Loading...
HomeMy WebLinkAboutSW8051217_HISTORICAL FILE_20080822STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 01) DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS IR HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 o 5 o 8 22 YYYYMMDD .� OF WAlFj9 Michael F. Easley, Governor �O (. William G. Ross Jr., Secretary rNorth Carolina Department of Environment and Natural Resources � 1. Q Coleen H. Sullins Director Division of Water Quality August 22, 2008 Carmen Gintoli, Director Facilities New Hanover County Schools 6410 Carolina Beach Road Wilmington, NC 28412 Subject: Stormwater Permit No. SW8 051217 Modification Ogden Elementary School High Density Project New Hanover County Dear Mr. Gintoli: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Ogden Elementary School on August 20, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 051217 Modification dated August 22, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until February 13, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit.This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Rhonda Hall, or me at (910) 796-7215. Si erely, ZaA�Z/Ie� Edward Beck Regional Supervisor Surface Water Protection Section ENB/rbh: S:\WOS\STORMWAT\PERMIT\051217MOD.aug08 cc: Renee Scott, CLH design, p.a. New Hanover County Building Inspections City of Wilmington Development Services Beth E. Wetherill, New Hanover County Engineering Rhonda Hall Wilmington Regional Office Central Files NollhCarolina Al tura/!y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Wilmington Regional Office Internet: ,w .nc.aterquality.orC Fax (910)350-2004 An Equal Opportunity/Affirmative Action Employer— 50 % Recycled/10 % Post Consumer Paper Customer Service 1-877-623-6748 aw<� State Stormwater Management Systems Permit No. SW8 051217 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carmen Gintoli & New Hanover County Schools Ogden Elementary School 3637 Middle Sound Loop Road, Wilmington, New Hanover County FOR THE construction, operation and maintenance of three infiltration basins in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 13, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater controls Ipbeled B1,2B2 and C have been designed to handle the runoff from 62,320 ft , 54,869 ft , and 51,030 ft , respectively, of impervious area. Each infiltration basin must be operated with a 50' vegetated filter. 3. The overall tract and each individual drainage area will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. This permit does not make provision for any future built -upon area. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 051217 6. The following design criteria have been provided in the infiltration basin and must be maintained at design condition: Basin Number: 131 B2 C a. Drainage Area, acres: 2.24 3.17 1.59 Onsite, ft2: 97,574 138,085 69,360 Offsite, ft2: 0 0 0 b. Total Impervious Surfaces, ft2: 62,320 54,869 51,030 C. Design Storm, inches: 1.5 1.5 1.5 d. Basin Depth, feet: 2.0 2.0 2.0 e. Bottom Elevation, FMSL: 28.0 29.0 29.4 f. Bottom Surface Area, ft2: 3,395 4,830 3,590 g. Bypass Weir Elevation, FMSL: 30.0 30.5 30.5 h. Permitted Storage Volume, ft3: 7,675 8,265 6,765 i. Type of Soil: Seagate j. Expected Infiltration Rate, in/hr: 12.0 k. Seasonal High Water Table, FMSL: 26.0 27.0 27.4 I. Time to Draw Down, hours: <3 <10 <7 M. Receiving Stream/River Basin: Howe Creek / Cape Fear n. Stream Index Number: 18-87- 0. Classification of Water Body: "SA ORW" (project is outside the 575' AEC) II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 4. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 051217 5. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowin.9 and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 6. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 051217 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 22"d day of August, 2008. NORTXCAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 051217 Modification Page 5 of 7 OFFICE USE ONLY 11 Date Received Fee Paid Permit Number11 11 -off- aD• DO State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation_ individual, etc. who owns the project): 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): 3. Mailing _Address for person listed in item 2 above: U (._a. o LA V\tx_- p5Q/_? CalfSC�, City: State: kc— Zip: Z&AI2— Telephone Number: 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): 08at,-YI C_11._IZLJt �^tr� G2c FFou� 5. Location of Project (street address): City: County: 6. Directions to project (from nearest major intersection): 7. Latitude: 2� � 0 f LDt Longitude: —I .4 9, 1 1�5 n of project 8. Contact person who can answer questions about the project: Name: {'.V11-.e anJGDTT Telephone Number: � (q�� �I — (P II. PERMIT INFORMATION: 1. Specify whether project is (check one): New Renewal _Modification Form SWU-101 Version3.99 Pagc 1 of4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number ' GjW S n5121 and its issue date (if known) }yyh hj(.p 3. Specify the type of project (check one) Low Density High Density Redevelop Ceneral Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major Sedimentation/Erosion Control _404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . 2. Stormwater runoff from this project drains to the �61r . cme2 -• River basin. 3. Total Project Area: 10• 1 2Z acres 5. How many drainage areas does the project have? 13 4. Project Built Upon Area: 39).1 % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 5 l Drainage Area 132•, Receiving Stream Name Receiving Stream Class Drainage Area z„Z L Existing Impervious* Area Q Proposed Impervious"Area (p7 ZQ S % Impervious* Area (total) I(Q , Q '/ . Impervious* Surface Area Drainage Area f5I Drainage Area$2, On -site Buildings cn5 H 2 '0'J•k On -site Streets 0O On -site Parking ;Z O O S• Z5 ( D C2. On -site Sidewalks C- C7 - 11 - g.p, Other on -site Off -site Q 0 Total: ZO Total: CJ Stv°I7d * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 1 Basin Information Drainage Area " L age Are Receiving Stream Name Receiving Stream class Drainage Area , Pxlsting impervious` Area Proposed Impervious'Area 51 O S• % Impervious` Area (total) Impervious* Surface Area Drainage Area L Or age Area On -site Buildings lb,sao S, r-- On -site Streets O On -site Parking S21:�, On -site Sidewalks O S Other on -site Off -site Total: ( 03 O Total: Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? W/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number _ as issued by the Division of Water Quality. These covenants may not be changed or ofeleted without the consent of the State. 2. No more than W / A _ square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and Ceneral Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that yen have provided the following required information by initialing in the spare provident next to each item. Initials • Original and one copy of the Smrmwater Management Permit Applicatinn Form RZ 2 • One copy of the applicable Supplement Fornt(s) for each BMP N/A • Permit application processing fee of $420 (payable to NCDENR) NfA • Detailed narrative description of sturmwaier treamnent/utanagement w/s. • Two copies of plans and specifications. including: 42-S - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & elate Mean high water line Dimensioned property/project boundary Location map with named streets or NCSR numhers Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stoI'll lwater control measures Wetlands delineated, or a note on plans that none exist Existing drainage. (including off -site), drainage easemen(s, pipe sizes, runoff calculations Drainage areas delineated Vegetated buffers (where required) VII. AGENT AUTHORIZATION If yen wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm):Pe—rt-.