Loading...
HomeMy WebLinkAboutSW8080202_HISTORICAL FILE_20080206STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 080202 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2002 020ko YYYYMMDD 9 � —i February 6, 2008 Todd Best, Manager Facilities and Maintenance GE Hitachi Nuclear Energy 3901 Castle Hayne Road Wilmington, NC 28401 Subject: Stormwater Permit No. SW8 080202 GE — FGE Office Expansion High Density Project New Hanover County Dear Mr. Best: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director Division of Water Quality The Wilmington Regional Office received a complete Stormwater Management Permit Application for GE — FGE Office Expansion on February 6, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 080202 dated February 6, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until February 6, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact,GKris Baker, or me at (910) 796-7215. Si erely, Edward Beck Regional Supervisor Surface Water Protection Section ENB/csb: S:\WQS\STORMWAT\PERMIT\080202.feb08 cc: Mark Hargrove, P.E., Withers and Ravenel New Hanover County Building Inspections City of Wilmington Stormwater Services New Hanover County Engineering Chris Baker Wilmington Regional Office oNr`thCarolina Central Files Jlatura!!y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office - Internet: w�.nc,vateroualityorg Fax (910)350-2004 1-877-623-6748 State Stormwater Management Systems Permit No. SW8 080202 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Todd Best and GE Hitachi Nuclear Energy GE — FGE Office Expansion Castle Hayne Road, New Hanover County FOR THE construction, operation and maintenance of a sand filter in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 6, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 3,200 square feet of impervious area. This basin must be operated with a 30' vegetated filter. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 080202 6. The following design criteria have been provided in the sand filter and must be maintained at design condition: a. Drainage2Area, acres: Onsite, ft : Offsite, ft2: b. Total Impervious Surfaces, ft2: C. Design Storm, inches: d. Sediment Chamber Surface Area, ft e. Sand Filter Surface Area, ft2: f. Bottom Elevation, FMSL: g. Bypass Weir Elevation, FMSL: h. Permitted Storage Volume, ft3: i. Type of Soil: j. Expected Infiltration Rate, in/hr: k. Seasonal High Water Table, FMSL: I. Time to Draw Down, hours: M. Receiving Stream/River Basin: n. Stream Index Number: o. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 0.21 3,200 None 3,200 1.5 72 72 37.7 40.2 380 Engineered Sand 3.5 N/A (closed system) 40 UT to NE Cape Fear / Cape Fear 18-74-(52.5) "C:SW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair.of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 080202 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 080202 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit iss=CAROLIN&SWIRJDNVENTAL 6th day of February, 2008. NO MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 080202 GE — FGE Office Expansion Stormwater Permit No. SW8 080202 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 080202 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections Page 7 of 7 DWQ USE ONLY Date Received Fee Paid Permit Number 02, oC� 1 2c�=, 1%ODO•— Ckna. 23q8 Gd80fiT Zo�� State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): GE Hitachi Nuclear Energy 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Todd Best - Manager Facilities and Maintenance 3. Mailing Address for person listed in item 2 above: City:Wilmington State:NC Zip:28401 Phone: (910 ) 675-6810 Fax: (910 1 362-6810 Email:Todd.Best@gnf.com 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): GE - FGE Office Expansion 5. Location of Project (street address): 3901 Castle Hayne Road City: W i Imington County:NC 6. Directions to project (from nearest major intersection): North two miles on Castle Hayne Road from the intersection of N. Kerr Ave. & Castle Hayne Road 7. Latitude:34 19' 27" Longitude:77 56' 46" W of project 8. Contact person who can answer questions about the project: Name:Mark Hargrove Telephone Number: (910 ) 256-9277 Email:mhargrove@withersravenel.com II. PERMIT INFORMATION: 1. Specify whether project is (check one): o ❑Renewal ❑Modification Form SWU-101 Version 8.07 Page I of Z If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): ❑Low Density []High Density ®Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks): ❑LAMA Major ®Sedimentation/Erosion Control 0404/401 Permit ❑NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated by the use of a sand filter to treat the roof water 2. Stormwater runoff from this project drains to the Cave Fear River basin. 