Loading...
HomeMy WebLinkAboutSW7110304_CURRENT PERMIT_20110502STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD I �r NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Governor Colleen H. Sullins Director Natural Resources Dee Freeman Mr. Craig A. Conrad, CEO and General Manager Carteret — Craven Electric Corporative PO Box 1490 Newport, NC 28570 Subject: Stormwater Permit No. SW7110304 Temples Point 115 to 15x25 KV Substation High Density Commercial Wet Pond Project Craven County Dear Mr. Conrad: �6 The Washington Regional Office received a complete Stormwater Management Permit Application for Temples Point 115 to 15x25 KV Substation on March 4, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7110304 dated May 2, 2011, for the construction of the subject project. This permit shall be effective from the date of issuance until May 2, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor, or me at (252) 946-6481. Si sere , AI coda Regional Supervisor Surface Water Protection Section AH/ sd: K:\WQS\STORMWATER\SD\SW7110304 cc: Bryan D. Maness, PE, Booth & Associates, Inc. (1011 Schaub Dr., Raleigh, NC 27606) Craven County Building Inspections %,Mashington Regional Office North Carolina Division of Water Quality Internet: www.newaterfluality.org 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 Not-thiCaa+rolliina An Equal Opportunity/Affirmative Action Employer -50%Recycled/10% Post Consumer Paper NRt' "alk State Stormwater Management Systems Permit No. SW7110304 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carteret — Craven Electric Cooperative Temples Point 115 to 15x25 KV Substation FOR THE construction, operation and maintenance of one wet detention pond in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 2, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. ' 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 35,284 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: Page 2 of 7 State Stormwater Management Systems Permit No. SW7110304 a. Drainage Area, ft2: 55,758 b. Total Impervious Surfaces, ft2: 35,284 C. Design Storm, inches: 1.5 d. Pond Depth - average, feet: 3.0 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 20.50 g. Permanent Pool Surface Area required, ft2: 4,104 h. Permanent Pool Surfacs Area, ft : 5,904 i. Min. Volume required, ft : 4,318 j. Permitted Storage Volume, ft3: 12,159 k. Temporary Storage Elevation, FMSL: 22.00 I. Controlling Orifice: 1.50"0 pipe M. Permitted Forebay Volume, ft3: 2,646 n. Receiving Stream/River Basin: West Prong Morton's Mill Pond/Neuse o. Stream Index Number: 27-123-2-1 p. Classification of Water Body: "SA; HQW, NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, Page 3 of 7 State Stormwater Management Systems Permit No. SW7110304 and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with Page 4 of 7 State Stormwater Management Systems Permit No. SW7110304 any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until May 2, 2021. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 2nd day of May, 2011. N4TH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SW7110304 Page 5 of 7 State Stormwater Management Systems Permit No. SW7110304 Temples Point 115 to 15x25 KV Substation Stormwater Permit No. SW7110304 Craven County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7110304 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Craven County Building Inspections Page 7 of 7 Temples Point 115 to 15x25 KV Substation Stormwater Permit No. SW7110304 Craven County Designer's Certification State Stormwater Management Systems Permit No. SW7110304 RECEIVED NOV - 6 2012 DWQ-WARO i, /Jryan'b, Maness , as a duly registered / ro�ssroka� C„ai.,rP� in the State of North Carolina, having been authorized to observe (periodically weekly/ full time) the construction of the project, for (-A? eraueh f lec6-k & e�(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation.of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature 4; Registration Number 033726 \\� N\i0gR0��/% Date 11/5-12az -4pFESSi��!y9� • a SEAL r-• _ 033726 : vG I N E��jy�Y ►I /s/��z Page 6 of 7 I State Stormwater Management Systems Permit No. SW7110304 Certification Requirements: JM1. The drainage area to the system contains approximately the permitted acreage. 'BbM2. The drainage area to the system contains no more than the permitted amount of built -upon area. pM 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. $h M 5. The cutlet/bypass structure elevations are per the approved plan. E_4_M_6. The outlet structure is located per the approved plans. IM 7. Trash rack is provided on the outlet/bypass structure. 'FhM 8. All slopes are grassed with permanent vegetation. 'ED 9. vegetated slopes are no steeper than 3:1. 'b M 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. EbM 11. The permitted amounts of surface area and/or volume have been provided. ?DM 12. Required drawdown devices are correctly sized per the approved plans. 