Loading...
HomeMy WebLinkAboutSW7080816_HISTORICAL FILE_20080915STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD v�MCIQM&CREED Venture IV Building 1730 Varsity Drive Raleigh, NC 27606 919.233.8091 Fax 919,233,8031 wv.n.mckimcreed.com September 11, 2008 Scott Vinson ENGINEERS SU RV EVO RS P L A N N E R S M&C 04135-0001(40) R C4rc TTVE® SEP 152008 NCDENR-DWQ �,p� /� 943 Washington Square Mall Dp�17CYKJt-WAR(,O Washington, NC 27889 RE: River Dunes - Village Center Phase II and Harbor Village VI (SW 7AW6146) High Density Stormwater Permit - Request for Additional Information Dear Mr. Vinson: In response to your request for Additional Information dated September 4, 2008: 1. All Supplements have been updated to include the required 50' vegetative filter and distance from surface waters, as well as corrected impervious areas and percentages. 2. We have added another small building footprint in the marina quarters area, revised Exhibit A for estimated impervious surfaces for the lots, and revised the table for Section III, Part 9 of the application. 3. We have labeled the proposed grassed swale between lots 626 and 627 and have shown the drainage easement along the lot line. 4. We have revised plan sheet C3.1 to include more spot grades, a short retaining wall, and revised contours to show the drainage from the Marina Quarters parking getting into basin VI-1. 5. We have designated more of the roadway centerline points as high and low points on sheet C3.1. 6. We are pleased to submit the following revised documents to reflect the above changes for your review and approval. • Two (2) copies of Supplements and Calc Sheets for Infiltration Basins VI-1, VI-2, and VI-3. Mr. Scott Vinson September 11, 2008 Page 2 of 2 • Two (2) copies of the Additional Drainage Area Information attachment to the Application. • Two (2) copies of revised plan sheet C3.1. The above documents and plan sheets are to be used in conjunction with the Calculations packages from our August 21s, submittal. 1 trust that this information will be sufficient for your review. If you require clarification or additional information, please do not hesitate to contact me. Thank you. Sincerely, McKIM & CREED, P.A. Curtis M. Blazier, PE Project Manager Enclosures cc: Ed Mitchell, River Dunes Corporation 48 ** £SCREED ® INFILTRATION BASIN DESIGN River Dunes Harbor VillageVl Infiltration Basin VIA • Project: 04135-0002 Prepared by: CMB Date: 8/1/2006 Drainage area: 120,454 sf Volume to Catch The First 3.0 Inches of Runoff: (no bypass provided) Runoff: Rv = 0.05 + 0.009' I Simple Method, Schueler Rv = 0.5450545 Volume: V = P ' Rv " A V = 16,414 cf Surface Area: SA = Volume / Depth Depth = 24 in SA = 8,207 sf Select Fill Soil: Conductivity (k) (in / hr) Sand 6 Loamy Sand 2 Sandy Loam 0.5 - 1 Clay Soils: Use Sandy Loam or Loamy Sand Fill Soil = Loamy Sand k= 1.3 I = Impervious Percent = Rv = Runoff Coefficient V = Required Storage Volume P = Design Rainfall = A = Drainage Area Page 1 of 2 RECEIVED SEP 1 52008 DWQ PROJ # 55 3 inch Cover SF Acres Sidewalks ' 4,99.4 0:11 ' Streets ` 12,356 0.28' Buildings 29,021 0.67 Parking '' 1g,886 -.,0.46 Other >.OAO ; Landscape 54,197 1.24 Other (pool) I 1 0.00 Totals 120,454 2.77 Elev Area Partial Volume Cumulative Volume vs. Required Volume Results 3.00 6146.00 0.00 16,414 Too Small 4.30 7438.971 8830.23 8830.23 > 16.414 Too Small 5.30 8498.41 7968.69 16798.92 > 16,414 OK! Notes: Impervious Pervious • River Dunes Harbor VillageVl Page 2 of 2 River Dunes Harbor VillageVl Infiltration Basin VI-1 Find Time Drawdown of Water Through Soil Laver: A. Rate of Drawdown: Qd = (2.3e-5) . k' SA' H / L H / L Approximatley = 1 Qd= 0.25410253 B. Find Time to Drawdown Water from Inundation to Saturation at Surface: RECEIVED Volume to Drawdown: Vi-s = SA' Depth Vi-s = 3694.96187 Time to Remove Volume of Water at Flowrate Qd: PROJ # Ti-s = Vi-s / Qd = 14,541 sec. = 4 hr. C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: n= 0.38 Volume to Drawdown: Vi-s = 2 feet' SA' n 27046 Vs-2 = 6458.79335 Time to Remove Volume of Water at Flowrate Qd: Ts-2 = Vs-2 / Qd = 25,418 sec. = 7 hrs D. Total Time to Draw Water Through Soil: T= 11 hrs SEP 1 5,2008 DWQ C J 0 INFILTRATION BASIN DESIGN Page 1 of River Dunes Harbor VillageVl Infiltration Basin VI-2 Project: 04135-0002 Prepared by: CMB Date: 8/1 /2006 Drainage area: 66,216 sf Volume to Catch The First 3.0 Inches of Runoff: (no bypass provided) Runoff : Rv = 0.05 + 0.009' I Simple Method, Schuster Rv = 0+5112035 Volume: V = P' Rv' A V = 8,462 cf Surface Area: 33932.41 Depth = 24 in SA = 4,231 sf Select Fill Soil: Conductivity (k) (in / hr) Sand 6 Loamy Sand 2 Sandy Loam 0.5 - 1 Clay Soils: Use Sandy Loam or Loamy Sand Fill Soil = Loamy Sand k= 1.3 RECEIVED SEP 15 2008 DWQ PROJ # I = Impervious Percent = 51 Rv = Runoff Coefficient V = Required Storage Volume P = Design Rainfall = 3 A = Drainage Area inch Cover SF Acres Sidewalks:. 5,516. 