Loading...
HomeMy WebLinkAboutSW7070911_HISTORICAL FILE_20210331STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW ljI& 1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATEDo�Z YYYYMMDD w x�p ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality March 31, 2021 River Dunes Investment Property, LLC Attention: Mr. Ed Mitchell, Manager P.O. Box 1505 New Bern, NC 28563 ` Subject: Stormwater Permit Renewal Stormwater Management Permit SW7070911 River Dunes Marina & Residential Development Harbor Village III Dear Mr. Mitchell: Pamlico County A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7070911 for a stormwater treatment system consisting of two infiltration basins serving Harbor Village III located in the River Dunes Marina & Residential Development in Pamlico County expires on October 29, 2021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal within 30 days. Permit application forms for renewal can be found on our website at: https://deq.nc.gov/abouUdivisions/energy-mineral-and-land- resources/stormwater/stormwater-prog ram/post-construction-2. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application form. You can request a copy by e-mailing me at roger.thorpeoncdenr qov. Sincerely, arm g-A 1��— 4 r' Roger K. Thorpe Environmental Engineer North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources wwM..�m r. Washington Regional Office 1 943 Washington Square Mall I Washington. North Carolina 27889 Mm 252,946.6481 STORMWATER MANAGEMENT PERMIT APPLICATION FOR (SWU-101 VER 3.99) PART Ill. PROJECT INFORMATION ITEM 1 DETAIL NARRATIVE — Addendum 1 RIVER DUNES MARINA AND RESIDENTIAL DEVELOPMENT � ��� for . RECE RIVER DUNES CORPORATION . OCT 1 7 2007 HIGH DENSITY STORMWATER MANAGEMENT PLAN D Q-W/RO HARBOR VILLAGE III I1f V The project site is located in Pamlico County at the confluence of Broad Creek and the Neuse River. The 1327-acre tract, owned by River Dunes Corporation, consists predominantly of loblolly pine stands characteristic of timber production use. Common soil units of upland areas include Wahee fine sandy loam, Argent loam, Yonges loamy fine sand, Fork loamy fine sand, and Altavista loamy fine sand. The existing drainage patterns at the site form seven drainage areas which discharge to the Tar, Broad, Paris, Mill, Cedar and Gum Thickets Creeks and the Neuse River. A conservation easement has been placed on the area of the Gum Thicket Creek watershed. The proposed subdivision is designed to preserve these seven existing drainage patterns within the project area. The River Dunes Marina and Residential Development has been planned as an overall low -density development in compliance with the coastal stormwater regulations. The low density stormwater management permit SW7060204 has been approved by NCDENR. There are several parcels, collectively described as the Harbor Village Residential Areas, the Harbor Village Center and Riverside Village (see Sheet M-1), which fall under the overall low -density provisions with respect to gross acreage but will be developed at higher net densities than the remainder of the property. The developer will employ a best management practice approach to these parcels to insure that water quality objectives are met for the entire property. A series of shallow grassed infiltration and bioretention basins will be employed at scattered strategic locations as needed to capture and infiltrate stormwater runoff from roadways and home sites. The use of stormwater culverts will be limited. Home sites and roadways will be setback from wooded wetlands where feasible to allow for a riparian buffer to dissipate sheet runoff. Other collected stormwater runoff will be directed to adjacent upland wooded areas and discharged into these areas through level spreader type devices in order to further assure maintenance of water quality. The eleven areas included in this approach will be the Harbor Villages I to V1, Riverside Village, Section 4A, the Village Center and Marina Service Area, the RV & Boat Storage Area and the Future Commercial along Orchard Creek Rd. (see Sheet M-1). The high density pocket of development covered in this permit application includes Harbor Village 111, containing approximately 134,350 square feet, or 3.1 acres. Harbor Village III consists of two drainage areas which discharge to the Neuse River. Two infiltration basins are proposed for stormwater management purposes (see Sheet M-1 for master plan of development). Built upon area for this site includes roadways, off-street parking, sidewalks, driveways, and the homes. Maximum built upon areas per lot on shown on Exhibit A. The following comments address stormwater solutions for this specific area of the River Dunes development plan: Two infiltration basins (1-1 and I-2) will be constructed to control stormwater runoff and discharge it to the Neuse River via wetlands fingers to the east and west of the site area (see Sheet C4). Level spreader overflow devices (LS-I and LS-2) located on the berms surrounding the basins and grassed filter strips will be utilized to minimize impact to adjacent wetlands and ensure state water quality standards. Stormwater runoff from Drainage Areas No. 1 and No. 2 will be collected in the roadways and lot -line grassed swales and enter the basins through concrete flumes and culverts. The swales, flumes and rip -rap energy dissipaters will all act as pretreatment for the infiltration basins. The low density stormwater permit includes the common areas and roadways. Therefore, this runoff only needs to be treated for water quality utilizing grassed swales and a level spreader before discharging to the wetlands. This approach is employed for Drainage Area No. 1 (se Sheet C4). However, for Drainage Area No. 2, it was not feasible from a design standpoint to divert this runoff to the wetlands on the east side of the site. As a result, this stormwater enters basin 1-2 through a culvert under the alley running across the site. The BMP areas will have their soils re-evaluated prior to construction. A silty clay layer from one to six feet in thickness exists at both basin locations (see geotechnical report and borings). This clay layer will be removed and replaced with suitable sandy fill per NCDENR Stormwater BMP Manual standards (see Exhibits B and Q. Suitable fill will be placed in areas immediately around the two infiltration basins, especially in the area between the basin and the wetlands. The extent of the fill placement will be governed by the location of the roads and adjacent lots. The placement of the suitable fill will help the stormwater to flow vertically and horizontally and prevent the formation of a clay barrier wall around the basins. The River Dunes property will be developed in a way that should meet the Neuse River Basinwide goal of protecting waters while accommodating economic growth. Additional BMPs will be employed to minimize impact to sensitive groundwater recharge areas. Measures may include conveying stormwater from roof -tops and walkways into dry gravel wells, applying gravel under decks to stabilize non -vegetated surfaces, locating sheds and garage structures upland from the shoreline, and