Loading...
HomeMy WebLinkAboutSW7110303_APPROVED PLANS_20110315STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW_ 7l�D�v3 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATEZ�Ci3� YYYYMMDD SIZE DATA: TOTAL SITE AREA: 4.458 ACRES TOTAL I LOTS. 1 BUILDING HEIGHT 1 STORY MINIMUM BUILDING SETBACKS: FRONT YARD: 20 FEET BACK YARD: 20 FEET SIDE YARD. 10 FEET UTILITY SERVICES WATER -CRAVEN COUNTY (PUBLIC) SEWER -SEPTIC ((PRIVATE ELECTRIC-PRI ESSENERGY GENERAL NOTES• 1. WASTEWATER SYSTEM SHALL BE INSPECTED AND APPROVED BY THE CRAVEN COUNTY HEALTH DEPARTMENT AND THE ENGINEER PRIOR TO BEING PLACED INTO SERVICE. 011 NC HIGHWAY 70 EAST NEW BERN, NC LOATAN SITE---%, Cam LA 1 x lNlwmv l SITE LOCATION ,. DRAWING SHEET INDEX CS COVER SHEET C3 SITE GRADING & EROSION CONTROL PLAN f 1A . s...r NOT TO SCALE C8 STORMWATER DETENTION POND PLAN & DETAILS C9 DETAILS *SHEETS Cl—C2 & C4—C7 NOT IN SET* CIVIL LEGEND EXISTING DESCRIPTION NEW TRANSFORMER DROP INLET & INLET PROTECTION WATER VALVE H CHECK DAM ® PEDESTAL UTILITY POLE LIGHT POLE 6 GUY POLE E GUY WIRE SURVEY CONTROL POINT RAW WATER MAIN STORM SEWER D — —w— — DOMESTIC WATER NI — —S— — SANITARY SEWER S — 0°ERHEAD ELECTRICAL UNCERGROUND ELECTRICAL — - — - — - — DITCH/SWALE 0 BITUMINOUS CONCRETE PAVEMENT 0 CONCRETE 0 404 WETLANDS TEMPORARY BENCHMARK 5.39 SPOT ELEVATIONS + 5.39 — —5— — CONTOUR LINES 5 TREE LINE —CL 'u TREE/BUSH --x—x— FENCE SILT FENCE — —SF — DEMOLITION ITEMS X x SOURCE/DESTINATION UNKNOWN --t STORMWATER APPROVED -)P7H e _INt' =NVI MENTAL MANAGEMENT c'OMMIS: IGN IVIaTO! CFL,f, F7 ^UE.LI?ti cate_M NOTE: SECTION 404 WETLANDS ARE NOT LOCATED WITHIN THE PROJECT LIMITS OF DISTURBANCE. GENERAL CONSTRUCTION NOTES: T. THE LOCATION ME DEPTHS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESP%SIBLE FOR SCANNING THE AREA OF WORK TO IDENTIFY TO HIS OWN SATISFACTION THE EXTENT OF UILITIES PRESENT INCLUDING THE UTILITIES INDICATED TO BE PRESENT, THOSE NOT SHOWN, AND THOf SHOWN TO BE IN A DIFFERENT LOCATION. 2. PHYSICAL SITE F9URES OUTSIDE THE AREA OF WORK OR THOSE FEATURES NOT RELEVANT TO THE WORK BEING PERFORMED ARE NOT SHOWN FOR CLARITY. 3. GRADE EVENLY BETWEEN SPOT ELEVATIONS SHOWN. oW H O zz tc-g� ,kE to m • ao 0 n rn N � F+1 c0 cID Z 1 ^ I_ —� rM N 0 c0 Zj U N m �Lu=v W �zx< Z E Z 0.-i � La o Zo m o CLj w Z cMo C t0 N V1 04 04 aC)o z o m _0 � o a a I w U) >-4 E--4 cf) C/D z w U Q w z w W �O F Z x x ��w o wz XP MAR 11 e %oI I MM 09042 i GENERAL CONSTRUCTION NOTES: 1. THE LOCATION AND DEPTHS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCANNING THE AREA OF WORK TO IDENTIFY TO HIS OWN SATISFACTION THE EXTENT OF UTILITIES PRESENT INCLUDING THE UTILITIES INDICATED TO BE PRESENT, THOSE NOT SHOWN, AND THOSE SHOWN TO BE IN A DIFFERENT LOCATION. 2. PHYSICAL SITE FEATURES OUTSIDE THE AREA OF WORK OR THOSE FEATURES NOT RELEVANT TO THE WORK BEING PERFORMED ARE NOT SHOWN FOR CLARITY. 3. GRADE EVENLY BETWEEN SPOT ELEVATIONS SHOWN. I I to II T DRIVE`d P1" 302 296 PS�PRPPRKINB LNT 30 30.z 29 8 Ex RR Spike Ek ,yR Spike of mI O 36 °]130.7 1 907 0 7 -'0:xn n IIII//" Q�oo.00c o0 o° 0 1 0 o' O 0 1 • NOTE: THE PROJECT NPDES CONSTRUCTION PERMIT REQUIRES THAT EROSION CONTROL DEVICES AND STORM WATER OUTFALLS BE INSPECTED WEEKLY AND WITHIN 24 HOURS OF A 1/2-INCH RAIN EVENT. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED, EVIDENCED BY 95% VEGETATIVE GROWTH FOR AREAS RECEIVING SEEDING. TO FACILITATE RAINFALL MONITORING, A RAIN GAGE IS REQUIRED TO BE ONSITE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED, INSPECTION RECORDS ARE TO BE FORWARDED TO THE CONTRACTING OFFICER AND ALL TEMPORARY EROSION CONTROL MEASURES REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES MUST BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL AND NPDES CONSTRUCTION PERMIT MUST BE MAINTAINED BY THE CONTRACTOR AT THE PROJECT SITE. DICKERSON & MORGAN ( portion 1 ) PC:E S:188 2567-602 LIMITS OF DISTURBANCE 3.9 ACRES STORMWATER BAST SWALE1 181,059 SF DRAINAGE BASIN 44.6% BUA C=0.56 _ 30.7 29.8 9 a +30.5 D3++30.0 O +29.6 + 29, ° 2.0 0 0 32. 