0.13 Streets•.6,262- 0.14 Buildings ;, 21,650 ' -'0.56 Parking ;,': 504 0.01 Otheq 71 000 . Landscape 32,284 0.74 Other (pool) 1 0.00 Totals 66,216 1.52 Elev Area i Partial Volume Cumulative Volume vs. Required Volume Results 3.30 3528.21 0.00 8,462 Too Small 4.30 4248.78 3888.50 3888.50 > 8,462 Too Small 5.30 5025.54 4637.16 8525.66 > 8.462 OK! Notes: Impervious Pervious ® River Dunes Harbor VillageVl Page 2 of 2 River Dunes Harbor VillageVl Infiltration Basin VI-2 Find Time Drawdown of Water Through Soil Laver: A. Rate of Drawdown: Qd = (2.3e-5) * k * SA * H / L H / L Approximately = 1 Qd= 0.15 B. Find Time to Drawdown Water from Inundation to Saturation at Surface: Volume to Drawdown: Vi-s = SA *Depth REC� IVE �j Y 99�� Vi-s = 2512.77 SEP 15 2008 Time to Remove Volume of Water at Flowrate Qd: Dµ,Q Ti-s = Vi-s / Qd = 16,722 sec. PROJ # = 5 hr. C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: ® n= 0,38 Volume to Drawdown: Vi-s = 2 feet * SA * n Vs-2 = 3819.4104 Time to Remove Volume of Water at Flowrate Qd: Ts-2 = Vs-2 / Qd = 25,418 sec. = 7 hrs D. Total Time to Draw Water Through Soil: T= 12 hrs U 0 KJ INFILTRATION BASIN DESIGN Page 1 of River Dunes Harbor VillageVl Infiltration Basin VI-3 Project: 04135-0002 Prepared by: AYEC Date: 8/18/2008 Drainage area: 91,984 sf Volume to Catch The First 3.0 Inches of Runoff: (no bypass provided) Runoff: Rv = 0.05+0.009' I Simple Method, Schueler Rv = 0.5837173 1 = Impervious Percent = Rv = Runoff Coefficient Volume: V = P " Rv ' A V = 13,423 cf V = Required Storage Volume P = Design Rainfall = Surface Area: 54548 A = Drainage Area Depth = 24 in SA = 6,712 sf Select Fill Soil: Conductivity (k (in / hr) Sand 6 Loamy Sand 2 Sandy Loam 0.5 - 1 RE CEI��� SEP 15 2008 PROD#DWQ 59 3 inch Cover SF Acres Sidewelks;;- j 5530- t 01, Streets' " '' 12,365 ' .�0.28' ; Buildings, 41,000 r0.94 i. k: Parking` 630� '0.01 ' Other 0.00 Other 0.00 Landscape 37,436 0.86 Other(pool) I 1 0.00 Clay Soils: Use Sandy Loam or Loamy Sand Totals 91,984 2.11 Fill Soil = Loamy Sand k= 1.3 Elev Area Partial Volume Cumulative Volume vs. Required Volume Results 3.30 5754.71 0.00 13,423 Too Small 4.30 6976.521 6365.61 6365.61 > 13,423 Too Small 5.30 8257.56 7617.04 13982.65 > 13,423 OK! Notes: Impervious Pervious River Dunes Harbor Village VI Page 2 of 2 River Dunes Harbor VillageVl Infiltration Basin VI-3 Find Time Drawdown of Water Through Soil Laver: A. Rate of Drawdown: Qd = (2.3e-5) * k * SA * H / L H / L Approximatley = 1 Qd= 0.24690091 B. Find Time to Drawdown Water from Inundation to Saturation at Surface: Volume to Drawdown: Vi-s = SA *Depth RECEIVED Vi-s = 4128.7778 SEP 15 2008 Time to Remove Volume of Water at Flowrate Qd: DWQ' FROJ # Ti-s = Vi-s / Qd = 16,722 sec. 5 hr. 54548 C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: n= 0.38 Volume to Drawdown: Vs-2 = 6275.74226 Vi-s = 2 feet * SA * n Time to Remove Volume of Water at Flowrate Qd: Ts-2 = Vs-2 / Qd = 25,418 sec. = 7 hrs D. Total Time to Draw Water Through Soil: T= 12 hrs 0 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality September 4, 2008 Mr. Ed Mitchell, President River Dunes Corporation 416-A Pollock Street New Bern, NC 28560 Subject: Stormwater Review SW7080816 River Dunes Marina & Residential Development Harbor Village VI & Village Center P111I Pamlico County Dear Mr. Mitchell: This office received a Coastal Stormwater permit application and plans for the subject project on August 21, 2008. A preliminary review of the project indicates that before a State Stormwater permit can be issued the following additional information is needed. 1. The Infiltration Basin supplement forms for Harbor Village VI basins 1, 2 & 3 have impervious areas and percentages given that do not correspond to the application form nor the provided calculations. Please verify, correct and re -submit revised pages. Also, located at the bottom of these 3 forms are incorrect lengths for the vegetated filter at 30', whereas 50' is required & provided and the distance from surface waters are incorrect. Please revise. 2. Please breakdown the Harbor Village VI -I drainage area's impervious numbers a little more. For example, what lots and marina headquarters buildings make up the 27,046 sf of impervious area listed under "Buildings"? What or how does the 20,936sf of impervious for the "Marina Quarters" and 10,475sf for the "Marina Parking" come under Application, Sec.11I, no.9 (attached table) for buildings, streets & parking? 3. Please delineate and label any proposed Swale between lots 626 & 627 on plan sheet C3.1 for Harbor Village VI. Please also verify that the area the swale will be located on is "common area". If not show the required permanent drainage easement on the plan. 4. Please show how the Marina Quarters parking will flow into Basin VI -I and not into the adjacent wetlands with additional proposed contours, swales, etc. on plan sheet C3.1. 5. Are there plan sheets with street profiles for the Harbor Village VI? If so, please include 2 copies to help verify high & low points and street drainage. 