Loading...
HomeMy WebLinkAboutSW3161202_CURRENT PERMIT_20170111STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW���i%iDa DOC TYPE CURRENT PERMIT (❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Mr. David Hughes D.R. Horton, Inc. 8001 Arrowridge Blvd. Charlotte, North Carolina 28273 Dear Mr. Hughes: ] R0 ROY COOPER c,Ilrt,,Il,r 9!;q,'1kd4.LL1AM G. ROSS, JR. %j S pDd C1 Acting S'rcrutrmy �O i2 p dLidp�o�ACY E. DAVIS 7. 4 p G January 11, 201Do-com. V Subject: Stormwater Permit No. SW3161202 Millbridge Phase 8 Residential Subdivision High Density Wet Detention Basins Waxhaw, Union County The Stormwater Permitting Unit received a complete package for the Millbridge -- Phase 8 Residential Subdivision on December 22, 2016. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 and Session Law 2006-246. We are forwarding this Stormwater Management Permit No. SW3170101, issued January 11, 2017, for the construction, operation and maintenance of the subject project and the stormwater BMPs. This permit shall be effective from the date of issuance until January 11, 2025, and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to follow the procedures for transfer of the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per NCGS 143-215(e) the petition must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. Slate of Non], Camlioa I Etrvironmenral Qualit} I Energy, Mineral and Land Resources 1612 Mail Service Center 1512 North SalisburyStreet I Raleigh, NC 27699-1612 919 707 9200 r Mr. David Hughes State Stormwater Permit SW3161202 -- Millbridge Phase 8 Residential Subdivision Waxhaw, Union County Page 2 After thirty days from the date of this letter, this project will be kept on file at the NCDENR Division of Energy, Mineral and Land Resources, Land Quality Section, Mooresville Regional Office. If you have questions after that time, please contact Zahid Khan, zahid.khan@ncdenr.gov, of that office. Until that time, if you have any questions or need additional information concerning this permit, please contact Richard Riddle at (919) 807-6375; or rick.riddle@ncdenr.gov. Sincerely, Original signed by Richard L. Riddle, Jr. Richard L. Riddle, Jr., Stormwater Engineer for Tracy E. Davis, P.E., CPM Director, Division of Energy, Mineral and Land Resources State of Notth Carolim I Enti o mml Q aEty] Enertry; \daual mdLand Retmutts 16LNU Smice Center 1 512 North Salitb=Street I Raleieh, NC 276M 16L 919 707 9200 T State Stormwater Permit Permit No. SW3161202 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations u PERMISSION IS HEREBY GRANTED TO Yn 103 D. R. Horton, Inc. cs for Millbridge Residential Subdivision —Phase S , CA Intersection of Coldwater Mill Dr. and Oakmere Ro$-�, ` 'v Waxhaw, Union County FOR THE construction, operation and maintenance of six wet detention basins in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources, Land Quality Section, and considered a part of this permit. This permit shall be effective from the date of issuance until January 11, 2025, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as shown on the approved site plan for this project, the stormwater application and all supporting data as referenced in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 1,256,052 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area as indicated in Section 1.2 of this permit, and per the application documents and as shown on the approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such. required easements, in accordance with the approved plans. Page 1 of 6 State Stormwater Permit Permit No. SW3161202 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. 7. The design criteria for the six wet detention basins can be found on the approved, stamped and signed site plan for this project and it is incorporated into this permit by reference and the project stormwater management system must be maintained at design condition as shown on the approved site plan. II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the completion of the construction of any built -upon surface and the issuance of any certificate of occupancy. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch' basins and piping. g. Access to the cell and outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Energy, Mineral and Land Resources, Land Quality Section, an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. The stormwater treatment system shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Page 2 of 6 State Stormwater Permit Permit No. SW3161202 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Energy, Mineral and Land Resources, Land Quality Section, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Energy, Mineral and Land Resources, Land Quality Section, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. Page 3 of 6 State Stormwater Permit Permit No. SW3161202 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 11th day of January, 2017. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Original Signed by Richard L. Riddle Jr. Richard L. Riddle, Jr, Stormwater Engineer for Tracy E. Davis, P.E., Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit Permit No. SW3161202 Millbridge Residential Subdivision — Phase 8 Waxhaw, Union County Stormwater Permit No. SW3161202 Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, Millbridge Residential Subdivision — Phase 8, Waxhaw, Union County (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Permit Permit No. SW3161202 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation, per the vegetation plan. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: Zahid Khan, Land Quality Section NCDEQ-DEMLR, Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 Page 6 of 6 DEMLR USE ONLY Date Received e Pt Nu ber Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph If - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: 41 .0 ' State of North Carolina yJ'6> 0, Department of Environment and Natural Resources® ep Division of Energy, Mineral and Land Resources a2 d%J STORMWATER MANAGEMENT PERMIT APPLICATION �Rlb1 This form may be pliotocopied for use as an original (� I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on 4,'#ns, Cit specifications, letters, operation and maintenance agreements, etc.): / er AA;11 -ii— Pk... A al( 1p �r 2. Location of Project (street address): City:Waxhaw County:Union 3. Directions to project (from nearest major intersection): From the intersection of Kensington Drive & Providence Road S (Hwv 16)., travel west alone Kensineton Drive for approximately .3 miles then left on Waxhaw-Marvin Road. Continue southwest on Waxhaw- Marvin Road for approximately 1.4 miles and then make a left onto Coldwater Mill Drive. Travel on Coldwater Mill Dr for aoorox. 0.1 miles and arrive at the intersection of Coldwater Mill Dr & Oakmere Rd. 4. Latitude:34° 55' 42" N Longitude:80° 45' 51" W of the main entrance to the project II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tReneu,als with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 70 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. is the project located within 5 miles of a public airport? ❑No ®Yes If yes, see S.L. 2012-200, Part VI: htti2://portal.ncdenr.org/web/Ir/rules-and-regulations 60 Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: D.R. Horton, Inc. Signing Official & b.Contact information for person listed in item la above: Street Address:8001 Arrowridge Blvd. City:Charlotte State:NC Zip:28273 Mailing Address (if applicable): City: State: Zip: Phone: (704 ) 787-5622 Fax: Email:DlHuizhes@drhorton.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if City: Phone: ( ) Email:s State: Zip: State: Zip: Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Signing Official & Title b.Contact information for person listed in item 3a above: Mailing Address: City: Phone: ( ) Email: 4. Local jurisdiction for building permits: State: Zip: Fax: ( ) Point of Contact:Chris Rice Phone #: (704 ) 843-2195 Form SWU-101 Version Oct. 31, 2013 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. During construction the stormwater runoff will be treated by sediment basins. After construciton is complete, the stormwater runoff will be treated by six wet detention basins placed throughout the project. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Catawba River basin. 4. Total Property Area: 78.40 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area`:78.40 acres Total project area shall be calculated to exclude thefollowing: the normal pool of imppounded structures, the area between the banks of streams and rivers, the area below the Nonnal High Water (NM line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 36.78 9. How many drainage areas does the project have?6 (For high densihll, count 1 for each proposed engineered stormwater BMP. For low densitlt and other projects, use 1 for the whole properhil area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Receiving Stream Name Twelvemile Creek Twelvemile Creek Twelvemile Creek Twelvemile Creek Stream Class C C C C Stream Index Number * 11-138 11-138 11-138 11-138 Total Drainage Area (so 494,509 341,657 346,658 234,101 On -site Drainage Area (so 468,340 341,657 346,658 234,101 Off -site Drainage Area (sf) 1 26,169 1 0 1 0 0 Proposed Impervious Area** (so 189,364 163,905 167,752 107,818 % Impervious Area** total 38.29 47.97 48.39 46.06 Impervious— Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 On -site Buildings/Lots (so 134,750 119,000 114,625 67,375 On -site Streets (so 42,635 33,266 39,054 30,660 On -site Parking (so 0 0 0 0 On -site Sidewalks (so 13,729 10,764 11,448 9,783 Other on -site (so 0 0 0 0 Future(so 0 0 0 0 Off -site (sf) 0 0 1 0 0 Existing BUA*** (so 0 0 0 0 Total (so: 189,364 163,905 167,752 107,818 * Stream Class and Index Number cal be determined at: httpf[portal.ncdenr.org/web/wq&slcsu/classi cations Form SWU-101 Version Oct. 31, 2013 Page 3 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the storm water runoff will be treated. During construction the stormwater runoff will be treated by sediment basins. After construciton is complete, the stormwater runoff will be treated by six wet detention basins placed throughout the project. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: It. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Catawba River basin. 4. Total Property Area: 78.40 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 78.40 acres Total project area shall be calculated to exclude the following the normal pool of imppounded strictures, the area between the batiks of streams and rivers, the area below the Nonnal High Water (NM line or Mean High Water (MHW) line, and coastal wetlands landward froth the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal letlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 36.78 9. How many drainage areas does the project have?6 (For high density, count 1 for each proposed engineered stornavater BMP. For low densihj and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 5 Drainage Area 6 Drainage Area _ Drainage Area _ Receiving Stream Name Twelvemile Creek Twelvemile Creek Stream Class * C C Stream Index Number * 11-138 11-138 Total Drainage Area (so 984,915 342,356 On -site Drainage Area (so 962,304 342,356 Off -site Drainage Area (so 22,611 0 Pro osed Impervious Area** (so 1 458,341 168,872 Impervious Area** total 46.54 1 49.33 Impervious— Surface Area Drainage Area 5 Drainage Area 6 Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 315,000 121,625 On -site Streets (so 108,414 35,637 On -site Parking (so 0 0 On -site Sidewalks (so 34,927 11,610 Other on -site (so 0 0 Future (so 0 1 0 Off -site (so 0 0 Existing BUA*** (so 0 0 Total (so: 458,341 168,872 Stream Class and Index Number can be determined at: http://yortal.nedenr.or eb/wq[ps/csu/classifications Form SWU-101 Version Oct. 31, 2013 Page 3 of 7 * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. The survey for the project included the topography of the adjacent phase/parcels. The offsite area drainingto o the project was delineated and the built upon area in the offsite area was measured in CADD Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from httD://Dortal.ncdenr.ore/web/wo/ws/su/bmD-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from h1W: / / portal.ncdenr.org/ web/ wq / ws / so / statesw/ forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map athqp://Rortal.ncderLr.org/web/wq/ws/su/maps ) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.htm] for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished Floor elevations. ETS L� E I S Form S WU-101 Version Oct. 31, 2013 Page 4 of 7 1. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify �E elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xlI" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) %Q�� 10. A copy of the most current property deed. Deed book: — Page No: 47 S7 ETS 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC 1=rs Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. htW://www.secretaly.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htW://12ortal.ncdenr.org/web/Ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Weston Boles, PE Consulting Firm: WK Dickson & Co., Inc. Mailing Address:616 Colonnade Drive City:Charlotte Phone: (704 ) 334-5348 Email: wboles@wkdickson.com State:NC Zip:28205 Fax: ( ) Form SWU-101 Version Oct. 31, 2013 Page 5 of 7 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I; (print or h/pe name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. I, a Notary Public for the State of , County of do hereby certify that personally appeared before me this _ day of . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission Form SWU-101 Version Oct. 31, 2013 Page 6 of 7 X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item la) David Hughes certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. M IZ•l•l (Av I, 1\a the I Nail es —a Notary Public for the State of N or;h edkblinac, County of May-jGnbUYq do hereby certify that Da v i d H un ws personally appeared before me this I day of Deeew lx.V _a 0 1 , and a o�wledg�� e� the /d�ue execution of the application for a stormwater permit. Witness my hand and official seal, XJ:JP,Q/y 7MECKLENBURG HELHAYES ARY PUBLIC COUNTY, NCssion Expires 5-3-2020 SEAL My commission expires �J ' 3 o� C6) C> Form SW U-101 Version Oct. 31, 2013 Page 7 of 7 WK LETTER OF TRANSMITTAL FODICKSON community infrastructure consultants 616 Colonnade Drive Charlotte, North Carolina 28205 704.334.5348 let. 704,334.0078 fax TO: NCDEQ I DATE: December 20, 2016 1612 Mail Service Center Raleigh, NC 27699 ATTENTION: Mike Randall RE: Landeavor Millbrid e — Phase 8 W KD#2016018100.00.CL We are sending via: ❑ Overnight ® Regular Mail ❑ Pick-up ❑ Hand Delivered -Courier The following items: ❑ Correspondence ® Plans ❑ Specifications ® Other as listed below: COPIES DATE NO. DESCRIPTION 2 NCDEQ Stormwater Permit Application 2 NCDEQ Stormwater Deed Restrictions 1 NCDEQ Wetpond Maintenance Agreements (6 Total) 1 Calculations 1 Stormwater Narrative 2 Millbrid e Phase 8 Construction Plans 1 Property Deed 1 USGS Quad Map 2 2 2016 1 Check 1 WATER RES URCE USDA Soils Report 401 & UMUUl 1 Secretary of State THESE ARE TRANSMITTED as checked below: N For Approval ❑ As Requested ❑ For Your Use ® For Review and Comment ❑ Approved as Submitted ❑ Returned for Corrections ❑ Approved as Noted ❑ Forward to Subcontractor REMARKS: Mike, please find the above attached for submittal. Should you have any questions or comments, please let us know. COPY TO: file SIGNED: Edwin Suddreth THIS CHECK. IS PRINTED IN RED AND BLUE INK ON THE FACE ON CHEN]ICAL AND BLEACH REACTIVE PAPER WITH INVISIBLE FLUORESCENT FIBERS AND BASK ETWEAVE ON BACK 11IIIIIIIm1\'': ! ControlledDisbnrsement Cheek, Number 335104 f(irlm•,kni fjmlAc.- - Wells Fargo Bank, N.A. 56-1553 Date Amount DRII Inc. Controlled Disb Acet. Vun Well, 011 301 Co n nerce,Sbcet, Suite 500 412 12/02/16 $******.505.00 Fort {North, 7:V 76102 1146258 -. Void after 6 months from date ofissue i i Pay FIVE HUNDRED FIVE AND 00/100 To to the Order Of. NCDEQ NC DEPT ENVIRONMENTAL QUALITY 610 E-CENTER AVE 9301 MOORESVILLE NC 28115 a- u'00335104ii1 1:041 2038 241: 96394818790' Permit Number: JW *316 1101 (to be provided by DWQ) Drainage Area Number: 6^1 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. w This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. C N This system (check one): ❑ does ® does not incorporate pretreatment other than a forebui 0 w Important maintenance procedures: Uj E — Immediately after the wet detention basin is established, the plants on thW_ vegetated shelf and perimeter of the basin should be watered twice week y if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page I of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: The inlet device: pipe or The pipe is clogged. swale The pipe is cracked or otherwise damaged. Erosion is occurring in the swale. Sediment has accumulated to the Unclog the pipe. Dispose of the sediment off -site. Replace the pipe. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. source a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Weeds are present. shelf Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Weeds are present. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than smavine. Prune according to best professional practices Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5;0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 55:0 feet in the forebay, the sediment shall be removed. Sediment Removal BASIN DIAGRAM (fill in the blanks) 572.00 I Pe manen Volume 571.00 -ft Min. Sediment Storage FOREBAV Permanent Pool Elevation 577.00 Pool Sediment Removal Elevation 572.00 Volume Bottom Elevation MAIN POND I-ft Vn. Sediment Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by D117Q) 1 acknowledge and agree by my signature below that 1 am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Millbridee Phase 8 BMP drainage area number: Print name:David Hughes Title:Land Manager Address:8001 Arrowridge Blvd. Charlotte, NC, 28273 Phone:(704) 787-5622 Si Date: 12 /• /` Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, RcL ;r y�[ H a,wS , a Notary Public for the State of Noy+h ea.ynlrria , County of McCK_JtnbLlya , do hereby certify that David H ughtS personally appeared before me this day ofj-C t'_Cyvnacknowledge the due execution of the forgoing wet detention basin maintenance requirements. seal, GRO—ck-a 9/1_1_.l QJ�J RACHELHAYES NOTARY PUBLIC MECKLENBURG COUNTY, NC My Commission EMphes 5-3-2020 SEAL My commission expires S - 3-- a Oa p Witness my hand and official Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: Sai 2 /6 1142 O,Z (to be provided big Dn'Q) Drainage Area Number: `{-�-2 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. o This system (check one):Ta ❑ does ® does not incorporate pretreatment