Loading...
HomeMy WebLinkAboutSW7071211_CURRENT PERMIT_20160822STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW%7C DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE (2 YYYYMMDD y,rvg F a L Y Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Mr. Timothy M. Cafferty Outer Banks Blue, LLC P.O. Box 1220 Kitty Hawk, NC 27949 Dear Mr. Cafferty: l J -Ko PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary TRACY DAVIS August 22, 2016 Director Subject: Permit No. SW7071211 Outer Banks Blue, LLC High Density Stormwater Project Dare County The Washington Regional Office received a completed Stormwater Name/Ownership Change Application for the subject project on July 19, 2016. Staff review and an on -site inspection has determined that the permit can be reissued. We are forwarding Permit No. SW7071211 dated August 22, 2016 to Outer Banks Blue, LLC. for the construction and operation of two infiltration basins to serve this project located on the southwest corner of the intersection of US 158 and First Flight Run in Kitty Hawk, North Carolina. This permit shall be effective from the date of issuance un December 28 2 nd shall be subject to the conditions and limitations as specified the irr. ease pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, Rog K. T p e — Environmental Engineer State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 943 Washington Square Mall I Washington, NC 27889 252-946-6481 T State Stormwater Management Systems Permit No. SW7071211 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Outer Banks Blue, LLC 3732 N. Croatan Highway, Kitty Hawk, NC Dare County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwaterrules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources and considered a part of this permit for two infiltration basins to serve the development located on southwest corner of the intersection of US 158 and First Flight Run in Kitty Hawk, North Carolina. This permit shall be effective from the date of issuance until December 28, 2021 and shall be subject to the following specified conditions and limitations: DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. State of North Carolma I Environmental Quality I Energy, Mineral and Land Resources 943 Washington Square Mall. I Washington, NC 27889 252-946-6481 T 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The stormwater control has been designed to handle the runoff from 30,723 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in this permit, and per approved plans. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 5. The following design criteria have been provided in the infiltration basins and must be maintained at design condition: Project Name: Permit Number: Location: Applicant: Mailing Address: PROJECT DATA Outer Banks Blue, LLC SW7071211 Dare County Outer Banks Blue, LLC P.O. Box 1220, Kitty Hawk, NC 27949 Receiving Stream and index No.: Kitty Hawk Bay, 30-19 Classification of Water Body: Sc Total Site Area: 1.18 ac Design Storm, inches: 1.0 State of North Carolina I Envnonmental Quality I Energy, Mineral and Land Resources 943 Washington Square Mall. I Washington, NC 27889 252-946-6481 T INFILTRATION BASIN #1 INFILTRATION BASIN #2 Drainage area to Basin: 0.23 ac 0.95 ac Impervious area in drainage basin: 5,875 sf 24,848 sf Infiltration Basin Depth: 1.50 ft 3.50 ft Basin bottom elevation, FMSL: 9.0 7.0 Bypass Overflow Elevation, FMSL: 11.50 11.50 Type of Soil: Newhan fine sand Newhan fine sand Provided Storage Volume: 518 cf 7,594 cf Time to Draw Down: 3 days 3 days Expected Infiltration Rate, in/hr: 20.0 20.0 6. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built -upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. State of North Carolina I Environmental Quality I Energy, Mineral and Land EeSOUrCea 943 Washington Square Mall I Washington, NC 27899 252-946-6481 T 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surfaces except roads. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. State of North Carolina I Environmental Quality I Energy, Mmeral and Land Resources 943 Washington Square Mall I Washington, NC 27889 252-946-6481 T 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Energy, Mineral and Land Resources. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permitee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 943 Washington Square Mall. I Washington, NC 27889 252446-6481 T 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. An application for permit renewal must be submitted at least 180 days prior the expiration of this permit along with the appropriate processing fee. The permit expires on December 28, 2021. Permit issued this the 22 nd day of August, 2016. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION For Tracy E. Davis, PE, CPM, Director Division of Energy, Mineral, and Land Resources By Authority of the Environmental Management Commission Permit Number SW7071211 State of North Carolina I Enuonmental Quality I Energy, Mineral and Land Resources 943 Washington Square Mall I Washington, NC 27889 252-946-6481 T ECEIVE JUN 2 19 2011 R&E Developments, LLC — Bank of Commonwealth, Kitty Hawk 7, Stormwater Permit No. SW7071211 We " WARD Designer's Certifi4ation �L=2hciiaark E��, any, r? (7 I, \ I CTo (L ln1 la ITS as a duly K./ Z7 P¢9 registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, B A i"J K or / t MW) OnJ W LIAt)j---T( y K I� RrlVAK (Project) for R +F �S�e�12IGOvr P �, iLC (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and spe9ific4tiT_s--, , % n _ Signature Registration Number Date (I:'I/2_1 A/ Certification Requirements: V 1. The drainage area to'the system contains approximately the permitted acreage. 2. The drainage area to ttiesystem contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. L_5. The outlet/bypass structure elevations are per the approved plan. NL_6. The outlet/bypass structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. _'�,_& All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. \� \ 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. �\ 11. The permitted-amounts'of surface area'and/or volume have been provided. 12. All required design depths are provided., 13, All required parts of the system are provided., 4 14. The required system dimensions are provided per the approved plans. DWQ USE ONLY Date Received Fee Paid Permit Number State of North Carolina 5wkK I VI IVo % Department of Environment and Natural Resources oE 0 _ avq Eel- 0 Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM DEC 13 2007 This form may be photocopied for use as an original 1�l pd KEAR . r5 ��LGENERAL'INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): d- C bVyf .5Pr0 rn7T s C.C. c 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): RAa6 UPPALApATI ftWAMa)N M0hBF9 3. Mailing Address for person listed in item 2 above: S-41 Uc>`Alo TRArL Surd' City: (26(LotrL-A State: AC. zip: 2,497- Phone: (.2i 2 1 n �1i53 - 3600 Email: ra�V tf B� I(t2rbJaoJfot)�,�o�n Fax: ( 151- ) y9I - $vim 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): BAMK OR CorAmci .IWEALTl4 K 1-il y liWK 5. Location of Project (street address): City: K tTTy I1AWK County: D A Rz;,- 6. Directions to project (from nearest major intersection): t�R<SFEAT`f afl CX-,?KER (OF 0S in F,RCT F11cKT RUN 1, KnTy 14AUK 7. Latitude: 3! o O �jt N I' H Longitude: --S ` cl 1(, " W of project 8. Contact person who can answer questions about the project: Name: VI C-t02 OF1 1TE . ? . Telephone Number: ( 2,52.- Email: 18n kf^mq leaur���Q� �bLrQ �t O ^'1 II. PERMIT INFORMATION: 1. Specify whether project is (check one): gNew ❑Renewal ❑Modification FormSWU-101 Version8.07 Page 1 of 1� 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit numberN/A and its issue date (if known) 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP []Other 4. Additional Project Requirements (check applicable blanks): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be conveyed via sheet flow to catch basins as well as directly to infiltration basins where it will infiltrate into the sandy soils. 2. Stormwater runoff from this project drains to the Pasquotank River basin. 3. Total Site Area: 1.18 acres 4. Total Wetlands Area: 0 acres 5. 100' Wide Strip of Wetland Area: N/A acres (not applicable if no wetlands exist on site) 6. Total Project Area":1.18 acres 7. Project Built Upon Area:59.92 % 8. How many drainage areas does the project have72 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Kitty Hawk Bay Kitty Hawk Bay Stream Class & Index No. SC SC Drainage Area (so 9796 41464 Existing Impervious` Area (so 0 0 Proposed Impervious'Area (so 5875 24848 % Impervious' Area (total) 1 59.97 59.93 Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) 3446 3447 On -site Streets (so 0 0 On -site Parking (so 1988 20437 On -site Sidewalks (sf) 257 245 Other on -site (so 184 719 Off -site (sf) N/A N/A Total (so: 5875 24848 lrupervious area is defined as the built upon area including, but act linuted to, buildings, roads, parking areas, sidewalks, gravel areas, etc. "Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. 