Loading...
HomeMy WebLinkAboutSW7070908_HISTORICAL FILE_20210726STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE Id 720 YYYYMMDD W a IZ�D ROY COOPER Governor JOHN NICHOLSON Intertrn Secretory BRIAN WRENN Director NORTH CAROLINA Environmental Quality July 26, 2021 City of Elizabeth City Attention: Montre' Freeman, City Manager P.O. Box 347 Elizabeth City, NC 27907-0347 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7070908 Elizabeth City Pasquotank County Airport Master Plan Pasquotank County Dear Mr. Freeman: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7070908 for a stormwater treatment system consisting of a wet detention basin serving the Elizabeth City Pasquotank County Airport located at 1028 Consolidated Road, Elizabeth City, NC expires on December 30, 2021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: hftps://deq.nc.gov/about/divisions/energy-mineral-and-I a*nd- resources/stormwater/stormwater-program/post-constructio,1-2. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at rNer.thoroeancdenr gov. Sincerely, 0( Roger K. Thorpe Environmental Engineer EF .yr North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources rmmN cwa w. �% Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 252946.6481 -PROJECT I ESCRIPTION ' ,N 1�xalizabeth City/ Pasquotank County Regional Airport v Elizabeth City - North Carolina August 7; 2007 Revised December j, 2007 lizabeth City/Pasquotank County Regional Airport is located at the intersection of ops 0 NC 34 (Weeksville Hwy) and SR 1131 (Consolidated Road) adjacent to the US Coast Guard Base. The airport occupies approximately 25 acres of land owned by The Elizabeth City-Pasquotank County Airport Authority and the City of Elizabeth City. The airport has developed a master plan for future expansion. The stormwater design for this project will address improvements made in recent years that were not permitted, as well as considering the maximum build out for the site. A corporate hangar of 5,788 sf was constructed with the promise of completion of this master plan. The corporate hangar is included in the area draining to the proposed detention pond. Downspouts will be added to the hangar to insure that all runoff from the hangar is directed to the pond. Another area that was added without permit modification is 55,100 sf of asphalt apron located at the eastern end of the airport. Due to the location of this apron and the fact that the drainage for the apron is tied in with drainage from the Coast Guard Base, it is not practical to treat the runoff from the apron. We proposed to offset the lack of treatment for this area by treating runoff from other existing impervious surfaces and by increasing the level of treatment provided by storing a volume in excess of the first two inches of runoff. Drainage Area 1 contains 7.21 acres at the southwestern end of the airport. Most of this land is currently vacant. Existing impervious areas from which runoff will be collected and routed to the detention pond include 16,840 sf of T-hangars, the 5,788 sf corporate hangar, 10,608 sf of concrete, and 11, 301 sf of asphalt. Total existing impervious area is 44,537 sf or 14% of the drainage area. Coverage shown within Drainage Area 1 on the Stormwater Master Plan is only 55%, but the detention pond has been designed to treat the first two inches of runoff from impervious surfaces totaling 80% of the drainage area to allow for future development. The drawdown orifice has been sized to release the volume of the I" rain over approximately 3 days. The detention pond will discharge into the existing ditch along Consolidated Road that drains directly to the Pasquotank River. Drainage Area 2 consists of the remaining ±17.79 acres of the airport from which runoff is collected in a variety of underground drainage and curb and gutter that is all routed to the large drainage ditch along Consolidated Road. The existing impervious coverage within this area includes 0.46 acres of buildings and 7.15 acres of concrete and asphalt for a total coverage of 7.61 acres or 43%. According to the Pasquotank County Soils Maps as prepared by USDA, Soil Conservation Service, the soils on this site are Roanoke. Two soil