Loading...
HomeMy WebLinkAboutSW8990453_HISTORICAL FILE_20140609STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 c�cl 0453 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE to I `f ou O 9 YYYYMMDD ALTI-IWA NC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 9, 2014 Winding River Plantation Community Association, Inca Mr. Robert Fuchs, President 1640 Goley Hewett Road, SE Bolivia, NC 28422 Subject: Approved Plan Revision Winding River POA Clubhouse Stormwater Permit No. SW8 990453 Brunswick County Dear Mr. Fuchs: John E. Skvada, III Secretary Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this plan revision now references DEMLR as the Division responsible for issuance of the permit On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which grants an extra year for a total of four (4) years extension. Accordingly, the Division is hereby notifying you that the permit, which was set to expire on January 30, 2017, shall now be effective from the date of issuance until January 30, 2021, and the project remains subject to the conditions and limitations as specified therein, except as indicated with this plan revision. On April 28, 2014, the Wilmington Regional Office received a request to revise the approved plans for Stormwater Management Permit Number SW8 990453. The revisions include: 1. The removal of the proposed shuffleboard courts and associated sidewalk from the approved plan, totaling 1,928 square feet of BUA, to be replaced with bocce ball courts totaling 1,200 square feet of BUA, for a net decrease of 728 square feet. This 728 square feet is available for future development within the on -site pond drainage area. 2. -Minor changes to the approved amount of BUA within the drainage area of the offsite detention pond under SW8 970936, with no change in the total BUA. The permitted BUA for future development within the drainage area to the offsite porid, remains at 562 square feet. It has been determined that a formal permit modification is not required for the proposed changes. We are forwarding you an approved copy of the revised plans for your files. Please replaced the previously approved plan sheet C2 with the attached new sheet C2. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 Mr. Fuchs June 9, 2014 State Stormwater Permit No. SW8 990453 Please be aware that all terms and conditions of the permit issued on January 30, 2007, remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be approved through this Office prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please do not hesitate to call me at (910) 796-7215. Sincerely, Linda Lewis Environmental Engineer III GDS\arl: G:\WQ\Shared\Stormwater\Permits & Projects\1999\990453 HD\2014 06 permit-pr 990453 cc: Brad Sedgwick, P.E., JBS Consulting Shannon Smith, CAMS Brunswick County Building Inspections Wilmington Regional Office Stormwater File Page 2 of 2 COPY DWQUSEONLY Date Received Fee Paid (ex ress only) Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This fonn may be photocopied for use as an original I. GENERAL INFORMATION ^t®V� I. Stormwater Management Permit Number: SW8 990453 6J9q Ge goa6 2. Project Name: WindingRiver POA Clubhouse 9^ 4 u b {A 3. Permit Holder's name (specify the name of the corporation, individual, etc.): , q�.' Winding River Plantation Community Association, Inc 4. Print Owner/Signing Official's name and title (person legally responsible for permit): Robert Fuchs President 5. Mailing Address for person listed in item 2 above: 1640 Coley Hewett Road SE City:Bolivia State:NC Zip:28422 Phone: (910 ) 755-7020 Fax: Email:ssmith@camsmgt.com II. PLAN REVISION INFORMATION 1. Summarize the plan revision proposed (attach additional pages if needed): See attached sheet for a summary of the changes. III. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ)..A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original & I copy of the Plan Revision Application Form • Two (2) copies of revised plans (must be revisions of original approved plan sheet(s)) If applying Express review (onl��available in 20 coastal countfeslfor Express review (onl��available in 20 coastal counties): • Application fee of $500.00 (made payable to NCDENR) VI. APPLICANT'S CERTIFICATION r- a-t 1K W-4—- 1, (print or type name of person listed in General information, item 3) Robert Fuchs certify that I have authorized these plan revisions and that the information included on this plan revision application is, t the best of my knowledge, correct and complete. Signature: Date: 4 z i I LZO I Plan Revision Form Rev 13July2010 Page I of I G CONSULTING, PA 7332 Cotesworth Drive J Wilmington, NC 28405 (910) 619-9990 PLANNING - ENGINEERING - PROJECT MANAGEMENT Winding River Plantation POA Clubhouse Summary of Plan Changes SW8 990453 4/28/14 List is a list of changes between the permitted plan dated 1-30-07 and as of the date of this requested plan change. The numbers correspond to the changes shown on the plans. 1. The Owner has elected NOT to install sidewalk in this area. The new BUA for this area is 2 - courts at 10' x 60' for a total of 1,200 sf. The courts are surrounded by grass. 2. Section A has been modified to show no sidewalk. 3. So noted. All changes to the site from the existing permitted plan are a decrease in the BUA. The Owner does not wish to modify the BUA in the permit. This item does not have a cloud on the plan. 4, Pipe layout has been clouded and a note added to the plans 5. A note has been added to the plan concerning the Owner electing to install a grass surface instead of an asphalt pavement. The grassed areas are setup for parking with the installation of wheel stops. This area is still considered impervious. Your question about the changed geometry are shown on the plans. Even thou we are counting the grassed area as BUA it is obvious that water quality is enhanced by the stormwater traveling over a grass surface before it enters the piping system. 6. The loading zone and dumpster pad have been converted into parking slots as shown on the plans. 7. Once again the plans show the "as constructed" geometry. All changes reduced the amount of BUA going to the pond and improved the water quality going to pond. Low impact development in 2006. imagine that. No cloud added to plan. 8. The dumpster pad was moved. The plans show the current location. The current pad is smaller than the 12' x 12' pad proposed on the permitting plans. 