-P. ✓C CFrr) CL-44 PE--:4 &1-4 PA, . Mailing Address: C200r14- I:21�, T '' UI.2- 5I0 City: State: N(✓ Zip: Phone: ( 11°7 ) I9-(O-7IL4 Vill. APPLICANT'S CERTIFICATION rax: ( °I I] ) -319 —151 (�o 1, (print or rype name of person listed in General Information. item Z) C--r1 r.P}n 1. certify that the information included on this permit application form is. to the best of my knowledge. correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed projecl complies with the requirements of ISA NCAC 7H lom(h Date: �12 Pond SWU-101 Version 3.99 Page 4 of 4 P. 01 TRANSACTION REPORT SEP-23-2008 Tl1E 09 : 35 AM FOR: NCDENR 910 350 2004 t SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP SEP-23 09:33 AM 94522899 2'07" 6 FAX TX OK 239 TOTAL : 2M 7S PAGES: 6 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor FAX COVER SHEET Daze: To: ��d/jo Co; Wdliam G. Ross, Jr., Secretary No. Pages (excl. cover): -� From: Jo Casmer Phone: (910)796-7245 Fax: �27 _ 2 S- ? % Fax» (91.0) 350-2004 Re: �6 OEtJ Z7 Z /rl E n r /i --j/ -:5,1V / -7 O'Xn' /1�172 i /79od:�•�,-t7/o-✓ :// -7/-Zz-2oo8. 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796.7215 • An Equal Opportunity Affirmative Action Employer 4 v State of North Carolina v Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor William G. Ross, Jr., Secretary FAX COVER SHEET Date: //2No. Pages (excl. cover): To: � U From: Jo Casmer Co: �oU7�I�/i/ �/l✓i/o�/n�irrPhone: (910)796-7245 Fax:S2 — Z % Fax: (910) 350-2004 Re: �G OEnJ EnI E n i /� SGU 8DS/� / % �o�o� o���n /� r r��/fr d - Gft -/ E�5 � 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer CLH design, p.a. MacGregor Park, 125Edinhurgh South, Suite 310 Cary, North Carobi is 27511 Phone: (919) 319-6716 Fax: (919) 319-7516 Email. clhdesign@clhdesignpa.corn LETTER OF TRANSMITTAL To: Rhonda Hall Company: NCDENR Water Quality Section Address: 127 Cardinal Drive City, State Zip: Wilmington, NC 28405 Phone: (910)395-3900 Fax: (910)350.2004 1-Oct-07 Method: Subject: ® Prints ® Reports UPS Ground Ogden Elementary School -Mobiles ❑ Originals ❑ Specifications ❑ Copy of Letter ❑ Submittals CLH Project Number: 1217-prmt ® Applications ❑ Other: We are sending you the following items: No of Copies Date Description • 2 1-Oct-07 Revised Sheet C3.1 • • IrD lQ f� Ti OCT 0 2 1007 Additional Remarks: Rhonda, Attached is the revised sheet C3.1. Vincent Lewis' name has been taken off the plans per your request. I look forward to your approval of this project. Thanks for your help. Please call me at (919) 319-6716 if you have any questions. Signed .9en4e scotf U0 cc: File CLH design, p.a. MacGregor Park, 129 Edinhurgh South, Suite 310 Cary, North Carolina 27911 Phone: (919) 319-6716 Fax: (919) 319-7.516 Emai/. clhdesignoclhdesignpa.com LETTER OF TRANSMITTAL To: Linda Lewis Company: NCDENR Water Quality Section Address: 127 Cardinal Drive City, State Zip: Wilmington, NC 28405 Phone: (910)395-3900 Fax: (910)350-2004 Method: UPS Air 16-Jul-07 Subject: Ogden Elementary School -Mobiles CLH Project Number: 1217-prmt E E Prints Reports ❑ Originals ❑ Copy of Letter ❑ Specifications ® Applications ❑ Submittals ❑ Other: We are sending you the following items: No. of Copies Date Description • 2 17-Jul-07 Modified Stormwater permit applications • 2 17-Jul-07 Calculations I Narrative • 1 17-July-07 Regular Permit Fee ($420.00) • 2 17-Jul-07 Sets of Plans Additional Remarks Please review the attached documents for DWQ approval for the modification to Ogden Elementary School. No design elements of infiltration basin B2 have changed. I trust this information is sufficient for your review. Please call me at (919) 319-6716 if you have any questions. Signed Renee Scott cc: File REC LIVF,D JUL 1 S 2007 BY: CLH design, p.a. MacGregor Park, 129 Edinburgh South, Suite 310 Cary; North Carolina 27511 Phone: (919) 319-6716 Pax (919) 319-7516 17-July-07 TO: Linda Lewis- Division of Water Quality -Modification to Application No. SW8 051217 FROM: Renee Scott RE: REGULAR REVIEW OGDEN ELEMENTARY SCHOOL CC: File (1217-prmt) Dear Ms. Lewis, Attached is a permit modification to the above mentioned project. The calculations attached prove