2: +32.5 II ° 32 0 31.38 0 ° ° ° ° ° 31.631 318 351F 4 I 31 SWALE DRAINAGE BA SWALE #1 DRAINAGE BASIN 47" E 29. ' +29.1 - 2e 3 2as 28.5 O 28.1 -� 2E 28.9 .8 - +-27 +26.9 28. O'R z, 6 ' 9 °° °°oo°° °° 26.8 35LF15 RCP 28.6 28. ;, 29. ° 29 ° 29.1 28. °°°°° ° 42 SEPTIC FIELD AREA ;° o ° ,its ,3 + 294 O O o \ WT29.5 ° 2 9.4 o 29.2t 29.T 0 I o ° 55. SWALE y1 ° ° 1 DRAINAGE BASIN 9.1 29. 93 0 29.4 1 0 9 28.5 0 0 0 7-------+2-9 ° 12" HOPE - 273 ASPHkT PARKING MAINTENANCE PLAN 1. REMOVE SEDIMENT FROM BEHIND SILT FENCING AND CHECK DAMS IN ACCORDANCE WITH THE INDIVIDUAL MAINTENANCE PLANS INDICATED FOR EACH DEVICE. 2. ALL AREAS WILL BE FERTILIZED, SEEDED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT ASPHALT ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. STORMWATER DETENTION POND SHALL BE USED AS A TEMPORARY SEDIMENT TRAP. UPON COMPLETION OF CONSTRUCTION, ALL SEDIMENT SHALL BE REMOVED FROM THE STORMWATER DETENTION POND TO RESTORE IT TO THE DESIGN DEPTHS. 61, E" 97.97' \ 1 6 oI WL =a6 WA v BAS \ g TI one �181,0 4 46% 1 11 4.6% BUA \ \6 -.5 \ v 1 IXI NG GRAVEL t ZONE 1 ZONE 2 1, Ivs LEA AREA 1 \� o � N WLll 1 1 S li1 COMMYNIC ONS D AGE BASIN 1683-235 z 1 UMUS OF DIS RBANCE N 1 3.9 ACRES of � lz - 29.5 0 37.7° °°°°°oo°° °°°°° 31.5 30.5 ° , 9 30.7 ° 29.5° °°7.75 29 °27. 11° o° 32.0 .2 / 27.1�. ° ° °° ° ° 36.25 35.0- °° 9 ° 6.5 35.25 j ° ° ° 35LF 2 HDPE 35.5 ° ° 29.3 ` 0 6.75 ° ° ° ° ° � . '' 465.0 EPTIC TANK AREA 26.8�' _ .. I IP.Vons •. .-.- 28.Oa' � -.... I 1500 SF IMPERVIOUS AREA MAXIMUM O__.._ I AMUSEMENT RIDE AREA 10 250 - - CAGES O 1 �'' WL N »•s • w 6' yL h O \ \ N u O ,p w c \IL6 E \ 5 �T5-1'SWAUE�, 1OLF 12" RC I 2,000 SF IMPERVIOUS AREA MAXIMUM - ]? I I 9] j.� .� 3� � 1 1� STORMWATER BASIN f I of a i II 3 .D DOE O eRLDpPRD E+ RR Pre m I II iP I,II I I I�o M " m m WA=a A SITE GRADING PLAN C3 C3 SCALE: 1" = 30' 44.6% BUA C=0.56 OMITS OF DISTURBANCE 3.9 ACRES 2S.5 181059 SF 1 I i 44.6% BUA ITI I ► I LIMITS OF DISTURBANCE HII I , DETENTION POND 1 : 3.9 ACRES of I I � III -WYNNE �I °J (Tract 2 W3.481'83 F BI i= g,--P _--- NOTE: SECTION 404 WETLANDS ARE NOT LOCATED WITHIN THE PROJECT LIMITS OF DISTURBANCE. NOTE: 1. ALL DISTURBED AREAS SHALL BE VEGETATED IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN. SEE DETAIL L, SHEET C9. NEW WORK ITEMS lO NEW ASPHALT ROAD. SEE DETAIL A, SHEET C9 O2 NEW ASPHALTIC CONCRETE PAVEMENT. SEE DETAIL B, SHEET C9 O3 NEW CONCRETE SIDEWALK. SEE DETAIL C, SHEET C9. ® NEW CONCRETE SLAB. SEE DETAIL D, SHEET C9. O5 NEW HANDICAP SPACE DESIGNATION & SIGNAGE. SEE DETAIL E, SHEET C9. © NEW PAVEMENT STRIPING. SEE DETAIL F, SHEET C9. O7 INSTALL GRAVEL CONTROL ENTRANCE. SEE DETAIL G, SHEET C9. ® INSTALL SILT FENCE. SEE DETAIL F, SHEET C9. O9 VEGETATED SWALE. SEE DETAIL H, SHEET C9. 10 INSTALL CHECK DAM. SEE DETAIL I, SHEET C9. 11 INSTALL INLET/OUTLET PROTECTION. SEE DETAIL J, SHEET C9 •� 9 N� Ts0 \11 (31 2 + n 1 a Pq 'S ONE 2 1 l .0 9 F MpuND � \ OZC J 00'A WLa P O STORMWATER BASI 181,059 SF262 44.6% BUA + o LIMITS OF DISTU CE 3.9 ACRES \ \ F 1 5:1 SWALF .N v.ONE�1 0 Wi20E%P20 © \ o\\\\. ZON 2\ MINIATURE GOLF RS W zo , S \ z 5 00SF f�Y AkEAMAXIMUM o O 6 p <, � IV \5.6 wile ? 