Loading...
HomeMy WebLinkAboutSW7090609_COMPLIANCE_20130626STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Compliance Inspection Report Permit: SW7090609 Effective: 11/13/09 Expiration: 12/30/21 Owner: Camden County Project: South Camden VFD - Shiloh Station 11 County: Camden 1061 S Hwy 343 Region: Washington Shiloh INC 27974 Contact Person: Randell Woodruff Title: Phone: 252-338-1919 Directions to Project: From the intersect of US 158 E and NC 343, travel southbound for approx 7.8 miles. Site is on the south side of NC 343, approx 0.3 miles past Pond Rd (SR 1114). Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Pasquotank River) (03-01-50 ) ( SB) On -Site Representative(s): Related Permits: Inspection Date: 06/26/2013 Entry Time: 01:00 PM Primary Inspector: William J Moore Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: 0 State Stormwater (See attachment summary) Exit Time: 01:30 PM Phone: 252-946-6481 Ext264 Inspection Type: Compliance Evaluation ova, Page: 1 Permit: SW7090609 Owner -Project: Camden County Inspection Date: 06/26/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: South Camden VFD is located at 1061 South, Hwy 343 near Shiloh. This is a 3 ac site with 0.9 ac BUA. SW is collected & treated in a 6138 sf wet pond. All BUA & sw control measures appeared to be constructed according to the approved plan. PE certification provided by Hyman Robey on 7/19/2012 Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Page: 2