / Qp Tp = 44.14 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 121,828 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.50 feet AFTER DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 FT RUNOFF COEF. 'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 25 YR 7.22 IN/FIR Qp = 55.16 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30,568 29,480 42,810 1.5 10.6645 0.4055 1.48 11.00 32,816 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33,968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183,511 5.5 12.1200 1.7047 5.62 Regression Output: Ks = 27939 b= 1.09 Constant 10.24 G:UOBS12014114026-VAML Phase 2C1CalcsN4026 routing25yr24hr_P0nd 2.xlsx 04/26/2016 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 25-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 22.06 cfs Qp = 55.16 cfs Tp = 44.1 min dT = 4 min BASIN DATA Ks = 27939 b = 1.09 ZO = 8.50 It Normal water elev = 8.50 It Peak Outflow = 19.18 cfs Box Weir Length = 16 ft Peak Stage = 12.60 ft Cw = 3.0 Maximum Storage = 130,161 cu ft Zcr = 12.60 ft Control Holes: State Orifice: Dia = 2.50 in Dd 36 in Inv = 8.50 It Cd 0.59 Weir: L = 18 In Zi 8.00 ft Inv = 10.00 ft Emergency Overflow Weir: L = 480.0 in Inv = 13.50 ft 14026 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cfs) (cu ft) (ft) () () (cfs) (cfs) (cfs) 0 0.0 0 8.50 0 0 0.00 0 0.00 4 1.1 0 8.50 0 0.00 0.00 0 0.00 8 4.4 266 8.51 0.00 0.00 0.00 0.00 0.00 12 9.5 1311 8.56 0.01 0.00 0.00 0.01 0.00 16 16.0 3580 8.65 0.03 0.00 0.00 0.03 0.00 20 23.5 7421 8.80 0.07 0.00 0.00 0.07 0.00 24 31.4 13052 9.00 0.10 0.00 0.00 0.10 0.00 28 38.9 20554 9.25 0.13 0.00 0.00 0.13 0.00 32 45.5 29855 9.56 0.16 0.00 0.00 0.16 0.00 36 50.7 40735 9.91 0.18 0.00 0.00 0.18 0.00 40 54.0 52850 10.29 0.93 0.00 0.00 0.21 0.72 44 55.2 65581 10.69 2.79 0.00 0.00 0.23 2.56 48 64.1 78149 11.07 5.22 0.00 0.00 0.25 4.97 52 51.0 89886 11.42 7.88 0.00 0.00 0.27 7.61 56 46.0 100223 11.73 10.49 0.00 0.00 0.28 10.20 60 40.9 108747 11.98 12.80 0.00 0.00 0.30 12.51 64 36.3 115488 12.17 14.73 0.00 0.00 0.30 14.42 68 32.3 120676 12.32 16.26 0.00 0.00 0.31 15.95 72 28.7 124526 12.44 17.43 0.00 0.00 0.32 17.12 76 25.5 127234 12.52 18.27 0.00 0.00 0.32 17.95 80 22.7 128976 12.57 18.81 0.00 0.00 0.32 18A9 84 20.2 129906 12.59 19.10 0.00 0.00 0.32 18.78 88 17.9 130161 12.60 19.18 0.00 0.00 0.32 18.86 92 15.9 129858 12.59 19.09 0.00 0.00 0.32 18.77 96 14.2 129100 12.57 18.85 0.00 0.00 0.32 18.53 100 12.6 127975 12.54 18.50 0.00 0.00 0.32 18.18 104 11.2 126556 12.50 18.06 0.00 0.00 0.32 17.74 108 9.9 124908 12.45 17.55 0.00 0.00 0.32 17.23 112 8.8 123083 12.39 16.99 0.00 0.00 0.31 16.68 116 7.9 121127 12.34 16.40 0.00 0.00 0.31 16.09 G:WOBS12014114026-VAML Phase 2C%Calcs114026 rouUng25yr24hr Pond 2.xlsx OV26/2016 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 25-year 24hr Storm 120 7.0 119077 12.28 15.79 0.00 0.00 0.31 15.48 124 6.2 116964 12.22 15.16 0.00 0.00 0.31 14.85 128 5.5 114816 12.15 14.53 0.00 0.00 0.30 14.23 132 4.9 112652 12.09 13.91 0.00 0.00 0.30 13.61 136 4.4 110492 12.03 13.29 0.00 0.00 0.30 13.00 140 3.9 108348 11.97 12.69 0.00 0.00 0.30 12.40 144 3.4 106232 11.90 12.11 0.00 0.00 0.29 11.81 148 3.1 104153 11.84 11.54 0.00 0.00 0.29 11.25 152 2.7 102119 11.78 10.99 0.00 0.00 0.29 10.70 156 2.4 100134 11.72 10.47 0.00 0.00 0.28 10.18 160 2.2 98202 11.67 9.96 0.00 0.00 0.28 9.68 164 1.9 96328 11.61 9.48 0.00 0.00 0.28 9.20 168 1.7 94511 11.56 9.02 0.00 0.00 0.28 8.74 172 1.5 92754 11.50 8.58 0.00 0.00 0.27 8.31 176 1.3 91057 11.45 8.17 0.00 0.00 0.27 7.89 180 1.2 89419 11.41 7.77 0.00 0.00 0.27 7.50 184 1.1 87841 11.36 7.39 0.00 0.00 0.27 7.13 188 0.9 86321 11.31 7.04 0.00 0.00 0.27 6.77 192 0.8 84858 11.27 6.70 0.00 0.00 0.26 6.44 196 0.7 83451 11.23 6.38 0.00 0.00 0.26 6.12 200 0.7 82099 11.19 6.08 0.00 0.00 0.26 5.82 204 0.6 80799 11.15 5.79 0.00 0.00 0.26 5.53 208 0.5 79550 11.11 5.52 0.00 0.00 0.26 5.26 212 0.5 78351 11.07 5.26 0.00 0.00 0.25 5.01 216 0.4 77200 11.04 5.02 0.00 0.00 0.25 4.77 220 0.4 76094 11.01 4.79 0.00 0.00 0.25 4.54 224 0.3 75032 10.97 4.57 0.00 0.00 0.25 4.33 228 0.3 74013 10.94 4.37 0.00 0.00 0.25 4.12 232 0.3 73034 10.91 4.17 0.00 0.00 0.24 3.93 236 0.2 72095 10.89 3.99 0.00 0.00 0.24 3.75 240 0.2 71192 10.86 3.82 0.00 0.00 0.24 3.57 244 0.2 70325 10.83 3.65 0.00 0.00 0.24 3.41 248 0.2 69492 10.81 3.50 0.00 0.00 0.24 3.26 252 0.1 68692 10.78 3.35 0.00 0.00 0.24 3.11 256 0.1 67923 10.76 3.21 0.00 0.00 0.24 2.97 260 0.1 67184 10.74 3.07 0.00 0.00 0.24 2.84 264 0.1 66473 10.71 2.95 0.00 0.00 0.23 2.71 268 0.1 65790 10.69 2.83 0.00 0.00 0.23 2.60 272 0.1 65132 10.67 2.72 0.00 0.00 0.23 2.48 276 0.1 64499 10.65 2.61 0.00 0.00 0.23 2.38 280 0.1 63890 10.63 2.51 0.00 0.00 0.23 2.28 284 0.1 63304 10.62 2.41 0.00 0.00 0.23 2.18 288 0.0 62739 10.60 2.32 0.00 0.00 0.23 2.09 292 0.0 62195 10.58 2.23 0.00 0.00 0.23 2.00 296 0.0 61670 10.57 2.15 0.00 0.00 0.23 1.92 300 0.0 61165 10.55 2.07 0.00 0.00 0.22 1.84 304 0.0 60677 10.54 1.99 0.00 0.00 0.22 1.77 308 0.0 60207 10.52 1.92 0.00 0.00 0.22 1.70 312 0.0 59753 10.51 1.85 0.00 0.00 0.22 1.63 316 0.0 59314 10.49 1.79 0.00 0.00 0.22 1.56 320 0.0 58891 10.48 1.72 0.00 0.00 0.22 1.50 324 0.0 58482 10.47 1.66 0.00 0.00 0.22 1.44 328 0.0 58087 10.46 1.61 0.00 0.00 0.22 1.39 332 0.0 57705 10.44 1.55 0.00 0.00 0.22 1.33 336 0.0 57336 10.43 1.50 0.00 0.00 0.22 1.28 340 0.0 56978 10.42 1.45 0.00 0.00 0.22 1.23 344 0.0 56632 10.41 1.40 0.00 0.00 0.22 1.19 348 0.0 56298 10.40 1.36 0.00 0.00 0.22 1.14 352 0.0 55974 10.39 1 .9 0.00 0.00 0.22 1.10 356 0.0 55660 10.38 1.27 0.00 0.00 0.21 1.06 360 0.0 55355 10.37 1.23 0.00 0.00 0.21 1.02 364 0.0 55060 10.36 1.20 0.00 0.00 0.21 0.98 368 0.0 54774 10.35 1.16 0.00 0.00 0.21 0.95 372 0.0 54497 10.35 1.13 0.00 0.00 0.21 0.91 376 0.0 54228 10.34 1.09 0.00 0.00 0.21 0.88 380 0.0 53967 10.33 1.06 0.00 0.00 0.21 0.85 384 0.0 53713 10.32 1.03 0.00 0.00 0.21 0.82 388 0.0 53467 10.31 1.00 0.00 0.00 0.21 0.79 392 0.0 53228 10.31 0.97 0.00 0.00 0.21 0.76 396 0.0 52995 10.30 0.94 0.00 0.00 0.21 0.73 400 0.0 52769 10.29 0.92 0.00 0.00 0.21 0.71 404 0.0 52549 10.28 0.89 0.00 0.00 0.21 0.68 408 0.0 52335 10.28 0.87 0.00 0.00 0.21 0.66 G:WOBS12014114026-VAML Phase 2C%CaIcsN4026 routing25y24hr_Pond 2.xlsx 00/26/2016 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 100-year 24hr Storm 14026 WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CHANGE IN HEIGHT 23 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 100 YR 8.48 IN/HR Qa = 26.91 CFS Ca = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = '. . 1.O..INCHES 100yr, 24hr PRECIPITATION CN = 63 ((98*0.40)+(39*0.60)) = 63 S = (1000/CN)-10 S = 5.97 Depth (D) = (P-0.2S)"2/(P+0.8S) D = 5.25 IN-100yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 53.82 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 174,477 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.50 feet AFTER DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 FT RUNOFF COEF. 'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 100 YR 8.48 IN/HR Qp = 64.79 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE Ins In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30,568 29,480 42,810 1.5 10.6645 0.4055 1.48 11.00 32,816 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33.968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183,511 5.5 12.1200 1.7047 5.62 Regression Output: Ks = 27939 b = 1.09 Constant 10.24 GMOBS12014114026-VAML Phase 2C%CaIcs114026 routing100y24hr_Pond 2.x1sx OV26/2016 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 100-year 24hr Storm 14026 CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 25.91 cis Qp = 64.79 cis Tp = 53.8 min dT = 4 min BASIN DATA Ks = 27939 b= 1.09 Zo = 8.50 ft Normal water elev = 8.50 ft Peak Outflow = 42.41 cis Box Weir Length = 16 ft Peak Stage = 13.11 ft Cw = 3.0 Maximum Storage = 147,873 cu ft Zcr = 12.60 ft Control Holes: State Orifice: Dia = 2.50 in Dd = 36 in Inv = 8.50 ft Cd = 0.59 Weir: L = 18 in Zi = 8.00 ft Inv = 10.00 ft Emergency Overflow Weir. L = 480.0 in Inv 13.50 ft Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cis) (cu ft) (ft) (cfs) (cis) (cis) (cfs) (cis) 0 0.0 0 8.50 0 0 0.00 0 0.00 4 0.9 0 8.50 0 0.00 0.00 0 0.00 8 3.5 211 8.51 0.00 0.00 0.00 0.00 0.00 12 7.6 1043 8.55 0.01 0.00 0.00 0.01 0.00 16 13.1 2872 8.62 0.02 0.00 0.00 0.02 0.00 20 19.7 6018 8.74 0.06 0.00 0.00 0.06 0.00 24 26.9 10727 8.92 0.09 0.00 0.00 0.09 0.00 28 34.5 17166 9.14 0.12 0.00 0.00 0.12 0.00 32 41.9 25407 9.42 0.15 0.00 0.00 0.15 0.00 36 48.8 36423 9.74 0.17 0.00 0.00 0.17 0.00 40 54.8 47091 10.11 0.37 0.00 0.00 0.20 0.17 44 59.6 60155 10.52 1.91 0.00 0.00 0.22 1.69 48 62.9 74003 10.94 4.37 0.00 0.00 0.25 4.12 52 64.6 88060 11.37 7.45 0.00 0.00 0.27 7.18 56 64.5 101778 11.77 10.90 0.00 0.00 0.29 10.61 60 62.7 114648 12.15 14.48 0.00 0.00 0.30 14.18 64 59.2 126220 12.49 17.95 0.00 0.00 0.32 17.64 68 54.4 136127 12.77 24.51 3.42 0.00 0.33 20.77 72 49.4 143302 12.98 34.60 11.14 0.00 0.34 23.12 76 44.8 146851 13.08 40.59 15.93 0.00 0.34 24.32 80 40.7 147873 13.11 42.41 17.41 0.00 0.34 24.66 84 37.0 147466 13.10 41.68 16.81 0.00 0.34 24.52 88 33.6 146335 13.06 39.68 15.20 0.00 0.34 24.14 92 30.5 144866 13.02 37.17 13.18 0.00 0.34 23.65 96 27.7 143258 12.98 34.53 11.09 0.00 0.34 23.11 100 25.1 141609 12.93 31.96 9.07 0.00 0.34 22.56 104 22.8 139966 12.88 29.54 7.19 0.00 0.33 22.02 108 20.7 138349 12.84 27.31 5.49 0.00 0.33 21.49 112 18.8 136763 12.79 25.28 3.98 0.00 0.33 20.97 116 17.1 135208 12.75 23.45 2.66 0.00 0.33 20.47 G:WOBS12014114026-VAML Phase 2C%Calcs114026 routing100y24hr_Pond 2.xlsx %/26/2016 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 100-year 24hr Storm 120 15.5 133674 12.70 21.85 1.54 0.00 0.33 19.98 124 14.1 132150 12.66 20.47 0.66 0.00 0.32 19.49 128 12.8 130612 12.61 19.40 0.07 0.00 0.32 19.00 132 11.6 129022 12.57 18.83 0.00 0.00 0.32 18.51 136 10.5 127286 12.52 18.28 0.00 0.00 0.32 17.97 140 9.6 125424 12.46 17.71 0.00 0.00 0.32 17.39 144 8.7 123468 12.41 17.11 0.00 0.00 0.31 16.79 148 7.9 121444 12.35 16.49 0.00 0.00 0.31 16.18 152 7.2 119376 12.29 15.87 0.00 0.00 0.31 15.57 156 6.5 117283 12.23 15.25 0.00 0.00 0.31 14.95 160 5.9 115180 12.16 14.64 0.00 0.00 0.30 14.33 164 5.4 113082 12.10 14.03 0.00 0.00 0.30 13.73 168 4.9 110999 12.04 13.44 0.00 0.00 0.30 13.14 172 4.4 108940 11.98 12.86 0.00 0.00 0.30 12.56 176 4.0 106913 11.92 12.29 0.00 0.00 0.29 12.00 180 3.6 104924 11.86 11.75 0.00 0.00 0.29 11.46 184 3.3 102978 11.81 11.22 0.00 0.00 0.29 10.93 188 3.0 101077 11.75 10.71 0.00 0.00 0.29 10.43 192 2.7 99225 11.70 10.23 0.00 0.00 0.28 9.94 196 2.5 97423 11.64 9.76 0.00 0.00 0.28 9.48 200 2.2 95674 11.59 9.31 0.00 0.00 0.28 9.04 204 2.0 93977 11.54 8.89 0.00 0.00 0.28 8.61 208 1.8 92333 11.49 8.48 0.00 0.00 0.27 8.20 212 1.7 90742 11.45 8.09 0.00 0.00 0.27 7.82 216 1.6 89204 11.40 7.72 0.00 0.00 0.27 7.45 220 1.4 87717 11.35 7.36 0.00 0.00 0.27 7.10 224 1.3 86282 11.31 7.03 0.00 0.00 0.27 6.76 228 1.1 84896 11.27 6.71 0.00 0.00 0.26 6.45 232 1.0 83560 11.23 6.40 0.00 0.00 0.26 6.14 236 0.9 82272 11.19 6.12 0.00 0.00 0.26 5.86 240 0.9 81030 11.15 5.84 0.00 0.00 0.26 5.58 244 0.8 79833 11.12 5.58 0.00 0.00 0.26 5.32 248 0.7 78679 11.08 5.33 0.00 0.00 0.25 5.08 252 0.6 77568 11.05 5.10 0.00 0.00 0.25 4.85 256 0.6 76498 11.02 4.87 0.00 0.00 0.25 4.62 260 0.5 75468 10.99 4.66 0.00 0.00 0.25 4.41 264 0.5 74475 10.96 4.46 0.00 0.00 0.25 4.21 268 0.4 73519 10.93 4.27 0.00 0.00 0.25 4.02 272 0.4 72599 10.90 4.09 0.00 0.00 0.24 3.84 276 0.4 71712 10.87 3.92 0.00 0.00 0.24 3.67 280 0.3 70858 10.85 3.75 0.00 0.00 0.24 3.51 284 0.3 70036 10.82 3.60 0.00 0.00 0.24 3.36 288 0.3 69243 10.80 3.45 0.00 0.00 0.24 3.21 292 0.2 68480 10.78 3.31 0.00 0.00 0.24 3.07 296 0.2 67744 10.75 3.17 0.00 0.00 0.24 2.94 300 0.2 67035 10.73 3.05 0.00 0.00 0.24 2.81 304 0.2 66352 10.71 2.93 0.00 0.00 0.23 2.69 308 0.2 65693 10.69 2.81 0.00 0.00 0.23 2.58 312 0.1 65057 10.67 2.70 0.00 0.00 0.23 2.47 316 0.1 64445 10.65 2.60 0.00 0.00 0.23 2.37 320 0.1 63853 10.63 2.50 0.00 0.00 0.23 2.27 324 0.1 63283 10.62 2.41 0.00 0.00 0.23 2.18 328 0.1 62733 10.60 2.32 0.00 0.00 0.23 2.09 332 0.1 62201 10.58 2.23 0.00 0.00 0.23 2.00 336 0.1 61688 10.67 2.15 0.00 0.00 0.23 1.92 340 0.1 61193 10.55 2.07 0.00 0.00 0.22 1.85 344 0.1 60714 10.54 2.00 0.00 0.00 0.22 1.77 348 0.1 60251 10.52 1.93 0.00 0.00 0.22 1.70 352 0.1 59804 10.51 1.86 0.00 0.00 0.22 1.64 356 0.1 69372 10.50 1.79 0.00 0.00 0.22 1.57 360 0.0 58954 10.48 1.73 0.00 0.00 0.22 1.51 364 0.0 58549 10.47 1.67 0.00 0.00 0.22 1.45 368 0.0 58158 10.46 1.62 0.00 0.00 0.22 1.40 372 0.0 57779 10.45 1.56 0.00 0.00 0.22 1.34 376 0.0 57412 10.44 1.51 0.00 0.00 0.22 1.29 380 0.0 57057 10.42 1.46 0.00 0.00 0.22 1.24 384 0.0 56713 10.41 1.42 0.00 0.00 0.22 1.20 388 0.0 56380 10.40 1.37 0.00 0.00 0.22 1.15 392 0.0 56057 10.39 1.33 0.00 0.00 0.22 1.11 396 0.0 55744 10.38 1.29 0.00 0.00 0.21 1.07 400 0.0 55440 10.37 1.25 0.00 0.00 0.21 1.03 404 0.0 55145 10.37 1.21 0.00 0.00 0.21 0.99 408 0.0 54859 10.36 1.17 0.00 0.00 0.21 0.96 G:WOBS12014114026-VAML Phase 2C%Calos114026 routing100y24hr Pond 2.xlsx 01126/2016 MLV WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CHANGE IN HEIGHT 23 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 100 YR 8.48 IN/HR Qa = 25.91 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P 10� INCHES 100yr, 24hr PRECIPITATION CN = 63 ((98*0.40)+(39*0.60)) = 63 S = (1000/CN)-10 S = 5.97 Depth (D) = (P-0.2S)A2/(P+0.8S) D = 5.25 IN-100yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)) / Qp Tp = 53.82 MINUTES Storage Volume Req'd = (Qp-Qa)"Tp*1.39*60 = 174,477 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.50 feet VAML Phase 2C Pond #2 Stormwater Pond Routing 100-year 24hr Storm Clogged AFTER DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 FT RUNOFF COEF. 'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 100 YR 8.48 IN/HR Qp = 64.79 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30,568 29,480 42,810 1.6 10.6645 0.4055 1.48 11.00 32,816 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33,968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183,511 5.5 1z.1200 1.7047 5.62 Regression Output: Ks = 27939 b = 1.09 Constant 10.24 14026 G:W0BS12014%14026-VAML Phase 2C1Calcs114026 routing100yr24hr dogged_Pond 2.xlsx V128l2016 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 100-year 24hr Storm Clogged CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 25.91 cfs QP = 64.79 cfs TP = 53.8 min dT = 4 min BASIN DATA Ks = 27939 b = 1.09 Zo 8.50 ft Normal water elev 8.50 ft Box Weir Length ft Cw 3.0 Zcr ft Dd = in Cd = 0.59 Zi = ft Peak Outflow = 49.05 cfs Peak State = 13.45 ft Maximum Storage = 159,889 cu ft Control Holes: State Ortfce: Emergency Overflow Weir: Dia = in Inv = ft L = 480 in Inv = 12.90 ft 14026 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cfs) (cu ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) 0 0.0 0 8.50 0 0 0.00 0 0.00 4 0.9 0 8.50 0 0.00 0.00 0 0.00 8 3.5 211 8.51 0.00 0.00 0.00 0.00 0.00 12 7.6 1043 8.55 0.00 0.00 0.00 0.00 0.00 16 13.1 2874 8.62 0.00 0.00 0.00 0.00 0.00 20 19.7 6026 8.74 0.00 0.00 0.00 0.00 0.00 24 26.9 10749 8.92 0.00 0.00 0.00 0.00 0.00 28 34.6 17209 9.14 0.00 0.00 0.00 0.00 0.00 32 41.9 25478 9.42 0.00 0.00 0.00 0.00 0.00 36 48.8 35529 9.75 0.00 0.00 0.00 0.00 0.00 40 54.8 47238 10.12 0.00 0.00 0.00 0.00 0.00 44 59.6 60392 10.53 0.00 0.00 0.00 0.00 0.00 48 62.9 74699 10.96 0.00 0.00 0.00 0.00 0.00 52 64.6 89804 11.42 0.00 0.00 0.00 0.00 0.00 56 64.5 105309 11.88 0.00 0.00 0.00 0.00 0.00 60 62.7 120795 12.33 0.00 0.00 0.00 0.00 0.00 64 59.2 135843 12.76 0.00 0.00 0.00 0.00 0.00 68 54.4 150059 13.17 16.92 0.00 0.00 0.00 16.92 72 49.4 159054 13.43 45.92 0.00 0.00 0.00 45.92 76 44.8 159889 13.45 49.05 0.00 0.00 0.00 49.05 80 40.7 158880 13.42 45.27 0.00 0.00 0.00 45.27 84 37.0 157786 13.39 41.29 0.00 0.00 0.00 41.29 88 33.6 156748 13.36 37.62 0.00 0.00 0.00 37.62 92 30.5 155773 13.33 34.28 0.00 0.00 0.00 34.28 96 27.7 154858 13.31 31.24 0.00 0.00 0.00 31.24 100 25.1 153999 13.28 28.47 0.00 0.00 0.00 28.47 104 22.8 153193 13.26 25.95 0.00 0.00 0.00 25.95 108 20.7 152436 13.24 23.66 0.00 0.00 0.00 23.66 112 18.8 151726 13.22 21.57 0.00 0.00 0.00 21.57 116 17.1 151060 13.20 19.67 0.00 0.00 0.00 19.67 G:W0BS12014114026-VAML Phase 2C%Calcs114026 routing100yrNhr clogged_Pond 2.xlsx V126/2016 VAML Phase 2C 14026 MLV Pond #2 Stonnwater Pond Routing 100-year 24hr Storm Clogged 120 15.5 150435 13.18 17.94 0.00 0.00 0.00 17.94 124 14.1 149848 13.16 16.36 0.00 0.00 0.00 16.36 128 12.8 149297 13.15 14.93 0.00 0.00 0.00 14.93 132 11.6 148779 13.13 13.62 0.00 0.00 0.00 13.62 136 10.5 148293 13.12 12.43 0.00 0.00 0.00 12.43 140 9.6 147837 13.11 11.34 0.00 0.00 0.00 11.34 144 8.7 147409 13.10 10.35 0.00 0.00 0.00 10.35 148 7.9 147007 13.08 9.45 0.00 0.00 0.00 9.45 152 7.2 146629 13.07 8.63 0.00 0.00 0.00 8.63 156 6.5 146274 13.06 7.88 0.00 0.00 0.00 7.88 160 5.9 145941 13.05 7.20 0.00 0.00 0.00 7.20 164 5.4 145627 13.04 6.58 0.00 0.00 0.00 6.58 168 4.9 145333 13.04 6.01 0.00 0.00 0.00 6.01 172 4.4 145057 13.03 5.49 0.00 0.00 0.00 5.49 176 4.0 144797 13.02 5.02 0.00 0.00 0.00 5.02 180 3.6 144553 13.01 4.59 0.00 0.00 0.00 4.59 184 3.3 144324 13.01 4.20 0.00 0.00 0.00 4.20 188 3.0 144108 13.00 3.84 0.00 0.00 0.00 3.84 192 2.7 143906 13.00 3.51 0.00 0.00 0.00 3.51 196 2.5 143715 12.99 3.22 0.00 0.00 0.00 3.22 200 2.2 143537 12.98 2.94 0.00 0.00 0.00 2.94 204 2.0 143368 12.98 2.70 0.00 0.00 0.00 2.70 208 1.8 143210 12.98 2.47 0.00 0.00 0.00 2.47 212 1.7 143061 12.97 2.26 0.00 0.00 0.00 2.26 216 1.5 142921 12.97 2.07 0.00 0.00 0.00 2.07 220 1.4 142790 12.96 1.90 0.00 0.00 0.00 1.90 224 1.3 142666 12.96 1.74 0.00 0.00 0.00 1.74 228 1.1 142550 12.96 1.60 0.00 0.00 0.00 1.60 232 1.0 142440 12.95 1.46 0.00 0.00 0.00 1.46 236 0.9 142337 12.95 1.34 0.00 0.00 0.00 1.34 240 0.9 142240 12.95 1.23 0.00 0.00 0.00 1.23 244 0.8 142149 12.94 1.13 0.00 0.00 0.00 1.13 248 0.7 142063 12.94 1.04 0.00 0.00 0.00 1.04 252 0.6 141982 12.94 0.96 0.00 0.00 0.00 0.96 256 0.6 141906 12.94 0.88 0.00 0.00 0.00 0.88 260 0.5 141834 12.94 0.81 0.00 0.00 0.00 0.81 264 0.5 141767 12.93 0.74 0.00 0.00 0.00 0.74 268 0.4 141703 12.93 0.68 0.00 0.00 0.00 0.68 272 0.4 141643 12.93 0.63 0.00 0.00 0.00 0.63 276 0.4 141587 12.93 0.58 0.00 0.00 0.00 0.58 280 0.3 141534 12.93 0.53 0.00 0.00 0.00 0.53 284 0.3 141484 12.93 0.49 0.00 0.00 0.00 0.49 288 0.3 141437 12.92 0.45 0.00 0.00 0.00 0.45 292 0.2 141392 12.92 0.42 0.00 0.00 0.00 0.42 296 0.2 141350 12.92 0.39 0.00 0.00 0.00 0.39 300 0.2 141311 12.92 0.36 0.00 0.00 0.00 0.36 304 0.2 141273 12.92 0.33 O.uu 0.00 0.00 0.33 308 0.2 141238 12.92 0.30 0.00 0.00 0.00 0.30 312 0.1 141205 12.92 0.28 0.00 0.00 0.00 0.28 316 0.1 141174 12.92 0.26 0.00 0.00 0.00 0.26 320 0.1 141144 12.92 0.24 0.00 0.00 0.00 0.24 324 0.1 141116 12.92 0.22 0.00 0.00 0.00 0.22 328 0.1 141090 12.91 0.21 0.00 0.00 0.00 0.21 332 0.1 141065 12.91 0.19 0.00 0.00 0.00 0.19 336 0.1 141042 12.91 0.18 0.00 0.00 0.00 0.18 340 0.1 141020 12.91 0.16 0.00 0.00 0.00 0.16 344 0.1 140999 12.91 0.15 0.00 0.00 0.00 0.15 348 0.1 140979 12.91 0.14 0.00 0.00 0.00 0.14 352 0.1 140960 12.91 0.13 0.00 0.00 n_on 0.13 356 0.1 140943 12.91 0.12 0.00 0.00 0.00 0.12 360 0.0 140926 12.91 0.11 0.00 0.00 0.00 0.11 364 0.0 140910 12.91 0.10 0.00 0.00 0.00 0.10 368 0.0 140895 12.91 0.10 0.00 0.00 0.00 0.10 372 0.0 140881 12.91 0.09 0.00 0.00 0.00 0.09 376 0.0 140868 12.91 0.08 0.00 0.00 0.00 0.08 380 0.0 140855 12.91 0.08 0.00 0.00 0.00 0.08 384 0.0 140843 12.91 0.07 0.00 0.00 0.00 0.07 388 0.0 140832 12.91 0.07 0.00 0.00 0.00 0.07 392 0.0 140821 12.91 0.06 0.00 0.00 0.00 0.06 396 0.0 140811 12.91 0.06 0.00 0.00 0.00 0.06 400 0.0 140801 12.91 0.06 0.00 0.00 0.00 0.06 404 0.0 140792 12.91 0.05 0.00 0.00 0.00 0.05 408 0.0 140783 12.91 0.05 0.00 0.00 0.00 0.05 G:UOBS12014114026-VAML Phase 2C%CaIcs114026 routing100yr24hr clogged_Pond 2.xlsx Johnson, Kelly From: Johnson, Kelly Sent: Monday, January 25, 2016 10:08 AM To: 'Monica Valsi' Subject: RE: SW8 150905, Village at Motts Landing Phase 2C OK. Thanks. KJ From: Monica Valsi [mailto:monica-trippeng@ec.rr.com] Sent: Monday, January 25, 201610:01 AM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Subject: RE: SW8 150905, Village at Motts Landing Phase 2C Kelly, We would like to request an extension with a re -submittal date of Tuesday, February 2. Please confirm this is acceptable or direct otherwise. Thank you, Monica From: Johnson, Kelly [mailto:kelly.p.johnson@ncdenr.gov] Sent: Tuesday, January 12, 201612:22 PM To: Monica Valsi (monica-trippeng@ec.rr.com) <monica-trippeng@ec.rr.com> Subject: SW8 150905, Village at Motts Landing Phase 2C Monica, Please see attached. Thanks, KJ ICel,I,1�JOhwSDw Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office: 910.796.7331 Fax: 910.350.2004 North Carolina Department of Environmental Quality Pat McCrory Governor January 12, 2016 Dr. Arnold L. Sobol, Manager Aftew Properties, LLC 2020 S. Churchill Drive Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8150905 The Village at Molts Landing Phase 2C New Hanover County Dear Dr. Sobol: Donald R. van der Vaart Secretary The Wilmington Regional Office received a Stormwater Management Permit Application for The Village at Motts Landing Phase 2C on September 30, 2015. A request for additional information was mailed on November 17, 2015 and a response was received on January 8, 2015. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Streams [15A NCAC 02H.1003 (g) (5) and 02H.1005 (d)]: a. 1/17/15: Please work with Chad Coburn of the Division of Water Resources, 910.796.7379, to determine if there -are streams onsite. I showed him the plan, and he is familiar with the site. Please label all streams on the plans, show the top of bank (TOB) of each stream, and also show a 50ft vegetative buffer measured from the TOB. b. 118/16: The environmental consultant has met onsite with Chad and two (2) streams were identified. The streams, TOB, and 50' buffer are shown and labelled. You will note that a portion of wet detention basin #1 is within the 50ft buffer, however, the buffer is outside of the permanent pool elevation.. c. 1/12/16: i. Stream Location: David Syster of SEGI and Chad Coburn of DWR/401 have indicated that the origin should be below Lot 324 rather than Lot 327. Please revise the plans accordingly. ii. Pond in a Buffer: 15A NCAC 02H .1005(e) prohibits wet ponds from being located in the buffer. The proposed plans show that the permanent pool is located outside of the buffer but that a portion of the embankment of the pond is inside the buffer.. This issue has come up on other projects, and we have received direction from our Central Office on how to proceed. Please remove the full embankment on the pond -side of the berm from the buffer. 