Loading...
HomeMy WebLinkAboutSW6070401_HISTORICAL FILE_20160525STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. I SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYM M DD ����'NT•of •��� ,wns DEPARTMENT OF THE ARMY US ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS, UNITED STATES ARMY GARRISON, FT BRAGG 2175 REILLY ROAD, STOP A FORT BRAGG, NORTH CAROLINA 28310-5000 May 25, 2016 DIRECTORATE OF PUBLIC WORKS I JUN 6 2016 I I Fayetteville Regional Office Division of Energy, Mineral and Land Resources Land Quality Section 225 Greene St., Suite 714 Fayetteville, North Carolina 28301-3043 Dear Sir/Madam: Fort Bragg requests the rescission of the following two HQW permits. 1. SW6090803 (SOF Training Facility Phase III & Phase IV) 2. SW6070401 (SOF Rowe Training Facility Phase V) The entire drainage area of the above two permits are captured, and treated by the SCM's installed for the latter permit SW6110203 SOP Prep and Conditioning Course. For further information, please contact Mr. William DeCarmine, Water Management Section at (910)907-5320. Sincerely, Lee P. Ward Chief, Water Management Section Directorate of Public Works, April 19, 2007 State of North Carolina Department of Environmental and Natural Resources Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 28304-5043 Attn: Mr. Mike Lawyer, RE: Stormwater Management Permit Application SOF Rowe Training Facility, Phase V Ft. Bragg, Camp MacKall, NC Dear Sir, DegB-FRO pit .lw20 ®n°Q Enclosed is the referenced application, drawings, narrative, and Review Fee check in the amount of $420.00. Drawings, narratives, and applications have been signed where appropriate by Ft. Bragg Directorate of Environment and Public Works and signed and sealed by a North Carolina Registered Professional Engineer. As previously discussed, this documentation certifies that significantly more than the required minimum stormwater retention on -site is percolated into the soil and not released to the High Quality Watershed of Drowning Creek. We trust this documentation will meet with your review and approval of the requested stormwater permit. If there is any question, clarification, or additional documentation required under this submittal please call me or Mr. Kirby E. McCrary (336) 499-1937 and we will respond immediately. a Lead Civil Eneinei Aerospace & Defense—Pfogni s Reynolds, Smith and Hills, Inc. 2235 N. Courtenay Pkwy., Ste. C Merritt Island, FL 32953 800-225-7201 F 321.453.0223 RSK IMPROVING YOUR WORLD Cc: A. Watt, RS&H/Jacksonville (for File) K. McCrary, RS&H/North Carolina (for File) L. Ward, DPW, Ft. Bragg, NC B. Usher, ACOE I R J 11 \ O JDS, SW E AND H BLS, Architectural, Engineering, Planning and Environmental Services® 2235 N. Courtenay Parkway, Suite "C" Merritt Island, Florida 32953-5227 FAX COVER LETTER RS&H Telephone Number: (321) 453-0212 RS&H Fax Number: (321) 453-0223 DATE: Ag; ( tool % FROM: T Z I C, f .O f o a:1 MESSAGE: x�, 6108 NUMBER OF PAGES (incl. cover): 3 C FAX #: to r 4 r 070 1 PHOA'EMATL #: 0-60ve.,. 1z rre Je- � Ps;o CL as V �p a- RSW W, The Leader in Design of Aerospace Ground Facilities '8 H l! 'ON HM and E:b LOR '�l 'UV 04, State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the 2, Print 3. Mailing Address for '0►► '4_ I Telephone Number: name and title (person listed in item 2 individual, etc. wh U.S. legally rrespcCnsib'l1e � n EN L owns the project): compliance): 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenan a agreements, etc,) goy__-- 5. Location of Project (street address): City: County: B, Directions to project (from yy,t� nearest major Intersection):f.�w,,// / I I4. 1.►..... %W I QA�t1*. Cm m k6v-, N�a�DPC IC. (Q NLv - p 7. Latitude: �' 5' 02 $ 502 , W Longitude: 47 21 1517 —__ of project B. Contact person who can answer questions about the project: A terry spy Name: (2%c,h0.rd \A +f..L+,K,3 Telephone Number: (_%o ) 43Zs 277 .. II. PERMIT INFORMATION: 1. Specify whether project is (check one): V New Form SWU-101 Version 3.99 Page 1 of 4 _—_Renewal ___Moditication Z 'd Hb c 'ON HIH NdvE:� Loot 'bZ 'UV 2. If this application is being submittel as the result of a renewal or modification to an existing permit list the existing permit number AI�ZA and its issue date (if known) N 11A 3. Specify the type of project (check one): Low Density —High Density —Redevelop —General Permit Other 4. Additional Project Require ents (check applicable blanks): —CAMA Major Require Control 404/401 Permit ZNPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. M. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative 2, Stormwater runoff from this project drains to the bvofwnlItq Creek FAimp basin. 3. Total Project Area; R_acres 4. Project Built Upon Area:--121 % 5. How many drainage areas does the project have? I 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Receiving Stream Name Receiving Stream Class at VJ Drainage Area 1'(09 CLC. Existing Impervious* Area el. 11 ac, Proposed Impervious*Area 0 1 S(s Q6 Cr % Impervious* Area (total) 52,Ci 70 Rn. UN ROW On -site Buildings .4 S a 7 E7. t n--, , 51719'11: /A On -site Streets 0.00 •a& On -site Parking CL ew On -site Sidewalks p 1 1-a, Other on -site 0. Total: r) !S at eo, Total: Impervious area Is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc, FormSNVU-101 Version3.99 E 'd HtE 'ON Page 2 of 4 Hasa Ad�E:� LOOZ)'UV 1 UNITED STATES POSTAL SERVICE First-Ctagelass Mail { Pos& Fees USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP in this box' NC DENR zo DWQ-SWP C ri1 ATTN: BELINDA HENSON �+ 225 GREEN ST., STE. 714 a c FAYEPTF.VILLE, NC 23301 0 j 0 H) n m ` • ; OF \ A19^ Michael P. Fasay, Governor ICJ' G William G. Ross Jr., Secretary 10 i North Carolina Department of Environment and Natural Resources � -� Alan W. KlimeA, N.E. Director Division of Water Quality December 27, 2006 CERTIFIED MAIL: 7001 2510 0006 9498 9050 RETURN RECEIPT REQUESTED Gregory G. Bean, Directorate of Public Works Bldg. 3-1634 Butner Road Fort Bragg, NC 28310-5000 SUBJECT: ,REQUEST FOR APPLICATION RoN'e Training Facility Phase V Camp MacKall-Richmond County Dear Mr. Bean: Please find enclosed the completed stream classification request form for the Rowe Training Facility Phase V project at Camp MacKall in Richmond County. Based on project location information provided on the USGS quad sheet that was included with the classification request form, it has been determined that stormwater from this project will drain to a section of Drowning Creek described as `From a point 0.4 mile upstream of US Hwy t to Lumber River' in the Lumber River Basin.' Due to the classification of this section of Drowning Creek as High Quality Water and the distance from the project area to the tributary/stream being less than one mile, a Stormwater Management Permit is required for this project prior to the construction of any built -upon areas. To acquire the Stormwater Management Permit, please complete and submit to this office Form SWU-101, any and all applicable supplement forms and the appropriate fee of$420, which must be in the form of a check made payable to the North Carolina Department of Environment and Natural Resources (NCDENR). You can find Form SWU-101 and all applicable supplement forms on our website at the following link: www.ncwaterquality.org/su/Forms_Documents.htm#sswmp. Also enclosed is a checklist of submittal requirements for your reference. If you have any questions regarding this matter, please contact me at 910-433-3329. Sincerely, Michael Lawyer Environmental Technician Enclosures(2) cc: Richard E. Young, PE -Reynolds, Smith and Hills, Inc. FRO-Surface_WaterProtectiori; `z one No)1licarollna ,ilrrturallY North Carolina Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Internet: www_ ncwaterauality.ore Far (910) 486-0707 'An Equal Opportunity/Affirmative Action Employer —50% Recycled/1 0% Post Consumer Paper Customer Service 1-877-623-6748 0 Ir QFFECAL USE Ir Postage $ Ir S Certified Fee Ir Postmark Return Receipt Fear Here .A 0• (Endorsement Required) O Restricted Delivery Fee O (Endorsement Required) O Total Postage & Fces a tiSent To �/ ------------------ C3 street. /> p or PO Box No. ---�-��7--'��-------- ---""_-------__------ � Ci ,State. ZIPad 300. January 20C North Carolina Waterbodies Listed by County Note: Waterhodics are listed in more than one county if they cross county lines. Report Date: 11108106 Records Found: 108 Search Parameters: County: Richmond Class: SpDes: Name: Desc: Index#: Name of Stream Description Curr. Class Date Prop. Class Basin Stream Index # County s,...,..:,.w....._..._..._.. ..._u...,� Drowning Creek From source to Naked WS-II; Sw,HQ 08/03,192 Lumber 14-2-(1) Creek W Naked Creek From source to Drowning WS-1I;ORW 08/03/92 Lumber 14-2-6 Creek Rocky Ford Branch From source to Naked WS-11;ORW 08/03;92 Lumber 14-2-6-1 Creek Drowning Creek From Naked Creek to Pis-1I; Sw,HQ 08/03/92 Lumber 1.4-2-(6.5) Horse Creek W Big Branch From source to Drowning WS-1 r; HQY! 08/03/92 Lumber 14-2-7 (Crappie Lake) Creek Drowning Creek From Horse Creek to a NiS-Lf; Sw, HQ 08/03/92 Lumber 14-2-(9) point 0.4 mile upstream W,CA ' of U.S. Hwy. 1 (Town of Southern Pines water supply intake) :Drowning -Creek From a,point 0 4 mile:' 08/03;92 Lumber' f_4 2 (10-5) .;to`Gumber' Rider. Big Muddy Creek From source Co Drowning C 12/01/63 Lumber 14-2-12 (Broadacres Creek Lakes, Big Muddy Lake) Gum Swamp Creek From source to Crawford C 12/01/63 Lumber 1.4-32-(1) (Pine Lake, Gum Branch Swamp Lake) Clay Branch From source to Gum C 12/O1/63 Lumber 14-32-2 Swamp Creek Mill Creek From source to Gum C 12/01/63 Lumber 14-32-3 (MCLeods Lake) Swamp Creek Camp Branch From source to Gum C 12/01/63 Lumber 1.4-32-5 Swamp Lake, Gum Swamp Creek Crawford Branch From source to Gum C 12/01/63 Lumber 14-32-8 (Crawford Lake) Swamp Creek Joes Creek From source to Gum C;Sw 12/01./63 Lumber 14-32-14 (Colons Mill Pond) Swamp Creek Ringsberry Creek From source to Joes C;Sw 12;01/63 Lumber 14-32-14-1 Creek Page I of 7 12/14/2006 09:05 FAI 910 196 0069 _ PWBC REAL PROPERTY State of North Carolina Department of Envirooment and Natural Division of Water Quality WATER QUALITY CLASSIFICATION REQUkST FORM lair wrm m.y 6e phatowptai for ntc err nn ori�+aeL . J DEC 22 -FAYITfE,nr.,_r REGIONAL OFACE In order to dticrmino whether a State StormwatcrManagement Ptamit will be tequirod for apmjcer located within a High Quality Water (HQW) or Outstanding Rrwurce Water (ORW) souc, the classification of the closest downslope surface waters (the surface waters that any sheet Ilow or overflow from tho project wotdd flow toward) must be determined. It is required that the sag- awhortzed pcnon that obtained the Approved Erosion and Sedimentation Control Plan tbmpletc only Section I and 11 below. Division of Water Quality stall -will determine The receiving stream classification, complete Section fit and rclura the mmpleTed form w you, --7- ---. ._ .. ._...._—•---�_.- 1. ProjcctNamo: ilow8T2AQWCr FA4:aITy PHASE Y _County: VIcHM0N6 2. Autbori=dContactPcrsoa(p(i7ntt): REYNOC�Sr SMtrHr ANb � Ave.. /eLSr i, . MaiihtgAddtT�s:_10748 VEERW00b (PARK &LeVARD auTH 4. city.JACKSoa1y,LIE ._State. Ft yiperode:3ZZ56Pbom-#: 800-74I-2o/4 5. Namc of closest downslope surf w � R�O%wHlp/Gr Ci qe cx 6. Signature of Contact Person: �t Gs • lDAtc: t 2-114 loa (1'a be Yj rod ey'[Le Savor prim nr Autlwixd Aomt w oa APPpv mn® 3 edim or Carrot Ptaal 7. Is an Erosion & Sedimentation Control Plan rogoired7 " No — IL RF.QL3RI:D ITEMS An 9,5" x I I" copy of the approptialc portion ora USGS quad slteee clearly showing the projeet's property botmdwios, receiving stream, major roads or Statc Roadnumbers and the nearest town w city. - - ' iI1':—CG.t�, SiF1t7rY7fSii REQTu'E3:'tT�eF�my�ttdEyrTcfiF-s:�QiCi'pr�-.�1"'-' I. Name ofswPucc waver . -IT t1V I1/` 2. River Basin: (Akyl .. Stnam bidex:/7 - lo. 3.LtA Classification(u mabliehtd t+y me7Go•iiormnwt Marujnrunr Lommi85teo): SW 4. Proposed Classification, if bit: _ V,4 5. Approximate distance in feet from project site if clsssificatiou is IIQW: G. State Stormwater Mang m=t Permit rLVired7 Yeses/ o_ 7. Signature of Rt�gional OfCtcc personnel: Dace: i (P DEC-14-2006 09:24 TEL)910 396 3069 ID) .i . k� A rF9 Michael F. Easley, Governor William G. Ross Jr., Secremry rNorth Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality November 20, 2006 CERTIFIED MAIL: 7001 2510 0006 9498 9142 RETURN RECEIPT REQUESTED Gregory G. Bean, Directorate of Public Works Bldg. 3-1634 Butner Road Fort Bragg, NC 28310-5000 SUBJECT: REQUEST FOR STREAYI CLASSIFICATION Rowe Training Facility Phase V Camp MacKall-Fort Bragg Dear Mr. Bean: On