other than a forebay. _ t Important maintenance procedures: �S — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page I of 4 Permit Number: (to be provided by DIVQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NIC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 55:5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5;5 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) 552.00 Pe manent ----------- Volume 551.00 ft Min. Sediment Storage FOREBAY Permanent Pool Elevation 557.50 Pool Sediment Removal Elevation 552.00 Volume Bottom Elevation 551.00 + 1-ft N n. Sediment Storage MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: : W 314 (;W (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Millbridye Phase 8 BMP drainage area number:2 (BMP 8-2) Print name:David Hughes Title:Land Manaper Address:8001 Arrowridye Blvd. Charlotte, NC, 28273 Phone:(704) 787-5622 Signature: Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, rFa lgt i t4aw e S a Notary Public for the State of NO r'Fh Cabo) ✓LPL , County of McC_e_1enh IUG do hereby certify that David i-il,!akw_c- personally appeared before me this day of Detwnbe t' , 10 1 to , and acknowledge the due execution of the, forgoing wet detention basin maintenance requirements. Witness my hand and official seal, (g jatA tQ X0(.CA&u%') RACHELHAYES NOTARY PUBLIC MECKLENBURG COUNTY, NC My Commission Expires 5-3-2020 SEAL My commission expires 5 - 3 - aoa o Form SW40I-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number. ��ti3�li IaOZ (to be provided DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the publ �; and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. m� G �O This system (check one):o BOG ® does ❑ does not incorporate a vegetated filter at the outlet. ® G t j °n °o This system (check one): y d„ ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page I of 4 Permit Number: (to be provided by D1VQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 55:5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 55:5 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 528.00 1 ----------------- FOREBAY BASIN DIAGRAM (fill in the blanks) -ft Min. Sediment Storage Permanent Pool Elevation 533.50 Pool Sediment Removal Elevation 528.00 Volu Bottom Elevation MAIN POND 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: 5031L /zf:)z (to be provided by DIVQ) acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Millbridge Phase 8 BMP drainage area Print name:David Hughes Title:Land Manager Address:8001 Arrowridge Blvd. Charlotte, NC, 28273 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, 'ROLC1 t'e- ( Haw , a Notary Public for the State of 0 or+h CaVO I i VIA County of AAP C9 (CAbLtvQ , do hereby certify that v i el H ua yes personally appeared before me this _ day of 'DeC2vnbie-11, 01(,, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, (j� &Zkt p gajjy RACHELHAYES NOTARY PUBLIC MECKLENBURG COUNTY, NC My Commission Expires 5-3-2020 SEAL My commission expires S- 3-Joao Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: SW 314 /0102 (Io be provided by N,Q) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, �J pretreatment including forebays and the vegetated filter if one is provided. oSc� r This system (check one): ®j d> Jt ® does ❑ does not incorporate a vegetated filter at the outlet.ay�p �- d �� > This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: wit — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page l of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe, otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 6.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 6.50 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM ill in the blanks) 520.00 I Pe anen� -------------- Volume 519.)0 -ft Min. Sediment Storage FOREBAY Permanent Pool Elevation 526.50 Pool Sediment Removal Elevation 520.00 ------------------------------------- Bottom Elevation MAIN POND 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: -:503/2 aal- (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Millbridge Phase 8 BMP drainage area number Print name:David Hughes Title:Land Manager Address:8001 Arrowridge Blvd. Charlotte, NC, 28273 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, RoLoNd HQm (-S , a Notary Public for the State of Nova- X COLAvDIMA County of UecrdertbU*- , do hereby certify that David H t tp S personally appeared before me this J— day of Deco- ►bev , 9.01(o , and acknowledge the due execution of the forgoin wet detention basin maintenance requirements. Witness my hand and official seal, RACHELHAYES NOTARY PUBLIC MECKLENBURG COUNTY, NC My Commission Expires 5-3-2020 SEAL My commission expires 5 - 3 - a oa a Form SW40I-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Wet Detention Basin Operation Permit Number: JW am, 1d fl2 (to be provided b , DfFQ) Drainage Area Number: s'3 and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outle� d This system (check one): ❑ does ® does not incorporate pretreatment other than a foreb Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly r needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page l of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW40I-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 6.