Loading...
HomeMy WebLinkAboutSW8091111_HISTORICAL FILE_20210317STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 pg1111 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 202► 03I-i YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor March 17, 2011 Division of Water Quality Coleen H. Sullins Director Commanding Officer c/o Carl Baker, Deputy Public Works Officer US MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 091111 Courthouse Bay BEQ's P-1142 Construction Contract# N6247O-06-D-6002-XO23 High Density Commercial Infiltration Basin Project— SA Waters Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete modified State Stormwater Management Permit Application for the Courthouse Bay BEQ's, P-1142 on March 11, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008- 211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 091111 dated March 17, 2011, for the construction of the subject project. Please replace the old approved plan sheets with the new ones. This permit shall be effective from the date of issuance until May 7, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson, or me at (910) 796-7215. Sincerely, _ Georgette Scott 1-ri-.'-'1. Stormwater Supervisor Division of Water Quality GDS/can: S:\WQS\STORMWATER\Permits & Projects\2009\091111 HD\2011 03 permit 091111 cc: Perry Davis, Cape Fear Engineering Wilmington Regional Office Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877.623-6748 North Carolina Internet: www.ncwaterquality.org ��turQ��� An Equal Oppodunily 1 Affirmative Action Employer !4 State Stormwater Management Systems Permit No. SW8 091111 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO US Marine Corps Base, Camp Lejeune Courthouse Bay BEQ, P-1142 Grace Street, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of one (1) infiltration basin with storage in a remote basin in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 7, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. Within the redevelopment portion of the project area, there is a total of 119,620 square feet of existing impervious area. This project proposes a total of 96,773 square feet of impervious area, as shown on the approved plans, which is a reduction of 22,847 square feet of impervious area. Due to a portion of the proposed impervious area being located closer to the surface water, the runoff from 33,859 square feet of impervious area will be collected and treated in the infiltration basin. The remaining 62,914 square feet of impervious area will be treated via sheet flow through vegetated areas prior to entering an existing ditch, which has been found to be equal or better stormwater control than had previously existed. 3. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The infiltration basin with storage in the remote basin has been designed to handle the runoff from 267,686 square feet of impervious area. This permit does not allocate any impervious area for future development. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 091111 4. This infiltration basin must be operated with a 50 foot vegetated filter, designed to pass the peak flow from the 10 year storm in a diffuse and non -erosive manner. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 7. Under redevelopment guidelines, a 30 foot wide vegetated buffer must be provided adjacent to surface waters measured perpendicular to and horizontally from, the normal pool of impounded structures, the top of bank of streams and rivers, and the mean high water mark of tidal waters. 8. The following design criteria have been permitted for the infiltration basin stormwater facility and must be provided and maintained at design condition: Storage Basin 16 Infiltration Basin 1A a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: 5.01 218,218 None 3.55 154,578 None b. Total Impervious Surfaces, ft : Onsite, ft2: Offsite, ft2: 162,353 162,353 None 105,333 105,333 0 c. Design Storm, inches: 3.83 3.83 d. Basin Depth, ft: 4.25 3.3 e. Bottom Elevation, FMSL: 4.0 4.5 PPE 4.0 f. Bottom Surface Area, ft: 8,148 at PPE 7,664 9. Storage/Bypass Weir Elevation, FMSL: 8.25 7.3 h. Storage/Bypass Weir Surface Area, ft : 12,905 12,332 i. Permitted Stora e Volume` 32,829 39 335 j. Pump: Operating Pump Range, gpm: Pump Off, FMSL: Pump On, FMSL: Tsurumi NK-2 series 103 4.5 5.5 n/a k. Type of Soil: Murville I. Expected Infiltration Rate, in/hr: 6.7 m. Seasonal High Water Table, FMSL 2.0 n. Time to Draw Down, days: 2.36 o. Rec6Z Stream/River Basin: Courthouse Bay / White Oak Stream Index Number: 19-36 q. Classification of Water Body: The infiltration basin, 1A, is sized to handle the runoff directly flowing into the basin and the pump rate from the Storage Basin, 1 B It. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, .. vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 091111 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 7. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 8. Upon completion of construction, prior to issuane of a Certificate of Occupancy, and prior to operation of this permitted facility, ace rtification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 091111 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division of Water Quality, signed by both parties, and accompanied by the appropriate documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 3. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party shall be considered an approved permit transfer request. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 8. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 091111 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 17th day of March 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 091111 Courthouse Bay BEQs, P-1142 Stormwater Permit No. SW8 091111 Construction Contract # N62470-06-D-6002-X023 Onslow Countv Designer's Certification 1, , as a duly registered State of North Carolina, having been authorized to time) the construction of the project, (Project) in the observe (periodically/ weekly/ full for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 091111 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 8 of 8 DWQ USE ONLY Date Received Fee Paid Permit Number Applicable I ules: ❑ Coastal SW -1995 Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Storm water Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This forty nay be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Courthouse Bay GEC's P-1142 2. Location of Project (street address): City:Camp Lp'm.iv�k County:Onslow Zip:28547-2539 3. Directions to project (from nearest major intersection): Intersection of US 17 and FI WY 172. Travel East on H WY 172 approximately 11.0 miles. Turn Right onto Marines Road / Landing Road. Turn Right onto Grace Street. Site is located at parking lot. 4. Latitude:34* 35' 03" N Longitude:77° 22' 00" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 091111 , its issue date (if known)May 7, 2010 , and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* "provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®I-ligh Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Seclimentation/Erosion Control: _ ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts ac of Disturbed Area b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: RECEIVED Form SWU-101 Version 07hm2010 Page I of FEB 2 4 2011 BY: III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Marine Corp'4 Base Camp Leieune Signing Official & Title:Carl Baker, Deputy Public Works Officer b.Contact information for person listed in item I above: Street Address:Blde 1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable): City: State: Zip: Phone: (910 ) 451-2213 Fax: (910 ) 451-2927 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if Phone: Fax: Zi 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: FormSWU-101 Version 07Jun20 10 Page 2of7 FEB 2 4 2011 Rv. Phone: Fax: ( I 4. Local jurisdiction for building permits: MCAS Camp Lejeune Point of Contact Doris Hardin -Langley Phone #: (910 1 451-5694 IV. PROJECT INFORMATION 1. In the space provicled below, briefly summarize how the stormwater runoff will be treated. a 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph 11 - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 19.46 acres 5. "Total Coastal Wetlands Area: n/a acres 6. Total Surface Water Area: n/a acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:19.46 acres * Total project area shall be calculated to exclude the follotvin the normal loot of im`hmmded structures, the area between the banks of streams and rivers, the area belceo the Nornml High Zter (NM line or Mean High Water (MHW) line, and coastal Wetlands landward from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal Wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 37.62 9. How many drainage areas does the project have?2 (For high dmnsihj, count 1 for each proposed engineered stornnvater BMP. For loin density and other projects, use 1 for the Whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. FormSWU-101 Version 07Jun2010 Page 3of7 R-RCEIVED FEB 2 4 2011 BY: s4A41A;tih Rekieloon' xi Basin Information Drainage Area 1 Drainage Area_ Draina e Area 2 Drainage Area _ Receiving Stream Name Courthouse Bay Courthouse Bay Stream Class * SA;FIQW SA;HQW Stream Index Number * 19-36 19-36 Total Drainage Area (so 372,796 sf (8.56 ac) 214,086 sf (4.91 ac On -site Drainage Area (so 372,796 sf (8.56 ac) 214,086 sf (4.91 ac Off -site Drainage Area (so n/a n/a Proposed Impervious Area" (so 267,686 sf (6.15 ac S A92sf (t44 to S14 ac 1,44 Impervious Area** total 71.80% ag,y '2�0/o Impervious— Surface Area Drainage Area 1 Drainage Area _ Drainage Area 2 Drainage Area _ On -site Buildings/Lots (so 16,073 sf (0.37 ac) 23,361 sf (0.54 ac On -site Streets (so 16,396 sf (0.38 ac) 20,228 sf (0.46 ac On -site Parking (so 221,481 sf (5.08 ac On -site Sidewalks (so 9,915 sf (0.23 ac) 7,418 sf (0.17 ac) Other on -site (so llg07 (0•a)oc Future (so Off -site (so Existing BUA*** (so 3,821 sf (0.09 ac) Total (so: 267,686 sf (6.15 ac) '9h,997-sf (9,< hdgt ac) I.49 " Stream Class and Index Number can be determined at: in�)://Inortal.tncdear.oroioebAt;43s/csu/classificationts Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report only that amount of existing BUA that will rennin after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. delineation taken Projects in Union Comity: Contuc(DIVo Central Qce .rlq(fto check if the project is located within a "l'lm•eatened Endangered Species watershed that may he subject to more stringent stornnvater requirements as per NCII C 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://12ortal.nccienr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available fromhtto://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Thecomplete application package should be submitted to the appropriate DWQ Office. (fhe appropriate office may be found by locating project on the interactive online map at ham://12ortal.ncdenr.org/web/wq/ws/su/mats.