the B2 basin designed under the original storm water permit can handle the additional BUA from the mobiles that will be located on site. Please refer to the plans for these mobile locations. Basin B2 has not been modified from the previous storm water permit (SW8 051217), therefore no detail sheets have been submitted with this package. Please let us know if you should have any questions. Sincerely, Renee Scott MW if..tun Cover Ulm,d. DESIGN CALCULATIONS CnnL✓S1TE WORK OGDEN ELEMENTARY SCHOOL 3637 MIDDLE SOUND LOOP ROAD NEW HANOVER COUNTY, NC JuLY, 2007 CLH design, p.a. MacGrggor Park, 125 Edinburgh South, Suite 310 Cary, North Carolina 27511 Phone: (919) 319-6716 Fax: (919) 319-7.516 CONTENTS STORMWATER DESIGN NARRATIVE CALCULATIONS STORMWATER MANAGEMENT STORMWATER MANAGEMENT Stormwater Management Narrative Ogden Elementary School July, 2007 The site is located on Middle Sound Loop Road approximately one half mile east of NC Highway 17. There is an existing elementary school with multiple classroom buildings and site infrastructure. A new elementary school building is proposed to replace the existing buildings currently on site. The site work Will include new bus and parent loops and new driveway access. Some of the current school buildings remain occupied and the school will remain operational during the project. The project is located within the Howe Creek watershed which is designated as SA waters. Wetlands encroach on site and are indicated on the plans: No streams are shown on USGS Quad maps or soil survey mapping. No wetlands are impacted by this project. The proposed site impervious area (which is 41.7% of the site) will require the site to meet High Density requirements. Due to the location of the project within areas in SA waters, the stormwater shall be treated in infiltration basins. The stormwater infiltration basins will be reviewed by NCDENR DWQ and New Hanover County. The basins provide both stormwater treatment and detention. Stormwater Treatment Requirements The infiltration basins will treat the first 1.5 inches of runoff. Due to the shallow Seasonal High Water Table, some fill will be required to meet the 2 foot minimum infiltration layer. The soils provide infiltration rates of 2.4 in/hr (see attached soils infiltration evaluation by ECS). Pre-treatment of stormwater prior to entering infiltration basin will be provided by sand filters and sediment basins. Pre / Post Development Runoff The temporary storage capacity of the infiltration basins and pre-treatment devices will be utilized to provide detention volume required to reduce the post -development runoff from the site to a peak rate less than the pre -development rate for the 2-yr, 10-yr and 25-yr 24-hr storm event. Detention hydrographs and pond routing calculated with Hydraflow Hydrographs 2002 version 7.0 by Intelisolve software. Pre / Post Development Runoff Summary Drainage Basin Area A Description: Southern portion of the site draining to the southern corner of the properly adjacent to the Brandywine subdivision. Run-off enters wetland prior to leaving the property. No additional off -site drainage enters Area `A'. Summary Pre -Development Post -Development With Detention DA (ac) 2.80 0.59 CN 53.8 38.0 Tc (min) 5.0 5.0 Peak Q2 (efs) 1.6 0.5 N/A Peak Q10 (efs) 6.3 0.2 N/A Peak Q25 (cfs) 8.8 0.01 N/A No detention necessary for Drainage Basin Area A. Drainage Basin Area B Description: Western portion of the site draining to the western property line. Run-off enters wetland prior to leaving the property. No additional off -site drainage enters Area `B'. Summary Pre -Development Post -Development With Detention DA (ac) 3.23 6.97 CN 58.1 64.0 Tc (min) 5.0 5.0 Peak Q2 (cfs) 2.9 9.9 0.7 Peak Q10 (cfs) 9.2 25.2 5.6 Peak Q25 (cfs) 12.2 32.3 8.9 Detention is provided by Infiltration Basins `B1' and `B2'. Drainage Basin Area C Description: Eastern portion of the site draining to the right-of-way of Middle Sound Loop Road. No additional oft -site drainage enters Area `C'. Summary Pre -Development Post -Development With Detention DA (ac) 4.09 2.56 CN 47.3 67.9 Te (min) 5.0 5.0 Peak Q2 (cfs) 0.7 4.6 0.5 Peak Q10 (cfs) 5.8 10.6 5.4 Peak Q25 (cfs) 8.8 13.3 8.5 Detention is provided by Infiltration Basin `C'. Total Site Summary Pre -Development Post -Development With Detention Q2 (cfs) 5.2 14.4 1.1 Q10 (cfs) 21.3 36.0 11.1 Q25(efs) 29.7 46.1 17.9 W111E ® SM] CL YN -Mt-Nb-ml Ate@ R-Ip WR.1 L6 JIY Po ]A\ Rpulsml-mlo am m nm z l02 zam - o GRAP SCALE ;Bawyw �ve�d@mcRs; Fp...1. 