Loading...
HomeMy WebLinkAboutSW7071212_CURRENT PERMIT_20080131STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �(% DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD wsv� -I r� January Mr. Jim Winebarger, Director of Maintenance & Construction Dare County Board of Education 508 Budleigh Street Manteo, NC 27959 Dear Mr. Winebarger: W«.R o Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Subject: Permit No. SW7071212 Dare Education Foundation Teacher Housing High Density Stormwater Project Dare County The Washington Regional Office received a completed Stormwater Application for the subject project on December 14, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7071212 dated January 31, 2008 to the Dare County Board of Education for the construction and operation of two infiltration basin systems to serve the proposed Dare Education Foundation Teacher Housing located on 8" Avenue in Kill Devil Hills, NC, t I f I ) This permit shall be effective from the date of issuance until January 31, 2018 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Roger Thorpe or me at (252) 946-6481. Sincerely, 410—dkROegllonaqlupervisor Surface Water Protection Section Washington Regional Office cc: Albemarle & Associates, LTD T wn of Kill Devil Hills Inspections ashington Regional Office Central Files North Carolina Division of Water Quality Internet: o•ww.nnratcnnialitv.ore 943 Washington Square Mail Phone (252) 946-6481 Washington, NC 27889 Fax (252) 946-9215 NorthCarolina Naturally An Equal Opportunity/Affirma&ve Action Employer - 50 % Recycled/10% Post Consumer Paper State Stormwater Management Systems Permit No. SW7071212 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Dare County Board of Education Dare Education Foundation Teacher Housing DARE COUNTY FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for two filtration basin systems to serve the proposed Dare Education Foundation Teacher Housing located on 81b Avenue in Kill Devil Hills, NC. This permit shall be effective from the date of issuance until January 3102018 and shall be subject to the following specified conditions and limitations: DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit, the Project Data Sheet. 3. A maximum of 57,802 square feet of built upon area is allowed on this 5.34 site. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with approved plans. 5. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. DIVISION OF WATER QUALITY PROJECT DATA Project Name: Dare Education Foundation Teacher Housing Permit Number: SW7071212 Location: Dare County Applicant: Dare County Board of Education Mailing Address: 508 Budleigh Street Manteo, NC 27959 Application Date: 12/14/2007 Receiving Stream: UT to Buzzard Bay Classification of Water Body: Sc Total Site Area: 5.34 ac Basin: # 1 (South) # 2 North Drainage Area to Basin: 113,819 sf 118573 sf Total Impervious: 28,888 sf 28,914 sf Infiltration Basin Storage Depth: 1.5 feet 1.7 ft Required Storage Volume: 2,643 cf 2,664 cf Provided Storage Volume: 9,327 cf 7,079 cf 6. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built -upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. & The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Water Quality. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. Ill. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. The Permittee, at least six (6) months prior to the expiration of this permit, shall submit in writing a request for an extension along with appropriate application fee. Permit issued this the 31 st day of January, 2008. CAROLINA ENVIRONMENTAL MANAGEMENT L. rgr Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7071212 Dare County Board of Education — Dare Education Foundation Teacher Housing Stormwater Permit No. SW7071212 Designer's Certification as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project for (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature .Registration Number Date Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. _3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. All slopes are grassed with permanent vegetation. _8. Vegetated slopes are no steeper than 3:1. _9. The permitted amounts of surface area and/or volume have been provided. 10. All required design depths are provided. _11. All required parts of the system are provided including any vegetated filter. 