Loading...
HomeMy WebLinkAboutSW6210908_O&M Agreement/Plan_20211012Operation & Maintenance Agreement Project Name: I Bay Tree Solar, LLC Project Location: 11700 George Long Road, Harrells, NC 28444 Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & co Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: DryPond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: ing O&M sheets Location Location Location Location Location Location Location Location Location Location Location Location Location Location Location Ty will be added automatically): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): pi : Dis ersed flow onl 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: i /� - Signature:�2A Date: 9/ q 07 I, iSU+, a Notary Public for the State of pa(� 6W ^0 County of U64 do hereby certify that ,le% �nq(r,W personally appeared before me this day of Denke ml—( 9 -)'L\ and acknowledge the due execution of the Oper ions and Maintenance Agr ement . Witness my hand and official seal, T iosolv �.. G �mfsaioq• 0��., �•�� NoTgA? I _ ;tn 'OUSLIC F'•••••••••••' My commission expires �b7h, Cous STORM-EZ Version 1.5 08M Agreement 9/212021 Page 1 of 1 Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area. After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. The vegetated conveyance or vegetated receiving area will be inspaphautterly Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetation Vegetation is too short or too Maintain grassed vegetation such that the swale or vegetated area does long. erode during the peak flow from the 10-year storm Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or erosiN Regrade the soil if necessary to remove the gully, and then re -sod (or pl Vegetated receiving areas with other appropriate species) and water until established. Provide lime gullies have formed. a one-time fertilizer application. Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device (if applicable) The outlet device is damaged Repair or replace the outlet device. Erosion or other signs of damage have occurred at the Repair the damage and improve the flow dissipation structure. outlet. The receiving water Discharges from the site are causing erosion or Contact the local NCDEO Regional Office. sedimentation in the receiving water. not nt and