surfacing parking pads with turf block or Geo mat. Grading will direct runoff toward woody wetlands for additional filtration prior to groundwater recharge. The marina Basin excavation will provide in excess of 500,000 cubic yards of material for use on site as fill for road construction throughout the project and for site development of the marina service areas (i.e. clubhouses, post office, retail, fitness and spa, chapel, swimming pools, and village center). This fill will also be utilized to prepare sites for developer construction clustered residential units. The excavated material consists of sand, sandy clay and sandy loam that is generally considered suitable for both compacted engineered fill for roadways, parking area and building pads and for un- compacted fill for landscape and infiltration areas. The infiltration areas proposed will be constructed on the fill area in order to obtain sufficient separation from groundwater as well as providing head to the discharge from the basins to drive the water into the existing vegetated riparian buffer areas without concentrating the flow. The design of infiltration basins will be in general accordance with NCDENR guidelines and will include suitable volume to contain runoff from a three (3) inch storm. An overflow "spillway" will be installed to allow excess water to be quickly removed from the infiltration basins during periods of rainfall in excess of the design storm. Vegetation within the infiltration basins will be as recommended by the NCSU Extension Service. Again, it is the intent of River Dunes Corporation to develop River Dunes in a way that should meet the Neuse River Basin wide goal of protecting waters while accommodating economic growth. For further information on the overall stonnwater management plan for the development, please refer to permit SW7060204 and associated application. vWcIQM&CREED October 16, 2007 Mr. Scott Vinson Environmental Engineer II NCDENR Division of Water Quality 943 Washington Square Mall Washington, NC 27889 ENGINEERS SURVEYORS PLANNERS M&C 04135-0001(40) OCT 1 7 2007 MOM RE: Stormwater Review SW7070911 River Dunes Marina and Residential Development, Pamlico County, North Carolina Harbor Village III Dear Scott: In response to your email request for additional information dated October 5, 2007: 1. A site visit was conducted on October 4, 2007 to verify soil and water table conditions. Borings were conducted at each of the two stormwater treatment systems. It is noted on the plans that the basins will be checked for suitable fill material, but because of the extensive amount of unsuitable fill found in the site investigations, and that they varied from the submitted nearby borings, it will be necessary to place additional suitable fill not only in the basins but in areas immediately around the basins. Additional soil borings need to be completed at the time of the replacement to help determine how much area around the basins may 200 MacKenan Coen need to be replaced with more suitable or sandy fill material. Both a soil scientist and the consulting engineer should be Gary. NC 27511 present at that time to determine how much fill replacement should be done in order to make sure the infiltration basin functions properly for the life of the project. There is the potential that 919. 233. 8091 areas immediately around the two basins may have pockets of clayey fill and could act as a barrier wall, thereby not allowing the Fax 919,233,8031 w w w.mckinncreed.com S:\4135\0002\40'111111l\NCDENRDWQSIormwaler\High Uerv.➢y Permit-1 larbor Village l 11\Add1nl<,- M`,Q-In1607,doe Mr. Scott Vinson October 12, 2007 Page 2 infiltration or exfiltration of stormwater out the basin bottom & sidewalls. We have provided seven additional soil borings for each of the infiltration basins. We will replace the clay layer in areas immediately the basins with suitable fill material. See the revised narrative for further explanation. 2. Please provide cross sectional details of the two or more sized streets shown on the plans. We have shown on sheet D4 the cross sectional details for the three alleys, Boathouse Road, and Back Cove in Harbor Village III. 3. Please clearly show on the plans by use of additional proposed contours, spot elevations, flow arrows, etc. how all the runoff from the proposed two drainage areas will drain into the proposed infiltration basins. It appears that some lot runoff has existing grades to allow runoff to drain away from the basins and it is hard to determine what the proposed grades will be that will direct runoff into the basins. See lots 32, 33, 1-3, 41 & 42. Also, please add the street profiles in order to help view the high & low points to better determine flow. Could additional road runoff from the drive, boarding the marina, drain down the two streets on either side of the "Common Area"? We have added additional flow arrows and spot grades to Sheet C4 to show how all the stormwater water runoff will flow to the basins. We have added a site plan sheet C1 to show the overall site layout of Harbor Village III, so that we could increase the scale on Sheet C4 to make the grading and flow arrows more readable. We have provided high and low points as well as flow arrows in the road in lieu of roadway profiles. We have revised the grades on Boathouse Road on either side of the common area to divert the stormwater runoff north to East Harborside Road. See the revised narrative for further explanation. 4. Please dimension the two infiltration basins on detail sheet D5 to help the contractors size it appropriately. We have dimensioned the two infiltration basins on detail sheet D5. 5.\4135\00NW-Verm It\ NC DENK DWQ Stormwater\ I I igh Dewily Permit-1 larbor Vi Iage I I I\Add lnlo_DWQ-101i 7.doc v �MCMM&CREED Mr. Scott Vinson October 12, 2007 Page 3 5. The calculations for both basins do not show how the provided Y+ volume was determined. Please provide complete calculations. See the revised calculation sheets for the infiltration basins. We calculated the provided basin volume based on incremental surface areas and volumes and side slopes of 3:1. 6. It is unclear on what size rain event the level spreader calculations are based on. Please refer to the Level Spreader BMP chapter for reference. Please also provide a signed operation & maintenance agreement for the two level spreaders. See the revised level spreader calculation sheets. Although these overflow devices are called "level spreaders", they function more like weirs and will provide diffuse flow to the grassed filter strip.. We have provided a signed O&M agreement for the two level spreader devices. We trust this additional information will be sufficient for you to complete your stormwater review and approval process. If you have any questions or request additional information, please let me know. Sincerely, McKIM & CREED, P.A. Curt Blazier, EI Civil Designer Enclosures cc: Ed Mitchell, President, River Dunes Corporation Grant Livengood, PE, Project Manager 5.