Loading...
HomeMy WebLinkAboutSW3211201_Supplement-EZ Form_20220121SUPPLEMENT-EZ COVER PAGE FORMSLCADFD PROJECT INFORMATION 1 Project Name Hamby Place 2 Project Area ac 43.82 3 Coastal Wetland Area ac 0 4 Surface Water Area (ac)0 5 Is this pfomect High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 100 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? NIA 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 1 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 Storm Filter 24 Silva Cell 25 Ba filter 26 FOterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Chris Bridges, P.E. 28 Organization: R. Joe Harris & Associates 29 Street address: 1186 Stonecrest Blvd. 30 City, State, Zip: Te a Ca , SC 29708 31 Phone number(s)7 803 802-1799 32 Email: cbridges@rjoeharris.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the nest of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. x O rr rr - R C OF5ss104, SEAL C-4168 z z 011Y I M I I f 1r11/1/ H CARC�%,,�� \:0 c)F ESS/0. SEAL z = 'C)Ln 043341 �z ;Par nnrrrulinitu��� Signs ure of Designer 1/2I/2-L, Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density,areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMSLOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond 5 Total drainage area (sq ft 1,908.799 811,523 6 Onsite drainage area (sq ft 1,908.799 811,523 7 Offsite drainage area (sq ft NIA 0 8 Total BUA in project (sq ft 314339 sf 304045 sf 9permitting) New BUA on subdivided lots (subject to s ft 174650 sf 168106 sf 10permitting) New BUA not on subdivided lots (subject to s 139689 sf 135939 sf 11 Offsite BUA (sq ft NIA NIA 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft 0 sf 0 sf Sidcwalk (sq ft 31875 sf 29775 sf Roof (sq ft 0 sf 0 sf Roadwa (sq ft 105686 sf 104036 sf Future (sq ft 0 sf 0 sf Other, please specify in the comment box below (sq ft 2128 sf 2128 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 0 sf 0 sf 14 New infiltrating permeable pavement not on subdivided lots (sq ft 0 sf 0 sf 15 Existing BUA that will remain (not subject to permitting)s ft 0 sf 0 sf 16 Existing BUA that is already permitted (sq ft 0 sf 0 sf 17 Existing BUA that will be removed (sq ft 44,896 sf 35,087 sf 18 Percent BUA 16.47% 37.47% 19 Design storm inches 5.25 in 20 Design volume of SCM cu ft 81757 cf 21 Calculation method for design volume SCS 24-hr Preci ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): The design storm & design volume is based off the 10-yr storm event for this site. The 'other" BUA is drivway area inside the street ROW. WETPOND 1 Drainage area number 1 21 Minimum required treatment volume cu ft 45637 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Na 7 Are the inlets, Outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume In excess of the desi n volume? Yes 9 W hat is the method for dowatering the SCM for maintenance? Pump referred 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC 8 ? Yes 12 Does the drainage easement comply with General MDC 9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an 0&M Agreement that complies with General MDC (11)? Yes 15 is there an 0&M Plan that complies with General MDC 12 ? Yes 161 Does the SCM follow the device specific MDC? Yes 171 Was the SCM designed by an NC licensedprofessional? Yes WET POND MAC FROM 0211.1053 18 Sizing method used SAIDA 19 Has a stagelstora e table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 675.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 676.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 682.00 231 Elevation of the permanent Pao[ fmsl) 682.00 24 Elevation of the top of the vegetated shelf fmsl) 683.00 25 Elevation of the temporary pouf (fmsl) 683.50 26 Surface area of the main permanent pool (square feet) 20.503 sf 27 Volume of the main permanent pool cubic feet 100359 cf 28 Average depth of the main pool feet 4.89 It 29 Average depth equation used Equation 2 30 If using equation 3, main pool perimeter (feet) NIA 311 If using equation 3, width of submerged veg. shelf feet NIA 32 Volume of the forebay cubic feet) 17215 cf 33 Is this 15-20 % of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 72 in 35 Design volume of SCM (cu ft) 81757 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 3" 38 If weir, weir height (Inches) NIA 39 If weir, weir length inches) NIA 40 Drawdown time for the temporary pool (days) 3.02 41 Are the inlets) and cutlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flowpath? Yes 43 Depth of forebay at entrance (inches) 84 in 44 Depth of forebay at exit (inches) 76.2 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- r, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC 9 is met.)NO 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment See into below 54 Hasa plantin2 plan been provided for the ve etated shelf? Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): The dam & embankment will use the ChadottelMecklenburg FACW Meadow seed mix. The vegitalion shelf uses several different turfs as well. All of this can be seen in more detail on the BMP planting plan (G4.03). Wet Pond 3 410 PM 1/20/2022