borings were performed in the area of the detention pond by Sean C. Robey, PE and Kimberly Hamby on June 27, 2007. All soil borings were conducted with and AMS 2-3/4" diameter 6' long hand mud auger. Boring 1 was located in an area where future hangars and taxiways are proposed. The existing elevation in the area is approximately 6.5'. They first 6" consisted of a clayey topsoil. From 6-36" was a silty clay. At 36" the soil changed to pale gray silty sand. At 48", the soil became brightly colored sand with obvious moisture present at 60". Boring 2 was located in the area of the detention pond adjacent to the main drainage ditch along Consolidated Road. The elevation at this location is approximately 7.0'. The first 6" was topsoil. From 6-36" was clay, from 36-48" was a fine gray sand, and from 48-60" we encountered fine silty sand that was wet at 60". Both borings are typical for Roanoke soils. Based upon these two borings, we estimate the water table to be elevation 2.0. Permanent pool elevation for the detention pond has been set at elevation 2.0. As the future improvements shown in the master plan are not fully designed or planned to be constructed in the near future, separate plan sheets have been provided to show immediate construction plans along with erosion and sedimentation control devices and limits of disturbance. The total disturbed area for this phase of the project will not exceed 3 acres. New construction plans will be submitted for review and approval prior to expansion of the hangars or taxiways. PERMANENT POOL DETENTION PONDS Hyman & Robey, PC DESIGN OF POND 150-A Hwy 158 East Camden, NC 27921 Elizabeth City Airport (252)-335-1888 10 Yr, 24 Hr Storm 12/03/07 DETENTION POND SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 7.0 FT 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 LO 0.9 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: 7.21 ACRES WATERSHED % IMPERVIOUS: 80 % PERMANENT POOL ELEVATION: 2 FT DESIGN PERMANENT POOL DEPTH: 4 FT SA/DA PERCENTAGE FACTOR: 7 % (FROM ABOVE TABLE- TAKEN FROM DESIGN OF STORM WATER CONTROL FACILITIES WORKSHOP MANUAL - PENC 1988) POND SURFACE AREA REQ'D: 21985 SF FOREBAY AREA: 6595 SF AT WIDTH = 0.33 LENGTH, WIDTH = 85.6052 LF (BASED UPON MINIMUM SURFACE AREA) LENGTH = 256.815 LF Use these dimensions: WIDTH 35 LF LENGTH 630 LF VOLUME OF V RAINFALL AREA OF ROOFS: 2.88 AC AREA OF PARKING/CONCRETE: 2.88 AC AREA OF GREEN AREAS: 1.45 AC VOLUME OF RUNOFF 21438.8 CF STORAGE DEPTH FOR MINIMUM AREA = ELEVATION OF I" RAINFALL = 2.97 Normal Pool Elevation 2 Impervious areas based on maximum of 80% coverage on 7.21 acre site VOL (CF)=[(ROOF' 1.0)+(PARKING'.95)+(GRASS'0 0.97 FT 1e550 FAN i C. FoA Page I DRAWDOWN - WATER QUALITY Paget Q(2 DAYS) = 0.12407 CFS Q(5 DAYS) = 0.04963 CFS I" RUNOFF STAGE 1.90 FT *manually input for this project only DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT 1" RUNOFF OUTLET DEVICE: 1.84198 INCH DIA HOLE A=[Q/(Cd*SQRT(2gh))]*144 Rad: SQRT(A/PI) Din. =2*Rad. DIAMETER OF HOLE TO USE: 1.75 INCH DIAMETER I" STORM RUNOFF DRAWDOWN TIME 3.16539 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 35 cfs Tc = Time of Concentration = 9 min Calculation of Tp (Time to Peak) From SCS NEH 4, page 15-7 Eqn. 15.4 Lag Time (L) = (IA0.8*(S+l)A0.7)/(1900*YA0.5) for L in Hrs where: I = hydraulic length of watershed (11) = 811 S = (1000/CN)-10 = 0.52632 CN = approximately same CN from TR-55 = 95 Y = avg. watershed land slope in % = 0.18 S = (1000/CN)-10 = 0.52632 L= 0.35431 hrs From SCS NEH 4 , page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4, page 16-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.01995 hrs Tp = 0.36428 hrs = 21.8568 min Volume under Hydrograph = 1.39 * Qp * Tp = 63800.1 Cubic Feet ,ttill r",n. = SEAL = 1tl30 E�Q. . ...... 