9. A note was added to the plans k r I 1 ' V ' Date Received Fee Paid (express only) Permit Number 11 2614- R)4-z i4 - 16600 c-2o¢53 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW8 990453 2. Project Name: 3. Permit Holder's name (specify the name of the corporation, individual, etc.): Winding River Plantation Community Association Inc 4. Print Owner/Signing Official's name and title (person legally responsible for permit): Robert Fuchs, President 5. Mailing Address for person listed in item 2 above: C—CEFI V APR 2 8 2014 1640 Goley Hewett Road SE City:Bolivia State:NC Zip:28422 Phone: (910 ) 755-7020 Fax: ( ) N/A Email:ssmith@camsmgt.com it. PLAN REVISION INFORMATION 1. Summarize the plan revision proposed (attach additional pages if needed): See attached sheet for a summary of the changes III. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. .—Initials • Original Pd 1 copy of the Plan Revision Application Form • Two (2) copies of revised plans (roust be revisions of original approved plan sheet(s)) If applying Express review (o�available in 20 coastal counties): Express review (o�available in 20 coastal counties): • Application fee of $500.00 (made payable to NCDENR) VI. APPLICANT'S CERTIFICATION I, (print or type name of person listed inGeneral 'Information, item 3) Robert Fuchs certify that 1 have authorize d these plan revisions and that the information included on this plan revision application is, t the best of my knowledge, correct and complete. Signature: -eat ' " " Date: - 2`i �O Itr Plan Revision Form Rev 13July2010 Page 1 of 1 f �.� �r �� .. e r� J�JBf CONSULTING, PA 7332 Cotesworth Drive _A� Wilmington, NC 28405 (910) 619-9990 Fax (910) 401-1620 PLANNING - ENGINEERING - CONSTRUCTION MANAGEMENT April 28, 2014 Mr. Linda Lewis NCDENR-DEMLR 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Responses to March 20, 2014 Email Stromwater Project SW8 990453 Mod Plan Revision Winding River HOA Clubhouse Brunswick County Dear Linda: This letter is response to your comment email responses are numbered the some as your reference is also used on the plans. F7 C r"I V Eq APR 18 2014 BY: dated March 20, 2014 (copy attached). My comments for your reference. The number 1. The Owner has elected NOT to install sidewalk in this area. The new BUA for this area is 2 - courts at 10' x 60' for a total of 1,200 sf. 2. 1 have modified Section A. 3. So noted. All changes to the site from the existing permitted plan are a decrease in the BUA. The Owner does not wish to modify the BUA in the permit. 4, Pipe layout has been clouded and a note added to the plans. 5. A note has been added to the plan concerning the Owner electing to install a grass surface instead of on asphalt pavement. The grassed areas are setup for parking with the installation of wheel stops. This area is still considered impervious. Your question about the changed geometry are shown on the plans. Even thou we are counting the grassed area as BUA it is obvious that water quality is enhanced by the stormwater traveling over a grass surface before it enters the piping system. See attached pictures. 6. The loading zone and dumpster pad have been converted into parking slots as shown on the plans. 7. Once again the plans show the "as constructed" geometry. All changes reduced the amount of BUA going to the pond and improved the water quality going to pond. Low impact development in 2006, imagine that. 8. The dumpster pad was moved. The plans show the current location. The current pad is smaller than the 12' x 12' pad proposed on the permitting plans. Page 2 of 2 9. A note has been added to plans. Velocity calcs are attached. See pictures on attached sheet. This has been installed since 2007, no erosion evident. I trust that is will answer all your questions. Please do not hastate to call if you have any addition questions. Sincerely yours; Bradford Sedgwick, PE Project Engineer Attached: 2 - Plan Revision Applications (1 - original, 1 - copy) 2 - Plan Sheets (Sheet C2) ECEIVE APR 2 8 20% BY: Page 1 Outlet Velocity Dissipator o • • o o DATE 4/28/2014 PROJECT NAME PROJECT NO Winding River PDA Clubhouse 032-001 LOCATION BY Brunswick County BDS OnSite Post Developed Overflow Outlet Protection CHECKED BY BDS Storm Outlet Structure B1= Pond Over Flow Culvert Q25/Qfull = 0.03 Pipe = 18 in VNfull = 0.42 Q25 = 0.25 cfs V = 1.8 fps Qfull = 7.43 cfs Vfull = 4.20 fps From Fig. 8.06.b.1: Zone =� From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in e Riprap Class = B e fl a `s Apron Thickness 3 9 La, Apron Length = 18 = 9.0 in ft < A, Upstream Width = 3xDia = 4.5 ft La. LenamW, Downstream Width = 10.5 ft_ 1EC E IVE APR 2 8 2014 BY: Site Outlet Velocity Dissipator PAGE 1 OF 1 s px rri } r. a= In Sol � CONSULTING, PA J-- /7332 Cotesworth Drive —�Wilmington, NC 28405 (910) 619-9990 PLANNING - ENGINEERING - PROJECT MANAGEMENT Winding River Plantation POA Clubhouse Summary of Plan Changes SW8 990453 4/28/14 List is a list of changes between the permitted plan dated 1-30-07 and as of the date of this requested plan change. The numbers correspond to the changes shown on the plans. 1. The Owner has elected NOT to install sidewalk in this area. The new BUA for this area is 2 - courts at 10' x 60' for a total of 1,200 sf. The courts are surrounded by grass. 2. Section A has been modified to show no sidewalk. 3. So noted. All changes to the site from the existing permitted plan are a decrease in the BUA. The Owner does not wish to modify the BUA in the permit. This item does not have a cloud on the plan. 4, Pipe layout has been clouded and a note added to the plans. 5. A note has been added to the plan concerning the Owner electing to install a grass surface instead of an asphalt pavement. The grassed areas are setup for parking with the installation of wheel stops. This area is still considered impervious. Your question about the changed geometry are shown on the plans. Even thou we are counting the grassed area as BUA it is obvious that water quality is enhanced by the stormwater traveling over a grass surface before it enters the piping system. 6. The loading zone and dumpster pad have been converted into parking slots as shown on the plans. 