3v —1i Form SWU-101 Version 8.07 Page 2 of 101 How was the off -site impervious area listed above derived? N IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BUT specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5M for the status and availability of these forms. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off -Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Biorelention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Welland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at hnp://h2o.enr.state.nc.us/su/msi maos.htm) Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form Ur.-) • Original and one copy of the Deed Restrictions & Protective Covenants Form J44 • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP VIE Li • Permit application processing fee of $505 ($4,000 for Express) payable to NCDENR V(ELJ • Calculations & detailed narrative description of stormwater treatment/management Or" • Copy of any applicable soil report VC0 • Three copies of plans and specifications (sealed, signed & dated), including: J£w - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individualorfiirJrm): J1CCok WN1� (-ANb�flRK �^S�.�you.yP,C. Mailing Address: .<2>. L'-X m16 City: K �Tty aAaK State: NL Zip: 27-14� Phone: ( 2S2 ) 255- 51 L Fax: ( 2-S)- ) )L55 - 099 L Email: VIIL APPLICANTS CERTIFICATION I, (print or type name of person listed in General Information, item 2) R-A S Ny - V P P A LA-P A-1 1 certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 21-1.1000. 1 Signature:Date: 12 l-+J 0� Form SWU-101 Version 8.07 Page 4 of 4 Permit No. (to be Prowled by DWQ) TASTORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Contact Person Phone Number Date Drainage Area Number Bank Revised (typed) 12/24/07 1- OF WaiFH Or 's II. DESIGN INFORMATION Site Characteristics Drainage area 9,796.00 flz Impervious area 5,875.00 fe Percent impervious 0.60 Design rainfall depth 1.0 in Peak Flow Calculations Is prelpost control of the 1-yr 24-hr peak flow required? 1-yr, 24-hr runoff depth 1-yr, 24-hr Intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA N (Y or N) N/A in N/A In/hr NIA ff'/sec N/A ff3/sec #VALUE! ft'/sec 490 'fl' 1,415 ft' N/A in N/A ft3 NIA ff3 #VALUE! it' N/A ft3 SP >20 n/hr 3.50 fmsl 3-Jan days 4 :1 9.00 fmsl 10.50 fmsl 11.50 fmsl 45 ft 2 8 105 e OK for non -SR waters 5 f-7,8 ;d`". r-QA- $96 \nAlre OK OK OK Forth SW401-InPolrabon Sawn-Rev.1 Parts 1. a II Design Summary, Page 1 of 2 Permit No. (to be pmvidad by DWLy 'Additional Information Total runoff volume captured by basin 0.39 ac-in OK Length of vegetative filter for overflow 55 ft OK Distance to structure 5 ft Too close to structure, must be minimum of 15-ft downgradient Distance from surface waters 500+ ft OK Distance from water supplywell(s) 500+ ft OK Separation from impervious soil layer 20+ ft OK Naturally occuring soil above shwt 55 ft OK Bottom covered with 4-in of clean sand) Y (Y or N) OK Recorded drainage easement provided? nla (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger stones? Y (Y or N) OK Pretreatment device provided Sump in C.B Form SW401-Infiftration Basin -Rev 1 Parts I & 11 Design Summary, Page 2 of 2 Permit No. (to be pmvided by DWC) III. -.REQUIRED ITEMS CHECKLIST :=. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. \k:L� G_ 1. Plans (1' - Sly or larger) of the entire site showing: Design at ultimate build -out, - Off -site drainage (d applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), 1, Overflow device, and ia16- Boundaries of drainage easement 2. Partial plan (1' = XY or larger) and details for the inlT6ration basin showing: -BypassstnKWre, NIA - Maintenance access - Basin bottom dimensions, - Basin cross-section with benchmark for sediment deanout, - Flow distribution detail for inflow, - Vegetated fitter, and A - Pretreatment device. Section view of the infiltration basin (1' = 217 or larger) Mowing: - Pretreatment and treabnent areas, and 1 Njm -Inlet and outlet structures. — 141A 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. Irk A'a 'gym 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration ifs. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. J G-Z 6. An assurance that the installed system will meet design specifications upon initial operation once the L project is complete and the entire drainage area is stabilize& 7. A construction sequence that shows how the infiltration basin will be protected from sediment until the J�cs entire drainage area is stabilized. 