Loading...
HomeMy WebLinkAboutSW8081007_HISTORICAL FILE_20140630STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20\kt Olo o YYYYMMDD f A WA M NC®ENK North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 30, 2014 John E. Skvarla, III Secretary Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28547 Subject: Stormwater Management Permit No. SW8 081007 Camp Johnson M200 Parking Area and Jogging Trail Overall Low Density Stormwater Project with areas of High Density Onslow County Dear Mr. Paul: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the M200 Area Parking and Jogging Trail at Camp Johnson on June 19, 2014. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding modified Permit No. SW8 081007 dated June 30, 2014, for the construction, operation and maintenance of the BMP's and built -upon area associated with the subject project. This permit shall be effective from the date of issuance until December 30, 2021, which includes all of the available extensions, and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit or approval that may be required. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems The following modifications are included and covered by this permit: 1. This is a minor modification to the permit as allowed under Section 2.(d)(5) of SL 2008-211. There is no net increase in built -upon area and Basin #2 is not being enlarged. 2. Basin #1 and its drainage area are being removed from this permit. The parking lot previously approved to be treated by Basin #1 will be modified and a new BMP will be designed as part of a concurrent modification to permit number SW8 120101. 3. Within the low density drainage area, 10,290 square feet of jogging trail is removed from this permit and will be accounted for under a concurrent modification to SW8 120101. 4. Reduces the overall low density project limits to 658,103 square feet. 5. Plan sheets C-2 (site plan) and C-4 (grading) for Basin #2 from the December 12, 2008 approved plan set, have been added to the June 30, 2014 approved plan set. Division of Energy, Mineral, and Land Resources Land Quality Section -Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 State Stormwater Management Systems Permit No. SW8 081007 If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 1508 of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, at (910) 796-7215. Sincerely, znl—. 4-x�ld 57= Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources $O'GDS/arl: G:1WQ1Shared\Stormwater\Permits & Projects120081081007 HD12014 06 permit 081007 cc: Vince Chirichella, P.E., Nexsen Pruet Wilmington Regional Office Stormwater File Page 2 of 9 State Stormwater Management Systems Permit No. SW8 081007 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT OVERALL LOW DENSITY DEVELOPMENT WITH AREAS OF HIGH DENSITY In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Camp Johnson M200 Parking Area Taft Road and Coolidge Road, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of a 24% overall low density development with one (1) infiltration basin treating an area of higher density in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division and considered a part of this permit. This permit shall be effective from the date of issuance until December 30, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The overall tract built -upon area percentage for the project must be maintained at no more than 24%, as required by the stormwater rules. 3. This permit covers the construction of a total of 117,221 square feet of built -upon area, with 58,093 sq. ft. allocated to the low density area and 59,128 sq. ft. allocated to the high density area. Within the untreated low density drainage area, the 58,093 square feet of proposed BUA includes 8,044 square feet of future BUA allocation and 9,976 square feet of existing BUA. 4. Within the high density area, an infiltration basin stormwater management system has been approved for the management of stormwater runoff as described in Section 1.14 of this permit. The stormwater control, Infiltration Basin #2, has been designed to handle the runoff from 59,128 square feet of proposed impervious area. This permit does not provide any allocation of built -upon area for future development within the high density drainage area. 5. The infiltration basin must be operated with a 50' vegetated filter, designed to pass the peak flow from the 10 year storm in a diffuse and non -erosive manner. 6. Within the designated low density area, the only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 081007 No piping is allowed within the low density areas except that minimum amount necessary to direct runoff beneath an impervious surface such as a road (or the jogging trail) or to provide access. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted high density drainage area of this project must be directed into the permitted stormwater control system. 10. The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. 11. All runoff directed into and through the vegetative buffer must flow through the buffer in a diffuse manner. 12. All runoff directed into wetlands shall flow into and through the wetlands at a non - erosive velocity of 2 feet per second or less. 13. Roof drains must terminate at the outer edge of the buffer. 14. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: Basin 2 a. Drainage Area, acres: 1.81 Onsite, ft2: 78,680 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 59,128 Onsite, ft2: 59,128 Offsite, ft2: 0 C. Design Storm, inches: 1.5 d. Basin Depth, feet: 2.30 e. Bottom Elevation, FMSL: 13.70 f. Bottom Surface Area, ft2: 6,490 g. Bypass Weir Elevation, FMSL: 14.80 h. Permitted Storage Volume, ft3: 7,774 i. Predev. 1 yr 24 hr peak flow, cfs: 0.02 k. Type of Soil: Baymeade I. Expected Infiltration Rate, in/hr: 3.40 M. Seasonal High Water Table, FMSL: 11.50 n. Time to Draw Down, hours: 4.2 o. Receiving Stream/River Basin: New River / White Oak P. Stream Index Number: 19-(11) q. Classification of Water Body: "SC HQW NSW' Page 4 of 9 i State Stormwater Management Systems Permit No. SW8 081007 II. SCHEDULE OF COMPLIANCE 1. The approved vegetated runoff conveyances shown on the approved plans shall not be altered, filled in, or piped, except for minimum driveway crossings, unless and until the permittee shall have submitted a modification to the permit and received approval from the DEMLR. 2. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 3. The permittee shall monitor the project on a routine basis and shall maintain compliance with the permitted maximum built -upon area limits described on the application documents. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 6. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 7. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 10. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 081007 11. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 12. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Redesign or addition to the approved amount of built -upon area. C. Further development, subdivision, acquisition, or sale of the project area, in whole or in part. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering or piping any vegetative conveyance shown on the approved plan, except for minimum driveway crossings. e. Construction of any designated future BUA amounts listed on the application documents. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Ill. GENERAL CONDITIONS Approved plans, application, supplements, and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 081007 4. Any person or entity found to be in noncompliance with the terms, conditions and limitations of a stormwater management permit is subject to enforcement action by the Division in accordance with NCGS 143, Article 21. 5. The issuance of this permit does not preclude the Permittee from complying with and obtaining any and all permits or approvals as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. 6. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility, subject to the Base's Visitor Policy. 8. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified and reissued this the 30`" day of June 2014. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 7 of 9 State Stormwater Management Systems Permit No. SW8 081007 Camp Johnson M200 Parking Area and Jogging Trail Stormwater Permit No. SW8 081007 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems 1 Permit No. SW8 081007 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided such as the runoff collection system of pipes, catch basins and swales, and the vegetated filter. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DEMLR Regional Office Page 9 of 9 DEMLR USE ONLY Date Received Fee Paid Permit Number 2iv 7. Applicable Rules: ❑ Coastal SW -1 95 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form nmy be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Camp Johnson -M200 Area Parking (Removing Infiltration Basin 4) 2. Location of Project (street address): City:Camp Lejeune County:Onslow Zip:28547-2539 3. Directions to project (from nearest major intersection): Intersection of US 17 and NC 24. Take NC 24 East to Montford Rd. Travel on Montford approximately 1.0 miles. Turn right onto Wilson Drive. Travel about 0.15 miles and site is on the right. 4. Latitude:34* 43' 36" N Longitude:77° 24' 51" W of the main entrance to the project. IL PERMIT INFORMATION: Mfr)W 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt 1 Renezoals roith modifications also requires SWU-102 - Renewal Applicatioa Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 081007 , its issue date (if known)April 17, 2012 and the status of construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ®Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control: ac ofrl�tlP ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts JUIV b.lf any of these permits have already been acquired please provide the Project Name, P ct/Permit Number, issue date and the type of each permit: BY: 5. Is the project located within 5 miles of a public airport? ®No [-]Yes If yes, see S.L. 2072-200, Part Vl: httl2://12ortal.ncdenr.org/web/Ir/rules-and-regulations Fonn SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. • CONTACT INFORMATION I. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organ ization:MCB Camp Lejeune Signing Official & Title:c/o Neal Paul, Deputy Public Works Officer b.Contact information for person listed in item I above: Street Address:Building 1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable): Phone: (910 ) 451-3238 Eniail:neal.paul@usmc.mil State: Zip: Fax: ( ) c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City:_ Phone: Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organiza Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Add City: Phone: ( 4. Local jurisdiction for building permits: Point of Fax: Fonn SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV., PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The permitted parking lot will be treated with the originallypermitted infiltration basin. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 15.108 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':15.108 acres Total project area shall be calculated to exclude the follooing the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Nora al High Water (NHW) line or Mean Hight Water (MHW) line, and coastal wetlands landward front the NHW (or MHI) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands Imudzoord of thte NHW (or MHW) line tray be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 17.8 % 9. How many drainage areas does the project have?7 (For high density, count 1 for each proposed engineered stonnwater BMP. For loco density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. I.ovJ Ii EaSufY Tu Tq, Basin Information Drainage Area 2 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name New River Northeast Creek Stream Class * SC;HQW,NSW SC -NSW Stream Index Number * 19-(11) 19-16-(4.5) Total Drainage Area (so 78,680 579,423 658,103 On -site Drainage Area (so 78,680 579,423 658,103 Off -site Drainage Area (sf) Proposed Impervious Area** (so 59,128 58,093 117,221 % Impervious Area** total 75.5 10.0 17.8 Impervious** Surface Area Draina e Area 2 Draina e Area _ Draina e Area _ Draina e Area _ On -site Buildings/Lots (so On -site Streets (so On -site Parking (so On -site Sidewalks (so 1,004 40,073 41,077 Other on -site (so Future (sf) 8,044 8,044 Off -site (sf) Existing BUA*** (so 58,124 9,976UTM Total (so: 59,128 1 58,093 1 W,2211hl 4 n )fllh Stream Class and Index Number can be determined at: littp.1117ortal.licdepir.orzIll7eH, aliTs7csiu classi crition Impervious area is defined as the built upon area including, but not limited to, bail t&, roads, parking area., sidewalks, gravel areas, etc. Report only that a count of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 11. I -low was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that atrp+ he subject to more .stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http•//portal.ncdennorg/web/wg/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at ham:/ /portal. ncdenr.org/ web/ wq/ ws/ so / maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdennorg/web/wq/ws/so/statesw/forms dots. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. uSL- 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII belaia) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to \JT(- http:/ / www.envheli).org/ pages/ onestopexpress.litin] for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor fit_ the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the VSc- receiving stream drains to class SA waters within rh mile of the site boundary, include the'h mile radius on the map. 7. Sealed, signed and dated calculations (one copy). JS� 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: V S� a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. �� �'` Vp� It. Identify all surface waters on the plans by delineating the normal pool elev impounded structures, the banks of streams and rivers, the MHW or NHW a of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. JUN 19 2014 • Delineate the vegetated buffer landward from the normal pool elevatio impounded structures, the banks of streams or rivers, and the MHW (or NHW) of ti waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page of6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SH WT elevations (Please identify V3� elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: "- 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporatioiis/CSearcli.asl2x VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from ham:///portal�ncdenr.org/web/Ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Vincent Chirichella, PE Consulting Firm: Clark Nexsen Mailing Address:333 Fayetteville Street Suite 1000 City:Raleigh State:NC Zip:27601 Phone: (919 ) 828-1876 Email:vchirichellaOclarknexsen.com Fax: (919 ) 828-1877 IX. PROPERTY OWNER AUTHORIZATION (if Con tact Information, item 21as been filler) out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type mane of person listed in Contact Information, itenn ]a) with (print or type name of organization listed in Contact Information, itenn 1 a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 ECEIV11= JUN 19 2014 5 Page 5 of 6 B' As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated .agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hype name of person listed in Contact Information, item 1a) Neal Paid certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwa)Cf)ules under 15A fCAC 21-1.1000 and any other applicable state stormwater requirements. v l/ Date: &Z1//i{' Signature. I, ///1 / l/ 9 a NoLt�ry Public for the State of /✓//�/ �� d , , County of hC% do hereby certify that ,G�/4a / personally appeared before me this day of z&l and ackwledg�the due execu on of the application for a stormwater permit. Witness my hand and official seal, ZZ/K - Ti'EI=] JGa Form SWU-101 Version Oct. 31, 2013 SEAL My commission expires vas ez�% ECEIVE JUN 19 2014 (0 6 BY: Page)CofX MEMORY TRANSMISSION REPORT TIME :06-30-2014 14:24 FAX NO.1 NAME FILENO. 314 DATE 06.30 14:21 TO e 919104512927 DOCUMENT PAGES 9 -- START TIME �: j06.36�14:21 END TIME ��/ 06.30 14:24 PAGES SENT 9 STATUS OK —SUCCESSFUL TX NOTICE' ��� "CCbER Nnrth Carolina Department of Environment and Natural Resources Pat Mccrory John E. Shvarla, III Governor Secretary Jun. 30, 2014 Commanaln9 ORlcor MCn Camp L no c/o Neel PsuL W.poly Public Works OHlcer 1005 Mlchaal Road Camp Leleunw, NC 25647 Subject: 8torrrlwater Management Perrnit Me. 811V8 091007 Camp John.an M200 Parking Arse s d Joppping Tr.11 lJvsrall Low Oanslty Storrrlwatsr ProjsO! ' it. areas of High Density tOnslow County Owar Mr. P.ulo 1 n. of W.I., they or. Tha Wilmin fton Roppional Office received a comploto, modlfiod Slate Stormwater Manag nl P.rmit Applicallon or Ina M200 Area P.rkinB and .IogBInB Trnil at Camp Johnson on Juno 10. 2014. Staff law of th0 plarlH antl Hp.GII1COtlona hoe detarminatl that lh0 pro eGt. asp paged. will comply with Ina 8tormwater ROQ la6one vet /orth In 8esaon Law 2008-211 antl rule 16A NCAC 2H. 1000. W. aro forwarding mOry1/10d P.rmlt NO- $Wa 091007 dated Juno 3G, 2014. /Or the conatmCtlan. OpOrallon antl rnaintananco of 010 BMP'a antl bull[ -upon area associated with the eubl.ct protect. Th. followlna modiflcwtionH aro inclutlod and oov.rel by thl. porrnlC 1. Thl. 1. a minor motliflcahon to the permit as .11ow.d under Section 2.(d)(5) of SL 200e-211. Th.rw Ia n.. nal bsroasa In built -upon area and Basin a2 iH not being enlarged. 2. n.aln M1 and Its drainoao area are beimp rsmavadl from this permit. The parking lot praviousl)o approved to pa troated by Basin 01 will be diflod and a now BMP will be as. gnarl as part f a concurmnt motliaca0on to permit nombar SWa 1201 Ol. 3. WIO.in lho low density drain. . . 10.290 alqu.ro feet of jogging troll In movod from [his permit and will be accounted�oreimlfer a cons. rent m.dIn..11an to swa 1200101. 4, Ineducas the ovorall.low density prol.ct limits to 050.103 square feet. S. Plan shoots C-2 (Site plan) and C-4 ((grading) for B.Hin fit from the Dec.rnber 12, 2008 approved plan Got. have been sad.d to the Juno 30, 2014 approval plan ant. plvlelon of Enerpy, M.ner., ens Land rtvsonrrns Lantl (]u.Iitr 9oollon - W11-1.1bn RHBlonel OMce 121 Coranctl Urlw Eztonalon, WllminG(on, Nonn Cerollne 28405 - (910)7Pn-921G / Fnw: (910) 33o-20n4 MEMORY TRANSMISSION REPORT TIME :06-30-2014 14:28 FAX NO.1 NAME FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 315 06.30 14:22 rt 919198281877 9 06.30 14:24 06.30 14:28 9 OK `SUCCESSFUL TX NOTICE - North Carolina Department of Environment and Natural Resources Pat McCrory John E. Shvarla, III Oovomor Snored., Jun. 30. 2014 Cammanaing Omcar m MCn Cap L ./o N..1 Paul e oputy public Worts OHicor 1005 Full .... I Road Camp Lejauns. NC 20547 Subject_ 131ormwat.r Manapcement pommit No. SWO 081007 olhammin 2 Overall Low Oe ol[y Stormlwu or Project witM1l a rraae of Hlgh Oen.1ty On.1ew Ceunty over Mr. Paul: Effactiva Augg t 1, 2013 the States Stormwator program has boa. transferred from th. pivislon of Water Ouallty (CWO)) to the Civlalan of Energy. Minoral and Land Resources (MMMLR). All prevlous raf.ranc.e to DWq ill In In oldor slormwator permits Issued prior to August 1. 2013 until they or. modified. Plaaa. note that thin permit will now roforonce IDIEMLR as the Oivlelon rasponalblo for I..ua.ca of the permit. with the an and Thies permit .hall be off.cliv. from the date of leeuanc. un01 O.r.embmr 30. 2021. whl.h Inclutloa .11 or tn. availabl. antmnslons, and shall be subject to the conAtlona and limltatlons an sp..ifi.0 thmr.ln, and d.os not au .r..d. any Other apancy permit or approvnl that may be raqulrod. "loans pay special .ttontlon to the condition. listed In thfe �].rmIt rapardinp the Oparml.. o Malnt...... or tn. FiMP(s), racordellon of dead restrictions. Proeed urge ror phanpinp wn ship. transferring th0 permit, and nowinp the pmmil. Failure to establish 6.... is yyslam for op.,.ti.. and maintenance of the etormwater mamagg.m.nt rlyetem, to record dead r.atricllo ,.. to transfer the permit, or to renew t". permit. will result rn future compllmnce pmblama Th. following morllscatlona arm Included and co,r ... d by this permit: 1 This Isl. no not I .rleIn ol st minor mmolficiation tothepermit as ollowod under Sactlon 2.(d)(6) of SL 2000-211. pun area Ono Basin 402 Is not being anlorgtrd. 2. Basin #1 and Its arminage area are bolnyd movOfrom this permit- The pnrkln9 m lot n-.vI.u.l, . no rov.d tot bo t,..tommtibb, perat milbl ber $Wfi 920nd new BMp will bB a.alp ad .a part I ncu3. Within the low o... ity tlralnaaa are.. 10.290 eaumns fast of jogging trail In removed from this permit and will be accounted for under a concurrent modticatlon to SWB 120101. 4. Roduc.a the ovormll.low Consity project limits to 658,103 spuar. fast. 5. Plan ."mate C-2 (alto plan) and C-4 (grading for Rosin 02 from the r oacsmbn12. 200B approved plan cot, have Oman added to the una 30. 2014 appmvad plan sat. .hd 12n .1Ed 1y. Mineral, and Lond Resources 127 Cardinal OrNs Extension.nW1 meinl9(on. North CeflollnoP >4e6 �(010)) 06-12151 Fea: (010) 350-2004 Architecture & Engineering 333 Fayetteville Street, Suite 1000 Raleigh, NC 27601 P. 919.828.1876 F. 919.828.1877 www.clarknexsen.com transmittal 5yJ8 v8100� LD 4 DATE: We transmit the following: June 18, 2014 ® Drawings ❑Specifications PROJECT: ❑ Change Order ❑ Shop Drawings Staff NCO Academic Facilities Project ❑ Computer File(s) ❑ Samples TO: NCDENR ATTN: Linda Lewis 127 Cardinal Drive Extension Wilmington, NC 28405 FROM: Vincent Chirichella, PE ❑ Product Literature ® Applications Conies Description 2 1 1 1 SUBJECT: Staff NCO Academic Facilities - Express Stormwater Submittal Remarks: 1 2 3 4 S 6 8 9 10 COMMISSION NUMBER: 4686 VIA: Mail ROUTE CC: Plans Original signed Stormwater Management Permit Application Original signed Low Density Supplement Check in amount of $5,500 (applies to SW8 081007, SW8 111207 and SW8 120101) ECEfVE JUN 19 2014 BY: Page 1 of 1 CN Comm. No.: 4686 Camp Johnson, North Carolina Stuff NCO Academic Building, Supply Building and Hoover Road Realignment STORMWATER NARRATIVE 19 June 2014 Clark Nexsen 333 Fayetteville Street, Suite 1000 Raleigh, NC 27601 License # C-1028 0- BY: lff%o'- /Aivol Engineer (s): Vincent Chirichella, P.E., LT-_ED AP BD+C McKenzie Myers, P.E., LEER AP BD+C TABLE OF CONTENTS 1.0 PROJECT NARRATIVE..............................................................................................1 1.1 GEOTEC14NICAL INVESTIGATION......................................................................................3 2.0 DESIGN APPROACH..................................................................................................3 2.1 SToRM DRAINAGE PIPING................................................................................................3 3.0 WATER QUALITY ANALYSIS..................................................................................4 4.0 WATER QUANTITY ANALYSIS...............................................................................4 4.1 PREDEVELOPMENT CONDITIONS......................................................................................5 4.2 POST DEVELOPMENT CONDITIONS....................................................................................5 APPENDIX A: LOCATION AND VICINITY MAPS APPENDIX B: STORM DRAINAGE CALCULATIONS APPENDIX C: POND ROUTING APPENDIX D: GEOTECHNICAL REPORT APPENDIX E: WETLAND DETERMINATION APPENDIX F: EROSION & SEDIMENTATION CONTROL CALCULATIONS Staff NCO Academic Building, Supply Building, and Hoover Road Realignment CN Comm. No. 4686 Stormwater Narrative Clark*Nexsen 1.0 PROJECT NARRATIVE 1. General Information A. Name of Project- Staff NCO Academy Facilities B. Street Address, City, County- Camp Johnson between Wilson Dr. and Hoover Road, Onslow County C. Acres in Tract- 18.11 acres D. Acres Being Disturbed- 18.11 acres E. Acres in Wetlands- 0.00 acres 1. Wetlands Must Be Delineated- Wetlands are delineated and the Jurisdictional Determination (JD) was approved by the Army Corps of Engineers on March 16, 2009, expiring March 16, 2014. See Appendix E for JD submittal. 2. Proposed Wetland Irnpacts Require Permits from Corps & DWQ-'Ihere will be no disturbance of wetlands. F. Ownership Information From NC Secretary of State Web Site- Camp Lejeune, NC G. Description of Development Proposal The Staff NCO Project includes four separate sites all located on Camp Johnson. The development proposal will include one Staff Non -Commissioned Officer's (NCO) Academic Instruction Building; associated parking, parade field, Outdoor Instruction building, one Supply Building; associated parking and lay down area, Realignment of Hoover Road, Temporary Gravel Parking lot and sidewalks. Stormwater runoff for the NCO Academic Instruction Building will be treated by one wet detention basin. Stormwater runoff for die Supply Building will be treated by one wet detention basin. Stormwater will be conveyed to the various Stormwater Control Measures (SCMs) by means of grassed swales and storm drainage pipe networks. The realignment of Hoover road will not require treatment as the existing road will be removed, resulting in a decrease in BUA. The Temporary Gravel Parking lot will not require treatment beyond the measures installed for E&SC as the lot will be removed upon completion of the NCO project. The sidewalks will be treated by sheet flow through grass. 1. Previous or Existing Permits. SW8 081007- M200 Area Parking and Jogging Trail Overall Low Density with Areas of High Density —Area of high density will be removed from permit as well as a low density jogging trail. Staff NCO Academic Building, Supply Building, and Hoover Road Realignment CN Comm. No. 4686 /I Stonnwater Narrative Clark*Nexsen SW8 111207- Neuse Road Extension Overall Low Density with an Area of High Density- Adjusting permit boundary and reallocating impervious from Future. SW8 120101- BEQ Between Wilson Dr and Hoover Road (3-1319)- Adding NCO Wet pond and Supply Wet pond. Although areas of sidewalk will only be treated by sheet flow through grass the overall treatment of BUA will decreased from Pre-existing conditions. Part of the existing parking lot area South of the NCO was not treated. This project will install a new parking lot in the same area as the existing and all of that area will be collected and treated. 