2. Seasonal High Water Table [15A NCAC 02H.1003 (g) (5). and 02H.1005 (d)]: a. 11/17/15: Please submit a stamped summary of the existing ground elevation, the distance to the SHWT and the resultant SHWT elevation for each pond to ensure that the ponds will not drain nearby wetlands by situating the permanent pool elevations at the appropriate elevations. i. Pond 1/ Boring 3: The soils report shows that the SHWT is at 73in. ii. Pond. 2/ Boring 4: The soils report shows that the depth to the SHWT is 39-471n, and that it is a perched SHWT. b. 118/16: i. Pond 1/ Boring 3: The existing ground elevation at boring 3 is 13.77, the distance to the SHWT -is 73: or 6.083ft and the resultant SHWT is 7.69. The permanent pool elevation is at elevation 8.00. The adjacent wetland elevation is at or below the SHWT elevation. ii. Pond-21 Boring 4: The existing ground elevation at boring 4 is 12.09, the distance to the SHWT is 39" or 3.25' and the resultant SHWT elevation is 8.84. The permanent pool elevation is at elevation 8.50. The adjacent wetland elevation is at or below SHWT. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 (910) 796-7215 /'Fax: (910) 350-2004 • Internet: hftp://portal.nodenr.oaMeb/irl An Equal ftorbunib 1 Affirmative Action Employer— Made in part by recwded paper c. 1/12/16: Both Ponds/Borings: 1. Please submit the data provided in your letter under seal. 2. Please specify the wetlands elevation adjacent to each pond in your summary in order to establish that the pond will not drain the wetlands. (The elevations are difficult to read on the plans because other data is on top of them.) Pond 2/ Boring 4: There is a typo on the supplement which says that the SHWT is at 9.75msl. I will revise it to show that it is 8.84msl. 3. Drainage Areal [15A NCAC 02H .1008(c)(1)]: a. 11/17/15: This drainage area appears to extend beyond the project boundary. Please make any necessary corrections to the application package, and account for any potential impervious area that could be constructed offsite at ultimate build out potential. b. 1/8/16: Correct, the drainage area does extend beyond the project boundary. The previously submitted application package accounts for any potential impervious area (future). c. 1/12/16: Perhaps this is an issue of clarification of the project area and the drainage area. i. Project Area: Where is the project area on the plan? Originally I thought that Sheet CO showed that area, but now I see that it excludes the wetlands. Please denote the full 28.58ac area to be covered by this permit on the plans with bearing/distance lines. ii. Drainage Areas: There are two drainage areas on the plans, one for each pond shown on Sheets DA1, DA2, and DA3. Sheet DA1 shows the drainage divides for a large area. DA3 shows many sub -drainage areas. DA2 shows what may be the two ponds' drainage areas. Are Sheets DA1 and DA3 needed for the full permitted set, or does DA2 show the full area draining to the ponds? Without the project area I am not sure where the drainage area extends beyond the project area. But, please account for any potential impervious area that could be constructed offsite (outside the project area but draining to the permitted ponds) at ultimate build out potential. For instance, if there.is 20,OOOsf of offsite drainage area to a pond what amount of that 20,OOOsf could be built out in the future? If zoning or other requirements limit development to 60%, then ultimate buildout is 12,OOOsf which should be accounted for in the pond. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to January 26, 2016, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time'to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143- 215.6A. If you have any questions concerning this matter please feel free to call me at (910) 796-7331 or email me at kelly.p.johnson@ncdenr.gov GDS/kpj: G:1WQ1SharedlStormWaterlPermits & Projects12015 \150905 HD12016 01 addinfo 150905 cc: Phil Tripp, PE, Tripp Engineering Wilmington Regional Office Page 2 of 2 Johnson, Kelly From: Hall, Christine Sent: Tuesday, January 12, 2016 8:51 AM To: Johnson, Kelly Subject: FW: Pond / State Stormwater Buffer questions Christine (Nelson) Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 ICI.- Nnthitw ('ompares - Email con*espondance to and from this address is su iect to the /Jorf;�, Carolina Public Records Law �,nd may be dicc!osed tc third parties. From: Lucas, Annette Sent: Wednesday, July 16, 2014 4:12 PM To: Nelson, Christine <christine.nelson@ncdenr.gov> Cc: Scott, Georgette <georgette.scott@ncdenr.gov>; Diuguid, Bill <bill.diuguid@ncdenr.gov>; Lewis,Linda <linda.lewis@ncdenr.gov>; Bennett, Bradley <bradley.bennett@ncdenr.gov> Subject: RE: Pond / State Stormwater Buffer questions Christine, I would say putting the level spreader and plunge pool are actually "impervious surface" and thus are specifically prohibitted within the buffer. Also, the level spreader is just the vehicle for spreading flow through a gently sloped vegetated area, where the treatment actually occurs. I agree Chapter 8 needs to be updated. But I think it is pretty clear in its words and diagrams that level spreaders don't belong in buffers. Hope that helps, Annette From: Nelson, Christine Sent: Wednesday, July 16, 2014 4:06 PM To: Lucas, Annette Cc: Scott, Georgette; Diuguid, Bill; Lewis,Linda; Bennett, Bradley Subject: RE: Pond / State Stormwater Buffer questions Annette, As always, thanks for your thoughtful insight and quick response. The consultant has posed a few more questions regarding the diffuse flow aspect... He is talking about switching over to a level spreader to provide diffuse flow of the design storm and a plunge pool type device to provide non -erosive flow from the 10-year storm event. Does this meet the intent of the diffuse flow requirement? (there is a slight disconnect between the diffuse flow guidance and Table 8-1 in LS/VFS chapter, which appears to indicate that the LS must be for the entire 10-year storm) Right now, the outlets are located within the 30' buffer. Can these devices (LS and plunge pool) be located in the buffer (say 10' from the stream) or do they have to be at the edge of the buffer? (the rules require diffuse flow through the vegetated buffer; however, they also allow BMPs to be located within the buffer ... ) Christine �'' ,�M]�Sp",Dl7:�E c,GTri�GlY<<11SG I, SS S-:I f i t� 'T''IC•"tf C.:rJlira�tliii7fi;:�ECC'trj �..7au \ �p�'� t fr( :%JyidiEi?iS ! iC _:..rd r dac,r ! s_ "� iT� L'.r! C,- Li7iiS:eCfOiY!'rrc From: Lucas, Annette _ 4 Sent: Wednesday, July 16, 2014 11:31 AM �-ve �'"E`�7 To: Nelson, Christine DP ' Cc: Scott, Georgette; Diuguid, Bill; Lewis,Linda; Bennett, Bradley N Subject: RE: Pond / State Stormwater Buffer questions Christine — T Well you started an interesting conversation with this project. Here is what we in CO think: based on the language in the 2H .1000 rules, we agree with Robert — only up to the top of the embankment of the wet pond should be in the buffer. We don't think including more than that is consistent with the foliowing rule language: Definition in .1002: "Vegetative Buffer" means an area of natural or established vegetation directly adjacent to surface waters through which stormwater runoff flows in a diffuse manner to protect surface waters from nwds degradation due to development activities. The width of the buffer is measured horizontally from the 5' normal pool elevation of impounded structures, from the bank of each side of streams or rivers, and from the mean high water line of tidal waters, perpendicular to the shoreline. C �G7� .1005 (e) Vegetative Buffer. Developments permitted under Paragraph (a) shall contain a 50 foot wide vegetative buffer, as Q bur, defined in Rule .1002(22) of this Section, for new development activities and a 30 foot wide vegetative buffer for 44 redevelopment activities. The width of a buffer is measured horizontally from the normal pool elevation of impounded structures, from the bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. The vegetative buffer may be cleared or graded, but must be planted with and maintained in grass or any other vegetative or plant material. Furthermore, stormwater control best management practices (BMPs), or stormwater control structures, with the exception of wet detention ponds, may be located within this vegetative buffer. The Division may, on a case -by -case basis, grant a minor variance from the vegetative buffer requirements of this section pursuant to the procedures set out in 15A NCAC 02B .0233(9)(b). Vegetative buffers and filters required by this section and any other buffers or filters required by State water quality or coastal management rules or local government requirements may be met concurrently and may contain, in whole or in part, coastal, isolated, or 404 jurisdictional wetlands that are located landward of the normal waterline. As far as the diffuse flow issue, I don't think providing a dissipater pad directly adjacent to the stream (even if the flow is small), meets the diffuse flow requirements. So the bottom line is that the proposed site plan just does not have enough space for a properly sited wet pond and diffuse flow measure. When I look at the site plan, 1 do think they may have opportunities to provide permeable pavement at an elevation that is far enough above SHWT to work. Another space -saving option would be a closed sand filter. I have to head out to take my daughter to some appointments now. If you have any questions, please shoot me an email and I will check it later this afternoon. Thanks for bringing up this issue so we could discuss it. Annette From: Nelson, Christine Sent: Wednesday, July 16, 2014 9:48 AM To: Lucas, Annette Subject: Pond / State Stormwater Buffer questions I ended up just taking a picture of the plans with my phone. I'm sorry that they are slightly blurry. As we discussed, this is a site that is being redeveloped into a higher density development. (going from 2.89 ac of BUA to 9.32 acres of BUA) They are being required to provide the 30' redevelopment vegetated buffer from the stream (vs. the standard 50'). The two questions come down to: 1. What parts of the pond can be within the buffer? The guidance I have gotten say either the top of the embankment (from Robert in 2012) or the TPE (from Linda in 2014). 2 2. How do we apply the diffuse flow guidance to pipe discharges? They are saying the plans meet option 5 since the discharge rate for the design storm is less than 0.5 cfs. But option 5 only mentions swales... Thanks! Christine TRIPP ENGINEERING, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 3anuary 6, 2016 NCDENR Division of Energy, Mineral and Land Resources 127 Cardinal Drive RECEIVED Wilmington, NC 28405-3845 Attn: Ms. Kelly Johnson JAN 0 8 200515 Re: Village at Motts Landing Phase 2C Stormwater Project No. SW8150905 TE 14026 Dear Kelly: In response to your Request for Additional Information dated November 17, 2015, we offer the following: 1. Streams [15A NCAC 0211.1003(g)(5) and 02h.1005(D)]: Please work with Chad Coburn of the Division of Water Resources, 910.796.7379, to determine if there are streams onsite. I showed him the plan, and he is familiar with the site. Please label all streams on the plans, show the top of bank (TOB) of each stream, and also show a 50 ft vegetative buffer measured from the TOB. • The environmental consultant has met onsite with Chad and two (2) streams were identified. The steams, TOB, and 50' buffer are shown and labelled. You will note that a portion of wet detention basin #1 is within the 50' buffer; however, the buffer is outside of the permanent pool elevation. 2. Seasonal High Water Table [15A NCAC 02H.1003(g)(5) and 02H.1005(d)]: Please submit a stamped summary of the existing ground elevation, the distance to the S1 WT and the resultant SHWT elevation for each pond to ensure that the ponds will not drain nearby wetlands by situating the permanent pool elevations at the appropriate elevations. a. Pond 1/Boring 3: The soils report shows that the SHWT is at 73 in. • The existing ground elevation at boring 3 is 13.77, the distance to the SHWT is 73" or 6.083' and the resultant SHWT elevation is 7.69. The permanent pool elevation is at elevation 8.00. The adjacent wetland elevation is at or below the SHWT elevation. JAIL b a '2^is BY: — b. Pond 2/13oring 4: The soils report shows that the depth to the SHWT is 39-47 S O-) 7 in, and that it is a perched SHWT. 9' C(. 7 • The existing ground elevation at boring 4 is 12.09, the dista the SHWT is 39" or 3.25' and the resultant SHWT elevation i 8.84 The permanent pool elevation is at elevation 8.50. The adjacen wetland elevation is at or below the SHWT elevation. 3. Drainage Area 1 [15A NCAC 02H.1008(c)(1)]: This drainage area appears to extend beyond the project boundary. Please make sure any necessary corrections to the application package, and account for any potential impervious area that could be constructed offsite at ultimate build out potential. • Correct, the drainage area does extend beyond the project boundary. The previously submitted application package accounts for any potential impervious area (future). Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. CA-"J4 Monica Valsi, E.I. MLV:dcb Enc. ECEIVEM. JAN 0 6 2016 BY: Johnson, Kelly From: Johnson, Kelly Sent: Wednesday, December 16, 2015 2:23 PM To: 'Monica Valsi' Subject: RE: VAML Ph 2C SW8 150905 January 8, 2016 will be the new submittal date. Thanks, KJ From: Monica Valsi [mailto:monica-trippeng@ec.rr.com] Sent: Wednesday, December 16, 20151:29 PM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Subject: VAML Ph 2C SW8150905 Kelly, The environmental consultant has met with Chad Coburn on site and two (2) streams have been identified on the subject project. This will impact our plan and may require site layout revisions. The owner/developer is reviewing at this time. We would like to request an extension on the Request for Additional Information letter dated November 17, 2015; however, I don't have concrete re -submittal date at this time. As a place holder, I will say Friday, January 8, 2016. Please confirm this is acceptable or direct otherwise. Thank you, Monica Valsi, El Tripp Engineering, PC 419 Chestnut Street Wilmington, NC 28401 Office: 910.763.5100 Fax: 910.763-5631 monica-trippeng@ec.rr.com NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the addressee. Any information contained within this correspondence is provided for your convenience. No assertion of accuracy is made by Tripp Engineering, P.C. unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use of this digital information. ► stl' This email has been checked for viruses by Avast antivirus software. t. &4, www.avast.com North Carolina Department of Environmental Quality Pat McCrory Governor November 17, 2015 Dr. Arnold L. Sobol, Manager Aftew Properties, LLC 2020 S. Churchill Drive Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No, SWO 150905 The Village at Motts Landing Phase 2C New Hanover County Dear Dr. Sobol: Donald R. van der Vaart Secretary The Wilmington Regional Office received a Stormwater Management Permit Application for The Village at Motts Landing Phase 2C on September 30, 2015. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Streams [15A NCAC 02H.1003 (g) (5) and 02H.1005 (d)]: Please work with Chad Coburn of the Division of. Water Resources, 910.796.7379, to determine if there are streams onsite. I showed him the plan, and he is familiar with the site. Please label all streams on the plans, show the top of bank (TOB) of each stream, and also show a 50ft vegetative buffer measured from the TOB. 2. Seasonal High Water Table [15A NCAC 02H.1003 (g) (5) and 02H.1005 (d)]: Please submit a stamped summary of the existing ground elevation, the distance to the SHWT and the resultant SHWT elevation for each pond to ensure that the ponds will not drain nearby wetlands by situating the permanent pool elevations at the appropriate elevations. a. Pond 1/ Boring 3: The soils report shows that the SHWT is at 73in. b. Pond 2/ Boring 4: The soils report shows that the depth to the SHWT is 39-47in, and that it is a perched SHWT. 3. Drainage Area 1 [15A NCAC 02H .1008(c)(1)]: This drainage area appears to extend beyond the project boundary. Please make any necessary corrections to the application package, and account for any potential impervious area that could be constructed offsite at ultimate build out potential. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to December 17, 2015, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143- 215.6A. Division of Energy, Mineral, and Land Resources Land Quality Section —Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 (910) 796-7215 / Fax: (910) 350-2004 s Internet: httc://Dodal.ncdenr.org/webArl An Eoual 0onortunb 1 Affirmative Action Employer— Made in pert by recvclad paper If you have any questions concerning this matter please feel free to call me at (910) 796-7331 or email me at kelly.p.johnson@ncdenr.gov neer GDS/kpj: G:1WQ1Shared\StormWater\Permits & Projects12015 \150905 HD1201511 addinfo 150905 cc: Phil Tripp, PE, Tripp Engineering Wilmington Regional Office Page 2 of 2 General Data: Impervious, Drainage Area and Volume PROJECT NUMBER: SW8 150905 Reviewer: K Johnson DRAINAGE BASIN: Cape Fear Current Date 16-Nov-15 Original Run Date: 16NOV-15 DA Number 3 4 6 6 7 8 9 10 BMP Type d No OFF BWin DA No B111Pit DA I178 it DR . No amp No Empki Nb` Pln DA Ndalltlait DA Receiving Stream kStream Index %MvbC-ftr*ekMoftGrftk' Class Method used to determine required volume? 7= 9.elagl Please Select Plowe Baled Plane S*;;t .plepaa 5glgdt @lease� Pines. Slot -Please Select Simple Method, Design Storm, P1,24,,r, in: (Enter if Project Is Subject to SA- NEEDED FOR BOTH SIMPLE AND SCS SA CALCs) Simple Method, Design Storm of Old Rule, in: (Ender if Part of Project is Permitted under an Old Rule Such as 1.0, If not leave blank) SCS Discrete (TR55) Method, Design Storm, Value of Ppao,r 7yr24hf, in: (Enter the Value of Per If Non -SA or Ph,2,k if SA) Project is Subject to SA? N N meew small passeedeet Please. Seled,Ralese seledt. ResseSelect Were Belent Waar.tDelad P..Iagee.SeleG Volume That is Required, fie: (Volume i. om either the Simple Method or tho SCS McOrod. If SCS Mahod for SA, compare PCS at 1 :Ah• to Simple at 1.5' and choose @^ Wager volume. Simple Method Volume Summary. Simple Method & SA (2008 Rule, Greater of 1.5" or 1 y24hr prolpost)+(Old Rule at 1.5") Simple Method & non -SA. (2008 Rule, 1.5")+(Old Rule, 1.0") SCS Discrete (TR55) Volume Summery. If TR-55 is used, then this spreadsheet is not act up to amount for adding that volume to an old rule calculated at a lower (1.0") store. It does not make sense to combine the volume calculations that SCS Discrete (TR55) & SA (2ODS Rule, Greater of 1.5" or 1 y24hr prelpost) 1R SCS Discrete r55 & .SA ImpervWmArea Proposed Impervious (ALL IMPERVIOUS), Total, fte: 38,174 38,174 300,5i5 36,229 38,22E 2B5,050 0 0 01 0 D 0 01 0 Onsite Buildings I f$iU t. . Onste Streets 58.1 . Onsits Parking Onsite Sidewalks 7 W.S.8, Onsite Other 0 25.600 Future 11$,625 10` Offske Existing 0 Y>4petvioui ad Rule.!°. 0 0 0 0 0 0 0 0 0 0 Onsite Buildings Onsite Streets Onsite Parking Onsite Sidewelks Onste Other Future O(fsite Existing preen; y :h—,WVKCR1_ SrLiaetta 2006011c8i' €, es 300,5151 285,050 01 0 0 0 0 0 Drat Far Wh Simpla alto SCS Oacrm- ^ Dr€ra , ge Area. Total, If: 698.6271 665,808 1- - Onsite, f? 69B 627 WliQ6 Onsite, R': _ Pfw", -F�,rrr. esd Ana,C7 E;wlo. : D D 0 0 0 0 0 0 0 0 Onsits, fte: Oifeite, fe: proposed DIA (8efffj}Ad*d6iJ AW), fe. 698,627 665,13013 Drainage Area, Subject to Old Rule, fe: 01 Di 01 0 0 0 0 0 0 0 Drainage Area, Subject to New Rule, fe: 1 898.65271 665.808 Volume Required, Old Rule, ft : i, 0 0 0 01 u 0 0 0 0 Rvp„n c,,,l,,n, Old Rule: Volume Required, 2008 Rule, fte: 38,174 36,229 Rvpr, ow, w m 2008 Rule: (Enter 0.05 if no pre -development BUA) Rvp,K D,, l,,., 2DD8 Rule: 0.44 0.44 Volume Requiredts•, fte: 38,174 36,229 0 0 D 0 0 0 0 D Volume Requiredtmfho fie: 0 01 01 0 0 0 0 0 0 0 Volume Calculations - Page 1/3 Wet Ponds PROJECT NUMBER: SW8 150905 Reviewer: K Johnson DRAINAGE BASIN: Cape Fear Current Date 16-Nov-15 Original Run Date: 16-Nov-15 DA Number 1 2 3 4 5 6 7 B 9 10 BMP Type Minimum Surface Area Wet Pond Wet Pond No BMP in DA No BMP in DA No BMP in DA No BMP in DA No BMP In DA No BMP in DA No BMP in DA No BMP In DA %impervious 43.0% 42.81% Lower Impervious 40.0% 40.0% Upper Impervious 50.0% 50.0% TSS (85 or 90): g0 90 Lower SAIDA 2.1 3.1 #NIA #N/A #N/Aj #NIA #N/A #N/A #N/A #N/A Upper SAIDA 2.7 3.9 #NIA #N/A #NIA #N/A #N/A #N/A #N/A #N/A SAIDA ratio 2.3 3.3 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A PP Surface Area req, : Storage Calculations 15,935 22,138 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Elevation, Bottom of Sediment (excavated de th),fmsl: 4.50 2 s0 Elevation, Top of Sediment (bottom and/designed bottom),fmsl113_0 DSO 3:5t1 Elevation, Bottom of shelf, fmsl: so .0 Elevation, Permanent Pool, fmsl: 8.50: Elevation, To of Shelf, fmsl: 9.00: Elevation, Temp. Pool, fmsl: 10.00 Area, Top of Sediment (bottom pond/designed bottom), ft?: 21,661 Area, Bottom of Shelf, fe: 13,690 21.661 Area, Perm Pool, ft?: 16,906 24,927 Area, Top of Shelf, ft?: Area, Temp.Pool, f?: 23,533 30,560 Volume Provided (Temp Pool), DWQ Calculated, 1:3: 40,438 21,516 0 0 0 0 0 0 0 0 Volume Provided (Temp Pool), Provided per Consultant, ft3: 42,193 42,810 Volume Required (Temp Pool), DWQ Calculated, ft3: 38,174 36,229 Consultant Provided Enough Volume? y y Average Depth Option 1 or Option 2 (Enter 1 or 2)? 2 2. Averse Depth Provided, ft 610 4,$' Average Depth - OPTION 1 -, DWQ Calculated, ft: 4.70 4.01 Average Depth - OPTION 2 -, DWQ Calculated, ft: Forebay Volume 6.01 4.50 Permanent Pool Volume, ft3: 79,498 99,937 0 0 0 0 0 0 0 0 Forebay Volume, Required, ft3: 15,900 19,987 0 0 0 0 01 0 0 0 Forebay Volume, Provided, ft : 15 987 21,431 Percent of Permanent Pool (18-22% is Target): Drawdown 20% 21 % Av era a Head, ft: 0.63 0.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Flow Q2, ft3/sec: 0.221 0.210 Average Flow Q5, ft3/sec: 0.088 0.084 QZ Area, inZ: 8.311 9.192 Q5 Area, in 2: 3.324 3.677 No. of Orifices 1 1' Orifice Diameter, in: 2.50 2.60 Orifice Area, in": 4.909 4.909 0.000 0.000 0.0001 0.000 0.000 0.000 0.000 0.000 Weir enter Y or N ? Weir Height, in: Weir Length, in: Weir C: Weir L, Effective Length, ft -0.126 -0.093 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Average Orifice Flowrate, DWQ Calc (QDwQ) ft3/sec: 0.130 0.112 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Average Orifice Flowrate, Reported (Qp, rred) ft3/sec: 01,30 0.120 Average Orifice Flowrate is Adequate? y y Runoff Coefficient Cc: 0.260 0.250 0.250 1 0.250 0.250 0.250 0.250 1 0.250 0.250 0.250 1 yr 24 hr rainfall depth, in: 3.80 3.50 1 yr 24 hr Intensity (1) inthr.. 