HomeMy WebLinkAboutSW7091014_COMPLIANCE_20101216STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
o/2JYn��/ l 2
YYYYMMDD
iJ 1
PAMLICO ENGINEERING
SERVICES, PLLC
December 15, 2010
Scott Vinson A- - 0' G ,
NCDENR DWQ
DEC 1 6 2010
Re: Modifications to SW Permit No. SW7091014
Dear Scott:
Please find attached a small scale drawing showing the proposed changes to the FUMC New
Horizons project. The church decided to modify the drive entrance and by doing so will be
removing one of the existing drives.
Since the area where the drive is being installed was already calculated as impervious there will
not be any net change to the original permit.
Please accept this drawing and letter as notification of these changes.
If you have any questions please let me know.
Sincerely,
PAMLICO ENGINEERING SERVICES, PLLC
sW \
Marie U. Peedin, PE _
pc: Kevin Rawls, WIMCO
Rick Howdy, FUMC
128 Abbey Lane I PHONE (252) 945.2983
Washington, NC 27889 E-MAIL pespllc@embargmail,com
y
(
;uIL bBSERVATiON REPORT
ReportNumber. 72091204.0001
Service Date. 10/05/09
Report Date: 10/07/09
Pamlico Fig
Attu: Marie Peednn
128 AbbeyLmme
Washington, NC 27889
Irerracon
314 Beacon Dr.
Wi7ucrv111e, NC 28590
Fist United Nlcdlodzt Chmch Addition
Third St and Vau Nordin St
Washington, NC
As requested by Ms. Marla P=bD, ZePrMS=W9 Pamlico t aqueer:n0
-----e. a wive of ieiraoan Consuhams, Inc, was on sine today.
The purpose Oftoday's site visit was to obtain a soil sample for soil pezmeablilitytesomg from the proposed project sedimentation basin
The proposed location for the sedimenMon pond is adjacent to and parallel with Third Street closer to the Gladden Street iatresacbm
The neat surface soils were explored by excavamtg test pits. TOM general, the soils encountered mehrded Yellow brawn clayey sand (0 to 2
feet),uuderLtin by light Yellow and light ran erne to medium sand with few bees A seasonal high water table condition was observed at a.
depth of six feet below the cx>stmg ground surface.
An Indisturbed sample of light yellow Sure to medium sand was obtamed from a depth of4S to 5S fat Upon to the labor:awry,
the in place dry unit weight was determined to be 952 pcf at an in place soil moisture of42 pence= Due to the in place soil moisture and
the loose relative density ofthe sample in the undisturbed condition, it was necessary to remold the sample for laboratory pry
testing.
The sample was remolded to a dry unit weight of99.6 pcfat an adjusted soil moisture of 4.8 percent the tested soil permeability
is
7.15 x 10'4 ceatbnetas Per second or 1.01 iocbes per hoar. The peaueabiluytest,
emits obtained are attached.
Ms Peedm was informed of our observations by written coaespondence (tElephouc facsimile) on October 7, 2009.
�Yw
Terrseoa Rep.: Bob Neel
Reported . Mariepee&n
Repo0rt 6m��lbntio.
t
Reviewed BY LOF�S1 F=
Carl P. Sumner, P- E
the t were pertorrned in gmema7 accordance wan at g57r„ t, AASHTO, err office Manager II
71�s report is
ttme aMa � tested at the Iocation(�ieferenced aW am � ty in T m %ft ft j* or l use �aPa* cbmt
�e 10
nece=PrOPerdes of Wier apparently scnaar or identical materials.
aCMi. 9-0909. Awn _
page I of I
PERMEABILITY TEST REPORT
TEST DATA:
SAMPLE DATA:
Specimen Height (cm): 10.17
Somple Identification: #1 at 4.5-5.5 ft
Specimen Diameter (cm): 7.11
Native, undisturbed
Ory Unit Weight (pcf): 99.6
Visual Description: Yellow Brown Fine to
Moisture Before Test (%): 4.8
Medium Sand
Moisture After Test (7.): 22.7
Remarks: ASTM 0 5084
Run Number: 1 0
2 •
Infiltration medium
Cell Pressure (psi): 44.0
44.0
Moximum Dry Density (pcf):
Test Pressure(psi): 42.0
42.0
Optimum Moisture Content (9):
Bock Pressure(psi): 4Q.0
40.0
Diff. Head (psi): 2.0
2.0
Percent Compaction:
Flow Rate (cc/sec):3.71 x 10--1 4.27
x 10--1
Permeometer type: Flexible Wait
Perm. (cm/sec): 6.24x 10--4 7.15x
10--4
Semple type: Remolded
0
U
N
N
U
Y
H
H
J
H
m
a
M
o:
w
a
0
2
4
6
10
t x 10'-3
8 x 10--4
6 x 10--4
4 x 10--4
2 x 10--4
1 x 10--4
G 5 10 15 20
AVERAGE HYDRAULIC GRADIENT - dH/L (cm/cm)
,,■■■■■■■■■■.IMM.■.■.WEEMEN OMEN
01■0.■�■�■.�..�■■■■.
��i►��MEMO
■MINEINNIMEMO���������
Project: First United Methodist Church Addt.