259 \\ 28.8t SPECIAL SEEDING NOTE: THE ANGLE FOR GRADED SLOPES AND FILL SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. ADDITIONALLY, WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS FROM THE COMPLETION OF THE PROJECT (WHICHEVER IS SHORTER), PERMANENT GROUND COVER SHALL BE ESTABLISHED. L -\., �zti un SEQUENCE OF OPERATION: 1. OBTAIN APPROVED EROSION AND SEDIMENTATION CONTROL PERMIT FROM THE NCDENR'S LAND QUALITY SECTION 2. REVIEW EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AT PRECONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. ERECT SILT FENCING. 5. EXCAVATE STORMWATER DETENTION POND AND STABILIZE. 6. CONSTRUCT SI-E IMPROVEMENTS. 7. STABILIZE WITH GRASS ALL AREAS NOT TO BE FURTHER DISTURBED BY CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN. 8. REMOVE ANY ACCUMULATED SEDIMENT FROM STORMWATER DETENTION POND. 9. ADDITIONAL MISCELLANEOUS EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE REQUIRED NHEN DEEMED NECESSARY BY THE PROJECT ENGINEER OR THE NCDENR'S LAND QUALITY SECTION. 10. REMOVE GRAVEL CONTROL ENTRANCE, SILT FENCING AND STONE CHECK DAMS AT COMPLETION OF CONSTRUCTION AND THE ESTABLISHMENT OF FINAL VEGETATION. 30 0 15 30 60 GRAPHIC SCALE: i" = 30' L0 • 00 O n N L0 1•� rn z co I (1) N w LO W-0 O C Lai Z 00 I/rq W m o O > L j M Lu Z C (0 r� V1 O Lo ON 04 ry : "m0 X Lii hO O a- D_ a O A-,' E-- E-- z � O W U U o CD V L W U O Q W C3 09042 i I I I I I � I I I I I I I I I I I I I I � I I I I I i I I I I I I I I I I I I I I I I I I I I I I I I � I I . -STORWATER BASIN LIMITS OF DISTURBANCE j 181,059 SF 13.9 ACRES J 42.5% BUA - C=0.56--------- - - - - CATION I 1 a U B I I I ! co CD e I I � a t1 I I I I 10 X I I 9o-00• ��� I � � ° I I 48.61 I i- - - - ---I L---------- STORWATER BARN 181,059 SF 42.5% BLIA LIMITS OF DISTURBANCE I 0=0.56 3.9 ACRES I I A Sib F (10N` POW 1: 3 L- VEGETATIVE SHELF 5 1 3 1 STORMWATER DETENTION POND CROSS-SECTION C8 I C8 J NOT TO SCALE ELEVATION=24.0' r, PERMANENT POOL ELEVATION 2# 5'; VEIN `= ` l,282 SF/ 'TEMPORARY POOL ELEVATION = 25.6', AREA = 10,174 SIF ELEVATION=23.5' FOREBAY _ _SEDIMENT CLEANOUT ELEVATION 0' - 18.1 POND BOTTOM ELEVATION = 17 0' 3 SOLID DDrrACT r`rA1r'D1_T1_ QAV #4 ALUMINUM1 4" O.C. 4" SCREW PVC OUTLET L2"x2"xl/4" CON1 3/8"x4" ALUMIN BOLTS AT 1' OP TRASH SCREEN-4 . .. ......... .... \ ® 4" O.C. EACH WAY WELDED TO FRAME 1_2"x2"x1/4" CONTINUOUS FRAME-WELDEI TOP RISER ELEV = 4" SCREW TYPE CAP 4" PVC 111111 .111111Ia1 10-YEAR PEAK 3/8"x4" ALUMINUM EXPANSION STAGE = 25.6 BOLTS AT 1' ON CENTER GROUT ANNULAR SPACE WITH NON -SHRINK GROUT INVERT OVERFLOW WEIR ELEV = 25.6 GROUT ANNULAR SPACE 1.55' CLEAR WITH NON -SHRINK GROUT (2 SIDES) 1' 2 f 3' CLEAR QUTT f lf?E 1i E`E1EV = 24.5' c ELEV=24.5' • INV OUT-24.` 4" PVC STUBBED INTO BOX a ` e: 4" PVC PLUG WITH t t LEpi ELEV = A 23.5' °. P a a CONNECTION POINT FOR SURFACE SKIMMER TO BE ; .' ' USED DURING CONSTRUCTION PERIOD ONLY. a 12^ a. a, ..•. 12^ TOP OF FOOTING = 21.5' BOTTOM OF PRECAST CONCRETE BASE = 20.5 POND STAGE/STORAGE RELATIONSHIP STAGE ELEVATION FT AR SF A VO CF TOTAL VOLUME ABOVE PERMANENT POOL 0 FT 24.5 7,282 0 0 0.5 FT 25.0 9,366 4,162 4,162 1.5 FT 26.0 10,713 10,039 14,201 2.5 FT 27.0 12,131 11,422 25,623 POKER SHBT PIMIING UST PIANDNG LOCATION SCIENIIHC PA16 (b111ON NAI6 9ZE SWi10W WR AR61 SNI11011 {NIOW IRE VRGRW'A BLUE FUG RE LARGE PLUG X PELTANDRA Emu ARROW ARUM LARGE PLUG X SAGRTANA wan BMITMIE IRGE PLUG X S4G UMA UTIFOLA DUCK POTATO LAR2 PU.IG X SPARGANRIN AWRICaNUM BUR -REED URGE PLUG X ZI MSIS NNIACFA WATER 111.0 LARGE PLUG % PROVIDE EVEN NUINER OF SPECES PW11FD AT 18' O.C. IN ALL MRECTNMIS WITHIN TEN FOOT WIDE PERWETER SHELF. PROVIDE A MIXTURE OF EACH PLANT SPECIES SO AS TO POIDE APPROXWATELY 33% IXAA7M OF THE PERWETER SHELF N DLH PUI K ZONE WOH SPECKS SPE90 FOR EACH PUWTWG ZOW a � 4.L J 8 11 6'x6' SECTION 2 DETENTION POND OUTLET STRUCTURE C8 C8 NOT