2. Stormwater Information Staff NCO Wet Detention Staff NCO Wet Detention Basin will treat the NCO Academic Building, Outdoor Instruction Budding, Parade Field, Parking lot and some offsite area. A rainwater cistern will collect roof runoff from the NCO building for building reuse. The wet detention basin was designed to accommodate the entire roof area and no credit will be sought for the cistern. Stormwater is conveyed using Low Impact Development (LID) methods of overland flow and grassed swales to maximum extent possible. The basin is drawn down through an orifice in the riser within 2 to 5 days. An emergency spillway is provided as a drain mechanism during emergency storm events. A minimum of 1-foot of freeboard will be provided above the 100-yr storm and has been designed per NCDENR Requirements to have a treatment efficiency of 90% TSS Removal for the first 1.5" of runoff. Supply Building Wet Detention Supply Building Wet Detention Basin will treat the Supply Building, surrounding parking and laydown area, and most of the entrance drive. Stormwater is conveyed using Low Impact Development (LID) methods of overland flow and grassed swales to maximum extent possible. The basin is drawn down through an orifice in the riser within 2 to 5 days. An emergency spillway is provided as a drain mechanism during emergency storm events. A minimum of 1-foot of freeboard will be provided above the 100-yr storm and has been designed per NCDENR Requirements to have a treatment efficiency of 90% TSS Removal for the first 1.5" of runoff. 2 Staff NCO Academic Building, Supply Building, and Hoover Road Realignment CN Comm. No. 4686 Stormwater Narrative Clark*Nexsen A. Will All Built Upon Area Be Collected -No. I. Areas of sidewalk will not be collected for treatment (8,916 sq.ft.). II. The Supple Building entrance will not be treated (577 sq.ft.) This area will be incorporated into the low density portion of SW8 111207. Future will be reallocated as On -Site Streets. B. Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development is Proposed Within A Buffer. NO C. Disclose Whether or Not Off -Site Runoff Is Coming Onto The Site or Into The Proposed SCM. Yes- The NCO Wet Pond has been sized to accommodate the offsite drainage. D. If An On -Site Evaluation Of The Soils Has Been Done, Discuss Infiltration Rates, Seasonal High Water Table, etc., and Include Date Of Site Evaluation. -A geotechnical report was prepared on February 5, 2014. Among other tests, seasonal high water table (SHWT) testing was completed in the areas of the SCMs. The Supply Building wet detention basin permanent pool elevation is within 6 inches of the SHWT. The NCO Building wet detention basin permanent pool is approximately 2.5 feet below the seasonal high water table. As nearby ditches are at elevation 10 to 13 it is not expected that the pond will draw the water table down. The elevation of the permanent pool was driven by the storm pipes being able to outlet into the pond while draining the entire site. 3. GEOTECFINICALINVESTIGATION Geotechnical investigation was performed by ECS Carolinas, LLP. A copy of the Geotechnical report is included in Appendix D. 2.0 DESIGN APPROACH 2.1 STORM DRAINAGE PIPING Permanent storm drainage piping systems are designed for a 10-year storm event using the Rational Method for rainfall analysis. Rainfall intensity values were taken from the NOAA website. Runoff coefficients are based on the following values: 3 Staff NCO Academic Building, Supply Building, and Hoover Road Realignment CN Comm. No. 4686 Stommater Narrative Clark*Nexsen Description Runoff Coefficient, C Paved and Roof Areas 0.95 Unimproved Areas 0.35 Using Bentley StormCAD V8i, the post -development stormwater collection system was modeled. An analysis of the hydraulic grade fine for the 10-year design rainfall event found the existing and proposed structures' rim elevations to be above the water level. See Appendix B for detailed information of the post -developed analysis. 3.0 WATER QUALITY ANALYSIS According to the NCDENR Design Guide, the wet detention basin stormwater treatment system is designed to remove 90 percent of the average annual post development total suspended solids Cl'SS), 25 percent of the average annual post development total nitrogen (FN), and 40 percent of the average annual post development total phosphorus (TP), by implementing these Stormwater Control Measures (SCMs). 4.0 WATER QUANTITY ANALYSIS The SCM routings were performed using the triangular hydrograph storage estimation method in the Flydraflow 1-lydrographs 2011 computer program. The analysis indicates that the total site post development condition peak runoff for the 1-year and 10-year design storms is less than the predevelopment condition. rd Staff NCO Academic Building, Supply Building, and Hoover Road Realignment CN Comm. No. 4686 Sionnwater Narrative Clark*Nexsen 4.1 PREDEVELOPMENT CONDITIONS The total development area is approximately 18.11 acres. There are two (2) existing SCMs on site that collect different portions of the developed area. The site ultimately drains to dhe east into New River of the White Oak River basin. The table below summarizes the predevelopment conditions peak runoff for the drainage areas. Predevelopment Condition Peak Runoff Summary Drainage Areas 1-year Peak 10-year Peak Runoff (cfs) Runoff (cfs) B 20.79 33.46 C 1.168 1.792 4.2 POST DEVEI.OPMIsNT CONDITIONS SW8 081007- M200 Area Parking and lon_eing frail: The modification to this permit includes the removal of a high density parking lot and low density jogging trail. Post development conditions will be included in SW8 120101 as part of a high density development treated by a wet detention basin. SW8 111207- Neuse Road Extension: Due to the location of the Supply building and driveway entrance being located within the low density boundary, the boundary was modified to include an equivalent area east of the Supply building. The area of the Supply driveway which overlaps the low density boundary will be captured as part of SW8 120101 and treated with a wet detention basin. A small portion of the driveway entrance and sidewalk additions are included in this Plan Revision by reallocation of Future Impervious. SW8 120101- CamR)ohnson BEQ between Wilson Dr and Hoover Rd (P-1319) Area A: Post development has been adjusted from pre development conditions by an increase in drainage area due to site grading conditions. Any additional impervious surface has been accounted for by reallocation of Future Impervious. G Staff NCO Academic Building, Supply Building, and Hoover Road Realignment CN Comm. No. 4686 Slonnwater Narrative Clark+Nexsen Area B: The Staff NCO Academic Building, Outdoor Instruction Building, parking, and walks are included in the post development drainage area. In addition to the new impervious from this development, existing asphalt jogging trails along the east and west side of development are being removed from SW8 081007 and captured in the wet detention basin. Additional offsite area was included in the sizing of the wet detention pond by topographic survey and field observation. The wet detention basin is located to the west of the development area across Hoover Road. The basin was designed for 90% TSS for the first 1.5" of rainfall. Area C: Post development includes the Supply building and associated parking and driveway entrance. All new impervious surfaces for the Supply building will be treated in a wet detention basin designed for 90% TSS for the first 1.5" of rainfall. See table below for runoff summary. Area D: This drainage area was used to capture all previously unaccounted/untreated impervious surface. These areas include the portion of Hoover Road included in the realignment and a parking lot located south of the M200 Parking Area being removed from SW8 081007. In the post development conditions, new impervious surface for walks and the relocated Hoover Road are not treated in with a SCM as the total unaccounted/untreated impervious surface has decreased from pre development conditions. Post development Condition Peak Runoff Summary Drainage Areas 1-year Peak 10-year Peak Runoff (cfs) Runoff (cfs) B 0.169 0.217 C 0.012 0.015 2 R1[ wuL x \Ai1\ -C6 sux wL lwFn rotil�x[\p�[lym\odl\9omiwb\Nm.l Lea a.4 4�W1 wu[ W [ d uW Rom WMM1. !ury 0. MI. - x:4m VSR. ntwiNY ep s 41` t 1 I v ' V, k'c ----- -- - - - - I(A n �m 5 —NAVAL FACILITIES ENGINEERING COMMAND —MID-ATLANTIC P$ppp rases sanori wvu srnnov. wear. mrwu d ¢ UNITED STATES MARINE CORPS BASE CAMP JOHNSON, NC a P-003 STAFF NCO ACADEMY FACILITIES PRE DEVELOPMENT DRAINAGE AREA MAP 4 4 § G ! i � xWc x \roi�\«es-oe srari xca xm.:w raa.,.\ww�or.\a.i\siom.aiw\owme xw.e.y urp� xwe. wsr w un xonco. uww, w.. aT, ror. - � oro� ussn .wzwa , yy 1'C I' l a�M;�I it l B" 4 1 5 \ \ - ,10 _ p /. HII V-1,------------ -1 ------------------ n + / oivu+TwTxr os mexw rwvu r.rxiTrservoxEexwecwweo y & } o g ° c NAVAL FACILITIES ENGINEERING COMMAND — MID -ATLANTIC y( W.w STATICw W.VKST�TCN.ItlS0.M, WIfwM { > O ° E UNITED STATES MARINE CORPS BASE CAMP JOHNSON, NC P-003 STAFF NCO ACADEMY FACILITIES r sIry ° POST DEVELOPMENT DRAINAGE AREA MAP d A@§g$ Z ! „ r% In T 2 480 000 FEET I i_ V Lam , I L/ " M 60 000 FEET 43'00" i5 000 FEET 3844 M N SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TO INUNDATION BY THE 1 % ANNUAL CHANCE FLOOD The 1 % annual chance Flood (100-year flood), also known as the base flood, is the flood that has a 1 % chance of being equaled or exceeded in any given year. The Special Flood Hazard Area is the area subject to flooding by the 1% annual chance flood. Areas of Special Flood Hazard include Zones A, AE, AH, AO, AR, A99, V, and VE. The Base Flood Elevation is the water -surface elevation of the 1% annual chance flood. ZONE A No Base Flood Elevations determined. ZONE AE Base Flood Elevations determined. ZONE AN Flood depths of 1 to 3 feet (usually areas of pending); Base Flood Elevations determined. ZONE AO Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain); average depths determined. For areas of alluvial fan floodin& velocities also determined. ZONE AR Special Flood Hazard Area formerly protected from the 1% annual chance flood by a flood control system that was subsequently decertified. Zone AR indicates that the former flood control system is being restored to provide protection from the 1% annual chance or greater flood. ZONE A99 Area to be -protected from 1 % annual chance flood by a Federal flood protection system under construction; no Base Flood Elevations determined. ZONE VE Coastal flood zone with velocity hazard (wave action); Base Flood Elevations determined. FLOODWAY AREAS IN ZONE AE The floodway is the channel of a stream plus any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be carried without substantial increases in flood heights. OTHER FLOOD AREAS ZONE X Areas of 0.2% annual chance flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1 % annual chance flood. OTHER AREAS ZONE X Areas determined to be outside the 0.2% annual chance floodplain. ZONE D Areas in which flood hazards are undetermined, but possible. COASTAL BARRIER RESOURCES SYSTEM (CBRS) AREAS \\ \ OTHERWISE PROTECTED AREAS (OPAs) CBRS areas and OPAs are normally located within or adjacent to Special Flood Hazard Areas. 1% annual chance floodplain boundary 0.2% annual chance floodplain boundary — — — — - Floodway boundary - Zone D Boundary .....w............• CBRS and OPA boundary Boundary dividing Special Flood Hazard Areas of different Base Flood Elevations, flood depths or flood velocities. 1.-"-0 NOAA's National,Weather Servlcb, I. aBBw Hydrometeorological Design Studies Cente Precipitation F.requ�ncy) Data, Servep(PFDS General lot. Momapege Current Projects FAO Glasea, Prncipitation Frequenry(PF) PF Data Server PF in GIS Forme, PF Maps • Temporal Distr. • Time Series Dare • PFDS Perform. PF Documems Probable Mosimum Precipitation (PMP) PMP Documents Miscellaneous Publications AEP Storm Analysis Reeertl Precipitation Contact Us Inquiries Lisl-server USA -gm_ ..nws.rgaa.aov 4t.r4� Search J16 NWSO All NOAAO� NOAA ATLAS 14 POINT PRECIPITATION FREQUENCY ESTIMATES: NC DATA DESCRIPTION Dma type: preoApu(ioninlensity 0 Units: Lnglish • Tme series type: penis, tluratlon SELECT LOCATION 1. Manually: a)EMerloutlon(dedmaltlegrms.uw'-'IorSeMW): Iatilutle:(__ J bgilu0e:�-suhmd;: b) Select ste0on (Dick hero for a liar of ate0ons metl In hpumry analysis for NC): selaG atntion 2. Use map: POINT PRECIPITATION FREQUENCY (PF) ESTIMATES Wffll 90% CONFIDENCE IN]ERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14, Volume 2, Version 3 r- PF graVh¢al I 5upplmnr;n�rcnalion PDS-based precipitation frequency estimates with 90 % confidence intervals (in inche51hour)' Duration Average recurrence latersal(yeare) 1 2 5 10 25 50 100 200 500 1000 5-min 5.IS 586.38) (641450) P39.B W) (0N-g73) 10.30 1210) 110.1'120) (109- 3.0) (11P?UO) (12B 15]) 3 1 (133-16.4) 10min 4.70 (4.a4-5.08) 5.54 (5.13-0.00) 9A1 (5.92-6.44) 7.19 NS:s-v.]e) 0.09 (1.42-BJ4) 8.0 (a08-s. u 9.53 (865-10.3) 10.2 agm-tt t) 11.1 (092-12.1) 11.9 (10.5-12.9) 15min 3.92 4.6.1 5.41 6.07 9.84 7.45 B 03 9.80 9.32 9.92 (002-425) (4.30-5.03) µw-5e5) (5se-6m) (8.20-y.Su (am -am) R.2B 0.081 O.76-9.31) (0.33-10.1) (678-10.0) JO+nln 2.0 3.21 3.84 4.40 5.08 5.81 815 B.BB 1.42 B.OJ 1240-2BU 12.9]-34]) 43.55.4.16) (405-4.i0) I4.&-54T) (5.12$08) 1558 865) N.04-L25) (663-0.05) (7,11-8.74) 80-min 1.1.1 3.3841 5.86 (LSSBt 02) n.mQ1e) 12.Y!'3091 128483101 0.096 I4.238500) (d 5i]01 (510-630) 1.0 .2L34 n �;� �(3U-4581 34)p 114.54, 11.I (2.02�3.41 JB3t]I 12.85-dISBI (3.41120) 13B J-0r 10000-0.0011 (003e 00]0) (1.02423 (132�148 La883]0 (4#�3001 (r00'2407 R.2J-2]5 1383,]20 (2 53]I B-hr 1040]440!93) (043-0.598) (09A-OJ53 10]40-O.B00) 10905001.11 1.oa-l.39) (1.21,1848) (1.3)---1,71) Oat-205) (t 83235) 0.2B1 0,316 0.401 0.403 0.598 0.704 0.810 Deals1.14 1.J2 12ar (02b-ON1) (0280-0352) 11 (036]-0H)) (0434-0538) I (0534-06m) 11 (0823-0]19) 1 (0I19-0W8) 11 10824-1m) 1 (D9]9-1m)n.11-146 0.102 0105 0.291 0.4I8 0.554 0.908 0.]00 24�r 37 01 a.3>-D 1851 0.18]-0201 (0215-0258 (0.258-0SR 16-0. (0 ]18-0.365) 58-0, (0388-0451) (04b-0525) (04&-O 60B) IO 573-0 73B (0.648-0853) 2day 0.06] 0.108 0.1JS 0.181 0.200 0.235 0.2]] 0.3tB O.J82 0.430 §| ..�. .! .• .! ,� �§ .; (`| z � _ g§.;•;®,.§|.| \ s e s 22/§\t9R! \/ or.-_ di-n-I !~4w_ \ 15-1 : .. .,■,:;;;a:,;:!!§ - - - - s o `\\§ | / §{ ! /\ ! §� . .............. | JeeeaaeGe,i ;:-.at u !\ EGQGSaaGa ! eRGQQBQ\A!t Label: AS Al'- A5 -Base Type: catch easln ID: 24 16.5 18 _ yoe-Cateh Basin. ID: 33 Type' Catch Basin — 17.5 label: AL. _ 4abe1:-P3—--_—__.—�� ID:'IS— Type: outranCatch Ba:n I 16 - _ label; CO-3 � I5 TYPe:{pndvrt - 4 Y14.5 --�----tabeh'CO-S---t'^ - ---"�—"�"'iYPe Label: cO-t C_niU —J--` _-_----____- _ ID: 25 --------- -- _ .y tI TYOe: CanduR ID: 1] — _ 3.5 - 13 12.5 — — --- I Labal: CO-23- TYPe;Conduit ID:89 ---- -- — --` - _�- J�-- I1.5. ji 0 50 -- 100 150 - 260 250 360 350 '. 400 .50 560 550 600 m\1,ed 3. \coa n\w-n 17\w-1 xN wa fink bnpth (h) 93.0 96.0 09.0 237.0 Ms. (In)Wn.n.I No 2..0\ tJ.P\ slA \Cann,([-,nl..pun) It... (hB) 0.003 0.411 0.004 -P.001 3p\1.6d 31\•1 33\N I61q T IJ 11u —I 3. U —_ —+ Graund lh) 6P0 lJ.tf 16.36 16.9. 19.6 Inv.n/h) 10. t P.6J 13.6P I3.x3 t40p 5t.[len th) 0.0 92.0 IM.O 3.1.0 6P..P - label: A2 - - type catch eosin A2 - AIS - Base - " - b I: A] Label: YPeCahh a9 Basin Lobel: A13 I_ Ty TYpe:CelcTi Besn ID' 49 - tD: R 1 .5 iD]32 jOuda0 TYp D. Ube!: ID: 91 all Lab I a14 Type C t56 Basin IDi 56 _I 16 -- - Type;C [dl,Besin C [Basin - - - - ID. 53 ID: at 15+5 Type. Catch Basin Label' CO-13 - ID na __- TYpn Conduit ID: 53 Label. CD 16 ..., 14.5. —..._-.��_._---_ _ ._ Ube]: Type: '6t 40 ti Basin --.--•-.___.-.._- _LAbel_CD-15. Label_ _-_ -.__�._ — D label: CO-32 _TYpe l C6ndult TYpe: Conduit - ___-._..�.�.___ -� ID: 95 label: CO-24 Type: Conduit Conduit Type: Candw[ ID: 50 label: CO-5 ) Type: Conduit ID: 55 ID: 5/ 14 - .TYpe: <An —. -----� -- - —IDr92— ID: 30 label: - �I > 13.5. Type: Conduit label: CO-26- label: CO 25 3. 48 ID: a8 - TYpe Co duii - ID: 96 13 jy 12.5. i_ 12- - 11.5. 10.5. _-.o--- '�--- —. 50 IDO 150 200 250 360 350 460 45O 500 550 660 650 I' 700 750 860 850 900 NLLabel 34\CO-3 4B\0'11 97\CO-36 9000-33 92\W24 Sf\W-if 54\W f4 - 5)\W1'11] 10\C411 37\W-16 fink 4nPh(M1) �R.0 ]0).0 63.0 N9.p 61A 14.0 14.0 —�H.O La.b 9].0 Nu (In)\Mrtetld 36A\ 39A\ 33.0\ 33.0\ 3a.0\ U.p\ ]4.0\ H.p\ U.p\ I5.0\ A- MIA) 22.10 MAI I0A4 11.89 17.03 13.86 I1.13 9d] 6.59 3.67 �— Slope(h/fi) -0.00] 0.003 0.003 0.003 0.003 -0.003 — 0.003 0.003 0.003 -0.003 N1LeEd 33VA3 l3 AZ 44 A) 93 49 4] 49 9l 4 0 334tl1 fi V41b R13 43 V4It S6 PI3 me.ae vv 1461 ix)z 1x4z lsnsn x)1 z4 46z Im�rt (M1hI) _]slpa ��uez Ib.M )p1.60 11.71 .03f �t 11x31 113 1 —i 514v1on IM1) 0.0 12.0 19 o 361.0 410.0 4jII-A� M.0 Wj .ae].0 MA 'ma 16 15.5 Type: Catch Basing ID: 33 v A3 - A6-.Base .- 16 Wbel _CO23 _ Type_ COnd t ID: 09 240 TY p e' Conduit D .29_ _ 280 300 320 340 360 380 400 Qp 440 28 �95.0 96.p 363.0 16.0\ 24.0X ]BA\ ]].60 [2.6] ].3] -0.M I 0.020 -s.Op6 z9 Wbal. A2 - Type: catch Basin A7 - A19 -Base ' ID. 33 tY 9ut— - 16 Type: Ca[chBasin Labl>I6 T M. 44 TYp C Ich Basin M. _LeheL.Al) TyDe'ca4h 1 111___ Basn L b ID: )6 Yp C T— I. A18 [ch Basn _ ID.']D-- - _� ___. �_.__...__ IDi l8 Label A19 - TYpa:Catch Basin label: CD-5 - - Labal: C c le- _ _.__. _—_ --- � -- -T ^— roED _ -- TYPIOt)SEUrc .ndul u m IDC34�t label CD-11 Label '- _ TYp : Condprc _ -y label eD v - -- TYp Ty CO Cpnduit 20 - label: CO-21 Iypa:.Cpnduit__— > 13.5. c .__._ ,. ID: 48 TYOe C ndut �',,�`-"v- _.__ )]I _ ID: 79 —y ID )1 13 12.5 - -- � 12 — • 11.5 - — ' 11 10.5. 160 - 150 200 250 360 350 460 450 500 550 600 NWbal 34\CO5 N\W-ll - ]1\c01] ]]\m-2p ]f\c019 _ JA Length(ft) I 12.0 I 107.0 169.0 t].0 I39.0 99.p Wu (In)WrtanA 36.01 I 29.0\ 34A\ 110% 19.0\ _ 19.0\ Ra«Ih•/sl 23.60 ME, 13.3I _ llA9 IOA] 1311 slepa(h]h) O413 f 1.113 -0.003 0.009 -O.00I -O.00I NLLabal 33\P] 33\42 w(N 70 \P16)6 Pi] JB V�AIB ]4\419 4NuvE (fl) l6pp I]AI .l9 146] l 1442 1 1493 1413]3 IIpO lmen (fi) iPM 10.67 iQ99 11.ap I1.a9 1L9A 13.,3.13 slnlon lfi) 0.0 92.0 19 0 161.0 39V.0 303.0 602.0 Labeh CB 3fi - ryoe carob Bann label: CB -al ryoaID: Ba]m m • Lek Bottom of Building -Base label: CB 38 - rraa: came Ba]n ID�126 _ ID:15 [D:I13O 1 -• ----- '1sB --- -'---'-' —'- - -—I--tabe CCB--3> -- Tyo ' Catdi Basin - ----_ I ---------- ---`- - --.— tabel:'nma --' 18.6 ---_ _CM.128—�._..TY016 MIB9ole-leEeR OF-S 18.4 Ebel- C9=as - - TYV_eLIOuHall 18.2 - - _ _ Tyo C ndvit ID 159 __ Lobel: CO a6 _�_ I ._.-. - _' --_ _-ID:I18]- 18 - I - TyOe. Condo, _ - -- I tOaO ------ l -- - ID: 16O I Lab TYG Conduit 17.8 -� 17.6 Y 1].2 C — a. F '2'L }: +`_•Y S`l�, ivoe Conduit u 1] .J y ' Bg' sy4fA. � +k - ID: 100 �- is. Tn 4. G 16.2_ i�.s�xq ab I CO-51 Type conduit — ---- _ �_.._�I - `]fi>_. i9dys xy'F {RBry ... ID.190_i _— __.__�__�— . .. 4 I B ( 15.6 16 — 1 �.-�z _. _ _ _- I ..m.-,....x.,.....n- -.v--.a.-.sa.—c•.v.�x:.n,--..a.�v�--:.-�{+�a�.-...,mr.�-..t+-sue{ -ae..w .5' 0 S.a 20 30 40 50 60 70 so- 90 160 110 In 13a 1<0 I 150 N\label u9\cO-as 16B\fA-K I m\Tati0 tfie\(9-00 t9o\TAdl Ilnk tvn9tA (h) �— 3B'B 91.0 I SBA I IB.a 9.0 Wn (inpMrtmd 6.0\ 6.0\ _ Si...(M1lh) a.ola a.oto 4.BIa o.oID a.olo .iLA.l ]36�®-36 ISB�6B-.3 33B \Cb3J 130\C0 )B IB9 \iMX-a 1B]�OF3 ... ... ....-.._... -t - - Gteunllh) 1B.]] 1.11 111.73 1.." 1e.30 16.00 tnv.rt lh) li.J] I6.97 16.56 15.98 15.07 1f.98 ]la[len lh) 0.0 38.0 1910 ]3].0 1.3.0 ]31.0 label: CB 30 Type: Catch Basin ID. 115 Label: CB-31 Type: Catch Basin ID' 117 Label <B-32 Front of Building Base Tyae; camn Basm - Label CB 40 Troa' came Basin ID: 134 el:OF3 ID: 119 - I - Type: 140:I140a ID- 18.60 I ' Type Band [ J- - LabcL CO-35 I 18.00. 17.00 - _. _...__ _ - ID. 120 -^- ~- label CO 43 17.60 ll.4p ID 136 Tvpe eo Eut 17.00 16.80 -" 16.60- .ry -a+T�$ �_ to i4 16.00 15.60 15.40 15.20 ( r 1s.0o.- 0!0 10.0 20.0, 30.0 40.0 50.0 60.0 76.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 166.0 120.0- 10o.0 196.0 N\Label lla \ COJ4 I'd kco.35 736 \ CO-43 141 \ CPH link I.,,h (h) H 0 47.0 6C.0 11.0 Ms. (in)V ...6.1 6.0 \ I.0 \ SON Fon lhxp) 0.31 O.S. 1.. 3.50 Slope (hJh) 0.010 0__010 d.010 -- 0.063 t m\Label 113\C1Y30 Ill\COdI 119\IC&3] D4\CB-40 PO\OF3 Ground:, t&]3 In-nh) 1].i3 1112 sli.15 I1.4] 14.40 5[ atlon (h) p0 .4a 311-0 V5.0 6.0 4 Inbtl: A2 FOOd IO CI$ICpO - Base Label: 2IB B Type: Cat8asin TYpeCafch Ba 'n - D' JJ - _ ID. 82 - 17.5 1 Label: Al 1 ll l TYoe.DuHall t 6.5.. _ 16 ... 15.5 _. _ _ _..... label: -A)— Type:Catch Basin —tab"I"A16- L 6 1 A]] ., Type. Catch Bai n' Label: Ate �- —_ is .� ID: w TypcCtd�Oasin ID: )6 Type: Catch Basin ID -0B _— I 14.5 a'r , - 0 19 -_ Trpe. lbnemt - ,--- Label CO 11 _�Y'- - label: CO "'c" 20 lab CO-21 Label CO 22 Type: Co dart �".' Y -i �b I CO ll -- _�:j(✓t TYp C d t TYve COOdat Type: Conduit 13.5 -.. ID. AB �+:e. .F T - .- TYOID )Idurt..n. v ID: - —IO 83 I 1] 12.5 12 10.5 0 50 too - 150 200 25 0 360 350 46G 45O 506 Sio _. NWbel 39\C03 U\CO-lI ]I\CO-V ])\CO-20 )9\[O-3t 03\CO-2] ILA 4ngeF (h) 93.p 101.0 I60A V.0 1I9.0 Q.0 Wu tln)l.etlnel 36A\ 29,0\ 24.0 19.0\ 19d\ UA\ Non the/a) 32.60 10.69 12.32 li.e9 I0.67 1.20 I}- Sloe th)h) -0.003 0.001 .a as IT 321P1 33 4 w1U )O W16 16 el] ZD\AIB 92\RO NLLebel ... ........... ---j1...________..__.—_—_._.__._..___._—._______...1._._._1.__..._—._...-------- .__.._._.___..._..__..}...._____.._—__—..__}__.. G,aund thl IG00 1].19 1967 le P2 I(33 19. Sl InNnth) � IO.w 1A6J t IQ90 11190 I1.� vll.9e 13.02 Slaalen lfil 0.0 93.0 199.0 367.0 3040 303.0 Sit{9.0 Architecture & Engineering Project Information Wet Detention Basin Design NCO Wet Detention Basin Project: NCO Facility Location: Jacksonville, NC Project Number: 4851 Date: Jun-16-2014 Designed: VJC Checked: VJC Site Information Sub Area Location: NCO Wet Detention Basin Drainage Area (DA) = 671,457 sf Impervious Area (IA) = 244,609 sf (includes 12,500sf of future impervious) Percent Impervious (1)= 36.4 % Elevations Top of Bank Elevation = 16.00 ft Emergency Elevation = 14.25 ft Temporary Pool Elevation = 13.10 Permanent Pool Elevation = 12.00 It Bottom of Pond Elevation = 0.50 ft 60,134 Sediment Cleanout, Bottom Elevation = 1.50 ft Basin AreaslVolumes Area of Permanent Pool = 25,765 sf Area of Bottom of Shelf = 22,402 sf Area of Bottom of Pond = 6,719 sf Area of Temporary Pool = 30,591 sf Volume, main pool = 103,072 cf Volume, forebay (sum of forebays) = 24,142 cf Volume, permanent pool = 127,214 cf Forebay % of permanent pool volume = 19.0 % Average Depth Depth of Pond = 10 ft Average Depth = 6.97 ft Use Average Depth of = 7.00 ft A Po,m ,1 (includes main pond & forebays) (Elev = 12.00 ) A e„ ,nau (includes main pond & forebays) A �, „,� (excluding sediment storage & forebays) A,,,,, -,„a (includes main pond and forebays) (Elev = 13.10 ) V,,,;,, (from Hydraflow) V ,.,,(from Hydraflow) V "(Vm'emr+V--n —1) OK Depth joist. btwn. bot. of shelf & btm. of pond, excludes sediment) Round down to nearest 0.5 Required Surface Area - Wetland SAfDA = 1.28 (90%TSS Removal via Pond) Min Req'd Surface Area = 8,595 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.5 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05+ 0.009 (1) = 0.38 info Storage Volume Required = 31,715 cf (above Permanent Pool) Side Slopes of Pond = 3 :1 Is Permanent Pool Surface Area Sufficient (yes/no)? Yes ( 25765 > 8595 ) sf Architecture & Engineering Wet Detention Basin Design NCO Wet Detention Basin 1.5 inch Volume Elevation Required Temporary Pool Volume = 31,715 cu ft Temporary Pool Lower Elevation Bound = 13.00 Temporary Pool Upper Elevation Bound = 14.00 Temporary Pool Lower Volume Bound = 28,664 cu ft Temporary Pool Upper Volume Bound = 60,134 cu ft Temporary Pool Elevation= 13.10 Orifice Sizing - Wet Detention O2 o.,= 0.1835 cis Oz o.,= 0.0734 cfs Orifice Size = 3.00 in Driving Head (H.) = 0.32 ft O u,,,.