HomeMy WebLinkAboutSW5220101_Plansheet - Notes_20220124TEMPORARY SEDIMENT TRAP DESIGN TABLE SEDIMENT TRAP ID ST-1 DRAINAGE AREA (AC.) 1.52 DISTURBED AREA (AC.) 1.21 FLOW Q10 (CFS) 6.3 BOTTOM ELEVATION (FT) 269.5 SEDIMENT DEPTH (FT) 2.0 FREEBOARD (FROM SEDIMENT DEPTH) 3 DEPTH TO CREST OF RISER (FT) 4 DEPTH TO CREST OF EMERGENCY SPILLWAY N/A (FT) SIDE SLOPES 3.0 H:1V SPILLWAY LENGTH (FT) N/A HEIGHT OF BERM (FT) 5 @ 274.50 TOP OF TRAP LENGTH (FT) 187 TOP OF TRAP WIDTH (FT) 43 STORAGE VOLUME REQUIRED (FT 3) 2178 STORAGE VOLUME PROV'D. (FT 3) 6140 SEDIMENT SURFACE AREA REQ'D (FTZ) 2050 SEDIMENT SURFACE AREA PROV'D (FTZ) 4230 NUMBER OF SKIMMERS 1 SKIMMER SIZE (IN) 2 SKIMMER ORIFICE SIZE (IN) 1 Notes: 1. SIDE SLOPES PERTAIN ONLY FOR THE VERTICAL HEIGHT FROM THE BASE TO THE TOP OF BERM, 2H:1V ABOVE THAT. 2. SEE DETAILS ON SILT FENCE BAFFLE SPACING. Know what's below. Call before you dig. NPDES SELF -INSPECTION PROGRAM: EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITY LARGER THAN ONE (1) ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING. ALL EROSION AND SEDIMENTATION CONTROL MEASURES, INCLUDING, BUT NOT LIMITED TO, SEDIMENTATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDIMENTATION PONDS, ROCK DAMS, TEMPORARY DIVERSIONS, TEMPORARY SLOPE DRAINS, ROCK CHECK DAMS, SEDIMENT FENCE OR BARRIERS, 2 ALL FORMS OF INLET PROTECTION, STORM DRAINAGE FACILITIES, ENERGY DISSIPATERS, AND STABILIZATION 2 METHODS OF OPEN CHANNELS MUST BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY, LANDOWNER, OR THEIR AGENT. OFFSITE SPOIL NOTE: IF AN OFFSITE SOIL SPOIL OR BORROW SITE IS UTILIZED, THEN THE DISTURBED AREA FOR THE SPOIL/BORROW SITE MUST BE INCLUDED IN THE LAND -DISTURBANCE PLAN AND PERMIT UNLESS THE SPOIL/BORROW SITE ALREADY HAS A SEPARATE LAND -DISTURBANCE PERMIT. STAGE 1 SPECIFIC SEQUENCE 1. OBTAIN LAND DISTURBING PERMIT AND PLACARD, AND POST THE PLACARD ON SITE. C2.PERPDE:REQUIREMENTS, A RAIN GAUGE, SELF -INSPECTIONS RECORDS, PERMIT, CERTIFICATE OFRAGD S&E PLAN ARE REQUIRED TO BE MAINTAINED ON SITE AND ACCESSIBLE DURINGCTIOIS RECOMMENDED THAT THESE ITEMS BE PLACED IN A PERMITS BOX AT THE BEGINNING ORANCROJECT. 3. OBTAIN AN APPROVED (STAMPED) S&E CONTROL PLAN AND KEEP IT ON SITE, EITHER IN THE INSPECTION BOX, CONSTRUCTION OFFICE OR WITH THE CONTRACTOR. 4. SCHEDULE A PRE -CONSTRUCTION MEETING WITH THE MUNICIPALITY AND OBTAIN A LAND DISTURBANCE PERMIT. 5. NO TIMBERING OR DEMOLITION OF EXISTING STRUCTURES WILL BE ALLOWED UNTIL PLAN IS APPROVED. 6. MINIMAL CLEARING AND GRUBBING TO INSTALL PERIMETER MEASURES AND CONVEYANCES WILL BE ALLOWED. STAGED STABILIZATION ON BARE SOILS OF SLOPES AND OTHER COMPLETE OR INACTIVE AREAS WILL BE DONE IN ATIMELY MANNER AS OUTLINED UNDER NPDES PERMIT CONDITIONS. 7. INSTALL TREE PROTECTION FENCING ACCORDING TO THE APPROVED EROSION CONTROL PLAN. CALL THE MUNICIPALITY EROSION CONTROL FOR INSPECTION AND OBTAIN PERMIT. 8. INSTALL TEMPORARY CONSTRUCTION FENCE, CONSTRUCTION ENTRANCE, SILT FENCING, SILT FENCE OUTLETS AND INLET PROTECTION AS SHOWN ON APPROVED STAGE 1 EROSION CONTROL PLAN. GRADE ONLY AS NECESSARY TO INSTALL THESE DEVICES. INSTALL SILT FENCE OUTLETS AT LOW POINTS IN THE SILT FENCING AS NEEDED TO PREVENT BLOWOUTS. 