12. The required system dimensions are provided per the approved plans. Dare County Board of Education - Dare Education Foundation Teacher Housing Stomiwater Permit No. SW7071212 Designer's Certification hliG 0 12008 I, MfcNA(--L -$ Moe, y/ as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe eriodical eeklylfull time) the construction of the project, 0 envcQTa Fo�tioA7k�,-� Tco c,�2 Nws �l (Project) for 0AU2 CcD„sc-y &aNZn ar �icA-AaJ(Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signs Regi: Date Certification Requirements: ✓ 1. The drainage area to the system contains approximately the permitted acreage. ✓2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓3. All the built -upon area associated with the project is graded such that the runoff drains to the % system. 4. All roof drains are located such that the runoff is directed into the system. '1_1�5. The outlet/bypass structure elevations are per the approved plan. Nlt-- ✓ 6. The outlet structure is located per the approved plans. 7. All slopes are grassed with permanent vegetation. TAK­-b ✓ 8.! Vegetated slopes are no steeper than 3:1. /9. The permitted amounts of surface area and/or volume have been provided. 10, All required design depths are provided. 11. All required parts of the system are provided including any vegetated filter. + It,_ ✓12. The required system dimensions are provided per the approved plans. t]-l:[s:C%'- •=''--'•�'-� DWQ USE ONLY Date Received Fee Paid Permit Number J C 14 2007 1 if vog- 5Wq&1Ja_JQ_ Dl QAIVRF® State of North Carolina SW�K / 7�°7 °� Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): dare County Board of Education 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Tim Winebarger, Director of Maintenance and Construction 3. Mailing Address for person listed in item 2 above: Dare County Board of Education, 508 Budleigh Street City:Manteo State:NC Zip:27959 Phone: (252 ) 480 - 8888 Fax: (252 ) 480 - 8885 Email:winebargedi@dare.kl2.nc.us i� 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans,,---' specifications, letters, operation and maintenance agreements, etc.): Dare Education Foundation Teacher Housing 5. Location of Project (street address): At the end of North Seventh Avenue (address to be assigned when subdivision is approved) City:Kill Devil Hills County:Dare 6. Directions to project (from nearest major intersection): Approximately 0.6miles south of SR 1217 (Colington Road) on US 158, turn west on Airstrip Road. Go approximately 0.5 miles and turn right on 8th Avenue. Property is approx. 0.2 mile on left. 7. Latitude:36 0.2' N Longitude:75 39.8' W of project 8. Contact person who can answer questions about the project. Name:Michael Morway, PE Telephone Number: (252 1 441-2113 Email: mikem®albal.us 11. PERMIT INFORMATION: 1. Specify whether project is (check one): R ❑Renewal ❑Modification Form SWU-101 Version 8.07 Page 1 of 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks): ❑LAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. The property has been divided into two areas with separate stormwater management systems. Stormwater will collect within the center island of the parking lot and be directed into one of two infiltration basins via culverts. 2. Stormwater runoff from this project drains to the Pasquotank River basin. 3. Total Site Area: 5.34 acres 4. Total Wetlands Area: 0 acres 5. 100' Wide Strip of Wetland Area: n/a acres (not applicable if no wetlands exist on site) 6. Total Project Area**:5.34 acres 7. Project Built Upon Area:25.1 % 8. How many drainage areas does the project have?2 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Buzzard Bay Buzzard Bay Stream Class & Index No. SC SC Drainage Area (so 113,819 118,573 Existing Impervious* Area (so 0 SF 0 SF Proposed Impervious*Area (sf) 1 28,888 SF 28,914 SF % Impervious* Area (total) 1 25.4% 24.4% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (so 6,163 SF 8,073 SF On -site Streets (so 0 SF 0 SF On -site Parking (so 19,255 SF 18,156 SF On -site Sidewalks (so 3,136 SF 2,258 SF Other on -site (so 334 SF 427 SF Off -site (so 0 SF 0 SF Total (so: 28,888 SF 28,914 SF * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. Form SWU-101 Version 8.07 Page 2 of 10. How was the off -site impervious area listed above derived?From calculations based upon what is proyosed. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off -Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SWU-101 Version 8.07/ Page 3 of Vl. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at htti)://h2o.enr.state.nc.us/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 ($4,000 for Express) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm):Michael Morway, PE - Albemarle & Associates. Ltd. Mailing Address:PO Box 3989 City:Kill Devil Hills State:NC Zip:27948 Phone: (252 ) 441-2113 Fax: (252 ) 441-0965 Email:mikem@albal.us VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) tim Winebarger, Dare County Board of Education , certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. _ Date: IZ/ It 107 Form SWU-101 Version 8.07 Page 4 of Permit No. (to be provided by DWQ) O�p4 WATT, �A �/� STORMWATER MANAGEMENT PERMIT APPLICATION FORM oW� NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Contact Person Phone Number Date Drainage Area Number Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? 