4# Cin pe�y Inflow Hydrograph Page 3 SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.04 1 138 0.20 0.10 0.07 4 459 0.30 0.19 0.11 7 872 0.40 0.31 0.15 11 1423 0.50 0.47 0.18 16 2157 0.60 0.66 0.22 23 3029 0.70 0.82 0.25 29 3764 0.80 0.93 0.29 33 4269 0.90 0.99 0.33 35 4544 1.00 1.00 0.36 35 4590 1.10 0.99 0.40 35 4544 1.20 0.93 0.44 33 4269 1_30 0.86 0.47 30 3947 1.40 0.78 0.51 27 3580 1.50 0.68 0.55 24 3121 1.60 0.56 0.58 20 2570 1.70 0.46 0.62 16 2111 1.80 0.39 0.66 14 1790 1.90 0.33 0.69 12 1515 2.00 0.28 0.73 10 1285 2.20 0.21 0.80 7 1900 2.40 0.15 0.87 5 1349 2.60 0.11 0.95 4 982 2.80 0.08 1.02 3 707 3.00 0.06 1.09 2 505 3.20 0.04 1.17 1 367 3.40 0.03 1.24 1 266 3.60 0.02 1.31 I 193 3.80 0.02 1.38 1 138 4.00 0.01 1_46 0 101 4.50 0.01 1.64 0 115 5.00 0.00 1.82 0 0 Volume under hydrograph = 60601 cf Based upon runoff volume = 63800.1 cf Depth req'd for minimum area = 2.89343 - Sasso i/sF41W CI I1 0O, STAGE STORAGE FUNCTION OF POND Page 4 (FOR RECTANGULER DETENTION POND ONLY) Pond Side Slope (M) = 3 Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s In Z Z est Elevation S Z sf cf cf ft 22050 0 0 0 Surface area at normal pool 2 24054 11526 11526 0.5 9.35 -0.69 0.54 2.5 26076 12533 24059 1 10.09 0.00 1.02 3 28116 13548 37607 1.5 10.53 0.41 1.50 3.5 30174 14573 52179 2 10.86 0.69 1.99 4 32250 15606 67785 2.5 11.12 0.92 2.50 4.5 34344 16649 84434 3 11.34 1.10 3.03 5 36456 17700 102134 3.5 11.53 1.25 3.57 5.5 38586 18761 120894 4 11.70 1.39 4.13 6 40734 19830 140724 4.5 11.85 1.50 4.71 6.5 42900 20909 161633 5 11.99 1.61 5.31 7 Regression Output Constant 9.34346 Ks = S/Z^b = 23585.64 Std Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 18 Riser Dia. (in) Etop = 20.00 Elev. Top Riser (ft) 4.89 Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 5 Number of Holes Hid = 2 Hole Dia. (in) EH1 = 20.00 Elev. Holes (I) -"•' 2j;•.• 9 H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) - es ° c EH2 = 20.00 Elev. Holes (2) % tiGmee. H3n = 0 Number of Holes 'iPFQN O,IiftOR��\;;`` H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 9.50 Elev Invert Barrel (ft) Barrell Adjustment Factor Cdb = 0.60 Barrel orifice coeff EMERGENCY WEIR Page 5 Elevation Cw Ecr Lw Riser Hole (1) = = = Riser Hole (2) 3 3.90 5 Riser Hole (3) Weir coeff Elev weir coeff (ft) Weir Length (ft) Riser Riser (weir) (orifice) Barrel Principal Spillway Emergcy Weir 2.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.04 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.09 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.16 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.26 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.39 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.55 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.72 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.89 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.06 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.22 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.38 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.51 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.64 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.74 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.83 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.90 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.96 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.2 4.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.5 4.09 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.2 4.14 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.8 4.17 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.1 4.18 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.3 4.19 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.3 4.18 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.3 4.18 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.2 4.17 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.1 4.15 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.9 4.14 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.8 4.11 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.5 4.08 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.2 Z�,; SENT_ 18550 �i ':FUgINEEP.