6. Please do not forget to have any plans, calculations, supplements, narrative, etc. revised, signed, sealed and dated as necessary when re -submitting The above requested information must be received in this office prior to September 12, 2008 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. oa N if arolina JYntura!!y North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet: h2o.enr.sele.ne.us 943 Washington Square Mall, Washington, NC 27889 1-877b23-6748 You should also be aware that the Stormwater Rules require that the pernut be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. Please reference the Stor mvater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3848. Sincerely, Scott Vinson Environmental Engineer Washington Regional Office cc: �is Blazier, PE McKim & Creed (email) ;,,'Washington Regional Office STORMWATER MANAGEMENT PERMIT APPLICATION FORM (SWU-101 VER. 3.99) PART III PROJECT INFORMATION ITEM 9 -DRAINAGE AREAS RIVER DUNES MARINA AND RESIDENTIAL DEVELOPMENT - HARBOR VILLAGE VI AND VILLAGE CENTER PHASE II � for A 1 I/v2 J/o^ 0 RIVER DUNES CORPORATION �v(`/ Drainage Area VI-1 VI-2 VI-3 VC11-11 VCII-12 Basin Information Receiving Stream Name Parris Creek Parris Creek Parris Creek Cedar Creek Cedar Creek Totals Receiving Stream Class SA NSW SA NSW SA NSW SA NSW SA NSW Drainage Area (Square Feet) 122,738 63,932 91,984 64,988 51,183 394,825 Existing Impervious Area (Square Feet) 0 0 0 0 0 0 Proposed Impervious Area (Square Feet) 66,943 31,279 54,548 447622 30,783 228,175 % Impervious Area (Total) 55 49 59 69 60 58 Impervious Surface Area (Sq. Feet) On -Site Buildings • 27,046 21,475 41,000 13,581 13,210 107,994 On -Site Streets 25,289 37784 12,365 11,731 5,601 80,077 On -Site Parking (street) 11,903 504 630 6,962 7,295 14,257 On -Site Sidewalks 2,705 5,516 553 3,078 4,677 7,755 Off -Site 0 0 0 p 0 0 Other (pool patio) 9,270 9,270 Total (Square Feet) 66,943 31,279 54,548 44,622 30,783 228,175 •- 'Impervious surface area for on -site buildings includes driveways and is a maximum amount. RIVER DUNES ESTIMATED IMPERVIOUS SURFACES EXHIBIT A R(Loj(d "j1)I40r • HARBOR VILLAGE VI LOT NUMBER LOTAREA SQ.FT. LOTAREA ACRES TOTAL ALLOWED IMPERVIOUS SQ.FT. PERCENT IMPERVIOUS % RECEIVING STREAM NAME 601 8,946 0.21 4,000 45% NEUSE RIVER 602 9,006 0.21 4,100 46% 603 9,602 0.22 4,100 43% 604 10,493 0.24 4,100 605 9,780 0.22 4,100 42% 606 9,780 0.22 4,100 42% 607 9,780 0.22 4,100 42% 608 9,780 0.22 4,100 420% 609 97780 0.22 4,100 42% 610 9,780 0.22 4,100 420/6 611 9,795 0.22 4,100 42% 612 11,895 0.27 4,100 34% 613 10,884 0.25 4,100 389% 614 11,021 0.25 4,100 37% 615 9,750 0.22 4,100 42% 616 9,751 0.22 4,100 42% 617 9,777 0.22 4,100 42% 618 9,778 0.22 4,100 42% 626 10,303 0.24 3,600 35% 627 8,963 0.21 3,700 _ 41% MARINA QUARTERS 36,486 0.84 /20,936 57% MARINA PARKINU 1 23,983 1 0.55 1, 10,475 44% ® 259,113 112,411 I 43% I See Sheet C1.1 for overall plan and lot layout in Harbor Village VI. C • 1 of 1 Red triangles at the upper right hand corner indicate design comments Please complete the yellow shaded items, ® STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Contact Person Phone Number Date Drainage Area Number II. DESIGN INFORMATION Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr hunch depth 1-yr. 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr ranch volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided • Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr hunch Post -development l-yr, 24-hr ranch Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA Additional Information Total hunch volume captured by basin Length of vegetatne filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally occuring soil above shwt Wottom covered wth 4-in of clean sand? River Dunes Marina & 122,738 It, 52,335 ftz 43 3,00 in 3.48 in 0.15 irVhr 1,779.70 ft3lsec 19.251.82 Wised 17,472.12 ft3lsec 16,596 tt3 16,799 ft 3 in h3 h3 n3 tt3 Loamy Sand 1.30 in/hr 0.70 frost 0.92 days OK 3.00 :1 OK 3.00 Imsl OK 5.30 fmsl 8,498 fit? 6.30 fmsl 109.00 ft 60.00 h 6,436.00 ff 5.00 ac-in 30.00 It NIA ft 30,00 It NIA It 0,00 It 2.00 It y (y or N) AU-' 1 am DWQ PROJ # IR ECEIVEI) AUJ 2 12008 DWQ PROJ # Maximum of 2 acre -inches allowed OK OK OK for non -SA waters OK OK for non -SA waters OK OK Proposed drainage easement provided? Capures all runoff at ultimate build -out? •Bypass provided for larger storms? Pretreatment device provided • 11 (Y or N) OK (Y or N) OK (Y or N) OK Red triangles at the upper right hand comer indicate design comments Please complete the yellow shaded items, • STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part IIQ must be panted, filled out and submitted along with all of the required information. Project Name Contact Person Phone Number Date Drainage Area Number II. DESIGN INFORMATION Site Characteristics Drainage area 63,932 fit' Impervious area 25,259 ft' Percent impervious 40 % Design rainfall depth 3.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 3.48 in 1-yr, 24-hr intensity 0.15 inRlr , Pre -development 1-yr, 24-hr runoff volume 927,02 Wised Post -development 1-yr, 24-hr runoff volume 9.090,84 Wised PrelPest 1-yr, 24-hr peak flow school 8,163.82 ft'Isec Storage Volume: Non -SR Waters Minimum design volume required 7,837 ry' Design volume provided 8,185 ft' •Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff it, Post -development 1-yr, 24-hr runoff ft' Minimum volume required ft' Volume provided ft' Soils Report Summary Soil type Loamy Sand Infltradon rate 1,30 inlhr SHWT elevation 0.70 fmsl Basin Design Parameters Drawdown time 0.49 days OK Basin side slopes 3.00 :1 OK Basin bottom elevation 3.30 fmsl OK Storage elevation 5,30 fmst Storage SA 4,840 ft? Top elevation 5.50 fmsl Basin Bottom Dimensions Basin length 64 ft Basin width 53 ft Bottom SA 3,374 ft Additional Information Total runoff volume captured by basin 5.00 ac-in Maximum of 2 acre -inches allowed Length of vegetative filter for overflow 30.00 ft OK Distance to structure NIA If OK Distance from surface waters 30.00 It OK for non -SA waters Distance from water supply wells) NIA It OK Separation from impervious soil layer 0.00 If OK for non -SA waters Naturally occuring soil above shwt 2.00 It OK 0oftom covered with 4-in of clean sand? y (Y or N) OK Proposed drainage easement provided? Capures all runoff at ultimate build -out? �ypass provided for larger storms? retreatment device provided f L'J 0 (Y or N) OK (Y or N) OK (Y or N) OK Red triangles at the upper right hand corner indicate design comments Please complete the yellow shaded items. STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Contact Person Phone Number Date Drainage Area Number Ill. DESIGN INFORMATION` Site Characteristics Drainage area 91,984 f, Impervious area 53,365 rys Percent impervious 58 Design rainfall depth 3.