= 0.135 cfs Drawdown Time = 2.7 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 4.00 it Outside Width= 4.00 ft Inside Length = 3.00 ft Inside Width = 3.00 ft Bottom Thickness = 0.50 ft Top of Riser = 13.75 sf Invert of Riser = 12.00 ft Area = 16.0 sf Volume = 36 cf Weight= 2,246 Ibs Factor of Safety = 1.20 WT Req'd of Anti -Flotation Device = 2,696 Ibs Volume of Concrete Req'd = 30.8 cf Additioal Concrete Req'd = 0.75 ft Volume Provided = 32.3 cf WT of Anti -Flotation Device Provided = 2,825 Ibs Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu It cu ft ft 12.00 25,766 0 0 0.0 12.50 29,286 13,752 13,752 0.5 13.00 30,372 14,912 28.664 1.0 14.00 32,588 31,470 60,134 2.0 15.00 34,860 33,714 93,848 3.0 16.00 37,189 36,015 129,863 4.0 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Outside Dim. = 4-ft x 4-ft, Inside Dim. = 3-ft x 3-ft) (Water Displaced - Top of Riser to Invert of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf (441 x 4-ft with solid bottom) OK Architecture & Engineering Wet Detention Basin Design Supply Wet Detention Basin Project Information Project: NCO Facility Location: Camp Johnson, NC Project Number: 4686 Date: Jun-03-2014 Designed: VJC Checked: VJC Site Information Sub Area Location: Supply Wet Detention Basin Drainage Area (DA) = 34,271 sf Impervious Area (IA)= 21,380 at Percent Impervious (1) = 6204 % Elevations Top of Bank Elevation = 16.50 ft Emergency Elevation = 15.00 if Temporary Pool Elevation = 14.60 Permanent Pool Elevation = 14.00 ft Bottom of Pond Elevation = 7.35 ft Sediment Cleanout, Bottom Elevation = 12.50 ft Basin Areas[Volumes Area of Permanent Pool = 3,674 at A i (includes main pond & forebays) (Elev = 14.00 ) Area of Bottom of Shelf = 2,570 sf A, (includes main pond & forebays) Area of Bottom of Pond = 20 sf A �, � (excluding sediment storage & forebays) Area of Temporary Pool = 5,024 at A,.,,,(includes main pond and forebays) (Elev = 14.60 ) Volume, main pool = 4,956 cf V man _,(from Hydraflow) Volume, forebay (sum of forebays) = 1,093 cf V t.,.., (from Hydra0ow) Volume, permanent pool = 6,049 cf V,,,, ' (V,—b., V... ,opI) Forebay % of permanent pool volume = 18.1 % OK Average Depth Depth of Pond = 5.15 If Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) Average Depth = 3.02 ft Use Average Depth of = 3.00 ft Round down to nearest 0.5 Required Surface Area - Wetland SA/DA = 7.20 (90%TSS Removal via Pond) Min Req'd Surface Area = 2,468 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Stom, = 1.5 inch (Project Does Not Drain to SA Waters) Determine Rv Value= 0.05 + 0.009 (1) = 0.61 in/In Storage Volume Required = 2,619 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 3674 > 2468 ) sf ray.;. ►o. •► Architecture & Engineering Wet Detention Basin Design Supply Wet Detention Basin 1.5 Inch Volume Elevation Required Temporary Pool Volume = 2,619 cu ft Temporary Pool Lower Elevation Bound = 14.50 Temporary Pool Upper Elevation Bound = 15.00 Temporary Pool Lower Volume Bound = 2,143 cu ft Temporary Pool Upper Volume Bound = 4,710 cu ft Temporary Pool Elevation = 14.59 Orifice Sizing - Wet Detention O2 Dal= 0.0152 cfs Os Dan= 0,0061 cfs Orifice Size = 1.00 in Driving Head (Ha) = 0.18 R O"_= 0.011 cfs Drawdown Time = 2.7 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 4.00 ft Outside Width = 4.00 ft Inside Length = 3.00 ft Inside Width= 3.00 ft Bottom Thickness = 0.50 ft Top of Riser = 14.60 sf Invert of Riser = 13.16 cf Area = 16.0 sf Volume= 31 cf Weight= 1,937 Ibs Factor of Safety = 1.20 WT Req'd of Anti -Flotation Device = 2,324 Ibs Volume of Concrete Req'd = 26.5 cf Additioal Concrete Req'd = 0.75 ft Volume Provided = 30.1 cf Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu It cu ft ft 14.00 3,674 0 0 0.0 14.50 4,929 2,143 2,143 0.5 15.00 5,344 2,567 4,710 1.0 15.50 5,766 2,777 7,487 1.5 16.00 6,196 2,990 10,477 2.0 16.50 6,646 3,210 13,687 2.5 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Top of Riser [Elev. 14.60] - Bottom of Riser [Elev. 13.161) (Outside Dim. = 4-ft x 4-ft, Inside Dim. = 3-ft x 3-ft) (Water Displaced - Top of Riser to Invert of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf WT of Anti -Flotation Device Provided = 2.635 Ibs OK Hydrograph Return Period Rep Hydrographs Extension for AutoCAD®Civil 3D®2014 by Autodesk, Inc. v10.3 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational ------ 20.79 ------- ------- ------- 33.46 ------ ------ 45.84 NCO Pre 2 Rational ------ 47.21 ------- ------ ------- 73.04 ---- ----- 97.70 NCO Post 3 Reservoir 2 0.169 ---- ---- 0.217 -- -- 0.394 NCO Pond 5 Rational ----- 1.168 ------- ---- ----- 1.792 ----- ------ 2.396 Supply Pre 6 Rational --- 3.362 --- ---- 5.161 ---- 6.899 Supply Post 7 Reservoir 6 0.012 ----- ------- ----- 0.015 ------ ----- 0.017 Supply Pond Proj. file: NCO Hydraflow—Site Final.gpw Tuesday, 06 / 3 / 2014 Hydrograph Summary Report Hydraflow Hydrogmphs Extension for AutoCAD®Civil 3D®2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Rational 20.79 1 20 24,952 --- -- NCO Pre 2 Rational 47.21 1 7 19,830 --- --- NCO Post 3 Reservoir 0.169 1 14 16,389 2 12.70 19,753 NCO Pond 5 Rational 1.168 1 5 350 ---- --- ---- Supply Pre 6 Rational 3,362 1 5 1,009 --- ---- Supply Post 7 Reservoir 0,012 1 10 901 6 14.23 1,005 Supply Pond NCO Hydraflow_Site Final.gpw Return Period: 1 Year Tuesday, 06 / 3 / 2014 3 Hydrograph Report Hydraflm Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 06 / 3 / 2014 Hyd. No. 1 NCO Pre Hydrograph type = Rational Peak discharge = 20.79 cfs Storm frequency = 1 yrs Time to peak = 20 min Time interval = 1 min Hyd. volume = 24,952 cuft Drainage area = 14.810 ac Runoff coeff. = 0.41 * Intensity = 3.424 in/hr Tc by User = 20.00 min IDF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 ' Composite (Area/C) _ [(3.440 x 0.95) + (11.370 x 0.25)] / 14.810 NCO Pre Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 - 15.00 12.00 12.00 9.00 9.00 6.00 - 6.00 3.00 3.00 000 - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time(min) Hyd No. 1 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADB Civil 3D® 2014 by Autodesk, Inc. 00.3 Tuesday, 06 / 3 / 2014 Hyd. No. 2 NCO Post Hydrograph type = Rational Peak discharge = 47.21 cfs Storm frequency = 1 yrs Time to peak = 7 min Time interval = 1 min Hyd. volume = 19,830 cult Drainage area = 15.410 ac Runoff coeff. = 0.57' Intensity = 5.375 in/hr Tc by User = 7.00 min IDF Curve = Jacksonville.IDF Asc/Rec limb fact = 1/1 Composite (Area/C) _ [(5.610 x 0.95) + (9.800 x 0.35)] / 15.410 Q (cfs) 50.00 40.00 30.00 20.00 10.00 000 NCO Post , Hyd. No. 2 -- 1 Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (min) — Hyd No. 2 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31DO 2014 by Autodesk, Inc. 00.3 Tuesday, 06 / 3 / 2014 Hyd. No. 3 NCO Pond Hydrograph type = Reservoir Peak discharge = 0.169 cfs Storm frequency = 1 yrs Time to peak = 14 min Time interval = 1 min Hyd. volume = 16,389 cuft Inflow hyd. No. = 2 -NCO Post Max. Elevation = 12.70 ft Reservoir name = NCO Temporary Pond Max. Storage = 19,753 cuft Storage Indication method used. Q (cfs) 50.00 40.00 30.00 20.00 10.00 000 NCO Pond Hyd. No. 3 -- 1 Year 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 V vv Time(min) — Hyd No. 3 —Hyd No. 2 II I I I I I� Total storage used = 19,753 cuff Pond Report ' 6 Hydraflow Hydrographs Extension for AutoCADS Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 06 / 3 / 2014 Pond No. 1 - NCO Temporary Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 12.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 12.00 0.50 12.50 1.00 13.00 2.00 14.00 3.00 15.00 4.00 16.00 Contour area (sgft) 25,766 29,286 30,372 32,588 34,860 37,189 Incr. Storage (cult) 0 13,752 14,912 31,470 33,714 36,015 Total storage (cult) 0 13,752 28,664 60,135 93,849 129,864 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 3.00 4.00 Inactive Crest Len (ft) = 9.00 35.00 3.00 Inactive Span (in) = 15.00 3.00 4.00 0.00 Crest El. (ft) = 14.00 14.00 13.70 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 12.00 12.00 13.10 0.00 Weir Type = 1 Broad Rect --- Length (ft) = 57.00 0.00 0.00 0.00 Multi -Stage = Yes No Yes No Slope (h) = 0.35 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: CulwiWonfice outflows are analyzed under inlet ic) and outlet (oc) control. Weir nsers checked for orifice conditions(ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C f ri Wr A Wr B Wr C Wr D Exfil User Total It cuft ft cfs cis cfs cfs cfs cis cfs cis cis cfs cfs 0.00 0 12.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 -- --- -- 0.000 0.50 13,752 12.50 0.15 oc 0.14 is 0.00 -- 0.00 0.00 0.00 --- -- -- 0.136 1.00 28,664 13.00 0.22 oc 0.21 is 0.00 --- 0.00 0.00 0.00 --- - --- 0.210 2.00 60,135 14.00 2.26 cc 0.24 is 0.36 is -- 0.00 0.00 1.64 -- --- --- 2.244 3.00 93,849 15.00 8.18 oc 0.02 is 0.04 is -- 5.61 s 91.00 2.51 s -- - -- 99.17 4.00 129,864 16.00 10.08 oc 0.01 is 0.02 is -- 7.18 s 257.39 2.80 s --- --- -- 267.40 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Tuesday, 06 / 3 / 2014 Hyd. No. 5 Supply Pre Hydrograph type = Rational Peak discharge = 1.168 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 350 cuft Drainage area = 0.790 ac Runoff coeff. = 0.25` Intensity = 5.912 in/hr Tc by User = 5.00 min OF Curve = Jacksonville.IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(0.790 x 0.25)] / 0.790 Q (Cfs) 2.00 1.00 Ad� Supply Pre Hyd. No. 5 -- 1 Year Q (cfs) 2.00 1.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 8 , Hydrograph Report Hydraflm Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Tuesday, 06 / 3 12014 Hyd. No. 6 Supply Post Hydrograph type = Rational Peak discharge = 3.362 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,009 cult Drainage area = 0.790 ac Runoff coeff. = 0.72" Intensity = 5.912 in/hr Tc by User = 5.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 ' Composite (Area/C) = [(0.490 x 0.95) + (0.300 x 0.35)) / 0.790 Q (cfs) 4.00 3.00 2.00 1.00 M Supply Post Hyd. No. 6 -- 1 Year i Q (cfs) 4.00 3.00 2.00 1.00 IO1[rUl 0 1 2 3 4 5 6 7 8 9 10 Time(min) Hyd No. 6 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2014 by Autodesk, Inc. 00.3 Tuesday, 06 / 3 / 2014 Hyd. No. 7 Supply Pond Hydrograph type = Reservoir Peak discharge = 0.012 cfs Storm frequency = 1 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 901 cuft Inflow hyd. No. = 6 -Supply Post Max. Elevation = 14.23 ft Reservoir name = Supply Temporary Pond Max. Storage = 1,005 cuft Storage Indication method used. Q (cfs) 4.00 3.00 2.00 r Supply Pond Hyd. No. 7 -- 1 Year Q (cfs; 4.00 3.00 2.00 1.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 7 —Hyd No. 6 ILILLLLII Total storage used = 1,005 cuff Pond Report -10 - Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Pond No. 3 - Supply Temporary Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 14.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 14.00 0.50 14.50 1.00 15.00 1.50 15.50 2.00 16.00 2.50 16.50 Contour area (scift) 3,674 4,929 5,344 5,766 6,196 6,646 Incr. Storage (cuft) 0 2,143 2,567 2,777 2,990 3,210 Total storage (cuft) 0 2,143 4,710 7,487 10,476 13,686 Tuesday, 06/3/2014 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 1.00 0.00 0.00 Crest Len (ft) = 9.00 10.00 3.00 0.00 Span (in) = 12.00 1.00 0.00 0.00 Crest El. (ft) = 14.85 15.00 14.60 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 13.16 14.00 0.00 0.00 Weir Type = 1 Broad Rect --- Length (ft) = 33.00 0.00 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%a) = 0.49 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TIN Elev.(ft) = 0.00 Note:CuherfOrifice ouHlows are analyzed under inlet(ic) and butter(oc) control. Weir risers checked for onfice conditions(ic) and submergence(s). Stage / Storage / Discharge Table Stage Storage Elevation CIv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cis cfs cfs cfs 0.00 0 14.00 0.00 0.00 -- --- 0.00 0.00 0.00 -- -- - 0.000 0.50 2,143 14.50 1.51 oc 0.02 is -- -- 0.00 0.00 0.00 - - - 0.018 1.00 4,710 15.00 3.67 oc 0.01 is -- - 1.74 s 0.00 1.92 s -- --- --- 3.671 1.50 7,487 15.50 4.85 oc 0.00 is -- - 3.27 s 11.77 1.57 s -- --- --- 16.62 2.00 10,476 16.00 5.61 oc 0.00 is -- -- 3.94 s 33.30 1.64 s --- --- --- 38.88 2.50 13,686 16.50 6.27 oc 0.00 is -- --- 4.45 s 61.18 1.73 s -- -- - 67.36 11 Hyd rog ra p h Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2014 by Autodesk, Inc. 00.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuff) Hydrograph Description 1 Rational 33.46 1 20 40,147 ----- ----- ---- NCO Pre 2 Rational 73.04 1 7 30,677 -- ---- NCO Post 3 Reservoir 0.217 1 14 24,784 2 13.06 30,574 NCO Pond 5 Rational 1.792 1 5 538 ------ ------ ------ Supply Pre 6 Rational 5.161 1 5 1,548 ------ ----- ------ Supply Post 7 Reservoir 0.015 1 10 1,371 6 14.36 1,543 Supply Pond NCO Hydraflow_Site Final.gpw Return Period: 10 Year Tuesday, 06 / 3 / 2014 112 Hydrograph Report Hydraflovv Hydrogmphs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 06 / 3 / 2014 Hyd. No. 1 NCO Pre Hydrograph type = Rational Peak discharge = 33.46 cfs Storm frequency = 10 yrs Time to peak = 20 min Time interval = 1 min Hyd. volume = 40,147 cuft Drainage area = 14.810 ac Runoff coeff. = 0.41` Intensity = 5.510 in/hr Tc by User = 20.00 min IDF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 ' Composite (Area/C) _ [(3.440 x 0.95) + (11.370 x 0.25)] / 14.810 NCO Pre Q (efS) Hyd. No. 1 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time(min) — Hyd No. 1 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 313®2014 by Autodesk, Inc. v10.3 Tuesday, 06 / 3 / 2014 Hyd. No. 2 NCO Post Hydrograph type = Rational Peak discharge = 73.04 cfs Storm frequency = 10 yrs Time to peak = 7 min Time interval = 1 min Hyd. volume = 30,677 cuft Drainage area = 15.410 ac Runoff coeff. = 0.57* Intensity = 8.316 in/hr Tc by User = 7.00 min IDF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 ' Composite (Area/C) _ [(5.610 x 0.95) + (9,800 x 0.35)] / 15.410 NCO Post Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 - - 20.00 10.00 - - 10.00 0 00 000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Hyd No. 2 Time(min) 114 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Tuesday, 06 / 3 / 2014 Hyd. No. 3 NCO Pond Hydrograph type = Reservoir Peak discharge = 0.217 cfs Storm frequency = 10 yrs Time to peak = 14 min Time interval = 1 min Hyd. volume = 24,784 cuft Inflow hyd. No. = 2 -NCO Post Max. Elevation = 13.06 ft Reservoir name = NCO Temporary Pond Max. Storage = 30,574 cuft Storage Indication method used. NCO Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs: 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 - 30.00 20.00 20.00 10.00 10.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time(min) — Hyd No. 3 — Hyd No. 2 [I I I I I I II Total storage used = 30,574 cuff ' 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Tuesday, 0613 / 2014 Hyd. No. 5 Supply Pre Hydrograph type = Rational Peak discharge = 1.792 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 538 cult Drainage area = 0.790 ac Runoff coeff. = 0.25" Intensity = 9.074 in/hr Tc by User = 5.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 ' Composite (Area/C) = ((0.790 x 0.25)] / 0.790 Q (cfs) 2.00 1.00 Supply Pre Hyd. No. 5 -- 10 Year Q (Cfs) 2.00 MKIIU] 0.00 hr 'I I 1 1 1 1 1 1"- 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time(min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Hyd. No. 6 Supply Post Hydrograph type = Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.790 ac Intensity = 9.074 in/hr OF Curve = Jacksonville. OF Composite (Area/C) = [(0.490 x 0.95) + (0.300 x 0.35)] / 0.790 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 rbTTo '16 Tuesday, 06 / 3 / 2014 Peak discharge = 5.161 cfs Time to peak = 5 min Hyd. volume = 1,548 cuft Runoff coeff. = 0.72" Tc by User = 5.00 min Asc/Rec limb fact = 1/1 Supply Post Hyd. No. 6 -- 10 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 E f1T17 0 1 2 3 4 5 6 7 8 9 10 Time(min) Hyd No. 6 ' Hydrograph Report 17 Hydraflovv Hydrographs Extension For AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Tuesday, 06 13 / 2014 Hyd. No. 7 Supply Pond Hydrograph type = Reservoir Peak discharge = 0.015 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 1,371 cuft Inflow hyd. No. = 6 -Supply Post Max. Elevation = 14.36 ft Reservoir name = Supply Temporary Pond Max. Storage = 1,543 cuft Storage Indication method used Supply Pond Q (Cfs) Hyd. No. 7 -- 10 Year Q (cfs; 6.00 6.00 5.00 5.00 4.00 4.00 3.00 - 3.00 2.00 2.00 1.00 1.00 000 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 7 —Hyd No. 6 U1111CII Total storage used = 1,543 cuft 18 Hydrograph Summary Re port Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Timeto Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (fl) Total strge used (cult) Hydrograph Description 1 Rational 45.84 1 20 55,010 --- -- NCO Pre 2 Rational 97.70 1 7 41,034 --- ----- --- NCO Post 3 Reservoir 0.394 1 14 31,933 2 13.39 40,887 NCO Pond 5 Rational 2.396 1 5 719 ---- -- --- Supply Pre 6 Rational 6.899 1 5 2,070 ------ ------ ----- Supply Post 7 Reservoir 0.017 1 10 1,805 6 14.48 2,064 Supply Pond NCO Hydraflow—Site Final.gpw Return Period: 100 Year Tuesday, 06 / 3 / 2014 Hydrograph Report 19 Hydraflm Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. 1 NCO Pre Hydrograph type = Rational Storm frequency = 100 yrs Time interval = 1 min Drainage area = 14.810 ac Intensity = 7.550 in/hr IDF Curve = Jacksonville.IDF Composite (Area/C) _ [(3.440 x 0.95) + (11.370 x 0.25)] 114.810 Q (cfs) 50.00 rI 16 10.00 r Tuesday, 06 / 3 / 2014 Peak discharge = 45.84 cfs Time to peak = 20 min Hyd. volume = 55,010 cult Runoff coeff. = 0.41' Tc by User = 20.00 min Asc/Rec limb fact = 1/1 NCO Pre Hyd. No. 1 -- 100 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 fflxl1ll>_ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time(min) Hyd No. 1 F Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31DS 2014 by Autodesk, Inc. v10.3 Tuesday, 06 / 3 / 2014 Hyd. No. 2 NCO Post Hydrograph type = Rational Peak discharge = 97.70 cfs Storm frequency = 100 yrs Time to peak = 7 min Time interval = 1 min Hyd. volume = 41,034 cuft Drainage area = 15.410 ac Runoff coeff. = 0.57i Intensity = 11.123 in/hr Tc by User = 7.00 min IDF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(5.610 x 0.95) + (9,600 x 0.35)] / 15.410 NCO Post Q (cfs) Q (cfs) Hyd. No. 2 -- 100 Year 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 000 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Hyd No. 2 Time(min) Hydrograph Report 21 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Tuesday, 06 / 3 / 2014 Hyd. No. 3 NCO Pond Hydrograph type = Reservoir Peak discharge = 0.394 cfs Storm frequency = 100 yrs Time to peak = 14 min Time interval = 1 min Hyd. volume = 31,933 cuft Inflow hyd. No. = 2 - NCO Post Max. Elevation = 13.39 ft Reservoir name = NCO Temporary Pond Max. Storage = 40,887 cuft Storage Indication method used. NCO Pond Q (`fS) Hyd. No. 3 -- 100 Year Q (cfs; 100.00 100.0( 90.00 - - 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 - - - - 40.00 30.00 - 30.00 20.00 20.00 10.00 — — -- — -- — — -- 10.00 0 00 — 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time(min) — Hyd No. 3 — Hyd No. 2 l l_Ll_LLII Total storage used = 40,887 cuft ,22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Tuesday, 06 / 3 / 2014 Hyd. No. 5 Supply Pre Hydrograph type = Rational Peak discharge = 2.396 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 719 cuft Drainage area = 0.790 ac Runoff coeff. = 0.25* Intensity = 12.130 in/hr Tc by User = 5.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = ((0.790 x 0.25)] / 0.790 Q (Cfs) 3.00 2.00 1.00 M Supply Pre Hyd. No. 5 -- 100 Year Q (Cfs) 3.00 2.00 1.00 0 1 2 3 4 5 6 7 8 9 10 Time(min) — Hyd No. 5 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Tuesday, 06 / 3 / 2014 Hyd. No. 6 Supply Post Hydrograph type = Rational Peak discharge = 6.899 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,070 cult Drainage area = 0.790 ac Runoff coeff. = 0.72' Intensity = 12.130 in/hr Tc by User = 5.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(0.490 x 0.95) + (0.300 x 0.35)] 10.790 Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 000 0 1 2 Hyd No. 6 Supply Post Hyd. No. 6 -- 100 Year Q (cfs) I nA 3 4 5 6 7 8 9 10 Time (min) 24 Hydrograph Report Hydrailm Hydrographs Extension for AutoCAD® Civil 3D®2014 by Autodesk, Inc. v10.3 Tuesday, 06 / 3 / 2014 Hyd. No. 7 Supply Pond Hydrograph type = Reservoir Peak discharge = 0.017 cfs Storm frequency = 100 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 1,805 cuft Inflow hyd. No. = 6 -Supply Post Max. Elevation = 14.48 ft Reservoir name = Supply Temporary Pond Max. Storage = 2,064 cuft Storage Indication method used. Supply Pond Q (cfS) Hyd. No. 7 -- 100 Year Q (cfs, 7.00 7.00 6.00 6.00 5.00 5.00 3.00 3.00 1.00 - 1.00 0 00 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 7 — Hyd No. 6 nl[]j3 Total storage used = 2,064 cult Time(min) Hydraflow Rainfall Report 25 Hydmflow Hydrographs Extension for AutoCAD® Civil 3DO 2014 by Autodesk, Inc. 00.3 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 77.3751 12.8000 0.8932 -- 2 84.8683 12.6000 0.8712 ------- 3 0.0000 0.0000 0.0000 ------- 5 88.0064 12.6000 0.8320 ---- 10 89.8227 12.4000 0.8025 ------ 25 80.5482 11.1000 0.7416 ------- 50 74.4992 10.1000 0.6977 ------ 100 69.4670 9.2000 0.6578 --- File name: Jacksonville.IDF Intensity = B / (Tc + D)"E Tuesday, 06 / 3 12014 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.91 4.74 3.97 3.42 3.02 2.70 2.45 2.24 2.06 1.92 1.79 1.68 2 6.98 5.61 4.71 4.08 3.60 3.23 2.93 2.69 2.48 2.31 2.16 2.03 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 8.10 6.57 5.57 4.85 4.30 3.88 3.54 3.26 3.02 2.82 2.64 2.49 10 9.07 7.41 6.30 5.51 4.91 4.44 4.06 3.75 3.48 3.26 3.06 2.89 25 10.26 8.39 7.17 6.30 5.64 5.12 4.70 4.36 4.07 3.82 3.60 3.41 50 11.21 9.18 7.86 6.93 6.22 5.67 5.22 4.85 4.54 4.28 4.04 3.84 100 12.13 9.95 8.54 7.55 6.80 6.22 5.75 5.36 5.03 4.74 4.50 4.28 Tc = time in minutes. Values may exceed 60. Preci . file name: H:\JOBS\Civil\IDF Curves\Durham. Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.93 3.54 1.00 3.73 5.09 6.00 6.72 7.44 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Wyatt L. Bone From: Craig Turner <cturner@lmgroup.net> Sent: Wednesday, March 26, 2014 3:59 PM To: Wyatt L. Bone Subject: RE: NCO Academic Facility Camp Johnson Wyatt, The answer to this question depends upon whether you take a short-term approach or a long-term approach. The short- term explanation is that the existing ditch does have a limited draw -down curve that results in the 40-inch SHWT at BMP1. If you construct the BMP, as shown, the resulting drawdown curve would lower the SHWT at BMP to the outlet elevation, 12' msl. The current soil water held between the 40-inch depth and 12 ft. msl would dewater during construction. The long-term answer is the SHWT has been lowered to the 12' elevation at BMP! therefore, no additional storage needs to be added to the BMP design volume. Please let me know if you need additional documentation for your case. Thank you, Craig Turner G. Craig Turner I Soil Scientist Direct: 452-0001 x 1914 1 Cell: 910.620.1137 1 Fax: 910.452.0060 Email: cturnerro lmgroup.net Land Management Group, Inc I Environmental Consultants 3805 Wrightsville Ave., Suite 15 1 Wilmington, NC 284031 www.lmgroup.net From: Wyatt L. Bone rmailto:wbone(a)ClarkNexsen.coml Sent: Monday, March 24, 2014 8:04 AM To: Craig Turner Cc: ahohmeierCglaetsolutionsinc.com; Schneider, Craig Subject: NCO Academic Facility Camp Johnson Craig, We recently met with NCDENR to go over our stormwater plans for the NCO project. The large pond for the main site has the permanent pool set at elevation 12. Your report indicates the seasonal high water table for BMP 1 is 40" below grade. That puts the SHWT at approximately elev. 14.66. We had to set the level of that pond below the SHWT due to pipe cover issues in the main site. There is an existing ditch north of the pond area with elevations around 12-13. Our pond will be excavated to 17.5' below grade. Based on the soil profile there is layer of clay 4' below grade extending to 7' below grade. As our pond excavation will extend through that clay layer. We projected the water table would lower down to that ditch elevation: 12. Would you have the same opinion? If you disagree we will size the pond draw down to drain the ground water inflow. If you agree, could you provide a memo explaining the reasoning for believing the SWHT will fall to elevation 12 as a result of the pond excavation. Thank you and feel free to give us a call and discuss further. Wyatt Bone PE, LEED AP BD+C Civil Engineer CLARK NEXSEN 4000 Westchase Boulevard Suite 280 Raleigh, NC 27607 919.828.1876 Office 919.828.1877 Fax wbone (ac la rknexsen.com www.clarknexsen.com # CON FIDENTIALITY NOTE: This e-mall and any files transmitted with it contain privileged and confidential information and are intended solely for the use of the individual or entity to which they are addressed. If you are not the intended recipient or the person responsible for delivering the a -mail to the intended recipient, you are hereby notified that any dissemination or copying of this e-mail or any of its attachments is strictly prohibited. If you have received this e-mail in error, please immediately notify the sending individual or entity by e-mail and permanently delete the original e-mail and attachments from your computer system.k Clark Nexsen Email Security: Click here to report this email as spam. Solutions, Inc. Geotechnical • Environmental - Testing REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES P003 Staff NCO Academy Facilities MCB Camp Lejeune, North Carolina G E T PROJECT NO: JX13-11OG February 5, 2014 Prepared for Whiting -Turner Contracting Co. 300 East Joppa Road Baltimore, Maryland 21286 ATTN: Mr. Craig Schneider Prepared by GET Solutions, Inc. 415 A Western Boulevard, Jacksonville, NC 28546 ♦ Phone 910-478-9915 ♦ Fax 910-418-9917 info@getsolutionsinc.com Soludons, Inc. February 5, 2014 C whnimf • EffWo eninf • Te Hng TO: Whiting -Turner Contracting Co. 300 East Joppa Road Baltimore, Maryland 21286 Attn: Craig Schneider RE: Report of Subsurface Investigation and Geotechnical Engineering Services P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G Dear Mr. Schneider: In compliance with your instructions, we have completed our Subsurface Investigation and Geotechnical Engineering Services for the above referenced project. The results of this study, together with our recommendations, are presented in this report. Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation. Thank you for the opportunity to work with you on this project. We trust that the information contained herein meets your immediate need, and should you have any questions or if we could be of further assistance, please do not hesitate to contact us. Respectfully Submitted, G E T Solutions, Inc. Glenn W. Hohmeier, P.E. Senior Project Engineer NC Reg. # 033529 Camille A. Kaftan, P.E. Principal Engineer NC Reg. # 014103 CAPO" PE No. 03M29 ........... �o �oFEs,o�.:�� =: ti. r4 9'•. SEAL r' 014103 415-A Western Boulevard • Jacksonville, NC 28546 • Phone: (910) 478-9915 • Fax: (910) 478-9917 info@getsoiLdionsinc.com TABLE OF CONTENTS EXECUTIVESUMMARY.............................................................................................i 1.0 PROJECT INFORMATION..............................................................................1 1.1 Project Authorization ........................................... :.................................. 1 1.2 Project Description.................................................................................1 1.3 Purpose and Scope of Services.............................................................2 2.0 FIELD AND LABORATORY PROCEDURES..................................................3 2.1 Field Exploration....................................................................................3 2.2 Laboratory Testing.................................................................................4 3.0 SITE AND SUBSURFACE CONDITIONS........................................................4 3.1 Site Location and Description................................................................4 3.2 Site Geology.......................................................................................... 5 3.3 Subsurface Soil Conditions....................................................................5 3.4 Groundwater Information.......................................................................6 4.0 EVALUATION AND RECOMMENDATIONS...................................................7 4.1 Clearing and Grading.............................................................................7 4.2 Subgrade Preparation............................................................................8 4.3 Structural Fill and Placement.................................................................8 4.4 Suitability of On -site Soils...................................................................... 9 4.5 Shallow Foundation Design Recommendations (Outdoor Covered Classroom and Supply Warehouse Buildings).......................................9 4.6 Shallow Foundation Settlements (Outdoor Covered Classroom and Supply Warehouse Buildings).......................................................10 4.7 Shallow Foundation Excavations (Outdoor Covered Classroom and Supply Warehouse Buildings)., ... ........ ........................................ 10 4.8 Deep Foundation Design Recommendations (Staff NCO Academy) ... 11 4.8.1 Axial Compression Capacity Recommendations ....................... 11 4.8.2 Pile Group Settlement................................................................ 13 4.8.3 Test Piles...................................................................................13 4.8.4 Dynamic Testing........................................................................14 4.8.5 Establishing Pile Driving Criteria ................................................ 15 4.8.6 Allowable Driving Stresses........................................................15 4.8.7 Hammer Types and Energies .................................................... 