1-yr,24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA Teacher 5-Dec-05 1 (South Basin) 113,819.00 ft' 28,888.00 ff 025 t.0 In N (Y or N) n/a in We inmr n/a ft3/sec n/a ft3/sec #VALUE! ft3/sec 2,448 ft3 4,948 ft3 n/a in n/a ft3 n/a ft3 #VALUE! ft3 n/a ft3 DuE OK for non -SR waters 15.00 in/hr 8.00 fmsl 0.1 days OK 4 :1 OK 12.00 fmsl OK 12.94 fmsl 13.50 fmsl varies It varies If 4,035 ftz DEC 14 2007 Fonn SW401-Infiftration Basin-Rev.t Parts I. a II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Additional Information Total runoff volume captured by basin 0.67 ac-in OK Length of vegetative filter for overflow NIA it OK Distance to structure 60 it OK Distance from surface waters >30 fl OK Distance from water supply well(s) >100 it OK Separation from impervious soil layer > 4.0 it OK Naturally occuring soil above shwt > 4.0 it OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? NIA (Y or N) OK Pretreatment device provided Y Middle island of packing lot Form SW401-Infieration Basin-Rev.1 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III: REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. A5n C f - "7 1. Plans (1' - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, r IP - High flow bypass system, ���'"' I t16�E 1 S - Maintenance access, Pj°"t v�rSS= u sTt�7 t-,lA - Recorded drainage easement and public right of way (ROW), — I -E;�D -Zt-'t tS �, I P - Overflow device, and 5 pu N iD - Boundaries of drainage easement. 1 "�.Fir,>.r' CI 1> 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: pt� - Bypass structure, u aC,0 /"t ES[-rC``� - Maintenance access, T,> k C c_ Basin bottom dimensions, Q J v Qy�fl Basin cross-section with benchmark for sediment cieanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. k6l"i\ Cl 2> 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. m3f~ C I -1-) 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. JWS e\ A7bk-t'O 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. MSI \ CL-'>_ 6. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. 4' `) t�\ CI • 7. A construction sequence that shows how the infitiration basin will be protected from sediment until the entire drainage area is stabilized. _i 8. The supporting calculations. MSN� t� 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement P/N 10. A copy of the deed restriction. Form SW401-Infiltration Basin-Rev.1 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 STORMWATER CALCULATIONS for DARE EDUCATION FOUNDATION AFFORDABLE TEACHER HOUSING PROJECT Stoernwater Drainage Area 1 (South Basin) Drainage Area 113,819sf = 2.61 w SURFACE AREA INFORMATION Surface Area C Value Area C-A Buildings 1.00 6,163 6,163 Parking/driveways 0.95 19,255 18,292 Sidewalk/conc 0.95 3,136 2,979 other 1.00 334 334 Cnassednandseape area (- sec note) 0.00 76,530 0 Total Drainage Arc. 105,418 27,768 Stormwater Management Amas C Value Area C•A Infiltration Basin Surface Areas 0.12 8,401 1,848 Total Stormwoter Management Area 8,401 1,848 Total Contributing Area 113,819 29.617 Composite C 0.26 Contributing Area 2.61 ac Infiltration Basin Characteristics Basin Storage Side Sloe Depth (n) V.lumo (cQ Infiltration Basin 1 4:1 1.5 9.327 Total 9,327 Pipe/Swale Storage Sim (n) Length (n) Volume (c Total 0 Infiltration 'Infiltration Basin A Total 8,401 15.00 Stormwmer Management 1" 1.5" 4.3" 5.0" Intensity(in./hr) 0.5 0.75 2.15 2.50 Runof(efs) 0.34 0.51 1.46 1.70 2-1-lour Runof Volume (cf) 2,448 3,671 10,525 12,238 Pond Storage Volume (cl) 9,327 9,327 9,327 9,327 Pond/Swale Infiltration Volume (cf) 21,003 21,003 21,003 21,003 Total Slonnwate, Managed (cf) 30,330 30,330 30,330 3U30 Percent Retained 1239 % 826 % 288 % 248 " - Stonnwaler falling upon the drainlield and perimeter areas with greater than two feel separation excluded from calculations due to the porosity of existing conditions. • - based no two how infiltrelion rate. DEC 14 2007 uDVVQ-1jy.A ;� ,\GS572 Prepared by Albemarie and Associates, Ltd. 12/13l2007 ®�� Permit No. (to be provided by DWQ) O2OF WATF' O �! STORMWATER MANAGEMENT PERMIT APPLICATION FORM o�C NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pad III) must be printed, filled out and submitted along with all of the required information. Contact Person Phone Number Date Drainage Area Number 5-Dec-07 2 (North Basin) II. DESIGN INFORMATION Site Characteristics Drainage area Impervious area 118,573.00 28,914.00 ft2 ftZ 6-1ltc�^Ci�� i•��`,,y+� Percent impervious 0.24 Design rainfall depth 1.0 in DEC 14 2007 Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? 