'EBM13. All required design depths are provided. &DH 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. ADM 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Craven County Building Inspections Page 7 of 7 Booth&Associates, Inc. engineering for the future since 1960 November 5, 2012 Mr. Al Hodge North Carolina Department of Environment & Natural Resources Water Quality Division 943 Washington Square Mall Washington, North Carolina 27889 Subject: Carteret -Craven Electric Cooperative Newport, North Carolina Temples Point 115 to 15 x 25 kV Substation Designer's Certification Dear Mr. Hodge: project. VIA UPS/G120UND RECEIVED NOV - 6 2012 DWQ-WARD Enclosed for your records is the Designer's Certification for the subject If yco should have any questions, please call our office. bdm/kpp enc/cc: Mr. Will Pittman Mr. William S. Dorsett, PE Enclosures 08-6836-8003/308 Sincerely, BOOTH & ASSOCIATES, INC. Bryan D. Maness, PE 5811 Glenwood Avenue 919.851.8770 office Raleigh, NC 27612 919.859.5918 facsimile www.booth-assoc.com Permit No. SC�� I (� 3 O Lt (to be pmvldeci by DWO) (Aj� ®�r•W O20F W A Pf9y y 9 NCD`ENR o� STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Dale Drainage area number II: DESIGN INFORMATION Site Characteristics Drainage area 55,757 ry' Impervious area, posbdevelopment 35,28411 ✓ % impervious 63.28 % V y Design rainfall depth 1,5 in Storage Volume: Non-SAWaters Minimum volume required fla Volume provided 113 Storage Volume: SA Waters 1.5' runoff volume 1,090 rya Pre -development 1-yr, 24-hr runoff 8,713 rya Post -development l-yr, 24-hr runoff 6,186. rya / Minimum volume required 1,090 rya✓/ Volume provided 12,159 ry3', Peak Flow Calculations Is the pre/post control of the lyr 24hr stone peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.6 in Rational C, pre -development I used SCS (unitless) Rational C, post -development I used SCS (unitless) Rainfall intensity: 1-yr, 24-hr storm I used SCS inlhr OK Pre development 1-yr, 24-hr peak flow 1.58 flalsec Post -development 1-yr, 24-hr peak flow 0.05 ft3/sec / Pre/Post 1-yr, 24-hr peak flow control -1.53 ft3lsec V Elevations Temporary pool elevation 22.00 fmsl Permanent pool elevation 2050.fmsl SHWT elevation (approx. at the pen, pool elevation) 20.50 frill Top of 1Oft vegetated shelf elevation 21.00 fmsl Bottom of 1Off vegetated shelf elevation 20.00 first Sediment cleanout, tap elevation (bottom of pond) 16.00 fmsl Sediment cleanout, bottom elevation 15.00 fmsl Sediment storage provided 1.00 ry Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the top of the additional volume 22.0 fmsl OK Form SW401-Wet Detention Basin-R.V B-9/17/09 Parts I. & 11. Design Summary, Page 1 of 2 Permit No. (to be pm,,aded by DWQ) II. DESIGN INFORMATION - Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Ape,, -Pod Area, bottom of 10ft vegetated shelf, Aua mal Area, sediment cleanout, top elevation (bottom of pond), Ay pq,d Volumes Volume, temporary pool Volume, permanent pool, Vp,,,,,ypa Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? MountainlPiedmont SAIDA Table Used? SA/DA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, V... Area provided, permanent pool, App, _p, Average depth calculated Average depth used in SAIDA, d„, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A,_. Area, bottom of 1Oft vegetated shelf, Apo eheo Area, sediment cleanout, top elevation (bottom of pond), Apo. 'Depth" (distance blw bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, it., (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Cc) Driving head (Ho) Drawdown through weir Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak Bow Post -development 1-yr, 24-hr peak Bow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of 0owpalh to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: 9,360 ft7 ,✓ 4,104 ft' 7.36 (unitless) ✓ 5,904 ft' OK ✓ 4,004 it' ✓ 1,380 ft' ✓ 12,159 ft' OK 13,085 ft' 2,646 rys 20.2% % OK 90 % Y (Y or N) ✓ N (Y or N) ✓� 7.36 (unitless) N (Yor N) 13,085 ft' 5,904 ft' ft Need 3 ft min. ft Y (Y or N) 5,904 ft' 4,004 ft2 1,380 ft' 4.00 ft 3.11 It 3.0 it OK OK Y (Yor N) 1.50 in In' 0.65 (unitless) 0.48 ft N (Yor N) (unitless) (unitless) It If 1.58 ft'Isec 0.04 ft`/sec 0.04 ft/sec 4.00 days OK, draws down in 2-5 days. 3:1 OK 10 :1 OK 10.0 It OK 5:1 OK 5.0 :1 OK Y (Y or N) OK 1.0 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 6' Diameter Capped Drain Pipe Form SW401-Wet Detention Basin-Rev.8.9/17/09 Pans I. & II. Design summary, Page 2 of 2 Pennit Number. �W -7 11 C` F (to be provided by DI9'Q) Drainage Area Number: -A>Q1 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity _ of structures, safe of the public, and the removal efficiency of the BMP. c The wet detention basin system is defined