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 3.48 in 1-yr, 24-hr intensity 0.15 inlhr Pre -development 1-yr, 24-hr runoff volume 1,334 ryslsec Post -development 1-yr, 24.hr mnoff volume 15,571 ry'Isec Pre/Post 1-yr, 24-hr peak Flow control 14,237 Itslsec Storage Volume: Non -SR Waters Minimum design volume required 13,423 rys Design volume provided 13,983 Its •Storage Volume: SRWatem 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff Its Post -development 1-yr, 24-hr runoff rys Minimum volume required rya Volume provided rys Soils Report Summary Soil type Loamy Sand Infiltrabon rate 1.30 inlhr SHWT elevation 0.70 fmsl Basin Design Parameters Drawdown time 0,49 days OK Basin side slopes 3.00 :1 OK Basin bottom elevation 3,30 fmsl OK Storage elevation 5.30 fmsl Storage SA 8,258 fe Top elevation 5.50 fmsl Basin Bottom Dimensions Basin length 133 It Basin width 85 ft Bottom SA 5,755 fe Additional Information Total mnoff volume captured by basin 5.00 ac-in Maximum of 2 acre -inches allowed Length of vegetative filler for overflow 30.00 It OK Distance to structure NIA It OK Distance from surface waters 3000 If OK for non -SA waters Distance from water supply wells) NIA ft OK Separation from impervious soil layer 0.00 If OK for non -SA waters Naturally occuring soil above shwt 2.00 If OK •Bottom covered with 4-in of clean sand? y (Y or N) OK Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided or N) OK or N) OK or N) OK • Red triangles at the upper right hand comer indicate design comments Please =plate the yellow shaded items. STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filed out, printed and submitted. The Required Items Checklist (Pad III) must be printed, filled out and submitted along with all of the required information. Contact Person Phone Number Date Drainage Area Number II:: DESIGN INFORMATION a Site Characteristics Drainage area 66,216 fit' Impervious area 33,932 flz Percent impervious 51 Design rainfall depth 3.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 3.48 in 1-yr, 24-hr intensity 0.15 inlhr Pre -development 1-yr, 24-hr runoff volume 960.14 fl Isec Post -development 1-yr, 24-hr runoff volume 9,816.49 ft'Isec Pre/Post 1-yr, 24-hr peak flow control 8,856.36 fielsec Storage Volume: Non -SR Waters Minimum design volume required 8,462 it, Design volume provided 8,526 ft Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff Rs Minimum volume required ft Volume provided t Soils Report Summary Soil type Loamy Sand Infiltration rate 1.30 inmr SHWT elevation 070 fmsl Basin Design Parameters Drawdown fime 0.49 days Basin side slopes 3.00 :1 Basin bottom elevation 3,30 Ind Storage elevation 5.30 fmsl Storage SA 5,026 It, Top elevation 5,50 fmsl Basin Bottom Dimensions Basin length 64 tt Basin width 53 tt Bottom SA 3,374 It, Additional Information Total runoff volume captured by basin 5.00 ac-in Length of vegetative filter for overflow 50.00 It Distance to structure NIA ft Distance from surface waters 50.00 it Distance from water supply well(s) NIA 0 Separation from Impervious soil layer 0.00 it Naturally occuring soil above shwt • 2.00 If Bottom covered with 4-in of clean sand? y (Y or N) RECEIVED SEP 1 5 2008 DWQ PROJ # OK OK OK Maximum of 2 acre -inches allowed OK OK OK OK OK OK OK S Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger stones? Pretreatment device provided 11 or N) OK or N) OK or N) OK RECEIVED SEP 1 5 2008 DWQ PROD # Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST ® Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. zQ$ G . C3, / 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 12yf.125' 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, • - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. 'Q 7LS 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and Inlet and outlet structures. G1►20 . A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. C/118 . 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The Pkq-5;r5av results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. C/rJ(3 Cd1zta`cr7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. fKanT 9. A copy of the deed restrictions (if required). SEerm,A) Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 �. M. • Red Wangles mfoettthe upper right hand indicate design Comments Please Complete the yellow shaded items. STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, phnted and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. LCiPRQIECT+INF.ORMi!v:.__... .r,.-.� _•e -.r• .z. -_'•'- -.. .. Project Name River Dunes Marina & Residential Development - Harbor Village VI Contact Person Mr. Ed Mitchell Phone Number (252)6343373 Date Oil3`21 Drainage Area Number VI-1 IL`DESIGN INFORMATION: r. •.� :.c"r, t,,.. /x .::n ., ,.?v [,'y�•,.s Site Characteristics Drainage area 120,454 Rv Impervious area 66,257 fi Percent impervious 55 % Design rainfall depth 3.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 3.48 in 1-yr, 24-hr intensity 0.15 irdhr Pre -development 1-yr, 24-hr runoff volume 1,746.58 ff'IseC 'DECEIVED Post -development 1-yr, 24-hr mnoff volume 19,039.66 flelsec PrelPost 1-yr, 244hr peak flow control 17,293.08 Itflsec Storage Volume: Nori Waters SEP 5 2��8 • Minimum design volume required 16,414 Its Design volume provided 16,799 ffe DWQ Storage Volume: SR Waters PROJ # 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff its Post -development 1-yr, 24-hr runoff It Minimum volume required Is Volume provided to Soils Report Summary Soil type Loamy Sand Infiltration fate 1.30 i1 SHWT elevation 0.70 fmsl Basin Design Parameters Drawdown time 0,46 days OK Basin side slopes 3.00 :1 OK Basin bottom elevation 3.00 fmsl OK Storage elevation 5.30 level Storage SA 8,498 Is Top elevation 6.30 first Basin Bottom Dimensions Basin length 109.00 It Basin width 60.00 It Bottom SA 6,436.00 11 Additional Information Total runoff volume captured by basin 5.00 ac-in Maximum of 2 acre -inches allowed Length of vegetative filter for overflow 50,00 fit OK Distance to structure NIA fit OK Distance from surface waters 50.00 It OK Distance from water supply well(s) WA It OK ® Separation from impervious soil layer 0.00 fl OK Naturally occurring soil above shwl 2.00 1 OK Bottom covered with 4-in of clean sand? y _ (Y or N) OK Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger stomas? Pretreatment device provided y (Y or N) OK y (Y or N) OK Y (Y or N) OK N RECEIVED SEP 15 2008 DWQ PROJ # Permit No. (to be provided by DWQ) III. 'REQUIRED ITEMS CHECKLIST • Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan RE U" EI v D Initials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: AUG 2 1 2W$ - Design at ultimate build -out, - Off -site drainage (if applicable), DWQ - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, PROJ # - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 17�! 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, O - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. t i t�1� 21, R!!5 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. • 4144y,LiTg4Atable of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. CMg A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The �ELTien1 results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. G/rrJg Cq�S 7. The supporting calculations. i� 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. C/17 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 STORMWATER MANAGEMENT PERMIT APPLICATION FOR (SWU-101 • VER 03.27.08) PART III. PROJECT INFORMATION ITEM 1 DETAIL NARRATIVE — Addendum 1 RIVER DUNES MARINA AND RESIDENTIAL DEVELOPMENT for RIVER DUNES CORPORATION HIGH DENSITY STORMWATER MANAGEMENT PLAN HARBOR VILLAGE VI AND VILLAGE CENTER PHASE II The project site is located in Pamlico County at the confluence of Broad Creek and the Neuse River. The 1327-acre tract, owned by River Dunes Corporation, consists predominantly of loblolly pine stands characteristic of timber production use. Common soil units of upland areas include Wahee fine sandy loam, Argent loam, Yonges loamy fine sand, Fork loamy fine sand, and Altavista loamy fine sand. The existing drainage patterns at the site form seven drainage areas which discharge to the Tar, Broad, Paris, Mill, Cedar and Gum Thickets Creeks and the Neuse River. A conservation easement has been placed on the area of the Gum Thicket Creek watershed. The proposed subdivision is designed to preserve these seven existing drainage patterns • within the project area. The River Dunes Marina and Residential Development has been planned as an overall low -density development in compliance with the coastal stormwater regulations. The low density stormwater management permit SW7060204 has been approved by NCDENR. There are several parcels, collectively described as the Harbor Village Residential Areas, the Harbor Village Center and Riverside Village (see Sheet M-1), which fall under the overall low -density provisions with respect to gross acreage but will be developed at higher net densities than the remainder of the property. The developer will employ a best management practice approach to these parcels to insure that water quality objectives are met for the entire property. A series of shallow grassed infiltration basins will be employed at scattered strategic locations as needed to capture and infiltrate stormwater runoff from roadways and home sites. The use of stormwater culverts will be limited. Home sites and roadways will be setback from wooded wetlands where feasible to allow for a riparian buffer to dissipate sheet runoff. Other collected stormwater runoff will be directed to adjacent upland wooded areas and discharged into these areas through level spreader type devices in order to further assure maintenance of water quality. The eleven areas included in this approach will be the Harbor Villages I to VI, Riverside Village, Section 4A, the Village Center and Marina Service Area, the RV & Boat Storage Area and the Fire Station Area along Orchard Creek Rd. (see Sheet M-1). • The high density pocket of