7. Once again the plans show the "as constructed" geometry. All changes reduced the amount of BUA going to the pond and improved the water quality going to pond. Low impact development in 2006. imagine that. No cloud added to plan. 8. The dumpster pad was moved. The plans show the current location. The current pad is smaller than the 12' x 12' pad proposed on the permitting plans. 9. A note was added to the plans. 146ECEwEh APR 2 8 20% BY: i i i C n � M-i Lewis,Linda From: Lewis,Linda Sent: Friday, June 06, 2014 11:40 AM To: 'Brad Sedgwick' Subject: RE: Winding River POA Clubhouse SW8 990453 I'm not purposefully trying to build mountains— it's more about being secure in my level of understanding of what's going on so I can write a plan revision approval letter that accurately reflects the proposed condition and provides the necessary leftover BUA for future use by the permittee. I don't want to short-change the permittee. I'm also trying to alleviate a potential problem in the future — I don't want to receive another revision down the line within the offsite pond DA, where someone tries to claim some leftover BUA by saying that back in 2014, Brad Sedgwick proposed a net decrease of 1,000 square feet (for example). Well, no your letter only indicates that there is a net decrease, but it doesn't specify the amount of the decrease. I cannot increase the 562 sf of remaining BUA that is currently in the permit. Based on your assertion that there is a net decrease of BUA within the offsite DA due to the revisions, but no specific number is provided, the available BUA in the offsite DA remains 562 sf, and the available BUA in the onsite DA is now 728 sf. That's what I'm putting in the plan revision letter, unless you provide me with a breakdown of the BUA in support of a different number. Linda From: Brad Sedgwick[mailto:bradsedgwickCalhotmail.com] Sent: Friday, June 06, 2014 11:03 AM To: Lewis,Linda Subject: RE: Winding River PDA Clubhouse SW8 990453 Linda I will have to check. I do believe you are making a mountain out of a molehill. You are correct that this started as a minor change to the bocce ball courts. We do not want to change the numbers going to either pond. Currently the amount of BUA going to the offsite is still as written in the permit. BUA (40,000 sf allocated, 39,438 sf constructed) draining offsite to the SW8 970936 pond. This has not changed, the only thing that changed was the surface type (grass vs. asphalt) The grass still needs to be counted as impervious because it is used for parking. The only change with the on site pond is as you stated "There is 1928 sf being removed from the proposed site plan, if you count the sidewalk and the shuffle board courts. There is 1200 square feet of BUA going back down for the bocce ball courts. Is that correct?" Yes this is correct. Does that help? JBS Consulting, PA Planning, Engineering, Project Management Iiad swig ick, PE 7332 Cow.,.ah Dn,e Wil.ngmq NC 28105 Phone: 1-910-619-9990 limail: 12mdscdg%jckQhomaJ.co It From: linda.lewis@ncdenr.gov To: bradsedswick(@hotmail.com Subject: Winding River POA Clubhouse SW8 990453 Date: Fri, 6 Jun 2014 14:33:56 +0000 Brad: I'm allowing myself to get confused about this application yet again, but perhaps if I write it all down, it will become clear what I need to do. The current permit is based on a portion of the clubhouse BUA (40,000 sf allocated, 39,438 sf constructed) draining offsite to the SW8 970936 pond; and the rest of the clubhouse BUA (50,712 sf permitted) draining to the onsite pond. This all started out as a proposal to change from the approved shuffleboard courts (2@ 52 x 10) to bocce ball courts, (2@ 60 x 10). This area is within the approved drainage area of the on -site pond. There is 1928 sf being removed from the proposed site plan, if you count the sidewalk and the shuffle board courts. There is 1200 square feet of BUA going back down for the bocce ball courts. Is that correct? The next thing to be cleared up is all the "minor" revisions to the parking lot area that are within the approved drainage area of the offsite pond. Your letter simply says that all the changes result in a net decrease of impervious area, but there are no specifics as to what this new decreased amount is. In order to write this plan revision, I need to know what is the total clubhouse BUA proposed to drain to the offsite pond, after all the revisions are accounted for? Right now, the maximum amount of clubhouse BUA that can be directed to the offsite pond is 40,000 sf. I need to know what the actual amount of clubhouse BUA draining to the offsite pond is so that the remainder can be included in the plan revision approval letter as available future BUA. Thanks Linda Lewis Environmental Engineer III Division of Energy, Mineral and Land Resources Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Main Office — 910-796-7215 Direct Line — 910-796-7343 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Lewis,Linda From: Lewis,Linda Sent: Thursday, March 20, 2014 1:18 PM To: Sedgwick, Brad Cc: Shannon Smith (ssmith@camsmgt.com) Subject: Winding River Amenity Center SW9 990453 Brad: A couple of comments regarding the plan revision submitted on January 31, 2014 to replace the shuffleboard courts with bocce ball courts: 1. 1 am coming up with 1656 sq. ft. of built -upon area: 456 sf for the sidewalk; and 1200 for the bocce courts. You did not provide any dimensions or details, so I had to scale the widths and lengths from the plans. There appears to be 152 feet of 3' wide sidewalk proposed - is that correct? 2. The sidewalk scales 3 feet wide, but the referenced detail, Section A, does not indicate the width of the sidewalk. Please add the sidewalk width to the detail. 