9. INSTALL DIVERSION DITCHES/BERMS AND INLET PROTECTION ON EXISTING INLETS AS SHOWN. CONTRACTOR TO DIVERT RUNOFF TO PROPOSED SEDIMENT TRAP. 2 10. ALL DITCHES SHALL BE LINED TO THE TOP OF BANK. 11. CONSTRUCTION FENCING SHALL BE PLACED ALONG LIMITS OF DEMOLITION. CONTRACTOR SHALL PLACE AND PHASE AS NECESSARY. ACCESS POINTS AND LIFE -SAFETY EGRESS SHALL COMPLY WITH OSHA REQUIREMENTS. 12. IF A STOCKPILE IS NECESSARY DUE TO EXCAVATION OF THE SEDIMENT TRAP/BASIN, PLACE A DOUBLE ROW OF SILT FENCE 10 FEET APART. TREES AND GROUNDCOVER MAY BE REMOVED ONLY AS NECESSARY FOR THIS STOCKPILE. IF MATERIAL IS GOING TO BE HAULED OFF -SITE, A SEPARATE EROSION CONTROL PERMIT MUST BE OBTAINED FOR THE DESTINATION OF THE MATERIAL. 13. NOTIFY THE MUNICIPALITY S&E SITE INSPECTOR AFTER MEASURES HAVE BEEN INSTALLED AND PROJECT HAS STARTED. 14. STABILIZE ALL DISTURBED AREAS AND OTHER CRITICAL EROSION CONTROL AREAS IMMEDIATELY UPON INSTALLATION. 15. ONCE APPROVED, BEGIN DEMOLITION OF EXISTING PARKING FIELD AND ASSOCIATED STRUCTURES AS OUTLINES ON THE DEMOLITION PLAN (SHEET C1.01) AND BEGIN GRADING REMAINDER OF THE SITE. MAINTAIN EROSION CONTROL DEVICES AS NEEDED. 0 ►ee 16. ALL CUT OR FILL SLOPES, SOIL PILES, UPSTREAM AND DOWNSTREAM BASIN SLOPES WILL BE COVERED WITH A SUITABLE RECP AFTER SEEDBED PREP, ADDITION OF SOIL AMENDMENTS AND SEEDING. ' 17. ANY BARE SOILS BETWEEN DOWNSTREAM TOE OF BASINS AND/OR DIVERSIONS AND THE PERIMETER MEASURES WILL BE SEEDED AFTER SEEDBED PREP WITH SOIL AMENDMENTS, MULCHED AND TACK. 18. STABILIZE GRADED AREAS AS THEY ARE CLEARED. TEMPORARILY SEED AND MULCH DENUDED AREAS. ONCE FINAL GRADE HAS BEEN ACHIEVED, PAVE OR PERMANENTLY SEED ALL AREAS AND SLOPES. 19. MAINTAIN EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RAIN EVENT THROUGHOUT CONSTRUCTION. 20. NO CRITICAL AREAS ON SITE CONTACT PERSON FOR MAINTENANCE REGGIE BARNACASCEL MOBILE: 919-669-3798 OFFICE: 252-937-6200 X 1350 STAGE 2 SPECIFIC SEQUENCE 1. CONSTRUCT UTILITIES AND INSTALL INLET PROTECTION. CONSTRUCT BUILDING AND PARKING LOT. 2. MAINTAIN EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RAIN EVENT THROUGHOUT CONSTRUCTION. 3. CONTRACTOR SHALL MAINTAIN INLET PROTECTION AROUND ALL CONSTRUCTED INLETS AS SHOWN ON PLANS. 4. STABILIZE GRADED AREAS AS THEY ARE BROUGHT TO FINAL GRADE. TEMPORARILY SEED AND MULCH DENUDED AREAS WITHIN 15 CALENDAR DAYS AFTER ANY PHASE OF GRADING. ONCE FINAL GRADE HAS BEEN ACHIEVED, PLACE COMPACTED STONE SUB GRADE OR PERMANENTLY SEED ALL AREAS AND SLOPES PER NCDENR'S EROSION SEDIMENT CONTROL PLANNING AND DESIGN MANUAL VERSION 5/13, CHAPTER 6.11.6.10 AND 6.11.6.11. SEE DETAIL SHEETS FOR SEEDING SPECIFICATIONS. 5. REQUEST FINAL APPROVAL BY CONSTRUCTION INSPECTOR. 6. PERIMETER MEASURE MUST BE LEFT IN PLACE UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURE AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUND COVER IS NOT ADEQUATE. SEDIMENT BASINS MAY NOT BE REMOVED OR CONVERTED TO PERMANENT SCMS UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. 7. UPON APPROVAL OF PERMANENT STABILIZATION BY EROSION CONTROL INSPECTOR, REMOVE REMAINDER OF EROSION CONTROL MEASURES, GRADE AND STABILIZE AND PAVE REMAINDER OF SITE. CONVERT SEDIMENT BASIN INTO PERMANENT SEDIMENT CONTROL MEASURE AS LAID OUT IN SECTION 16 OF EROSION CONTROL NOTES. 