Loading...
HomeMy WebLinkAboutSW7070121_CURRENT PERMIT_20070709STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 7��1 DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATES YYYYMMDD W ATFRO Michael F. Easley, GovernorQ ��F Jr., Secretary r. William G. Ross North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director - Division of Water Quality DIVISION OF WATER QUALITY July 9, 2007 Harvey Point Defense Testing Activity Attn: Mr. Gary Sheeres 2835 Harvey Point Road Hertford, NC 27944 Subject: Stormwater Permit No. SW7070121 Harvey Point Defense Facility CTEC Building High Density Stormwater Project Perquimans County Dear Mr. Sheeres: The Washington Regional Office received your completed Stormwater Application for the subject project on May 3, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1O00. We are forwarding Permit No. SW7070121 dated July 9, 2007 to Harvey Point Defense Testing Activity at Hertford, NC. This permit shall be effective from the date of issuance until July 9, 2017 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. North Carolina Division of Water Quality Internet h2o.enr.state.nc.us 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 PAX 252.946-9215 An Equal GpportunitylAKrmadve Aadon Employer — 50% Recycled170°% Post Consumer Paper Nne orthCarolina Naturally Harvey Point Defense Testing Activity July 9, 2007 Page Two If you have any questions, or need additional information concerning this matter, please contact Mr. Bill Moore at (252)998- 3919. kierely, Al Hod e, Aegional Supervisor Surface Water Protection Section Washington Regional Office cc: Ijankins & Anderson Consulting Engineers ARO Stormwater Files Central Files W d State Stormwater Management Systems Permit No. SW7070121 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Harvey Point Defense Testing Activity Perquimans County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with -and approved by the Division of Water Quality and considered a part of this permit for grassed swales and (2) Extended Dry Detention Basins to serve the new CTEC Building located near Hertford, NC. This permit shall be effective from the date of issuance until July 9, 2017, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the, application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 4 of this permit, the Project Data Sheet. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 3 DIVISION OF WATER QUALITY PROJECT DATA Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Water Body Receiving Stormwater Runoff: Classification of Water Body: Total Site Area: Total Impervious Surfaces Allowed: Basin Depths: Required Storage Volume: Provided Storage Volume: Provided Surface Area: Storage Elevations: 19 Harvey Point DTA New CTEC Building SW7070121 Perquimans County Harvey Point Defense Testing Activity 2835 Harvey Point Road Hertford, NC 27944 O1/16/2007; original O3/03/2007; complete UT-Perquimans River SB 5.9 acres 5.7 acres 1.67 - South Basin 2.50 - North Basin 8033 cf - South Basin 13,349 cf - North Basin 10;200 cf South Basin 16,019 cf North Basin 6240 sf South Basin 14,095 sf North Basin 6.50 ft South Basin 6.00 ft North Basin A 1 4. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built - upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built - upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: 0 a. Semi-annual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this. permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Water Quality. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 6 W 9. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. At least 6 months prior to the expiration date, the permittee shall request that this permit be renewed. Permit issued this the 9 th day of July, 2007. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION For Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Permit Number SW7070121 7 Management Commission Stormwater Permit SW7070121 Harvey Point Defense Testing Activity New CTEC Facilities Grassed Swales & (2) Extended Dry Detention Basins Designer's Certification , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project) (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date 7 July 9, 2007 Director's Certification For Coleen H. Sullins Subject: Waiver of Deed Restrictions and Protective Covenants for Harvey Point Defense Testing Facility Stormwater Permit No. SW7070121 Project Name - CTEC Building Perquimans County As provided in the Director's Certification provisions of 15A NCAC 21-1,1003(d)(4), this letter waives the requirements for mandatory deed restrictions and protective covenants contained in 15A NCAC 2H.1003(d)(1) and 2H.1003(d)(2) for all United States Department of Defense (DoD) facilities and installations located within North Carolina. In lieu of these deed restrictions and protective covenants, DoD installations and facilities affected by this Certification will be required to submit written correspondence certifying that the Facility Master Plan will be appropriately modified to ensure that the subject development will be maintained consistent with the plans and specifications approved by the Division of Water Quality in the applicable permits. CC: Al Hodge, WARO Bradley Bennett, Stormwater Group -4e4t Stormwater Permit SW7070121 Harvey Point Defense Testing Activity New CTEC Facilities Grassed Swales & (2) Extended Dry Detention Basins Designer's Certification MAY 0 4 Zoos as a duly registered Professional Engineer in the State of 'North Carolina, having been authorized to'observe (periodically/weekly/full time) the construction of the project, 4 ZZZ- F�4-111 (Project) ct Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to. be built within substantial, compliance and intent of the approved. plans and specifications. Signature Registratih-, G ber /(fir'- PE - +4e Date z4r2// 3Q, 10� N i .y -'+• .r „� ° r ,' ,. � y �. ::� � . 1 ��� •;: 4 4t J' I� /• i� •r . �: Flu, -/6 -0 7 Rik1VM-i1., Date Received( Fee Paid Permit Number MAY - 3 2001 2D ry DWQ-WAR® State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Ncvvr'J NbeeASc Tr5'4C.q_�ic�tvty (c!$, Lovrlrno( 2. Print Owner/Signing Official's name and title Mr. 6 � cc res D Yr legally responsible for facility and compliance): eC- ovGir 3. Mailing Address for person listed initem 2 above: \, A !�y►V . Co rla /a, Z6 � �3 t�� Z 835 140.rQ(4 I"atJ P- wd `. City: lei+-Fo r l State: N• G • Zip: Z7 o,4 4- Telephone Number: ( 252 ) 42-4 - 436 0 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): C7EC 5. Location of Project (street address): City: 4e/+Tor County: 6. Directions to project (f om nearest major intersection): �o�ss dS �� i7 i�t�rco� 7o the e�dv�roasl�fy�f 7. Latitude: 1 3C * 06 15 Longitude: t^-J 7C , 2 0 g 3P of project 8. Contact person who can answer questions about the project: Name: Ti..J �or Telephone Number: ( 252 ) 4-26 _ 434 0 II. PERMIT INFORMATION: 1. Specify whether project is (check one): ti/New Renewal Modification FormSWU-101 Version3.99 Page Iof4 ✓ - � ' CUi1S � YAN; �.; ,,,; .,r-;� ;� '- a°. . , �. v . , 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): =Low Density ­_P High Density ✓ Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major ✓ Sedimentation/Erosion Control 404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing 1storm11 wttater management for the project. SS SFdfr w.}v W.11 �t TIf.Tta ro�94 ��� ✓5t. o4rj lre� SwnlC$ M -}wo Gx+C�lf Dry �ti-G.'('lon 13 a$t..5 2. Stormwater runoff from this project drains to the 49�U1/_11- /r � River basin. 3. Total Project Area: 5.89 acres 5. How many drainage areas does the project have? 1 4. Project Built Upon 1,VAc: 30.7 9/6 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provicje✓-irythe same format albe1 . Q 1? 7 Basin riformation , ""- � Receiving Stream Name � rea Dnama ��. pef u. �_ -- - R W e/ Receiving Stream Class Z a Drainage Area 5.89 Acres Existing Impervious" Area p,'7e( Arr,c Proposed Impervious*Area ), 35 A Uc S % Impervious` Area (total) 2 , O' I. 1._.M _,_�_ eras Im oery'ous SurfeeAwrea Ch-site Buildings raua e Area -1 v mar r O. A-) Acres rai an QeAr 2 On -site Streets o, Iq - . - - . A Ue-S On -site Parking O 6 o Acrns On -site Sidewalks 0.01 Acre S Other on -site Off -site � Total:. � , 35 flu'�S � Total: Impervious area is defined as the built upon area including, butnotlimited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. �� Form SWU-101 Version 3.99 Page 2 of 4 /J fV �� r .. � Y n. 7. How was the off -site impervious area listed above derived? GAD D Mt0.5�tr^+a. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Original and one copy of the Stormwater Management Permit Application Form One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow Initials TR t3 7R (3 G-' Oc; y)1' / yrl.J�GxSI�, ��U:piiwtff�i Yr— R B Y R (3 - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Mailing Address: City: Phone: VIII. APPLICANT'S CERTIFICATION State: Fax: I, (print or type name ofperson listed in General Information, item 2) ..6 h SiiF Es certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 21-1 .1000. l Iu Date: /0 Form SWU-101 Version 3.99 Page 4 of 4 STORMWATER MANAGEMENT NARRATIVE Harvey Point Defense Testing Activity RECEIVED CTEC Facilities !14 ''� t'4 '4"(J MAY - 3 2007 April 13, 2007 DWQ-WARD This is a brief description of the drainage philosophy currently shown on the design drawings. Stormwater management (85% TSS removal requirement) is achieved by the use of the grass lined swales (35% TSS removal) and extended dry detention basin (50% TSS removal). Both the `North Swale' and the `Pond' contain both of these features to achieve a total of 85% TSS removal from both drainage areas. The outfall for the 'North Swale' will be located just upstream from where the swale connects to an existing drainage swale. The pond outlet control will create a 60 hour draw down time using a 1.25" orifice. The outfall for the `Pond' drainage area will be located within the island created by the circular paved drive. This outfall control structure will have a 1.0" orifice that will create a 62 hour draw down time for the 1" storm. Small buildings that use to house trainees have been removed and the other two remaining buildings will be renovated for the new user. A new shop and warehouse and a hotel type structure will replace the former buildings. The surrounding adjacent area has been declared wetlands and will not be disturbed with this project. The site area is approximately 5.89 acres, with Approximately 3.3 acres being disturbed with new construction. Approximately 2150 feet of sanitary sewer will be installed off -site. The drainage plan for the CTEC facilities is relatively flat because the site and the surroundings are very flat, with only 1 drainage outfall location for the disturbed area. E&S is handled through a combination of seeding, mulching, top soiling, a construction entrance and a sediment trap. The sediment trap achieves the required volume through the use of the proposed permanent swale that surrounds the north and east sides of the site. The proposed swale/sediment trap and construction entrance are required prior to any land disturbance. The proposed swale outfalls into an existing swale that runs north from the site approximately 400 feet to the Perquimans River. DILQ/10ARO Fax:252-946-9215 Jan 16 '07 10:39 P.02 Permit No. (7'o be provided by DWO State of North Carolina RECEIVED Department of Environment and Natural Resources t t,l Division of Water Quality MAY - 3 2007 STOR-NMATER MANAGEMENT PERMIT APPLICATION FORM EXTENDED DRY DETENTION BASIN SIJPPLENIENT �INQ-INAR� Thislo ",„ ,ay be aho:ocapled for use as a' original. DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes an extended dry detention basin supplement for each basin, design calculations, plans and specification showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. I. PROJECT INFORMATION (Please complete the following information): Project Name: Hotrve 4PoH1 C7EL Facc�c�ieS Contact Person: Saral T4 for Phone Number: 25 Z - 42 6 - S Z-L I For projects with multiple basins, specify which basin this worksheet applies to: P" CSo�` A Elevations Bottom Elevation: 4-. 8 3 fmsl ? 6qoor of the basin) Design Storage Elevation: 6. S o fmsl (elevation at which the total volume is provided.) Sediment Storage Elevation: 5.01 finsl (elevation of the 20% sediment accumulation) Areas Drainage Area: 1.Zf g6,399 square feet Built -upon Area: 1.11 or�96, 39a _square feet Bottom Surface Area: ? zZ square feet Design Storage Surface Area: �, Z4o square feet (onsite and offsite drainage to the basin) (onsite and offsite drainage to the basin) (floor of the basin) (the top of the 1 " plus sediment storage) Volumes Design Storm: 91 year-24 hour storm ® 1" (Please check only one box) Required Design Volume: k 8 o•33 cubic feet (Based on chosen Design Storm) Detention Volume Provided. I o, Zoo_ cubic feet (Total volume provided at the storage elevation) Sediment Storage Provided: ),407 cubic feet (Equivalent to 20% of the detention volume) Other Parameters SHWT elevation: 4.1 fmsl Drawdown Orifice Size: I inches feet (circle appropriate units) 3 Orifice Invert Elevation: '.Z S fmsl Time to drawdowTt: 67 hours (<48 hours for 1 yr.