0.158 0.158 0.000 0.000 0.000 0.000 0.0001 0.000 0.000 0.000 1 yr 24 hr Pre -Development (Q), ft3/sec: 0.635 0.605 Avg. Orifice flow<Pre Q? OK OK Drawdown, days: Soils Report Data 3.39 3.75 Ground Elevation at Boring in Soils Report, fmsl: 13.77 13,00 Distance Ground to SHWT per Soils Report, in: 73-00 39..001 Distance Ground to SHWT per Soils Report, ft: 6.08 3.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SHWT Elevation, DWQ Calculated, fmsl: 7.69 9.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SHWT Elevation, Reported by Consultant, fmsl: 7.89 9.75 Distance SHWT to PP, ft: Design OK if., 0<= Value <= 0.5 -0.31 1.25 D.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Permanent Pool Elevation, fmsl: Pump B.coi 8.50 0.001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Max HP: 114 1/3 N/A N/A N/A N/A N/A N/A NIA N/A Excavated Depth Bottom Pond/Top Sediment Bottom Shelf PP Wet Pond #1 Basin Contour El (ft) SA (sf) Inc Vol (A Cum Vol (cf) Contour El (ft) -05 0 0 0.5 8,3fi1: 0 0 5.0 73 $6.361. 58,527 58,5271 7.5 84 :'a: 4.984 3.;111 9.0 TPVolume: 40,438 = ?•: ,?1' 103,479 PP Volume: 73,42.4 - = 15,E-s7 PP Area: 16,905 = 5329 Forebay #1 Volume: 7 % Forebay #1: 20% Average Depth (Option 1): 4.7-->Round 4.5 Average Depth (Option 2): 6.1 -->Round 6.0 X: Depth of Water at Bottom of Shelf 0.50 ft ABonhdf 13,690 fe Main Pond + Forebay AP -Pool 16,905 ft' Main Pond + Forebay ABotPond 8,361. ft? Main Pond Only depth 7.00 ft Bottom Shelf to Bottom Pond Bottom Shelf 7.50 msl Bottom Pond/Top Sediment 0.50 msl El I SA I Inc Vol I Cum Vol I EI (ft) (sf) (cf) (cf) ft) Excavated Depth Z.51 1 0 Bottom Pond/Top Sediment 351 15,5381 0 Bottom Shelf 8.01 15,5381 69,921 PP r H.Sl i8.n"ia I R.SR6 TP Volume: 41,621 = 1-,' _743 109,122 PP Volume: 99,937 21,431 PP Area: 24,927 - I�'h(c Forebay #1 Volume: 21,431 % Forebay #1: 21% Average Depth (Option 1): 4.0 -->Round 4.0 Average Depth (Option 2): 4.3 -->Round 4.5 X: Depth of Water at Bottom of Shelf 0.50 ft ABobadf 21,661 ft2 Main Pond + Forebay Ap.,,,,pe„ 24,927 fe Main Pond + Forebay ABoreond 1.5,538 fe Main Pond Only depth 4.50 ft Bottom Shelf to Bottom Pond Bottom Shelf 8.00 msl Bottom Pond/Top Sediment 3.50 msl SA Inc Vol Cum Vol El SA Inc Vol Cum Vol (sf) (cf) M (ft) I (sf) (cQ I (cf) 0 0 -0.5 0 0 1 5,329 0 0 0.5 13,690 0 5,329 13,323 13,323 7.5 13,690 95,830 95,83i _.._. 2,665 15,987 8.0 16.905 7.649 103.47 NOTE, ENGINEER GOTv2,193CF Forebay Total Contour SA Inc Vol Cum Vol El SA Inc Vol Cum Vol (sf) (cf) (cf) (ft) (sf) (cf) (d) 0 0 2.5 0 0 1 6,123 0 0 3.5 21,661 0 1 6.123: 18,369 18,369 8.0 21.661 97.475 97.47 NOTE, ENGINEER GOT42,810CF Casmer, Jo From: Casmer, Jo Sent: Thursday, October 08, 201511:41 AM To: 'lobos251@aol.com; Tripp Engineering (tdppeng@ec.rr.com) Subject: The Village at Motts Landing Phase 2C; Stormwater Permit SW8 150905 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Permit Application and $505.00 fee on September 30, 2015. The project has been assigned to Kelly Johnson and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. .Jo 4rsow Administmtive Assistant for DEMLIt/Storm inter Section NC Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7336 Fax: (910) 350-2004 J o.casmerC3 ncdenr.gov Email correspon*nce to and firm this address may be subW to the North Caroline Public Records law and may be disdosred to third pestles Completeness Review Checklist Project Name: 1LQ. 0 11�C,A, 0_+ MZ Received Dater Y j 2-6 Project Location:, Accepted Date: Rule(s) 08 Coastal 1995 Coastal11 Phase 11(WiRO.) ®Universal 1988 Coastal Type of Permit New r Mod or PR Existing Permit # (Mod or PR): PE Cert on File? Density: elD or LD Type: Commercial or Residential NCG: %: (% OK?) Stream Class: SA Map Offsite to SW8 Subdivided?: Subdivision or Single Lot I MORW Map nExempt Paperwork Emailed Engineer on: pplement(s) (1 original per BMP) BMP Type(s): O&M with correct/original signatures (1 original per BMP except LS/VFS and swales) plication with correct/original signatures e C or LLC: Sig. Auth. per SoS or letter Em 'Address: Design Engineer r7paC(within 6mo) Email Address: Owner E1,Is Report with SHWT Note to Reviewer: 86' C ations (signed/sealed) �c�cSL / No obvious errors /D Density includes common areas, etc L.JDLfed Restrictions, if subdivided: igned & Notarized rect Template (Comm/Res D) or Dec. Covenants & Rest. Plans 2 Sets �jv1 �Jt Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) rading ®Wetlands: Delineated or No Wetlands MKcility Map out (proposed BUA dimensions) gend F3PrA Maps 00611ect Boundaries Infiltration Wet Pond Offshe Soils Report LJSoils Report ED PE Cert for Master Lot #: SHWT: SHWT: ®Deed Rest for Master ®Lot # Matches Master Bottom: PP: BUA Permitted (Master): sf Visited: BUA Proposed (Offsite): sf Additional information: Permitted Proposed: Proposed: Proposed: BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) M TRIPP ENGINEERING, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 - FAX: (910) 763-5631 September 25, 2015 NCDENR Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Kelly Johnson Re: The Village at Motts Landing Phase 2C TE 14026 Dear Kelly: ECEIVE Is am SEP302015 BY:— We are requesting a high density stormwater permit for the Village at Motts Landing Phase 2C subdivision. Enclosed please find the following items for review: • 2 sets of plans • $505 check • Narrative o StorrXater appricatron — one original and one copy • (2) Wet Detention Basin Supplements • (2) Operation and Maintenance Agreements . Deed Restrictions • Calculations • USGS map • Soils Reports • Secretary of State info. • Copy of the Deed Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. Monica Valsi, E.I. MLV:dcb Enc. RECEIVED sp *�;b"6 09/23/15 TE 14026 Stormwater & Erosion Control Narrative The Village at Motts Landing Phase 2C New Hanover County, NC The Village at Motts Landing (VAML) Phase 2C is a residential site consisting of 61 single-family lots in New Hanover County, Parcel lD# R07600-006-010-000, owned by AFTEW Properties, LLC. The project area is approximately 28.58 acres. Wetlands exist on the site. VAML Phase 2C proposes sixty-one (61) single-family lots, an amenity area, asphalt roadway with curbing, concrete sidewalks, two (2) wet detention basins, and utility extensions. The site has two (2) drainage areas. Drainage Area 1 is approximately 16.04 acres. The total impervious area for DA 1 is 6.90 acres. Drainage Area 2 is approximately 15.28 acres. The total impervious area for DA 2 is 6.54 acres. The project will be treated by erosion control measures such as drop inlets with inlet protection, temporary silt fence, gravel construction entrance, and two (2) sediment basins. Two (2) wet detention basins provides sufficient storm water management to meet the State's 1.5" requirement, provides 90% TSS removal, and alternately sized for the 2-, 10-, and 25-yr storm events and analyzed for the 100-yr storm event. An emergency spillway has been designed for the 100-year storm assuming the principal spillway is obstructed or not operating properly. Prior to clearing of the site, one temporary construction entrance and temporary silt fence will be installed. After clearing of the project site, the wet detention basins will be constructed to include the proposed forebays. The roadway locations will then be graded. Underground utilities, including the stormwater drainage system will be installed and inlet protection put into place. The proposed roadways and sidewalks will be constructed, final site grading, and stabilization of the site. Temporary erosion control measures will remain in -place until such time as when areas are stabilized. Permanent measures include permanent stands of grass and energy dissipaters. Specific measures and directions to the contractor are noted on the plans. E G E � SEP 3 0 20b 1 BY: 4M4 North Carolina Elaine Jam; Marshall _� � a��; ��'MN Secretary SECRE TAR'Y o ` TAT:-: PO Box 236 '?. RsItwi4i NC 27626-0622 919)801-2000 Click Here To: View Document Filings File an Annual Report Print a Pre -Populated Annual Report form Amend a Previous Annual Report Corporate Names Legal: Aftew Properties, LLC Limited Liability Company Information Sosld: 0637949 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 7/11/2002 Fiscal Month: December State of Incorporation: NC Registered Agent: Sobol, Arnold Corporate Addresses Mailing: 2020 South Churchill Drive Wilmington, NC 28403 Principal Office: 2020 South Churchill Drive Wilmington, NC 28403 Reg Office: 2020 South Churchill Drive Wilmington, NC 28403 Reg Mailing: 2020 South Churchill Drive Wilmington, NC 28403 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager: Arnold L Sobol 2020 South Churchill Drive Wilmington NC 28403 Manager: Florence S Sobol 2020 South Churchill Drive Wilmington NC 28403 ECEIVE BY: Account Login Register �~ *opCL G' a rr .�.,�' :. #�"��-,��' ' � •y�� `� r k� :' * -�- �: � � r� � � � r � • � ,� 1. « � fit•: i � �` r Fes' • � - - �. .;tA e�, .�"``r : f; . ,✓." ry, �- V i + i r J ',1 ,:'i o't�'�'l: � � � � a _V � 14? • � � fi^,.—..1.�`'Z. is - �'Y y..rt'+�(K, i ci♦ i f 9L a�%' 1 ;R�+�i �� � �,,}-. °3' �: z T.; �. ,�R. `+ � �7 F t..-�-y at_ •-�a..~�` 'o '' �! Y j .. gt .y, �_ • w R. %•s $ (`:' Ra \�'1@:. f� 10 r1 � :y:{, � � d r � +A •' . r'S � � � ! p� ram..! � � �j ��•�.ti.a R { 7 is,3i18y,�, .T °F•.d G, .• t, 1 r F : e �......�; .. f;••a y q� ti: id° o ', "'► -�t'e ^'f \.:` �l_.,, i.. �'ei r!/ \ tl[.y�• LL � \i.,l "�• ;;yggy..i''R!` at r :wJ'i+��+r. t�� ` ..�.. +'` r . �w � '!.,` .J5 %FFj 4_J•' �, o ��.... 11MMMM4�---� t �; �' tf`S—•s+p y '�,♦:�• Ir ♦ ,��r u.,�.,�, 1� 1{ � '' vG-+Y � 1 �� '�`-�` �,� `i_..,.v'''.I�a,�+..��� klt i , �.. �'! � \ �� I , �• $_ • • .fir x, _ $ _..ri��" n�.�.., l! 4 a++� f �' ''i �.�.-� e,w, a V, ,� ., `�, f�FA'f�,�C.yl♦ j�I+ ��N�^:�I,�" JIIJ�• `.1 {�' • --�_ � P •�, /vy��y} ((��.t �• '+ St � .e �'� "�.. f T + 9C � � ..� f f [ °h•• � i' % � •� �4 ':- , ° ' y,0. rya s- .. �. �4 1••'S � � ' � f�1:, M, S_• ;AT �•`` 1, .•,..-s � �•jt _q„^� �-y �+�`7�'<'•'ii' 's .1 �, .v�\,*� � �, �I i+ �I I }� � � in r!Nlu- eJ ram• � � ��',:� "by 09/23/2015 MLV Total Drainage Area sq. ft. I acres 6495,(0$ 1528 VAML Phase 2C DA #2 Wet Detention Basin Calculation Impervious Area Land Use sq.ft. acres Lots i rft" is 4.26 Roads WA ." 1.29 Sidewalks .I345'..`:`,�. 0.19 Amenity Area ';° 0.59 Future Total j.; t` 'bU .. 0.23 285,050 6.54 Stormwater Calculations: Time of Concentration: Hydraulic Length (L) = .'`: ',A• 29.0-ft' change in Height (H) _ Tc = (L' /H)-"' / 128 = 10.28 min. Flow for 1 year, 24 hour Storm ply QPRE _ (CPRE) x (11) x (Area) 11.92 cfs QPOST = (CPosT) x 00 x (Area) 31.06 cis Detention Pond Desion: Main Pond Size: Does Area Drain to SA Waters? n % impervious = 0.428 = 42.8% CPRE = 0.2 CPOST = (% imp.)(.95)+(1 °% imp.)(.20) 0.52 11 = 3.90 in/hr 110 = 7.23 in/hr Flow for 10 year, 24 hour Storm (Q1o): QPRE _ (CPRE) x (110) x (Area) 22.10 cfs QPOST = (C'POST) x 010) x (Area) 57.59 cfs State Surface Area Required at normal Dool: Pond side slopes = 3 :1 Depth b/w Bot. of V.S. & 4.50 Bot. Pool = SA/DA = 0.0334 for.4.5' ave. "de fh' Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Red SA =(SA/ DA x Total Draina a Area 22.238 sq. ft. Provided SA = 24.927 sq. ft. Pond Size: ,,,u, yU, %lunu. Vol. tlevation Surf. Area Incr. Vol (ftJ (so. ft) (cf) (CO ft. s of Bank % 11400: ° °°': 3,854 :;. ;: 116,598 228,730 Top of Bank 14. Q 6,,1. 3. 24,492 P. Pool 1(f, 0 �' 24�U 23,357 112,132 Temp. Pool 1p f)© ;. 6,923 9,185 of V.S.1';A.$ 10,268 88,775 Perm. Pool 8:59 , : 6 23 3,062 n. Pool Of V.S. $ 5Q, s$, b4 f3 t 1° i 8,586 69,921 78,507,E Bot. of V.S. i.00 6;123 " 18,369 of Pool ,tft�yj3$ `.%=;i0 15 69,921 Bot. Pool 5.00 . _ .;613_ 0 • . 38; 0 r► D 3WT 8.75 Bottom SA = 15,538 sq. ft. Bottom of VS SA= 15,538 sq. ft. Permanent Pool SA = 18,804 sq. ft. Vol. = [((PP SA + Bottom VS SA)/2) x (PP el. - Bottom VS el.)] + [((Bottom VS SA + Bottom Pool SA)/2) x (Bottom VS el. - Bottom Pool el.)] 78,507 cu. ft. Fore bay: Provided Normal Forebay Pond Volume Bottom of Pool SA= 6,123 sq. ft. Permanent Pool SA = 6,123 sq ft Vol. = [(P.P. SA + Bottom SA) / 2] x (P.P. el. - Bottom el.) = 21,431 cu. ft. Depth= 3.50 ft Required Forebay Volume 18%-22% required) Vol. = 22°% of Permanent Pool volume of Pond and Forebay = 21,986 cu. ft. Volume required to contain from design storm(ft')= 36,229 Therefore, maximum sta a is between stages and cumulative volumes (main pond plus forebay): Stage Cuml. Volume 8.50 4. 00 183,0900 14026 E1 SEP 3 0 20$5 BY: 30,615 21,431 18,369 0 °o®eealCAR al lei►osooBo ° e/ ° SEA o 4 ,fit �1d111111� Total Provided PP Volume a'Z�• = 99,936 cu.8. Actual °% of Forebay Volume = 21.44 Using Interpolation to determine stage at volume = 36,229 Maximum Stage (feet) = 9.58 Therefore set Temporary Pool Elevation at or higher than Maximum Stage 14026 Pond Calcs.xlsx 1 of 4 MLV /2015 VAML Phase 2C 1 DA #2 402B Pond Size for Determining Storage Volume: wet Detention Basin Calculation Elev. SA Incr. Vol. Cum. Vol. (ft) (sq.ft.) (cu.ft.) (cu.ft.) Temp. Pool 10.00 30,568 29,480 42,810 Top of V.S. 9.00 t'`2E1_;S92': 13,330 13,330 Penn. Pool 8.50 24,927 0 0 Provided Storage Volume: Vol. _ [((PP SA + Top of VS SA)/2) x (Top of VS Elev. — PP Elev.)] + [((Top of VS SA+TP SA)/2) x (TP Elev. - Top of VS Elev.)] Vol. = 42,810 cu. ft. State Volume Req. for Storage of first 1.5" runoff., Rv = .05+ .009(% imp) = 0.435 V= (Design rainfall)(Rv)(Drainage Area) = 36,229 cu. ft. Outlet Structure Desiaw Flow for 2-day drawdown: for Min. Volume required of stormwater, Q = Min. Vol. Req_ / 172,800 sec. (2-days) 0.210 cfs Required Area of Pipe for 2-day drawdown: A= Q/[Cd xSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./s2 h = (T.P. elev.- N.P. Elev.) /3 0.50 ft. A = 0.0616 s . ft. Diameter of Pipe for 2-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.2800 ft. = 3.36 in. Drawdown Calculation Orfice Used= �2:5 in. Drawdown rate= 0.116 cfs Drawdown time= 3.61 days Outlet Structure Check: Using �4'x4' asin,Perimeter 16 ft. Q = CIA C = (% imp.)(.95) + (1 % imp.)(.25) 0.52 1 = 7.23 in. for a 10 yr. Storm A = 15.28 Acres = 57.59 cfs Flow for 5-day drawdown: for Min. Volume required of stormwater, Q = Temp. Pool Vol. / 432,000 sec. (5-days) 0.084 cfs Required Area of Pipe for 5-day drawdown: A= Q/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./sZ h = (F.P. elev. - N.P. Elev.) / 3 0.5 ft. A = 0.0246 s . ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4)1 pi] 0.1771 ft. 2.13 in. Q= CwxLxH'"s H = [Q / (Cw x L)]2r3 Cw = 3 1.13 ft. Peak elevation = flood pool elevation + H 11.13 ft. 14026 Pond Calcs.xlsx 2 of 4 09/23/2015 VAML Phase 2C MLV DA #2 14026 Wet Detention Basin Calculation Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv = 0.05+0.009(IA) Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (inches) IA = Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres) IA= 42.8 % Rv = 0.435 Design Rainfall Depth = 1.50 in. Drainage Area = 15.28 acres Volume = 36,229 ft' 14026 Pond Calcs.xlsx 3 of 4 09/23/2015 VAML Phase 2C MLV DA #2 Wet Detention Basin Calculation Average Death Calculated Permanent Pool Volume (ft) 99,936.0 Permanent Pool Area (ft) 24,927.0 Option 1 - Average Depth (ft) 4.01 Bottom Vegetated Shelf Area (ft) 21661.0 Permanent Pool Area (ft?) 24927.0 Bottom Pond Area (ft) 15538.0 Depth (ft) 4.5 Option 2 - Average Depth (ft) 4.33 Average Depth for use in Table (ft) 4.33 Round to nearest 0.5 for SAIDA (ft) 4.50 14026 14026 Pond Calcs.xlsx 4 of 4 09/23/2015 MLV Total Drainage Area sq. ft. acres 698,027 +?:1 16.04 VAML Phase 2C DA #1 Wet Detention Basin Calculation Impervious Area Land Use sq. ft. acres Lots i6Q0Of:_ 2.75 Roads 1.30 Sidewalks `' ; 7,$6 ..... 0.18 0.00 Future Total �05 2.66 6.90 a-tormwater calculations: Time of Concentration: Hydraulic Length (L) = 2;765 ft. change in Height (H) _ 26.5 ft. Tc = (L3 /H).aas / 128 20.89 min. Flow for 1 year, 24 hour Storm (Q,): QPRE — (CPRE) X (11) x (Area) 12.51 cfs QPosT = (CPosT) x (11) x (Area) 32.69 cfs Detention Pond Design: Main Pond Size: Does Area Drain to SA Waters? n % impervious = 0.430 = 43.0% CPRE = 0.2 CPOST = (% [mp.)(.95)+(1-% imp.)(.20) = 0.52 11 = 3.90 in/hr 110 = 7.23 in/hr Flow for 10 year, 24 hour Storm (Q10); QPRE _ (CPRE) X (110) X (Area) 23.19 cfs QPosT = (CPosT) x 010) x (Area) 60.60 cfs State Surface Area Required at normal pool: Pond side slopes = 3 :1 Depth b/w Bot. of V.S. & 7.00 Bot. Pool = SA/DA = 0.0228;for 3 0' Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Red SA = SA/DA x Total Drainage Area = 15.929 sq. ft. Provided SA = 16,905 sq. ft. Pond Size: elevation Surface Area Incr. Vol Cuml. Vol. Elevation Surf. Area Incr. Vol. Cuml. Vol ft. . ft. Top of Bank :,`14D0 .. `w '•2 458 l b ' R. Temp. Pool fit} 91,324 186,370 Top of Bank ft. 74.00 s(CO 5;3r29 21,316 47,961 fit] a$ 204, 24,894 95,046 Temp. Pool 1°b 00Sz9.• • . 10,658 26,645 To of P V.S. 50 ' ` 6,641 70,152 Perm. Pool . Ei 00 :? 5 329.. 2.665.. 15,987 Perm. Pool s 1 AM d. Bot. of V.S. g5, : _ 4,984 58,527 63,511 58,527 Bot. of V.S.-50 Bot. Pool 5.AII, 329 29: `. 13,323 p 13,323 0 Bot. of Pool Ei ` _ r 8,3(i1 0 0 Bottom SA = 8,361 sq. ft. Bottom of VS SA= 8,361 sq. ft. Permanent Pool SA = 11,576 sq. ft. Vol. = [((PP SA + Bottom VS SA)/2) x (PP el. - Bottom VS el.)] + [((Bottom VS SA + Bottom Pool SA)/2) x (Bottom VS el. - Bottom Pool el.)] 63,511 cu.ft. Fore bay: moulded Normal Forebay Pond Volume Bottom of Pool SA= 5,329 sq. ft. Permanent Pool SA = 5,329 sq ft Vol. = [(P.P. SA + Bottom SA) / 2] x (P✓.P/el. - Bottom el.) = 1900 cu. ft. Depth= 3.00 ft Required Forebay Volume 18%-22% required) Vol. = 22% of Permanent Pool volume of Pond and Forebay 17,489 cu. ft. Volume required to contain from design storm(ft3)= 38,174 Therefore, maximum sta a is between stages and cumulative volumes (main pond plus forebay): Stage Cum[. Volume 8.00 0 14.00 154,833 Total Provided PI Volume 79,497 cu.ft. Actual % of Forebay Volume = 20.11 Using Interpolation to determine stage at volume = 38,174 Maximum Stage (feet) = 9.48 Therefore set Temporary Pool Elevation at or higher than Maximum Stage 14026 14026 Pond Calcs.xlsx 1 of 4 09/23/2015 VAML Phase 2C MLV DA fl1 14026 Pond Size for Determining Storage Volume: Wet Detention Basin Calculation Elev. SA Incr. Vol. Cum. Vol. (ft) (sq.ft.) (cu.ft.) (cu.ft.) Temp. Pool 10.00 23,533 32,888 42,193 Top of V.S. 8.50 ; 22tJ`3:�'7. 9,306 9,306 Perm. Pool 8.00 16,905 0 0 Provided Storage Volume: Vol. _ [((PP SA + Top of VS SA)/2) x (Top of VS Elev. — PP Elev.)] + [((Top of VS SA+TP SA)/2) x (TP Elev. - Top of VS Elev.)] Vol. = 42,193 cu. ft. State Volume Req. for Storage of first 1.5" runoff: Rv = .05+ .009(% imp) 0.437 V= (Design rainfall)(Rv)(Drainage Area) 38,174 cu. ft. Outlet Structure Design: Flow for 2-day drawdown: for Min. Volume required of stonnwater, Q = Min. Vol. Req. / 172,800 sec. (2-days) 0.221 cfs Required Area of Pipe for 2-day drawdown: A= Q/ [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft./sZ h = (T.P. elev.- N.P. Elev.) /3 0.67 ft. A = 0.0562 s . ft. Diameter of Pipe for 2-day drawdown: DIA. = SQRT[(A x 4)1 pi] = 0.2675 ft. 3.21 in. Drawdown Calculation Orifice Used= _ _ 2.5 in. Drawdown rate= 0.134 cfs Drawdown time= 3.30 days Outlet Structure Check: Using a 4' x 4' Basin, Perimeter L = 16 ft. Q = CIA C = (% imp.)(.95) + (1-% imp.)(.25) 0.52 1= 7.23 in. for a 10 yr. Storm A = 16.04 Acres = 60.60 cfs Flow for 5-day drawdown: for Min. Volume required of stormwater, Q = Temp. Pool Vol.1432,000 sec. (5{iays) = 0.088 cfs Required Area of Pipe for 5-day drawdown: A= Q/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./sZ h = (F.P. elev. - N.P. Elev.) / 3 = 0.666667 ft. A = 0.0225 s . ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4)1 pi] 0.1692 ft. 2.03 in. Q= CwxLxH"s H = [Q / (Cw x L)]u' Cw = 3 1.17 ft. Peak elevation = flood pool elevation + H 11.17 ft. 14026 Pond Celcs.xlsx 2 of 4 09/2312015 VAML Phase 2C 14026 MLV DA #1 Wet Detention Basin Calculation Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv= 0.05+0.009(IA) Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (inches) IA Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres) IA= 43.0 % Rv = 0.437 Design Rainfall Depth = 1.50 in. Drainage Area = 16.04 acres Volume = 38,174 ft3 14026 Pond Calcs.xlsx 3 of 4 09123/2015 VAML Phase 2C MLV DA #1 Wet Detention Basin Calculation Average Depth Calculated Permanent Pool Volume (ft) 79,497.3 Permanent Pool Area (ft) 16.905.0 Option 1 - Average Depth (ft) 4.70 Bottom Vegetated Shelf Area (ft) 13690.0 Permanent Pool Area (ft) 16905.0 Bottom Pond Area (ft2) 8361.0 Depth (ft) 7.0 Option 2 - Average Depth (ft) 6.09 Average Depth for use in Table (ft) 6.09 Round to nearest 0.5 for SA/DA (ft) 6.00 14026 14026 Pond Calcs.xlsx 4 of 4 09/23/2015 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 2-year 24hr Storm 14026 WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2800 FT CHANGE IN HEIGHT 34.5 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 19.15 MIN INTENSITY 2 YR 4.14 IN/HR Qa = 41.97 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 4.5 INCHES 2yr, 24hr PRECIPITATION CN = 64 ((98*0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) = (P-0.2S)1121(P+0.8S) D = 1.29 IN - 2yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 26.05 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 _ (16,168) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.00 feet AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANGE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 2 YR 4.14 IN/HR Qp = 34.53 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S 2 CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.00 16,905 0 0 0 0 0 0.00 9.00 21,365 19,135 19,135 1.0 9.8593 0.0000 1.01 10.00 23,533 22,449 41,584 2.0 10.6355 0.6931 1.98 11.00 25,760 24,647 66,231 3.0 11.1009 1.0986 2.95 .12.00 28,046 26,903 93,134 4.0 11.4418 1.3863 3.96 13.00 30,392 29,219 122,353 5.0 11.7147 1.6094 5.01 14.00 32,787 31,590 163,942 6.0 11.9443 1.7918 6.11 Regression Output. Ks = 18824 b = 1.16 Constant 9.84 G:UOBS12014114026 VAML Phase 2=81Cs114026 r0ut1ng2y24hr Pond 1.x1sx 09/23/2015 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 2-year 24hr Storm 14026 CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 41.97 cfs Qp = 34.53 cfs Tp = 26.1 min dT = 4 min BASIN DATA Ks = 18824 b= 1.16 Zo = 8.00 ft Normal water elev = 8.00 ft Peak Outflow = 4.82 cfs Box Weir Length = 16 ft Peak Stage = 10.83 ft Cw = 3.0 Maximum Storage = 63,046 cu ft Zcr = 12.75 ft Control Holes: State Orifice: Dia = 2.50 in Dd = 36 in Inv = 8.00 ft Cd = 0.59 Weir: L = 24 in Zi = 8.00 ft Inv = 10.00 ft Emergency Overflow Weir: L = 480.0 in Inv = 13.50 ft Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cfs) (cu ft) (ft) (cfs) (cfs) "0 ON (ems) (Cfs) 0 0.0 0 8.00 0 0.00 0 0.00 4 2.0 0 8.00 0 0.00 0.00 0 0.00 8 7.4 473 8.04 0.00 0.00 0.00 0.00 0.00 12 15.1 2254 8.16 0.04 0.00 0.00 0.04 0.00 16 23.3 5878 8.37 0.08 0.00 0.00 0.08 0.00 20 30.1 11455 8.65 0.12 0.00 0.00 0.12 0.00 24 34.0 18658 8.99 0.15 0.00 0.00 0.15 0.00 28 34.1 26783 9.35 0.18 0.00 0.00 0.18 0.00 32 30.3 34913 9.70 0.20 0.00 0.00 0.20 0.00 36 24.9 42132 10.00 0.22 0.00 0.00 0.22 0.00 40 20.4 48046 10.24 0.95 0.00 0.00 0.24 0.71 44 16.7 52707 10.43 1.92 0.00 0.00 0.25 1.68 48 13.7 56250 10.57 2.82 0.00 0.00 0.25 2.56 52 11.2 58853 10.67 3.54 0.00 0.00 0.26 3.28 56 9.2 60689 10.74 4.09 0.00 0.00 0.26 3.82 60 7.5 61908 10.79 4.46 0.00 0.00 0.26 4.20 64 6.1 62639 10.82 4.69 0.00 0.00 0.27 4.43 68 5.0 62989 10.83 4.80 0.00 0.00 0.27 4.54 72 4.1 63046 10.83 4.82 n nn 0.00 0.27 4.55 76 3.4 62879 10.83 4.77 0.00 0.00 0.27 4.50 80 2.8 62646 10.81 4.66 0.00 0.00 0.27 4.40 84 2.3 62091 10.80 4.52 0.00 0.00 0.26 4.25 88 1.9 61551 10.77 4.35 0.00 0.00 0.26 4.09 92 1.5 60952 10.75 4.17 0.00 0.00 0.26 3.90 96 1.2 60317 10.73 3.97 0.00 0.00 0.26 3.71 100 1.0 59663 10.70 3.78 0.00 0.00 0.26 3.52 104 0.8 59000 10.67 3.59 0.00 0.00 0.26 3.33 108 0.7 58341 10.65 3.40 0.00 0.00 0.26 3.14 112 0.6 57690 10.62 3.21 0.00 0.00 0.26 2.96 116 0.5 57054 10.60 3.03 0.00 0.00 0.25 2.78 G:WOBS12014114026-VAML Phase 2C%Calcs114026 routing2y24hr Pond 1.xlsx 09/23/2015 VAML Phase 2C 14026 MLV Pond #1 Stormwater Pond Routing 2-year 24hr Storm 120 0.4 56436 10.57 2.87 0.00 0.00 0.25 2.61 124 0.3 55839 10.55 2.71 0.00 0.00 0.25 2.45 128 0.3 55263 10.53 2.55 0.00 0.00 0.25 2.30 132 0.2 54710 10.51 2.41 0.00 0.00 0.25 2.16 136 0.2 54181 10.49 2.28 0.00 0.00 0.25 2.03 140 0.1 53675 10.47 2.15 0.00 0.00 0.25 1.91 144 0.1 53191 10.45 2.04 0.00 0.00 0.25 1.79 148 0.1 52729 10.43 1.93 0.00 0.00 0.25 1.68 152 0.1 52289 10.41 1.82 0.00 0.00 0.24 1.58 156 0.1 51870 10.39 1.73 0.00 0.00 0.24 1.48 160 0.1 51470 10.38 1.64 0.00 0.00 0.24 1.40 164 0.0 51089 10.36 1.55 0.00 0.00 0.24 1.31 168 0.0 50726 10.35 1.48 0.00 0.00 0.24 1.23 172 0.0 50380 10.33 1.40 0.00 0.00 0.24 1.16 176 0.0 50050 10.32 1.33 0.00 0.00 0.24 1.09 180 0.0 49736 10.31 1.27 0.00 0.00 0.24 1.03 184 0.0 49436 10.30 1.21 0.00 0.00 0.24 0.97 188 0.0 49149 10.29 1.15 0.00 0.00 0.24 0.92 192 0.0 48875 10.27 1.10 0.00 0.00 0.24 0.86 196 0.0 48614 10.26 1.05 0.00 0.00 0.24 0.81 200 0.0 48364 10.25 1.00 0.00 0.00 0.24 0.77 204 0.0 48124 10.24 0.96 0.00 0.00 0.24 0.72 208 0.0 47895 10.24 0.92 0.00 0.00 0.24 0.68 212 0.0 47675 10.23 0.88 0.00 0.00 0.23 0.65 216 0.0 47465 10.22 0.84 0.00 0.00 0.23 0.61 220 0.0 47263 10.21 0.81 0.00 0.00 0.23 0.58 224 0.0 47069 10.20 0.78 0.00 0.00 0.23 0.54 228 0.0 46883 10.19 0.75 0.00 0.00 0.23 0.51 232 0.0 46704 10.19 0.72 0.00 0.00 0.23 0.49 236 0.0 46532 10.18 0.69 0.00 0.00 0.23 0.46 240 0.0 46366 10.17 0.67 0.00 0.00 0.23 0.43 244 0.0 46207 10.17 0.64 n nn 0.00 0.23 0.41 248 0.0 46053 10.16 0.62 0.00 0.00 0.23 0.39 252 0.0 45905 10.15 0.60 0.00 0.00 0.23 0.37 256 0.0 45762 10.15 0.58 0.00 0.00 0.23 0.35 260 0.0 45623 10.14 0.56 0.00 0.00 0.23 0.33 264 0.0 45490 10.14 0.54 0.00 0.00 0.23 0.31 268 0.0 45361 10.13 0.52 0.00 0.00 0.23 0.29 272 0.0 45236 10.13 0.50 0.00 0.00 0.23 0.27 276 0.0 45115 10.12 0.49 0.00 0.00 0.23 0.26 280 0.0 44998 10.12 0.47 0.00 0.00 0.23 0.24 284 0.0 44885 10.11 0.46 0.00 0.00 0.23 0.23 288 0.0 44775 10.11 0.44 0.00 0.00 0.23 0.22 292 0.0 44668 10.10 0.43 0.00 0.00 0.23 0.20 296 0.0 44565 10.10 0.42 0.00 0.00 0.23 0.19 300 0.0 44464 10.10 0.41 0.00 0.00 0.23 0.18 304 0.0 44366 10.09 0.40 0.00 0.00 0.23 0.17 308 0.0 44271 10.09 0.39 0.00 0.00 0.23 0.16 312 0.0 44179 10.08 0.38 0.00 0.00 0.23 0.15 316 0.0 44089 10.08 0.37 0.00 0.00 0.23 0.14 320 0.0 44001 10.08 0.36 0.00 0.00 0.23 0.13 324 0.0 43915 10.07 0.35 0.00 0.00 0.23 0.12 328 0.0 43832 10.07 0.34 0.00 0.00 0.23 0.11 332 0.0 43750 10.07 0.33 0.00 0.00 0.23 0.11 336 0.0 43671 10.06 0.32 0.00 0.00 0.23 0.10 340 0.0 43593 10.06 0.32 0.00 0.00 0.23 0.09 344 0.0 43517 10.06 0.31 0.00 0.00 0.23 0.08 348 0.0 43443 10.06 0.30 0.00 0.00 0.23 0.08 352 0.0 43371 10.05 0.30 0.00 0.00 0.22 0.07 356 0.0 43300 10.05 0.29 0.00 0.00 0.22 0.07 360 0.0 43230 10.05 0.28 0.00 0.00 0.22 0.06 364 0.0 43162 10.04 0.28 0.00 0.00 0.22 0.05 368 0.0 43095 10.04 0.27 0.00 0.00 0.22 U.05 372 0.0 43029 10.04 0.27 0.00 0.00 0.22 0.04 376 0.0 42964 10.04 0.26 0.00 0.00 0.22 0.04 380 0.0 42901 10.03 0.26 0.00 0.00 0.22 0.04 384 0.0 42839 10.03 0.26 0.00 0.00 0.22 0.03 388 0.0 42777 10.03 0.25 0.00 0.00 0.22 0.03 392 0.0 42717 10.03 0.25 0.00 0.00 0.22 0.02 396 0.0 42658 10.02 0.24 0.00 0.00 0.22 0.02 400 0.0 42599 10.02 0.24 0.00 0.00 0.22 0.02 404 0.0 42541 10.02 0.24 0.00 0.00 0.22 0.01 408 0.0 42484 10.02 0.23 0.00 0.00 0.22 0.01 G:UOBS12014114026-VAML Phase 2MCalcs114026 routing2yr24hr_Pond 1.xlsx 09/23/2015 MLV VAML Phase 2C Pond #1 Stormwater Pond Routing 10-year 24hr Storm 14026 WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2800 FT CHANGE IN HEIGHT 34.5 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 19.15 MIN INTENSITY 10 YR 5.15 IIS - Qa = 52.21 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 7 INCHES 10yr, 24hr PRECIPITATION CN = 64 ((98-0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) = (P-0.2S)"2/(P+0.8S) D = 3.04 IN -10yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 49.36 MINUTES Storage Volume Req'd = (Qp-Qa)'Tp`1.39`60 (38,101) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.00 feet AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANCE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 10 YR 5.15 IN/HR Qp = 42.96 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.00 16,905 0 0 0 0 0 0.00 9.00 21,365 19,135 19,135 1.0 9.8593 0.0000 1.01 10.00 23,533 22,449 41,584 2.0 10.6355 0.6931 1.98 11.00 25,760 24,647 66,231 3.0 11.1009 1.0986 2.95 12.00 28,046 26,903 93,134 4.0 11.4418 1.3863 3.96 13.00 30,392 29,219 122,353 5.0 11.7147 1.6094 5.01 14.00 32,787 31,590 153,942 6.0 11.9443 1.7918 6.11 Regression Output: ==> Ks = 18824 b = 1.16 Constant 9.84 GMOBS12014114026-VAML Phase 2C%Calcs114026 routing10y24hr Pond 1.x1sx /2015 VAML Phase 2C MLV Pond #1 14026 Stormwater Pond Routing 10-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 52.21 cfs Qp = 42.96 cfs Tp = 49.4 min dT = 4 min BASIN DATA Ks = 18824 b = 1.16 Zo = 8.00 ft Normal water elev = 8.00 ft Box Weir Length = 16 ft Peak Outfow = 20.29 cis Peak Stage = 12.23 ft Cw = 3.0 Maximum Storage = 100,407 cu ft Zcr = 12.75 ft Control Hales: State Orifice: Dia 2.50 in Dd = 36 in Inv 8.00 It Cd = 0.59 Weir: L 24 in Zi = 8.00 ft Inv 10.00 ft Emergency Overflow Weir: 480.0 in Inv = 13.50 ft Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (min} (cfs) (cu ft) (g) (ems) (cfs) (Emergency Overflow) 0 0.0 0 8.00 0 0 (cls) (cfs) (ofs) 4 0.7 0 8.00 0 0.00 0.00 0.00 0 0.00 8 2.7 166 8.02 0.00 0.00 0.00 0 0.00 0.00 0.00 12 16 6.0 10.2 820 2249 8.07 0.01 0.00 0.00 0.01 0.00 20 15.2 4690 8.16 8.30 0.04 0.00 0.07 0.00 0.00 0.04 0.00 24 20.5 8315 8.49 0.10 0.00 0.00 0.00 0.07 0.00 28 26.0 13223 8.74 0.13 0.00 0.00 0.10 0.00 32 31.1 19428 9.03 0.15 0.00 0.00 0.13 0.00 36 35.6 26861 9.36 0.18 0.00 0.00 0.15 0.18 0.00 40 39.3 35373 9.72 0.20 0.00 0.00 0.20 0.00 0.00 44 41.7 44745 10.11 0.44 0.00 0.00 0.23 0.21 48 42.9 54651 10.50 2.40 0.00 0.00 0.25 2.15 52 42.7 64366 10.88 5.25 0.00 0.00 0.27 4.98 56 60 41.1 73343 11.23 8.43 0.00 0.00 0.28 8.15 64 38.2 81175 11.52 11.55 0.00 0.00 0.30 11.25 68 34.6 87574 11.76 14.30 0.00 0.00 0.31 13.99 72 31.1 92434 11.94 16.50 0.00 0.00 0.32 16.18 76 28.0 25.2 95938 12.07 18.14 0.00 0.00 0.32 17.82 80 22.7 98302 99723 12.15 12.20 19.27 0.00 19.95 0.00 0.32 18.94 84 20.4 100375 12.23 0.00 20.27 0.00 0.00 0.00 0.33 19.63 88 18.4 100407 12.23 20.29 0.00 0.00 0.33 19.94 92 16.5 99945 12.21 20.06 0.00 0.00 0.33 19.96 96 14.9 99097 12.18 19.65 0.00 0.00 0.33 19.73 100 13.4 97951 12.14 19.10 0.00 0.00 0.33 0.32 19.32 104 12.0 96581 12.09 18.44 0.00 0.00 0.32 18.77 108 10.8 95046 12.03 17.72 0.00 0.00 0.32 18.12 17.40 112 116 9.8 93397 11.97 16.94 0.00 0.00 0.32 16.63 8.8 91673 11.91 16.15 0.00 0.00 0.31 15.83 GAJ0BS12014114026-VAML Phase 2C%Ca1r-M14026 routing10yr24hr_Pond 1.xlsx 09/23/2015 VAML Phase 2C MLV Pond #1 14026 Stormwater Pond Routing 10-year 24hr Storm 120 7.9 89905 11.84 15.34 0.00 0.00 0.31 15.03 124 7.1 88120 11.78 14.54 0.00 0.00 0.31 14.23 128 8.4 86337 11.71 13.76 0.00 0.00 0.31 13.46 132 5.8 84573 11.65 12.99 0.00 0.00 0.30 12.69 136 5.2 82838 11.58 12.25 0.00 0.00 0.30 11.95 140 4.7 81143 11.52 11.54 0.00 0.00 0.30 11.24 144 4.2 79494 11.46 10.86 0.00 0.00 0.30 10.b6 148 3.8 77897 11.40 10.21 0.00 0.00 0.29 9.92 152 3.4 76354 11.34 9.60 0.00 0.00 0.29 9.31 156 3.1 74867 11.28 9.02 0.00 0.00 0.29 8.73 160 2.8 73438 11.23 8.47 0.00 0.00 0.28 8.18 164 2.5 72068 11.18 7.95 0.00 0.00 0.28 7.67 168 2.2 70754 11.13 7.47 0.00 0.00 0.28 7.19 172 2.0 69498 11.08 7.01 0.00 0.00 0.28 6.73 176 1.8 68297 11.03 6.59 0.00 0.00 0.28 6.31 180 1.6 67151 10.99 6.19 0.00 0.00 0.27 5.91 184 1.5 66057 10.95 5.81 0.00 0.00 0.27 5.54 188 1.3 65013 10.91 5.46 0.00 0.00 0.27 5.19 192 1.2 64019 10.87 5.13 0.00 0.00 0.27 4.87 196 1.1 63072 10.83 4.83 0.00 0.00 0.27 4.56 200 1.0 62169 10.80 4.54 0.00 0.00 0.26 4.28 204 0.9 61309 10.76 4.28 0.00 0.00 0.26 4.01 208 0.8 60491 10.73 4.03 0.00 0.00 0.26 3.77 212 0.7 59711 10.70 3.79 0.00 0.00 0.26 3.53 216 0.6 58969 10.67 3.58 0.00 0.00 0.26 3.32 220 0.6 58262 10.65 3.37 0.00 0.00 0.26 3.12 224 0.5 57589 10.62 3.18 0.00 0.00 0.26 2.93 228 0.5 56948 10.59 3.01 0.00 0.00 0.25 2.75 232 0.4 56337 10.57 2.84 0.00 0.00 0.25 2.59 236 0.4 55755 10.55 2.68 0.00 0.00 0.25 2.43 240 0.3 55200 10.53 2.54 0.00 0.00 0.25 2.29 244 0.3 W71 10.50 2.40 0.00 0.00 0.25 2.15 246 0.3 54167 10.49 2.28 0.00 0.00 0.25 2.03 252 0.2 53686 10.47 2.16 0.00 0.00 0.25 1.91 256 0.2 53227 10.45 2.05 0.00 0.00 0.25 1.80 260 0.2 52789 10.43 1.94 0.00 0.00 0.25 1.69 264 0.2 52371 10.41 1.84 0.00 0.00 0.24 1.60 268 0.2 51971 10.40 1.75 0.00 0.00 0.24 1.51 272 0.1 51589 10.38 1.66 0.00 0.00 0.24 1.42 276 0.1 51225 10.37 1.58 0.00 0.00 0.24 1.34 280 0.1 50876 10.35 1.51 0.00 0.00 0.24 1.27 284 0.1 50542 10.34 1.44 0.00 0.00 0.24 1.20 288 0.1 50222 10.33 1.37 0.00 0.00 0.24 1.13 292 0.1 49916 10.32 1.31 0.00 0.00 0.24 1.07 296 0.1 49623 10.30 1.25 0.00 0.00 0.24 1.01 300 0.1 49342 10.29 1.19 0.00 0.00 0.24 0.95 304 0.1 49073 10.28 1.14 0.00 0.00 0.24 0.90 308 0.1 48815 10.27 1.09 0.00 0.00 0.24 0.85 312 0.1 48567 10.26 1.04 0.00 0.00 0.24 0.81 316 0.0 48329 10.25 1.00 0.00 0.00 0.24 0.76 320 0.0 48100 10.24 0.96 0.00 0.00 0.24 0.72 324 0.0 47880 10.23 0.92 0.00 0.00 0.24 0.68 328 0.0 47669 10.23 0.88 0.00 0.00 0.23 0.65 332 0.0 47466 10.22 0.84 0.00 0.00 0.23 0.61 336 0.0 47270 10.21 0.81 0.00 0.00 0.23 0.58 340 0.0 47082 10.20 0.78 0.00 0.00 0.23 0.55 344 0.0 46901 10.20 0.75 0.00 0.00 0.23 0.52 348 0.0 46726 10.19 0.72 0.00 0.00 0.23 0.49 352 0.0 46557 10.18 0.70 0.00 0.00 0.23 0.46 356 0.0 46395 10.17 0.67 0.00 0.00 0.23 0.44 360 0.0 46237 10.17 0.65 0.00 0.00 0.23 0.41 364 0.0 46086 10.16 0.62 0.00 0.00 0.23 0.39 368 0.0 45939 10.16 0.60 0.00 0.00 0.23 0.37 372 0.0 45798 10.15 0.58 0.00 0.00 0.23 0.35 376 0.0 45661 10.15 0.56 0.00 0.00 0.23 0.33 380 0.0 45528 10.14 0.54 0.00 0.00 0.23 0.31 384 0.0 45400 10.13 0.53 0.00 0.00 0.23 0.30 388 0.0 45275 10.13 0.51 0.00 0.00 0.23 0.28 392 0.0 45155 10.12 0.49 0.00 0.00 0.23 0.26 396 0.0 45038 10.12 0.48 0.00 0.00 0.23 0.25 400 0.0 44925 10.12 0.46 0.00 0.00 0.23 0.23 404 0.0 44815 10.11 0.45 0.00 0.00 0.23 0.22 408 0.0 44708 10.11 0.44 0.00 0.00 0.23 0.21 G:WOBS12014114026-VAML Phase 2CICalcs\14026 routing10yr24hr_Pond 1.xlsx 09/23/2015 MLV WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2806 FT CHANGE IN HEIGHT 34.5 FT RUNOFF COEF.'C' 0.2 TIME OF CONCENTR 19.15 MIN INTENSITY 25 YR 5.83 IN/HR Qa = 69.10 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 8.05 INCHES 25yr, 24hr PRECIPITATION CN = 64 ((98*0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) = (P-0.2S)A2/(P+0.8S) D = 3.86 IN - 25yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)) / Qp Tp = 55.43 MINUTES Storage Volume Req'd = (Qp-Qa) Tp*1.39*60 (48,438) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.00 feet VAML Phase 2C Pond #1 Stormwater Pond Routing 25-year 24hr Storm AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANGE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 25 YR 5.83 IN/HR Qp = 48.63 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.00 16,905 0 0 0 0 0 0.00 9.00 21,365 19,135 19,135 1.0 9.8593 0.0000 1.01 10.00 23,533 22,449 41,584 2.0 10.6355 0.6931 1.98 11.00 25,760 24,647 66.231 3.0 11.1009 1.0986 2.95 12.00 28,046 26,903 93,134 4.0 11.4418 1.3663 3.96 13.00 30,392 29,219 122,353 5.0 11.7147 1.6094 5.01 14.00 32,787 31,590 153,942 6.0 11.9443 1.7918 6.11 Regression Output: Ks = 18824 b = 1.16 Constant 9.84 14026 G:UOM2014114026-VAML Phase 2MCaIcs114026 routing25y24hr Pond 1.xlsx 09/23/2015 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 25-year 24hr Storm 14026 CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 59.10 cis Qp = 48.63 cfs Tp = 55.4 min dT = 4 min BASIN DATA Ks = 18824 b = 1.16 Zo = 8.00 ft Normal water elev = 8.00 ft Peak Outflow = 27.10 cfs Box Weir Length = 16 ft Peak Stage = 12.71 It Cw = 3.0 Maximum Storage = 113,783 cu ft Zcr = 12.75 ft Control Holes: State Orifice: Dia = 2.50 in Dd = 36 in Inv = 8.00 It Cd = 0.59 Weir: L = 24 in Zi = 8.00 ft Inv = 10.00 It Emergency Overflow Weir: L = 480.0 in Inv = 13.50 It Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cfs) (cu ft) (ft) (cfs (cfs) (cfs) (cfs) (cfs) 0 0.0 0 8.00 0 0 0.00 0 0.00 4 0.6 0 8.00 0 0.00 0.00 0 0.00 8 2.5 149 8.02 0.00 0.00 0.00 0.00 0.00 12 5.4 739 8.06 0.01 0.00 0.00 0.01 0.00 16 9.3 2035 8.15 0.03 0.00 0.00 0.03 0.00 20 14_n 4267 8.28 0.07 0.00 0.00 0.07 0.00 24 19.2 7615 8.46 0.10 0.00 0.00 0.10 0.00 28 24.7 12207 8.69 0.12 0.00 0.00 0.12 0.00 32 30.2 18107 8.97 0.15 0.00 0.00 0.15 0.00 36 35.3 25309 9.29 0.18 0.00 0.00 0.18 0.00 40 39.9 33742 9.65 0.20 0.00 0.00 0.20 0.00 44 43.7 43271 10.05 0.29 0.00 0.00 0.22 0.06 48 46.5 53690 10.47 2.16 0.00 0.00 0.25 1.91 52 48.2 64333 10.88 5.24 0.00 0.00 0.27 4.97 56 48.6 74636 11.28 8.93 0.00 0.00 0.29 8.64 60 47.8 84161 11.63 12.81 0.00 0.00 0.30 12.51 64 45.8 92562 11.94 16.56 0.00 0.00 0.32 16.24 68 42.7 99584 12.20 19.89 0.00 0.00 0.33 19.56 72 39.0 105063 12.40 22.60 0.00 0.00 0.33 22.26 76 35.5 108999 12.54 24.60 0.00 0.00 0.34 24.26 80 32.3 111615 12.63 25.96 0.00 0.00 0.34 25.62 84 29.4 113143 12.69 26.76 0.00 0.00 0.34 26.42 88 26.8 113783 12.71 27.10 0.00 0.00 0.35 26.76 92 24.4 113709 12.71 27.06 0.00 0.00 0.35 26.72 96 22.2 113069 12.68 26.73 0.00 0.00 0.34 26.38 100 20.2 111986 12.65 26.16 0.00 0.00 0.34 25.81 104 18.4 110562 12.59 25.41 0.00 0.00 0.34 25.07 108 16.8 108882 12.53 24.54 0.00 0.00 0.34 24.20 112 15.3 107015 12.47 23.59 0.00 0.00 0.34 23.25 116 13.9 105017 12.40 22.57 0.00 0.00 0.33 22.24 G:U0BS12014114026-VAML Phase 2C\CeIcs114026 r0uting25yr24hr_P0nd 1.xlsx 09/23/2015 VAML Phase 2C 14026 MLV Pond #1 Stormwater Pond Routing 25-year 24hr Storm 120 12.7 102934 12.32 21.53 0.00 0.00 0.33 21.20 124 11.5 100803 12.24 20.48 0.00 0.00 0.33 20.15 128 10.5 98652 12.16 19.43 0.00 0.00 0.32 19.11 132 9.5 96505 12.09 18.40 0.00 0.00 0.32 18.08 136 8.7 94379 12.01 17.40 0.00 0.00 0.32 17.08 140 7.9 92289 11.93 16.43 0.00 0.00 0.32 16.12 144 7.2 90245 11.86 15.50 0.00 0.00 0.31 15.19 148 6.6 88255 11.78 14.60 0.00 0.00 0.31 14.29 152 6.0 86325 11.71 13.75 0.00 0.00 0.31 13.45 156 5.4 84458 11.64 12.94 0.00 0.00 0.30 12.64 160 5.0 82657 11.58 12.17 0.00 0.00 0.30 11.87 164 4.5 80924 11.51 11.45 0.00 0.00 0.30 11.15 168 4.1 79259 11.45 10.76 0.00 0.00 0.29 10.47 172 3.7 77661 11.39 10.12 0.00 0.00 0.29 9.82 176 3.4 76130 11.33 9.51 0.00 0.00 0.29 9.22 180 3.1 74664 11.28 8.94 0.00 0.00 0.29 8.65 184 2.8 73263 11.22 8.40 0.00 0.00 0.28 8.12 188 2.6 71923 11.17 7.90 0.00 0.00 0.28 7.62 192 2.3 70644 11.12 7.43 0.00 0.00 0.28 7.15 196 2.1 69422 11.08 6.99 0.00 0.00 0.28 6.71 200 1.9 68256 11.03 6.57 0.00 0.00 0.28 6.30 204 1.8 67144 10.99 6.18 0.00 0.00 0.27 5.91 208 1.6 66084 10.95 5.82 0.00 0.00 0.27 5.55 212 1.5 65072 10.91 5.48 0.00 0.00 0.27 5.21 216 1.3 64107 10.87 5.16 0.00 0.00 0.27 4.90 220 1.2 63188 10.84 4.87 0.00 0.00 0.27 4.60 224 1.1 62311 10.80 4.59 0.00 0.00 0.26 4.32 228 1.0 61475 10.77 4.33 0.00 0.00 0.26 4.06 232 0.9 60677 10.74 4.08 0.00 0.00 0.26 3.82 236 0.8 59917 10.71 3.86 0.00 0.00 0.26 3.59 240 0.8 59192 10.68 3.64 0.00 0.00 0.26 3.38 244 0.7 5950o in RR 3.44 0.00 0.00 0.26 3.18 248 0.6 57840 10.63 3.25 0.00 0.00 0.26 3.00 252 0.6 57210 10.60 3.08 0.00 0.00 0.25 2.82 256 0.5 56609 10.58 2.91 0.00 0.00 0.25 2.66 260 0.5 56035 10.56 2.76 0.00 0.00 0.25 2.51 264 0.4 55487 10.54 2.61 0.00 0.00 0.25 2.36 268 0.4 54963 10.52 2.48 0.00 0.00 0.25 2.23 272 0.4 54463 10.50 2.35 0.00 0.00 0.25 2.10 276 0.3 53985 10.48 2.23 0.00 0.00 0.25 1.98 280 0.3 53528 10.46 2.12 0.00 0.00 0.25 1.87 284 0.3 53091 10.44 2.01 0.00 0.00 0.25 1.77 288 0.2 52673 10.43 1.91 0.00 0.00 0.25 1.67 292 0.2 52273 10.41 1.82 0.00 0.00 0.24 1.58 296 0.2 51890 10.39 1.73 0.00 0.00 0.24 1.49 300 0.2 51523 10.38 1.65 0.00 0.00 0.24 1.41 304 0.2 51171 10.37 1.57 0.00 0.00 0.24 1.33 308 0.2 50835 10.35 1.50 0.00 0.00 0.24 1.26 312 0.1 50512 10.34 1.43 0.00 0.00 0.24 1.19 316 0.1 50202 10.33 1.37 0.00 0.00 0.24 1.13 320 0.1 49905 10.32 1.30 0.00 0.00 0.24 1.06 324 0.1 49620 10.30 1.25 0.00 0.00 0.24 1.01 328 0.1 49346 10.29 1.19 0.00 0.00 0.24 0.95 332 0.1 49083 10.28 1.14 0.00 0.00 0.24 0.90 336 0.1 48831 10.27 1.09 0.00 0.00 0.24 0.85 340 0.1 48588 10.26 1.05 0.00 0.00 0.24 0.81 344 0.1 48354 10.25 1.00 0.00 0.00 0.24 0.77 348 0.1 48129 10.24 0.96 0.00 0.00 0.24 0.73 352 0.1 47913 10.24 0.92 0.00 0.00 0.24 0.69 356 0.0 47705 10.23 0.89 0.00 0.00 0.23 0.65 360 0.0 47504 10.22 0.85 0.00 0.00 0.23 0.62 364 0.0 47311 10.21 0.82 0.00 0.00 0.23 0.58 368 0.0 47124 10.20 0.79 0.00 0.00 0.23 0.55 372 0.0 46945 10.20 0.76 0.00 0.00 0.23 0.52 376 0.0 46771 10.19 0.73 0.00 0.00 0.23 0.50 380 0.0 46603 10.18 0.70 0.00 0.00 0.23 0.47 384 0.0 46442 10.18 0.68 0.00 0.00 0.23 0.45 388 0.0 46285 10.17 0.65 0.00 0.00 0.23 0.42 392 0.0 46134 10.16 0.63 0.00 0.00 0.23 0.40 396 0.0 45988 10.16 0.61 0.00 0.00 0.23 0.38 400 0.0 45847 10.15 0.59 0.00 0.00 0.23 0.36 404 0.0 45710 10.15 0.57 0.00 0.00 0.23 0.34 408 0.0 45577 10.14 0.55 0.00 0.00 0.23 0.32 G:WOBM2014114026-VAML Phase =Calr-M14026 routing25y24hr Pond 1.xlsx 09/23/2015 MLV VAML Phase 2C Pond #1 Stormwater Pond Routing 100-year 24hr Storm 14026 WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2800 FT CHANGE IN HEIGHT 34.5 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 19.15 MIN INTENSITY 100 YR 6.89 IN/HR Qa = 69.85 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = . 40 INCHES 100yr, 24hr PRECIPITATION CN = 64 ((98*0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) = (P-0.2S)"2/(P+0.8S) D = 5.48 IN-100yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 66.55 MINUTES Storage Volume Req'd = (Qp-Qa)`Tp*1.39*60 _ (68,728) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.00 feet AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANGE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 100 YR 6.89 IN/HR Qp = 67.47 CFS Op = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR ]NCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.00 16,905 0 0 0 0 0 0.00 9.00 21,365 19,135 19,135 1.0 9.8593 0.0000 1.01 10.00 23,533 22,449 41,584 2.0 10.6355 0.6931 1.98 11.00 25,760 24,647 66,231 3.0 11.1009 1.0986 2.95 12.00 28,046 26,903 93,134 4.0 11.4418 1.3863 3.96 13.00 30,392 29,219 122,353 5.0 11.7147 1.6094 5.01 14.00 32,787 31,590 153,942 6.0 11.9443 1.7918 6.11 Regression Output: Ks = 18824 b = 1.16 Constant 9.84 G:W0BS12014114026-VAML Phase 2MCaIcs114026 routing100yr24hr Pond 1.x1sx 09/23/2015 VAML Phase 2C 14026 MLV Pond #1 Stormwater Pond Routing 100-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 69.85 cfs Qp = 57.47 cfs Tp = 66.6 min dT = 4 min BASIN DATA Ks = 18824 b = 1.16 Zo = 8.00 ft Normal water elev = 8.00 ft Box Weir Length = 16 ft Cw = 3.0 Zcr = 12.75 ft Dd = 36 in Cd = 0.59 Zi = 8.00 ft Peak Outflow = 47.59 cfs Peak Stage = 13.17 ft Maximum Storage = 126,944 cu ft Control Holes: State Orifice: Dia = 2.50 in Inv = 8.00 ft Weir: L = 24 in Inv = 10.00 ft Emergency Overflow Weir: L = 480.0 in Inv = 13.50 ft Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) cfs) (cu ft) (ft (Cfs (ems(cfs) (Cfs) (cfs 0 0.0 0 8.00 0 0 0.00 0 0.00 4 0.5 0 8.00 0 0.00 0.00 0 0.00 8 2.0 123 8.01 0.00 0.00 0.00 0.00 0.00 12 4.5 608 8.05 0.01 0.00 0.00 0.01 0.00 16 7.8 1684 8.13 0.02 0.00 0.00 0.02 0.00 20 11.9 3553 8.24 0.06 0.00 0.00 0.06 0.00 24 16.6 6391 8.39 0.09 0.00 0.00 0.09 0.00 28 21.7 10343 8.60 0.11 0.00 0.00 0.11 0.00 32 27.0 15512 8.85 0.14 0.00 0.00 0.14 0.00 36 32.4 21960 9.14 0.16 0.00 0.00 0.16 0.00 40 37.7 29702 9.48 0.19 0.00 0.00 0.19 0.00 44 42.7 38705 9.86 0.21 0.00 0.00 0.21 0.00 48 47.1 48894 10.28 1.10 0.00 0.00 0.24 0.87 52 51.0 59942 10.71 3.86 0.00 0.00 0.26 3.60 56 54.0 71244 11.15 7.65 0.00 0.00 0.28 7.37 60 56.1 82363 11.57 12.05 0.00 0.00 0.30 11.75 64 57.3 92937 11.96 16.73 0.00 0.00 0.32 16.41 68 57.4 102664 12.31 21.40 0.00 0.00 0.33 21.07 72 56.5 111304 12.62 25.80 0.00 0.00 0.34 25.46 76 54.7 118678 12.88 32.06 2.34 0.00 0.35 29.38 80 51.9 124100 13.07 41.60 8.89 0.00 0.36 32.35 84 48.3 126566 13.16 46.76 12.67 0.00 0.36 33.73 88 44.7 126944 13.17 47.59 13.29 0.00 0.36 33.94 92 41.3 126250 13.15 46.08 12.16 0.00 0.36 33.55 96 38.2 125115 13.11 43.67 10.39 0.00 0.36 32.92 100 35.4 123811 13.06 41.02 8.47 0.00 0.36 32.19 104 32.7 122454 13.02 38.41 6.61 0.00 0.36 31.44 108 30.2 121085 12.97 35.94 4.90 0.00 0.36 30.69 112 28.0 119718 12.92 33.66 3.37 0.00 0.35 29.94 116 25.9 118353 12.87 31.59 2.04 0.00 0.35 29.20 G:U0B&2014114026-VAML Phase 2C1CalW14026 routin9100y24hr_Pond 1.xlsx 4` 09/23/2015 VAML Phase 2C 14026 MLV Pond #1 Stormwater Pond Routing 100-year 24hr Storm 120 23.9 116980 12.82 29.76 0.95 0.00 0.35 28.46 124 22.1 115581 12.77 28.23 0.17 0.00 0.35 27.71 128 20.5 114117 12.72 27.28 0.00 0.00 0.35 26.93 132 18.9 112481 12.66 26.42 0.00 0.00 0.34 26.07 136 17.5 110684 12.60 25.48 0.00 0.00 0.34 25.13 140 16.2 108771 12.53 24.49 0.00 0.00 0.34 24.15 144 15.0 106780 12.46 23.47 0.00 0.00 0.34 23.13 148 13.8 104741 12.39 22.44 0.00 0.00 0.33 22.10 152 12.8 102680 12.31 21.41 0.00 0.00 0.33 21.08 156 11.8 100616 12.24 20.39 0.00 0.00 0.33 20.06 160 11.0 98565 12.16 19.39 0.00 0.00 0.32 19.07 164 10.1 96540 12.09 18.42 0.00 0.00 0.32 18.10 168 9.4 94550 12.02 17.48 0.00 0.00 0.32 17.16 172 8.7 92602 11.94 16.58 0.00 0.00 0.32 16.26 176 8.0 90704 11.87 16.71 0.00 0.00 0.31 15.39 180 7.4 88857 11.81 14.87 0.00 0.00 0.31 14.56 184 6.9 87067 11.74 14.08 0.00 0.00 0.31 13.77 188 6.3 85333 11.68 13.32 0.00 0.00 0.30 13.01 192 5.9 83658 11.61 12.60 0.00 0.00 0.30 12.30 196 5.4 82041 11.55 11.91 0.00 0.00 0.30 11.61 200 5.0 80483 11.50 11.26 0.00 0.00 0.30 10.97 204 4.6 78983 11.44 10.65 0.00 0.00 0.29 10.36 208 4.3 77540 11.38 10.07 0.00 0.00 0.29 9.78 212 4.0 76153 11.33 9.52 0.00 0.00 0.29 9.23 216 3.7 74821 11.28 9.00 0.00 0.00 0.29 8.71 220 3.4 73542 11.23 8.51 0.00 0.00 0.29 8.22 224 3.1 72314 11.19 8.04 0.00 0.00 0.28 7.76 228 2.9 71136 11.14 7.61 0.00 0.00 0.28 7.33 232 2.7 70007 11.10 7.20 0.00 0.00 0.28 6.92 236 2.5 68924 11.06 6.81 0.00 0.00 0.28 6.53 240 2.3 67886 11.02 6.44 0.00 0.00 0.28 6.17 244 2.1 66891 In 9R 6.10 0.00 0.00 0.27 5.82 248 2.0 65937 10.94 5.77 0.00 0.00 0.27 5.50 252 1.8 65023 10.91 5.47 0.00 0.00 0.27 5.20 256 1.7 64147 10.87 5.18 0.00 0.00 0.27 4.91 260 1.6 63308 10.84 4.90 0.00 0.00 0.27 4.64 264 1.4 62503 10.81 4.65 0.00 0.00 0.27 4.38 268 1.3 61732 10.78 4.41 0.00 0.00 0.26 4.14 272 1.2 60994 10.75 4.18 0.00 0.00 0.26 3.92 276 1.1 60285 10.73 3.96 0.00 0.00 0.26 3.70 280 1.1 59607 10.70 3.76 0.00 0.00 0.26 3.50 284 1.0 58956 10.67 3.57 0.00 0.00 0.26 3.31 288 0.9 58332 10.65 3.39 0.00 0.00 0.26 3.14 292 0.8 57733 10.63 3.22 0.00 0.00 0.2E 2.97 296 0.8 57159 10.60 3.06 0.00 0.00 0.25 2.81 300 0.7 56608 10.58 2.91 0.00 0.00 0.25 2.66 304 0.7 56080 10.56 2.77 0.00 0.00 0.25 2.52 308 0.6 55573 10.54 2.64 0.00 0.00 0.25 2.38 312 0.6 55086 10.52 2.51 0.00 0.00 0.25 2.26 316 0.5 54619 10.50 2.39 0.00 0.00 0.25 2.14 320 0.5 54170 10.49 2.28 0.00 0.00 0.25 2.03 324 0.4 53740 10.47 2.17 0.00 0.00 0.25 1.92 328 0.4 53326 10.45 2.07 0.00 0.00 0.25 1.82 332 0.4 52928 10.44 1.97 0.00 0.00 0.25 1.73 336 0.4 52545 10.42 1.88 0.00 0.00 0.25 1.64 340 0.3 52178 10.41 1.80 0.00 0.00 0.24 1.55 344 0.3 51824 10.39 1.72 0.00 0.00 0.24 1.47 348 0.3 51484 10.38 1.64 0.00 0.00 0.24 1.4n 352 0.3 51157 10.37 1.57 0.00 0.00 0.24 1.33 356 0.2 50842 10.35 1.50 0.00 0.00 0.24 1.26 360 0.2 50539 10.34 1.44 0.00 0.00 0.24 1.20 364 0.2 50248 10.33 1.37 0.00 0.00 0.24 1.13 368 0.2 49967 10.32 1.32 0.00 0.00 0.24 1.08 372 0.2 49696 10.31 1.26 0.00 0.00 0.24 1.02 376 0.2 49435 10.30 1.21 0.00 0.00 0.24 0.97 380 0.1 49183 10.29 1.16 0.00 0.00 0.24 0.92 384 0.1 48941 10.28 1.11 0.00 0.00 0.24 0.88 388 0.1 48707 10.27 1.07 0.00 0.00 0.24 0.83 392 0.1 48481 10.26 1.03 0.00 0.00 0.24 0.79 396 0.1 48263 10.25 0.99 0.00 0.00 0.24 0.75 400 0.1 48052 10.24 0.95 0.00 0.00 0.24 0.71 404 0.1 47849 10.23 0.91 0.00 0.00 0.24 0.68 408 0.1 47653 10.23 0.88 0.00 0.00 0.23 0.64 G:%JOBS12014114026-VAML Phase 2C%CalcM14026 roubng10Dyr24hr_Pond 1.xlsx 09/23/2015 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 100-year 24hr Storm Clogged WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 50.69 ACRES HYDRAULIC LENGTH 2800 FT CHANGE_ IN HEIGHT 34.5 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 19.15 MIN INTENSITY 100 YR 6.89 IN/HR Qa = 69.86 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P , 10 INCHES 100yr, 24hr PRECIPITATION CN = 64 ((98*0.43)+(39*0.57)) = 64 S = (1000/CN)-10 S = 5.54 Depth (D) = (P-0.2S)^2/(P+0.8S) D = 5.48 IN-100yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 66.55 MINUTES Storage Volume Req'd = (Qp-Qa) Tp*1.39*60 (68,728) cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT 8.00 feet AFTER DEVELOPMENT WATERSHED AREA 16.04 ACRES HYDRAULIC LENGTH 2765 FT CHANGE IN HEIGHT 26.5 FT RUNOFF COEF. 