Loading...
HomeMy WebLinkAboutSW6080802_APPROVED PLANS_20080806STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. I SW 1170 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE I "akzg YYYYMMDD I LIMITS OF CONSTRUCTION SHALL BE EDGE OF ROADWAY AND LIMITS OF CLEARING LINES REVISIONS SYM. DESCRIPTION DATE BY 1 REVISED PER NCDENR COMMENTS 05/22/08 TFW al I / / / / // // // / ....• •y/ ) ... / / / / // // / /.'•••• "•/ I • • .�I ....... . 34 : - 31 30 2927 / 28 I x / ■ / I: / / + .... I .. .. xj 25 / / w wTs� vY': Sg¢r :r'i / '`�y'•'3• Si ,� fr; / p� •�X: •1• k / nr• // `}.': / � A$.}/i I/ �.S }ivy !'Y'`• \ s..v — — — — •'�4' # — � Is � DAY WAY NEW \ N,t / .i+' ,"' .ik•. x. — — — ---� •.•. ...>ti =q'�e a =` ., _� / s ;i� 4. .e. n as; ry—.—_. / ',s.n f .:i^. / a ». •// Sih., : •;,i .i,�:-t• / Q, / i:y'{ t,',�.r / ... .........-•'............. '•� ............. DRAINAI AREA 13 ,0 BOUNDARY x. 20 O -X......... w• '.X..... X X= ��X / ,�: / / s:. '•'a' • i• . V4 / ;; a ✓..... , , 4-PVC UNDERDRMN �• h / / : / // / : W/MIN. 4 CLEANOUTS /i • • ........%�.. .............. \ ...... ,.` ..... / / •/ / x / / 21,/ -/ // 3 4 '�� 5 8- - - - - - - 10 .... x..: ./?Gx..... x� ..... x..... =x�-x ....... ... .. i,X. QXCROFT RD SR 1915-4 — I ' EXISTING 20' DRAINAGE EASEMENT L EGENDo EXISTING 20' DRAINAGE EASEMENT LIMITS OF CONSTRUCTION DWQ SILTFENCE —X—APPROXIMATE LOCATION OF 8" GRAVEL ► . EXISTING WETLAND CAPPED CLEAN —OUT DIVERSION SWALE � r--�— 3'-5' 2 EACH MIN. lSTONE CHECK DAM h� GRASS 2"_4"/\//\\\\®. \//\//\//\ \' /��//%\j�/j\�/ " —12" �1\/%\\/%\\/%\\/%\\/%\\! BIORETENTION NOTES: GRAVEL CONSTRUCTION ENTRACE 9 3-jii;:ij //\//\//\//\//\� MULCH LAYER SHALL BE OF A HARDWOOD MULCH TO AVOID HAVING ..... PONDING \\\\\\\\\\\\\\\�\\ CONTOURS — — — — ////// THE MULCH FROM FLOATING. ................ \ \\ \\ \\ \\ \\ \\ .. . FILL. SOIL MEDIA \\\\\\ pLA,eRNTiNG MEDIA AT SHALL DEPBH OFD AT INCHES. TOP OF THE ENTIRE EASEMENT/RIGHT OF WAY — - - — \\ \\ \\ \\ \\ \\ ........MIX: ............ /\/\/\/\/\/\/ DEPTH: /\//\//\//\//\//\/ WETLANDS—'—'—'- 3 MIN. TREE/SHRUB CELL, -.85-$8% -SAND DURING CONSTRUCTION OF THE BIORETENTION AREAS THE AREAS WILL 2' MIN. GRASS CELL�jV . ' 8-12%. FINES..'.. / NCASE 8 #57 STONE -NOff--40VEN FILTER BE INSPECTED WHEN THE SOILS ARE EXCAVATED AND THEN TO ENSURE //�///�\ _ 3-5% ORGANIC' /j A R ...... 