Loading...
HomeMy WebLinkAboutSW7110101_COMPLIANCE_20140604STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW uol DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Pat McCrory Governor AIKII NCENR North Carolina Department of Environment and Natural Resources June 4, 2014 CERTIFIED MAIL #7012 2210 0002 4887 2332 RETURN RECEIPT REQUESTED W.E. Partners II, LLC Mr. Garald Cottrell, Member Manager 1836 Eastchester Drive, Suite 108 High Point, NC 27265 Subject: NOTICE OF DEFICIENCY NOD-2014-PC-0123 Permit No. SW7110101 W.E. Partners II — Perdue Lewiston Bertie County Dear Mr. Cottrell: John E. Skvarla, III Secretary On May 29, 2014, Mr. Samir Dumpor of the Washington Regional Office of the Division of Energy, Mineral, and Land Resources (DEMLR) inspected W.E. Partners II — Perdue Lewiston development near Lewiston -Woodville, Bertie County to determine compliance with Stormwater Management Permit Number S W7110101. The Stormwater Management Permit Number SW7110101 was originally issued on January 13, 2011, to W.E. Partners II, LLC. During the inspection, it was discovered that the bio- retention basin is not functioning properly. The bio-retention basin is holding water due to either improper installation or lack of maintenance. Accordingly, the following permit condition violation is noted during the DEMLR's inspection: Failure to Provide Operation and Maintenance Schedule of Compliance, Section II. No. 1 of the Stormwater Permit SW7110101 requires that "the stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface".... and Section II. No.3 of the Stormwater Permit SW7110101 requires permittee to provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. Required Response This Office requests that you respond to this letter in writing within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address. Your Division of Energy, Mineral, and Land Resources . Land Quality Section Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946-64811 FAX, 252-975-3716 Internet: httoiloortal ncdenr.org/web/Ir/land-quality An Equal Opportunity 1 Affirmative Action Employer- 50% Recycled 110% Post Consumer Paper - response "should provid"c a written -"Plan of Action" which"outlines-the actions you -will---- take to correct the above violation and a time frame for completion of those actions. Thank you for your attention to this matter. This office requires that the violation as described above be properly resolved. Unresolved violations may lead to the issuance of a Notice of Violation and/or assessments of civil penalties. If you have any questions or require any additional information, please contact Samir Dumpor or me at (252)946-6481. Sincerely*HMcClain� P, PE Regional Engineer Enclosures: Inspection Report and pictures cc:✓WaRO File Copy- SW Permit SW7110101 Bradley Bennett - Stormwater Permitting Unit Permit: SW7110101 County: Bertie Region: Washington Compliance Inspection Report Effective: 01/13/11 Expiration: 01/13/21 Contact Person: Garald Cottrell Title: Directions to Project: From INC 11, take NC 308 west to Griffins Quarter Road Type of Project: State Stormwater - HD - Bioretention Drain Areas: 1 - (Flag Run Gut) (03-02-08) ( C) On -Site Representative(s): Related Permits: Inspection Date: 05129/2014 EntryTime: 10:00 AM Primary Inspector: Samir Dumpor Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: 0 Compliant ■ Not Compliant Question Areas: 0 State Stormwater - (See attachment summary) Owner: W E Partners I LLC Project: W.E. Partners 2 - Perdue Lewiston 100 Griffins Quarter Rd Lewiston Woodville NC 27849 Phone: 360-750-3583 Exit Time: 10:30 AM Phone: 252-948-3960 Inspection Type: Compliance Evaluation Page:1 Permit: SW7110101 Owner - Project: W E Partners I LLC Inspection Date: 05/29/2014 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Project inspected on May 29, 2014 by Samir Dumpor of WaRO. Bioretention system not operating properly and holds water all the time. en., o...,:-, Is the permit active? Signed copy of the Engineers certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Yes No NA NE ■DDD ■ D D D ■❑DD ■DDD Yes No NA NE Yes No NA NE ■D❑D ■ D D D ■❑DD Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? D ■ D D Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ D D ■ ❑ upon request? Comment: Bioretention not functioning properly and holds water all the time. Page:2 +1 � t Y .. �✓K _r �;4r ' F J "�i17f 1 wt.1 R a 7 r '1