Loading...
HomeMy WebLinkAboutSW6210907_Design Calculations_20211105SI-orm wafer Monogemenf Reporf Ocfo,ber 22, 2021 Timberland Gas Station Calloway Road Hoke County, NC Prepared for: Double D Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: Bowman North Carolina, Ltd. (Formerly Triangle Site Design, 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 Firm#F-1445 j TRIANGLE rl SITE DESIGN a Bowman company PLLC) �1E%k irk', a¢dF , SEAL 051571 I Ofa; 2 r . .......... •f 1« 1111110 TABLE OF CONTENTS OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUC NOAA POINT PRECIPITATION FREQUENCY ESTIMATES SHWT REPORT WATER QUANTITY -INFILTRATION BASIN DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAFHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION OVERVIEW This report contains the storm water management overview for the proposed gas station site on Calloway Road in Hoke County. The project site is currently un—developed. The proposed site consists of 4.392 acres and approximately 3.72 acres will be disturbed as part of this project for the construction of the site improvements. The proposed site is located in Flood Zone `X' as shown on FEMA FIRM Panel 3710940400J with an effective date of 10/17/06. Flood zones are subject to change by FEMA. There are no existing stream or wetland features on the proposed property. The drainage area consists of 18,267sf (0.42 ac) off —site area that will be considered 100% BUA. The drainage area also consists of 7,822sf of the future Phase 2 building and parking area. The proposed storm water management facility (infiltration basin) outlined in this report has been designed for post —development peak attenuation to treat the impervious areas of the development. The Infiltration Basin is designed to capture a drainage area of 2.90 ac with an impervious area of 2.13 ac. The balance of the site is open space and will by—pass the proposed SCM. The SCM are designed to treat a 1,0" storm event. Impervious Area &mmary — Infiltration Basin Parking 62,156 1.43 Sidewalk 1718 0.04 Building 3,000 0.07 Future Impervious 7 822 0.18 Off -Site 18,267 1 0.42 Total IA to Pond 92,963 1 2.13 Soils The County Soils Survey indicates that Autryville Loamy Sand and Candor Sand soils are present on the site. FIGURES M.OE ST o6L M.'&M .GC MAEX ou F' 18 Z-aiiiic M.'&ST .6L N w N O N N � CO m a o ZU) m w o U) o 90 r c O m Z z O Q 0 z Ca C 0 z W W J a •N N a� .O w m m M = N o 7 •lD V p U ` N M N L d (0 N N N U N 3 0 O N N m O L N 7 E W w l0 U _ o O O C C o. E CO 'i n N _rnm — Y — U ca tm C U l0 w 0 n N L N 7 U m E N N C O E O_ m m m N m (`") .L d m 1 N C CO O C w w N a N U N C coi C E m a L U) 2 N C7 O N D O O y Z .O 0 Z O O O N N " j N U E p a '> 3 rn m ci o a N co a v v m o 3 v o �aU'pLN L E M'at2 CN mNC Om �dCEL'6. � E co U cu - cu NyOO > ai w C OO O mDdNQumlN0i E .mUIn _C> Cc: O 0 C =c v E m� C CO a) 7 0) Zaov ` ° O OQ O to w N C (d 10 _ m L�pa C� EN o m Za m Z n .0 m o d o p m E C3Nc _r > i Ol O > N C as>. a) a �£�0mN a N co N E C —>' E N E c O U 7 7 0 •N a m N E -g c Evm `�' .0. 0'oc °.s�asi: f2 o> a)d >; ao m Lazrn v C 10 j O. N m m 7 L a.� .m. d O CL N 0 d O N a O� L N C N C O U W E_ U N 41 N a. E p Ul p (n i..) f0 0 N L a'a Q 10 L .� O 0 7 co co O �? 0 � f0 0 � N L p L F- U ._ N m O m 0 MDN c m '0 3 T a m O c m S N U O o 16 O w E v o O o O a a° L a a G� U) 0 m U . m U c) O Z in o IT D oj v Q � r � ■ ■ ■ o a LL F aU m s m w � m m 0 m 0 N N C O C O a°_°_ 0 rn 0a IL Q a a m m U O Z Q m oam 0 Z Q am m < N 0 f0 a � �z N o co N N � N N OI 00 a T U1 Z m co 'o ZU) c > co O U) d L O �U c 0 Z Hydrologic Soil Group —Hoke County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AuA Autryville loamy sand, 0 to 2 percent slopes Candor sand, 1 to 8 percent slopes A 0.9 16.7% CaB A 4.7 83.3% Totals for Area of Interest 5.6 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method. Dominant Condition USDA Natural Resources Web Soil Survey 8/26/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 R, E 0 70 (6 N m O _O LL cu 0 co Z e �ou_ 1. .1 v w d m or` @ •X a LL ? a N V� c E O i m Q @ L L E a > ~ coO U a O E @ m N D N @ m Y V = 3 @ LL (a c O y N m o c •_ 40 o Q v v 3? >" ° co o U c m mm� a;a �c-otu oomEa l0 Yi O 0 6 C c co a O a e T L a = W LL N lO E—LL Q3 O co 3 LLN N@ WLLCO OGI N O O L