1p" OVERLAP THAT THERE IS SUFFICIENT #57 WASHED STONE AND WASHED SAND \\ \\ \\ \\ \\ \ H $., PRIOR TO THE PLANTING MEDIA BEING INSTALLED. THEN THE AREAS AqHFn qANW-,�-•-A ,//AT ALL SEAMS (TYP.) ARE TO BE INSPECTED TO ENSURE THAT THE PLANTING MEDIA IS OF t3N= THE PROPER DESIGN MIX PRIOR TO PLANTING OF VEGETATION. THESE 57 STON UNDERDRAIN — 4" MIN. PERFORATED PIPE/ ITEMS ARE TO BE DONE PRIOR TO THE AREAS BEING GIVEN CERTIFICATION FROM THE REGISTERED PROFESSIONAL ENGINEER. NOTE: SEE BIORETENTION CELL SUPPLEMENTS FOR ALL DESIGN DIMENSIONS, ELEVATIONS AND CRITERIA. BIORETENTION CELL DETAIL NOT TO SCALE BIORETENTION CELLS SCHEDULE CELL NO. SA TOP OF BIO. CELL LENGTH OF CELL WIDTH OF CELL DEPTH OF PONDING SOIL COMPOSITION TEMP. POOL ELEVATION PLANTING ELEVATION BOTTOM OF CELL PLANTING DEPTH MULCH DEPTH % SAND % FINES % ORGANIC 1 5,507.1 SF 200' 27.5' 12" 85% 10% 5% 366 FMSL 365 FMSL 1 362 FMSL 3.0' 4" 74s or— cs •: 1. NC l' fn aEO 00 I0 �^ C o � 2 N O N O f Q f ii a Eto I �.: y+ to .� N O 3 aEi e mm 3 c Na O V T 00 F- 0 O3: CK z z0Q J V 0- 000z Q U) 0> W W ft W W U) DATE: JULY 2008 DESIGNED: FDW DRAWN: FDW CHECKED: TKG SCALE: AS SHOWN SHEEP NO. SW-1 OF: Q J U Z Z) 0 w 0 2 vbe4i, '-Aslw4)�bh LIMITS OF CONSTRUCTION SHALL BE EDGE OF ROADWAY AND LIMITS OF CLEARING LINES REVISIONS SYM. DESCRIPTION 1 REVISED PER NCDENR COMMENTS TFW •r...... .. 35 34 : \ •I: ii .............. 2 _ .... / / % i • I: � 31 30 Ile/ — 29 2825 NEW DAY WAY a 19 ,.� ems., — syri r� —-------....,----------------- 1 \ / � •:$�" {. >! I: `4,�:: / r:!,i •d::k ' � —._— f'r /r}r �. t_.—ooe= / i" — — / "__ 1 \ / "3"t;s 4 A• / • ........... ........... ........... ........... .,•i..... 1 \ / �- , `:; .` • „: : 18 : ............... . \\ \ P�v ,,• 17 16 15 14 >iy BOUNDARY DRAJNA6E AREA 20 /cc ....%..... rK.....:t�'�%• • • • • :-\ _% 19 II= _ / I / / , /• y •-F,::� \^.may — i' • �. / /'' / BIO�ETEWTIO • C LLB a� I =?:': S�+`.�t •.� ... ✓.... / / // r '\ 4-PVC UNDEIjDRAIN W/MIN. 4 CLEANOUTS / — .y "' ....... j .. .��... ......... �' • ........... ......•. :. \` •.a..�, _' ij// - / './ ,/ // .// // // :/// / .. . ..... . ,� ..... .............. 2 / 8 10­ .....:....:x— : .- .... .. : •. %.:-; :/?;:....:_�;' �."c1[....