1-yr, 24-hr runoff depth N n/a (Y or N) in (� D v {/� bf Q-1; 1AR 1-yr, 24-hr intensity n/a inmr Pre -development 1-yr, 24-hr runoff volume nla ft'/sec Post -development 1-yr, 24-hr runoff volume n/a ft'Isec PrelPost 1-yr, 24-hr peak flow control #VALUE! ft3/sec Storage Volume: Non -SR Waters Minimum design volume required 2,523 to Design volume provided 4,832 to OK for non -SR waters Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA We in We ft' n/a w #VALUE! ft3 nla to DuE 15.00 inmr 10.30 fmsl 0.1 days 4 :1 12.50 fmsl 13.78 fmsl 14.20 fmsl varies If varies It 2,255 f? OK OK OK Form SW401-Infiltration Basin-Rev.1 Pans 1. a n. Design Summary, Page 7 of 2 Permit No. (fo be pmviderl by DWQ) Additional Information Total runoff volume captured by basin 0.67 ac-in OK Length of vegetative filter for overflow NIA it OK Distance to structure 60 it OK Distance from surface waters >30 ff OK Distance from water supplywell(s) >100 it OK Separation from impervious soil layer > 6.3 It OK Naturally oocuring soil above shwt > 6.3 it OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? NIA (Y or N) OK Pretreatment device provided Y Middle island of parking lot Form SW401-Infittretion Basin-Rev.1 Parts I. a It. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C-I • 1. Plans (1' - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, W N6 1 S I P. -High flow bypass system, No G I - Maintenance access, top, - Recorded drainage easement and public right of way (ROW), — 1 i Tr-N k5 SN k e 1 S� N I A - Overflow device, and Tr+EYLc I s 1�0 N IN - Boundaries of drainage easement. 1 ��✓� C l 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: u r�l ESQ ptp - Bypass structure, Maintenance access, Basin bottom dimensions, Q Jt PJ Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. ON5 VA CI • 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. �3l^ CI 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. M-S f \ 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. WStv\ C I 6. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. tMi� CI - 7. A construction sequence that shows how the infitration basin will be protected from sediment until the entire drainage area is stabilized. PD 8. The supporting calculations. ASP"\ M W_— 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. IJ IN 10. A copy of the deed restriction. Form SW401-Infiltration Basin-Rev.1 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 STORMWATER CALCULATIONS for DARE EDUCATION FOUNDATION AFFORDABLE TEACHER HOUSING PROJECT Stormwater Drainage Area 2 (North Basin) Drainage Area 118.573 sr = 2.72 ac SURFACE AREA INFORMATION Surface Area CValue Area C'A Buildings 1.00 8,073 $073 Asphalt 0.95 18,156 17,248 Sidewalk/cone 0.95 2,258 2,145 Gazebo 1.00 427 427 Cnassedllandscap: area (• see note) 0.00 83,583 0 Total Drainage Area 112,497 27,893 Stormwater Management Areas C Value Area C'A Infiltration Basin Surface Areas 0.22 6,076 1,337 Total Stormwater Management Area 6,076 1,337 Total Contributing Area 118,573 29,230 Composite C 0.25 Contributing Area 2.72 ae Infiltration Basin Characteristics Basin Storage Side Slo c Depth (III Volume (cQ Infiltration Basin 1 4:1 1.7 1 7,079 Total 1 7,079 Pipe/Swale Storage Size (in) Length (0) Volume (cQ 'Total 0 Total Stornow:der Management 1" 1.5" 4.3" 5.0" Intensity (in.4a) 0.5 0.75 2.15 2.50 Runoff (cfs) 0.34 0.50 1.44 1.68 2-1 lour Runoff Volumc (cf) 2,416 3,624 10 388 12,079 Pond Storage Volume (ef) 7,079 7,079 7,079 7,079 Pond/Swale Infiltration Volmne(eQ 15,190 15,190 15,190 15,190 Total Stonnwale� Managed (ef) 22.269 22.269 22,269 22,269 Percent Retained 922% 615 % 214 % 184 % • - Stormwater falling upon the drainfield and perimeter areas with greater than two feet separation excluded loom calculati.m due to the porosity of existing conditions. " - based on Iwo hour infiltration mlc. DEC 14 2007 D;A1,-VVA4I0 Prepared by Albemarle and Associates, Ltd. 12/132007 DEC 14 2007 Infiltration Basin Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the infiltration basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Jim Winebarger Title: Construction and Maintenance Director Address:PO Box 1508, Nags Head, NC 27959 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, .0 'I ,--cL.c-(/l , a Notary Public for the State of A)k(r � tJ,Je4Ft , County of -Z:>4p? , do hereby certify that personally appeared before me this 3 day of eccc.10<� 7 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, S�� � � •� �� �� % k, f �i ' U ;4 SEAL My commission expires 6Cf 2 00�j3