U O @ tOC 3LLLN AQ m�O LLh0 Qj Uc7@i O 1 WmiIOiN am@ rm Lb W-2OCN C ma D7 cu1 EOab@ oEOOZa@0 a' E 0.c O m 7@a co > O LL -0 a -0 0 c E m m E@0 a@m 'a 0 aC O �r -co m adO O (gyjO>b o ZO COa) !E o 'm OE 4)o@Nm� N-2 0LL c OU'N 0. N a N O > N o a @a> O N • (cYc@0e d 3 O 0w '- E > ~> O0 (a ._ O0 0 .0NNO> @O >rLLUdomLLc� Oa NrO.i E0 E L N pcj w T (ip O C O �j ' _ Nm '� II l I I ❑o ` to c 3yt v30 Em o �@o" a@ N 3 N c J @ a m a E m E O N o v = c o c a -9 c 0 • k z a@ Na (�z o aN,� m�� �a a Q LL O Q Q w w w w a@@ t> w c z CL E -°o w e@ Q W W d' 2 a' O E ul co N m a < N d' W r Z a o N T a y O L O a q q @ w o ._ a o l @ c @ a o u ¢O _ ¢� w U O w a 0 E Y 9 1 w t 6 o E m c c m q Q _ LL Q :E TO L U L J@E O L d- E c m U w O H ^� H a H co@ 3 - Hi+.0 H O_LL J i 0o I.- LL O O LL O O N 0 0 LO 0 0 0 0 0 LO 0 LO N r'l [.ci Ri} U Q7 Y c w ena neapnjj 0 O O ii W U 4 z U v I vi W v� � U E �? L C p 3 z D w rCD G E E 'L u !� G U t Cl-1 6 Rp ao al U y N C 0} ru j O cn r� ❑ U ❑ 3: E i? N O ji, � rlt>i 0. } la N t 1, I StSlpor, Yq1 O`1 U L � Y � 4J U m g a`a L9 LL 6. a f p M Q In 0 QOL O � O O U T4 a u _ z u z N Q � � Q Q •� dJ Q eN-I a�-1 � � fi7 J:kr rl O E Yi ppz�\� 'S1J\O 8/26/2021 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Raeford, North Carolina, USA' Latitude: 35.0094°, Longitude:-79.3095' Elevation: 379.97 ft- 'source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M. Bonnin, D Martin, B. Lin, T. Parzybok, M-Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 puration Average Q 2 5 10 recurrence interval (years) 25 50 100 200 500 1000 6-min 0.665071-0 0 30 q8 R.4o0 0 569 0,54T-.0.0fi3 [0.604 0 732) (d 6.515 815) [0.7019-0 874 0.7� -0932 () 803 i} 98 0_sp61�b i 0.8951.11 10�t1in 0.636 0.769 0-15 $09i❑ 0.8776706 0-967 617 (1 0711830) (1.15 1739 1.213 49) 1 [1 2741356] 1 345267 1 40-1974) 6.872 1.04 1.22 1.35 1.50 1.61 1.71 1.80 1.91 1.99 15 mtn 0-794.0-962 . 0.945-1-14 1-11-1.34 1-22-148 1 36-1..65 1.45-1 76 (153-187) 1 (1 61.1.97) (169-210 1 75-219 3.04 3.22 1.20 1.43 1.73 1.95 2.22 2.42 2.62 2.80 30{t1m (1-09-1.32) 1 (1.31-1.58) 1 (1.58-1.91) 1 (1 77-2 15) 2.01-2-44 2.18.2.65) (2-35-2-87)2.50.3-07) 11 (2 69.3.34) (2 84.3 54) 1.49 1.80 2.22 2.54 2.96 3.28 3.60 3.93 4.37 4.71 604tun .1,36-1.64 1,64-1.96) 1 (2.31.2.79 2G7-3-25 2.96-3.60 3-23.3.95 3-61-430 3.86-479 414-517 2-hr 1.58 1 94 1.91 215 2 442595 2 6-3 41 3-25 4.02) 3.63-4.51 (4.005000 4.37 5650) 1(4.6758.18 5-25-6.73 3-hr (1.62 2406 Z022350 2 55-3.14 (2 96 3866) (3.5 -4.37 3.96 4.94) (4.4195.54 (4-87-616 . 5.51'3 ,05 (B 000177 6-hr 1.99 244 22 95 3-04-.172 (3.54 4234) (4.22509) 11 (4. 63589) 1 (532-6.62 (5.897239 6: $-8-4& 7 0938 6.4511 12-hr [2-34 2988 2-84.3.49 3- 94-42. 4-20-518 5.03 fi424] 5 71-7 (6-41-8.04) 1 (7 4-905) (5- 5--10.5 8.96-111 7 24-h r (2: 3 3530 3.2 4900) 4-325705 5.02-5599 5,99-`-7 04 5 763 .96 7 548.92) (8.36.9.9❑ (946.11 3) 1(10.3. 2 4 11.8 12.9 3.54 4.28 5.377 6.23 7.42 F 8.38 9.36 10.4 2�tay (3-30 3-82}1 (3-98.4.61) 1[4 99-5.78} (5 78-6 71 6.86-7.99 7-71-9.01) 11 (8-59-10.1) (9,48.11.2) (10 7-12 7) 11 ( 11 7-1-39) 3.76 4.53 5.65 6.55 7.77 8.75 9.76 10.8 12.2 3�lay 3.51-4.03 4.23-4.8 5.27-5.06 6.09-7.01 ? 7.20.8 3� 8-069 37 8.99-10.5 9-91-11.fi 11.2-13.1 ry13.4 1_.1-14 4 4�iay 3 2 4825 4.48-5.11 5 55-a 34y 6.4087631 s 18 66 8.46 9373 9:39-0.8 10 3-12-0 11 6-13.6 (12 6--14 8 7�ay [A.3 4193} (5.1G5189) (7 23-8 29 8 48 9 74) (9 46- 0.9 10.5- 2.1 (11 5-13:3) (1219-15.0 1 [140-16.4) 10�ay 4-98 5862y (5 336.6) [7 I6 H 08) 8.181 941 9-39-10.0 10 4- 1.8} t11 4-13.0 1214-14 2 13.74-15.8 14 8- U 1 F 20.1 7.11 8.41 10.00 11.2 12.9 14.2 15.5 16.9 20�1ay 6.71-7-53 7.95-8.92 9-43-10-6) 1 (10 6-11 9 12 1-13 7) 1 14.5-16.5 15.7-17 9 (17 3-19.9) (18 6-21 4) 3.5 2 30�ay 8-5 9334 9.8 -141-0 1115-129 1218--14-3 (1414-16.2 15,7--17.6 16.9- 91) 181- 0.5 198-225 210- 4,0 45 day 11.2 (10-6-11.8) 13.1 (12 4-13.8) 15.1 (14 3-15.9) 16.6 (15-7-17 5 18.5 17.5-19.5) 20.0 (18-8-21-1) 21.4 ( 20 2-22 6) 22.8 1 (21.5-24-1)23.1-26.1 28.2 (24.4-27 7) 29.7 13.4 15.7 17.8 19.5 21.6 23.2 24.7 26.2 60{lay 12.7-14 1 14.9-16.5 16 9-18 7) 18.5-20 5 ) 20.5-22 7 21 9-24 4 (23 q 28.1 24 7-27.7 26.5-29.8 27.8-31 4 t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS)- Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5% Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=35.0094&Ion=-79.3095&data=depth&units=english&series=pds 