Loading...
HomeMy WebLinkAboutSW6100103_HISTORICAL FILE_20120907STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 1jX2 J3 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD USPS.com® - Track & Confirm Page 1 of 1 E,I.xh eustomere/rviice USPS Mobile R.I., l Sign In Aausps.coA• Search USPS. com or Track Packages Quick Tools Ship a Package Send Mail Manage Your Mail Shop Business Solutions Track & Confirm GET EMAIL UPDATES PRINT DETAILS YOUR LABEL NUMBER SERVICE STATUS OF YOUR ITEM DATE TIME LCCATbN FEATURES 70090820000024741655 Delivered August 31, 2012, 1:18 pm LUMBERTON, NO 28358 Cenefied Mail Arrival at Unit August 31, 2012. 8:30 am LUMBERiON, NC 25358 Depart USPS Son August 31, 2012 FAYETTEVILLE, NC 28302 Faallly Processed through August 31, 2012, 320 am FAYETTEVILLE, NO 28302 USPS Sort Facility ( Check on Another Item Mat your label (or receipt) number) Find LEGAL ON LIPS COM Privacy Policy, Govemmew Services, Terms of Use, BUY Starnes 8 Shop. FOIA i Print a Label with Postage, No FEAR ADT EEO Data, Customer Sorel Site Index, Copyrll 2012 USPS. An Rights Resenod ON ABOUFLISPSCOM About USPS Home Newsmoia, Mail Service Updates, Fomis8 PUNiraila^s i Careers, OTHER USPS SITES Business Customer Gateway , Posta. Inspectors) nspector General, Postal Esyloier, https://tools.usps.com/go/TrackConfirmAction.action 9/7/2012 Anderson Lnaineeri. P.O. Box 1736 305 North Chippewa Lumberton, N.C. 28359 Licensure No.: C-0793 January 19, 2010 NCDWQ Surface Water Protection Section Attention: Mike Lawyer 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Ref: Robeson County DSS Facilit, Stormwater Management:Per Mike, Please find enclosed the `folloa review and approval:, ;' • One original and one;c( • One onginal dithe ,el • One original of,the Wel • One original of the Det • One USGS map idcm4 • One copy of the.sealed,' • One copy of theapplio • One copy of the most c • One original of the con • Two sets of plans, • One permit application & Assoc., P.A. ®ENP—PP0 JAfV2 �0/^��vtal ®g�VVQ the above of the StormivaterManagement Permit? tention Basm Supplement Form, tentioh Basin Operation and Mamtenanc 3 Narrative, the site location,£ lied and dated Calculations, soils report from ECS, LLP, nt Property Deed, tPA "Parf.aTT _ RannirF+A 74nme (`harlrlict" Larry Anderson, RE. President ect for your 301231). Should you require any additional information, please do not hesitate to contact me. Sincerely, AND RSON ENGINE RING & ASSOCIATES, P.A. Sam. 711. Powers P Form, SJP/rrc National Society of Enclosures Professional Engineers® Phone: (910) 671-9530 • Fax: (910) 618-0838 • Email: andersonengineer@bellsouth.net t 6h -d ate Received Fee Paid Permit Number Applicable Rules: (select all that apply) ❑ oastal SW —1995 ❑ Coastal SW — 2008 ❑ Ph II - Post Construction NrNon-Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Robeson County DSS Facility 2. Location of Project (street address): 120 Glen Cowan Road (SR 1547) City:Lumberton County:Robeson Zip:28360 3. Directions to project (from nearest major intersection): Take Exit 17 from I-95, head west on NC Hwy 711 for approximately 0.78 mi, then turn right on SR 1547 (Glen Cowan Road) The proposed main entrance for the proposed development will be located approximately 450 linear feet north of the NC Hwy 711-SR 1547 intersection on your left 4. Latitude:340 37' 43.284" N Longitude:79° 03' 51.984" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed' ❑ Completed` "provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System []Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently Proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 30_0 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the ProJ'ect Name, Project/Permit Number, issue date and the type of each permit:Project Name: Robeson County DSS Facility Proj ID: ROBES-2010-005 Issue