3. Please list all of the proposed plan changes in Section II of the Plan Revision application form, and address the associated BUA increases/decreases. The other changes I see are: a. The permitted piped collection system to the on -site pond now runs on the northeast side; b. The sidewalk and parking area in front of the "Existing Building' (hatched area noted on the plan) have been pushed further out and expanded. c. The loading zone area and dumpster pad adjacent the tennis courts has been converted to 4 parking spaces. d. The small 9-space parking area by the sewage pump station has been expanded. The drive aisle in that parking lot scaled 18' on the 2007 approved plan, but on the proposed plan, it scales 24'. e. A concrete area (dumpster pad?) is now shown adjacent the pump station. f. An 18" pipe has been added southeast of the "Proposed Building" to direct vegetated area runoff into the wetland. Please provide calculations at the outlet of the pipe to demonstrate that the velocity entering the wetland is non -erosive. Please provide the requested information by April 20, 2014. Thanks, Linda Lewis Environmental Engineer III Division of Energy, Mineral and Land Resources Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Main Office - 910-796-7215 Direct Line - 910-796-7343 6 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Casmer, Jo From: Casmer, Jo ?j Sent: Tuesday, February 18, 2014 11:51 AM To: Sedgwick, Brad; 'ssmith@camsmgt.com' 1``"�'� Subject: Winding River PAO Clubhouse; Stormwater Permit SW8 �avd.78 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Plan Revision Application on January 31, 2014. The project will be assigned to a staff member and reviewed within 75 days of receipt You will be notified if additional information is needed. Jo Casmer Administrative Assistant for DEMLR/Stormwater Section NC Department of Environment & Natural Resources Division of Environmental Assistance & Customer Service 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7336 Fax: (910) 350-2004 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disdosed to third parties a Completeness Review Checklist Project Name: I,Ji�� Received Date: Project Location: Accepted Date: ZA% Rule(s) 132008 Coastal ❑1995 Coastal El Phase II (WiRO) ®Universal ®1988 Coastal Type of Permit: New or Mod or PR Existing Permit It (Mod or PR): PE Cert on File? -- Densit HD ----or...-.- -LD— - :--- ommercial=or-=.--Residential-_ -_- NCG ,-- Y::._ YPe.. _. %: n(% OK?) Stream Class: MSA Map ❑Offsite to SW8 Paperwork Emailed Engineer on: ®Supplement(s) (1 original per BMP) BMP Type(s): ®0&M with correct/original signatures (1 original per BMP except LS/VFS and swoles) plication with correct/original signatures ❑Deed ❑Corp or LLC: Sig. Auth per SoS or letter Email Address: ®$505 (within 6mo) r—JEmail Address: Design Engineer Owner ®Soils Report with SHWT Note to Reviewer: Calculations (signed/sealed) ®No obvious errors (� Density includes common areas, etc :d Restrictions, if subdivided: L JSigned & Notarized ®Correct Template (l Plans :DZ<ets 7Grading Vicinity Map Legend Infiltration Soils ReportSHWT: Bottom: Visited: Additional Information: Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Wetlands: Delineated or No Wetlands Layout (proposed BUA dimensions) F1DA Maps ❑Project Boundaries Wet Pond ®Soils Report SHWT: PP: PE Cert for Master JDeed Rest for Master BUA Permitted (Master): BUA Proposed (Offsite): Lot #: ❑Lot # Matches Master sf sf Prnnnsed: BUA (sf) nnn reLeu r---- DA (sf) PP (el) SHWT (el) Depth (ft) SA (so CONSULTING, PA 7332 Coteswodh Drive i Wilmington,NC 28405 (10)6910) 19-9990 PLANNING - ENGINEERING - PROJECT MANAGEMENT January 31, 2014 Mr. Linda Lewis NCDENR-DWQ 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Plan Revision Stromwater Project SW8 990453 Mod Winding River HOA Clubhouse Brunswick County Dear Linda: Attached is an application for a plan revision. The revision includes work in the "Bocce Ball Area" of the clubhouse, adjacent to the tennis courts. During the original work on this plan and permit modification we had identified work in this area to include 1,929 SF of BUA. Current work planned includes only 1582 SF of BUA. I have explained to the HOA that the planned work would be permissible under the current permit but based on a phone call to you (you suggested a plan mod) the board has elected to submit this plan modification. All other work on this plan was completed under the original plan and the work shown n the "clouded area" is the only modification at this time. Please do not hastate to call if you have any addition questions. Sincerely yours; Brad Sedgwick, PE Attached: 1 - Plan Revision Application - Original 1 - Plan Revision Application - Copy 2-Revised Plans dated 1-31-14 E'VE rJOAN 3 1 2014 BY: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW8 990453 2. Project Name: Winding River POA Clubhouse 3. Permit Holder's name (specify the name of the corporation, individual, etc.): 4. Print Owner/Signing Official's name and title (person legally responsible for perm JAN 3 1 2014 Robert Fuchs, President 5. Mailing Address for person listed in item 2 above: 1640 Goley Hewett Road, SE City:Bolivia State:NC Zip:28422 Phone: (910 ) 755-7020 Email:ssniith@camsmZ.com II. PLAN REVISION INFORMATION Fax: ( ) N/A 1. Summarize the plan revision proposed (attach additional pages if needed): III. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. 1pitials • Original & 1 copy of the Plan Revision Application Form • Two (2) copies of revised plans (must be revisions of original approved plan sheet(s)) If aMlying for Express review (only available in 20 coastal counties)7 • Application fee of $500.00 (made payable to NCDENR) VI. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information, item 3) Robert Fuchs certify that I have authorized these plan revisions and that the information included on this plan revision application i tto the bestof knowledge, correct and complete. Signature: "`-"-✓` Date: i zt ?Q( Plan Revision Form Rev 13July2010 Page 1 of 1 Lewis,Linda From: Lewi s, Li nda Sent: Thursday, October 17, 2013 5:02 PM To: 'Shannon Smith' Subject: RE: Winding River - SW8 990453 Shannon - I am sorry, but I had no way of knowing that the shuffleboard courts we had originally permitted had NOT been built. thought the Bocce court was in addition to what had been previously permitted. This will certainly make the approval process MUCH easier and faster. While it isn't a modification to the permit, it will require a plan revision to show the removal of the 2 shuffleboard courts and the new layout of the proposed bocce courts and surrounding 2' walkway. As long as the post -developed built -upon area total doesn't change or is less than what we permitted, then you should be in good shape. You can use any type of surface you want. The only limiting factor is that the amount of built -upon area you put back to build the bocce court cannot exceed the shuffleboard total that was permitted to be there. If my math is right, each of those 2 courts was accounted for at 10 x 52, so that frees up 1040 sf of BUA. That's the amount you would be allowed to put