124 M ,. ,NrYryp. MC 28 f� Ogden Elementary School Replacemeni Project # 820-9113 3637 Middle Sound RoE STORMWATER MANAGEMENT PRE -DEVELOPMENT OMNA6E AREAS R,R mmr m vuwu. xwri.-me-msao rbm - o O I xA\ xvxxr TTT/' m nawne� t RbIrS-ni-an-M E zoc¢ R-m X� x m uw w for w..n-on-Minim imm INRLTRA77C POND 'C' AREA 'A' a' I r 0 JJ All efr� e AREA 'C' -\ mBAOf .. mm�wmv AREA 'C BYPASS GRAPHIC scA �inX �rR Rwis on'-ar a INFILTRATION POND 'B1' __ Rw.ao-msRns-Poo / 1r � I 7 06 NIS w bN o-me-xw-a A(A R-If A/ mrmwnn .a.m-am-u�mo PR�]^OSD R6N usAoxsxm+rs � / �'AREA 'B' BYPASS ,INFILTRATION POND '82' i 1VIROPFNFxmi$ By x000! John sawyw �vasc�si P.O. Bu fR 1i. MXMX�sI NFnwbM1 NC iBGU1 I. G10.lO2ST e: N�IX.�:OmLaRITI Ogden Elementary School Replacemeni Project # 820-9113 3637 Middle Sound Roa PMYvu' STORMWATER MANAGEMENT POST -DEVELOPMENT DRAiN -W �---%a INFx TRA T/ON BAS/N BZ STOMNAVATER ANALYSIS - OGDEN F.LEMENTARY SCHOOL AREA 131 - PORTION OF SITE ENTERING POND Site Area = 2.24 ac Te Wt. CN = 76.7 Site Soils: Seagate/Murville 12= 5.87 in/hr 110= 7.24 inflr 125= 8.15 in/hr Wooded Area: Impervious Area: Lawn Area: Weighted C: Site Arm = 3.17 ac Te Wt. CN = 66.0 Site Soils: Seagate/Murville 12= 5.87 in/hr 110= 7.24 in/hr 125= 8.15 in/hr Wooded Area: Impervious Arm: Lawn Area: Future Impervious Area: Weighted C: Site Arcs = 1.56 ac Tc Wt. CN = 41.9 Site Soils: Seagate/Murville 12= 5.87 in/hr 110= 7.24 in/hr 125= 8.15 in/hr Wooded Area: Impervious Arm: Lawn Area: Weighted C: = 5.00 min Qa25 = 14.24 efs Qal0 = 11.74 cfs (Hydrologic Soil Group A) Qa2 = 5.94 cfs 0.00 ac CN= 36 1.43 ac CN= 98 0.81 ac CN= 39 76.7 = 5.00 min Qa25 = 15.59 cfs Qa10 = 12.29 cis (Hydrologic Soil Group A) Qa2 = 5.08 cis 0.00 ac CN= 36 1.26 ac CN= 98 1.72 ac CN= 39 0.19 ac CN= 98 66.0 = 5.00 min Qa25 = 2.13 cfs Qa10 = 1.21 cis (Hydrologic Soil Group A) Qa2 = • 0.07 cfs 0.83 ac CN= 36 0.12 ac CN= 98 0.61 ac CN= 39 41.9 98 000a &IW1217-P-MAnely^le'moeoas.xLS oxmea: 711 fi@OW 10sn nm Page 1 of t G DATE 2/7/06 PROJECT NAME PROJECT NO Ogden Elementary School 1217 u l v LOCATION BY New Hanover County KAL Drainage Area, (DA) = 3.17 ac Impervious Area (c=0.95) = 1.45 ac Pervious Area (c=0.35) = 1.72 ac Cc = 0.62 Infiltration Basin % Impervious = 46 % Soil Infiltration Rate = 2.40 in/hr Design Storm Rainfall 1.50 in (Typically 1-in) Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.46 in/in Required Volume (design rainfall)(Rv)(DA) = 7,969 cf Volume Provided: 8,265 cf Proposed depth of infiltration device: 1.50 ft Avg. Surface Area Required: 5,313 sf Full Depth Surface Area Provided: 4,831 sf Pretreatment % of required volume requiring pretreatment = 50 % Volume of pretreatment device= 3,984 cf Drawdown Soil Infiltration Rate = 2.40 in/hr Proposed depth of infiltration device: 1.50 ff Drawdown Time: (Vol/Area*Rate)= 8.6 hrs 0.36 days s:\1319\0001\celcs\1217-PondSlze-Pond B2. Mobiles XLS printed: 7116200710:56 AM Page 1 of 1 e Reservoir Report Page 1 Reservoir No. 3 - POND B2 Hydraflow Hydrographs by Intelisolve Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 29.00 4,830 0 0 1.00 30.00 17,910 11,370 11,370 2.00 31.00 27,885 22,898 34,268 3.00 32.00 81,000 54,443 88,710 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 15.0 0.0 0.0 0.0 Crest Len ft = 0.00 0.00 0.00 0.00 Span in = 15.0 0.0 0.0 0.0 Crest El. ft = 0.