\A135\0002H0-11,,mil\NC DEN N DWQ5lmmaelcr\High D,n,ily Village 111\ Add lnfo_DWQ_101607&o v �MCICM&CREED October 5, 2007 Mr. Ed Mitchell, President River Dunes Corporation 416-A Pollock Street New Bern, NC 28560 Subj=: Dear Mr. Mitchell: "dud F. Easlry, Gos or William G. Ross Jr., $cacay Nonh Carolina Depvtmem of Emironmcm and Nmunl Resources .Nan W. Klima P.E. Ducaor Division of wa Qualav Stormwater Review S W7070911 River Dunes Marina & Residential Development Harbor Village III Pamlico County This office received a Coastal Stormwater Derntit application and plans for -h! abiecs project September IS, 2007. A prcliminan- review of the project indicates that before a State Sto-mv:ate: _nzrm : car. be issued the foliowina additional information is necdec 1. A site visit was conducted on October 4, 2007 to verify soil and water table conditions. Borings were conducted at each of the two storm«ater treatment systems. It is noted on the plans that the basins will be checked for suitable fill material, but because of the extensive amount of unsuitable fill found in the site investigations. and that they varied from the submitted nearby borings, it will be ncccscan to place additional suitable fill not only in the basins but in areas immediately around the basins. Additional soil borings need to be completed at the time of the replacement to help determine how much area around the. basins may need to be replaced with more suitable or sandy fill material. Both a soil scientist and the consulting engineer should be present at that time to determine how much fill replacement should be done in order to make sure the infiltration basin functions properly for the life of the project. There is the potential that areas immediately around the two basins may have pockets of ciayey fill and could act as a barrier wall. thereby not allowing the infiltration or extiltration of stormwater out the basin bottom sidewalls. . Please provide z cross sectional dc,: is of the two or more sized streets shown on the clans 3. Please clearly show on the plans by use of additional proposed contours. spot elevations- fiow arr ows. c.c. how all the runoff from the proposed two drainage areas will drain into the proposed innhraion basins. It appears that some lot runoff has existing grades to allow runoff to drain away from the basins and it is hard to determine what the proposed grades will be that will direct runoff into the basins. See lots 32, 33. 1-3. 41 & 42. Also, please add the street profiles in order to help view the high &- low points to better determine flow. Could additional road runoff from the drive, boarding the marina, drain down the , ,;o streets on either side of the -Common Area"' 4. Please dimension the two infiltration basins on detail sheet D5 to help the contractors size it appropriatell . The calculations for both basins do not show how the provide_ 3"= volume was deter -mined. Please provide complete calculations. It is unclear on what size rain event the level spreader calculations are based on, Please refer to the Level Spreader BMP chanter f: r - creme. Please alsn - ,: ; snore' L' Fe3.i:',rF'tl:(,'mr i7rn°..::::. ur :: ..a-a:nc u:v: rs:_c c; r-a::.-:mu::' \`:.•_.icnc:na P.: glen::. i:`ue: ^nonr .___ - -. .__ m-.^: :' The above requested information must be received in this office prior to October 12. 2007 or your application will be returned as incomplete. The return of this project will necessitate resubmittzl of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. You should also he aware that the Stormwater Rules require that the permit be issued prior to anN development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. Please reference the Storm -water Project Number above on all correspondence. If you have questions; please feel free to contact me at (252) 948-3848. Sincwrel} , Scot Vinson Em-ironmental En_eineer Washington ReLional Office _ n � l IK tom. cc: Curtis Blazier, PE McKim $ Creed (email) 'yti�' IdrX�l I v/rf W 2{Z Washington Regional Office n —14 UT 'rit sw7060-70'y D. c . ��F Ij'i'F% Re: Extension request for SW7070911 Subject: Re: Extension request for SW7070911 From: Scott Vinson <Scott. Vinson@ncmail. net> Date: Thu, 1 I Oct 2007 14:07:20 -0400 To: Curtis M Blazier <CBlazier@tnckirncreed.corn> Curtis, next Tuesday is fine for the submittal. Thanks for writing, Scott Curtis M Blazier wrote: Scott, We need additional time to submit the required information and would like to request an extension for the submittal of SW7070911 stormwater permit for Harbor Village III. We could submit it on Tuesday of next week If it has to be pushed back to later in the week because of NCDENR schedule, please just let me know. Thanks. I have faxed this request to you, as well. **Curtis M. Blazier** **Civil Designer*** * M*^C *KIM/&/CREED ENGINEERS SURVEYORS PLANNERS 200 MacKenan Court Cary, NC 27511 919.233.8091 919.233.8031 fax http://www.mckimcreed.com <http://www.mcl:imcreed.com/> This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the system manager. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e-mail. I of I to/11/2007 2:07 PM 1.0/11.;2007 THU 13:04 FAX 10001; D01. v MCK M&CR]EED v 200 MacKenan Court, Suite 200 Cary, NC 27511 Tel: (919) 233-8091 Fax: (919) 233-8031 FACSIMILE TRANSMITTAL DESIGNATED RECIPIENT: Scott Vinson FAX NO: 252-946-9215 COMPANY: NCDENR Division of Water Quality DATE: 10/11/07 SENDER: Curt Blazier, EI TIME: 12:50 PM NUMBER OF TRANSMISSION PAGES PROJECT NUMBER 04135-0001 this page): 10, PROJECT NAME River Dimes ® THIS IS YOUR ORIGINAL ❑ HARD COPY TO FOLLOW COMMENTS: * * IF NOT CORRECTLY RECEIVED OR PAGES FAULTY, PLEASE CALL SENDER AT 919/233-8091 ** REMARKS: Scott, We need additional time to submit the required information and would like to request an extension for the submittal of SW7070911 stormwater permit for Harbor Village III. We could submit it on Tuesday of next week. Please just let me know. Thanks. ATTENTION THE INFORMATION CONTAINED IN rflS FACSIMU: MIESSAGE IS PRIVILEGED AND CONFIDENTIAL INFORMATION MEIN= ONLY MR IFE USE OF THE INDIVIDUAL OR ENTITY NAMED ABOVE. IF 711E READER OF TH6 MLSAGE IS NOT THE INTENDED RECIPIEW. OR THE EMPLOYEE OF/OR AGENT RESPONSIBLE TO DEulek IT TO THE INTERDEC RECNENT, YOU ARE F.ERBY NOTIFED TEAT ANY D:SSEMINAIIOV, DIST3iBUTION CR COPYING OF THIS CO.V.MUNICATION G STR:C. LY TROT II SITED. IF YOU HAVE.RECoVEL THIS COMMU NICAIICN IN LRROR, PLEASE NOTIFY US BY TELEPI TO." E AND RETURN THE ORIGINAL MESSAGE TO US A II HE ABOVE A DDRESS VIA I HE U.S. POSTALSERVICE. WE MLLREIMBURSE YOU FOR ANY COSTS INCURRED. 5A4135\0002\4G-Permit\NC DENR DWO Sterinwater\High Density Permit -Harbor Village III\Extension Request Faxdoc Rev.