16 4.8.8 Driven Pile Installation Monitoring... ........................................... 16 4.8.9 Adjacent Structures.................................................................... 17 4.9 Building Floor Slabs.............................................................................18 4.10 Pavement Design................................................................................18 4.11 Design Soil Parameters.......................................................................20 4.12 Seismic Evaluation...............................................................................20 4.13 Soil Permeability..................................................................................20 TABLE OF CONTENTS cost. 5.0 CONSTRUCTION CONSIDERATIONS.........................................................22 5.1 Drainage and Groundwater Concerns.................................................22 5.2 Site Utility Installation...........................................................................22 5.3 Excavations......................................................................................... 22 6.0 REPORT LIMITATIONS.................................................................................23 APPENDIX I BORING LOCATION PLANS APPENDIX II PREVIOUSLY COMPLETED BORINGS ASSOCIATED WITH THE FEASABILITY STUDY DATED AUGUST 12, 2012 ALONG WITH THE BORING LOCATION SKETCHES APPENDIX III COMPREHENSIVE LABORATORY TEST RESULTS APPENDIX IV BORING LOGS APPENDIX V GENERALIZED SOIL PROFILE APPENDIX VI DCP TEST DATA APPENDIX VII CAMP JOHNSON SEASONAL HIGH WATER DETERMINATIONS REPORT APPENDIX VIII HYDRAULIC CONDUCTIVITY WORKSHEETS APPENDIX IX L-PILE ANALYSIS APPENDIX X CLASSIFICATION SYSTEM FOR SOIL EXPLORATION i. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G EXECUTIVE SUMMARY The project consists of a single contract to design and build a two story 85,498 square foot Academy Instruction Building to house the Staff NCO Academy at Camp Johnson, a 43,562 square foot parade and drill field, a 4,000 square foot outdoor covered classroom area, a minimum 250 space surface parking lot and a one story 5,113 square foot supply warehouse building, and associated site work. It is expected that the structures will be of steel frame and/or CMU wall design with brick veneer exterior walls supported by deep foundations (NCO Academy Instruction Building) and shallow foundations for the outdoor covered classroom and supply warehouse buildings. The maximum column and/or wall foundation loads provided by the client associated with the NCO Academy Instruction building are not expected to exceed 300 kips and 4 to 5 kips per linear foot, respectively. The maximum column and/or wall foundation loads provided by the client associated with the one story Outdoor Covered Classroom and Supply Warehouse buildings are not expected to exceed 30 kips and 2 to 3 kips per linear foot, respectively. The ground floors are anticipated to be of slab -on -grade design with the distributed loads estimated at 150 pounds per square foot. The structures' first floor elevation(s) are expected to be located slightly above existing site grade elevations. Based on the grading plan provided by the client, the cut and/or fill operations are not anticipated to exceed from about 1 to 3 feet. Also, light and heavy duty paved parking and drive lanes and BMP systems are planned for this development, along with other infrastructure components. Our field exploration program included twenty six (26) 3 to 80-foot deep Standard Penetration Test (SPT) and hand auger borings, along with infiltration and CBR testing. A brief description of the natural subsurface soil conditions is tabulated below: AVERAGE DEPTH ' RANGES.OF (Feet) STRATUM DESCRIPTION SPThI N- VALUES 0 6 inches of topsoil material was encountered at to Sur iicial the boring locations. 2.5 to 4.75 inches of asphalt 0.21 — 0.5 and 4 to 8.5 inches of Gravel at Al through A-4 boring locations SAND (SP-SM, SM, SC) with varying amounts of SAND 0.21 — 0.5 silt and/or clay; interbedded layers of CLAY (CL, WOH12I to to I CL-CH) ranging from 4 to 18.5 feet below the 100 25 to 80 existing site grade elevations at the location of A15 borings B-2, 134 through B-6, W-1, W-2 and 2 BMP-1 t Note (1) SPT = Standard Penetration Test, N-Values in Blows -per -foot 2 WOH = Weight of Hammer gm Solut=Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G The groundwater level was recorded at the boring locations and as observed through the wetness of the recovered soil samples during the drilling operations. The initial groundwater table encountered at the boring locations was measured to occur at a depth ranging from about 8 to 14 feet below current grades corresponding to elevations ranging from about 6 to 9 feet MSL. The variation in groundwater depths are anticipated to have been contributed by the variations in existing site grade elevations and the associated distance between boring locations. The boreholes were backfilled and grouted in accordance with DENR requirements upon completion for safety considerations, thus these readings may not be indicative of the static groundwater level. Groundwater was not encountered at boring A-1 through A-4 locations at the time of drilling to depths explored. Also, the soils recovered from boring BMP-1 through BMP-10 locations (storm water management area borings) were visually classified to identify color and texture changes to aid in indicating the normal estimated Seasonal High Water Table (SHWT). The results are provided in Appendix VII Camp Johnson Seasonal High Water Determinations. The following evaluations and recommendations were developed based on our field exploration and laboratory -testing program: • A field testing program is recommended during construction. This testing program should include as a minimum, subgrade load testing (proofrolling), compaction testing, and PDA testing and pile installation monitoring. ■ The proposed construction area should be cleared by means of removing the existing topsoil, stumps, associated root mat and asphalt. It is estimated that a cut of 2.5 to 4.75 inches in depth will be required to remove the asphalt materials at boring A-1 through A-4 locations. Based on the SPT borings, it is estimated that a cut of about 6 inches in depth will be required to remove the topsoil material; however, a majority of the project sites were previously wooded and is expected to contain varying amounts of organic laden soils. As such, based on our experience with similar site conditions (wooded areas) this initial cut to remove organic laden soils and root mat could extend to 12 to 18 inches. This cut is expected to extend deeper in isolated areas to remove deeper deposits of unsuitable material which become evident during the clearing. It is recommended that the clearing operations extend laterally at least 5 feet beyond the perimeter of the proposed construction areas. • Shallow foundations (Outdoor Covered Classroom and Supply Warehouse structures) designed using a net allowable bearing capacity of 2,000 psf (24-inch embedment, 24-inch width). Estimated post -construction total and differential settlements up to 1-inch and'/2-inch, respectively. ii GET Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G • NCO Academy Instruction Building - deep foundation design comprised of driven, SPPC piles can be implemented to support the structure's frame. Some design capacities are presented below. Allowable Allowable Lateral Lateral Pile Depth Compression Tension Capacity Capacity Pre-Augering PPile Type (ft)(I Capacity Capacity Free Head Fixed Head Depth (tons) (tons) Condition tons t Condition tons M 12" SPPC 50 to 60 60 to 70 30 2.5 6.5 10 to 15 "' Depth below the existing site grades at the boring locations. The pile tip depth will vary due to the differing soil stratigraphy: 50 feet (boring B-1), 55 feet (borings B-2, B-3, B-4, B-5) and 60 feel (borings B-6, B-7, B-8) locations. Js) According to the 2009 IBC, Section 1810.3.3.2, the recommended allowable lateral capacity is based on one- half of the lateral load that produces 1 inch of lateral displacement. Batter piles would enhance lateral capacity. • The floor slabs may be constructed as slab -on -grade members provided the recommended earthwork activities and evaluations are carried out properly. ■ The parking area pavements may be designed using a CBR Value of 17.25. ■ This site is classified as a site Class D, based on which seismic designs should be incorporated. This recommendation is based on the data obtained from the 25 to 80-foot deep SPT borings, our experience with 100-foot deep CPT soundings and SPT borings performed within the vicinity of the project site, as well as the requirements indicated in the North Carolina State Building Code (2009 International Building Code). This summary briefly discusses some of the major topics mentioned in the attached report. Accordingly, this report should be read in its entirety to thoroughly evaluate the contents. iii GET Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET ProjectNo: JX13-11OG 1.0 PROJECT INFORMATION 1.1 Project Authorization G E T Solutions, Inc. has completed our subsurface investigation and geotechnical engineering services for the proposed P003 Staff NCO Academy Facilities project located within the Camp Lejeune military installation in North Carolina. The Geotechnical Engineering Services were conducted in general accordance with G E T Solutions, Inc. Proposal No. PJX12-124G (revised 10-9-13). Furthermore, these services were provided in conjunction with the previously completed feasibility study dated August 21, 2012 (GER Project No. 110-5980). Authorization to proceed with the Geotechnical Engineering Services was received from Mr. Craig Schneider of Whiting -Turner Contracting Co. 1.2 Project Description The project consists of a single contract to design and build a two story 85,498 square foot Academy Instruction Building to house the Staff NCO Academy at Camp Johnson, a 43,562 square foot parade and drill field, a 4,000 square foot outdoor covered classroom area, a minimum 250 space surface parking lot and a one story 5,113 square foot supply warehouse building, and associated site work. It is expected that the structures will be of steel frame and/or CMU wall design with brick veneer exterior walls supported by deep foundations (NCO Academy Instruction Building) and shallow foundations for the outdoor covered classroom and supply warehouse buildings. The maximum column and/or wall foundation loads provided by the client associated with the NCO Academy Instruction building are not expected to exceed 300 kips and 4 to 5 kips per linear foot, respectively. The maximum column and/or wall foundation loads provided by the client associated with the one story Outdoor Covered Classroom and Supply Warehouse buildings are not expected to exceed 30 kips and 2 to 3 kips per linear foot, respectively. The ground floors are anticipated to be of slab -on -grade design with the distributed loads estimated at 150 pounds per square foot. The structures' first floor elevation(s) are expected to be located slightly above existing site grade elevations. Based on the grading plan provided by the client, the cut and/or fill operations are not anticipated to exceed from about 1 to 3 feet. Also, light and heavy duty paved parking and drive lanes and BMP systems are planned for this development, along with other infrastructure components. If any of the noted information is incorrect or has changed, please inform G E T Solutions, Inc. so that we may amend the recommendations presented in this report, if appropriate. Solutions, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11 OG 1.3 Purpose and Scope of Services The purpose of this study was to obtain information on the general subsurface conditions at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated: General assessment of the soils revealed by the borings performed at the proposed development. 2. General location and description of potentially deleterious material encountered in the borings that may interfere with construction progress or structure performance, including existing fills, expansive soils, or surficial/subsurface organics. 3. Soil subgrade preparation, including stripping, grading and compaction. Engineering criteria for placement and compaction of approved structural fill material. 4. Construction considerations for fill placement, subgrade preparation, and foundation excavations. 5. Feasibility of utilizing a shallow foundation system for support of the proposed Outdoor Covered Classroom and Supply Warehouse structures. Design parameters required for the foundation system, including foundation sizes, allowable bearing pressures, foundation levels and expected total and differential settlements. 6. Feasibility of utilizing deep foundation systems for support of the proposed NCO Academy Instruction building. Design parameters required for a deep foundation system including pile types, pile lengths, allowable capacities, expected total and differential settlements, and pile installation and testing criteria. 7. Typical parking area pavement sections recommendations based on the results of our field and laboratory testing program (Dynamic Cone Penetrometer (DCP) testing) and our experience with similar soil conditions. 8. Permeability (infiltration) values are provided based on the results of in -situ Saturated Hydraulic Conductivity Testing performed within the proposed storm water management basins as well as our experience with similar soil conditions. Normal seasonal high groundwater table (SHWT) was also estimated. 9. Seismic site class determination in accordance with the 2009 International Building Code. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11OG The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. Prior to development of this site, an environmental assessment is advisable. 2.0 FIELD AND LABORATORY PROCEDURES 2.1 Field Exploration In order to explore the general subsurface soil types and to aid in developing associated foundation parameters, eight (8) 80-foot deep Standard Penetration Test (SPT) borings (designated as B-1 through B-8) and four (4) 25-foot deep Standard Penetration Test (SPT) borings (designated as C-1, C-2, W-1 and W-2) were drilled within the proposed structures' footprints. In order to explore the general subsurface soil types and to aid in developing associated pavement design parameters, four (4) 3-foot deep hand auger borings (designated as A-1 through A-4) were drilled within the proposed parking and drive lane areas (currently an existing parking lot to be re -constructed as part of this project). To aid in developing associated storm water management parameters, nine (9) shallow hand auger borings (varying depths) were advanced within the proposed storm water management areas (designated as BMP-2 through BMP-10) and one (1) 14-foot deep hand auger boring designated as BMP1 were drilled. The purpose of these borings was to quantify the depth of the seasonal high water table (SHWT). The results are provided in Appendix VII Camp Johnson Seasonal, High Water Determinations. In addition, nine (9) saturated hydraulic conductivity tests (in -situ) were completed at these hand auger boring locations within the proposed stormwater management areas located throughout the project site. The SPT borings were performed with the use of rotary wash "mud" drilling procedures in general accordance with ASTM D 1586. The tests were performed continuously from the existing ground surface to depths of 10 and 12-feet, and at 5-foot intervals thereafter. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30" long split -spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches, using an automatic hammer. The number of blows required to drive the sampler each 6-inch increment of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value (uncorrected for automatic hammer). A representative portion of each disturbed split -spoon sample was collected with each SPT, placed in a glass jar, sealed, labeled, and returned to our laboratory for review. The recently completed borings were performed in conjunction with the previously completed borings associated with the project's feasibility study dated August 21, 2012 (GER Project No. 110-5980). Accordingly, four (4) 80-foot deep SPT borings identified as B-1 through B-4, one (1) CPT boring identified as SCPTu-1 (Staff NCO Academy building Solutions, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Leieune, North Carolina GET Project No: JX13-11OG borings) and three (3) 15-foot deep SPT parking area borings identified as S-1 through S-3 performed during the initial feasibility study for the proposed project, are included herein in Appendix II and in our evaluations and recommendations for this project. The remaining borings performed during the initial feasibility study are not included in this report as these borings could not be accurately located within the project area. The boring locations were established and staked in the field by the client. The approximate boring locations are shown on the attached 'Boring Location Plans" (Appendix 1), which were reproduced based on the site plans provided by the client. The boring elevations (as indicated on the logs) were estimated from the General Site Plan and their accuracy is not warranted. A boring schedule tabulating the SPT boring depths and locations is presented Appendix IX. 2.2 Laboratory Testing Representative portions of all soil samples collected during drilling were sealed in glass jars, labeled and transferred to our laboratory for classification and analysis. The soil classification was performed by a Geotechnical Engineer in accordance with ASTM D2488. A total of forty one (41) representative soil samples were selected and subjected to laboratory testing which included Atterberg Limit and/or natural moisture and 4200 sieve wash testing and analysis, in order to corroborate the visual classification. These test results are provided in Appendix III and are also presented on the "Boring Log" sheets in Appendix IV. A total of four (4) Dynamic Cone Penetrometer (DCP) tests were completed within the area of the existing asphalt parking lot along with four (4) 3-foot deep hand auger borings. The results of the field Kessler DCP testing procedures are presented in Appendix VI. 3.0 SITE AND SUBSURFACE CONDITIONS 3.1 Site Location and Description The proposed project sites are generally located within two sections of the Camp Johnson portion of the MCB Camp Lejeune, NC. The project areas generally consist of recently timbered open lands and an existing asphalt paved parking lot. These sites are located between Hoover Road and Wilson Drive (NCO Academy Instruction and the outdoor covered classroom buildings) and abutting Monford Landing Road (supply warehouse building). The project sites are bordered in all directions by various MCB Camp Lejeune facilities. The sites are generally level with existing grade elevations generally ranging from about 13 to 16 feet MSL (NCO Academy Instruction and the outdoor covered classroom building areas) and about 17 to 18 feet MSL (supply warehouse building area), as indicated on the Grading and Drainage Plans provided by the client. A Ma Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11OG 3.2 Site Geology The project site lies within a major physiographic province called the Atlantic Coastal Plain. Numerous transgressions and regressions of the Atlantic Ocean have deposited marine, lagoonal, and fluvial (stream lain) sediments. The regional geology is very complex, and generally consists of interbedded layers of varying mixtures of sands, silts and clays. Based on our review of existing geologic and soil boring data, the geologic stratigraphy encountered in our subsurface explorations generally consisted of marine deposited sands, silts and clays. Based on our review of the Geologic Map of North Carolina 1985, the project area is within the Belgrade formation which consists of oyster mounds in tan and orange sand with fossiliferous clayey sand. 3.3 Subsurface Soil Conditions The results of our field exploration indicated the presence of approximately 6 inches of topsoil material at the boring locations B-1 through B-8, C-1 a, C-2, W-1, W-2 and BMP-1. The In addition, the results of our field exploration also indicated the presence of approximately 2.5 to 4.75 inches of asphalt and about 4 to 8.5 inches of gravel materials at boring locations A-1 through A-4. The topsoil, asphalt and gravel material thicknesses are expected to vary between boring locations and throughout the sites. Underlying the topsoil, asphalt and gravel materials and extending to the SPT boring termination depths, the subsurface soils encountered generally consisted of SAND (SP-SM, SM, SC) with varying amounts of silt and clay. As an exception, interbedded layers of Clay (CL, CL-CH) were encountered at boring locations B-2 and B-4 (4 to 6 feet), B-5 (6 to 8 feet), B-6 (6 to 10 feet), W-1 (4 to 8 feet), W-2 (13.5 to 18.5 feet) and BMP-1 (4 to 7 feet). The (SPT) results, N-values, recorded within the granular soil layer ranged from Weight -of - Hammer (WOH) to 100 blows -per -foot (BPF) indicating a very loose to very dense relative density. The N-values, recorded within the cohesive soils ranged from 2 to 15 (BPF), indicating a very soft to stiff consistency. The previously completed borings associated with the project's feasibility study dated August 21, 2012 (GER Project No. 110-5980) indicated similar soil conditions with the exception of Clay (CH) which was encountered at GER borings B-1, B-2, B-3, B-4 from depths ranging from about 17 to 24 feet and S-1 from depths ranging from about 4 to 6 feet Solutions, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G The subsurface description is of a generalized nature provided to highlight the major soil strata encountered. The records of the subsurface exploration are included on the "Boring Log" sheets (Appendix IV) and in the "Generalized Soil Profile" (Appendix V), which should be reviewed for specific information as to the individual borings. The stratifications shown on the records of the subsurface exploration represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the transition may be gradual or occur between sample intervals. It is noted that the topsoil designation references the presence of surficial organic laden soil, and does not represent any particular quality specification. This material is to be tested for approval prior to use. 3.4 Groundwater Information The groundwater level was recorded at the boring locations and as observed through the wetness of the recovered soil samples during the drilling operations. The initial groundwater table encountered at the boring locations was measured to occur at a depth ranging from about 8 to 14 feet below current grades corresponding to elevations ranging from about 6 to 9 feet MSL. The variation in groundwater depths are anticipated to have been contributed by the variations in existing site grade elevations and the associated distance between boring locations. The boreholes were backfilled and grouted in accordance with DENR requirements upon completion for safety considerations, thus these readings may not be indicative of the static groundwater level. Groundwater was not encountered at boring A-1 through A4 locations at the time of drilling to depths explored. Also, the soils recovered from boring BMP-1 through BMP-10 locations (storm water management area borings) were visually classified to identify color and texture changes to aid in indicating the normal estimated Seasonal High Water Table (SHWT). The results are provided in Appendix VII Camp Johnson Seasonal High Water Determinations completed by Land Management Group, Inc. dated January 7, 2014. It should be noted that perched water conditions may occur throughout the site during periods of heavy precipitation and/or during the wet season. The perched condition is anticipated to occur in areas where shallow subsurface cohesive soils were encountered. These soils will act as a restrictive layer allowing excessive moisture to accumulate within the overlying granular soils. Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, sidewalks, etc.). Seasonal groundwater fluctuations of ± 2 feet (or more) are common in the project's area; however, greater fluctuations have been documented. We recommend that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on the construction procedures. Val Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11OG 4.0 EVALUATIONS AND RECOMMENDATIONS Our recommendations are based on the previously discussed project information, our interpretation of the soil test borings and laboratory data, and our observations during our site reconnaissance. If the proposed construction should vary from what was described, we request the opportunity to review our recommendations and make any necessary changes. 4.1 Clearing and Grading The proposed construction area should be cleared by means of removing the existing topsoil, stumps, associated root mat and asphalt. It is estimated that a cut of 2.5 to 4.75 inches in depth will be required to remove the asphalt materials at boring A-1 through A-4 locations. Based on the SPT borings, it is estimated that a cut of about 6 inches in depth will be required to remove the topsoil material; however, a majority of the project sites were previously wooded and is expected to contain varying amounts of organic laden soils. As such, based on our experience with similar site conditions (wooded areas) this initial cut to remove organic laden soils and root mat could extend to 12 to 18 inches. This cut is expected to extend deeper in isolated areas to remove deeper deposits of unsuitable material which become evident during the clearing. It is recommended that the clearing operations extend laterally at least 5 feet beyond the perimeter of the proposed construction areas. Following the initial clearing, the resulting exposed subgrade will generally be comprised of SAND (SM) and GRAVEL (borings A-1 through A-4. Accordingly, combinations of excess surface moisture from precipitation ponding on the site and the construction traffic, including heavy compaction equipment, may create pumping and general deterioration of the bearing capabilities of the surface soils. Therefore, undercutting to remove loose soils in isolated areas may be required. The extent of the undercut will be determined in the field during construction based on the outcome of the field testing procedures (subgrade proofroll). In this regard, and in order to reduce undercutting, care should be exercised during the grading and construction operations at the site. Control of surface water is very important to the successful completion of the proposed construction. The contractor should plan his grading activities to control surface water and minimize erosion of exposed cut or fill material. This may include constructing temporary berms, ditches, flumes and/or slope drains to intercept runoff and discharge it in a controlled fashion, while complying with state and local regulations. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G 4.2 Subgrade Preparation Following the clearing operation, the exposed subgrade soils should be densified with a large static drum roller. After the subgrade soils have been densified, they should be evaluated by G E T Solutions, Inc. for stability. Accordingly, the subgrade soils should be proofrolled to check for pockets of loose material hidden beneath a crust of better soil. Several passes should be made by a large rubber -tired roller or loaded dump truck over the construction areas, with the successive passes aligned perpendicularly. The number of passes will be determined in the field by the Geotechnical Engineer depending on the soils conditions. Any pumping and unstable areas observed during proofrolling (beyond the initial cut) should be undercut and/or stabilized at the directions of the Geotechnical Engineer. The prepared subgrade should be sloped to prevent the accumulation and/or ponding of surface water. If the exposed subgrade becomes wet or frozen, the geotechnical engineer should be consulted. Following the proofroll and approval by the engineer, it is recommended that the newly exposed subgrade soils be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557), as tested to a depth of at least 12 inches. The suitability of compacting the natural subgrade soils should be more accurately determined in the field by the G E T Solutions, Inc. representative at the time of construction as the compaction operations could deteriorate the subgrade soil conditions. Accordingly, it is anticipated that this site will require monitoring of the clearing, subgrade preparation, and fill placement procedures by a G E T Solutions, Inc. representative in order to minimize potential deterioration of the natural subgrade soils. The compaction testing of the natural subgrade soils may be waived by the Geotechnical Engineer, where firm and stable bearing conditions are observed during the proofroll. 4.3 Structural Fill and Placement Following the approval of the natural subgrade soils by the Geotechnical Engineer, the placement of the fill required to establish the design grades may begin. Any material to be used for structural fill should be evaluated and tested by G E T Solutions, Inc. prior to placement to determine if they are suitable for the intended use. Suitable structural fill material should consist of sand or gravel containing less than 20% by weight of fines (SP, SP-SM, SM, SW, SW-SM, GP, GP -GM, GW, GW-GM), having a liquid limit less than 20 and plastic limit less than 6, and should be free of rubble, organics, clay, debris and other unsuitable material. Solutions.lnc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11OG All structural fill should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557). In general, the compaction should be accomplished by placing the fill in maximum 10-inch loose lifts and mechanically compacting each lift to at least the specified minimum dry density. A representative of G E T Solutions, Inc. should perform field density tests on each lift as necessary to assure that adequate compaction is achieved. Backfill material in utility trenches within the construction areas should consist of structural fill (as described above), and should be compacted to at least 95 percent of ASTM D1557. This fill should be placed in 4 to 6 inch loose lifts when hand compaction equipment is used. This lift thickness can be increased to 8 to 10 inches if suitably sized compaction equipment is used to ensure the bottom of the lift is properly compacted. Care should be used when operating the compactors near existing structures to avoid transmission of the vibrations that could cause settlement damage or disturb occupants. In this regard, it is recommended that the vibratory roller remain at least 25 feet away from existing structures; these areas should be compacted with small, hand -operated compaction equipment. 4.4 Suitability of On -site Soils The shallow subsurface soils encountered at the boring locations and classified to consist of Silty SAND (SM) and SAND (SP-SM) appear to meet the criteria recommended in this report for reuse as structural fill. Further classification testing (natural moisture content, gradation analysis, and Proctor testing) should be performed in the field during construction to evaluate the suitability of excavated soils for reuse as fill within building and pavement areas. The remaining on -site excavated soils (CLAY (CL, CL-ML) and SAND (SC) are not anticipated to be suitable for re -use as structural fill but may be used as fill within green areas. Non-structural green areas should be compacted to at least 85 percent of ASTM D1557. 4.5 Shallow Foundation Design Recommendations (Outdoor Covered Classroom and Supply Warehouse structures) Provided that the construction procedures are properly performed, the proposed structures can be supported by shallow spread footings bearing upon firm natural soil or well compacted structural fill material. The footings can be designed using a net allowable soil pressure of 2,000 pounds per square foot (psf). In using net pressures, the weight of the footings and backfill over the footings, including the weight of the floor slab, need not be considered. Hence, only loads applied at or above the finished floor need to be used for dimensioning the footings. In order to develop the recommended bearing capacity of 2,000 pounds per square foot (psf), the base of the footings should have an embedment of at least 24 inches beneath finished grades and wall footings should have a minimum width of 24 inches. In addition, • Solutions, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11 OG isolated square column footings are recommended to be a minimum of 3 feet by 3 feet in area for bearing capacity consideration. The recommended 24-inch footing embedment is considered sufficient to provide adequate cover against frost penetration to the bearing soils. 4.6 Shallow Foundation Settlements - (Outdoor Covered Classroom and Supply Warehouse structures) It is estimated that, with proper site preparation including the subsurface improvements noted above (where required), the maximum resulting post construction total settlement of the proposed building foundations should be up to 1 inch, as contributed by the foundation bearing soils. The maximum differential settlement magnitude is expected to be less than /2 -inch between adjacent footings (wall footings and column footings of widely varying loading conditions), as contributed by the foundation bearing soils. The settlements were estimated on the basis of the results of the SPT borings. Careful field control will contribute substantially towards minimizing the settlements. 4.7 Shallow Foundation Excavations (Outdoor Covered Classroom and Supply Warehouse structures) In preparation for shallow foundation support, the footing excavations should extend into firm natural soil or well compacted structural fill. All foundation excavations should be observed by G E T Solutions, Inc. At that time, the Geotechnical Engineer should also explore the extent of excessively loose, soft, or otherwise unsuitable material within the exposed excavations. Also, at the time of footing observations, the Geotechnical Engineer may find it necessary to make hand auger borings or use a hand penetration device in the bases of the foundation excavations. If pockets of unsuitable soils requiring undercut are encountered in the footing excavations, the proposed footing elevation should be re-established by means of backfilling with "flowable fill", an open graded washed stone (such as No. 57 stone), or a suitable structural fill material compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D 1557), as described in Section 4.3 of this report, prior to concrete placement. Immediately prior to reinforcing steel placement, it is suggested that the bearing surfaces of all footings be compacted using hand operated mechanical tampers, to a dry density of at least 95% of the Modified Proctor maximum dry density (ASTM D 1557) as tested to a depth of 12 inches, for bearing capacity considerations. In this manner, any localized areas, which have been loosened by excavation operations, should be adequately recompacted. The compaction testing in the base of the footings may be waived by the Geotechnical Engineer, where firm bearing soils are observed during the footing inspections. Soils exposed in the bases of all satisfactory foundation excavations should be protected against any detrimental change in condition such as from physical disturbance, rain orfrost. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11OG Surface run-off water should be drained away from the excavations and not be allowed to pond. If possible, all footing concrete should be placed the same day the excavation is made. If this is not possible, the footing excavations should be adequately protected. 4.8 Deep Foundation Design Recommendations (NCO Academy Instruction Building) The following sections describe the pile capacity analyses and provide our recommendations for static axial compressive pile capacities, pile testing program, and pile construction criteria. In addition, we have provided estimates of potential settlement. We evaluated a driven precast prestressed concrete pile deep foundation system to support the proposed structure's frame. Other means (deep foundation) of supporting the structure may be considered however it is anticipated that the SPPC pile foundations will be the most cost effective and practical approach. 4.8.1 Axial Compression Capacity Recommendations We conducted pile capacity analyses using static formulas with coefficients recommended by Geoffrey Myerhoff and George Sowers. The analyses include the contributions of shaft friction and end bearing to the pile capacity. The piles are expected to derive their capacity from a combination of shaft friction and end bearing in the deeper Sand layers at the depth presented in the table (Table 1) on the following page. The soil materials typically exhibit time -dependent strength characteristics; consequently shaft friction and end bearing support tend to increase from initial installation through a process termed "soil setup". Essentially, the dynamics of driving piles will cause excess pore pressures to develop, thereby decreasing driving resistance during initial pile installation. The pile capacities developed during driving are usually much lower than the design values. Once driving is complete, the excess pore pressures dissipate with time (and soil setup occurs) and the bearing capacity of the pile will increase. Based upon our experience with similar projects in the area, 5 to 7 days is usually required for the full pore pressures to dissipation and soil setup to occur. For the reasons previously described, it will not be possible to confirm pile capacities with a simple driving criterion such as number of hammer blows per foot of advanced pile. Instead, driving criteria will likely consist of a target tip elevation and/or certain embedded length in a bearing material with specified driving resistance. The specified driving resistance should be based on a Wave Equation Analysis of the contractor's selected hammer. Solutions, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET ProjectNo: JX13-11OG Table I provides our recommended pile type for the structure's foundations. The allowable capacity for the piles includes a safety factor of at least 2.0 to allow for a pile load test program that relies primarily on dynamic testing. The capacity of a group of piles spaced at least 3 pile diameters apart, center to center, can be taken as the sum of the individual capacities with no reduction factor. If closer pile spacing is anticipated, the geotechnical engineer should be contacted to evaluate the efficiency of the specific pile group. The final order lengths and tip elevations will be adjusted based on the results of the test piles and load test programs. Table I- SPPC Pile Recommendations Allowable Allowable Lateral Lateral a e Pile Depth Compression Tension Capacity Capacity Pre-Augering PPile Type (ft Capacity Capacity Free Head Fixed Head Depth (tons) (tons) Condition Condition (ft) tons l21 tons t 12" SPPC 50 to 60 60 to 70 30 2.5 6.5 10 to 15 "' Depth below the existing site grades at the boring locations. The pile tip depth will vary due to the differing soil stratigraphy: 50 feet (boring B-1); 55 feet (borings B-2, B-3, B4, B-5) and 60 feet (borings B-6, B-7, B-8) locations. (I) According to the 2009 IBC, Section 1810.3.32, the recommended allowable lateral capacity is based on one-half of the lateral load that produces 1 inch of lateral displacement. Batter piles would enhance lateral capacity. The lateral analysis was conducted using L-Pile Plus, a computer software package by ENSOFT. The software requires as input, quantitative data related to strength and deformation behavior of the subsurface materials, the structural properties of the pile, and an understanding of shaft/soil interaction during lateral loading. The program calculates the lateral deflections, internal moment forces and internal shear forces experienced by a pile subjected to the specific loading conditions. The program does not analyze whether the pile is structurally capable of resisting the moments and shear stresses generated. This analysis should be performed by the project structural engineer. The L-Pile analysis is attached to this report (Appendix IX). We recommend pre-augering the pile locations prior to driving to the depth shown in the table. This is necessary to help in minimizing the effects of vibrations from the driving effort on adjacent buildings, penetrate fill materials and to reduce the potential for pile breakage. Following the pre-augering, the piles should be installed and advanced by driving with an impact hammer to their design tip elevations. If for some reason during construction, pile driving "capacity" is encountered before the piles reach their design tip elevations, the Geotechnical Engineer should be retained to review driving records and field reports to determine whether the pile can adequately support the design loads. If the pile driving hammer is not properly matched to the pile type, size and subsurface conditions, it may reach practical refusal before the pile reaches the design tip elevation, or the required capacity. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G 4.8.2 Pile Group Settlement Based on the results of load tests performed on piles driven in similar soils conditions, it is anticipated that the total butt settlements (including elastic shortening) will not exceed about '/z-inch, which is the settlement necessary to mobilize the soil/pile capacity in combination with the pile group settlements due to the stress increase in the underlying soils. 4.8.3 Test Piles We recommend that a test pile program be implemented for the purpose of assisting in the development of final tip elevations and to confirm that the contractor's equipment and installation methods are acceptable. The test program should involve at least five (5) test piles to provide an indication of various driving and/or installation conditions. The test pile locations should be established by the Geotechnical Engineer based on the structural characteristics. It is important to note the relationship between the required testing and our design assumptions. We chose safety factors based upon the recommended pile testing program. We expect that the pile testing program will include primarily dynamic evaluation with a Pile Driving Analyzer (PDA). The piles should be driven using the drive system submitted by the contractor and approved by the geotechnical engineer. Test pile lengths should be at least ten feet longer than anticipated production pile lengths to ensure that the required capacity is developed, to allow for refinement of estimated capacities, and for dynamic and static testing reasons. The indicator piles installed during the Test Pile Program, which satisfy the geotechnical engineer's requirements for proper installation, may also be used as permanent production piles. The contractor should include in his equipment submittal a Wave Equation Analyses (using GRLWEAPTM software) modeling the behavior of the test piles during driving, or what is termed by GIRL as a "Drivability Study." The primary intent of the Wave Equation Analyses is to estimate the feasibility of the contractor's proposed pile driving system with respect to installing the piles. Since the results of the Wave Equation Analyses are dependent on the chosen hammer, the pile type and length, and the subsurface conditions, it is likely that at least one Wave Equation Analysis per hammer will be required. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G Pile driving equipment should not be mobilized for the test piles until the Wave Equation Analyses have been submitted and approved by the geotechnical engineer. If the contractor's proposed pile driving system is rejected, subsequent submittals of alternative drive systems should also include appropriate Wave Equation Analyses that are subject to the approval of the geotechnical engineer. The Wave Equation Analyses are also used to estimate: ■ Compressive and tensile stresses experienced by the modeled pile during driving • The total number of blows required to install the pile • Driving resistance (in terms of blows per foot) within the various soil strata the pile is embedded in • Driving time The results of the WEAP analyses are highly dependent on the many input parameters related to the soil conditions, static pile capacity estimates, as well as specific characteristics associated with different makes and models of pile driving hammers. 4.8.4 Dynamic Testing Dynamic testing was developed as a method of improving upon the reliability of the wave equation and other dynamic predictions by actually measuring the acceleration and strain of a pile during driving. This technique was developed in the mid-1960's and has been continually refined. The use of dynamic pile testing has permitted the possibility of checking the driving stresses in the pile and the hammer performance during pile driving. It is also possible to estimate the static capacity of the pile based upon the strain and acceleration measurements taken during.pile driving. The test pile installation should be monitored by the Geotechnical Engineer using the PDA, an electronic device that records driving stresses and pile/soil interactions, among other things. The PDA results will confirm that the pile driving system (hammer type/energy, cushion type/ thickness, etc.) can successfully install the piles without over stressing them in compression or tension. It is essential the test pile restrikes also be monitored with the PDA. No sooner than 7 days after installation, all of the test piles should be re -struck while being monitored with the PDA. This test establishes the "static capacity' of the pile. The initial hammer blow during re -strike activities is critical to the quality of dynamic data with respect to capacity interpretation. The contractor should make every effort to insure an initial high- energy blow of the hammer. After several blows during re -strike activities, pore pressures increase, soil setup diminishes, and ultimately pile capacities (as recorded by the PDA) decrease. Loss of estimated static capacity following repeated hammer blows is the reason the initial blows are critical. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G The dynamic data recorded by the PDA during restrike testing should be further refined by using CAPWAP® analysis. CAPWAP® analysis, not the initial assessment of capacity determined by the PDA, should be the basis of static pile capacity estimates. Interpretation of CAPWAP® data, in the context of the soils subsurface conditions and previous static pile capacity estimates, should allow the Geotechnical Engineer to estimate ultimate pile capacities and recommend appropriate production pile lengths. Our previous experience with the PDA indicates that a significant cost savings may be realized if the PDA is properly utilized to monitor the installation of test piles, confirm pile capacity in production installations, and monitor potentially damaging stresses during driving. The use of the PDA permits the confirmation of allowable compression and uplift Capacities and pile integrity on several piles for a cost similar to or less than that of a single full-scale static load test. We recommended the design builder retain the services of the Geotechnical Engineer to perform the dynamic testing, not the installation contractor, to avoid possible conflicts of interest. 4.8.5 Establishing Pile Driving Criteria Prior to driving production piles, the geotechnical engineer should establish the criteria for pile installation. The criteria will be based on the data collected during monitoring of the test pile installation and the subsequent restriking. The intent of establishing driving criteria is to facilitate installation of the production piles without damage and to provide a means of establishing when piles have achieved the design capacities. The driving criteria may include: hammer type, hammer energy, ram weight, pile cushion and thickness, hammer cushion type and thickness, required tip elevations and driving resistance necessary to achieve capacities, and possibly predrilling recommendations (if the test pile results warrant the need). 4.8.6 Allowable Driving Stresses Guidelines from the Prestressed Concrete Institute (PCI), American Society of Civil Engineers (ASCE), and the Association of State Highway Transportation Officials (AASHTO) indicate that maximum compressive stresses, imposed on driven precast concrete piles during installation, should be less than the following equation: 0.85 x f, (concrete compressive strength, psi) - fpe (effective pre -stressing after losses from relaxation). The three groups differ on the maximum tensile stresses. PCI recommends 6 x square root of f', + fpe ; ASHTO and ASCE recommend 3 x square root fC + fPe. We recommend using the consensus value for the maximum compressive stress, and the ASCE/AASHTO recommended value for the maximum tensile stress. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11OG 4.8.7 Hammer Types and Energies In comparing hammers of equal energy, the Prestressed Concrete Institute (PCI) states that hammers with heavier rams and lower impact velocities are less likely to cause damaging stresses in concrete piles. Hammers with proportionally higher ram weights and short stroke heights (low impact velocities) are usually air, steam and hydraulic driven, and not diesel fueled. For this project, we recommend that the contractor use a hammer sufficiently large enough to drive through dense granular soils encountered at several of the boring locations (typically around elevation 0 MSQ. These granular soils are expected to undergo densification during pile installation. This densification is expected to be greater in larger pile caps during the installation of each subsequent pile. It has been our experience that air, steam and hydraulic hammers are more appropriate for the installation of precast concrete piles than similarly sized (in terms of energy) diesel hammers. We recommend that the contractor use an air, steam or hydraulic driven hammer whose ram weight is roughly equal to 0.5 to 1.0 times the weight of the pile itself. The actual determination of an acceptable ram weight should be determined through the results of the Test Pile Program. If the contractor elects to use a diesel hammer, we recommend a critical, detailed review of the contractor's Wave Equation Analysis prior to driving the test piles. 4.8.8 Driven Pile Installation Monitoring The geotechnical engineer should observe the installation of the test piles and all production piles. The purpose of the geotechnical engineer's observations is to determine if production installations are being performed in accordance with the previously derived Pile Driving Criteria. Continuous driving and installation records should be maintained for all driven piles. Production piles should be driven utilizing the approved system established as a result of the Test Program. The field duties of the geotechnical engineer (or a qualified engineer's representative) should include the following: • Being knowledgeable of the subsurface conditions at the site and the project -specific Pile Driving Criteria. • Being aware of aspects of the installation including type of pile driving equipment and pile installation tolerances. • Keeping an accurate record of pile installation and driving procedures. • Documenting that the piles are installed to the proper depth indicative of the intended bearing stratum. Also documenting that appropriate pile splicing techniques are used, if necessary. • Recording the number of hammer blows for each foot of driving. • Generally confirming that the pile driving equipment is operating as anticipated. • Solutions.lnc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G • Record the energy rating of the hammer. • Informing the geotechnical engineer of any unusual subsurface conditions or driving conditions. • Notifying the design builder and structural engineer when unanticipated difficulties or conditions are encountered. • Confirming from visual appearance that the piles are not damaged during installation and observing the piles prior to installation for defective workmanship. The geotechnical engineer should review all driving records prior to pile cap construction. 4.8.9 Adjacent Structures When considering the suitability of a driven pile foundation, consideration should be given to the integrity of nearby structures, if applicable. Due to the large amount of energy required to install driven deep foundations, vibrations of considerable magnitude are generated. These vibrations may affect nearby structures. These structures can, due to their proximity, be detrimentally affected by the construction unless proper protection measures are taken. In addition, experience has shown that these construction features will often lead adjacent property owners to conclude that damage to their property has taken place, even though none has occurred. It is therefore recommended that a thorough survey of the adjacent property be made prior to starting construction. This will help to better evaluate real claims and refute groundless nuisance claims. The survey should include, but not be limited to, the following: Visually inspect adjacent structures, noting and measuring all cracks and other signs of distress. Take photographs as needed. 