'C' 0.52 TIME OF CONCENTR 20.89 MIN INTENSITY 100 YR 6.89 IN/HR Qp = 57.47 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.00 16,905 0 0 0 0 0 0.00 9.00 21,365 19,135 19,135 1.0 9.8593 0.0000 1.01 10.00 23,533 22,449 41,584 2.0 10.6355 0.6931 1.98 11.00 25,760 24,647 66,231 3.0 11.1009 1.0986 2.95 12.00 28,046 26,903 93,134 4.0 11.4418 1.3863 3.96 13.00 30,392 29,219 122,353 5.0 11.7147 1.6094 5.01 14.00 32,787 31,590 153,942 6.0 11.9443 1.7918 6.11 Regression Output: Ks = 18824 b 1.16 Constant 9.84 14026 G:U0BS12014114026-VAML Phase 2MUCs114026 routing100yr24hr clogged Pond t.xlsx 09/23/2015 VAML Phase 2C MLV Pond #1 Stormwater Pond Routing 100-year 24hr Storm Clogged CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 69.85 cfs Qp = 57.47 cis Tp = 66.6 min dT = 4 min BASIN DATA Ks = 18824 b = 1.16 Zo = 8.00 ft Normal water elev = 8.00 ft Box Weir Length = It Cw = 3.0 Zcr = It Dd = in Cd = 0.59 Zi = ft Peak Outflow = 55.95 cfs Peak Stage = 13.50 ft Maximum Storage = 136,290 cu ft Control Holes: State Orifice: Emergency Overflow Weir: Dia = in Inv = It L = 480 in Inv = 12.90 ft 14026 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cfs) (cu ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) 0 0.0 0 8.00 0 0 0.00 0 0.00 4 0.5 0 8.00 0 0.00 0.00 0 0.00 8 2.0 123 8.01 0.00 0.00 0.00 0.00 0.00 12 4.5 609 8.05 0.00 0.00 0.00 0.00 0.00 16 7.8 1686 8.13 0.00 0.00 0.00 0.00 0.00 20 11.9 3561 8.24 0.00 0.00 0.00 0.00 0.00 24 16.6 6413 8.40 0.00 0.00 0.00 0.00 0.00 28 21.7 10385 8.60 0.00 0.00 0.00 0.00 0.00 32 27.0 15582 8.85 0.00 0.00 0.00 0.00 0.00 36 32.4 22063 9.15 0.00 0.00 0.00 0.00 0.00 40 37.7 29844 9.49 0.00 0.00 0.00 0.00 0.00 44 42.7 38893 9.87 0.00 0.00 0.00 0.00 0.00 48 47.1 49133 10.28 0.00 0.00 0.00 0.00 0.00 52 51.0 60446 10.73 0.00 0.00 0.00 0.00 0.00 56 54.0 72675 11.20 0.00 0.00 0.00 0.00 0.00 60 56.1 85629 11.69 0.00 0.00 0.00 0.00 0.00 64 57.3 99095 12.18 0.00 0.00 0.00 0.00 0.00 68 57.4 112837 12.68 0.00 0.00 0.00 0.00 0.00 72 56.5 126613 13.16 16.20 0.00 0.00 0.00 16.20 76 54.7 136290 13.50 55.95 0.00 0.00 0.00 55.95 80 51.9 135978 13.49 54.45 0.00 0.00 0.00 54.45 84 48.3 135359 13.47 51.50 0.00 0.00 0.00 51.50 88 44.7 134601 13.44 47.96 0.00 0.00 0.00 47.96 92 41.3 133821 13.42 44.40 0.00 0.00 0.00 44.40 96 38.2 133088 13.39 41.14 0.00 0.00 0.00 41.14 100 35.4 132392 13.37 38.12 0.00 0.00 0.00 38.12 104 32.7 131731 13.34 35.32 0.00 0.00 0.00 35.32 108 30.2 131104 13.32 32.73 0.00 0.00 0.00 32.73 112 28.0 130509 13.30 30.33 0.00 0.00 0.00 30.33 116 25.9 129944 13.28 28.11 0.00 0.00 0.00 28.11 GAJOBS12014114026-VAML Phase 2C%CalcsN4026 rouling100yr24hr clogged_Pond 1.xlsx 09/23/2015 VAML Phase 2C MLV Pond #1 14026 Stormwater Pond Routing 100-year 24hr Storm Clogged 120 23.9 129407 13.26 26.05 0.00 0.00 0.00 26.05 124 22.1 128898 13.24 24.14 0.00 0.00 0.00 24.14 128 20.5 128414 13.23 22.38 0.00 0.00 0.00 22.38 132 18.9 127955 13.21 20.74 0.00 0.00 0.00 20.74 136 17.5 127519 13.20 19.23 0.00 0.00 0.00 19.23 140 16.2 127105 13.18 17.83 0.00 0.00 0.00 17.83 144 15.0 126712 13.17 16.53 O.UO 0.00 0.00 16.53 148 13.8 126339 13.15 15.32 0.00 0.00 0.00 15.32 152 12.8 125985 13.14 14.21 0.00 0.00 0.00 14.21 156 11.8 125648 13.13 13.18 0.00 0.00 0.00 13.18 160 11.0 126328 13.12 12.22 0.00 0.00 0.00 12.22 164 10.1 125025 13.11 11.33 0.00 0.00 0.00 11.33 168 9.4 124736 13.10 10.51 0.00 0.00 0.00 10.51 172 8.7 124462 13.09 9.75 0.00 0.00 0.00 9.75 176 8.0 124202 13.08 9.04 0.00 0.00 0.00 9.04 180 7.4 123955 13.07 8.39 0.00 0.00 0.00 8.39 184 6.9 123720 13.06 7.78 0.00 0.00 0.00 7.78 188 6.3 123497 13.05 7.22 0.00 0.00 0.00 7.22 192 5.9 123285 13.05 6.70 0.00 0.00 0.00 6.70 196 5.4 123084 13.04 6.22 0.00 0.00 0.00 6.22 200 5.0 122892 13.03 5.77 0.00 0.00 0.00 5.77 204 4.6 122710 13.03 5.36 0.00 0.00 0.00 5.36 208 4.3 122538 13.02 4.97 0.00 0.00 0.00 4.97 212 4.0 122374 13.01 4.62 0.00 0.00 0.00 4.62 216 3.7 122218 13.01 4.29 0.00 0.00 0.00 4.29 220 3.4 122069 13.00 3.98 0.00 0.00 0.00 3.98 224 3.1 121928 13.00 3.70 0.00 0.00 0.00 3.70 228 2.9 121795 12.99 3.43 0.00 0.00 0.00 3.43 232 2.7 121667 12.99 3.19 0.00 0.00 0.00 3.19 236 2.5 121546 12.98 2.96 0.00 0.00 0.00 2.96 240 2.3 121431 12.98 2.75 0.00 0.00 0.00 2.75 244 2.1 121322 12.98 2.56 0.00 0.00 0.00 2.56 248 2.0 121218 12.97 2.37 0.00 0.00 0.00 2.37 252 1.8 121119 12.97 2.21 0.00 0.00 0.00 2.21 256 1.7 121026 12.97 2.05 0.00 0.00 0.00 2.05 260 1.6 120936 12.96 1.91 0.00 0.00 0.00 1.91 264 1.4 120861 12.96 1.77 0.00 0.00 0.00 1.77 268 1.3 120771 12.96 1.65 0.00 0.00 0.00 1.65 272 1.2 120694 12.95 1.53 0.00 0.00 0.00 1.53 276 1.1 120621 12.95 1.43 0.00 0.00 0.00 1.43 280 1.1 120552 12.95 1.33 0.00 0.00 0.00 1.33 284 1.0 120486 12.95 1.23 0.00 0.00 0.00 1.23 288 0.9 120423 12.95 1.15 0.00 0.00 0.00 1.15 292 0.8 120363 12.94 1.07 0.00 0.00 0.00 1.07 296 n.8 120307 12.94 0.99 0.00 0.00 0.00 0.99 300 0.7 120252 12.94 0.93 0.00 0.00 0.00 0.93 304 0.7 120201 12.94 0.86 0.00 0.00 0.00 0.86 308 0.6 120152 12.94 0.80 0.00 0.00 0.00 0.80 312 0.6 120106 12.93 0.75 0.00 0.00 0.00 0.75 316 0.5 120062 12.93 0.70 0.00 0.00 0.00 0.70 320 0.5 120019 12.93 0.65 0.00 0.00 0.00 0.65 324 0.4 119979 12.93 0.60 0.00 0.00 0.00 0.60 328 0.4 119941 12.93 0.56 0.00 0.00 0.00 0.56 332 0.4 119905 12.93 0.52 0.00 0.00 0.00 0.52 336 0.4 119870 12.93 0.49 0.00 0.00 0.00 0.49 340 0.3 119838 12.92 0.46 0.00 0.00 0.00 0.46 344 0.3 119806 12.92 0.43 0.00 0.00 0.00 0.43 348 0.3 119777 12.92 0.40 0.00 0.00 0.00 0.40 352 0.3 119748 12.92 0.37 0.00 0.00 0.00 0.37 356 0.2 119721 12.92 0.35 0.00 0.00 0.00 0.35 360 0.2 119696 12.92 0.32 0.00 0.00 0.00 0.32 364 0.2 119671 12.92 0.30 0.00 0.00 0.00 0.30 368 0.2 119648 12.92 0.28 0.00 0.00 0.00 0.28 372 0.2 119626 12.92 0.26 0.00 0.00 0.00 0.26 376 0.2 119605 12.92 0.24 0.00 0.00 0.00 0.24 380 0.1 119584 12.92 0.23 0.00 0.00 0.00 0.23 384 0.1 119565 12.91 0.21 0.00 0.00 0.00 0.21 388 0.1 119547 12.91 0.20 0.00 0.00 0.00 0.20 392 0.1 119530 12.91 0.19 0.00 0.00 0.00 0.19 396 0.1 119513 12.91 0.17 0.00 0.00 0.00 0.17 400 0.1 119497 12.91 0.16 0.00 0.00 0.00 0.16 404 0.1 119482 12.91 0.15 0.00 0.00 0.00 0.15 408 0.1 119468 12.91 0.14 0.00 0.00 0.00 0.14 G:WOBS12014114026-VAML Phase 2C1Calcs114026 routing1 o0yr24hr clogged Pond 1.xlsx 14026 09/23/2015 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 2-year 24hr Storm WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CHANGE IN HEIGHT 23 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 2 YR 5.28 IN/HR Qa = 16.14 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = _ . 4.5 INCHES 2yr, 24hr PRECIPITATION CN = 63 ((98*0.40)+(39*0.60)) = 63 S = (1000/CN)-10 S = 5.97 Depth (D) = (P-0.2S)"2/(P+O.BS) D = 1.18 IN - 2yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 19.40 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 44,151 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.50 feet AFTER DEVELOPMENT WATERSHED AREA 16.45 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 FT RUNOFF COEF. 'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 2 YR 5.28 IN/HR Qp = 43.43 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30,568 29,480 42,810 1.5 10.6645 0.4055 1.48 11.00 32,816 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33,968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183,511 5.5 12.1200 1.7047 5.62 Regression Output: Ks = 27939 b= 1.09 Constant 10,24 G:W0B6%2014114026-VAML Phase 2C%Calcs114026 routing2yr24hr Pond 2.x1sx 09/23/2015 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 2-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 16.14 cfs Qp = 43.43 cis Tp = 19.4 min dT = 4 min BASIN DATA Ks = 27939 b = 1.09 Zo = 8.50 ft Normal water elev = 8.50 ft Peak Outflow = 2.58 cfs Box Weir Length = 16 ft Peak Stage = 10.65 ft Cw = 3.0 Maximum Storage = 64,331 cu ft Zcr = 12.80 ft Control Holes: State Orifice: Dia - 2.50 in Dd 36 in Inv = 8.50 ft Cd 0.59 Weir: L = 18 in Zi = 8.00 ft Inv 10.00 ft Emergency Overflow Weir L 480.0 in Inv 13.50 ft 14026 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emerge Overflow) (min) (cfs) (cu ft) (ft) (�) (�) s (Cf (cfs) (Cfs) 0 0.0 0 8.50 0 0 0.00 0 0.00 4 4.4 0 8.50 0 0.00 0.00 0 0.00 8 15.8 1056 8.55 0.01 0.00 0.00 0.01 0.00 12 29.6 4850 8.70 0.05 0.00 0.00 0.05 0.00 16 40.2 11948 8.96 0.10 0.00 0.00 0.10 0.00 20 43.3 21578 9.29 0.13 0.00 0.00 0.13 0.00 24 37.7 31944 9.63 0.16 0.00 0.00 0.16 0.00 28 28.9 40945 9.92 0.18 0.00 0.00 0.18 0.00 32 22.1 47827 10.14 0.43 0.00 0.00 0.20 0.23 36 16.9 53021 10.30 0.95 0.00 0.00 0.21 0.74 40 12.9 56846 10.42 1.43 0.00 0.00 0.22 1.22 44 9.9 59600 10.50 1.83 0.00 0.00 0.22 1.61 48 7.6 61532 10.56 2.12 0.00 0.00 0.23 1.90 52 5.8 62835 10.60 2.33 0.00 0.00 0.23 2.10 56 4.4 63661 10.63 2.47 0.00 0.00 0.23 2.24 60 3.4 64130 10.64 2.55 0.00 0.00 0.23 2.32 64 2.6 64329 10.65 2.58 0.00 0.00 0.23 2.35 68 2.0 64331 10.65 2.58 0.00 0.00 0.23 2.35 72 1.5 64186 10.64 2.56 0.00 0.00 0.23 2.33 76 1.2 63935 10.64 2.51 0.00 0.00 0.23 2.28 80 0.9 63610 10.63 2.46 0.00 0.00 0.23 2.23 84 0.7 63232 10.61 2.40 0.00 0.00 0.23 2.17 88 0.5 62819 10.60 2.33 0.00 0.00 0.23 2.10 92 0.4 62384 10.59 2.26 0.00 0.00 0.23 2.03 96 0.3 61936 10.57 2.19 0.00 0.00 0.23 1.96 100 0.2 61484 10.56 2.12 0.00 0.00 0.23 1.89 104 0.2 61031 10.55 2.05 0.00 0.00 0.22 1.82 108 0.1 60583 10.53 1.98 0.00 0.00 0.22 1.75 112 0.1 60141 10.52 1.91 0.00 0.00 0.22 1.69 116 0.1 59708 10.51 1.84 0.00 0.00 0.22 1.62 G:W0BS\2014114026-VAML Phase 2C%CaIcs114026 routing2yr24hr Pond 2.xlsx 09/23/2015 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 2-year 24hr Storm 120 0.1 59284 10.49 1.78 0.00 0.00 0.22 1.56 124 0.0 58871 10.48 1.72 0.00 0.00 0.22 1.50 128 0.0 58469 10.47 1.66 0.00 0.00 0.22 1.44 132 0.0 58079 10.46 1.61 0.00 0.00 0.22 1.39 136 0.0 57700 10.44 1.55 0.00 0.00 0.22 1.33 140 0.0 57333 10.43 1.50 0.00 0.00 0.22 1.28 144 0.0 50976 10.42 1.45 0.00 0.00 0.22 1.23 148 0.0 56631 10.41 1.40 0.00 0.00 0.22 1.19 152 0.0 56296 10.40 1.36 0.00 0.00 0.22 1.14 156 0.0 55972 10.39 1.32 0.00 0.00 0.22 1.10 160 0.0 55657 10.38 1.27 0.00 0.00 0.21 1.06 164 0.0 55353 10.37 1.23 0.00 0.00 0.21 1.02 168 0.0 55057 10.36 1.20 0.00 0.00 0.21 0.98 172 0.0 54771 10.35 1.16 0.00 0.00 0.21 0.95 176 0.0 54493 10.35 1.12 0.00 0.00 0.21 0.91 180 0.0 54223 10.34 1.09 0.00 0.00 0.21 0.88 184 0.0 53961 10.33 1.06 0.00 0.00 0.21 0.85 188 0.0 53707 10.32 1.03 0.00 0.00 0.21 0.82 192 0.0 53461 10.31 1.00 0.00 0.00 0.21 0.79 196 0.0 53221 10.31 0.97 0.00 0.00 0.21 0.76 200 0.0 52988 10.30 0.94 0.00 0.00 0.21 0.73 204 0.0 52762 10.29 0.92 0.00 0.00 0.21 0.71 208 0.0 52542 10.28 0.89 0.00 0.00 0.21 0.68 212 0.0 52328 10.28 0.87 0.00 0.00 0.21 0.66 216 0.0 52120 10.27 0.84 0.00 0.00 0.21 0.64 220 0.0 51917 10.27 0.82 0.00 0.00 0.21 0.61 224 0.0 51720 10.26 0.80 0.00 0.00 0.21 0.59 228 0.0 51528 10.25 0.78 0.00 0.00 0.21 0.57 232 0.0 51341 10.25 0.76 0.00 0.00 0.21 0.55 236 0.0 51159 10.24 0.74 0.00 0.00 0.21 0.53 240 0.0 50981 10.24 0.72 0.00 0.00 0.21 0.52 244 0.0 50808 10.23 0.70 0.00 0.00 0.21 0.50 248 0.0 50640 10.23 0.69 0.00 0.00 0.21 0.48 252 0.0 50475 10.22 0.67 0.00 0.00 0.20 0.46 256 0.0 50314 10.21 0.65 0.00 0.00 0.20 0.45 260 0.0 50158 10.21 0.64 0.00 0.00 0.20 0.43 264 0.0 50005 10.21 0.62 0.00 0.00 0.20 0.42 268 0.0 49855 10.20 0.61 0.00 0.00 0.20 0.40 272 0.0 49709 10.20 0.59 0.00 0.00 0.20 0.39 276 0.0 49567 10.19 0.58 0.00 0.00 0.20 0.38 280 0.0 49428 10.19 0.57 0.00 0.00 0.20 0.36 284 0.0 49291 10.18 0.55 0.00 0.00 0.20 0.35 288 0.0 49158 10.18 0.54 0.00 0.00 0.20 0.34 292 0.0 49028 10.17 0.53 0.00 0.00 0.20 0.33 9QFt 0.0 48901 10.17 0.52 0.00 0.00 0.20 0.32 300 0.0 48776 10.17 0.51 0.00 0.00 0.20 0.31 304 0.0 48654 10.16 0.50 0.00 0.00 0.20 0.30 308 0.0 48535 10.16 0.49 0.00 0.00 0.20 0.29 312 0.0 48418 10.16 0.48 0.00 0.00 0.20 0.28 316 0.0 48304 10.15 0.47 0.00 0.00 0.20 0.27 320 0.0 48191 10.15 0.46 0.00 0.00 0.20 0.26 324 0.0 48082 10.15 0.45 0.00 0.00 0.20 0.25 328 0.0 47974 10.14 0.44 0.00 0.00 0.20 0.24 332 0.0 47868 10.14 0.43 0.00 0.00 0.20 0.23 336 0.0 47765 10.14 0.42 0.00 0.00 0.20 0.22 340 0.0 47663 10.13 0.41 0.00 0.00 0.20 0.22 344 0.0 47564 10.13 0.41 0.00 0.00 0.20 0.21 348 0.0 47466 1 n.13 0.40 0.00 0.00 0.20 0.20 352 0.0 47370 10.12 0.39 0.00 0.00 0.20 0.19 356 0.0 47276 10.12 0.38 0.00 0.00 0.20 0.19 360 0.0 47184 10.12 0.38 0.00 0.00 0.20 0.18 364 0.0 47093 10.11 0.37 0.00 0.00 0.20 0.17 368 0.0 47004 10.11 0.36 0.00 0.00 0.20 0.17 372 0.0 46916 10.11 0.36 0.00 0.00 0.20 0.16 376 0.0 46830 10.11 0.35 0.00 0.00 0.20 0.15 380 0.0 46746 10.10 0.35 0.00 0.00 0.20 0.15 384 0.0 46663 10.10 0.34 0.00 0.00 0.20 0.14 388 0.0 46581 10.10 0.33 0.00 0.00 0.20 0.14 392 0.0 46501 10.10 0.33 0.00 0.00 0.20 0.13 396 0.0 46422 10.09 0.32 0.00 0.00 0.20 0.13 4n0 0.0 46344 10.09 0.32 0.00 0.00 0 2n 0,12 404 0.0 46267 10.09 0.31 0.00 0.00 0.20 0.12 408 0.0 46192 10.09 0.31 0.00 0.00 0.20 0.11 G:%JOBS12014114026-VAML Phase =CalcM14026 routing2y24hr_Pond 2.xlsx 09/23/2015 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 10-year 24hr Storm WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CHANGE IN HEIGHT 23 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 10 YR 6.43 IN/HR Qa = 19.65 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = .7, INCHES 10yr, 24hr PRECIPITATION CN = 63 ((98`0.40)+(39"0.60)) = 63 S = (1000/CN)-10 S = 5.97 Depth (D) = (P-0.2S)A2/(P+0.8S) D = 2.86 IN -10yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 38.71 MINUTES Storage Volume Req'd = (Qp-Qa)`Tp"1.39'60 107,296 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.50 feet AFTER DEVELOPMENT WATERSHED AREA 16.45 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 FT RUNOFF COEF. 'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 10 YR 6.43 IN/HR Qp = 52.89 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (it) (ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30,568 29,480 42,810 1.5 10.6645 0.4055 1.48 11.00 32,816 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33,968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183.511 5.5 12.1200 1.7047 5.62 Regression Output: ==> Ks = 27939 b = 1.09 Constant 10.24 G:IJOBS12014114026-VAML Phase 2C1Caics114026 routinglOyr24hr Pond 2.xtsx 09/23/2015 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 10-year24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 19.65 cfs Qp = 52.89 cis Tp = 38.7 min dT = 4 min BASIN DATA Ks = 27939 b = 1.09 Zo = 8.50 it Normal water elev = 8.50 it Peak Outflow = 15.33 cfs Box Weir Length = 16 It Peak Stage = 12.23 ft Cw = 3.0 Maximum Storage = 117,538 cu it Zcr = 12.80 it Control Hales: State Orifice: Dia = 2.50 in Dd = 36 in Inv = 8.50 it Cd = 0.59 Weir: L = 18 in Zi = 8.00 it Inv = 10.00 ft Emergency Overflow Weir: 480.0 in Inv = 13.50 it 14026 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (S) (cu ft) (ft) (Cfs) (cfs) (cis) (CIS) (ds) 0 0.0 0 8.50 0 0 0.00 0 0.00 4 1.4 0 8.50 0 0.00 0.00 0 0.00 8 5.4 332 8.52 0.00 0.00 0.00 0.00 0.00 12 11.6 1623 8.57 0.01 0.00 0.00 0.01 0.00 16 19.3 4399 8.68 0.04 0.00 0.00 0.04 0.00 20 27.8 9029 8.85 0.08 0.00 0.00 0.08 0.00 24 36.2 15689 9.09 0.11 0.00 0.00 0.11 0.00 28 43.5 24345 9.38 0.14 0.00 0.00 0.14 0.00 32 49.1 34754 9.72 0.17 0.00 0.00 0.17 0.00 36 52.3 46489 10.10 0.33 0.00 0.00 0.20 0.13 40 52.7 58960 10.48 1.73 0.00 0.00 0.22 1.51 44 50.5 71192 10.86 3.82 0.00 0.00 0.24 3.57 48 45.7 82393 11.20 6.14 0.00 0.00 0.26 5.88 52 40.0 91891 11.48 8.37 0.00 0.00 0.27 8.10 56 35.0 99489 11.70 10.30 0.00 0.00 0.28 10.01 60 30.6 105417 11.88 11.88 0.00 0.00 0.29 11.59 64 26.8 109909 12.01 13.13 0.00 0.00 0.30 12.83 68 23.4 113179 12.11 14.06 0.00 0.00 0.30 13.76 72 20.4 115418 12.17 14.71 0.00 0.00 0.30 14.40 76 17.9 116796 12.21 15.11 0.00 0.00 0.31 14.80 80 15.6 117460 12.23 15.31 0.00 0.00 0.31 15.00 84 13.7 117538 12.23 15.33 0.00 0.00 0.31 15.02 88 11.9 117139 12.22 15.21 0.00 0.00 0.31 14.90 92 10.4 116355 12.20 14.98 0.00 0.00 0.31 14.68 96 9.1 115267 12.17 14.66 0.00 0.00 0.30 14.36 100 8.0 113939 12.13 14.28 0.00 0.00 0.30 13.98 104 7.0 112429 12.08 13.84 0.00 0.00 0.30 13.54 108 6.1 110782 12.04 13.38 0.00 0.00 0.30 13.08 112 5.3 109037 11.99 12.88 0.00 0.00 0.30 12.59 116 4.7 107225 11.93 12.38 0.00 0.00 0.29 12.09 GAJ0BM12014114026-VAML Phase 2C%Ca1cs114026 rouring10yr24hr_P0nd 2.xlsx 09/23/2015 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 10-year 24hr Storm 120 4.1 105374 11.88 11.87 0.00 0.00 0.29 11.58 124 3.6 103504 11.82 11.36 0.00 0.00 0.29 11.07 128 3.1 101633 11.77 10.86 0.00 0.00 0.29 10.58 132 2.7 99774 11.71 10.37 0.00 0.00 0.28 10.09 136 2.4 97939 11.66 9.89 0.00 0.00 n2R 9.61 140 2.1 96137 11.61 9.43 0.00 0.00 0.28 9.15 144 1.8 94373 11.55 8.99 0.00 0.00 0.28 8.71 148 1.6 92654 11.50 8.56 0.00 0.00 0.27 8.28 152 1.4 90982 11.45 8.15 0.00 0.00 0.27 7.88 156 1.2 89361 11.40 7.76 0.00 0.00 0.27 7.49 160 1.1 87792 11.36 7.38 0.00 0.00 0.27 7.11 164 0.9 86276 11.31 7.03 0.00 0.00 0.27 6.76 168 0.8 84813 11.27 6.69 0.00 0.00 0.26 8.43 172 0.7 83403 11.23 6.37 0.00 0.00 0.26 6.11 176 0.6 82045 11.19 6.07 0.00 0.00 0.26 5.81 180 0.5 80738 11.16 5.78 0.00 0.00 0.26 5.52 184 0.5 79482 11.11 5.50 0.00 0.00 0.25 5.25 188 0.4 78275 11.07 5.25 0.00 0.00 0.25 4.99 192 0.4 77116 11.04 5.00 0.00 0.00 0.25 4.75 196 0.3 76002 11.00 4.77 0.00 0.00 0.25 4.52 200 0.3 74933 10.97 4.55 0.00 0.00 0.25 4.31 204 0.2 73907 10.94 4.35 0.00 0.00 0.25 4.10 208 0.2 72922 10.91 4.15 0.00 0.00 0.24 3.91 212 0.2 71977 10.88 3.97 0.00 0.00 0.24 3.72 216 0.2 71069 10.85 3.79 0.00 0.00 0.24 3.55 220 0.1 70198 10.83 3.63 0.00 0.00 0.24 3.39 224 0.1 69362 10.80 3.47 0.00 0.00 0.24 3.23 228 0.1 68558 10.78 3.32 0.00 0.00 0.24 3.09 232 0.1 67787 10.75 3.18 0.00 0.00 0.24 2.95 236 0.1 67046 10.73 3.05 0.00 0.00 0.24 2.81 240 0.1 66334 10.71 2.92 0.00 0.00 0.23 2.69 244 0.1 65649 10.69 2.80 0.00 0.00 0.23 2.57 248 0.1 64991 10.67 2.69 0.00 0.00 0.23 2.46 252 0.0 64359 10.65 2.58 0.00 0.00 0.23 2.35 256 0.0 63750 10.63 2.48 0.00 0.00 0.23 2.25 260 0.0 63164 10.61 2.39 0.00 0.00 0.23 2.16 264 0.0 62600 10.60 2.29 0.00 0.00 0.23 2.07 268 0.0 62057 10.58 2.21 0.00 0.00 0.23 1.98 272 0.0 61534 10.56 2.12 0.00 0.00 0.23 1.90 276 0.0 61031 10.55 2.05 0.00 0.00 0.22 1.82 280 0.0 60545 10.53 1.97 0.00 0.00 0.22 1.75 284 0.0 60076 10.52 1.90 0.00 0.00 0.22 1.68 288 0.0 59624 10.50 1.83 0.00 0.00 0.22 1.61 292 0.0 59188 10.49 1.77 0.00 0.00 0.22 1.55 296 0.0 58767 10.48 1.70 0.00 0.00 0.22 1.48 300 0.0 58361 10.46 1.66 0.00 0.00 0.22 1.43 304 0.0 57968 10.45 1.59 0.00 0.00 0.22 1.37 308 0.0 57588 10.44 1.54 0.00 0.00 0.22 1.32 312 0.0 57222 10.43 1.49 0.00 0.00 0.22 1.27 316 0.0 56867 10.42 1.44 0.00 0.00 0.22 1.22 320 0.0 56523 10.41 1.39 0.00 0.00 0.22 1.17 324 0.0 56191 10.40 1.34 0.00 0.00 0.22 1.13 328 0.0 55869 10.39 1.30 0.00 0.00 0.22 1.09 332 0.0 55558 10.38 1.26 0.00 0.00 0.21 1.05 336 0.0 55256 10.37 1.22 0.00 0.00 0.21 1.01 340 0.0 54963 10.36 1.18 0.00 0.00 0.21 0.97 344 0.0 54680 10.35 1.15 0.00 0.00 0.21 0.94 348 0.0 54405 10.34 1.11 0.00 0.00 0.21 0.90 352 0.0 54138 10.33 1.08 0.00 0.00 0.21 0.87 356 0.0 53879 10.33 1.05 0.00 0.00 0.21 0.84 360 0.0 53627 10.32 1.02 0.00 0.00 0.21 0.81 364 0.0 53383 10.31 0.99 0.00 0.00 0.21 0.78 368 0.0 53146 10.30 0.96 0.00 0.00 0.21 0.75 372 0.0 52915 10.30 0.93 0.00 0.00 0.21 0.72 376 0.0 52691 10.29 0.91 0.00 0.00 0.21 0.70 380 0.0 52473 10.28 0.88 0.00 0.00 0.21 0.68 384 0.0 52261 10.28 0.86 0.00 0.00 0.21 0.65 388 0.0 52055 10.27 0.84 0.00 0.00 0.21 0.63 392 0.0 51854 10.26 0.81 0.00 0.00 0.21 0.61 396 0.0 51659 10.26 0.79 0.00 0.00 0.21 0.59 400 0.0 51469 10.25 0.77 0.00 0.00 0.21 0.57 404 0.0 51283 10.25 0.76 0.00 0.00 0.21 0.55 408 0.0 51103 10.24 0.73 0.00 0.00 0.21 0.53 G:WOBS12014114026-VAML Phase 2C\Calcs114026 rouling10yr24hr_Pond 2.xlsx 09/23/2015 MLV WATERSHED