TO SCALE STORMWATER DETENTION POND TABLE FOREBAY ONLY CONTOUR AREA SF AVG. AREA SF A VOL CF CUMM. VOL. 17 50 - - 0 18 128 _ - - 0 19 237 182 182 182 20 379 308 308 490 21 552 465 465 1 955 22 757 654 654 1,609 23 995 876 876 2,485 24 1,264 1,129 1,129 3,614 24.5 11,932 1,598 799 4,413 POND ONLY CONTOUR AR SF AVG. AREA SF A VOL CF CUMM. VOL. 17 796 - - - 18 1,155 - - - 19 1,546 1,350 1,350 1,350 20 1,968 1,757 1,757 3,107 21 2,423 2,195 2,195 5,302 22 2,910 2,666 2,666 7,968 23 3,428 3.169 3,169 11,137 24 3,979 3,703 3,703 14,840 24.5 5,350 4,664 2,332 17,172 NOTE: STORMWATER DETENTION POND SHALL BE USED AS A TEMPORARY SEDIMENT TRAP. UPON COMPLETION OF CONSTRUCTION, ALL SEDIMENT SHALL BE REMOVED FROM THE STORMWATER DETENTION POND TO RESTORE IT TO THE DESIGN DEPTHS. SAFETY LEDGE TEMPORARY POOL = 25.6' �" 3' \` ELEVATION24.0' MAIN POOL SEDIMENT CLEANOUT ELEVATION_=_48_0'_ _ _ 1 3 3 POND BOTTOM ELEVATION 17.0' AREA TO BE VEGETATED IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN PROVIDE PLANTINGS SPECIFIED AROUND FULL POND PERIMETER (10 FOOT STRIP) SHALLOW WATER AREA . SHALLOW LAND AREA 10, 2' 2' CORED 18" CORRUGATED NUM PIPE 3" WIDE x 1/4" THICK GALVANIZED METAL STRAPS 24" O.C. ANCHORED IN CONCRETE 12" MIN. (TYPICAL OF 4) 50 LF 18" CORRUGATED ALUMINUM PIPE ° I e a 30" WIDE x 9" THICK CONCRETE ANCHORAGE FOR PIPE 2' Vent Inlet 6 Aluminum straps 4' Sch 40 with Orange tip suscendinp inlet Couping Connection t 4' pvc That / 33. z 3' 40 SOLID pvc barrel `y\ or"arm" SUPPLIED BY USER 3 33' Y hYnta StlWSt I Skimmer shown in floating position Whose. sa clamps 3'threaded male nipple 4' inlet 4' HEAD on center of on outlet end extension 4 inlet and orifice NOTES: 1. TO BE USED DURING CONSTRUCTION PERIOD ONLY. 2. REMOVE POND OUTLET DEVICE ORIFICE PLUG TO CONNECT SKIMMER DURING CONSTRUCTION PERIOD. 3. REPLACE ORIFICE PLUG ONCE CONSTRUCTION IS COMPLETE. 4. SKIMMER TO BE 4-INCH AS MANUFACTURED BY J. W. FAIRCLOTH AND SON OF HILLSBOROUGH, NC. 3 DETENTION POND DRAWDOWN SKIMMER C8 C8 NOT TO SCALE SOIL ANALYSIS AND AMENDMENTS 1. THE CONTRACTOR SHALL BE REQUIRED TO COLLECT A MINIMUM OF TWO SOIL SAMPLES AT A DEPTH OF 6 INCHES FROM SEPARATE AREAS OF THE PERIMETER SHELF AREA OF EACH POND. 2. THE SAMPLES SHALL BE SUBMITTED FOR ANALYSIS FOR RECOMMENDED SOIL AMENDMENTS FOR THE PLANTINGS SPECIFIED. 3. THE CONTRACTOR SHALL PROVIDE SOIL AMENDMENTS NECESSARY TO ADJUST SOIL pH, ORGANIC CONTENT AND SOIL TEXTURE TO MEET THE FOLLOWING: PH VALUE 5.5 TO 7.0 ORGANIC CONTENT 5% MINIMUM BY DRY WEIGHT SOIL TEXTURE LOAMY SAND WITH NO MORE THAN 10% CLAY 4. ANY SOIL AMENDMENTS SHALL BE APPLIED AND MIXED INTO THE TOP 6 INCHES OF SOIL DEPTH 5. THE SOIL SHALL BE FINE GRADED TO REMOVE ALL STONES OR ROOTS GREATER THAN 1 INCH DIAMETER PLANT INSTALLATION AND ESTABLISHMENT 1. THE CONTRACTOR SHALL UTILIZE FRESH, NURSERY RAISED PLANTS AS SPECIFIED IN THE PLANT LIST. 2. ALL PLANTS SHALL BE INSTALLED WITHIN 48 HOURS OF RECEIPT FROM THE NURSERY AND SHALL BE MAINTAINED WITH ADEQUATE MOISTURE AND SUN TO MAINTAIN THEIR VITALITY. 3. PLANTS SHALL BE INSTALLED BY HAND AT THE SPACING SPECIFIED. 4. NEWLY INSTALLED PLANTS SHALL BE WATERED IMMEDIATELY AFTER INSTALLATION UNLESS THEY ARE INSTALLED IN A SUBMERGED SHELF AREA PLANTING RESTRICTIONS 1. PLANTING SHALL ONLY OCCUR DURING THE MONTHS OF APRIL THROUGH JUNE OR SEPTEMBER THROUGH NOVEMBER FOR SHALLOW LAND AREA PLANTINGS. SHALLOW WATER PLANTING SHALL ONLY OCCUR BETWEEN APRIL 1 THROUGH JULY 15. 2. FOR STORMWATER PONDS COMPLETED OUTSIDE THIS PLANTING WINDOW, TEMPORARY VEGETATION SHALL BE ESTABLISHED ON THE SHALLOW LAND PLANTING AREAS UNTIL THE PLANTING WINDOW IS REACHED. PLANTING MAINTENANCE 1. THE CONTRACTOR SHALL INSPECT ALL PLANTINGS ON A WEEKLY BASIS FOR THE FIRST 60 DAYS AFTER PLANTING. THE CONTRACTOR SHALL WATER ALL PLANTS AS NEEDED TO ENSURE SURVIVAL. 