Loading...
HomeMy WebLinkAboutSW6210503_Design Calculations (Storm Drainage)_20211110STORM DRAINAGE / HYDRAULIC GRADE LINE ANALYSIS (10 YEAR) Townsend Estates PRELIM REVISION LOCATION Near Raeford, North Carolina RECORD OTHER CHECKED BY CSB (SPECIFY) STORM DRAINAGE SCHEDULE CONTINUED AREAS 0 � 000 - 00 0.00 0.00 0.00 0.50 1�® ®® ® ®� �® ®® ®® ®� ®� �® ®� ®® ®® ®� �® ®� �® ®� �® 000 ®� -- �- ------� �® �® ®� �® ®� �® 0.50 1.17 007 009 1 08 000 �® �® ������ STORM DRAINAGE / HYDRAULIC GRADE LINE ANALYSIS (10 YEAR) PROJECT NAME Townsend Estates PRELIM CONSTR X REVISION RECORD OTHER (SPECIFY) LOCATION Near Raeford, North Carolina CHECKED BY CSB 0.013,S70RM 226 26 DRAINAGE SCHEDULE -CONTINUED 09.29 218.05 45 ®� ®� ®� 1.36 00M�� ®� �®18.11 ®� �® ®® ®®�0� ®� � ®�74 a�118 �® o� ®� a� �®� 0.00mom 84 01 ®886 �m�41 ®� �m� ®12.84 ®�m��� �® �m� ®��®� ��® NAME n= 9= h= 0.013 226 26 HYDRAULIC GRADE LI PIPE AREA FT HYDRAULIC RADIUS FT FROM TO Cl 32 Cl 33 Cl 33 Cl 34 1.2272 1.2272 0.3125 0.3125 Cl 34 CI1 1.2272 0.3125 CI1 Cl2 1.2272 0.3125 Cl2 CI3 1.7671 0.3750 CI3 Cl4 1.7671 0.3750 NAME TE -08-21 OJECT NO 51 P ECKED BY INLET W.S. ELEV. BEND OUTLET OUTLET INLET USE FLOW FREE- HGL �TO LOSS W.S. ELEV CONTOL CONTROL CONDITION BOARD CROWN COMMENTS CAPACITYVS K (FT1 fFTI fFTI fFTI CONTROL (FT1 DISCHARGE --------------- 21902 -- ------ ----- -------- ------ -------- ------ -------- ------ -------- ------ --------------- -------- ------ 211.90 211.19 211.90 -------- ------ -------- ------ --------------- --------------- PHASE X/ N I DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (9 and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cr--0.50 (Per CR-7107) Date: 10I52021 Time: —AM AM Pape 3 of 6 • - • - r PROJECT NAME Townsend Estates • - - • DATE 02-08-21 PROJECT NO 1651 DESIGN PHASE PRELIM CONSTR REVISION / X / LOCATION Near Raeford, North Carolina BY CJP RECORD OTHER CHECKED BY CSB (SPECIFY) n= g= h= o.o13 226 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS INLETS INLET AREA AC INLET Cc RUNOFF COEFF. INLET DISCHARGE CFS) 0 (+) UPSTREAM BYPASS (CFS) 0(-) INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC INLET TIME MIN PIPE TIME MIN Tc TIME OFCONC. MIN I INTENSITY IN/HR Cc RUNOFF COEFF. FROM TO 3.96 o.o0 0.00 RI P02 RI 1.00 0.99 3.96 1.00 5.00 0.00 5.00 7.29 0.99 Page 4 of 6 " 6 " • 6 " • DESIGN PHASE r02-08-21 PRELIMCT NAME PROJECT NO CONSTR / Xsend Estates 1651 REVISION / /ION 7Near BV RECORD / /Raeford, North Carolina CJP OTHER CHECKED BY (SPECIFY) CSB n= 0.013 STORM DRAINAGE SCHEDULE - CONTINUED 9= 226 h= 26 O O SIDE- CAPACITY SEGMENT UPPER LOWER UPSTREAM TOP BOX COVER Cl COVER BELOW FROM TO DISCHARGE STREAM SLOPE DIA. (FULL) V FULL LENGTH TIME INV. INV. ELEV. DEPTH SUBGRADE CFS) (CFS) (IN) (CFS) (FPS FT MIN FT FT FT 8" 57 211.00 RI P02 84.77 0.00 0.0262 36 108.1 15.3 0.06 205.50 204.00 5.50 1.38 Page 5 of 6 NAME n= 0.013 HYDRAULIC GRADE LI 9= 226 h= 26 PIPE HYDRAULIC FROM TO AREA RADIUS FT FT RI PO2 7.0686 0.7500 NAME TE -08-21 OJECT NO 51 P ECKED BY BEND OUTLET OUTLET INLET USE FLOW FREE- HGL LOSS W.S. ELEV CONTOL CONTROL CONDITION BOARD TO CROWN COMMENTS CAPACITYVS K FT FT FT FT CONTROL FT DISCHARGE 0.00 206.40 208.64 213.20 213.20 INLET (2.20) (4.70) OVERFLOW 23.29 PHASE X/ N DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (9 and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 Oare: 10ISI2021 Time: —AM AM Page 6 of 6