DATA WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CHANGE IN HEIGHT 23 F 1 RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 25 YR 6.43 IN/HR Qa = 19.65 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = .8.05, INCHES 25yr, 24hr PRECIPITATION CN = 63 ((98*0.40)+(39*0.60)) = 63 S = (1000/CN)-10 S = 5.97 Depth (D) = (P-02S)"2/(P+0.8S) D = 3.66 IN - 25yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)) / Qp Tp = 49.56 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 137,376 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.50 feet VAML Phase 2C Pond #2 Stormwater Pond Routing 25-year 24hr Storm AFTER DEVELOPMENT WATERSHED AREA 16.45 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 FT - RUNOFF COEF. 'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 25 YR 6.43 IN/HR Qp = 62.89 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30,568 29,480 42,810 1.5 10.6645 0.4055 1.48 11.00 32,818 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33,968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183,511 5.5 12.1200 1.7047 5.62 Regression Output: Ks = 27939 b = 1.09 Constant 10.24 14026 G:WOBS12014114026-VAML Phase 2C1Calcs114026 routing25yr24hr_Pond 2.xlsx 09/23/2015 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 25-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 19.65 cis Qp = 52.89 cis Tip = 49.6 min dT = 4 min BASIN DATA Ks = 27939 b = 1.09 Zo = 8.50 It Normal water elev = 8.50 It Peak Outflow = 20.35 cfs Box Weir Length = 16 ft Peak Stage = 12.71 ft Cw = 3.0 Maximum Storage = 133,834 cu ft Zcr = 12.80 It Control Holes: State Orifice: Dia = 2.50 in Dd = 36 in Inv = 8.50 It Cd = 0.59 Weir: L = 18 in Zi = 8.00 It Inv = 10.00 it Emergency Overflow Weir: L = 480.0 in Inv = 13.50 ft 14026 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (cu ft) (ft) (Cis) (cfs) (cfs) (cfs) (cfs) 0 0.0 0 8.50 0 0 0.00 0 0.00 4 0.8 0 8.50 0 0.00 0.00 0 0.00 8 3.3 203 8.51 0.00 0.00 0.00 0.00 0.00 12 7.3 1002 8.55 0.01 0.00 0.00 0.01 0.00 16 12.5 2749 8.62 0.02 0.00 0.00 0.02 0.00 20 18.6 5738 8.73 0.06 0.00 0.00 0.06 0.00 24 25.1 10177 8.90 0.09 0.00 0.00 0.09 0.00 28 31.8 16189 9.11 0.11 0.00 0.00 0.11 0.00 32 38.1 23794 9.36 0.14 0.00 0.00 0.14 0.00 36 43.7 32911 9.66 0.17 0.00 0.00 0.17 0.00 40 48.2 43361 10.00 0.19 0.00 0.00 0.19 0.00 44 51.3 54878 10.36 1.17 0.00 0.00 0.21 0.96 48 52.8 66899 10.73 3.02 0.00 0.00 0.23 2.79 52 52.6 78835 11.09 5.37 0.00 0.00 0.26 5.11 56 50.7 90165 11.43 7.95 0.00 0.00 0.27 7.68 60 47.3 100428 11.73 10.54 0.00 0.00 0.28 10.26 64 42.8 109250 11.99 12.94 0.00 0.00 0.30 12.65 68 38.6 116423 12.20 15.00 0.00 0.00 0.31 14.70 72 34.7 122078 12.37 16.69 0.00 0.00 0.31 16.37 76 31.3 126407 12.49 18.01 0.00 0.00 0.32 17.69 80 28.1 129587 12.58 19.00 0.00 0.00 0.32 18.68 84 25.3 131782 12.65 19.70 0.00 0.00 0.32 19.37 88 22.8 133138 12.69 20.13 0.00 0.00 0.33 19.81 92 20.5 133783 12.70 20.34 0.00 0.00 0.33 20.01 96 18.5 133834 12.71 20.35 0.00 0.00 0.33 20.03 100 16.7 133389 12.69 20.21 0.00 0.00 0.33 19.89 104 15.0 132536 12.67 19.94 0.00 0.00 0.32 19.61 108 13.5 131351 12.63 19.56 0.00 0.00 0.32 19.24 112 12.2 129897 12.59 19.10 0.00 0.00 0.32 18.78 116 10.9 128231 12.54 18.58 0.00 0.00 0.32 18.26 G:W0BS12014114026-VAML Phase 2C1Calcs114026 routing25y24hr_P0nd 2.xlsx 09/23/2015 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 25-year 24hr Storm 120 9.9 126400 12.49 18.01 0.00 0.00 0.32 17.69 124 8.9 124444 12.43 17.41 0.00 0.00 0.32 17.09 128 8.0 122396 12.37 16.78 0.00 0.00 0.31 16.47 132 7.2 120287 12.31 16.15 0.00 0.00 0.31 15.84 136 6.5 118138 12.25 15.51 0.00 0.00 0.31 16.20 140 5.8 115972 12.19 14.87 0.00 0.00 0.31 14.56 144 5.3 113803 12.12 14.24 0.00 0.00 0.30 13.94 148 4.7 111647 12.06 13.62 0.00 0.00 0.30 13.32 152 4.3 109513 12.00 13.02 0.00 0.00 0.30 12.72 156 3.8 107411 11.94 12.43 0.00 0.00 0.29 12.14 160 3.5 105347 11.88 11.86 0.00 0.00 0.29 11.57 164 3.1 103329 11.82 11.32 0.00 0.00 0.29 11.03 168 2.8 101359 11.76 10.79 0.00 0.00 0.29 10.50 172 2.5 99441 11.70 10.28 0.00 0.00 0.28 10.00 176 2.3 97578 11.65 9.80 0.00 0.00 0.28 9.52 180 2.0 95770 11.59 9.34 0.00 0.00 0.28 9.06 184 1.8 94019 11.54 8.90 0.00 0.00 0.28 8.62 188 1.7 92326 11.49 8.48 0.00 0.00 0.27 8.20 192 1.5 90689 11.44 8.08 0.00 0.00 0.27 7.80 196 1.3 89108 11.40 7.70 0.00 0.00 0.27 7.43 200 1.2 87584 11.35 7.33 0.00 0.00 0.27 7.07 204 1.1 86114 11.31 6.99 0.00 0.00 0.26 6.72 208 1.0 84698 11.26 6.66 0.00 0.00 0.26 6.40 212 0.9 83334 11.22 6.35 0.00 0.00 0.26 6.09 216 0.8 82021 11.18 6.06 0.00 0.00 0.26 5.80 220 0.7 80757 11.15 5.78 0.00 0.00 0.26 5.52 224 0.6 79542 11.11 5.52 0.00 0.00 0.26 5.26 228 0.6 78372 11.07 5.27 0.00 0.00 0.25 5.01 232 0.5 77247 11.04 5.03 0.00 0.00 0.25 4.78 236 0.5 76165 11.01 4.81 0.00 0.00 0.25 4.56 240 0.4 75125 10.98 4.59 0.00 0.00 0.25 4.34 244 0.4 74124 10.95 4.39 0.00 0.00 0.25 4.14 248 0.3 73162 10.92 4.20 0.00 0.00 0.25 3.95 252 0.3 72237 10.89 4.02 0.00 0.00 0.24 3.77 256 0.3 71347 10.86 3.85 0.00 0.00 0.24 3.60 260 0.3 70490 10.84 3.68 0.00 0.00 0.24 3.44 264 0.2 69667 10.81 3.53 0.00 0.00 0.24 3.29 268 0.2 68874 10.79 3.38 0.00 0.00 0.24 3.14 272 0.2 68112 10.76 3.24 0.00 0.00 0.24 3.00 276 0.2 67378 10.74 3.11 0.00 0.00 0.24 2.87 280 0.1 66671 10.72 2.98 0.00 0.00 0.23 2.75 284 0.1 65991 10.70 2.86 0.00 0.00 0.23 2.63 288 0.1 65335 10.68 2.75 0.00 0.00 0.23 2.52 292 0.1 64704 10.66 2.64 0.00 0.00 0.23 2.41 296 0.1 64096 10.64 2.54 0.00 0.00 0.23 2.31 300 0.1 63509 10.62 2.44 0.00 0.00 0.23 2.21 304 0.1 62944 10.61 2.35 0.00 0.00 0.23 2.12 308 0.1 62399 10.59 2.26 0.00 0.00 0.23 2.04 312 0.1 61873 10.57 2.18 0.00 0.00 0.23 1.95 316 0.1 61366 10.56 2.10 0.00 0.00 0.23 1.87 320 0.1 60876 10.54 2.02 0.00 0.00 0.22 1.80 324 0.0 60403 10.53 1.95 0.00 0.00 0.22 1.73 328 0.0 59947 10.51 1.88 0.00 0.00 0.22 1.66 332 0.0 59505 10.50 1.81 0.00 0.00 0.22 1.59 336 0.0 59079 10.49 1.75 0.00 0.00 0.22 1.53 340 0.0 58667 10.47 1.69 0.00 0.00 0.22 1.47 344 0.0 58269 10.46 1.63 0.00 0.00 0.22 1.41 348 0.0 57884 10.45 1.58 0.00 0.00 0.22 1.36 352 0.0 57511 10.44 1.53 0.00 0.00 0.22 1.31 356 0.0 57150 10.43 1.48 0.00 0.00 0.22 1.26 360 0.0 56801 10.42 1.43 0.00 0.00 0.22 1.21 364 0.0 56463 10.41 1.38 0.00 0.00 0.22 1.16 368 0.0 56135 10.40 1.34 0.00 0.00 0.22 1.12 372 0.0 55818 10.39 1.30 0.00 0.00 0.22 1.08 376 0.0 55510 10.38 1.25 0.00 0.00 0.21 1.04 380 0.0 55212 10.37 1.22 0.00 0.00 0.21 1.00 384 0.0 54923 10.36 1.18 0.00 0.00 0.21 0.97 388 0.0 54642 10.35 1.14 0.00 0.00 0.21 0.93 392 0.0 54370 10.34 1.11 0.00 0.00 0.21 0.90 396 0.0 54105 10.33 1.08 0.00 0.00 0.21 0.87 400 0.0 53848 10.33 1.05 0.00 0.00 0.21 0.83 404 0.0 53599 10.32 1.02 0.00 0.00 0.21 0.80 408 0.0 53357 10.31 0.99 0.00 0.00 0.21 0.78 G:IJOBSI2014114026-VAML Phase 2CICalcs114026 routing25yr24hr_Pond 2.xlsx 09/23/2015 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 100-year 24hr Storm WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CI4ANGE IN HEIGHT 23 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 100 YR 8.48 IN/HR Qa = 25.91 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 1t0 INCHES 100yr, 24hr PRECIPITATION CN = 63 ((98*0.40)+(39*0.60)) = 63 S = (1000/CN)-10 S = 5.97 Depth (D) = (P-0.2S)^21(P+0.8S) D = 5.25 IN-100yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 53.82 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 196,743 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 8.50 feet AFTER DEVELOPMENT WATERSHED AREA 16.45 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 FT RUNOFF COEF. 'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 100 YR 8.48 IN/HR Qp = 69.76 CFS (gip = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30.568 29,480 42,810 1.5 10.6645 0.4055 1.48 11.00 32,816 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33,968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183,511 5.5 12.1200 1.7047 5.62 Regression Output: Ks = 27939 b = 1.09 Constant 10.24 14026 G:W0BS12014114026-VAML Phase 2MCa1os114026 routing100yr24hr Pond 2.x1sx 09/23/2015 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 100-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 25.91 cfs Qp = 69.75 cis Tp = 53.8 min dT = 4 min BASIN DATA Ks = 27939 b = 1.09 Zo = 8.50 ft Normal water elev = 8.50 ft Peak Outflow = 46.74 Cfs Box Weir Length = 16 It Peak Stage = 13.34 It Cw = 3.0 Maximum Storage = 155,922 cu ft Zcr = 12.80 ft Control Holes: State Orifice: Dia = 2.50 in Dd 36 in Inv = 8.50 It Cd 0.59 Weir: L = 18 in Zi 8.00 ft Inv = 10.00 ft Emergency Overflow Weir: L = 480.0 in Inv = 13.50 ft 14026 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (Cfs) (cu ft) (ft) (cfs) (Cfs) (cfs) (cfs) (Cfs) 0 0.0 0 8.50 0 0 0.00 0 0.00 4 0.9 0 8.50 0 0.00 0.00 0 0.00 8 3.7 227 8.51 0.00 0.00 0.00 0.00 0.00 12 8.2 1123 8.55 0.01 0.00 0.00 0.01 0.00 16 14.1 3092 8.63 0.03 0.00 0.00 0.03 0.00 20 21.2 6479 8.76 0.06 0.00 0.00 0.06 0.00 24 29.0 11548 8.94 0.09 0.00 0.00 0.09 0.00 28 37.1 18481 9.18 0.12 0.00 0.00 0.12 0.00 32 45.1 27354 9.48 0.15 0.00 0.00 0.15 0.00 36 52.5 38138 9.83 0.18 0.00 0.00 0.18 0.00 40 59.0 50701 10.23 0.69 0.00 0.00 0.21 0.49 44 64.2 64696 10.66 2.64 0.00 0.00 0.23 2.41 48 67.8 79464 11.11 5.50 0.00 0.00 0.25 5.25 52 69.6 94405 11.55 8.99 0.00 0.00 0.28 8.72 56 69.5 108939 11.98 12.86 0.00 0.00 0.30 12.56 60 67.5 122525 12.38 16.82 0.00 0.00 0.31 16.51 64 63.8 134689 12.73 20.63 0.00 0.00 0.33 20.30 68 58.6 145042 13.03 29.25 5.21 0.00 0.34 23.71 72 53.2 152077 13.23 39.92 13.46 0.00 0.35 26.10 76 48.3 155260 13.32 45.52 17.96 0.00 0.35 27.21 80 43.8 155922 13.34 46.74 18.94 0.00 0.35 27.44 84 39.8 155225 13.32 45.45 17.90 0.00 0.35 27.20 88 36.1 153866 13.28 43.01 15.94 0.00 0.35 26.73 92 32.8 152215 13.23 40.15 13.65 0.00 0.35 26.15 96 29.8 150451 13.18 37.23 11.34 0.00 0.34 25.54 100 27.0 148664 13.13 34.42 9.15 0.00 0.34 24.93 104 24.5 146892 13.08 31.80 7.13 0.00 0.34 24.33 108 22.3 145151 13.03 29.40 5.32 0.00 0.34 23.74 112 20.2 143444 12.98 27.23 3.72 0.00 0.34 23.17 116 18.4 141766 12.93 25.29 2.35 0.00 0.34 22.61 G:U0BS12014114026-VA1V1L Phase 2C1Ca1cs114026 routing100y24hr Pond 2.xlsx 09/23/2015 VAML Phase 2C 14026 MLV Pond #2 Stormwater Pond Routing 100-year 24hr Storm 120 16.7 140104 12.89 23.61 1.21 0.00 0.33 22.06 124 15.1 138442 12.84 22.21 0.36 0.00 0.33 21.52 128 13.7 136746 12.79 21.30 0.00 0.00 0.33 20.97 132 12.5 134934 12.74 20.71 0.00 0.00 0.33 20.38 136 11.3 132960 12.68 20.07 0.00 0.00 0.33 19.75 140 10.3 130862 12.62 19.41 0.00 0.00 0.32 19.08 144 9.3 128674 12.56 18.72 0.00 0.00 0.32 18.40 148 8.5 126423 12.49 18.02 0.00 0.00 0.32 17.70 152 7.7 124135 12.43 17.31 0.00 0.00 0.32 17.00 156 7.0 121828 12.36 16.61 0.00 0.00 0.31 16.30 160 6.3 119519 12.29 15.92 0.00 0.00 0.31 15.61 164 5.8 117222 12.22 16.24 0.00 0.00 0.31 14.93 168 5.2 114948 12.16 14.57 0.00 0.00 0.30 14.27 172 4.7 112707 12.09 13.92 0.00 0.00 0.30 13.62 176 4.3 110505 12.03 13.30 0.00 0.00 0.30 13.00 180 3.9 108349 11.97 12.69 0.00 0.00 0.30 12.40 184 3.6 106242 11.90 12.11 0.00 0.00 0.29 11.82 188 3.2 104189 11.84 11.55 0.00 0.00 0.29 11.26 192 2.9 102192 11.78 11.01 0.00 0.00 0.29 10.72 196 2.7 100253 11.73 10.50 0.00 0.00 0.28 10.21 200 2.4 98372 11.67 10.01 0.00 0.00 0.28 9.72 204 2.2 96550 11.62 9.54 0.00 0.00 0.28 9.26 208 2.0 94787 11.57 9.09 0.00 0.00 0.28 8.81 212 1.8 93084 11.51 8.66 0.00 0.00 0.27 8.39 216 1.6 91438 11.47 8.26 0.00 0.00 0.27 7.99 220 1.5 89850 11.42 7.87 0.00 0.00 0.27 7.60 224 1.4 88318 11.37 7.51 0.00 0.00 0.27 7.24 228 1.2 86841 11.33 7.16 0.00 0.00 0.27 6.89 232 1.1 85418 11.29 6.83 0.00 0.00 0.26 6.56 236 1.0 84046 11.25 6.51 0.00 0.00 0.26 6.25 240 0.9 82726 11.21 6.22 0.00 0.00 0.26 5.96 9AA 0.8 81454 11.17 5.93 0.00 0.00 0.26 5.68 248 0.8 80230 11.13 5.67 0.00 0.00 0.26 5.41 252 0.7 79062 11.10 5.41 0.00 0.00 0.25 5.16 256 0.6 77918 11.06 5.17 0.00 0.00 0.25 4.92 260 0.6 76827 11.03 4.94 0.00 0.00 0.25 4.69 264 0.5 75777 11.00 4.73 0.00 0.00 0.25 4.48 268 0.5 74766 10.97 4.52 0.00 0.00 0.25 4.27 272 0.4 73794 10.94 4.32 0.00 0.00 0.25 4.08 276 0.4 72858 10.91 4.14 0.00 0.00 0.24 3.89 280 0.3 71957 10.88 3.96 0.00 0.00 0.24 3.72 284 0.3 71089 10.85 3.80 0.00 0.00 0.24 3.55 288 0.3 70255 10.83 3.64 0.00 0.00 0.24 3.40 292 0.3 69451 10.80 3.49 0.00 0.00 0.24 3.25 296 0.2 68676 10.78 3.34 n nn 0.00 0.24 3.11 300 0.2 67931 10.76 3.21 0.00 0.00 0.24 2.97 304 0.2 67213 10.74 3.08 0.00 0.00 0.24 2.84 308 0.2 66520 10.72 2.96 0.00 0.00 0.23 2.72 312 0.2 65853 10.69 2.84 0.00 0.00 0.23 2.61 316 0.1 65211 10.68 2.73 0.00 0.00 0.23 2.50 320 0.1 64591 10.66 2.62 0.00 0.00 0.23 2.39 324 0.1 63993 10.64 2.52 0.00 0.00 0.23 2.29 328 0.1 63416 10.62 2.43 0.00 0.00 0.23 2.20 332 0.1 62860 10.60 2.34 0.00 0.00 0.23 2.11 336 0.1 62323 10.59 2.25 0.00 0.00 0.23 2.02 340 0.1 61805 10.57 2.17 0.00 0.00 0.23 1.94 344 0.1 61304 10.56 2.09 0.00 0.00 0.23 1.86 348 0.1 60821 10.54 2.01 0.00 0.00 0.22 1.79 352 0.1 60354 10.53 1.94 0.00 0.00 0.22 1.72 356 0.1 59903 10.51 1.87 0.00 0.00 0.22 1.66 360 0.1 59467 10.50 1.81 0.00 0.00 0.22 1.59 364 0.0 59045 10.49 1.75 0.00 0.00 0.22 1.52 368 0.0 58637 10.47 1.69 0.00 0.00 0.22 1.47 372 0.0 58242 10.46 1.63 0.00 0.00 0.22 1.41 376 0.0 57860 10.45 1.57 0.00 0.00 0.22 1.36 380 0.0 57491 10.44 1.52 0.00 0.00 0.22 1.30 384 0.0 57133 10.43 1.47 0.00 0.00 0.22 1.26 388 0.0 56786 10.42 1.43 0.00 0.00 0.22 1.21 392 0.0 56450 10.41 1.38 0.00 0.00 0.22 1.16 396 0.0 56125 10.40 1.34 0.00 0.00 0.22 1.12 400 0.0 55809 10.39 1.29 0.00 0.00 0.22 1.08 404 0.0 55503 10.38 1.25 0.00 0.00 0.21 1.04 408 0.0 55207 10.37 1.22 0.00 0.00 0.21 1.00 G:WOBS12014114026-VAML Phase 2MCaIcs114026 routing100y24hr_Pond 2.xlsx 09/23/2015 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 100-year 24hr Storm Clogged WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 15.28 ACRES HYDRAULIC LENGTH 1535 FT CHANGE IN HEIGHT 23 FT RUNOFF COEF. 'C' 0.2 TIME OF CONCENTR 11.18 MIN INTENSITY 100 YR 8.48 IN/HR Qa = 26.91 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 10 INCHES 100yr, 24hr PRECIPITATION CN = 63 ((98*0.40)+(39*0.60)) = 63 S = (10001CN)-10 S = 5.97 Depth (D) = (P-0.2S)^2/(P+0.8S) D = 5.25 IN-100yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)] / Qp Tp = 53.82 MINUTES Storage Volume Req'd = (Qp-Qa)*Tp*1.39*60 196,743 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT 8.50 feet AFTER DEVELOPMENT WATERSHED AREA 16.45 ACRES HYDRAULIC LENGTH 1290 FT CHANGE IN HEIGHT 17 f=T RUNOFF COEF.'C' 0.50 TIME OF CONCENTR 10.28 MIN INTENSITY 100 YR 8.48 IN/HR Qp = 69.75 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 8.50 24,927 0 0 0 0 0 0.00 9.00 28,392 13,330 13,330 0.5 9.4978 -0.6931 0.51 10.00 30,568 29,480 42,810 1.5 10.6645 0.4055 1.48 11.00 32,816 31,692 74,502 2.5 11.2186 0.9163 2.46 12.00 35,119 33,968 108,469 3.5 11.5942 1.2528 3.47 13.00 37,494 36,307 144,776 4.5 11.8829 1.5041 4.52 14.00 39,977 38,736 183,511 5.5 12.1200 1.7047 5.62 Regression Output: Ks = 27939 b = 1.09 Constant 10.24 14026 G:W0BS12014114026-VAML Phase 2MCaIcs114026 routing100yr24hr doggec_Pond 2.x1sx 09/2312015 VAML Phase 2C MLV Pond #2 Stormwater Pond Routing 100-year24hr Storm Clogged CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 25.91 cis Qp = 69.75 cis Tp = 53.8 min dT = 4 min BASIN DATA Ks = 27939 b = 1.09 Zo = 8.50 It Normal water elev = 8.50 ft Peak Outflow = 57.88 cfs Box Weir Length = ft Peak Stage = 13.52 ft Cw = 3.0 Maximum Storage = 162,154 cu It Zcr = It Control Holes: State Orifice: Dia = in Dd = in Inv = ft Cd = 0.59 Emergency Overflow Weir: L = 480 in Zi = ft Inv = 12.90 It 14026 Time Inflow Storage Stage Outflow W Riser Weir Orifice Weir (Emergency Overflow) (min) (cfs (cu ft) (ft) cfs) (cfs) (cis (cfs) cfs) 0 0.0 0 8.50 0 0 0.00 0 0.00 4 0.9 0 8.50 0 0.00 0.00 0 0.00 8 3.7 227 8.51 0.00 0.00 0.00 0.00 0.00 12 8.2 1123 8.55 0.00 0.00 0.00 0.00 0.00 16 14.1 3094 8.63 0.00 0.00 0.00 0.00 0.00 20 21.2 6487 8.76 0.00 0.00 0.00 0.00 0.00 24 29.0 11572 8.95 0.00 0.00 0.00 0.00 0.00 28 37.1 18527 9.19 0.00 0.00 0.00 0.00 0.00 32 45.1 27429 9.48 0.00 0.00 0.00 0.00 0.00 36 52.5 38250 9.83 0.00 0.00 0.00 0.00 0.00 40 59.0 50855 10.23 0.00 0.00 0.00 0.00 0.00 44 64.2 65017 10.67 0.00 0.00 0.00 0.00 0.00 48 67.8 80419 11.14 0.00 0.00 0.00 0.00 0.00 52 69.6 96680 11.62 0.00 0.00 0.00 0.00 0.00 56 69.5 113372 12.11 0.00 0.00 0.00 0.00 0.00 60 67.5 130044 12.60 0.00 0.00 0.00 0.00 0.00 64 63.8 146245 13.06 7.82 0.00 0.00 0.00 7.82 68 58.6 159672 13.44 48.23 0.00 0.00 0.00 48.23 72 53.2 162154 13.52 57.88 0.00 0.00 0.00 57.88 76 48.3 161025 13.48 53.42 0.00 0.00 0.00 53.42 80 43.8 159791 13.45 48.68 0.00 0.00 0.00 48.68 84 39.8 158628 13.41 44.34 0.00 0.00 0.00 44.34 88 36.1 167536 13.38 40.40 0.00 0.00 0.00 40.40 92 32.8 156512 13.35 36.81 0.00 0.00 0.00 36.81 96 29.8 155551 13.33 33.54 0.00 0.00 0.00 33.54 100 27.0 154650 13.30 30.56 0.00 0.00 0.00 30.56 104 24.5 153803 13.28 27.86 0.00 0.00 0.00 27.86 108 22.3 153010 13.26 25.39 0.00 0.00 0.00 25.39 112 20.2 152264 13.23 23.15 0.00 0.00 0.00 23.15 116 18.4 151565 13.21 21.11 0.00 0.00 0.00 21.11 GNOM2014114026-VAML Phase 2C1Calcs114026 routing100yr24hr clogged Pond 2.xlsx 09/23/2015 VAML Phase 2C MLV Pond #2 14026 Stormwater Pond Routing 100-year 24hr Storm Clogged 120 16.7 150909 13.20 19.25 0.00 0.00 0.00 19.25 124 15.1 150293 13.18 17.55 0.00 0.00 0.00 17.55 128 13.7 149714 13.16 16.01 0.00 0.00 0.00 16.01 132 12.5 149171 13.15 14.61 0.00 0.00 0.00 14.61 136 11.3 148662 13.13 13.33 0.00 0.00 0.00 13.33 140 10.3 148183 13.12 12.16 0.00 0.00 0.00 12.16 144 9.3 147733 13.10 11.10 0.00 0.00 0.00 11.10 148 8.5 147311 13.09 10.13 0.00 0.00 0.00 10.13 152 7.7 146915 13.08 9.25 0.00 0.00 0.00 9.25 156 7.0 146543 13.07 8.45 0.00 0.00 0.00 8.45 160 6.3 146193 13.06 7.72 0.00 0.00 0.00 7.72 164 5.8 145865 13.05 7.05 0.00 0.00 0.00 7.05 168 5.2 145556 13.04 6.44 0.00 0.00 0.00 6.44 172 4.7 145266 13.03 5.88 0.00 0.00 0.00 5.88 176 4.3 144994 13.03 5.38 0.00 0.00 0.00 5.38 180 3.9 144738 13.02 4.92 0.00 0.00 0.00 4.92 184 3.6 144498 13.01 4.50 0.00 0.00 0.00 4.50 188 3.2 144272 13.01 4.11 0.00 0.00 0.00 4.11 192 2.9 144059 13.00 3.76 0.00 0.00 0.00 3.76 196 2.7 143860 12.99 3.44 0.00 0.00 0.00 3.44 200 2.4 143672 12.99 3.16 0.00 0.00 0.00 3.15 204 2.2 143496 12.98 2.88 0.00 0.00 0.00 2.88 208 2.0 143330 12.98 2.64 0.00 0.00 0.00 2.64 212 1.8 143174 12.97 2.42 0.00 0.00 0.00 2.42 216 1.6 143027 12.97 2.22 0.00 0.00 0.00 2.22 220 1.5 142890 12.97 2.03 0.00 0.00 0.00 2.03 224 1.4 142760 12.96 1.86 0.00 0.00 0.00 1.86 228 1.2 142638 12.96 1.71 0.00 0.00 0.00 1.71 232 1.1 142523 12.96 1.56 0.00 0.00 0.00 1.56 236 1.0 142415 12.95 1.44 0.00 0.00 0.00 1.44 240 0.9 142314 12.95 1.32 0.00 0.00 0.00 1.32 244 n A 142218 12.95 1.21 0.00 0.00 0.00 1.21 248 0.8 142128 12.94 1.11 0.00 0.00 0.00 1.11 252 0.7 142043 12.94 1.02 0.00 0.00 0.00 1.02 256 0.6 141964 12.94 0.94 0.00 0.00 0.00 0.94 260 0.6 141889 12.94 0.86 0.00 0.00 0.00 0.86 264 0.5 141818 12.94 0.79 0.00 0.00 0.00 0.79 268 0.5 141751 12.93 0.73 0.00 0.00 0.00 0.73 272 0.4 141689 12.93 0.67 0.00 0.00 0.00 0.67 276 0.4 141630 12.93 0.62 0.00 0.00 0.00 0.62 280 0.3 141574 12.93 0.57 0.00 0.00 0.00 0.57 284 0.3 141522 12.93 0.52 0.00 0.00 0.00 0.52 288 0.3 141472 12.93 0.48 0.00 0.00 0.00 0.48 292 0.3 141426 12.92 0.44 0.00 0.00 0.00 0.44 296 0.2 141382 12.92 0.41 0.00 0.00 0.00 0.41 300 0.2 141341 12.92 0.38 0.00 0.00 0.00 0.38 304 0.2 141302 12.92 0.35 0.00 0.00 0.00 0.35 308 0.2 141265 12.92 0.32 0.00 0.00 0.00 0.32 312 0.2 141230 12.92 0.30 0.00 0.00 0.00 0.30 316 0.1 141198 12.92 0.28 0.00 0.00 0.00 0.28 320 0.1 141167 12.92 0.25 0.00 0.00 0.00 0.25 324 0.1 141138 12.92 0.24 0.00 0.00 0.00 0.24 328 0.1 141110 12.91 0.22 0.00 0.00 0.00 0.22 332 0.1 141084 12.91 0.20 0.00 0.00 0.00 0.20 336 0.1 141060 12.91 0.19 0.00 0.00 0.00 0.19 340 0.1 141036 12.91 0.17 0.00 0.00 0.00 0.17 344 0.1 141015 12.91 0.16 0.00 0.00 0.00 0.16 348 0.1 140994 12.91 0.15 0.00 0.00 0.00 0.15 352 0.1 140974 12.91 0.14 0.00 0.00 0.00 0.14 356 0.1 140956 12.91 0.13 0.00 0.00 0.00 0.13 360 0.1 140939 12.91 0.12 0.00 0.00 0.00 0.12 364 0.0 140922 12.91 0.11 0.00 0.00 0.00 0.11 368 0.0 140907 12.91 0.10 0.00 0.00 0.00 0.10 372 0.0 140892 12.91 0.10 0.00 0.00 0.00 0.10 376 0.0 140878 12.91 0.09 0.00 0.00 0.00 0.09 380 0.0 140865 12.91 0.08 0.00 0.00 0.00 0.08 384 0.0 140852 12.91 0.08 0.00 0.00 0.00 0.08 388 0.0 140840 12.91 0.07 0.00 0.00 0.00 0.07 392 0.0 140829 12.91 0.07 0.00 0.00 0.00 0.07 396 0.0 140819 12.91 0.06 0.00 0.00 0.00 0.06 400 0.0 140808 12.91 0.06 0.00 0.00 0.00 0.06 404 0.0 140799 12.91 0.06 0.00 0.00 0.00 0.06 408 0.0 140790 12.91 0.05 0.00 0.00 0.00 0.05 G:%JOBS12014114026-VAML Phase 2=81CA14026 routing100y24hr clogged_Pond 2.xlsx 7 F rS October 18, 2013 Soils Engineering and Testing Services Tripp Engineering, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 ECEIVE Attention: Mr. Brock Daniel SEP3020- BY: Reference: Infiltration Testing and Seasonal High Watertable Estimates Stormwater Systems The Village at Mott's Landing Phase II Wilmington, North Carolina RFTS Job No. 901-13 Dear Mr. Daniel: RFTS is pleased to provide testing services during the design phase of the Village at Mott's Landing residential development located off River Road in Wilmington, North Carolina. Specific site grading plans had not been provided to us at the time this report was prepared. D SCRIPT-1074 OF AC'i'iVTIES AI+TD x+R ifflI GS As requested, our staff visited the site on October 11 and 15, 2013, to perform infiltration testing and estimate the seasonal high watertable at six locations identified by you. The purpose of this testing was to provide soil parameters for stormwater infiltration design. Seasonal High Watertable Estimate Hand auger borings were advanced at two locations to depths ranging from approximately 3 to 10 feet below the existing ground surface in areas proposed by the civil designer for infiltration structures. The encountered soils were logged and visually classified by depth and a Munsell Soil Color Chart was used to determine the hue, value, and chroma of the visually distinct soil layers. Our soil logs are presented in Table 1. Locations 1 through 3 and 6 Soils encountered in these borings consisted entirely of interbedded clean. fine sands with no distinct zones of soil cementation in the profiles. Based on our experience with similar soils and comparisons of the soil coloration to the Munseil Chart, it is our opinion that seasonal high water table level at these locations occurs approximately 91 inches at location 1, 102 inches at location 2, 73 inches at location 3, and 18 inches at location 6. All depths are referenced from the existing ground surface at the time of our testing. Measurements made 1 hour after augering indicate RFTS, PLLC Committed to Responsive Service Office: 910 458-1377 �M 1305 3A Carolina Beach Ave N Carolina Beach North Carolina 28428 avu'w.rftspllc.com Fax: 910-458-5261 Tripp Engineering, P.C. October 18, 2013 RFTS Job No. 901-13 Page Two depths