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.orVIweb/wq/ws/su/statesw/forms dots. Initialp 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants W /A Form. (if required as per Part VII below) ~"c`� v`..ID Form SWU-101 Version 073un2010 Page 4 of 7� FEB 2 4 2011 ate. 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M -CI agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCOENR. (For an Express review, refer to N -yAAr http://www.envhelp.org/pages/`onestol2express.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for I,-l k� 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the N /t (;N Qptcuvgt. receiving stream drains to class SA waters within rh mile of the site boundary, include the 1/ k�e ; t mile radius on the map. sQv7-";rrAL) 7. Sealed, signed and dated calculations. MrJ4- 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MI -I W or NHW line of tidal waters, and any coastal wetlands landward of the MI -I W or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NFIW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). N 1 0h^-t6 t NP�- 9. Copy of any applicable soils report with the associated SFI WT elevations (Please identify N elevations in addition to depths) as well as a map of the boring locations with the existing Po2mt 7 elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the S�13N XTAf-) project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: -N/A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N / A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. httl2://www.secretary.state.iic.us/Corporations/CSearch.aspx xEcr1VED Form SWU-101 Version 07Jun2010 Page 5 of 7 FEB 2 4 Z011 BY: VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from Imp://portal.ncdenr.org/web/wq/ws/so/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer.Perry G. Davis Consulting Firm: Cape Fear Engineering, Inc Mailing Address:151 Poole Road, Suite 100 City:Belville State:NC Zip:28451 Phone: (910 ) 383-1044 I"mail:12errydavis@capefearengineering.com Fax: (910 ) 383-1045 IX. PROPERTY OWNER AUTHORIZATION (if Con tact Information, item 2 has been filted out, complete this section) I, (print or hjpe nante of person listed in Contact Information, item 2n) certify that I own the property identified in this permit application, and thus give permission to (print or hIpe name of person listed in Contact Information, item In) with (print or type none of organization listed in Contact Information, item 1n) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. FormSWU-101 Version 07Jun2010 Page 6of7 FEB 2 4 2011 BY: As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Da a Notary Public for the State of , County of do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION 1, (print or hjpe name of person listed in Contact Information, item In) Carl Baker certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stor/n//y�xvoo��'//ter rules u errn15nA NCAC 21-1 .1000, SL 2006-246 (Ph. 11 - Post Construction) or SL 2008-211. Signature: \O,f Q M -/ Date: I;p p�� f I,-I(�%)t — tVOr6-s,allo�tary�P_ublicfortheS/tateof�0(4CM0 CUCountyof h o`J do hereby certify that ll ���QheJi personally appeared before me this ($ day of ` ` bf%AOLVI 9011 , and ack wledge the due execution of the application for a stormwater permit. Witness my hand nd official seal, SYLVIA NORRIS NOTARY PUBLIC ONSLOW COUNTY, MY COMMISSION EXPIRES 2.FIS SEAL My commission expires-3 ao,5 FormSWU-101 Version071un2010 Page 7of7 1 FEB 2 4 2011 Sheetl COURTHOUSE BAY SITE BUA DATA SHEET: Draining to BMP Drainage Area to Drainage Area 1 B Basin Information Total Drainage (1A+ 1 B) (to Infiltration Basin) (to Storage Basin) Receiving Stream Name Courthouse Bay Courthouse Bay Courthouse Bay Receiving Stream Class SA;HWQ SA;HWQ SA;HWQ Drainage Area 372,796 sf or 8.56 ac 154,578 sf or 3.55 ac 218,218 sf or 5.01 ac Proposed Impervious Area 267,686 sf or 6.15 ac 105,333 sf or 2.42 ac 162,353 sf or 3.73 ac % Impervious Area (total) 71.80% 68.14% 74.40% Impervious Surface Area On -site Buildings / Driveways 16,073 sf or 0.37 ac 16,073 sf or 0.37 ac 0 sf or 0.00 ac On -site Streets & Curbing 16,396 sf or 0.38 ac 16,396 sf or 0.38 ac 0 sf or 0.00 ac On -site Parking 221,481 sf or 5.08 ac 69,354 sf or 1.59 ac 152,127 sf or 3.49 ac On -site Sidewalks 9,915 sf or 0.23 ac 3,510 sf or 0.08 ac 6,405 sf or 0.15 ac Future - Reserve 0 sf or 0.00 ac 0 sf or 0.00 ac 0 sf or 0.00 ac Existing 3,821 sf or 0.09 ac 0 sf or 0.00 ac 3,821 sf or 0.09 ac TOTALS 267,686 sf or 6.15 ac 105,333 sf or 2.42 ac 162,353 sf or 3.73 ac FEB 2 4 2011 vI Page 1 MEMORY TRANSMISSION REPORT FILE NO. 222 DATE 03.17 15:20 TO R 919104512927 DOCUMENT PAGES 9 START TIME 03.17 15:20 END TIME 03.17 15:22 PAGES SENT 9 STATUS OK *** SUCCESSFUL TX NOTICE TIME :03-17-'11 15:22 FAX NO.1 :910-350-2018 NAME :DENR Wilmington *k! Stag of Nortt. Carotins pvpseem�ut M 6nW�oameut autl Natv�'W lu�aur�n� WttmtoIIton Rny}onv ORtca Bawi(y 6o.r Rrda1 a�ovaeuo� FAX COVER 9t'>$ET Bay PlVvwe.., 9ae�atary Co: _N�= / �kl\C Pt.onc: �CO. �.�•�d33 Fn. Fnx. fQjQ]330-J004 t 2'1 C�.lu ml DeivC E�trn�ian �. W�t���{u pton. NC 2690f � (910J 796. )2t3 � An F?qual �+�v.r n�nity ARi�inatiw Ae��on Emplayn� MEMORY TRANSMISSION REPORT FILE NO. 223 DATE 03.17 15:21 TO S 93831045 DOCUMENT PAGES 9 START TIME 03.17 15:22 END TIME 03.17 15:24 PAGES SENT 9 STATUS OR *** SUCCESSFUL TX NOTICE TIME :03-17-'ll 15:24 FAX NO.1 :910-350-2018 NAME :DENR Wilmington *** Sanm orrvo.rn caroum r>°r.�a.ne.ea or ¢n.4rnr...ena .na Iv.aora Re.o ors... ( wu..a raenr Rsgln n.l omen Qavir(y 6�a{vn. PaMra. (�ovneveor FAX COV¢R SHE F'r' //ww F�nronnq S.c rctn ry rlpa - v- No. Pngae (cxcl. cover): Co: //vP/\/Yl Pfi one f 6-TZ3=3 (y [y 71— Fnx: (9101 350-2004 cy>R f 37 Grdinal O�Ive Hwtmefon. Wnm��yfon. NC .... 9 - (910) 996-1213 . An Aef(on Cn�PloYo� � gooCAPE FEAR o Engineering, Inc. 151 Poole Road, Suite 100 BBNllle, NC 28451 TEL (910)383-1044 FAX (810)383-1045 www.capefearengineering.com To: NC DWQ Surface Water Protection State Stormwater Section 127 Cardinal Drive Ext. Wilmington, NC 28405 Attn: Christine Nelson RECO MAR 11 2011 Transmittal Date: March 11, 2011 File: 558-66 "36" Subject: Courthouse Bay P-1142 MCB — Camp Lejeune SW8 091111 Modification Express Review Program ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. 'nal Description 1 7rgi Cover Letter 1 Copy Revised Infiltration Basin Supplement 1 Copy Revised Calculations 1 Copy Revised Level Spreader #1A Supplement (Page 1 of 3) 1 Copy Revised Level Spreader #1 B Supplement (Page 1 of 3) 1 Copy Existing Conditions Exhibit (Half Size) 1 Copy Vicinity Map 3 Copy Revised Stormwater Plan Sheets CS-107, CS-109, & CS-110 REMARKS Please find the above information in response to your Request for Additional Information dated March 3, 2011. Please note that an additional copy of the revised plan sheets have been included to be stamped approved and returned to CFE. If you have any questions or need any additional information please do not hesitate to contact me directly. Thanks. CC: Cape Fear EEEnngineering, nc. File 558-66 "36" -A� Signed: Matthew Haley, E.I. Received By: MAR 1 1 2011 PA558\558-M Counhouse Bay P14001 min\STOR MwATER12011-03-11 Trans_NCDENR.dw BY: r l- ' rd i, i •`• I .`+ ' ,r 'ri.- t�"-��-. �•• - _ _ _ _ _ _ ,, � r 1. 1117 'St'13y�46 ^'�• r( 1�.f g':LLXY y� .l n4 1���t' J . a •q� XwIII t vc .=5•COURTHO�U SAY•BEUS *,E �r �� � x'� c C,�(FVtk KI 9�45 ��y��..�'$!a � r Y �'!v "•}�'Z � � . `� �sq� '.li L'`e o' ,K\ }�J` Y! �YS s �iir•'rY^'�,��� C t� c _ ,� '\ �r '=W< �I � 74 .{. �� a'fr :t a { v yl �,—s ��♦� t v. fy+. Y : v ✓�" k r .Fli �. o �)1 t}�. `.`fie'`. s'.• a14 ahlt� b�a'�(,r v,-v`.`r'el:5fn°Ja. _,��t 4' ~ ^'4,7'r ><+rl��T P" r�/r S+ H-"izY'{j} v.-.YS ��;v /.+i.y.�- :�k^•_3!•-S�:nrR,�, .� .� •J �r ,n. J S+--'y!: (� v.apt v,. R•7'�"« !(o`°rr"'""IP. {c 12 9i 1/i'y"7lv,i,..]'`s`r! �-hY''1 S }e y ytol' .4 1 � '{ � F� +c ' i xi"'256V''x� A i y ! /�I`".. � ',` �ry *°wk'�`art .Ya!` Y t '4 l t+ �.�.•� s ��,tii }'�''✓i r "��} r j t � � - + / f 4 .y��\ f�,�FCC'i r �r �yc�� j• 41 r ` K�.� n n��t'-iilfi"' '\ � "���z '"\ 4',i`,3".h`"'" I � '� ��v'[jyi f _ 'Q}(�" '1 4 i 1( 5r-i�.. ''✓ 1 a n * f t+ y� ? Yi .1 �.ti r R'1F • N ��' j /'VYy V• r � l ,4�' ¢4 -dr �°� I ,"{ U S !, -rcl 6t 1; e� �" s-� .� -�•T+ �t -0i �t 'X L^y�, •3„ e n7,en�i 1 G +T S a'I F1,- d.,•'�. a a S J ( ' � �.{ j +� � "�� n„�� � e lk%.� _ r. ai _ ��ih'. ' o 'E `.r "t I r � %62�H. '� v i 7r� .w.✓�� V ���7+�t �rNA , K'ef •i•1 1 �j'( ...Y it{1"�� T •'•t;� ( �T� Di]9t/� :a w•r"Y -. <C �+r.t-sr t'aa.- + yy F ,r A� _ e, I ��A rry ,{4�;�'�„i��-� �i'•.i�e." . -��� RS7� �1 �17 ��f a �vyi � r T �� -.=�j.,,lS: = xf .��ir '� �'t� 1{4'S''T'v��41 � t V^- avy, ��',� �rf 1 .f= - - \�.. �°� ��'��,�' �a�� -�rk-ti y+y{-S•S-I Y�iy1 * i�` `�.• ..7i.«2 .�i}r 1L +� d t, , ,Gs�,�ia �, y: •; .r/: y 6c'•.�c^' s '+� Y`9 3 ,b' 3 r i�, �1 'v ♦ .�- I(ma6 ®Y`oi O9Ult IGI e �.` �A"j'4 .a.—..t a {V�IN ]. ry + Yh { iG SIOYNOAA 55,�N Y'LHG.I�GE6CO�C,� w: F .r r' 4� "-�(+I 02010 fit\ aJ\ - I 9 U JIS 5 G 191�1S • F(�,."./J±xs !:•_.9 %. �.i�'. "yrx r_ } aa•a`rrR Fu• Imnnn ..oma .onannaT J 77 m 5tormwater Calculations Subject: Courthouse Bay P-1142 Modification for P-1400 Marine Corps Energy Initiative MCB Camp Lejeune, North Carolina Prepared for: Marine Corps Base, Camp Lejeune Building 1005, Michael Road MCB Camp Lejeune, NC 28547 Date: February 2011 Revised: March 2011 Prepared by: Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, North Carolina 28451 (910)383-1044 - --•r,77� MAR 1 1 2011 Water Quality Calculations ,aIVED LMAR 1 1 2011 .Y: INFILTRATION BASIN DATA SHEET DE51GN CALCULATIONS FOR � COURTHOUSE BAY DRAINAGE AREA (Ad) = IMPERVIOUS AREA (A1): PERCENT IMPERVIOUS (1): 218,218 50. FT BUILDINGS: 0 SQ. FT PARKING: 152,127 50. FT SIDEWALKS: G,405 50. FT EXISTING: 3,821 5Q. FT RESERVE: O 50. FT TOTAL: I G2,353 50. FT I = Ad/Ai = 74.40% DATE: 3/9/2011 PROJECT NO.: 558-GG DESIGNED BY: MTN Note: System shall be designed to store the larger of the 1 .5" water quality design storm or the difference In the pre -development and post -development volume for the I -year 24-hour storm event. See calculations below for how each volume was determined. REQUIRED VOLUME (1 .5" SIMPLE METHOD) = 19,G29 CF REQUIRED VOLUME (PRE -POST I -YR 24-HP) = 38,801 CF DESIGN VOLUME = 35,501 CF REQUIRED VOLUME (SIMPLE METHOD BY TOM 5CHUELER): Rv=0.05 +0.009' (I) Rv= 0.71959505 VOLUME= I .5"Pv'AcI= 0.450G 1 008 AC -FT 19,G29 FT^3 P:\558\558-GG Courthouse Bay P 1400\CALC5\5tormwater\201 1 -03-09 CB -Infiltration Basn Calc5 RS C'F."gT-jq�7 MAR 1 1 2011 BY: INF STORAGE BA51N DATA SHEET PAGE I OF 5 REQUIRED VOLUME (PRE -POST I -YEAR 24-HOUR) PRE -DEVELOPMENT I % IMPERVIOUS = 2.5% G,?V,,3 a7a77 3f j1 3OA P.v=0.05 +0.009' (() Rv= 0. I G25 VOLUME= 3.83"'Rv'Acl = 0.259820G I AC -FT = 11,315 FT^3 POST -DEVELOPMENT % IMPERVIOUS = 74.4% Rv=0.05 +0.009' (I) Rv= 0.71959508 VOLUME= 3.83" Pv'Ad = 1 .15055773 AC -FT = 50, 118 FT-3 VOLUME POST - VOLUME PRE = 38,801 CF VOLUME PROVIDED INCREM. TOTAL F.L. SA (5f) VOL, (CF) VOL (CF) PUMP OFF 4.5 8, 146 0 0 5 8.724 4,218 4,218 5.5 9,32G 4,513 5,731 G 9.555 4,821 13,552 7 1 1,273 1 O,G I G 24, I G7 8 1 2,GG9 1 1,971 3G, 138 WEIR 8.25 12,005 3, 197 35,335 5.75 13,37G 9,7G7 45,505 STORAGE VOLUME PROVIDED AT ELEV (8.25) = 35,335 CF 11 VOL. PROV'D= 30,335 > 36,601 =VOL. REQ'D OK P:\558\558-GG Courthouse Bay P 1400\CALC5\5tormwater\201 I-03-09 C.Infiltration Basin Calcs MAR 1 1 2011 INF STORAGE BA51N DATA SHEET PAGE 2 OF 5 INFILTRATION BASIN # 1 A ONLY DRAINAGE AREA (Ad) = 154,576 5Q. FT IMPERVIOUS AREA (AI): BUILDINGS: I G,073 SQ. FT STREETS: I G.39G 50. FT PARKING G9,354 SQ. FT 51DEWALKS 3,510 50. FT TOTAL: 105,333 5Q. FT PERCENT IMPERVIOUS (I): I = AWN = G8. 