2. AFTER 30 DAYS, ANY DISEASED DEAD OR DYING PLANTS SHALL BE REPLACED WITH THE SAME SPECIES. 3. THE CONTRACTOR SHALL WARRANT ALL PLANTINGS FOR A MINIMUM PERIOD OF 12 MONTHS AFTER INSTALLATION. Qt to 0 0 • ^ 00 N o LO z � J 1 M W `° �J w ~ '0 z ZE � I-4 Wz o Z0mo CWM W wzto -oar C c0 N En v Lo u7 v a O U O to Z o W Q Z E-A W U Q Z O � � w O E-' U � Q W H r� O U) 09042 PER FOOT H —18'— PAVEMENT SLOPE: 1/4" PER FOOT 91. SLOPE ROADWAY DRAINAGE AWAY FROM SOW FIELD A INVERTED CROWN R TION C2 C9 NOT TO SCALE Z w w Q d 0 C. HkLSIDES ASPHALTIC CONCRETE SURFACE COURSE W 8" AGGREGATE BASE COURSE III —III COMPACTED SUBGRADE B NEW PAVEMENT ;SECTION C2 C9 NOT TO SCALE FINISH GRADE AS INDICATED 1/4":1' } x 1" 2" 4" 6x6 WWF 10/10 SIDEWALK WITHOUT INTEGRAL CURB NOTES: 1. PROVIDE EXPANSION JOINTS ALONG ALL EXISTING STRUCTURES AND WALKS AND AT 50' INTERVALS ALONG STRAIGHT SECTIONS OF WALK 2. PROVIDE CONTRACTION JOINTS AT 5'-0" INTERVALS AND AT ALL CHANGES IN DIRECTION OF WALK. CONTRACTION JOINTS SHALL BE 1/8" WIDE X 3/4" DEEP. C CONCRETE SWEWALK C2 Cl NOT TO SCALE » J2 1 1 4" 8" 2" (2) #4 CONT. D CONCRETE APRON C2 C9 NOT TO SCALE #4 @ 12" O.C. EACH WAY 4 • FILL 11, SHOULDER PER FOOT ASPHALT ' _ PAVING STBC OR ABC [1T:711Iy GRADE 12" RESERVED PARKING 12" MAXIMUM PENALTY $250 GS 20-37.6 NOTES: 1. COLORS BACKGROUND: WHITE LEGEND AND BORDER: GREEN WHITE SYMBOL ON BLUE BACKGROUND 2. MOUNT THE SIGN 60" ABOVE GRADE. 12" VAN ACCESSIBLE E HANDICAP PARKING SIGN C2 C9 NOT TO SCALE LANE WIDTH JcV STOP BAR -WHITE SPACE DESIGNATION -WHITE / PAVEMENT STRIPING / MARKING C2 C9 NOT TO SCALE 2� o O O O ° O ° 6" LAYER OF COARSE AGGREGATE OVER 0 0 0 0 ° 12" LAYER OF STONE BASE COURSE 0 0 0 o ° 0 0 0 0 MAINTENANCE: ° 0 ° O ° t. MAINTAIN ENTRANCE CONDITION. 0 0 0 0 O THIS MAY REQUIRE REPLACMENT OF STONE. 00000 0 o°o°o°o EDGE OF EXISTING ROADWAY PAVEMENT G GRAVEL CONTROL ENTRANCE C3 C9 NOT TO SCALE SELF -ANCHORING METAL POST ® 6' O.C. MAX 12 GAGE 6"x6" WIRE MESH FILTER FABRIC 8 BURY <�= FLOW MAINTENANCE: 1. INSPECT STRUCTURES WEEKLY AND AFTER AT LEAST A 1/2" OR GREATER RAINFALL EVENT. 2. REMOVE SEDIMENT FROM BEHIND SILT FENCE PRIOR TO IT REACHING A MAXIMUM DEPTH OF 6 INCHES. H SILT FENCE C3 C9 NOT TO SCALE PROVIDE CHANNEL LINING OF CENTIPEDE SOD FROM TOP OF SLOPE TO TOP OF SLOPE CENTIPEDE SOD PINNED IN PLACE 3 VCENTERLINE 3 ELEVATON AS INDICATED 3:1 VEGETATED SWALE PROVIDE CHANNEL LINING OF CENTIPEDE SOD UtivnrLUL �)UU PINNED IN PLACE 11 11 5 5 244 SOW eay, CENTERLINE ELEVATON AS INDICATED 5:1 VEGETATED SWALE VEGETATED SWALE C3 C9 NOT TO SCALE 11" THICK NCDOT #57WASHED STONE ON UPSTREAM SIDE 12" THICK NCDOT #57 STONE ON UPSTREAM SIDE 3 -FILTER CLOTH I I CLASS B I RIPRAP 00 2 ���1 CLASS A NON -WOVEN I- 4' MINIMUM _ GEOTEXTILE FABRIC 6' MAXIMUM MAINTENANCE 1. CONSTRUCT CHECK DAM OF RIP RAP STONE PLACED IN ACCORDANCE WITH DETAIL. 2. SEDIMENT BEHIND THE CHECK DAM SHALL BE REMOVED PRIOR TO THE LEVEL REACHING WITHIN 6" OF THE CENTERLINE CREST OF THE DAM. 3. SHOULD SCOUR DEVELOP AT THE DOWNSTREAM END, IT SHALL BE RFPAIRFf) IMIMFnIATFI Y AOUTLET PIPE 0 FLOW PLAN OUTLET PIPE CLASS A NON-..-.