as the wet detention basin, MAR 4 2011 pretreatment including forebays and the vegetated filter if one is provided' This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ® does ❑does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by UWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise 'damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the ElanL5 rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How 1 will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water F osion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 21 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 21 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 20.5 16 Pe maw Pool -------- -------♦--- Volume Sediment Removal Elevation 16 Volume `15-ftMin.------------------------------------------A------i Storage Sedimei Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev,4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project naine:Carteret-Craven EC - Temples Point 115 to 15 x 25kV Substation BMP drainage area number: Print name: Jacob H. Joplin, PE Title: Director of Eneineerine Services Address: 1300 HiehNvay 24 West Newport, NC 28557 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, CI 1 h l fb • W t 130 f) , a Notary Public for the State of n 0(I h U 0) ) h CcJ, County of C o (4 P I(C4— , do hereby certify that 76 COh r � '1 - 1U p 1 t fl personally appeared before me this 0 day of Q b( U CI ( , and acknowledge the due execution of the forgoing wet detention Asin maintenance requirements. Witness my hand and official seal, My commission expires U 1 d , 4()) 3 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 U�ae_ DWQ USE ONLY Date Received Pee Paid Permit Number Applicable .ules: ❑ Coastal SIN -1995 (select all that apply) ❑ Non -Coastal SW- HQW/ORW ❑ Other WQ M mt Plan: ❑ Coastal SW - 2005 ❑ Ph II - Post Construction Waters ❑ Universal Stormivater Manegen ent Plan 3 State of North Carolina Departirient of Environment and Natural Resources Division of Water Quality MAR 4 2011 STORMINATER MANAGEMENT PERMIT APPLICATION FORM ' "I This form may be photocopied for use as mi origival - 1. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): TEMPLES POINT 115 TO 15 X 25 kV SUBSTATION 2. Location of Project (street address): N.C. HIGHWAY 101 City: HA VELOCK CountS,:CRA VEN Zip:28532 3. Directions to project (from nearest major intersection): The entrance to the site is along N.C. Highway 101 approximately 1 /10 mile west of the intersection of N.C. Highway 101 and Temples Point Road 4. Latitude:34' 52' 07" N Longitude:76° 4747" iN of the main entrance to the project. II. PERMIT INFORMATION 1. a. Specify whether project is (check one): ®New ❑Modification b. if this application is being submitted as the result of a modification to an existing permit, list the existing permit number its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed" *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density []Drains to an Offsite Stermwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than con ently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-S77-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 1.76 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Fonn SWU-101 Version 07hin2010 Page] of6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Or ganization:CARTERET-CRAVIiN ELECTRIC COOPERATIVE Signing Official & Title:CRAIG A. CONRAD, PE - CEO AND GENERAL MANAGER b.Contact information for person listed in item la above: Street Address:1300 HIGHWAY 24 WEST City:NEWPORT State:NC Zip:28557 Mailing Address (if applicable):POST OFFICE BOX 1490 City:NE14IORT State:NC Zip:28570 Phone: (252 ) 247-3107 Fax: (252 ) 247-5997 Email:craioc@ccemc corn c. Please check the appropriate box. The applicant listed above is: © The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy, of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Lformation, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/1 Signing Official & b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if City: Phone: ( State: Fax: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:JACOB H. iOPLIAT, PE Signing Official & Title:DIRECTOR OF ENTGIN7EERING SERVICES b. Contact information for person listed in item 3a above: Mailing Address:POST OFFICE BOX 1490 City:I\TEWPORT Phone: (252 1 247-3107 Email:craizc©ccennc.r om 4. Local jurisdiction for building permits: Point of Contact: State:ATC Zip:28570 Fax: (252 1 247-5997 Phone #: Form SNVU-101 Version Mun2010 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. THE STORMWATER WILL BE COLLECTED IN GRASS -LINED CHANNELS AND ROUTED INTO A WET DETENTION BASIN. REFERENCE THE STORMWATER MANAGEMENT PLAN FOR A DETAILED 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the LOWER NEUSE River basin. 