-D:n=s CAROLINA ENGINEERS.'PA CAROLINA ENGINEERS, PA Geotechnical • Construction Materials • Forensic • Site Development • Surveying August 30, 2007 McKim & Creed, P.A. 200 Mackenan Court Cary, NC 27511 Attention: Mr. Curtis Blazier PROJ # SEP 1 g 2007 owe Subject: Additional Subsurface Soil Profiles for Harbor Village III, River Dunes Development Panilico County, NC Dear Mr. Blazer, In accordance with your request, Carolina Engineers, P. A. has completed additional subsurface soil profiles for the Stormwater Best Management Practices (BMP) locations at Harbor Village II I in the River Dunes Development located in Pamlico County, North Carolina. We excavated two locations, B13 and B14, to a depth of 14 feet to better define the clay strata and classify the soils at depths below the clay strata. Attached you will find a location map depicting boring locations B-13 and B-14 where the test pits were excavated and the Excavated Pit Soil Profile Data logs. The Soil Profile Data sheets show visual soil classifications and water table depths to an excavated depth of 14 feet. We appreciate the opportunity of assisting you on this project. If we can answer any questions or should you need additional assistance, please do not hesitate to contact us. Sincerely, CAROL A ENGINEER . L C. HUDDLE, P.E. Project Engineer North Carolina Registration No. 20670 Enclosures: Excavated Pit Soil Profile Data (2) Soil Boring Location Plan (1) PO Box 1595, New Bern, NC 28563, Tele: (252) 633-2425, Fax: (252) 633-1370, www.carolinaengineers.com .O 592 sq.fN ?8 acres :n es sq. + acres 't - 2 41 o O -,;:;��/'� — - 6ot sq. ft r .% �o+wA m4° nacres 0(,0 acre \ \\LL 1 ; ..- ^ Common \ -40 ^a P 6,446 sq. ft. ;09 /cre 0.15 acres +" vim`\\ 27 \\ 4 I 10.6 39ac es 7,748 sq. a2,9 \ \ ) 0. t8 acres 5 B / 17,348 sq. ft. 9,800 sq. t` \ ' 16 a40 acres 0.22 acre \ 18, 782 sq. ft. / I 0.43 acres / 6 70 1 \ �26a / / ✓ 19,400 sq.ft. 11922 sq. ft.� f . 25 0.45 acres b.27 acres 8,182 sq. - 0. l9 acre 107,552 sq. . 40 acrest / 7 - i8a B- 21,522 sqA 'fi 317 sq. /L B 24 C \ a#9 ar"s 6.40 acres 0.18 agrest �1aq ft 4l o 26,917 s4ff. 31,1 24a / \ \ a62 acre - \ a7 B. ft. -- 23 - \ 0.19 a 19.9f7 soft \ - i — a46 / / 3a ii22 !7 sq: ft. .24 acres 22319 s4R. Q51 aws - / \ 1s\ \ 8,813 1�719 sq. R - 20 on \ + 6.29 acres Harbor illage III\ asi \ +aka oPe, \ 3aam 2sa xrh �.812 \ B-1520 - /- 0.53 orxs � 3 sq.lf. SCALE: 1" = 100' 0 50 100 200 400 UiTlTA .f&CRL'QD Harbor Village III - Soil Boring Location Plan River Dunes Corporation B-5 Car North Carolina Excavated Pit Soil Profile Data Client: River Dunes Corp. Date: August 30,2007 Project Harbor Village III, River Dunes Development, Pamlico County, NC Project No.: ce.191-07 Technicians: John Switzer Boring No.: B-13 A Auger Location: B-13, Northeast section of Harbor Village III Boring Method: Excavator Depth Lab Data Sol Description and ernarks USCS Symbols Water (a) NM (%) 200(%) LL (%) PI (%) I Table (it) - - - - tan to gray slightly silty poorly graded sand (rill) ... I."...SP-SM —... 2 feet .:.............[::..::I:::::::::. 3u7ixc L i'Yta�tp�' 322 52 46 24 Stiff gray fine silly to sandy clay NM", cL UrA GS`.0 ✓�j(1N 6 feet"" . w g"' y{t &t V son gray fine silty to smrd cloy With traces 01 organics 3 M 5 m e feet Tan poorly graded sand ._..,..,.,,SP :: ..� 11 feet Gray slightly silty poorly graded sand SP-SM 14 feet Pvrn,df. t.innim al 141ret Ground water encountered at 71re[ CaroMa Engineers, PA - P.O. Bax 1595 - Now Bern, NC 28563 - Phone (252)633-2424 - Fax (252)L33-1370 Excavated Pit Soil Profile Data Client: River Dunes Corp. Date: August 30, 2007 Project: Harbor Village III, River Dunes Development Pamliw County, NC Project No.: ce.191-07 Technicians: John Switzer Boring No.: R-14 A Auger Location: B-14, Northeast section of Harbor Vllage III Boring Method: Excavator 14 feet - 117.6 1 NP I NP I tan to gray slightly silty poorly graded sand (fill) Gray fine silty to sandy clay Tan poorly graded sand Gray slightly silty poorly graded sand CarolinaEngineers, PA - P.O. Box 1595 - New Bern, NC 28563 - Prone (252)E33-2424 - Fax (252)b33-1370 CAROLINA' ENGINEERS. -PA August 10, 2007 CAROLINA ENGINEERS, PA Geotechnical • Materials Testing • Forensic • Site Development • Surveying McKim & Creed, P.A. 200 Mackenan Court Cary, NC 27511 Attention: Mr. Curtis Blazier Subject: Subsurface Soil Investigation for Proposed Stormwater BMP Locations Harbor Village III, River Dunes Development, Pamlico County, NC Dear Mr. Blazier, In accordance with your request, Carolina Engineers, P.A. has completed a subsurface soil investigation and performed a geotechnical evaluation for the proposed Stormwater Best Management Practices (BMP) locations at Harbor Village III, River Dunes Development located in Pamlico County, North Carolina. The objective of our investigation was to evaluate the in -situ soil conditions for preliminary selection of BMPs to be used in retention and treatment of stormwater runoff from the proposed Harbor Village III site. This report contains visual soil classifications, water table depths and approximate infiltration rates for in -situ soils at selected locations. We appreciate the opportunity of assisting you on this project. If we can answer any questions or you need additional assistance, please do not hesitate to contact us. Sincerely, CAROLINA ENGINEERS, P.A. CARL C. HUDDLE, P.E. Project Engineer North Carolina Registration No. 20670 Enclosures: Narrative (1) Hand Auger Boring Data (3) Mckim and Creed Soil Boring Location Plan (1) PO Box 1595, New Bern, NC 28563, Tele: (252) 633-2425, Fax: (252) 633-1370, www.carolinaengineers.com River Dunes, Harbor Village III August 10, 2007 Page 2 of 3 1. INTRODUCTION Carolina Engineers, P.A. was retained by McKim & Creed, P.A. to provide a subsurface soil investigation and provide geotechnical services for site selection and preliminary design of the BMP locations for the proposed Harbor Village III site located in the River Dunes Development in Pamlico County, North Carolina. The proposed Harbor Village III site is located southwest of the newly excavated marina and is comprised of approximately 12 acres. The site is currently cleared and grubbed of vegetation and root mat and has been filled to depths of 1 to 3 feet with excavated soils from the marina excavation. Three BMP locations (labeled B-13, B-14, and B-15) were chosen by McKim & Creed and are depicted on the attached sketch. 2. FIELD EXPLORATION AND SUBSURFACE CONDITIONS Field Exploration The field exploration consisted of performing three hand augured borings to depths of 6 feet and classifying the encountered soils in accordance with ASTM D-2488. The results of the borings are provided as hand auger boring data logs describing subsurface soils at each boring site including soil classifications, stratification lines and water table depths. The water table depths are the average daily readings taken from piezometers during the week ending August 18, 2007. Subsurface Conditions Hand auger borings performed at locations 13=13 and 13-14 encountered approximately 2 feet of tan to gray slightly silty poorly graded sand (till material). Below the sandy fill material, a stiff gray sandy to silty clay was found to the auger termination depth of 6 feet. Peizometer readings indicated the water table to be at 3 feet below existing surface elevations at each location. Hand auger boring performed at location 13-15 encountered approximately 3 feet of tan to gray slightly silty poorly graded sand (fill material) underlain with a stiff gray sandy to silty clay. The gray sandy to silty clay was found to the auger termination depth of 6 feet. Peizometer readings at location 13-15 indicated the water table to be at 4.5 feet below existing surface elevations. Visual soil classifications in accordance with the Unified Soil Classification System (USCS) determined subsurface soils at all boring locations to be slightly silty poorly graded sands (SP-SM) and silty to sandy clays (CL). Infiltration Rates River Dunes, Harbor Village III August 10, 2007 Page 3 of 3 The following infiltration rates are from published typical permeability values for each soil type: USCS Soil Tyne Infiltration Rate SP-SM 0.14 inches/hour CL 5.9x10-7 inchesihour Summary Based on the low Infiltration rates and classifications of in -situ soils, the construction of BMPs at the proposed locations can only be performed with modifications to the sites. These modifications will include but are not limited to the following: Raise the drainage areas to allow positive drainage into the BMP locations without lowering the proposed BMP elevations. Removal of the silty sandy clayey soils (type CL) found below the fill material to the lower silty sand strata and back fill with a clean permeable sand. Prior to final design and construction of the proposed stormwater BMPs, a test location should be constructed and on -site infiltration tests performed to verify infiltration rates. The test location can be one of the proposed BMP locations. The construction should consist of over excavation to a depth of approximately 8 feet and back filling with a clean sand with a fines content of no more than 10%. Excavation of the marina encountered a permeable strata of silty sand at approximately 6 feet below existing surface elevations and with the current fill depths of 2 to 3 feet the 8 foot excavation should suffice. A geotechnical engineer or representative should witness the over excavation and test the back fill for compliance. This narrative represents our opinion based on the limited augured borings and testing performed. Assumption has been made that the limited exploratory borings are representative of conditions at each site. If during construction phases, conditions are encountered which differ significantly from those reported, we should be notified so our analyses and recommendations can be reviewed and/or revised as necessary. II CARC)LINA CNGINCrRS. IN HAND AUGER BORING DATA Client: River Dunes Corp. Date: August 9, 2007 Project: Harbor Village III, River Dunes Development, Pamlico County, NC Project No.: ce.191-07 Technicians: John Switzer t'" Boring No.: B-13 Auger Location: B-13, Northeast section of Harbor Village III Boring Method: Hand Auger Depth Lab Data Soil Description and Remarks USCS Symbols Water fl Table ft NIA % -200 % LL °/a PI % - - - - tan to gray slightly silty poorly graded sand (fill) SP-ISM' 2 feet 32.2 52 46 24 Stiff gray fine silty to sandy clay _ - CL':-c - T 6 feet boring terminated at 5 teet Water table recorded at 3 feet Carolina Engineers, PA - P.O. Box 1595 - New Bern, NC 28563 - Phone (252)-633-2424 - Fax (252)-633-1370 115 HAND AUGER BORING DATA Client: River Dunes Corp. Date: August 9, 2007 Project: Harbor Village III, River Dunes Development, Pamlico County, NC Project No.: ce.191-07 Technicians: John Switzer Boring No.: B-14 Auger Location: B-14, Northwest section of Harbor Village III Boring Method: Hand Auger Depth Lab Data Soil Description and Remarks USCS Symbols Water ft NM % 200 % LL % PI % Table ft - 17.6 NP NP tan to gray slightly silty poorly graded sand (fill) SP-SM' 2.5 feet - SEC - - - - Still gray fine silty to sandy clay CL . 6 feet ' boning terminated at 6 feet Water table recorded at 3 feet Carolina Engineers, PA - P.O. Box 1595 - New Bern, NC 28563 - Phone (252)-633-2424 - Fax (252).633-1370 2.Z5 HAND AUGER BORING DATA Client: River Dunes Corp. Date: August 9, 2007 Project: Harbor Village III, River Dunes Development, Pamlico County, NC Project No.: ce.191-07 Technicians: John Switzer Boring No.: B-15 Auger Location: B-15, South center section of Harbor Village III Boring Method: Hand Auger Depth Lab Data Soil Description and Remarks USCS Symbols - Water NM % -200 % LL % PI % fi Table fi - - - - tan to gray slightly silty poorly graded sand (fill) SPSM 3 feet -' - - - - Stiff gray fine silty to sandy clay CLk'._, 6 feet boning terminated at 6 feet Water table recorded at 4.5 feet Carolina Engineers, PA - P.O. Box 1595 - New Bern, NC 28563 - Phone (252)-633-2424 - Fax (252)-633-1370 Z;50 ' 2 V - J92 sq. fN ?6 acres ss 1 w r0 \ 11` �tCs6av\\. oc est0 f04 sq. ul - 41 pot TM t5.23 acre \ \ ! 2a Ma Com man \ !',�,d� 40 9 sere 6,446 sq. /1. 9 \ 0.15 acres 27 \ 4 17,046 sq.f So 28 \ 0.J9 acres 76748 s . t 004e60 ac `042s26 0.22Dire\yy} 18, 782 sq. ft. / , 0.4J acres / 6 26a / 19,400 sq.It. 1 sq. It. 0.45 acres 182 sq. t . 25 0.27 acres , 19 acre 17,552 crest. ! 0.40 acres / ! �' So B / / \ /21.522 safe. 'r7,317 sq. ft. 24 \ a49 acres ! 0.40 acres 70 18 oc acres �70.41 sq lt. \ \ / ! ! / 8 26,917 sq. ft. 31,1 / 84 240' ft. !' 23 `\\ 0.62 acres! \ \ a7 0.19 acr 19,917 sq. ft. / 2Ja J17 sq. ft. 0.24 acres! 22,J19 sq ft. ! i ! 0.51 ocres ! \ \ \ 15 \ \ i 1'�, 719 sq. ft. Harbor 0.29 acres ! ! ! \ Village III 76 ' 22,J78 'sq.ft \\ \ \�81 acres\ 31250 sq.ft. \ 14 \q\ a51 apes ! ! \ \ �\ Q81 Dare: 1TO oce3 \ ! i ! 23.76sasq.It. . 17 0.55 ones , \� \81(lu sq It\ SCALE: 1" = 100' 0 50 100 20o 400 River Dunes Boring and Piezometer Data Harbor Village III Water Water Water Water Elevation Elevation Elevation Elevation Measured in Measured in Measured in Measured in Average Water Piezometer Ground Piezometer Piezometer Piezometer Piezometer Elevation Number Elevation 8/9/2007 8/30/2007 9/7/2007 9/10/2007 0.40 P-13 5.28 2.28 -1.72 0.28 0.78 P-14 1 4.14 1 1.14 1 -3.36 -0.86 1 -0.86 1 -1.00 Location Ground Elev. Piezo. No. W.T. Elev. Boring No. W.T. Elev. Design W.T. Elev. Infiltration Basin 1-1 4.14 P-14 -1.00 B-14 -3.36 1.15 Infiltration Basin 1-2 5.28 P-13 0.40 B-13 -1.72 1.10 Determination of Seasonal Iligh Water Table Values For the Harbor Village ❑I area for this high density stormwater permit, the contractor performed soil borings and installed piezometers at a couple locations inside the boundaries of the proposed infiltration basins (see bulletin drawing 13-5). The results are listed in the table above. The hand auger method was used for the initial soil borings, while subsequent borings were performed by excavated test pits. The water table level indicated by each boring indicates the existing groundwater table at that point in time that the boring was conducted. Depending on weather conditions and rainfall amounts, this water table level may not be indicative of true groundwater table. The piezonmeter logs show a somewhat erratic water table level as a result of readings taken over the course of a month. Ideally, piezometer readings would be conducted over a period of several months. "rhe piezometers recorded water levels at approximately -1.0 finsl and 0.40 fmsl. Piezometers installed for previous infiltration and bioretention basins on site recorded water levels in the range of 0.5 to 1.5 fmsl. As a result, we decided to disregard the negative readings in the calculations of our average water table elevation, considering them anomalies. INFILTRATION BASIN DESIGN River Dunes Harbor Village III Infiltration Basin 1-1 Project: 04135-0001 Prepared by: CMB Date: 8/19/2007 Drainage area: 56,380 sf Volume to Catch The First 3.0 Inches of Runoff: (no bypass provided) Runoff : Rv = 0.05 + 0.009 • I Simple Method, Schueler Rv = 0.482 Volume: V = P' Rv' A V = 6,794 cf Surface Area: SA = Volume / Depth Depth = 24 in SA = 3,397 sf Select Fill Soil: Soil Conductivity (k) (in / hr) Sand 6 Loamy Sand 2 Sandy Loam 0.5 - 1 Clay Soils: Use Sandy Loam or Loamy Sand Fill Soil = Loamy Sand k = 1.3 Notes: I = Impervious Percent = Rv = Runoff Coefficient V = Required Storage Volume P = Design Rainfall = A = Drainage Area Page 1 of 2 48 3 inch Cover SF Acres Sidewalks 922 0.02 Streets 8,077 0.19 Buildings (1) 17,800 0.41 Parking 552 0.01 Landscape 29,029 0.67 Totals (1) Impervoius cover area for buildings includes drivewaysandis a maximum amount. 