-.... .". , .. ,.. SECTION A -A 0 O°00o° 0�00 O 0o°0 0 O 00 00 °p RIP RAP OOo000 �00000 0 0 p °° 8 00°0 OpO 0 Op O A O o O O° 0 0 0 o O O ocyoo A B C D E MIN. RIP RAP SIZE MAX. RIP RAP SIZE 12 -15 4 6 6 9 4 6 18" (POND OUTLET) 4.5' 10' 11.5' 14" 6" 9" 12' FLOW CLASS A NON -WOVEN FILTER FABRIC .. . INLET TO POND MAINTENANCE: 1. INSPECT STRUCTURES AT LEAST WEEKLY AND AFTER ANY RAINFALL EVENT GREATER THAN ONE-HALF INCH. 2. IMMEDIATELY MAKE ALL NEEDED REPAIRS. K INLET/OUTLET PROTECTION C3 C9 NOT TO SCALE YEAR ROUND VEGETATIVE SEEDING AFTER COMPLETION OF GRADING ACTIVITIES AND THE CONSTRUCTION OF SWALES, ALL EXPOSED AREAS SHALL BE SEEDED TO THE FOLLOWING SPECIFICATIONS: SEED BED LIME 1-1/2 TON PER ACRE FERTILIZER 1/2-TON PER ACRE SEED RYE GRAIN 50 LBS PER ACRE TALL FESCUE 100 LBS PER ACRE MAY THROUGH AUGUST: CENTIPEDE 5 LBS PER ACRE PROCEDURE STRAW MULCH SHALL BE APPLIED AT A RATE WHICH WILL INSURE APPROXIMATELY 75% COVERAGE OF THE SEEDED AREA. THE STRAW AND SOWN SEED WILL BE LIGHTLY DISCED INTO THE BED TO GIVE IT FURTHER RESISTENCE TO BLOWING AND WASHING. THE CONTRACTOR SHALL GUARANTEE A FULL STAND OF GRASS OVER THE ENTIRE DISTURBED AREA. IF NECESSARY THE CONTRACTOR WILL WET DOWN THE AREAS TO ASSIST IN SEED GERMINATION OR AID IN GROWTH IN TIMES OF EXCESSIVELY DRY WEATHER. A STAND OF GRASS WILL BE CONSIDERED ACCEPTABLE WHEN THE ENTIRE STAND OF GRASS IS AT LEAST FOUR INCHES HIGH AND HAS ACHIEVED AT LEAST 95% COVERAGE OF DISTURBED AREAS. RESEEDING WILL BE REQUIRED AS NECESSARY BY THE CONTRACTOR TO OBTAIN THE SPECIFIED STAND OF GRASS. L VEGETATION PLAN C3 C9 NOT TO SCALE C'0 O 0) r2l W W O r, zfm .� co a� w Q, co Lo • m o ^ cV Lo 1+1 Q co � Z I 'k�•L J to 0 to V m Zj 0 N �wir X� W c Z Z Cz I--q C w 0 �omo z�C W M W Z co W -0' � C w CV 04 �voz 0 m o � o a E-1 P4 U Q o Z C � w m E--i Q '4= Q x x Z CHECK DAM 2 C9 NOT TO SCALE 09042 THE PROJECT NPDES CONSTRUCTION PERMIT REQUIRES THAT EROSION CONTROL DEVICES AND STORM WATER OUTFALLS BE INSPECTED WEEKLY AND WITHIN 24 HOURS OF A 1/2-INCH RAIN EVENT. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED, EVIDENCED BY 95% VEGETATIVE GROWTH FOR AREAS RECEIVING SEEDING. TO FACILITATE RAINFALL MONITORING, A RAIN GAGE IS REQUIRED TO BE ONSITE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED, INSPECTION RECORDS ARE TO BE FORWARDED TO THE CONTRACTING OFFICER AND ALL TEMPORARY EROSION CONTROL MEASURES REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES MUST BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF'THE EROSION AND SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL AND NPDES CONSTRUCTION PERMIT MUST BE MAINTAINED BY THE CONTRACTOR MAINTENANCE PLAN 1. REMOVE SEDIMENT FROM BEHIND SILT FENCING AND CHECK DAMS IN ACCORDANCE WITH THE INDIVIDUAL MAINTENANCE PLANS INDICATED FOR EACH DEVICE. 2. ALL AREAS WILL BE FERTILIZED, SEEDED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT ASPHALT ROAD SHALL BE REMOVED ON A DAILY BASIS. AT THE PROJEGT SITE It. STORMWATER DEfEN1I0N POND SHALL BE USED AS A TEMPORARY SEDIMENT TRAP. UPON COMPLETION OF CONSTRUCTION, ALL SEDIMENT SHALL BE REMOVED FROM THE STORMWATER DETENTION POND TO RESTORE IT TO THE DESIGN DEPTHS. DICKERSON & MORGAN ( portion 1 ) PC:E S:188 I 2567-602 LIMITS OF DISTURBANCE �I 3.9 ACRES _._.. "wIVEVPY 302 m ON K f 1 0 '' 1•' INAGE BASI •� av0 OJ G O ` ' N yy o o y 91.2 �° ° c` •4 mac, ''� °ti • - c c ~ • 4 �4�C o ,�' ' t it �lm R '�� ,� o car='��b ,a�� o � ,y��•. 11'�C ol�loo,01 Mills G ql, JJO`JJ ..1 5 � . • ,::1111 • s = 1 VIP C^„ 32r4�_ _ — - 1 • 7• BASINWill SF .56 1 / •1 1 ILIMITS OF DISTURBANCE 3.9 ACRES 1'ATER a NSF 18 V 1 1 059.1 - I 0 UL OF DISTURBANCE I •' 3.9 ACES Y r i v' 1 r 1 • • r �l NOTE: SECTION 404 WETLANDS ARE NOT LOCATED WITHIN THE PROJECT LIMITS OF DISTURBANCE. 1 MOVED POND DISCHARG JCA 1 8 21 11 L. 1AMA A&44 141A 11 NOTE. 1. 1. ALL DISTURBED AREAS SHALL BE VEGETATED IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN. SEE DETAIL L, SHEET C9. NEW WORK ITEMS lO NEW ASPHALT ROAD. SEE DETAIL A, SHEET C9 O2 NEW ASPHALTIC CONCRETE PAVEMENT. SEE DETAIL B, SHEET C9 O3 NEW CONCRETE SIDEWALK. SEE DETAIL C, SHEET C9. ® NEW CONCRETE SLAB. SEE DETAIL D, SHEET C9. 