Loading...
HomeMy WebLinkAboutSW8080649_CURRENT PERMIT_20210601STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 OSO�DI4O\ DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2.021 obo 1 YYYYMMDD ROY COOPER Governor DIONNE DELLI-GATTI Secrerary BRIAN WRENN NORTH CAROLINA Director Envbwunenrd Quality June 1.2021 Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28547 Subject: Permit Renewal State Stormwater Management Permit No. SW8 080649 TECOM (MCCSSS) Interim Facilities- Humvee Garage Onslow County Dear Mr. Paul: The Wilmington Regional Office received a complete 8 year Stomwater Management Permit Renewal Application for the subject project on May 17, 2021. The Division is hereby notifying you that permit SW8 080649 has been renewed on June 1, 2021, and shall be effective until December 30, 2029,. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on July 23, 2008 and most recently modified on October 23, 2017, will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOA14.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, U `CIA ,T Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment C — Permitting History Renewal Application Documents DES/ams: %Stornwater\Permits & Projects\2008\080649 HD\2021 06 permit 080649 cc: NCDEQ-DEMLR Wilmington Regional Office er D En 0% North Carolina Department of Environmental Quality I Division of Energy. Mineral and land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I wilmingtom North Carolina 28405 �rnmrraouvn 910.796.7215 State Stormwater Management Systems Permit No. SW8 080649 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune TECOM (MCCSSS) Interim Facilities-Humvee Garage Neuse Road, Camp Johnson Area, MCB Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (1995 Rules) as amended by Session Law (SL) 2006-246 and as subsequently amended on January 1, 2017 (2017 Rules), as applicable (collectively, the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until December 30, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the management and volume of stormwater described in the application and other supporting data. The maximum amount of built -upon area (BUA) allowed for the entire project is 91,801 square feet. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 this permit. The stormwater control measures labeled Pond 1 and Pond 2 have been designed to handle the runoff from 45,871 and 45,930square feet of built - upon area, respectively. This permit does not provide any allocation of built -upon area for future development. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A vegetated filter strip is not required for these ponds as they have been designed for a 90% total suspended solids removal efficiency. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 5 State Stormwater Management Systems Permit No. SW8 080649 The following design criteria have been provided in the wet detention ponds and must be maintained at design condition: Pond 1 Pond 2 a. Drainage Area, acres: Onsite, ftz: Offsite, ftz: 2.908 126,679 0 1.97 85,634 0 b. Total Impervious Surfaces, ftz: Onsite, ftz: Offsite, ftz: 45,871 45,871 0 45,930 45,930 0 c. Average Pond Design Depth, feet: 3.0 3.0 d. TSS Removal Efficiency: 90% 90% e. Design Storm, inches: 1.5 1.5 f. Permanent Pool PP Elevation, FMSL: 1T5 17.5 g. Permitted PP Surface Area, ftz: 10,809* 8,459 h. Temporary Storage Elevation, FMSL: 18.5 18.5 i. Permitted Storage Volume, ft3: 12,983* 10,671 j. Predevelopment 1 yr-24 hr. discharge rate, cfs: 3.4 0.34 k. Controlling Orifice, inch 0 pipe: 2 1 1.25 I. Orifice Flow Rate, cfs: 0.1 0.03 m. PP Volume, ft3: 28,236* 21,277 n. Forebay Volume, ft3: 4,680* 4,519 o. Maximum Fountain Horsepower: n/a n/a p. Receiving Stream/River Basin: Wilson Bay / White Oak q. Stream Index Number: 19-14 r. Classification of Water Body: Sc, HOW, NSW *Based on the original calculations. Any future modifications to Pond 1 or its drainage area will need to confirm and permit the as -built condition of Pond 1 It. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. a. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 2 of 5 State Stormwater Management Systems Permit No. SW8 080649 The permittee shall submit an annual summary report to the Division of Energy, Mineral and Land Resources of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. Decorative spray fountains will not be allowed in the stormwater treatment system until calculations are provided documenting the permeant pool volume is greater than 30,000 cubic feet. 8. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 12. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. Page 3 of 5 State Stormwater Management Systems Permit No. SW8 080649 III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed 'Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08, C. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; Current Permittee Name or Address Changes: The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; C. A mailing address change of the permittee; 6. The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 7. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any permit conditions. 9. Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Page 4 of 5 State Stormwater Management Systems Permit No. SW8 080649 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 21-1.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit renewed, updated and reissued this the 1 day of June 2021, NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION I.,YVt ti�Y.w. 0 M bnan rein , 6irector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Construct Camp Johnson MCCSSS PEB Permit No. SW8 080629 Approval Date Permit Action BIMS Version Description of the Changes 7/23/2008 Original Approval 10 10/23/2017 Modification 1.1 Modifications made to Ponds I & 2 6/l/2021 Renewal 2.0 Permit Number: - ) O � 0�6 �4 q (to be provid d by DWQ) Drainage Area Number:_ Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: g'ECEIVE Immediately after the wet detention basin is established, the plan@9T 8 2017 vegetated shelf and perimeter of the basin should be watered twieekly if needed, until the plants become established (commonly six weeks)By; No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. I approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page I of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra mi . The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. E(cEIVE OCT 18 aon Form S W401-Wet Detention Basin O&M•Rev.4 By. PaR of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An amtual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Re air or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The treasuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.55 feet in the forebay, the sediment shall be removed. E(CEIVER OCT 18 2017 BASIN DIAGRAM (fill in the blanks) BY: Sediment Removal . 13 1 Pe en Pool Elevatio Form SW401-Wet Detention Basin O&M-Rev.4 -------------- Bott om Permanent Pool Elevation 17.5 --- Volume Sediment Removal Elevation 12.5 Page Volume 12 -fi Min. -------------------------------------------- ------ Sediment Bottom Elevation 11.5 1-ft Storage Sedtmer Storage FOItEBAY MAID POND 3 of 4 Permit Number: (ro be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project nantc:Construct PEB, Camp Johnson BMP drainage area number: Print name:Thomas Bradshaw, PE Title:Civil Engineer, Public Works Department Phone: 910-450-5803 Date: 9111117 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I� a Notary Public for the State of y6k�\ (Va , County of ' 46kjk'-� , do hereby certify that personally appeared before me this 1 day ofaj �km �_, QIi 11, and acknowledge the due execution of the forgoing w t detention basin maintenance requirements. Witness my hand and official 0% ;ttiSAgip!,,,' J� F Nolory Public Onslow County _My Commission Expires= z 05/26/2019 lNrClAIt SEAL My commission expires o51 a� Ii� ECEI V E OCT 18 2017 BY: --- - Fonn SW401-Wet Detention Basin O&M-RevA Page 4 of 4 :i:�. , `a ' ,. �> ' �y ,`rV 6 '- -RSA �D�.G�W:Z.n.0 F':>aa1_ pV'�oM C'_-USA :9 J1'�:A ti'Ipa: ` �. . Permit Number: _<_� to YOYCAO V (to be provided b DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a 5L9- log in a known set location. Any deficient BMP elements noted in the inspection will be SPr corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will rernediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. 10 V\1 ogm 943'� a LI& Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4 Permit Number:11 (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the al al growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4 Permit Number: J �U kU ke (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1756. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. 