14% Note_ System shall be designed to store the larger of the 1 .5" water quality design storm or the difference in the pre -development and post -development volume for the I -year 24-hour storm event. See calculations below for how each volume was determined. REQUIRED VOLUME (1 .5" SIMPLE METHOD) = 12.81 G CF REQUIRED VOLUME (PRE -POST I -YR 24-HR) = 24,440 CF DESIGN VOLUME = 24,440 CF 11 REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05 +0.009' (I) Rv= O.GG3280G7 VOLUME= 1.5"'Rv'Ad = 0.25421 GG AC -FT 12,81G FT^3 MAR 1 1 Z011 /a. INF STORAGE BA51N DATA SHEET P:t558%558-GG Courthouse Bay P 140GCALC5\5tormwater1201 1 -03-09 CB -Infiltration Basin CAV5 PAGE 3 OF 5 REQUIRED VOLUME (PRE -POST I -YEAR 24-HOUR) PRE -DEVELOPMENT �pa5O % IMPERVIOUS = 13. 1 % G p-vx t Rv=0.05+0.009'(1) t Rv= 0. 1 G79 VOLUME= 3.83-Rv'AcI = 0. 150) G388 AC -FT 8,284 FT^3 PRE -DEVELOPMENT IMPERVIOUS = G8. 14% Rv=0.05 +0.009' (I) Rv= O.GG3280G7 VOLUME= 3.83"'Rv'Acl = 0.75 123305 AC -FT 32,724 FT^3 VOLUME P05T - VOLUME PRE = 24,440 CF TOTAL REQUIRED STORAGE VOLUME NOTE: BECAUSE THE INFILTRATION FLOW RATE OUT OF BA51N # I A (I. 15 CF5) GREATLY EXCEEDS THE PUMPING RATE FROM STORAGE BA51N N I B (0.23 CFS) THERE 15 NO NEED FOR ANY ADDITIONAL STORAGE VOLUME IN BA51N N I A. TOTAL KEQ'D VOLUME = 24,440 CF VOLUME PROVIDED: INCREM. TOTAL Fes. SA (5F) Vol- (CF) VOL. (CF) 4 7,GG4 0 0 5 5,011 8,338 8,335 G 10,4 1 G 5,7)4 1 8,05 1 7 1 1,577 1 1, 1 47 29,198 WEIR 7.3 12,332 3,G31 32,529 8 13,395 5,005 41,834 1 .5" STORAGE VOLUME PROVIDED AT ELEV (7.3) = 32,829 CF VOL. PROV'D= 32,629 > 24,440 =VOL. REQ'D OK `A555\555-GG Courthouse Bay P 1400\CALC5\5tormwate`i201 1-03-09 CB -Infiltration Balm Calc5 PIT CFJVE MAR 1 1 2011 r v. INF STORAGE BA51N DATA SHEET PAGE 4 OF 5 DRAWDOWN TIME: INFILTRATION BA51N # I A LINEAR INFILTRATION RATE = G.7 IN/HR = 0.000) 55 FT/5 BASIN BOTTOM AREA = 7,GG4 5F INFILTRATION FLOWRATE = 1. 1 88G25G3 CF5 VOLUME TO DRAWDOWN = 32,829 CF INFILTRATION TIME = 4GO MIN 7.7 HOURS 0.32 DAYS STORAGE BASIN # 113 PUMP RATE = 0.23 CF5 VOLUME TO DRAWDOWN = 35,335 CF PUMPING TIME = 2550 MIN = -17.5 11OUR5 = 1.58 DAYS LINEAR INFILTRATION RATE = G.7 IN/t K = 0.000155 FT/5 BA51N BOTTOM AREA = 7,GG4 SF INFILTRATION FLOWRATE = 1. 188G29G3 CF5 VOLUME TO DRAWDOWN = 33,335 CF INFILTRATION TIME = 552 MIN 5.2 HOURS 0.38 DAYS (FROM DRAINAGE BA51N # I A ONLY) TOTAL DRAWDOWN TIME = PUMPING TIME + INFILTRATING TIME _ F:\558\558-GG Courthouse Bay f 1400\CALC5�5tormwater\201 -03-03 CB -Infiltration BaSm Calc5 2.3G DAYS VFD MAR 1 1 Y011 INF STORAGE BASIN DATA SHEET PAGE 5 OF 5 C C )I JI I IC 14 m O O X i]A V) D D MZ>M A C)C) W 50 F}mD C N A Z Ln nm ,q D W III � TDJ L 3 �mg mn a g�mm g �� N am 3 e O L� ^� o a 9[ ®€ K tl x �j g S8 frcrvmme EFACILITIES ENGINE RING COMMAND MIQ -ATLAmNnTc ICwwwo gg ag � ��9 as sa wNwrc I �941 � 11 P-1400 rq CB MARINE CAMPLIE EUNEP AINITIATIVES ENERGY PRE -FINAL CKSONVILLE, NORTH CAROLIN$ lu � ®® COURTHOUSE BAY — EXISTING CONDITIONS i J .. Routing Calculations MAR 1 1 2011 *Y: ` HydrafloW Table of Contents 2011-03-09 CB-ROUTING.gpw n Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Watershed Model Schematic................................................................................ 1 Hydrograph Return Period Recap........................................................................ 2 iW SummaryReport ................................................................................................................... 3 HydrographReports............................................................................................................. 4 Hydrograph No. 1, SCS Runoff, Storage Basin Pre-Dev.................................................. 4 Hydrograph No. 2, SCS Runoff, Inf Basin Pre-Dev............................................................ 5 Hydrograph No. 3, Combine, Combined Pre-Dev.............................................................. 6 Hydrograph No. 5, SCS Runoff, Post-Dev Storage Basin .................................................. 7 Hydrograph No. 6, Reservoir, Routed Storage Basin......................................................... 8 PondReport - Storage Basin......................................................................................... 9 Hydrograph No. 8, Diversion1, Pumped to Inf Basin ........................................................ 11 Hydrograph No. 9, Diversion2, Through VFS & Spillway ................................................. 12 Hydrograph No. 11, SCS Runoff, Post-Dev Inf Basin ...................................................... 13 Hydrograph No. 13, Combine, From Storage+Post Dev Infil. Basin ................................. 14 Hydrograph No. 15, Reservoir, Inf Basin Routed............................................................. 15 Pond Report - Infiltration Basin.................................................................................... 16 Hydrograph No. 17, Combine, Combined Post................................................................ 18 10 - Year SummaryReport ................................................................................................................. 19 HydrographReports........................................................................................................... 20 Hydrograph No. 1, SCS Runoff, Storage Basin Pre-Dev................................................ 20 Hydrograph No. 2, SCS Runoff, Inf Basin Pre-Dev.......................................................... 21 Hydrograph No. 3, Combine, Combined Pre-Dev............................................................ 22 Hydrograph No. 5, SCS Runoff, Post-Dev Storage Basin ................................................ 23 Hydrograph No. 6, Reservoir, Routed Storage Basin ....................................................... 24 Hydrograph No. 8, Diversion1, Pumped to Inf Basin ........................................................ 25 Hydrograph No. 9, Diversion2, Through VFS & Spillway ................................................. 26 Hydrograph No. 11, SCS Runoff, Post-Dev Inf Basin ...................................................... 27 Hydrograph No. 13, Combine, From Storage+Post Dev Infil. Basin ................................. 28 Hydrograph No. 15, Reservoir, Inf Basin Routed............................................................. 29 Hydrograph No. 17, Combine, Combined Post................................................................ 30 MAR 1 1 Z011 1 Watershed Model Schemat �Fdraflow Hydrographs Extension for AutoCAD®Civil 3D®2010 by Autodesk, Inc. v9.25 Y 13 Legend Hvd. Origin Description 1 SCS Runoff Storage Basin Pre-Dev 2 SCS Runoff Inf Basin Pre-Dev 3 Combine Combined Pre-Dev 5 SCS Runoff Post-Dev Storage Basin 6 Reservoir Routed Storage Basin 8 Diversionl Pumped to Inf Basin 9 Diversion2 Through VFS & Spillway 11 SCS Runoff Post-Dev Inf Basin 13 Combine From Storage+post Dev Infil. Basin 15 Reservoir Inf Basin Routed 17 Combine Combined Post ol9 Y 17 RTrCE VED MAR 1 1 2011 Project: CB-ROUTING.gpw I Wednesday, Feb 23, 2011 Hydrograph Return Period Rytcovographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff --- 0,099 ---- -- - — - 2,890 -- -- -- Storage Basin Pre-Dev 2 SCS Runoff 0.013 1.111 Inf Basin Pre-Dev 3 Combine 1,2 0.099 ---- ---- ----- 4.000 ---- ------ ----- Combined Pre-Dev 5 SCS Runoff 9.062 21.79 Post-Dev Storage Basin 6 Reservoir 5 0.230 -- --- -- 11.41 -- -- Routed Storage Basin 8 Diversionl 6 0.230 --- --- ---- 0.230 --- ---- --- Pumped to Inf Basin 9 Diversion2 6 0.000 11.18 Through VFS & Spillway 11 SCS Runoff ---- 3.971 ----- ----- ----- 10.43 ----- ------ ------- Post-Dev Inf Basin 13 Combine 8, 11, 4.201 10.66 From Storage+Post Dev Intl. Basin 15 Reservoir 13 0.000 ----- ----- ----- 0.000 ------ ------ ----- Inf Basin Routed 17 Combine 9, 15, 0.000 11.18 Combined Post MAR 1 1 2011 Proj. file: 2011-03-09 CB-ROUTING.gpw Friday, Mar 11, 2011 Hydrograph Summary Re Kyld aflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuN) 1 SCS Runoff 0.099 1 839 2,555 -- -- Storage Basin Pre-Dev 2 SCS Runoff 0.013 1 1043 390 Inf Basin Pre-Dev 3 Combine 0,099 1 916 2,945 1,2 -- Combined Pre-Dev 5 SCS Runoff 9.062 1 732 38,464 ---- ---- ------ Post-Dev Storage Basin 6 Reservoir 0.230 1 714 30,567 5 7.35 28,403 Routed Storage Basin 8 Diversionl 0.230 5 3570 152,833 6 Pumped to Inf Basin 9 Diversion2 0.000 5 n/a 0 6 Through VFS & Spillway 11 SCS Runoff 3.971 1 747 23,408 ---- ----- ---- Post-Dev Inf Basin 13 Combine 4.201 1 747 53,976 8, 11, --- --- From Storage+post Dev Infil. Basin 15 Reservoir 0.000 1 1150 0 13 5.13 9,632 Inf Basin Routed 17 Combine 0.000 1 1150 0 9, 15, --- -- Combined Post MAR 1 1 2011 2011-03-09 CB-ROUTING.gpw Return Period: 1 Year Friday, Mar 11, 2011 4 Hydrograph Report 1 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 1 Storage Basin Pre-Dev Hydrograph type = SCS Runoff Peak discharge = 0.099 cfs Storm frequency = 1 yrs Time to peak = 839 min Time interval = 1 min Hyd. volume = 2,555 cult Drainage area = 5.010 ac Curve number = 45' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 48.66 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.690 x 98) + (4.310 x 36)) / 5.010 Storage Basin Pre-Dev Q (Cfs) Q (Cfs) Hyd. No. 1 -- 1 Year 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 000 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) n <�VED MAR 1 1 Z011 Ir1: Hydrograph Report 5 _ Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 2 Inf Basin Pre-Dev Hydrograph type = SCS Runoff Peak discharge = 0.013 cfs Storm frequency = 1 yrs Time to peak = 1043 min Time interval = 1 min Hyd. volume = 390 cuft Drainage area = 3.550 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 41.10 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 000 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) �TED MAR 1 1 Z011 Inf Basin Pre-Dev Hyd. No. 2 -- 1 Year - Hydrograph Report s Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 3 Combined Pre-Dev Hydrograph type = Combine Peak discharge = 0.099 cfs Storm frequency = 1 yrs Time to peak = 916 min Time interval = 1 min Hyd. volume = 2,945 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 8.560 ac Combined Pre-Dev Q (Cfs) Q (Cfs) Hyd. No. 3 -- 1 Year 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 000 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 —Hyd No. 1 —Hyd No. 2 Time (min) "TVED MAR 1 1 2011 I 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 5 Post-Dev Storage Basin Hydrograph type = SCS Runoff Peak discharge = 9.062 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 38,464 cuft Drainage area = 5.010 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.34 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Post-Dev Storage Basin Q (ems) Hyd. No. 5 -- 1 Year 10.00 m Om 4.00 2.00 WWP Q (cfs) 10.00 M "fill 4.00 2.