50 NEW HANDICAP SPACE DESIGNATION do SIGNAGE. SEE DETAIL E. SHEET C9. © NEW PAVEMENT STRIPING. SEE DETAIL F, SHEET C9. O7 INSTALL GRAVEL CONTROL ENTRANCE. SEE DETAIL G, SHEET C9. ® INSTALL SILT FENCE SEE DETAIL F, SHEET C9. O9 VEGETATED SWALE. SEE DETAIL H, SHEET C9. 10 INSTALL CHECK DAM. SEE DETAIL I, SHEET C9. 11 INSTALL INLET/OUTLET PROTECTION. SEE DETAIL J, SHEET C9 d� N 1/1 Wo VL6 9 r n s FP 0 w s 275 \ 1 , L5 /ry � �P< S•o N h ➢ < 0 5 9� 0. ssd. Zl N W � c ^yam G P ' VL1 I O'i ATER a \ \ v s r �P 181 9 S Fvy 2s6s = 44.6 BUA G=O. p WITS OF DISH �\ s �X 9 ACRES 5:1 ZONE\t 0 0 ZON] 22 \ Jp �• M IATURE GOLF IRS 5,004 IMPEffMIQ�I 1:IAXIMUM o p AS • \ \ rp w.y VTLB 3 NEW DROP INLET (TYPICAL) \8 \ NOTE: POND %CW1RGE IS 16' FROM PROPERTY LINE ANEW PIPING (TYPICAL) SPECIAL SEEDING NOTE: THE ANGLE FOR GRADED SLOPES AND FILL SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. ADDITIONALLY, WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS FROM THE COMPLETION OF THE PROJECT (WHICHEVER IS SHORTER), PERMANENT GROUND COVER SHALL BE ESTABLISHED. ltutlVtL Lg4D 0UA0TY'lEQTI0N eHiNGTOR REGIONAL rlvr 0 SEQUENCE OF OPERATION: 1. OBTAIN APPROVED EROSION AND SEDIMENTATION CONTROL PERMIT FROM THE NCDENR'S LAND QUALITY SECTION 2. REVIEW EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AT PRECONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4, ERECT SILT FENCING. 5. EXCAVATE STORMWATER DETENTION POND AND STABILIZE. 6. CONSTRJCT SITE IMPROVEMENTS. 7. STABILI2E WITH GRASS ALL AREAS NOT TO BE FURTHER DISTURBED BY CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN. 8. REMOVE ANY ACCUMULATED SEDIMENT FROM STORMWATER DETENTION POND. 9. ADDITIONAL MISCELLANEOUS EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE REQUIRED WHEN DEEMED NECESSARY BY THE PROJECT ENGINEER OR THE NCDENR'S LAND QUALITY SECTION. 10, REMOVE GRAVEL CONTROL ENTRANCE, SILT FENCING AND STONE CHECK DAMS AT COMPLETION OF CONSTRUCTION AND THE ESTABLISHMENT OF FINAL VEGETATION. REVISED EROSION & SEDIMENTATION CONTROL PLAN SHOWING PIPING VS. DITCHED AREAS SEPTEMBER 27, 2011 30 0 15 30 60 GRAPHIC SCALE: 1" = 30' ..I Q •— co • In 00 0 O N in co L J r7 sue^ V1 3D WO t0 1 &0 N 11 W ~ LO 04 04 W Cz� Z 1--1 T� C Laz O m o O C W M w Ld Z (00 C co N v V) to X W Ovmo d ^0 LL 0 Ix E--I E- 4 0 W U U Z W U � Q W U) C3_ 09042 GENERAL CONSTRUCTI0N NOTES: 1. THE LOCATION AND DEPTHS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCANNING THE AREA OF WORK TO IDENTIFY TO HIS OWN SATISFACTION THE EXTENT OF UTILITIES PRESENT INCLUDING THE UTILITIES INDICATED TO BE PRESENT, THOSE NOT SHOWN, AND THOSE SHOWN TO BE IN A DIFFERENT LOCATION. 2. PHYSICAL SITE FEATURES OUTSIDE THE AREA OF WORK OR THOSE FEATURES NOT RELEVANT TO THE WORK BEING PERFORMED ARE NOT SHOWN FOR CLARITY. 3. GRADE EVENLY BETWEEN SPOT ELEVATIONS SHOWN. C (/� C/-) Q D z CD A SITE GRADING PLAN C3 C3 SCALE: 1" = 30' NOTE: THE PROJECT NPDES CONSTRUCTION PERMIT REQUIRES THAT EROSION CONTROL DEVICES AND STORM WATER OUTFALLS BE INSPECTED WEEKLY AND WITHIN 24 HOURS OF A 1/2-INCH RAIN EVENT. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED, EVIDENCED BY 95% VEGETATIVE GROWTH FOR AREAS RECEIVING SEEDING. TO FACILITATE RAINFALL MONITORING, A RAIN GAGE IS REQUIRED TO BE ONSITE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED, INSPECTION RECORDS ARE TO BE FORWARDED TO THE CONTRACTING OFFICER AND ALL TEMPORARY EROSION CONTROL MEASURES REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES MUST BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL AND NPDES CONSTRUCTION PERMIT MUST BE MAINTAINED BY THE CONTRACTOR AT THE PROJECT SITE. MAINTENANCE PLAN 1. REMOVE SEDIMENT FROM BEHIND SILT FENCING AND CHECK DAMS IN ACCORDANCE WITH THE INDIVIDUAL MAINTENANCE PLANS INDICATED FOR EACH DEVICE. 