8. WHEN PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. 9. NO CRITICAL AREAS ON SITE CONTACT PERSON FOR MAINTENANCE REGGIE BARNACASCEL MOBILE: 919-669-3798 OFFICE: 252-937-6200 X 1350 CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811 ". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. EROSION CONTROL NOTES: 1. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PER THE STANDARDS AND SPECIFICATIONS OF THE MOST RECENT VERSION OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2. CONTRACTOR SHALL NOTIFY THE DEMLR RALEIGH REGIONAL OFFICE (919. 791. 4200) AT LEAST 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY. 3. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES (INCLUDING TIMBERING AND DEMOLITION) OCCUR. 4. APPROVAL OF THIS PLAN BY NCDEQ DOES NOT ABSOLVE THE OWNER/OPERATOR FROM OBTAINING PERMITS FROM OTHER AGENCIES. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION CONTROL DEVICES FOR THE DURATION OF THE PROJECT. ALL EROSION CONTROL DEVICES SHALL BE CHECKED DAILY TO ENSURE THAT ALL ARE PROPERLY IN PLACE AND FUNCTIONING AS PLANNED. ALL EROSION CONTROL DEVICES WILL BE REPAIRED (CLEANED) AS NECESSARY, AND WITHIN 48 HOURS FOLLOWING ANY RUNOFF PRODUCING STORM EVENT. 6. SELF -INSPECTIONS FOR EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PREFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT GREATER THAN ONE INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. 7. CONTRACTOR SHALL SEED AND STABILIZE ALL STEEP SLOPES (STEEPER THAN 3HAV OR GREATER THAN 50 FT IN LENGTH) WITHIN 7 DAYS, 14 DAYS FOR MODERATE SLOPES (3H:1V OR FLATTER) . 8. FOR ANY LAND -DISTURBING ACTIVITY WHERE GRADING ACTIVITIES HAVE BEEN COMPLETED, TEMPORARY OR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION SHALL BE PROVIDED AS SOON AS PRACTICAL, BUT IN NO CASE LATER THAN SEVEN (7) DAYS AFTER COMPLETING THE WORK. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE ON THE PLAN. 9. NO DEBRIS SHALL BE TRACKED ONTO PUBLIC RIGHT OF WAY. IF THE SITUATION OCCURS WHERE MUD, ROCK AND DEBRIS IS TRACKED ONTO PAVEMENT, THE CONTRACTOR SHALL CLEAN THE PAVEMENT AND INSTALL ADDITIONAL MEASURES TO PREVENT THE FUTURE OCCURRENCE. 10. ALL DISTURBED AREAS NOT RECEIVING OTHER PROPOSED IMPROVEMENTS TO RECEIVE TEMPORARY SEEDING, PERMANENT SEEDING AND MULCH. ALL SLOPES OF 2:1 OR GREATER MUST RECEIVE BLANKET AND MATTING IN ADDITION TO SEEDING AND MULCHING PRACTICES AS STATED IN THE MOST RECENT VERSION OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 11. CONTRACTOR TO TEMPORARY SEED & MULCH DIVERSIONS IMMEDIATELY FOLLOWING CONSTRUCTION. 12. CONTRACTOR TO BE RESPONSIBLE FOR REROUTING ALL TEMPORARY DIVERSIONS AND SILT FENCE AS NECESSARY DURING CONSTRUCTION TO MAINTAIN PROPER DRAINAGE OF DISTURBED AREAS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL ADDITIONAL E&S MEASURES OR MAINTENANCE REQUESTS OR REROUTING, OR RELOCATING, E&S MEASURES AS DEEMED NECESSARY BY THE LOCAL AUTHORITY OR LATEST EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 13. ALL FILL AREAS TO BE STRIPPED OF UNSUITABLE MATERIAL BEFORE PLACING AND COMPACTING FILL MATERIAL. 