Date: 9.28.2009, Type: New Land Disturbing Permit DENIM -FRO JAN 2 0 610 DWQ Form SWU-101 Version 07July2009 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the oroTect): Applicant/Organization:County of Robeson Signing Official & Title:Kenneth N. Windley, Jr. - County Manager b. Contact information for person listed in item la above: Street Address:701 North Elm Street City:Lumberton State:NC Zip:28358 Mailing Address (if apylicable):Same As Above Phone: (910 ) 671.3022 Email:ken.windley@co.robeson.ne.us Zip: Fax: (910 ) 671.3010 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) El Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if Phone: State: State: Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Sam [sham, Metcon Construction Signing Official & Title:Sam Isham. Project Manager b.Contact information for person listed in item 3a above: Mailing Address:PO Box 1149 City:Pembroke Phone: (210 ) 521.8013 State:NC Zip:28372 Fax: (910 ) 521.8014 Email:sam.isham@metconconstruction.net Form SWU-101 Version 07July2009 Page 2 of 6 4. Local jurisdiction for building permits: City of Lumberton Planning & Inspections Department Point of Contact:Brandon Love Director Phone #: (910 ) 671.3976 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Wet Detention Pond 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) thePProject has been designed in accordance with: El Coastal SW —1995 U Ph II — Post Construction 3. Stormwater runoff from this project drains to the Lumber River basin. 4. Total Property Area: 24,91 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area*: 24.91 acres Total project area shall be calculated to exclude the following: the normal yool of imppounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 67.9 % 9. How many drainage areas does the project have?l (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. ;Basinvinforrnation's xkr F 15t iDfiaihageiAreallf EDfauia e,Area!C ,, ;Drain e Area; �i ',Drain elAr6e Receiving Stream Name Lumber River Stream Class * WS-IV,B; Sw,H W Stream Index Number * 14-(7) Total Drainage Area (so 1,085,079.6 On -site Drainage Area (sf) 1,085,079.E Off -site Drainage Area (sf) 0 Proposed Impervious Area** (sf) 736,490.7 % Impervious Area** (total) 1 67.9 'IinOn-site` iviousi�::Suefa`ce?Ar"eas,�-,�'°� =_Diaina e Areavlrz lDraina eAieal ?Drains e'Area`�'� 'Drains etArea�'= Buildings/Lots (sf) 52,707.6 On -site Streets (so 0 On -site Parking (sf) 248,727.6 On -site Sidewalks (so 14,810.4 Other on -site (sf) 0 Future (so 420,245.1 Off -site (so 0 Existing BUA*** (sf) 0 Total (sf): 736,490.7 btream Class and Index Number can be determined at: http:llh2o enr state ne.us/bims/reports/reportsW6 htnd ** Imyervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 07July2009 Page 3 of 6 *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by nero BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Proiects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhtto://h2o_.enr.state.nc.us/su/bmo forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2o.enr.state.nc.us/su/`bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hUp://h2o.enr.state.nc.us/su/bmp forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to hUp://www.envhelp.org/pages/onestopexpress.htrnl for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within '6 mile of the site boundary, include the 1h mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Initials 6S9 W' A ssP 55P ss? S3P SSP ST? Form SWU-101 Version 07July2009 Page 4 of 6 p. Vegetated buffers (where required). Copy of any applicable soils report with the associated SHWT elevations (Please identify S7P elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1699 Page No: 447-450 53P 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N A. Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hU://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bml2 forms.htmadeed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Samuel 1. Powers, PE Consulting Finn: Anderson Engineering and Associates. PA Mailing Address:305 North Chippewa Street City:Lumberton State:NC Zip:28358 Phone: (910 ) 671.9530 Email:sampowers@bellsouth.net Fax: (910 ) 618.0838 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact In%ormation, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item lb) to develop the project as currently Proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07July2009 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANTS CERTIFICATION I, (print or type name of person listed in Contact Information, item 2) Kenneth N. Windley, Ir. (County Manager) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. T1 WAJD` - . do hereby certify that T-Q/ before me this W`day o a0lb stormwater permit. Witness my hand d official seal, w�Mwwwww�+ .. a y ~ NOTAIpy � �'�COUK �A j SEAL Date: 1-1 2-fo the StatQ of County of (� personally appeared Towle tge thud execution of the application for a My commission expires Form SWU-101 Version 07July2009 Page 6 of 6 Anderson Lnzineering & Assoc., P.A. P.O. Box 1736 305 North Chippewa Lumberton, N.C. 28359 Licensure No.: C-0793 ROBESON COUNTY DSS FACILITY STATE STORMWATER PERMIT NARRATIVE JANUARY 18, 2010 DEER —FRO JAB; 2 0 2010 PROJECT DESCRIPTION: D V Q The Department of Social Services (DS. housed in a conglomeration of�buildi g� approximately 14.7 acres of.land. The'A causing the need for growth<a d�expaans 30 acre parcel of land wbicFis part of a Robeson County. It'rs plAnned to constl 100,000+ square fe t of new building ai relocated DSS facility=and staff. Antici] !r' _ $ kE .construction is scheduledato begin the ei spaces will be provided for this facility. with avvroxrmately<400 parkine snaces approximately 1 Larry Anderson, P.E. President CA,?( Robeson County is currently egCparcels of land totaling rrji'eztremely undersized, thus n decidedjro:relocate DSS to a iiccre ptract of land currently owned by facility which -will provide iated parking to•accommodate the ;tion time is,13,m6nths, and 2010. Approximately 550 parking ployee parkng.lot will be provided The tract of land selected'for this 'proposed project totals +/= 39.67 acre. The site was previously used for agriculturallparposes and will requir"e minimal demolition to prepare the site for construction This facility and associa ed parking wrll'only utilize approximately 30 acres of the,pareel?during,ythis`phase of construction. The site is currently divided into this 30 acre tca`ctand�theh sepal e�9+ acre tract by an existing drainage canal which currently drains the proposedsiteand surrounding properties. Slopes on the site are mild ranging from 0 — 5%. Based on NRCS Soil Survey data, the predominant soils on the site are Faceville fine sandy loam and Goldsboro loamy sand. Lakeland sand, Lynchburg sandy loam, and Rains sandy loam are present on the site as well according to the NRCS Soil Survey data. The site is bordered to the north by NC Highway 72, to the east by SR 1547 (Glen Cowan Road), and to the south by NC Highway 711. It is proposed to access the site with two separate entrances. The main entrance will be a driveway access from Glen Cowan Road, with a secondary employee/service entrance off NC Highway 72. National Society of Professional Engineerse AMPELicenwdblendw Phone: (910) 671-9530 • Fax: (910) 618-0838 • Email: andersonengineer@bellsouth.net STORMWATER CONTROL: It is proposed to utilize a single wet detention basin to treat stormwater runoff from all proposed impervious, or built -upon, areas on the site. This wet detention basin has been designed for ultimate build -out of the 30 acre site, including an assumption of 85% ,,MY- �n maximum impervious area limitation