Loading...
HomeMy WebLinkAboutSW6210907_Supplement-EZ Form_20211105SUPPLEMENT-EZ COVER PAGE FORMS LOADED f PROJECT INFORMATION- 4f 1 Project Name Timberland Gas Station 2 Project Area (ac) _ 4.392 3 Coastal Wetland Area (ac) 4 ISurface Water Area ac _ - 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) _ { _7 l Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface DIS 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba alter 0 26 _ Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Organization— Carlo Pardo, PE 28 Bowman North Carolina, Ltd. 29 _ Street address: 4004 Barrett Drive, Suite 101 30 City, State, Zip: Raleigh, NC 27609 31 Phone numbers : 919-553-6570 32 Email: cpardo@bowman.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. AIRQ� S51p0;q�'��� SEAL 051571 C. ......... Signature of Designer b ';�a a Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 o, number of drainage areas/SCMs If sDoes 1 3 this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entfire Site 1 4 Type of SCM �~ - Infiltration Basin 5 Total drainage area (sq ft 191320 sf 126116 sf 6 Onsite drainage area (sq ft 191320 sf 107849 sf 7 Offsite drainage area (sq ft 18267 sf 18267 sf 8 Total BUA in project (sq fl 101189 sf 92963 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10 New BUA not on subdivided lots (subject to permitting) (sf) 11 Offsite BUA (sq ft 18267 sf 18267 sf 12 Breakdown of new BUA not on subdivided lots: Parkin (sq ft Sidewalk (sq ft 1718 sf 1718 sf Roof (sq ft 3000 sf 3000 sf Roadway s ft 70382 sf 62156 sf Future (sq ft Other, please specify in the comment box below sq ft 7822 sf 7822 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting)_ Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 xis inq BUA that will be removed (sq ft 18 Percent BUA 39.25%'On Site 74% 19 Design storm inches 1.0 in 20 Design volume of SCM (cu ft) 7498 cf 21 1 Calculation method for design volume I Simple Method ITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Offsite Drainage area includes a portion of Calloway Road and the future Lot 68 in the Timberland Ranch development = 18267 sf. There is future building/sidewalk/pavement included in the impervious calculations: 5000sf/620sf/2202sf, respectively = 7822 sf. There is 8226sf of bypass from INFILTRATION SYSTEM 1 Drama e area number _ � 1 2 Minimum required treatment volume (cu ft) 7498 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? NIA 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed rofessional? Yes TIM cvc-mM iM FROM fixk{ . Si 18 Proposed sloe of the subgrade surface (°l,) 0% 19 Are terraces or bafflesprovided? No 20 ]Type of pretreatment: Forebay 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation (fmsl) 366.00 _ 23 Depth to SHWT per soils report (in) 180.00 24 Ground elevation at boring in soils re ort (fmsl) 381.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes 26 Soil infiltration rate (in/hr) 11.00 27 Factor of safety (FS) (2 is recommended): 2.00 Elevaflbns 29 Bottom elevation (fmsl) 378 ft 30 Storage elevation (fmsl) 380. ft 31 Bypass elevation (fmsl) 380.7 ft For Basins Only 32 Bottom surface area (ft 2)4975 ft 33 Stora a elevation surface area ft2 7075. ft 34 Length (ft) 35 jWidth (ft) 36 jPerforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total len th of perforated piping 39 Stone type, if applicable 40 Stone porosity (%) 41 Is stone free of fines? 42 Is the stone wrapped in 2eotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 IDesion volume of SCM (cu ft) 7498 of 45 ITime to draw down (hours) 3 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 3 9:50 AM 1012212021