2. ALL AREAS WILL BE FERTILIZED, SEEDED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT ASPHALT ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. STORMWATER DETENTION POND SHALL BE USED AS A TEMPORARY SEDIMENT TRAP. UPON COMPLETION OF CONSTRUCTION, ALL SEDIMENT SHALL BE REMOVED FROM THE STORMWATER DETENTION POND TO RESTORE IT TO THE DESIGN DEPTHS. CGS` Jan,, C� J ' V y� : • as C• L 1' C f c4 1 1 0 u,Ju C G JCu O G v � s :!( ••_ � 1 ^v • U U �� � Ir ,C•: J O '-I O Q „ i O s r :1'-1 emu o. �orol�f�lo•, ,olVIcI�Io7T���IJ11oto1n~G�c_ O G '♦IvuuGvv♦ V J 29, Zsr � AMUSEMENT RIDE AREA 2,000 SF IMPERVIOUS AREA MAXIMUM z0.5 -STORMWATER BASIN 181,059 SF 44.6% BUA C=0.56 LIMITS OF DISTURBANCE 3.9 ACRES i SWA E DRAINAGE 80 SEPTIC TANK AREA 9 10 10 IOLF 1Y RCI 3 5:1 SW 9 </. I e 0 STORMWATER BASIN 181,059 SF 1 1 44.6% BUA 1 C=0.56 DETENTION POND I 3.9 LIMITS OF DMURBANCE 8 - 1 L -_ .99E .. - WYNNE 1 (Tract 2 2653 481.83 F _= � ►1, 9-, FOR l�� �� NOTE: SECTION 404 WETLANDS ARE NOT LOCATED WITHIN THE PROJECT LIMITS OF DISTURBANCE. 181 9 SF260 ° • \ 44. BUA MITS OF OISTU .9 ACRESEwp o \ o O M IATURE GOLF a 5 SF IMPEtfVI MAXIMUM o� o O NEW DROP INLET (1 NEW PIPING (MICAL) "" 3 SPECIAL SEEDING NOTE: THE ANGLE FOR GRADED SLOPES AND FILL SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. ADDITIONALLY, WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS FROM THE COMPLETION OF THE PROJECT (WHICHEVER IS SHORTER), PERMANENT GROUND COVER SHALL BE ESTABLISHED. 1 IMOVED POND DISCHARGq JCA 1 8/21/11 2 1ADDED PIPING I JCA 1 9/27/11 NOTE 1. ALL. DISTURBED AREAS SHALL BE VEGETATED IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN. SEE DETAIL L, SHEET C9. NEW WORK ITEMS NEW ASPHALT ROAD. SEE DETAIL A, SHEET C9 O2 NEW ASPHALTIC CONCRETE PAVEMENT. SEE DETAIL B, SHEET C9 O3 NEW CONCRETE SIDEWALK. SEE DETAIL C, SHEET C9. ® NEW CONCRETE SLAB. SEE DETAIL D, SHEET C9. O5 NEW HANDICAP SPACE DESIGNATION k SIGNAGE. SEE DETAIL E, SHEET C9. © NEW PAVEMENT STRIPING. SEE DETAIL F, SHEET C9. 0INSTALL GRAVEL CONTROL ENTRANCE. SEE DETAIL G, SHEET C9. ® INSTALL SILT FENCE. SEE DETAIL F, SHEET C9. ( VEGETATED SWALE. SEE DETAIL H, SHEET C9. 10 INSTALL CHECK DAM. SEE DETAIL 1, SHEET C9. 11 INSTALL INLET/OUTLET PROTECTION. SEE DETAIL J, SHEET C9 z 5E-QUENCE OF 01'ERATION: 1. OBTAIN APPROVED EROSION AND SEDIMENTATION CONTROL PERMIT FROM THE NCDENR'S LAUD QUALITY SECTION 2. REVIEW EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AT PRECONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. ERECT SILT FENCING. 5. EXCAVATE STORMWATER DETENTION POND AND STABILIZE. 6. CONSTRUCT SITE IMPROVEMENTS. 7. STABILIZE WTIIi GRASS ALL AREAS NOT TO BE FURTHER DISTURBED BY CONSTRUCTION) ACTIVITIES IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN. 8. REMOVE ANY ACCUMULATED SEDIMENT FROM STORMWATER DETENTION POND. 9. ADDITIONAL MSCELLANEOUS EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE REQUIRED WHEN DEEMED NECESSARY BY THE PROJECT ENGINEER OR THE NCDENR'S LAND QUALTTI SECTION. 10. REMOVE GRAIEL CONTROL ENTRANCE, SILT FENCING AND STONE CHECK DAMS AT COMPLETION )F CONSTRUCTION AND THE ESTABLISHMENT OF FINAL VEGETATION. REVISED EROSION 3 SEDNEiTATION CONTROL PLAN SHOWING PIPING VS DITM AREAS SHOW K MION POND OUTLET PIPE SERUBER 27, 2011 30 0 15 30 60 GRAPHIC SCALE: 1" = 30' N • ^ m N o C_ Z_ 0 Lo N w ~ W C Z U- E Z 1I C w CID O w M W LIJ Z co � to CS1 �'t /� O to V/ F�1 Ovm0 > _ a O �E^ J z �� CD Imp 04 W x 46 Z z z Q O .j v✓t.r OC 1 3 t0'1 LAND Oj1AIJTY SECTIOfV +Nrir1 ;F0!0NAi. nr,- I �,1 ,11 h. ' `,ti � �r'1•,�.t �., it t .i'1'(I�1 ,II �'NIj1 I �� 09042