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) F3� �1"' V �.� MAR I 1 2011 Hydrograph Report $ - Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 6 Routed Storage Basin Hydrograph type = Reservoir Peak discharge = 0.230 cfs Storm frequency = 1 yrs Time to peak = 714 min Time interval = 1 min Hyd. volume = 30,567 cult Inflow hyd. No. = 5 - Post-Dev Storage Basin Max. Elevation = 7.35 ft Reservoir name = Storage Basin Max. Storage = 28,403 cult Storage Indication method used Routed Storage Basin Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0 00 0 00 0 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 6 — Hyd No. 5 ® Total storage used = 28,403 cult 7MAR:ThVjE-D 3000 Time (min) Pond Report Vj Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 in Pond No. 1 - Storage Basin Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 4.50 it Stage / Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr. Storage (cuft) Total storage (cult) 0.00 4.50 8,148 0 0 0.50 5.00 8,724 4,217 4,217 1.50 6.00 9,958 9,333 13,550 2.50 7.00 11,273 10,608 24,158 3.50 8.00 12,669 11,963 36,121 4.25 8.75 13,376 9,765 45,885 Friday, Mar 11, 2011 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 Inactive 0.00 0.00 Crest Len (ft) = 2.00 20.00 0.00 0.00 Span (in) = 18.00 0.00 0.00 0.00 Crest El. (ft) = 8.25 8.25 0.00 0.00 No. Barrels = 10 10 0 0 Weir Coeff. = 3.330.00 2.60 3.33 3.33 Invert El. (ft) = 5.00 0.00 0.00 0.00 Weir Type = 1 Broad - - Length (ft) = 34.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 4.40 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note.Culvert/Orifice outflows are analyzed under inlet(ic) and outlet (oc) control. Weir risers checked for critics conditions l ic) and submemence(a). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cis cis cis cfs cis cfs cis cis cis 0.00 0 4.50 0.00 -- -- -- 0.05 422 4.55 0.00 0.10 843 4.60 0.00 - -- - 0.15 1,265 4.65 0.00 0.20 1,687 4.70 0.00 - -- -- 0.25 2,108 4.75 0.00 0.30 2,530 4.80 0.00 - -- - 0.35 2,952 4.85 0.00 - - -- 0.40 3,373 4.90 0.00 -- - -- 0.45 3,795 4.95 0.00 - 0.50 4,217 5.00 0.00 -- -- -- 0.60 5,150 5.10 0.00 - 0.70 6,083 5.20 0.00 -- -- -- 0.80 7,017 5.30 0.00 - - - 0.90 7,950 5.40 0.00 -- -- - 1.00 8,883 5.50 0.00 - - - 1.10 9,817 5.60 0.00 -- -- -- 1.20 10,750 5.70 0.00 1.30 11,683 5.80 0.00 --- -- -- 1.40 12,617 5.90 0.00 1.50 13,550 6.00 0.00 --- - -- 1.60 14,611 6.10 0.00 1.70 15,672 6.20 0.00 --- -- -- 1.80 16,732 6.30 0.00 1.90 17,793 6.40 0.00 --- - - 2.00 18,854 6.50 0.00 - - - 2.10 19,915 6.60 0.00 --- -- -- 2.20 20,975 6.70 0.00 - - - 2.30 22,036 6.80 0.00 --- -- -- 2.40 23,097 6.90 0.00 - 2.50 24,158 7.00 0.00 --- -- -- 2.60 25,354 7.10 0.00 - 2.70 26,550 7.20 0.00 -- -- -- 2.80 27,747 7.30 0.00 - 2.90 28,943 7.40 0.00 --- -- -- 0.00 0.00 0.00 0.00 -- - 0.00 0.00 -- - 0.00 0.00 -- -- 0.00 0.00 - - 0.00 0.00 -- - 0.00 0.00 - - 0.00 0.00 -- - 0.00 0.00 -- - 0.00 0.00 - - 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 --- 0.00 0.00 0.00 0.00 0.00 0.00 - -- 0.00 0.00 -- - 0.00 0.00 - -- 0.00 0.00 -- -- 0.00 0.00 - 0.00 0.00 -- -- 0.00 0.00 -- -- 0.00 0.00 -- - 0.00 0.00 -- - 0.00 0.00 -- 0.00 0.00 - -- 0.00 0.00 - -- 0.00 0.00 -- -- 0.00 0.00 - 0.00 0.00 - -- 0.00 0.00 - - 0.00 0.00 0.00 0.00 - -- 10.00-_.0.00 - 0.000 --- 0,023 0.023 - 0.046 0.046 --- 0.069 0.069 - 0,092 0.092 --- 0.115 0.115 0.138 0.138 -- 0.161 0.161 0.184 0.184 -- 0.207 0.207 0.230 0.230 0.230 0.230 0.230 0.230 -- 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 -- 0,230 0.230 0.230 0.230 -- 0,230 0.230 -- 0.230 0.230 - 0,230 0.230 -- 0.230 0.230 0.230 0.230 -- 0.230 0,230 0.230 0.230 -- 0.230 0.230 0.230 0.230 --- 0.230 0.230 -- 0.230 0.230 0.230 0.230 -- 0.230 0,230 --- 0.230 0.230 MAR 1 1 2011 T2V• Continues on next page _ 10 Storage Basin Stage / Storage / Discharge Table Stage Storage Elevation ClvA ClvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.00 30,139 7.50 0.00 -- --- --- 0.00 0.00 -- -- -- 0.230 0.230 3.10 31,335 7.60 0.00 - 0.00 0.00 - -- -- 0.230 0.230 3.20 32,532 7.70 0.00 - - - 0.00 0.00 - - - 0.230 0.230 3.30 33,728 7.80 0.00 -- -- --- 0.00 0.00 - -- -- 0.230 0.230 3.40 34,924 7.90 0.00 - -- -- 0.00 0.00 -- --- -- 0.230 0.230 3.50 36,121 &00 0.00 - - - 0.00 0.00 - - - 0,230 0.230 3.58 37,097 8.08 0.00 - - - 0.00 0.00 - -- - 0,230 0.230 3.65 38,074 8.15 0.00 -- -- -- 0.00 0.00 -- --- -- 0.230 0.230 3.73 39,050 8.22 0.00 -- -- - 0.00 0.00 -- -- -- 0,230 0,230 3.80 40,027 8.30 0.08 is - - - 0.07 0.58 - - - 0.230 0.886 3.88 41,003 8.37 0.29 is -- -- - 0.29 2.30 -- --- -- 0.230 2.822 3.95 41,980 8.45 0.62 is --- -- -- 0.60 4.65 --- -- --- 0.230 5.477 4.03 42,956 8.52 0.72 is -- - - 0.70 is 7.50 - - --- 0.230 8,434 4.10 43,932 8.60 0.80 is - - - 0.80 is 10.77 - - - 0.230 11.79 4.18 44,909 8.67 0.88 is --- -- -- 0.88 is 14.41 --- -- --- 0.230 15.51 4.25 45,885 8.75 0.97 is -- -- --- 0.95 is 18.38 - - --- 0.230 19.57 ...End MAR 1 1 2011 .BY. - - Hydrograph Report 11 - nyaranow nymuyiapns ❑xtension ror nu[oUnuav Urvu auw to iu oy Au[ooesK, mc, va.[o Hyd. No. 8 Pumped to Inf Basin Hydrograph type = Diversionl Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 5 min Hyd. volume Inflow hydrograph = 6 - Routed Storage Basin 2nd diverted hyd. Diversion method = Constant Q Constant Q Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 Friday, Mar 11, 2011 = 0.230 cfs = 3570 min = 152,833 cuff =9 = 0.23 cfs Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 1500 3000 4500 6000 7500 9000 10500 12000 13500 15000 — Hyd No. 8 -- Up to 0.23 cfs —Hyd No. 6 --Inflow — Hyd No. 9 -- 6 minus 8 Time (min) P IFL CFIIVED MAR 1 1 2011 BY:------ Pumped to Inf Basin Hyd. No. 8 -- 1 Year Hydrograph Report 12 n Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO2010 by Autodesk, Inc. v9.25 Hyd. No. 9 Through VFS & Spillway Hydrograph type = Diversion2 Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 5 min Hyd. volume Inflow hydrograph = 6 -Routed Storage Basin 2nd diverted hyd Diversion method = Constant Q Constant Q Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 Through VFS & Spillway Hyd. No. 9 -- 1 Year 0 50 100 150 200 Hyd No. 9 -- > 0.23 cfs — Hyd No. 6 -- Inflow Friday, Mar 11, 2011 = 0.000 cfs = n/a = 0 cult =8 = 0.23 cfs Q (cfs) 0.50 0.45 0.40 0.35 -- - - - - 0.30 0.25 - - - - - 0.20 0.15 0.10 - - — 0.05 0.00 250 300 Hyd No. 8 Time (min) - RF•` 7,,7VED MAR 1 1 2011 Sy. Hydrograph Report 13 - Hydraflow Hydrographs Extension for AutoCADG Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 11 Post-Dev Inf Basin Hydrograph type = SCS Runoff Peak discharge = 3.971 cfs Storm frequency = 1 yrs Time to peak = 747 min Time interval = 1 min Hyd. volume = 23,408 cuft Drainage area = 3.550 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 37.80 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Post-Dev Inf Basin Q (cfs) Q (Cfs) Hyd. No. 11 -- 1 Year 4.00 3.00 4.00 2.00 3.00 1.00 2.00 000 1.00 n nn 0 120 240 360 480 600 720 840 960 Hyd No. 11 1080 1200 1320 1440 1560 Time (min) IRI 2011 Hydrograph Report 14 - Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 13 From Storage+Post Dev Infil. Basin Hydrograph type = Combine Peak discharge = 4.201 cfs Storm frequency = 1 yrs Time to peak = 747 min Time interval = 1 min Hyd. volume = 53,976 cuft Inflow hyds. = 8, 11 Contrib. drain. area = 3.550 ac Q (cfs) 5.00 4.00 3.00 r M 1.00 From Storage+Post Dev Infil. Basin Hyd. No. 13 -- 1 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 — Hyd No. 13 —Hyd No. 8 —Hyd No. 11='--.. ,.,, A Time (min) ���� j MAR 11 2011 15 Hydrograph Report - Hydraflow Hydrographs Extension for AutoCAD® Civil 3D0 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 15 Inf Basin Routed Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 1150 min Time interval = 1 min Hyd. volume = 0 tuft Inflow hyd. No. = 13 -From Storage+Post Dev Mfik.ISdeimtion = 5.13 ft Reservoir name = Infiltration Basin Max. Storage = 9,632 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 5.00 4.00 3.00 2.00 1.00 A Inf Basin Routed Hyd. No. 15 -- 1 Year Q (cfs) 5.00 99111111 2.00 1.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 — Hyd No. 15 —Hyd No. 13 ®Total storage used = 9,632 tuft Time (min) MAR 1 1 2011 I Pond Report 's Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Pond No. 2 - Infiltration Basin Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 4.00 It Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 4.00 7,664 0 0 1.00 5.00 9,011 8,328 8,328 2.00 6.00 10,416 9,704 18,032 3.00 7.00 11,877 11,137 29,169 3.30 7.30 12,327 3,630 32,799 3.77 7.77 12,995 5,949 38,748 4.00 8.00 13,395 3,034 41,783 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 0.00 0.00 0.00 Crest Len (li = 4.00 20.00 0.00 0.00 Span (in) = 18.00 0.00 0.00 0.00 Crest El. (ft) = 7.30 7.50 0.00 0.00 No. Barrels = 10 0 0 0 Weir Coeff. = 3.330.00 2.60 3.33 3.33 Invert El. (ft) = 4.00 0.00 0.00 0.00 Weir Type = 1 Broad -- --- Length (ft) = 30.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%I = 5.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 6.70,000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Now CulveNCrifice outflows are analyzed under inlet(ic) and outlet loci control. Weir risers checked for orifice conditions(ic) and submergence (a). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total it cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 4.00 0.00 - - - 0.10 833 4.10 0.00 - - - 0.20 1,666 4.20 0.00 -- -- -- 0.30 2,498 4.30 0.00 -- --- --- 0.40 3,331 4.40 0.00 - --- -- 0.50 4,164 4.50 0.00 - -- - 0.60 4,997 4.60 0.00 - - - 0.70 5,829 4.70 0.00 - - - 0.80 6,662 4.80 0.00 - -- --- 0.90 7,495 4.90 0.00 --- --- --- 1.00 8,328 5.00 0.00 -- -- -- 1.10 9,298 5.10 0.00 - 1.20 10,268 5.20 0.00 - - - 1.30 11,239 5.30 0.00 - - -- 1.40 12,209 5.40 0.00 -- --- --- 1.50 13,180 5.50 0.00 --- --- -- 1.60 14,150 5.60 0.00 -- -- - 1.70 15,120 5.70 0.00 - - - 1.80 16,091 5.80 0.00 - - - 1.90 17,061 5.90 0.00 -- -- --- 2.00 18,032 6.00 0.00 --- --- -- 2.10 19,145 6.10 0.00 - --- -- 2.20 20,259 6.20 0.00 - - - 2.30 21,373 6.30 0.00 - - - 2.40 22,487 6.40 0.00 -- - - 2.50 23,600 6.50 0.00 -- -- --- 2.60 24,714 6.60 0.00 - --- --- 2.70 25,828 6.70 0.00 - -- -- 2.80 26,942 6.80 0.00 - - - 2.90 28,055 6.90 0.00 - - - 3.00 29,169 7.00 0.00 -- -- -- 3.03 29,532 7.03 0.00 -- --- --- 3.06 29,895 7.06 0.00 -- -- -- 3.09 30,258 7.09 0.00 - - -- 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 0.00 0.00 -- 0.00 0.00 -- 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 0.00 0.00 -- 0.00 0.00 -- 0.00 0.00 -- 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 0.00 0.00 --- 0.00 0.00 -- 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 0.00 0.00 -- 0.00 0.00 -- 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 0.00 0.00 -- 0.00 0.00 -- 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 0.00 0.00 -- 0.00 0.00 --- 0.00 0.00 7-0.00'kO�OOa MAR 1 1 2011 BY: - 0.000 - 0.000 - 0.140 - 0.140 -- 0.280 -- 0.280 -- 0.419 --- 0.419 --- 0.559 --- 0.559 - 0.699 - 0.699 - 0.839 - 0.839 - 0.978 - 0.978 --- 1.118 -- 1.118 --- 1,258 --- 1.258 - 1.398 -- 1.398 - 1.419 -- 1.419 - 1.441 - 1.441 - 1.463 -- 1.463 --- 1A85 --- 1.485 --- 1.506 --- 1,506 - 1.528 -- 1,528 - 1.550 - 1.550 - 1.572 - 1.572 -- 1.594 -- 1.594 --- 1.615 --- 1.615 -- 1.638 -- 1.638 - 1.661 - L661 - 1.683 - 1.683 - 1,706 - 1,706 --- 1.729 --- 1.729 --- 1.751 --- 1.751 -- 1.774 - 1.774 - 1.797 - 1.797 - 1.819 - 1.819 -- 1.842 -- 1.842 --- 1.849 -- 1.849 --- 1.856 --- 1,856 - 1,863 - 1.863 Continues on next page 17 Infiltration Basin Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft Cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.12 30,621 7.12 0.00 -- -- -- 0.00 0.00 --- --- 1.870 --- 1.870 3.15 30,984 7.15 0.00 --- -- -- 0.00 0.00 --- -- 1.877 -- 1.877 3.18 31,347 7.18 0.00 - - - 0.00 0.00 1.884 - 1.884 3.21 31,710 7.21 0.00 - - - 0.00 0.00 - - 1.891 - 1.891 3.24 32,073 7.24 0.00 - 0.00 0.00 -- - 1.898 - 1.898 3.27 32,436 7.27 0.00 --- -- --- 0.00 0.00 --- -- 1.905 -- 1.905 3.30 32,799 7.30 0.00 -- --- --- 0.00 0.00 -- --- 1.912 --- 1.912 3.35 33,394 7.35 0.14 is - - -- 0.14 0.00 - - 1.922 -- 2.058 3.39 33,989 7.39 0.38 is - - - 0.38 0.00 - - 1.933 - 2.316 3.44 34,584 7.44 0.72 is - - - 0.71 0.00 - - 1.943 - 2.648 3.49 35,179 7A9 1.11 is -- -- -- 1.09 0.00 -- -- 1.953 --- 3.039 3.54 35,774 7.54 1.53 is --- -- -- 1.52 0.34 -- --- 1.964 -- 3.822 3.58 36,369 7.58 2.03 is -- - - 1.99 1.22 -- --- 1.974 -- 5.190 3.63 36,964 7.63 2.51 is - - - 2.51 2.41 - - 1.984 - 6.907 3.68 37,559 7.68 3.11 is - - - 3.07 3.84 - - 1.995 - 8.905 3.72 38,154 7.72 3.66 is - - - 3.66 5.48 - -- 2.005 -- 11.15 3.77 38,748 7.77 4.34 is --- -- --- 4.29 7.30 --- --- 2.015 -- 13.60 3.79 39,052 7.79 4.65 is - -- --- 4.61 8.25 --- -- 2.022 -- 14.88 3.82 39,355 7.82 4.52 is - - - 3.86 is 9.24 - - 2.028 - 15.13 3.84 39,659 7.84 4.44 is - - - 3.95 is 10.26 - - 2.034 - 16.25 3.86 39,962 7.86 4.36 is -- - -- 4.03 is 11.33 -- - 2.040 - 17.40 3.89 40,266 7.88 4.29 is --- -- --- 4.11 is 12.42 --- -- 2.046 -- 18.58 3.91 40,569 7.91 4.21 is --- --- -- 4.19 is 13.55 -- --- 2.053 --- 19.80 3.93 40,873 7.93 4.27 is - - - 4.27 is 14.71 - - 2.059 - 21.04 3.95 41,176 7.95 4.35 is - - - 4.35 is 15.91 - - 2.065 - 22.32 3.98 41,479 7.98 4.42 is - - - 4.42 is 17A3 - - 2,071 - 23.63 4.00 41,783 8.00 4.50 is -- -- -- 4.50 is 18.38 -- -- 2.077 -- 24.96 ...End MAR 1 1 2011 Hydrograph Report 18 Hydraflow Hydrographs Extension for AutoCAD9 Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 17 Combined Post Hydrograph type = Combine Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 1150 min Time interval = 1 min Hyd. volume = 0 cuft Inflow hyds. = 9, 15 Contrib. drain. area = 0.000 ac Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 240 480 Combined Post Hyd. No. 17 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 720 960 1200 1440 1680 1920 2160 2400 2640 — Hyd No. 9 —Hyd No. 15 Time (min) MAR 1 1 2011 BY:_---- 19 Hydrograph Summary Re plPyldraflow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.890 1 762 24,295 --- -- -- Storage Basin Pre-Dev 2 SCS Runoff 1.111 1 763 10,988 Inf Basin Pre-Dev 3 Combine 4.000 1 762 35,284 1,2 -- Combined Pre-Dev 5 SCS Runoff 21.79 1 732 94,137 ---- ----- ----- Post-Dev Storage Basin 6 Reservoir 11.41 1 748 74,679 5 8.59 43,822 Routed Storage Basin 8 Diversionl 0.230 5 3695 162,147 6 -- Pumped to Inf Basin 9 Diversion2 11.18 5 3740 211,256 6 Through VFS & Spillway 11 SCS Runoff 10.43 1 746 61,341 ----- ---- --- Post-Dev Inf Basin 13 Combine 10.66 1 746 93,766 8, 11, --- ---- From Storage+post Dev Infil. Basin 15 Reservoir 0.000 1 1132 0 13 7.10 30,358 Inf Basin Routed 17 Combine 11.18 1 748 42,251 9, 15, -- -- Combined Post MAR 1 1 '1011 2011-03-09 CB-ROUTING.gpw Return Period. 10 Year Friday, Mar 11, 2011 Hydrograph Report 20 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 1 Storage Basin Pre-Dev Hydrograph type = SCS Runoff Peak discharge = 2.890 cfs Storm frequency = 10 yrs Time to peak = 762 min Time interval = 1 min Hyd. volume = 24,295 cuft Drainage area = 5.010 ac Curve number = 45' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 48.66 min Total precip. = 7.22 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.690 x 98) + (4.310 x 36)] 15.010 Q (cfs) 3.00 2.00 1.00 Wi Storage Basin Pre-Dev Hyd. No. 1 -- 10 Year Q (cfs) 3.00 2.00 1.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) MAR 1 1 2011 y =i Hydrograph Report 21 i Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 2 Inf Basin Pre-Dev Hydrograph type = SCS Runoff Peak discharge = 1.111 cfs Storm frequency = 10 yrs Time to peak = 763 min Time interval = 1 min Hyd. volume = 10,988 cuft Drainage area = 3.550 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 41.10 min Total precip. = 7.22 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 Inf Basin Pre-Dev Hyd. No. 2 -- 10 Year Q (Cfs) 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) MAR 1 1 2011 ,BY; Hydrograph Report 22 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Hyd. No. 3 Combined Pre-Dev Friday, Mar 11, 2011 Hydrograph type = Combine Peak discharge = 4.000 cfs Storm frequency = 10 yrs Time to peak = 762 min Time interval = 1 min Hyd. volume = 35,284 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 8.560 ac Combined Pre-Dev Q (cfs) Hyd. No. 3 -- 10 Year Q (Cfs) 4.00 3.00 4.00 2.00 3.00 1.00 2.00 000 1.00 n nn 0 120 240 Hyd No. 3 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 —Hyd No. 2 Time (min) RF,CE' IV:tED MAR 1 1 Z011 BY: _ — Hydrograph Report 23 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 5 Post-Dev Storage Basin Hydrograph type = SCS Runoff Peak discharge = 21.79 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 94,137 cuft Drainage area = 5.010 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.34 min Total precip. = 7.22 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 24.00 16.00 12.00 M 4.00 "I Post-Dev Storage Basin Hyd. No. 5 -- 10 Year Q (cfs) 24.00 20.00 16.00 12.00 [:II8101 4.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) MAR 11 2011 Hydrograph Report 24 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. No. 6 Routed Storage Basin Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - Post-Dev Storage Basin Max. Elevation Reservoir name = Storage Basin Max. Storage Storage Indication method used. Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 000 Routed Storage Basin Hyd. No. 6 -- 10 Year Friday, Mar 11, 2011 = 11.41 cfs = 748 min = 74,679 cult = 8.59 ft = 43,822 cuft Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 — Hyd No. 6 —Hyd No. 5 [per Total storage used = 43,822 tuft Time (min) MAR 1 1 2011 TY: PAI zs Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Friday, Mar 11. 2011 Hyd. No. 8 Pumped to Inf Basin Hydrograph type = Diversion1 Peak discharge = 0.230 cfs Storm frequency = 10 yrs Time to peak = 3695 min Time interval = 5 min Hyd. volume = 162,147 cuft Inflow hydrograph = 6 -Routed Storage Basin 2nd diverted hyd. = 9 Diversion method = Constant Q Constant Q = 0.23 cfs Pumped to Inf Basin Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 000 000 0 1500 3000 4500 6000 7500 9000 10500 12000 13500 15000 Time (min) — Hyd No. 8 -- Up to 0.23 cfs —Hyd No. 6 -- Inflow —Hyd No. 9 -- 6 minus 8 VD MAR 1 1 2011 r_ z*, 26 ' Hydrograph Report HydraFlow Hydrographs Extension for AutoCAD® Civil 31302010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 9 Through VFS & Spillway Hydrograph type = Diversion2 Peak discharge = 11.18 cfs Storm frequency = 10 yrs Time to peak = 3740 min Time interval = 5 min Hyd. volume = 211,256 cuft Inflow hydrograph = 6 - Routed Storage Basin 2nd diverted hyd. = 8 Diversion method = Constant Q Constant Q = 0.23 cfs Through VFS & Spillway Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1500 3000 4500 6000 7500 9000 10500 12000 13500 15000 — Hyd No. 9 -- > 0.23 cfs —Hyd No. 6 --Inflow —Hyd No. 8 Time (min) R- C IVI MAR 1 1 2011 PY� 27 Hydrograph Report • Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 11 Post-Dev Inf Basin Hydrograph type = SCS Runoff Peak discharge = 10.43 cfs Storm frequency = 10 yrs Time to peak = 746 min Time interval = 1 min Hyd. volume = 61,341 cuft Drainage area = 3.550 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 37.80 min Total precip. = 7.22 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Post-Dev Inf Basin Q (Cfs) Q (cfs) Hyd. No. 11 -- 10 Year 12.00 10.00 8.00 6.00 4.00 2.00 000 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) ?77 .,.,.. lED MAR 1 1 2011 15y: Hydrograph Report zs Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 13 From Storage+post Dev Infil. Basin Hydrograph type = Combine Peak discharge = 10.66 cfs Storm frequency = 10 yrs Time to peak = 746 min Time interval = 1 min Hyd. volume = 93,766 cuff Inflow hyds. = 8, 11 Contrib. drain. area = 3.550 ac From Storage+post Dev Infil. Basin Q (cfs) Hyd. No. 13 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 ago 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 13 — Hyd No. 8 — Hyd No. 11 Time (min) MAR 1 1 2011 29 Hydrograph Report w Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 15 Inf Basin Routed Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = 1132 min Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 13 -From Storage+Post Dev Wk.fflisiration = 7.10 ft Reservoir name = Infiltration Basin Max. Storage = 30,358 cuft Storage Indication method used. Exfiltration extracted from Outflow Inf Basin Routed Q (cfs) Hyd. No. 15 -- 10 Year Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 000 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 15 —Hyd No. 13 ®Total storage used = 30,358 cuft Time (min) - . IVEID MAR 1 1 2011 Hydrograph Report 30 • Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Mar 11, 2011 Hyd. No. 17 Combined Post Hydrograph type = Combine Peak discharge = 11.18 cfs Storm frequency = 10 yrs Time to peak = 748 min Time interval = 1 min Hyd. volume = 42,251 cuft Inflow hyds. = 9, 15 Contrib. drain. area = 0.000 ac Combined Post Q (Cfs) Hyd. No. 17 -- 10 Year Q (Cfs) 12.00 10.00 8.00 6.00 4.00 2.00 000 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 17 —Hyd No. 9 —Hyd No. 15 Time (min) : ICEIV ED MAR 1 1 2011 Y:_ -- Velocity Calculations :ECEIVFD MAR 11 2011 Channel Report t Hydraflow Express Extension for AutoCAD® Civil 313® 2010 by Autodesk, Inc. Storage Basin #1 B -Velocity through Spillway Trapezoidal Bottom Width (ft) = 50.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 8.25 Slope (%) = 1.00 N-Value = 0.069 Calculations Compute by: Known Q Known Q (cfs) = 10.62 Elev (ft) Section 9.00 8.75 8.50 'APO Friday, Mar 11 2011 Highlighted Depth (ft) = 0.25 Q (cfs) = 10.62 Area (sqft) = 12.69 Velocity (fUs) = 0.84 Wetted Perim (ft) = 51.58 Crit Depth, Yc (ft) = 0.12 Top Width (ft) = 51.50 EGL (ft) = 0.26 0 5 10 15 20 25 30 35 40 45 Reach (ft) 50 55 60 65 MAR 1 1 2011 Depth (ft) 0.75 0.50 0.25 ME _n 9r Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. Storage Basin #1 B - Velocity through VFS Trapezoidal Bottom Width (ft) = 10.