in areas intended for future buildings/parking. The 7�?0 remaining +/- 9.67 acres of the property to the southwest of the existing drainage canal has not been included in this stormwater management system. The proposed wet detention basin will utilize two forebays for pretreatment and will discharge through a�Fiism c7uPe single discharge control structure. The control structure utilizes two 4" 0 orifices to —kas elf Cl regulate stormwater discharge to meet state and local quality and quantity control a eaa� s oti standards. The wet detention basin has been designed to treat stormwater runoff for 90% TSS removal since a vegetated filter has not been incorporated at the outlet. A frame and grate will be installed on top of the discharge control structure as a trash rack so that it can be used as an emergency overflow device as well. The wet detention basin has also been designed such that it can be drained by gravity flow through an 8" sluice gate in case of emergency, or if maintenance is needed. This project is to be considered as high density, so there is no problem with conveying stormwater runoff from the proposed building and parking lots through a piped storm drainage system. This storm drainage system and wet detention basin have designed to accommodate the 10-year storm. Storm drainage drop inlets have been provided at strategic locations to allow future development to simply tie into the system as the wet detention basin has already been designed for these future developments. The permanent pool elevation for the wet detention basin was also determined to be 36" below existing ground by hand auger borings at two locations. Survey data at these two locations indicate an existing ground elevation of approximately 137', thus a seasonal' high water table of 134' was assumed and the permanent pool elevation was set at 133.50' which is 6" below the determined seasonal high water table. 2 a �k�f _- - -N34 E375- , Ir ' [j1 — 11 —N34':r3333' ..J•• IL PROPOSED DS331i'E Lum,bert S1 JJ • 12.,` �,. ��:. it ' JW __` Y� _ ` _ +�� oi[. _ t/ — �`�.. gyp• ` �� Wate �Z5 urblRERwvexC @ '. . . .`.'. 814. N3F.620@3' NW O +ss1; _... 17, ..[tr. Q • i Mq*Qmh f'g7vW? 9"Dda Ystii NEW% Sm#Daw U.= i 3.VL kJe 1 1_001 Dam] UO Dan= 14I;;,a1 STORMWATER RETENTION CALCULATIONSProj`°"ems Date: ect: Robeson 011 8-2010 County DSS Facility y:Job #: 60 p DENR-FRO ��a JAh 2 G[.A DWQ STAGE -STORAGE FUNCTION (ABOVE PERMANENT POOL) S Z CONTOUR CONTOUR AREA INCR. VOL. ACCUM. VOL. STAGE In S In Z Z est [FT2] [FTJ [FTC] [FT] [FT] 13.5. Du u u u.0 134.00 63756.65 15939 15939 0.5 9.6765 -0.6931 0.49 135.00 68383.00 66070 82009 1.5 11.3146 0.4055 1.60 136.00 73065.84 70724 152733 2.5 11.9364 0.9163 2.50 137.00 77805.80 75436 228169 3.5 12.3378 1.2528 3.35 Constant (y-Intercept) 10.66931 Ks = 43015 Slope (X Coefficient) 1.37567 b = 1.38000 Standard Error of Coefficient 0.07825 RZ = 0.99703 STAGE -STORAGE FUNCTION log -log plot 12,0000 0-0000 -- 000 -- 6.0000 y = 1.3757x + 10.669 R' = 0997 --&.0000 - --- -4,0000 2.0000 -1.0000 -0.5000 0.0000 0.5000 1.0000 1.5000 In Z Future Building Area = 11.35 ac Proposed Asphalt Area = 5.71 ac Proposed Building Area (Roof) = 1.21 ac Proposed Concrete Area = 0.34 ac Treated Pervious Area = 6.30 ac Untreated Pervious Area = 3.30 ac Pond Area = 1.79 ac Total Drainage Area = 30.00 ac 0 Seriesl -Linear (Seriesl) I STORMWATER RETENTION CALCULATIONS Project: Robeson County DSS Facility By: Sip Date: 01-18-2010 Job #: 60-1214 Runoff Coefficient, C: Pre -Development ID Area (ac) C. C x A Unimproved cleared area 30.00 0.35 10.50 Wooded, deep ground litter 0.00 0.10 0.00 Total 30.00 10.50 C� = 0.35 Post -Development UNTREATED RUNOFF (PERVIOUS AREAS ONLY) ID Area (ac) C. C x A Wooded, Deep Ground Litter 3.00 0.10 0.30 Lawn, dense soil, flat 2% 0.30 0.17 0.05 Commercial, Generalized 0.00 0.85 0.00 Total 3.30 0.35 TREATED RUNOFF ID C� = 0.11 Area (ac) C. C x A Roof, inclined 1.21 1.00 1.21 Street, driveway, sidewalk 6.05 0.95 5.75 Lawn, dense soil, flat 2% 6.30 0.17 1.07 Commercial, Generalized 11.35 0.85 9.65 Total 24.91 17.68 C, = 0.71 *Source: Elements of Urban Stormwater Design by H. Rooney Malcolm, P.E. - Exhibit 1 Storm Intensit L = 1100 ft H= 4 ft KH T� = 14.92 min T, = Say 15 min UNTREATED TREATED Design Storm: 10 year Location: Lumberton, NC Duration [min] Intensity [in/hr] 5 8.10 15 110 10 6.48 So, 110 = 4.86 QP= Cx110xA= Qp= Cx110xA= 1.76 cfs 85.95 cfs STORMWATER RETENTION CALCULATIONS Project: Robeson County DSS Facility By: Sip Date: 01-18-2010 Job #: 60-1214 a Estimate Volume of Runoff V P 10 = 2.58 in Storm: 1-hr 10 yr Location: Lumberton, NC SCS CURVE NUMBER: Soil Type: Goldsboro Hydrologic Soil Group: B 32% Faceville B 24% Lynchburg C 14% Rains B/D 16% Lakeland A 13% Wagram A 1% ID Area (ac) CN' CN x A Impervious - Roof 1.21 98 118.58 Impervious - Parking lot, Sidewalk 6.05 98 592.90 Lawn, Good condition 6.30 61 384.30 Commercial & Business 85% Impervious 11.35 92 1044.20 Total 24.91 2139.98 CNaff= 86 `Source: NC Erosion and Sediment Control Planning and Design Manual - Tables 8.03(e) - (g) 1000 s=--to CN S = 1.63 in Q. = 1.31 in V = Q* x A = 118374 cf ID Area (ac) Imperviousnp. Area (ac) Impervious - Roof 1.21 100% 1.21 Impervious - Parking lot, Sidewalk 6.05 100% 6.05 Lawn, Grass Medians 6.30 0% 0.00 Commercial & Business 85% Impervious 11.35 85% 9.65 Total 24.91 16.91 SIMPLE METHOD Rv=0.05+0.9*IA V =3630 *RD * R v *A Time to Peak. T.: T V 1.39•QP Ro = 1.0 in IA = 68% Rv = 0.66 in/in V = 59758 cf Tp = 16.5 min STORMWATER RETENTION CALCULATIONS Project: Robeson County DSS Facility By: Sip Date: 01-18-2010 Job #: 60-1214 Allowable Discharge (Pre -development Conditions): Qall = Qpre = Cpre x I1 o x A C'pre = Im= A= Qall= Qpre= Peak Inflow* = 85.22 cfs Peak Unrestricted Outflow = 1.76 cfs Peak Pond Outflow* = 1.16 cfs Peak Elevation* = 135.57 ft Peak Storage* = 117347 cf *See Storm Routing on Next Page 0.35 4.86 cfs 30.00 ac 51.03 cfs Top of Pond El. [ft] = 137.00 Storage Avail.[cf] = 152733 Actual Allowed cfs cfs 2.92 < 51.03 OK! OK! OK! STORM ROUTING Pipe (Orifice): V-Notch: Input Data: N 2 Q = C[tan(0/2)]H512 Qp 85.95 cfs Cd 0.6 C = 2.5 Tp 17 min D 4 6 = 0 degrees AT 3 min Zi 133.50 9 = 0.0000 radians Weir: Invert= 134.00 feet Ks 43015 Cw 3.0 b 1.38 L 9.0 ft Zcr 135.75 ft TIME INFLOW STORAGE STAGE ORIFICE V-NOTCH WEIR OUTFLOW [min] [cfs] [ft3] IN [cfs] [cfs] [cfs] [cfs] 0 0.00 0 133.50 0 0.00 0.00 0.00 3 6.44 0 133.50 0.00 0.00 0.00 0.00 6 23.82 1159 133.57 0.04 0.00 0.00 0.04 9 46.94 5440 133.72 0.19 0.00 0.00 0.19 12 68.88 13856 133.94 0.44 0.00 0.00 0.44 15 83.05 26175 134.20 0.61 0.00 0.00 0.61 18 85.22 41014 134.47 0.75 0.00 0.00 0.75 21 74.74 56219 134.71 0.86 0.00 0.00 0.86 24 59.53 69517 134.92 0.94 0.00 0.00 0.94 27 47.32 80063 135.07 0.99 0.00 0.00 0.99 30 37.62 88402 135.19 1.03 0.00 0.00 1.03 33 29.91 94988 135.28 1.06 0.00 0.00 1.06 36 23.78 100180 135.35 1.09 0.00 0.00 1.09 39 18.90 104264 135.40 1.10 0.00 0.00 1.10 42 15.03 107468 135.44 1.12 0.00 0.00 1.12 45 11.95 109972 135.47 1.13 0.00 0.00 1.13 STORMWATER RETENTION CALCULATIONS"''"ram• Project: Robeson County DSS Facility By: SJP� Date: 01-18-2010 Job M 60-1214 48 9.50 111920 135.50 1.14 0.00 0.00 1.14 51 7.55 113425 135.52 1.14 0.00 0.00 1.14 54 6.00 114578 135.53 1.15 0.00 0.00 1.15 57 4.77 115453 135.55 1.15 0.00 0.00 1.15 60 3.79 116105 135.55 1.15 0.00 0.00 1.15 63 3.02 116580 135.56 1.15 0.00 0.00 1.15 66 2.40 116915 135.56 1.16 0.00 0.00 1.16 69 1.91 117139 135.57 1.16 0.00 0.00 1.16 72 1.52 117274 135.57 1.16 0.00 0.00 1.16 75 1.20 117338 135.57 1.16 0.00 0.00 1.16 78 0.96 117347 135.57 1._16 J 0.00 0.00 1.16 81 0.76 117311 135.57 1.16 0.00 0.00 1.16 84 0.61 117240 135.57 1.16 0.00 0.00 1.16 87 0.48 117141 135.57 1.16 0.00 0.00 1.16 90 0.38 117019 135.57 1.16 0.00 0.00 1.16 93 0.30 116880 135.56 1.16 0.00 0.00 1.16 96 0.24 116727 135.56 1.15 0.00 0.00 1.15 99 0.19 116562 135.56 1.15 0.00 0.00 1.15 102 0.15 116389 135.56 1.15 0.00 0.00 1.15 105 0.12 116209 135.55 1.15 0.00 0.00 1.15 108 0.10 116023 135.55 1.15 0.00 0.00 1.15 111 0.08 115833 135.55 1.15 0.00 0.00 1.15 114 0.06 115640 135.55 1.15 0.00 0.00 1.15 117 0.05 115444 135.54 1.15 0.00 0.00 1.15 120 0.04 115245 135.54 1.15 0.00 0.00 1.15 123 0.03 115046 135.54 1.15 0.00 0.00 1.15 126 0.02 114844 135.54 1.15 0.00 0.00 1.15 129 0.02 114642 135.53 1.15 0.00 0.00 1.15 132 0.02 114439 135.53 1.15 0.00 0.00 1.15 135 0.01 114236 135.53 1.15 0.00 0.00 1.15 138 0.01 114032 135.53 1.14 0.00 0.00 1.14 141 0.01 113828 135.52 1.14 0.00 0.00 1.14 144 0.01 113623 135.52 1.14 0.00 0.00 1.14 147 0.00 113419 135.52 1.14 0.00 0.00 1.14 150 0.00 113214 135.52 1.14 0.00 0.00 1.14 153 0.00 113009 135.51 1.14 0.00 0.00 1.14 156 0.00 112805 135.51 1.14 0.00 0.00 1.14 159 0.00 112600 135.51 1.14 0.00 0.00 1.14 162 0.00 112395 135.51 1.14 0.00 0.00 1.14 165 0.00 112191 135.50 1.14 0.00 0.00 1.14 168 0.00 111986 135.50 1.14 0.00 0.00 1.14 171 0.00 111782 135.50 1.14 0.00 0.00 1.14 174 0.00 111578 135.50 1.13 0.00 0.00 1.13 177 0.00 111374 135.49 1.13 0.00 0.00 1.13 180 0.00 111170 135.49 1.13 0.00 0.00 1.13 aM . �� 70.00 50.00 u 0 M 40.00 30.00 20.00 10.00 I �� Chainsaw Routing Results - 10 Year Design Storm 0 20 40 60 80 100 120 140 160 180 Time [min] —:— Inflow t Discharge STORMWATER RETENTION CALCULATIONS By: SJP�tersr Project: Robeson County DSS Job #: 60-1214 Date: 0 1 - 18-2010 q$ p a ��6'@trtory �s/ STAGE -STORAGE FUNCTION (TOTAL) S Z CONTOUR INCR. ACCUM. CONTOUR AREA VOL. VOL. STAGE In S In Z Z est (FT2] [FT) [FT) [FT] [FT] 129.00 0 0 0.0 130.00 35231.23 17616 17616 1.0 9.7765 0.0000 0.98 131.00 38783.10 37007 54623 2.0 10.9082 0.6931 2.09 132.00 42428.19 40606 95228 3.0 11.4640 1.0986 3.03 133.00 46166.08 44297 139526 4.0 11.8460 1.3863 3.92 133.50 54898.84 25266 164792 4.5 12.0124 1.5041 4.38 134.00 63756.65 29664 194456 5.0 12.1780 1.6094 4.90 135.00 68383.00 66070 260525 6.0 12.4705 1.7918 5.96 136.00 73065.84 70724 331250 7.0 12.7106 1.9459 7.00 137.00 77805.80 75436 406686 8.0 12.9158 2.0794 8.04 Constant (y-Intercept) 9.81028 Ks = 18220 Slope (X Coefficient) 1.48567 b = 1.49000 Standard Error of Coefficient 0.03539 R2 = 0.99886 STAGE -STORAGE FUNCTION (FOREBAY 11 S Z CONTOUR INCR. ACCUM. CONTOUR AREA VOL. VOL. STAGE In S In Z Z est 129.00 0 0 0.0 130.00 5391.19 2696 2696 1.0 131.00 6010.52 5701 8396 2.0 132.00 6662.25 6336 14733 3.0 133.00 7346.33 7004 21737 4.0 133.50 8620.94 3992 25729 4.5 7.8994 0.0000 0.97 9.0356 0.6931 2.09 9.5978 1.0986 3.05 9.9868 1.3863 3.96 10.1554 1.5041 4.43 Constant (y-Intercept) 7.93775 Ks = 2801 Slope (X Coefficient) 1.49209 b = 1.49000 Standard Error of Coefficient 0.04843 R2 = 0.99788 Drainage Area 16.12 Total Drainage Area 24.91 % of Total 65% Required % of Perm. Pool Volume 13% % OF TOTAL PERMANENT POOL VOLUME 14% OKI STORMWATER RETENTION CALCULATIONS By: SJP Project: Robeson County DSS Job #: 60-1214 Date: 01-18-2010 STAGE -STORAGE FUNCTION (FOREBAY 2) S Z CONTOUR INCR. ACCUM. CONTOUR AREA VOL. VOL. STAGE In S In Z Z est [FT2] [FT) [FT'] [FT] [FT] 129.00 0 0 0.0 130.00 2276.41 1138 1138 1.0 7.0372 0.0000 0.98 131.00 2720.42 2498 3637 2.0 8.1988 0.6931 2.07 132.00 3193.10 2957 6593 3.0 8.7938 1.0986 3.03 133.00 3694.25 3444 10037 4.0 9.2140 1.3863 3.96 133.50 4631.84 2082 12119 4.5 9.4025 1.5041 4.47 Constant (y-Intercept) 7.06559 Ks = 1171 Slope (X Coefficient) 1.56305 b = 1.56000 Standard Error of Coefficient 0.03625 Rz = 0.99892 Drainage Area 8.79 Total Drainage Area 24.91 % of Total 35% Required % of Perm. Pool Volume 7% % OF TOTAL PERMANENT POOL VOLUME 7% OK! STORAGE VOLUME DRAWDOWN