3. Total Site Area: 0.21 acres 4. Total Wetlands Area: 0 acres 5. 100' Wide Strip of Wetland Area: 0 acres (not applicable if no Wetlands exist on site) 6. Total Project Area**:0.21 acres 7. Project Built Upon Area:35 % 8. How many drainage areas does the project have?1 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Unamed trib. to NE Cape Fear River Stream Class & Index No. Class C, SW,18-74-(52.5) Drainage Area (so 3,200 Existing Impervious* Area (so 0 Proposed Impervious*Area (so 3,200 % Impervious* Area (total) 100% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) 3,200 On -site Streets (so 0 On -site Parking (so 0 On -site Sidewalks (sf) 0 Other on -site (so 0 Off -site (sf) Total (so: 3,200 * 6npervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of Wetlands in the built upon area percentage calculation. Form SWU-101 Version 8.07 Page 2 of 10. How was the off -site impervious area listed above IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off -Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm) Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initial • Original and one copy of the Stormwater Management Permit Application Form Al� • Original and one copy of the Deed Restrictions & Protective Covenants Form • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP AtN • Permit application processing fee of $505 ($4,000 for Express) payable to NCDENR =t N • Calculations & detailed narrative description of stormwater treatment/management M N • Copy of any applicable soil report MN • Three copies of plans and specifications (sealed, signed & dated), including: iU - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm):Withers & Ravenel, Inc. Mailing Address:7040 Wrightsville Avenue, Suite 101 City:Wilmington State:NC Zip:28403 Phone: (910 ) 256-9277 Fax: (910 1 256-2584 Email:mhargrove@withersravenel.com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Todd Best certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Date: Z _ S — o is Form SWU-101 Version 8.07 Page 4 of * , � j' � TRANSACTION REPORT FEB-07-2008 THU FOR: NCDENR 9103502004 SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE P. 01 09:32 AM >K M# DP FEB-07 09:28 AM 93626810 4'47" 16 FAX TX OK 741 TOTAL 4M 47S PAGES: 16 � Aw NCDENR State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor William G. Ross Jr., Secretary FAX COVER SHEET Data: February 7, 2008 No. Of Pages: (excluding cover) 15 To: Todd Best, Manager Facilities From: Azita Sartipi CO: GE Hitachi Nuclear Energy CO: Express Permitting Fax No. 910-362-6810 Tel No. 910-675-6910 Tel No.: 910-796.7500 ext. 7377 FAX No. 910-350-2004 E-mail: azita.eartipinncmail.net REMARKS: Permit No. SW8080202 / GE—FGE Office Expauston Dear Mr. Hargrove, I will mail you a hard copy of the following pages. Please do not hesitate to contact me if you have any questions. Best regards, . Azita IV Cudinvl ndve Essen ., W(Imh jw, N.C. 28405.384S Telvphooe (910) 796-7215 F. (910) 350,2004 Ae Equol Opportunity Affi m dve Ace.. Employer TRANSACTION REPORT FEB-07-2008 FOR: NCDENR 9103502004 P. 01. U !091127 IAM SEND �I � DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP t. FEB-07 09125 AM 92562584 2'27" 16 FAX TX OK 740 TOTAL 2M 27S PAGES: 16 k�� NCDENR; State of North Camlina Department of Environment and Natural Resources Wilmington Regional,Office 1 Michael F. Easley, Governor William G. Ross Jr., Secretary ' FAX COVER SHEET Date: Febmary7, 2008 No. Of Pages: (excluding cover) 15 To: Mark Hargrove, P.E. From: Azita Sartipi CO:Withers & Ravenel CO: Express Permitting Fax No. 910-256-2584 Tel No, 910-256-9277 Tel No.: 910-796-7500 ext. 7377 FAX No. 910-350-2004 E-mail: azitasartini(a>rncmail.ntt REMARKS: Permit No. SW8080202 / GE— FGE Office Expansion Dear Mr. Hargrove, I will mail you a hard copy of the following pages. Phase do not hesitate to contact me if you have any questions. Best regards, . Azita I , I I 127 CSMinsl ntive Extension, Wilmingon, NC 28405J345 Telcphoae (910) 796-7215 Fax (910) 350-2004 An Equal Oppommity Anlrmadve Action Employer I i i I , i ' I I li SAX AX NCDiENR State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor William G. Ross Jr., Secretary FAX COVER SHEET Date: February 7, 2008 No. Of Pages: (excluding cover) 15 To: Mark Hargrove, P.E. From: Azita Sartipi CO: Withers & Ravenel CO: Express Permitting Fax No. 910-256-2584 Tel No. 910-256-9277 Tel No.: 910-796-7500 ext. 7377 FAX No. 910-350-2004 E-mail: azita.sartipi chi ncmail.net REMARKS: Permit No. SW8080202 / GE — FGE Office Expansion Dear Mr. Hargrove, I will mail you a hard copy of the following pages. Please do not hesitate to contact me if you have any questions. Best regards, Azita 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 Telephone (910) 796-7215 Fax (910) 350-2004 An Equal Opportunity Affirmative Action Employer . A MR NCDENR State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor William G. Ross Jr., Secretary FAX COVER SHEET Date: February 7, 2008 ' To: Todd Best, Manager Facilities CO: GE Hitachi Nuclear Energy Fax No. 910-362-6810 Tel No. 910-675-6810 No. Of Pages: (excluding cover) 15 From: Azita Sartipi CO: Express Permitting Tel No.: 910-796-7500 ext. 7377 FAX No. 910-350-2004 E-mail: azita.sartipi cr,ncmail.net REMARKS: Permit No. SW8080202 / GE — FGE Office Expansion Dear Mr. Hargrove, I will mail you a hard copy of the following pages. Please do not hesitate to contact me if you have any questions. Best regards, Azita 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 Telephone (910) 796-7215 Fax (910) 350-2004 An Equal Opportunity Affirmative Action Employer WITHERS & RAVENEL ENGINEERS IPLANNERS ISURVEYORS 7040 Wrightsville Avenue, Suite ioi WILMINGTON, NORTH CAROLINA,28403 (910) 256-9277 FAX (910) 256-2584 To: NC Division of Water Quality WE ARE SENDING YOU ❑ Shop Drawings ❑ Copy of Letter ❑ Attached ❑ Prints ❑ Change order LETTER OF TRANSMITTAL DATE 2/0/08 JOB NO. O O 11 .00 1 ATTENTION Chris Baker PHONE# RE: GE — FGE Office Expansion ❑ Underseparate covervia ® Plans ❑ Samples ❑ Diskette ❑ the following items: ❑ Specifications COPIES DATE NO. DESCRIPTION z Sets of plans for stormwater permit 2 Copies of stormwater calculations 2 Stormwater Management Permit Application Form (one original, one copy)-- 2 Copies of Sand Filter Supplement i Application fee for $ 000.00 for express permitting i Copy of Wetland Letter 2 Copies of 0&M Agreement (One original & one copy) THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted ❑ As requested ❑ Returned for corrections ❑ For review and comment ❑ ❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: For a COPYTO: File, Billy Hines ❑ Resubmit ❑ Submit ❑ Return copies for approval copies for distribution corrected prints If enclosures are not as noted, kindly notify us at once. GE - HITACHI NUCLEAR ENGERGY GE - FGE OFFICE EXPANSION STORM WATER CALCULATIONS FOR NCDWQ February 5, 2008 SEAL .` 19742 �y FNGIOS Q RI ' Withers & Ravenel, Inc. 7040 Wrightsville Avenue, Suite 101 Wilmington, North Carolina 28403 (910) 256-9277 STORM WATER NARRATIVE GE - FGE OFFICE EXPANSION WILMINGTON, NC FEBRUARY 5, 2008 The address of the site is 3901 Castle Hayne Road, Wilmington, NC. The General Electric site encompasses approximately 1,621 acres. The project involves constructing a + 3,200 sf building expansion over an existing asphalt and stoned area at the GE facility. The project limits is 0.21 acres. Stormwater runoff from the rooftop will be directed to a proposed sand filter for treatment before the runoff enters a proposed and existing grassed swale. The soils report from ECS, LLP indicated that the soils were not suitable for infiltration due to a poor infiltration rate. There is approximately 1,276 sf of existing asphalt that will be removed and this area will now be grassed. The project limits of this project is considered the building expansion and the area downstream of the building that includes the sand filter area and grassed swale. Total Project Area = 9,042 SF = 0.21 AC Total Proposed Impervious Surface Area Draining to Sand Filter: Proposed Building = 3,200 sf Required Storage for 1.5-Inch of Runoff For Sand Filter: (use Schueler Method) = 0.05 + 0.009 (1) = 0.05 + 0.0090 00) = 0.95 _ (1.5")(0.95)(1/12)(3,200) = 380 cf - water quality volume Adjusted Water Quality Volume: = 380*.75 = 285 cf Volume Provided: assume 6-inch depth over top of sand filter for volume calculations _ (4*18*0.5)+(4*18*3.5) = 288 cf storage provided GE - FGE OFFICE EXPANSION SAND FILTER CALCULATIONS Imp = 3200 sf Rv = 0.05+.9*100 = WQV = 380.00 ft"' WQVadj = 285.00 ft"' FEBRUARY 5, 2008 0.95 hmax WQVadj As+Af (ft) (ft"') (ft"') 1 285.00 285.00 2 285.00 142.50 3 285.00 95.00 4 285.00 71.25 5 285.00 57.00 As = 25.12 ft" required Af = 32.70 ft" required Use chambers 4' wide and 18' deep -- 72 sf Used Hmax of 2 ft — need 142.5 ft" Provided 144 sf - OK Width Ht over SF 4 0.5 Length Sed Depth 18 3.5 Total volume provided exceeds volume required Total Volume 288 RE: GE- FGE Office Expansion Subject: RE: GE- FGE Office Expansion From: "Mark Hargrove" <MHargrove@withersravenel.com> Date: Fri, 1 Feb 2008 15:52:11 -0500 To: "Janet Russell" <Janet.Russell@ncmail.net> we will be there on Feb 6 at 8:30 am. -----Original Message ----- From: Janet Russell [ mailto:Janet.RusselI@ncmail.net Sent: Friday, February 01, 2008 3:50 PM To: Mark Hargrove Subject: GE- FGE Office Expansion Mark, please confirm by return email that you're coming in with your submittal on 2/6/08 at 8:30. I need an email confirmation to put with the Express package. Also, for future projects and times when you need a scoping meeting - please let me know. The new Express form has a place to check "scoping" and then we're able to enter it into the computer tracking and get "credit" for our weekly accounting of how many meetings we had. Right now it's a numbers game and every meeting counts. Maybe every business is like that. Thanks, Janet I of 1 2/1/2008 3:53 PM 7,7 , .,* •r WITHERS &- RAVENEL ENGINEERS IPLANNERS ISURVEYORS January 31, 2008 Mr. Chris Baker NC Division of Water Quality Stormwater Permitting Unit 127 Cardinal Drive Extension Wilmington, NC 28405 Mr. Baker: The GE — FGE Office Expansion project site was reviewed by Withers and Ravenel to determine if the project site contained jurisdictional wetlands and/or waters (see attached aerial). The determination was based on a review of aerial photographs, the New Hanover County Soils Map and a site visit by W&R staff on January 16, 2008. The proposed project area is located within a previously developed portion of the GE complex. The majority of the project site currently consists of existing buildings and asphalt, with several small areas of grass and a small drainage Swale. The grassed areas are mowed on a regular basis, and do not exhibit any of wetland characteristics. The drainage Swale did not exhibit an Ordinary High Water line, nor contain wetland vegetation. Therefore, based on the review of the soils map, aerial photographs and the site visit, it was determined that the project site does not contain any jurisdictional wetlands and/or waters and consists entirely of uplands. Troy easley Withers and Ravenel 7040 Wrightsville Ave, Suite ioi Wilmington, North Carolina 28403 tel: 910-256-9277 fax:910256-2584 www.w ith a rsraven el.c o m RE: GE - FGE Office Expansion - express review Subject: RE: GE - FGE Office Expansion - express review From: "Hines, Billy D. (GE Infra, Energy)" <Billy.Hines@ge.com> Date: Tue, 29 Jan 2008 15:46:09 -0500 To: "Janet Russell" <Janet.Russell@ncmail.net>, "Mark Hargrove" <MH argrove@withersravenel. com> Janet, I will be there on 2/6. Look forward to meeting you. Billy Hines GE -Hitachi Nuclear Energy Wilmington Site Facilities Manager T 910-675-5492 F 910-362-5492 D 8 *292-5492 C 910-547-2760 E billy.hines@ge.com www.ge-energy.com/nuclear 3901 Castle Hayne Rd. (P.O. Box 780), M/C G50 Wilmington, North Carolina, 28402 -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Monday, January 28, 2008 5:45 PM To: Mark Hargrove; Hines, Billy D. (GE Infra, Energy) Subject: Re: GE - FGE Office Expansion - express review As a matter of fact.... we have The Express Stormwater submittal meeting has been scheduled with *Chris Baker on February 6, 2008 at 8:30 AM *here in the Wilmington Regional Office. A representative of GE must attend the submittal meeting Please review the submittal requirements attachment. Please review the BMP Manual web site for the latest stormwater application forms, supplements, maintenance agreements, information checklist, etc. If the Feb. 6th meeting date works for you and client, please let me know. Thanks, Janet Russell Express Permitting Mark Hargrove wrote: Have you come up with a date for the review yet? Mark Hargrove Withers & Ravenel Inc. 7040 Wrightsville Ave.,Suite 101, Wilmington, NC 28403 tel: 910.256.9277 fax: 910.256.2584 http://www.withersravenel.com <http://www.withersravenel.com/> 1 of 1 1/29/2008 5:01 PM about:blank As a matter of fact.... we have. The Express Stormwater submittal meeting has been scheduled with Chris Baker on February 6, 2008 at 8:30 AM here in the Wilmington Regional Office. A representative of GE must attend the submittal meeting. Please review the submittal requirements attachment. Please review the BMP Manual web site for the latest stormwater application forms, supplements, maintenance agreements, information checklist, etc. If the Feb. 6th meeting date works for you and client, please let me know. Thanks, Janet Russell Express Permitting Mark Hargrove wrote: Have you come up with a date for the review yet? MARK N. HARGR CIv C, P.E. WITHERS ft>a RAVENEL 7o&o 4irlUlawille krenua„Adle;m 11Vilnllngroq N.C. M C1 , tol. ,O 2569a1 7i W: �ra_5bay8q N9;^.'7,1',1(il e f51"a YC IiC' l.G 6 n5 1 of 1 1/28/2008 5:45 PM Express Review Request Subject: Express Review Request From: "Mark Hargrove" <MHargrove@withersravenel.com> Date: Fri, 25 Jan 2008 15:15:15 -0500 To: "Janet Russell" <Janet.Russell@ncmai1.net> Janet, Please see attached the files associated with the request for an Express Review for the GE - FGE Office Expansion Project. This project will be submitted as a Redevelompent Project. Please give me a call to discuss a submittal date. Thanks MARK N. HARGRCIVE, P.E. WITHERS 0 RAVENEL 7os�'��dylrtsrille lcnnue, Suile m: r IYihningmn, Pic, ",Cr3 WP qio nf..pr7� :a.:9rc.zi5s;en A,=w. ;ithersravenel.con Content -Description: EXPRESS COVERSHEET.doc EXPRESS COVERSHEET.doc Content -Type: application/msword Content -Encoding: base64 (Express Permit Questionnaire - GE FGE Expa Express Permit Content -Description: Questionnaire - GE FGE Expansion.doc Content -Type: application/msword Content -Encoding: base64 Content -Description: VICINITY-MAP.pdf VICINITY-MAP.pdf Content -Type: application/octet-stream Content -Encoding: base64 1 of 1 1/28/2008 10:25 AM ©/ + Reviewer G S 13 NCDENR Submit a /G North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 FAX (910)350-200 Time Request for Express Permit Review Confirm FILL-IN all information below and CHECK required Permit(s). 11,E FAX to Express Coordinator along with a detailed narrative and vicinity map of the project location. �C Projects must be submitted by 5:00 pm the day before the review date, unless prior arrangements are made. APPLICANT Name: Billy Hines Title: Site Facilities Manager Company Name: General Electric Address: 3901 Castle Hayne Road City: Wilmington, NC Zip: 28409 Phone : 910-675-5492 Fax : 910-362-5492 Email : billy. hines(a)gnf.com PROJECT Name: iGE — FGE Office Expansion County: New Hanover PROJECT DRAINS TO : Unname Trib to Northeast Cape Fear River (Stream name) the Cape Fear RIVER BASIN ENGINEERICONSULTANT INFORMATION: Name: Mark N. Hargrove , PE Company: Withers & Ravenel Address: 7040 Wrightsville Ave. City: Wilmington State: NC Zip: 28403 Phone : 910-256-9277 Fax : 910-256-2584 Email : mhargrovena withersravenel.com State or National Environmental Policy Act (SEPA or NEPA) — EA or EIS Required? ❑Yes ® No -------------------------------------------------------------------------------------------------------------------------------------------------- ❑STREAM ORIGIN DETERMINATION # of Stream calls Stream Name ® STORMWA TER ❑ Low Density ❑ High Density -Detention Pond ® High Density - Other (check all that apply) ❑ Low Density -Curb & Gutter e High Density -Infiltration 8 Off -site Wetlands MUST be addressed below NPDES Phase II Plan Revision ----------------------------------------------------------------------------------------- ----------------------------------------- ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with acres to be disturbed WETLANDS (401) Wetlands on Property ? ❑ Yes ® No Isolated Wetlands on Property? ❑ Yes ❑ No (Check all that apply) Wetlands will be impacted? ❑ Yes ® No Wetland impacts: 0 acre(s) Wetlands delineation has been completed? ® Yes ❑ No ❑ Buffers impacted: Acre(s) USACOE Approval of Delineation completed? ❑ Yes ® No 404 Application in Process w/USACOE? ❑ Yes ® No / Permit recv'd from USACOE❑Yes ❑ No 401 Application Required? ❑ Yes ® No If Yes, ❑ Regular ❑ Express ----------------------------------------------------------------------------------------------------------------------------------------------------------------------- Additional fees, not to exceed 50% of the original Express Review permit application fee may be charged for subsequent reviews due to the insufficiency of the permit application. Total Fee:$ Stormwater $ E GDae RreceyuedE D CAMA $ JAN 2 5 2108 LQS $ 401 $ DWO i Arxv ENGINEERS 1 PLANNERS I SURVEYORS O - Pfogeet lBo and*ry./R'euiew Area rae010ft A. M IM FYYY�...MC LIn st natn.m m:MupAn1 P s P SITE 132 VICINITY MAP (N. T. S.) NARRATIVE THE GENERAL ELECTRIC SITE IS t 1,691 ACRES AND IS LOCATED AT 3901 CASTLE HAYNE ROAD IN WILMINGTON, NC. THE PROPOSED PROJECT IS A 2,500 SF EXPANSION TO AN EXISTING BUILDING. THE DISTURBED AREA FOR THIS PROJECT WILL BE ONLY +/- 0.3 ACRES DUE TO TWO UNDERGROUND UTILITIES THAT WILL HAVE TO BE RELOCATED. THIS PROJECT WILL BE SUBMITTED AS A REDEVELOPMENT PROJECT. THERE WILL ACTUALLY BE A REDUCTION IN IMPERVIOUS AREA AT THE PROJECT LOCATION AFTER THE PROJECT HAS BEEN CONSTRUCTED. A SAND FILTER WILL BE UTILIZED TO TREAT THE RUNOFF FROM THE BUILDING EXPANSION. GE- FGE Office Expansion REQUEST FOR EXPRESS PERMIT REVIEW DATE JANUARY 25, 2008 E C E D JAN 2 5 2008 DWO PROD # Project Name: GE - FGE Office Expansion Stormwater Express Questionnaire (1/25/2008) What is the applicant's full legal name? General Electric Is the applicant associated with Sole proprietor Corporation ❑ LLC Partnership Municipality If it's an LLC, is it ❑ Manager -managed or ❑ Member -managed? OWhat is the applicant's title within the Corp., LLC or Partnership? Will an agent (someone other than the applicant) be signing the application? Yes No If Yes, what is the agent's name and title? Bill Hines - Site Facilities Mana er ease no e me application signature requirements are listed in NCAC 2H.1003 (e). In summary, only the sole proprietor of a sole proprietorship, the designated manager, member - manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active. Please note that spelling, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on file with the NC Secretary of State. 2 Where is the project located? County New Hanover Nearest Town/City Wilmington (Attach a detailed vicinity map with both local street names and SR, NC, US or Interstate highway numbers, plus other relevant information such as town or city names, directions to, etc. Show the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway.) If the project is located in Brunswick, Onslow, or New Hanover Counties, or a small portion of northern Pender County or the unincorporated areas outside of Morehead City and Atlantic Beach in Carteret County, NPDES Phase II Post -Construction rules will apply, unless a vested development right, as described in the Session Law, can be Q demonstrated, which is dated prior to July 1, 2007. i LU 3. What is the name of the receiving stream? Unnamed Trib to NE Cape Fear River CWhat River Basin is it located in? Cape Fear River W N o L hat is the classification of the receiving stream? Class SC Z For SA or SR waters, a separate scaled topographic map will be required. The project must be V Q #accurately located on the map and the % mile radius from the property corner closest to the SA -or SR receiving stream must be drawn on the map. If you claim that the project is not within W ¢mile of SA or SR waters, you must conduct a series of chlorides tests to demonstrate that the °chlorides level at a point in the receiving stream that is at least % mile from the project is less than 500 ppm. Samples must be sent to a State certified lab for testing. 4. If the project is high density, what type of stormwater management BMP's are being proposed? (check all that apply) Wet Detention Infiltration Trench Infiltration Basin Sand Filter Bio-retention Wetlands Alternative ® Offsite Dry Detention NPDES Phase II Other How many separate BMP's are being proposed? 9 i 2 3 4 5 6 7 8 9 10 11 12 Other 5. Is there offsite runoff from the adjacent properties or public right-of-way that will drain into any of the proposed BMP's on the project and is not being diverted? LJ Yes ® No ❑ N/A 6. Is a road across other property required to access the project? ❑ Yes ® No ❑ N/A 7. Is there any existing development or pre-1988 existing BUA located on the property? (Please document, delineate and identify on the plans.) ® Yes u No ❑ N/A Page 1 of 3 Project Name: GE — FGE Office Expansion Will the high density project collect all of the proposed BUA? ® Yes ❑ No ❑ N/A (If not, attach a separate explanation sheet) Will the project involve the subdivision and sale of property? ❑ Yes ® No ❑ N/A Is the subdivision ❑ residential or ❑ commercial? How many lots are proposed? N/A (Deed restrictions are required for all residential, commercial, low density or high density sub- divisions. Specific language for the various types of subdivisions is available from DENR.) 10. Will the plans show all delineated wetlands? ❑ Yes ❑ No ® N/A (All projects require either a signed wetlands delineation map or a wetlands report to be submitted with the application. Only a trained professional may provide information regarding the presence or absence of wetlands.) 11. Are wet detention ponds or other engineered controls proposed to be located adjacentwetlands? El Yes Z No ❑ N/A (If, yes, a physical means to prevent the dewatering of the wetland must be provided, or the SHWT must be provided to demonstrate that the permanent pool of the BMP is above the SHWT and will not dewater the wetlands over time. Where possible, all BMP's and swales should outlet into back the wetland (with level spreaders). 12. For infiltration projects, a site visit must be completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided in the soils report. What is/was the scheduled site visit date: N/A (Include a copy of the consultant's soil report with the application.) 13. Level Spreaders are required at the outlet of all engineered controls and swales prior to entering surface waters or wetlands. Will the plans reflect level spreaders? ® Yes ❑ No ❑ N/A (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14. Is this project A modification to an existing permit A lot that will be treated in an existing, previously permitted BMP? What is the name of the existing permitted facility: GE - Huntersville SW8 060318 GE - Wilmington Field Service Center SW8 980604 Mod GE - FCO Cafeteria SW8 070509 GE — HQ Site & Modular Office Complex — SW8 070807 GE — Tooling Repair Center Project — SW8 071203 (High Density Project) GE — Tooling Repair Center Project (Road Project) — SW8 071202 (Low Density Project) What is the permit number of the existing permitted facility? see above Is the permitted facility in compliance with its permit? Yes No N/A Have the deed restrictions been recorded? Yes No N/A Have the deed restrictions been submitted? Yes No N/A Has the Designer's Certification been submitted? Yes No N/A 15. Do the plans reflect all information in 15A NCAC 2H.1003 (g)? ® Yes ❑ No ❑ N/A 16. Will all of the design requirements for each proposed BMP be met? ® Yes ❑ No ❑ N/A (If not, attach a separate explanation sheet. Please note that the Express program is not set up to handle any type of deviation from the standard design.) 17. For each BMP in all high density projects, and low density curb outlet swale projects, the individual drainage area for each proposed BMP must be clearly delineated. RE C E I Y E DI JAN 2 5 2008 Page 2 of 3 DWQ PROJ # Project Name: GE — FGE Office Expansion 18. Any revisions made to the application as a result of this review may cause changes to the other documentation. Plans, calculations, application, and supplements should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement. Page 3 of 3 IMP ECS CAROLINAS, LLP CAROLINAS Geotechnical • Construction Materials • Environmental • Facilities January 17, 2008 Mr. Neal Andrew, P.E. Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue Suite 300 Wilmington, North Carolina 28403 Re: • Additional Infiltration Evaluation GE-FGE Expansion Wilmington, North Carolina ECS Project No. 22.13672 Dear Mr. Andrew, ECS Carolinas, LLP (ECS) recently conducted an infiltration evaluation for the proposed infiltration area at the FGE Building at the GE facility in Wilmington, North Carolina. This letter, with attachments, is the report of our evaluation. Field Testing On January 16, 2008 ECS conducted an exploration of the subsurface soil and ground water conditions at an additional requested location shown on the attached Site Diagram. The borings were located by using a scaled site map provided by Andrew Consulting Engineers. The purpose of this exploration was to obtain subsurface information of the suitability of the in - place soils for the proposed infiltration area. We explored the subsurface soil and ground water conditions by advancing one hand auger boring into the existing ground surface at the requested boring location. We visually classified the subsurface soils and obtained representative samples of each soil type encountered. We also recorded the ground water level observed at the time of each hand auger boring. The attached Infiltration Evaluation Form provides a summary of the subsurface conditions encountered at each hand auger boring location. The ground water level and the seasonal high ground water level (SHWL) were estimated at each boring location below the existing.grade elevation. Below is a summary of each boring location. Location Water Level SHWL 1 48 inches 30 inches We have conducted an infiltration test near the hand auger boring to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SB WL. 7211 Ogden Business Park • Suite 201 • Wilmington, NC 29411 • (910) 686-9114 • Fax (910) 686-9666 * www.ecslimited.com Asheville. NC • Charlotte. NC • Greensboro. NC • Greenville, SC • Raleigh. NC - Swansboro. NC * Wilmington. NC * testing services only Infiltration Evaluation FGE Building Wilmington, North Carolina ECS Project No. 22.13672 Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/hour Inches/minute 1 Grey silty SAND 12 inches 0.14 0.002 Infiltration rates and SHWL may vary within the proposed site due to changes in elevation and subsurface conditions. If you have any questions regarding this report, please contact us at (910) 686-9114. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Staff Geologist Attachments: Site Diagram hiffitration Evaluation Walid M. Sobh, . E. Principal Engineer NC License No. 22983 Infiltration Evaluation GE-FGE Building Wilmington, North Carolina ECS Project No. 22.13672 January 16, 2008 Location Depth Soil Description 1 0-36" Grey silty SAND 36"-60" Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 30 inches below the existing grade elevation. Infiltration Rate: 0.002 inches per minute (0.14 inches per hour) Test was conducted at 12 inches below existing grade elevation Ground water was encountered at 48 inches below the existing grade elevation. rni t?� (D ECS CAROLINAS, LLP CAROLINAS Geotechnical • Construction Materials • Environmental • Facilities December 21, 2007 Mr. Neal Andrew, P.E. Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue Suite 300 Wilmington, North Carolina 28403 Re: Infiltration Evaluation GE-FGE Expansion Wilmington, North Carolina ECS Project No. 22.13672 Dear Mr. Andrew, ECS Carolinas, LLP (ECS) recently conducted an infiltration evaluation for the proposed infiltration area at the FGE Building at the GE facility in Wilmington, North Carolina. This letter, with attachments, is the report of our evaluation. Field Testing On December 20, 2007 ECS conducted an exploration of the subsurface soil and ground water conditions at two requested locations shown on the attached Site Diagram. The borings were located by using a scaled site map provided by Andrew Consulting Engineers. The purpose of this exploration was to obtain subsurface information of the suitability of the in -place soils for the proposed infiltration area. We explored the subsurface soil and ground water conditions by advancing one hand auger boring into the existing ground surface at the two requested boring locations. We visually classified the subsurface soils and obtained representative samples of each soil type encountered. We also recorded the ground water level observed at the time of each hand auger boring. The attached Infiltration Evaluation Form provides a summary of the subsurface conditions encountered at each hand auger boring location. The ground water level and the seasonal high ground water level (SHWL) were estimated at each boring location below the existing grade elevation. Below is a summary of each boring location. Location Water Level SHWL 1 48 inches 26inches 2 48 inches 26 inches We have conducted two infiltration tests near the hand auger borings to estimate the infiltration rate for the subsurface soils. The infiltration tests are typically conducted at two feet above the SHWL. 7211 Ogden Business Park • Suite 201 • Wilmington, NC 28411 • (910) 686-9114 • Fax (910) 686-9666 • www.ecslimited.com Asheville, NC - Charlotte, NC - Greensboro, NC - Greenville, SC - Raleigh, NC - Swansboro, NC * Wilmington, NC • testing services only Infiltration Evaluation FGE Building Wilmington, North Carolina ECS Project No. 22.13672 Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/hour Inches/minute 1 Grey silty 10 inches .0.48 .008 SAND 2 Grey silty 10 inches 0.25 .004 SAND Infiltration rates and SI-IWL may vary within the proposed site due to changes in elevation and subsurface conditions. If you have any questions regarding this report, please contact us at (910) 686-9114. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Staff Geologist Attachments: Site Diagram Infiltration Evaluation lhl,6d Vx. sty. Walid M. Sobh, P. E. Principal Engineer NC License No. 22983 / 11 �•.CoNci'� 40 ASPHALT ORIW / CHAIN IINN FENOE 2 STEPS • ..'S0.1• • • • •.• I \ (OPEN AT 37. wV METAL rc z6 I _ NG FP 1.6 , 1 I 1 I \ � 1 I P METAL1.2M 4FRAME \ c1.2•i FFE I ASPHALT 1 IF I I II j 41.7 MAD", I I a ua u 1 45 4U.4 ` I i9,E1I 1 R 4 .9 P ABENCFDIARK: s / 5.2•_ 1 MAC NAIL IN PAVEMENT 61.4• m. W1 ElEv. v 41.27• ss— SS_ _ _SS_. _ _SS l ASPHALT OPoVE / O 591H 41.25• PoY —w_ _ _w wwv..Z Cq UCTQJ ER1V.D2- �Q \ ' CFFICE TRAILER FI' E \ E \ 36. NyV 45• Q.41 RIM MY ABOVE ASPHALT) � } �YIED A J9.fi WATER / v ASPHAtl pRT F / IC 119 1.5 CURB` / Po 41.) 4051 ASPHALT DRIVE \ •O.1\ R103 1 46 C 41.4 �4E 3;vEc.vty� yc F4uiirl� t,itr,r�wt�roAv tic Pro'ectNo. t3C��2 1vrs •• Infiltration Evaluation GE-FGE Building Wilmington, North Carolina ECS Project No. 22.13672 December 20, 2007 Location Depth Soil Description 1 0-24" Grey silty SAND 24"-60" Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 26 inches below the existing grade elevation. Infiltration Rate: 0.008 inches per minute (0.48 inches per hour) Test was conducted at 10 inches below existing grade elevation Ground water was encountered at 48 inches below the existing grade elevation. Location Depth Soil Description 2 0-24" Grey silty SAND 24"-60" Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 26 inches below the existing grade elevation. Infiltration Rate: 0.004 inches per minute (0.25 inches per hour) Test was conducted at 10 inches below existing grade elevation Ground water was encountered at 48 inches below the existing grade elevation.