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 3.20 Slope (%) = 2.00 N-Value = 0.240 Calculations Compute by: Known Q Known Q (cfs) = 0.80 Elev (ft) Section 4.00 3.75 3.50 3.25 3.00 2.75 0 2 4 6 8 10 Reach (ft) Friday, Mar 11 2011 Highlighted Depth (ft) = 0.24 Q (cfs) = 0.800 Area (sqft) = 2.57 Velocity (ft/s) = 0.31 Wetted Perim (ft) = 11.52 Crit Depth, Yc (ft) = 0.06 Top Width (ft) = 11.44 EGL (ft) = 0.24 12 14 16 18 - �VED ,t MAR 1 1 2011 Inv. Depth (ft) 0.80 0.55 0.30 0.05 now-01 _n Ar Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. Infiltration Basin #1A - Velocity through Spillway Trapezoidal Highlighted Bottom Width (ft) = 20.00 Depth (ft) Side Slopes (z:1) = 3.00, 3.00 Q (cfs) Total Depth (ft) = 0.50 Area (sqft) Invert Elev (ft) = 7.50 Velocity (f /s) Slope (%) = 1.00 Wetted Perim (ft) N-Value = 0.069 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 0.00 Friday, Mar 11 2011 = 0.01 = 0.000 = 0.20 = 0.00 = 20.06 = 0.01 = 20.06 = 0.01 Elev (ft) Section 9.00 8.50 8.00 7.50 7.00 0 5 10 15 20 25 30 35 Reach (ft) i ' �ryFIVED MAR 1 1 2011 Depth (ft) 1.50 1.00 0.50 -0.50 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. Infiltration Basin #1A - Velocity through VFS Trapezoidal Bottom Width (ft) = 10.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 4.20 Slope (%) = 7.00 N-Value = 0.240 Calculations Compute by: Known Q Known Q (cfs) = 0.00 Friday, Mar 11 2011 Highlighted Depth (ft) = 0.01 Q (cfs) = 0.000 Area (sqft) = 0.10 Velocity (ft/s) = 0.00 Wetted Perim (ft) = 10.06 Crit Depth, Yc (ft) = 0.01 Top Width (ft) = 10.06 EGL (ft) = 0.01 Elev (ft) Section 5.00 4.75 4.50 4.25 4.00 3.75 0 2 4 6 8 10 12 r 1,4 16 18 11V27D Reach (ft) MAR 1 1 2011 Depth (ft) 0.80 0.55 [1I91f, 0.05 -0.20 -0.45 . a.. CAPE FEAR Engineering, Inc. March 11, 2011 Christine Nelson NCDENR Water Quality Section - Stormwater 127 Cardinal Dr. Ext. Wilmington, NC 28405 RE: Request for Additional Information Stormwater Project No. SW8 091111 Courthouse Bay BEQs P-1142 Onslow County Dear Christine, Please find the following responses to your Request for Additional Information dated March 3, 2011 for the above referenced project. 1. The Infiltration Basin supplement has been revised to more accurately describe the system and the two sub -basins. 2. The Storage Basin #I B and Infiltration Basin #lA calculations have been revised to use the Simple Method to determine the pre and post development volumes for the 1-year 24- hour storm. A half-size exhibit, demonstrating how the pre -development conditions were determined has been included for reference. Based on our review of the approved permit tile, it appears that the originally permitted Storage Basin # I B was only sized for the 1.5-inch storm and that no consideration was given to the difference in pre -post volumes for the I -year 24-hour storm. As a result, the originally permitted Storage Basin # I B was undersized. The following modifications have been made to Storage Basin # 1 B in order to provide the required water quality volume. • The "Pump Off Elevation' has been lowered to an elevation of 4.5-ft. • The `Bypass Weir Elevation' has been raised to an elevation of 8.25-ft • The "Top of Bank Elevation' has been raised to an elevation of 8.75-ft • The "Emergency Spillway" has been raised to an elevation of 8.25-ft The Intiltration Basin Supplement, routing calculations, and velocity calculations have �z been revised to reflect the above changes. Additionally, the revised routing calculations indicate that the originally permitted 4-ft r wide weir in Infiltration Basin 4IA does not require revision as shown in the original permit modification submittal. As a result, Plan Sheet CS-109 has been revised. -- 151 Poole Road, Suite 100 • Belville, NC 28451 • TEL (910)383-1044 •FAX: (910)383-1045 www capefearengineering. com P, 5SIB558-b CwMouu Bay PI400\Adnain\ST0RAI WATI:RU011-03-11 NCOENR Add Info Respomcdm -. Please note that the revised routing calculations use the originally permitted Pre - Developed and Post -Developed SCS Curve Numbers and Times of Concentrations for both Storage Basin # 1 B and Infiltration Basin # 1 A. The only modification to these values is a slight increase in the Storage Basin # I B Post -Developed Curve Number to account for the minor increase in impervious area. 3. The Storage Basin # I B calculations have been revised to only consider the storage volume provided between the "Pump Off Elevation" and the "Bypass Weir Elevation". As noted above the both the "Pump Off Elevation" and the "Bypass Weir Elevation" have been modified to provide the required water quality volume. 4. Storage Basin # 1 B was originally permitted with a peak 10-year discharge of 12.29 cfs, of which approximately 7.8 cfs was bypassed to the level spreader (LS) and vegetated filter strip (VFS) and 4.49 cfs was discharged through the emergency spillway. Based on the LS & VFS length requirement of 10-ft per cfs, the originally permitted Storage Basin #1 B required a 78-ft long LS & VFS; however, for whatever reason only a 10-ft LS & VFS was provided and permitted. Revised routing calculations indicate a peak 10-year discharge of 11.41 cfs, of which approximately 0.79 cfs is bypassed to the LS & VFS and 10.62 cfs is discharged through the emergency spillway. Based on the LS & VFS length requirement of 10-ft per cfs, the originally permitted 10-ft long LS & VFS is adequate and does not require modification. The proposed modifications to Storage Basin # I B, effectively reduces the 10-year flow that is bypassed to the LS and VFS to levels that can be reasonably handled by the previously permitted and installed LS & VFS. It should be noted that site constraints prohibit increasing the size of the level spreader and vegetated filter. In summary, the proposed modification will increase the Storage Basin drainage area by only 540 sf (0.25%) and impervious area by 4,320 sf (2.9%) but will increase the Storage Basin Volume by approximately 100% (See Response to Comment #3), decrease the 10- year flowrate to the LS & VFS by approximately 90% and will decrease the total 10-year discharge by approximately 10%. As a result, the proposed modification should greatly improve the system's overall treatment ability and should result in significantly improved water quality than if the system were to remain as originally perm itted. 5. A "Pavement Expansion and Grading Detail" has been added to Plan Sheet CS-107. This detail shows how the existing pavement slopes will be extended through the new pavement areas. This will ensure that the runoff from the new impervious areas will be collected and directed to the pond. �., S T" TED A._l. .�.. MAR 1 1 2011 PM5W58-MC.ah.0 lie, 1`1400\Ad.m\SfO IWATERV011-03-11 NCDGNR Add W. Response d. T� BY'- 6. A Vicinity Map showing the nearest intersection of two major roads has been included for your review. I trust that this information is sufficient to issue this modification for the subject stormwater permit. However, if you have any questions or need any additional information please do not hesitate to contact me. Sincerely Matthew E.I. CC: CFE File 558-66 "36" P ;; f -k-TR DU _MAR 1 1 2011 : P:M8158-66CouNh.. Bay P14MAd.WSTOWWAT[R@011-03-11 NCDENR Add ❑do Rd,.o ed. NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director March 3, 2011 Commanding Officer c/o Carl Baker, Deputy Public Works Officer US MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 091111 Courthouse Bay BEQ's P-1142 Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a modified Express Stormwater Management Permit Application for the Courthouse Bay BEQ's P-1142 on February 24, 2011. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide additional information on the infiltration basin supplement to accurately describe the system and the two sub -basins. Specifically,, please breakout the storage volume section to identify the required and provided volumes for the two sub -basins. 2. Please use the simple method to determine the pre and post development volumes for the 1-year, 24-hr storm event for the storage basin drainage area. The SCS method can only be used for approved LID sites or if it is demonstrated to be more conservative than the simple method (refer to Section 3.3 of the NC BMP manual.) Also, please demonstrate or describe how the pre -development conditions were determined. 3. Please re-evaluate the volume provided in the storage basin to only consider the volume provided above the permanent pool elevation of the basin. For instance, although the basin has a bottom elevation of 4, the plans indicate that the pump will not pump below an elevation of 5 while the pump will not turn on until an elevation of 5.5. This 1 to 1.5 foot of storage will not be available for the required storage volume. 4. Level spreaders and vegetated filter strips are required to treat the runoff in excess of the design volume from infiltration devices for the 10 year storm, up to 10 cfs. It appears that only 1.19 cfs of the 21.33 cfs 10-year storm event bypassing the storage basin is being.treated by a level spreader and vegetated filter strip. Please provide a level spreader and filter strip designed to treat the runoff in excess of the design volume from this storage basin for the 10 year storm event, up to 10 cfs. 5. Please provide a grading plan that demonstrates how the runoff from the additional impervious surfaces proposed will be collected and directed to the storage basin. 6. Please add the nearest intersection of two major roads to a legible vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway. 7. The express additional information fee has been waived for this request for additional information. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One 1. 1 Phone: 910-796-72151 FAX 910-350-20041 Customer Service. 1-877-623-6748 North Carolina Internet: wvvvii.navaterquality.org Naturally An Equal Opportunity 1 Affirmative Action Employer li/�/ls Carl Baker March 3, 2011 Stormwater Application No. SW8 091111 8. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to March 11, 2011, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncdenr.gov. Sincerely, G'V -CJU y wx-�,J Christine Nelson Environmental Engineer GDS/can: S:\WQS\StormWater\Permits & Projects\2010\091111 HD\2011 03 addinfo 091111 cc: Perry Davis, Cape Fear Engineering Christine Nelson Wilmington Regional Office Page 2 of 2 I Nelson, Christine From: Nelson, Christine Sent: Thursday, March 03, 2011 5:43 PM To:'perrydavis@capefearengineering.com'; Towler CIV David W; Thomas Bradshaw (Thomas. bradshaw@usmc. m il) Cc: Russell, Janet; 'Matt -Haley' Subject: caddinfo-for Courthouse-Bay-BEQ's.(SW8.091-111.) Attachments: 091111.pdf; example.pdf Gentlemen, I've attached a pdf of the request for additional information for the modification to the Courthouse Bay BEQ's P-1142 (SW8 091111). To help with item tt1, I've also included a pdf of an infiltration basin supplement approved for another site with similar issues. Copies -of -the -request -will also-be-sent:in`the Please let me know if you have nuy --any Christine Christine Nelson Environmental Engineer NC DWQ - Stormwater Program Wilmington Regional Office 910-796-7323 E-mail correspondence to and fronrthis address may be subject to the North Carolina public Records law and may be disclosed to third parties. ���o� CAPE FEAR Engineering, Inc. 151 Poole Road, Suite 100 Belville, NC 28451 TEL (910)383-10" FAX (810) 383-1045 www. capefearengineering. corn To: NC DWQ Surface Water Protection State Stormwater Section 127 Cardinal Drive Ext. Wilmington, NC 28405 Attn: Christine Nelson ❑ As Requested ❑ For Your Files ❑ Sent via Mail ❑ Sent via Courier Transmittal 2011 61-1- Y:1 Subject: I Courthouse Bay P-1142 MCB — Camp Lejeune SW8 091111 Modification Express Review Program ❑ For Distribution ® For your Review / Action / Approval Quantity Drawing No. Description 1 Original $4,000 Express Review Fee (Check #22581) 1 Original Cover Letter / Design Narrative 2 Original & Copy State Stormwater Application 1 Original Infiltration Basin Supplement, Checklist, and O&M Agreement 1 Original Level Spreader Supplements, Checklists, and O&M Agreement 1 Original Dry Detention Basin O&M Agreement 1 Copy Calculations 1 Copy Correspondence with NCDENR about PV Canopies being considered Pervious 3 Copy Stormwater Plans ON ` AcrgoV,Er G>= ED REMARKS If you have any questions please call me at 383-1044. Thank you, Matt Haley CC: Cape Fear Engineering, Inc. File 558-66 "36" Signed: RrE, CF,IVED Matthew Haley, E.I. FEB 2 4 2011 Received By: Date: P155M58-66 C0u0house Bay P14001Admin\STORMWATER12011-02-24 Trans_NCDENR,dw a d�FCAPE FEAR Engineering, Inc. February 24, 2011 Christine Nelson NCDENR Water Quality Section - Stormwater 127 Cardinal Dr. Ext. Wilmington, NC 28405 RE: Modification to NCDENR Stormwater Permit for Courthouse Bay BEQs P-1142 (SW8 091111) to Accommodate P-1400 Project Improvements Dear Christine, Cape Fear Engineering is submitting a permit modification for the above referenced project. Existing Permit Info This project was originally permitted on May 7, 2010 as SW8 091111. The original project included the construction of two BEQ buildings, parking lots, and miscellaneous recreational courts and facilities. The original project included the removal of an existing 2.86 acre parking lot and driveway as part of a redevelopment drainage area. To date, only a portion of the originally permitted improvements have been completed. Proposed Modifications The proposed permit modification is to accommodate additional impervious areas that will be generated by the construction of solar canopies as part of the Marine Corps Energy Initiative (13-1400) project. Unlike some solar canopy designs which are completely closed (impervious), the proposed design has openings along all sides of each individual panel. These openings will allow Stormwater runoff to flow through the structure to the ground beneath. Georgette Scott, Stormwater Program Supervisor of the Wilmington Regional Office confirmed via email on January 25, 2010 that the proposed solar canopy design utilized by this project will be considered pervious. A copy of all correspondence with NCDENR has been included for your files. Please note that the proposed modifications are limited to the Storage Basin 9 1 B Drainage Area. No changes are being proposed to Infiltration Basin #IA Drainage Area or the Redevelopment Area. I':(-`T•,IVED FEB 2 4 2011 151 Poole Road, 5uite 100 • Belville, NC 28451 • TEL: (910)383-1044 • FAX: (910)383-104_5,Y www.capefearengincering.com P \558\558-66 C.nh..0 Bay P 14W\Admin\ST0RN1 W Al'1!NV.011-02-24 CB-NMENB Cover 1<ae,da K1 The modifications to Storage Basin #1B Drainage Area A include the following: Overall drainage area has increased from 217,678 sf to 218,218 sf. This increase is the result of widening the parking lot to accommodate the solar canopy caissons. Parking area impervious has increased from 147,807 sf to 152,127 sf. This increase is the result of widening the parking lot and paving over two islands to accommodate the solar canopy caissons. Soils Information This modification relies on the previously permitted SHWT elevation and infiltration rates. No additional geotechnical investigations have been performed for the purposes of stormwater permitting. Basin Geometry This modification does not make any changes to the previously permitted Storage Basin #1 B or Infiltration Basin 41 A geometry. All elevations, surface areas, and volumes remain unchanged from the previously permitted values. Bypass Structure / Emergency Spillway In order to attenuate the peak discharge from the site for the 1-year 24-hour storm and to limit the flowrate to the existing level spreader and vegetated filter strip, the following modifications were made to the Storage Basin #113 and Infiltration Basin #IA bypass structures and emergency spillways. Storage Basin #1B • The length of the weir has been revised to 2.0-feet • The width of the Emergency Spillway has been revised to 50.0-ft Infiltration Basin #IA • The length of the weir has been revised to 2.0-feet Please note that the above modifications do not alter the weir or spillway elevations. Water Quality Calculations Revised water quality calculations have been prepared to demonstrate that with the proposed modifications the system has the ability to treat and infiltrate the water quality design storm within a period of 5-days. The revised water quality calculations consider both the 1.5-inch water quality design storm and the difference in the pre -post volumes for the 1-year 24-hour storm event for both the Storage Basin 91 B and Infiltration Basin #IA drainage areas. FEB 2 4 2011 P'MM58- C... Bay P14MW.mi TOI WATEB@011-02-24 CB-NCOENB CoverLn¢edo If3Y Routing Calculations Revised routing calculations have been prepared to demonstrate that with the proposed modifications, the system has the ability to attenuate the peak discharge from the site for the 1-year 24-hour storm and that the level spreaders and vegetated filter strips are appropriately sized for the 10-year storm. The revised routing calculations are summarized in the tables below. Table-1: Pre/Post Develo ment Peak I lowrates for the 1-year 24-hour Storm Peak Flowrate (CFS) Pre -Development 3.849 H dra ra h #3) Post -Development 0.582 (H dra ra h #17 Table-2: Peak Discharge from 10-year 24-hour Storm Pumped Through To Level (CFS) Spillway Spreader (CFS) (CFS) Storage Basin #1B 0.23 20.3 1.19 Infiltration Basin #1A n/a 0.27 0.72 Level Spreaders & Vegetated Filter Strips The Level Spreaders (LS) and Vegetated Filter Strips (VFS) for both Storage Basin #1 B and Infiltration Basin # I A were previously designed and permitted as 10.0 ft long. Based on the modeled 10-year 24-hour peak discharges (See Table-2) and a required LS and VS length of 10-ft per cfs, the length of the Storage Basin #1 B LS&VFS has been increased to 12.0 ft while no change is required to the LS and VFS for Infiltration Basin #IA. Velocity Calculations The peak discharges from the 10-year 24-hour storm (See Table-2) were modeled through the vegetated filter strips and the emergency spillways to ensure non -erosive velocities. The expected I0-year velocities are summarized in the table below. Please note that in all cases, the expected velocity is less than 2.0 ft/s and should be non -erosive. Table-3: Peak Velocity from 10-year 24-hour Storm Through Through Spillway Vegetated Filter (FT/S) (FT/S) Storage Basin #1B 1.07 0.34 Infiltration Basin #IA 0.27 0.43 FEB 2 4 2011 P1558WSS C... Bay P14W dminl$TORA1WATBRQ011-02-24 CB-NCDI!NR Cover Le ,doe I trust that this information is sufficient for you to issue the proposed permit modification for the subject project; however, it you have any questions or need any additional information please do not hesitate to contact me. Sincerely V Matthew Haley, E.I. CC: CFE File 558-67 "36" FEB 2 4 Z011 PA558\558-66 Courthouse Bey P1400\Admin\STORM W A'I17R\2011-02-24 CB-NCDFN It Cover Letter. doe E;Y1 N1 o(l omit \ 1 11 k - A1. North Carolina Department of Environment and Natural Resources NCDENR Request for Express Permit Review For OENR Use ONLY RG c {,, v Submit: Time: L (D 35v Confirm: 2— Z — t FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan IPDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296.4698;alison.davidson@ncdenr.Dov • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.leenD ncdenr.00v • Mooresville & -Patrick Grogan 704-663.3772 or patrlck.grogan(),nCdenr.goV • Washington Region -Lyn Hardison 252-946.9215 or IVn.hardison cDncdenr.00y • Wilmington Region -Janet Russell 910.350.2004orignet.russellanncdenr.goy NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: COURTT IOUs I3 BAY BEGS I'-1142 County: ONSLOW Applicant: CARL BAKER. DEPUTY PUBLIC WORKS OFFICFR Company: MCB Camp I.ciounc Address: 13 m)(i 1005 MICI IABL ROA I) City: MC13 CAMP LEJ EUN E, Stale: NG Zip: 28547- Phone: 910-451-2213, Fax: 910-451-2927, Email: carI.h.bakcr@usnn:.mil Physical LOcation:GRACE STREET MCI3 CAMP I.IiJEUNE Project Drains into COURT I IOUSE BAY waters — Water classification SA'u W (for classification see- http://h2o.enr.state.nc.us/bims/reports/reportsWB.html Permits of request SW 8 091111 SW SW SW SW vkj�o�kA-\ Project Located in W I I ITe OAK River Basin. Is project draining to class ORW waters? N , within '/z mile and draining to class SA waters v or within 1 mile and draining to class HOW waters? Y_ Engineer/Consultant: PERRY DAVIS, N, Company: CAPE FEAR ENGINEERING, INC RECEIVED Address: 151 110OLE ROAD, SUITE 100 City: BELVILLE, Stale: NC Zip: 28451- Phone: 910-383-1044, Fax: 910-383-1045, Email: perrydaviz@cancicarcnginccrine.com FEB 0 1 Z011 SECTION ONE: REQUESTING A SCOPING MEETING ONLY )6coping Meeting ONLY ® DWO, ❑ DCM, ❑ DLR, ❑ OTHER: W. SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittentlPerennial Determination: _ If of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Welland (_linear it or —acres) ❑ Riparian Buffer Authorization ❑ Minor Variance Major General Variance ® State Stormwater ® General ❑ SFR, ❑ SFR < 1 So. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, . ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond # Treatment Systems ® High Density -Infiltration / #Treatment Systems ❑ High Density -Bio-Retention _ If Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems /® MOD:® Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW 8 091111 (Provide permit th Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront El Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be dislurbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No Received from US ACOE ❑ Yes ® No DEN It use Buffer Impacts: ® No ❑ YES: —acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit PCL %L error Subsystem:. Error: / R legalOperatorSequence SetNeutralAxis Posi Russell, Janet From: Matt Haley [matt.haley@capefearengineering.com] Sent: Tuesday, February 01, 2011 11:32 AM To: Russell, Janet Cc: Perry Davis, Tom Purvis; Maria Jones Subject: Express Scoping Meeting Requests Attachments: CB-NCDENR Express Scoping Request.pdf; CB -Site Plan.pdf; CB -Express Scoping Narrative.pdf; HP-NCDENR Express Scoping Request.pdf; HP -Site Plan.pdf; HP-Expess Scoping Narrative.pdf Janet, I would like to schedule Express Scoping Meetings in preparation for modifying the following permits SW8 091111 — Courthouse Bay BEQ P-1142 SW8 100401 — Hadnot Point BEQs P-1104 and P-1193 Please find the attached Express Scoping Request Forms, Project Narratives, and Site Plans for each. If possible we would like to meet on both projects at the same time, and at your earliest available appointment time. Please let me know if you have any questions or need any additional information. Thanks, Matthew T. Haley, El, LEED Green Assoc. CAPE FEAR Engineering, Inc. matt. haley(a)capefeareng i neeri nq.com C: 910.639.5987 0: 910.383.1044 ext. 136 F: 910.383.1045 Notice: The information contained in this message is intended only for use of the individual(s) named above and may contain confidential, proprietary or legally privileged information. No confidentiality or privilege is waived or lost by any mistransmission. If you are not the intended recipient of this message you are hereby notified that you must not use, disseminate, copy it in any form or take any action in reliance of it. If you have received this message in error please delete it and any copies of it and notify the sender immediately. FEg � i "',t' February 01, 2011 Janet Russell NCDENR Water Quality Section - Stormwater 127 Cardinal Dr. Ext. Wilmington, NC 28405 RE: Courthouse Bay P-1142 Marine Corps Base (MCB) — Camp Lejenue DWQ Stormwater Permit Number: SW8 091111 Narrative for Express Scoping Dear Janet, On behalf of the MCB, Camp Lejeime Public Works Division, Cape Fear Engineering is submitting a permit modification for the above referenced project. This project was originally permitted on May 7, 2010 as SW8 091111. The original project included the construction of two BEQ buildings, parking lots, and miscellaneous recreational courts and facilities. To date, only a portion of the originally permitted improvements have been completed. The proposed permit modification is to accommodate additional impervious areas that will be generated by the construction of solar canopies as part of the Marine Corps Energy Initiative (13- 1400) project and to add reserve impervious area where possible. Unlike some solar canopy designs which are completely closed (impervious), the proposed design has openings along all sides of each individual panel. These openings will allow stormwater runoff to flow through the structure and to the ground beneath. Georgette Scott, Stormwater Program Supervisor of the Wilmington Regional Office confirmed via email on January 25, 2010 that the proposed solar canopy design utilized by this project will be considered pervious. Please note that the proposed improvements are limited to Drainage Area I B (Storage Basin 113); however, because runoff from Storage Basin I is pumped to Drainage Basin IA (Infiltration Basin I A) for treatment, calculations, supplements, etc will need to be modified for both basins. Modifications to both the Storage Basin and the Drainage Basin should be limited to the weir elevations of the bypass structures only and should not affect either basin's geometry.374,528 sf. This increase is the result of widening the west parking lot to accommodate the solar canopy caissons. The proposed permit modification submittal will include revisions to several of the originally permitted plans sheets and several new plan sheets showing the proposed solar canopy layout and parking lot revisions. g?a, CFIVIE Sincerely FEB 1 2U11 Matthew Haley, E.I. CC: CFE File 558-66 "36" P9558\558-66 Counhouse Bay P1400Wdrain�S rORMW ATERQ011-02-01 Express Scoping Request\CE-Express Scoping Narrative doc 00 .. WE m mm O 000 ®®O®O 99a Ise � � R 9 � g�ajd s-RNA ; a�,$ � F �4R� A og m\/ - I I I I aa, 83 livl8o;n 4 �� oe$F i� S B gm n m FACILITIES ACILITI Er«Sw ENGINEERING COMMAND MID-ATLANTIC ID-ATLANTIC wn $ } - ,P N ¢ a d P-1400 MARINE CORPS ENERGY INITIATIVE - PRE -FINAL 1 MCB CAMP LEJEUNE, JACKSONVILLE, NORTH CAROLINA Z, 0 g,9- N i3 SITE PLAN I PRE-RDAL (100%) SUBMITTAL - 1'/`10/11 N mz N =D m Z RE IN b Iv W 41 1� Matt Haley From: Scott, Georgette [georgette.scott@ncdenr.gov] Sent: Tuesday, January 25, 2011 9:27 AM To: Matt Haley Cc: Perry Davis; Linda Lewis Subject: RE: Stormwater Question - Solar Panel Canopies at Camp Lejeune Matt, I apologize for not getting back to you right away. I reviewed your drawings and discussed with Raleigh. For this particular design we are going to allow this to be considered pervious. Georgette Scott Stormwater Program Supervisor State Stormwater Program NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone (910) 796-7335 Fax (910) 350-2004 E-mail correspondence to and from this address may be subject to the North Carolina Public Records law and may be disclosed to third parties. From: Matt Haley [mailto:matt.haley@capefearengineering.com] Sent: Monday, January 24, 2011 1:04 PM To: Scott, Georgette Cc: Perry Davis; Linda Lewis Subject: RE: Stormwater Question - Solar Panel Canopies at Camp Lejeune Georgette, Have you had an opportunity to discuss with Raleigh? if not, when do you anticipate doing so? Thanks, Matthew T. Haley, El, LEED Green Assoc. CAPE FEAR Engineering, Inc. Notice: The information contained in this message is intended only for use of the individual(s) named above and may contain confidential, proprietary or legally privileged information. No confidentiality or privilege is waived or lost by any mistransmission. If you are not the intended recipient of this message you are hereby notified that you must not use, disseminate, copy it in any form or take any action in reliance of it. If you have received this message in error please delete it and any copies of it and notify the sender immediately. From: Scott, Georgette [mailto:georgette.scott@ncdenr.gov] Sent: Tuesday, January 04, 2011 11:00 AM To: Matt Haley Cc: Perry Davis; Linda Lewis Subject: RE: Stormwater Question - Solar Panel Canopies at Camp Lejeune I will discuss with Raleigh and get back to you. Georgette Scott Stormwater Program Supervisor State Stormwater Program 2/23/2011 ;LlY CEI V F,D FEB 2 4 2011 BY: NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone (910) 796-7335 Fax (910) 350-2004 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to thud parties. From: Matt Haley [mailto: matt. haley@capefearengineering.com] Sent: Tuesday, January 04, 2011 10:23 AM To: Scott, Georgette Cc: Perry Davis; Linda Lewis Subject: RE: Stormwater Question - Solar Panel Canopies at Camp Lejeune Georgette, Please see my original email to Linda and her response below. It should be again pointed out that unlike some canopy designs which are completely closed (impervious), the proposed design has openings along all sides of each individual panel. These openings will allow stormwater runoff to flow through the structure and to the ground beneath and should function similar to raised wooden decking which is considered pervious. Please let us know what NCDENR's position on this project will be. Thank you in advance for your assistance. Matthew T. Haley, El CAPE FEAR Engineering, INC matt.haley@capefearengineering.com 910.383.1044 ext. 136 Notice: The information contained in this message is intended only for use of the individual(s) named above and may contain confidential, proprietary or legally privileged information. No confidentiality or privilege is waived or lost by any mistransmission. If you are not the intended recipient of this message you are hereby notified that you must not use, disseminate, copy it in any form or take any action in reliance of it. If you have received this message in error please delete it and any copies of it and notify the sender immediately. From: Lewis,Linda [mailto:linda.lewis@ncdenr.gov] Sent: Monday, January 03, 2011 9:18 AM To: Matt Haley; Linda Lewis Cc: Perry Davis; Scott, Georgette Subject: RE: Stormwater Question - Solar Panel Canopies at Camp Lejeune Matt: The rules are clear that uncovered, open slatted decking is considered pervious. At this time, there is no indication that solar panels can be considered as pervious area, despite the comparison of available open area to decking. That question would have to be answered by someone higher up than me. In my past meetings with both Progress Energy and Camp Lejeune staff regarding their individual solar panel projects, the panels themselves were considered as BUA. You are free to make your case to my supervisor, Georgette Scott. Linda 2/23/2011 PACE' )[VF,,D FEB 2 4 2011 3Y: Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Matt Haley [mailto:matt.haley@capefearengineering.com] Sent: Thursday, December 30, 2010 1:27 PM To: Linda Lewis Cc: Perry Davis Subject: Stormwater Question - Solar Panel Canopies at Camp Lejeune Linda, am working on a project at Camp Lejeune that involves the construction of elevated solar panel canopies in existing parking areas at two sites. Because there are some areas where the canopies will extend beyond the limits of the existing parking areas, I would like to know if NCDENR will consider the canopies as pervious or impervious. It should be noted that unlike some canopy designs which are completely closed (impervious), the proposed design has openings along all sides of each individual panel. These openings will allow stormwater runoff to flow through the structure and to the ground beneath. I have attached a detail of the proposed structure for your reference. The structure should function similar to raised open wood decking which is considered pervious. In fact the attached calculations indicate that the proposed canopy design actually has a higher percentage of open space than typical wood decking. We are under a tight timeline on this project and a quick response would be greatly appreciated. Thank you in advance for your assistance. Matthew T. Haley, El CAPE FEAR Engineering, INC maft.haley@capefearengineering.com 910.383.1044 ext. 136 Notice: The information contained in this message is intended only for use of the individual(s) named above and may contain confidential, proprietary or legally privileged information. No confidentiality or privilege is waived or lost by any mistransmission. If you are not the intended recipient of this message you are hereby notified that you must not use, disseminate, copy it in any form or take any action in reliance of it. If you have received this message in error please delete it and any copies of it and notify the sender immediately. RF-C]E1VVF:D FEB 2 4 2011 2/23/2011 E TYPICAL SOLAR PANEL TOTAL AREA = 2,667.5660 sq in PANEL AREA = 2,598.0360 sq in COVERED AREA = 97.394% OPEN AREA = 2.606% 0.375" 0.0625" 39.375" + 0.125" 440" TYPICAL WOOD DECKING 0.0625" TOTAL AREA = 2,616.0750 sq in PANEL AREA = 2,557.94 sq in COVERED AREA = 97.778% OPEN AREA = 2.222% 1 1V" w vuv mal f. NERDS. C0. MM NOTES c�cE�NOIE` mwumlm .+ uunim u�`m m CA If NUNS' FEB 2 4 2011 (BUILD GROUP, INC.( 0112 aul