� • C "q[f CI I VkO�J\\,�� ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Page ' Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway I(hr) cfs cf Elevation cfs (1+2+3) CIS cfs cfs cfs cfs 0.000 0 0 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.036 1 0 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.073 4 137.698 2.01 0.00 0.00 0.00 0.00 0.00 0.00 0.109 7 596.691 2.04 0.00 0.00 0.00 0.00 0.00 0.00 0.146 11 1468.78 2.09 0.00 0.00 0.00 0.00 0.00 0.00 0.182 16 2891.66 2.16 0.00 0.00 0.00 0.00 0.00 0.00 0.219 23 5048.93 2.26 0.00 0.00 0.00 0.00 0.00 0.00 0.255 29 8078.28 2.39 0.00 0.00 0.00 0.00 0.00 0.00 0.291 33 11842 2.55 0.00 0.00 0.00 0.00 0.00 0.00 0.328 35 16110.7 2.72 0.00 0.00 0.00 0.00 0.00 0.00 0.364 35 20654.7 2.89 0.00 0.00 0.00 0.00 0.00 0.00 0.401 35 25244.6 3.06 0.00 0.00 0.00 0.00 0.00 0.00 0.437 33 29788.7 3.22 0.00 0.00 0.00 0.00 0.00 0.00 0.474 30 34057.3 3.38 0.00 0.00 0.00 0.00 0.00 0.00 0.510 27 38004.7 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.546 24 41584.8 3.64 0.00 0.00 0.00 0.00 0.00 0.00 0.583 20 44706 3.74 0.00 0.00 0.00 0.00 0.00 0.00 0.619 16 47276.3 3.83 0.00 0.00 0.00 0.00 0.00 0.00 0.656 14 49387.7 3.90 0.00 0.00 0.00 0.00 0.00 0.00 0.692 12 51177.8 3.96 0.21 0.00 0.00 0.00 0.00 0.21 0.729 10 52664.3 4.01 0.53 0.00 0.00 0.00 0.00 0.53 0.801 7 55094.8 4.09 1.23 0.00 0.00 0.00 0.00 1.23 0.874 5 56673.4 4.14 1.77 0.00 0.00 0.00 0.00 1.77 0.947 4 57559.7 4.17 2.10 0.00 0.00 0.00 0.00 2.10 1.020 3 57992.4 4.18 2.26 0.00 0.00 0.00 0.00 2.26 1.093 2 58105.8 4.19 2.31 0.00 0.00 0.00 0.00 2.31 1.166 1 58005.6 4.18 2.27 0.00 0.00 0.00 0.00 2.27 1.239 1 57778 4.18 2.18 0.00 0.00 0.00 0.00 2.18 1.311 1 57472.6 4.17 2.06 0.00 0.00 0.00 0.00 2.06 1.384 1 57124.6 4.15 1.93 0.00 0.00 0.00 0.00 1.93 1.457 0 56755.7 4.14 1.80 0.00 0.00 0.00 0.00 1.80 1.639 0 55830.8 4.11 1.47 0.00 0.00 0.00 0.00 1.47 1.821 0 54981.7 4.08 1.19 0.00 0.00 0.00 0.00 1.19 4.18707 = maximum stage elevation 2.30711 = maximum discharge 41 'o' '� '• - t�SEAL 18F60 / •+FNGINEE4+•. C. �FqN 1011110111110\\\\N\ Page 7 Elizabeth City Regional Airport Pasquotank County 10 yr STORM 40 ..r 35 aft ' m0 3042 / o C 25 / m � e - i `a / s. y 15 o / q 10 a. Q vt♦NH N1♦Kt♦e♦14- i' C-; - m �� 0.000 0.500 1.000 1.500 2.000 Time (hrs) c INFLOW (cfs) • OUTFLOW (cfs) '��'}LWEEF.•'. C: FN ..- �'rriCi I fA�� y � >, ° s 1 Q � w ro w G •C � a f j :` 0 a a �, G t 04 3 0 3 ¢° O b U o �i, O O E '� 'b a� °��' a r a� o p. ; 0. c •bD O N O F. a y 3 n o b 0 ° wo 0 0 > °Jro� 0 v c as 0 a x � s O 3 ca cp� 0 a y p '> '> 'o o6 o 2 0a°00 0 O Ora C ca a\ l� ctl .A+ O > O cNC ctl 'O 0.1 O N W O W O vi M O M c 0 y .u•O Fp„ �� 3�xk z .. Cc =��-�. 0 m v °N cn N '0 O 0 O N cn a U E !n W CL Z cu O r, E i O G too 'to itl 0 0 O O❑ 0 °" N p b ^ l„\ cc cl ro s :: b v y y 0 0 o w uj o o coo H o oar =3�b a H p 0 3 o� Cd Q � Q� RE: Elizabeth City Airport imap://cros.ncmai i.net:993/fetch°/u3 EUID°/n3 E/IN BOX"/o3 E 17075?h... Subject: RE: Elizabeth City Airport From: "Kim Hamby" <kim@hymanrobey.com> Date: Fri, 30 Nov 2007 15:42:59 -0500 To: "'Scott Vinson"' <Scott.Vinson@ncmai1.net> Scott, I really appreciate the "heads up" on this. I just resolved my stormwater issues w/ Ernest yesterday, so I'm ready to get started on these corrections. - First of all, I have no clue why you don't have an original. I only have a copy in my file. I am going to contact the applicant to see if he was somehow given the original. Second, I'd like to discuss this with you. We have used the 80% to "master plan" the site. They really don't know exactly what they want to build at this time. Third - I understand completely. Sorry, I haven't dealt with this kind of situation before. I'll make necessary corrections. Please call me when you get a chance so that we can discuss the second item. Thank you, Kim -----Original Message ----- From: Scott Vinson [mailto:Scott.Vinson@ncmail.net] Sent: Tuesday, November 20,,2007 5:04 PM To: Kim Hamby Subject: Elizabeth City Airport Kim, I just wanted to let you know that there were some questions I had on the airport application. Please call or write if you have any questions. Below is the letter. . Thanks, Scott --------------------------------------------------------------------- November 19, 2007 Mr. Richard C. Olson, City Manger City of Elizabeth City / Elizabeth City Pasquotank County Airport Authority PO Box 347 Elizabeth City, NC 27907 Subject: Stormwater Review SW7070908 Elizabeth City / Pasquotank County Regional Airport Pasquotank County ' I oft 12/4/2007 11:47 AM RE: Elizabeth City Airport Dear Mr. Olson imap://cm s.ncmai l.net:993/fetch°/n3 EUI D%3 E/INBOX%3 E l 7075?h... This office received a Coastal Stormwater permit application and plans for the subject project on September 10 2007. A preliminary review of the project indicates that before a State Stormwater permit can be issued the following additional information is needed. 