56,380 1.29 A 9 028419 ;a '92j,F;;GINEEP� �� •-•.M• LIV�c�r'' River Dunes Harbor Village III Infiltration Basin 1-1 Find Time Drawdown of Water Through Soil Laver: A. Rate of Drawdown: Qd = (2.3e-5) ' k ' SA " H / L Qd= 0.1016 cf Page 2 of 2 H / L Approximately = 1 B. Find Time to Drawdown Water from Inundation to Saturation at Surface: Volume to Drawdown: Vi-s = SA' Depth Vi-s = 6,794 Time to Remove Volume of Water at Flowrate Qd: Ti-s = Vi-s / Qd = 66,890 sec. 19 hr. C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: Porosity (n) = 0.38 Volume to Drawdown: Vi-s = 2 feet " SA' n Vs-2 = 2,582 Time to Remove Volume of Water at Flowrate Qd: Ts-2 = Vs-2 / Qd = 25,418 sec. = 7 hrs D. Total Time to Draw Water Through Soil: T= 26 hrs Assume: G = 2.70 e = (2.70`62.4/103.7) -1 = 0.625 n = 0.625/(1+0.625) = 0.38 NC c> 08419 --7 9�Lj F:VG.NF.. . ,,,M. LIVE.,., INFILTRATION BASIN DESIGN River Dunes Harbor Village III Infiltration Basin 1-2 Project: 04135-0001 Prepared by: CMB Date: 8/19/2007 Drainage area: 80,100 sf Volume to Catch The First 3.0 Inches of Runoff: (no bypass provided) Runoff : Rv— 0.05 + 0.009 ` I Simple Method, Schueler Rv = 0.473 1 = Impervious Percent = Rv = Runoff Coefficient Volume: V = P . Rv " A V = 9,472 cf V = Required Storage Volume P = Design Rainfall = Surface Area: SA = Volume / Depth A = Drainage Area Depth = 24 in SA = 4,736 sf Select Fill Soil: Soil Conductivity (k) (in / hr) Sand 6 Loamy Sand 2 Sandy Loam 0.5 - 1 Clay Soils: Use Sandy Loam or Loamy Sand Fill Soil = Loamy Sand k = 1.3 Page 1 of 2 47 3 inch Cover SF Acres Sidewalks 783 0.02 Streets 9,615 0.22 Buildings (1) 26,800 0.62 Parking 368 0.01 Landscape 42,534 0.98 Totals Notes: (1) Impervoius cover area for buildings includes driveways and is a maximum amount. 80,100 1.84 ,�N_CAR vLHL ' I 028419 ;o 1-OF --7 ..;�? LIVE•••` River Dunes Harbor Village III Page 2 of 2 Infiltration Basin 1-2 Find Time Drawdown of Water Through Soil Laver: A. Rate of Drawdown: Qd = (2.3e-5) * k * SA * H / L H / L Approximatley = 1 Qd= 0.1416 cf B. Find Time to Drawdown Water from Inundation to Saturation at Surface: Volume to Drawdown: Vi-s = SA *Depth Vi-s = 9,472 Time to Remove Volume of Water at Flowrate Qd: Ti-s = Vi-s / Qd = 66,890 sec. 19 hr. C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: Porosity (n) = 0.38 Assume: G = 2.70 Volume to Drawdown: Vi-s = 2 feet * SA * n e = (2.70*62.4/103.7) -1 = 0.625 Vs-2 = 3,599 n = 0.625/(1+0.625) = 0.38 Time to Remove Volume of Water at Flowrate Qd: Ts-2 = Vs-2 / Qd = 25,418 sec. 7 hrs D. Total Time to Draw Water Through Soil: T= 26 hrs SAIL 0�8419 iL F r4 07 '� 'Gj•'•:vGINEEQ:� �0� �NtCKIM&CREED CALCULATIONS Project: River Dunes Marina and Residential Development — Harbor Village III Project No: 04135-0001 Date: September 7, 2007 Author: CMB Subject: Level Spreader LS-1 Calculate flow going over weir Q = Cw*L*H� 5 Use Cw = 3.0 for free overfall Assume L = 20.0 It for weir length Assume H = 3 in. = 0.25 11 Q = 3.0 * 20.0 * (0.25)� 5 = 7.50 cfs Q Overflow = 7.50 cfs c�; 028419 ro vMgK M&CREED CALCULATIONS Project: River Dunes Marina and Residential Development — Harbor Village III Project No: 04135-0001 Date: September 7, 2007 Author: CMB Subject:. Level Spreader LS-2 Calculate flow going over weir Q = Cw*L*HE'S Use Cw = 3.0 for free overfall Assume L = 20.0 ft for weir length Assume H = 3 in. = 0.25 ft Q = 3.0 * 20.0 * (0.25)� S = 7.50 cfs Q Overflow = 7.50 cfs CAq JtAl- 9 028419 fo cf�i4 07.E -.,. M• LIVE....,. CALCULATION PROJECT /C -�r PROJ. NO.S�I CLIENT 'v 05 DATE 9 76 - DES. BY eMS SUBJECT CHK. BY Gr/G REMARKS ,QQ —aCON �R_E1 /�IozTf�_ZPE — � ss L,v� O•_%O NSA ��aT 5:�,�Dy Sari ll oltvtagvs- eia 2,/, F LAyNs *410�- 2�B/Olx-(D: yr� fi; 22, GoS�d•-iot)- _ ~S• O! Ti5 Dss CoppvC,,PE_TE '�v�G Dnl �� SD.E S/M 20r — of = 6�11 , 900 21$O.i95' T-I_r.1 I 1-1 C 1/ 1'161 U I I1_)�3 KAo VAmEe 800-743-5557 • w mckimcreed.com v�MCIQM&CREED CALCULATION PROJECT teir<2 eE- —yUlu,fGE� PROJ. NO. s64 R ) CLIENT )CIy6L �7u. --5 CARFdR%%7/AN DATE SUBJECT sNF/�TeA%.nN �itz/N f <' o[Js DES. BY G�1R 2 CHK. BY 6*11- awl El 0 mom mmommom EMMMMMENN MEMEMME M MEN ommoommom EMNON 0 NONE anomnaml— mmmm NONE ON No MMMMMI momimm No NONE 0 INN MEMO M IN INW-MOMMMEM EMOMEMEMMOMMM Ell No moomm MEIN mmmom No No HEADQUARTERS 800-743-5557 • www.mckirncreed.com � MMIQMF�CREED Worksheet for Concrete Flume into 1-1 - Harbor Village III Fro­ject�'Djscr',ption, Flow Element: Rectangular Channel Friction Method: Manning Formula Solve For: Normal Depth 11p - � , n, —,- i" - "1 4 Roughness Coefficient: 0.013 Channel Slope: 0.33000 ft/ft Bottom Width: 2.00 It Discharge: 0") 4.36 ftl/s 'ResultsJLL0.14 Normal Depth: It Flow Area: 0.27 ft' Wetted Perimeter: 2.27 It Top Width: 2.00 It Critical Depth: 0.53 It Critical Slope: 0,00536 ft/ft Velocity: 15.98 ft/s Velocity Head: 3.97 ft Specific Energy: 4.11 ft Froude Number: 7.63 Flow Type: Supercritical :dVF Input Data , , , I - ". 1, Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 �0 Upstream Depth: 0.00 It Profile Description: Profile Headloss: 0.00 It Downstream Velocity: Infinity ft/s Upstream Velocity: Infinity ft/s Normal Depth: 0.14 It Critical Depth: 0.53 It Channel Slope: 0.33000 ft/ft Critical Slope: 0.00536 ft/ft Worksheet for Concrete Flume into 1-2 - Harbor Village III (west side) � Project Description ,77, �L-.-L Flow Element: Rectangular Channel Friction Method: Manning Formula Solve For Normal Depth [input Data Roughness Coefficient: 0.013 Channel Slope: 0.33000 ft/ft Bottom Width: 2.00 It Discharge: (40) 1.65 1131s Results. , , , , , , , 1, +, I , , . jj� 1�1�i ,- 1 111 ''1 1. , L Normal Depth: 0.07 ft Flow Area: 0.15 Wetted Perimeter: 2.15 ft Top Width: 2.00 ft Critical Depth: 0.28 ft Critical Slope: 0.00523 ft/ft Velocity: 11.07 ft/s Velocity Head: 1.90 It Specific Energy: 1.98 It Froude Number: 7.15 Flow Type: Supercritical ,GVF In Downstream Depth: 0.00 ft Length 0.00 ft Number Of Steps: 0 ,GYF Output Data Upstream Depth: 0.00 It Profile Description: Profile Headloss* 0.00 ft Downstream Velocity: Infinity ft/s Upstream Velocity: Infinity ft/s Normal Depth: 0.07 fit Critical Depth: 0.28 It Channel Slope: 0.33000 ft/ft Critical Slope: 0.00523 ft/ft Worksheet for Concrete Flume into 1-2 - Harbor Village III (north side) P To ct Description, I Crlp!1, 0 0 Flow Element: Rectangular Channel Friction Method: Manning Formula Solve For Normal Depth Roughness Coefficient: 0.013 Channel Slope: 0.33000 ft/ft Bottom Width 2.00 It