1/4 Scott Cole, A'CLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 Double D Engineering, PLLC Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines, NC 28387 August 10, 2021 Re: Seasonal High -Water Table Identification and Soil Infiltration Rates: Proposed Gas Station (Timberland Ranch). Hoke County, NC (PIN 594060001097) Soil conditions and infiltration rates were evaluated and measured on the above -referenced property within the proposed storm water BMP device. Work was conducted in accordance with Parts A-2 and C- 1 of the North Carolina De )arlmel7l of Environmental Quality Stoi-iniv ter Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with a chroma of 2 or less (in Munsell color notation) in mottles or the horizon matrix. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table (SHWT). The SHWT for this P ra'ect was identified within the pro used BMP device at elevation 366' Ca_ntbroaimateIy_15' belowground surface.). SATURATED HYDRAULIC CONDUCTIVITY KSa, Soils within the proposed stormwater BMP device typical of those within the Candor Sand series. Candor Sands are very deep and excessively drained soils with moderately high rates of permeability. Infiltration rates were measured to determine the suitability for installation of a stormwater infiltration BMP. Infiltration rates were measured using a Johnson Constant Head Perneameter. Measurements were recorded at varying intervals until equilibrium was reached. A summary of observations within the proposed Stormwater BMP Device is shown in the table below. BMP Device Site #1 Boring 9 SHWT Dlunsell Color Ksat #t Ksat 42 Ksat 43 Ksat #4 (feet below Notation round surface 1 15' 51' 8/1 0-7' 7-9.5' 9.5-13' 13-15 SHWT 2.5Y 7/1 LS/SL Perched water SL/SCL Crs LS elevation: 366' 22" / hour Not Measured 3" / hour 15" / hour Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates; however, methods used to measure these rates can influence the results. Side walls of the bore hole are "smeared" by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both of these factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on -site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank you. Scxol North Carolina Licensed Soil Scientist 9,P+ KL 1 Q a F. ---i- -„ \ , "?(} l fir\ 7 co M \ zW lL1, Y �I I 5 SC VCL 13SL 1SS i STORMwAiEPy .� . ENT -- Solt C Test Location (Elevation 381') CA=CZVAY R(L SHWT: 15' bgs t SHWT Elevation: 366' Ksat 0-7' LSISL: 22" 1 hour Ksat 7-9.5' SCLlSC: perched water NOT Measured r Ksat 9.5-13' SUSCL: 3" / hour ~� Ksat 13-15' LS Coarse: 15" 1 hour _ � r T� 2AOR11ir �' I ems+ � ��1 •-�� 1 inch = 60 feet -�- WATER QUANTITY -INFILTRATION BASIN PCV-- bf)'Acoe- 1I 4.O -beA/aoeCd SUPPLEMENT-EZ COVER PAGE FORMS LOADED f PROJECT INFORMATION- 4f 1 Project Name Timberland Gas Station 2 Project Area (ac) _ 4.392 3 Coastal Wetland Area (ac) 4 ISurface Water Area ac _ - 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) _ { _7 l Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface DIS 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba alter 0 26 _ Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Organization— Carlo Pardo, PE 28 Bowman North Carolina, Ltd. 29 _ Street address: 4004 Barrett Drive, Suite 101 30 City, State, Zip: Raleigh, NC 27609 31 Phone numbers : 919-553-6570 32 Email: cpardo@bowman.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. AIRQ� S51p0;q�'��� SEAL 051571 C. ......... Signature of Designer b ';�a a Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 o, number of drainage areas/SCMs If sDoes 1 3 this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entfire Site 1 4 Type of SCM �~ - Infiltration Basin 5 Total drainage area (sq ft 191320 sf 126116 sf 6 Onsite drainage area (sq ft 191320 sf 107849 sf 7 Offsite drainage area (sq ft 18267 sf 18267 sf 8 Total BUA in project (sq fl 101189 sf 92963 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10 New BUA not on subdivided lots (subject to permitting) (sf) 11 Offsite BUA (sq ft 18267 sf 18267 sf 12 Breakdown of new BUA not on subdivided lots: Parkin (sq ft Sidewalk (sq ft 1718 sf 1718 sf Roof (sq ft 3000 sf 3000 sf Roadway s ft 70382 sf 62156 sf Future (sq ft Other, please specify in the comment box below sq ft 7822 sf 7822 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting)_ Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 xis inq BUA that will be removed (sq ft 18 Percent BUA 39.25%'On Site 74% 19 Design storm inches 1.0 in 20 Design volume of SCM (cu ft) 7498 cf 21 1 Calculation method for design volume I Simple Method ITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Offsite Drainage area includes a portion of Calloway Road and the future Lot 68 in the Timberland Ranch development = 18267 sf. There is future building/sidewalk/pavement included in the impervious calculations: 5000sf/620sf/2202sf, respectively = 7822 sf. There is 8226sf of bypass from INFILTRATION SYSTEM 1 Drama e area number _ � 1 2 Minimum required treatment volume (cu ft) 7498 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? NIA 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed rofessional? Yes TIM cvc-mM iM FROM fixk{ . Si 18 Proposed sloe of the subgrade surface (°l,) 0% 19 Are terraces or bafflesprovided? No 20 ]Type of pretreatment: Forebay 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation (fmsl) 366.00 _ 23 Depth to SHWT per soils report (in) 180.00 24 Ground elevation at boring in soils re ort (fmsl) 381.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes 26 Soil infiltration rate (in/hr) 11.00 27 Factor of safety (FS) (2 is recommended): 2.00 Elevaflbns 29 Bottom elevation (fmsl) 378 ft 30 Storage elevation (fmsl) 380. ft 31 Bypass elevation (fmsl) 380.7 ft For Basins Only 32 Bottom surface area (ft 2)4975 ft 33 Stora a elevation surface area ft2 7075. ft 34 Length (ft) 35 jWidth (ft) 36 jPerforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total len th of perforated piping 39 Stone type, if applicable 40 Stone porosity (%) 41 Is stone free of fines? 42 Is the stone wrapped in 2eotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 IDesion volume of SCM (cu ft) 7498 of 45 ITime to draw down (hours) 3 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 3 9:50 AM 1012212021 Triangle Site Design, PLLC Timberland Gas Station, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions Drainage Area (acres 4.81 Existing Soil Groups_ Sod Grouo Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 4.41 92% A CaB Candor Sand 0.40 8% _Existing Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Stand A 4.72 59 57.9 Impervious -Roadway A 0.09 98 1.8 Cumulative Curve # = 59.7 Triangle Site Design, PLLC Timberland Gas Station, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions to Infiltration Basin Drainage Area (acres]_.' 2.90 Existing Soil Groups. Soil Grouo Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 2.50 86% A CaB Candor Sand 0.40 14% Proposed Land Uses: Land Use Description Existinq_Soil Group Acres Curve # Weighted CN Open Space - Good Stand A 0.77 59 15.7 Impervious Area A 2.13 98 72.0 Cumulative Curve # = 87.6 Triangle Site Design, PLLC Timberland Gas Station, Hoke County, NC Curve Number Calculation (CN) Post -Developed Bypass Conditions to Infiltration Basin Drainage Area {acres : 1.91 Existing Soil Groups_ Soil Group Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 1.91 100% A CaB Candor Sand 0.00 0% Proposed Land Uses' Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Stand A 1.72 59 53.1 Impervious Area A 0.19 98 9.7 Cumulative Curve # = 62.9 Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin Drainage Area (DA) = 2.90 Acres 126116 sf Impervious Area (IA) = 2.13 Acres 92963 sf Percent Impervious (1) = 73-7 % Required Water Quality Volume Design Storm = 1 inch Determine Rv Value = 0.05 + .009 (1) = 0.71 in/in Water Quality Volume = 0.172 ac-ft Water Quality Volume = 7,496 cf Water Quality Volume = 0.713 inches of runoff NOAA 1-year. 24-hour event = 3.05 inches Minimum Surface Area SA = (12-FS"DV)/(K"T) Factor of Safety (FS) = 2 Design Volume (DV) = 7497.7 cf Hydraulic Conductivity of Soil = 11.00 in/hr Max Dewatering Time = 72 hours SA = 227.2 sf Time to Draw Down Dewatering Time = (12-FS"DV)/(K"SA) Factor of Safety (FS) = 2 Design Volume (DV) = 7497.7 cf Hydraulic Conductivity of Soil = 11.00 in/hr Surface Area (SA) Provided = 4975 sf T = 3.3 hrs 0 00 r m l \\ \ I I I i I 'STAGE/STORAGE TABLE INFILTRATION BASIN STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) LFT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 378.0 4975 0 0 1.0 379.0 5995 5485 5485 2.0 380.0 7075 6535 12020 3.0 381.0 8205 7640 19660 4.0 382.0 9400 8803 28463 ORMWATER MANAGEMENT DESIGN INFILTRATION BASIN RIVER BASIN: CAPE FEAR RECEIVING STREAM: MILL CREEK STREAM INDEX: 18-31-11 STREAM CLASS: C HUC: 03030004 POND DESIGN SUMMARY DRAINAGE AREA TO POND: 2.90 ACRES SITE IMPERVIOUS AREA TO POND: 1.71 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.42 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 2.13 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED POST DEVELOPED POST DEVELOPED THROUGH POND BYPASS COMBINED DRAINAGE AREA: 4.81 AC 2.90 AC 1.91 AC CURVE NUMBER: 59.7 87.6 62.9 INFILTRATION RATE: 11.0 IN/HR 1.0" STORM EVENT: 0.515 CFS 0.000 CFS 1-YEAR STORM EVENT: 0.957 CFS 8.850 CFS 0.000 CFS 0.908 CFS 0.908 CFS 2-YEAR STORM EVENT: 2.226 CFS 11.52 CFS 0.000 CFS 1.794 CFS 1.794 CFS 10-YEAR STORM EVENT: 7.302 CFS 18.88 CFS 0.000 CFS 4.805 CFS 4.805 CFS 100-YEAR STORM EVENT: 17.60 CFS 30.49 CFS 18.87 CFS 10.59 CFS 29.46 CFS z' Z O i- Q W J W 00 J J d fJ) F- Z W m Y Z Z Qm O O L? N W 00 M W J O W D_ O H O LO z Z � U J Ckc w 3= v z 3 h cn Q N L) N Z U N N 00 3 N N m Lo 2 M e� ZW Cl M OJ (J rrj LNG 3 0 o0 00 J � F► O_ J J N Li Z � N Oo M II Z W ME Y Z Q m M W L- C) O_ O O DO M II Z O H Q > J W Q 3 J_ d N Sf �O Q J z__ Q Z C (n W z o LLJ O z Q w z J W J Z � 3 Q GO m Ln Q CC)) � J Z J Z � J (/) m LL Z C7 LLJ X O W F- F. ■ 'C7? J ¢ CY W Q CD W mCD a¢ Cf)Of �O z Cl w ¢o 75; z ¢ J C/) W Z W O � O v) O w U) p (/) (/) z CD ¢ Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name Max. Elevation = 381.33 ft Max. Storage 0 Friday, Oct 22, 2021 = 18.87 cfs = 12.00 hrs = 13,670 cuft = BMP Pond = 22,439 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values - 1 00% of Op) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.931 30.49 << 380.97 ----- ----- ----- ----- 5.614 ----- ----- ----- 2.081 5.614 11.97 29.29 381.22 ---- ----- _-_-- ----- 14.55 -- ----- ----- 2.155 14.55 12.00 22.87 381.32 << __-- - - ----- ----- 18.87 ----- ----- ----- 2.185 18.87 << 12.03 14.33 381.29 ----- - - --- ----- 17.70 ----- ----- ---- 2.178 17.70 12.07 7.866 381.20 ----- ----- ----- ----- 13.71 ----- ----- ----- 2.149 13.71 12.10 4.875 381.10 ----- - - --_-- ----- 9.728 ----- ----- ----- 2.118 9.728 12.13 3.998 381.01 ----- - - ----- ----- 6.906-------- ----- 2.094 6.906 12.17 3.826 380.95 ----- - - ----- ----- 5.001 ----- ----- ----- 2.075 5.001 12.20 3.664 380.91 ----- ----- --- ----- 3.761 ----- ---- ----- 2.063 3.761 12.23 3.502 380.88 ----- ----- ----- ----- 3.035 ----- ----- ----- 2.055 3.035 12.27 3.339 380.86 ----- ----- ----- -- 2.534 ----- ----- ----- 2.048 2.534 12.30 3.176 380.84 ----- - - ----- ----- 2.136 ----- - -- ----- 2.043 2.136 12.33 3.013 380.83 ----- -_-_- ___-- ___- 1.810 ----- _ - _---- 2.039 1.810 12.37 2.849 380.81 ----- ---- ---- -- 1.534 ----- -__-- ----- 2.036 1.534 12.40 2.686 380.80 ---- -- - ----- 1.293 ----- ----- ----- 2.032 1.293 12.43 2.522 380.79 ----- ----- ----- ----- 1.141 ----- ----- --- 2.030 1.141 12.47 2.358 380.78 ----- _ - ----- ----- 1.012 ----- ----- ----- 2.027 1.012 12.50 2.193 380.77 ----- ---- ----- ----- 0.878 ----- ----- ----- 2.023 0.878 12.53 2.041 380.76 ----- ---- ---- ---- 0.739 ----- ----- ----- 2.020 0.740 12.57 1.928 380.75 ----- ----- ----- ----- 0.603 ----- ----- ----- 2.017 0.603 12.60 1.857 380.74 ----- ----- ---- ----- 0.475 ----- ----- ---- 2.014 0.475 12.63 1.811 380.73 ----- ----- ----- ----- 0.359 ---- ----- ----- 2.011 0.359 12.67 1.774 380.72 ----- ----- ----- ----- 0.257 ----- ----- ----- 2.009 0.257 End 10/22/21, 9:44 AM NORTH AMERICAN GREEN' SPILLWAY ANALYSIS > > > Grass Spillway Name Grass Spillway Discharge 18.87 Peak Flow Period 1 Channel Slope 0.3333 Channel Bottom Width 15 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam (GM) C350 - Class C - Mix (Sod & Bunch) - Very Good 80-95% ECMDS 7.0 North American Green 5401 St. Wend el -Cynthia na Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress I Factor Pattern C350 Straight 18.87 cfs 8.66 ft/s 0.15 ft 0.027 3.2 Ibs/ft2 3.02 Ibs/ft2 1.06 STABLE E Unvegetated Underlying Straight 18.87 cfs 8.66 ft/s 0.15 ft 0.027 3.03 Ibs/ft2 2.96 Ibs/ft2 1.02 STABLE E Substrate C350 Reinforced Straight 18.87 cfs 8.17 ft/s 0.15 ft 0.03 12 Ibs/ft2 3.19 Ibs/ft2 3.76 STABLE E Vegetation Underlying Straight 18.87 cfs 8.17 ft/s 0.15 ft 0.03 3.2 Ibs/ft2 3.13 Ibs/ft2 1.02 STABLE E Substrate https://ecmds.com/projecUl 1/1 Pond Report M Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, Oct 22, 2021 Pond No. 1 - BMP Pond Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 378.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 378.00 4,975 0 0 1.00 379.00 5,995 5,485 5,485 2.00 380.00 7,075 6,535 12,020 3.00 381.00 8,205 7,640 19,660 4.00 382.00 9,400 8,803 28,463 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrPRSr] [A] [B] [C] [D] Rise (in) Inactive Inactive Inactive Inactive Crest Len (ft) = 15.00 0.00 0.00 000 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 380.70 0.00 0.00 0.00 No. Barrels = 0 0 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 11.000 (by Contour) Multistage = n/a No Yes No TW Elev. (ft) = 0.00 Stage (ft) 4.00 3.00 2.00 M6 0.00 0.00 6.00 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 12.00 18.00 24.00 30.00 36.00 42.00 48.00 Elev (ft) 382.00 381.00 380.00 379.00 378.00 54.00 60.00 66.00 Discharge (cfs) Hydrograph Summary Re p aflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 0.957 2 730 6,074 -- - ---- SCM Pre -Developed 2 SCS Runoff 8.850 2 716 18,065 — --- ------ SCM Post -Developed 3 Reservoir 0.000 2 712 0 2 379.25 7,103 Post Through SCM 4 SCS Runoff 0.908 2 722 3,218 --- ------ - SCM Post -Developed Bypass 6 SCS Runoff 0.515 2 146 2,378 --- ---- 1.0 Post -Developed to SCM 7 Reservoir 0.000 2 152 0 6 378.11 607 1.0inPost Through SCM Infiltration.gpw Return Period: 1 Year Friday, Oct 22, 2021 P: Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area - 4.810 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.05 in Storm duration = 24 hrs SCM Pre -Developed Friday, Oct 22, 2021 Peak discharge = 0.957 cfs Time to peak = 730 min Hyd. volume = 6,074 cuft Curve number = 59.7 Hydraulic length = 0 ft Time of conc. (Tc) = 20.80 min Distribution = Type II Shape factor = 484 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 1.00 ;- 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 2.900 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.05 in Storm duration = 24 hrs Q (cfs) 10.00 M . �� H YX rm SCM Post -Developed Hyd. No. 2 -- 1 Year 120 240 360 480 600 720 Hyd No. 2 Friday, Oct 22, 2021 Peak discharge = 8.850 cfs Time to peak = 716 min Hyd. volume = 18,065 cuft Curve number = 87.6 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Q (cfs) 10.00 we] 4.00 2.00 0.00 840 960 1080 1200 1320 1440 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D0 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 10.00 More 4.00 2.00 0.00 0 120 240 Hyd No. 3 Post Through SCM Hyd. No. 3 -- 1 Year 360 480 600 720 Hyd No. 2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Friday, Oct 22, 2021 = 0.000 cfs = 712 min = 0 tuft = 379.25 ft = 7,103 cuft Q (cfs) 10.00 ee . �e 4.00 2.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) ® Total storage used = 7,103 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 SCM Post -Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.910 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.05 in Storm duration = 24 hrs Q (cfs 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 — 0.60 0.50 0.50 0.40 0.40 0.30 - 0.30 0.2'0 0.20 0.10 0.10 0.00 — - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 0 Friday, Oct 22, 2021 Peak discharge = 0.908 cfs Time to peak = 722 min Hyd. volume - 3,218 cuft Curve number = 62.9 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 SCM Post -Developed Bypass Hyd. No. 4 -- 1 Year 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 6 1.0 Post -Developed to SCM Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 2.900 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 1.00 in Storm duration = 6.00 hrs Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 Friday, Oct 22, 2021 Peak discharge = 0.515 cfs Time to peak = 146 min Hyd. volume = 2,378 cuft Curve number = 87.6 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to SCM Hyd. No. 6 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 0 60 120 180 240 300 360 420 Time (min) Hyd No. 6 Hydrograph Report 0 Hydraflow Hydrographs Extension for AutoCADO Civil 31DO 2009 by Autodesk, Inc. v6.066 Friday, Oct 22, 2021 Hyd. No. 7 1.0inPost Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 152 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - 1.0 Post -Developed to SCM Max. Elevation = 378.11 ft Reservoir name - BMP Pond Max. Storage = 607 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 60 120 180 240 300 360 420 480 540 600 660 Hyd No. 7 Hyd No. 6 ® Total storage used = 607 cult Time (min) 1.0inPost Through SCM Hyd. No. 7 -- 1 Year 10 Hydrograph Summary Re p Nydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow Maximum hyd(s) elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 2.226 2 730 10,701 - - ------ SCM Pre -Developed 2 SCS Runoff 11.52 2 716 23,754 -- - - - - SCM Post -Developed 3 Reservoir 0.000 2 862 0 2 379.64 9,664 Post Through SCM 4 SCS Runoff 1.794 2 722 5,359 ------ -- SCM Post -Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 ---- ---- ---- 1.0 Post -Developed to SCM 7 Reservoir 0.000 2 n/a 0 6 378.00 0.000 1.0inPost Through SCM Infiltration.gpw Return Period: 2 Year Friday, Oct 22, 2021 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 4.810 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.69 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1.00 SCM Pre -Developed Hyd. No. 1 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Friday, Oct 22, 2021 Peak discharge = 2.226 cfs Time to peak = 730 min Hyd. volume = 10,701 cuft Curve number = 59.7 Hydraulic length = 0 ft Time of conc. (Tc) = 20.80 min Distribution = Type II Shape factor = 484 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, Oct 22, 2021 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Peak discharge = 11.52 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 23,754 cuft Drainage area = 2.900 ac Curve number = 87.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post -Developed Hyd. No. 2 -- 2 Year 10.00 Were �re 4.00 2.00 Q (cfs) 12.00 10.00 M MIX 4.00 2.00 0.00 ` I I^� - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) Hydrograph Report 13 Hydraflow Hydrographs Extension forAutoCAD® Civil 31DO2009 byAutodesk, Inc. v6.066 Friday, Oct 22, 2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 862 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 379.64 ft Reservoir name = BMP Pond Max. Storage = 9,664 cuft Storage Indication method used. Exfiltration extracted from Outflow Post Through SCM Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 12.00 - 12.00 10.00 10.00 8.00 — 8.00 6.00 6.00 4.00 4.00 I 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 3 Hyd No. 2 ® Total storage used = 9,664 cult 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 SCM Post -Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 1.910 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.69 in Storm duration = 24 hrs Q (cfs) W ItM 1.00 M Friday, Oct 22, 2021 Peak discharge = 1.794 cfs Time to peak = 722 min Hyd. volume = 5,359 cuft Curve number = 62.9 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 SCM Post -Developed Bypass Hyd. No. 4 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 4 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 17 Hydrograph Summary Rep OY aflow Hydrographs Extension for AUtoCADV Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 7.302 2 728 27,532 ---- - — --- SCM Pre -Developed 2 SCS Runoff 18.88 2 716 40,027 ------ -- — SCM Post -Developed 3 Reservoir 0.000 2 974 0 2 380.70 17,359 Post Through SCM 4 SCS Runoff 4.805 2 722 12,822 — - SCM Post -Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 - ------ 1.0 Post -Developed to SCM 7 Reservoir 0.000 2 n/a 0 6 378.00 0.000 1.0inPost Through SCM Infiltration.gpw Return Period: 10 Year Friday, Oct 22, 2021 Hydrograph Report Hydraflow Hydrographs Extension for AUtoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 4.810 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 5.45 in Storm duration = 24 hrs MIX 4.00 WIR SCM Pre -Developed Hyd. No. 1 -- 10 Year 120 240 360 480 600 720 840 Hyd No. 1 18 Friday, Oct 22, 2021 Peak discharge = 7.302 cfs Time to peak = 728 min Hyd. volume = 27,532 cuft Curve number = 59.7 Hydraulic length = 0 ft Time of conc. (Tc) = 20.80 min Distribution = Type II Shape factor = 484 Q (cfs) 8.00 . 1H 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 2.900 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 5.45 in Storm duration = 24 hrs SCM Post -Developed Friday, Oct 22, 2021 Peak discharge = 18.88 cfs Time to peak = 716 min Hyd. volume = 40,027 cuft Curve number = 87.6 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 21.00 21.00 - 18.00 = 18.00 15.00 15.00 12.00 12.00 9.00 - 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 2 Time (min) K11 Hydrograph Report Hydraf low Hydrographs Extension forAutoCAD® Civil 3DO2009 byAutodesk, Inc. v6.066 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Friday, Oct 22, 2021 = 0.000 cfs = 974 min = 0 cuft = 380.70 ft = 17,359 cuft Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 1 - —j. -- _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 ® Total storage used = 17,359 cuft Hlydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 SCM Post -Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 1.910 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 5.45 in Storm duration = 24 hrs 4.00 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 4 21 Friday, Oct 22, 2021 Peak discharge = 4.805 cfs Time to peak = 722 min Hyd. volume = 12,822 cuft Curve number = 62.9 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 SCM Post -Developed Bypass Hyd. No. 4 -- 10 Year 360 480 600 720 840 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 24 Hydrograph Summary Re PC I-rydraflow Hydrographs Extension for AUtoCAD@ Civil 3D® 2009 by Autodesk, Inc. v6.066 Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph Hyd. No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cult) (ft) (cult) 1 SCS Runoff 17.60 2 728 61,984 - -- ------ ------ SCM Pre -Developed 2 SCS Runoff 30.49 2 716 66,764 ----- ------ --- SCM Post -Developed 3 Reservoir 18.87 2 720 13,670 2 381.33 22,439 Post Through SCM 4 SCS Runoff 10.59 2 720 27,561 ----- -- --- SCM Post -Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 ------ - -- ---- 1.0 Post -Developed to SCM 7 Reservoir 0.000 2 n/a 0 6 378.00 0.000 1.0inPost Through SCM Infiltration.gpw Return Period: 100 Year Friday, Oct 22, 2021 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 4,810 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.25 in Storm duration = 24 hrs 15.00 12.00 • 0H . 0H 3.00 SCM Pre -Developed Hyd. No. 1 -- 100 Year 25 Friday, Oct 22, 2021 Peak discharge = 17.60 cfs Time to peak = 728 min Hyd. volume = 61,984 cuft Curve number = 59.7 Hydraulic length = 0 ft Time of conc. (Tc) = 20.80 min Distribution = Type II Shape factor = 484 Q (cfs) 18.00 15.00 12.00 we] 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 2.900 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.25 in Storm duration = 24 hrs SCM Post -Developed Friday, Oct 22, 2021 Peak discharge = 30.49 cfs Time to peak = 716 min Hyd. volume = 66,764 cuft Curve number = 87.6 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 35.00 - 35.00 30.00 30.00 25.00 25.00 20.00 - 20.00 15.00 - 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 2 Time (min) • Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM 27 Friday, Oct 22, 2021 Peak discharge = 18.87 cfs Time to peak = 720 min Hyd. volume = 13,670 cuft Max. Elevation = 381.33 ft Max. Storage = 22,439 cuft Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 - 25.00 20.00 20.00 15.00 — 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 Time (min) Hyd No. 3 Hyd No. 2 ® Total storage used = 22,439 cult pl- Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 byAutodesk, Inc. v6.066 Hyd. No. 4 SCM Post -Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 1.910 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.25 in Storm duration = 24 hrs 10.00 . IX 4.00 2.00 Friday, Oct 22, 2021 Peak discharge = 10.59 cfs Time to peak = 720 min Hyd. volume = 27,561 cuft Curve number = 62.9 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 SCM Post -Developed Bypass Hyd. No. 4 -- 100 Year Q (cfs) 12.00 10.00 M M. We 4.00 2.00 0.00 -+ 1 1 1 �Pp� I I I 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 -- Hyd No. 4 Time (min) [ i( aƒ ! 2 (! { | � J{ _ �f ! |\ � & I § \§ ) \ k of w £. | !�■ | �!� ! (,« (; k �E § § ({R § ) a � B�! / S|! ■ ■ §