14. CONTRACTOR SHALL CONTACT ENGINEER IF ADDITIONAL CONSTRUCTION ENTRANCE MEASURES ARE NEEDED TO PREVENT THE TRACKING OF MUD, DIRT, OR DEBRIS ONTO ANY PAVED SURFACES INSIDE OR OUTSIDE OF THE PROPOSED CONSTRUCTION LIMITS. 15. UPON COMMENCEMENT OF DEMOLITION ACTIVITIES THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND SUPPLYING THE NECESSARY SAMPLES AND RESULTS TO DETERMINE FERTILIZER AND NUTRIENT APPLICATION FOR THE ESTABLISHMENT OF GRASS IN THE SITE. i v v v v v v v v v v v v v v v v v � 16. DURING THE INITIAL STAGES OF CONSTRUCTION, THE STORMWATER CONTROL MEASURE MAYBE USED AS A SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. IF SO, THE CONTRACTOR SHALL FOLLOW THE GENERAL CONSTRUCTION SEQUENCE BELOW: A. THE CONTRACTOR SHALL CONSTRUCT THE ENTIRE FACILITY (PERMANENT OUTLET STRUCTURE, DAM, ETC.) WITH THE EXCEPTION OF THE INTERIOR FINE GRADING FOR THE FACILITY. THE INTERIOR FINE GRADING WILL BE CONSTRUCTED ONCE THE EROSION CONTROL PHASE IS COMPLETE. B. THE TEMPORARY DRAW DOWN RISER (OR SKIMMER) SHALL BE CONNECTED TO THE PERMANENT 6"0 DIP DRAIN PIPE. C. ONCE THE UPSTREAM DRAINAGE AREA IS STABILIZED AND THE EROSION CONTROL INSPECTOR APPROVES THE REMOVAL OF THE SEDIMENT BASIN, THE CONTRACTOR SHALL REMOVE THE TEMPORARY DRAW DOWN RISER (OR SKIMMER) AND CLEAN OUT THE BASIN. ALL SEDIMENT, TRASH, ETC. SHALL BE DISPOSED OF PROPERLY (I.E. - PLACED IN A LANDFILL) AND NOT STOCKPILED IN AN AREA WHERE WATER QUALITY COULD BE ADVERSELY AFFECTED. D. IT IS ANTICIPATED THAT DEWATERING WILL BE NECESSARY FOR CLEANING OUT THE BASIN AND PROPOSED INTERIOR GRADING. THEREFORE, THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE, AND MAINTAIN ANY PUMPING EQUIPMENT, ETC. NEEDED FOR REMOVAL OF WATER FROM VARIOUS PARTS OF THE STORMWATER CONTROL MEASURE SITE. THE CONTRACTOR SHALL KEEP THE WATER LEVEL BELOW THE BOTTOM OF THE EXCAVATION / CONSTRUCTION AREAS. THE MANNER IN WHICH THE WATER IS REMOVED SHALL BE SUCH THAT THE EXCAVATION BOTTOM AND SIDE SLOPES ARE STABLE, WITH NO SEDIMENT DISCHARGED FROM THE SITE (I.E. PUMPED WATER SHALL BE DIRECTED TO AN APPROVED EROSION CONTROL DEVICE SUCH AS A SEDIMENT FILTER BAG (ACF ENVIRONMENTAL), OR ENGINEER APPROVED EQUIVALENT, PRIOR TO DISCHARGE). E. ALL DEWATERING DURING THE CONVERSION SHALL BE DONE THROUGH THE USE OF A SEDIMENT FILTER BAG WITH A FLOATING INTAKE THAT IS CONTINUOUSLY MONITORED DURING OPERATION. F. ONCE THE BASIN IS CLEANED AND PUMPED OUT, AND ALL EROSION CONTROL DEVICES REMOVED, THE CONTRACTOR SHALL CONSTRUCT THE INTERIOR GRADING SHOWN ON THIS SHEET. G.ONCE THE GRADING IS COMPLETE, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION AND AN AS -BUILT SURVEY PRIOR TO INSTALLATION OF THE STORMWATER CONTROL MEASURE PLANTS. IF THE CONTRACTOR PLANTS THE PROPOSED VEGETATION PRIOR TO AN AS -BUILT SURVEY (AND SUBSEQUENT APPROVAL), ANY CHANGES TO THE GRADING / RE -PLANTING OF PLANTS WILL BE AT THE CONTRACTOR'S EXPENSE. H. ONCE THE ENGINEER HAS APPROVED THE AS -BUILT GRADING, THE CONTRACTOR SHALL PLANT THE PROPOSED STORMWATER CONTROL MEASURE PLANTS SHOWN ON THE LANDSCAPE PLAN FOR THE FACILITY. AFTER COMPLETION OF THE PLANTING, THE LANDSCAPE CONTRACTOR SHALL PROVIDE A LETTER TO THE ENGINEER CERTIFYING THAT THE PLANTS HAVE BEEN INSTALLED PER THE APPROVED STORMWATER CONTROL MEASURE PLANTING PLAN. TEMPORARY SEEDING