to standing water in the boreholes of 111 inches at location 1, 118 inches at location 2, 82 inches at location 3, and 23 inches at location 6. Again, all depths are referenced from the existing ground surface at the time of our testing. Additional details of the soil classifications for these locations are presented as Table 1. Location 4 Soils encountered at this boring consisted interbedded clean fine sands in the upper 51 inches below the existing site grade. From 51 inches to 55 inches clayey sand was encountered, and from 55 inches to the boring termination depth of 63 sandy Clay was encountered. Based on our experience with similar soils and comparisons of the soil coloration to the Munsell Chart, it is our opinion that seasonal high water table level at this location occurs approximately 39 inches below the existing ground surface. This is most likely a perched water table condition. No standing water was measured in the borehole at this location. Location 5 Soils encountered at this boring consisted interbedded clean fine sands in the upper 41 inches below the existing. site grade. From 41 inches to 45 inches clayey sand was encountered, and from 45 inches to .the boring termination depth of 60 inches, sandy Clay was encountered. Based on our experience with similar soils and comparisons of the soil coloration to the Munsell Chart, it is our opinion that seasonal high water table level at this location occurs approximately 24 inches below the existing ground surface. This is most likely a perched water table condition. No standing water was measured in the borehole at this location. Infiltration Testing Infiltration testing was performed using a model 2800 Guelph Permeameter which is a constant -head device which operates on the Mariotte siphon principle and is referenced in ASTM D-5126. The permeameter is used to determine field saturated hydraulic conductivity in centimeters per second for soil at a specified depth. This testing involves advancing a borehole to the desired infiltration depth and introducing water at a constant head to determine the steady state flow rate from which the hydraulic conductivity can be calculated. The rates obtained during. our testing ranges from 10.3 to 17.3 inches per hour. The results of our permeameter testing are presented in Table 2. REC'OMMENDAT11"ONS Based on the results of our field testing and soil classifications at the test location, we offer the following recommendations for stormwater infiltration design: Tripp Engineering, P.C. RFTS Job No. 901-13 October 18, 2013 Page Three At the test locations 1, 2, and 3 it is our opinion that in order to achieve the steady state flow rate obtained during our testing; the areas of infiltration galleries or other infiltration structure should introduce stormwater at approximately 36 inches below the existing ground surface elevation. For purposes of sizing the structures we recommend ultimate application rates of 10.2, 17.2, and 17.3 inches per hour, respectively. At test location 4, water should be introduced at 17 inches below the existing ground surface elevation with an ultimate application rate of 16.9 inches per hour. At test locations 5 and 6, water should be introduced at 8 inches below the existing ground surface elevation with ultimate application rates of 13.4 and 11.8 inches per hour, respectively. These recommendations should be reviewed by appropriate regulatory authorities before finalizing the details of any civil design. C ,OSURZ Please find attached our field data and a sketch showing the approximate test locations. If you have any questions after reviewing this letter, please do not hesitate to contact us at your convenience. Sincerely, FTS9 P LLI David L. Winstead Ste end Field Operations Manager Senior E. DLW:SDK/dlw NC Regi Attachments , P.E. idn No. 17638 Table 1 Munsell Soil Classifications The Village at Mott's Landing Phase II Wilmington, North Carolina RFTS Job No. 901-13 Loc Soil Description Hue Value Chroma Depth (in.) Comments 1 Topsoil - - - 0-10 Dark Brown fine SAND, trace organics IOYR 3 3 10-21 Dark Yellowish Brown. fine SAND, trace organics IOYR 3 4 21-31 Dark Grayish Brown fine SAND, trace organics IOYR 4 2 31-53 Very Dark Gray fine SAND 7.5Yk 3 1 53-60 Gray fine SAND 7.5YR 6 1 60-65 Light Gray fine SAND IOYR 7 1 65-76 Yellowish Brown fine SAND 10YR 5 6 76-81 Yellowish Brown fine SAND IOYR 5 8 81-91 Brownish Yellow fine SAND IOYR 6 6 91-103 SHWTi Pale Yellow fine SAND 2.5Y 7 4 103-121 E120 . 111" 2 Topsoil - - - 0-6 Light Gray fine SAND IOYR 1 7 2 6-18 Yellowish Brown fine SAND IOYR 5 6 18-24 Yellowish Brown fine SAND IOYR 5 8 24-35 Brownish Yellow fine SAND 10YR 6 6 _ 35-57 Pale Yellow fine. SAND 2.5Y 7 4 57-71 Pale Yellow fine SAND 2.5Y 1 8 4 71-91 Brownish Yellow fine SAND IOYR 6 8 91-102 Yellow fine SAND 2..5Y 7 6 102-108 SZr1rWT Strong Brown fine SAND 7.5YR 5 8 108-123 1.1120118" 3 Topsoil - - - 0-10 Light Gray fine SAND IOYR 7 1 10-17 Gray fine SAND IOYR 5 1 17-21 Brown fine SAND IOYR 4 3 21-31 Yellowish Brown fine SAND 1 OYR. 5 4 31-73 Light Yellowish. Brown fine SAND IOYR 6 4 73-87 SEWT(?a 737D 1H200Z» Table 1 - continued Mansell Soil Classifications The Village at Mott's Landing Phase II Wilmington, North Carolina RFTS Job No. 901-13 Loc 4 Soil Description Topsoil Hue - Value - Chroma - Depth (in.) 0-10 Comments Yellowish Brown fine SAND 10YR 5 4 10-17 Pale Yellow fine SAND - 2.5Y 7 4 17-28 Olive Yellow fine SAND. 2.5Y 6 6 28-39 Strong Brown fine SAND 7.5Y.R 5 6 8 6 39-47 47-51 Perched Sa�'JT Olive Yellow fine SAND 2.5Y Gray Clayey SAND 2.5Y 6 1 51-55 Gray Sandy CLAY 2.5Y 6 1 55-63 No H2O 5 To soil - - - 0-10 Brown fine. SAND 10YR 5 3 1.0-14 Very Dark Brown fine SAND 7.5YR 2.5 3 14-24 Yellowish Brown fine SAND Pale Yellow fine SAND lOYR 2.5Y -5 7 -6 3 24-33 3341 Perched SHWT Li ht Gray Clayey fine SAND 5Y 7 1 41-45 Light Gray CLAY some Sand 5Y 7 1 45-60 No H�.O 6 To soil - - - 0-8 Dark Yellowish Brown fine SAND IOYR 8-12 Brown fine SAND I OYR 12-18 Black fine SANS, trace of Silt Very Dark Brown. fine SAND I 2.5YR 7.5YR 18-29 29-36 1 S;EiWT H203se Table 2 Guelph Permeameter Test Results The Village at Mott's Landing Phase II Wilmington, North Carolina RFTS Job No. 901-13 Location 1 2 3 4 5 6 Depth (in.) 36 36 36 17 8 8 Hl (cm) 5 5 5 5 5 5 Rl (cm/min) .3 8.0 6.0 5.8 5.2 8.0 Rrs (cm/sec) 0.05 0.1333 0.10 0.0966 0.0866 0.1333 HAM) 10 10 10 10 10 10 R2 (cm/min) 7.0 15.6 1.3.0 12.6 10.8 14.0 Res (cm/sec) 0.1166 0.26 0.2166 0.21 0.18 0.2333 Kf§ (cm/sec) 7.32x 10" 1.12xlO-2 1.22x 16-2 1.19x10" 9.52x10" 8.30x10" Xf, (in/hr) 10.3 17.2_ 1 7.3 15.9- 13.4 11.3 Defuution of Terms RI,2 - Established 3 or more constant rate of water level change (cm/min) RI s, 2s - Calculated steady state flow rates (cm/sec) H1.,2 - Maintained Head of H2O (cm) Kf5 - Calculated field saturated hydraulic conductivity (cm/sec) Om - Matric flux potential (cm/sec) a - Alpha parameter Depth - Depth of well hole (in.) Location - Test location identification number Note: Diameter of well is 3.0 cm. CM N z m Q o �a cc =U U m O to ipzti Aso O U Jvmo a m rn C6 Lf) w�2UO CO— z LL, 0� t= 2 Q= U a. O C� rj) Z ujz0 zip QQzCf) zwzr 0<�Y z0 z LL LU o tr 6LAS7 I5OR05 FOR REGISTRiiTION REGISTER OF DEEDS REBECCR T. CHRISTIAN @ NEW HRNOVER COUNTY NC ECEIVE 2N2 0a 38 D9:46: t4 AM SEP 3 0 20� BIN TROTIS0OWN .N BY: DEED Parcels: R07600-006-014-000; R07600-006-012-000; R07600-006-013-000; R075004004-003-000; R07600-006-010-000; R07600-006-008-001; R07500-001-001-000; R07500-004-004-OW Revenue Stamps STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER THIS DEED, made and entered into this the 4th day of September, 2002, by and between ARNOLD L. SOBOL and wife, FLORENCE S. SOBOL, ELLEN SOBOL STEIN and husband, ALVIN L. STEIN, WARREN M. SOBOL and wife, MARLENE GANZ SOBOL and TODD L. SOBOL and wife, JODY GLASSER SOBOL, parties of the fast part; and AFTEW PROPERTIES, LLC, a North Carolina limited liability company, having an address of 2020 S. Churchill Drive, Wilmington, NC 28403, party of the second part; WITNESSETH: That the parties of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said parties paid by the party of the second part, the receipt of which hereby is acknowledged, have bargained and sold and by these presents do bargain, sell and convey unto the party of the second part, said party's successors and assigns, the following described property, to wit: a-reparea by Ward and Smith, :�. ° ., 1001 College Court, New Bern, NC 28562. RETURNED To No opinion on title is rendered b and and Smith, P.A. without a separate written opinion on title from Ward and Smith, P.A. All those certain tracts or parcels of land lying and being situate in New Hanover County, North Carolina, and being more particularly described on Exhibit A attached hereto and incorporated herein by reference. TO HAVE AND TO HOLD said property and all privileges and appurtenances thereunto belonging to the party of the second part, said parry's successors and assigns forever. Arnold L. Sobol and Florence S. Sobol covenant that they are seized of Tract 3, Tract 4, Tract 8, Tract 9, Tract 10 and Tract 11 as described above in fee and have the right to convey same in fee simple, that same are free from encumbrances except any encumbrances or restrictions mentioned above and that said parties will warrant and defend the title to same against the lawful claims of all persons whomsoever. Arnold L. Sobol and Florence S. Sobol covenant that they are seized of an eighty- five percent (85%) undivided interest in Tract 1, Tract 2, Tract 5, Tract 6, Tract 7 and Tract 12 as described above in fee, and have the right to convey said undivided interest in fee simple; that said undivided interest is free from encumbrances except any encumbrances or restrictions mentioned above and that said parties will warrant and defend the title to said undivided interest against the lawful claims of all persons whomsoever. Each of Ellen Sobol Stein, Warren M. Sobol and Todd L. Sobol covenant that they are seized of an undivided one-third (1/3) interest in an undivided fifteen percent (15%) interest in Tract 1, Tract 2, Tract 5, Tract 6, Tract 7 and Tract 12 as described above in fee, that they have the right to convey their undivided one-third (1/3) interest in an undivided fifteen percent (151%) interest in fee simple; that their undivided one-third (1/3) interest in an undivided fifteen percent (15%) interest is free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to their individual 2 undivided one-third (1/3) interest in an undivided fifteen percent (15%) interest against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the parties of the first part have set said parties' hands hereto and have adopted as said parties' seals the typewritten word "SEAL" appearing beside said parties' names, this the day and year first above written. (Signatures appear on the following pages) 3 Wi� � w� . _ 109, . • • L. Sobol "T SEAL Florence S. Sobol STATE OF CAROLINA COUNTY OF (( j I, Y *Sy ft4m a Notary Public in and for said County and State, do hereby certify that ARNOLD L. SOBOL and wife, FLORENCE S. SOBOL personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and notarial seal, this the 42x_ day of C61LO. 2002. My Commission Expires: Notary seal or stamp must appear within above box. UIC/ > J- (SEAL) Ellen Sobol Ste' c;� (SEAL) Alvin L. STATE OF COUNTY OF aX..71 j./!�(�.e.t.i-•. I, k4 a Notary Public in and for said County and State, do hereby certify t ELLEN SOBOL STEIN and husband, ALVIN L. STEIN personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and notarial seal, this the y& day of Le, 2002. 9 No blic My Commission Expires: _ MARY C. COFFMAN. Notary Pubrfe � En and For the State of Ohio My Notary seal or stamp must appear within above box. Cj�k�� M (SEAT,) Warren M. Sobol nwL.— b U4(SEAL) Marlene Ganz Sobol STATE OF 4��L COUNTY OF I, a Notary Public in and for said County and State, do hereby certify that W. MN M. SOBOL and wife, MARLENE GANZ SOBOL personally appeared before me this day airdacknowledged the due execution of the foregoing instrument. WITNESS my hand and notarial seal, this the day of 2002. Notary Pu h Tx-vcbarn M Z-mmermon My Commission Expires: ;ar within above box. 6 /40, &/ (SEAL) Todd L. Sobol -&W(S ) Jody ias obol STATE OF COUNTY OF L - �-�' YAW _ a Notary Public in and for said County and State, do hereby certify that TODD L. SOBOL and wife, JODY GLASSER SOBOL personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and notarial seal, this the Vr*, day of 2002. My Commission Expires: LBA A. KETTLER OHIO W COMMISSION WIRES O4-08-06 p iO ' "'44 Notary Public Notary seal or stamp must appear within above box. 7 STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER The foregoing certificates of Notaries Public of said Count[ylies], and State[s], are certified to be correct. This instrument was presented for registration this day and hour and duly recorded in the office of the Register of Deeds of New Hanover County, North Carolina, in Book , Page This day of , 2002, at o'clock M. 020365-0001 NBMAFW01083. l 8 Register of Deeds Exhibit A 1. Parcel R07600-006-014-000 TRACT 1 (Deeds recorded in Book 843, Page 554, Book 843, Page 88, Book 843, Page 552, Book 844, Page 588 and Book 842, Page 557) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in those certain deeds dated October 8, 1968 from Lorean (also known as Lorena) McDonald Nixon, widow, to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 843, Page 554; deed dated October 8, 1968 from George McDonald and wife, Louise McDonald to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 843, Page 88; deed dated October 14, 1968 from Eliza Pearl McDonald, single, to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 843, Page 552; deed dated October 8, 1968 from Elisha (also known as Elijah) McDonald and wife, Augusta McDonald to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 844, Page 588; and deed dated October 4, 1968 from Harry McDonald and wife, Olivia McDonald to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 842, Page 557, all in the office of the Register of Deeds of New Hanover County, the legal descriptions of the property therein conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. Each of the above referenced deeds conveys a one -fifth (115) undivided interest in the property therein described as follows: BEING all of Tract 5 of the J.H. McDonald Division, as the same is shown on a map of said division recorded in Book 285, at Page 3041/2, of the New Hanover County Registry, EXCEPTING HOWEVER, that tract heretofore sold to Horace McDonald by deed recorded in Book 638, at Page 316, of said Registry. The conveyance of this Tract I is made subject to a life estate reserved by Lorean (also known as Lorena) McDonald Nixon, in the deed recorded in Book 843, Page 554, in and to the following described tract; BEGINNING at the Southeastern corner of a tract of land conveyed to Horace McDonald by deed recorded in Book 638, at Page 316, of the New Hanover County Registry, and running thence along said Horace McDonald's Southern line North 77' West 200 feet to his Southwestern corner; thence South 13' West 50 feet to a point; thence South 77' East 200 feet to a point, thence North 13° East 50 feet to the point of beginning. The conveyance of this Tract 1 is further made subject to a life estate reserved by George McDonald, one of the parties of the first part in the deed recorded in Book 843, Page 88, in and to the following described tract: BEGINNING at the Northeastern comer of that tract of land conveyed to Horace McDonald by deed recorded in Book 638, at Page 316, of the New Hanover County Registry, and running thence with said Horace McDonald's northern line North 77° West 200 feet to Horace McDonald's northwestern corner; thence North 13' East 50 feet; thence South 77° East 100 feet; thence South 131 West 50 feet to the point of Beginning. This conveyance of Tract 1 is further made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 2. Parcel R07600-006-012-OW TRACT 2 (Deed Book 832, Page 860) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in that certain deed dated May 15, 1968 from A. Duncan McDonald, widower, to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 832, Page 860, in the office of the Register of Deeds of New Hanover County, the legal description of the property therein conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. That deed describes the property therein conveyed as follows: 2 ALL of Lot four (4) of the J.H. Mc Donald Land, as shown on a map recorded in Book 285, at Page 3041/2 of the New Hanover County Registry. EXCEPTING, THEREFROM, the following described property; 13EGINNING at a granite stone marked "McD" in the western line of the River Road, also being designated as State Road 1100 (50.0 feet from its centerline) said stone also being in the dividing line of tracts 3 and 4 of the division of the J.H. McDonald land as shown on a map as recorded in Record Book 285 at Page 304 1/2 of the New Hanover County Registry, said stone also being located the following courses and distances from the intersection of the centerline of said River Road with the southern edge of the concrete bridge through which flow the water of Motts Creek as measured along the centerline of said River Road to the dividing line of the aforesaid tracts 3 and 4 of the J.H. McDonald division, south 41 degrees, 05 minutes east 252.2 feet to a railroad spike and the beginning of a curve to the right of said River Road, continuing thence with said centerline (as measured along the chords of said curve) south 40 degrees, 20 minutes east 100.0 feet; south 35 degrees, 53 minutes east 100.0 feet; south 28 degrees 10 minutes east 100.0 feet and south 22 degrees, 13 minutes east 97.15 feet to a railroad spike in the aforementioned dividing line of tracts 3 and 4; running thence with said dividing line south 75 degrees, 50 minutes west 50.17 feet to said beginning point; running thence from said beginning point and along the curve to the right to a point in said curve, said point being north 30 degrees, 08 minutes west 222.06 feet from the preceding point as measured along the chord of said curve; running thence parallel to the dividing lines of tracts 3 and 4 of the aforementioned J.H. McDonald division south 75 degrees, 50 minutes west 728 feet to an iron pipe; continuing thence same course south 75 degrees, 30 minutes west 60 feet, more or less, to the run of Motts Creek; running thence in a generally southwesterly direction down the run of Motts Creek 625 feet, more or less, to a point in the dividing line of the aforesaid tracts 3 and 4 of the McDonald division; running thence with said dividing line north 75 degrees 50 minutes east 50 feet, more or less, to a cypress stake in the said Iine; continuing thence with said dividing line north 75 degrees 50 minutes east 1,254 feet, more or less, to the point of beginning, containing 4.35 acres, more or less and being the southerly 213.5 feet of tract #4 of the J.H. McDonald division lying west of the aforementioned River Road (State Road 1100). (This description furnished by George Losak, R.L.S.) This conveyance of Tract 2 is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use 3 ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 3. Parcel R07600-006-013-000 TRACT 3 (Deed Book 1001, Page 780) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in that certain deed dated April 18, 1974 from Rosa Bell Futch, widow, to Arnold L. SoboI and wife, Florence S. Sobol, recorded in Book 1001, Page 780, in the office of the Register of Deeds of New Hanover County, the legal description of the property therein conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. That deed describes the property therein conveyed as follows: BEGINNING at an iron pipe in the eastern line of Lot No. 5 of the J.H. McDonald land, a map of which is recorded in Book 285 at Page 304Y2 of the New Hanover County Registry; said pipe bearing south 13 degrees west 250 feet from the Northeast corner of Lot No. 5 (as described in a deed in Book 224 at Page 457 in the New Hanover County Registry) said pipe being in the western line of a 40-foot avenue; from the above -described beginning point runs with the eastern line of said Lot no. 5 south 13 degrees west 100 feet to a pipe; thence north 77 degrees west 200 feet to a pipe; thence north 13 degrees east 100 feet to a pipe; thence south 77 degrees east 200 feet to the point of beginning, as surveyed August 11, 1960; the above described parcel of land being a part of Lot No. 5 as referred to above. This conveyance of Tract 3 is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, 4 lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 4. Parcel R07600-006-012-000 TRACT 4 (Deed Book 849, Page 587) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in that certain deed dated January 25, 1969 from Irene McDonald Sampson and husband, Willie Sampson to Arnold L. SoboI and wife, Florence S. SoboI, recorded in Book 849, Page 587, in the office of the Register of Deeds of New Hanover County, the legal description of the property therein conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. That deed describes the property therein conveyed as follows: BEING all of Tract 6 of the J.H. McDonald Division, as the same is shown on a map of said division recorded in Book 285 at Page 304 1/2, of the New Hanover County Registry. It being the intention of this Deed to convey all of the interest owned by parties of the first part as heirs of Levy and Clarence McDonald, including any rights -of -way or interest therein as well as any fee simple interest. This conveyance of Tract 4 is made subject to casements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 5 5. Parcel R07600-006-012-000 TRACT 5 (Deeds recorded in Book 924, Page 587 and Book 924, Page 590) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in those certain deeds dated November 4, 1971 from Ben Bordeaux, husband of Hazel McDonald Bordeaux, Ida Belle McDonald, and Wanda McDonald, wife of Adolph McDonald, to Arnold L. Sobol and wife, FIorence S. Sobol, recorded in Book 924, Page 587; and deed dated July 21, 1971 from Harlee McDonald and wife, Lucille McDonald, Adolph McDonald, James McDonald and wife, Elizabeth McDonald, Elijah Leonard and wife, Lillie Leonard, Walter Brown and wife, Rosa Brown, Laura McDonald, widow, Henry McDonald and wife, 011ie McDonald and Came M. Canty to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 924, Page 590, in the office of the Register of Deeds of New Hanover County, the legal description of the property conveyed in said deeds being incorporated herein by reference for a more perfect description of the property herein conveyed. The above referenced deeds describe the property therein conveyed as follows: BEGINNING at the northwest corner of a tract of land conveyed to Harlee B. McDonald by deed recorded in Book 763, at Page 50 of the New Hanover County Registry, said beginning point also being in the northern line of Tract 6 of the J.H. McDonald Division as the same is shown on a map of said division recorded in Book 285, at Page 304-1/2 of the New Hanover County Registry; and running thence from said Beginning point South 23 deg. 50 min. West 705.13 feet to an iron pipe; thence South 80 deg. 56 min. West 1605.0 feet to an iron pipe in the run of Molts Creek; thence Northeastwardly along the run of Motts Creek to an iron rod, the northwest corner of Tract 6 of the J.H. McDonald Division according to the map above referred to; thence North 82 deg. 01 min. East along the northern line of said Tract 6 above referred to 1218.70 feet to the point of Beginning; containing 19.7 acres. 