back for the bocce court. As you can see on your plan, a four -foot -wide sidewalk has already been accounted for running adjacent the shuffleboard court, connecting the clubhouse to the tennis court area and parking lot. As long as the plantings you add are not in the 404 and do not prevent or divert runoff from being directed into the collection system it's OK to plant sound buffering plants around the court. I cannot speak as to where that note regarding "1929 sf remaining' comes from, because it is not on the January 30, 2007 approved plans in our file. The old shuffleboard courts are located in the onsite pond drainage area. The design standards for the onsite pond are listed in Section 1.7 of the January 30, 2007 permit. Please note that although the January 30, 2007 permit was transferred in 2011, the terms and conditions of that permit remain in effect. The total amount of BUA permitted for the onsite pond is 50,712 sf. All of this BUA is accounted for on the plan — there is no future allocation in the permit for the onsite pond. Your permit does not provide for 524 sf as available BUA. I think you might be mixed up with the slight bit of future allocation that is available in the offsite pond. The permit for the offsite wet pond allowed for a maximum of 40,000 sf of BUA to drain from the clubhouse. The offsite pond design standards are listed in Section 1.8 of your permit. The BUA actually proposed under your permit for the clubhouse to drain to the offsite pond is 39,438 sf, which is a difference of 562 sf. But the bocce court area is not within the drainage area of the offsite pond, so you can't use that 562 sf for the bocce court. You're stuck with the 1040 sf freed up by removing the shuffleboard courts from the proposed plans. You're not really using up any "future" allocation in this case because the shuffleboard courts were already accounted for as BUA in the permit, which would be a separate amount from any future allocation. A plan revision requires the completion of a one -page form (very simple) and 2 sets of the revised plans. There is no fee for a plan revision in the regular program. I know this is very convoluted. Let me know if you have further questions. Linda Frbm: Shannon Smith [mailto:ssmith@camsmgt.com] Sent: Thursday, October 17, 2013 2:10 PM To: Lewis,Linda Subject: RE: Winding River - SW8 990453 Hi Linda, This may the final exchange on this subject! I consulted an stormwater engineer to begin the process of modifying our permit to include the new structure and they pointed out to me a section of our original plans for this permit that already called for sports courts that were never built. I don't have the capability to scan such a large document here but I have attached a portion of it that has information has the information about the original shuffleboard courts and the impervious calculations already factored in for this (roughly 1,929 sq ft for two courts and a walkway). The bottom page number is C2, if that helps. The stormwater part of this was built (the inlets exist and are tied into the system and working) but the shuffleboard courts themselves were nixed at the last minute due to funding. This is the same area where we would intend to put the bocce court. Instead of two 10'x52' shuffleboard court, we are proposing one 10'x60' court with a 2' walkway around it. The bocce court would be designed to flow to the same inlets to which the shuffleboard court was supposed to drain. It was their contention that our original permit already included this so we shouldn't have to modify it for as small of a design change (one slightly larger court instead of two smaller ones, bocce instead of shuffleboard) and that in fact, we would be well under the impervious designated for this area. Perhaps if I had known that in the beginning or shared with you where we were planning to put it, we could have saved a lot of time and energy. But I need to ask for my Board to feel comfortable approving the bocce court— is that the correct interpretation of our existing plan? That we already have approval for a sports court in that area and could build a smaller, slightly modified court from the original plan without needing a formal permit modification? Does it make a difference that there will be rails for the bocce court (you have seen the drainage proposal to make sure that water doesn't accumulate on top)? Could we go with a different surface, if desired, other than the Astroturf plan we proposed already? And can you confirm that the "1,929 SF IMPERVIOUS SURFACE REMAINING" referenced in the section of the plan I attached is for that area only, or does that also include the 524 sq ft noted on our permit as available BUA? Finally, I note that no landscaping is noted on this stormwater plan so I am assuming that as long as the plantings are not in 404 and do not change the flow of runoff to the existing inlets, it would be okay to plant sound buffering plants around the court? Thanks for your assistance, now and always. SHANNON R. SMITH, CMCAO 4�arc: ON -SITE COMMUNrTV MANAGER FOR WINDING RIVER PLANTATION Office: 910-787-6720 Corporate Office: W7-gR<AM5(7767) Email: ssml[h@camsmgccom \VICAMS www.camsmgt.com SnISG RIVER Fl.rn,i,irn From: Lewis,Linda[mailto:linda.lewisCdncdenr.aovl Sent: Friday, September 27, 2013 2:44 PM Lewis,Linda From: Lucas, Annette Sent: Friday, August 16, 2013 9:57 AM To: Bennett, Bradley, Lewis,Linda Cc: Randall, Mike Subject: RE: Winding River - SW8 990453 Bradley and Linda, I have seen a couple of projects (one in Winston-Salem and one in Holly Springs) where Astroturf (or similar) has been proposed and the applicant is seeking credit for reduced BUA and/or stormwater treatment. Both of the two projects have local SW programs that will be reviewing of course. But I have advised them to approve with the same credit awarded to permeable pavement if the design, construction and maintenance of the Astroturf meets the permeable pavement design standards and they can provide evidence that the Astroturf will maintain its permeability and structure long-term. Let me know if you have further questions. Thanks, Annette From: Bennett, Bradley Sent: Friday, August 16, 2013 7:52 AM To: Lucas, Annette Cc: Randall, Mike Subject: FW: Winding River - SW8 990453 Annette, I think we have always said these were impervious unless they could show infiltration, which