development covered in this permit application includes Harbor Village VI and Village Center Phase 11, containing approximately 394,820 square feet, or 9.1 acres. Harbor Village VI consists of three drainage areas which discharge to Parris Creek and on to the Neuse River. Village Center Phase II consists of two drainage areas which discharge to Cedar Creek and on to the Neuse River. Five infiltration basins are proposed for stormwater management purposes (see Sheet M-1,for master plan of development). Maximum built upon areas per lot for Harbor Village VI on shown on Exhibit A. The following comments address stormwater solutions for this specific area of the River Dunes development plan: For Harbor Village VI, three infiltration basins (VI-1 thru VI-3) will be constructed to control stormwater runoff and discharge it to the Neuse River via wetlands fingers in the west and central portions of the site area (see Sheets C 1.1 and C3.1). Level spreader overflow devices (LS-I thru LS-3) located on the berms surrounding the basins, grassed swales, and filter strips will be utilized to minimize impact to adjacent wetlands and ensure state water quality standards. Stormwater runoff from the drainage areas will be collected in the roadways and enter the basins through concrete flumes. Runoff will also sheet flow into basins from surrounding residential lots and the marina quarters. The rip -rap energy dissipaters and grassed strips around the perimeter of the basins will act as pretreatment for the infiltration basins. For Village Center Phase II, two infiltration basins (VCII-I1 and VCII-12) will be constructed to control stormwater runoff and discharge it to the Neuse River via wetlands fingers to the north and south of the site area (see Sheets C 1.1 and C3.1). Level spreader overflow devices located on the berms surrounding the basins and grassed filter strips will be utilized to minimize impact to adjacent wetlands and ensure state water quality standards. Stormwater runoff from the two drainage areas will be collected in the main roadway and enter the basins through grated inlets, as well as by sheet flow. Sumps in the bottom of the grated inlets, inflow pipes and rip -rap energy dissipaters will act as pretreatment for the infiltration basins. The BMP areas will have their soils re-evaluated prior to construction. A silty clay layer approximately 2 to 4 feet in thickness exists at the basin locations (see geotechnical report and borings). This clay layer will be removed and replaced with suitable sandy fill per NCDENR Stormwater BMP Manual standards (see Exhibits B and Q. Double -ring infiltrometer tests were run on the infiltrating soils in each basin. These results are shown in the table in the back of the geotechnical data section. The average infiltration rates for basins VI-1, VI-3, and VCII-I1 were all below the minimum 0.52 inches per hour required by NCDENR. The average infiltration rates for basins VI-2 and VCII-12 were 0.55 in/hr and 0.79 in/hr, respectively. Although these rates are above the minimum requirement, clay soils exist in the infiltration zone above the SHWT and will need to be scarified and replaced with suitable fill. In addition to replacing unsuitable soils in the basin areas, suitable fill will also be placed in areas immediately around the five infiltration basins, especially in the area between the basin and the wetlands. The extent r1 LJ of the fill placement will be governed by the location of the adjacent buildings. The placement of the suitable fill will help the stormwater to flow vertically and horizontally and prevent the formation of a clay barrier wall around the basins. The River Dunes property will be developed in a way that should meet the Neuse River Basinwide goal of protecting waters while accommodating economic growth. Additional BMPs will be employed to minimize impact to sensitive groundwater recharge areas. Measures may include conveying stormwater from roof -tops and walkways into dry gravel wells, applying gravel under decks to stabilize non -vegetated surfaces, locating sheds and garage structures upland from the shoreline, and surfacing parking pads with turf block or Geo mat. Grading will direct runoff toward woody wetlands for additional filtration prior to groundwater recharge. The marina Basin excavation will provide in excess of 500,000 cubic yards of material for use on site as fill for road construction throughout the project and for site development of the marina service areas (i.e. clubhouses, post office, retail, fitness and spa, chapel, swimming pools, and village center). This fill will also be utilized to prepare sites for developer construction clustered residential units. The excavated material consists of sand, sandy clay and sandy loam that is generally considered suitable for both compacted engineered fill for roadways, parking area and building pads and for un- compacted fill for landscape and infiltration areas. The infiltration areas proposed will be constructed on the fill area in order to obtain sufficient separation from groundwater as well as providing head to the discharge from the basins to drive the water into the existing vegetated riparian buffer areas without concentrating the flow. The design of infiltration basins will be in general accordance with NCDENR guidelines and will include suitable volume to contain runoff from a three (3) inch storm. An overflow "spillway" will be installed to allow excess water to be quickly removed from the infiltration basins during periods of rainfall in excess of the design storm. Vegetation within the infiltration basins will be as recommended by the NCSU Extension Service. Again, it is the intent of River Dunes Corporation to develop River Dunes in a way that should meet the Neuse River Basin wide goal of protecting waters while accommodating economic growth. For further information on the overall stormwater management plan for the development, please refer to permit SW7060204 and associated application. 0 �x,qm-r- 6 Carolina Engineers, P.A. Sieve Analysis Report SOURCE OF MATERIAL: North Side Marina Stockpile CLIENT: River Dunes Corporation PROJECT: River Dunes; Pamlico County, NC PROP. USE: Infiltration Basin Fill Material SAMPLED: May 24, 2006 PROJECT NO. 484 SAMPLE NUMBER. No. 1 SIEVE ANALYSIS DATE: 5/25/2006 TECHNICIAN: John Switzer SAMPLE SIZE: 741.5 (g) Sieve Size Weight Retained Percent Retained Total Percent Passed Specifications t4 1.2 0.16 99.6 NA #mo 2.1 0.28 99.7 NA #40 374.4 50.5 1 49.5 NA 4200 691.5 93.4 6.6 NA �xKI�17' C Laporatory Report Version 4.2 Permeability of Granular Soils (Constant Head) #5MME ASTM D 2434 'ect #: 1053-07- Report Date: 3/27/07 ct Name: Trader Construction Company Test Date(s) 3/23 - 3/26/07 Client Name: Trader Construction Company Client Address: .2500 Hwy. 70 East, New Bern, NC 28560 Boring No. Bulk Bag Sample No. 2 Sample Date: 3/5/07 Location: Basin 2A - Stockpile at Riverside Elevation: NA Sample Description: Light Brown SAND (Visual) Diameter, in: 2.879 Diameter, in: 2.879 Length, in: 5.740 Length, in: 5.740 Wet Unit Weight, pcf: 121.4 Wet Unit Weight, pcf: 128.6 Dry Unit Weight, pcf: 103.7 Dry Unit Weight, pcf: 103.7 Moisture Content, %: 17.0 Moisture Content, %: 24.0 11 FEj2MEg81ClTYMEASUREMENT5k-r_' '• +I i' rTYIQl..1Y V' n Ura4, Ont,°,516, i; tiS. cm%secj j� t ti�unco rested , s�" E' J�co rec�tedY . 1 53.17 9.00 19.0 8.97E-04 9.20E-04 2 51.8.7 9.00 19.0 .8.75E-04 8.97E-04 3 154.82 28.00 19.0 8.40E-04 8.61E-04 �.�el; �{`Kaveragew = ; ,: 8.71E-04 8.92E-04 L, cm: 14.580 A, cm 2: 41.999 h; cm: 38.100 P.,.OIiQUS DL5 k=VL160Ath where: k = hydraulic conductivity, cm/sec V = volume of water discharged, cm 3 SOIL L = length of test specimen, cm A = cross -sectional area of test specimen, cm ` SPECIMEN t = total time of discharge, min h = hydraulic head difference (HI - H2), cm POROZ7s.DIS Remarks: Test specimen compacted to 100% at 2.0% wet of optimum moisture (ASTM D-698). References: I ❑ician Name: *nical Responsibility: ASTM D422: Method for Particle -Size Analisys of Soils Mal Kraian Mal Kraian cen jmdm, u CONSTANT HEAD FILTER HI PA Laboratory Supervisor 3201 Spring Forest Road S&NE, INC. Raleigh, NC 27616 Sam le #2 Basin 2A - p Stocpile at Riverside n i 2 � r � q y r' Dowdy Point StDrto i. " Y 2' ._y �X j' i a ewe J. a i / Pointe Hill Fork Pt �' .E Point jjW `�� ' QM� 'Greek xzq� ..�+ Greco Point ✓ `; �`� r{8fniti0n , ' Pt (mma j rd r Skate Paint BROAD ` �' �. .r i t �Buiatl Pt Y. w A * v N y 1' 6 i Gum n,kwt L GUM �`M f,:> � CKE P ei Oy r....,,.MM 7 1=7 A. of k ice.. v�MCMM&CREED ENGINEERS S U R V E Y O R 5 P L A N N E R S August 21, 2008 04135-0001 (40) Mr. Scott Vinson Division of Water Quality North Carolina Department of Environmental and Natural Resources 943 Washington Square Mall Washington, NC 27889 RE: River Dunes Marina and Residential Development, Pamlico County, North Carolina High Density Stormwater Permit Dear Mr. Vinson: On behalf of River Dunes Corporation and Ed Mitchell, please find enclosed for your review the high density stormwater permit for the River Dunes Marina and Residential Development located in Pamlico County, North Carolina. This permit specifically covers Harbor Village VI and Village Center Phase II. River Dunes Corporation will be mailing separately the following items: 1) Signed permit application 2) Signed and notarized operation and maintenance agreements for the stormwater BMPs 3) Signed and notarized deed restrictions and covenants page 4) Check for $4,000 for express review permit application fee If you have any questions or request additional information, please let me know. Sincerely, McK1M & CREED, PA Venture IV Building Suite 500 Curt Blazier, PE 1730 Varsity Drive Project Engineer �gp-�� yq�yryr ED EI RECEIVED Raleigh, NC 27606 yE " AUG 1 : 8G8 919.233.8091 ,,nnrr I)VV�-V ARO Fax 919.233.8031 9:\4135\0001\40.Permit\Vi..DWQ0821W,doc \\\1N\ CAR p �Ike •.•• / 03384 g- C'G,p��'vGIN�� IMII I \\\\ ww w. m c k i m c r e e d. c.m STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL AND NATURAL RESOURCES DIVISION OF WATER QUALITY STORMWATER MANAGEMENT PERMIT RIVER DUNES MARINA AND RESIDENTIAL DEVELOPMENT for RIVER DUNES CORPORATION HARBOR VILLAGE VI AND VILLAGE CENTER PHASE 11 TABLE OF CONTENTS I. PERMIT APPLICATION 11. SUPPLEMENTS III. CALCULATIONS IV. GEOTECHNICAL DATA V. PLANS 9 0 AUG "%„l '2008 DVVQ-VVVAR0 For DENR Use ONLY North Carolina Department of Environment and Reviewer. Natural Resources Submit: NCDENR Request for Express Permit Review Time Confirm. FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidsonCo)ncmaiLnet • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(a.ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.grogan(a)ncmail.net ®®C��++ • Washington Region -Lyn Hardison 252-946-9215 or lvn.hardison(�ncmail.net E��// /�PRHES7S • Wilmington Region -Janet Russell 910-350-2004 or janet.russelipr cmail.net AUG 212008 NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: RIVER DUNES MARINA & RESIDENTIAL, HV vi & cent 2. County: PAMLICO NC DENR Applicant: ED MITCHELL Company: RIVER DUNES CORPORATION Address: 416-A POLLOCK STREETCity: NEW BERN, State: NC Zip: 28560- Phone: 252-634-3373 Fax::252-633-5775 Email: ed.mitchell@riverdunes.com Physical Location:SR 1317 Project Drains into _ waters — Water classification _ (for classification see-http://h2o.enr.state.nc.us/bims/reports/repoasWB.html) Project Located in NEUSE River Basin. Is project draining to class ORW waters? Y/N , within 'h mile and draining to class SA waters Y. or within 1 mile and draining to class HQW waters? Y/N Engineer/Consultant: CURTIS BLAZIER Company: MCKIM & CREED Address:1730 VARSITY DRIVE, SUITE 500City: RALEIGH, State: NC Zip: 27606-_ Phone: 919-233-8091 Fax::252-233-8031 Email: cblazier@mckimcreed.com (Check all that apply) ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: ❑ Stream Origin Determination: # of stream calls — Please attach TOPO map marking the areas in questions ® State Stormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ® High Density -Infiltration 5 #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density—Stormwater Wetlands _ # Treatment Systems ❑ High Density -Other _# Treatment Systems /❑ MODIFICATION: [IMajor ❑ Minor ❑ Revision SW ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use); WETLANDS QUESTIONS MUST BE ADDRESSED BELOW ❑ Wetlands (401): Check all that apply Isolated wetland on Property ❑ Yes ❑ No Wetlands on Site ❑ Yes ❑ No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Minor Variance: ❑ No ❑ YES US ACOE Approval of Delineation completed: ❑ Yes ❑ No Major General Variance ❑ No ❑ YES 404 Application in Process w/ US ACOE: ❑ Yes ❑ No 401 Application required: []Yes ❑ No If YES, ❑ Regular Permit Received from US ACOE ❑ Yes ❑ No Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENIR use only Fees lit for multiplepermits: Check# a3 Total Fee Amount S SUBMITTAL DATES I Fee I I SUBMITTAL DATES Fee CAMA 1 $ Variance ❑ Ma'; ❑ Min $ SW ® HD, ElLD, ❑ Gen $ 401: $ LQS 1 $ Stream Deter,_ $ NCDENR EXPRESS July 2008 Red mangles at the upper right hand comer indicate design comments • Plane complete the yellow shaded item. STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled our, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information, Contact Person Phone Number Date Drainage Area Number Mr. Ed Mitchell (252) 634-3373 811312008 V1­3 Ill. DESIGN INFORMATION Site Characteristics Drainage area 91,984 fil' Impervious area Percent impervious 54,548 59 f? % Design rainfall depth 3.00 in RECEIVED Peak Flow Calculations 1-yr, 24-hr nurniff depth 3.48 in SEP 1-yr, 24-hir intensity 0.15 inthr Pre -development 1-yr, 24-hr runoff volume 1,334 ft/sec Post -development 1-yr, 24-hr runoff volume 15,571 ftisec DWQ Pre/Post 1-yr, 24-hr peak flow control 14,237 folsec PROJ # - - - - - - - - - Storage Volume: Non -SR Waters Minimum design volume required 13,423 It, Design volume provided 13,983 ft3 Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff It, Post -development I -yr, 24-hr runoff to Minimum volume required It, Volume provided It, Solis Report Summary Soil type Loamy Sand Infiltrafion rate 1.30 in/hr SHWT elevation 0.70 first Basin Design Parameters Drawdown time 0.49 days OK Basin side slopes 3.00 . I OK Basin bottom elevation 3,30 level OK Storage elevation 5.30 fmsl Storage SA 8,258 fit' Top elevation 6.30 firnsl Basin Bottom Dimensions Basin length 133 It Basin width 85 it Bottom SA 5,755 IF Additional Information Total runoff volume captured by basin 5.00 ac-in Maximum of 2 acre -inches allowed Length of vegetative filter for overflow 50.00 It OK Distance to structure N/A It OK Distance from surface waters 50.00 It OK Distance from water supply well(s) N/A ft OK Separation from impervious soil layer 0,00 it OK Naturally occuring soil above shwt 2.00 it OK Bottom covered with 4-in of clean sand? y (Y or N) OK ® Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided 0 (Y or N) OK (Y or N) OK (Y or N) OK RECEIVED SEP 15.12008 DWQ PROJ # Permit No (to be provided by OWQ) III. REQUIRED ITEMS CHECKLIST •Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. CJ� G'I 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High Flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. GrhR 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and C/7R `J u� - Pretreatment device. r 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. c _45�c7. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. G� /[,g_ce _��r1GJ5. A soils report that is based upon an actual Feld investigation, soil borings, and infiltration tests. The SEC_Row results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. cl 6. A construction sequence that shows how the infiltration basin will be protected from sediment until the entire drainage area is stabilized. C_�j C W;S 7. The supporting calculations. � ` lqL �af�er A copy of the signed and notarized operation and maintenance (0&M) agreement. a�c. elimV A copy of the deed restrictions (if required). • Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1