Location: Washington, NC
Dote: 10-6-2009
PERMEABILITY TEST REPORT
TERRACON CONSULTANTS, -TNC-
Project No.: 72091204
File No.:
Lob No.:
Tested by: LW
Checked by: BN
Test: CH - Constont.heod
voogie iviaps
Page i of I
Gologle maps
.0553I6&spn=o.... I ()/i onnno
I
NOTES:
... I UNRLO MEINNL51 C. RAOMI
BUTUO NO SEE IRLIN,a Si
MERIT SITE IIIAC
TOTAL IMCERVWS AREA" A]IN Y
CMICURS SHNN ARE IN LO .1 ..IN.
THEIR"
ARE AO AETUnDS ONT•£ I.NNE111 TO SE OWITONO
Y ALL 0T REVAT US SNOHN ARE EOOE OF PAVEMENT UNLESS
OMERRSE TAI
OR IMAM W1E5
MIAL NA ARE. MLSLWED "111 AC
DIAL iW ER. AREA " I. AL
A'HAERLROUS " 56i
ITT LCIM
CfI2RE5ENT) TI. TIE
..("WATHOSM)
,LL tl19TE DOW SMALL BE RELUCN 10 IW PRESINT
I MA ST. NfNI.
BLL SM —MR SMALL OF DMRMID A. ME ENT
ETER'. AMA AND 11 NOR OUTLEI IS DIVPMO
OWITHOW EIOLVATON 1 NI IS RI
SITE ra POLO oNLE iNE
ECAR1Ofs�[ eMP nsNED. AS TSTHE .1111CIIOF I
wax TO CONSTRUCTION ON THE BM .ALL o'slLwazo
AREAS NEM i0 BE STANI 50 THE MUNI RIFLE,
CAN OE CLEANED WT AM. LONSIRULTOH OF TUNE BID
RERNTION AREA CAM EFECH
NO RERNMN CALCNATMS
CONTROL ELEV HOR IS' VOL CE RMN 15 5.8 AT MI5
RENATCN .HE SO RETENTIONp V" SNS CA AMC ME
WREACE AREA IS SSOSNSE. THE DEPTI OFTREATMENT RATE. 5 SHE IWI. E OHRRON ELE-TARN ION ME
OUTLET IS SET AT 6.0' TO ALLOM EM ME STORAGE OF
THE I HE ]a MR STORM N£M.
THE CONTROL ELNATON FOR THE 1 M 31 MG EVCNI IS
ITO '. AT MO ELEVATION THE SURI AREA 5 I6.7]b.6]
S,
. THE REOUMND STORAM VOLUME FOR ME I YE ]A MR
EVENT IS 7527 CFI M ME uCIWE Or THE 810
RERNMW AREA E TOTAL STORAGE Ht MIUSO CF MR
MA¢ IS ANW AIE .1. THE STORM EKNT WHICHMIST BE LMTINIEO TO MEET THE tlM1 OFWAywGDA:Y
"RAW WATER EARRAANTCi.
I COMMA. STRUCNRES IN ADDITTON 10 TIE SO
R,EIENTON QUIET HAVE &EN O[5'GN[D TO GRAIN THE
ADDITIONAL
ELAN !ATOM THE 5'MM LAN75 GREATER MnTHUx
, CoINSTRRUUCIEo NOT AA WESE ON WAALLLSAsusrw Scarp THE
RESTRITATHEH11 1. THE MRAW IN NUT. H"` AU TTHE
AET awnTH w EACH BASIN H CS
BID RETENTION P"N'TINC NOTES
ENTIRE BID RETENTION All IS TO BE
SODDED UROX CENTIPEDE SOD WHICH
HAS NOT BEEN CROHN IN A CL\T WEE
SOIL AND ALLOtt FOR IRRIGATION UNTIL
THE GRASS HAS E=TABIISHED,
DEC 16 2010
?1 V.A kl�. 41
D
i
-w
GRAPHIC SCAM
YJ ��
REST SHOO STREET ( C NOV. M)
_ _NyIRMW
alrtA MA, --I— u
BUILDING
FFE SO 10.0
M.,Dnm. T
RE " 6i'
i 0
_T
w
'
�
REST SECOND STREET
wpO caw
R
HT MR.
M.— RR RANTRAN
\ I 1
\ I
\ I I
I
— I
I
\I
� 1
I\ I
\ I
L \
I 1 \
I � \
IN
UA$ \
/rYwev�rrr. — I INN* \
I
II `\
I I \
I \
I I
I I \
1 I \
I i \
E:ISL a ro az EwAo I \
ND R[BURT Ne1H MM
COHR EYISTNc GPMEs I \
VNWVOWN \
I \
I 1) \
1 \
I \
I I \
I I \
I
i I I \
I \
1 I
I A
I
— 5 —
re<ru
rF
GI NIO
A�SER
m
inLlW9 E.04ELANCAURRI >LLC
AN
NAM
w w yr
'RE FAS, RANI
WM N
�Y FA CH ANAN
oP --
FORTANT", ARE
:, RREMIT RMHU,
ARNAR
All Im T, FRA,ne
♦
� YanawR ♦A
,4 —p..I
e — / RURAL,
ALN•.nrµ��
— rvmoCS"
O LpR6
NNAAmrawAruL
'F
STP
ST
III ARRAW.,
as Mw LrcWAaxn•�R 13j1
�
0
STORM > rzR MmnGnpLlcma
iBPo
IU,
Reris .M/laaue
Dote
GRADING PLAN
FIRST UNITED
METHODIST CHURCH
WASHINGTON, NC
PAMLICO
ENGINEERING
SERVICES, PLLC
1URWEVLWE
WASHINOTON, w 2,m
ORSA5.ABa
AMAR
WARM
OWN
SHEET
ON
I0(15(09
NO.
C-2
WAR
l-•30'