Discharae://). )1 4.03 WIS �Results jo Normal Depth: 0.13 ft Flow Area: 0.26 ft' Wetted Perimeter: 2.26 It Top Width: 2.00 ft Critical Depth: 0.50 ft Critical Slope: 0.00533 ft/ft Velocity: 15.53 ft/s Velocity Head: 3.75 ft Specific Energy: 3.88 ft Froude Number: 7.60 Flow Type: Supercritical ,GVFInpu1; Data,j Downstream Depth: 0.00 ft Length 0.00 It Number Of Steps: 0 ,GVF Output Data Upstream Depth: 0.00 It Profile Description: Profile Headloss: 0.00 It Downstream Velocity: Infinity ft/s Upstream Velocity: Infinity ft/s Normal Depth: 0.13 ft Critical Depth: 0.50 ft Channel Slope: 0.33000 ft/ft Critical Slope: 0.00533 ft/ft Worksheet for Concrete Flume into 1-1 - Harbor Village III Project Description 1, Flow Element: Rectangular Channel Friction Method: Manning Formula Solve For: Normal Depth Input Data Roughness Coefficient: 0.013 Channel Slope: 0.33000 ft/ft Bottom Width: 2.00 ft Discharge: C 5.20 ft3/s Normal Depth: 0.15 ft Flow Area: 0.30 ft' Wetted Perimeter: 2.30 ft Top Width: 2.00 ft Critical Depth: 0.59 ft Critical Slope: 0.00546 ft/ft Velocity: 17.07 ft/s Velocity Head: 4.53 ft Specific Energy: 4.68 ft Froude Number: 7.71 Flow Type: Supercritical :GVF Input Data Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 Upstream Depth: 0.00 ft Profile Description: Profile Headloss: 0.00 ft Downstream Velocity: Infinity ft/s Upstream Velocity: Infinity ft/s Normal Depth: 0.15 ft Critical Depth: 0.59 ft Channel Slope: 0.33000 ft/ft Critical Slope: 0.00546 ft/ft Worksheet for Concrete Flume into 1-2 - Harbor Village III (west side) Tr�oj�7ct—D Description, Element: Rectangular Channel Friction Method: Manning Formula Solve For: Normal Depth Input Data Roughness Coefficient: 0.013 Channel Slope: 0.33000 ft/ft Bottom Width: 2.00 ft Discharge: oze') 1.96 ftl/s Results' "" —7-77 Normal Depth: 0.08 fit Flow Area: 0.17 ft. Wetted Perimeter: 2.17 ft Top Width: 2.00 ft Critical Depth: 0.31 ft Critical Slope: 0.00522 ft/ft Velocity: 11.85 ft/s Velocity Head: 2.18 ft Specific Energy: 2.26 ft Froude Number: 7.26 Flow Type: Supercritical :GVF-lnput Data Downstream Depth: 0.00 ft Length* 0.00 ft Number Of Steps: 0 ,GVF Outp it Data Upstream Depth: 0.00 ft Profile Description: Profile Headless: 0.00 ft Downstream Velocity: Infinity flits Upstream Velocity: Infinity ft/s Normal Depth: 0.08 ft Critical Depth: 0.31 ft Channel Slope: 0.33000 Wit Critical Slope: 0.00522 ft/ft Worksheet for Concrete Flume into 1.2 - Harbor Village III (north side) Flow Element: Rectangular Channel Friction Method: Manning Formula Solve For: Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope: 0.33000 ffift Bottom Width: 2.00 ft Discharge: 4.80 W/s :Results,,, A Normal Depth: 0.14 ft Flow Area: 0.29 ft' Wetted Perimeter: 2.29 ft Top Width: 2.00 ft Critical Depth: 0.56 ft Critical Slope: 0.00541 ft/ft Velocity: 16.55 ft/s Velocity Head: 4.26 ft Specific Energy: 4.40 It Froude Number: 7.66 Flow Type: Supercritical Downstream Depth: 0.00 ft Length* 0.00 ft Number Of Steps: 0 rGVFOutput Data" Upstream Depth: 0.00 ft Profile Description: Profile Headloss: 0.00 ft Downstream Velocity: Infinity ft/s Upstream Velocity: Infinity ft/s Normal Depth: 0.14 ft Critical Depth: 0.56 ft Channel Slope: 0.33000 ft/ft Critical Slope: 0.00541 ft/ft Worksheet for Concrete Flume into 1-2 - Harbor Village III (north side) 'P.roject Descrippoht Flow Element: Rectangular Channel Friction Method: Manning Formula Solve For: Normal Depth Input Dat� � �''� Roughness Coefficient: 0.013 Channel Slope: 0.33000 ft/ft Bottom Width: 2.00 ft Discharge: �(��� 4.80 ft3/s 'Results Normal Depth: 0.14 It Flow Area: 0.29 ft' Wetted Perimeter: 2.29 ft Top Width: 2.00 ft Critical Depth: 0.56 ft Critical Slope: 0.00541 ft/ft Velocity: 16.55 ft/s Velocity Head: 4.26 ft Specific Energy: 4.40 ft Froude Number: 7.66 Flow Type: Supercritical GVF Input'Data - Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 GVF Output Data.. • Upstream Depth: 0.00 ft Profile Description: Profile Headless: 0.00 ft Downstream Velocity: Infinity ft/s Upstream Velocity: Infinity ft/s Normal Depth: 0.14 ft Critical Depth: 0.56 ft Channel Slope: 0.33000 ft/ft Critical Slope: 0,00541 ft/ft Appendices NEW YORK DOT DLSSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: "Bank and channel lining procedures", New York Department of Transportation, Division of Design and Construction, 1971.) Note: To use the following chart you must know: (1) Q full capacity (2) QIo (3) V full (4) VIo where Q = discharge in cfs and V = Velocity in FPS ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute now velocity Vo at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do=Ao, where A: cross -sectional area of Dow at outlet. For multiple culverts, use Do=1.25xDo of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). 20 — 5- mom ram®® rams ',�mmuwmmoml.mmommm® otmOum�mm�r.o 'um® I�m�® immmromvmmm.ummm•mmuo �®tmum\mmmmuo�® �uo-mommuouumov®aa�omoo mnoaouu�mrrmuommr,®r.��muo •mm_v�>.mmmou ���a/r.��mommu®ram®mtmm mmm>.ur�ootrvrrrurr®mmmm mmv®ma�muo m ®ammmsmm® �mmmt �nmuoumoumumOQ�m\®m�um ml�uov�mama�o�mu �uu®comma mmmmm imm®turn vuvummmm®uuuou uon�mruunommmoo rmmmomumu.�m�u�m®���n nmmm��-\m®o�vummnm�mmm ■ma�moo svr.mmrr►v��mn�mmmm �ma\ur.�m�mmauorurum�ummrvu �®mom®� ��mnoumturao amromma®s��mmw-uumruvurou ummy�mmmmd�o®®v®® oouavo®mo�mWm��®mu mmraua�m�m-ram. �rrn�msm��mmR�rr�u�m�unmr.mtu�rro ©o .®�ruou►m ii mOmr..mrAram�m�rm� m'\�.\YYYROmlm�mlal��\YtIm�Y��� QOOAO<A�R\YAmtmA��V mOtI�OA V W <t� oY o .memo®vouorrrvum�mm���morr� muR\vramommammms�mr.00mo� m��Y►tnpmtlRV m�lpt♦t♦t♦®��m�m•p�� mmmvmmrr._ �muo�nmm®vum�uo®ram.-mrruo mrouprrmmacurnuoo mmuuamrmpa�rrmuu®mtrrs�oru m�Ytm6Am�lOm\V p��pYpO��mm��0 0 CKYY it 01 5' Figure 8.06.b.1 I I I I 10, 15 20' 25' DIAMETER (Ft.) a='. tags 8.06.5 El W Z (N] APRON MAIERUIL PROTECT=VEM L7 TO PREVENTSCOUR HOLE USE U ALWAYS L2 1 STONE FILLING (FINE) CL. A 3 x Do 4 x Do 2 STONE FILLING (LIGHT) CL. B 3 x Do 6 xDo 3 STONE FILLING (MEDIUM) CL. 1 4 x Do 8 x Do 4 STONE FILLING (HEAVY) CL. 1 4 x Do 8 x Do 5 STONE FILLING (HEAVY) CL 2 5 x Do 10 x Do 6 STONE FILLING (HEAVY) CL 2 6 x Do 10 x Do 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Fig. 8.06.b.2 Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIXES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1) Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps=20" or 550 lbs. Step 2) Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.) Note: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Mannin's Min. thickness (inches) "n., of fining (inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 .0.044 30 36 (Channels) (Dissapaton) 8.06.6 R". IZ93 Exhibit 1 Depth -duration -frequency data for selected cities (Tabulated values are precipitation depth [in]) Location Return 5 min 10 15 30 1 hr 2 hr 3 hr 6 hr 12 hr 24 hr Period r min min min Asheville;NC 2 0.46 0.73 0.91 1.35 1.80 2.02 2.24 2.80 3.30 3.80 5 0.53 0.87 1.10 1.66 2.26 2.55 2.84 3.59 4.26 4.92 10 0.59 0.97 1.23 1.89 2.58 2.92 3.26 4.14 4.92 5.70 25 0.67 1.12 1.43 2.22 3.04 3.45 3.86 4.92 5.86 6.80 50 0.74 1.24 1.59 2.47 3.39 3.86 4.33 5.52 6.59 7.65 100 0.80 1 1.35 1.74 2.72 3.75 4.27 4.80 6.13 7.31 8.50 Charlotte, NC 2 0.46 0.76 0.96 1.31 1.67 1.87 2.07 . 