Loading...
HomeMy WebLinkAboutSW7091106_COMPLIANCE_20130613STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ .COMPLIANCE EVALUATION INSPECTION DOC DATE X �OM YYYYMMDD Permit: SW7091106 County: Beaufort Region: Washington Compliance Inspection Report Effective: 03/08/10 Expiration: 12/31/21 Owner: O'Reilly Automotive Inc Project: O'Reilly Auto Parts - Washington US 17 Pierce St Contact Person: Charles Downs Title: Directions to Project: Southeast of US Hwy 17 & Pierce St. intersect Type of Project: State Stormwater - HD - Bioretention Drain Areas: 1 - (Jack Creek) (03-03-07 ) ( C;NSW) 2 - (Jack Creek) (03-03-07 ) ( C;NSW) 3Re - (Jack Creek) (03-03-07) ( C;NSW) On -Site Representative(s): Related Permits: Inspection Date: 0611312013 Entry Time: 03:45 PM Primary Inspector: Scott A Vinson Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: S State Stormwater (See attachment summary) Washington INC 27889 Phone: 417-862-3333 State Stormwater - Redevelopment Exit Time: 04:15 PM Phone: 252-946-6481 Ext.208 Inspection Type: Compliance Evaluation Page: 1 Permit: SW7091106 Owner • Project: O'Reilly Automotive Inc Inspection Date: 06/13/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Site is in good shape and appears well maintained. If inspection and maintenance records have not been kept, please start keeping these records. Please submit the design engineer's certification to DWQ in the Washington Regional Office. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the rile? Comment: Please submit the Design Engineer's Ceritification that can be found attached to the back of the issued stormwater permit to the Divsion of Water Quality in the Washington Regional Office. Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Yes No NA NE ■ ❑ ❑ ❑ ❑ ■ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Vne Nn NA NF ■ ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ❑ ■ upon request? Comment: Other Permit Conditions Is the site compliant with other conditions of the permit? Comment: Other WQ Issues Is the site compliant with other water quality issues as noted during the inspection? Comment: Yes No NA NE ■ ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ Page: 2