-24 hr. storm, 2-5 days for I " storm.) Proposed .Additional BMP to achieve 85% TSS (check one): Grassed swale ❑Vegetated Filter ❑Other (Describe) Form SWU- Page 1 of 3 DlilO/WARO Fax:252-946-9215 Jan 16 '07 10:39 P.03 777777777T777- Permit No. _ (Ta be provided by DWQ) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the latest version of the Stormwater Best Management Practices Manual (N.C. Department of Environment and Natuial Resources) and Administrative Section 15A NCAC 2H.1008. Initial in the blank space provided in front of each item to indicate the following desieti requirements have been met and supporting documentation is attached. if the applicant has designated an agent in the Stortnwater Management Permit Application Fonn; the agent may initial below. If a requirement has not been met, please attach written justification. (Applicant or authorized agent- Please initial in the appropriate blanks, or mark the blank N/A if a requirement does not apply) NSA a. The basin captures the runoff from the 1 year, 24 hour storm and releases it over a period of 48 hours b OR the basin captures the volume of runoff from the I inch storm and allows it to draw down over a period of 2-5 days. ✓ c. The minimum flow length ratio is 3:1, L:W. d. Basin sideslopes,are no steeper than 3:1. e. A small permanent pool has been provided at the outlet to reduce clogging. f. Cleanout access has been provided, sufficient for heavy equipment. g. A drain has been provided which will completely. empty the basin for cleanout. / h. Sufficient volume has been provided to meet any local government peak flow requirements. ,/ i. If the basin was used during construction as a sediment basin or trap, it must be cleaned out to design specifications prior to operation as a dry detention basin. j. A vegetation plan has been prepared by a N.C. licensed professional. Consideration must be given to the grasses specified due to the frequent inundation. k. The basin must be stabilized within 14 days of construction. 1. The design provides for a sediment storage volume that is equal to 20% of the runoff detention volume. in. Inlet and outlet channels have been protected from scour during high flows from large storms. Z n. In areas of easily erodible soils, an additional plunge pool at the inlet has been provided, or riprap is used as an energy dissipator. i g o. A forebay to capture sediment is provided to make cleanout easier. p. The basin is located in uncompacted natural soils. q. The seasonal high water table is located at least I foot below the bottom of the extended dry detention basin. r. An additional BMP has been designed to operate in conjunction with this dry detention basin to meet the required minimum 85% TSS removal. III. EXTENDED DRY DETENTION OPERATION AND MAINTENANCE AGREEMENT The extended dry detention system is defined as the dry detention basin, forebay, and the required additional BMP. This system (check one) edoes does not incorporate a vegetated filter. This system (check one) does does not incorporate non-integrated pretreatment. At a minimum, the following maintenance activities shall be performed: I. All grassed areas of the system shall be mowed at least twice annually, more frequently during the summer months, as needed. 2. Monthly or after a runoff -producing rain event- inspect the system to make s� it is functionins properly. Remove any accumulated debris from the system, outlet and orifice. Form S«'U- Page 2 of 3 DWG/WARD Fax:252-946-9215 Jan 16 '07 10:59 P.04 Permit No. (To be provided by DIVA) 3. Repair and revegetate any eroded side slopes and any erosion around the inlets and outlet immediately. 4. Check the depth of the system. If sediment has accumulated to the point that the volume has been reduced to 75% of the original depth, it must be removed. 