SCHEDULE SEEDING DATE SEEDING MIXTURE APPLICATION RATE JAN 1 - MAY 1 RYE (GRAIN) 120 LBS/AC KOBE LESPEDEZA 50 LBS/AC MAY 1 - AUG 15 GERMAN MILLET 40 LBS/AC AUG 15 - DEC 30 RYE (GRAIN) 120 LBS/AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 4,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER (FROM AUG 15 - DEC 30, INCREASE 10-10-10 FERTILIZER TO 1000 LB/AC). �2 MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. WHEN ASPHALT TACKING IS UTILIZED, IT SHALL BE DISPERSED AT A RATE OF 400 GALLONS PER ACRE. ZL JAN 1 - AUG 15: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 - DEC 30: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB/AC OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. PERMANENT SEEDING SCHEDULE SEEDING DATE SEEDING MIXTURE APPLICATION RATE AUG 25 - OCT (BEST) TALL FESCUE 200 LBS/AC RYE (GRAIN) 50 LBS/AC GERMAN MILLET 50 LBS/AC FEB -APR 15 (POSSIBLE) TALL FESCUE 200 LBS/AC RYE (GRAIN) 50 LBS/AC GERMAN MILLET 50 LBS/AC SOILAMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 4,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 1000 LB/AC 10-10-10 FERTILIZER. MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. WHEN ASPHALT TACK IS UTILITIES, IT SHALL BE DISPERSED AT A RATE OF 400 GALLONS PER ACRE. MAINTENANCE INSPECT AND REPAIR MULCH FREQUENTLY. REFERTILIZE IN LATE WINTER OF THE FOLLOWING YEAR; USE SOIL TESTS OR APPLY 150 LB/AC 10-10-10 FERTLIZER. MOW REGULARLY TO A HEIGHT OF 2-4 INCHES. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. SEEDBED PREPARATION AREAS TO BE SEEDED TO BE SCARIFIED 4" DEEP. A FIRM, WELL PULVERIZED, UNIFORM SEEDBED SHOULD BE PROVIDED. FERTILIZER SHALL BE PLACED DURING SCARIFICATION AS FOLLOWS: LIME: 45 LBS/ 1,000 SF PHOSPHOROUS: 20 LBS / 1,000 SF FERTILIZER: 17 LBS / 1,000 SF GROUND STABILIZATION SITE AREA DESCRIPTION STABILIZATION STABILIZATION TIME TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND 7 DAYS NONE SLOPES HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE IF SLOPES ARE 10' OR LESS SLOPES STEEPER THAN IN LENGTH AND ARE NOT 7 DAYS 3:1 STEEPER THAN 2:1, 14 DAYS ARE ALLOWED 7-DAYS FOR SLOPES SLOPES 3:1 OR FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH NONE (EXCEPT FOR SLOPES FLATTER THAN 14 DAYS PERIMETERS AND HOW 4:1 ZONES) BUILDING WASTES HANDLING • NO PAINT OR LIQUID WASTES IN STREAM OR STORM DRAINS • DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION AND OTHER WASTES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. • EARTHEN -MATERIAL STOCKPILES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. • CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATER, WETLANDS, OR BUFFERS. 'J D A MS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT BODDIE-NOELL ENTERPRISES, INC. P.O. BOX 1908 ROCKY MOUNT, NC 27802 Contact PHONE: 252. 937. 2800 W W J Q W W - z am_ az Z z aom J M W LLI W o?S 0 O N a %%%'111►111j",1, SEAL Ray Watson Jan 20 2022 8:46 AM REVISIONS NO. DATE 1 12. 17. 2021 OWNER COMMENTS 2 1. 20. 2022 NCDEQ RESUBMISSION #1 3 4 5 6 PLAN INFORMATION PROJECT NO. 2021110321 FILENAME 2021110321-ECN1 CHECKED BY RW DRAWN BY WHM SCALE N/A DATE 12. 20. 2022 SHEET EROSION CONTROL NOTES C6e00 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION