Loading...
HomeMy WebLinkAboutSW8070926_HISTORICAL FILE_20100819STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2010 0$1�1 YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director August 19, 2010 Carl Baker, Deputy Public Work Officer MCB Camp Lejeune BLDG 1005 Michael Road MCB Camp Lejeune, NC 28547-2521 Subject: Stormwater Permit No. SW8 070926 MOD Wounded Warrior Hope and Care Center High Density Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application Modification for Wounded Warrior Hope and Care Center on August 18, 2010. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 070926MOD dated August 19, 2010 for the construction and operation of the subject project. This permit shall be effective from the date of issuance until November 16, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, please contact Chris Baker or me at (910) 796-7215. Sincerely, Georgette S t Stormwater Supervisor Surface Water Protection Section GDS/csb: S:\WQS\STORMWATER\PERMIT\070926mod.aug10 cc: James W. Farrell, P. E., Hoggard-Eure Associates, P. C. Onslow County Building Inspections Wilmington Regional Office Central Files Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 NorthCarolina Phone: 910-796.72151 FAX: 910-350-2004 1 Customer Service: "77 623-6746 orthC "lull/ IntemeC www.ncwaterquality.org Li State Stormwater Management Systems Permit No. SW8 070926 MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carl Baker, Deputy Public Works Officer and USMCB Camp Lejeune USMCB Camp Lejeune Wounded Warrior Barracks Site Brewster Blvd, Jacksonville, USMCB Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of three (3) wet detention ponds ane one (1) infiltration basinin compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 16, 2017, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Sections 1.8 and 1.9 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 366,791 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Sections 1.8 and 1.9 on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. Wet ponds #1, 2 and the infiltration basin must be operated with a 30' vegetated filt er, designed to pass the peak flow from the 10 year storm in a diffuse and non -erosive manner. Paae 2 of 8 State Stormwater Management Systems Permit No. SW8 070926 MOD r;1 Q The project shall provide a 50' wide vegetated buffer adjacent impounded structures, streams, rivers, and tidal waters in Drainage Area Number 3 & 4, which is subject to 15A 02H A000 and SL2008-211, effective October 1, 2008. The following design criteria have been provided in the wet detention ponds and must be maintained at design condition: ueRK Pond #1 DA #1 ;Pond #2 DA #2 Pond #3 DA #4 a Drainage Area acres Onsite, ft2. Offsite, ft2 9.3 405,846 None 6.5 281,346 None 10.41 453,394 None b = Total Impervious Surfaces, ft : 'Onsite;ft2 F°;`Offsite; ft2 94,955 94,955 None 128,503 128,503 None 137,467 137,467 None c: - Desi n'Storm, inches: 1.5 1.5 1.5 d. j Average P nd Design Depth, feet: 3 3 3.5 e.. TSS removal efficiency: 85 85 90 f. < . Permanent Pool Elevation, FMSL:- 7 14 14.5 Permanent Pool Surface Area, ft : J 19,323 18,345 15,208 h. Permitted storage Volume, ft: . 21,210 20,318 20,652 L ; Temporary Storage Elevation, FMSL:. 8 14 15.7 Pre-dev.l: r-24 hr. discharge rate, cfs: ** ** 5.43 k. .:.Controlling Orifice, in: 2.5 2.5 2.5 L. Orifice flowrate, cfs: '" ** 0.09 m. Permitted Foreba Volume, ft :. 12,967 15,872 9,429 n. fountain Horsepower. . , 1/4 1/4 1/4 o. Receiving Stream/River Basin: Northeast Creek / White Oak p. Stream Index Number: 19-16- 3.5 q. Classification of Water Body: "SC;HWQ,NSW" " At the time of permitting, November 16, 2007, this criteria was not a requirement for ponds #1 & #2 The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: a. 8 Drainage Area, acres: Onsite, ft2: Offsite, ft2: Total Impervious Surfaces, ft2: Onsite, ft2: Onsite, ft2: Design Storm, inches: Basin Depth, feet: Bottom Elevation, FMSL: Bottom Surface Area, ft2: Bypass Weir Elevation, FMSL: Permitted Storage Volume, ft3: Predevelopment 1 yr 24 hr peak flow, cfs: Post -development 1 yr 24 hr peak flow, cfs: Type of Soil: Expected Infiltration Rate, in/hr: Seasonal High Water Table, FMSL: Time to Draw Down, hours: Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: Infiltration Basin - DA #3 0.38 16,578 0 5,866 5,866 0 1.5" 1 14.0 3,500 15.0 3,878 0.28 0.06 Baymeade 0.80 11.50 16.6 Northeast Creek / White Oak 19-16-(3.5) "SC;HWQ,NSW' Paae 3 of 8 State Stormwater Management Systems Permit No. SW8 070926 MOD II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. h. Maintain level spreaders in accordance with approved plans and specifications. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower fora fountain in these three ponds is 1/4 horsepower. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. Paae 4 of 8 State Stormwater Management Systems Permit No. SW8 070926 MOD' 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership of any part of the permitted property. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after, notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Pace 5 of 8 State Stormwater Management Systems Permit No. SW8 070926 MOD Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. 10. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 19th day of August, 2010. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION �ct for Coleen K Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 (Y)Cd 0� 2�0 S w 8 � no�kDZ For DENR Use ONLY North Carolina Department of Environment and Reviewer:] 4, f, 41 Natural Resources Submit 5 l7 7c.esA NCDENR Request for Express Permit Review Time: 11•100 _. Confirm .h '-. < FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity man (same items expected in the application package of the project location. Include this form in the application package. (j • Asheville Region -Alison Davidson 828.296-4698;alison.davidson(o)ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee(a)ncmail.net �_ t O • Mooresville & -Patrick Grogan 704-663.3772 orpatrick.oropan(a)ncmail.net • Washington Region -Lyn Hardison 252-946.9215 or Ivn.hardison(dncmaii.net • Wilmington Region -Janet Russell910-350.2004 orianet.russell(0cmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: P1378-WOUNDED WARRIOR HOPE AND CARE CENTER County: ONSLOW Applicant: MR. CARL BAKER, DEPUTY PUBLIC WORKS DIVISION Company: USMC, CAMP LEJEUNE Address: 1005 MICHAEL STREET City: CAMP LEJEUNE, State: NC Zip: 28547 Phone:910-451-2213 Fax:910-451-2927 Email: CARL.H.BAKERpnUSMC.MIL Project is Drains into SC:HQW. NSW waters Project Located in WHITE OAK River Basin Engineer/Consultant: JAMES FARRELL Company: HOGGARD-EURE ASSOCIATES, PC Address: 901 PORTCENTER PARKWAY, SUITE 5 City: PORTSMOUTH, State: VA Zip: 23704 APR 2010 Phone: 757-484-9670 Fax::757-484-7498 Email: JIM o(?,HOGGARD-EURE.COM (Check all that apply) ❑ Scoping Meeting ONLY ® DWQ, ❑ DCM, ® DLR, ❑ OTHER: ❑ Stream Origin Determination: # of stream calls — Please attach TOPO map marking the areas in questions ® State Stormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)j ® High Density -Detention Pond 1 # Treatment Systems ❑ High Density -Infiltration _#Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —Constructive Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems ® MODIFICATION SW 70926 (Pirovide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 6.35 acres to be disturbed.(CK # (for DENR use)) WETLANDS QUESTIONS MUST BEADDRESSED BELOW ❑ Wetlands (401): Check all that apply Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Fee Split for multiple permits: (Check # Isolated wetland on Property ❑ Yes ® No Buffer Impacts: ® No ❑ YES: acre(s) Minor Variance: ❑ No ❑ YES Major General Variance ❑ No ❑ YES 401 Application required: ❑Yes ❑ No If YES, ❑ Regular Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Total Fee Amount SUBMITTAL DATES I Fee SUBMITTAL DATES Fee CAMA $ Variance ❑ ❑Min Mai; $ SW ❑ HD CILD ❑ Gen $ 401: $ LQS $ I Stream Deter_ $ DWQ USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph fI - Post Construction (select all that apply) ❑Non-CoastalSW-HQW/ORWWaters ❑ Universal StormwaterManagement Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent nvith project name on plans, spificatious, letters, operation and maintenance agreements, etc.): P-1378 Wounded Warrior Hope and Care Center 2. Location of Project (street address): Hospital Corps Road City:MCB Camp Lejeune County:Onslow Zip:28547 3. Directions to project (from nearest major intersection): Camp Lejeune Main Gate Make right onto Brewster Blvd, right onto Hospital Corps Road Approximatelly 1200' make left onto unnamed road. Project site on Left Southeast of BEO construction Project 4. Latitude:34042' 12" N Longihrde:77* 21' 50" W of the main entrance to the project. H. PERMIT INFORMATION: 1, a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 070926 , its issue date (if known)April 7, 2009 and the status of conshvetion: ❑Not Started ®Partially Completed* Q Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density []Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater• ®Sedimentation/Erosion Control:19.8 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:SW8 070926 - Wounded Warrior Barricks Site Form SWU-10l Version 06May2010 Page I of 6 AUG 1 0 2010 ,3Y: pw_v.. tx�r�ss III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the oroiect): Applicant/Organization:Commanding Officer. Marine fjrs• Base. Camp Lejeune Signing Official & Title:Mr. Carl Baker, Deputy Public Works Officer b. Contact information for person listed in item 1a above: Street Address:1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable):1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Phone: (910 ) 451-2213 Fax: (910 ) 451-2927 Ema l:carl.h.baker®usmc.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact hiformation, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & b. Contact information for person listed in item 2a above: Street Address: State: Zip: Mailing Address (if applicable): Phone: O_ _ _ Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Signing Official & b. Contact information for person listed in item 3a above: Mailing Address: Phone: State: Fax: ( ) 4. Local jurisdiction for building permits: N/A - Federal Property Point of Contact:N/A Phone #: ( ) r` -'V AUG 1 0 2010 FonnSWU-101 Version 06May1010 Page 2of6 BV: . _ _ IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater shall be collected in grassed swales and an inlet and pipe system and transported to a wet detention basin. Additional Low Impact Development (Not permitted) shall be constructed to fulfill Navy requirements. An existing Infiltration basing will be modified by reducing the area flowing to this feature. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ® Coastal SW -1995 ❑ Ph II - Post Construction 3. Storm water runoff from this project drains to the White Oak River basin. 4. Total Property Area: 26.6 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:26.6 acres Total project area shall be calculated to exclude thefollowing: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) lime, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Noii-coastal wetlands latdward of the NHW (orMHW) lice tray be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 31.9 % 9. How many drainage areas does the project have? 4 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Receiving Stream Name Northeast Creek Northeast Creek Northeast Creek Northeast Creek Stream Class * SC; SC; SC; SC; Stream Index Number * 19-16-(3.5) 19-16-(3.5) 19-16-(3.5) 19-16-(3.5) Total Drainage Area (sf) 405,846 281,346 16,578 453,394 On -site Drainage Area (so 405,946 281,346 16,578 453,394 Off -site Drainage Area (sf) 1 0 0 1 0 0 Proposed Impervious Area** (so 94,955 128,502 7,660 137,467 Im pervious Area** total 23.4% 45.7% 46.2% Impervious** Surface Area Draina e Area 1 Draina e Area 2 Draina e Area 3 Draina e Area 4 On -site Buildings/Lots (so 10,827 31,799 0 43,565 On -site Streets (so 54,729 6,910 5,866 15,285 On -site Parking (so 10,429 84,942 0 61,139 On -site Sidewalks (so 18,907 4,792 0 15,870 Other on -site (so N/A N/A N/A 1,608 Future (so 0 0 0 0 Off -site (so 0 1 0 0 0 Existing BUA*** (so 0 0 0 0 Total (so: 94,955 128,503 5,866 137,467 Stream Class and Index Number can be determined at: bttp://povtal.medenr.or ueb/uq[ps/csu/clnssificatiorrs " Impervious area is defined as the built upon area including, but not lirnited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report oily that armount of existing BUA that will remain after development. Do not report ait j Qxistiitg BUA that is to be removed and which will be replaced by nezv BUA. Form SWU-101 Version 06May2010 Page 3 of AUG 1 0 2010 11. How was the off -site impervious area listed above determined? Provide documentation. No off -site impervious areas Projects in Union County: Contact DIVQ Central Ofice staffto check ifthe project is located idthiu a Threatened & F,ndangered Species watershed Neat fray be subject to rrore stringent storrnvater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stornnnvater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://tiortal.iicdenr.orsz/web/wn/ivs/su/bniD-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://12ortaLncdeiir.org/iveb/wq/ivs/su/statesiv/forms dots. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.iicdenr.org/web/ivq/ivs/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://12ortatncdeiir.ore/nveb/wq/ws/sit/statessv/forms dots. 1. Original and one copy of the Stormvater Management Permit Application Form. — 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII belono) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreennent(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://;viviv.envhelp.org/12ages/oiiestopexpress.htni for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided hi the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW Pules. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document).. p. Vegetated buffers (where required). I - �: FormSWU-101 Version06Ma)2010 Page 4of6 AUG 1 0 2010 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify �S— elevations in addition to vs) i ll 11 f tl I,I l l cep as u e as a map o ne orng ocahons wit n tie exnshng elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifrj the SHWF prior to snnbnuittnl, (910) 796-7378.1. A copy of the most current property deed. Deed book: N/A Page No: For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, itenn la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://wwiv.secretaTy state ucus/Coporltions/CSearcli.as2x VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from bttp://Vortal.iicdeiir.org/xveb/­%vq/ivs/su/states%v/foriiis dots. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded properly restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming tinder them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot, VIll. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineerlames W. Farrell Consulting Firm: Hoggard-Eure Assocoates, PC Mailing Address:901 Portcenter Parkway, Suite 5 City:Portsmouth Phone: (757 ) 484-9670 Email:l im®hogga rd-eure.corn Stale:VA Zip:23704 Fax: (757 ) 484-7498 IX. PROPERTY OWNER AUTHORIZATION (if Con toet Information, items 2 has been filled ont complete this section) I, (print or type none of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type nmue of organization listed in Contact Information, item 1b) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Ah„ 1 0 20W 1 Form SWU-101 Version 06Ma}2010 Page 5 of As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days, otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Stage 143-2151 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. do hereby certify before me this _ day of a Notary Public for the State of . County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION L (print or type name of person lister! in Contact Information, item 2) C kR� c of 'ee certify that the information included on this permit application form is, to the best of nr kn wledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective venmrts will be recorded, and that the proposed project complies with the requirements of the applicable s rill water ndes er 1 NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signah�re: c�W Date: � �//L) 1d I, -n , I / L�ih,( JI , a Notary Public for the State of VOLA444 n�.county of _µ do hereby certify that �Q�1 �� ,S'S��_n personally appeared before me thist0. 'day of a loIO . and ac rowledge the due execution of the application for a stormwater permit. Witness my #and and official seal, SYLVIA NORRIS NOTARY PUBLIC E NSLOWCOUNTY, CAIISSIONEXPIRES 3 SEAL My commission expires o1 2 015- Form SWU-101 Version 06May2010 Page 6 of AUG 1 0 2010 'r. 3 ; ..c:1 ASuJYZ r :'.1;ti;M1UO:i WOJZt1Pr 1PS'.169 YA? _ H'n'N'F w+w'� a>mm_t+3nvwmwtsri ZJO Z 0513d 6r)od "20c,2-& 64r, 1 DENR Use ONLY North Carolina Department of Environment and ;e"ewer: 1� ©�•�� Natural Resources Submit Request for Express Permit Review NCDENR Time: Confirm 0 FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Include this form in the application package. • Asheville Region -Alison Davidson 828.196.4698;alison.davidson(@_ncmail.net pp ` M5 21, • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee(ftcmail.net • Mooresville & -Patrick Grogan 704-663.3772 or patrick.groyan(ftcmail.net • Washington Region -Lyn Hardison 252-946-9215orlyn.hardison(dncmail.net • Wilmington Region -Janet Russell 910.350.2004 or janet.russell(lncmaiLnet NOTE: Project application received after 12 noon will be stamped in the following work day. 4 Project Name: P1378-WOUNDED WARRIOR HOPE AND CARE CENTER County: ONSLOW Applicant: MR. CARL BAKER, DEPUTY PUBLIC WORKS DIVISION Company: USMC, CAMP LEJEUNE Address: 1005 MICHAEL STREET City: CAMP LEJEUNE, State: NC Zip: 28547 Phone:910-451-2213 Fax:910-451-2927 Email: CARL.H.BAKER(g USMC.MIL RE J 'J !! Project is Drains into SC'HQW, NSW waters Project Located in WHITE OAK River Basin Engineer/Consultant: JAMES FARRELL Company: HOGGARD-EURE ASSOCIATES, PC JUL 2 9 2010 Address: 901 PORTCENTER PARKWAY, SUITE 5 City: PORTSMOUTH. State: VA Zip: 23704 Phone: 757-484-9670 Fax::757-484-7498 Email: JIM gOHOGGARD-EURE.COM_- (Check all that apply) ❑ Scoping Meeting ONLY ® DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: ❑ Stream Origin Determination: # of stream calls —Please attach TOPO map marking the areas in questions ® State Stormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ® High Density -Detention Pond 1 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —Constructive Wetlands _ # Treatment Systems ❑ High Density -Other _ #,Treatment Systems ® MODIFICATION SW 70926 (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ElErosion and Sedimentation Control Plan with 6.35 acres to be disturbed.(CK # (for DENR use)) WETLANDS QUESTIONS MUST BE ADDRESSED BELOW J LLN e, 10 1 201 b EC A c'OJ A ` ❑ Wetlands (401): Check all that apply Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Fee Split for multiple permits: (Check # Isolated wetland on Property ❑ Yes ® No Buffer Impacts: ® No ❑ YES: acre(s) Minor Variance: ❑ No ❑ YES Major General Variance ❑ No ❑ YES 401 Application required: ❑Yes ❑ No If YES, ❑ Regular Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Total Fee Amount SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance ❑ Ma' ❑Min $ SIN ❑ HD ❑ LD [I Gen) $ 401: $ Los $ Stream Deter_ $ O - l on Z(P 04 P-1378 Wounded Warrior Hope and Care Center Solicitation Number N40085-06-R-6029 P-1330 Wounded Warrior Battalion Headquarters Building Marine Corps Base, Camp Lejeune, North Carolina EARTHWORK - Site grading shall be in accordance with the UFC 3-200-ION "Design: General Civil/ Geotechnical / Landscape Requirements". Building finished floor elevations of all structures shall be above the 100-year flood elevation. Positive drainage shall be provided away from the new building. The finished floor of the building shall be a minimum of 6-inches above the finished grade around the building. Piping, ditches and swales shall be provided as need to convey storm water runoff away from the building. EROSION AND SEDIMENTATION CONTROL — (Permit Previously Approved) Temporary and permanent Sediment and Erosion Control features shall be provided to prevent erosion and transportation of sediment from the project site. Permanent and temporary erosion and sedimentation control measures shall be in accordance with the North Carolina Erosion and Sedimentation Control Planning and Design Manual. Planned Erosion and Sedimentation Control measures shall include, but not limited to: Silt Fencing Basin Inlet Protection Stone Outlet Protection Construction Entrance Temporary Sediment Trap. Temporary Seeding Y x 2of2 P-1378 Wounded Warrior Hope and Care Center Solicitation Number N40085-06-R-6029 P-1330 Wounded Warrior Battalion Headquarters Building Marine Corps Base, Camp Lejeune, North Carolina DESIGN NARRATIVE SECTION I CIVIL GENERAL - Projects P1378 Wounded Warrior Hope & Care Center and P1330 Battalion Headquarters Building shall be designed in accordance with the RFP, appropriate UFC criteria, and the State of North Carolina regulations. EXISTING SITE CONDITIONS - The existing site is located north of Brewster Blvd, west of the Hospital and just south of the BEQ Wounded Warrior Battalion, currently under construction. Existing utilities for use by projects P1378 & P1330 are currently under constructed by project `BEQ Wounded Warrior Battalion." SITE DEMOLITION - The project site is mostly undeveloped. The only anticipated demolition / relocation will be of an access road currently under construction by the BEQ project. Tree clearing shall be kept to the minimum required. SITE DRAINAGE AND STORMWATER RUNOFF — Stormwater management will comply with the requirements of the applicable UPC and the stormwater management instructions included in the RFP. The Stormwater Management design will emphasize Low Impact Development (UFC 3-210-10) Best Management Practices including grassed swalcs, filter strips, and infiltration trenches (where possible). The geotechnical report prepared for Projects P1378 Wounded Warrior Hope & Care Center and P1330 Battalion Headquarters Building indicates different conditions from those provided in the RFP. The geotechnical report indicates ground water observed at 1-5' below existing grade. These elevations may be due to a perched water table condition. The geotechnical report states that the Normal Seasonal High Water Table (SHWT) is estimated at I to 2.5' below existing grade. The elevation of the SHWT will not allow the use of sand filters, bio-retention, and infiltration due to the design requirements of NCDENR. NCDENR requires a minimum of two (2) feet of separation between the management feature and the SHWT. To satisfy the LID requirements of the Camp Lejeune and the Navy, infiltration trenches will be provided throughout the site to capture and transport stormwater through the site. These trenches will capture the required volume to satisfy the LID calculations, the 951h Percentile storm event, 2.4 inches. This volume will be infiltrated thru into the existing ground. Due to high SHWT, under drains shall be provided to ensure drainage. See civil calculation for exact numbers. Other LID features shall include minimizing curbing, paving and storm piping, while maximizing overland Flow, green space, and natural features. One (1) wet ponds shall be constructed to satisfy the requirements of NCDENR. This pond will be sized to comply with NCDENR design regulations. The infiltration trenches will transport overflow storm water to the wet ponds. It is our intent to not have the infiltration trenches part of the storm water permit since they will not meet the —design requirements. �1F' Chi-V,013, I of 2 1 JUL 2 9 2010 MEMORY TRANSMISSION REPORT FILE NO. 052 DATE 08.20 12:49 TO : 8 917574847498 DOCUMENT PAGES 9 START TIME 08.20 12:49 END TIME 08.20 12:50 PAGES SENT 9 STATUS OK *** SUCCESSFUL TX NOTICE TIME :08-20-'10 12:50 FAX NO.1 :910-350-2004 NAME :DENR Wilmington *** o o s y T � e w l7 � Q \ A oS � State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor Dee Freeman, Secretary FAX COVER SHEET Date: if' 2') -/a N'o. Of Pages: (excluding cover) _ To: 5 . i 0. r'Ay From:. CO: CO: NC DE FAX #: %S'�7 — j� c(- 7yW FAX#: 910-35.0-2004 REMARKS:,40 rt F �i✓b� 070 9�(� iLt�� 127 Cardinal Drive Extension, Wilmington, N.C. 28405-7845 Telephone (910) 796-7215 Fax (910) 350-2004 An Equal Opportunity Affirmative Action Employer 'V. MEMORY TRANSMISSION REPORT FILE NO. 051 DATE 08.20 12:43 TO : 8 919104512927 DOCUMENT PAGES 9 START TIME 08.20 12:44 END TIME 08.20 12:46 PAGES SENT 9 STATUS OR *** SUCCESSFUL TX NOTICE 4 91 M® N TIME :08-20-'10 12:46 FAX NO.1 :910-350-2004 NAME :DENR Wilmington 5e c7 H C7 � o e v o � O v 3 0 O � � n b Q l _ oO a Sp � y 5�5 � S P. H v State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor Dee Freeman, Secretary FAX COVER SHEET Date: "� — 2.0 — tO To: ,r CO: FAX#: Ito - `-tfi- 2-12-7 REMARKS: /- No. Of Pages: (excluding cover) From: CO: NC DENA FAX#: 910-350-2004 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 Telephone (910) 796-7215 Fax (910) 350-2004 An Equal Opportunity Affirmative Action Employer a A >ggard-Eure kssociatesP.-. EERS 6URVEVORS PL�NNERe 757-484-9670 - Fax: 757-484-7498 - 901 Port(entre Parkway, Suite 5 - Portsmouth, Rginia 23704 August 17, 2010 North Carolina Department of Environment and Natural Resources Wilmington Region 127 Cardinal Drive Extension Wilmington, North Carolina 28405 ATTN: Mr. Chris Baker Re: P1378-WOUNDED WARRIOR HOPE AND CARE CENTER Marine Corps Base Camp Lejeune, North Carolina Our File No. 3126.00.09 Dear Mr. Baker: Hoggard / Eure Associates, P.C. has received your comment letter dated August 16, 2010, and respectfully submits the following information in response to your comments. 1. The plans received on August 12, 2010 are not sealed, please correct. Enclosed are drawings C-003, C-004, and C-005, full size, and two copies of each. 2. Stormwater plans must be submitted on standard engineering scales, please correct. i Drawings scales shall be changed to 1"2e 30 3. The wet pond section detail shows the bottom of the vegetated shelf and the middle of the vegetated shelf to both be at elevation 14.5, please correct. Detail has been clarified. Grade of 14.50 changed to 14.00 4. The orifice on the outlet structure detail calls for a 2 nW cap with a 2" hole on a 6" pipe, please correct. 2 '/a" corrected to read 6" 5. An infiltration basin supplement form will be required due to the change in drainage area (3) and surface area it is treating. The original Infiltration basin Supplement has been edited to indicate the current drainage area and the current impervious surface. 6. Section 2.13 "Pond Routing Calculations' show the surface area at elevation 15.7 to be 26,836 sf. The wet pond supplemental form reports the surface area at elevation 15.75 to be 19,212. Please determine which is in error and correct. The AutoCAD drawings were rechecked and the calculations were corrected to match the construction drawings. The 15.7 vs 15.75 have been corrected. Please note that elevations 15 thru 18 are calculated by including the area that runs north— south Yusbwestofthe pond. -1 AUG 1 8 2010 -.-D%JQ E,LPvcSS The following information is included in this package to clarify your comments described above. In response to comments 1, 2, 3, and 4 listed above the following drawings are included. Full size, signed and sealed, and scale changed to V = 30'. The following drawings are included. Drawing that were determined "not required" at the meeting last week have not been included. C-001 C-105 C-115 C-002 C-106 C-116 C-003 C-107 C-117 C-004 C-108 C-507 C-005 C-114 2. In response to comments 5 listed above an Infiltration Basin Supplemental for has been included for Sub Basin #3. 3. In response to comment 6 listed above the narrative and calculations have been revised and reprinted. Revised numbers are underlined in red. I have not included information in the calculation package that were not affected, specifications, maps and geotechnical report. I will repackage and deliver at you request. Please contact me if any questions or comments arise during your review. I will be able to visit your office or speak to you by telephone if necessary to help with your review. Very truly yours, H G COATES, P.C. ."0 J es . Farrell, P.E. J plir, 1 S 2010 MEMORY TRANSMISSION REPORT FILE NO. 494 DATE 08.16 15:23 TO S 919104512976 DOCUMENT PAGES 2 START TIME 08.16 15:24 END TIME 08.16 15:24 PAGES SENT 2 STATUS OK *** SUCCESSFUL TX NOTICE TIME :08-16-'10 15:24 FAX NO.1 :910-350-2018 NAME :DENR Wilmington *** p7 �ENR North Carolina Department of Environment and Natural Resources 0M.I.n of Water Ouallty Bovady Eaves Perdue C.1.re H. Sullins Oaa Fraoman Governor Olroalor Secrotary August 10, 2010 Carl anker, Deputy Public Works OfHcar USCMB Camp Lajauna 1006 Micheal Road USMCB Camp L.Jeune,, NC 28547 Subject: M-14 t for Addltlonal Information Stormwatar Project No_ SW9 070929MOU Woundad Warrior Hopa and Care Cantor Onelow County Dear Mr. Raker Tha Wllming9ton Ra�glonalr WOMIca mcalvad and accoptad a modNlad State Stormwatar Management Permit Applicatlon foounded Warrior Hoppe and Cara Center on August 12. 2010. A preliminary in- dnpth ravlaw of that Information has datnrmined that the application Is not compinta. Tha following Information In needed to continua the atormwatar ravlaw: 1. Tha plans racaivad on August 12. 2010 are not sanlad, please correct. 2. Stormwatar plans must me nubmtttad on standard engineering acalas. please, correct. 3. Tha wat pond section detail shown the bottom of the vegetated shelf and lha mlddla of the vagatstad .half both to be, at alavatlon 14.6', please correct_ 4. Tha oriftoa on the outlet ntructura datall calla far a 2 1/ - cap with a drilled 2- hole, on a 6" pip., please co rract. 6. An Inflltration baaln supplemental form will be roqulmd duo to the chpnge, In drainage area and surface area It la treating. 6. Sactlon 2.13 "Pond Routing Calculation.' show the surface area at alavatlon 15.7 to be 26,836 of. Tha wet pond aupplamental form roporta the aurfaca area at alavatlon 15.76 to be, 10.212 .1. Plaasa rlatarmina which In In error and correct. Kaopp in mind soma or all of these comments may cause raqulrad changes In the atormwatar permit nppllcatlon, supplemental forma. plans, calculations, etc. Pleaaa n to that thin request for addittonsl Information is In raspnnse to a preliminary review. Tha raauastad Information should be, racaivad In this Ofgce prior to august 23. 2010. or tM1he application will be, returned as incompinta. Tha return of a project will nacassitata rasubmittal of all required items, including the application fee. 121 m I4� NpW,rw @afarrlm, j .i@io-r@ea�aielF awrviow c m.•on,. .et@a arr.e:�arw W, Av MEMORY TRANSMISSION REPORT TIME :08-16-'10 15:23 FAX NO.1 :910-350-2018 NAME :DENR Wilmington FILE NO. 493 DATE 08.16 15:23 TO R 917574847498 DOCUMENT PAGES 2 START TIME 08.16.15:23 END TIME 08.16_15:23, PAGES SENT STATUS �: OK�� *** SUCCESSFUL TX NOTICE I.VC-NIEW, ERR- -- - — - North Carolina Department of Environment and Natural Resources- Dlvislon of Water Quality, - Beverly Eaves Porduo Colssn H. Sul line One Frsaman i r3overnor DbsclorSecratary August 19. 2010 Carl BaKar. Doputy Public Works O If er USCMS Camp Lelaune v ��✓/� 1005 Michael Road USMCB Camp Let.un.. NC 20547 SUbjec,t] Roq uast for Additional Information \ / Stormwator Project No_ SW9 070929M00 Woundad Warrior Hope and Cara Contor- Onalow County-- D.ar Mr. Baker- Th. Wilmingpton Raplonal Office received and acc.ptad a modified States Stormwatar M"nagemant Pormit Appllcation for Woundad Warrior Hopes and Cara Canter on August 12. 2010- Apra liminary In- dapth review of that information has determined that the application Is not complata. Tha following Information is n.adad to continua the atormwatar review: 1. Tha plans racaivad on August 12. 2010 are not sealed. please correct. 2. Stormwatar plane must me submitted on standard anginaaring acalas. please correct. 3. Tha wet pond section detail shows the bottom of the, vegetated shelf and the middle of the vegetated shelf both to be at alavatlon 14.5'. please correct. 4. The orifice on the outlet atructura detail calla for at 2 1/2" cap with a drilled 2" hole, on a S" pipe. plaoaa co rr.ct. 5. An infiltration baaln supplemental form will be, requlrod due to the change In drainage area and surtaco area It In treating. 5. Sactlon 2.13 "Pond Routing Calculatlona" ahow the Surface eras st alavatlon 15.7 to be, 29 830 af. Tha wet pond supplemental form report. the aurf.ca area at alavatlon 15.75 to 6a 10.212 sf. Plaasa determine which Is In error and corract. Keep In mind some or all of these commants may cause required changes in the atormwatar permit application. aupplemantal forma. plans, calculetlons. etc. Pl.asa not. that thla request for adalltional Information Is In mapansa to a preliminary review_ Tha U%quaslad information ahould be, racalvad In this O Ica prior to august 23. 2010. or the application will returned as lnC mP later. -rho return of a project will nacaaaiteta rasubmittal of all required items. including the application fee. P�\: Y10.140-'/316\FNf:Y\OJ60-]00�\CurOn�lr Barvlw: l-0rrTT3#)b +��nrCtttCatO a AGNA NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor August 16, 2010 Carl Baker, Deputy Public Works Officer USCMB Camp Lejeune 1005 Michael Road USMCB Camp Lejeune, NC 28547 Division of Water Quality Coleen H. Sullins Director Subject: Request for Additional Information Stormwater Project No. SW8 070926MOD Wounded Warrior Hope and Care Center Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Wounded Warrior Hope and Care Center on August 12, 2010. A preliminary in- depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: The plans received on August 12, 2010 are not sealed, please correct. Stormwater plans must me submitted on standard engineering scales, please correct. The wet pond section detail shows the bottom of the vegetated shelf and the middle of the vegetated shelf both to be at elevation 14.5', please correct. The orifice on the outlet structure detail calls for a 2 1/2" cap with a drilled 2" hole on a 6" pipe, please correct. An infiltration basin supplemental form will be required due to the change in drainage area and surface area It is treating. Section 2.13 "Pond Routing Calculations" show the surface area at elevation 15.7 to be 26,836 sf. The wet pond supplemental form reports the surface area at elevation 15.75 to be 19,212 sf. Please determine which is in error and correct. Keep in mind some or all of these comments may cause required changes in the stormwater permit application, supplemental forms, plans, calculations, etc. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in. this Office prior to august 23,.2010, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Wilmington Regional Office One 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-7 51FAX:910350-20041 Customer Service: "77{23-8748 NorthCaroina Internet: w.ncwaterquality.org Natmralk Carl Baker, Deputy Public Works Officer August 16, 2010 Stormwater Application No. SW8 070926MOD f you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at chris.baker@ncdenr.gov. Sincerely, ` Chris Baker Baker Environmental Engineer II GDS/csb: S:\WQS\STORMWATER\ADDINFO\2010\070926MOD.aug10 cc: James W. Farrell, P. E., Hoggard-Eure Assocoates, P. C. Wilmington Regional Office Stormwater File Page 2 of 2 0 o. )ggard-Eure kssociatesP.a. JEEPS SURVEYORS PLANNERS 757 484-9670 - Fax: 757 464-7498 - 901 Port(en re Parkway, Suite 5 - Portsmouth, Viainia 23704 August 10, 2010 North Carolina Department of Environment and Natural Resources Wilmington Region 127 Cardinal Drive Extension Wilmington, North Carolina 28405 ATTN: Mr. Chris Baker Re: P1378-WOUNDED WARRIOR HOPE AND CARE CENTER Marine Corps Base Camp Lejeune, North Carolina Our File No. 3126.00.09 L Dear Mr. Baker: Hoggard / Eure Associates, P.C. respectfully requests review of the above mentioned project. The enclosed submittal package includes the Stormwater management Report. The following have been enclosed: 1. One (1) Original "Stormwater Management Permit Application Form", two (2) copies 2. One (1) Original "Wet Detention Basin Operation and Maintenance Agreement', two (2) copies 3. One (1) Original "Wet Detention Basin Supplement', (2) copies 4. Three (3) copies of Stormwater Management Report, includes Calculations & Specifications. 5. Three (3) Full Size sets of the civil construction plans (Stormwater Specific Only), and \6. Submittal Review Fee - $ 4,000 The plans and specifications submitted for your review reflect the contract documents that will be utilized for ;truction after permit approval. Please contact me if any questions or comments arise during your review. I will be able to visit your office or speak to telephone if necessary to help with your review. Very truly yours, HO RD IATES, P.C. Ja .Farrell, P.E. AUG 1 0 Z010 3Y:pw0.E-.k r* KN Hoggard-Eure _Associates ENOINEEN—es VEVOS I4 NEF9 757-484 9670 - Fax:757-484-7498 - 901 Port(entre Parkway. Suite 5 - Portsmouth, Virginia 23704 August 10, 2010 North Carolina Department of Environment and Natural Resources Wilmington Region 127 Cardinal Drive Extension Wilmington, North Carolina 28405 ATTN: Ms. Janet Russell Re: P1378-WOUNDED WARRIOR HOPE AND CARE CENTER Marine Corps Base Camp Lejeune, North Carolina Our File No. 3126.00.09 Dear Ms. Russell: Hoggard / Eure Associates, P.C. respectfully requests review of the above mentioned project. The enclosed submittal package includes the Stormwater management Report. The following have been enclosed: 1. Two (2) Copies of Sheet C-004 2. Two (2) Copies of the layout Sheets (C-1 05)-(C-1 08) 3. Two (2) Copies of the overall layout plan. 4. Two (2) Copies of the overall grading plan. The plans and specifications submitted for your review reflect the contract documents that will be utilized for construction after permit approval. Please contact me if any questions or comments arise during your review. I will be able to visit your office or speak to you by telephone if necessary to help with your review. Very truly yours, HOGGARD/EURE ASSOCIATES, P.C. 4151� Jack Bloom, P.E. AUG 11 2010 w STORMWATER MANAGEMENT PERMIT APPLICATION P-1378 WOUNDED WARRIOR HOPE AND CARE CENTER MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA August 10, 2010 Rev. August 17, 2010 By comments dated 8-16-10 HOGGARD/EURE ASSOCIATES. P.0 ENGINEERS/SURVEYORS/PLANNERS 901 PORTCENTRE PARKWAY SUITE 5 iUPORTSMOUTH, VIRGINIA 23704 (757)484-9670 AUG 1 8 2010 DU)Q C'acpress TABLE OF CONTENTS CIVIL CALCULATIONS 1.0 PROJECT NARRITIVE 1.1 General Information 1.2 Storm water Information 1.3 Storm water Narrative 1.4 Erosion and Sediment Control Measures 1.5 Permanent Stabilization 1.6 Soils 1.7 Ground Water 1.8 Operation & Maintenance Plan (O&M) 2.0 DRAINAGE CALCULATIONS r 2.1 PREDEVELOPED DRAINAGE CHARACTERISTICS 2.2 DEVELOPED DRAINAGE CHARACTERISTICS 2.3 TEMPORARY SEDIMENT BASIN SIZING 2.4 SWALE - VELOCITY CALCULATIONS 2.5 STORM PIPE CALCULATIONS 2.6 HYDRAULIC GRADELINE CALCULATIONS 2.7 LID STORAGE VOLUME REQUIREMENTS 2.8 LID STORAGE VOLUME PROVIDED 2.9 WET DETENTION POND SIZING CALCULATIONS 2.10 WET DETENTION POND VOLUME 2.11 FOR EBAY VOLUME 2.12 AVERAGE DEPTH CALCULATION 2.13 POND ROUTING CALCULATIONS 2.14 NCDENR WET DETENTION BASIN SUPPLIMENTAL _----jp,2.15 NCDENR INFILTRATION BASIN SUPPLIMENTAL 3.0 APPENDICES 3.1 Applicable Project Specifications Section 01 57 13.10 22 "Erosion and Sediment Control" Section 31 23 00.00 20 "Excavation and File' Section 32 92 19 "Seeding" 3.2 Location Map 3.3 USGS Map 3.4 Geotechnical Report AUG 1 8 2010 P1378 —WOUNDED WARRIOR HOPE AND CARE CENTER (WWHCC) MARINE CORPS BASE CAMP LEJEUNE PROJECT NARRATIVE EROSION & SEDIMENT CONTROL 1. GENERAL INFORMATION a. Name of Project: P1378 — WOUNDED WARRIOR HOPE AND CARE CENTER b. Street Address: West of Hospital Corps Road, currently unnamed road City: Camp Lejeune County: Onslow C. Acres in Tract: Property is all located within the Boundary of Camp Lejeune d. Acres Being Disturbed: This is a Modification of an existing permit. The total acreage of the project is 26.56 The actual Wounded Warrior site, Sub Basin #4 is 10.41 acres. Additional acreage disturbed = 6.36, not previously disturbed. e. Acres in Wetlands: None f. Ownership Information: United States Marine Corps g. Description of Proposed Development: Project P1378 —Wounded Warrior Hope and Care Center includes two (2) buildings, a 7,400 sf Battalion Headquarters Building and a 36,152 sf Hope and Care Center a 100 car parking lot, a wet storm water management basing and associated utilities. Low Impact Development features are being constructed to satisfy Navy Criteria to promote infiltration. Due to the Seasonal High Water Table, we understand that these features are not designed to NCDENR standards and request that these features not be permitted. These LID features will act as conveyance of the storm water from the site to the proposed Wet Detention Pond. 1 WWHCC: The proposed building is located just south of the Wounded Warrior BEQ project, ' currently under construction. The site is located just west of a currently unnamed access road, and north of a proposed "Ring Road" currently out for bids. t Due to the overlapping of the WWHCC project with the BEQ project the permit for the BEQ shall be modified. The Wounded Warrior Hope and Care Center will require extensive earthwork and utility construction. The Latitude and Longitude of the site are as follows: Latitude: 340 43' 12.2" N 34.7200550 tLongitude: 770 21' 50.88" W-77.3641340 AUG 1 8 MID r. The increase in impervious surface is as follows: Pre -Developed % Impervious = 21.2% Developed % Impervious = 31.9% h. All erosion control measures shall be constructed prior to land disturbance. All Stormwater treatment facilities shall be constructed at their appropriate timing. i. Sanitary sewer and water supply shall be provided by extension of the existing utility systems. All sewer and water systems are owned and operated by MCB Camp Lejeune. j. There are no historical sites or public monies associated with this project. k. We do not believe there are any compliance issues with the site. 1.2 STORMWATER INFORMATION a. Water Body Information River Basin: White Oak Stream Classification: SC; Index Number: Northeast Creek, 19-16-(3.5) b. High Density, based on location at Camp Lejeune Commercial — US Government NPDES Phase II C. The proposed total percentage of impervious will be increased by this project. Pre -Developed % Impervious = 21.2% Developed % Impervious = 31.9% :710"I R_X� Stormwater management will comply with the requirements of the applicable UFC and the stormwater management instructions included in the RFP. The Stormwater Management design will emphasize Low Impact Development (UFC 3- 210-10) Best Management Practices including grassed swales, filter strips, and infiltration trenches (not permitted with NCDENR). ' The geotechnical report prepared for Projects P1378 Wounded Warrior Hope & Care Center and P1330 Battalion Headquarters Building indicates different conditions from those provided in the RFP. The geotechnical report indicates ground water observed at 1-5' below existing grade. These elevations may be due to a perched water table condition. The geotechnical report states that the Normal Seasonal High Water Table (SHWT) is estimated at 1 to 2.5' below existing grade. The elevation of the SHWT will not allow the use of sand filters, bio-retention, and infiltration due to the design requirements of NCDENR. NCDENR requires a minimum of two (2) feet of separation between the management feature and the SHWT. AUG i 8 2010 To satisfy the LID requirements of the Camp Lejeune and the Navy, infiltration trenches will be provided throughout the site to capture and transport stormwater through the site. These trenches will capture the required volume to satisfy the LID calculations, the 95th Percentile storm event, 2.4 inches. This volume will be infiltrated thru into the existing ground. Due to high SHWT, under drains shall be provided to ensure drainage. See civil calculations for storage volumes. Other LID features shall include minimizing curbing, paving and storm piping, while maximizing overland flow, green space, and natural features. One (1) wet ponds shall be constructed to satisfy the requirements of NCDENR. This pond will be sized to comply with NCDENR design regulations. The routed pond outflow shall maintain the 25YR storm to less than pre -developed conditions. The 100YR storm shows an increase from 12.50 cfs to 15 cfs. The pond routing calculations do not consider the potential loss of runoff within the LID infiltration features. Being conservative, the pond has been sized without recognizing the added befifit of the infiltration areas. This thought process was also established to accommodate the NCDENR requirements. The infiltration trenches will transport overflow storm water to the wet ponds. It is our intent to not have the infiltration trenches part of the storm water permit since they will not meet the design requirements, specifically 2' separation from the SHWT. ' 1.4 EROSION AND SEDIMENT CONTROL MEASURES ' All Erosion & Sediment Control Measures will be installed in accordance with the latest edition of the North Carolina Erosion and Sediment Control Manual. Erosion Control measures to be implemented on this site include: ' Top soiling Temporary Gravel Construction Entrance/Exit Temporary Seeding Permanent Seeding Grass -Lined Channels ' Outlet Stabilization Structure Rock Pipe Inlet Protection Stone Check Dam ' Sediment Fence Temporary Sediment Basin Dust Control Sediment fence will be used to prevent sediment from traveling off the site into the adjacent areas. A construction entrance will also be placed at a convenient location to facilitate construction operations. One (1) temporary sediment basin shall be provided for the site and shall be located in the area of the permanent wet detention pond. The sediment trap shall provide 3600 1 cubic feet of sediment storage per acre of disturbed area. ' FAUG 1 9 2010 ITrap characteristics are as follows: 1 Sediment Basin Disturbed Area = 453.395 Square Feet = 10.41 acres Volume required = 37,471 cubic feet, @ 3600cf/ac Volume provided at principal spillway, elevation 16.65 = 49,242 cubic feet. The site will be stabilized as the construction is completed. The seeding schedule will be followed as stated on the construction documents. 1.6 SOILS The soils report was prepared by GET Solutions, Inc., Virginia Beach, Virginia (Dated December 16, 2009). The report indicated the following: The results of our soil test borings indicated the presence of 4 to 24 inches of topsoil at the boring locations. The subsurface soils encountered below the topsoil were generally noted to consist of CLAY (CL, CH) with varying amounts of sand. The Standard Penetration Test (SPT) results, N-values, recorded within this initial soil layer ranged from 3 to 14 blows-perfoot (BPF) indicating a soft to stiff relative density. Borings B-4, B-5, CBR-1 through CBR-3, and BMP-1 through BMP-4 were terminated within this stratum. 1.7 GROUND WATER The groundwater level was recorded at the location of borings B-1 through B-6, CBR-1 through CBR-3, and BMP-1 through BMP-4 as observed through the ' wetness of the recovered soil samples during the drilling operations. The initial groundwater table was measured to occur at depths ranging from 1 to 5 feet below current grades at the boring locations which coincides with elevations ranging from ' 14 to 17.5 feet MSL. However, these groundwater readings are anticipated to be the result of perched conditions over restrictive soil layers occurring near the ' surface. The boreholes were backfilled upon completion for safety considerations. As such, the reported groundwater levels may not be indicative of the static groundwater level. 1 The SHWT depths at these boring locations were estimated based on the Munsell® color classifications and our experience with similar soil conditions. Furthermore, the normal SHWT depths were estimated to be about 1 to 2.5 feet below the ' existing site grade elevations at the above noted boring locations, which corresponds to elevations ranging from about 15.3 to 17.5 feet MSL. I AUG 1 8 2010 1 1.8 O&MPLAN ' MAINTENANCE OF STORM WATER MANAGEMENT AND EROSION CONTROL STRUCTURES All permanent storm water management and erosion control structures will be maintained by the Contractor during construction. After construction is complete, the temporary erosion control measures will be removed by the Contractor and the permanent stormwater management basins will become the responsibility of the Facilities Maintenance Officer, at MCB Camp Lejeune. 1. INSPECT AFTER EVERY RUNOFF PRODUCING RAINFALL EVENT: 1. Basin inlet (Flared -end sections) - Remove any clogging debris. 2. Wet Detention Pond - Remove trash accumulation and repair eroded areas. 2. INSPECT QUARTERLY: 3. Inlet Piping - Repair undercutting, remove interior trash, and replace rip -rap. 4. Wet Detention Pond - Repair eroded areas, remove trash. 3. INSPECT SEMI-ANNUALLY (EVERY 6 MONTHS): 5. Basin Depth - Sediment shall be removed when it accumulates to a depth of approximately (6") six inches. 4. GENERAL MAINTENANCE NOTES: 6. Stabilize side slopes and re-establish stone check dams pre-treatment within dry detention ponds regularly. AUG 1 8 2010 _J 2.1 PREDEVELOPED DRAINAGE CHARACTERISTICS File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Date: 5/10/2010 WWHCC SUBBASIN #1 Site Area: 9.32 SF AC "C', A'C Pervious Area 310,891 7.14 0.30 2.14 On Site Buildings 10,827 0.25 0.90 0.22 On Site Streets 54,729 1.26 0.90 1.13 On Site Parking 10,492 0.24 0.90 0.22 On Site Sidewalks 18,907 0.43 0.90 0.39 Other On Site - 0.00 0.90 0.00 Off Site - 0.00 0.90 0.00 405,846 9.32 0.44 Weighted C Impervious 94,955 % Impervious: 23.4% WWHCC SUBBASIN #2 Site Area: 6.50 SF AC "C., A'C Pervious Area 154,637 3.55 0.30 1.06 On Site Buildings 31,799 0.73 0.90 0.66 On Site Streets 6,970 0.16 0.90 0.14 On Site Parking 84,942 1.95 0.90 1.76 On Site Sidewalks 4,792 0.11 0.90 0.10 Other On Site - 0.00 0.90 0.00 Off Site - 0.00 0.90 0.00 283,140 6.50 0.57 Weighted C Impervious 128,503 Impervious: 45.4% WWHCC SUBBASIN #3 Site Area: 4.01 SF AC "C'. A'C Pervious Area 152,937 3.51 0.30 1.05 On Site Buildings - 0.00 0.90 0.00 On Site Streets 16,883 0.39 0.90 0.35 On Site Parking - 0.00 0.90 0.00 On Site Sidewalks 4,258 0.10 0.90 0.09 Other On Site 791 0.02 0.90 0.02 Off Site - 0.00 0.90 0.00 174,869 4.01 0.38 Weighted C Impervious 21,932 % Impervious: 12.5% II AUG 1 8 2010 1 1 2.1 PREDEVELOPED DRAINAGE CHARACTERISTICS WWHCC SUBBASIN #4 Site Area: 6.73 SF AC "C', A*C Pervious Area 293,309 6.73 0.30 2.02 On Site Buildings 0.00 0.90 0.00 On Site Streets - 0.00 0.90 0.00 On Site Parking - 0.00 0.90 0.00 On Site Sidewalks 0.00 0.90 0.00 Other On Site - 0.00 0.90 0.00 Off Site - 0.00 0.90 0.00 293,309 6.73 0.30 Weighted C Impervious - % Impervious: 0.0% WWHCC SITE AREA "Total" Site Area: 26.56 SF AC "C', A*C Pervious Area 911,774 20.93 0.30 6.28 On Site Buildings 42,626 0.98 0.90 0.88 On Site Streets 78,582 1.80 0.90 1.62 On Site Parking 95,434 2.19 0.90 1.97 On Site Sidewalks 27,957 0.64 0.90 0.58 Other On Site 791 0.02 0.90 0.02 ' Off Site - 0.00 0.90 0.00 0.43 Weighted 1,157,164 26.56 Impervious 245,390 ' % Impervious: 21.2% I, 2.2 DEVELOPED DRAINAGE CHARACTERISTICS File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Date: 5/10/2010 WWHCC SUBBASIN #1 NO CHANGE Site Area: 9.32 SF AC "C" A*C Pervious Area 310,891 7.14 0.30 2.14 On Site Buildings 10,827 0.25 0.90 0.22 On Site Streets 54,729 1.26 0.90 1.13 On Site Parking 10,492 0.24 0.90 0.22 On Site Sidewalks 18,907 0.43 0.90 0.39 Other On Site - - 0.90 - Off Site - - 0.90 - 405,846 9.32 0.44 Weighted C Impervious 94,955 % Impervious: 23.4% WWHCC SUBBASIN #2 Site Area: 6.46 SF AC "C', A*C Pervious Area 152,843 3.51 0.30 1.05 On Site Buildings 31,799 0.73 0.90 0.66 On Site Streets 6,970 0.16 0.90 0.14 On Site Parking 84,942 1.95 0.90 1.76 On Site Sidewalks 4,792 0.11 0.90 0.10 Other On Site - 0.00 0.9 0.00 Off Site - 0 0.9 0 281,346 6.46 0.57 Weighted C Impervious 128,503 % Impervious: 45.7% WWHCC SUBBASIN #3 Site Area: 0.38 SF AC "C', A*C Pervious Area 8,918 0.20 0.30 0.06 On Site Buildings - - 0.90 - On Site Streets 7,660 0.18 0.90 0.16 On Site Parking - - 0.90 - On Site Sidewalks ' 0.90 - Other On Site 0.90 - Off Site 0.90 - 16,578 0.38 0.58 Weighted C Impervious 7,660 % Impervious: 46.2% 2.2 DEVELOPED DRAINAGE CHARACTERISTICS WWHCC SUBBASIN #4 Site Area: 10.41 SF AC "C" A'C Pervious Area 315,927 7.25 0.30 2.18 On Site Buildings 43,565 1.00 0.90 0.90 On Site Streets 15,285 0.35 0.90 0.32 On Site Parking 61,139 1.40 0.90 1.26 On Site Sidewalks 15,870 0.36 0.90 0.33 Other On Site 1,608 0.04 0.90 0.03 Off Site - 0.00 0.90 0.00 453,394 10.41 0.48 Weighted C Impervious 137,467 3.16 % Impervious: 30.3% WWHCC SITE AREA "Total" Site Area: 26.56 SF AC "C', A'C Pervious Area 788,579 18.10 0.30 5.43 On Site Buildings 86,191 1.98 0.90 1.78 On Site Streets 84,644 1.94 0.90 1.75 On Site Parking 156,573 3.59 0.90 3.23 On Site Sidewalks 39,569 0.91 0.90 0.82 Other On Site 1,608 0.04 0.90 0.03 Off Site - 0.00 0.90 0.00 1,157,164 26.56 0.49 Weighted C Impervious 368,585 % Impervious: 31.9% 2.3 TEMPORARY SEDIMENT BASIN SIZING File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JIB Date: 5/10/2010 Revision: TEMPORARY SEDIMENT BASIN DRAINAGE AREA= 453,395 square feet DRAINAGE AREA = 10.41 Acres DISTURBED AREA = 10.41 Acres OFFSITE DISTURBED AREA = 0.00 Acres TOTAL DISTURBED AREA = 10.41 Acres VOLUME REQUIRED (@3600 cf/ac) = 37471 Cubic Feet VOLUME PROVIDED @ 16.65 = 49242 Cubic Feet BOTTOM ELEV. = 14.50 Feet TOP OF EMBANKMENT = 17.00 Feet BASIN DEPTH = 2.50 Feet SIDE SLOPE = 3:1 MAX TEMPORARY SEDIMENT BASIN ELEV FT CHANGE IN ELEV. AREA SF VOL. CF SUM VOL. CF 14.5 15208 0 0.5 8734 15 19728 8734 1 21669 16 23610 30403 1 25607 17 27604 56010 2.3 TEMPORARY SEDIMENT BASIN SIZING ISurface Area Required 325 SF x Q10 CFS = Surface Area (SF) Q10 (CFS)= 27.78 Surface Area Required= 9,029 Area Provide 26,206 (At E1 16.65) HYDROLOGIC REPORT FOR combined SUMMARY OF PEAK FLOW RATES FREQ PRE -DEVELOPED POST -DEVELOP POND ROUTED FLOW FLOW ELEVATION STORAGE OUTFLOW (yr) (c.f.s.) (c.f.s.) (ft.) (cuft) (c.f.$) 2 10.09 13.09 15.90 30052.0 0.11 10 13.87 17.36 16.51 45561.3 0.13 HYDROLOGIC REPORT - POND OUTPUT DEVICES 1=CIRCULAR ORIFICE (SKIMMER OUTLET ELEVATION) INVERT 14.5000 C 0.6000 D 0.1600 if(H<D)Q=3.0'D'(H"1.5) if (H >= D) Q = C' A' SQRT(64.4' (H - RAID) 3=TRAPEZODIDAL BROAD CRESTED WEIR INVERT 16.6500 W 5.0000 A 45.0000 Q = 4.8' (H " 1.5) - (0.667' W + 0.533' H ' TAN(A) 2.4 SWALE VELOCITY CALCULATIONS File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Dare: 5/10/2010 Swale Calculation Swale "A" Area: 0.75 Acres C value: 0.3 Intesit 10 r 5.53 in/hr Actual Discharge 1.24 cfs Tc = 21.9 min Bottom Width 0 FT Velocity 1.00 FPS LT Side Slope 3 :1 (H:V) Flow Area 1.24 SF RT Side Slope 3 :1 (H:V) Flow Top Width 3.85 FT Manning's N 0.03 Wetted Perimeter 4.06 FT Channel Slope 0.002 FT/FT Critical Depth 0.40 FT Depth 0.64 FT/FT Critical Slope 0.024 FT/FT Discharge 1.24 CFS Froude Number 0.31 Swale Calculation Swale "B" Area: 3.13 Acres C value: 0.3 Intesit (10 r 5.29 in/hr Actual Discharge 4.97 cis Bottom Width 0 FT LT Side Slope 3 :1 (H:V) RT Side Slope 3 :1 (H:V) Manning's N 0.03 Channel Slope 0.0015 FT/FT Depth 1.14 FT/FT Discharge 4.97 CFS Tc = 24.7 min Velocity 1.27 FPS Flow Area 3.90 SF Flow Top Width 6.84 FT Wetted Perimeter 7.21 FT Critical Depth 0.70 FT Critical Slope 0.0020 FT/FT Froude Number 0.30 Stone Check Dams added to Swale to reduce velocity. 2.5 STORM PIPE CALCULATIONS FILE: 3126.00.09 Sheet 1 of 3 Project: Wounded Warriors Hope and Care Center& HQ Location: Camp Lejeune, NC HOGGARD/EURE ASSOCIATES Design: HE 901 PortCentre Pkary., Suite 5 - Date: Mar-10 Portsmouth, Virginia 23704 Yr. Storm: 10 N Value: 0.013 (RCP) STORM SEWER DESIGN COMPUTATIONS FROM TO DRAIN. RUN-OFF CxA CxA INLET RAIN RUNOFF "Q" INVERT INVERT LENGTH SLOPE PIPE VELOCITY CAPACITYFLOW FLOW FLOWLINE PT. PT. AREA COEFF. INCR. ACCUM. TIME FALL "Q" ACCUM. UP LOW DIAM. TIME RATIO ELEV. INCR. RIM acres ..C. min. in1hr cis cfs ft ft./ft. inches ft./sec. cfs min. Qp/Qf ft. All A10 0.05 0.90 0.05 0.05 15.00 5.25 0.25 0.25 17.43 16.96 70.0 0.0067 6 2.35 0.46 0.50 0.54 21.40 A10 A9 0.52 0.61 0.32 0.36 15.50 5.19 1.66 1.91 16.96 16.87 92.0 0.0010 12 1.44 1.13 1.07 1.69 19.30 A9 AS 0.49 0.38 0.19 0.55 16.56 5.08 0.96 2.83 16.87 16.66 82.0 0.0025 15 2.64 3.24 0.52 0.87 19.30 AS A7 0.11 0.55 0.06 0.61 17.08 5.03 0.30 3.11 16.66 16.38 115.0 0.0025 15 2.64 3.24 0.73 0.96 20.80 A7 A6 0.00 0.00 0.00 0.61 17.81 4.96 0.00 4.90 16.38 16.16 36.0 0.0060 15 4.09 5.02 0.15 0.98 20.80 A6 As 0.48 0.47 0.23 0.84 17.95 4.94 1.14 6.04 16.16 15.94 222.0 0.0010 15 1.67 2.05 2.22 2.95 19.15 AS A4 0.55 0.51 0.28 1.12 20.17 4.75 1.34 7.21 15.94 15.18 152.0 0.0050 18 4.21 7.45 0.60 0.97 19.15 A4 A3 0.07 0.64 0.04 1.21 20.77 4.70 0.21 7.57 15.18 14.93 82.0 0.0030 24 3.95 12.42 0.35 0.61 20.50 A3 A2 0.21 0.82 0.17 1.38 21.12 4.67 0.81 8.34 14.93 14.62 79.0 0.0040 24 4.57 14.35 0.29 0.58 19.65 A2 Al 0.22 0.75 0.16 1.54 21.41 4.65 0.76 9.07 14.62 14.55 47.0 0.0015 24 2.80 8.78 0.28 1.03 18.20 16.55 A4-1 A4 0.07 0.64 0.04 0.04 15.00 5.25 0.23 0.23 15.48 15.18 100 0,0030 15 2.89 3.55 0.58 0.06 20.50 20.50 1.12 0.33 0.37 1 0.37 A7-4 A7-3 148.50 3.28 1.22 1.22 16.72 16.62 36 0.0030 15 2.89 3.55 0.21 0.34 19.10 A7-3 A7-2 0.00 0.00 0.00 0.37 48.71 3.28 0.00 1.22 16.62 16.57 42 0.0010 15 1.67 2.05 0.42 0.59 20.00 A7-2 A7-1 0.21 0.52 0.11 0.48 49.13 3.26 0.36 1.57 16.57 16.42 51 0.0030 15 2.89 3.55 0.29 0.44 18.50 A7-1 A7 0.16 0.52 0.08 0.56 49.42 3.25 0.27 1.84 16.42 16.38 44 0,0010 15 1.67 2.05 0.44 0.90 18.50 20.80 B4 B3 0.79 0.46 0.36 0.36 15.00 5.25 1.92 1.92 15.07 14.79 112 0.0025 15 2.64 3.24 0.71 0.59 19.30 B3 B2 0.25 0.83 0.21 0.57 15.71 5.17 1.10 2.99 14.79 14.59 79 0.0025 15 2.64 3.24 0.50 0.92 18.95 B2 B1 0.33 0.79 0.27 0.84 16.21 5.12 1.37 4.33 14.59 14.50 46 0.0020 1 18 2.67 4.71 0.29 0.92 18.40 17.60 C2 C1 1.03 0.41 5.25 2.20 2.20 14.65 14.53 48 0.0025 15 2.64 3.24 0.3017.80 E4 E3 A0.420A215.00 6.84 6.84 13.00 12.78 35 0.0064 18 4.77 8.43 0.12 0.81 16.30 E3 E2 0.45 0.60 15.00 5.25 1.44 8.28 12.78 12.38 50 0.0080 18 5.33 9.42 0.16 0.88 18.53 E2 El 0.00 0.00 15.16 5.23 0.00 8.28 12.38 11.52 107 0.0080 18 5.33 9.42 0.33 0.88 16.85 7.50 F2 F1 0.15 0.60 0.09 0.09 15.00 5.25 0.47 0.47 16.90 16.80 50 0,0020 15 2.36 2.90 0.35 0.16 20.00 9.50 D2 D1 1.19 0.46 0.55 0.55 15.00 5.25 2.91 2.91 16.20 16.00 64 0.003 15 2.94 3.61 0.36 0.81 19.84 19.17 H2 H1 2.31 0.41 0.95 0.95 15.00 5.25 5.02 5.02 16.50 15.25 64 0.0195 15 7.37 9.04 0.14 0.56 19.50 19.75 G2 G1 0.15 0.60 0.09 0.09 15.00 5.25 0.48 0.48 15.15 14.61 72 0.0075 15 4.57 5.61 0.26 0.09 17.70 17.70 2.6 STORM SEWER DESIGN COMPUTATIONS (CONTINUED) FILE: 3126.00.09 Ji I Sheet 2 of 2 Project: Wounded Warriors Hope and Care Center& HQ HOGGARD/EURE ASSOCIATES Location: Camp Lejeune, NC 901 PortCentre Pkwy., Suite 5 Design: HE Portsmouth, Virginia 23704 Date: 3/1912010 Yr. Storm: 10 N Value: 0.013 HYDRAULIC GRADE LINE CALCULATIONS BASIN 1 1. Enter Tailwater Elevation (ft.) ? 16.77 2. Enter "N" value for pipe? 1 0.013 (RCP) FROM TO 000T PIPE LOUT FRICTION DNSTREAM VOLT M.H. INLET 0IN PIPE ANGLE VIN F.L.E. H.G.E. PT. PT. (cfs) DIA. (ft.) SLOPE INVERT (FPS) SHAPE (cfs) DIA. 'K' (fps) All A10 0.25 6.00 70.00 0.0067 16.96 2.35 Y Y 0.00 6.000 0.00 0.00 21.40 19.43 1.97 A10 A9 1.91 12.00 92.00 0.0010 16.87 1.44 Y Y 0.25 12.000 0.00 2.35 19.30 18.95 0.35 A9 A8 2.83 15.00 82.00 0.0025 16.66 2.64 Y Y 1.66 15.000 0.70 1.44 19.30 18.84 0.46 AB A7 3.11 15.00 115.00 0.0025 16.38 2.64 Y Y 0.96 15.000 0.00 2.64 20.80 18.60 2.20 A7 A6 4.90 15.00 36.00 0.0060 16.16 4.09 Y Y 0.30 15.000 0.70 2.64 20.80 18.28 2.52 A6 A5 6.04 15.00 222.00 0.0010 15.94 1.67 Y Y 0.00 15.000 0.00 4.09 19.15 17.98 1.17 A6 A4 7.21 18.00 152.00 0.0050 15.18 4.21 Y Y 1.14 18.000 0.28 1.67 19.15 17.70 1 A5 A4 A3 7.57 24.00 82.00 0.0030 14.93 3.95 Y Y 1.34 24.000 0.28 4.21 20.50 16.90 3.60 A3 A2 8.34 24.00 79.00 0,0040 14.62 4.57 Y Y 0.21 24.000 0.00 3.95 19.65 16.29 3.36 A2 Al 9.07 24.00 47.00 0.0015 14.55 2.80 Y Y 0.81 24.000 0.00 4.57 18.20 16.29 1.91 A4-1 A4 0.23 15.00 100.00 0,0030 15.18 2.89 Y Y 0.00 15.000 0.00 0.00 18.50 16.49 2.01 A7-4 A7-3 1.22 15.00 36.00 0.0030 16.62 2.89 Y Y 0.00 15.000 0.22 0.00 20.80 17.75 3.05 A7-3 A7.2 1.22 15.00 42.00 0.0010 16.57 1.67 Y Y 1.22 15.000 0.00 2.89 19.30 17.63 1.67 A7.2 AM 1.57 15.00 51.00 0.0030 16.42 2.89 Y Y 0.00 15.000 0.00 1.67 18.95 17.63 1.32 A7-1 A7 1.84 15.00 44.00 0.0010 16.38 1.67 Y Y 0.36 15.000 0.00 2.89 18.40 17.45 0.95 B4 B3 1.92 15.00 112.00 0.0025 14.79 2.64 Y Y 0.00 15.000 0.00 0.00 18.00 15.79 2.21 B3 B2 2.99 15.00 79.00 0.0025 14.59 2.64 Y Y 1.92 15.000 0.00 2.64 17.80 15.70 2.10 B2 B1 4.33 18.00 4&00 0.0020 14.50 2.67 Y Y 1.10 18.000 0.00 2.64 16.30 15.70 0.60 C2 C1 2.20 15.00 48.00 0.0025 14.53 2.64 Y Y 0.00 15.000 0.00 0.00 16.85 15.53 1.32 E1 E2 6.84 18.00 35.00 0.0064 12.78 4.77 Y Y 0.00 18.000 0.00 0.00 16.30 13.98 2.32 E2 E3 8.28 18.00 50.00 0.0080 12.38 5.33 Y Y 6.84 18.000 0.00 4.77 18.53 13.58 4.95 E3 E4 8.28 18.00 107.00 0.0080 11.52 5.33 Y Y 8.28 18.000 0.70 5.33 16.85 12.72 4.13 F2 F1 0.47 15.00 50.00 0.0020 16.80 2.36 Y Y 0.00 15.000 0.00 a00 20.00 17.80 2.20 M M Illlllllllo M M M M IIIIIIII! 2.7 LID REQUIRED STORAGE VOLUME Runoff Volume Calculations CN 98 57 SCS Runoff Curve Number Method pavement grass total I composite 1 yr rainfall 1 yr runoff 1 r runoff 2 yr rainfall 2 yr runoff 2 r runoff & buildings CN P S la D P S Q sf sf sf inches inches cf inches inches cf Pre -Development 21932 446246 468178 58.9 3.62 6.97 1.39 0.539 21011 _ 4.41 6.97 0.91 35524 Post -Development 143333 324845 468178 69.6 3.62 4.38 0.88 1.058 41260 4.41 4.38 1.579 61600 increase 0.519 20249 0.668 26076 I CN 98 57 SCS Runoff Curve Number Method pavement grass total composite 95th 95th 95th & buildings CN Percentile S la Percentile Percentile . sf sf sf P inches cf Pre -Development 21932 446246 468178 58.9 2.40 6.97 1.39 0.127 4946 Post -Development 143333 324845 468178 69.6 2.40 4.38 0.88 0.394 15362 increase 0.267 10417 LID REQUIRED STORAGE VOLUME 1 1 2.8 LID VOLUMES PROVIDED File: 3126.00.09 Project: Wounded Warrior Hope 8 Care Center 1 Location: Camp Lejeune, NC Design: JWF Date: 5110t2010 1 LID FEATURE -A VOLUME 1 TOP OF LID = 20.00 18.30 2262 0 RIM OF LID = 19.30 0.7 1851.15 BOTTOM OF LID= 18.30 19.00 3027 1851 1 19.30 0.3 3667 1004.1 2855 cfs LID FEATURE - B VOLUME 1 TOP OF LID = 20.00 18.25 246 0 RIM OF LID = 19.00 0.25 77 BOTTOM OF LID = 18.25 18.50 370 77 0.5 225 1 19.00 530 302 cfs 1 LID FEATURE -C VOLUME TOP OF LID = 20.00 18.25 154 0 RIM OF LID = 19.00 0.25 45.625 BOTTOM OF LID = 18.25 18.50 211 46 1 0.5 129 19.00 305 175 cfs 1 LID FEATURE -D VOLUME TOP OF LID = 20.15 18.15 3544 0 RIM OF LID = BOTTOM OF LID= 19.15 18.15 19.00 0.85 5903 4014.98 4015 0.15 912 19.15 6257 4927 cfs 1 LID FEATURE -E VOLUME TOP OF LID = 18.00 14.20 68 0 RIM OF LID = 15.50 0.8 720.4 1 BOTTOM OF LID= 14.20 15.00 1733 720 0.5 1131.5 15.50 2793 1852 cfs LID FEATURE F VOLUME - 1 TOP OF LID = RIM OF LID = 20.00 19.30 18.80 0.2 1047 254.4 0 BOTTOM OF LID = 18.80 19.00 1497 254 0.3 480.6 1 19.30 1707 735 cfs 1 TOTAL STORED VOLUME 10846 cfs 1 2.9 Wet Detention Pond Sizing Calculations Pond Drainage Area(D.A.)- 10.41 Acres Impervious Area - 3.16 Acres 8 Impervious, (I) - 30.3 8 Use a 3.5 foot deep pond, with 90% TSS Therefore, SA/DA= MINIMUM REQUIRED SURFACE AREA AT PERMANENT POOL (PP): - SA/DA x Drainage Area - MINIMUM REQUIRED VOLUME Rv - .05 + .009(1)- 0.32 VOLUME - (1.5"/12") X Rv X D.A. X 43560 - 18299 CUBIC FEET 305 (From Table 3.3-3) 13829 SF SURFACE AREA (S.A.) PROVIDED AT PP : - 15208 SF(>Required S.A.)@ Elev. 14.50 ft SET ELEVATION OF TEMPORARY POOL (TP): REQ. VOL./S.A. PROVIDED @ PP = 1.20 FEET THEREFORE USE 120 FEET TP ELEV. - 15.700 FEET SURFACE AREA AT TEMPORARY POOL ELEVATION: = L x W = 22753 SQUARE FEET VOLUME PROVIDED (S.A. PROVIDED(PP) + S.A. @ TP ELEV.)/2 x (IF ELEV. - PP ELEV) _ (B21+B36)/2 X (C28) 22777 CUBIC FEET (> REQUIRED VOL., OKAY) _ .9� FOREBAY VOLUME: BOTTOM OF POND ELEVATION AND SURFACE AREA: 59.0 FT - 676 SF - PERMANENT POOL VOLUME - 45637 CUBIC FEET FOREBAY VOLUME REQUIRED- .2(VOL. OF PP)- FOREBAY VOLUME PROVIDED- 9492 CUBIC FEET 9127 CUBIC FEET 20.8% ORIFICE SIZING: Qp — REQ. VOL./172800 — 0.106 CFS (FLOWRATE REQUIRED FOR A 2 DAY DRAWDOWN Q, — REQ. VOL./259200 — 0.071 CFS (FLOWRATE REQUIRED FOR A 3 DAY DRAWDOWN Qs — REQ. VOL./432000 — 0.042 CFS (FLOWRATE REQUIRED FOR A 5 DAY DRAWDOWN CHOOSE A CIRCULAR ORIFICE, AVERAGE HEAD = 2.5 0.208 ORIFICE — DRIVING HEAD (H/3) = 0.331 FEET AREA — 3.14R' AREA — 0.0341 SF Q-Co(A2gh)112 Q- 0.094 CFS (.106/—.078</—.042) USE ONE (1) — ONE INCH (2.5") DIAMETER PVC AUG 1 8 2010 2.10 WET DETENTION POND VOLUME File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Date: 05/01 /10 ELEVATION AREA VOLUME SUM VOL 10 6908 0 1 7575 11 8241 7575 1 8936 12 9630 16510 1 10353 13 11076 26863 1 11827 14 12578 38690 BOTTOM SHELF 0.5 6947 14.5 45637 PERM POOL 0.5 15 54438 TOP SHELF 0.7 15.7 69401 0.3 "2393276404 16 76404117 02320118 32232 AUG 18 2010 I 2.11 FOREBAY VOLUMES File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Date: 5/15/2010 ELEVATION AREA VOLUME SUM VOL 11 2257 0 1 2544 12 2830 2544 1 3145 13 3460 5689 1 3803 14 4146 9492 Top of Forebay -1 All; 8 2010 2.12 AVERAGE DEPTH CALCULATIONS File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Date: 05/05/10 POND B day = 0.25 X 1 + Abot_shelf + Abot_shelf + Abot_pond X Depth Aperm pool 2 Abot_shelf 0.25 X 1 + 12578 + 19486 X 4.5 15208 2 12578 0.25 X 1+ 0.83 + 9743.00 X 0.00036 0.25 X 1.83 + 3.49 0.46 + 3.49 day = 3.942495 AUr, 1 8 2010 1 2.13 POND ROUTING CANCULATIONS-1 I Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Wed Jun 16 09:17:29 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\WWHCC-PONDS.pro HYDROLOGIC REPORT - SUMMARY OF PEAK FLOW RATES ----------------------------------------------------------------------- BASIN: combined ID: PREDEVELOPMENT AREA = 6.73 AVERAGE BASIN SLOPE 0.00 HYDRAULIC LENGTH 0.00 TIME OF CONCENTRATION = 30.00 BASIN CURVE NUMBER = 0.30 DEVELOPMENT AREA 10.41 AVERAGE BASIN SLOPE - 0.00 HYDRAULIC LENGTH = 0.00 TIME OF CONCENTRATION 20.00 BASIN CURVE NUMBER 0.48 BYPASS AREA = 0.13 AVERAGE BASIN SLOPE 0.00 ' HYDRAULIC LENGTH 0.00 TIME OF CONCENTRATION = 0.00 BASIN CURVE NUMBER = 0.00 Frequency Pre -developed By-pass area Developed Allowable peak (years) Peak Q (cfs) ----------------------------------------------------------------------- Peak Q (cfs) Peak Q (cfs) Peak Q (cfs) 1 5.4 0.0 17.5 5.4 2 6.5 0.0 20.9 6.5 ' 10 9.0 0.0 27.8 9.0 25 10.3 0.0 31.5 10.3 100 12.5 0.0 37.2 12.5 1 1 11 II AUG 1 S 2010 I Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 ' Portsmouth, VA 23704 Tue Aug 17 13:40:03 2010 I I r J 7 L 1 1 1 u 1 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\WWHCC-PONDS.pro ---------- _------ _--- _____________________________ HYDROLOGIC REPORT FOR combined SUMMARY OF PEAK FLOW RATES FREQ PRE -DEVELOPED POST -DEVELOP POND ROUTED FLOW FLOW ELEVATION STORAGE OUTFLOW (yr) (c.f.s.) (c.f.s.) (ft.) (cu.ft.) (c.f.$) --- ---------- ------------- 17.54----------- ------------------ 1 5.93 17 .54 16.26 37596.5 0.97 2 6.52 20.94 16.44 42287.2 1.55 10 8.96 27.78 16.77 50747-.5 5.92 25 10.32 31.48 16.96 55721.7 9.39 100 12.50 37.23 17.22 63381.5 15.38 Allh 1 S Zola Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Tue Aug 17 13:38:42 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\WWHCC-PONDS.pro -------------------------------------------------------------------------------- HYDROLOGIC REPORT - POND DEPTH VS STORAGE PROVIDED POND: Pond A ELEV DEPTH AREA VOLUME SUMVOL feet feet sq.£t. cu.ft. cu.ft. ----------------------------------------------------------------------- 14.5 15208.0 0.0 0.5 8801.8 15.0 19999.0 8801.8 0.7 14963.2 15.7 22753.0 23765.0 0.3 7002.E 16.0 23932.0 30767.8 1.0 25916.0 17.0 27900.0 56683.8 1.0 29912.0 18.0 31924.0 86595.8 AUG 1 8 2010 Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Tue Aug 17 13:'41:09 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\WWHCC-PONDS.Pro HYDROLOGIC REPORT - POND OUTPUT DEVICES POND: Pond A 1=CIRCULAR ORIFICE INVERT 14.5000 C 0.6000 D 0.2080 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) 2=CIRCULAR STANDPIPE INVERT 16.3000 C 1.5000 D 2.5000 if (H <= D) Q = C * 3.14159 * D * (H ** 1.5) a if (H > D) Q = C * A * SQRT(64.4 * H) 3=TRAPEZODIDAL BROAD CRESTED WEIR INVERT 16.6500 W 5.0000 A 45.0000 Q = 4.8 * (H ** 1.5) *.(0.667 * W + 0.533 * H * TAN(A) � 4=CIRCULAR ORIFICE INVERT 15.7000 C 0.6000 D 0.3300 if (H < D Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) 'i 7 1 1 II II II II Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Tue Aug 17 13:41:45 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\WWHCC-PONDS.pro -------------------------------------------------------------------------------- HYDROLOGIC REPORT - STAGE, STORAGE, AND DISCHARGE POND: Pond A ----------------------------------------------------------------------- 1=CIRCULAR ORIFICE INVERT 14.50 C 0.60 D 0.21 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) 2=CIRCULAR STANDPIPE INVERT 16.30 C 2.50 D 1.50 if (H <= D) Q = C * 3.14159 * D * (H ** 1.5) if (H > D) Q = C * A * SQRT(64.4 * H) 3=TRAPEZODIDAL BROAD CRESTED WEIR INVERT 16.65 W 5.00 A 45.00 Q = 4.6 * (H ** 1.5) * (0.667 * W + 0.533 * H * TAN(A) 4=CIRCULAR ORIFICE INVERT 15.70 C 0.60 D 0.33 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) ELEV OUTFLOW -STORAGE (CU.FT.) CFS) ------------------------------------------- 14.50 0.0 0.000 14.58 1467.0 0.015 14. 67 2933.9 0.042 14.75 4400.9 0.063 14.83 5867.9 0.078 14.92 7334.8 0.091 15.00 8801.8 0.103 15.12 11295.7 0.117 15.23 13789.5 0.130 15.35 16283.4 0.141 15.58 21271.1 0.162 15.70 23765.0 0.171 15.75 24932.1 0.186 15.80 26099.3 0.210 15.85 27266.4 0.240 15.90 28433.5 0.275 15.95 29600.7 0.314 16.00 30767.8 0.356 16.05 32063.6 0.374 .16.10 33359.40.900 16.15 34655.2 0.423 16.20 35951.0 0.445 16.25 37246.8 0.465 16.30 38542.6 0.485 16.36 40054.4 0.769 16.42 41566.1 1.263 16.48 43077.9 1.874 16.53 44589.7 2.547 16.59 46101.4 3.247 16.65 47613.2 3.946 16.71 49125.0 4.833 16.77 50636.7 5.852 16.82 52148.5 6.835 16.88 53660.3 7.832 16.94 55172.0 8.955 17.00 56683.8 10.144 17.17 61669.1 13.902 17.33 66654.5 18.197 AUG 1 8 2010 STORMWATER MANAGEMENT PERMIT APPLICATION P-1378 WOUNDED WARRIOR HOPE AND CARE CENTER MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA August 10, 2010 .•� �� .0 a,O�oQOFE � • 2. Q EAL 9� 02 _ HOGGARD/EURE ASSOCIATES. P.0 ENGINEERS/SURVEYORS/PLANNERS 901 PORTCENTRE PARKWAY SUITE 5 PORTSMOUTH, VIRGINIA 23704 (757) 484-9670 0 2010 ��Q_C-xQress I ' 1.0 TABLE OF CONTENTS CIVIL CALCULATIONS PROJECT NARRITIVE 1.1 General Information 1.2 Storm water Information 1.3 Storm water Narrative ' 1.4 Erosion and Sediment Control Measures 1.5 Permanent Stabilization 1.6 Soils 1 1.7 Ground Water 1.8 Operation & Maintenance Plan (O&M) 2.0 DRAINAGE CALCULATIONS 2.1 PREDEVELOPED DRAINAGE CHARACTERISTICS 2.2 DEVELOPED DRAINAGE CHARACTERISTICS 2.3 TEMPORARY SEDIMENT BASIN SIZING 2.4 2.5 SWALE - VELOCITY CALCULATIONS STORM PIPE CALCULATIONS 2.6 HYDRAULIC GRADELINE CALCULATIONS 2.7 2.8 LID STORAGE VOLUME REQUIREMENTS LID STORAGE VOLUME PROVIDED 2.9 WET DETENTION POND SIZING CALCULATIONS 2.10 WET DETENTION POND VOLUME 1 2.11 FOREBAY VOLUME 2.12 AVERAGE DEPTH CALCULATION 2.13 POND ROUTING CALCULATIONS 2.14 NCDENR WET DETENTION BASIN SUPPLIMENTAL ' 3.0 APPENDICES 3.1 Applicable Project Specifications Section 01 57 13.10 22 "Erosion and Sediment Control' Section 31 23 00.00 20 "Excavation and Fill' Section 32 92 19 "Seeding" 3.2 Location Map 3.3 USGS Map ' 3.4 Geotechnical Report ' 2.1 PREDEVELOPED DRAINAGE CHARACTERISTICS File: 3126.00.09 'Project: Location: Wounded Warrior Hope & Care Center Camp Lejeune, NC Design: JWF Date: 5/10/2010 WWHCC SUBBASIN #1 Site Area: 9.32 SF AC ..C., A'C Pervious Area 310,891 7.14 0.30 2.14 On Site Buildings 10,827 0.25 0.90 0.22 On Site Streets 54,729 1.26 0.90 1.13 On Site Parking 10,492 0.24 0.90 0.22 On Site Sidewalks 18,907 0.43 0.90 0.39 Other On Site - 0.00 0.90 0.00 Off Site - 0.00 0.90 0.00 405,846 9.32 0.44 Weighted C Impervious 94,955 Impervious: 23.4% WWHCC SUBBASIN #2 Site Area: 6.50 SF AC "- A'C Pervious Area 154,637 3.55 0.30 1.06 On Site Buildings 31,799 0.73 0.90 0.66 On Site Streets 6,970 0.16 0.90 0.14 On Site Parking 84,942 1.95 0.90 1.76 On Site Sidewalks 4,792 0.11 0.90 0.10 Other On Site - 0.00 0.90 0.00 Off Site - 0.00 0.90 0.00 283,140 6.50 0.57 Weighted C Impervious 128,503 % Impervious: 45.4% WWHCC SUBBASIN #3 Site Area: 4.01 SF AC "C., A'C Pervious Area 152,937 3.51 0.30 1.05 On Site Buildings - 0.00 0.90 0.00 On Site Streets 16,883 0.39 0.90 0.35 On Site Parking - 0.00 0.90 0.00 On Site Sidewalks 4,258 0.10 0.90 0.09 Other On Site 791 0.02 0.90 0.02 Off Site - 0.00 0.90 0.00 174,869 4.01 0.38 Weighted C Impervious 21,932 Impervious: 12.5% 1 Alir, 1 0 2010 1 ' 2.1 PREDEVELOPED DRAINAGE CHARACTERISTICS WWHCC SUBBASIN #4 Site Area: 6.73 SF AC Pervious Area 293,309 6.73 ' On Site Buildings 0.00 On Site Streets - 0.00 On Site Parking - 0.00 ' On Site Sidewalks 0.00 Other On Site - 0.00 Off Site - 0.00 ' 293,309 6.73 Impervious - %Impervious: 0.0% WWHCC SITE AREA "Total" Site Area: 26.56 SF AC Pervious Area 911,774 20.93 On Site Buildings 42,626 0.98 On Site Streets 78,582 1.80 On Site Parking 95,434 2.19 On Site Sidewalks 27,957 0.64 Other On Site 791 0.02 Off Site - 0.00 ' 1,157,164 26.56 Impervious 245,390 ' %Impervious: 21.2% "C" A'C 0.30 2.02 0.90 0.00 0.90 0.00 0.90 0.00 0.90 0.00 0.90 0.00 0.90 0.00 0.30 Weighted C A'C 0.30 6.28 0.90 0.88 0.90 1.62 0.90 1.97 0.90 0.58 0.90 0.02 0.90 0.00 0.43 Weighted C p.11ri 1 0 2010 '2.2 DEVELOPED DRAINAGE CHARACTERISTICS File: 3126.00.09 Project: Wounded Warrior Hope 8 Care Center Location: Camp Lejeune, NC Design: JWF Date: 5/10/2010 WWHCC SUBBASIN #1 NO CHANGE Site Area: 9.32 SF AC "C" A'C Pervious Area 310,891 7.14 0.30 2.14 On Site Buildings 10,827 0.25 0.90 0.22 On Site Streets 54,729 1.26 0.90 1.13 On Site Parking 10,492 0.24 0.90 0.22 On Site Sidewalks 18,907 0.43 0.90 0.39 Other On Site - - 0.90 - Off Site - - 0.90 - 405,846 9.32 0.44 Weighted C Impervious 94,955 % Impervious: 23.4% WWHCC SUBBASIN #2 Site Area: 6.46 SF AC "- A'C Pervious Area 152,843 3.51 0.30 1.05 On Site Buildings 31,799 0.73 0.90 0.66 On Site Streets 6,970 0.16 0.90 0.14 On Site Parking 84,942 1.95 0.90 1.76 On Site Sidewalks 4,792 0.11 0.90 0.10 Other On Site - 0.00 0.9 0.00 Off Site - 0 0.9 0 281,346 6.46 0.57 Weighted C Impervious 128,503 % Impervious: 45.7% WWHCC SUBBASIN #3 Site Area: 0.38 SF AC "C., A'C Pervious Area 8,918 0.20 0.30 0.06 On Site Buildings - - 0.90 - On Site Streets 7,660 0.18 0.90 0.16 On Site Parking - - 0.90 - On Site Sidewalks - - 0.90 - Other On Site - - 0.90 - Off Site - - 0.90 - 16,578 0.38 0.58 Weighted C Impervious 7,660 % Impervious: 46.2% 2.2 DEVELOPED DRAINAGE CHARACTERISTICS WWHCC SUBBASIN #4 Site Area: 10.41 11 SF AC C A C Pervious Area 315,927 7.25 0.30 2.18 On Site Buildings 43,565 1.00 0.90 0.90 On Site Streets 15,285 0.35 0.90 0.32 On Site Parking 61,139 1.40 0.90 1.26 On Site Sidewalks 15,870 0.36 0.90 0.33 Other On Site 1,608 0.04 0.90 0.03 Off Site - 0.00 0.90 0.00 453,394 10.41 0.48 Weighted C Impervious 137,467 3.16 . % Impervious: 30.3% WWHCC SITE AREA "Total" Site Area: 26.56 SF AC "C" A*C Pervious Area 788,579 18.10 0.30 5.43 On Site Buildings 86,191 1.98 0.90 1.78 On Site Streets 84,644 1.94 0.90 1.75 On Site Parking 156,573 3.59 0.90 3.23 On Site Sidewalks 39,569 0.91 0.90 0.82 Other On Site 1,608 0.04 0.90 0.03 Off Site - 0.00 0.90 0.00 1,157,164 26.56 0.49 Weighted C Impervious 368,585 Impervious: 31.9% AllG 1 0 2010 2.3 TEMPORARY SEDIMENT BASIN SIZING File: Project: Location: Design: Date: Revision: 3126.00.09 Wounded Warrior Hope & Care Center Camp Lejeune, NC JIB 5/10/2010 TEMPORARY SEDIMENT BASIN DRAINAGE AREA = 453,395 square feet DRAINAGE AREA = 10.41 Acres DISTURBED AREA = 10.41 Acres OFFSITE DISTURBED AREA = 0.00 Acres TOTAL DISTURBED AREA = 10.41 Acres VOLUME REQUIRED (@3600 cf/ac) = 37471 Cubic Feet VOLUME PROVIDED @ 16.65 = 49242 Cubic Feet BOTTOM ELEV. = 14.50 Feet TOP OF EMBANKMENT = 17.00 Feet BASIN DEPTH = 2.50 Feet SIDE SLOPE = 3:1 IMAX TEMPORARY SEDIMENT BASIN ELEV CHANGE IN AREA VOL. SUM VOL. FT ELEV. SF CF CF 14.5 15208 0 0.5 8734 15 19728 8734 1 21669 16 23610 30403 1 25607 17 27604 56010 2 010 1 2.3 1 1 I 11 1 1 t t u 1 1 1 TEMPORARY SEDIMENT BASIN SIZING ISurface Area Required 325 SF x Q10 CFS = Surface Area (SF) Q10 (CFS)= Surface Area Required= Area Provide (At E1 16.65) HYDROLOGIC REPORT FOR combined SUMMARY OF PEAK FLOW RATES , FREQ PRE -DEVELOPED POST -DEVELOP POND FLOW FLOW ELEVATION (yr) (c.f.s.) (c.f.s.) (ft.) ----------------- _________------- _--------- ________-__-----_---___—_____-_-, 2 10.09 13.09 15.90 10 13.87 17.36 16.51 HYDROLOGIC REPORT - POND OUTPUT DEVICES 1=CIRCULAR ORIFICE (SKIMMER OUTLET ELEVATION) INVERT 14.5000 C 0.6000 D 0.1600 if(H<0)Q=3.0'D'(H"1.5) if (H >= D) Q = C' A' SQRT(64.4' (H - RAID) 3=TRAPEZODIDAL BROAD CRESTED WEIR INVERT 16.6500 W 5.0000 A 45.0000 Q = 4.8 - (H " 1.5) - (0.667 ' W + 0,533 ' H ` TAN (A) 27.76 9,029 26,206 ROUTED STORAGE OUTFLOW (cult.) (c.f.$) 30052.0 0.11 45561.3 0.13 AUG 1 0 2010 1 2.4 SWALE VELOCITY CALCULATIONS File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Dare: 5/10/2010 Swale Calculation Swale "A" Area: 0.75 Acres C value: 0.3 Intesit 10 r 5.53 in/hr Actual Discharge 1.24 cfs Il[awliw+liilril Bottom Width 0 FT Velocity 1.00 FPS LT Side Slope 3 :1 (H:V) Flow Area 1.24 SF RT Side Slope 3 :1 (H:V) Flow Top Width 3.85 FT Manning's N 0.03 Wetted Perimeter 4.06 FT Channel Slope 0.002 FT/FT Critical Depth 0.40 FT Depth 0.64 FT/FT Critical Slope 0.024 FT/FT Discharge 1.24 CFS Froude Number 0.31 Swale Calculation Swale "B" Area: 3.13 Acres C value: 0.3 ntesit 10 r 5.29 in/hr Actual Discharge 4.97 cfs Bottom Width 0 FT LT Side Slope 3 :1 (H:V) RT Side Slope 3 :1 (H:V) Manning's N 0.03 Channel Slope 0.0015 FT/FT Depth 1.14 FT/FT Discharge 4.97 CFS Tc = 24.7 min Velocity 1.27 FPS Flow Area 3.90 SF Flow Top Width 6.84 FT Wetted Perimeter 7.21 FT Critical Depth 0.70 FT Critical Slope 0.0020 FT/FT Froude Number 0.30 Stone Check Dams added to Swale to reduce velocity. AUG 1 0 2010 BY: 2.13 POND ROUTING CANCULATIONS-1 Hoggard-Sure Associates, P.C. 901 PortCentre Parkway, Suite 5 ' Portsmouth, VA 23704 Wed Jun 16 09:17:29 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\WWHCC-PONDS.pro -------------------------------------------------------------------------------- HYDROLOGIC REPORT - SUMMARY OF PEAK FLOW RATES ----------------------------- BASIN: combined __-----------_--_ ID: PREDEVELOPMENT AREA = 6.73 AVERAGE BASIN SLOPE 0.00 HYDRAULIC LENGTH _ 0.00 TIME OF CONCENTRATION = 30.00 BASIN CURVE NUMBER = 0.30 _ DEVELOPMENT AREA - 10.41 AVERAGE BASIN SLOPE = 0.00 HYDRAULIC LENGTH = 0.00 TIME OF CONCENTRATION 20.00 BASIN CURVE NUMBER 0.48 BYPASS AREA = 0.13 AVERAGE BASIN SLOPE 0.00 1 HYDRAULIC LENGTH 0.00 TIME OF CONCENTRATION = 0.00 BASIN CURVE NUMBER = 0.00 Frequency Pre -developed By-pass area Developed Allowable peak (years) Peak Q (cfs) Peak Q (cfs) Peak Q (cfs) Peak Q (cfs) ----------------------------------------------------------------------- 1 5.4 0.0 17.5 5.4 2 6.5 0.0 20.9 6.5 ' 10 9.0 0.0 27.8 9.0 25 10.3 0.0 31.5 10.3 100 12.5 0.0 37.2 12.5 1 2.13 POND ROUTING CANCULATIONS-2 Hoggard-Sure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Wed Jun 16 09:19:39 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM -------------------------------------------------------------------------------- SEWER - POND\WWHCC-PONDS.pro HYDROLOGIC REPORT FOR combined SUMMARY OF PEAK FLOW RATES FREQ PRE -DEVELOPED POST -DEVELOP POND ROUTED FLOW FLOW ELEVATION STORAGE OUTFLOW (yr) (c.f.s.) (c.£.s.) (ft.) (cu.ft.) (c.f.$) ----------------------------------------------------------------------- 1 5.43 17.54 16.21 37948.4 0.43 2 6.52 20.94 16.42 43396.5 1.32 10 8.96 27.78 16.75 51766.6 5.51 25 10.32 31.48 16.94 56688.5 8.93 ' 100 12.50 37.23 17.21 64541.9 15.04 i 1 1 2.13 POND ROUTING CANCULATIONS-1 Hoggard-Sure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Wed Jun 16 09:21:15 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\WWHCC-PONDS.pro -------------------------------------------------------------------------------- HYDROLOGIC REPORT - POND DEPTH VS STORAGE PROVIDED POND: Pond A ELEV DEPTH AREA VOLUME SUMVOL feet sq_ft_ _cu_ft_ _cu_ft_ ------- __ _feet 14.5 15208.0 0.0 0.5 8734.0 15.0 19728.0 8734.0 0.7 16297.9 15.7 26836.0 25031.4 0.3 7566.9 16.0 23610.0 32598.3 1.0 25607.0 17.0 27604.0 58205.3 1.0 29657.5 ' 18.0 31711.0 87862.8 1 p 1 2.13 POND ROUTING CANCULATIONS _J Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Wed Jun 16 09:22:05 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\WWHCC-PONDS.pro HYDROLOGIC REPORT - POND OUTPUT DEVICES POND: Pond A 1=CIRCULAR ORIFICE INVERT 14.5000 C 0.6000 D 0.2080 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) 2=CIRCULAR STANDPIPE INVERT 16.3000 C 1.5000 D 2.5000 if (H <= D) Q = C * 3.14159 * D * (H ** 1.5) e if (H > D) Q = C * A * SQRT(64.4 * H) 3=TRAPEZODIDAL BROAD CRESTED WEIR INVERT 16.6500 W 5.0000 A 45.0000 Q = 4.8 * (H ** 1.5) * (0.667 * W + 0.533 * H * TAN(A) 4=CIRCULAR ORIFICE INVERT 15.7500 C 0.6000 D 0.3300 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) 1 1 ' 2.13 POND ROUTING CANCULATIONS 1 Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Wed Jun 16 09:23:20 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - ----------------------------------------------------------- HYDROLOGIC REPORT - STAGE, STORAGE, AND DISCHARGE POND: Pond A ----------------------------------------------------------- 1=CIRCULAR ORIFICE INVERT 14.50 C 0.60 D 0.21 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) 2=CIRCULAR STANDPIPE INVERT 16.30 C 2.50 D 1.50 if (H <= D) Q = C * 3.14159 * D * (H ** 1.5) if (H > D) Q = C * A * SQRT(64.4 * H) 3=TRAPEZODIDAL BROAD CRESTED WEIR INVERT 16.65 W 5.00 A 45.00 Q = 4.8 * (H ** 1.5) * (0.667 * W + 0.533 * H * TAN(A) 4=CIRCULAR ORIFICE INVERT 15.75 C 0.60 D 0.33 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) ELEV STORAGE OUTFLOW (CU.FT.) (CPS) 14.50 0.0 0.000 14.60 1746.8 0.020 14.70 3493.6 0.056 14.80 5240.4 0.072 14.90 6987.2 0.089 15.00 8734.0 0.103 15.14 11993.5 0.120 15.28 15253.0 0.135 15.42 18512.4 0.148 15.56 21771.9 0.160 15.70 25031.4 0.171 15.71 25283.6 0.172 15.72 25535.9 0.173 15.73 25788.1 0.174 15.74 26040.3 0.174 15.75 26292.6 0.175 15.80 27553.7 0.190 15.85 28814.9 0.214 15.90 30076.0 0.244 15.95 31337.2 0.278 16.00 32598.3 0.317 16.06 34134.7 0.368 16.12 35671.1 0.388 16.18 37207.6 0.417 16.24 38744.0 0.444 16.30 40280.4 0.469 16.37 42072.9 0.840 16.44 43865.4 1.484 16.51 45657.9 2.258 16.58 47450.4 3.092 16.65 49242.8 3.934 16.72 51035.3 5.017 16.79 52827.8 6.219 16.86 54620.3 7.424 16.93 56412.8 8.708 17.00 58205.3 10.134 17.20 64136.8 14.674 POND\WWHCC-PONDS.pro Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Wed Jun 16 09:23:20 2010 PROJECT: RTEXCO\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\WWHCC-PONDS.pro HYDROLOGIC-REPORT---STAGE,-STORAGE,- YDROLOGICREPORT-STAGE,STORAGE, AND DISCHARGE POND: Pond A ____________________________________________ 17.40 70068.3 ___ 20.049 17.60 75999.8 26.086 17.80 81931.3 33.058 18.00 87862.8 77.648 I I 1 I 1 1 1 1 LJ 1 ®® M M M� M M® M® M M 2.5 STORM PIPE CALCULATIONS FILE: 3126.00.09 Sheet 1 of 3 Project: Wounded Warriors Hope and Care Center& HO Location: Camp Lejeune, NC HOGGARD/EURE ASSOCIATES Design: HE 901 PortCentre Pkwy., Suite 5 Date: Mar-10 Portsmouth, Virginia 23704 Yr. Storm: 10 N Value: 0.013 (RCP) STORM SEWER DESIGN COMPUTATIONS FROM TO DRAIN. RUN-OFF CxA CxA INLET RAIN RUNOFF '0' INVERT INVERT LENGTH SLOPE PIPE VELOCI CAPACI FLOW FLOW FLOWLINE PT. PT. AREA COEFF. INCR. ACCUM. TIME FALL "0" ACCUM. UP LOW DIAM. TIME RATIO ELEV. INCR. RIM acres 'C" min. irVhr cfs ds ft ft./ft. inches ft./sec. cfs min. 0 /Of ft. A11 Al A9 A8 A7 A6 AS A4 A3 A2 A10 A9 A8 A7 A6 A5 A4 A3 A2 Al 0.05 0.52 0.49 0.11 0.00 0.48 0.55 0.07 0.90 0.61 0.38 0.55 0.00 0.47 0.51 0.64 0.05 0.32 0.19 0.06 0.00 0.23 0.28 0.04 6 0.05 0.36 0.55 0.61 0.61 0.84 1.12 1.21 1.38 1.54 15.00 15.50 16.56 17.08 17.81 17.95 20.17 20.77 21.12 21.41 5.25 5.19 5.08 5.03 4.96 4.94 4.75 4.70 4.67 4.65 0.25 1.66 0.96 0.30 0.00 1.14 1.34 0.21 0.81 0.76 0.25 1.91 2.83 3.11 4.90 6.04 7.21 T57, 8.34 9.07 17.43 16.96 16.87 16.66 16.38 16.16 15.94 15.18 14.93 14.62 16.96 16.87 16.66 16.38 16.16 15.94 15.18 14.93 14.62 14.55 70.0 92.0 82.0 115.0 36.0 222.0 152.0 82.0 79.0 47.0 0.0067 0.0010 0.0025 0.0025 0.0060 0.0010 0.0050 0.0030 0.0040 0.0015 6 12 15 15 15 15 18 24 24 24 2.35 1.44 2.64 2.64 4.09 1.67 4.21 3.95 4.57 2.80 0.46 1.13 3.24 3.24 5.02 2.05 7.45 12.42 14.35 8.78 0.50 1.07 0.52 0.73 0.15 2.22 0.60 0.35 0.29 0.28 0.54 1.69 0.87 0.96 0.98 2.95 0.97 0.61 0.58 1.03 21.40 19.30 19.30 20.80 20.80 19.15 19.15 20.50 19.65 18.20 6.55 A4-1 A4 M.820671-77 4 0.04 15.00525 0.23 0.23 15.48 15.18 100 0.0030 15 2.89 3.55 0.58 0.06 20.50 20.50 7 0.37 A7-4 A7.3 48.503.28 1.22 1.22 16.72 16.62 36 0,0030 15 2.89 3.55 0.21 0.34 19.10 A7-3 A7-2 A7-2 A7-1 0.21 0.52 00 0.11 0.37 0.48 48.71 49.13 3.28 3.26 0.00 0.36 1.22 1.57 16.62 16.57 16.57 16.42 42 51 0.0010 0.0030 15 15 1.67 2.89 2.05 3.55 0.42 0.29 0.59 0.44 20.00 18.50 A7-1 A7 0.16 0.52 0.08 0.56 49.42 3.25 0.27 1.84 16.42 16.38 44 0.0010 15 1.67 2.05 0.44 0.90 18.50 20.80 84 B3 82 B3 B2 81 0.79 0.25 0.33 0.46 0.83 0.79 0.36 0.21 0.27 0.36 0.57 0.84 15.00 15.71 16.21 5.25 5.17 5.12 1.92 1 1.10 1.37 1.92 2.99 4.33 15.07 14.79 14.59 14.79 14.59 14.50 112 79 46 0.0025 0.0025 0,0020 15 1 15 18 2.64 2.64 2.67 3.24 3.24 4.71 1 0.71 0.50 0.59 0.92 19.30 18.95 18.40 17.60 C2 C1 1.03 041 0.42 0.42 15.00 5.25 2.20 2.20 14.65 14.53 48 0,0025 15 2.64 3.24 18.0017.80 J0.290.92 E4 E3 E3 E2 0.45 0.60 Routed Equivalent 0.27 0.27 15.00 5,25 6.84 1.44 6.84 8.28 13.00 12.78 12.78 12.38 35 50 0.0064 0.0080 16 18 4.77 5.33 8.43 9.42 16.30 18.53 E2 E1 0.00 0.00 0.00 027 15.16 5.23 0.00 8.28 12.38 11.52 107 0.0080 18 5.33 9.42 16.85 17.50 F2 F1 0.15 0.60 0.09 0.09 15.00 5.25 0.47 0.47 16.90 1 16.80 50 0.0020 1 15 2.36 2.90 0.35 0.16 20.00 19.50 D2 D1 1.19 0.46 0.55 0.55 15.00 5.25 2.91 2.91 16.20 16.00 64 0.003 15 2.94 3.61 0.36 0.81 19.84 19.17 H2 H1 2.31 0.41 0.95 0.95 15.00 5.25 5.02 5.02 16.5 115.25 64 0.0195 15 7.37 9.04 0.14 0.56 19.50 9.75 G2 01 0.15 0.60 0.09 0.09 15.00 5.25 0.48 0.48 15.15 14.61 72 0.0075 15 4.57 5.61 0.26 0.09 17.70 7.70 2.6 STORM SEWER DESIGN COMPUTATIONS (CONTINUED) FILE: 3126.00.09 Sheet 2 of 2 Project: Location: Wounded Warriors Hope and Care Center& HQ Camp Lejeune, INC HOGGARD/EURE ASSOCIATES 901 PortCentre Pkwy., Suite 5 Design: Date: HE 3/1912010 Portsmouth, Virginia 23704 Yr. Storm: INValue: 0.013 HYDRAULIC GRADE LINE CALCULATIONS BASIN 1 1. Enter Tailwater Elevation (R.) ? 16.75 2. Enter "N" value for pipe? 0.013 (RCP) FROM TO OUT PIPE LOUT FRICTION DNSTREAM VOLT M.H. INLET OIN PIPE "K" ANGLEF2.35 F.L.E. H.G.E. PT. PT. (cfs) DIA. (R.) SLOPE INVERT (FPS) SHAPE (cfs) DIA. A11 A10 A9 AS A7 A6 AS A4 A3 A2 A10 A9 A8 A7 A6 A5 A4 A3 A2 A7 0.25 1.91 283 3.11 4.90 604 7.21 7.57 8.34 9.07 6.00 12.00 1500 15.00 15.00 15.00222.00 18.00 24.00 24.00 24.00 70.00 92.00 8200 115.00 36.00 152.00 82.00 79.00 47.00 0.0067 0.0010 0.0025 0.0025 0.0060 0.0010 0.0050 0.0030 0.0040 0,0015 16.96 16.87 16.66 16.38 16.16 15.94 15.18 14.93 14.62 14.55 2.35 1.44 2.64 2.64 4.09 1.67 4.21 3.95 4.57 2.80 Y Y V Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y 0.00 0.25 1.66 0.96 0.30 ` 0.00 1.14 1.34 0.21 0.81 6.000 12.000 15.000 15,000 15.000 15.000 18.000 24.000 24.000 24.000 0.00 0.00 0.70 0.00 0.70 0.00 0.28 0.28 0.00 0.00 1.67 4.21 3.95 4.57 21.40 19.30 19.30 20.80 20.80 19.15 19.15 20.50 19.65 18.20 19.43 18.95 18.84 18.60 18.28 17.98 17.70 16.90 16.29 16.29 1.97 0.35 0.46 2.20 2.52 1.17 1.45 3.60 3.36 1.91 A4-1 A4 0.23 15.00 100.00 0.0030 15.18 2.89 Y Y 0.00 15.000 0.00 0.00 18.50 16.49 2.01 A7-4 A7-3 A7-2 A7-1 A7-3 A7-2 A7-1 A7 1.22 1.22 1.57 1.84 15.00 15.00 15.00 15.00 36.00 42.00 51.00 44.00 0.0030 0.00 00 0.0030 0.0010 16.62 16.57 16.42 16.38 2.89 1.67 2.89 1.67 Y Y Y Y Y Y Y Y 0.00 1.22 0.00 0.36 15.000 15.000 15.000 15.000 0.22 0.00 0.00 0.00 0.00 2.89 1.67 2.89 20.80 19.30 18.95 18.40 17.75 17.63 17.63 17.45 3.05 1.67 1.32 1 0.95 B4 B3 B2 B3 82 B1 1.92 2.99 4.33 V5.00 15.00 18.00 112.00 79.00 46.00 0.0025 0.0025 0.0020 14.79 14.59 14.50 2.64 2.64 2.67 Y Y Y Y Y Y 0.00 1.92 1.10 15.000 15.000 18.000 0.00 0.00 0.00 0.00 2.64 2.64 18.00 17.80 16.30 15.79 15.70 15.70 2.21 2.10 0.60 C2 Ct 2.20 15.00 48.00 0.0025 14.53 2.64 Y V 0.00 15.000 0.00 1 0.00 16.85 15.53 1.32 E1 E2 E3 E2 E3 E4 6.84 828 8.28 18.00 18..00 1800 35.00 50.00 107.00 0,0064 0..0080 00080 12.78 12.38 11.52 4.77 5.33 5.33 V Y Y Y a00 6.84 2 18.000 18.000 000 0.00 0.00 0.70 0.00 5.33 16.30 11 85 6 13.98 13.58 12.72 2.32 4.95 4.13 F2 F1 0.47 1 15.00 50.00 0.0020 16.80 2.36 Y Y 0.00 15.000 0.00 0.00 20.00 17.80 2.20 2.7 LID REQUIRED STORAGE VOLUME I I Runoff Volume Calculations CN 98 57 SCS Runoff Curve Number Method pavement grass total composite 1 r rainfall 1 yr runoff 1 r runoff 2 yr rainfall 2 r runoff 2 r runoff & buildings I CN P S la D P S I Q sf sf sf inches inches cf inches inches of Pre -Development Post -Development 21932 143333 446246 324845 468178 4681781 58.9 69.6 3.62 3.62 6.97 4.38 1.39 1 0.88 0.539 1.058 21011 41260 4.41 4.41 6.97 14.381 0.91 1.579 35524 61600 increase 0.519 20249 1 1 0.668 26076 I I I I I I CN 98 57 SCS Runoff Curve Number Method pavement grass total composite 95th 95th 95th & buildings CN Percentile S la Percentile I Percentile sf sf sf P inches cf I Pre -Development 21932 446246 4681781 58.9 2.40 6.97 1.39 1 0.127 4946 Post -Development 143333 324845 4bb1781 69.6 2.40 4.38 0.88 0.394 15362 increase 0.267 10417 LID REQUIRED STORAGE VOLUME 1 ' 2.8 LID VOLUMES PROVIDED File: 3126.00.09 Project: Wounded Warrior Hope 8 Care Center Location: Camp Lejeune, NC Design: JWF Date: 5/102010 ' LID FEATURE -A VOLUME TOP OF LID = 20.00 18,30 2262 0 RIM OF LID= 19.30 0.7 1851.15 BOTTOM OF LID = 18.30 19,00 3027 1851 0.3 1004.1 19.30 3667 2855 cfs LID FEATURE - B VOLUME TOP OF LID = 20.00 18.25 246 0 RIM OF LID = 19.00 0.25 77 BOTTOM OF LID = 18.25 18.50 370 77 0.5 225 19.00 530 302 cfs LID FEATURE - C VOLUME ' TOP OF LID = 20.00 18.25 154 0 RIM OF LID = 19.00 0.25 45.625 BOTTOM OF LID = 18.25 18.50 211 46 1 0.5 129 19.00 305 175 cfs LID FEATURE - D VOLUME TOP OF LID = 20.15 18.15 3544 0 RIM OF LID= 19.15 0.85 4014.98 BOTTOM OF LID = 18.15 19.00 5903 4015 ' 0.15 912 19.15 6257 4927 cfs ' LID FEATURE - E VOLUME TOP OF LID = 18.00 14.20 68 0 ' RIM OF LID = BOTTOM OF LID = 15.50 14.20 15.00 0.8 1733 720.4 720 0.5 1131.5 15.50 2793 1852 cfs LID FEATURE - F VOLUME TOP OF LID = 20.00 18.80 1047 0 RIM OF LID = 19.30 0.2 254.4 BOTTOM OF LID = 18.80 19.00 1497 254 0.3 480.6 ' 19.30 1707 735 cfs TOTAL STORED VOLUME 10846 cfs 1 2.9 Wet Detention Pond Sizing Calculations Pond Drainage Area(D.A.)- 10.41 Acres Impervious Area - 3.16 Acres 9 Impervious, (I) = 30.3 9 Use a 3.5 foot deep pond, with 90% TSS Therefore, SA/DA- MINIMUM REQUIRED SURFACE AREA AT PERMANENT POOL (PP): = SA/DA x Drainage Area= MINIMUM REQUIRED VOLUME Rv- .05 + .009(I)- 0.32 VOLUME - (1.5"/12") X Rv X D.A. X 43560 18299 CUBIC FEET 3.05 (From Table 3.3-3) SURFACE AREA (S.A.) PROVIDED AT PP : 15208 SF(>Required S.A.)@ Elev. _ SET ELEVATION OF TEMPORARY POOL (TP): REQ. VOL./S.A. PROVIDED @ PP = THEREFORE USE 120 FEET TP ELEV. - 15.700 FEET SURFACE AREA AT TEMPORARY POOL ELEVATION: - L x W 19212 SQUARE FEET 13829 SF 14_50 ft 1.20 FEET VOLUME PROVIDED (S.A. PROVIDED(PP) + S.A. @ TP ELEV.)/2 x (TP ELEV. - PP ELEV) (B21+B36)/2 X. (C28) 20652 CUBIC FEET (> REQUIRED VOL., OKAY) FOREBAY VOLUME: BOTTOM OF POND ELEVATION AND SURFACE AREA: 59.0 FT - 676 SF PERMANENT POOL VOLUME = 45637 CUBIC FEET FOREBAY VOLUME REQUIRED- .2(VOL. OF PP)- 2122 CUBIC FEET FOREBAY VOLUME PROVIDED- 9492 CUBIC FEET 20.8% ORIFICE SIZING: Qi - REQ. VOL./172000 - 0.106 CFS (FLOWRATE REQUIRED FOR A 2 DAY DRAWDOWN Qy - REQ. VOL./259200 - 0.071 CPS (FLOWRATE REQUIRED FOR A 3 DAY DRAWDOWN Q5 - REQ. VOL./432000 - 0.042 UPS (FLOWRATE REQUIRED FOR A 5 DAY DRAWDOWN CHOOSE A CIRCULAR ORIFICE, AVERAGE HEAD = 2.5 0,208 ORIFICE - DRIVING HEAD (H/3) = 0.331 FEET AREA - 3.14R' AREA = 0.0341 SF Q-Cp(A2gh)i/' Q= 0.094 CPS (.106/-.078</-.042) USE ONE (1) - ONE INCH (2.5") DIAMETER PVC 2.10 WET DETENTION POND VOLUME File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Date: 05/01/10 ELEVATION AREA VOLUME SUM VOL 10 6908 0 1 7575 11 8241 7575 1 8936 12 9630 16510 1 10353 13 11076 26863 1 11827 14 12578 38690 BOTTOM SHELF 0.5 6947 14.5 15208 45637 PERM POOL 0.5 8301 15 17995 53937 TOP SHELF 0.7 13022 15.7 19212 66960 0.3 5843 16 19743 72803 1 20645 17 21547 93448 1 22477 18 23407 115925 2.11 FOREBAY VOLUMES File: 3126.00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Date: 5/15/2010 ELEVATION AREA VOLUME SUM VOL 11 2257 0 1 2544 12 2830 2544 1 3145 13 3460 5689 1 3803 14 4146 9492 Top of Forebay _1 AUG 1 0 2010 13': I 1 O I 1 1 1 1 1 1 1 1 I 2.12 AVERAGE DEPTH CALCULATIONS File: 3126,00.09 Project: Wounded Warrior Hope & Care Center Location: Camp Lejeune, NC Design: JWF Date: 05/05/10 POND B day = 0.25 X 1+ Abot_shelf + Abot_shelf + Abot_pond X Depth Ape"_pool 2 Abot shelf 0.25 X 1+ 12578 + 19486 X 4.5 15208 2 12578 0.25 X 1+ 0.83 + 9743.00 X 0.00036 0.25 X 1.83 + 3.49 0.46 + 3.49 day = 3.942495 AUr 1 0 2010 1 P1378 — WOUNDED WARRIOR HOPE AND CARE CENTER (WWHCC) MARINE CORPS BASE CAMP LEJEUNE PROJECT NARRATIVE EROSION & SEDIMENT CONTROL 1. GENERAL INFORMATION a. Name of Project: P1378 — WOUNDED WARRIOR HOPE AND CARE CENTER b. Street Address: West of Hospital Corps Road, currently unnamed road City: Camp Lejeune County: Onslow C. Acres in Tract: Property is all located within the Boundary of Camp Lejeune d. Acres Being Disturbed: This is a Modification of an existing permit. ' The total acreage of the project is 26.56 The actual Wounded Warrior site, Sub Basin #4 is 10.41 acres. Additional acreage disturbed = 6.36, not previously disturbed. e. Acres in Wetlands: None f. Ownership Information: United States Marine Corps g. Description of Proposed Development: Project P1378 —Wounded Warrior Hope ' and Care Center includes two (2) buildings, a 7,400 sf Battalion Headquarters Building and a 36,152 sf Hope and Care Center a 100 car parking lot, a wet storm water management basing and associated utilities. Low Impact Development features are being constructed to satisfy Navy Criteria to promote infiltration. Due to the Seasonal High Water Table, we understand that these features are not designed to NCDENR standards and request that these features not be permitted. These LID features will act as conveyance of the storm water from the site to the proposed Wet Detention Pond. WWHCC: The proposed building is located just south of the Wounded Warrior BEQ project, currently under construction. The site is located just west of a currently unnamed access road, and north of a proposed "Ring Road" currently out for bids. Due to the overlapping of the WWHCC project with the BEQ project the permit for the BEQ shall be modified. The Wounded Warrior Hope and Care Center will require extensive earthwork and utility construction. The Latitude and Longitude of the site are as follows: Latitude: 340 43' 12.2" N 34.7200550 Longitude: 770 21' 50.88" W-77.3641340 [13Y AUG 1 0 2010 : The increase in impervious surface is as follows: ' Pre -Developed % Impervious = 21.2% Developed % Impervious = 31.9% ' h. All erosion control measures shall be constructed prior to land disturbance. All Stormwater treatment facilities shall be constructed at their appropriate timing. i. Sanitary sewer and water supply shall be provided by extension of the existing 1 utility systems. All sewer and water systems are owned and operated by MCB Camp Lejeune. ej. There are no historical sites or public monies associated with this project. k. We do not believe there are any compliance issues with the site. 1.2 STORMWATER INFORMATION 1 1 1 1 a. C. Water Body Information River Basin: Stream Classification: Index Number: White Oak SC; Northeast Creek, 19-16-(3.5) High Density, based on location at Camp Lejeune Commercial — US Government IID��7�9��'f�ll The proposed total percentage of impervious will be increased by this project - Pre -Developed % Impervious = 21.2% Developed % Impervious = 31.9% 1.3 STORMWATER NARRATIVE ' Stormwater management will comply with the requirements of the applicable UFC and the stormwater management instructions included in the RFP. The Stormwater Management design will emphasize Low Impact Development (UFC 3- ' 210-10) Best Management Practices including grassed swales, filter strips, and infiltration trenches (not permitted with NCDENR). The geotechnical report prepared for Projects P1378 Wounded Warrior Hope & Care Center and P1330 Battalion Headquarters Building indicates different conditions from those provided in the RFP. The geotechnical report indicates ground water observed at 1-5 below existing grade. These elevations may be due to a perched water table condition. The geotechnical report states that the Normal Seasonal High Water Table (SHWT) is estimated at 1 to 2.5' below existing grade. The elevation of the SHWT will not allow the use of sand filters, bio-retention, and infiltration due to the design requirements of NCDENR. NCDENR requires a minimum of two (2) feet of separation between the management feature and the SHWT. Cl I �I 1 I I 1 To satisfy the LID requirements of the Camp Lejeune and the Navy, infiltration trenches will be provided throughout the site to capture and transport stormwater through the site. These trenches will capture the required volume to satisfy the LID calculations, the 95th Percentile storm event, 2.4 inches. This.volume will be infiltrated thru into the existing ground. Due to high SHWT, under drains shall be provided to ensure drainage. See civil calculations for storage volumes. Other LID features shall include minimizing curbing, paving and storm piping, while maximizing overland flow, green space, and natural features. One (1) wet ponds shall be constructed to satisfy the requirements of NCDENR. This pond will be sized to comply with NCDENR design regulations. The routed pond outflow shall maintain the 25YR storm to less than pre -developed conditions. The 100YR storm shows an increase from 12.50 cfs to 15.04 cfs. The pond routing calculations do not consider the potential loss of runoff within the LID infiltration features. Being conservative, the pond has been sized without recognizing the added befifit of the infiltration areas. This thought process was also established to accommodate the NCDENR requirements. The infiltration trenches will transport overflow storm water to the wet ponds. It is our intent to not have the infiltration trenches part of the storm water permit since 1 they will not meet the design requirements, specifically 2' separation from the SHWT. 1.4 EROSION AND SEDIMENT CONTROL MEASURES All Erosion & Sediment Control Measures will be installed in accordance with the latest edition of the North Carolina Erosion and Sediment Control Manual. Erosion Control measures to be implemented on this site include: ' Top soiling Temporary Gravel Construction Entrance/Exit Temporary Seeding Permanent Seeding Grass -Lined Channels Outlet Stabilization Structure ' Rock Pipe Inlet Protection Stone Check Dam Sediment Fence 1 Temporary Sediment Basin Dust Control ' Sediment fence will be used to prevent sediment from traveling off the site into the adjacent areas. A construction entrance will also be placed at a convenient location to facilitate construction operations. 1 One (1) temporary sediment basin shall be provided for the site and shall be located in the area of the permanent wet detention pond. The sediment trap shall provide 3600 ' cubic feet of sediment storage per acre of disturbed area. LJ ITrap characteristics are as follows Sediment Basin Disturbed Area = 453,395 Square Feet = 10.41 acres Volume required = 37,471 cubic feet, @ 3600cf/ac Volume provided at principal spillway, elevation 16.65 = 49,242 cubic feet. 1.5 PERMANENT STABILIZATION The site will be stabilized as the construction is completed. The seeding schedule will be followed as stated on the construction documents. 1.6 SOILS ' The soils report was prepared by GET Solutions, Inc., Virginia Beach, Virginia (Dated December 16, 2009). The report indicated the following: The results of our soil test borings indicated the presence of 4 to 24 inches of ' topsoil at the boring locations. The subsurface soils encountered below the topsoil were generally noted to consist of CLAY (CL, CH) with varying amounts of sand. ' The Standard Penetration Test (SPT) results, N-values, recorded within this initial soil layer ranged from 3 to 14 blows-perfoot (BPF) indicating a soft to stiff relative density. Borings B-4, B-5, CBR-1 through CBR-3, and BMP-1 through BMP-4 were terminated within this stratum. 1.7 GROUND WATER ' The groundwater level was recorded at the location of borings B-1 through B-6, CBR-1 through CBR-3, and BMP-1 through BMP-4 as observed through the wetness of the recovered soil samples during the drilling operations. The initial groundwater table was measured to occur at depths ranging from 1 to 5 feet below current grades at the boring locations which coincides with elevations ranging from 14 to 17.5 feet MSL. However, these groundwater readings are anticipated to be the result of perched conditions over restrictive soil layers occurring near the surface. The boreholes were backfilled upon completion for safety considerations. As such, the reported groundwater levels may not be indicative of the static groundwater level. The SHWT depths at these boring locations were estimated based on the Munsell® color classifications and our experience with similar soil conditions. Furthermore, the normal SHWT depths were estimated to be about 1 to 2.5 feet below the existing site grade elevations at the above noted boring locations, which 1 corresponds to elevations ranging from about 15.3 to 17.5 feet MSL. 1 1 1 1 1.8 O&MPLAN MAINTENANCE OF STORM WATER MANAGEMENT AND EROSION CONTROL STRUCTURES All permanent storm water management and erosion control structures will be maintained by the Contractor during construction. After construction is complete, the temporary erosion control measures will be removed by the Contractor and the permanent stormwater management basins will become the responsibility of the Facilities Maintenance Officer, at MCB Camp Lejeune. 1. INSPECT AFTER EVERY RUNOFF PRODUCING RAINFALL EVENT: ' 1. Basin inlet (Flared -end sections) - Remove any clogging debris. 2. Wet Detention Pond - Remove trash accumulation and repair eroded areas. ' 2. INSPECT QUARTERLY: 3. Inlet Piping - Repair undercutting, remove interior trash, and replace rip -rap. 4. Wet Detention Pond - Repair eroded areas, remove trash. ' 3. INSPECT SEMI-ANNUALLY (EVERY 6 MONTHS): 5. Basin Depth - Sediment shall be removed when it accumulates to a depth of ' approximately (6") six inches. 4. GENERAL MAINTENANCE NOTES: ' 6. Stabilize side slopes and re-establish stone check dams pre-treatment within dry detention ponds regularly. I 1 U 1 1 1 1 IWounded Warrior Hope and Care Center ' SECTION O1 57 13.00 22 ' EROSION AND SEDIMENT CONTROL 07/06 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM D 3787 (2001) Bursting Strength of Textiles - Constant -Rate -of -Traverse (CRT), Ball Burst Test ASTM D 4533 (1991; R 1996) Trapezoid Tearing Strength of Geotextiles ' ASTM D 4632 (1991; R 1996) Grab Breaking Load and Elongation of Geotextiles ' NORTH CAROLINA SEDIMENT CONTROL COMMISSION (NCSCC) NCSCC ESCM (1993) Erosion and Sediment Control Planning and Design Manual 1.2 DESCRIPTION OF WORK The work includes the provision of temporary and permanent erosion control measures to prevent the pollution of air, water, and land within the project limits and in areas outside the project limits where work is accomplished in conjunction with the project. 1.3 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Construction Sequence Schedule; G SD-03 Product Data Sediment Fence Dust Suppressors SECTION O1 57 13.00 22 Page 1 ' Wounded Warrior Hope and Care Center 31260009 ' Filter Fabric 1.4 CONSTRUCTION SEQUENCE SCHEDULE ' Submit a contractor furnished construction work sequence schedule, a minimum of 30 days prior to start of construction. The work schedule shall coordinate the timing of land disturbing activities with the provision of erosion control measures to reduce on site erosion and off site sedimentation. Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and pollution. e1.5 STATE APPROVED PLAN The erosion control plan indicated has been approved by the State. No additional State review and approval of the erosion control plan is required, unless the Contractor desires to modify the erosion control plan indicated. Should the Contractor desire to modify the State approved plan, a resubmittal to the State, including the State's approval is required prior to the start of construction. The contractor shall be responsible for any additional costs and time incurred as a result of the resubmittal of the previously approved erosion control plan. The contractor shall ' anticipate a minimum 45 day review period by the State. Provide and maintain erosion control measures in accordance with NCSCC ESCM, and as specified herein. ' PART 2 PRODUCTS 2.1 SEDIMENT FENCE 2.1.1 State Standard Sediment Fence NCSCC ESCM Standard 6.62.4 thru 6.62.7, sediment fence (maximum height of 24 inches). ' 2.2 CATCH BASIN PROTECTION 2.2.1 State Standard Catch Basin Protection NCSCC ESCM Standard 6.52. 2.3 CONSTRUCTION ENTRANCE ' 2.3.1 State Standard Construction Entrance 2.3.1.1 Aggregate ' NCSCC ESCM, Standard 6.06. 2.3.1.2 Filter Fabric A woven or nonwoven polypropylene, nylon, or polyester containing stabilizers and/or inhibitors to make the fabric resistant to deterioration from ultraviolet, and with the following properties: ' a. Minimum grab tensile strength (TF 25 #1/ASTM D 4632) 180 pounds b. Minimum Puncture (TF 25 #4/ASTM D 3787) 75 psi in the weakest direction SECTION O1 57 13.00 22 Page 2 e ' Wounded Warrior Hope and Care Center 31260009 ' C. Apparent Opening Size 40-80 (U.S. Sieve Size) ' d. Minimum Trapezoidal tear strength (TF 25 #2/ASTM D 4533) 50 pounds 2.4 DUST SUPPRESSORS Calcium chloride, or other standard manufacturer's spray on adhesives designed for dust suppression. 2.5 TEMPORARY SEEDING 2.5.1 State Standard Temporary Seeding See Specification Section 32 92 19 SEEDING 8 PART 3 EXECUTION 3.1 CONSTRUCTION SEQUENCE SCHEDULE Stabilize areas for construction access immediately with gravel. Install principal sediment basins and traps before any major site grading takes t place. Provide additional sediment traps, sediment fences, and filter barriers as grading progresses. Provide catch basin protection around existing drainage structures, and inlet and outlet protection at the ends of new drainage systems. Stabilize graded and disturbed areas immediately ' after grading. Permanent stabilization shall be provided immediately on areas that have been final graded. Temporary seeding and mulching shall be provided on disturbed areas as specified in the paragraph entitled "Temporary Seeding." Installation of temporary erosion control features t shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and sediment deposition. Remove temporary erosion control measures at the end of construction and provide permanent seeding. ' 3.2 SEDIMENT FENCES Install posts at the spacing indicated, and at an angle between 2 degrees ' and 20 degrees towards the potential silt load area. Sediment fence height shall be approximately18-24 inches Do not attach filter fabric to existing trees. Secure filter fabric to the post and wire fabric using staples, tie wire, or hog rings. Imbed the filter fabric into the ground as indicated. ' Splice filter fabric at support pole using a 6 inch overlap and securely seal. 3.3 CATCH BASIN PROTECTION ' Install as indicated. 3.4 CONSTRUCTION ENTRANCE ' Provide as indicated, a , at points of vehicular ingress and egress on the construction site. Construction entrances shall be cleared and grubbed, and then excavated a minimum of 3 inches prior to placement of the filter ' fabric and aggregate. The aggregate shall be placed in a manner that will prevent damage and movement of the fabric. Place fabric in one piece, where possible. Overlap fabric joints a minimum of 12 inches. SECTION O1 57 13.00 22 Page 3 Wounded Warrior Hope and Care Center 3.5 DUST SUPPRESSORS 31260009 Immediately dampen the surface before calcium chloride application. Apply dust suppressors on unsurfaced base, subbase and other unsurfaced travel ways. Apply calcium chloride at the rate of 1.0 to 1.25 pounds per square yard of surface for pellets for the initial application. For subsequent applications of calcium chloride, application rates may be approximately 75 percent of initial application rates. Do not apply when raining or the moisture conditions exceed that required for proper application. Apply other dust suppressors in accordance with manufacturers instructions. Protect treated surfaces from traffic for a minimum of 2 hours after treatment. Repeat application of dust suppressors as required to control dust emissions. 3.6 TEMPORARY SEEDING 3.6.1 Time Restrictions Within 48 hours after attaining the grading increment specified herein, provide seed, fertilizer, mulch and water on graded areas when any of the following conditions occur: a. Grading operations stop for an anticipated duration of 30 days or more. b. When it is impossible or impractical to bring an area to finish grade so that permanent seeding operations can be performed without serious disturbance from additional grading. C. Grading operations for a specific area are completed and the seeding seasons specified for permanent seeding in Section 32 92 19, "SEEDING" is more than 30 days away. d. When an immediate cover is required to minimize erosion, or when ' erosion has occurred. e. Provide on erosion control devices constructed using soil materials. ' 3.6.2 Seeding Requirements 3.6.2.1 State Standard Seeding Requirements ' See Specification Section 32 92 19 3.7 MAINTENANCE AND INSPECTION ' Inspect erosion control devices after each rainfall and daily during pro longed rainfall. Remove sediment deposits after each rainfall or when sediment reaches approximately one-half the barrier height. Immediately t repair damaged erosion control devices and damaged areas around and underneath the devices. Maintain erosion control devices to assure continued performance of their intended function. Modify the erosion control plan as required to control problem areas noticed after each ' inspection. Modifications shall be approved by the Contracting Officer. 3.8 CLEAN UP At the completion of the job, or when directed or approved by the SECTION O1 57 13.00 22 Page 4 ' Wounded Warrior Hope and Care Center tibGiQ1DY] Contracting Officer, temporary erosion control devices shall be removed. Erosion control devices and areas immediately adjacent to the device shall be filled (where applicable), shaped to drain and to blend into the surrounding contours, and provided with permanent seeding. Erosion control devices may remain in place after job completion when approved by the Contracting Officer. End of Section SECTION O1 57 13.00 22 Page 5 Wounded Warrior Hope and Care Center 31260009 SECTION 31 23 00.00 20 EXCAVATION AND FILL 04/06 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. AMERICAN WATER WORKS ASSOCIATION(AWWA) AWWA C600 (2005) Installation of Ductile -Iron Water Mains and Their Appurtenances ASTM INTERNATIONAL (ASTM) ASTM C 136 (2005) Sieve Analysis of Fine and Coarse Aggregates ASTM C 33 (2003) Concrete Aggregates ASTM D 1140 (2000) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve ASTM D 1556 (2000) Density and Unit Weight of Soil in Place by the Sand -Cone Method ASTM D 1557 (2002e1) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2,700 kN-m/m3)) ASTM D 2216 (2005) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass ASTM D 2321 (2005) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity -Flow Applications ASTM D 2487 (2000) Soils for Engineering Purposes (Unified Soil Classification System) ASTM D 2922 (2004) Density of Soil and Soil -Aggregate in Place by Nuclear Methods (Shallow Depth) ASTM D 3017 (2004) Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth) ASTM D 4318 (2000) Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D 698 (2000ael) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-Ibf/cu. ft. (600 SECTION 31 23 00.00 20 Page 1 Wounded Warrior Hope and Care Center kN-m/cu. m.)) U.S. ARMY CORPS OF ENGINEERS (USACE) EM 385-1-1 (2003) Safety -- Safety and Health Requirements U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) EPA 530/F-93/004 EPA 600/4-79/020 1.2 DEFINITIONS 1.2.1 Capillary Water Barrier 0=161414M] (1993; Rev 0; Updates I, II, IIA, IIB, and III) Test Methods for Evaluating Solid Waste (Vol IA, IB, IC, and II) (SW-846) (1983) Methods for Chemical Analysis of Water and Wastes A layer of clean, poorly graded crushed rock, stone, or natural sand or gravel having a high porosity which is placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to the area immediately below a slab. 1.2.2 Degree of Compaction ' Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 1557, for general soil types, abbreviated as percent laboratory maximum density. 1.2.3 Hard Materials Weathered rock, dense consolidated deposits, or conglomerate materials ' which are not included in the definition of "rock" but which usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal. 1.2.4 Rock Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which ' can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1 cubic yard in volume. ' Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production. ' 1.3 SUBMITTALS Government approval is required for submittals with a "G" designation; ' submittals not having a 11G" designation are The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Shoring and Sheeting Plan SECTION 31 23 00.00 20 Page 2 Wounded Warrior Hope and Care Center Dewatering work plan Submit 15 days prior to starting work. SD-06 Test Reports Borrow Site Testing; G Fill and backfill test Select material test Porous fill test for capillary water barrier Density tests Moisture Content Tests 31260009 Copies of all laboratory and field test reports within 24 hours of the completion of the test. 1.4 DELIVERY, STORAGE, AND HANDLING Perform in a manner to prevent contamination or segregation of materials. 1.5 CRITERIA FOR BIDDING Base bids on the following criteria: a. Surface elevations are as indicated. b. Pipes or other artificial obstructions, except those indicated, will not be encountered. C. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction. e. Material character is indicated by the boring logs. g. Borrow material Suitable backfill and bedding material in the quantities required are not available at the project site- h. Blasting will not be permitted. Remove material in an approved manner. 1.6 REQUIREMENTS FOR OFF SITE SOIL Soils brought in from off site for use as backfill shall be tested for TPH, BTEX and full TCLP including ignitability, corrosivity and reactivity. Backfill shall contain less than 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and less than 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and shall not fail the TCPL test. TPH concentrations shall be determined by using EPA 600/4-79/020 Method 418.1. BTEX concentrations shall be determined by using EPA 530/F-93/004 Method 5030/8020. TCLP shall be performed in accordance with EPA 530/F-93/004 Method 1311. Provide Borrow Site Testing for TPH, SECTION 31 23 00.00 20 Page 3 Wounded Warrior Hope and Care Center 191YXSQ1LF1 BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site. Material shall not be brought on site until tests have been approved by the Contracting Officer. 1.7 QUALITY ASSURANCE 1.7.1 Shoring and Sheeting Plan Submit drawings and calculations, certified by a registered professional engineer, describing the methods for shoring and sheeting of excavations. Drawings shall include material sizes and types, arrangement of members, and the sequence and method of installation and removal. Calculations shall include data and references used. ' 1.7.2 Dewatering Work Plan Submit procedures for accomplishing dewatering work. ' 1.7.3 Utilities Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor's risk. Excavation made t with power -driven equipment is not permitted within two feet of known Government -owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the ' indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility ' lines or subsurface construction immediately to the Contracting Officer. PART 2 PRODUCTS ' 2.1 SOIL MATERIALS 2.1.1 Satisfactory Materials ' Any materials classified by ASTM D 2487 as GW, GP, GM, GP -GM, GW-GM, GC, GP -GC, GM -GC, SW, SP, SM, SW -SC, SP-SM, SP-SC, free of debris, roots, wood, scrap material, vegetation, refuse, soft unsound particles, and frozen, deleterious, or objectionable materials. Unless specified otherwise, the maximum particle diameter shall be one-half the lift thickness at the intended location. 2.1.2 Unsatisfactory Materials Materials which do not comply with the requirements for satisfactory materials. Unsatisfactory materials also include man-made fills, trash, refuse, or backfills from previous construction. Unsatisfactory material 1 also includes material classified as satisfactory which contains root and other organic matter, frozen material, and stones larger than 3 inches. The Contracting Officer shall be notified of any contaminated materials. 2.1.3 Cohesionless and Cohesive Materials Cohesionless materials include materials classified in ASTM D 2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM, GP -GM, GW-GM, SW-SM, SECTION 31 23 00.00 20 Page 4 IWounded Warrior Hope and.Care Center 31260009 SP-SM, and SM shall be identified as cohesionless only when the fines are nonplastic (plasticity index equals zero). Materials classified as GM and SM will be identified as cohesive only when the fines have a plasticity index greater than zero. 2.1.4 Common Fill Approved, unclassified soil material with the characteristics required to compact to the soil density specified for the intended location. 2.1.5 Backfill and Fill Material ASTM D 2487, classification GW, GP, GM, GC, SW, SP, SM, SC with a maximum ASTM D 4318 liquid limit of 35, maximum ASTM D 4318 plasticity index of 12, and a maximum of 25 percent by weight passing ASTM D 1140, No. 200 sieve. 2.1.6 Select Material Provide materials classified as GW, GP, SW, SP, by ASTM D 2487 where indicated. The liquid limit of such material shall not exceed 35 percent when tested in accordance with ASTM D 4318. The plasticity index shall not be greater than 12 percent when tested in accordance with ASTM D 4318, and not more than 35 percent by weight shall be finer than No. 200 sieve when tested in accordance with ASTM D 1140. ' 2.1.7 Topsoil Provide as specified in Section 32 92 19SEEDING. 2.2 POROUS FILL FOR CAPILLARY WATER BARRIER ASTM C 33 fine aggregate grading with a maximum of 3 percent by weight passing ASTM D 1140, No. 200 sieve, or 1-1/2 inches and no more than 2 percent by weight passing the No. 4 size sieve or coarse aggregate Size 57, 67, or 77 and conforming to the general soil material requirements specified in paragraph entitled "Satisfactory Materials." 2.3 UTILITY BEDDING MATERIAL Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent ' of ASTM D 698 maximum density. Plastic piping shall have bedding to spring line of pipe. Provide ASTM D 2321 materials as follows: a. Class I: Angular, 0.25 to 1.5 inches, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells. b. Class II: Coarse sands and gravels with maximum particle size of ' 1.5 inches, including various graded sands and gravels containing small percentages of fines, generally granular and noncohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class as specified in ASTM D 2487. 1 SECTION 31 23 00.00 20 Page 5 ' Wounded Warrior Hope and Care Center 31260009 2.3.1 Gravel Clean, coarsely graded natural gravel, crushed stone or a combination ' thereof having a classification of GW GP in accordance with ASTM D 2487 for bedding . Maximum particle size shall not exceed 3 inches. 2.4 BORROW Obtain borrow materials required in excess of those furnished from excavations from sources outside of Government property. 2.5 BURIED WARNING AND IDENTIFICATION TAPE Polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inch minimum width, color coded as specified below for the intended utility with warning and 1 identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording. Color and printing shall be permanent, unaffected by moisture or soil. ' Warning Tape Color Codes Yellow: Electric ' Yellow: Gas, Oil; Dangerous Materials Orange: Telephone and Other Communications Blue: Water Systems Green: Sewer Systems 2.5.1 Warning Tape for Metallic Piping ' Acid and alkali -resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of tape shall be 0.003 inch. Tape shall have a minimum strength of 1500 psi lengthwise, and 1250 psi crosswise, with a maximum 350 percent elongation. ' 2.5.2 Detectable Warning Tape for Non -Metallic Piping Polyethylene plastic tape conforming to the width, color, and printing ' requirements specified above. Minimum thickness of the tape shall be 0.004 inch. Tape shall have a minimum strength of 1500 psi lengthwise and 1250 psi crosswise. Tape shall be manufactured with integral wires, foil backing, or other means of enabling detection by a metal detector when tape ' is buried up to 3 feet deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection. 2.6 DETECTION WIRE FOR NON-METALLIC PIPING Detection wire shall be insulated single strand, solid copper with a minimum of 12 AWG. 1 1 SECTION 31 23 00.00 20 Page 6 Wounded Warrior Hope and Care Center 31260009 PART 3 EXECUTION 3.1 PROTECTION 3.1.1 Shoring and Sheeting Provide shoring, bracing,trench boxes and sheeting as required. In addition to Section 25 A and B of EM 385-1-1 , include provisions in the shoring and sheeting plan that will accomplish the following: a. Prevent undermining of pavements, foundations and slabs. b. Prevent slippage or movement in banks or slopes adjacent to the excavation. 3.1.2 Drainage and Dewatering Provide for the collection and disposal of surface and subsurface water encountered during construction. 3.1.2.1 Drainage 1 So that construction operations progress successfully, completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils, prevent erosion and undermining of ' foundations. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ' ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing. Excavation shall be performed so that the site, the area ' immediately surrounding the site, and the area affecting operations at the site shall be continually and effectively drained. 3.1.2.2 Dewatering ' Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of ' construction. French drains, sumps, ditches or trenches will not be permitted within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, the water level shall be maintained continuously, at least 1 feet below the working level. 1 Operate dewatering system continuously until construction work below existing water levels is complete. Submit performance records weekly. ' SECTION 31 23 00.00 20 Page 7 ' Wounded Warrior Hope and Care Center 31260009 ' 3.1.3 Underground Utilities Location of the existing utilities indicated is approximate. The Contractor shall physically verify the location and elevation of the ' existing utilities indicated prior to starting construction. The Contractor shall contact the Public Works Department for assistance in locating existing utilities. 2.1.4 Machinery and Equipment Movement of construction machinery and equipment over pipes during construction shall be at the contractor's risk. Repair, or remove and provide new pipe for existing or newly installed pipe that has been displaced or damaged. 3.2 SURFACE PREPARATION 3.2.1 Clearing and Grubbing Unless indicated otherwise, remove trees, stumps, logs, shrubs, brush and vegetation and other items that would interfere with construction operations within the clearing limits. Remove stumps entirely. Grub out matted roots and roots over 2 inches in diameter to at least 18 inches below existing surface. 3.2.2 Stripping Strip suitable soil from the site where excavation or grading is indicated and stockpile separately from other excavated material. Material unsuitable for use as topsoil shall be stockpiled and used for backfilling. Locate topsoil so that the material can be used readily for the finished grading. Where sufficient existing topsoil conforming to the material requirements is not available on site, provide borrow materials suitable for use as topsoil. Protect topsoil and keep in segregated piles until needed. 3.2.3 Unsuitable Material Remove vegetation, debris, decayed vegetable matter, sod, mulch, and rubbish underneath paved areas or concrete slabs. 3.3 EXCAVATION Excavate to contours, elevation, and dimensions indicated. Reuse excavated materials that meet the specified requirements for the material type required at the intended location. Keep excavations free from water. Excavate soil disturbed or weakened by Contractor's operations, soils softened or made unsuitable for subsequent construction due to exposure to weather. Excavations below indicated depths will not be permitted except to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed. Refill with select material and compact to 95 percent of ASTM D 1557 maximum density. Unless specified otherwise, refill excavations cut below indicated depth with satisfactory material and compact to 95 percent of ASTM D 1557 maximum density. Satisfactory material removed below the depths indicated, without specific direction of the Contracting officer, shall be replaced with satisfactory materials to the indicated excavation grade; except as specified for spread footings. Determination of elevations and measurements of approved overdepth excavation of unsatisfactory material SECTION 31 23 00.00 20 Page 8 ' Wounded Warrior Hope and Care Center 31260009 ' below grades indicated shall be done under the direction of the Contracting Officer. ' 3.3.1 Structures With Spread Footings Ensure that footing subgrades have been inspected and approved by the Contracting Officer prior to concrete placement. Fill over excavations with concrete during foundation placement. 3.3.2 Pipe Trenches Excavate to the dimension indicated. Grade bottom of trenches to provide uniform support for each section of pipe after pipe bedding placement. Tamp if necessary to provide a firm pipe bed. Recesses shall be excavated to accommodate bells and joints so that pipe will be uniformly supported for the entire length. Rock, where encountered, shall be excavated to a depth of at least 6 inches below the bottom of the pipe. 3.3.3 Excavated Materials Satisfactory excavated material required for fill or backfill shall be placed in the proper section of the permanent work required or shall be separately stockpiled if it cannot be readily placed. Satisfactory material in excess of that required for the permanent work and all unsatisfactory material shall be disposed of as specified in Paragraph "DISPOSITION OF SURPLUS MATERIAL." ' 3.3.4 Final Grade of Surfaces to Support Concrete Excavation to final grade shall not be made until just before concrete is ' to be placed. Only excavation methods that will leave the foundation rock in a solid and unshattered condition shall be used. Approximately level surfaces shall be roughened, and sloped surfaces shall be cut as indicated into rough steps or benches to provide a satisfactory bond. Shales shall ' be protected from slaking and all surfaces shall be protected from erosion resulting from ponding or flow of water. 3.4 SUBGRADE PREPARATION ' Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. The surface shall be scarified to a depth of 6 ' inches before the fill is started. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material. When subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of 6 inches, pulverized, and compacted to the specified density. When the subgrade is part fill and part excavation or natural ground, the excavated or natural ground portion shall be scarified to a depth of 12 inches and compacted as specified for the adjacent fill. ' Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic -tired rollers, steel -wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used. Minimum subgrade density shall be as specified herein. SECTION 31 23 00.00 20 Page 9 IWounded Warrior Hope and Care Center 1 3.4.1 Proof Rolling 31260009 Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping, proof roll the existing subgrade of the building and pavements with six passes of a 15 ton, pneumatic -tired roller. Operate the truck in a systematic manner to ensure the number of passes over all areas, and at speeds between 2 1/2 to 3 1/2 miles per hour. When proof rolling under buildings, the building subgrade shall be considered to extend 5 feet beyond the building lines, and one-half of the passes made with the roller shall be in a direction perpendicular to the other passes. Notify the Contracting Officer a minimum of 3 days prior to proof rolling. Proof rolling shall be performed in the presence of the Contracting Officer. Rutting or pumping of material shall be undercut as directed by the Contracting Officerand replaced with select material. 3.5 FILLING AND BACKFILLING Fill and backfill to contours, elevations, and dimensions indicated. Compact each lift before placing overlaying lift. 3.5.1 Common Fill Placement Provide for general site . Use satisfactory materials. Place in 6 inch lifts. Compact areas not accessible to rollers or compactors with mechanical hand tampers. Aerate material excessively moistened by rain to a satisfactory moisture content. Finish to a smooth surface by blading, rolling with a smooth roller, or both. 3.5.2 Backfill and Fill Material Placement ® Provide for paved areas and under concrete slabs, except where select material is provided. Place in 6 inch lifts. Do not place over wet or frozen areas. Place backfill material adjacent to structures as the structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or against the structure. 3.5.3 Select Material Placement Provide under structures not pile supported. Place in 6 inch lifts. Do 1 not place over wet or frozen areas. Backfill adjacent to structures shall be placed as structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or against structure. 3.5.4 Backfill and Fill Material Placement Over Pipes and at Walls Backfilling shall not begin until construction below finish grade has been ' approved, underground utilities systems have been inspected, tested and approved, forms removed, and the excavation cleaned of trash and debris. Backfill shall be brought to indicated finish grade and shall include backfill for outside oil water seperators. Where pipe is coated or wrapped for protection against corrosion, the backfill material up to an elevation 2 feet above sewer lines and 1 foot above other utility lines shall be free from stones larger than 1 inch in any dimension. Heavy equipment for spreading and compacting backfill shall not be operated closer to ' foundation or retaining walls than a distance equal to the height of SECTION 31 23 00.00 20 Page 10 1 IWounded Warrior Hope and Care Center 1921V 16I18R, backfill above the top of footing; the area remaining shall be compacted in layers not more than 4 inches in compacted thickness with power -driven hand tampers suitable for the material being compacted. Backfill shall be placed carefully around pipes or tanks to avoid damage to coatings, wrappings, or tanks. Backfill shall not be placed against foundation walls prior to 7 days after completion of the walls. As far as practicable, backfill shall be brought up evenly on each side of the wall and sloped to drain away from the wall. 3.5.5 Porous Fill Placement Provide under floor and area -way slabs on a compacted subgrade. Place in 4 inch lifts with a minimum of two passes of a hand -operated plate -type vibratory compactor. 3.5.6 Trench Backfilling Backfill as rapidly as construction, testing, and acceptance of work permits. Place and compact backfill under structures and paved areas in 6 inch lifts to top of trench and in6 inch lifts to one foot over pipe outside structures and paved areas. 3.6 BORROW Where satisfactory materials are not available in sufficient quantity from required excavations, approved borrow materials shall be obtained as specified herein. 3.7 BURIED WARNING AND IDENTIFICATION TAPE ' Provide buried utility lines with utility identification tape. Bury tape 12 inches below finished grade; under pavements and slabs, bury tape 6 inches below top of subgrade. t 3.8 BURIED DETECTION WIRE Bury detection wire directly above non-metallic piping at a distance not to exceed 12 inches above the top of pipe. The wire shall extend continuously ' and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 3 feet of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over its entire length. The wire shall enter manholes ' between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe. ' 3.9 COMPACTION Determine in -place density of existing subgrade; if required density exists, no compaction of existing subgrade will be required. Density requirements specified herein are for cohesionless materials. When cohesive materials are encountered or used, density requirements may be reduced by 5 percent. 3.9.1 General Site Compact underneath areas designated for vegetation and areas outside the 5 foot line of the paved area or structure to 85 percent of ASTM D 1557. SECTION 31 23 00.00 20 Page 11 IWounded Warrior Hope and Care Center 31260009 3.9.2 Structures, Spread Footings, and Concrete Slabs Compact top 12 inches of subgrades to 95 percent of ASTM D 1557. Compact common fill fill and backfill material and select material to 95 percent of ASTM D 1557. 3.9.3 Adjacent Area Compact areas within 5 feet of structures to 90 percent of ASTM D 1557. 3.9.4 Paved Areas Compact top 12 inches of subgrades to 95 percent of ASTM D 1557. Compact fill and backfill materials to 95 percent of ASTM D 1557. 3.10 FINISH OPERATIONS 3.10.1 Grading Finish grades as indicated within one -tenth of one foot. Grade areas to drain water away from structures. Maintain areas free of trash and debris. For existing grades that will remain but which were disturbed by Contractor's operations, grade as directed. 3.10.2 Topsoil and Seed Provide as specified in Section 32 92 19 SEEDING. 3.10.3 Protection of Surfaces Protect newly backfilled, graded, and topsoiled areas from traffic, erosion, and settlements that may occur. Repair or reestablish damaged grades, elevations, or slopes. 3.11 DISPOSITION OF SURPLUS MATERIAL Remove from Government property surplus or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber. 3.12 FIELD QUALITY CONTROL 3.12.1 Sampling Take the number and size of samples required to perform the following tests. 3.12.2 Testing Perform one of each of the following tests for each material used. Provide additional tests for each source change. 3.12.2.1 Fill and Hackfill Material Testing Test fill and backfill material in accordance with ASTM C 136 for conformance to ASTM D 2487 gradation limits; ASTM D 1140 for material finer than the No. 200 sieve; ASTM D 4318 for liquid limit and for plastic limit; ASTM D 699 or ASTM D 1557 for moisture density relations, as applicable. SECTION 31 23 00.00 20 Page 12 Wounded Warrior Hope and Care Center 3.12.2.2 Select Material Testing 31260009 Test select material in accordance with ASTM C 136 for conformance to ASTM D 2487 gradation limits; ASTM D 1140 for material finer than the No. 200 sieve; ASTM D 698 or ASTM D 1557 for moisture density relations, as applicable. 3.12.2.3 Porous Fill Testing Test porous fill in accordance with ASTM C 136 for conformance to gradation specified in ASTM C 33. 3.12.2.4 Density Tests Test density in accordance with ASTM D 1556, or ASTM D 2922 and ASTM D 3017. When ASTM D 2922 and ASTM D 3017 density tests are used, verify density test results by performing an ASTM D 1556 density test at a location already ASTM D 2922 and ASTM D 3017 tested as specified herein. Perform an ASTM D 1556 density test at the start of the job, and for every 10 ASTM D 2922 and ASTM D 3017 density tests thereafter. Test each lift at randomly selected locations every 2500 square feet of existing grade in fills for structures and concrete slabs, and every 2500 square feet for other fill areas and every 2500 square feet of subgrade in cut. Include density test results in daily report. a. Bedding and backfill in trenches: One test per 50 linear feet in each lift. 3.12.2.5 Moisture Content Tests In the stockpile, excavation or borrow areas, a minimum of two tests per day per type of material or source of materials being placed is required during stable weather conditions. During unstable weather, tests shall be made as dictated by local conditions and approved moisture content shall be tested in accordance with ASTM D 2216. Include moisture content test results in daily report. -- End of Section -- SECTION 31 23 00.00 20 Page 13 Wounded Warrior Hope and Care Center 31260009 SECTION 32 92 19 SEEDING 10/06 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM C 602 (2006) Agricultural Liming Materials ' ASTM D 4427 (1992; R 2002el) Peat Samples by Laboratory Testing ASTM D 4972 (2001; R 2007) pH of Soils ' U.S. DEPARTMENT OF AGRICULTURE (USDA) AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act ' DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey Laboratory Methods Manual, Version 3.0 ' 1.2 DEFINITIONS 1.2.1 Stand of Turf ' The contractor shall guarantee a full stand of grass over the entire disturbed area. If necessary the contractor will wet down the areas to assist in seed germination or aid in growth in times of excessively dry ' weather. a stand of grass will be considered acceptable when the entire stand of grass is at least four inches high and has achieved at least 95% coverage of disturbed area. Reseeding will be required by the contractor as necessary to obtain the specified stand of grass. 95 percent ground ' cover of the established species. The contractor shall guarantee a full stand of grass over the entire disturbed area. If necessary the contractor will wet down the areas to assist in seed germination or aid in growth in times of excessively dry weather. a stand of grass will be considered acceptable when the entire stand of grass is at least four inches high and has achieved at least 95% coverage of disturbed area. Reseeding will be required by the contractor as necessary to obtain the specified stand of grass. 95 percent ground cover of the established species. The ceremonial lawn is to be established with a high grade bermuda seed or sprig. The area is to be pre -planted with a 19-19-19 ratio before seeding or sprigging. The lawn is to be well established and durable creating a robust lawn. The seed shall have no less than 95% germination, not less than 85% pure seed and not more than 0.5% Weed seed.The established lawn shall have no bare spots. ' SECTION 32 92 19 Page 1 ' Wounded Warrior Hope and Care Center 31260009 Begin maintenance immediately after each area is planted and continue until acceptable lawn is established, but not for less than the following periods: Seeded or sprigged lawns: 60 Days from date of substantial completion. When full maintenance period has not elapsed before end of planting season, or if lawn is not fully established, continue maintenance during next planting season. Maintain and establish lawn by watering, fertilizing, weeding,mowing, trimming, replanting and other operations. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth lawn. In areas where mulch has been disturbed by wind or maintenance operations, add new mulch. Anchor as required to prevent displacement.The weed control fabric must be achored. watering: Schedule watering to prevent wilting , puddling, erosion, and displacement of seed or mulch. Water lawn at a minimum rate of 1 inch per week. Mowing: Mow lawn as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than 40 percent of grass height. Remove no more than 40 percent of grass height, remove no more than 40% of grass -leaf growth in initial or subsequent mowings. Do not delay mowing until grass blades bend over and become matted. Do not mow when grass is wet. Schedule initial and subsequent mowings to maintain the following grass height: Mow grass 3 to 4 inches high. ' Lawn post fertilization: Apply fertilizer after initial mowing and when grass is dry. ' Use fertilizer that will provide actual nitrogen of at least 1 lb/1000 sq. ft. to lawn area. ' 1.3 RELATED REQUIREMENTS Section 31 23 00.00 20 EXCAVATION AND FILL ' 1.4 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section O1 33 00 SUBMITTAL PROCEDURES: SD-03 Product Data ' Wood cellulose fiber mulch Fertilizer Include physical characteristics, and recommendations. SD-06 Test Reports SECTION 32 92 19 Page 2 IWounded Warrior Hope and Care Center 31260009 Topsoil composition tests (reports and recommendations). SD-07 Certificates State certification and approval for seed SD-08 Manufacturer's Instructions 1.5 DELIVERY, STORAGE, AND HANDLING 1.5.1 Delivery 1.5.1.1 Seed Protection Protect from drying out and from contamination during delivery, on -site storage, and handling. 1.5.1.2 Fertilizer Gypsum Sulfur Iron and Lime Delivery Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer gypsum sulphur iron and lime may be furnished in bulk with certificate indicating the above information. 1.5.2 Storage 1.5.2.1 Seed, Fertilizer Gypsum Sulfur Iron and Lime Storage Store in cool, dry locations away from contaminants. 1.5.2.2 Topsoil Prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non -selective herbicide. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil. 1.5.2.3 Handling Do not drop or dump materials from vehicles. 1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS 1.6.1 Restrictions Do not plant when the ground is frozen, snow covered, muddy, or when air temperature exceeds 90 degrees Fahrenheit. 1.7 TIME LIMITATIONS 1.7.1 Seed Apply seed within twenty four hours after seed bed preparation. SECTION 32 92. 19 Page 3 ' Wounded Warrior Hope and Care Center 31260009 PART 2 PRODUCTS 2.1 SEED ' 2.1.1 Classification Provide State -certified seed of the latest season's crop delivered in original sealed packages, bearing producer's guaranteed analysis for percentages of mixtures, purity, germination, weedseed content, and inert material. Label in conformance with AMS Seed Act and applicable state seed laws. Wet, moldy, or otherwise damaged seed will be rejected. Field mixes ' will be acceptable when field mix is performed on site in the presence of the Contracting Officer. ' 2.1.2 Planting Dates See construction drawings for temporary and perminent seeding dates. ' 2.2 TOPSOIL 2.2.1 On -Site Topsoil ' Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on -site in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL. 2.2.2 Off -Site Topsoil Conform to requirements specified in paragraph entitled "Composition." Additional topsoil shall be furnished by the Contractor. 2.2.3 Composition Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D 4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials. Other components shall conform to the following limits: ' Silt 7 to 17 percent Clay 4 to 12 percent Sand 20-35 percent pH 5.5 to 7.0 Soluble Salts 600 ppm maximum 2.3 SOIL CONDITIONERS ' Add conditioners to topsoil as required to bring into compliance with "composition" standard for topsoil as specified herein. 2.3.1 Lime Commercial grade limestone containing a calcium carbonate equivalent ' (C.C.E.) as specified in ASTM C 602 of not less than 94 percent. ' SECTION 32 92 19 Page 4 Wounded Warrior Hope and Care Center 31260009 2.3.2 Aluminum Sulfate Commercial grade. 2.3.3 Sulfur 100 percent elemental 2.3.4 Iron 100 percent elemental 2.3.5 Peat Natural product of peat moss derived from a freshwater site and conforming to ASTM D 4427. shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation. 2.3.6 Sand Clean and free of materials harmful to plants. 2.3.7 Perlite Horticultural grade. 2.3.8 Composted Derivatives Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties: 2.3.8.1 Particle Size Minimum percent by weight passing: No. 4 mesh screen 95 No. 8 mesh screen 80 2.3.8.2 Nitrogen Content Minimum percent based on dry weight: Fir Sawdust 0.7 Fir or Pine Bark 1.0 2.3.9 Gypsum Coarsely ground gypsum comprised of calcium sulfate dihydrate 61 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen. 2.3.10 Calcined Clay Calcined clay shall be granular particles produced from montmorillonite clay calcined to a minimum temperature of 1200 degrees F. Gradation: A minimum 90 percent shall pass a No. 8 sieve; a minimum 99 percent shall be retained on a No. 60 sieve; and a maximum 2 percent shall pass a No. 100 sieve. Bulk density: A maximum 40 pounds per cubic foot. SECTION 32 92 19 Page 5 Wounded Warrior Hope and Care Center 31260009 2.4 FERTILIZER 2.4.1 Granular Fertilizer Organic Synthetic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients: 10 percent available nitrogen 20 percent available phosphorus 8 20 percent available potassium 2.4.2 Hydroseeding Fertilizer Controlled release fertilizer, to use with hydroseeding and composed of pills coated with plastic resin to provide a continuous release of nutrients for at least 6 months and containing the following minimum percentages, by weight, of plant food nutrients. 10 percent available nitrogen 20 percent available phosphorus 20 percent available potassium 2.5 MULCH Mulch shall be free from noxious weeds, mold, and other deleterious materials. 2.5.1 Straw Stalks from oats, wheat, rye, barley, or rice. Furnish in air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Straw shall contrain no fertile seed. 2.5.2 Wood Cellulose Fiber Mulch Use recovered materials of either paper -based (100 percent) or wood -based (100 percent) hydraulic mulch. Processed to contain no growth or germination -inhibiting factors and dyed an appropriate color to facilitate visual metering of materials application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 5.5 to e.2 . Use with hydraulic application of grass seed and fertilizer. 2.6 WATER Source of water shall be approved by Contracting Officer and of suitable quality for irrigation, containing no elements toxic to plant life. PART 3 EXECUTION 3.1 PREPARATION 3.1.1 EXTENT OF WORK Provide soil preparation (including soil conditioners as required), fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations. SECTION 32 92 19 Page 6 tWounded Warrior Hope and Care Center ' 3.1.1.1 Topsoil 31260009 Provide 4 inches of off -site topsoil, on -site topsoil orexisting soilto meet indicated finish grade. After areas have been brought to indicated finish grade, incorporate fertilizer pH adjusters soil conditioners into soil a minimum depth of 4 inches by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic. 3.2 SEEDING 3.2.1 Seed Application Seasons and Conditions Immediately before seeding, restore soil to proper grade. Do not seed when ground is muddy frozen snow covered or in an unsatisfactory condition for seeding. If special conditions exist that may warrant a variance in the above seeding dates or conditions, submit a written request to the Contracting Officer stating the special conditions and proposed variance. Apply seed within twenty four hours after seedbed preparation. Sow seed by approved sowing equipment. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing. 1 3.2.2 Seed Application Method Seeding method shall be broadcasted and drop seedingor hydroseeding. 3.2.2.1 Broadcast and Drop Seeding Seed shall be uniformly broadcast at the rate as indicated on the construction drawings.. Use broadcast or drop seeders. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing. Cover seed uniformly to a maximum depth of 1/4 inch in clay soils and 1/2 inch in sandy soils by means of spike -tooth harrow, cultipacker, raking or other approved devices. 3.2.2.2 Hydroseeding First, mix water and fiber. wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydroseeding operation. Fiber shall be added at 1,000 pounds, dry weight, per acre. Then add and mix seed and fertilizer to produce a homogeneous slurry. Seed shall be mixed to ensure broadcasting at the rate as indicated on the construction drawings. When hydraulically sprayed on the ground, material shall form a blotter like cover impregnated uniformly with grass seed. Spread with one application with no second application of mulch. ' 3.2.3 Mulching 3.2.3.1 Hay or Straw Mulch Straw mulch shall be applied at a rate which will insure approximatelly 75% coverage of the seeded area. The straw and sown seed will be lightly disced into the bed to give it further resistence to blowing and washing. Straw mulch shall be spread uniformly at the rate of 2 tons per acre. ' Mulch shall be spread by hand, blower -type mulch spreader, or other ' SECTION 32 92 19 Page 7 ' Wounded Warrior Hope and Care Center 31260009 approved method. Mulching shall be started on the windward side of relatively flat areas or on the upper part of steep slopes, and continued uniformly until the area is covered. The mulch shall not be bunched or clumped. Sunlight shall not be completely excluded from penetrating to the ground surface. All areas installed with seed shall be mulched on the same day as the seeding. Mulch shall be anchored immediately following spreading. e3.2.3.2 Asphalt Adhesive Tackifier Asphalt adhesive tackifier shall be sprayed at a rate between 10 to 13 gallons per 1000 square feet. Sunlight shall not be completely excluded from penetrating to the ground surface. 3.2.3.3 Asphalt Adhesive Coated Mulch Straw mulch may be spread simultaneously with asphalt adhesive applied at a rate between 10 to 13 gallons per 1000 square feet, using power mulch ' equipment which shall be equipped with suitable asphalt pump and nozzle. The adhesive -coated mulch shall be applied evenly over the surface. Sunlight shall not be completely excluded from penetrating to the ground surface. 3.2.4 Rolling Immediately after seeding, firm entire area except for slopes in excess of ' 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width. If seeding is performed with cultipacker-type seeder or by hydroseeding, rolling may be eliminated. ' 3.2.5 Watering Start watering areas seeded as required by temperature and wind conditions. Apply water at a rate sufficient to insure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out. 3.3 PROTECTION OF TURF AREAS tImmediately after turfing, protect area against traffic and other use. 3.4 RESTORATION ' Restore to original condition existing turf areas which have been damaged during turf installation operations at the Contractor's expense. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete. -- End of Section -- 1 SECTION 32 92 19 Page 8 m ® M- ®- ® = = a--=- = = s _ ® = = •iY ♦ s �t spy i� AUG 1 0 2010 Ii3Y: 3 1 i I Solutions, Inc. Geotechnical • Environmental • Testing REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNCIAL ENGINEERING SERVICES P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T PROJECT NO: EC09-296G December 16, 2009 Prepared for VIRTEXCO Corporation 4007 M L King Jr. Blvd. New Bern, NC 28562 ATTN: MR. Kevin McBride Prepared by GET Solutions, Inc. AUG 1 0 2010 BY: 504 E. Elizabeth Street Ste. 2, Elizabeth City, NC 27909 ♦ Phone 252-335-9765 ♦ Fax 252-335-9766 info@getsolutionsinc.com GET December 16, 2009 Ge Whnitul "EnoirorurunmL Trstinx TO: VIRTEXCO Corporation 4007 ML King Jr Blvd New Bern, NC 28562 Attn: Mr. Kevin McBride RE: Report of Subsurface Investigation and Geotechnical Engineering Services P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base ' Camp Lejeune, North Carolina G E T Project EC09-296G Dear Mr. McBride: In compliance with your instructions, we have completed our Subsurface Investigation and Geotechnical Engineering Services for the referenced project. The results of this study, together with our recommendations, are presented in this report. Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation. We trust that the information contained herein meets your immediate need, and we would ask that you call this office with any questions that you may have. Respectfully Submitted, •. •`'�•��C'allo f'•. G E T Solutions, Inc. ,.`'o���.......°�%y''•. SEAL of 034336 Gerald W. Stalls Jr., P.E. Senior Project Engineer �;c`�' f!✓GIN6`�' �.' ��'•.,;� !y, S1�.'�� NC Reg. #034336""tt""'• Camille A. Kattan, P.E. SEAL SEAL o14103 Principal Engineer NC Reg. # 014103 A: •�P Copies: (3) Client ."•... 504 Gast Elizabeth Street; Suite 2 . Elizabeth City, NC 27909 • Phone: (252)335-9765 • Fax: (252)335-9766 info a gelsohtlionsinc.com I ' Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G EXECUTIVE SUMMARY The project site is located along the north side of Brewster Boulevard within the ' northern portion of the Camp Lejeune military installation in North Carolina. The construction at this site is planned to consist of building two (2) single story structures consisting of a Wounded Warrior Hope and Care Center and Battalion Headquarters. The maximum wall and column foundation loads associated with the structures are not expected to exceed 4 kips per linear foot and 50 kips, respectively, and the floor loads are expected to be on the order of about 150 PSF. The construction at this site is also ' planned to include asphalt paved entrance roadways and parking lots, BMP ponds, as well as associated site infrastructure components. I I I S 0 1 0 e F e C Our field exploration program included six (6) 20- to 50-foot deep Standard Penetration Test (SPT) borings, drilled by G E T Solutions, Inc. within the footprint of the proposed structures. Additionally, three (3) 5-foot deep hand auger borings were drilled within the proposed pavement areas along with CBR testing, as well as four (4) 10-foot hand auger borings drilled within the anticipated BMP pond areas along with saturated hydraulic conductivity (infiltration) testing performed at two (2) of the locations. A brief description of the natural subsurface soil conditions is tabulated below: AVERAGE RANGES OF DEPTH (Feet) STRATUM DESCRIPTION SPT(') N- VALUES Borings: B-1 through B76, BMP-1 through BMP-4, and CBR-1 through CBR-3 0 to TOPSOIL 0.3-2 0.3 — 2 SAND (SP-SM, SM, SC-SM, SC) with varying to I amounts of silt and clay; Not Encountered at 3 to 9 1.5 — 4 Borings B-2 or CBR-3 CLAY (CL, CH) with varying amounts of sand. 0.5 — 2 The soils within this stratum extended to the boring to II termination depth at Borings B-4, B-5, CBR-1 3 to 14 13 — 23 through CBR-3, and BMP-1 through BMP-4 13 — 23 SAND (SP, SP-SM, SM, SC) with varying amounts to III of sand. The soils within this stratum extended to 4 to 76 20 to 50 the boring termination depth at Borings B-1, B-2, B- 3, and B-6 33 — 38 IV Fat CLAY (CH); Boring B-6 only 1 Note (1) SPT = Standard Penetration Test, N-Values in Blows -per -foot solutions. Inc. 1 1 Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G The groundwater level was recorded at the boring locations and as observed through the wetness of the recovered soil samples during the drilling operations. The initial groundwater table was measured to occur at depths ranging from 1 to 5 feet below current grades at the boring locations. The following preliminary evaluations and recommendations were developed based on our field exploration and laboratory -testing program: • Field testing program during construction to include, subgrade proofrolling, compaction testing, and foundation excavation observations for bearing capacity verification. All other applicable testing, inspections, and evaluations should be performed as indicated in the North Carolina State Building Code (2006 International Building Code with North Carolina Amendments). • An estimated cut depth generally ranging from about 4 to 24 inches will be required to remove the topsoil and associated root mat from within the construction areas. • Some subgrade improvements should be anticipated within the construction areas (undercutting and backfilling with select fill) as a result of potentially unstable cohesive subgrade soils. • Shallow foundations designed using a net allowable bearing capacity of 1,600 psf (18-inch embedment, 24-inch width). As an exception, the wall footings within the high bay area should have a minimum width of 30 inches. Additionally,, all foundations should have a maximum footing embedment depth of 2.5 feet below finished grades. • Estimated post -construction total and differential settlements up to 1-inch and''/z inch, respectively. • The foundations should also be designed with the use of top and bottom reinforcing steel for added rigidity and to increase the foundation performance with respect to settlement. • Concrete Masonry Unit wall construction should be designed to contain construction joints at on -center distances not exceeding 25 feet. These joints will provide for more flexible wall members that are less likely to crack as a result of settlement. • Based on the results of the completed field exploration program for the neighboring Wounded Warrior BEQ project (100-foot deep CPT sounding with shear wave velocity testing), the project site is within a site class 'D' in accordance with Table 1615.1.1 of the 2006 International Building Code. 1 Solutions, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G • Pavement sections to be designed using a CBR value of about 8, typical pavement sections are provided in the body of the report. This summary briefly discusses some of the major topics mentioned in the attached report. Accordingly, this report should be read in its entirety to thoroughly evaluate the contents. Solutions, Inc. ' TABLE OF CONTENTS ' EXECUTIVE SUMMARY..............................................................................................i 1.0 PROJECT INFORMATION..............................................................................1 1.1 Project Authorization..............................................................................1 1.2 Project Description.................................................................................1 1.3 Purpose and Scope of Services............................................................2 2.0 FIELD AND LABORATORY PROCEDURES..................................................3 2.1 Field Exploration....................................................................................3 2.2 Laboratory Testing.................................................................................4 3.0 SITE AND SUBSURFACE CONDITIONS........................................................6 3.1 Site Location and Description................................................................6 3.2 Subsurface Soil Conditions....................................................................6 4.0 3.3 Groundwater Information .................... :.................................................. EVALUATION AND RECOMMENDATIONS....................................................8 7 4.1 Clearing and Grading.............................................................................9 4.2 Subgrade Preparation..........................................................................10 4.3 Structural Fill and Placement...............................................................10 4.4 Shallow Foundation Design Recommendations..................................11 4.5 Settlements..........................................................................................12 4.6 Foundation Excavations......................................................................12 4.7 CMU Wall Construction Joints and Foundation Reinforcement ........... 4.8 Floor Slabs...........................................................................................13 13 4.9 Pavement Design................................................................................14 4.10 Seismic Evaluation.............................................................................. 4.11 Storm Water,Design Parameters.........................................................15 15 5.0 CONSTRUCTION CONSIDERATIONS.........................................................17 5.1 Drainage and Groundwater Concerns.................................................17 5.2 Site Utility Installation...........................................................................17 ' 5.3 Excavations.........................................................................................18 6.0 REPORT LIMITATIONS.................................................................................19 ' APPENDIX I BORING LOCATION PLAN APPENDIX II BORING LOGS ' APPENDIX III GENERALIZED SOIL PROFILE APPENDIX IV CONSOLIDATION TEST DATA APPENDIX V SUMMARY OF CBR TEST DATA APPENDIX VI SATURATED HYDRAULIC CONDUCTIVITY TEST RESULTS ' APPENDIX VII CLASSIFICATION SYSTEM FOR SOIL EXPLORATION GET I 11 1 1 LIIJ N 1 1 1 1 1 C 1 Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G 1.0 PROJECT INFORMATION 1.1 Project Authorization G E T Solutions, Inc. has completed our subsurface investigation and geotechnical engineering services for the proposed P1378 Wounded Warrior Hope & Care Center and the proposed P1330 Battalion Headquarters projects located within the Camp Lejeune military installation in North Carolina. The Geotechnical Engineering Services were conducted in general accordance with scope of services stipulated and authorized by Mr. Kevin McBride during email correspondence received on December 1, 2009. 1.2 Project Description It is our understanding that the proposed construction at this site is planned to consist of building two (2) single story structures. Additionally, paved parking areas, entrance roadways, and other infrastructure components will also be constructed at the site as part of this development. The Warrior Hope and Care Center (approximately 36,108 square feet in plan area) will consist of two functional areas, which include an administrative section and a fitness/physical therapy area. The Wounded Warrior Battalion Headquarters (approximately 7,696 square feet in plan area) will contain the administrative and support functions of the battalion. It is our understanding that the structures will include reinforced masonry walls with brick veneer, reinforced concrete foundation and floors, and standing seam metal roofs. The maximum wall and column foundation loads associated with the structures are not expected to exceed 4 kips per linear foot and 50 kips, respectively. The floor loads are expected to be on the order of about 150 PSF. The proposed finished floor elevation for the structures was established to be 22 feet MSL, which is slightly above the existing site grade elevations, which generally range from about 18 to 20 feet MSL. As an exception, isolated areas were noted to have existing elevations as low as 16.3 feet MSL. The existing site grade elevations within the limits of the proposed pavement areas were 1 noted to range from about 16.7 to 20.4 feet MSL. Additionally, two (2) stockpiles of spoils were observed at the project site and were noted to have elevations ranging from about 27.1 to 33.9 feet MSL, corresponding to about 7 to 14 feet above the natural site grade 1 elevations. Accordingly, cut and fill operations necessary to establish the design grade elevations are expected to range from about 7 to 14 feet of cut (stockpiles) and 2 to 5 feet of fill, respectively. 1 If any of the noted information is incorrect or has changed, please inform G E T Solutions, Inc. so that we may amend the recommendations presented in this report, if appropriate. 1 I GET 1 1 Report of Subsurface Investigation and Geotechnical Engineering Services December 16. 2009 P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G 1.3 Purpose and Scope of Services The purpose of this study was to obtain information on the general subsurface conditions ' at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated: 1. General assessment of the soils revealed by the borings performed at the proposed development. ' 2. General location and description of potentially deleterious material encountered in the borings that may interfere with construction progress or ' structure performance, including existing fills orsurficial/subsurface organics. 3. Soil subgrade preparation, including stripping, grading, and compaction. Engineering criteria for placement and compaction of approved structural fill material. 4. Construction considerations for fill placement, subgrade preparation, and foundation excavations. I 5. Feasibility of utilizing a shallow foundation system for support of the proposed structures. Design parameters required for the foundation systems, including foundation sizes, allowable bearing pressures, foundation levels, and expected total and differential settlements. 6. Seismic site classification provided based on the results of the 100-foot deep CPT sounding performed at the neighboring Wounded Warrior BEQ project site as well as our experience in the project area. 7. Typical pavement sections based on the field exploration activities [three (3) 5-foot deep hand auger borings and three (3) CBR tests] and our experience with similar soil conditions. 8. Storm water design parameters including infiltration rates and estimated seasonal high groundwater levels based on the results of four (4) 10-foot deep hand auger borings, two (2) saturated hydraulic conductivity (infiltration) tests, and our experience with similar soil conditions. 2 GET Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G ' The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. Any statements in this report or on the boring logs regarding odors, color, unusual or suspicious items or conditions are strictly for the information of the client. Prior to development of this site, an environmental assessment is advisable. ' 2.0 FIELD AND LABORATORY PROCEDURES ' 2.1 Field Exploration In order to explore the general subsurface soil types and to aid in developing associated ' foundation design parameters, a total of six (6) 20- to 50-foot deep Standard Penetration Test (SPT) borings (designated as B-1 through B-6) were drilled by G E T Solutions, Inc. within the limits of the proposed structure. ' In order to explore the general subsurface soil types and to aid in developing associated pavement design parameters, a total of three (3) 5-foot deep hand auger borings ' (designated as CBR-1 through CBR-3) were drilled within the proposed parking and driveway areas. Additionally, bulk CBR soil sampling was performed at each of the hand auger boring locations. The bulk subgrade soil sampleswere collected from depths ranging ' from 0.5 to 1.5 feet below existing grades. The bulk soil samples were returned to our laboratory and subjected to CBR testing in accordance with ASTM standards. Finally, in order to explore the general subsurface soil types and to aid in developing ' associated storm water design parameters, a total of four (4) 10-foot deep borings (designated as BMP-1 through BMP-4) were performed within the anticipated BMP pond areas, as designated by Hoggard-Eure Associates, PC. Additionally, saturated hydraulic conductivity (infiltration) testing was performed at the location of borings BMP-2 and BMP- 4. The infiltration testing could not be performed at the location of borings BMP-1 or BMP-3 as a result of perched water levels occurring about 1-foot, or less, below the existing site grade elevations. Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. The tests were performed continuously from the existing ground surface to depths of 10 to 12 feet, and at 5-foot intervals thereafter. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30" long split -spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value. A representative portion of each disturbed split -spoon sample was collected with each SPT, placed in a glass jar, sealed, labeled, and returned to our laboratory for review. 3 GET Ifl LJ I LJ in fl 1 I I Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G One (1) thin -walled tube sample was obtained from the very soft CLAY stratum, by hydraulically pressing a 3-inch outside diameter Shelby tube into the soils. Specifically the tube sample was obtained at the location of boring B-4 at a depth of 4 to 6 feet below the existing site grades. The tube was sealed to prevent moisture loss and returned to the laboratory for extraction, classification and consolidation testing. Following the exploration procedures, the borings were backfilled with a neat cement grout mix in accordance with NCDENR requirements. More specific information regarding boring locations and depths is provided in the following table (Table I — Boring Schedule). Table I — Boring Schedule Number oring Boring Depth (feet) Boring Location B-1 45 Battalion Headquarters; North Third, Approximate Center B-2 20 Battalion Headquarters; South Third, Approximate Center B-3 20 Hope & Care Center; North Wing; Approximate Northeast Corner B-4 20 Hope & Care Center; Approximate Center B-5 20 Hope & Care Center; Approximate Center of South End B-6 50 Hope & Care Center; Approximate Center of East End CBR-1 5 South Parking Lot; West Side CBR-2 5 South Parking Lot; East Side CBR-3 5 North Parking Lot/Service Entrance; Approximate Center BMP-1 10 BMP Area West of South Parking Lot BMP-2 10 BMP Area South of South Parking Lot; West Side BMP-3 10 BMP Area South of South Parking Lot, East Side BMP-4 10 BMP Area Southeast of the Battalion Headquarters Southeast Corner The boring locations were established and staked in the field by a representative of G E T Solutions, Inc. The approximate boring locations are shown on the attached "Boring Location Plan" (Appendix 1), which was reproduced based on the site plan provided by the client. 2.2 Laboratory Testing Representative portions of all soil samples collected during drilling were sealed in glass jars, labeled and transferred to our laboratory for classification and analysis. The soil classification was performed by a Geotechnical Engineer in accordance with ASTM D2488. Solutions. Inc ' Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G Nineteen (19) representative soil samples were selected and subjected to laboratory testing, which included natural moisture and 4200 sieve wash testing and analysis, in order to corroborate the visual classification. These test results are provided in the ' following table (Table II - Laboratory Test Results) and are presented on the "Boring Log" sheets (Appendix ll), included with this report. 1 I I I 1 F S 1 I I Table II - Laboratory Test Results Boring No. Sample Type Depth (Feet) Natural Moisture % % Passing #200 Atterberg Limits LLIPLIPI USCS Classification B-1 Split Spoon 4-6 22.8 67.3 45/17/28 CL B-1 Split Spoon 8-10 36.2 91.0 60/21/39 CH B-2 Split Spoon 2-4 32.2 83.8 Not Tested CL B-2 Split Spoon 8-10 26.6 Not Tested 52/20/32 CH B-2 Split Spoon 13-15 20.1 43.0 Not Tested Sc B-4 Split Spoon 2-4 26.7 56.8 Not Tested CL B-4 Shelby Tube 4-6 30.6 89.0 63/21/42 CH B-4 Split Spoon 6-8 31.1 82.2 50/20/30 CH B-5 Split Spoon 4-6 30.4 70.2 Not Tested CH B-5 Split Spoon 8-10 31.4 82.6 Not Tested CH B-5 Split Spoon 13-15 46.0 86.4 Not Tested CH B-6 Split Spoon 2-4 22.0 36.2 Not Tested Sc B-6 Split Spoon 4-6 29.6 72.8 Not Tested CH B-6 Split Spoon 6-8 29.1 67.0 Not Tested CL CBR-1 Bulk Sample 0.5-1.5 21.6 30.6 18/16/2 SM CBR-2 Bulk Sample 0.5-1.5 14.4 48.4 25/17/8 Sc CBR-3 Bulk Sample 0.5-1.5 19.3 50.1 34/17/17 CL BMP-2 Hand Auger 1-2 20.4 48.2 Not Tested SC BMP-4 Hand Auger 0.5-1 17.4 25.5 Not Tested SM One (1) one-dimensional consolidation test was performed on a specimen from the Shelby tube sample obtained at the location of boring B-4 at a depth of 4 to 6 feet beneath the existing site grades. The consolidation test was performed at our Virginia Beach laboratory in general accordance with ASTM D 2435. A representative specimen of the Shelby tube was also subjected to natural moisture content, Atterberg Limits, and 4200 sieve testing. A summary of the consolidation test results is presented in the following table (Table III - Consolidation Test Results) and the comprehensive results are provided in Appendix IV. Solutions. Inc I I lip I u I N I L D I I Report of Subsurface Investigation and Geotechnical Engineering Services P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G December 16, 2009 Table III - Consolidation Test Results (Shelby Tube Samples) Boring Depth Natural Overburden Pre consolidation No. (ft) Moisture Pressure Pressure C° Cr e° (%) (tsf) PC (tsf) B-4 4-6 30.6 0.33 3.53 0.28 0.04 0.839 The selected representative bulk subgrade soil samples (from the pavement areas) were subjected to natural moisture content, 4200 sieve, Atterberg Limits, Standard Proctor, and CBR testing in accordance with ASTM standards. A summary of the CBR test results and the moisture density relationship curves (Proctor Curves) are presented in Appendix V. 3.0 SITE AND SUBSURFACE CONDITIONS 3.1 Site Location and Description The project site is located along the north side of Brewster Boulevard within the northern portion of the Camp Lejeune military installation in North Carolina. The site currently consists of an undeveloped parcel comprised of wooded areas and grass covered areas. As an exception, the proposed construction areas currently contain two (2) 7- to 14-foot high stockpiles of soils which are located within the northern limits of each proposed structure. Based on the topographic information provided on the project site plan performed by Hoggard-Eure Associates, PC, the existing (natural) site grade elevations generally range from about 16.3 to 20.0 feet MSL within the proposed building areas and 16.7 to 20.4 feet MSL within the proposed pavement areas. As an exception, the building areas containing the previously mentioned stockpiles of soils were noted to have established elevations generally ranging from 27.1 to 33.9 feet MSL. The proposed construction area is bordered to the north by the Wounded Warrior BEQ project currently under construction, to the west by wooded areas, to the east by a combination of wooded areas and the existing Hospital entrance roadway with the Hospital beyond, and to the south by wooded areas followed by Brewster Boulevard. 3.2 Subsurface Soil Conditions The results of our soil test borings indicated the presence of 4 to 24 inches of topsoil at the boring locations. The subsurface soils encountered below the topsoil were generally noted to consist of CLAY (CL, CH) with varying amounts of sand. The Standard Penetration Test (SPT) results, N-values, recorded within this initial soil layer ranged from 3 to 14 blows -per - foot (BPF) indicating a soft to stiff relative density. Borings B-4, B-5, CBR-1 through CBR- 3, and BMP-1 through BMP-4 were terminated within this stratum. Solutions. Inc 1 Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G Shallow subsurface deposits of SAND (SP-SM, SM, SC-SM, SC) were encountered above the initial cohesive soil layer at the location of borings B-1, B-3 through B-6, CBR-1, CBR-2, and BMP-1 through BMP-4. These shallow deposits extended below the topsoil to depths ranging from 0.3 to 4 feet below existing grades. The Standard Penetration Test (SPT) results, N-values, recorded within these granular soil deposits ranged from 3 to 9 blows - per -foot (BPF) indicating a very loose to loose relative density. aThe second and final soil layer was noted to consist of SAND (SP, SP-SM, SM, SC) with varying amounts of silt and/or clay. The Standard Penetration Test (SPT) results, N- values, recorded within this soil layer ranged from 4 to 76 blows -per -foot (BPF) indicating a very loose to very dense relative density. Borings B-1 through B-3 and B-6 were terminated within this stratum. The cohesive and/or the granular soils encountered at the location of borings B-2, B-3, B-4, and B-6 were noted to contain trace amounts of organics at depths ranging from about 18 to 23 feet below the existing site grade elevations. Additionally, a 5-foot thick deposit of very soft CLAY (CH) was encountered within the deeper granular soils at location of boring B-6. This very soft clay layer was encountered at a depth 33 feet below existing site grade elevations and extended to 38 feet. Finally, the on -site stockpiles of excavation spoils, presumed to be associated with the Wounded Warrior BEQ project site, were noted to consist of either Topsoil (south stockpile) or SAND (SM with clay, SC-SM, SC; north stockpile). The subsurface description is of a generalized nature provided to highlight the major soil 8 strata encountered. The records of the subsurface exploration are included in Appendix II (Boring Log sheets) and in Appendix III (Generalized Soil Profile), which should be reviewed for specific information as to the individual borings. The stratifications shown on the records of the subsurface exploration represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the transition may be gradual. 3.3 Groundwater Information The groundwater level was recorded at the location of borings B-1 through B-6, CBR-1 through CBR-3, and BMP-1 through BMP-4 as observed through the wetness of the recovered soil samples during the drilling operations. The initial groundwater table was measured to occur at depths ranging from 1 to 5 feet below current grades at the boring locations which coincides with elevations ranging from 14 to 17.5 feet MSL. However, these groundwater readings are anticipated to be the result of perched conditions over restrictive soil layers occurring near the surface. The boreholes were backfilled upon completion for safety considerations. As such, the reported groundwater levels may not be indicative of the static groundwater level. GEC' 1 1 Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G The soils recovered from the location of borings B-1 through B-6, 3MP-1 through BMP-4, and CBR-1 through CBR-3 were classified in general accordance with ASTM D 2487 test method. Also, the soils recovered from boring 13MP-1 through BMP-4 were classified using t the Munsell® Soil Color Charts to aid in estimating normal Seasonal High Water Table (SHWT). I 0 u 1 I 0 I Ill I 1 Il I 1 It is noted that soil morphology is not a reliable indicator of the SHWT in drained soils, as indicated in the "Soil Morphology as an Indicator of Seasonal High Water Tables" (prepared by Peter C. Fletcher; U.S. Department of Agriculture Soil Conservation Service). However, slight color distinctions were observed within the soil samples collected at the location of borings BMP-1 through BMP-4. The SHWT depths at these boring locations were estimated based on the Munsell®color classifications and our experience with similar soil conditions. Furthermore, the normal SHWT depths were estimated to be about 1 to 2.5 feet below the existing site grade elevations at the above noted boring locations, which corresponds to elevations ranging from about 15.3 to 17.5 feet MSL. The current groundwater levels encountered at the project site and the estimated normal SHWT depths are anticipated to be contributed to a combination of the varying existing site grade elevations, existing drainage features, as well as shallow subsurface restrictive soil layers. Furthermore, perched water levels should be expected to occur near or slightly below the existing site grade elevations. Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, sidewalks, etc.). Seasonal groundwater fluctuations of±2feet are common in the project's area; however, greater fluctuations have been documented. We recommend that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on the construction procedures. 4.0 EVALUATION AND RECOMMENDATIONS Our recommendations are based on the previously discussed project information, our interpretation of the soil test borings and laboratory data, and our observations during our site reconnaissance. If the proposed construction should vary from what was described, we request the opportunity to review our recommendations and make any necessary changes. Soludons. Inc S ' Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G ' 4.1 Clearing and Grading The proposed construction area should be cleared by means of removing the existing topsoil and associated root mat. It is estimated that a cut ranging from about 4 to 24 inches in depth (averaging about 10 inches) will be required to remove the existing topsoil and its associated root mat and expose the underlying CLAY (CL, CH) and/or SAND (SP- 1 SM, SM, SC-SM, SC). A cut depth ranging from about 7 to 10 feet is anticipated to be required in order to remove the existing stockpiled materials, which are not anticipated to be suitable for re -use as select fill materials. This cut is expected to extend deeper in I I 1 I 1!1 1 d I II v W isolated areas to remove deeper deposits of unsuitable material which become evident during the clearing. It is recommended that the clearing operations extend laterally at least 5 feet beyond the perimeter of the proposed construction areas. Following the initial clearing, the resulting exposed subgrade will generally be comprised of CLAY (CL, CH) and/or SAND (SM, SC-SM, SC) containing an appreciable amount of fines. Furthermore, as observed during our field exploration procedures perched wateroccurring near the surface will likely result in these soils having natural moistures above their respective optimum moisture contents. Accordingly, combinations of excess surface moisture from precipitation ponding on the site and the construction traffic, including heavy compaction equipment, may create pumping and general deterioration of the bearing capabilities of the surfical soils. Therefore, undercutting to remove loose/soft soils should be expected. The extent of the undercut will be determined in the field during construction based on the outcome of the field testing procedures (subgrade proofroll). In this regard, and in order to reduce undercutting, care should be exercised during the grading and construction operations at the site. Furthermore, inherently wet subgrade soils combined with potential poor site drainage make this site particularly susceptible to subgrade deterioration. Thus, grading should be performed during a dry season if at all possible. This should minimize these potential problems, although they may not be eliminated. The project's budget should include an allowance for subgrade improvements (undercut and backfill with structural fill or aggregate base in the building and pavement areas). Soludons.lnc - 1 1 Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G ' 4.2 Subgrade Preparation Following the clearing operation, the exposed subgrade soils should be densified with a ' large static drum roller. After the subgrade soils have been densified, they should be evaluated by G E T Solutions, Inc. for stability. Accordingly, the subgrade soils should be proofrolled to check for pockets of loose material hidden beneath a crust of better soil. Several passes should be made by a large rubber -tired roller or loaded dump truck over the construction areas, with the successive passes aligned perpendicularly. The number of passes will be determined in the field by the Geotechnical Engineer depending on the soils conditions. Any pumping and unstable areas observed during proofrolling (beyond the initial cut) should be undercut and/or stabilized at the directions of the Geotechnical Engineer. Following the proofroll and approval by the engineer, it is recommended that the newly exposed subgrade soils be compacted to a dry density of at least 95 percent of the ' Modified Proctor maximum dry density (ASTM D1557), as tested to a depth of at least 12 inches. ' 4.3 Structural Fill and Placement Following the approval of the natural subgrade soils by the Geotechnical Engineer, the placement of the fill required to establish the design grades may begin. Any material to be used for structural fill should be evaluated and tested by G E T Solutions, Inc. prior to placement to determine if they are suitable for the intended use. Suitable structural fill material should consist of sand or gravel containing less than 20% by weight of fines (SP, SM, SW, GP, GW), having a liquid limit less than 20 and plastic limit less than 6, and should be free of rubble, organics, clay, debris and other unsuitable material. 1 The subsurface soils encountered at the boring locations underlying the topsoil classified to consist of SAND (SP, SP-SM, SM) appear to meet the criteria recommended in this report for reuse as structural fill. Due to the potential for surficial and/or shallow subsurface 1 perched water conditions to occur, it is likely that any soils excavated on -site and proposed to be reused as select fill will require stockpiling in order to the soils to air dry and obtain a moisture content suitable for placement and compaction. S 1 1 1 10 GET S Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G ' The remaining encountered natural soils noted to consist of CLAY (CL, CH) or SAND (SM with clay, SC-SM, SC) as well as the on -site stockpiles of soil (topsoil and/or SAND; SM with clay, SC-SM, SC) do not appear to meet the criteria for suitable structural fill, but may be used as fill within green areas. The soils noted to consist of SAND (SM with clay, SC- SM, SC) may potentially be reused as pavement select fill soils. However, these soils would likely require drying in the form of stockpiling and/or placing in relatively thin lifts and scarifying in order to obtain a moisture content suitable for compaction, which would likely prove uneconomical for this site considering the potential for suficial and/or shallow subsurface perched water levels. Further classification testing (natural moisture content, ' gradation analysis, and Proctor testing) should be performed in the field during construction to evaluate the suitability of excavated soils for reuse as fill within the building areas. All structural fill should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557). In general, the compaction should be accomplished by placing the fill in maximum 10-inch loose lifts and mechanically compacting each lift to at least the specified minimum dry density. A representative of G E T Solutions, Inc. should perform field density tests on each lift as necessary to assure that adequate compaction is achieved. 0 Backfill material in utility trenches within the construction areas should consist of structural fill (as previously above), and should be compacted to at least 95 percent of ASTM D1557. This fill should be placed in 4 to 6 inch loose lifts when hand compaction equipment is used. Care should be used when operating the compactors near existing structures to avoid transmission of the vibrations that could cause settlement damage or disturb occupants. In this regard, it is recommended that the vibratory roller remain at least 25 feet away from existing structures; these areas should be compacted with small, hand -operated compaction equipment. 4.4 Shallow Foundation Design Recommendations Provided that the recommended earthwork construction procedures are properly performed, the proposed structures can be supported by shallow spread footings, bearing over firm natural soil or well compacted structural fill material. The footings can be designed using a net allowable soil pressure of up to 1,600 pounds per square foot (psf). In using net pressures, the weight of the footings and backfill over the footings, including the weight of the floor slab, need not be considered. Hence, only loads applied at or above the finished floor need to be used for dimensioning the footings. LI I t I GET 1 Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G ' In order to develop the recommended bearing capacity, the base of the footings should have an embedment of at least 18 inches beneath finished grades, and wall footings should have a minimum width of 24 inches. As an exception, the wall footings within the ' high bay area having maximum wall loads of 4 klf should have a minimum width of 30 inches. Additionally, all foundations should have a maximum footing embedment depth of 2.5 feet below finished grades. Deeper footing embedment depths could result in ' excessive settlement magnitudes beyond that indicated in Section 4.5 of this report. In addition, isolated square column footings are recommended to be a minimum of 3 feet by 3 feet in area for bearing capacity consideration. The recommended 18-inch footing ' embedment is considered sufficient to provide adequate cover against frost penetration to the bearing soils. ' 4.5 Settlements It is estimated that, with proper site preparation, the maximum resulting post construction 1 settlement of the foundations should be up to 1 inch. The maximum differential settlement magnitude is expected to be up to %-inch between adjacent footings (wall footings and column footings of widely varying loading conditions). As previously stated in Section 4.4 of this report, the footing embedment depths for all foundations should not exceed a depth of 2.5 feet, which corresponds to an elevation of ' about 19.5 feet MSL. If deeper embedment depths are anticipated, they should be evaluated on a case by case scenario. 1 The settlements were estimated on the basis of the results of the field penetration tests as well as our laboratory consolidation tests in conjunction with the design first floor finished elevation of 22 feet MSL and the maximum design loads of 4 klf and 50 kips. Careful field control will contribute substantially towards minimizing the settlements. 4.6 Foundation Excavations In preparation for shallow foundation support, the footing excavations should extend into firm natural soil or well compacted structural fill. All foundation excavations should be observed by G E T Solutions, Inc. At that time, the Geotechnical Engineer should also explore the extent of excessively loose, soft, or otherwise unsuitable material within the exposed excavations. Also, at the time of footing observations, the Geotechnical Engineer may find it necessary to perform hand auger borings or use a hand penetration device in the bases of the foundation excavations. 12 GET I 1 i� 1 Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G If pockets of unsuitable soils requiring undercut are encountered in the footing excavations, the proposed footing elevation should be re-established by means of backfilling with "flowable fill", an open graded washed stone (such as No. 57 stone or equivalent), or a suitable structural fill material compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D 1557), as described in Section 4.3 of this report. This construction procedure will provide for a net allowable bearing capacity of 1,600 psf. Immediately prior to reinforcing steel placement, it is suggested thatthe bearing surfaces of all footings be compacted using hand operated mechanical tampers, to a dry density of at least 95% of the Modified Proctor maximum dry density (ASTM D 1557) as tested to a depth of 12 inches, for bearing capacity considerations. In this manner, any localized ' areas, which have been loosened by excavation operations, should be adequately re - compacted. 1 Soils exposed in the bases of all satisfactory foundation excavations should be protected against any detrimental change in condition such as from physical disturbance, rain or frost. Surface run-off water should be drained away from the excavations and not be ' allowed to pond. If possible, all footing concrete should be placed the same day the excavation is made. If this is not possible, the footing excavations should be adequately protected. 4.7 CMU Wall Construction Joints and Foundation Reinforcement: ' In order to further reduce the effect of any potential settlements upon the partial height CMU and brick walls, it is recommended that construction joints be implemented at on - center distances not exceeding 25 feet. These joints will provide for more flexible wall 1 members that are less likely to crack as a result of any settlement. In order to provide a more rigid foundation system, more tolerant to the anticipated differential settlements, the wall footings should be designed with top and bottom steel e reinforcement and stirrups. This approach will permit the footings to more effectively bridge over soft areas, minimizing the potential for foundation cracking. Column footings should also have top and bottom steel reinforcement. 1 4.8 Floor Slabs The floor slabs may be constructed as slab -on -grade members provided the previously recommended earthwork activities and evaluations are carried out properly. It is recommended that the ground floor slab be directly supported by at least a 4-inch layer of ' relatively clean, compacted, poorly graded sand (SP) or gravel (GP) with less than 5% passing the No. 200 Sieve (0.074 mm). The purpose of the 4-inch layer is to act as a capillary barrier and equalize moisture conditions beneath the slab. 13 GET Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G It is recommended that all ground floor slabs be "floating". That is, generally ground supported and not rigidly connected to walls or foundations. This is to minimize the possibility of cracking and displacement of the floor slabs because of differential ' movements between the slab and the foundation. Slab -on -grade post construction settlements should be limited to'/x-inch or less. I H F li„ I 0 I 0 B 1 1 It is also recommended that the floor slab bearing soils be covered by a vapor barrier or retarder in order to minimize the potential for floor dampness, which can affect the performance of glued tile and carpet. Generally, use a vapor retarder for minimal vapor resistance protection below the slab on grade. When floor finishes, site conditions or. other considerations require greater vapor resistance protection; consideration should be given to using a vapor barrier. Selection of a vapor retarder or barrier should be made by the Architect based on project requirements. 4.9 Pavement Design The California Bearing Ratio (CBR) test results indicated soaked CBR values ranging from 10.2 to 14.1, averaging 12.0. A comprehensive summary of the, CBR test data and the moisture density relationship curves (Proctors) are presented in Appendix V. The average CBR value obtained from the laboratory CBR testing procedures was multiplied by a factor of two-thirds to determine a pavement design CBR value. The two-thirds factor provides the necessary safety margins to compensate for some non -uniformity of the soil. Therefore, a CBR value of 8 should be used in designing the pavement sections. The typical pavement design sections provide in the following table (Table IV — Pavement Sections) are based on our experience with similar soil conditions and similar project requirements. However, a specific AASHTO or Unified Facilities Criteria (UFC) pavement design analysis has not been requested at this time. Accordingly, the pavement design analysis is anticipated to be completed by the Civil Engineer of Record. Table IV —Pavement Sections Section Hot Mix Asphalt Aggregate Subgrade (2) Surface Surface Intermediate Base(l) SF-9.SA 5-12.5 I-196 Stable and Lined Heavy Duty Asphalt T N/A 3" 8" with Geotextile Geofabric Standard Duty Stable and Lined Asphalt 2" N/A N/A 8" with Geotextile Geofabric Note (1) = NCDOT ABC compacted to a dry density of at least 100% of the Modified Proctor maximum dry density (ASTM D 1557). Note (2) = Compacted to a dry density of at least 95% of the Modified Proctor maximum dry density (ASTM D 1557). m' r Solutions. Inc Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G ' All pavement material and construction procedures should conform to Unified Facilities Criteria (UFC) and North Carolina Department of Transportation (NCDOT) requirements. ' Following pavement rough grading operations, the exposed subgrade should be observed under proofrolling. This proofrolling should be accomplished with a fully loaded dump truck or 7 to 10 ton drum roller to check for pockets of soft material hidden beneath a thin crust of better soil. Any unsuitable materials thus exposed should be removed and replaced with a well -compacted material. The inspection of these phases should be performed by the Geotechnical Engineer or his representative. The subgrade soils are likely to be unstable ' at the time of construction and some ground improvements are likely. As such, the project's budget should include a contingency to accommodate the potential ground improvements. Where excessively unstable subgrade soils are observed during proofrolling and/or fill placement, it is expected that these weak areas can be stabilized by means of thickening ' the ABC layer by 4 to 6 inches or the asphalt base course layer by 2 to 4 inches and/or reinforcing the ABC materials with a biaxial geotextile geogrid (Tensar BX1100 or equivalent). These alternatives are to be addressed by the Geotechnical Engineer during 1 construction, if necessary, who will recommend the most economical approach at the time. 4.10 Seismic Evaluation ' It is noted that, in accordance with the NC Building Code; Chapter 16, this site is classified as a site Class D, based on which seismic designs should be incorporated. This recommendation is based on the data obtained from the completed 100-foot deep CPT t sounding completed for the adjacent Wounded Warrior BEQ project as well as our experience with shear wave velocity testing performed on other projects within the vicinity of this project site. 4.11 Storm Water Design Parameters 1 Two (2) infiltration tests were performed at the location of borings BMP-2 and BMP-4 at depths of approximately 1 and 2 feet below existing grades due to the encountered ' perched water level depths of 2 to 3 feet. The infiltration testing could not be performed at the location of borings BMP-1 or BMP-3 as a result of perched water levels occurring about 1-foot, or less, below the existing site grade elevations. The boreholes were prepared utilizing an auger to remove soil clippings from the base. Infiltration testing was then ' conducted within the vadose zone utilizing a Precision Permeameter and the following testing procedures. 1 I SoluBons. Inc Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 Pi378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G ' A support stand was assembled and placed adjacent to each borehole. This stand holds a calibrated reservoir (200 ml or 2000 ml) and a cable used to raise and lower the water control unit (WCU). The WCU establishes a constant water head within the borehole ' during testing by use of a precision valve and float assembly. The WCU was attached to the flow reservoir with a 4-meter (approximately 13-foot) braided PVC hose and then lowered by cable into the borehole to the test depth elevation. 1 u LI I 0 0 I I I i I N As required by the Glover solution, the WCU was suspended above the bottom of the borehole at an elevation of approximately 5 times the borehole diameter. The shut-off valve was then opened allowing water to pass through the WCU to fill the borehole to the constant water level elevation. The absorption rate slowed as the soil voids became filled and an equilibrium developed as a wetting bulb developed around the borehole. Water was continuously added until the flow rate stabilized. The reservoir was then re -filled in order to begin testing. During testing, as the water drained into the borehole and surrounding soils, the water level within the calibrated reservoirwas recorded as well as the elapsed time during each interval. The test was continued until relatively consistent flow rates were documented. During testing the quick release connections and shutoff valve were monitored to ensure that no leakage occurred. The flow rate (Q), height of the constant water level (H), and borehole diameter (D) were used to calculate Ks utilizing the Glover Solution. Based on the field testing and corroborated with laboratory testing results (published values compared to classification tests), the hydraulic conductivity of the shallow soils is provided in the following table (Table V —Saturated Hydraulic Conductivity Test Results) and is presented on the "Hydraulic Conductivity Worksheet" reports (Appendix VI), included with this report. Table V - Saturated Hydraulic Conductivity Test Results Test No. Test Depth (ft) (1) Groundwater Level (ft.) (11C�1 Percent Silt and/or Clay Average Infiltration Test Results (Ksat Values) cm/sec cm/day in/hour BMP-2 2 3 48.2 1.29E-04 11.1 0.183 BMP-4 1 2 25.5 5.03E-04 43.4 1 0.712 Note (1) = The depths noted above are referenced from below the existing (natural) site grade elevations. Note (2) = The observed groundwater levels noted above, in Section 3.3 of this report, on our Boring Log sheets, and on our Generalized Soil Profile sheets were obtained through soil wetness at the time of our subsurface exploration procedures. Groundwater monitoring wells are recommended to obtain stabilized readings. ' Solutions. -,Inc 1 Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Drainage and Groundwater Concerns ' It is expected that dewatering may be required for excavations that extend near or below the existing groundwater table. Dewatering above the groundwater level could probably be accomplished by pumping from sumps. Dewatering at depths below the groundwater level may require well pointing. If water collects in foundation excavations, it will be necessary to remove the water form the excavation, remove the saturated soils, and re -test the adequacy of the bearing surface soils to support the design bearing pressure prior to concrete placement. Perched water table conditions within the select fill materials and/or shallow subsurface soils may be encountered throughout the project site during periods of heavy precipitation 1 and/or during the "wet' season. This is expected to occur as a result of the surficial and/or shallow subsurface restrictive soil layers generally encountered throughout the project site at depths ranging from 0.3 feet to 2 feet and extending to depths ranging from 13 to 18 feet below existing grades. Accordingly, some undercut and backfill with suitable structural fill materials and/or de - watering of the structural fill materials and/or shallow subsurface soils may be required during the subgrade preparation and/or foundation construction procedures. Alternatively, an under drain system may be used in order to aid in alleviating the potential for saturated bearing soil conditions and/or to aid in minimizing foundation undercutting procedures. It would be advantageous to construct all fills early in the construction. If this is not accomplished, disturbance of the existing site drainage could result in collection of surface water in some areas, thus rendering these areas wet and very loose. Temporary drainage ditches should be employed by the contractor to accentuate drainage during construction. If water collects in foundation excavations, it will be necessary to remove water from the excavations, remove saturated soils, and re -test the adequacy of the bearing surface soils to support the design bearing pressure prior to concrete placement. 1 5.2 Site Utility Installation The base of the utility trenches should be observed by a qualified inspector prior to the pipe and structure placements to verify the suitability of the bearing soils. If unstable bearing soils are encountered during installation someform of stabilization may be required to provide suitable bedding. This stabilization is typically accomplished by providing additional bedding materials (NCDOT No. 57 stone). In addition, depending on the depth of the utility trench excavation, some means of dewatering may be required to facilitate the utility installation and associated backfilling. 17 GET Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center ' P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G All utility excavations should be backfilled with structural fill, as described in Section 4.3 of this report. ' The subsurface CLAY (CL, CH) and/or SAND (SC, SC-SM, and SM with clay) soils encountered at the boring locations do not appear to meet the criteria recommended in this report for reuse as structural fill, but may be used as fill within green areas. However, the SAND (SP, SP-SM, and SM) soils encountered at the site may be suitable for reuse as structural fill. Due to the potential for surficial and/or shallow subsurface perched water conditions to occur, it is likely that any soils excavated on -site and proposed to be reused as select fill will require stockpiling in order to the soils to air dry and obtain a moisture content suitable for placement and compaction. Additionally, the soils noted to consist of SAND (SM with clay, SC-SM, SC) may potentially be reused as pavement select fill soils. However, these soils will require drying in the form of stockpiling and/or placing in relatively thin lifts and scarifying in order to obtain a moisture content suitable for compaction, which would likely prove uneconomical for this site considering the potential for suficial and/or shallow subsurface perched water levels. Further classification testing (natural moisture content, gradation analysis, and Proctor testing) should be performed in the field during construction to substantiate the suitability of excavated soils for reuse as fill within construction areas. 5.3 Excavations In Federal Register, Volume 54, No. 209 (October, 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that all excavations, whether they be utility trenches, basement excavation or footing excavations, be constructed in accordance with the new (OSHA) guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial 1 penalties The contractor is solely responsible for designing and constructing stable, temporary ' excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. ' We are providing this information solely as a service to our client. G E T Solutions, Inc. is not assuming responsibility for construction site safety or the contractor's activities; such ' responsibility is not being implied and should not be inferred. 18 GET 11 t [J 1 I; I H I 1 1 1 1 L Report of Subsurface Investigation and Geotechnical Engineering Services December 16, 2009 P1378 Wounded Warrior Hope & Care Center P1330 Battalion Headquarters Building, Marine Corps Base Camp Lejeune, North Carolina G E T Project EC09-296G 6.0 REPORT LIMITATIONS The recommendations submitted are based on the available soil information obtained by G E T Solutions, Inc. and the information supplied by the client for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc. should be notified immediately to determine if changes in the foundation recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. After the plans and specifications are more complete the Geotechnical Engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents, in order that the earthwork and foundation recommendations may be properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of Virtexco Corporation and their consultants for the specific application to the proposed P1378 Wounded Warrior Hope and Care Center and the proposed P1330 Battalion Headquarters projects located within the Camp Lejeune military installation in Jacksonville, North Carolina. SoluBons, Inc APPENDICES I BORING LOCATION PLAN 11 BORING LOGS III GENERALIZED SOIL PROFILE IV CONSOLIDATION TEST DATA V SUMMARY OF CBR TEST DATA VI SATURATED HYDRAULIC CONDUCTIVITY TEST RESULTS VII CLASSIFICATION SYSTEM FOR SOIL EXPLORATION m m m m m ® _ ® ® ® ® ® ® ® o = m ® = M. BMP-4 9 a-IBM i I I I m >y i`mr a®e LEGEND —FPPRO%fN•TE 9OR G LOCATIONS CBR=2 C — CBR-3— B ® Be 3 ` JB-4 C ( 1 84 � BMP-1 i A 8q� BMPP-2 ya4 01 men IYnAi09 Mom+ rAv I BORING LOCATION PLAN IOT m svaE I 1 1 1 1 1..J 1 I I I 1 I I I 0 I L GETPROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Lejeune; North Carolina PROJECT NO.: EC09-296G eAu x�n:e , BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 21.0' MSL BORING LOG DRILLER: Fishburne Drilling LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Mud Rotary (wash) DATE: 12-9-09 B-1 DEPTH TO WATER - INITIAL': $ 5' AFTER 24 HOURS: S CAVING> S o •Z �a m v o TEST RESULTS Plastic Limit H Liquid limit m a m Description n a 6 E a> E$ a E 3 [o o y > gr w m o E❑ m Z N in a z v Moisture Content -• �o e N-Value- 10 20 30 40 50 60 70 0 0 24 Inches of Sandy TOPSOIL "' 4 ' ., ... .�. 1 22 SS 5 8 12 ...._.,...._:...:...:_. 9 :...:...:...............:... Tan, moist, Clayey fine SAND (SC) with silt, loose ...... .'..'„'. 2 20 SS s 4 4 8 7. " 5 Tan with slight Gray Mottling, moist to wet, Sandy Lean CLAY (CL), medium stiff to very stiff 3 22 SS 4 4 1s 2 Wet from 5 feet Mottled Tan -Gray from 6 feet 5 .. ; . \.:...:. ...... _ :... 5 4 22 SS 7 14 5 8 1. Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) with trace sand, medium stiff 5 24 SS 3 s n s 10 4 13 3 :...:...:...:...:...:...:... Tan, wet, Silty fine SAND (SM) with trace fine gravel, loose 6 22 SS 5 3 8 15 ::::: 3 4 :. ..:... :.. .:...:. ..:. .. :. .. 5 s Gray, wet, poorly graded fine to medium SAND (SP) to poorly grade fine to medium SAND SP-SM with silt, very loose to very dense ( ) ry ry '.i':f L :':k t 1:r.rr 7 22 SS 2 2 0 ..:...:... :.. .:.. .... .iil i xt+: tff). ....... 4 .i:err 8 23 SS 3 2 5 .:...:...:...:...: ........... 25 .j:1 tr[ 3 :r[ X(r ar 1):ti ra:n: ...:...:...:...:...:...:...:... '+cry L N. ........................ 5 :I:[1 ill 9 24 SS 7 10 17 :. ..:. ..:... :.. .:.. .:... 30 f i' 12 ....... .... ... .... .. .. .. 10 [9:fJ. r1 to i YfJ- 22 t 10 20 SS 35 68 35 +'I'It 37 .15 a:[1 IN r 25 .0 r [ 27 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample Hammer PAGE 1 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. I S F 0 I 1 I I 1 1 LJ 1 1 GETPROJECT: --"' BORING LOG B-1 P1378 WW Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Lejeune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 21.0' MSL DRILLER: Fishbume Drilling LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Mud Rotary (wash) DATE: 12-9-09 DEPTH TO WATER - INITIAL': S 5' AFTER 24 HOURS: _ CAVING> S" o ,� .� > w a d m ❑ E❑ c- 6 a1 d Description c a m y a d E Z a� E o y m rs o E M I- 3 io o y = a c �� ) Z o e TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value- 10 20 30 40 50 60 70 . .:...:...:... : .. .:.. .:.. .:. .. ...........................:... ...:. ..:...:.. .:...:. ..:. .. :... ..:.. .:. .. I...I...:.. .:...:. .. ..:. 12 yo i;rir S 1::T ixlr licti P 1'I1 f r 11 Ss 19 32 34 59 76 20 14 12 SS 20 Z7 3� 3e 45 25 Boring terminated at 45 ft. 16 50 55 -35 18 60 40 20 65 -45 22 0 -50 75 55 Notes: SS = Split Spoon Sample ST= Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 2 o/ 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. I 1 1 1 1 1 1 1 IF I GET -'— uaw��+nir..wT=n�x.rwnr BORING LOG B-2 PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 19' MSL DRILLER: Fishburne Drilling LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Mud Rotary(wash) DATE: 12-9-09 DEPTH TO WATER -INITIAL': 8 4' AFTER 24 HOURS: b5 CAVING> .L C... m > w n d �, ❑ E o- m �, ❑ Description c o" o a o E Z a> E o , a °' E rn 3 tO o 0 m n m z o u v o TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value- 10 20 30 40 50 60 70 0 0 11 7 6 7 6 6 9 3. 3. 24 inches of Sandy TOPSOIL ... 1 23 SS ° ° r ...:...:_.:_.:...:...:... :...:...:f..:...:...:...:... •.. . ... :I .:...:...t ..........:...:... :...:...I :...:...:...:...:... :...:..I :...:...:...:...:... . . ' I I .........;,.. .I ...j...•....... ...:...:.. .:. ..:. .. :. ..:... :... ... .. ... ... ...... .... .... ... .. Tan, moist to wet, Sandy Lean CLAY (CL), medium stiff Wet from 4feet Mottled Tan -Gray from 6feet 2 22 SS a 3 4 15 2 5 3 20 SS a i 4 4 21 SS 4 a 4 10 Mottled Gray -Tan, wet, Fat CLAY (CH) with trace sand, medium stiff 13 Mottled Reddish Tan -Gray, wet, Clayey fine SAND (SC) with silt, loose 8 Dark Gray, wet, Silty fine SAND (SM) with trace organics, loose ... ..... - . �...... 5 24 SS 2 4 10 4 6 23 SS 2 2 4 5 5 15 7 22 SS 2 s 6 0 20 Boring terminated at 20 ft. 5 9 25 .10 30 10 -15 35 .20 Notes: SS = SPI@ Spoon Sample ST=Shelby Tube Sample HA =Hand Auger Sample BS =Bulk Sample WOH PAGE 1 of 1 Standard Penetration Tests were performed in the held in general accordance with ASTM D 1586. I LI 1 1 I CI 11 I H I e GETPROJECT: BORING LOG B-3 P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G LOCATION: BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 19.5' MSL DRILLER: Fishbume Drilling LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Mud Rotary (wash) DATE: 12-10-09 DEPTH TO WATER - INITIAL': S 5' AFTER 24 HOURS: _ _ CAVING> -L a= w J` o E r o Description y a d Z m o y 0 vEi H 3: m n z ao # e TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 0 0 3 5 6 7—'- 6 11 11 24 inches of Sandy TOPSOIL ... 1 21 SS 2 i 2 ..:...:...:...:...:...:...:... .:...:...:...:._:...:...:... i t a .:...:...:...:...:...:...:... ........................... .... d ...:...:...:...:...:...:...... q. ...:...:...:................... Reddish Tan, moist, Clayey fine SAND (SC) with sill, loose .'...,. 2 20 SS z 3 3 15 2 s N Reddish Tan, moist to wet, Sandy Lean CLAY (CL), medium stiff Wet from 5 feet 3 23 SS 2 3 a Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) with trace sand, medium stiff 13 ray, wet, poorly graded fine to medium SAND (SP) to poorly grade fine to medium SAND (SP-SM) with silt, medium dense Dark Gray, wet, Silty fine SAND (SM) with trace organics and root fragments, medium dense 1:4(1: '�' t e i:1 i5frc 4 21 SS a 3 4 5 24 SS 2 2 5 io 4 6 23 SS 4 5 7 24 SS 3 4 2 6 o 20 Boring terminated at 20 ft. e s -10 30 i0 is 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample le BS = Bulk Sampav not be indicative of the static aroundarater level WQH = "feinht of Hammer PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. I 1 I l I 1�1 L CI H I 1 1 1 I 1 I I GET BORING LOG B-4 PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 17.5' MSL DRILLER: Fishbume Drilling LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Mud Rotary(wash) DATE: 12-9-09 DEPTH TO WATER - INITIAL': a 1.5' AFTER 24 HOURS: S _ CAVING> L c > w aai w Description c m E z E m m o E o m l o> m n 0 2 o a a TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 0 0 3 6 3 7 6 2----— 4 56.. 39.. 32.. 4 inches of TOPSOIL 1 22 SS 2 2 1 ..:...:...:...:... :...:...:... ...... t: _................. .. t... ............... . :I :...... .: ..:...:...:.. .:...:...:...:...:...:...:... ...:.. .:. ..:. ..:... :.. .:...:... [ f ...:...:._ :...:...:...:...:... .:...:...:...:...:...: ..:.. .:...:. ..:... :.. .:.. .:... .13j Gray, moist to wet, Silty Clayey fine SAND (SC-SM) to Clayey fine SAND (SC), very loose Wet from 1.5 feet 1s 2 23 SS z 2 y 3 2 Mottled Gray -Reddish Tan, wet, Sandy Lean CLAY (CL), medium Stiff s . .- _ _ ' 3 20 ST 1 1 z 10 Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) with trace sand, ve soft to medium stiff Shelby Tube Sample Taken from 4 to 6 feet 1 Dark Gray, wet, Fat CLAY (CH) with trace organics and root fragments, very soft to soft_:_ Gray from 18 feet 4 22 SS z 4 3 5 24 SS 2 n 3 10 4 6 24 SS 1 1 3 15 0 6 7 24 SS z 3 20 Boring terminated at 20 ft. 25 d0 30 10 .15 35 r-20 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. I 1 11 F 1 1 1 1 1 I 1 1 GET _� BORING LOG B-rJ PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 18' MSL DRILLER: Fishbume Drilling LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Mud Rotary(wash) DATE: 12-9-09 DEPTH TO WATER - INITIAL': V, 4' AFTER 24 HOURS: 3' _ CAVING> L c .- is > m w a v o d ❑ E❑ n d o V? Description u a 0 m a o E Z rn a> E o N Q E ) 3 to o m a y Z o # o TEST RESULTS Plastic Limit H Liquid Limit Moisture Content -• N-Value - 10 20 30 40 50 60 70 0 0 5 5 6 7 6 7 4 0. 2. 36.. 6 inches of TOPSOIL iiiii 1 22 SS 1 n 3 .:...:...:...:... :...:...:... t :...:... j...........:... ...I. ..:.. .. ; t: ;. _....;...;.�;...:. _:... . ............................. ..:...:...:...:...:...:...: ..:...:...:... :...:...:...:... Gray, moist, poorly graded fine to medium SAND (SP-SM) with silt to Silty fine SAND (SM), loose 1s 2 24 SS 3 3 a 2 Tan, moist, Clayey fine SAND (SC) with silt, loose ;!;.:.: g Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) with trace sand, soft to medium stiff Dark Gray from 13 feel 3 24 SS 2 3 4 24 SS 4 4 10 5 24 SS 2 2 4 10 4 5 6 24 SS 2 4 3 15 g p 7 24 SS 2 2 2 20 Boring terminated at 20 ft. 5 25 f0 30 10 -15 35 ]-20 Notes: SS = Split Spoon Sample ST =Shelby Tube Sample HA =Hand Auger Sample BS = Bulk Sample *The initial aroundwater readino may rint be indicative of the stair, loval WOH - Welaht of PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. I I 1 I 1 1 1 I 1 1 1 I 1 i 1 GET PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Lejeune, North Carolina PROJECT NO.: EC09-296G = r..w—.-Tk m' BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 18' MSL BORING LOG DRILLER: Fishbume Drilling LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Mud Rotary (wash) DATE: 12-9-09 B-G DEPTH TO WATER - INITIAL': a 4' AFTER 24 HOURS: T CAVING> -C. o" L C s_ Q N �, H m oo TEST RESULTS Plastic Limit H Liquid Limit .� a m o. m m DBSCfipli0rl La d z a > a d 3 tO # Q E o N f- m a Z v Moisture Content -• w ¢ e Value - 10 20 30 40 50 60 70 0 0 6 inches of TOPSOIL 2 iiiii 1 20 SS 3 3 7 6 6. :_.:...:...:. ..: ...:...:... . Tan, moist, Silty fine SAND (SM), loose 15 Mottled Gray -Reddish Tan, moist, Clayey fine SAND (SC) with silt, loose 2 23 SS 3 3 3 \ 4 5 Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) with trace sand, medium stiff 3 22 SS 2 3 5 2.� 2 a 7 7. _.f _.' ..:.. +...:...:...:. Mottled Gray -Reddish Tan, wet, Sandy Lean CLAY (CL), medium stiff 4 24 SS a a 10 s 7 - .......: -. Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) with trace sand, soft to medium stiff 5 24 SS 3 a 10 Gray from 13 feet a ........................:.. 4 5 1 6 24 SS z 4 ..:...:...t...t._:...:. _:... 1s 2 0 18 6 Gray, wet, Fat CLAY (CH) with trace sand and organics, medium stir • - • • - 7 24 SS 2 3 3 5 : .:...:...:...: _.:...:_.:... 20 5 a Gray, wet, poorly graded fine to medium SAND (SP) to poorly grade fine to medium SAND (SP-SM) with silt, medium dense ?'4 f 1: '�° 8 23 SS 10 17; lxrr Gray, wet, poorly 26 y p y graded fine to medium SAND (SP-SM) with silt to Silty fine SAND(SM), medium dense iiEEE ..... ..... 9 21 SS s 6 6 14 . . .- 0 10 3 11 5 Dark Gray, wet, Fat CLAY (CH) with trace sand, very soft 10 24 SS woB war 1 1 _ .;...I...I...I...t...t.,.t... 35 38 .... 2 ...:...:...:.......:...:... 20 Ej ray, wet, poorly graded fine to medium SAND (SP) to poorly grad Notes: SS = Split Spoon Sample ST= Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. I 1 t 1 1 I I 1' 1 I I I I I I 1 GET E.n2, .I.WN, BORING LOG B-6 PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 18' MSL DRILLER: Fishbume Drilling LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Mud Rotary (wash) DATE: 12-9-09 DEPTH TO WATER- INITIAL': & 4' AFTER 24 HOURS: 41� CAVING> L c _ O `—L m w� o. ^' o E L a m a Description a 0 c2 m Z rn N N m m m(0a) N m t- y— m a m Z. o O v o TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 12 do fine to medium SAND (SP-SM) with silt, loose [r ii .r�:u' 1 :ii li is [t.• LJ: tJ 11 24 SS s 10 40 49 ...:...:._:...:...:...i... ...:...:...:...:...:...:...:... ...:...:...:... ........:.,. ..:...:...:...:...:...:...:... ...:...:...:...:...:...:...:... .25 14 Gray, wet, Silty fine SAND (SM), dense 12 21 SS is 26 27 45 i iiii -30 a j ' a a28 13 20 SS 24 zs 18 50 Boring terminated at 50 Ft. 55 18 -40 60 -45 20 65 50 70 55 75 80 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample *The initial aroundwa BS = Bulk Sample PAGE 2 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586, GET BORING LOG C BRA PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 18' MSL DRILLER: G E T Solutions, Inc. LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Hand Auger DATE: 12-9-09 DEPTH TO WATER - INITIAL': $ 1' AFTER 24 HOURS: a CAVING> L o c 'm > w t L^ a d N N o E .c .. a m 0,2 O` Description u a t7 m rz o E Z M a > E$ rn m �- °1 E 3'0 o m a m Z o # v TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 0 0 t HA BS HA HA 0. 6 inches of TOPSOIL H� ..:...:...:...:...:...:...:... ...:.. .: .. .:. ..:. .. :. ..:. .. :... ..:...:...:... :...:...:... :... s. ..:. .. :...:...: .. .:...:. ..:. .. Tan, moist, Silty fine SAND ISM), loose 1. Tan, moist to wet, Clayey fine SAND (SC) with silt, loose Wet from 2 feel is P s10 Mottled Tan -Reddish Tan, wet, Sandy Lean CLAY (CL) Boring terminated at 5 ft. to 0 4 s 1s 0 0 20 s g s -10 30 10 -15 35 p Notes: SS = Split Spoon Sample ST= Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. C� I 1 1 1 t t I 1 GET BORING LOG C BR-2 PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Lejeune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 19.5' MSL DRILLER: G E T Solutions, Inc. LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Hand Auger DATE: 12-9-09 DEPTH TO WATER - INITIAL': S 3' AFTER 24 HOURS: TS _ CAVING> _1 co z > w 0 ❑ E 0� ❑ Description 0 E 0 E z° M E rn rr E 0 rn � 0 m a 0 M z o u v TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 0 BS HA 48.4 4 inches of TOPSOIL .. ... : *I` - ...:...:...:...:...:... :...:... . ....................:... ..:...:...:...:...:... :... :... ..:...:...:...:...:...:...:... ...:...:...:...:...:...:...:... ...:...:...:...:...:...:...:... ...:...:...:...:...:........... 6. Mottled Gray -Reddish Tan, moist, Clayey fine SAND (SC) with silt 15 z Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) 5 Boring terminated at 5 ft. 10 10 4 5 5 6 0 20 6 5 25 -10 30 m 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586, F CI 1 I 1 1 1 1 1 1 GET BORING LOG C BR-3 PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leieune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 18' MSL DRILLER: G E T Solutions, Inc. LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Hand Auger DATE: 12-9-09 DEPTH TO WATER - INITIAL-: S 2' AFTER 24 HOURS: _ CAVING> _C_ c-- 0 2 w a o E a d a Description a E 0 a 6 m z rn a' rn tr a m F v1 3 fO in a z o o TEST RESULTS Plastic Limit H Liquid Limit Moisture Content -• N-Value - 10 20 30 40 50 60 70 0 0 BS HA- 0.1 6 inches of TOPSOIL ...:...:...:...:...:...:...:... ...:...:...:...:...:...:...:... ..:...:. ..:. ..:...:...[...[... .. .:...:. f._ I...I...[...:. .. ... :...:...:.. .:...:. ..:. .. :... ..:...:...:.. .:...:. ..:. .. :... Z. Tan, moist to wet, Lean CLAY (CL) Wet from 2 feet Mottled Tan -Reddish Tan from 2.5 feet 15 2 3.5 Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) 5 Boring terminated at 5 ft. 10 10 4 5 15 5 0 20 5 8 5 -10 30 10 15 35 do Notes: SS = Split Spoon Sample ST= Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample WOH -We art of Hammer PAGE 1 of 1 Standard Penetration Tests were Performed in the field in general accordance with ASTM D 1586. I R H 1 1 1 1 11 GET BORING LOG BM P-1 PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 18' MSL DRILLER: G E T Solutions, Inc. LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Hand Auger DATE: 12-9-09 DEPTH TO WATER - INITIAL': 1' AFTER 24 HOURS: _ CAVING> L w o E o :? D2SCfiptlOB o. 2 c� a d m z cn a> m o in u m I- rn 3 m m c- m# z ° o TEST RESULTS Plastic Limit H Liquid Limit Moisture Content -• N-Value - 10 20 30 40 50 60 70 0 0 HA HA 8 inches of TOPSOIL iiii ...:. .. :...:... :.. .:...:. ..:. .. . . . . . . ............................... ............................... ...�...�._�...i_.:...�...i... ...:...:...:...:...:...:...:... .. .:...:. ..:...:.. .:...:. ..:... Tan -Gray, moist to wet, Silty fine SAND (SM) Wet from 1 fool Estimated Normal Seasonal High Water Table = 1' 1s z Mottled Gray -Reddish Tan, wet, Lean CLAY (CL)HA s Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) m 10 4 Boring terminated at 10 ft. g 15 fi 0 IO -5 g 25 -10 10 -15 35 p Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. I 1 1 I 1 1 1 ij I 1 F C 1 GET c-x��t.ic BORING LOG BM P-2 PROJECT: P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 17.8' MSL DRILLER: G E T Solutions, Inc. LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Hand Auger DATE: 12-9-09 DEPTH TO WATER - INITIAL': $ 3' AFTER 24 HOURS: T CAVING> -C c E To wo a$ E m o Description u a m a d Z a a a 3 to m a N m# Z o o TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 0 0 HA HA...........................:... HA 8' 8 inches of TOPSOIL .............................. ..:...:...:...:...:...:...:... ......... ....... .. .. .... .. .... . .:...:. ..:...:...:.. .:.. .:. .. . ........... .. ... .... ...... .... ...... ....... ...... ... .... ..... .... .... ......... .... ... .... .. 0.HA Gray -Tan, moist, Silty fine SAND (SM) 15 Tan, moist to wet, Clayey fine SAND (SC with silt Mottled Tan -Reddish Tan from 2.5 �eet Estimated Normal Seasonal High Water Table = 25" Wet from 3 feet " 3 - 5 Mottled Gray -Reddish Tan, wet, Lean CLAY (CL) 4 Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) 10 10 Boring terminated at 10 ft. 5 15 6 0 IO 5 5 0 10 30 -15 35 20 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM O 1586. 0 I l 1 1 1 1 I 1 1 1 1 1 GET uaud:mr..,Hq�m:. rrel�,e BORING LOG BM P-3 PROJECT: P1378 W W Hope and Care Center 8 P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 19' MSL DRILLER: G E T Solutions, Inc. LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Hand Auger DATE: 12-9-09 DEPTH TO WATER - INITIAL': a 1.5' AFTER 24 HOURS: _ CAVING> -C _ M > 1n W n d �, O E a v d Description a a d E Z a' E u rn a °' E )~ 3'O o m n N m Z. o e TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value- 10 20 30 40 50 60 70 0 0 HA HA HA 10 inches of TOPSOIL .,.. "" ...:...:...:...:...:...:...:... _.._.._..................... ..:...:...:...:...:...:...:... ..:...:...:...:...:...:...:... ................ ...:...:...:...:...:...:...:... ..:...:...:...:...:...:...:... ..:...:...:...:...:...:...:... Tan -Gray, moist, Silty fine SAND (SM) Mottled Reddish Tan -Gray, wet, Lean CLAY (CL) Estimated Normal Seasonal High Water Table = 1.5' 1s 2 Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) 10 m a Boring terminated at 10 k. 5 6 0 20 .5 25 10 30 10 45 35 SS = SpIft Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample L Hammer PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. I 1 1 1 1 I I' I I I e O O O GETPROJECT: _. "_.'_.. BORING LOG BM P-4 P1378 W W Hope and Care Center & P1330 Battalion Headquarters CLIENT: VIRTEXCO Corporation PROJECT LOCATION: Camp Leleune, North Carolina PROJECT NO.: EC09-296G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 18.5' MSL DRILLER: G E T Solutions, Inc. LOGGED BY: G. Stalls, P.E. DRILLING METHOD: Hand Auger DATE: 12-9-09 DEPTH TO WATER - INITIAL': $ 2' AFTER 24 HOURS: S CAVING> L o m w r i i S o E L fi d o w Description P 2 a 2 d n 6 E Z n> E o o. °' E rn I- 3 fO o m a ? Z o # o TEST RESULTS Plastic Limit H Liquid Limit Moisture Content -• N-Value - 10 20 30 40 50 60 70 0 0 HA HA HA 5. 8 inches of TOPSOIL . .... �. ............................... ...i...i...:...:...i...i...:... ............................... - ...:...:...:...:...:...:...:... ..:...:...:...:...:...:...:... ...:...:...:...:...:...:...:... . ..:...:...:...:...:...:...:... . ..:...:...:...:...:...:...:... . ..:...:...:...:...:...:...:... ..:...:...:...:...:...:...:... . ..:...:...:...:...:...:...:... Tan -Gray, moist, Silty fine SAND (SM) Tan -Gray, moist, Clayey SAND (SC) with silt 1. Mottled Tan -Gray, moist to wet, Lean CLAY (CL) Estimated Normal Seasonal High Water Table = 1.5' Wet from 2feet Mottled Gray -Reddish Tan from 2.5 feet F" is 2 s — Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) 10 10 a Boring terminated at 10 fit. s 15 6 0 20 5 25 10 30 0 15 35 20 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA - Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. KEY T Symbol Description Strata symbols Topsoil Clayey Sand ® Lean Clay ® Fat Clay Silty Sand ii Poorly graded Sand "'''''' with Silt In Silty Sand with organics Fat Clay with Organics Misc. Symbols s Water table during drilling 1. Exploratory borings were drilled on 12-9-09 using a 4-inch diameter continuous flight power auger. 2. No free water was encountered at the time of drilling or when re -checked the following day. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. These logs are subject to the limitations, conclusions, and recommendations in this report. Results of tests conducted on samples recovered are reported on the logs. 0 I 1 0 1 I 0 I 1 0 0 I I 1 O APPENDIX III GENERALIZED SOIL PROFILE B 0- 4 6 20 JJJ JJJ )5 dd JJJ dd )d JJJ 22 d 11 a 34 .. JJJ '" '" ""xz d d 0 3 d NM1k3ffi 22 22 d 3 3 J Xz LL=45 d 5 LL=dS 3 d _ 3 2 3 J NM=22.0 5 7= 3 2] 2 2 NM=26.) d J ) 9 3 d d d 1 2 NM=30.8 2 3 NM=3ed = 3 d 2 2 NM=29.6 3 d 2 3 NI.t--36.2 4 d 3 d 1 2 LL=63 5 5 LL=W 3 d 2 2 2 J NM=31.1 3 3 d d 2 3 NM=29,1 d 5 10 2 2 NW26.6 LL 5 5 _ 2 2 2 = . —2-3—t0 dd dd 3 35 33 2 2 NM=20.1 3 ) d2 A". } { 45 •C9,C3. 11 23 NM=66.0 12 da:CV 11 33 22 22 a 0 2d 0 O -1-h1- :I ::C1 f .: - - - �_ 22 22 33 43 22 m a: L r -J• 10) 1012 dGCi i:I:ht :I •I: 1 1 cri 9 11 .10 2233 3537 :Y1 WOH WOH 2527 1 2 f 1;11; 3234 66 :I•C' 3]39 •, t31d : 28 2) 30 Zd 25 20 Strata symbols art, Poody graded Sand ds°! with Silt Topsoil El Silty Sand with organics GET Solutions, Inc. Clayey Sand Fat Clay with GENERALIZED SOIL PROFILE ® Organics SCALE: DRAWN BY/APPROVED BY DATE DRAWN Lean Clay l2/1G/2009 ® SCALE 1=1 GWS P1378 WW Hope and Care Center & P1330 Fat Clay ® Battalion Head uarterI Silty Sand FIGURE NUMBER PROJECT NO. EC09-2960 0 M CBR-1 NId=116 =20 CBR BMP-1 J J J NW21 8 LL-18 =— LLU — NM=206 1p 10 0 p 4 I' ? O O 10 10 J nl 10 J0 30 Strata smbbolssmbbols �,, Poorly graded Sand with Silt Topsoil Silty Sand with pr9yn;pe GET Solutions, Inc. Clayey Sand Fat Clay with GENERALIZED SOIL PROFILE Organics OARLe DRAWN BY/APPROVED BY El Lean Clay DATE DRAWN 71 scAL, .=m GWS 12/16/2009 P1378 W W Hope and Care Center & P1330 Fat Clay ® Battalion Headquarters Silty Sand FIGURE NUMBER PROJECT NO. EC09-296G 10 20 !A NM-1 ] 4 10 10 0 0 i 2 10 0 -to W ZO p JO JO � 40 Strata svmbols �qp�. Poorly graded Sand 4xor with Silt Topsoil Silty Sand with GET Solutions, Inc. Clayey Sand organics Fat Clay with GENERALIZED SOIL PROFILE Organics SCALE: DRAWN BY/APPROVED BY DATE DRAWN ® Lean Clay sCALF r=ia GWS 12/16/2009 P1378 W W Hope and Care Center & P1330 Fat Clay ® Battalion Headquarters Silty Sand FIGURE NUMBER PROJECT NO. EC09-2960 Symbol Description Strata svmbols Topsoil Clayey Sand ® Lean Clay ® Fat Clay goSilty Sand Poorly graded Sand with Silt Silty Sand with organics Fat Clay with Organics Misc. Symbols s Water table during drilling 1. Exploratory borings were drilled on 12-9-09 using a 4-inch diameter continuous flight power auger. No free water was encountered at the time of drilling or when re -checked the following day. 3. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. These logs are subject to the limitations, conclusions, and recommendations in this report. Results of tests conducted on samples recovered are reported on the logs. I 1 1 1 1 t 1 1 I 1 1 LJ 1 1 1 1 CONSOLIDATION TEST REPORT -1.25 0 00 1.25 2.50 3.75 c U 5.00 d 6.25 7.50 8.75 10.00 11.25 .1 .2 .5 1 2 5 Applied Pressure - tsf Natural Dry D Dens. LL PI Sp. Gr. Overburden (tsf) P (tsf) Cc Cr Swell Press. (tsf) Swell % e0 Sat. Moist. 100.0 % 30.6 % 1 93.0 1 63 1 42 1 2.74 0.33 3.53 0.28 1 0.04 1 1 1 0.839 MATERIAL DESCRIPTION USCS AASHTO Mottled Gray -Tan, Fat CLAY CH A-7-6(41) Project No. EC09-296G Client: VIRTFXCOCorporation Remarks: Project: P1378 Wounded Warrior Hope K Care Center-P133013allalion Ileadquarters 13uilding, Boring I3-4 Marine Corps Base Sample Obtained 12/10/09 B-4 Depth=5.5 ft. % Passing #200 Sicve=89 CONSOLIDATION TEST REPORT GET SOLUTIONS INC. Figure 11 Dial Reading vs. Time Project No.: EC09-296G Project: P1378 Wounded Warrior Hope & Care Center- P1330 Battalion Headquarters Building; Marine Corps Base Location: as 190 190 99824 9950 rc fY O O Square Root of Elapsed Time (min.) Square Root of Elapsed Time (min.) laid .99245 t90 _ g rc ¢ 9 n o 0 675 50 Square Root of Elapsed Time (min.) Square Root of Elapsed Time (min.) Dial Reading vs. Time GET SOLUTIONS INC. Figure Load NI 0.13 isr �, (d)0.38 min= 5.61 rt2/dav 99]99 99]]4 - 9Wa9 99]24 - - - 99699 996]4 99649 - - 99624 99599 - B9Aa 000 0.5 1.50 2.25 J00 JJS 4.50 535 fi.00 6]5 ]50 99100 99tts - Load K3 0 13 tsC �, ®043 min= 4.89 R2/dav 991]0 99145 9Bt60 991I5 99190 99205 - - 99Y10 99235 .992500.00 0]5 1.50 2.25 3.00 3.]5 4.50 5.25 600 6.I5 ].5 Load A2 0.25 tsC Cv CS 1.26 min= L66 rt 2/dav 9946 9942 99]0 9934 - 99}0 - 9926 9922 9910 991a 99100.00 OJ5 L50 2.25 J00 JJS 4.50 i25 6.00 6]5 ].50 99230 Load d4 0.25 tsC Cy (03 0.98 min- 2_l2 R.2/dav 99215 99200 99105 - 99t]0 - 99155 99140 99125 991f0 - 99095000 0.I5 150 2]5 },Op 3J5 0.50 525 6.00 ] ] Dial Reading vs. Time Project No.: EC09-296G Project: P1378 Wounded Warrior Hope & Care Center -PI 330 Battalion Headquarters Building, Marine Corps Base Location: 13-4 9085 t90 .98125 ten to to O O 0 0 Square Root of Elagaed Time (min.) Square Root of Elapsed Time (mint .97335 190 95] 190 K rc 9 O p O Square Root of Elapsed Time (min.) Square Root of Elapsed Time (min.) Dial Reading vs. Time GET SOLUTIONS INC. Figure Load k5 0.50 tsf Cv @ 7.25 m in. 1.65 ft.2/dav 9880 9015 90]0 - 9065 9060 - 9055 9850 9045 - 90d0 90J5000 0]5 150 235 MO 3]5 4.50 5l5 fi.00 G.)5 ).5 9]PU Load k7 2.00 tsC min= 1.65 ft 2/dav 9]O85 969fi0 - 9fi0]5 9fi]10 96505 96d60 96315 96210 9fi005000 0.]5 L50 2.25 J.00 3J5 4.50 5.25 6.00 6.]5 ].50 Load k6 I. W fsf Cv @ 1.49 min- 1.36 ft,2/dav 90050 9]9]5 9)900 9)025 - W6]5 9)600 W525 - 9N50 9)3]50.00 0.)5 1.50 225 J,00 3]5 4.50 5.25 600 6)5 ].5 955 Load q8 4.00 tsf C� @ 8.95 mini o.zl n.z/aa� 95] - 951 949 9O 945 1 943 9d1 939 I 93)000 0.)5 1.50 225 ].00 3.]5 4.50 5.25 6.00 6]5 TN Dial Reading vs. Time Project No.: EC09-296G Project: P 1379 Wounded Warrior Hope & Care Center-P 1330 Battalion Headquarters Building, Marine Corps Base Location: 13-4 .9530 tim .9010 11 rc rc O O 50 5 bee 6.25 ].50 0.75 10.00 1135 1250 Square Root of Elapsed Time (min.) Square Root of Eapsed Time (min.) fan .915 t90 rc O of O 16 18 20 Square Root of Elapsed Time (min) Square Root of Elapsed Time (min.) Dial Reading vs. Time GET SOLUTIONS INC. Figure Load N9 8.00 tsf Cv ®30.46 m in = 0.06 fL2/dav 9455 9]80 9J05 - 9230 9155 - 9080 9005 - - 8930 0855 1 8]80000 1.25 2. ]] 9064 Load'411 1.00 tsf Cv ®2.09 min= 0.84 R2/dav 90]9 9094 9109 9124 91]9 9154 91fi9 9181 9199 - 92fI000 0.]5 1,50 225 J00 JJS 1.50 5.25 6.00 6]5 ]50 9m4 9010 Load &10 4.00 tsf Cv � 096 min.= 1.79 R.2/dav - 9022 9026 - - 90J0 90J1 90]8 9042 904fi ��000 0.]5 1.50 2.25 ]00 ].]5 L50 5.25 6.00 fi.]5 ].50 91e Load #12 0.251sf Cv� 83J1 min- 0.02 ft1/dav 921 921 92] 9]0 s]a 9]6 939 I 912 9150 2 4 fi e 10 1 11 Dial Reading vs. Time Project No.: EC09-296G Project: P 1379 Wounded Warrior Hope & Care Center-P 1330 Battalion Headquarters Building, Marine Corps Base Location: 13-4 OM7 t90 rc 0 Load 411 I 1 0 I 8 0 0 I APPENDIX V SUMMARY OF CBR TEST DATA I rl I I I I I I I SUMMARY OF CBR TEST RESULTS Project: P-1378 Wounded Warrior Hope & Care Center/ P-1330 Battall ion Hdqts. Project Location: Camp Lejeune, North Carolina Client: VIRTEXCO Corporation Project Number: EC09-296G Sample Number Sample Location Sample Depth (tt) Symbol Natural Moisture Content (%) Atterberg Limits (LL/PL/PI) Passing #200 Sieve (/) Maximum Dry Density (Pcf1l Optimum Moisture (%) Soaked CBR Value Resiliency Factor Swell (%) CBR-1 CBR-1 6"- 18" SM w/clay 21.6 18/16/2 30.6 108.9 13.5 14.1 3.0 0.6 CBR-2 CBR-2 6"-18" Sc 14.4 25117/8 48.4 110.7 13.8 11.6 2.5 0.7 CBR-3 CBR-3 6"-181, CL 19.3 34/17/17 50.1 111.5 13.3 10.2 2.5 1.7 GET womAiww� Soo E. Elizabeth Street; sure 2 Elizabeth City, North Carolina 27999 Tel 252-335-9765 Fax: 252-335-9766 page 1 o/ 1 IF S 1 I JI I 1 J I 1 1 J 1 J 1 F MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) 112 110 ZAV for 108 Sp.G. _ D 2.65 c a> a — ❑ 106 104 102 8 10 12 14 16 18 20 Water content, % Test specification: ASTM D 698-00a Method A Standard Elevl Depth Classification Nat. Moist. Sp.G. LL PI %> No.4 %< No.200 USCS AASHTO 6"-18" SM A-2-4(0) 21.6 18 2 0.0 30.6 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 108.9 pef Optimum moisture = 13.5 % 'Pan Silty fine SAND (SM) with clay Project No. PEC09-296G Client: Vinexco Corporation Project: 111378 W W Hope and Care Center & 111330 Battalion Headquarters • Location: CBR-1 Remarks: CBR-1 Resiliency Factor = 3.0 Soaked C13R Value = 14.1 Figure MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) GET SOLUTIONS INC. 1 m i m i I m Ml m m ! m ® m ® ® m 350 300 250 200 C a CO 150 100 50 N Wounded Warrior Hope & Care Center - CBR-1 0.050 0.100 0.150 0.200 0.250 0.300 0.350 Penetration e 0 0 I I 1 1 1 1 t 1 1 1 MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) 115 113 111 U n C N 109 ZAV for Sp.G. _ 2.65 107 105 8 10 12 14 16 18 20 Water content, % Test specification: ASTM D 698-OOa Method A Standard Elevl Depth Classification Nat. Moist. Sp.G. LL PI %> No.4 %< No.200 USCS AASHTO 6"-18" SC A-4(1) 14.4 25 8 0.0 48.4 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 110.7 pef Optimum moisture = 13.8 % Tan Clayey fine SAND (SC) with silt Project No. PFC09-296G Client: Vinexco Corporation Project: 111378 WWI- lope and Care Center& P1330 Battalion Headquarters • Location: C13R-2 Remarks: CBR-2 Resiliency Factor =2.5 Soaked C13R = 11.6 Figure MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) GET SOLUTIONS INC. I 200 180 160 140 120 w a y 100 m J Wounded Warrior Hope & Care Center - CBR-2 0.050 0.100 0.150 0.200 0.250 0.300 0.350 Penetration 1 1 1 t 1 1 MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) 115 113 I I 111 I a N ZAV for Sp.G. _ Q — 2.65 109 107 105 7 9 11 13 15 17 19 Water content, % Test specification: ASTM D 698-00a Method A Standard Elevl Depth Classification Nat. Moist. Sp.G. LL PI %> No.4 I %< I No.200 USCS AASHTO 6"-18" CL A-6(5) 19.3 34 17 0.0 50.1 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 111.5 pcf Optimum moisture = 13.3 % Tan Sandy ],can CLAY (CL) with silt Project No. PFC09-2960 Client: Virtexco Corporation Project: P1378 W W Hope and Care Center & 111330 Battalion Headquarters • Location: CBR-3 Remarks: CBR-3 Resiliency Factor = 2.5 Soaked CBR=10.2 Figure MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) GET SOLUTIONS INC. m m m m m m m ! ! ! _ _ m 160 140 — 120 100 — :N a y 80 - m N 60 — 40 20 - 0 0.000 Wounded Warrior Hope & Care Center - CBR-3 0.050 0.100 0.150 0.200 0.250 0.300 0.350 Penetration APPENDIX VI 1 SATURATED HYDRAULIC CONDUCTIVITY TEST RESULTS 1 1 LJ 1 1 I 1 G E T Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: 1 of 1 Project Name.: Wounded Warrior Hope & Care Cente Parcel ...............: Terminology and Solution Boring No......: BMP-2 jDate .................: 12/9/2009 Ksat : Saturated hydraulic conductivity Investigators.: J. Meads lFile Name.........: O: Steady-state rate of water flow into the soil Boring Depth.: 2 feet JWCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm JWCU Susp. Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Rad. r : 4.15 cm lConst. Wtr. Ht. H: 30.2 cm Ksat = O Binh-1 H/r - r2/H2+1 .5 + r/H / 2 H2 Glover Sol VOLUME (ml) Volume Out ml a] TIME (hr: min: sec al Elapsed Time Flow Rate Q ml/min alb --- ------------ Ksat Equivalent Values- --------------- hr:min:sec min b cm/min cm/sec(cm/day) in/hr ft/da 2000 7:30:00 AM 1990 10 7:30:43 AM 0:00:43 0.72 13.95 0.004 7.35E-05 6.3 0.104 0.21 1980 10 7:3127 AM 0:00:44 0.73 13.64 0.004 7.18E-05 6.2 0.102 0.20 1970 10 7:32:12 AM 00045 0.75 13.33 0.004 7.02E-05 6.1 0.100 0.20 1960 10 7:32:55 AM 00043 0.72 13.95 0.004 7.35E-05 6.3 0.104 0.21 1950 10 7:33:39 AM 0:00:44 0.731 13,641 0.004 7.18E-05 6.2 0.102 0.20 1940 10 7:34:30 AM 0:00:51 0.85 11.761 0.004 6.20E-05 5.41 0.088 0.18 1930 10 7:35:13 AM 00043 0.72 13.95 0.004 7.35E-05 6.3 0.104 0.21 1920 10 7:35:54 AM " 00041 0.68 4.63 0.005 7.71 E-05 6.7 0.109 0.22 1910 10 7:36:39 AM 0:00:45 0.75 3.33 0.004 7.02E-05 6.1 0.100 0.20 1900 10 7:37:23 AM 0:00:44 0.73 3.64 0.004 7.18E-05 6.2 0.102 0.20 1800 100 7:38:08 AM 0:00:45 0.75 :133.33 0.042 7.02E-04 60.7 0.995 1.99 Natural Moisture: 20.4% 11nit. Satur.Time: 7:00:00 AM ESTIMATED FIELD KSAT: 0.008pl.29E-04111.1 0.183 0.37Clayey fine SAND laStructure/Fabric: Consistency: loose Slo a/Landsc: Depth to an Impermeable Layer: NIA Depth to Bedrock ...................: N/Ad °/ Passing #200 Sieve = 48.2 %exture/Classif: Water and Estimated Normal Seasonal ksatReportl.As Precision Permeameter" Rev. 4/5/002 G E T Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: 1 of 1 Project Name.: Wounded Warrior Hope & Care Cente Parcel ...............: Terminology and Solution Boring No......: BMP-4 jDate .................: 12/9/2009 Ksat: Saturated hydraulic conductivity Investigators.: J. Meads IFile Name.........: 0: Steady-state rate of water flow into the soil Boring Depth.: 1 foot jWCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm jWCU Susp. Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Red. r : 4.15 cm lConst. Wtr. Ht. H: 30.2 cm Ksat = 0 Binh-1 H/r - r2/H2+1 .5 + r/H / 2 H2 Glover Sol VOLUME ml Volume Out ml a TIME hr:min:sec al Elapsed Time Flow Rate Q ml/min alb ------------------- Ksat Equivalent Values ----------------- hr:min:sec min b cm/min(cm/sec) (cm/day) in/hr ft/da 1600 9:30:00 AM 1 1590 10 9:30:04 AM 0:0004 0.07 150.00 0.047 7.90E-04 68.2 1.120 2.24 1580 10 9:30:08 AM 00004 0.07 150.001 0.047 7.90E-04 68.2 1.120 2.24 1570 10 9:30:12 AM 0:00:04 0.07 150.00 0.047 7.90E-04 68.2 1.120 2.24 1560 10 9:30:20 AM 0:00:08 0.13 75.00 0.024 3.95E-04 34.1 0.560 1.12 1550 10 9:30:28 AM 00008 0.13 75.00 0.024 3.95E-04 34.1 0.560 1.12 1540 10 9:30:36 AM 0:00:08 0.13 75.00 0.024 3.95E-04 34.1 0.560 1.12 1530 10 9:30:44 AM 0:00:08 0.13 75.00 0.024 3.95E-04 34.1 0.560 1.12 1520 10 9:30:52 AM 0:00:08 0.13 75.00 0.024 3.95E-04 34.1 0.560 1.12 1510 10 9:31:00 AM 0:00:08 0.13 75.00 0.024 3.95E-04 34.1 0.560 1.12 1500 10 9:31:08 AM 0:00:08 0.13 75.00 0.024 3.95E-04 34.1 0.560 1.12 1490 10 9:31:16 AM 0+00+08 0.13 75.00 0.024 3.95E-04 34.1 0.560 1.12 ral Moisture: 17.4% Init. Satur.Time: 9:00:00 AM ESTIMATED FIELD KSAT: 0.030 5.03E-04 43.4 0.712 1.42 urelClassif: Silty fine SAND SM cture/Fabric: [kltF Consistency: loose Slo e/Landsc: Depth to an Impermeable Layer: N/A Depth to Bedrock ...................: N/A Notes: % Passing #200 Sieve = 25.5 % Perched Water and Estimated Normal Seasonal eportl As Precision Permeameter' Rev. 4/5/002 APPENDIX VII ' CLASSIFICATION SYSTEM FOR SOIL EXPLORATION 1 1 1 I, 1 1 'n t GE®Virginia Beach Office Williamsburg Office IIizabeth City Office 1 • 204 Grayson Road 1592 Penniman lid. Suite E 504 Past Elizabeth St. Suite 2 Virginia Beach, VA 23462 Williamsburg, Virginia 23185 Elizabeth City, NC 27909 (757) 518-1703 (757) 564-6452 (252) 335-9765 ' CLASSIFICATION SYSTEM FOR SOIL EXPLORATION Standard Penetration Test (SPT). N-value 1 Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D 1586. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30" long split -spoon sampler. The sampler was driven with Mows of a 140 Be. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment (4 increments for each soil sample) of penetration was recorded and is shown on the bnring logs. The sum of the second and third penetration increments is termed the SPT N-value. 1 NON COHESIVE SOILS COHESIVE SOILS (SILT, SAND, GRAVEL and Combinations) (CLAY, SLI; I' and Combinations) 1 Relative Density Consistency Very Loose 4 blows/h. or less Very Soft 2 blow,/fi. or less Loose 5 to 10 blows/ft. Soh 3 to 4 blow,/ft. Medium Dense I to 30 blows/h. Medium Stiff 5 to 8 blows/ft. 1 Dense 31 to 50 blows/ft. Stiff 9 to 15 Mows/ft. Very Dense 51 blows/ft. or more Very Stiff 16 to 30 blows/ft Ilard 31 blows/ft- or more Particle Size Identification Boulders 8 inch diameter or more Cobbles 3 to 8 inch diameter Gravel Coarse I to 3 inch diameter Medium 1/2 to I inch diameter Fine I/a to Vz inch diameter Sand Coarse 2.00 tam to 1/a inch (diameter of pencil lead) Medium 0.42 to 2.00 man (diameter of broom straw) Fine 0.074 to 0.42 man (diameter of human hair) Silt 0.002 to 0.074 mm (cannot see particles) CLASSIFICATION SYMBOLS (ASTM D 2487 and D 2488) Coarse Grained Soils Mom than 50%retained on No. 200 sieve GW - Well -graded Gravel GP - Poorly graded Gravel GW-GM - Well -graded Gravel W/Silt GW-GC - Well -graded Gravel w/Clay GP -GM - Poorly graded Gravel w/Silt GP -GC - Poorly graded Gravel w/Clay GM - Silty Gravel GC - Clayey Gravel GC -GM - Silty, Clayey Gravel SW - Well -graded Sand SP - Poorly graded Sand SW-SM - Well -graded Sand w/Silt SW -SC - Well -graded Sand w/Cla-v SP-SM - Poorly graded Sand w/Silt SP-SC - Poorly graded Sand w/Clay SM - Silty Sand SC - Clayey Sand SC-SM - Silty, Clayey Sand Fine -Grained Soils 50%or more passes the No. 200 sieve CL - Lean Clay CL-NIL - Silty Clay ML - Silt OL - Organic Clay/Silt Liquid Limit 50%or greater CH - Fat Clay MH - Elastic Silt OH -Organic Clay/Silt Highly Organic Soils PT - Peat Page 1 of 1 GET Revivon 1W12107 Relative Proportions Descriptive Term Percent 'trace 0-5 Few 5-10 Little 15-25 Some 30-45 Mostly 50-100 Strata Changes In the column "Description" on the boring log, the horizontal lines represent approximate strata changes. Groundwater Readings Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as tidal influences and man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, side walks, eta.). Depending on percentage of fines (fraction smaller than No. 200 sieve size), coarse -grained soils are classified as follows: Less than 5 percent GW, GP, SW,SP hfore than 12 percent GM, GC, SM, Sc 5 to 12 Percent Borderline cases requiring dual symbols 60 50 6 x 40 0 S 30 U 20 5 10 CL. Plasticity Chart CL CH 00 10 20 30 40 SO 60 70 80 90 10D LIQUID LIMB (Ly (%)