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. ft = 30.50 0.00 0.00 0.00 Weir Type = - -- --- -- Length It = 84.0 0.0 0.0 0.0 Multl-Stage = No No No No Slope e/ = 4.07 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multistage = n/a No No No Exfiltratlon Rate = 0.52 in/hr/sgft Tailwater Elev. = 0.00 ft Note. All Duffles have been analyzed unow inlet antl outlet control. Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cuft It cis cis cfs cis cis cis cis cfs cis cfs 0.00 0 29.00 0.00 --- -- - --- --- --- --- 0.000 0.00 1.00 11,370 30.00 0.00 -- --- -- -- -- -- --- 0.216 0.22 2.00 34,268 31.00 1.10 -- --- -- -- -- -- --- 0.336 1.44 3.00 88,710 32.00 5.53 --- --- --- --- --- --- --- 0.975 6.50 Hydrograph Plot Hyd. No. 11 AREA B2 TO POND Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration. = SCS Runoff = 2 yrs = 3.17 ac = 0.0 % USER = 4.50 in = 24 hrs Hydmflow Hydrographs by Inteltsolve Peak discharge = 5.08 cfs Time interval = 1 min Curve number = 66 Hydraulic length = 0 ft Time of conc. (Tc) = 5 min Distribution = Type III Shape factor = 484 Hydrograph Volume = 16,546 cult 11 - SCS Runoff - 2 Yr - Qp = 5.08 cfs 6 N w. V C'1 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19 .0 Time (hrs) ® Hyd. 11 5 - 4 3 2 — 1 - 0 .2 21.6 24 Hydrograph Plot Hyd. No. 11 AREA B2 TO POND Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 3.17 ac = 0.0 % = USER = 7.00 in = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 12.29 cfs Time interval = 1 min Curve number = 66 Hydraulic length = 0 ft Time of conc. (Tc) = 5 min Distribution = Type III Shape factor = 484 Hydrograph Volume = 37,980 cult 11 - SCS Runoff -10 Yr - Qp = 12.29 cfs 15 10 w Cl 5 0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) ® Hyd. 11 Hydrograph Plot Hyd. No. 11 AREA B2 TO POND Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 25 yrs = 3.17 ac = 0.0 % = USER = 8.05 in = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 15.59 cfs Time interval = 1 min Curve number = 66 Hydraulic length = 0 ft Time of conc. (Tc) = 5 min Distribution = Type III Shape factor = 484 Hydrograph Volume = 47,987 cult 11 - SCS Runoff - 25 Yr - Qp = 15.59 cfs 20 15 rn w � 10- CY 5 0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) ® Hyd. 11 Hydrograph Plot Hyd. No. 11 AREA B2 TO POND Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 3.17 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 10.00 in Storm duration = 24 hrs 25 2 r� 1 1 Hydraflow Hydrographs by Intelisolve Peak discharge = 21.94 cfs Time interval = 1 min Curve number = 66 Hydraulic length = 0 ft Time of conc. (Tc) = 5 min Distribution = Type III Shape factor = 484 Hydrograph Volume = 67,537 cuft 11 - SCS Runoff - 100 Yr - Qp = 21.94 cfs 0 — 5 0 5 - 0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) O Hyd. 11 Re: Ogden Elementary School (SW permit no. SW8 051217) Subject: Re: Ogden Elementary School (SW permit no. SW8 051217)' From: Linda Lewis <linda.lewis@ncmail.net> Date: Wed, 11 Jul 2007 10:42:47 -0400 To: Renee Scott <rscott@clhdesignpa.com> Renee: All modifications use the same application forms as a new project would. You need to complete a new application SWU-101 showing the information for all of the unchanged basins and the revised BUA information for the basin(s) that will be changing. An original signature on the application is required. We cannot "reuse" the previous signature page for a modification. Additionally, a signed and revised supplement form will be needed if any of the permitted design elements of the basin(s) will be revised. Two sets of plans are required for all new or modified projects. As an environmental agency, we encourage conservation by encouraging you to submit only the revised sheets rather than the entire set, but only if the revised sheets show all of the unchanged previously permitted information plus the new revised information. Please remember to include the detail sheet if the detail sheet changes. In order to demonstrate that the basin(s), as previously permitted, can handle the additional BUA, you will need to provide signed, sealed and dated calculations for the revised basin(s) only, as if the basin(s) was being designed from scratch, using the increased BUA. Linda Renee Scott wrote: Linda, I am getting ready to submit a permit modification for the above mentioned project. I have a couple of questions. 