%....._ ;%��x...... .?�..� �4�— : .% .... .....—'—%-----'-�/// /• /'/J / •Y/ '// x• /J J JJ '/ '/ / y/lam' x. —j— — — — — — �S <,�. ., / \: / ! s'k :S / ,n.ti:*'!--�;_..• ri \ „ — — ` — ` ~ �k .. %TT,% / fir. / / //_ — :>en / — •;4__a�� _—\_— _./... / , .. ..: ... If �Y;qis�' 'S:a3 / S:-ii ,:`ytiy_—•� +'.� �----•--\ '1'/ �"'�----Tin. �--y_ �� \���--\ /__' // /, // J / .'�.. / ...... % / QXCROFT RD SR 191 — / \ EXISTING 20' DRAINAGE EASEMENT P LEGEND: EXISTING 20' LIMITS OF CONSTRUCTION DRAINAGE EASEMENT SILTFENCE —x_ APPROXIMATE LOCATION OF 8" GRAVEL DIVERSION SWALE EXISTING WETLAND 3'-5' CAPPED CLEAN —OUT 2 EACH MIN. GRASS 2" 4" \�j/\//\\\%/\\j, STONE CHECK DAM MULCH BIORETENTION NOTES: GRAVEL CONSTRUCTION ENTRACE 9" —12" FORDING /\\/\\/\\/\\/\\/\\ MULCH LAYER SHALL BE OF A HARDWOOD MULCH TO AVOID HAVING CONTOURS THE MULCH FROM FLOATING. ............. \/\/\/\/\/\/\< ... ............."\\\\\\/ HARDWOOD MULCH SHALL BE PLACED AT THE TOP OF THE ENTIRE EASEMENT RIGHT OF WAY \\\\\ .... _"_ .' .-.'.'.'FILL SOIL MEDIA.'. PLANTING MEDIA AT A DEPTH OF 4 INCHES. / — - - — DEPTH: /i�/i,./i,./i,./i,/i, // // , 3' MIN. TREE/SHRUB CELL, 85-$$% 'SAND j \\,\\\,\\\,\� \\,\\\; DURING CONSTRUCTION OF THE BIORETENTION AREAS THE AREAS WILL WETLANDS 2' MIN. GRASS CELLS/��j� 8-12%.FINES.... NCASE 8 #57 STONE BE INSPECTED WHEN THE SOILS ARE EXCAVATED AND THEN TO ENSURE //\�//\/\\//\\ . 3-5% ORGANIC .. . ' //� 17H NON=WCSVEN FILTER THAT THERE IS SUFFICIENT #57 WASHED STONE AND WASHED SAND /\\/\\/\\/\\/\\/\ \�FA��21F N(ITJ I 1 OVERLAP PRIOR TO THE PLANTING MEDIA BEING INSTALLED. THEN THE AREAS \ \ \ \ \ 'ii:•:T. ". �//�//�//�//�//�//\ �'�=: WASHED . ' .•_ Al ALL SEAMS (TYP.) ARE TO BE INSPECTED TO ENSURE THAT THE PLANTING MEDIA IS OF 8" 57 STON UNDERDRAIN — 4" IN. PERFORATED PIPE THE PROPER DESIGN MIX PRIOR TO PLANTING OF VEGETATION. THESE \\/ \ \\ ITEMS ARE TO DONE PRIOR TO THE AREAS BEING GIVEN CERTIFICATION RE FROM THE REGISTERED PROFESSIONAL ENGINEER. NOTE: SEE BIORETENTION CELL SUPPLEMENTS FOR ALL DESIGN DIMENSIONS, ELEVATIONS AND CRITERIA. BIORETENTION CELL DETAIL NOT TO SCALE BIORETENTION CELLS SCHEDULE CELL NO. SA TOP OF BIO. CELL LENGTH OF CELL WIDTH OF CELL DEPTH OF PONDING SOIL COMPOSITION TEMP. POOL ELEVATION PLANTING ELEVATION BOTTOM OF CELL PLANTING DEPTH MULCH DEPTH % SAND % FINES % ORGANIC 1 5,507.1 SF 200' 27.5' 12" 85% 10% 5% 366 FMSL 365 FMSL 362 FMSL 3.0' 4" a� rl y'• ^ m F� C Mom] co asr v Q qV u. E I tCAz � t0 N�. !n N % ZW•c A, GO o H C> =v 0�/ w z 0 ofa F Ii 0 U) y, 00 F— 0 o3: F-LL z z X 0 0 Q 0W 111 W U) DATE: JULY 2008 DESIGNED: FDW DRAWN: FDW CHECKED: TKG SCALE: AS SHOWN SHEET NO. SW-1 OR LIMITS OF CONSTRUCTION SHALL BE EDGE OF ROADWAY AND LIMITS OF CLEARING LINES REVISIONS SYM. DESCRIPTION DATE BY 1 1 REVISED PER NCDENR COMMENTS 05/22/08 TFW _ •" "'�' y... / 2 r : " ; 31 30 2829 27 J. /' • // �\ "ice ��. *�' �� / i•:''�••—:tom\.. {art =.....: �.t.�.�—._.....x .. �x�y�=....._ •�� \ / ��' -- / 25 / /' t1°:� .ia� •Y..i( ..tY ,\�—./ .3:n — — i.'+a �� •)s:sk — — — / i%..:! P' t :� \`— ,/ x. / /'� •' NEW DAY WAY:'" 19 IV- \ A. nw .(�.. // k ♦. --` ...i ,_s a�'ae a s'•— • ; I. \ 7`S.H ati' •. a 8'. va.�! �1�. cT�—.--.--_ / i / �:•.VVV-_ i \ / � yi M —.— � 7' (r �• t{:.i .;A. •i 44. 6:i,. •r(�ti � ' ••�.. ell 18 / / DRAINAL6`E AREA 13 I N I I: / ��' BOUNDARY \ 20 I / _'- / // 1� / r—x..... x.... fix..... x..... x-'-fix..... F.: :x.. ..a x= : / I /' ,�:� ' //' \-'�''r�' ��s._ �s.,# /"�• Ic / x _J . s^ i� ETE ,:..!..... .....!—��... --- ------ ��— :/ /' / / / r *: r BIOff NTIO C ILL U DE DRAIN ' / - W MIN. 4 CLEANOUTS / / r e-t ............. / • ............max:.... x..: /?Gx..... x_s—s�K..... x... L •_=+�r--s `� _ r!.....l..... _111 —f— — — — —!C< Z. .- � 4. •i.':S / n'�;w -�'- Q— �---r• _•'':t �:. x'T�x .'--.1. � ,' . • % .. � %�• ' ; ..f .- .--1� / — a. /_ — :y.a / — _: •----a��\ lii-Y.w ��,_C'�,i — ��_i�_'—.---_-- —\_„r-- ._s._.. .. .. •i�x.—� — T ... .... � r QXCkOFT RD SR 19154=— 8" GRAVEL CAPPED CLEAN -OUT 3'-5' 2 EACH MIN. GRASS. 2"-4„ " " MULCH 9 -12 PONDING ............ _..FILL SOIL MEDIA... DEPTH:........MIX:........... 3' MIN. TREE/SHRUB CELL. 85-8$% 'SAND \/\\; 2' MIN. GRASS CELL%jam/j\ . 8-12%. FINES. / N .. 3-5% ORGANIC- ........................ NOTE: SEE BIORETENTION CELL SUPPLEMENTS FOR ALL DESIGN DIMENSIONS, ELEVATIONS AND CRITERIA. BIORETENTION CELL DETAIL NOT TO SCALE EXISTING 20' DRAINAGE EASEMENT BIORETENTION NOTES: MULCH LAYER SHALL BE OF A HARDWOOD MULCH TO AVOID HAVING THE MULCH FROM FLOATING. HARDWOOD MULCH SHALL BE PLACED AT THE TOP OF THE ENTIRE PLANTING MEDIA AT A DEPTH OF 4 INCHES. STONE DURING CONSTRUCTION OF THE BIORETENTION AREAS THE AREAS WILL J FILTER BE INSPECTED WHEN THE SOILS ARE EXCAVATED AND THEN TO ENSURE OVERLAP' THAT THERE IS SUFFICIENT #57 WASHED STONE AND WASHED SAND PRIOR TO THE PLANTING MEDIA BEING INSTALLED. THEN THE AREAS YP.) ARE TO BE INSPECTED TO ENSURE THAT THE PLANTING MEDIA IS OF THE PROPER DESIGN MIX PRIOR TO PLANTING OF VEGETATION. THESE ITEMS ARE TO BE DONE PRIOR TO THE AREAS BEING GIVEN CERTIFICATION FROM THE REGISTERED PROFESSIONAL ENGINEER. LEGEND: EXISTING 20' LIMITS OF CONSTRUCTION DRAINAGE EASEMENT SILTFENCE _x— APPROXIMATE LOCATION OF DIVERSION SWALEEXISTING WETLAND STONE CHECK DAM GRAVEL CONSTRUCTION ENTRACE oY�iha`ti CONTOURS - - - - - EASEMENT/RIGHT OF WAY — - - — WETLANDS ....... BIORETENTION CELLS SCHEDULE CELL NO. SA TOP OF BIO. CELL LENGTH OF CELL WIDTH OF CELL DEPTH OF PONDING SOIL COMPOSITION TEMP. POOL ELEVATION PLANTING ELEVATION BOTTOM OF CELL PLANTING DEPTH MULCH DEPTH % SAND % FINES % ORGANIC 1 5,507.1 SF 200' 27.5' 12" 85% 10% 5% 366 FMSL 365 FMSL 362 FMSL 3.0' 4" plf y YY 00 F- 0 O O U) F- 0W Z X 0 00Z OW ww DATE JULY 2008 DESIGNED: FDW DRAWN: FDW CHECKED: TKG SCALE: AS SHOWN SHEET NO. SW-1 OF: Q z J d' U 0 O 2 LIMITS OF CONSTRUC11ON SHALL BE EDGE OF ROADWAY AND LIMITS OF CLEARING LINES REVISIONS 1 1 (REVISED PER NCDENR COMMENTS 1 05/22/08 1 TFW 1 35 � x• �' 33 I 2 �• I: .... ... .. _---- /�3130 x ( `• w ; x•_ I• : I' : 29 x. 7." ... ....... ,27 f... �....._..... ..... �1_J• .. ..... I _ 25 / NEW DAY WAY 19 \ \ i"•�7'6.-i ., .. ♦ ey.3 *�., a. sti _' — _ _ � _ / s. y • _i'' VVV \ / 'j:S'.4Y 4 .# / . . • .. . ..... , . ........... . ............ •'i4l jt' ; tl • // @ / i:,rt ,!.'.?.•S'' _ — --' \ \ 2O �'ti.;F.• \ ; ............... / ~ �:, .;;; --24 \ U _— / \ / / @ / 1 7 ; 1 6 1 rj ; 1 4 .:y I O I /, 1 /! / @ ^r:�'.•. DRaNaG`E aaEn \ v --- 13 - \ / / /' / �C @ BOUNDARY 20 \ / / Y.,.,\ .�. .... .....�:��x..... 3:.... ' / �1 ' / / y .,.' \ `:�:. -••• j. i \ //' x/ \\ •'•/ / / / / / // j?a `• t x .:.. x..... x ..... x . _ — — \ \ \ /' ' ' / ' : / / / s tf \ / BID 'ErElq 1O C LL_ ........ • / C UNDE DRAIN W/MIN. 4 CLEANOUTS • ....... ..s2 •ti- ' 2 3 10 — — — — / ---- \�♦�,�t// —Ttn�---- /— ��_\--\ /--/ // `//1 // / •%/'Y'�/.. i .......