TIME Number of orifices = 2 CD = 0.6 D= 4 in A = 0.09 sf g = 32.2 ft/sec2 ElevalionoVERFLOW = 136 ElevationINVERT = 133.5 Ha = 2.5 Hd3 = 0.83 Q = 0.77 cfs TemporaryPOOIVOLUME = 152733 cf TImeDEWATERING - 199091 seconds TImeDEWATERING = 3318 min TImeDEWATERING = 55.30 hours TImeDEWATERING = 2.30 days 0 ECS CAROLINAS, LLP "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental • Facilities October 16, 2009 Mr. Sam Isham®ENR-FRO Metcon Inc.c. d- 763 Comtech Drive Pembroke, NC 28372 JAN 2 0 610 RE: Test Pit Exploration and Geotechnical Evaluation Robeson County Social Services Building Complex Glen Cowan Road Lumberton, North Carolina ECS Project Number 33:1151, Addendum No. 1 Dear Sam As requested ECS Carolinas, LLP has completed the requested test pits and bearing capacity evaluation for the above referenced project. Test pit excavations were performed at the locations selected by Anderson Engineering and Associates. Please see the attached location diagram in appendix A. The hand auger borings were performed by a rubber tire backhoe. Dynamic Cone Penetrometer (DCP) tests at 1 foot intervals were performed in the test pits at the depths noted on the DCP boring logs in general accordance with ASTM procedure STP-399. This test consists of driving a 1.5-inch diameter conical point into the soil using a 15 pound ring weight, free -falling a height of 20 inches. The number of blows required to drive the cone into the soil a distance of 1.75 inches is termed the DCP Resistance Value (blows per increment) and is indicated for each test on the hand auger logs. These results and soil classifications are attached Appendix A. DCP Tests in Test Pit No. 1 showed an allowable net bearing capacity of 2,000 psf in the upper 4 feet from existing ground surface and increased to 3,000 psf to test pit termination depth (Approximately 6 feet). DCP Tests in Test Pit No. 2 showed an available net bearing capacity of 3,000 psf to a depth of 3 feet, decreased to 2,500 psf from 3 to 4 feet and increased to 3,000 psf to test pit termination depths. DCP Tests in Test Pit No. 3 showed an allowable net bearing capacity of 2,000 psf in the upper 2 feet and increased to 3000 psf to test pit termination depth. Due to the variability of the upper silty sand and/or clayey sand layers and the information collected at the locations explored we have concluded that the upper soil strata of the locations explored should be capable of supporting foundations designed for an allowable net bearing capacity of 2,000 pounds per square foot (psf) at a depth of 2 feet below existing ground surface. If foundations could be extended to a bearing depth of 3 feet below existing graded surface they maybe designed for an allowable net bearing capacity of 3,000 psf. Please note that pockets of loose sands may be 726 Ramsey St., Suite 3 • Fayetteville, NC 28301 • T 910-401.3288 • F: 910-323-0539 • www.ecsfimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC • ECS Mid -Atlantic. LLC • ECS Southeast, LLC • ECS Texas, LLP encountered along the foundation lines of the proposed structures and potential undercutting should still be anticipated to reach design bearing capacities. In -situ Test Results One in -situ infiltration test was performed, two auger borings were performed to determine seasonal high groundwater table at the location of the proposed retention pond. The volume of water that flows through the sample in a given time is measured and used to compute the hydraulic conductivity of the soil. Based upon the in -situ testing performed; the following seasonal high water table and infiltration rates were obtained: Coordinates Seasonal High Infiltration Rates Location ID Water Table performed at 48 inches I 1 790 04'03" 36 inches 340 37'43" NA 1-2 790 04'04" 36 inches 1.02 in/hr 340 37'45" Average 36 inches 1.02 in/hr Respectfully Submitted, ECS CAROLINAS, LLP Miguel A. Santiago, P.E. Vice President / Branch Manager NC PE License No. 033082 YNai:la�inathan, P.E. Principal Engineer NC PE License No. 019937 'e q1 yp q 12 ai"'Il.11flf'em t f) •' r c I�'!01 I��. �' Ei SITE DEVELOPMENT PLAN P n ��; t'3i•lil�i :f1� Fqq pm FOR S4 4 �� +I��Ilt�l'Ij Bg5 Q ROBESON COUNTY s �tjx DEPARTMENT OF SOCIAL SERVICES f• 1! i O CAMCDO-11M S ECS Carolinas, LLP 726 Ramsey Street, Suite 3 Fayetteville, NC 28301 Phone: (910) 401-3288 Fax: (910) 323-0539 www.ecslimited.com DYNAMIC CONE PENETROMETER TEST JOB INFORMATION NAME Robeson County Social Services Department NUMBER 33:1151 LOCATION Glen Cowan Road Lumberton, North Carolina DATE Wednesday,September 30 2009 FIELD CREW Mike Santiago, Brooks Wall, James Davis Boring Sample Depth 1-3/4- 1-3/4- 1-3/4" EstimatedB earing Capacity USCS Remarks/Soil Classification Test Pit No. I Surface NA NA NA NA NA SM Brown Silty Sand S-1 1' 5 6 7 2000 SM Orange brown silty sand S-2 2' 6 8 8 2000 SC Orange tan brown orange silty clayey sand S-3 3' 6 7 6 2000 SC Orange tan brown orange silty clayey sand S-4 4' 8 9 8 3000 SM Orange tan brown orange silty sand 5-5 5' 9 13 10 >3000 SM Orange tan brown orange silty sand S-6 6 10 10 12 >3000 SM Orange tan brown orange silty sand Test Pit No. 2 Surface NA NA NA NA NA SM Brown Silty Sand S-1 1' 10 11 13 >3000 SC Orange brown tan clayey sand S-2 2' 9 8 9 3000 SC Orange brown tan clayey sand S-3 3' 7 8 7 2500 SC Orange brown tan clayey sand S-4 4' 13 1 12 13 >3000 1 SC Orange brown tan clayey sand S-5 5' 14 1 16 1 20 >3000 SC Orange brown tan clayey sand 5-6 6' 20 19 1 18 >3000 1 SC Orange brown tan clayey sand Soils samples were obtained by means of the hand auger procedure. Tice borings at the site were advanced using a three-inch diameter hand auger. In addition, Dynamic Cone Penetrometer (DCP) tests were performed in the hand auger boreholes at the depths noted on the boring logs In accordance with ASTM STP-399. In the DCP test a 1.5 inch diameter cone Is driven into the soil by a 15 pound ring weight with a free fall of 20 Inches. The number of blows required to drive the cone into the soil a distance of 1.75 inches is termed the DCP Resistance Value and is indicated for each test on the hand auger logs. Page 1 of 2 ECs Carolinas, LLP r- 726 Ramsey Street, Suite 3 ` Fayetteville, NC 28301 � Phone: (910) 401-3288-3288 o Fax: (910) 323-0539 www.ecslimited.com DYNAMIC CONE PENETROMETER TEST JOB INFORMATION NAME Robeson County Social Services Department NUMBER 33:1151 LOCATION Glen Cowan Road, Lumberton, North Carolina DATE Wednesday,September 30, 2009 FIELD CREW Mike Santiago, Brooks Wall, James Davis Boring Sample Depth 1-3/4" 1-3/4" 1-3/4" Estimated Bearing Capacity USCS Remarks/soil Classification Test Pit No. 3 Surface NA NA NA NA NA SM Brown Silty Sand S-1 1' 8 7 7 2000 SM Orange gray sandy clay S-2 2' 10 11 12 3000 SC Orange tan brown orange silty clayey sand S-3 3' 9 10 9 3000 SC Orange tan brown gray orange silty clayey sand S-4 4' 12 12 11 >3000 1 SC Orange tan brown gray orange silty clayey sand S-5 S. 14 15 16 >3000 1SM SM Orange tan brown gray orange silty clayey sand S-6 6' 18 19 21 >3000 Orange tan brown gray orange silty clayey sand Soils samples were obtained by means of the hand auger procedure. The borings at the site were advanced using a three-inch diameter hand auger. In addition, Dynamic Cone Penetrometer (DCP) tests were performed in the hand auger boreholes at the depths noted on the boring logs in accordance with ASTM STP-399. In the DCP test a 1.5 inch diameter cone is driven into the soil by a 15 pound ring weight with a free fall of 20 inches. The number of blows required to drive the cone Into the soil a distance of 1.75 inches is termed the DCP Resistance Value and is indicated for each test on the hand auger logs. Page 2 of 2