1. Is there a permit modification form I need to fill out or do I just have a cover letter stating that the attached information is a modification to permit no. SW8 051217? 2,. Do you need to see the entire application again or is it just the sheets that will be modified based on the changes? If you do need to see the entire application again, do I need to get it signed by the owner again? 3. How many sets of plans do you need to see? 4. I have supporting calculations showing the increase in BUA. Do you need to see our entire calculations for the infiltration basin that the additional BUA will be flowing to or just the supporting calculations proving that the infiltration basin can handle the additional BUA? Please let me know as soon as possible, I would like to send the information 1 'of4 7/11/2007 12:26 PM Re: Ogden Elementary School (SW permit no. SW8 051217) 0 to you in the next couple of days. Thanks! Renee -----Original Message ----- From: Linda Lewis [mailto:linda.lewis@ncmail.net] Sent: Wednesday, June 06, 2007 3:13 PM To: Renee Scott Subject: Re: Ogden Elementary School (SW permit no. SW8 051217) Renee: You need to submit a permit modification. The additional BUA needs to be added to the application and you need to demonstrate that the basin as designed can accommodate the increased BUA. May I suggest that when you oversize a pond or basin for a future project, please be sure to add the additional BUA to the application as a "contingency" amount. That will make the modification process much smoother and quicker (for both of us!!) Linda Renee Scott wrote: /Linda,/ /I am contacting you concerning Ogden Elementary School in New Hanover County. I received a storm water permit from your office in February of 2006 (Stormwater Permit No. SW8 051217). As you may recall, this project drained to SA waters and was a high density site. We treated the water runoff with infiltration basins./ /When we permitted the stormwater, there were no mobile units planned to be located on site. Recently we received a request from New Hanover County Schools for 3 mobile units to be located on site for the upcoming school year./ /I immediately looked at our stormwater spread sheets to see how this effects our basins and impervious area. The runoff for these new mobile units would drain to infiltration basin B2, see attached plan. � 2 of 4 7/11/2007 12:26 PM Re: Ogden Elementary School (SW permit no. SW8 051217) These mobile units would produce an additional .10 acres or 4,356 s.f. of additional impervious area. In our calculation spread sheets we oversized the Infiltration Basin B2 for an additional .30 acres of future impervious area. If we add .09 acres of impervious area from the new mobiles, then the basin can still accommodate an additional .20 acres of impervious area in the future. See the attached application sheet with redline markups and also our calculations for this basin./ /One complication we ran into was that when we filled out the Storm Water Management Permit Application Form , section III, Drainage Area B2, under proposed impervious area we did not account for this "future impervious", because it technically is not in the project and there were no breakout lines for "future impervious". /The question I have is what do we need to do as far as these revisions are concerned to still be in accordance with this permit?/ /Please let me know as soon as possible. There is somewhat of a time crunch to get these mobiles located./ /Thanks,/ /Renee/ /*Renee C. Scott*/ /*Project Manager*/ /*CLH Design, P.A.*/ /*125 Edinburgh South Drive*/ /*Suite 310*/ /*Cary, NC 27511*/ /*P: (919) 319-6716 F: (919) << ... >> << ... >> / 319-7516*/ / << ... >> 3 of 4 7/11/2007 12:26 PM