6 This conveyance of Tract 5 is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and Iand use ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 6. Parcel R076004006-012-001 TRACT 6 (Deed Book 842, Page 697) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in that certain deed dated August 19, 1968 from Eleanor A. Reaves, single, to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 842, Page 697, in the office of the Register of Deeds of New Hanover County, the legal description of the property therein conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. That deed describes the property therein conveyed as follows: BEGINNING at an iron pipe in the western right of way line of U.S. Highway #421 (80.0 feet from its centerline), said pipe being located North 630 39' West 50.07 feet from a railroad spike in the centerline of the southbound lane of said highway, said spike being located North 29° 29' East 1,151.35 feet from the intersection of the centerline of said southbound lane with the centerline of a concrete culvert under said lane, said concrete culvert being located northwardly 0.25 miles from the intersection of said lane with the centerline of State Road #1187, said iron pipe also being in the southern line of a 30 acre tract conveyed by W.H. McMillan to Thomas Whitfield by deed duly recorded on the 1 Ith day of November, 1902, at Page 4, in Book 35, of the New Hanover County Registry; running thence from said beginning point and with the southern line of said Thomas Whitfield tract, North 63' 39' West 275.8 feet, more or less, to a stone rnarking the southwestern corner of the formerly Thos. Whitfield tract of land, now being the southwestern corner of Maggie W. 7 Nixon tract of land, said stone also being in the formerly J.H. McDonald line; running thence with the formerly J.H. McDonald line, South 13° 19 West 980.25 feet to an iron pipe in the western right of way line of the aforementioned U.S. Highway #421; running thence with said western right of way line, North 29' 29' East 955.9 feet to the point of beginning, containing 3.03 acres, more or less, and being that portion south of the aforementioned Thomas Whitfield lying west of U.S. Highway #421 and east of the aforesaid J.H. McDonald tract of land. This conveyance of Tract 6 is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 7. Parcel R07600-006-012-000 TRACT 7 (Deed Book 1146, Page 1447) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in that certain deed dated March 12, 1979 from Equestrian Estates, Ltd. to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 1146, Page 1447, in the office of the Register of Deeds of New Hanover County, the legal description of the property therein conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. That deed describes the property therein conveyed as follows: BEGINNING at a railroad spike in the center line of the River Road (S.R. 1100) at the intersection of the dividing Iine between Tracts 3&4 of the Division of the J.H. McDonald Tract as shown on a map recorded in Bk. 285, Pg. 304, 1/2 of the New Hanover County Registry said railroad spike in the center line of said River Road being located 890.7 feet southwardly from the center line of a concrete bridge through which flows 8 the waters of Mott's Creek, said bridge being located about 5.3 miles southwardly from Shipyard Blvd. as measured along the River Road, RUNNING THENCE, from said beginning point and with the dividing line between Tracts 3&4 of said McDonald Division, south 78 degrees, 30 minutes west, 1360.71 feet to an iron pipe in Mott's Creek, RUNNING THENCE with the eastern line of the now or formerly Saunders Tract, South 31 degrees, 20 minutes East 722.1 feet to an old iron pipe, the southwestern corner of Tract 3 of the aforesaid McDonald Division, running thence with the dividing line between said Tracts 3&2, North 76 degrees, 21 minutes east; 2405.46 feet to an iron pipe in the dividing line between Tracts 2&3 of the aforesaid McDonald Division; RUNNING THENCE, North 13 degrees, 43 minutes, 30 seconds West, 589.01 feet to an iron pipe in the dividing line between Tracts 3&4 of the aforesaid McDonald Division; RUNNING THENCE, South 78 degrees, 30 Minutes West, 1265.02 feet to a railroad spike in center line of River Road, the point and place of beginning; said tract containing 35.141 acres exclusive of the right-of-way of said River Road; said tract of land being of portion of tract of Iand heretofore conveyed to the grantor herein by RICHARD A. SHEW AND wife, IDALORA W. SHEW, by deed recorded in Bk. 1049 at Pg. 380 in the office of Register of Deeds of New Hanover County, North Carolina. TOGETHER with a perpetual right-of-way and easement for ingress, egress and regress, over a stripe of land sixty (60) feet wide from the western end of Grand Champion Road, to the eastern end of the tract of land hereinafore described, said stripe of land to be at the location designated and selected by the Grantor herein whether said Grand Champion Road is extended by the Grantor, or the Grantee herein, or their assigns, Grand Champion Road is presently shown on plat recorded in map, Book 18 at Page 66 in the office of the Register of Deeds of New Hanover County, North Carolina. This conveyance of Tract a is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, rJ lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 8. Parcel R07500-004-003-000 and R07600-006-010-000 TRACT 8 (Deed Book 1613, Page 1354) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in that certain deed dated July 21, 1992 from Harvey H. Shiflet and wife, Mary Virginia Shiflet to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 1613, Page 1354, in the office of the Register of Deeds of New Hanover County, the legal description of the property therein conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. That deed describes the property therein conveyed as follows: Tract I BEGINNING at an old iron pipe in the dividing line between Lots 1 and 2 of the Division of the J.H. McDonald Land as shown on a map prepared by E. J. Anders, C.E. and duly recorded in Book 285 at Page 304-1/2, said pipe being South 81 deg. 54 min. West 394.45 feet from the point of intersection of said dividing line with the western right of way line of U. S. Highway 421 (160-foot right of way); running thence from said point of beginning and with and along said dividing line South 81 deg. 54 min. West a distance of 2314.3 feet to a concrete monument; thence continuing with said dividing line South 69 deg. 28 min. 30 sec. West 954.87 feet to an old pipe where said dividing line intersects the northern line of S. R.1187 (100-foot right of way); running thence with and along the northern right of way line of S. R.1187, South 84 deg. 06 min. West 716.07 feet to a right of way monument; thence continuing with and along said northern right of way line South 79 deg. 31 min. West a chord distance of 626.13 feet; thence continuing with said right of way line 10 South 74 deg. 25 nun. West, a chord distance of 78.71 feet to another pipe at the intersection of the Northern right of way line of S. R.1187 (100-foot right of way) and the Southeastern right. of way line of River Road (S. R.1100) (100-foot right of way); running thence with and along the southeastern right of way line of S. R. 1100, North 41 deg. 47 min. East, a chord distance of 98.38 feet; thence continuing with and along said right of way fine North 28 deg. 29 min. East a chord distance of 640.03 feet to a concrete monument marking the intersection of the dividing line between Tracts 2 and 3 of the J.H. McDonald Division, with the eastern right of way line of River Road (S. R. 1100); thence with and along the dividing line between Tracts 2 and 3 of the J.H. McDonald Division North 76 deg. 24 min. East 2259.37 feet to an old pipe; thence continuing with said dividing line North 84 deg. 55 min. 30 sec. East 2211.1 feet to an old pipe in said line; thence leaving said line and running with the western property line of E.E. Dees, South 08 deg. 14 min. East 151.30 feet to an old pipe; thence continuing with Dees' western line South 30 deg. 32 min. West 291.49 feet to a new pipe; thence continuing with said line South 30 deg. 32 min. West 76.81 feet to an old pipe in said line; thence continuing with said line South 30 deg. 32 min. West 30.30 feet to an old pipe in the dividing line between Tracts 1 and 2 of the J.H. McDonald Division, the point of BEGINNING, said tract containing 58.56 acres and being shown on a survey for Wilmington Racquet Club Associates by George Losak, R. L. S., dated September 2, 1977 and being the same property conveyed to Lloyds of Norfolk, Ltd., by E.E. Dees, widow, et al, by deed recorded in Book 1000 at Page 48 of the New Hanover County Registry. TOGETHER WITH AN EASEMENT 60-feet in width, running from the above described tract to the western line of U.S. Highway 421 (160-foot right of way), said easement being described as follows: BEGINNING at an old iron pipe in the western property line of E.E. Dees, said pipe being located the following courses and distances from the intersection of the western right of way line of U.S. Highway 421 (160-foot right of way), and the dividing line between Tracts 1 and 2 of the J.H. Medonald Division as shown on map recorded in Book 285 at Page 304-1/2 of the New Hanovef County Registry, South 81 deg. 54 min. West 394.45 feet to an old iron pipe; thence with and along the westem property line of 11 E.E. Dees, North 30 deg. 32 min. East 30.30 feet to another old pipe in said western line, the point of BEGINNING, running thence from said beginning point with and along the western property line of E.E. Dees, North 30 deg. 32 min. East 76.81 feet to a new pipe in said line, running thence north 81 deg. 54 min. East 394.45 feet to a point in the western right of way line of U.S. Highway 421; running thence South 30 deg. 32 min. West with and along the western right of way line of U.S. Highway 421, 76.81 feet; running thence South 81 deg. 54 min. West 394.45 feet to an iron pipe in the western property line of E.E. Dees, the point of BEGINNING. This property is conveyed subject to Easements in favor of Carolina Power & Light Company recorded in Book 1039 at Page 450 and Book 672 at Page s507 and 510, all of the New Hanover County Registry. This property is conveyed subject to an easement in favor of Tidewater Power Company recorded in Book 239 at Page 136 of the New Hanover County Registry. This property is conveyed subject to a sight easement in favor of the N.C. Department of Transportation located at the intersection of Sanders Road and River Road. Tract II Parcel R07600-006-008-001 BEGINNING AT AN OLD IRON PIPE in the western right-of-way line of Carolina Beach Road (U.S. Highway #421) 80.0 feet from the centerline thereof, and in the dividing line between Tracts 1 and 2 of the Division of the J.H. McDonald land as recorded in Book 285 at Page 3041/2 of the New Hanover County Registry; RUNNING THENCE FROM SAID BEGINNING POINT along the dividing line between said Tracts 1 and 2, South 81 degrees 51' West 394.45 feet to an iron pipe, the southeastern corner of the tract conveyed in Deed recorded in Book 1000, Page 48 of the NHC Registry; THENCE along the eastern line of said tract, North 130 degrees 28' East 30.3 feet to an iron pipe; THENCE 12 Parallel with the dividing line between said Tracts 1 and 2, North 81 degrees 51' East 394A5 feet to an iron pipe in the western right-of-way line of aforementioned Carolina Beach Road (80.0 feet from the centerline thereof); THENCE along the western right-of-way line of said Carolina Beach Road, South 30 degrees 28' West 30.3 feet, to the POINT OF BEGINNING. This property comprises approximately 0.2 acres, and is the same property over which an easement was conveyed to Lloyd's of Norfolk, Ltd. by Deed of Easement recorded in Book 1000, Page 50, New Hanover County Registry. This being the same property conveyed to Harvey H. Shiflet and wife, Mary Virginia Shiflet from Elizabeth E. Dees (Unmarried) by Deed dated June 26, 1990 and recorded June 29, 1990 in Book 1502 at Page 0329 of the New Hanover County Registry. This conveyance of Tract 8 is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 9. Parcel R07500-001 -001 -000 TRACT 9 (Deed Book 1619, Page 1202) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in that certain deed dated August 31, 1992 from Elizabeth Elaine Dees, widow, Martha Byers Cathey, widow, to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 1619, Page 1202, in the office of the Register of Deeds of New Hanover County, the legal description of the property therein conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. 13 That deed describes the property therein conveyed as follows: BEGINNING at a point in the northwestern right-of-way line of the River Road (S.R. #1100) where the same is intersected by the northern Iine of Tract 2 of the J.H. McDonald Division, which Division is shown on a map recorded in Book 285 at Page 304-1/2 of the New Hanover County Registry; and running thence from said beginning point along the northern line of said dividing line, South 76 degrees 20 minutes West, 843.4 feet to the northwestern corner of said Tract 2; thence South 31 degrees 18 minutes East, along the western line of said Tract 2 of the J.H. McDonald Division, 569.3 feet to an iron pipe in said northwestern right-of-way line of the River Road; thence along and with the northwestern right-of-way line of the River Road as it curves to the North to the point of Beginning, containing 7 acres, more or less, and being all of said Tract 2 of the John H. McDonald land lying West of said River Road. This conveyance of Tract 9 is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 10. Parcel R075004004-004-000 TRACT 10 (Deeds recorded in Book 1709, Page 280 and Book 1709, Page 283) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: Being all of the property described in those certain deeds dated July 6, 1993 from Joan E. Ryals, divorced, Individually and as Trustee Under Trust dated September 5,1992 to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 1709, Page 280; deed dated July 6, 1993 from Granville A. Ryals and wife, Deloris C. Ryals to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 1709, Page 283, in the office of the Register of Deeds of New Hanover County, the legal description of the property therein 14 conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. Each of the above referenced deeds conveys a one-half (%) undivided interest in the property therein described as follows: BEGINNING at a point in the Southern line of the Arnold Sobol tract# 4, of the J.H. McDonald Land as shown on map recorded in Book 285 at Page 304Vi of the New Hanover County Registry. Said point being located South 88 degrees 15 minutes West 382.17 feet and South 78 degrees 30 minutes West 984.09 feet from the Northwest comer of lot 27, section 1, Equestrian Estates, map of same being recorded in map Book 18 at Page 66 of the New Hanover County Registry. Running thence from said beginning point with a new line South 13 degrees 47 minutes 00 seconds East 580.4 feet to a point in the Northern line of the Hartman -Perkins tract. Running thence with the Hartman -Perkins Northern Pane, South 76 degrees 21 minutes West 245.72 feet to a point, the same being the Southeast comer of the Arnold Sobol tract. Running thence with the Eastern line of the Arnold Sobol tract, North 13 degrees 47 minutes 00 seconds West 589.63 feet to a point in the Southern line of the first mentioned Arnold Sobol tract. Thence with the Arnold Sobol Southern line North 78 degrees 30 minutes East 245.91 feet to the point of beginning. Containing 3.3 acres more or less. This conveyance of Tract 10 is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 11. Parcel R076W-006-010-000 CT 11 (Deed Book 2138, Page 158) All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: 15 Being all of the property described in that certain deed dated January 30, 1997 from Carlotta Sanders, widow, to Arnold L. Sobol and wife, Florence S. Sobol, recorded in Book 2138, Page 158, in the office of the Register of Deeds of New Hanover County, the legal description of the property therein conveyed being incorporated herein by reference for a more perfect description of the property herein conveyed. That deed describes the property therein conveyed as follows: To arrive at the point of beginning commence at a point at the intersection of the westerly right-of-way line of Carolina Beach Road (160 foot right-of-way), also known as U.S. Highway 421 and the northerly right-of- way line of Sanders Road (100 foot right-of-way) also known as S.R. No. 1187. Go thence South 57 degrees 17 minutes 00 seconds West 90.60 feet along the northerly right-of-way line of said Sanders Road to a point, go thence South 84 degrees 04 minutes 00 seconds West 1052.60 feet along the northerly right-of-way of said Sanders Road to a point, go thence South 84 degrees 04 minutes 00 seconds West 162.60 feet along the northerly line of said Sanders Road to a point, go thence South 8 degrees 59 minutes 00 seconds West 1652.06 feet along said northerly right-of-way line to a point, go thence North 6 degrees 01 minute 00 seconds West 118.46 feet to a point in the dividing line between Tract 1 and Tract 2 of the J.H. McDonald Division, the TRUE POINT OF BEGINNING. Running thence from said beginning point: 1. South 06 degrees 01 minute 00 seconds East 118.46 feet to a point in the northerly right-of-way line of said Sanders Road; thence 2. South 83 degrees 59 minutes 00 seconds West 463.04 feet with the northerly right-of-way line of said Sanders Road to a point in the dividing line between Tract 1 and Tract 2 of the J.H. McDonald Division; thence 3. North 69 degrees 38 minutes 00 seconds East 477.95 feet with said dividing line to the point of beginning 16 The above described Tract contains 0.63 acres. The same being a portion of that Tract deeded to Nelson Sanders and wife, Carlotta Sanders by deed recorded in Book 935 at Page 490 of the New Hanover County Registry. This conveyance of Tract 11 is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 12. Parcel R07600-006-012-000 TRACT 12 All that certain tract or parcel of land lying and being situate in Federal Point Township, New Hanover County, North Carolina, and being more particularly described as follows: All right, title and interest of Arnold L. Sobol and wife, Florence S. Sobol in the parcel of land upon which a 40 foot unnamed road previously was located, which road was closed by Order of the New Hanover County Commissioners, said Order being dated September 4, 1990 and recorded in Book 1548, Page 5 in the office of the Register of Deeds of New Hanover County. The aforesaid order is incorporated herein by reference for a more perfect description of the property hereinabove described and conveyed. This conveyance of Tract 12 is made subject to easements of record or on the ground, restrictive covenants of record, the provisions of all applicable zoning and land use ordinances, statutes and regulations, municipal building code restrictions, any liens, lappages or encroachments of record or upon the property and ad valorem taxes for the current year. 020449-0001-001 WLM.a RM7079%1 17 REBECCA T. CHRISTIAN REGISTER OF DEEDS, NEW HANOVER JUDICIAL BUILDING 316 PRINCESS STREET WILMINGTON, NC 28401 *RwRw*wtrfeirrlw*tiiiwR:*irrrwxwwwlieriiw*wlwf*lerrxxxxwxirwr#f*wwr*!*i**!*w*r**w*!**!f!w*wtxwwrifi+ltrRiflww!lrrRlww!* Filed For Reglstration: 10/30/2002 09:46:10 AM Book: RE 3497 Page: 246-270 Document No.: 2002054722 DEED 26 PGS $86.00 Recorder: JACQUELINE NELSON State of North Carolina, County of New Hanover The foregoing certificate of CHRISTINE W SANDERS, MARY C COFFMAN , BARBARA M ZIMMERMAN , LESA A KETTLER Nptfries Ore d�rtlfled to be correct. This 30TH of October 2002 RE E A T. C ISTIIIJ R ISTER OF DEEDS ey: De nt RIAtier of Deeds !R!R*!!R!f!*r#R#RRwf4R*f!*fi!#*iR!lfltrxRlilwirR*!f!f!#r*R#R!R!!k#RiiR!*!* *2002054722* 2OO2Os4722 CA201508904392 SOSED: 0637949 Date Filed: 3/30/201511:45:00 AM is LIMITED LIABILITY COMPANY ANNUAL Elaine F. Marshall North Carolina Secretary of State NAME OF LIMITED LIABILITY COMPANY: Aftew Properties, LLC CA2015 089 04392 SECRETARY OF STATE ID NUMBER: 0637949 STATE OF FORMATION: NC REPORT FOR THE YEAR: 2015 , M - e- , 7,717,3197, 1. NAME OF REGISTERED AGENT: ARNOLD SOBOL 2. SIGNATURE OF THE NEW REGISTERED AGENT: 3. REGISTERED OFFICE STREET ADDRESS & COUNTY 2020 South Churchill Drive Wilmington, NC 28403 New Hanover SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Real Estate. Filing 01fice Use Only ❑ Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 4. REGISTERED OFFICE MAILING ADDRESS . 2020 South Churchill Drive Wilmington, NC 28403 2. PRINCIPAL OFFICE PHONE NUMBER: (910) 763-2629 3. PRINCIPAL OFFICE EMAIL: 4. PRINCIPAL OFFICE STREET ADDRESS & COUNTY 5. PRINCIPAL OFFICE MAILING ADDRESS 2020 South Churchill Drive 2020 South Churchill Drive Wilmington, NC 28403 New Hanover Wilmington, NC 28403 SECTION C: COMEANY OFFICIALS/ORGANIZERS (Enter additional Company Officials/Organizers in Section E.) NAME: Arnold L Sobol TITLE: Manager ADDRESS: 2020 South Churchill Drive Wilmington, NC 28403 NAME: Florence S Sobol NAME: TITLE: Manager TITLE: ADDRESS: ADDRESS: 2020 South Churchill Drive Wilmington, NC 28403 SECTION D: CER ", OF ANNUAL REPORT. Section D must be completed in its entirety by a personibusiness entity. 4"*�440 ' — �4 -1h e SIGNATIJR 9 V DATE Form must be signed by a Company Official/Organizer listed under Section C of this form. Q t Sq CPL- "A - Print or Type Name of Company Official/Organizer TITLty SUBMIT THIS ANNUAL REPORT WITH THE REQUIMIZE J11IG FEE OF S200 MAIL TO: Secretary of State, Corporations Division, Post Office Box 29525. Raleigh, NC 27626-0525