maybe they can do :I Bradley Bennett Stormwater Program Phone: (919) 807-6378 NC Division of Energy, Mineral & Land Resources Fax: (919) 807-6494 1617 Mail Service Center Email: bradlev.benneft®nodenr.00v Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws From: Lewis,Linda Sent: Thursday, August 15, 2013 8:57 AM To: Bennett, Bradley; Vinson, Scott; Randall, Mike Cc: Vinson, Toby Subject: FW: Winding River - SW8 990453 I need some help in determining what to call this surface. The POA clubhouse area all drains to an offsite permitted wet pond. I have no idea whether this type of construction should be considered BUA or not. Any information you can provide is most appreciated. I am leaning toward calling it pervious and allowing that footprint to be 'treated' via infiltration. Even if it doesn't infiltrate, there is a pond that will ultimately pick up any runoff and treat it. Linda Lewis NC Division of Energy, Mineral and Land Resources Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties. From: Shannon Smith [mailto:ssmith(acamsmgt.mm] Sent: Friday, August 09, 2013 1:19 PM To: Lewis,Linda; Weaver, Cameron Cc: Shannon Smith Subject: RE: Winding River - SW8 990453 Hi Linda, Thanks again for the information that you gave to us. Attached is some additional information about the infiltration rates for the astroturf. I also have included an updated proposal from the contractor for the new location. Site preparation will be very minimal. Please let me know if you think this would be considered pervious, or impervious based on the additional information supplied. Thank you, :SHANNONR-SMITH, CMCA® ArL�fc ON -SITE COMMUNITY MANAGER FOR WINDING RIVERPLANTATION Affice: 910-755-7020 Corporate Office: gn-672-CAMS (2267) Email: ssmithreacamsmgtmm S p� q www.camsmgt.com 11r1\•_D1\1Q RIVERCAMS' 9 1'la uro lien ormescamasssr..�ett..d From: Lewis,Lindarmailto:linda.lewis(cbncdenr.gov] Sent: Friday, July 12, 2013 10:30 AM To: Weaver, Cameron Cc: Shannon Smith Subject: RE: Winding River - SW8 990453 Shannon: My position is no longer funded by Express, but I am currently.still doing stormwater review and permitting. After reading through the specs provided, I would tend to say that this is an impervious surface. I base this on the 2 layers of 40 mil filter fabric that are shown on the estimate, the compaction of the subgrade, the use of crushed stone and the use of Astro-turf. If more information on the filter fabric and Astro-turf infiltration rates could be provided, and if the soils are suitable for infiltration, the area of the bocce court could be considered pervious or, if it's determined to be an impervious surface, then the area under the proposed bocce court could be added to the permit as an infiltration BMP. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Weaver, Cameron Sent: Thursday, July 11, 2013 9:48 PM To: Lewis,Linda Subject: FW: Winding River - SW8 990453 Hi Linda. This probably should just be answered directly by you or someone else in SW. This will likely be the last day that I look at my emails until I return on the 26th. Thanks and see you then! Cameron From: Shannon Smith [ssmith@camsmgt.com] Sent: Thursday, July 11, 2013 5:47 PM To: Weaver, Cameron Subject: Winding River - SW8 990453 Hi there, I have corresponded with Linda Lewis in the past but understand she is in a different position now. Some of my co-workers at CAMS indicated that you were helpful to them in answering questions about storm water concerns in properties that they manage. I was hoping that you could be of assistance to me as well. Specifically, Winding River is a community in Bolivia and has an amenity center that was constructed in 2007 and issued the above -referenced high -density storm water permit. The association would like to add a bocce court to its grounds and wanted to know if the bocce court, as proposed, would be considered pervious. The drawing for the court is on page four of the attachment and would be constructed of crushed oyster shells and Astroturf. The court would be installed in an area that is already level so minimal, if any, grading/site preparation would have to be done. If you believe that the proposed design would be considered impervious, we would likely exceed our impervious allotment, as the surface area of the court is designed to be 10' by 60' (not including the 2' walkway beside the court, which would be a pervious wooden walkway). If so, could you tell me what our options would be, including alternative materials to use that would meet your standards, adding a french drain to contain the runoff, and/or the ability to modify our permit? Thanks in advance for your assistance with this! .SHANNON R. SMITH,'CMCA® ON-SrTE COMMUNITYMANAGER FOR WINDING RIVER PLANTATION Office: 910;755=7020 Corporate Office: 877-672-CAMS (2267) Email: ssmhh@mmsmgt.com RiVER ww.w.camsm9t:com ��1I\Ut\G. -M Flaeta frva A<\MC NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 30, 2011 Winding River Plantation Community Association, Inc. C/o Author Scureman, President 1630 Military Cutoff Road, Suite 108 Wilmington, NC 28403 Subject: Name Change / Ownership Change Winding River Amenity Center Stormwater Permit No. SW8 990453 Brunswick County Dear Mr. Scureman: On July 29, 2011, the Wilmington Regional Office received a request for the transfer of ownership of the Stormwater Management Permit for the subject project. Staff of the Division of Water Quality have inspected the project, determined that the documentation is in order, and the project is in compliance with the Stormwater permit requirements. As indicated on the Name/Ownership Change form, you have acknowledged receipt of a copy of the permit, which includes the application and supplement forms, a copy of the approved plans and a copy of the required Operation and Maintenance agreement from the previous permittee. By acknowledging receipt of the permit, and by signing the Name/Ownership Transfer form, you have accepted the responsibility for complying with the terms and conditions outlined in this permit. If you need additional copies of the permit, or copies of the approved plans, please contact the Division of Water Quality in the Wilmington Regional Office at the phone number below. Please replace the old second page of the permit with the enclosed updated page. Please be aware that the project's built -upon area and