1. Please provide the originally signed permit application and wet pond supplement forms. Only copies were submitted. 2. As referenced in the narrative there is only 55% impervious area within the wet pond drainage area. To conservatively design the pond is acceptable and encouraged. However the amount of impervious area listed under Section III, item 6 on the application needs to represent what is actually proposed to be built and shown on the plans (55% impervious, not 80%) Please revise page 2 of the application to reference the actual amount of impervious area that is shown on the plans and is proposed to be constructed. 3. The calculations should also reference this conservative design so that there is no misinterpretation on what is actually proposed to be built. Please also keep in mind that the draw down orifice should be based on drawing down just the 1" design storm within 2-5 days and not necessarily the excess storage provided. Again, excess storage is praised and encourage, but if the draw down orifice is based on a larger storm, then it will allow the 1" first flush, or most polluted runoff, to leave the pond quicker than 2 days. A 2.5" orifice will allow the actual 1" storm runoff to drain out of the pond quicker then the 2 day minimum. Please revise plans, calculations and forms as needed. 4. Please do not forget to seal, sign and date any revised plans & calculations, and provide 2 copies of revised forms and plans. The above requested information must be received in this office prior to December 19, 2007 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. *If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address.* You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3848. Sincerely, Scott Vinson Environmental Engineer Washington Regional Office cc: Sean Robey, PE Washington Regional Office 2 of 2 12/4/2007 11:47 AM o y ° V « O V U rUi� Ul O N G C N tO y O �, td '; c 3 m° 3Dv m >'�6 6 Ece Ooc o°L°n'Qv n,❑ °o L � N7 oou or m ooQ�sv zt wq Ea`Q 2 y .m mn q° E °u'e 3 -0 o ° >E ° ri ca N c N � O W ,o c o v ro o 0 o a Y 0 n au o oY Y Y w .a y •d .` a •�-' 0 'y z U 'C w N s� 3 v a c aNi 'C v v •„ .4 w d m Z '- O � 6' N w T73 O❑ N� W 'fl N° p U � C y 'p � i1 ❑n MS°.N°aSuo❑c 0 nc c3 Yua°u �Nd+ o^cov0 m nYv >o UC �oi ° C aSa° a 5 0 a e o E CP L Cvw� o •° o 5 c° € ° c a o v Q W W P, o� v = \° C O O o a�i v N C o > •- w° a v m v .D CL.� a C* '— W N N C 7L U 7 a` a m u 0 3 o O E n y o r ' o U y v Asa acs 3 ��v` 9 c z w o c° o a° c " o o o v^ n. u w e N _ u° o y e c• N v s t ca > o o a 5 Z o ° o° y o ° o E F s ° 3 n 3 e w u ti c v� a°o a° C N ❑ u o o c E c Oaca �'� �—° v�.E w and o ° CL ° N > o v U U c c c t .� .� .� cos..: N • «. ' c N .5 ._ w �e 3 .0 E O so'°-�°g n r a° bo a �w o ua0a��o�c o� uE'U o07 U 2, Cn>? uo >°-' 'o �E o abD A v'C w vuov3YaoG .y aomo." U ' 3 N •°�r `� � O ca '- '� N 3 ai u S m' id y •p V 3 C vCJ O .c.."-� °y No�eu s`°Aon3='> a� scca oar:° "o oD � E� �•E k o 93 :)/S1 n i Cl U a. W rn . ca ... o v C7 6 Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3848. Since rely,, Scott Vinson Environmental Engineer Washington Regional Office cc: Sean Robey, PE Washington Regional Office HECEIVE® i.��Id a v. SEP 1 0 2007 Elizabeth City/ Pasquotank County Regional Airport Elizabeth City - North Carolina F.T.:= `✓ - ',_�-ye�...e _ �__�.^:�Y �' 't.'.�e'�+=--w=>'.Hi t, isr `�.� f � �#,:4 <• The Elizabeth City/Pasquotank County Regional Airport is located at the intersection of NC 34 (Weeksville Hwy) and SR 1131 (Consolidated Road) adjacent to the US Coast Guard Base. The airport occupies approximately 25 acres of land owned by The Elizabeth City-Pasquotank County Airport Authority and the City of Elizabeth City. The airport has developed a master plan for future expansion. The stormwater design for this project will address improvements made in recent years that were not permitted, as well as considering the maximum build out for the site. A corporate hangar of 5,788 sf was constructed with the promise of completion of this master plan. The corporate hangar is included in the area draining to the proposed detention pond. Downspouts will be added to the hangar to insure that all runoff from the hangar is directed to the pond. Another area that was added without permit modification is 55,100 sf of asphalt apron located at the eastern end of the airport. Due to the location of this apron and the fact that the drainage for the apron is tied in with drainage from the Coast Guard Base, it is not practical to treat the runoff from the apron. We proposed to offset the lack of treatment for this area by treating runoff from other existing impervious surfaces and by increasing the level of treatment provided by storing a volume in excess of the first two inches of runoff. Drainage Area 1 contains 7.21 acres at the southwestern end of the airport. Most of this land is currently vacant. Existing impervious areas from which runoff will be collected and routed to the detention pond include 16,840 sf of T-hangars, the 5,788 sf corporate hangar, 10,608 sf of concrete, and 11, 301 sf of asphalt. Total existing impervious area is 44,537 sf or 14% of the drainage area. Coverage shown within Drainage Area 1 on the Stormwater Master Plan is only 55%, but the detention pond has been designed to treat the first two inches of runoff from impervious surfaces totaling 80% of the drainage area or 5.76 acres. The detention pond will discharge into the existing ditch along Consolidated Road that drains directly to the Pasquotank River. Drainage Area 2 consists of the remaining t17.79 acres of the airport from which runoff is collected in a variety of underground drainage and curb and gutter that is all routed to the large drainage ditch along Consolidated Road. The existing impervious cover within this area includes 0.46 acres of buildings and 7.15 acres of concrete and as a total coverage of 7.61 acres or 43%. M. .e According to the Pasquotank County Soils Maps as prepared by > SoafAL Conservation Service, the soils on this site are Roanoke. Two soil bor§igs`:wer1e550 sFaN C. �Q� performed in the area of the detention pond by Sean C. Robey, PE and Kimberly Hamby on June 27, 2007. All soil borings were conducted with and AMS 2-3/4" diameter 6' long hand mud auger. Boring 1 was located in an area where future hangars and taxiways are proposed. The existing elevation in the area is approximately 6.5'. They first 6" consisted of a clayey topsoil. From 6-36" was a silty clay. At 36" the soil changed to pale gray silty sand. At 48", the soil became brightly colored sand with obvious moisture present at 60". Boring 2 was located in the area of the detention pond adjacent to the main drainage ditch along Consolidated Road. The elevation at this location is approximately 7.0'. The first 6" was topsoil. From 6-36" was clay, from 36-48" was a fine gray sand, and from 48-60" we encountered fine silty sand that was wet at 60". Both borings are typical for Roanoke soils. Based upon these two borings, we estimate the water table to be elevation 2.0. Permanent pool elevation for the detention pond has been set at elevation 2.0. As the future improvements shown in the master plan are not fully designed or planned to be constructed in the near future, separate plan sheets have been provided to show immediate construction plans along with erosion and sedimentation -control devices and limits of disturbance. The total disturbed area`for this phase of the project will not exceed 3 acres. New construction plans will be submitted for review and approval prior to expansion of the hangars or taxiways. ELIZABETH CITY ^/ PASQUOTANK- �' 'COUNTY REGIONAL AIRPORT: -± , '1 • off, .....--.�...-�-r., �ti . _�. .. .._..,,. �.. .., - v�.�..j ^- _t_.. .. .... .....-..,^--., - .- �J � _, i.- _ �.. .._.,.v.._,... .._. �, BORE LOCATION MAP XNE '27, 2'007 �0 x,- Xo, Xa,v Xe sa X. os .i , � 1 X6,67 Xfi 69 X6.60, {E J 1 M X646 X614 J(6.9 i X6.50 X%ss eanec n • X, os Xs%, Xs,6 X699 ., q I m t I,• Y Xs.99 X6,B g , Xe 56 Xav X].se � Xs ' o a LIDA - - _ CONSO TED-RD.S.R 1131 (60'R%IN)�� V. 5V �(�R'o�NwflfSRll i i OFFICE USE ONLY I% L'D,ate Rddeived'W K I Fee Paid Permit Number SEP 1 U 200 _moo D Q_WARO State of North Carolina 5WA-CK q/t i-o 7 Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may he photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Rid'k� C- OLsm, Cifz.,Mmager City ob Elizabeth City 3. Mailing Address for person listed in item 2 above: City: Fl i zahnth (-.i ty State: la^ Zip: 2= Telephone Number: ( 252 ) 337-6864 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Elizabeth Citv/Pasouotank opunty Regicn31 Ain^nYY 5. Location of Project (street address): 1028 Omsolidsted Road City: El i zalwth ri ty County: 23--p ntank 6. Directions to project (from nearest major intersection): 7. Latitude: 36016' Longitude: 760111 of project 8. Contact person who can answer questions about the project: Name: Ki Therl y n Telephone Number: ( 2s? ) II. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification Form SWU-101 Version 3.99 Paee I of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): _Low Density X High Density _Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major x Sedimentation/Erosion Control _404/401 Permit X NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. All ruroff from Drairage Area 1 gill be collected usirn a c mbuation of tnciengrcund pipnia and grassed stales. Ruroff will be routed to a detaition pod desiwiecl for 90% TSS remval The first 2" of nmoff will be stored. Runoff frm the rest of the site will continue to chain as it currEntly dam. 2. Stormwater runoff from this project drains to the R:i o rit-ank River basin. 3. Total Project Area: +25 acres 4. Project Built Upon Area: ±34 % 5. How many drainage areas does the project have? 2 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information , _ Drainage Area 1 = ; Draina a Area 2 Receiving Stream Name Receiving Stream Class 3c;1— 3-6z Drainage Area 7 .21 AC Existing Impervious' Area 1.02 AC 7.61 AC Proposed Impervious*Area 4.74 AC -o- % Impervious` Area (total) + Impervious`.Surface Aiea : •'.. Drainage Area 1 Drainage Area 2 On -site Buildings 2.88 AC 46 Pc On -site Streets/PaVeiMt 2.88 AC 7.15 AC On -site Parking On -site Sidewalks Other on -site Off -site Total: 5.76 Ac. Total: 7.61 AC mipervious area is belied as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 l/ , 7. How was the off -site impervious area listed above IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Bullt-upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Nee 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. I iQ'tials • Original and one copy of the Stormwater Management Perini[ Application Form _. U`✓ • One copy of the applicable Supplement Form(s) for each BMP /ter • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management G1t-- • Two copies of plans and specifications, including: ol� - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): rfimcn z pc 4, cr Mailing Address: m n ,. 239 City: tit State: nr Zip: 7x3�1 Phone: I ?52 ) 335=18 i Fax: ( 252 ) '2"2�5s5q VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) gi chgrd n]=,On certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protectivepdl�pnants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. / �� .. l p Signature: V( _� Date: 0 Form SWU-101 Version 3.99 Page 4 of 4 19 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stotmwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: El i�EMth r1i t-c>�o-nr,r k njntc l Aii; rye Contact Person: n;,+ar0 cs, Phone Number: (252 ) 2.27 For projects with multiple basins, specify which basin this worksheet applies to: rxa;n,-ge man 1 elevations Basin Bottom Elevation _9-0am ft. (floor of the basin) Permanent Pool Elevation 2•% ft. (elevation of the orifice) Temporary Pool Elevation 3-90 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 22,(-Y97 sq. ft. Drainage Area Impervious Area volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DAl Diameter of Orifice Design Rainfall Design TSS Removal 2 Form SWU-102 Rev 3.99 7.21 ac. 5.76 ac. (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off -site drainage to the basin) 3g,121 cu. ft. (combined volume of main basin and forebay) 49.376 cu. ft. (volume detained above the permanent pool) 7442 cu. ft. (approximately 20% of total volume) 7.0 (surface area to drainage area ratio from DWQ table) 2.5 in. (2 to 5 day temporary pool draw -down required) 9-75 in. (10 Year storm) 90 % (minimum 85% required) Page I of 4 Footnotes: 1 When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials U� a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. 0 k- d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. It. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- s — of -way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. (1NP) III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does H does not incorporate a vegetated filter at the outlet. This system (check one) 0 does 0t does not incorporate pretreatment other than a forebay. Form SWJ-102 Rev 3.99 Pace 2 cf 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.25 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 2.0 Sediment Re oval El. —029 75 ------- ------ -- Sediment Removal Elevation —1.0 Bottom Ele ation —1.0 1 %---------------------------------------------lz5! FOREBAY Bottom Elevation —2.0 25% MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SW J-102 Rev 3.oQ paee 3 of d All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Richard C. Olson Title: CitY Marrxler, City OE izabeth City Address: FO lDx 347 Elizabeth City, IQC 27907 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, `M10 roc r�r J. C c-cp& a Notary Public for the State of ,.N County of - , do hereby certify that rA C c-N, lsor personally appeared before me this 10" day of _(--\uk as\ , acN-s1 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, UARIMNE 1. CBM NOTARY PUBLIC PASQUOTANN COUNIX NC SEAL My commission expires b - I k- pt( Form SWt1-102 Rev 3.99 Page a of d HYMAN Oo SOLUTIONS FROM THE GROUND UP J- ,� September 6, 2007 I A S Mr. Bill Moore Dept. of Environment and Natural Resources Water Quality Section 943 Washington Square Mall Washington, NC 27889 Subject: Stormwater Management Permit Elizabeth City— Pasquotank County Regional Airport Proj. # 070169 } Dear Mr. Moore: Enclosed for your review and approval, please find the following items: 1. Two (2) copies of the above referenced plans. 2. The original and one (1) copy of the Stormwater Exemption Application b ' and Wet Detention Basin Supplement. I 3. Two (2) copies of the project description, including soil boring data and,_zs maps, and calculations. 4. Check in the amount of $420.00 for the required fee. If you have any questions, please do not hesitate to call this office at (252) 335-1888. Sincerely, a�an C. Robey, P.E. . � era ► .. k -�__ . Kimberly D. 14amby Project Manager cc: file r:y Mr. Rich Olsonq' Mr. Scott Hinton N,B' 'i. Consulting Engineers and Land Surveyors (252) 335-1888 Office 150 A US Highway 158 East, Camden, NC 27921 (252) 338-2913 Office (252)338-5552 Fax Transmittal Date September 7, 2007 Number of pages including cover sheet To Mr. Bill Moore Phone Dept. of Environment & Natural Resources Fax Water Quality Section 943 Washington Square Mall Washington NC 27889 From Hyman & Robey Phone (252)338-2913 PO Box 339 Camden NC 27921 Fax (252)338-5552 Subject Elizabeth City Pasquotank County Project Ground Track Regional Airport 070169 Please call For your review For your Approval X As you requested for further and comment discussion As we For your Files For your use Other discussed Please call the above number if this fax was received in error or if you do not receive all of this transmission. Message: Consulting Engineers and Land Surveyors 150 A US Highway 158 East, Camden, NC 27921 Transmittal (252)335-1888 Office (252) 338-2913 Office (252)338-5552 Fax Date 9/7/2007 Number of pages including cover sheet 2 To Bill Moore Phone Fax 331-1291 From Kimberly D. Hamby Project Manager Phone (252) 335-1888 Fax ax (252) 338-5552 Subject/ Project # 070169 EC -PC Airport Sent Via mail Enclosures Check in the amount of $85.00 Please call For your review For your Approval As you requested for further and comment discussion As we For your Files For your use X Other discussed Message: Bill, We received an email from Samir regarding the fee change after we had put this project together. We have attached a separate check for the difference. Thank you, t Kim v`i✓