4. Total Property Area: 1.75 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area*:1.75 acres Total project area shall be calculated to exclude the followin the normal pool of innppounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NM line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MH1line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 46 9. How many drainage areas does the project have? 1 (For high density, count 1 for each proposed engineered stornmwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. _., .-,_ . s-F -. tBasnn Informapon �,�n'->a.� , t9�� Tje`,., ,Drama e;Atea,7 � Drama epAiea „Drama e Area,�lf Drama e,Area:» Receiving Stream Name West Prong Morton's Mill Pond Stream Class SA;I-IQW,NSW Stream Index Number * NC-27-123-2-1 Total Drainage Area (so 55,758 On -site Drainage Area (so 0 Off -site Drainage Area (so 0 Proposed Impervious Area** s 35,284 % Impervious Area** total 64% iIin iecvious"*`Surface Area 0; �-Draina `eAma l' jDr2ina e Areii;:g rDra_iiia e,AreaW 1Draiiia e Area °- On -site Buildings/Lots (so 0 On -site Streets (sf) 0 On -site Parking (so 0 On -site Sidewalks (so 0 Other on -site (so 0 Future (so 35,284 Off -site (so 0 Existing BUA*** (so 0 Total (so: 35,284 ) Streams Class and Index Number can be determined at: kitty://portal.ncdenr.org/webkud[ps/csu/classifications Form SWU-101 Version 07Jun2010 Page 3 of bnzzlervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidezvalks, gravel areas, etc. Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and Which zoill be replaced by nezo BUA. 11. I -low was the off -site impervious area listed above determined? Provide documentation. Proieets in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent saornnvater requirements as per NC11 C 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://Liortal.ncdenr.org/web/wq/ws/su/bap-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://pmtal.ncdcnr.Ol'g/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/w(:b/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdennorg/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. `ECM 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N/A Form. (if required as per Part V11 below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M TDM agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to 'EDM http://www.envhelp.org/pages/onestopexpress.iitml for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor Bt\M the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the 130 receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 'AW 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: 'ROM a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MI-iW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with hearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. Form SWU-101 Version 07Jun2010 Page 4 of 6 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage casements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify Bow elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 2749 Page No: 724 ` b 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC WA Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1 a, 2a, and/or 3a per NCAC 2I-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.seci,etary.state.nc.LIS/Corpoi-atioiis/CSearch.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/cvs/su/Statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:BRYAN D. MANESS, PE Consulting Firm: BOOTH & ASSOCIATES, INC. Mailing Address:1011 SCHAUI3 DRIVE City:RALEIGH State:NC Zip:27606 Phone: (919 ) 851-8770 Fax: (919 ) 859-5918 Eniail:niaiiessbd@booth-assoc.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 21as been filled out, complete this section) I, (print or hype name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or hype nanne of organization listed in Contact Information, item In) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of As the legal property owner 1 acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property, owner, it is my responsibility to notify DWQ immediate]), and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1. and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witless my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print m, type rnnme of person listed in Contact Information, item 1a) CRAIG A. CONRAD, PE certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC,�H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2005-211. Date: Februar�?O11 I, Peggy Ann HOTrp l 1 a Notary Public for the State of North -Carolina County of Ca rterpi- , do hereby certify that C'ra i q A . CDn rn cl personally appeared before me this2 8 thay of February 2011 and acknowledge the due execution of the applicationn 'for . ` a stormwater permit. Witness my hand and official seal, Peagv Ann Horrel 1 -U_:_ �.lL1A�%� i ( SEAL My commission expires 4 / 1 / 2 015 Form SWU-101 Version 07Jun2010 PaV 6 of 6