2. Visually inspect adjacent pavements, noting and measuring any significant cracks, depressions, etc. Take photographs as needed. 3. Establish several benchmarks along foundation walls on adjacent structures. Both vertical and horizontal control should be employed. 4. Determine if equipment in any adjacent building is sensitive to vibration, and if so, establish proper control and monitoring system. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11OG 4.9 Building Floor Slabs The building floor slabs may be constructed as slab -on -grade members provided the previously recommended earthwork activities and evaluations are carried out properly. It is recommended that the ground floor slab be directly supported by at least a 4-inch layer of relatively clean, compacted, poorly graded sand (SP) or gravel (GP) with less than 5% passing the No. 200 Sieve (0.074 mm). The purpose of the 4-inch layer is to act as a capillary barrier and equalize moisture conditions beneath the slab. The slabs can be designed with the use of a subgrade modulus on the order of about 125 psi/in for compacted structural fill. It is recommended that all ground floor slabs be "floating". That is, generally ground supported and not rigidly connected to walls or foundations. This is to minimize the possibility of cracking and displacement of the floor slabs because of differential movements between the slab and the foundation. It is also recommended that the floor slab bearing soils be covered by a vapor barrier or retarder in order to minimize the potential for floor dampness, which can affect the performance of glued tile and carpet. Generally, use a vapor retarder for minimal vapor resistance protection below the slab on grade. When floor finishes, site conditions or other considerations require greater vapor resistance protection; consideration should be given to using a vapor barrier. Selection of a vapor retarder or barrier should be made by the Architect based on project requirements. 4.10 Pavement Design (Parking Area) The field DCP testing indicated correlated in -place CBR values ranging from 7 to 24 at depths of about 36 inches below the existing site grade elevations at the A-1 through A-4 parking area boring locations. Therefore, on a preliminary basis, an average CBR value of 17.25 may be used in designing the pavement section thicknesses. At this time our services did not include an AASHTO pavement design analysis. G E T Solutions, Inc. would be pleased to provide these services as well as a laboratory CBR analysis as necessary once the need has been determined. The results of the field DCP testing procedures are presented in Appendix VI. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11OG Typical pavement design recommendations are presented below (Table II). Table II — Typical Minimum Pavement Sections Hot Mix Asphalt Concrete Aggregate Surface (SF- Intermediate Section Base" Subgrade 9.5A or 9.5B) (1-19B Standard Duty 2 t3 Firm, Stable and Asphalt Compacted Heavy Duty 2 3 8 Firm, Stable and Asphalt Compacted Rigid 5 5 Firm, Stable and Standard Du Com acted Rigid 6 Firm, Stable and Compacted —(HeavyDuty)10 Fire Lane Firm, Stable and (Around 8 Compacted Buildings)*** Concrete minimal compressive strength of 4500 psi at 28 days/flexural strength of 650 psi NCDOT Type ABC, compacted to a dry density of at least 100% of the Modified Proctor maximum dry density (ASTM D 1557). Typically fire lanes are constructed around buildings with a Grass Paver System which is proprietary. Final design should be provided by system manufacturer to meet H2O load rating once final fire lane alignment has been determined. Actual pavement section thickness should be provided by the design civil engineer based on traffic loads, volume, and the owners design life requirements. The above sections correspond to thickness representative of typical local construction practices and as such periodic maintenance should be anticipated. All pavement material and construction procedures should conform to North Carolina Department of Transportation (NCDOT) requirements. Following pavement rough grading operations, the exposed subgrade should be observed under proofrolling. This proofrolling should be accomplished with a fully loaded dump truck or 7 to 10 ton drum roller to check for pockets of soft material hidden beneath a thin crust of better soil. Any unsuitable materials thus exposed should be removed and replaced with a well -compacted material. The inspection of these phases should be performed by the Geotechnical Engineer or his representative. The subgrade soils are likely to be unstable at the time of construction and some ground improvements are likely. As such, the project's budget should include a contingency to accommodate the potential ground improvements. Where excessively unstable subgrade soils are observed during proofrolling and/or fill placement, it is expected that these weak areas can be stabilized by means of thickening the base course layer (i.e. placement of 2 to 4 inches of additional aggregate base) and Subgrade soils should be lined with the use of a Geotextile fabric (Mirafi HP270 or equivalent) or Geogrid (such as Tensar TX140 or BX1100 or equivalent). These alternatives should be addressed by the Geotechnical Engineer during construction, if necessary, who will recommend the most economical approach at that time. Solutions, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11 OG 4.11 Design Soil Parameters The estimated soil parameters are presented below (Table III). Table III - Estimated Soil Parameters SAND SAND Soil Type (SM, SP, (SM, SC, CLAY SP-SM SP-SM)(CL, CL-CH) Stratum Structural Fill (upper 50 feet) Deposits Average SPT N-value - 8 8 Total Moist Unit Weight 120 115 115 Friction Angle 32 30 5 degrees Cohesion (c) 0 0 800 cf Active Soil Pressure 0.31 0.33 0.84 Ka At -Rest Soil Pressure 0.47 0.50 0.91 Ko Passive Soil Pressure 3.25 3.00 1.19 K Friction Factor 0.39 0.39 0.06 4.12 Seismic Evaluation It is noted that, in accordance with the NC Building Code; Chapter 16, this site is classified as a site Class D, based on which seismic designs should be incorporated. This recommendation is based on the data obtained from the 25 to 80-foot deep SPT borings, our experience with 100-foot deep CPT soundings and SPT borings performed within the vicinity of the project site, as well as the requirements indicated in the North Carolina State Building Code (2009 International Building Code). 4.13 Soil Permeability Nine (9) infiltration tests were performed at boring locations BMP-1 through BMP-6, BMP-8 through BMP-10 (one test at each location). The tests were performed at depths ranging from 2 to 2.5 feet below the existing site grade elevations. The boreholes were prepared utilizing an auger to remove soil clippings from the base. Infiltration testing was then conducted within the vadose zone utilizing a Precision Permeameter and the following testing procedures. Solutions, lnc. Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-110G A support stand was assembled and placed adjacent to each borehole. This stand holds a calibrated reservoir (2000 ml) and a cable used to raise and lower the water control unit (WCU). The WCU establishes a constant water head within the borehole during testing by use of a precision valve and float assembly. The WCU was attached to the flow reservoir with a 2-meter (6.6 foot) braided PVC hose and then lowered by cable into the borehole to the test depth elevation. As required by the Glover solution, the WCU was suspended above the bottom of the borehole at an elevation of approximately 5 times the borehole diameter. The shut-off valve was then opened allowing water to pass through the WCU to fill the borehole to the constant water level elevation. The absorption rate slowed as the soil voids became filled and an equilibrium developed as a wetting bulb developed around the borehole. Water was continuously added until the flow rate stabilized. The reservoir was then re -filled in order to begin testing. During testing, as the water drained into the borehole and surrounding soils, the water level within the calibrated reservoir was recorded as well as the elapsed time during each interval. The test was continued until relatively consistent flow rates were documented. During testing the quick release connections and shutoff valve were monitored to ensure that no leakage occurred. The flow rate (Q), height of the constant water level (H), and borehole diameter (D) were used to calculate KS utilizing the Glover Solution. Based on the field testing and corroborated with laboratory testing results (published values compared to classification results), the hydraulic conductivity of the shallow soils is tabulated on the following page (Table IV) and is presented on the "Hydraulic Conductivity Worksheet" (Appendix VIII), included with this report. Table IV - Infiltration Test Results Boring Boring depth ff Percent Silt and/or Clay Ksat Value cm/sec Ksat Value in/hr Ksat Class BMP-1 2.5 14.8 1.07 x 10 1.515 High BMP-2 2.0 42.9 1.02 x 104 0.144 Moderate/ High BMP-3 2.0 33.4 3.94 x 104 0.558 Moderately High BMP4 2.0 29.8 6.95 x 10 0.985 Moderate/ High BMP-5 2.0 34.9 2.24 x 10 0.317 Moderate/ High BMP-6 2.0 46.8 8.99 x 10 0.127 Moderate/ Low BMP-8 2.0 43.6 9.65 x 10 0.137 Moderate/ Low BMP-9 2.0 25.0 1.21 x 10' 1.718 High BMP-10 2.0 32.5 7.94 x 10 1.125 Moderate) Hi h Solurions, Inc Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET Project No: JX13-11 OG 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Drainage and Groundwater Concerns It is expected that dewatering may be required for excavations that extend near or below the existing groundwater table. Dewatering above the groundwater level could probably be accomplished by pumping from sumps. Dewatering at depths below the groundwater level may require well pointing. It would be advantageous to construct all fills early in the construction. If this is not accomplished, disturbance of the existing site drainage could result in collection of surface water in some areas, thus rendering these areas wet and very loose. Temporary drainage ditches should be employed by the contractor to accentuate drainage during construction. If water collects in foundation excavations, it will be necessary to remove water from the excavations, remove saturated soils, and re -test the adequacy of the bearing surface soils to support the design bearing pressure prior to concrete placement. 5.2 Site Utility Installation The base of the utility trenches should be observed by a qualified inspector prior to the pipe and structure placements to verify the suitability of the bearing soils. If unstable bearing soils are encountered during installation some form of stabilization may be required to provide suitable bedding. This stabilization is typically accomplished by providing additional bedding materials (NCDOT No. 57 stone). In addition, depending on the depth of the utility trench excavation, some means of dewatering may be required to facilitate the utility installation and associated backfilling. All utility excavations should be backfilled with structural fill, as described in Section 4.3 of this report. 5.3 Excavations In Federal Register, Volume 54, No. 209 (October, 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that all excavations, whether they be utility trenches, basement excavation or footing excavations, be constructed in accordance with the new (OSHA) guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial penalties. Solutions.lnc. ' I Report of Subsurface Investigation and Geotechnical Engineering Services February 5, 2014 P003 Staff NCO Academy Facilities Camp Lejeune, North Carolina GET ProjectNo: JX13-11OG The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. We are providing this information solely as a service to our client. G E T Solutions, Inc. is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. 6.0 REPORT LIMITATIONS The recommendations submitted are based on the available soil information obtained by G E T Solutions, Inc. and the information supplied by the client and their consultants for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc. should be notified immediately to determine if changes in the foundation recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. After the plans and specifications are more complete the Geotechnical Engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents, in order that the earthwork and foundation recommendations may be properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of the client and their consultants for the specific application to the proposed P003 Staff NCO Academy Facilities project located within the Camp Lejeune military installation in North Carolina. Solutions, Inc. APPENDICES BORING LOCATION PLANS II PREVIOUSLY COMPLETED BORINGS ASSOCIATED WITH THE FEASABILITY STUDY DATED AUGUST 12, 2012 ALONG WITH THE BORING LOCATION SKETCHES III COMPREHENSIVE LABORATORY TEST RESULTS IV BORING LOGS V GENERALIZED SOIL PROFILE VI DCP TEST DATA VII CAMP JOHNSON SEASONAL HIGH WATER TABLE DETERMINATIONS REPORT VIII HYDRAULIC CONDUCTIVITY WORKSHEETS IX L-PILE ANALYSIS X CLASSIFICATION SYSTEM FOR SOIL EXPLORATION � A G i I L � DRAINAGE NOTES J f- - T MATCHLINE - SEE SHEET CG101 ®DsoR — 88 LF - 36 RCP A4 I7 203 LF - 30' RCP- _ _ _ _ _ 103 LF - 24" RCP Alb I 0 0.50z ____ _ _ ______ _ O_050z AS `•• :'/ /,,'�; �y ---- _ ,i _ 47;NFORCED CONCRETE 74 LF - 30" RCP _•01�.5Oz 0 0.50% ____ , _________ fi e�d A7 s y_$ _ �• o ______ ______ 16- ' l�j"'--_ ------ _ ---- A11 _ __ ._____ A-2 ___ ______ 75 LF - 18' RCP 0 0.51% ------' 75 LF - 24- RCP I• 0 O,51% I! BMP-8 __—_----- —_16 I'— _ _ 7 ` A6 _ ___ _16 Al2 I' > A-1 810-REiEN710N AREA /3 — — — + n j SOIL MEDIA DEPTH = 3 FT 3-6' HDPE UNDERDRAIN PIPES E, r pK 17 —17 KN ®� D 810-RETENTION AREA 12 w SOIL MEDIA DEPTH = kFf........ 77.- wI' 3-6' HOPE UNDERDRAIN PIPES ; _e MP-9 WI; _ _______ _1_____— --__ A73 Wit Cl) AB 17__ W it A 3 s 18 73'LF--13'4RCP =I! $ 1 Op 7J 0 0.51z a f o MJB Y iNh r D, - E:ei. = n5+ BOORETENTION AREA it SOIL MEDIA DEPTH = 3 FT 3-6' HOPE UNDERDRAN PIPES '>> - ---- ---- 9 --- _ _; _______-___' -_ ___- UMIT OF OISWRBANCE I� ------------------------- I. r ._____ -_—__ .._________I__ _ ' _______ , _ ______________F -77_____________ ___ _------- 17 _____ _______________ r I' I it I I z A 1,,,ull: PRELIMINARY M FT Lions NOT FOR CONS'rRUC'nON C cations iA 3 Z A, E �Q € W 3v� 0 H v Y J g ' z < j < LL w t0 z O W < 0 a j z a Q U z Q < 0 u z Z w Z o i I= p LL €Jt z Q LL O' 9 < oz, 7 HHH-IFI-/IN GRAPHIC SCALE 0 3D' so' 20' CG102 -30, C , DRAINAGE NOTES t 4 ° I l MR OF DISIIRBANCE 1� NO VERTICAL•,,.PXTA PROVIDED FOR SIDEWALK 2 \6 ' � ------------ NR1'Fs'i'C �0 BB 15 B7 BB ___ . PRELIMINARY l9 ,^ 98 LF - 24- RCP O 0.48% 99 lF,- 16- RCP O 0.50% 0 4 --- ------------_ -_ coNNOTSiROOR CTION NJ _ ____ .17----------- C-Z .�. C 1a e -------`---------- --- - ------ — --- - B5 Il tie � � ,y 9. 84 69 O _ - - _ ° 17/12/12 �, ---- ---------- _ 1611 _ - , p oxlmate Re g � -A r cen G T o n Lo a s 5._yyyy Ap______ _____ __ ___ !oxlmate revious 3ER ring ocations __ _ l A _ B-y / 9ca w E 3 B-4 _ Z Bs NCO ACADEMIC J m Q, o W - B-4 INSTRUCTION BUILDING BMP 13 Q J Z - 5 -_ o a - FF 17.3 - _ - gz E u- w - — r— b n I SCPTu-1 - A77 ��; � � Z U Z Q a _ Q Q B / Z { e l= B. B-t --- ---- B 8 Z a ll of ^e l^ , , 17 zR a - A — �bI2lENIpN ARPA 14 _ — . / A . — . — . — . — . �' •,'� ,t�%' - 0 2 v ( B2 /-�• - -- _ _ Sal �27_ _________ I ____- _ AIS _ ____ _ _ _ . -�'�� - { -_ _ _____ _ - -- - - 'f, I47s(`�y A14 15��/]� I - _?__�I _ BMP-S —_----_11 14— MATCHLINE - SEE SHEET CG102 GRAPHIC SCALE 0 30' 60' 120' w� CG101 1-=30' H:\2012\4686—DB SIOH NCO Academy Facilities\Phase II\CAD\CML\Shee,s\CGl03.d,g Mon, 17 Dec 2012 — 11:34am alile I C / a 1 _, ------\--- `-- — — — — —----�--- -----I — — -- — — — — -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — r — — 39" r r Cy Vie, ,••` •n�f,L ���� ��o�� oa _ 1. \ /' <-- Is i I 7 e 9_ ; B S fl 3 'off Ad _ rJf ---�J • G/ 7 B a"rgC'p ®0 *BR r9 16 1 n MATCHLINE - SEE SHEET CG1O2 11 7 n E$ py d K NAVAL FACILITIES ENGINEERING COMMAND <«AGENCY» «COYMHFM HWE» CAMP JOHNSON JACKSONVILLE, NC 55 O 9 " ! STAFF NCO ACADEMY FACILITIES GRADING AND DRAINAGE PLAN F C L J T �\ DRAINAGE NOTES )I € BIO-REFFMpN AREA 15 3-6' HOPE uNDERORUNs C� it - p Ij �`o`g 17 _ 7q III -JL R E �, � 03FAA-OUTLET I RIP PROlECTI011, \ \ CLA S A-9TONE- v--,ram_ `o\� ,WIDTH;A)`OUTLET 6.0 4-`7,; .�„ 18 WIDTH,'AT-ED OF PAD 15.2';11 \o:� •, ��. D Rk = 9' _ ' ' 7 NPUFAiC GRADE Df[CH,713_NOTFOR `•�\\; + �� BIO-REiFNIIQLi.'ys `\�'. Y ., PRELIMINARY -___- �� CONSTRUCTION , , 8 e , , , -------------- Iiy \- ,,•� RIP RAP OUTLET PROTECTION wziF .°, 17/72/12 I - ` CLASS A STONE �SUPP�Y WAR L' �1. •„;p WIDTH AT END OF - 6.0' E17 , I' WIDTH AT END OF PAD = 15.2' W-1 FFE �V m 38 LF - 24' RCP 0 2.16% 5'r � LENGTH = 8.0' n; >C -...Li E 3 Z. J U) Z - GRADE DNCH TO \�o�` v H B10-RETFMION \ �0 610-RETEMION AREA 16 `' > C I a U g IT 3-6'IHDPE UNDER DRAINS LIMN OF DISTURBANCE J O z z 0 • 0 LLcl I7 0 F o a a GRAPHIC SCALE 0 30- ' 60' 120' �, W� CG104 n:\2012\46e6-Da Stall NCO bcueemy Fucalres\Phase 11\CAD\CML\Sheet5\C0105.Ovg uoq n Dec 2012 - 11:300m Elite r it p f F t A DPW of ili raw ruvu FSFaunLs Dwirv[uaxc couuwlo ¢ pp g ppg q$ 2 4 gg d 56 NAVAL FACILITIES ENGINEERING COMMAND - «AGENCY» «CMMNCW NWE»CO CAMP JOHNSON JACKSONVILLE, NC p� o- STAFF NCO ACADEMY FACILITIES fi §1 GRADING AND DRAINAGE PLAN g T APPENDIX II PREVIOUSLY COMPLETED BORINGS ASSOCIATED WITH THE FEASABILITY STUDY DATED AUGUST 12, 2012 ALONG WITH THE BORING LOCATION SKETCHES RT OF RELIMINARY OTECHNICAL UDY Staff NCO Training Academy and CIF Warehouse Camp Johnson, MCB Camp Lejuene Jacksonville, NC A/E Contract N62470-12-D-2003, WE10 GER Project No. 110-5980 Envirwn nlal • Groundwater • Hazardous Matenals prepared for NAVFAC Mid -Atlantic Norfolk, Virginia August 21 , 2012 2712 Southern Boulevard, Suite 101 Virginia Beach, Virginia 23452 Fax 757-463-3080 www.geronline.com Vx r s , x �JY�F� I� �j; f11 �• T ♦ � �'y zY� + � 1 tL Sljj + $ �.� 711--tIl � LMG LAND MANAGEMENT GROUP Environmental Consultants January 7, 2014 Glenn W. Hohmeier, GET Solutions, Inc. 415A Western Blvd. Jacksonville, NC 28546 Re: Camp Johnson Seasonal High Water Table Determinations. Glenn, On Monday, December 30, 2013 Land Management Group, Inc. evaluated ten proposed stormwater basin areas for Camp Johnson, Camp, MCAS, Onslow County. The site located on the southeast side of US 17 and adjacent to New River within the confines of Camp Lejeune, MCAS, Jacksonville, NC. The purpose of the evaluation was, to quantify the depth to the seasonal high water table (SHWT) for the project engineer. Selected sites are shown in Figure One. The soils on this site are mapped as the Baymeade fine sand and Baymeade-Urban Land Complex in the Soil Survey of Onslow County (USDA, 1990). The pre -selected sites were cleared, staked and numbered for ease of location. LMG collected soils data at staked location. Results of the borings are shown in Table One. TARI F ONF - CAMP JOHNSON SOILBORINGS i�3�711iS��iL�l • � amm iruo�� The seasonal high water table (SHWT) is normally evident by observation of redoximorphic features suggesting past conditions of saturation and reduction. There is evidence of relict redoximorphic features at depth in all borings. From observation of historic and regional drainage of the lands surrounding the site and based on soil morphological features we have estimated the contemporary SHWT. In summary, this site has areas that are proposed for stormwater basin placement. These areas have soils with contemporary seasonal high water tables from 16" in boring 3 to a depth of 65" in boring 9 from the soil surface as shown in Table 1. Please do not hesitate to contact me if you have any questions with this report or if you wish for LMG to perform any additional site specific studies in accordance with the NC DENR DWQ guidance memo. If you have any questions about this report or need any additional information I may be reached at 910-452-0001, 910- 620-1137 or at cturner@lmgroup.net. Sincerely, . , If l -� G. Craig Turner Vice President Land Management Group, Inc 3805 Wrightsville Ave., Suite 15 Wilmington, NC28403 910-452-0001: Office 910-452-0060: FAX 910-620-1137: Cell cturner@ Imgroup.net N.C. Licensed Soil Scientist, #1091 S.0 Certification Number 57 www.lmgroup.net • info@Imgroup.net • Phone:910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 -Head Borehole Permeameter Test Analytical Method: Glover Solution GETConstant On Project Name......: Staff NCO Training Academy - Boring No...........: BMP-1 Investigators.......: J. Huber; L. Brown Project No......: JX13-11OG Proj. Location...: MCB Camp Lejeune, NC Date ..................: 12/31/2013 Terminology and Solution (R. E. Glover Solution Ksata: (Coefficient of Permeability) @ Base Tmp. TB (°C) 14 Q: Rate of flow of water from the borehole Boring Depth......: 2.5 (m, cm, ft, in) Boring Diameter..: 8.3 cm Boring Radius r... : 4.15 cm Soil/Water Tmp. T: 11 oC Dyn. Visc. @ T °C.: 0.001271 kg/m•s WCU Base Ht. h: 15.0 cm WCU Susp. Ht. S: 6.4 cm Const. Wtr. Ht. H: 21.4 cm H/r.. 5.2 .................... Dyn. Visc. @ TB°C.: 0.001170 kg/m•s H: Constant height of water in the borehole r: Radius of the cylindrical borehole V: Dyn. Visc. of water @ Tmp. T "C/Dyn. Visc. of water @ Ta Ksat =Q[sinh*t H r rz Hz+1 "s+r H 2nHz ( / 1- ( / ) / 1/( 1 [Basic Glover Solu.] Ksata= QV[sinh-t(H/r) - (r2/H2+1)'s+ r/H]/(2nH2) [Tmp. Correction] VOLUME ml Volme Out uml TIME h:mm:ss A P Interval Elapsed Time Flow Rate Q ml min ------------- Ksata Equivalent Values ---------------- hr:min:sec min cm min cm sec cm da in hr ft da 3,000 11,24,21 AM 2,900 100 11:24:57 AM 0:00:361 0.60 166.67 0.096 1.59E-03 137.5 2.256 4.51 2,800 100 11:25:39 AM 0:00:42 0.70 142.86 0.082 1.36E-03 117.9 1.934 3.8 2,700 100 11:26:23 AM 0:00A4 0.73 136.36 0.078 1.30E-03 112.5 1.846 3.69 2,600 100 11:27:12 AM 0:00:49 0.82 122.45 0.070 1.17E-03 101.1 1.658 3.32 2,500 100 11:28:07 AM 0:00:55 0.92 109.09 0.063 1.04E-03 90.0 1.477 2.95 2,400 100 11:29:01 AM 0:00:54 0.90 111.11 0.064 1.06E-03 91.7 1.504 3.01 2,300 100 11:29:56 AM 0:00:55 0.92 109.09 0.0631 1.04E-03 90.0 1,477 2.95 2,200 100 11:30:51 AM 0:00:55 0.92 109.09 0.063 1.04E-03 90.01 1.477 2.95 2,100 100 11:31:42 AM 0:00:51 0.85 117.65 0.067 1.12E-03 97.1 1.593 3.19 2,000 100 11:32:34 AM 0:00:52 0.87 115.38 0.066 1.10E-03 95.2 1.562 3.12 Natural Moisture......: 12.6 lConsistency ...............: Loose Field -Estimated Ksat: 0.0641 1.07E-03 92.3 1.5151 3.03 USDA Txt./USCS Class: SM lWater Table Depth ... 8.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. truct./%Pass. g200.: 14.8 linit. Saturation Time.: 11:24,00 AM Glover, R. E. 1953. Flow from a test -hole located above groundwater level, pp. 69-71. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USER. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the welCH/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13 Particle Size Distribution Report �_ G. o ry00y0 0p oeo 100 90 80 I I I I I I I I I I I I I I 70 I I z 60 LL I z so I I I v w 40 a I I I I I I I I I I I I I I I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I I I I I I I I I I I I 10 I I I I I I I I I I I I I I p I I 100 10 1 0.1 0.01 0.001 GRAIN SIZE - mm. % +3„ 01. Gravel % Sand % Fines Coarse Fine Coarse Medium Fine Silt Clay 0.0 0.0 0.1 0.0 2.0 83.1 14.8 SIEVE PERCENT SPEC." PASS? Constant -Head Borehole Permeameter Test Analytical Method: Glover Solution GE® Project Name......: Staff NCO Training Academy Boring No...........: BMP-2 Investigators .......: J. Huber; L. Brown Project No......: JX13-110G Proj. Location...: MCB Camp Lejeune, NC Date ..................: 1/6/14 Terminology and Solution (R. E. Glover Solution) KsatB: (Coefficient of Permeability) @ Base Tmp. TB (°C) 14 Q: Rate of flow of water from the borehole Boring Depth......: 2 (m, cm, ft, in) Boring Diameter..: 8.3 cm Boring Radius r... : 4.15 cm Soil/Water Tmp. T: 11 oC Dyn. Visc. @ T *C.: 0.001271 kg/m•s WCU Base Ht. h: 15.0 cm WCU Susp. Ht. S: 6.4 cm Const. Wtr. Ht. H: 21.4 cm H/r..................... : 5.2 Dyn. C.@ TB°C.: 0.001170 kg/m•s H: Constant height of water in the borehole r: Radius of the cylindrical borehole V: Dyn. Visc. of water @ Tmp. T "C/Dyn. Visc. of water @ Ta Ksat = Q[sinh"(H/r) - (r2/H'+1)s+ r/H]/(2nH2) [Basic Glover Solu.] KsatB= QV[sinh-'(H/r) - (r'/H'+1)s+ r/H]/(2nH') [Tmp. Correction] VOLUME ml Volume Out ml TIME h:mm:ssA P Interval Elapsed Time Flow Rate Q ml min ---------------- Ksats Equivalent Values------------ hr:min:sec min cm min cm sec cm da in hr ft da 120 8:00:19 AM 115 5 8:00:40 AM 0:00:21 0.35 14.29 0.008 1.36E-04 11.8 0.193 0.39 110 5 8:01:01 AM 0:00:21 0.35 14.29 0.008 1.36E-04 11.8 0.193 0.3 105 5 8:01:25 AM 0:00:24 0.40 12.50 0.007 1.19E-04 10.3 0.169 0.34 100 5 8:01:51 AM 0:00:26 0.43 11.54 0.007 1.10E-04 9.5 0.156 0.31 95 5 8:02:17 AM 0:00:26 0.43 11.54 0.007 1.10E-04 9.5 0.156 0.31 90 5 8:02:44 AM 0:00:27 0.45 11.11 0.006 1.06E-04 9.2 0.150 0.30 85 5 8:03:10 AM 0:00:261 0.431 11.54 0.0071 1.10E-04 9.51 0,156 0.31 80 5 8:03:37 AM 0:00:271 0.45 11.11 0.0061 1.06E-04 9.2 0.150 0.30 75 5 8:04:08 AM 0:00:31 0.52 9.68 0.006 9.24E-05 8.0 0.131 0.26 70 5 8:04:37 AM 0:00:29 0.48 10.34 0.006 9.88E-05 8.51 0.140 0.28 65 5 8:05:09 AM 0:00:32 0.53 9.38 0.005 8.95E-05 7.71 0.127 0.25 60 5 8:05:42 AM 0:00:33 0.55 9.09 0.005 8.68E-05 7.5 0.123 0.25 55 5 8:06:14 AM 0:00:32 0.53 9.38 0.005 8.95E-05 7.7 0.127 0.25 Natural Moisture......: 15.9 lConsistency ...............: Loose Field -Estimated Ksat:1 0.0061 1.02E-041 8.81 0.1441 0.29 USDA TM./USCS Class: SM lWater Table Depth ... 8.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. tract./% Pass. M200.: 42.9 linit. Saturation Time.: 8:00:00 AM Glover, R. E. 1953. Flow from a test -hole located above groundwater level, pp. 69-71. in: Theory and Problems of Water Percolation. C. N. ganger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the welCH/r>5 to>10 Johnson Permeameter, LLC Revised 11/29/13 100 90 80 70 x Z 60 LL Z 50 W U W 40 a ct( 20 10 % +3" Particle Size Distribution Report 0.0 1 0.1 SIEVE SIZE PERCENT FINER SPEC! PERCENT PASS? (X=NO) 1.5" 100.0 1" 100.0 .5" 100.0 .375" 100.0 #4 100.0 #8 99.9 #10 99.9 #16 99.8 #40 98.4 #100 55.3 #200 42.9 (no specification providcd) Sample Number: BMP-2 GET SOLUTIONS, INC. Jacksonville North Car V SIZE - mm. % Sand % Fines Wium Fine Silt 1.5 1 55.5 42.9 Material Description Atterbera Limits PL= LL= PI= Coefficients D90= 0.3302 D85= 0.2938 D60= 0.1703 D50= 0.1232 Dgp= D15= D10= Cu= Cc= Classification USCS= AASHTO= Remarks Client: Whiting -Turner Construction Co. Project: P003 Staff NCO Academy Facilities Date: Constant -Head Borehole Permeameter Test Analytical Method: Glover Solution GE® Project Name......: Staff NCO Training Academy Boring No...........: BMP-3 Investigators.......: J. Huber; L. Brown Project No......: JX13-110G Proj. Location...: MCB Camp Lejeune, NC Date ..................: 1/6/14 Terminology and Solution (R. E. Glover Solution) Ksat.: (Coefficient of Permeability) @ Base Tmp. Te (°C) 14 Q: Rate of flow of water from the borehole Boring Depth......: 2 (m, cm, ft, in) Boring Diameter..: 8.3 cm Boring Radius r... : 4.15 cm Soil/Water Tmp. T: 11 oC Dyn. Visc. @ T *C.: 0.001271 kg/m•s WCU Base Ht. h: 15.0 cm WCU Susp. Ht. S: 6.4 cm Const. Wtr. Ht. H: 21.4 cm H/r**...................: 5.2 Dyn. Visc. @ TeeC.: 0.001170 kg/m•s H: Constant height of water in the borehole r: Radius of the cylindrical borehole V: Dyn. Visc. of water @ Tmp. T °C/Dyn. Visc. of water @ TB Ksat =Qfsinh'(H/r)-(rz/Hz+1)'s+r/H]/(2nHz) [Basic Glover Solu.] KsatB= QV[sinh B(H/r) - (rz/H2+1) s+ r/H]/(2nH2) [Tmp. Correction] VOLUME ml Volume Out ml TIME h:mm:ssA P Interval Elapsed Time Flow Rate Q ml min ---------- Ksate Equivalent Values - - - - - - - - - - - - hr:min:sec min cm min cm sec cm da in hr ft ayL 120 8,40,12 AM 115 51 8:40:21 AM 0:00:091 0.15 33.33 0.019 3.18E-04 27.5 0.451 0.90 110 5 8:40:30 AM 0:00:09 0.15 33.33 0.019 3.18E-04 27.5 0.451 0.9 105 5 8:40:38 AM 0:00:08 0.13 37.50 0.021 3.58E-04 30.9 0.508 1.02 100 5 8:40:46 AM 0:00:08 0.13 37.50 0.021 3.58E-04 30.9 0.508 1.02 95 5 8:40:55 AM 0:00:09 0.15 33.33 0.019 3.18E-04 27.5 0.451 0.90 90 5 8:41:01 AM 0:00:06 0A0 50.00 0.029 4.78E-04 41.3 0.677 1.35 85 5 8:41:07 AM 0:00:06 0.10 50.00 0.0291 4.78E-04 41.3 0.677 1.35 80 5 8:41:13 AM 0:00:06 0.10 50.00 0.029 4.78E-04 41.31 0.677 1.35 75 5 8:41:20 AM 0:00:07 0.12 42.86 0.025 4.09E-04 35.4 0.580 1.16 70 5 8:41:27 AM 0:00:07 0.12 42.86 0.025 4.09E-04 35.4 0.580 1.16 65 5 8:41:34 AM 0:00:07 0.12 42.86 0.025 4.09E-04 35.41 0.5801 1.16 Natural Moisture......: 18.9 lConsistency ...............: Loose Field -Estimated Ksat: J 0.0241 3.94E-041 34.01 0.5581 1.12 USDA TM./USCS Class: SM lWater Table Depth ... 8.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. truct./% Pass. #200.: 33.4 linit. Saturation Time.: 8:40:00 AM Glover, R. E. 1953. Flow from a test -hole located above groundwater level, pp. 69-71. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USSR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the welCH/r>5 to>10 Johnson Permeameter, LLC Revised 11/29/13 100 90 80 70 60 50 40 30 20 10 0 Particle Size Distribution Report %+3„ %Gravel Coarse Fin, 0.0 0.0 0.1 SIEVE SIZE PERCENT FINER SPEC! PERCENT PASS? (X=NO) 1.5" 100.0 1" 100.0 .5" 100.0 .375" 100.0 #4 99.9 #8 99.5 #10 99.4 #16 99.2 #40 96.5 #100 46.2 4200 33.4 (no specification provided) Sample Number: BMP-3 GET SOLUTIONS, INC. Jacksonville North Carolina Silt Material Description Atterbera Limits PL= LL= P1= Coefficients D90= 0.3563 D85= 0.3201 D60= 0.2021 D50= 0.1648 D30= D15= D10= Cu= Cc Classification USCS= AASHTO= Remarks Client: Whiting-TumerConsimction Co. Project: P003 Staff NCO Academy Facilities Project No: JX13-I IOG Date: Constant -Head Borehole Permeameter Test Analytical Method: Glover Solution GE® Project Name......: Staff NCO Training Academy Boring No...........: BMP-4 Investigators.......: J. Huber; L. Brown Project No......: JX13-11OG Proj. Location...: MCB Camp Lejeune, NC Date ..................: 1/6/14 Terminology and Solution (R. E. Glover Solution) Ksats: (Coefficient of Permeability) @ Base Tmp. T. (°C) 14 Q: Rate of flow of water from the borehole Boring Depth....... 2 (m, cm, ft, in) Boring Diameter..: 8.3 cm Boring Radius r... : 4.15 cm Soil/Water Tmp. T: 11 'C Dyn. Visc. @ T °C.: 0.001271 kg/m•s WCU Base Ht. h: 15.0 cm WCU Susp. Ht. S: 6.4 cm Const. Wtr. Ht. H: 21.4 cm H/r**...................: 5.2 Dyn. Visc. @ Ta°C.: 0.001170 kg/m•s H: Constant height of water in the borehole r: Radius of the cylindrical borehole V: Dyn. Visc. of water @ Tmp. T "C/Dyn. Visc. of water @ T8 Ksat = Q[sinh*'(H/r) - (r2/H2+1)s + r/H]/(2nH2) [Basic Glover Solu.] Ksata= QV[sinh-'(H/r) - (r'/Hz+1).s+ r/H]/(2nHz) [Tmp. Correction] VOLUME ml Volume Out ml TIME h:mm:ssA P Interval Elapsed Time Flow Rate Q ml min ---------- Ksats Equivalent Values------------ hr:min:Sec min cm min cm sec cm da in hr ftda 2,400 9:05:35 AM 2,3001 100 9:06:28 AM 0:00:53 0.88 11 1.21 0.065 1.08E-03 93.4 1.533 3.07 2,2001 100 9:07:31 AM 0:01:03 1.05 95.241 0.055 9.10E-04 78.6 1.289 2.5 2,100 100 9:08:49 AM 0:01:18 1.30 76.92 0.044 7.35E-04 63.5 1.041 2.08 2,000 100 9:10:10 AM 0:01:21 1.35 74.07 0.042 7.08E-04 61.1 1.003 2.01 1,900 100 9:11:27 AM 0:01:17 1.28 77.92 0.045 7.44E-04 64.3 1.055 2.11 1,800 100 9:12:52 AM 0:01:25 1.42 70.59 0.040 6.74E-04 58.3 0,956 1.91 1,700 100 9:14:09 AM 0:01:17 1.28 77.92 0.0451 7.44E-04 64.31 1.055 2.11 1,600 100 9:15:34 AM 0:01:25 1.42 70.59 0.040 6.74E-04 58.3 0.956 1.91 1,500 100 9:17:12 AM 0:01:38 - 1.63 61.22 0.035 5.85E-04 50.5 0.829 1.66 Natural Moisture......: 11.6 lConsistency ...............: Loose Field -Estimated Ksat: 0.0421 6.95E-04 60.01 0.9851 1.97 USDA Tct./USCS Class: SM lWater Table Depth ... 8.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. truct./%Pass. p200.: 29.8 11nit. Saturation Time.: 9:05:00 AM Glover, R. E. 1953. Flow from a test -hole located above groundwater level, pp. 69-71. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the welCH/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13 Z Z LL F Z w U w W a- Particle Size Distribution Report % +3" SIEVE SIZE PERCENT FINER SPEC.` PERCENT `PASS? (X=NO) 1.5" 100.0 V 100.0 .5" 100.0 .375" 100.0 #4 99.9 #8 99.8 #10 99.8 #16 99.5 #40 98.1 #100 65.2 #200 29.8 (no specification provided) Sample Number: BMP4 Material Description Atterberg Limits PL= LL= Pl= Coefficients D90= 0.2888 D85= 0.2454 D60= 0.1343 D50= 0.1099 D30= 0.0753 D15= D10= Cu= Cc= Classification USCS= AASHTO= Remarks Date: GET Client: Whiting-TumerConstmetion Co. SOLUTIONS, INC. Project: P003 Staff NCO Academy Facilities Jacksonville North Carolina Project No: JX13-IIOG Figure Constant -Head Borehole Permeameter Test Analytical Method: Glover Solution GE® Project Name......: Staff NCO Training Academy Boring No...........: BMP-5 Investigators.......: J. Huber; L. Brown Project No......: JX13-110G Proj. Location...: MCB Camp Lejeune, NC Date ..................: 1/6/14 Terminology and Solution (R. E. Glover Solution) Ksata: (Coefficient of Permeability) @ Base Tmp. Ta (°C) 14 Q: Rate of flow of water from the borehole Boring Depth......: 2 (m, cm, ft, in) Boring Diameter..: 8.3 cm Boring Radius r...: 4.15 cm Soil/Water Tmp. T: 11 oC Dyn. Visc. @ T'C.: 0.001271 kg/m.s WCU Base Ht. h: 15.0 cm WCU Susp. Ht. S: 6.4 cm Const. Wtr. Ht. H: 21.4 cm H/r **........... .......: 5.2 Dyn. Visc. @ To" 0.001170 kg/m•s H: Constant height of water in the borehole r: Radius of the cylindrical borehole V: Dyn. Visc. of water @ Tmp. T °C/Dyn. Visc. of water @ Tg Ksat = Q[sinh-t(H/r) - (r2/H2+1)'s+ r/H]/(2nH2) [Basic Glover Solu.] Ksata= QV[sinh-1(H/r) - (rz/Hz+1)'s + r/H]/(2nHz) [Tmp. Correction] VOLUME ml Volume Out ml TIME h:mm:ssA P Intel Elapsed Time rva Flow Rate Q ml min 1 Ksata Equivalent Values ----------------- hr:min:sec min cm min cm sec cm da in hr ftda 120 9:30:00 AM 110 10 9:30:14 AM 0:00:14 0.23 42.86 0.02SI 4.09E-04 35.4 0.580 1.16 100 10 9:30:31 AM 0:00:17 0.281 35.29 0.020 3.37E-04 29.1 0.478 0.9 90 10 9:30:49 AM 0:00:181 0.30 33.33 0.019 3.18E-04 27.5 0.451 0.90 80 10 9:31:04 AM 0:00:15 0.25 40.00 0.023 3.82E-04 33.0 0.542 1.08 70 10 9:31:21 AM 0:00:17 0.28 35.29 0.020 3.37E-04 29.1 0.478 0.96 60 10 9:31:40 AM 0:00:19 0.32 31.58 0.018 3.02E-04 26.1 0.428 0.86 50 10 9:31:58 AM 0:00:18 0.30 33.33 0.019 3.18E-04 27.5 0.451 0.90 40 10 9:32:20 AM 0:00:22 0.37 27.27 0.0161 2.60E-04 22.5 0.369 0.74 . 30 10 9:32:44 AM 0:00:24 0.40 25.00 0.014 2.39E-04 20.6 0.338 0.68 20 10 9:33:13 AM 0:00:29 0.48 20.69 0.012 1.98E-04 17.1 0.280 0.56 10 10 9:33:42 AM 0:00:29 0.48 20.69 0.012 1.98E-04 17.1 0.280 0.56 Natural Moisture......: 15.1 Consistency ...............: Loose Field -Estimated Ksat: 0.0131 2.24E-041 19.31 0.3171 0.63 USDA TM./USCS Class: SM lWate, Table Depth ... 8.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. trust./%Pass. p200.: 34.9 11nit. Saturation Time.: 9:30:00 AM Glover, R. E. 1953. Flow from a test -hole located above groundwater level, pp. 69-71. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the welICH/r>5 to>10 Johnson Permeameter, LLC Revised 11/29/13 100 90 80 70 60 50 40 30 20 10 0 Particle Size Distribution Report ,ICI %+3.1 - " Coarse Fine Coarse Medium Fine Silt I Clay 0.0 1 0.0 0.0 0.2 1.2 63.7 34.9 SIEVE SIZE PERCENT FINER SPEC.* PERCENT PASS? (X=NO) 1.5" 100.0 V. 100.0 .5" 100.0 .375" 100.0 #4 100.0 #8 99.9 #10 99.8 #16 99.7 #40 98.6 #100 60.9 #200 34.9 (no specification provided) Sample Number: BMP-5 GET SOLUTIONS, INC. Jacksonville North Carolina Material Description Atterbera Limits PL= LL= Pl= Coefficients Dgo= 0.3078 D85= 0.2678 D80= 0.1467 D50= 0.1136 D30= D15= D10= Cu= Cc Classification USCS= AASHTO= Remarks Client: Whiting-TumerConstmction Co. Project: P003 Staff NCO Academy Facilities Project No: JX13-110G Date: Constant -Head Borehole Permeameter Test Analytical Method: Glover Solution GE® Project Name......: Staff NCO Training Academy Boring No...........: BMP-6 Investigators.......: J. Huber; L. Brown Project No......: JX13-11OG Proj. Location...: MCB Camp Lejeune, NC Date ..................: 12/31/13 Terminology and Solution (R. E. Glover Solution) Ksats: (Coefficient of Permeability) @ Base Tmp. Ta (°C) 14 Q: Rate of flow of water from the borehole Boring Depth......: 2 (m, cm, ft, in) Boring Diameter..: 8.3 cm Boring Radius r... : 4.15 cm Soil/Water Tmp. T: 11 oC Dyn. Visc. @ T *C.: 0.001271 kg/m•s WCU Base Ht. h: 15.0 cm WCU Susp. Ht. S: 6.4 cm Const. Wtr. Ht. H: 21.4 cm H/r**...................: 5.2 Dyn. Visc. @ T.°C.: 0.001170 kg/m•s H: Constant height of water in the borehole r: Radius of the cylindrical borehole V: Dyn. Visc. of water @ Tmp. T °C/Dyn. Visc. of water @ Ts Ksat =Q[sinh"(H/r)-(r'/Hz+1)'s+r/H]/(2nH') [Basic Glover Solu.] I Ksata= QV[sinh-t(H/r) - (r'/H'+1)'s+ r/H]/(2nH') [Tmp. Correction] VOLUME ml Volume Out ml TIME h:mm:ss A P Interval Elapsed Time Flow Rate Q ml min -------------- Ksats Equivalent Values ------------------- hr:min:sec min cm min cm sec(cm/day)in hr ft da 120 1 9:10:19 AM 110 10 9:10:44 AM 0:00:25 0.42 24.00 0.014 2.29E-04 19.8 0.325 0.65 100 10 9:12:19 AM 0:01:35 1.58 6.32 0.004 6.03E-05 5.2 0.086 0.1 90 10 9:13:30 AM 0:01:11 1.18 8.45 0.005 8.07E-05 7.0 0.114 0.23 80 10 9:14:51 AM 0:01:21 1.35 7.41 0.004 7.08E-05 6.1 0.100 0.20 75 5 9:15:22 AM 0:00:31 0.52 9.68 0.006 9.24E-05 8.0 0,131 0.26 70 5 9:15:50 AM 0:00:28 0.47 10.71 0.006 1.02E-04 8.8 0.145 0.29 65 5 9:16:23 AM 0:00:33 0.55 9.09 0.0051 8.68E-05 7.51 0.123 0.25 60 5 9:16:48 AM 0:00:25 0.42 12.00 0.007 1.15E-04 9.9 0.162 0.32 55 5 9:17:16 AM 0:00:281 0.47 10.71 0.006 1.02E-04 8.8 0.145 0.29 50 5 9:17:45 AM 0:00:29 0.48 10.34 0.006 9.88E-05 8.5 0.140 0.28 Natural Moisture......; 14.0 lConsistency ...............: Loose Field -Estimated Ksat: 0.005 8.99E-05 7.8 0.127 0.25 USDA TKt./USCS Class: SM lWater Table Depth ... 8.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. truct./% Pass. #200.: 46.8 linit. Saturation Time.: 9:10:00 AM Glover, R. E. 1953. Flow from a test -hole located above groundwater level, pp. 69-71. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the welICH/r>5 to>10 Johnson Permeameter, LLC Revised 11/29/13 100 90 80 70 60 50 40 30 20 10 0 Particle Size Distribution Report �I �II■�1■1 1 Coarse Medium Fine 0.0 1.3 51.9 SIEVE SIZE PERCENT FINER SPEC! PERCENT PASS? (X=NO) 1.5" 100.0 V 100.0 .5" 100.0 .375" 100.0 #4 100.0 #8 100.0 #10 100.0 #16 99.8 #40 98.7 #100 71.0 #200 46.8 (no specification provided) Sample Number: BMP-6 GET SOLUTIONS, INC. Jacksonville North Carolina Silt 46.8 Material Description Atterbera Limits PL= LL= PI= Coefficients D90= 0.2744 D85= 0.2299 D60= 0.1092 D50= 0.0821 D30= D15= D10= Cu= Cc= Classification USCS= AASHTO= Remarks Date: Client: Whiting -Tumor Construction Co. Project: P003 Staff NCO Academy Facilities Project No: JX13-110G Figure Constant -Head Borehole Permeameter Test Analytical Method: Glover Solution GE® Project Name......: Staff NCO Training Academy Boring No...........: BMP-8 Investigators.......: J. Huber; L. Brown Project No......: JX13-11OG Proj. Location...: MCB Camp Lejeune, NC Date ..................: 12/31/13 Terminology and Solution (R. E. Glover Solutionf Ksate: (Coefficient of Permeability) @ Base Tmp. T. (°C) 14 Q: Rate of flow of water from the borehole Boring Depth......: 2 (m, cm, ft, in) Boring Diameter..: 8.3 cm Boring Radius r... : 4.15 cm Soil/Water Tmp. T: 11 oC Dyn. Visc. @T°C.: 0.001271 kg/m•s WCU Base Ht. h: 15.0 cm WCU Susp. Ht. S: 6.4 cm Const. Wtr. Ht. H: 21.4 cm H/r **...................: 5.2 Dyn. Visc. @Ta°C.: 0.001170 kg/m•s H: Constant height of water in the borehole r: Radius of the cylindrical borehole V: Dyn. Visc. of water @ Tmp. T °C/Dyn. Visc. of water @ Ta Ksat=Q[sinh-t(H/r)-(rz/Hz+1)'s+r/H]/(2nHz) [Basic Glover Solu.] Ksata=QV[smt(H/r)-(rz/Hz+1)s+r/H]/(2nHz)[Tmp. Correction] VOLUME ml Volume Out ml TIME h:mm:ssA P Interval Elapsed Time Flow Rate Q ml min ----------- Ksata Equivalent Values------------ hr:min:sec min cm min cm sec cm da in hr ft da 120 9:50:10 AM - 110 10 9:50:23 AM 0:00:13 0.22 46.15 0.026 4.41E-04 38.1 0.625 1.25 100 10 9:50:45 AM 0:00:221 0.37 27.27 0.016 2.60E-04 22.51 0.369 0.7 90 10 9:51:15 AM 0:00:30 0.50 20.00 0,011 1.91E-04 16.5 0.271 0.54 80 10 9:51:52 AM 0:00:37 0.62 16.22 0.009 1.55E-04 13.4 0.220 0.44 70 10 9:52:39 AM 0:00:47 0.78 12.77 0.007 1.22E-04 10.5 0.173 0.35 60 10 9:53:28 AM 0:00:49 0.82 12.24 0.007 1.17E-04 10.1 0.166 0.33 50 10 9:54:28 AM 0:01:00 1.00 10.00 0.006 9.55E-05 8.3 0.135 0.27 40 10 9:55:33 AM 0:01:05 1.08 9.23 0.005 8.82E-05 7.6 0.125 0.25 30 10 9:56:40 AM 0:01:071 1.12 8.96 0.005 8.55E-05 7.4 0.121 0.24 Natural Moisture......: 12.4 lConsistency ...............: Loose Field -Estimated Ksat:1 0.0061 9.65E-05 8.3 0.1371 0.27 USDA TXt./USCS Class: SM lWater Table Depth ... 8.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. truct./% Pass. f1200.: 43.6 11nit. Saturation Time.: 9:50:00 AM Glover, R. E. 1953. Flow from a test -hole located above groundwater level, pp. 69-71. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the welICH/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13 Particle Size Distribution Report ooa !O CJ N \ n \ h # A # # # A 100 90 80 I I I I I I I I I I I I I I I I I I I I I I I I I I I 70 I I Z so I I I I I LL I I z 50 I I I U I I w ao a I I I I I I I I I I I I I I I I I I I 3o I I I I I I I I I I I I I I I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I I I to I I I I I I I I I I I I I I 0 I I I too 10 1 0.1 0.01 0.001 GRAIN SIZE - mm. % +3„ %, Gravel % Sand % Fines Coarse Fine Coarse Medium Fine Slit Clay 0.0 0.0 0.0 0.0 2.0 54.4 1 43.6 SIEVE PERCENT SPECS PASS? Constant -Head Borehole Permeameter Test Analytical Method: Glover Solution GE® Project Name......: Staff NCO Training Academy Boring No...........: BMP-9 Investigators.......: J. Huber; L. Brown Project No......: JX13-11OG Proj. Location...: MCB Camp Lejeune, NC Date ..................: 12/31/13 Terminology and Solution [R. E. Glover Solutionf Ksata: (Coefficient of Permeability) @ Base Tmp. T. (°C) 14 Q: Rate of flow of water from the borehole Boring Depth......: 2 (m, cm, ft, in) Boring Diameter..: 8.3 cm Boring Radius r... : 4.15 cm Soil/Water Tmp. T: 11 eC Dyn. Visc. @ T °C.: 0.001271 kg/m•s WCU Base Ht. h: 15.0 cm WCU Susp. Ht. S: 6.4 cm Const. Wtr. Ht. H: 21.4 cm H/r....................... 5.2 Dyn. Visc. @ TO°C.: 0.001170 kg/m•s H: Constant height of water in the borehole r: Radius of the cylindrical borehole V: Dyn. Visc. of water @ Tmp. T °C/Dyn. Visc. of water @ Ta Ksat = Q[sinh-'(H/r) - (r'/H'+1)'s+ r/H)/(2nH2) [Basic Glover Solu.] Ksata= QV[sinli'(H/r) - (r'/H'+1)5+ r/H]/(2nHz) [Tmp. Correction] VOLUME ml Volume Out ml TIME h:mm:ss A P Interval Elapsed Time Flow Rate Q ml min I ----------- Ksata Equivalent Values------------- hr:min:sec min cm min (cm/sec cm da in hr ftda 1,500 10:22:14 AM - 1,4001 100 10:22:41 AM 0:00:27 0.45 222.22 0.1271 2.12E-03 183.4 3.008 6.02 1,3001 100 10:23:12 AM 0:00:31 0.52 193.551 0.1111 1.85E-03 159.7 2.620 5.2 1,200 100 10:23:53 AM 0:00:41 0.68 146.34 0.084 1.40E-03 120.8 1.981 3.96 1,100 100 10:24:34 AM 0:00:41 0.68 146.34 0.084 1.40E-03 120.8 1.981 3.96 1,000 100 1015:15 AM 0:00:41 0.68 146.34 0.084 1.40E-03 120.8 1.981 3.96 900 100 10:25:59 AM 0:00:44 0.73 136.36 0.078 1.30E-03 112.5 1.846 3.69 800 100 10:26:48 AM 0:00:491 0.82 122,45 0.070 1.17E-031 101.1 1.658 3.32 700 100 10:27:33 AM 0:00:45 0.75 133.33 0.076 1.27E-03 110.0 1.805 3.61 600 100 10:28:25 AM 0:00:52 0.87 115.38 0.066 1.10E-03 95.2 1.562 3.12 Natural Moisture......: 11.7 lConsistency ...............: Loose Field -Estimated Ksat: 1 0.0731 1.21E-031 104.71 1.7181 3.44 USDA Tzt./USCS Class: SM Water Table Depth ... 8.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. tract./% Pass. #200.: 25.0 linit. Saturation Time.: 10:22:00 AM Glover, R. E. 1953. Flow from a test -hole located above groundwater level, pp. 69-71. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists hen the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the we11.*H/n5 to >10 Johnson Permeameter, LLC Revised 11/29/13 Particle Size Distribution Report (O (7 N \ n '1Z 100 90 I I I I I I 80 I I I I I I I I I I I I I I I I 70 so I I I z I I I LL I I I I z so I I I I I I I I I I I I I I v w ao I I w CL I I 3o I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 10 I I I I I I I I I I I I I I 0 I 100 10 1 0.1 0.01 0.001 GRAIN SIZE - mm. % +3„ °/, Gravel % Sand % Fines Coarse Fine Coarse Medium Fine Silt Clay 0.0 0.0 0.6 0.4 2.2 71.8 25.0 SIEVE PERCENT SPEC.' PASS? Constant -Head Borehole Permeameter Test Analytical Method: Glover Solution GE® Project Name......: Staff NCO Training Academy Boring No...........: BMP-10 Investigators.......: J. Huber; L. Brown Project No......: JX13-11OG Proj. Location...: MCB Camp Lejeune, NC Date ..................: 12/31/13 Terminology and Solution (R. E. Glover Solutionf Ksata: (Coefficient of Permeability) @ Base Tmp. TB (°C) 14 Q: Rate of flow of water from the borehole Boring Depth......: 2 (m, cm, ft, in) Boring Diameter..: 8.3 cm Boring Radius r... : 4.15 cm oil/Water Tmp.T: 11 °C Dyn. Visc. @ T °C.: 0.001271 kg/m-s IDyn. WCU Base Ht. h: 15.0 cm WCU Susp. Ht. S: 6.4 cm Const. Wtr. Ht. H: 21.4 cm H/r**...................: 5.2 Visc. @ Ta °C.: 0.001170 kg/m-s H: Constant height of water in the borehole r: Radius of the cylindrical borehole V: Dyn. Visc. of water @ Tmp. T "C/Dyn. Visc. of water @ TB Ksat=Q(sinh'(H/r)-(r2/H'+1)'s+r/H]/(2nH2) [Basic Glover Solu.] Ksata= QV[sinli t(H/r) - (r2/H'+1)�s+ r/H]/(2nH2) [Tmp. Correction] VOLUME ml Volume Out ml TIME h:mm:ssA P Interval Elapsed Time Flow Rate Q ml min(cm/min) ------------ Ksata Equivalent Values-------------- hr:min:sec min n cm sec cm da in hr ft da 3,100 10:43:40 AM 3,000 100 10:44:25 AM 0:00:45 0.75 133.33 0.076 1.27E-03 110.0 1.805 3.61 2,900 100 10:45:26 AM 0:01:01 1.02 98.36 0.056 9.39E-04 81.2 1.332 2.6 2,800 100 10:46:22 AM 0:00:561 0.93 107.14 0.061 1.02E-03 88.4 1.450 2.90 2,700 100 10:47:29 AM 0:01:07 1.12 89.55 0.051 8.55E-04 73.9 1.212 2.42 2,600 100 10:48:40 AM 0:01:11 1.18 84.51 0.048 8.07E-04 69.7 1.144 2.29 2,500 100 10:49:59 AM 0:01:19 1.32 75.95 0.044 7.25E-04 62.7 1.028 2.06 2,400 100 10:51:13 AM 0:01:14 1.23 81.08 0,0461 7.74E-04 66.91 1,098 2.20 2,300 100 10:52:22 AM 0:01:09 1.15 86.96 0,050 8.31E-04 71.8 1.177 2.35 2,200 100 10:53:32 AM 0:01:10 1.17 85.71 0.049 8.19E-04 70.7 1.160 2.32 2,100 100 10:54:42 AM 0:01:101 1.17 85.71 0.049 8.19E-04 70.7 1.160 2.32 Natural Moisture......: 18.3 lConsistency ...............: Loose Field -Estimated Ksat:1 0.0481 7.94E-041 68.61 1.1251 2.25 USDA Tnt./USCS Class: SM lWater Table Depth ... 8.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. truct./% Pass. N200.: 32.5 linit. Saturation Time.: 10:43:00 AM Glover, R. E. 1953. Flow from a test -hole located above groundwater level, pp. 69-71. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the welICH/r>5 to>10 Johnson Permeameter, LLC Revised 11/29/13 Particle Size Distribution Report 100 I I I I I I I I I I I I 90 I I I I I I I I I I I I I I I I so I I I I I I I I I I I I I I I I I I I I I I I I I I I 70 Of I I I I I Z so I I ILLI I I I z so I I I v w I I w ao a I I I I I I I I I I I I I I I I I I I I I I I I I I 3o I I I I I I I I I I I I I I I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I I I I I I I I I I I I I I to I I I I I I I I I I I I I I 0 I 100 10 1 Ql 0.01 0.001 GRAIN SIZE - mm. %+3" % Gravel % Sand % Fines Coarse Fine Coarse Medium Fine Silt Clay 0.0 0.0 0.0 1 0.7 6.1 60.7 1 32.5 SIEVE PERCENT SPEC.' PASS? GET uvua"wt . Emrmnmmmm . rruaq Virginia Beach Office 204 Grayson Road Virginia Beach, VA 23462 (757)518-1703 Williamsburg Office 1592 Penniman Rd. Suite E Williamsburg, Virginia 23185 (757)564-6452 CLASSIFICATION SYSTEM FOR SOIL EXPLORATION Elizabeth City Office 504 East Elizabeth St. Suite 2 Elizabeth City, NC 27909 (252)335-9765 Standard Penetration Test (SPT), N-value Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D 1586. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30" long split -spoon sampler. The sampler was driven with blows of a 140 Ib. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment (4 increments for each soil sample) of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value. NON COHESIVE SOUS (SILT, SAND, GRAVEL and Combinations) Relative Density Very Loose 4 blows/ft. or less Loose 5 to 10 blows/ft. Medium Dense I to 30 blows/ft. Dense 31 to 50 blows/ft. Very Dense 51 blows/ft. or more Particle Size Identification Boulders 8 inch diameter or more Cobbles 3 to 8 inch diameter Gravel Coarse 1 to 3 inch diameter Medium 1/2 to 1 inch diameter Fine 1/q to 1/r inch diameter Sand Coarse 2.00 mm to 1/a inch (diameter of pencil lead) Medium 0.42 to 2.00 min (diameter of broom straw) Fine 0.074 to 0.42 mm (diameter of human hair) Silt 0.002 to 0.074 min (cannot see particles) CLASSIFICATION SYMBOLS (ASTM D 2487 and D 2488) Costae Grained Soils More than 50%retained on No. 200 sieve GW - Well -graded Gravel GP - Poorly graded Gravel GW-GM - Well -graded Gravel w/Silt GW-GC - Well -graded Gravel w/Clay GP -GM - Poorly graded Gravel w/Silt GP -GC - Poorly graded Gravel w/Clay GM - Silty Gravel GC - Clayey Gravel GC -GM - Silty, Clayey Gravel SW - Well -graded Sand SP - Poorly graded Sand SW-SM - Well -graded Sand w/Silt SW -SC - Well -graded Sand w/Clay SP-SM - Poorly graded Sand w/Silt SIP -SC - Poorly graded Sand ve/Clay SM - Silty Sand SC - Clayey Sand SC-SM - Silty, Clayey Sand Fine -Grained Soils 50% or more passes the No. 200 sieve CL - Lean Clay CL-ML - Silty Clay ML - Silt OL - Organic Clay/Silt Liquid Limit 50%or greater CH - Fat Clay MH - Elastic Silt OH - Organic Clay/Silt Highly Organic Soils PT - Peat COHESIVE SOILS (CLAY, SILT and Combinations) Consistency Very Soft 2 blows/ft. or less Soft 3 to 4 blows/ft. Medium Stiff 5 to 8 blows/ft. Stiff 9 to 15 blows/ft. Very Stiff 16 to 30 blows/ft. Hard 31 blows/ft. or more Relative Pro_nortions Descriptive Term Percent Trace 0-5 Few 5-10 Little 15-25 Some 30-45 Mostly 50-100 Strata ChaneeS In the column "Description" on the boring log, the horizontal lines represent approximate strata changes. roundwater Readin Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as tidal influences and man-made influences, such as existing swales, drainage ponds, underdmins and areas of covered soil (paved parking lots, side walks, etc.). Depending on percentage of fines (fraction smaller than No 200 sieve size), coarse -grained soils are classified as follows: Less than 5 percent GW, GP, SW,SP More than 12 percent GM, GC, SM, SC 5 to 12 percent Borderline cases requiring dual .symbols Plasticity Chart 60 50 6 X 40 w 30 20 5 10 a 0 CH 0 Pape 1 of 1 GET Revision 12 12107 0 10 20 30 40 50 60 70 80 90 100 LIQUID LIMB (LL) (%) U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. 2008 2570 County: Onslow-U.S.G.S. Quad: Camp Leieune NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner/Agent: USNIC- CanmLelcune Consultant: Geo=i\imiire'•[ncm•noraled Address: attn: IYlarty Korenck alto: Jef DeBerry PSC Box 20004 2713 Maeruder, Blvd, Suite D Camp Leieune, NC 28542 Hamilton, VA 23666 Property description Size (acres) + 2000 acres Nearest Town Camp Lcleune Nearest Waterway Northeast and New River Watersheds River Basin White Oak USGS HUC 0303000/ Coordinates N 34.7247 W 71.3770 Location description The review area Is located withhn Canto Lcleune specifically within Camp J Indicate'Which of the Following ADO : A. Preliminary Determination Based on preliminary information, there may be wctlands'ou the above described properly. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action_ under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our -published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, file Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be. verified by the Corps. _ The wetland on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by lire Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for aperiod not to exceed five years. The wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on 3/16/2009. Unless there is a change in the law or our published regulations, this determination may he relied upon for a period not to exceed five yeas from fine date of this notification. _ "There are no waters of the U.S., to include wetlands, present on file above described properly which are 'subject to the permit requirements of Section 404 of file Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years, from the date'of this notification. The property is located in one of the 20 Coastal Commies -subject to regulation under tine Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Washington, NC, at (252) 946-6481 to determine their requirements. Page 1 of 2 Action ID: Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Brad Shaver at 910-251-4611. C. Basis For Determination The subject area exhibits wetland criteria asdescribed fit the 1987 Corns Delineation Manual and Is abutting or represented by relatively nermaneat walerbodies which ultimately flow Into the Northeast Creek and New River, both traditional navigable waters of the US. D. Remarks The site was field verified by Emily Hughes and Brad Shaver on 5/27108, 6/24/08, 7/29/08, 8/12/08, 8/19/08, 8126/08 9/9/08, nntl 9/16/08. E. Appeals Infot•mation (This information applies only to approved jurisdictional determinations as Indicated In B. above) This correspondence'constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. IFyou request to appeal this deterniinalion you must submit a completed RFA form to the Following address: District Engineer, Wilmington Regulatory Division Atin: Brad Shaver, Project Manager, Wilmington Regulatory Field Office 69 Darlington Ave Wilmington,.North Carolina 28402-1890 A. In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it his been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at rho above address by 5/16/2009. **It is not necessary to submit an RFA form to the District Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: _ id. l d.'t' Date 3/16/2009 Expiration Date 3/16/2014 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit littl):Hhvww.saw.tis,ice.army.mil/WETLANDS/index html to complete, the survey online. Copy furnished: Charles F. Riggs & Associates; Inc. attic Charles Riggs, P.L.S P.O. Box 1570 Jacksonville, NC 28541 Page 2 of 2 U.S MARINE CORPS BASE CAMP JOHNSON WETLANDS SURVEY PROJECT AREA - ONSLUW COUNTY MAP DATE- SEPTEMBER 18, ZOOS DATA ANALSIS BASED ON HAD 1983 UTH ISN BASE GRID INFORMATION WETLANDS DELINEATED BY JEFFREY W. DEBERRY, PVS GEO-MARINE, INC. L713 MAGRUDER BOULEVARD, SUITE D HAMPTON, VA. L3666 TEL, (797) 873-3702 FAX, (787) 873-3703 SURVEYED AND PREARED BY JOHN L. PIERCE 6 ASSOCIATES 405'JOHNSON BOULEVARD JACKSONVILLE, N.C. 28340 TEL, (910) 346-9000 FAX- (910) 346-1210 ' UNDER THE DIRECTION OF JOHN L. PIERCE , PROFESSIONAL LAND SURVEYOR, L-2596 NERAL NOTES, ALL DISTANCES SHOWN ARE GROUND HORIZONTAL, THIS SURVEY IS TIED TO GRID AND THE DATUM IS - RAO-83. THIS SURVEY IS SUBJECT TO ALL EASEMENTS, r AGREEMENTS AND RIGHT-OF-VAY OF RECORD PRIOR TO THE DATE OF THE SURVEY. THIS SURVEY IS OF WETLANDS BOUNDARIES OF 170AND 36 PROJECT AREA CAMPJOHNSDN BY GEOiIARINE AND F 6. THIS IA A CLASS •A• DGPS. SURVEY. THIS NM IS A CERTIFIED SURVEY BUT HAS NOT BEEN REVIEWED BY A LOCAL GOVERNMENT AGENCY FOR COMPLIANCEWITH ANY APPLICABLE LAND DEVELOPMENT REGULATIONS AND THEREFORE DOES NOT MEET THE MINIMUM STANDARDSFI3R RECORDING .,WUUnq)lie. , i BILE Cct Alaw0rc A - DATE 3'(d'z0°l 1AALY ACnDN 0 LSO 0 U.S. MARINE CORPS BASE CAMP JOHNS13N WETLANDS SURVEY PROJECT AREA - ONSLOW COUNTY MAP DATE, SEPTEMBER IS, 2008 DATA ANALSIS BASED ON NAB 1983 UTM IBM BASE GRID INFORMATION WETLANDS DELINEATED BY JEFFREY W. DEBERRY, PWS GED-MARINE, INC. 2713 MAGRUDER BOULEVARD, SUITE D HAMPTON, VA. 23666 TEL, (757) 873-3702 FAX- (757) 873-3703 SURVEYED AND PREARED BY JOHN L. PIERCE 6 ASSOCIATES 405 JOHNSON BOULEVARD JACKSONVILLE, N.C. 28540 TEL, (910) 346-9800 FAX, (910) 346-12I0 UNDER THE DIRECTION [IF JOHN L. PIERCE PROFESSIONAL LAND SURVEYOR, L-2596 NERAL NOTES, ALL DISTANCES SHOWN ARE GROUND HORIZONTAL. THIS SURVEY IS TIED TO GRID AND THE DATUM IS NAD-83. THIS SURVEY IS PREARED WITHOUT THE BENEFIT OF A TITLE REPORT AND MAY NOT INDICATE ALL ENCU14BRANC ON THE PROPERTY. THIS SURVEY IS SUBJECT TO ALL EASEMENTS, AGREEMENTS AND RIGHT-OF-WAY OF RECORD PRIOR TO THE DATE OF THE SURVEY. THIS SURVEY IS OF WETLANDS BOUNDARIES OF I7097-1 36 PROJECT AREA CAMP JOHNSON BY GEO-MARINE AND SURVEYED BY JOHN L. PIERCE 6 ASSOCIATES. TA A CLASS 'A' DGPS SURVEY. THIS MAP IS A CERTIFIED SURVEY BUT HAS NOT BEEN REVIEWED BY A LOCAL GOVERNMENT AGENCY FOR COMPLIANCEWITH ANY APPLICABLE LAND DEVELOPMENT REGULATIONS AND THEREFORE DOES NOT MEET THE MINIMUM STANDARDS FOR RECORDING, THIS IS TO WITNESS NY HAND L SEAL I!0_. n FOR THE ORIGINS OF INTERMITTENT AND PERENNIAL STREAMS (VERSION al) AND ARE ACCURATELY IDENTIi1ED ON THIS COPY OF THIS PUT. UNLESS MERE IS A CHARGE IN ME LAW OR OUR PUBLISHED REGULATIONS, THIS DETERMINADON MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE YEARS FROM THIS OATS' REGULATORY OfFlaAL 13i " /' TITLE ^lec�..,�qp �' DATE 3I6.1"'I USAGE ACTION ID ZA LSj,9 N. WETLANDS- ARKING AREA 'A' !at t tt CT Lit J.j y hm DISTURBANCE`LIMITS OF PARKING AREA BT-\ o0c/s; Z� 4 d f A. .. . ... .... t I if % ;ETt 4 NOS VVITHIN,PRWE-T UMrr$'.- it I DRANAGEAR I 4, ------ Jol 4x. ... .... .. iq 71 j DECISZUUR 1 ef "J Raleih. NC00 75 2 G-3 L Wt/ PIROPOPE INFILTRAWIN BAS IN'S'- 't. - - � � il; ;. —.<'! r�l/ I/�'� � 1%�, EARTH TECH AECOM 919-8g54-02 ah�-- t MARINE CORPS BASE ,aal, X. BRPE E t BRP�E t 9r" M200 AREA PARKNG SITE 0VE11\`IIM A, fin NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary April 03, 2014 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS MCB-Camp Lejeune ATTN: Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28547 RE: Project Name: Staff NCO Academic Facilities -EXPRESS Project ID: ONSLO-2014-076 Acres Approved: 17.89 County: Onslow, Hoover Road and Wilson Drive, Camp Johnson River Basin: White Oak Stream Classification: Other Submitted By: Wyatt L. Bone, PE, Clark Nexsen Date Received by LOS: April 2, 2014 Plan Type: New Dear Mr. Paul: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B . 129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). Please be aware that your project will be covered by the enclosed NPDES Construction Stormwater General Permit NCG010000. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Please he advised that Title 15A NCAC 4B .01 18(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter to give the Notice required by G.S. 1 13A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Division of Energy, Mineral, and Land Resources Land Quality Section —Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 29405 • (910) 796-7215 / Fax: (910) 350-2004 An Equal Opportunity 1 Affirmative Action Employer • 30% Post Consumer Paper - Internet: http:/Ipo0al.ncdenr.oLg/web/Ir/ Letter of Approval with Modifications and Performance Reservations Project :- Staff NCO Academic Facilities April 03, 2014 Page 2 of 4 North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 1 13A-51 thru 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you have provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, % ,%kJA Rhonda Hall Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications and Performance Reservations NPDES Permit cc: Wyatt L. Bone, PE, Clark Nexsen DWQ Regional Supervisor Letter of Approval with Modifications and Performance Reservations Project :- Staff NCO Academic Facilities April 03, 2014 Page 3 of 4 MODIFICATIONS AND PERFORMANCE RESERVATIONS Project Name: Staff NCO Academic Facilities Project ID: ONSLO-2014-076 County: Onslow 1. This plan approval shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. 2. The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete. 3. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed development unless otherwise noted. The removal of vegetation within any existing ditch or channel is prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to 1 vertical or less steep. Bank slopes may be mowed, but stripping of vegetation is considered new earth work and is subject to the same erosion control requirements as new ditches. 4. The developer is responsible for obtaining any and all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval; however, in the case of a Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All highland would still have to be in compliance with the N.C. Sedimentation Pollution Control Act. 5. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act, the developer is responsible for compliance with the requirements of the Division of Water Resources (DWR), the Corps of Engineers and the Environmental Protection Agency (EPA) respectively. Any erosion control measures that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to installation. The Land Quality Section must be notified of a relocation of the measures in question to the transition point between the wetlands and the uplands to assure that the migration of sediment will not occur. If that relocation presents a problem or contradicts any requirements of either DWR, the Corps, or the EPA, it is the responsibility of the developer to inform the Land Quality Section regional office so that an adequate contingency plan can be made to assure sufficient erosion control remains on site. Failure to do so will be considered a violation of this approval. Letter of Approval with Modifications and Performance Reservations Project :- Staff NCO Academic Facilities April 03, 2014 Page 4 of 4 6. Any borrow material brought onto this site must be from a legally operated mine or other approved source. Any soil waste that leaves this site can be transported to a permitted mine or separately permitted construction sites without additional permits. Disposal at any other location would have to be included as a permit revision for this approval. 7. This permit allows for a land disturbance, as called for on the application plan, not to exceed 17.89 acres. Exceeding that acreage will be a violation of this permit and would requi e a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and stormwater retention measures. 8. The construction detail for the proposed silt fence requires reinforcing wire and steel posts a maximum of eight (8) feet apart. Omission of the reinforcing wire is a construction change that necessitates more posts for support, i.e., the spacing distance needs to be reduced to no greater than six (6) feet apart. 9. Because the sediment traps and basins are shown on the Plan as the primary sedimentation and erosion control devices on this project, it is necessary that the traps and basins and their collection systems be installed before any other grading takes place on site, and that every structure that receives more than one acre of drainage is built so that each dewaters only from the surface. If that proves to be impractical, a revised plan must be submitted and approved that addresses erosion and sediment control needs during the interim period until the traps and basins are fully functioning. 10. A graveled construction entrance must be located at each point of access and egress available to construction vehicles during the grading and construction phases of this project. Access and egress from the project site at a point without a graveled entrance will be considered a violation of this approval. Routine maintenance of the entrances is critical. 11. As a condition of the provided NPDES General Stormwater Permit, groundcover stabilization must meet specific time frames. Slopes (including cuts, fills, and ditch banks) that are steeper than 3 horizontal to 1 vertical left exposed will, within seven (7) calendar days after completion of any phase of grading, be provided with groundcover. Slopes that are 3 horizontal to 1 vertical or flatter will be provided with groundcover within fourteen (14) calendar days. 12. As a part of routine monitoring of the approved land -disturbing activity, the financially responsible party shall assure inspections of the area covered by the approved plan after each phase of the plan has been completed and after establishment of temporary ground cover in accordance with North Carolina General Statute 113A 54.1(e). The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environment and Natural Resources in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 413.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 413.0127 (b). Date of Plan Approval Staff NCO Academic Facilities Project Name and Location AAr �' NCDENR clla�ou Assistant Regional Engineer Architecture & Engineering Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE h- T Channel Location: Ditch 1A Estimate 10-yr Peak Runoff: Rational C 0.50 Intensity in/hr 9.00 Drainage Area 0.52 ac Qio 2.35 cfs Additional Flow cfs QIo Total, Qdeslgn 2.35 cfs Channel Information: Channel Bottom Width, b 2.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.011 ft/ft Flow Depth, d 0.60 ft Selected Channel Lining: Selected Channel Linin Jute Net Maximum Permissible Velocity max s 4 Permissible Shear Stress t (sf 0.45 Calculations: e 1.8 ft Side Sloe Length, m 1.9 ft Top Width, T 5.6 ft Channel Area, A 2.28 sq ft Wetted Perimeter, Pw 5.79 ft Hydraulic Radius, Rh 0.39 ft Mannin s "n" 0.078 Calculated Flow Rate, Qmin 2.45 cfs Calculated Velocity, Vcaic 1.08 fps Calculated Shear Stress, tcalo 0.41 psf Q calc _> Q design? yes V calc 5 V max? yes t calc 5 t p? yes Architecture & Engineering Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE T Channel Location: Ditch 1B Estimate 10-yr Peak Runoff: Rational C 0.50 Intensity in/hr 9.00 Drainage Area 0.22 ac QIo 0.99 cfs Additional Flow cfs Qm Total, Qdesign 6.99 cfs Channel Information: Channel Bottom Width, b 2.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.019 ft/ft Flow Depth, d 0.35 ft ' Selected Channel Lining: Selected Channel Linin Jute Net Maximum Permissible VelocityVmax (fps) 4 Permissible Shear Stress t (sf) 1 0.45 Calculations: e 1.1 ft Side Sloe Length, m 1.1 ft Top Width, T 4.1 ft Channel Area, A 1.07 sq ft Wetted Perimeter, Pw 4.21 ft Hydraulic Radius, Rh 0.25 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcalc 1.12 cfs Calculated Velocity, Vcaic 1.05 fps Calculated Shear Stress, tcalc 0.41 psf Q calc >_ Q design? yes V calc 5 V max? yes t talc 5 t P? yes Architecture & Engineering Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE h _/I T Channel Location: Ditch 1C Estimate 10-vr Peak Runoff: Rational C 0:50 Intensity in/hr 9.00 Drainage Area 0.25 ac Q10 1.13 cfs Additional Flow cfs Q10 Total, Qdesign 1.13 cfs Channel Information: Channel Bottom Width, b 2.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.020 ft/ft Flow Depth, d 0.35 ft Selected Channel Lining: Selected Channel LiningJute Net Maximum Permissible Velocity max (fps) 4 Permissible Shear Stress {tp} ( sf 0.45 Calculations: e 1.1 ft Side Sloe Length, m 1.1 ft Top Width, T 4.1 ft Channel Area, A 1.07 sq ft Wetted Perimeter, Pw 4.21 ft Hydraulic Radius, Rh 0.25 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcaic 1.15 cfs Calculated Velocity, Vcalc 1.08 fps Calculated Shear Stress, teak 0.44 psf Q talc > Q design? yes V talc 5 V max? yes t talc 5 t p? yes Architecture & Engineering Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE T Channel Location: Ditch 1D Estimate 10-vr Peak Runoff: Rational C 0.50 Intensity in/hr 9.00 Drainage Area 0.63 ac Q10 2.84 cfs Additional Flow cfs Q10 Total, Qdesign 2.84 cfs Channel Information: Channel Bottom Width, b 2.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.011 Wit Flow Depth, d 0.65 ft Selected Channel Lininq: Selected Channel Linin Jute Net Maximum Permissible Velocity max (fps) 4 Permissible Shear Stress {tp} (psf) 0.45 Calculations: e 2.0 ft Side Sloe Length, m 2.1 ft Top Width, T 5.9 ft Channel Area, A 2.57 sq ft Wetted Perimeter, Pw 6.11 ft Hydraulic Radius, Rh 0.42 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcaic 2.89 cfs Calculated Velocity, Vcaic 1.12 fps Calculated Shear Stress, tcaic 0.45 psf Q calc ? Q design? yes V calc 5 V max? yes t calc 5 t P? yes rA ► \ffD\ Architecture & Engineering Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE T Channel Location: Ditch 1E Estimate 10-yr Peak Runoff: Rational C 0.50 Intensity in/hr 9.00 Drainage Area 0.35 ac Q10 1.58 cfs Additional Flow cfs Qio Total, Qdesign 1.58 cfs Channel Information: Channel Bottom Width, b 0.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.005 ft/ft Flow Depth, d 0.85 ft Selected Channel Linina: Selected Channel Linin Jute Net Maximum Penmissible Velocity max (fps) 4 Permissible Shear Stress (t (psf) 0.45 Calculations: e 2.6 ft Side Sloe Length, m 2.7 ft Top Width, T 5.1 ft Channel Area, A 2.17 sq ft Wetted Perimeter, Pw 5.38 ft Hydraulic Radius, Rh 0.40 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcaic 1.60 cfs Calculated Velocity, Vcaic 0.74 fps Calculated Shear Stress, tcaic 0.27 psf Q calc >_ Q design? yes V calc 5 V max? yes t calc 5 t P? yes Architecture & Engineering Channel Design L TRAPEZOIDAL/TRIANGULAR SHAPE T Channel Location: Ditch 1F Estimate 10-vr Peak Runoff: Rational C 0.50 Intensity in/hr 9.00 Drainage Area 0.35 ac Q10 1.58 cfs Additional Flow cfs QIo Total, Qdesign 1.58 cfs Channel Information: Channel Bottom Width, b 0.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.005 fUft Flow Depth, d 0.85 ft Selected Channel Linin : Selected Channel LInin5 I Jute Net Maximum Permissible Velocity max (fps) 4 Permissible Shear Stress tp (psf) 0.45 Calculations: e 2.6 ft Side Slope Length, m 2.7 ft Top Width, T 5.1 ft Channel Area, A 2.17 sq ft Wetted Perimeter, Pw 5.38 ft Hydraulic Radius, Rh 0.40 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcalc 1.60 cfs Calculated Velocity, Vcalc 0.74 fps Calculated Shear Stress, tcaic 0.27 psf Q calc > Q design? yes V calc 5 V max? yes t calc 5 t P? yes Architecture & Engineering Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE +— T m �rb T I e Channel Location: Channel 2A Estimate 10-vr Peak Runoff: Rational C 0.50 Intensity in/hr 9.00 Drainage Area 0.14 ac Qio 0.64 cfs. Additional Flow cfs Qio Total, Qdesign 0.64 cfs Channel Information: Channel Bottom Width, b 2.0 fUft Side Slope x:1 3.0 Channel Slope, S 0.010 ft/ft Flow Depth, d 0.35 ft Selected Channel Lining: Selected Channel Lining Cenit ede Maximum Permissible Velocity max s 4 Permissible Shear Stress {tp} (psf) 1 0.60 Calculations: e 1.1 ft Side Slope Length, m 1.1 ft Top Width, T 4.1 ft Channel Area, A 1.07 sq ft Wetted Perimeter, Pw 4.21 ft Hydraulic Radius, Rh 0.25 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcalc 0.82 cfs Calculated Velocity, Vcaic 0.76 fps Calculated Shear Stress, tease 0.22 psf Q calc a Q design? yes V calc 5 V max? yes t calc 5 t p? yes Architecture & Engineering Channel Design TRAPEZEI➢AL/TRIANGULAR SHAPE T Channel Location: Channel 2B Estimate 10- r Peak Runoff: Rational C 0.35 Intensity in/hr 9.00 Drainage Area 0.20 ac 010 0.62 Us Additional Flow cfs Qi0 Total, Qdesign 0.62 cfs Channel Information: Channel Bottom Width, b 2.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.021 ft/ft Flow Depth, d 0.30 ft Selected Channel Linin : Selected Channel Linin Cenitpede Maximum Permissible Velocity max s 4 Permissible Shear Stress {tp} (psf) 0.60 Calculations: e 0.9 ft Side Slope Length, m 0.9 ft Top Width, T 3.8 ft Channel Area, A 0.87 sq ft Wetted Perimeter, Pw 3.90 ft Hydraulic Radius, Rh 0.22 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcalc 0.89 cfs Calculated Velocity, Vcaic 1.02 fps Calculated Shear Stress, tcalc 0.39 psf Q calc >_ Q design? yes V calc 5 V max? yes t calc 5 t PZ yes Architecture & Engineering Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE h- T Channel Location: Channel 2C Estimate 10-vr Peak Runoff: Rational C 0.35 Intensity in/hr 9.00 Drainage Area 0.04 ac Qm 0.11 cfs Additional Flow 0.62 cfs Qio Total, Qdealgn 0.74 cfs Channel Information: Channel Bottom Width, b 2.0 ft/ft Side Sloe x:1 3.0 Channel Slope, S 0.005 ft/ft Flow Depth, d 0.40 ft Selected Channel Lining: Selected ChanneLl-ining I Cenitpede Maximum Permissible Velocity max (fps) 4 Permissible Shear Stress t) (psf) 0.60 Calculations: e 1.2 ft Side Sloe Length, m 1.3 ft Top Width, T 4.4 ft Channel Area, A 1.28 sq ft Wetted Perimeter, Pw 4.53 ft Hydraulic Radius, Rh 0.28 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcalc 0.74 cfs Calculated Velocity, Waic 0.58 fps Calculated Shear Stress, tcalc 0.12 psf Q calc >_ Q design? yes V calc 5 V max? yes t calc 5 t P? yes Architecture & Engineering Channel Design TRAPEZOI➢AL/TRIANGULAR SHAPE f- T Channel Location: Channel 2D Estimate 10-yr Peak Runoff: Rational C 0.80 Intensity in/hr 9.00 Drainage Area 0.16 ac Q10 1.18 cfs Additional Flow cfs Qi0 Total, Qdeslgn 1.18 cfs Channel Information: Channel Bottom Width, b 3.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.020 ft/ft Flow Depth, d 0.30 ft Selected Channel Lininq: Selected Channel Linin Cenitpede Maximum Permissible VelocityVmax(fps)4 Permissible Shear Stress t sf 0.60 Calculations: e 0.9 ft Side Sloe Length, m 0.9 ft Top Width, T 4.8 ft Channel Area, A 1.17 sq ft Wetted Perimeter, Pw 4.90 ft Hydraulic Radius, Rh 0.24 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcalc 1.22 cfs Calculated Velocity, Vcaic 1.04 fps Calculated Shear Stress, tcalc 0.37 psf Q calc > Q design? yes V calc 5 V max? yes t talc 5 t P? yes Architecture & Engineering Channel Design TRAPEZE]IDAL/TRIANGULAR SHAPE Channel Location: Channel 2E Estimate 10-vr Peak Runoff: Rational C 0:95 Intensity in/hr 9.00 Drainage Area 0.15 ac Q10 1.31 cfs Additional Flow cfs Qio Total, Qdesign 1.31 cfs Channel Information: Channel Bottom Width, b 2.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.020 ft/ft Flow Depth, d 0.40 ft Selected Channel Lining: Selected Channel LiningCenitpede Maximum Permissible Velocity max (fps) 4 Permissible Shear Stress (t psf 0.60 Calculations: e 1.2 ft Side Slope Length, m 1.3 ft Top Width, T 4.4 ft Channel Area, A 1.28 sq ft Wetted Perimeter, Pw 4.53 ft Hydraulic Radius, Rh 0.28 ft Mannin s "n" 0.078 Calculated Flow Rate, Qcalc 1.49 cfs Calculated Velocity, Vcalc 1.16 fps Calculated Shear Stress, halo 0.50 psf Q calc >_ Q design? yes V calc 5 V max? yes t calc 5 t P? yes Architecture & Engineering Manning's Roughness Coefficient, n Manning's Roughness Coefficient for Temporary Lining Materials: Table 8.05e from Erosion and Sediment Control Planning and Design Manual Lining Type 0-0.6 ft 0.5-2.0 ft >2.0 ft Woven Paper Net 0.016 0.015 0.015 Jute Net 0.028 0.022 0.019 Fiberglass Roving 0.028 0.021 0.019 Straw with Net 0.065 0.033 0.025 Curled Wood Mat 0.066 0.035 0.028 Synthetic Mat 0.036 0.025 0.021 Manning's Roughness Coefficient: Table 8.05f from Erosion and Sediment Control Planning and Design Manual Lining Category Lining Type 0-0.5 ft 0.5-2.0 ft >2.0 ft Rigid Concrete 0.015 0.013 0.013 Grouted Riprap 0.04 0.03 0.028 Stone Masonry 0.042 0.032 0.03 Soil Cement 0.025 0.022 0.02 Asphalt 0.018 0.016 0.016 Unlined Bare Soil 0.023 0.02 0.02 Rock Cut 0.045 0.035 0.025 Gravel Riprap ' 1-inch D50 0.044 0.033 0.03 2-inch D50 0.066 0.041 0.034 Rock Riprap 6-inch D50 0.104 0.069 0.035 9-inch D50 (Class B) 0.11 0.074 0.038 12-inch D50 (Class 1) 0.115 0.078 0.04 15-inch D50 Class II 0.12 1 0.082 1 0.042 Architecture & Engineering Maximum Permissible Velocities Maximum Permissible Velocities: Table 8.05d from Erosion and Sediment Control Planning and Design Manual Maximum Permissible Velocities (fp: Sand (noncolloidal) 2.5 d Loam (noncolloidal) 2.5 Loam (noncolloidal) 3 inary Firm Loam 3.5 Fine Gravel 5 Stiff Clay (very colloidal) 5 Graded, Loam to Cobbles (noncolloidal) 5 Graded, Silt to Cobbles (colloidal) 5.5 Alluvial Silts (noncolloidal) 3.5 Alluvial Silts (colloidal) 5 Coarse Gravel (noncolloidal) 6 Cobbles and Shingles 5.5 Maximum Permissible Velocities: Hydrology and Urbam Water systems by Dr. Rooney Malcom Maximum Permissible Materials Velocities (fps) Grass - Uncertain Maintenance 4 Grass - Good Cover, Proper Maintenance 5 FORD, M= Architecture & Engineering Maximum Permissible Shear Stress Permissible Shear Stresses for Riprap and Temporary Liners: Table 8.05g from Erosion and Sediment Control Planning and Design Manual Lining Category Lining Type Permissible Unit Shear Stress Td (psf) Temporary Woven Paper Net 0.15 Jute Net 0.45 Fiberglass Roving: Single 0.60 Double 0.85 Straw with Net 1.45 Curled Wood Mat 1.60 Synthetic Mat 2.00 d50 Stone Sizes in Gravel Riprap 1 0.33 2 0.67 Rock Riprap 6 2.00 9 (Class B) 3.00 12 (Class 1) 4.00 15 (Class 11) 5.00 18 6.00 21 7.80 24 8.00 Permissible Shear Stresses for Vegetation: Table 2 from HEC 15: Design of Roadside Channels with Flexible Linings Permissible Unit Shear Stress Td Lining Category Lining Type (psf) Vegetation Class A 3.70 Class B 2.10 Class C 1.00 Class D 0.60 Class E 0.35 *See attached table for classifications. Permissible Shear Stresses for Bare Soil: Table 2.3 from HEC15: Design of Roadside Channels with Flexible Linings Lining Category Lining Type Permissible Unit Shear Stress Td s Cohesive Bare Soil Clayey Sands 0.037-0.095 Cohesive Bare Soil Inorganic Silts 0.027-0.11 Cohesive Bare Soil Silty Sands 0.024-0.072 Cohesive Bare Soil Inorganic Clays 0.14 Classification of Vegetal Covers: Table 1 from HEC 15: Design of Roadside Channels with Flexible Linings Retardance Class Cover Condition A Weeping lovegrass Excellent stand, tall(average 30")(76cm) Yellow bluestem Excellent stand, tall avers a 36" 91cm B Kudzu Very dense growth, uncut Bermuda grass Good stand, tall (avg. 12")(30cm) Native grass mixture Good stand, unmowed Weeping lovegrass Good stand, tall (avg. 24")(61cm) Lespedeza sericea Good stand, not woody, tall (avg. 19")(48cm) Alfalfa Good stand, uncut (avg. 13")(33cm) Weeping lovegrass Good stand, unmowed (avg. 13")(33cm) Kudzu Dense growth, uncut Blue gamma Good stand, uncut (avg. 13" 28cm C Crabgrass Fair stand, uncut (10 to 48")(25 to 120cm) Bermuda grass Good stand, mowed (avg. 6")(15cm) Common lespedeza Good stand, uncut (avg. 11")(28cm) Grass -legume mixture Good stand, uncut (6 to 8")(15 to 20cm) Centipede grass Very dense cover (avg. 6")(15cm) Kentucky bluegrass Good stand, headed 6 to 12" 15 to 30cm D Bermuda grass Good stand, cut (2.5")(6cm) Common lespedeza Excellent stand, uncut (avg. 4.5")(11cm) Buffalo grass Good stand, uncut (3 to 6")(8 to 15cm) Grass -legume mixture Good stand, uncut (4 to 5")(10 to 13cm) Les edeza sericea After cuttin to 2" 5cm , Very good stand before E Bermuda grass Good stand (1.5")(4cm) Bermuda grass Burned stubble COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License N C-2710 May 7, 2014 Christine Nelson Express Review Permitting N.C. Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Engineer's Certification M200 Area Parking and Jogging Trail CSD Project No. I 1-0239CJ Stormwater Project No. SW8 081007 Dear Christine: Enclosed please find the following items for the referenced project: ECEIVIG MAY 0 8 2014 BY: - two (2) copies of the surveyor's certification of the adjusted weir crest elevations - one (1) original Designer's Certification We appreciate your assistance in this matter. Please call if you require any additional information. Sincerely, Howard Resnik, PE Encl.: As noted above MAY 0 8 2014 I Professional Land"S,urveyors Y 604E Cedar Point B(V, Cedar point, NC 28584 ' e " (252) 393-6I01 fax (252) 39313522 d , „ r n x M&ch•24, 2014'- { X6A P 1319 Camp Johnson= t " I, Cyrus Alan Bell, Professional=Landry Sueyor; d' �h'- certify that I'personally _° venfiedon this date that the weir crest elevation for a S WP 178(Pondasbee A) hn adjusted,"� to 15 50' and the,wen uest:elevation'for SWp;177(PondlB) has Been adjustadao 14 80'f Elevatonsareielative aNA'UD`1988.' h. C/A aQPOF E � C Al 11, �° T' L S P eli& Phillips Surveying, PLLC ° r L 2fi�gx r x - S, t s f r : } i 1 1 r ry r, - - I y , i n - y w r ,