2.59 3.04 3.50 5 0.54 0.89 1.13 1.61 2.10 2.35 2.59 3.20 3.75 4.31 10 0.59 0.98 1.26 1.82 2.41 2.68 2.95 3.64 4.26 4.88 25 0.68 1.13 1.45 2.13 2.84 3.16 3.47 4.28 4.99 5.71 50 0.74 1.24 1.59 2.37 3.18 3.53 3.88 4.77 5.56 6.36 100 0.81 1.36 1.74 1 2.61 3.52 3.90 4.29 5.26 6.13 7.00 Greensboro/ 2 0.48 0.74 0.92 1.25 1.60 1.81 2.02 2.55 3.03 3.50 Winston-Salem, NC 5 0.55 0.87 1.09 1.55 2.02 2.28 2.54 3.19 3.78 4.36 10 0.60 0.97 1.22 1.76 2.32 2.61 2.90 3.64 4.31 4.97 25 0.68 1.11 1:41 2.06 2.74 3.08 3.43 4.29 5.07 5.84 50 0.75 1.22 1.55 2.30 3.07 3.45 3.83 4.80 5.66 6.52 100 0.81 1.34 1.70 2.53 3.40 3.82 4.24 5.30 6.25 7.20 Fayetteville, NC 2 0.49 0.82 1.05 1.47 1.90 2.11 2.32 2.85 3.33 3.80 5 0.56 0.94 1.21 1.79 2.39 2.67 2.95 3.66 4.29 4.92 10 0.61 1.04 1.34 2.02 2.74 3.06 3.39 4.22 4.96 5.70 25 0.69 1.18 1.53 2.36 3.23 3.63 4.02 5.02 5.91 6.80 50 0.75 1.29 1.67 2.63 3.62 4.06 4.51 5.63 6.64 7.65 100 0.81 1.41 1.82 2.89 4.00 1 4.50 4.99 6.25 7.38 8.50 Raleigh/Durham, NC 2 0.48 0.79 1.01 1.35 1.70 1.91 2.12 2.65 3.13 3.60 5 0.55 0.92 1.18 1.64 2.12 2.40 2.68 3.38 4.02 4.65 10' 0.60 1.02 1.31 2.41 2.74 3.07 3.90 4.64 5.38 25 0.68 1.17 1.51 2.161.85 2.84 3.23 3.62 4.62 5.52 6.41 50 0.75 1.28 1.66 2.40 3.17 3.61 4.06 5.19 6.20 7.21 100 0.81 1.40 1.81 2.64 3.50 4.00 4.49 5.75 6.88 8.00 Wilmington, NC 2 0.49 0.84 1.09 1.58 2.10 2.36, 2.63 3.30 3.90 4.50 5 10 0.55 0.60 0.96 1.05 1.24 1.36 1.90 2.12 2.58 2.92 2.93 3.34 3.29 3.76 4.20 4.82 5.00 5.77 5.81 6.72 25 . 0.68 1.19 1.54 2.46 3.41 3.92 4.42 5.71 6.86 8.01 50 0.74 1.30 1.69 2.72 3.80 4.37 4.94 6.40 7.70 9.01 100 0.80 1.41 1.83 2,98 4.18 4,82 5.46 7.09 8.55 10.00 Elizabeth City, NC 2 0.48 0.80 1.02 1.40 1.80 2.04 2.28 2.90 3.45 4.00 5 0.55 0.93 1.19 1.71 2.24 2.57 2.89 3.72 4.46 5.20 10 0.60 1.02 1.32 1.92 2.55 2.94 3.32 4.29 5.16 6.03 25 0.66 1.17 1.51 2.24 3.00 3.46 3.92 5.10 6.15 7.19 50 0.75 1.29 1.66 2.49 3.35 3.87 4.40 5.73 6.91 8.10 100 1 0.81 1 1.40 1 1.81 2.74 3.70., 4.28 4.87 6.35 1 7.68 9.00 pyright H.R Malcom, 2003 [5-2] Exhibits Rational Runoff Coefficient Values Description of Area Runoff Coeffic Woodlands .2 - .025 Parks, Cemeteries 0.25 0.35 y soil, flat, 2% 0.10 y soil, average, 2 - 7% 0.15 y soil, steep, > 7% 0.20 soil, flat, 2% 0.17 soil, average, 2 - 7% 0.22 soil, steep, > 7% 0.35 Sandy soil, flat, 0 - 5% 0.30 Sandy soil, flat, 5 - 10% 0.40 Gayey soil, flat, 0 - 5% 0.50 Clayey soil, average, 5 - 10% 0.60 :sideritial: ->mgle Family (R-4) 0.50 Single Family (R-6) 0.55 Multi -family (R-10) 0.60 Multi -family (R-20) 0.70 Multi -family (R-30) 0.75 Commercial: O and I (I,II,III) 0.85 I1 and I2 .85 - .95 Shopping Centers .85 - .96 Streets: Gravel Areas 0.50 Drives, walks, and roofs 0.95 Asphalt and Concrete .95 - 1.00 C (Sources: NC Erosion/Sediment Control Planning and Design Manual, and the City of Raleigh 's Storm Drainage Design Manual, 1989) 1�1 0 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL AND NATURAL RESOURCES DIVISION OF WATER QUALITY STORMWATER MANAGEMENT PERMIT RIVER DUNES MARINA AND RESIDENTIAL DEVELOPMENT for RIVER DUNES CORPORATION HARBOR VILLAGE III TABLE OF CONTENTS I. PERMIT APPLICATION REcE D 11. SUPPLEMENTS SEF 18 2007 III. CALCULATIONS ®WQ-W" IV. V. GEOTECIINICAL DATA PLANS `R® �f76 1 v I Soil Map -Pamlico County North Carolina (River Dunes pev_ a=op ate aumv 35M �saoo as.aoo asemo C \ i-�Ilk ` , u�� � \�✓ �, � `I ' Ali.. 1 s^ s� : >{ l' kl ` P ` Yv E ' 1f�j, J' l7A,sr'n Vtickr'E Gum�dcetGrc,. ���rs./YcAJr,,J., A o ,,.00 sao Tao ece . 0 ,,500 3.000 FB°� &0W 9,W0 C0A Natural Resources Web Soil Survey 2.0 Conservation Service National Cooperative Soil Survey 9/17/2007 Page 1 of 3 AM NCDENR North Carolina Department of Environment and Natural Resources Request for Express Permit Review FILL-IN all information below and CHECK required Permit(s). Fax or email this completed form along with a narrative and vicinity map of the project location to the appropriate One -Stop Coordinator: • Winston Salem Region -Sonja Basinger 336-771-4633 or Sonia.basinger(a),ncmail.net • Mooresville & Asheville Region -Patrick Grogan 704-663.3772 or Patrick. grogan(amcmail.net RiE'Q um; • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee(a)ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(a,ncmaiLnet SEP • Wilmington Region -Cameron Weaver 910-350-2004 or cameron.weaver(alncmail.net 13 2007 APPLICANT Name Mr. Ed Mitchell Company River Dunes Corporation QWQ-WARO Address 416-A Pollock Street City/State New Bern, INC Zip 28560 Phone (252) 634-3373 Fax (252) 633-5775 Email ed.mitchell(�dverdunes.com PROJECT SYSTEM(S) TRIBUTARY TO NEUSE RIVER SURFACE WATER CLASSIFICATION NEUSE RIVER PROJECT Name River Dunes Marina and Residential Development - Harbor Village III County Pamlico PROJECT LOCATION (ADDRESS) SR 1317 (Orchard Creek Road) Oriental NC 28571 ENGINEER/CONSULTANT Company McKim & Creed, P.A. Address 200 MacKenan Court City/State Cary, NC Zip 27511 Phone (919) 233-8091 Fax (919) 657-8896 Email cblazier(mckimcreed.com State or National Environmental Policy Act (SEPA, NEPA) - EA or EIS Required []Yes ❑ No ❑ STREAM ORIGIN Determination: of Stream calls; Stream Name ® STORMWATER ❑Low Density ❑ High Density -Detention Pond ❑ High Density -Other ❑ Low Density -Curb & Gutter ® High Density -Infiltration ❑ Off Site WETLANDS MUST BE ADDRESSED BELOW ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with _acres to be disturbed.(CK # (for DENR use)) ❑ WETLANDS (401): Check all that apply Wetlands on Site ❑ Yes ❑ No I Isolated wetland on Property ❑ Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No / Buffer Impacts: ❑ No ❑ YES: acre(s) US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ❑ No I Permit Received from US ACOE ❑ Yes ❑ No 401 Application required: [-]Yes ❑ No If YES, ❑ Regular ❑ Express Perennial, Blue line stream, etc on site ❑ yes ❑ No The legislation allows additional fees, not to exceed 50% of the original Express Review permit application fee, to be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only Fee Split for multiple permits: (Check # 2Z-3 5(. ) Total Fee Amount $ 144)06— SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA I i LQS SW HD; 0 LID) - 18- 01 000 401: �McIQM&CREED September 17, 2007 E � I � I— t ,1 N$�' StN 1 ,3 2UU7 DWQ-WAR® ENGINEERS SURVEYORS PLANNERS 04135-0001 (40) Mr. Scott Vinson Division of Water Quality North Carolina Department of Environmental and Natural Resources 943 Washington Square Mall Washington, NC 27889 RE: River Dunes Marina and Residential Development, Pamlico County, North Carolina High Density Stormwater Permit Dear Mr. Vinson: On behalf of River Dunes Corporation and Ed Mitchell, please find enclosed for your review the high density stormwater permit for the River Dunes Marina and Residential Development located in Pamlico County, North Carolina. This permit specifically covers Harbor Village III. If you have any questions or request additional information, please let me know. Sincerely, Curt Blazier, El McKIM & CREED, P.A. 200 Mac Kenan Court /CMB Cary, NC 27511 919.233.8091 Fax '>;]\a liilOaD}f4PPermit\NC DF.NN DI\'Q Sturm.vater\I ligh Density l'ermit_Harbor Village 111\�'109050]. D\1'Q Iligh Density 1'crmitJrx w w w.mckimcreed.com