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 6.50 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 542.00 1 ----------------- FOREBAY BASIN DIAGRAM (fill in the blanks) -ft Min. Sediment Storage Permanent Pool Elevation 548.50 Pool Sediment Removal Elevation 542.00 Volu Bottom Elevation MAIN POND 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: 5 W 3 (& /,A 02 (to be provider/ by DJVQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Millbridee Phase 8 BMP drainage area number:5 (BMP 8-5) Print Title:Land Manager Address:8001 Arrowri4w Blvd. Charlotte, NC, 28273 Signature: Date: 1-2- ' ' Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. 1, Rachel HQu es , a Notary Public for the State of (\JO ✓+ 'A COYO I i Y1Ct , County of AJ ec.Jy_Ieyib(ll-G , do hereby certify that David HuakeS personally appeared before me this day of DeCeWlacknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, (AaA_k� �ea_44� RACHELHAYES NOTARY PUBLIC MECKLENBURG COUNTY. NC My Commission Expires 53-2020 SEAL My commission expires 5 " 3- oZ Da (7 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: :5U) 3 o IZQ% (lobe provided v DWQ) Drainage Area Number: 6_ Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. d) a This system (check one): J�G ® does ❑ does not incorporate a vegetated filter at the outlet. ® os This system (check one): �U A y d ys does ® does not incorporate pretreatment other than a forebay. CP �p '0�> o Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page I of 4 Permit Number: (to be provided by Dli'Q) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50 % of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How 1 will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5.50 feet in the forebay, the sediment shall be removed. Sediment Removal 569.00 -------------- FOREBAY BASIN DIAGRAM (fill in the blanL) -ft Min. Sediment Storage Permanent Pool Elevation 574.50 Pool Sediment Removal Elevation 569.00 Volu Bottom Elevation MAIN POND IQd Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Pennit Number: -6au lANL (to be provided by DWQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Millbridae Phase 8 BMP drainage area number:6 (BMP 8-6) Print name: Address:800I Arrowridge Blvd. Charlotte, NC, 28273 Signature: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I,�L( Q C�o S a Notary Public for the State of jJ Or� V1) J1 not , County of "e CKJenbuYG , do hereby certify that p 6LV 1 d 4kA Q SUS personally appeared before me this Ok 11 day of P- ap 1(0, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, 9; ea_cbL s Jea_4 � RACHELHAYES NOTARY PUBLIC MECKLENBURG COUNTY, NC My Commission Expires 5-3-2020 SEAL My commission expires rJ - 3- D d Q O Form SW40I-Wet Detention Basin O&M-Rev.4 Page 4 of 4 High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. J I, David Hughes acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are inte ed o gns}�re ongoing compliance with State StormwW Management Permit Number to / s issued by the Division of Energy, Wral ao Land Resources under the Stormwater Management Regulations. /` s !ram m, 2. The State of North Carolina is made a beneficiary of these covenants to the extent necess r�y o � maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming cr them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Energy, Mineral and Land Resources. 6. The maximum allowable built -upon area per lot is 3500 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA This allotted amount includes any built -upon area�constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. 8. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. Form DRPC-3 Rev.2 05Nov2009 Page 1 of 2 Sig High Density Residential Subdivisions Deed Restrictions & Protective Covenances 'e ( "CL�L( PS , a Notary Public in the State of MOt-44-i C a_v01 ina (County of /I�P.W16rn hL ,44 C do hereby certify that ClV1 S personally appeared before me this the day of ()CC MkX V , 2011p, and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, GRSEAL Signature (' C /1 AYES My Commission expires C 3 ��y RA NOTARY PUBLIC NOTARY PUBLIC MECKLENBURG COUNTY, NC My Commission Expires 5-3-2020 Form DRPC-3 Rev.2 05Nov2009 Page 2 of 2