Loading...
HomeMy WebLinkAboutSW6211101_O&M Agreement/Plan_20211130--------------------- -- - Operation & Maintenance Agreement Project Name: MASON RIDGE SUBDIVISION Project Location: NURSERY ROAD, HARNETT COUNTY Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & cc Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: O&M sheets wil Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: oe aaaea automaticai swa I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Signature: Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Elvis PO Box 1310 Broadway, NC 27505 (919) 499-8190 eivisfairclothO-Yahoo.com Date: I 7 \/ / - / / - � /��� cl c f r(-,4J , a Notary Public for the State of % V��Ci IL Octi co i ,1CL, County of %. 6 do hereby certify that al b'/ !�' /'�i re k/1' personally appeared before me this day of �L ✓e k" b e r U cP- and acknowledge the due execution of the rati a Maintenance ement . Witness my hand and official seal, Seal My commission expires d� STORM-EZ 11 /10/2021 Version 1.5 O&M Agreement Page 1 of 1 Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizerwill not be applied to the vegetated receiving The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. ection activitiesshall be performed asfollows. Any problemsthat are found shall be repaired immedial SCM element: Potential problem: How to remediate the problem: Maintain grassed vegetation such that the Swale or Vegetation istoo short Vegetation vegetated area does not erode during the peakflow or too long. from the 10-year storm Remove the trash/debris. Areasof bare soil egra e the soil it necessary to remove the gully, an then re -sod (or plant with other appropriate species) and/or erosive gullies Vegetated receiving have formed. and water until established. Provide lime and a one - areas time fertilizer aipiplication. Trees and/or other Remove the trees and woody vegetation from the woody vegetation are Swale, regrade the swale if necessary and re-establish present in the Swale. grassasshown on the approved plans. Trash/debris is Remove the trash/debris. present. Areas of bare soil egra e the soil it necessary to remove the gully, an then re -sod (or plant with other appropriate species) and/or erosive gullies and water until established. Provide lime and a one- have formed. time fertilizer aipiplication. Sedim Sediment covers the Remove sediment and dispose in an area that will not grass t the bottom of Vegetated impact streams or SCMs. Re -sod if necessary. the swalth e. conveyances / The side slope is Regrade the slopesto the permitted configuration per swales / roadside ditches (other than steeper than the the approved plan and reestablish vegetation. If as - curb outlet swales) approved built or existing conditionsdo not allow the slopesto configuration. be regraded, contact the applicable permitting Determine the source of the problem: soils, Grass is dead, hydrology, disease, etc. Remedy the problem and diseased or dying. replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. rees and/or other Remove the trees and woody vegetation from the woody vegetation are vegetated conveyance, regrade the vegetated present in the conveyance if necessary and re-establish grass as ve etated shown on the amproved 1plans. Clogging has Clean out the outlet device. Dispose of the sediment occu rred. off -site. The outlet device (if applicable) The outlet device is Repair or replace the outlet device. damaged Erosion or other signs Repair the damage and improve the flow dissipation of damage have occurred at the outlet. structure. The receiving water Discharges from the site are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receivin a water. Dry Pond Maintenance Requirements Important operation and maintenance procedures: - The drainage area will be managed to reduce the sediment load to the dry pond. - Immediately after the dry pond is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - After the initial fertilization to establish vegetation in the dry pond, fertilizer will not be applied to the dry pond. I IIG VUYULdIIUII III cIIU c[UUIIU LIIG UcNII VVIII IJG IIIcIIIIIdIIIGU dl d IIUIYIIL UI ­nrn i—nfoki civ i—h- - At least once annually, a dam safety expert will inspect the embankment. Any problemsthat are found will be repaired immediately. After the dry pond is established, it shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. ection activitiesshall be performed asfollows. Any problemsthat are found shall be repaired immedial SCM element: Potential problem: How to remediate the problem: The entire SCM Remove the trash/debris. Areas of bare soil Regrade the soil if necessary to remove the gully, The perimeter of the and/or erosive gullies plant ground cover and water until it is established. SCM have formed. Provide lime and a one-time fertilizer application. The inlet pipe is Unclog the pipe. Dispose of the sediment in a clogged (if location where it will not cause impactsto streamsor The inlet pipe is The inlet device cracked or otherwise Repair or replace the pipe. damaged (if Erosion isoccurring in Regrade the Swale if necessary and provide erosion the Swale (if control devices such as reinforced turf matting or applicable). riprap to avoid future problemswith erosion. Sediment has Search for the source of the sediment and remedy the accumulated to a problem if possible. Remove the sediment and depth greater than the dispose of it in a location where it will not cause original design depth impactsto streamsorthe SCM. The forebay for sediment storage. Provide additional erosion protection such as Erosion has occurred. reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Sediment has Search for the source of the sediment and remedy the accumulated to a problem if possible. Remove the sediment and depth greater than the dispose of it in a location where it will not cause original design depth impactsto streamsorthe SCM. The main treatment for sediment storage. Water is standing area more than 5 days after Checkthe outlet structure for clogging. If it is design issue, consult an appropriate professional. a storm event. Weeds and noxious Remove the weeds, preferably by hand. If pesticide is plantsare growing in used, wipe it on the plants rather than spraying. the main treatment Dry Pond Maintenance Requirements (continued) SCM element: Potential problem: How to remediate the problem: Shrubs have started to grow on the Remove shrubs immediately. embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers beaver activity is and repair any holes or erosion. A tree has started to Consult a dam safety specialist to remove the tree. The embankment grow on the An annual inspection by an appropriate professional shows Make all needed repairs immediately. that the embankment needs re air. Clean out the outlet device. Dispose of the sediment Clogginghas in a location where it will not cause impacts to The outlet dev ice occurred. streams or the SCM. The outlet device is Repair or replace the outlet device. damaged Erosion or other signs Repair the damage and improve the flow dissipation of damage have occurred at the outlet. structure. The receiving water Discharges from the dry pond are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the Ireceiving water. Dry Detention Pond Design Summary DRY POND ID 1 Pretreatment No Has Veg. Filter I No DRY POND ID 2 Pretreatment Has Veg. Filter FOREBAY Temporary Pool El: Clean Out Depth: 0 Sediment Storage El: Bottom Elevation: FOREBAY Temporary Pool El: Clean Out Depth: 0 Sediment Storage El: Bottom Elevation: MAIN POND Temporary Pool El: 308.42 Clean Out Depth: 308.42 Sediment Storage El: Bottom Elevation: 305.5 MAIN POND Temporary Pool El: 323.29 Clean Out Depth: 323.29 Sediment Storage El: Bottom Elevation: 322