Loading...
HomeMy WebLinkAboutNCC215266_ESC Approval Submitted_20210927ROY COOPER Governor JOHN NICHOLSON Interim Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality June 11, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Buncombe County Solid Waste Department ATTN: County Manager 200 College St, Suite 300 Asheville, NC 28801 RE: Project Name: Buncombe Co. Solid Waste Management Facility Acres Approved: 79 acres Project ID: BUNCO-1996-000 County: Buncombe City: Asheville Address: NC 251 River Basin: French Broad Stream Classification: B, C Submitted By: Kenton J. Yang, P.E. Date Originally Received by LQS: October 19,1995 Date Current Revision Received by LQS: June 2, 2021 Plan Type: Landfill County Manager, This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The Modifications required for approval are attached. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNO1 form to Annette Lucas at Annette.lucasC@ncdenr.gov or Paul Clark at ®� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 Noarri cnRaurw � D.Pen MmQ.'d r 828.296A500 Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. S , cer Mi ael Smith Assi ant Regiona Engineer Division of Energy Mineral and Land Quality Enclosures: Modifications Required for Approval NPDES NCG01 Fact Sheet D Q �� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 I Swannanoa, North Carolina 28778 LoacMaAouun ! Envl[u .1-1-1u $28.296.4500 o¢paNne ec: Mr. Kenton J. Yang, P.E. KYang@scsengineers.com Ms. Kristy Smith kristy.smith@buncombecounty.org cc: Regional Office file MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Buncombe Co. Solid Waste Management Facility Project ID: BUNCO-1996-000 County: Buncombe 1. Because the information on the original Financial Responsibility/Ownership Form (FRO) submitted in 1995 has changed over the years, please provide an updated, original, signed, and notarized copy of this form with updated information. This information should include the current address of the project, project contact information, and name, current mailing address and other requested information for the financially responsible party for the landfill. The original FRO for this permitted section of the landfill is on file at this office and a copy may be obtained by request. {G.S.113A-57 (3)}. 2. The original plan sheet for this sediment pond shows two jurisdictional systems entering sediment basin 7 from the northeast and northwest. Please check on the status of any 404/401 certifications that may have be issued in the past for this site. {G.S. 113A-57 (3)1. 3. Because the stream below sediment basin 7 may be a jurisdictional water feature, please do not place rock check dams, sediment fence or other erosion control measures within the channel below the basin. (G.S. 113A-57 (3)}. 4. Please note that the limits of disturbance (LOD) for this plan revision should be (previously) included in the original plan set limits of disturbance. {G.S. 113A-57 (3)}. S. In addition to the diagram shown on drawing sheet 01, please include in the plan sheet typicals, a pump around detail for dewatering the sediment basin. {G.S. 113A- S7 (3). North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NORTH CAROLJN4 oepenmemor e�mmme Juavn, 828.296.4500 6. Please add specifications and additional notes to the plan detail drawing for the special stilling basin (silt bag) to; {G.S.113A-57 (3)1. a)to discharge the silt bag into well vegetated at least 50' away from a stream or wetland, b) not to place silt bags on slopes greater than 5.0% without stability measures, c) maintain spare silt bags on site near the operation. 7. Please add to the plan sheets the two new sample plan sheets. Ground Stabilization and Materials Handling and Inspection, Recordkeeping and Re ortin . These two plan sheets can be easily downloaded in either pdf., CAD, or CAD 2013 format from the NCDEQW Construction Stormwater website at the address copied below. {G.S. 113A-57 (30). htt s: de .nc. ov about divisions ener -mineral-land-resources ener -mineral-land- nermitsfstormwater-permitsfconstruction-sw Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources r//� Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NOQum uepeM.tn1ftOo a WUua� 828.296A500