5. Inspect and repair the emergency spillway to keep in good working order 6. Remove woody vegetation from the banks of the system. Any areas of the system found to be deficient shall be repaired or replaced to design standards immediately. Written records of the inspections and maintenance activities shall be kept on file. See the permit for specific written record requirements. I acknowledge and agree by my signature below that I am responsible for the performance of the above operation and maintenance procedures for this extended dry detention system. I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address. Print name: C f e q .'5H E EP-D Title: 1Dl (? Address:_�j3,vj T)n /an— ArnA 4: t). Phone Date: s U Note: The legally respon ' le shall notbe a homeowner's association unless more than 50% of the lots are sold, or the developer no longer holds a majority vote, and a resident of the subdivision has been named the president. a Notary Public for the State of County of ? S do hereby certify that appeared before me this the c�rJ day of Qprl 1 % and acknowledge the due execution of the forgoing extended dry detention basin operation and maintenance agreement. Witness my hand and official seal, SEAT, Notary Signature My Commission expires a ap Izi Form SWZT-_ Page 3 of 3 Reservior Drawdown Calculations Project Orifice Q = CAA-(2gl-E"2 Quantity 1 Diameter 1 inch Coefficient 0.61 Centerline Elevation 3.25 Area 0.005 sf Countour Area Incremental Cumulative Elevation Volume Volume (sn (cf) (cf) 4.8 1 5.0 ..... 2604 6.0 8934 - 6.5 9634 0 0 151 151 5454 5604 4641 10245 RECEIVED MAY-�p32007 ®WQ-WAR® Head Flow At Accumulated Rate t (f) (cfs) (min) (hr) 1.6 0.0 0 62 1.8 0.0 71 61 2.8 0.0 2053 27 3.3 0.0 1607 Hankins and Anderson, Inc. 4/13/2007 Page 1 l C e, C, , 18 v YAM DIWLIRRO Fax:252-946-9215 Jan 16 '07 10:39 P.02 Permit No. (7'o be provided by DWQ) State of North Carolina RECEIVED Department of Environment and Natural Resources C� Division of Water Quality �I04Y lilt200�Y STORMWATER MANAGEMENT PER-ti11T APPLICATION FORA4 EXTENDED DRY DETENTION BASIN SITPPUNIIENT DWQ_WARO This Jornn c:ay loe p{:o:oco�i?d j' use as a» urigfnI DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes an extended dry detention basin supplement for each basin, design calculations, plans and specification showing all basin and outlet structure details, and a fully executed operation and ma ntenance agreement. I. PROTECT INFORMATION (Please complete the following information): Project Name: OQrve porr"t - GTEC Fac-,14 es Contact Person: Sey,�, 'T0.._Lor Phone Number: 7-57- 47-6 - 5L2I For projects with multiple basins, specify which basin this worksheet applies to: J �or l Sw4� Elevations Bottom Elevation: 3 .S v finsl> 2 (floor of the basin) Design Storage Elevation: 6. o fmsl (elevation at which the total volume is provided.) Sediment Storage Elevation: 3.9'L fmsl (elevation of the 20% sediment accumulation) Areas Drainage Area: 3• 1-2 c-16 I i S S square feet (onsite and offsite drainage to the basin) Built -upon Area: 3e44ai i Sz, o-)q square feet (onsite and offsite drainage to the basin) Bottom Surface Area: 36 3 1 square feet (floor of the basin) Design Storage Surface Area: 14 oy 5 square feet (the top of the 1 " plus sediment storage) Volumes Design Storm:] 1 year-24 hour storm [�C 1" (Please check only one box) Required Design Volume: ✓ 34+ cubic feet (Based on chosen Design Storm) Detention Volume Provided. 1 oo 19 cubic feet ('Total volume provided at the storage elevation) Sediment Storage Provided: 7-, 67 o cubic feet (.Equivalent to 20% of the detention volume) Other Parameters SHWT elevation: '2 fmsl DrawdoNvn Orifice Size: 1.25 inche feet (circle appropriate units) Orifice Invert Elevation: 2.; 3 fmsl Time to drawdowat: 6 0 hours (<48 hours for 1 yr.-24 hr. storm, 2-5 days for I " storm.) Proposed Additional BNIP to achieve 85% TSS (check one): ®Grassed swale ❑Vegetated Filter []Other (Describe) Form SWU- Page ] of') a 0 c .� � e.—: ..: i �. . F �. �r � N DWQ/WRRD Fax:252-946-9215 Jan 16 '07 1n:39 P.03 Permit No. (To be prrnided by DWQ) II. . REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the latest version of the Stormwater Best Management Practices Manual (N.C. Department of Environment and Natufal Resources) and Administrative Section 15A \TCAC 21-1.1008. Initial in the blazil< space provided in front of each item to indicate the following design requirements have been met and supporting documentation is attached. If he applicant has designated an agent in the Stora-nvater Management Pemiit Application Form, the agent may initial below. If a requirement has not been met, please attach written justification. (Applicant' or authorized agent- Please initial in the appropriate blanks, or mark the blank N/A if a requirement does not apply) V NIA a. The basin captures the runoff from the 1 year, 24 hour storm and releases it over a period of 48 hours ✓ b OR the basin captures the volume of runoff from the 1 inch storm and allows it to draw down over a period of 2-5 days. ✓ c. The minimum flow length ratio is 3:I, L:W. ✓• d. Basin sideslopes are no steeper than 3:1. e. A small permanent pool has been provided at the outlet to reduce clogging. _/ f. Cleanout access has been provided, sufficient for heavy equipment. A drain has been provided which will completely empty the basin for cleanout. ✓ h. Sufficient volume has been provided to meet any local government peak flow requirements. i. If the basin was used during construction as a sediment basin or trap, it must be cleaned out to design specifications prior to operation as a dry detention basin. ✓ j. A vegetation plan has been prepared by a N.C. licensed professional. Consideration must be given to the grasses specified due to the frequent inundation. ✓ k. The basin must be stabilized within 14 days of construction. ,/ 1. The design provides for a sediment storage volume that is equal to 20% of the runoff detention volume. ✓ in. Inlet and outlet channels have been protected from scour during high flows from large storms. ,/ n. In areas of easily erodible soils, an additional plunge pool at the inlet has been provided, or riprap is used as an energy dissipator. ti 1A o. A forebay to capture sediment is provided to make cleanout easier. ✓ p. The basin is located in uncompacted natural soils. q. The seasonal high water table is located at least 1 foot below the bottom of the extended dry detention basin. r. An additional BMP has been designed to operate in conjunction with this dry detention basin to meet the required minimum 85% TSS removal. III. EXTENDED DRY DETENTION OPERATION AND MAINTENANCE AGREEMENT The extended dry detention system is defined as the dry detention basin, forebay, and the required additional BMP. This system (check one) does does not incorporate a vegetated filter. This system (check one) Bdoes does not incorporate non-integrated pretreatment. At a minimum, the following maintenance activities shall be performed: 1. All grassed areas of the system shall be mowed at least twice annually, more frequently during the summer months, as needed. 2. Monthly or alter a ruIloff-piodticing Iain event- inspect the System to make sure it is functioninS properly. Remove any accumulated debris from the system, outlet and orifice. Form 8WU-_ Page 2 of 3 DW AYAR0 Fax:252-946-9215 Jan 16 '07 10:39 P.04 Permit No. (To he provided by DiVo Repair and revegetate any eroded side slopes and any erosion around the inlets and outlet immediately. Check the depth of the system. If sediment has accumulated to the point that the volume has been reduced to 75% of the original depth, it must be removed. Inspect and repair the emergency spillway to keep in good working order. 6. Remove woody Vegetation from the banks of the system. Any areas of the system found to be deficient shall be repaired or replaced to design standards immediately. Written records of the inspections and maintenance activities shall be kept on file. See the permit for specific written record requirements. I acknowledge and agree by my signature below that I am responsible for the performance of the above operation and maintenance procedures for this extended dry detention system. I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible patty, or, address. -Y Print name: Q A 5 H��1ZL,5 Title: i P Address: Note: The legally responsi or the developer no' zo 4/,oxa .patty shall notbe a homeowner's association unless more than 50% of the lots are sold, ger holds.a majority vote, and a resident of the subdivision has been named the president. a Notary Public for the State of NorN , County of do hereby certify that appeared before me this the day of Q Lf6 a Od and acknowledge the due execution of the forgoing extended dry detention basin operation and maintenance agreement. Witness my hand and official seal, SEAT, Notary Signature �� p My Commission expires Q ��� Form S'VUT- Page 3 of 3 Reservior Drawdown Calculations Project Orifice Q = C,A*(2gH)" Quantity 1 Diameter 1.25 inch Coefficient 0.61 Centerline Elevation 2.33 Arca 0.009 sf Countour Area Incremental Cumulative Elevation Volume Volume (so (co (ct) 1 0 0 3.5 40 2221 378 378 5.0 " 8074 4843 5221 6.0 14095 10946 16167 RECEIVED ( MAY - 3 2007 DWQ-WARO Head Flow At Accumulated Rate t (ft) (cfs) (min) (hd 1.2 0.0 0 60 1.7 0.1 117 58 2.7 0.1 1184 38 3.7 0.1 2283 Hankins and Anderson, Inc. 4/13/2007 Page 1 Permit No. (to be proWded by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FOI l ry :��® EgVE'. 1R' 1 t: CURB OUTLET SYSTEM SUPPLEMENT ` }� FOR LOW DENSITY DGVELOPMI:N'r \NI'1'hl CURB AND GU'I"1'CR This form may be photocopied for use as an original DINQ-VUAR® DWO Stormwater Management Plan Review' A complete stormwater management plan submittal includes a stormwater management permit application, a curb outlet system supplement, a low density supplement, design calculations, and plans and specifications showing all stormwater conveyances and curb outlet details. 1. PROJECT INFORMATION Project Name: fiovac4 P-1 4' — GTEL FaedJre5 Contact Person: Swcwl T4U v/ Phone Number. (2521 4Z6-5LZ1 Curb outlets to (check one): )K Swale 0 Vegetated Area If. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 21­1 .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants initials TrZR a. Curb outlets direct flow to a Swale or vegetated area. TQR b. Swales or vegetated areas receiving curb outlet flow are designed to carry, at a minimum, the peak flow from the 10-year stone. TKR c. Flow velocity is non -erosive for peak flow from the 10-year storm event. _M9 d. Longitudinal slope of the swale or vegetated area does not exceed 5%. 'TRt3 6. Side slopes of the swale or vegetated area are no steeper than 5:1 (horizontal to vertical). _rR_% f. Length of swale or vegetated area is _> 100 feet. 'TRS g. The system takes into account the run-off at ultimate built -out potential from all surfaces draining to the system (delineate drainage area for each swale). 71?8 h. Swales are located in recorded drainage casements. TRR i. Grass type(s) for permanent vegetative cover specified on detail. TR f3 j. Swale detail provided on plans. Form SWU-I05 Ver 3.99 Page I of 3 III. DESIGN INFORMATION Complete the following table. If additional space is needed the information should be provided in the same format as Table I and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State of North Carolina Erosion and Sediment Control Planning and Design Manual. Table I. Swale Dcsie,n Information Swale No. Drainage Area ac Impervious Area ac Grassed Area ac C Q efs V,,,,— (fps) V,,,,,,,, fps Flow Depth ft 1.10 044 0.6L 0.40 2A4 2.0 0.23 1.59 c 2.0Z 0.808 1.212 0.40 4.52 2.0 0.Z7 2.07 p 4,34- 2.' 8V I.01S'3 0.55 10.79 Z.0 0.c0 2-•69 95 2.21 1.591 0.6101 0.7Z 11.01 Z.0 0.24 1.-7 -7 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Form SWU-105 Ver 3.99 Page 2 of 3 Ill. CURB OUTLET SYSTEM MAINTENANCE REQUIREMENTS Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time. 2. Swales will be inspected monthly or aticr every runoff producing rainfall event for sediment build-up, erosion, and trash accumulation. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded following sediment removal. Eroded areas of the swales will be repaired and reseeded. Swales will be revcgctatcd as needed and in a timely manner based on the monthly inspections. Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. Swales will not be altered, piped, or filled in without approval from NCDENR Division of Water Quality. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Date: Signature: Note: The legally responsible pa ty s uld not be a homeowners association unless more than 50% of the lots have been sold and a resident of the snbdi tas been named the president. I, 1 c -N V Vim.. (l-) , a Notary Public for the State of A • L , County of t^MCvn do heerebbyC y certify that _� �� Q�t'�rj personally appeared before me this i day of _ R Pf! l , gam_, and acknowledge the due execution of the forgoing infiltration basin maintenance J requirements. Witness my hand and official seal, SEAL _ My commission expires,4 v FormSWU-105 Ver3.99 Page 3of 3