Loading...
HomeMy WebLinkAboutSW8120215_CURRENT PERMIT_20120222STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 VL 02-\5 DOC TYPE T CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2012 o2 22 YYYYMMDD A A. V�C+DEE R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Govemor Director Secretary February 22, 2012 Marty K. Lawing, County Manager Brunswick County P.O. Box 249 Bolivia, NC 28422 Subject: EXEMPTION from Stormwater Management Permit Regulations Boiling Spring Lakes Sewer Transmission Force Main -Utility Project Stormwater Project No. SW8120215 Brunswick County Dear Mr. Lawing: The Wilmington Regional Office of the Division of Water Quality received a copy of the Linear Utility Line application for the subject utility project on February 14, 2012. Staff has reviewed the application for the applicability of the Stormwater Management rules to this project. Based on our review, you do not appear to be proposing development activities on this site at this point in time that would be subject to the stormwater requirements as provided for in 15A NCAC 2H.1000. However, be advised that other regulations will potentially apply to your proposed activities. In accordance with 15A NCAC 2B.0231 and Division policy, new or continued ditching activities after March 1,1999, may be a violation of state wetland standards. Violation of these standards may result in the assessment of civil penalties and other requirements to bring the project into compliance without additional wetlands impacts. In addition to the wetland standards, if your project disturbs one acre or more and has a point source discharge of stormwater runoff, then it is also subject to the National Pollutant Discharge Elimination System (NPDES) stormwater discharge requirements. You are required to have an NPDES permit for stormwater discharge from projects meeting these criteria. Any temporary built -upon area associated with the construction of the project must be removed wfthin 30 days of completing the project, or when it is no longer needed, whichever occurs first. If at any time in the future, development of any part of this site is planned, as defined in NCAC 2H.1000, or you do not develop the project in the manner indicated in the application, you must apply for and receive a Stormwater Management Permit prior to construction. If you have any questions concerning this matter, please do not hesitate to call Linda Lewis at (910) 796-7301 or email her at linda.lewis@ncdenr.gov. Sincerely, ��p q�.�� �� -Charles akild, P.E., Director Division of Water Quality GDS/ad: S:1WQMStornwaterlPermits & Projects12012 \1 2021 5 Exemption\ 2012 02 permit 120215 cc: Phillip G. Tripp; Tripp Engineering Brunswick County Building Inspections Brunswick_ County_ Engineering -Department — — — -- (- ilmington.Regiona(bifiee,StormwaterFile-7 Wilmington Regional Orrice 127 cardinal Owe Extension, Wilmington, North Carolina 28405 Plane: 91D.796-72151 FAX 910J50-20D4 Internet .rxwaterqualdy org An Equal Opportunity \ Affirmative Action Employer "oe NrnCarolina Naturally