8. The supporting calculations. hC� 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement 4 tj ]A 10. A copy of the deed restriction. Form SW401-Infiltration Basin-Rev-1 Page 1 of 1 Part ill. Required Items Cheddist, Page 1 of 1 Permit (to be pmwded by DWQ) //�� �Q, WArE, ®c m" STORMWATER MANAGEMENT PERMIT APPLICATION FORM oo~ NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part ///) must be printed, filled out and submitted along with all of the required information. Contact Person Phone Number Date Drainage Area Number Revised (typed)12124/07 2 II. DESIGN INFORMATION Site Characteristics Drainage area 41,464.00 ft2 Impemnous area 24,848.00 ftz Percent impervious 0.60 Design rainfall depth 1.0 in Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? N , (Y or N) 1-yr, 24-hr runoff depth NIA in 1-yr, 24-hr intensity NIA irJhr Pre -development 1-yr, 24-hr runoff volume NIA 83/sec Post -development 1-yr, 24-hr runoff volume NIA ft'/sec Pre/Post 1-yr, 24-hr peak flow control #VALUE! ft/sec Storage Volume: Non -SR Waters Minimum design volume required 2,071 its Design volume provided 10,314 fp Storage Volume: SR Waters 1-yr, 24-hr rainfall depth NIA in Pre -development 1-yr, 24-hr runoff N/A ft3 Post -development 1-yr, 24-hr runoff N/A it, Minimum volume required #VALUE! it' Volume provided N/A it, Soils Report Summary Soil type SP Infiltration rate >20 in/hr SHWT elevation 3.50 fmsl Basin Design Parameters Drawdown time 3-Jan days Basin side slopes 4 :1 Basin bottom elevation 7.00 (rust Storage elevation 10.50 fmsl Top elevation 11.50 first Basin Bottom Dimensions Basin length 75 ft Basin width 8 ft Bottom SA 587 fe OK for non -SR waters 71594 -f{3 -:t> 21720 -R3 Wy�R OK OK OK Form SW401-Infiarabon Basin-Rev.1 Parts I. a It. Design Summary, Page 1 of 2 Permit No. (robe provided by DWQ) Additional Information Total runoff volume raptured by basin Length of vegetabve filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally occuring soil above shwt Bottom covered with 4-in of dean sand? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided 2.84 ac-in 55 ft 125 ft 500+ ft 500+ ft 20+ It 3.5 ft Y (Y or N) n/a (Y or N) Y (Y or N) Y (Y or N) Sumo in C.B. Maximum of 2 acre -inches allowed OK OK OK OK OK OK OK OK OK OK corJ• agED —M 134Sa+ Form SW401-Infiaration Basin -Rev 1 Parts I. a 11 Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. OCA's _ 1. Plans (1' - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), r. Overflow device, and A :lo- 5 1 Boundaries of drainage easement s 2. Partial plan (14 = W or larger) and details for the infiltration basin showing: - Bypass structure, NIA - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cieanout, - Flow distribution detail for inflow, - Vegetated filter, and NIA U 1 - Pretreatment device. Section view of the infiltration basin (1' = 20' or larger) showing: -Pretreatment and treatment areas, and ti N/S4 - Inlet and outlet structures. � "JA C s c s . 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. 0 A-Q : m, 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. G-Z 6. An assurance that the installed system will meet design specifications upon initial operation once the _ I project is complete and the entire drainage area is stabilized. 7. A construction sequence that shows how the infiflration basin will be protected from sediment until the entire drainage area is stabilized. �d� r irk 5 8. The supporting calculations. 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. ttA � O )A 10. A copy of the deed restriction. Fomn SW4014 fihration Basin-Rev.1 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 DEC 13 2U07 Infiltration Basin Inspection and Maintenance Agreement MElQAY1%%.RQ I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetatiorL — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet 733-1786. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: RA7 U V. UPFAh-APA 1 I Title: NIA IJ A G 1 iJ Cp M G M S& 2 Phone: LE C-Alpt—IAt_ Itjyc—rTMC--NtS LLL Q"! oCCzkV Traill, S•.:4.4iCam ILca,Nc.2'492� 53 36o6 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, A M M k� a Notary Public for the State of (JaA n CAPz)U IJW County of •{uCIL , do hereby certify that REHk V • Ll-y g u D q-[ - personally appeared before me this 1 day of , a0 b-7 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, a lt�� TAMMY J. FINCHAM Notary Public North Carolina Currituck County SEAL My commission expires -1- 51(D L)1 1