stormwater controls must be built and maintained in compliance with the permit documents and the approved plans. Maintenance of the approved system shall be performed in accordance with the Operation and Maintenance agreement. Any modifications to this project must be submitted to the Division of Water Quality and approved prior to construction. The issuance of this approval does not preclude you from complying with all other applicable statutes, rules, regulations or ordinances, which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please do not hesitate to call David Cox or me at (910) 796-7215. Sincerely, Georgette 1;cott Stormwater Supervisor Division of Water Quality GDS/ dwc: S:\WQS\Stormwater\Permits & Projects 2011 09 permit 990453 cc: Blue Green Carolina Lands, LLC Brunswick County Building Inspections Wilmington Regional Office File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-7215\ FAX: 910-350-2004\ Customer service: 1-877-623-6748 1 Nort L. lCaroltrta Internet: w .ncwaterquality,org Ncrturrrllil An Equal Opportunity \ AKrma"o Action Employer September 6, 2011 Winding River Amenity Center Permit # SW8 990453 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Winding River Plantation Community Association, Inc. Winding River POA Clubhouse 1640 Goley-Hewett Road, Winding River Plantation, Bolivia, Brunswick County FOR THE construction, operation and maintenance of an onsite wet detention pond and the for the construction of impervious areas to be treated in an offsite wet detention pond, permitted under SW8 970936, in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 30, 2017, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The onsite stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 50,712 square feet of impervious area. 3. The offsite stormwater system, which was approved under SW8 970936, has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from a total of 237,576 square feet of impervious area. A total of 40,000 square feet of built -upon area has been allocated under the offsite facility permit for the treatment of a portion of the runoff from this project. This project proposes to direct the runoff from a total of 39,438 square feet to the offsite wet detention pond. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 562 square feet. s` EIM 1U1 2 9 2911 North Carolina Department of Environment and Natural), Resources Division of Water Quality _ Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary STATE STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM I. CURRENT PERMIT INFORMATION 1. Stormwater Management Permit Number: SW8 990453 2. Project Name: Winding River Amenity Center 3. Current Permit Holder's Company Name/Organization: Bluegreen Carolina Lands, LLC 4. Signing Official's Name: Partrick Rondeau Title: Vice -President 5. Mailing Address: 6060.North Central Expressway, Suite 138 City: Dallas State: TX Zip: 76006 6. Phone: 5( 61 ) 912-8000 Fax: (� fgA54 q3z 855 3,1-7 ' g72 ge�a It. PROPOSED PERMITTEE / OWNER / PROJECT / ADDRESS INFORMATION This request is for: (please check all that apply) ✓ Name change of the owner (Please complete Items 1, 2 and 3 below) Name change of project (Please complete Item 5 below) ✓ Change in ownership of the property/company (Please complete Items 1, 2, 3, and 4 below) ✓ Mailing address / phone number change. (Please complete Item 4 below) Other (please explain): 1. Proposed permittee's company name/organization: Winding River Plantation community Association, Inc. 2. Proposed permittee's signing official's name: _ 3. Proposed permittee's title: President of the 4. Mailing Address:1630 Military Cutoff Road, Suite 108 City: Wilmington State: NC Zip: 28403 Phone: (910 ) 755-7020 Fax: (910)755-7025-7025 5. New Project Name to be placed on permit: Arthur Scureman Board of Directors Please check the appropriate box. The proposed permittee listed above is: HOA or POA (Attach documentation showing that the HOA or POA owns, controls, or has a recorded easement for all areas that contain stormwater system features. Print name of HOA or POA in #1 above and provide name of HOA/POA's authorized representative in #2 above) ❑ The property owner ❑ Lessee (Attach a copy of the lease agreement and complete Property Owner Information on page 4) ❑ Purchaser (Attach a copy of the pending sales agreement. Final approval of this transfer will be granted upon receipt of a copy of the recorded deed) ❑ Developer (Complete Property Owner Information on page 4) SSW N/O Change Rev15Feb2011 Page 1 of 4 III. REQUIRED ITEMS A request to transfer a permit will not be approved by the Division of Water Quality (DWQ) unless all of the applicable required items listed below are included with the submittal. Failure to provide the listed items may result in processing delays or denial of the transfer. 1. This completed and sioned form. tThis certification mustbe:com`plefed-and.si4ned'bv`both the 2. Legal documentation of the property transfer to a new owner. 3. A copy of any recorded deed restrictions, covenants, or easements, if required by the permit. 4. The designer's certification (DWQ Engineer and Designer Certification Forms are available from each DWQ Regional office), if required by the permit and if not already submitted to DWQ. 5. If the proposed permittee is a firm, partnership, association, institution, corporation, limited liability company, or other corporate entity, provide documentation showing the authority of the named representative to act on behalf of the proposed permittee. 6. The $40.00 processing fee. If this is an initial transfer from the original permittee the processing fee is not required. Subsequent ownership transfers will require the $40.00 processing fee. IV. CURRENT PERMITTEE'S CERTIFICATION Please check one of the following statements and fill out the certification below that statement: ❑ Check here if the current permittee is only changing his/her/its name, the project name, or mailing address, but will retain the permit. I, , the current permittee, hereby notify the DWQ that I am changing my name and/or I am changing my mailing address and/or I am changing the name of the'permitted project. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. Q✓ Check here if current permittee is transferririg'the property to a new owner and will not retain ownership of the permit. I, Paw& H. Rondeau, V.P. Bluegreen Caolina Lands, LLC the current permittee, am submitting this application for a transfer of ownership for permit # swe990453" I hereby notify DWQ of the sale or other legal transfer of the stormwater system associated with this permit. I have provided a copy of the most recent permit, the designer's certification for each BMP, any recorded deed restrictions, covenants, or easements, the DWQ approved plans and/or approved as -built plans, the approved operation and maintenance agreement, past maintenance records, and the most recent DWQ stormwater inspection report to the proposed permittee named in Sections II and V of this form. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. I assign all rights and obligations as permittee to the proposed permitte named in Sections II and V of this form. I understand that this transfer of ownership c nno e approve y the DWQ unless and until the facility is in compliance with the permit. Signature: Date: 6 S "I _, a Notary Public for the State of ofdo hereby certify that personally appeared before me this the day of \744-tee , 20/, and acknowledge the due execution of the for g g instrument. Witness my hand and official seal, Notary Signature SSW N/O Change Rev15Feb2011 Page 2 of 4 (Notary Seal) CONSTANCE P. MANUEL ' • Notary ic Commomvsalb off ma Meaaachueette MY COMIrdalon Expires April 27, 2018 V. PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the Proposed Permittee for all transfers of ownership) Arthur Scureman , hereby notify the DWQ that I have acquired through sale, lease or legal transfer, the responsibility for operating and maintaining the permitted stormwater management system, and, if applicable, constructing the permitted system. I acknowledge and attest that I have received a copy of: (check all that apply to this permit) ❑✓ the most recent permit ❑✓ the designer's certification for each BMP F/ any recorded deed restrictions, covenants, or easements ✓❑ the DWQ approved plans and/or approved as -built plans 0✓ the approved operation and maintenance agreement ®✓ past maintenance records from the previous permittee (where required) ✓ DWQ stormwater inspection report showing compliance within 90 days prior to this transfer have reviewed the permit, approved plans and other documents listed above, and I will comply with the terms and conditions of the permit and approved plans. I acknowledge and agree that I will operate and maintain the system pursuant to the requirements listed in the permit and in the operation and maintenance agreement. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application not comple r' a required supporting information and attachments listed above are not cud d, th; a licati package will be returned as incomple e. Signature: / Date: D I, C 1i2,S'74QnPe S7_ a Notary Public for the State of 1;4. xl, , County of do hereby certify that A-A6""- � Y�!" An personally appeared before me this the v071-6 day of �1z, 20 ii , and acknowledge the d�.efE @�� �pp, of the forgoing instrument. Witness my hand and official seal, :=�O NX � o AR (Notary fEAI) Notary ignature ? m Pus �,� 2 e 9,. Additional copies of the original permit and the approved Operation and Maintenance agreement can be obtained from the appropriate Regional Office of the Division of Water Quality. This completed form, including all supporting documents and processing fee (if required), should be sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural Resources, Division of Water Quality, as shown on the attached map. Please note that if the Proposed Permittee listed above is not the property owner, the property owner must complete and sign page 4 of this document. Both the lessee / developer and the property owner will appear on the permit as permittees. SSW N/O Change Revl5Feb2011 Page 3 of 4 VI. PROPERTY OWNER CONTACT INFORMATION AND CERTIFICATION If the Proposed Permittee listed in Sections 11 and V of this form is not the Property Owner, the Property Owner must provide his/her Contact Information below and sign this form: Printed Name: Organization: Title within the Organization: Street Address: City: Mailing Address: City: Phone: Email: State: (if different from street address) State: Fax: Zip: I certify that I own the property identified in this permit transfer document and have given permission to the Proposed Permittee listed in Sections II and V to develop and/or, lease the property. A copy of the lease agreement or other contract, which indicates the party responsible for the construction and/or operation and maintenance of the stormwater system, has been provided with the submittal. As the legal property owner I acknowledge, understand, and agree by my signature below, that I will appear as a permittee along with the lessee/developer and I will therefore share responsibility for compliance with the DWQ Stormwater permit. As the property owner, it is my responsibility to notify DWQ by submitting a completed Name/Ownership Change Form within 30 days of procuring a developer, lessee or purchaser for the property. I understand that failure to operate and maintain the stormwater treatment facility in accordance with the permit is a violation of NC General Statute (NCGS) 143-215.1, and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature of the property owner Date: I, a Notary Public for the State of County of , do hereby certify that personally appeared before me this the day of ; 20 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, Notary Signature SSW N/O Change Rev15Feb2011 Page 4 of 4 (Notary Seal) CONSULTING, PA 7332 Cotesworth Drive Wilmington, NC 28405 (910) 619-9990 Fax (910) 401-1620 PLANNING - ENGINEERING - CONSTRUCTION MANAGEMENT December 31, 2007 Mr. Ed Beck NCDENR - DWQ 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Stormwater Project Number SW8 990453 Project Name: Winding River POA Clubhouse Expansion Brunswick County, NC Designers Certification �qN I, Bradford Sedgwick, PE, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically) the construction of the project, Winding River POA Clubhouse Expansion (Project) for Mr. Greg Taylor, TMC Taylor (Project Contractor) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on Page Two of this is included in the certification. Noted deviations from approved plans and specifications: None Signal Registration Number Date 12/31/07 Attachment: Checklist