November 7, 2006, the Fayetteville Regional Office of the Division of Water Quality received a copy of the Letter of Approval dated November 3, 2006 for the Rowe Training Facility Phase V project located at Camp MacKall. A review of the location of this project shows that it may be within a High Quality Water zone. State regulation 15A NCAC 02H .1003 requires that any development activity that is required to obtain either a CAMA major permit within the twenty coastal counties or an approved Erosion and Sedimentation Control Plan in which the project is draining to Outstanding Resource Waters or within one mile of and draining to High Quality Waters to apply for and obtain a Stormwater Management Permit. In order to determine if a Stormwater Management Permit will be required for this project, this office must verify the classification of and distance to the receiving waters. Please return the enclosed classification request form with a color copy of that portion of the USGS quad sheet with the project and the closest downslopc named receiving waters clearly identified. Upon classification of the receiving waters by this office, you will be sent either a Stormwater Management Permit application via certified mail or a letter stating that it Stormwater Management Permit is not required for this project. The local governing authority for compliance must review projects that drain to Water Supply Watersheds. Please be advised that construction of any built -upon areas prior to receipt of a Stormwater Management Permit, if required, will be considered a violation of the North Carolina Administrative Codes. If you have any questions concerning this matter, please call me at 910-433-3329. Sincerely, Michael La cr Environmental Technician Enclosure NonhCarolina North Carolina Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 29301-,043 Phone(910) 433-3300 Customer Service Internet: vcww.1ewalerau2li1v OrL, Fax (910) 486-0707 I-,477-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled110 % Post Consumer Paper FLl U- QFF�C0AL USE m Postage s .39 G' Y Certified Fee t Postmark Return Receipt Fee Here (Endorsement Required) O Restricted Delivery Fee 11/21/06 O (Endorsement Required) O Total Postage 8 Fees I $ r9 �1 ru IMPGORY G. BEAN --------------------------------------------------------------------------- 0 r3 oo9o°o BLDG. 3-1634 BUTNER RD. N �'�R? BRAGG, NC 28310-5000 :rr rt UNITED STATES POSTAL SERVICE I I I I I I First-class Mail Postage 8 Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4 in this box 1(je D AJ R -F!ye t -e-V Ile MC a�301 irrirlir,ir,rli,((,rrrrrliririrli,r,rirriri,iririrririr„irr(1 North Carolina James D. Simons, PG, PE Director and State Geologist Directorate of Public Works Attn: Gregory G. Bean. Bldg. 3-1634 Butner Road Fort Bragg, NC 28310-5000 NCDENR Department of Environment and Division of Land Resources Land Quality Section November 3, 2006 LETTER OF APPROVAL 5 7 /O.`.: Natural Resources Michael F. Easley, Governor William G. Ross Jr., Secretary RB: Project Name: Rowe Training Facility Phase. V, Camp Mackall Acres Approved: 1.79 Project ID: Bragg-2007-010 County: Fort Bragg Camp MacKall Special Forces Way River Basin: Stream Classification: Submitted By: Reynolds, Smith and Hills, Inc. Date Received by LQS: 10/9/2006 Plan Type: New Dear Directorate of Public Works: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. l I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Fayetteville Regional Office 225 Green Street — Suite 714, Fayetteville, North Carolina 28301 e Phone: 910433-3300 / FAX: 910-486-0707 Letter of Approval Directorate of ublic Works November 3,W6 Paac 2..of:2,.;::.a: Acceptance and approval ofthis plan is conditioned upon your compliance with Federal and State water quality laws, regulations; and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please be aware that your project will be covered by the enclosed NPDES General Storm -water Permit NCGO1000 (Construction Activities). You should first become familiar with all of the requirements for compliance with the enclosed general permit. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which ,you provided. You are requested to file an amended form if there is any changc in the information included on the form. In addition, it would be . helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, l iodi Pace, El Land Quality Section Enclosures: Certificate of Approval NPDES Permit cc: Reynolds, Smith and Hills, Inc. Directorate of ENV & PW, Building Inspector Belinda Henson, Division of Water Quality Land Quality Section -Regional Office File William G. Ross Jr., Secretary North Carolina Department of Environment :md Natural Resources Alan W. Klimek P.G., Director Division of Water Quality November 7, 2006 Gregory G. Bean Director of Public Works Bldg. 3-1634 Butner Road Fort Bragg, NC 28310-5000 SUBJECT: NPDES General Stormwater Permit No. NCGO10000 Project ID: Bragg-2007-010 Rowe Training Facility Phase V, Camp MacKall Fort Bragg Dear Mr. Bean: Recently you were sent a letter from the Division of Land Resources (DLR) regarding approval of your Sedimentation and Erosion Control Plan for the subject development project. Accompanying the DLR letter, was a National Pollutant Discharge Elimination System (NPDES) General Stormwater Permit No. NCGO10000. That permit authorizes you to discharge stormwater to the surface waters of North Carolina. Those point source discharges are associated with activities such as clearing, grading, and other land disturbing and construction activities. The purpose of this letter is to draw your attention to and to stress the importance of that NPDES General Stormwater Permit. The requirements contained in the stormwater permit coupled with the requirements called for by the Division of Land Resources are vitally important to the protection of the waters of the State. If you have not already done so, you are urged to immediately read and adhere to the stormwater permit requirements contained there in. Of particular importance are Parts I and lI of the permit. Parts I and li set forth the minimum visual monitoring and reporting requirements for your stormwater discharge. In particular, Part I, Section B describes the visual monitoring frequencies and locations, the requirement to maintain a rain gauge onsite, and the need to maintain a written record of all inspections. Upon commencement of your land disturbing activity, you must initiate the visual monitoring and record keeping requirements as called for in the permit. The visual monitoring data results, along with all other permit required records must be maintained on -site and made available to Division of Water Quality representatives upon request and/or during upcoming inspections. The remaining parts of the Permit set forth definitions, general conditions and special conditions applicable to stormwater discharge(s). .The conditions include special reporting requirements in the event of noncompliance, bypasses, treatment unit/process failures, etc. Noor`thCarolina �atura/!� North Carolina Division of Water Quality 225 Green Street — Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Customer Service Internet: w .ncwaterquafnyorg ,FA,X (910)486-0707 1-877-623-6748 An Equal OpportumlylAlfrmative Action Employer — 50% Recycled110% Post Consumer Paper Gregory G. Bean Page 2 November 7. 2006 "this letter is also meant to advise you that should you fail to comply with the terms and conditions of the permit you could be subject to enforcement as called for in Section 143-215.6 of the North Carolina General Statutes. A civil penalty (fine) of up to $25,000 per violation per day may be assessed for such violations. We ask that if you find at an`y time that you are unable to comply with the terms and conditions of the Permit, that you contact this Office immediately. As mentioned previously, the purpose of this letter is to advise you of the importance of the NPDES General Stormwater Permit and by this notification prevent unnecessary impacts to the waters of the State. Again, if you have not already done so,. please read t1te permit and contact Mr. Michael Lawyer or Mr. Chad Turlington of this Office at (910) 433-3360 if you have any questions or need clarification. Sincerely, Belinda Henson Regional Supervisor Surface Water Protection Section BH/bsm Cumberland County Stormwater Files DWQ Ceiiiral Piles