�/' /n✓ =nth "i� I. 27 / QXCTZOFT RD SR 1915'/ EXISTING 20' DRAINAGE EASEMENT LEGEND: EXISTING 20' LIMITS OF CONSTRUCTION DRAINAGE EASEMENT SILTFENCE _x— APPROXIMATE 8" GRAVEL LOCATION OF CAPPED CLEAN -OUT y / 3'-5' 2 EACH MIN. / / / DIVERSION SWALE EXISTING WETLAND GRASS 2 -4 // //\//\\//\/ STONE CHECK DAM MULCH BIORETENTION NOTES GRAVEL CONSTRUCTION ENTRACE 9 -12" PONDING /\\/\\/\\/\\/\\/\\ MULCH LAYER SHALL BE OF A HARDWOOD MULCH TO AVOID HAVING CONTOURS \//\//\\/ /// THE MULCH FROM FLOATING. FILL SOIL MEDIA. //\//\//\//\//\//\� HARDWOOD MULCH SHALL BE PLACED AT THE TOP OF THE ENTIRE EASEMENT RIGHT OF WAY ---- /\\\\\\\\\\\\\\\\ MIX: ' ' jj/\\ j PLANTING MEDIA AT A DEPTH OF 4 INCHES. / DEPTH: /i�/i,/i,./i,/i,/i, / /\/\/\, 3' MIN. TREE/SHRUB CELL_ ... 85-$8% _SAND'._ .. \\ ,\\ ,\\ ,\\ ; DURING CONSTRUCTION OF THE BIORETENTION AREAS THE AREAS WILL WETLANDS ...... - 2' MIN. GRASS CELL%/� 8-1�%. FINES ... / NCASE 8" #57 STONE BE INSPECTED WHEN THE SOILS ARE EXCAVATED AND THEN TO ENSURE �/j� 3-5% ORGANIC \// AI.... .... C5V8 FILTER OVERLAP' THAT THERE IS SUFFICIENT #57 WASHED STONE AND WASHED SAND � z�� 4i� //�Al ALL EMS TYP. PRIOR TO THE PLANTING MEDIA BEING INSTALLED. THEN THE AREAS W AN- �• \\/\, \, \, \, � , ) ARE TO BE INSPECTED TO ENSURE THAT THE PLANTING MEDIA IS OF //\\/�\\/�\�\\ SE 8" 57 STON UNDERDRAIN - 4" IN. PERFORATED PIPE ITEMS ARETHE TO BEGN DONEXPRRORRTOOPLANTING THE AREASOBEINGGGIVEN CERTIFICATION /n��%\/�%�\�/\\..\ \..\.\\.\\i\.�\!\\.\\.\\.\\. \.\\.\\/\/\�/\�/\\�/\/\/\\/\! FROM THE REGISTERED PROFESSIONAL ENGINEER. NOTE: SEE BIORETENTION CELL SUPPLEMENTS FOR ALL DESIGN DIMENSIONS, ELEVATIONS AND CRITERIA. BIORETENTION CELL DETAIL NOT TO SCALE BIORETENTION CELLS SCHEDULE CELL NO. SA TOP OF BIO. CELL LENGTH OF CELL WIDTH OF CELL DEPTH OF PONDING SOIL COMPOSITION TEMP. POOL ELEVATION PLANTING ELEVATION BOTTOM OF CELL PLANTING DEPTH MULCH DEPTH % SAND % FINES %ORGANIC 1 5,507.1 SF 200' 27.5' 1 12" 85% 107. 1 5% 1,366 FMSL 365 FMSL 362 FMSL 3.0, 4" a € � co 00 � M � cq O t � o N .UC c ' E dap 20 �+ — N V.l N •� f/1 O W 4z e 0 DO y O M =v 0 Z OO 0 03:U Q U F- L- Z IL) (yJ z z X Oz DQ :D U) Ill0U W W 0 2 DATE: JULY 2008 DESIGNED: FDW DRAWN: FDW CHECKED: TKG SCALE: AS SHOWN SHEET NO. SW-1 OF: _