4 -F4 M� When the permanent pool depth reads �- fee the main pond, the sediment shall be removed. Sf�Pin When the permanent pool depth reads �.71� fee the forebay, the sediment shall be removed Sediment Removal Bottom 12.5 --------------- BASIN DIAGRAM (fill in the blanks) (-ft Min. Sediment Storage Permanent Pool Elevation 17.5 Pool Sediment Removal Elevation 13.5 volume ------- ---------------- ------ Bottom Elevation 12.5 1 I-ft Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.3 Page 3 of 4 Permit Number: S Lo yU k O(p4 i (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:TECOM (MCCSSS) INTERIM FACILITIES, MCB, CLNC BMP drainage area number: Print name:Carl Baker Title:Deauty Public Works Officer Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, A tO f F LC-F CGnSIQ l , a Notary Public for the State of /y6P,-T4 O At2u_y) 4 , County of DA1Sc _n4:� , do hereby certify that l A ✓_ F2 personally appeared before me this ZL:EV day of 5U A V[_ and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, `0 J%U1111111g1 ELi E 'IF. NOT, �N ` S . !0 . •. SEAL qlq_� kuk &*LA__11 My commission expires 2-1 o - Z66? Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of 4 •� UEMLH USE UNLY Date Fee Paid Permit Number Rye! f a1 ItW5� Sys03D4, NC DEQ Division of Energy, Mineral and Land Resources ECEI,VE STATE STORMWATER: KAYA2T-) PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: 2. Project name: TECOM (MCCSSS) Interim Facilities- Humvee Garage High Density Commercial Wet Pond Project 3. Project street address: City: MCB Camp Leieune County: Onslow ZIP: 28542 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https:Hdeg.nc.gov/about/divisions/e B. PERMITTEE.INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/abouVdivisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp L.ejeune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: 6. Phone: (910) 451-2213 Email: neal.paulCusmc.mil State: ZIP : Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: HEB 1. A permit application processing fee of $505.00 payable to NCDEQ. HEB 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. HEB 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. HEB 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. HEB 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITT S CERI(YeITIF CATION I, o&6iT . Lo w �' , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or owriership. All i or tion provided on this permit renewal application is, to the best of my knowledge, co ect co(ete. Signature: Date: 2 NOTARIZATION: j��, V uf\ IV tuSc)rl a Notary Public for the State of ioYkV, County of do hereby certify that �dYU_r-4 IA . UbXPI &L— personally appeared before me this the L- day of IN& LA-) 20 21 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seat)\VER���'� Notary Signature: r1OTARY'2 My commission expires ­7 %,_O %` PLIBoc, +_ -"';0vc0v11,1111110 ?.. Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 A •i I ml53 j/i�� 1"�' 4 �t •p, J U p MiN O /MI5O 0 o y l.11510 � o 4 ' M1mc � I ° op 12 Minn °Yc.rr _ A r C ? e� �j " p � �" �+`O � .. ,� *yam,"1r. ' � ..Et+': • �, 4 SW IWlh CUN CL&Oa ale6111NySegmenl CUN 0 30 60 120 Yards Permit No. _s5k 8/ lfo be podded by DWOI AA tot W ALF NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This loan must be filled out printed and submitted. The Required Items Checklist (Pad Ill) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Date Drainage area number II. DESIGN INFORMATION Site Characteristics Drainage area 85,634 rye Impervious area, post -development 45,930 1? %impervious 53.64 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr stone Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the pen. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment deanout top elevation (bottom of pond) Sediment cleanout bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 5,706 tt3 10,671 fl3 OK, volume provided is equal to or in excess of volume required. tt3 ft3 It ff3 It Y (Y or N) 2.5 in 0.30 (unittess) 0.60 (unifless) 5.90 irdhr OK 3.40 tt3/sec 0.03 ff3/sec -3.37 ail, 18.50 finsl 17.50 hrsl 17.50 finsl 18.00 first 17.00 fmsl 12.50 finsl 11.50 first 1.00 It Y (Y or N) EUEOVE 18.5 fins] OK OCT 18 2011 8Yt Form SW401-Wet Detention Basin-Rev.94/18/12 Parts I. a II. Design Summary, Page 1 of 2 II. DESIGN INFORMATION Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, A.,, Area, bottom of 1 Oft vegetated shelf, Ab,, � Area, sediment deanouL top elevation (bottom of pond), Awt,p Volumes 11,993 ft 5,232 f? 6.11 (unkless) 8,4591? OK 6,954 ft 1,261 ft` Volume, temporary pool 10,671 ft Volume, permanent pool, Vp,,,, 21,277 its Volume, forebay (sum of forebays if more than one forebay) 4.519 ft' Forebay % of permanent pool volume 21.2% % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? NountaWPiedmork SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Va _xd Area provided, permanent pool, Ar,,, Average depth calculated Average depth used in SAIDA, d„, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided. permanent pool, A._,w Area, bottom of 1011 vegetated shelf, A. „m 90 % Y (Y or N) N (Y or N) 6,11 (urdOess) (Y or N) 21,277 fl 8,459 ft it it Y (Y or N) 8,459 ft 6,954 8 OK OK Need 3 it min. Area, sediment deanout, top elevation (bottom of pond), A,�„a 1,261 ft' 'Depth' (distance Nw bottom of 10ft shelf and top of sediment) 4.50 it Average depth calculated 3.11 it OK Average depth used in SAIDA, d„, (Round to down to nearest 0.5k) 3.0 ft OK Drawdown Calculations Dmwdovm through orifice? Diameter of orifice (ft dreular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Drying head (Hoj Drawdown through weir? Weir type Coefficient of discharge (C,) Length of weir (L) Drivbg head (H) Predevelopmenl 1-yq 24-hn peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of towpath to width ratio Length to width ratio Trash rack for overflow & odfice? Freeboard provided Vegetated fiker provided? Recorded drainage easement provided? Capures all mnofl at ukirnate buil"ut? Drain mechanism for maintenance or emergencies a: Y (Y or N) 1.25 in in' 0.60 (unitiess) 0.33 It N (Ycr N) (unitless) (unitless) If 8 0.34 8s/sec 0.33 N'isec 0.03 A'kec 2.79 days I 3 :1 10 :1 10.04 3 :1 3.01 Y (Y or N) Yft Y (Y or N) N (Y or N) Y (Y or N) Permit No. ao oe p'ovided eyOWW) OK, draws down in 25 days. y OCT L 3 ZJ9l 19 M: -�� OK OK OK OK OK OK OK OK Insufficient Recordeddrainageeasementrequired. OK Form SW401-Wet Ddenlim BaC"ay.a4 18112 Pam: 1. & 11. D iqn summary, Pere 2 d 2 Permit Ill. REQUIRED ITEMS CHECKLIST po ae provided by DWQJ Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result In a request for additional Information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan In Is Sheet No. C3 1. Plans (1' - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, - High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement C3 2. Partial plan (1' = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, - Vegetation specification for planting shelf, and c �L EIVE - Filter ship. 4— NIA 3. Section view of the wet detention basin (1' = 20' or larger) showing: OCT 18 2017 - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and BY, - Inlet and outlet structures. 6 NIA 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. Calcs 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. C3 6. A construction sequence that shows how the wet detention basin will be protected from sediment unfit the entire drainage area is stabilized. !� Celcs 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. NIA 9. A copy of the deed restrictions (if required). _ NIA 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9418112 Part Ill. Required Items Checkllsl, Page 1 of 1 Permit No. d U g (to be provided by DWO of wnrF9 NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be (fled out, printed and submitted. ""3 �yl c^`t1 ,,,�C� 1k The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. ' L 'PROJECT; INFORMATION „ y r � '^ `?' zm Project name A TECOM (MCCSSS) INTERIM FACILITIES, MCS, CLNC Contact person Frank Wanko Phone number 910-692-5616 Dale 61312008 (Revised 718/2008) Drainage area number DA 2 Site Characteristics Drainage area Impervious area % impervious Design rainfall depth Storage Volume: Non.SRWaters Minimum volume required Volume provided Storage Volume: SR Waters 1-yr, 24-hr runoff depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is prelpost control of the 1-yr 24-hr peak flow requi(ed? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow PrelPosl 1-yr, 24-hr peak flow control Basin Elevations Basin bottom elevation Sediment cleanout elevation Bottom of shelf elevation Permanent pool elevation Top of shelf elevation Temporary pool elevation Volume and Surface Area Calculations SAIDA ratio Surface area at the bottom of shelf Volume at the bottom of shelf Permanent pool, surface area required Permanent pool, surface area provided Permanent pool volume Average depth for SAIDA tables Surface area at the top of shelf Volume at the top of shelf .�n J ft2Ia4(,7r ft2 y5 Z71 N %in 5,053 ft3 8,352 ft'* )1)11+ 11144 = Ya9$S in ft3 ft3 ft3 ft3 Y (Y or N) 2,5 in 0.3 (unitless) 0.6 (unitless) 5.9 inlhr 3.4 ft'/sec 6.7 ft3lsec 3.3 ft3lsec 11.50 It 12.50 ft 17.00 ft 17.50 If 18.00 ft 18.50 ft 5.60 (unitless) ft2 Ja 1b3O * 1349 — (artag + = 1441 12850.00 40454. 00 ft3 a — 14541 5,053 ft2 v1 15,561 ft2 A OK — QId4t IbdD = ►'J3� Rz^ 46,854 ft3 jt — a355b t968a �a8a3 3.010989011 . It OK 53929 ft2 4 _ Its ' 133 J, 3 24936 ft3 0 Form SW401-Wet Detention Basin-Rev.3 Parts I. 811. Design Summary Page 1 or2' JUL 1 U 7008 cN to Permit NoK 3TC pao Oe y 4 (to be provided by DWQ) Forebay volume Forebay % of permanent pool volume Temporary pool, surface area provided Drawdown Calculations Treatment volume drawdown time Treatment volume discharge rate Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Additional Information Diameter of orifice Design TSS removal Basin side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies Form SW401-Wet Detention Basin-Rev.3 9,529 ft' s — tic�av 20 % OK 19,470 ftZ at _ faaT%+ ZOY: = 14336 4.2 days OK 0.10 ftl/s 3.40 ftl/s OK 0.10 ftl/s OK 2.00 in 90 % 3 :1 OK 10 :1 OK 10 ft OK 3 :1 OK 3 :1 OK Y (Y or N) OK 1 ft OK Y (Y or N) OK N (Y or N) Need a recorded drainage easement Y (Y or N) OK Y Owner to be required to provide pump for pond draining `t 0. 'kit CtA V�', Ca.,CS, 11v^n%Qr5 'CtJv'n )� Parts I. & II. Design Summary, Page 2 of 2 c,k ro la3/tl Permit No. Sly—y�!OFiU%�/ 7 (to be provided by DWD) III. REQUIRED ITEMS CHECKLIST .' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan In'ti s Sheet No. 3 1. Plans (r - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, t - Recorded drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. t% f 1)- S 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, ' - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, ' - Vegetation specification for planting shelf, and - Filter strip. 3. Section view of the dry detention basin (V = 20' or larger) showing: ' - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. C 3 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified 6 N oII osed on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, �i Aaru. to verify volume provided. 6. An assurance that the installed system will meet design specifications upon initial operation once the fv1 project is complete and the entire drainage area is stabilized. 7. A construction sequence that shows how the wet detention basin will be protected from sediment until the (c^0% ICt entire drainage area is stabilized. 8. The supporting calculations. 9. A copy of the inspection signed and notarized and maintenance (I&M) agreement. 1 � ,4 10. A copy of the deed restriction. ' Form SW401-Wet Detention Basin-Rev.1 Part III. Required Items Checklist, Page 1 of 1 } State Stormwater Management Systems Permit No. SW8 080649 TECOM (MCCSSS) Interim Facilities-Humvee Garage Stormwater Permit No. SW8 080649 Onslow County (1� �5 d I ap, ,V Designer's Certification I, 14�O 3. /3%/' ~5 , as a duly registered ti ov{« in the State of North Carolina, having been authorized to observe ica weekly/ full time) the construction of the project, (Project) for M03 C?mP LOry (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: 21P Pnr P^_I4r �.Av-e >- i,,-`i,, 4--o P,^,S . Signature .(V�_ Registration Number E ?// ,?S Date 71 OcT-o 5 � A CAgo :A !•. 31185 . v•'•FNGINEEP.�S`. 9y�S J.6%3 NOV 0 62009 BY Page 7 of 8 State Stormwater Management Systems Permit No. SW8 080649 Certification Requirements: —1. The drainage area to the system contains approximately the permitted acreage. f 2. The drainage area to the system contains no more than the permitted / amount of built -upon area. ✓ 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. t/' 4. All roof drains are located such that the runoff is directed into the system. Z5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. �9. ,Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. 'All required design depths are provided. V14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. V 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections