Loading...
HomeMy WebLinkAboutSW6211003_Plansheet - Grading/Drainage Plan_20211019a �oK LQ ° D®LODE / / / / �O/ / 2o6.o EX.TP / o /INV=204.2 MATCH EXISTING / PAVEMENT / 6o'-15" RCP CLASS / III @0.50% / 1G / 208.29(EX.TP' GRASS CHANNEL#1 / LIMITS OF DISTURBANCE % o /�/ J2o6.4�GR ' h Know what's below. Call before you dig. � \ 1 I o_ 48'-1 HHDPE \ \ @o.63% \ ` ,;(WATER -TIGHT). \ \ LIMITS OF / \ DISTURBANCE- r2.o2oACRES ra \\ \ \ A PORTION OF ~ " a \ \\\ \ PIN..•2993woo lo21 \\ \ \ \\ \ WILLISP. RODGERS, JR, \\ \ \ \\ \ D.B. 290, PG. 559 GRAPHIC SCALE i 6o I INCH = 3o FEET / 2o6.8 TP 20 TS tio1 ti �v / s fO / s 20 TS � � 20 TS �. \ � .,�- , � � o�w �,'" _.. _.. _F.O 1/ 20 .8 TS _.. / w�. - 0�/ CHANNEL' B 20.8 Ts SD CLEANOUT #105 20 . IS c y CONNECTROOF RIM-207.3 \ o 207.o5(TP) DRAINS TO HEADER �INV=2o4.0 i7 / /O / \ a TS 2o6.2 TP \ "'°� .� PIPE (TYP) 2 zo TP �� 20 .2 TP O 20 .6 TPCHANNEL,\ / o`a zo .21 / . 93 -12 HDPE d2o6.8 / DRAIN .•••.. @ 2.15% d �O 20 . TS a . (WATER -TIGHT) 1 20 .o TPA / LO 20 . GR \ ROOF DRAIN 0K / (TYP) \ \ FO L ­N 2o3.2 " SD CLEANOUT #ro6 / 20 .1 e.. R M=2o7.3 / .., l l l Lp Wd � ao INV=2o6.0 � _/ oKY' I lb INV=204.0..._ FO L 0� MATCH EXISTING 7/ l l l LO OR �pL�LO 1C R / / PAVEMENT 7 20 .8 TS �� B _... _. L .... ; :.. ",,, o � 35 • / � � / 6 '-15' RCP CLASS III / 4 O NIP O ........._........._........._............1 /i @ 1.25/ r,. /........_......_............_ ry a rNOTE TCONTRACTOR: aM ....... O Roa / / �1 s� ♦ S 5 F / t �1 �e / zo .o EX.TP / / THE NCDEQ STOPAIWATER MANAGEMENT PERMIT REQUIRES THE DESIGN PROFESSIONAL TO LOIN \ �O ♦ FO Old VV , / / / PERIODICALLY OBSERVE THE CONSTRUCTION OF THE STORMWATER MANAGEMENT SYSTEM / - �h / / AND TO PREPARE A DESIGNER'S CONSTRUCTION CERTIFICATION FOR SUBMITTAL TO NCDEQ 10 f LIMITS OF J���� LO 20 . TS O /GRASS �� / / / PRIOR TO THE CERTIFICATE OF OCCUPANCY BEING ISSUED FOR THE PROJECT. THE 21 WATERLINE DISTURBANCE - / / CHANNEL#2 1105 208.6 EX.TP / � HOKECOUNTY L CONTRACTOR SHALL COORDINATE WITH THE DESIGN CONSULTANT FOR THE CONSTRUCTION f DEPARTMENT/ /[R / / / OBSERVATION AND PREPARATION OF THE CONSTRUCTION CERTIFICATION BY CONTACTING: �LO / LIMITS OF ✓ / / DISTURBANCE / / � / MATT LOWDER, PE - TRIANGLE SITE DESIGN, PLLC O / d ® / / I� 919-553-6570 O . • jM q �� � � F mlowder@trianglesitedesign.com / �1 FO /' / LONG. o SS CHANNEL LINING / O NIp / / ° / / / DITCH SLOPE(/) H B W PROJECTBENCHMARK � 1� �l l FIREHYDRANTFLANGE / FO / /' / /' / / BOLTBETWEENU&EIN / / / ° 'MUELLER" FO GRASS CHAIWEL #1 " 1.24 6 1.0 1.0' S.o 2:1 STRAW WITH NET NAGDS 75 GRASS CHANNEL #2 1,34% 1.0' 1. o' 5.0' 2:1 STRAW WITH NET NAG DS75 l�� EL.=215.13 O-/ / // / W. . ......,/ F / °mow / / / � GRASS CHANNEL DATA BLOCK / / �O / / / �/ / / _� Downspout EXTEND LINING TO W EXTEND LINING TO / Transition Boot TOP OF DITCH TOP OF DITCH �- / / o�w / Wire screen for rodents / FO / / / 6" MIN. FREEBOARD ' FO //' / / / sty; H CHANNEL LINING) 'SS \(FO,.,,�L\ / / / / / 12'Dlaximum Proposed Grade B 45' Bend 8" on 1.00%Min. Slope GRASS CHANNEL 2 N.T.S. Refer to drainage p rS" 5" PRO SERIES LOAD STAR OR / tCAST IRON / for size of storm sewer / MIN. SAW CUT SECTION AT 5 CHANNEL RO SERIES GRATE / NOTE: 6" NEW FELT EXPANSION JOINT / A / V V IV SPO U 1 DETAIL ALL DOWNSPOUT COLLECTOR DO / 1 PIPE SHALL BE SCHEDULE EXISTING OR NEW ExtsTING ORNEw N.T.S. 40 PVC OR HDPE z w CONCRETE SLAB CONCRETE SLAB , 0- IIIIIIiII II °° 6 AIN 1 I�III "I1I1I..' II EROSION CONTROL NOTEII AN EROSION AND SEDIMENTATION CONTROL PERMIT SHALL BE I !l.. III !ii III l.ii III III / 3.1..1. i.i..i. i.i..i.:: Li..i. i.i..i. la..i: i.i..i. 1.1..1.:: �" tt � ^� i. i.i..i. i.i..i..:: ili -1.11 ili 111 -ili 111 11 ili 111 ili 111 -ili 111 111 i REQUIRED BY NCDEQ PRIOR TO START OF CONSTRUCTION. U. -11 11 I-i--I11--I-1 11 �11 _..... :::III Ili EN I.II iii_:: Iii iii III. III 111 iii ii iii aIiI 1Ii iii.... iii iii:::Iii iii Iii.. iiI 1Ii • :: i.1.i ::a.1.1::: i.1.i ::a.1.1::: i.1.i ::a.1.1_::a.1.is::::..1_::a...i :::...l;:a.l.l::::a ;::::1.1.1_a.1.i :::a...l_::a.1.i :: i.1.i ::a.1.1::: i.1.i .1.1::: i.l.i .l..l.i STTRVF,Y NOTE-. Ilr_i i_:-::a i_:-:::! i_:-:::1 i_:-:::1 i_:-:-1 i_:-:::1 i_:-:-1 i_:-:::1 i_:- i i_:-::a ALL EXISTING BOUNDARY AND TOPOGRAPHIC INFORMATION TAKEN FROM A LAND SURVEY PREPARED BY: MCNEILL SURVEYING. STREAM/WETLAND NOTE: THERE ARE NO PROPOSED IMPACTS TO ANY EXISTING STREAM/AND OR WETLAND FEATURES ON THE PROPOSED PARCEL. FLOOD ZONE NOTE: THE PROPERTY IS LOCATED IN FLOOD ZONE X AS SHOWN ON FEMA FLOOD PANED 37109422ooJ, DATED OCTOBER 17, 2006. MAPS QUBJECT TO CHANGE BY FEMA J #4 REBAR HORIZONTAL PLACE TOP EXISTING SOILS & BTM. OF CONC. POUR 3" CLR @ BT14. #3 OR #4 REBAR STAKE MT). SECTION SUSPENSION METHOD. LENGTH OF STAKE NOTES: APROX. W'. ,. CHANNELS TO BE INSTALLED WITH GRATE. GRATE TO BE PROTECTED FROM CONCRETE POUR 2. INSTALLATION TO BE COMPLETED IN ACCORDANCE 1NTTH MANUFACTURER'S SPECIFICATIONS. 3. DO NOT SCALE DRAWING. 4. THIS DRAWNG IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS c AND N �S DESIGN PROFESSIONALS FOR PLANNING PURPOSES ONLY,.�*w.,o. � �+• 5. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED NDS, INC. AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 851 NORTH HARVARD AVE. LINDSAY, CA 93247 CHANNEL DRAIN SYSTEM TOLL FREE: 1-Boo-726-1994 3 PHONE: (559) 562-9888 5" PRO SERIES INSTALLATION DETAIL FAX: (559) 562-4488 ewwv.ndsproxom I. REFER TO THE SITE PLAN FOR RELATED NOTES. 2. ALL CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES. 3. ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK, AND THIS MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 4. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR INSTRUCTION PRIOR TO PROCEEDING. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES, AND SHALL REPAIR ALL DAMAGE TO EXISTING UTILITIES THAT OCCUR DURING CONSTRUCTION. 6. THE CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 7. LIMITS OF CLEARING SHOWN ON GRADING PLAN ARE BASED UPON THE APPROXIMATE CUT AND FILL SLOPE LIMITS, OR OTHER GRADING REQUIREMENTS. 8. THE PROPOSED CONTOURS SHOWN IN DRIVES AND PARKING LOTS AND SIDEWALKS ARE FINISHED ELEVATIONS INCLUDING ASPHALT. REFER TO PAVEMENT CROSS SECTION DATA TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 9. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE SO THAT RUNOFF WILL DRAIN BY GRAVITY FLOW ACROSS NEW PAVEMENT AREAS TO NEW OR EXISTING DRAINAGE INLETS OR SHEET OVERLAND. 1o. ANY GRADING, BEYOND THE LIMITS OF CONSTRUCTION AS SHOWN ON THE GRADING PLAN, IS SUBJECT TO A FINE. 1T. GRADING WITHOUT AN APPROVED EROSION CONTROL PLAN IS SUBJECT TO A FINE. 12. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON DENUDED AREAS AND ESPECIALLY WHEN THE CONSTRUCTION SEQUENCE REQUIRES IT. 13. ALL GRADED SLOPES ARE TO BE SEEDED OR LANDSCAPED WITHIN 15 DAYS OF COMPLETION OF GRADING. ALL REMAINING AREAS ARE TO BE SEEDED WITHIN 3o DAYS. 14. EXISTING GRADES, CONTOURS, UTILITIES AND OTHER EXISTING FEATURES FROM FIELD RUN SURVEY. 15. THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ANY DEWATERING NECESSARY TO CONSTRUCT THE PROJECT AS SHOWN ON THE PLANS. 16. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SHEETING, SHORING, BRACING AND SPECIAL EXCAVATION MEASURES REQUIRED TO MEET OSHA, FEDERAL, STATE, AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THESE DRAWINGS. THE DESIGN ENGINEER ACCEPTS NO RESPONSIBILITY FOR THE DESIGN(S) TO INSTALL SAID ITEMS. 17. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATION, ELEVATION, AND DIMENSIONS OF EXIT DOORS, RAMPS, BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 18. ALL FILL MATERIALS, EXISTING BUILDING FOUNDATIONS, PAVEMENT AND UTILITY STRUCTURES, TOPSOIL, AND ANY OTHER DELETERIOUS MATERIALS SHALL BE COMPLETELY REMOVED FROM WITHIN THE BEARING ZONE BELOW THE STRUCTURE. 19. ALL FOUNDATION EXCAVATION SHALL BE INSPECTED BY A QUALIFIED GEOTECHNICAL REPRESENTATIVE TO DETERMINE WHETHER UNSUITABLE MATERIAL MUST BE REMOVED. ALL UNDESIREABLE MATERIAL SHALL BE REMOVED, BACKFILLED AND COMPACTED AS REQUIRED BY THE GEOTECHNICAL REPRESENTATIVE. 2o. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED OR DEPICTED. 21. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE GENERAL N.P.D.E.S PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES. 22. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. 23. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. 24. ALL UNSURFACED AREAS DISTRURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL CONTRACTOR SHALL APPLY STABILIZATION FABRIC TO ALL SLOPES 3H:1V OR STEEPER. 25. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. DRAINAGE NOTES L A MINIMUM GRADE OF o.5o % SHALL BE MAINTAINED ON ALL PIPES, UNLESS OTHERWISE NOTED. 2. PIPE LENGTHS AND SLOPES INDICATED ON THE PLANS ARE APPROXIMATE ONLY. 3. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHERAPPLICABLE CRITERIA: A. NO MORE THAN Soo LF OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACK -FILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RESTABALIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE EROSION AND SEDIMENT CONTROL REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. 4. CATCH BASINS, MANHOLES, FRAMES, GRATES, ETC. SHALL MEET THE REQUIREMENTS OF THE LATEST EDITION OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD DRAWINGS. REFERENCE THE FOLLOWING STANDARD DETAILS: 840.02 - CONCRETE CATCH BASIN 840.03 - FRAME, GRATES, AND HOOD FOR CATCH BASINS 840.14 - CONCRETE DROP INLET 840.04 - CONCRETE OPEN THROAT CATCH BASIN 840.14 - CONCRETE DROP INLET 840.16 - DROP INLET FRAME AND GRATES 840.31- CONCRETE JUNCTION BOX 840.36 - TRAFFIC BEARING GRATED DROP INLET 840.52 - PRECAST MANHOLE 840.45 - PRECAST DRAINAGE STRUCTURE 838.80 - PRECAST CONCRETE ENDWALL 5. ALL PIPES SHALL BE LAID ON STRAIGHT ALIGNMENTS AND EVEN GRADES USING A PIPE LASER OR OTHER ACCURATE METHOD. 6. STORM PIPE SHALL BE AS FOLLOW UNLESS OTHERWISE NOTED: TYPE 1: RCP, CLASS III PER ASTM C-76, WITH FLEXIBLE PLASTIC BITUMEN GASKETS AT JOINTS. TYPE 2: HIGH DENSITY POLYETHYLENE PIPE (HDPE) - AASHTO DESIGNATION M252 TYPE S, M294 TYPE S AND MP7-97 TYPE S, SMOOTH INTERIOR/ANNULAR EXTERIOR. ONLY PERMITTED WHEN SPECIFICALLY INDICATED ON THE CONSTRUCTION DRAWINGS. PIPE SHALL BE INSTALLED IN ACCORDANCE WITH PIPE MANUFACTURER'S INSTALLATION GUIDELINES. PIPE JOINTS AND FITTINGS SHALL BE WATERTIGHT. 7. ALL STORM DRAINAGE WITHIN THE PUBLIC ROADS SHALL BE CLASS III REINFORCED CONCRETE PIPE UNLESS OTHERWISE NOTED. 8. EXISTING DRAINAGE STRUCTURES TO BE INSPECTED AND REPAIRED AS NEEDED, AND EXISTING PIPES TO BE CLEANED OUT TO REMOVE SILT AND DEBRIS. 9. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 1o. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. 11• PRECAST STRUCTURES MAYBE USED AT CONTRACTORS OPTION• 12. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". 13. STRUCTURE TOP ELEVATIONS SHOWN HERE ARE APPROXIMATE. CONTRACTOR SHALL ADJUST AS NECESSARY. 14. RIM ELEVATIONS AS NOTED ARE TO THE GUTTER FLOW LINE. W z 0 N o w m Z o w m aim _N CONSULTANT: Bowman North Carolina, Ltd. (Formerly Triangle Site Design, PLLC) 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 mlowder@bowman.com FIRM# F-1445 ���,ryrerrlpr.,r 4+.1° M "# •• JIrw OWNER/DEVELOPER: RHETSON COMPANIES, INC. ATTN. ALAN CAGLE 2075 JUNIPER LAKE ROAD WEST END, NC 27376 (910)944-0881 alan@rhetson.com This document, together with the concepts and designs presented herein, as an instrument of services, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Bowman North Carolina, Ltd. shall be without liability to Bowman North Carolina, Ltd. CIO 0 CIO Drawn Checked Rhetson Project# 20138 Project No. 058001 Initial Date: September 20, 2021 Title GRADING & DRAINAGE PLAN Sheet NoC-4 )G#23213-Red Springs (Hoke