Loading...
HomeMy WebLinkAboutSW8990462_Historical File_20030711C WATFR Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources co f -_� Alan W. Klimek P.E.,Director O K Division of'Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality July 11, 2003 Messrs. Charles E. Wells, Ronnie Graves and Freddie Brown 1641INC 1-1wi. 53 West Bur(: ;;3 a�, NC 28425 Subject: Permit No. SW8 990462 Modification Rocky Point Commercial Park High Density Subdivision Stormwater Project Pender County Dear Messrs. Wells, Graves and Brown: The Wilmington Regional Office received a complete Stormwater Management Permit Application for ;pocky Point Commercial Park on July 8, 2003. Staff review of the plans and has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 990462 Modification, dated July 11, 2003, for the construction of the subject project. This permit shall be effective from the date of issuance until July 11, 2013, and shall be subj*x,t to the conditions and limitations as specified therein. Please pay special attention goy the operation and Maintenance requirements in this permit. Failure to estad)0'-)A; an adequate system for operation and maintenance of the stormwater man�:frrint :aystem will result. in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petifico-"i, °';o arming to Chapter 150B of the North Carolina General Statutes, and filed nrith I io 0' fie of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you liav�� any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor ,2SSs:'-ii'3 3:1WQS\STORMWAT\PERMI-R99O462.juIO3 Jim Honeycutt, P.E. Pender County Inspections Linda Lewis Wilmington Regional Office Central Files N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 39"900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 State Stormwater Management Systems Permit No. SW8 990462 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr. Charles Wells, Mr. Ronnie Graves, Mr.Freddie Brown Rocky Point Commercial Park Pender County FOR THE construction, operation and maintenance of 5 wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules' and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water' Quality and considered a part of this permit. This permit shall be effective from.the date of issuance until July 11, 2013 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1, This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The subdivision is' permitted for 18 lots, each allowed a maximum amount of built - upon area, more particularly described in Condition 11.13 of this permit. Lots 1, 2, 3, 4, 5, 6, A, B, C, J, K, and L must direct their runoff into Pond #1; Lots H & I must direct their runoff into Pond #2; Lot G must direct its runoff into Pond #3; Lots E & F must direct their runoff into Pond #4; and Lot D must direct its runoff into Pond #5. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 2 State Stormwater Management Systems Permit No. SW8 990462 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr. Charles Wells, Mr. Ronnie Graves, Mr.Freddie Brown Rocky Point Commercial Park Pender County FOR THE construction, operation and maintenance of 5 wet detention, ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 11, 2013 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The subdivision is permitted for 18 lots, each allowed a maximum amount of built - upon area, more particularly described in Condition 11.13 of this permit. Lots 1, 2, 3, 4, 5, 6, A, B, C, J, K, and L must direct their runoff into Pond #1; Lots H & I must direct their runoff into Pond #2; Lot G must direct its runoff into Pond #3; Lots E & F must direct their runoff into Pond #4; and Lot D must direct its runoff into Pond #5. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the projecti will be recorded showing all such required easements, in accordance with the approved plans. 2 State Stormwater Management Systems Permit No. SW8 990462 Modification DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: Rocky Point Commercial Park Permit Number: SW8 990462 Location: Highway 117, Rocky Point, Pender County Applicant: Charles Wells, Ronnie Graves and Freddie Brown Mailing Address: 1640 NC Highway 53 West Burgaw, NC 28425 Application Date: July 8, 2003 Receiving Stream / River Basin: Pike Creek / Cape Fear Stream Index Number: 18-74-46 Classification of Water Body: "C Sw" Design Storm: 1" Pond Number: 1 2 3 4 5 Drainage Area, acres: 27.67 3.88 3.79 4.25 1.59 Onsite: 25.78 3.88 3.79 4.25 1.59 Offsite: 1.89 0 0 0 0 Total Impervious Surfaces, ft2: 937,274 152,091 148,735 166,700 62,289 (D Lots, ft2: 811,339 152,091 148,735 166,700 62,289 Roads/Parking, ft2: 51,989 0 0 0 0 Offsite, ft2: 73.946 0 0 0 0 Pond Depth, feet: 7.5 6.5 7.0 7.0 5.0 OO TSS removal efficiency: 90% 90% 90% 90% 90% Permanent Pool Elev., FMSL: 27.00 28.20 26.50 29.00 28.50 OPermitted Surface Area, ft2: 32,702 7,802 7,203 7,500 4,680 Permitted Storage Volume, ft3: 119,961 18,304 16,902 14,381 11,412 Temporary Storage Elev., FMSL: 30.2 30.2 28.5 30.68 30.5 ®Controlling Orifice: 3.0" cp 1.5" T 1.5" cp 1,75" T 1.0" cp Lots 1, 2, 3, 4, 5, 6, A, B, C, J, :, and L must direct their i undi into Pond #1; Lots H & I must direct their runoff into Pond #2; Lot G must direct its runoff into Pond #3; Lots E & F must direct their runoff into Pond #4; Lot D must direct its runoff into Pond #5. O If 90% is provided, a vegetated filter is not required O The permitted surface area must be provided at the permanent pool -elevation ® The orifice must draw down the 1" volume in 2-5 days. 3 State Stormwater Management Systems Permit No. SW8 990462 Modification II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Committee (ARC) is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the ARC do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 7. The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and 4 State Stormwater Management Systems Permit No. SW8 990462 Modification specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. Decorative spray fountains will not be allowed in the stormwater treatment system 12. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 13. Prior to the sale of any lot, deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Section I, Part 2. The recorded statements must follow the form: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 990462, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot, in square feet, is as follows: Lot 1 75,907 Lot A 77,551 Lot G 148,735 Lot 2 77,899 Lot B 52,867 Lot H 78,350 Lot 3 89,299 Lot C 59,436 Lot 1 73,741 Lot 4 77,899 Lot D 62,289 Lot J 64,295 Lot 5 77,899 Lot E 83,067 Lot K 63,418 Lot 6 59,849 Lot F 83,633 Lot L 35,020 This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that naturally drain into the system are not required to provide these measures. 5 State Stormwater Management Systems Permit No. SW8 990462 Modification 14. Prior to transfer of the permit, the stormwater facilities must be inspected by DWQ personnel, and determined to be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 15. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 16. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must bear the signature of the Permittee, the deed book number and page, and stamp/signature of the Register of Deeds: 18. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 19. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved, including as may be required, but not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with the terms and conditions of this permit until such time as the Director approves the transfer request. 0 State Stormwater Management Systems Permit No. SW8 990462 Modification 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 11th day of July, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 990462 7 Date 'ved Fee Paid Permit Number Co D 2—� 7�Z S W (� /2`-//- 2CX)Z State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be pho#ocopied fior use as an original L GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): C H ARLES E. W E. LLSO gor i j S GLAy E5, F REDpj r Be"o 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): CHAAL95 E. WELLS, m_ANAro1PG PA2rN6R. ^ 3. Mailing Address for person listed in item 2 above: l In 0 W , 140Y 53 WEST City _ B u 2 fDA W State: 0 C. Zip: - :a�- 2 S4Z5 Telephone Number: ( 910 ) "7 (o 3"5COO or q l U Z 5a- 4O7 O 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Rocky Pow ccMAIM_A- mpt.r. 5. Location of Project (street address): City:. 6. Directions to project (from nearest major intersection): County: PC-1lAER 9X17 X-" 014 NW Y 210 WF.57' ARE R!�T AT /r47VJZSECTiW 0,F Hwy T _117- SUM A OOT '14, /) iL.6 oti Fleur 7. Latitude: .3!f a 27100-11 Longitude: 7-7 6 53 boo /of of project 8. Contact person who can answer questions about the project: Name: �iM 140N YCU Telephone Number. ( 910 ) 3SO--M31 IL PERMIT INFORMATION: 1. Specify whether project is (check one): J_New Renewal Modification — -- a}►F—L" mt Is nemg suDmi ted as the result of a renewal or modification to an existing permit, list the existing permit number W1A_and its issue date (if known) 3. Specify the type of project check one): Low Density High Density —Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMS, Major Sedimentation/Erosion Control ,404/401 permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III- PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) ditAmbmg stormwater management for the project. ET nil 2- Stormwater runoff from "project drains to the _CAPE FEAR _ River basin. 3. Total Project Area: J 3 . —7 —] acres 4. Project Built Upon Area;.9r7 % % 5. How many drainage areas does the project have?_ 5 OVEP- 4 LL 6. Complete the following information for each drainage area. If there are more than two drainage areas in Project, attach an additional sheet with the information for each area provided in the same format as below.e Fes! Receiving Stream Name (ICE Receiving stream Class C S UJ Drainage Area `'I q Existing ervious* Area sed Inn wus*'Area 2 1 .5 2 %Impervious* Area (total) 97 °lo On-site Buildings N On -site Streets 51 q Sri O s Parking N On site Sidewalks N Other on-s'te 911.333, N N N JUAN.3 CR BE -. N * Total r] Qt713 . Total: Impervious area is defined as the built g� 15 09 1 upnn area imiudin but not limited to buildings, roads, parking areas, sideioalks, gravel areas, etc. SEE ATTA,CHO) Form S J U-101 Version 3.99 Page 2 of 4 S H EEr FDP_ PUNDS 3, + 4S. ROCKY POINT COMMERCIAL PARK 1640 NC HIGHWAY 53 WEST BURGAW, N.C. 28457 BASIN INFORMATION DRAINAGE AREA 3 DRAINAGE AREA 4 DRAINAGE AREA 5 Receiving Stream Name Pike Creek Pike Creek Pike Creek Receiving Stream Class C SW C SW C SW Drainage Area 3.79 Acres 4.25 Acres 1.59 Acres Existing Impervious Area N/A N/A N/A Proposed Impervious Area 3.41 Acres 3.83 Acres 1.43 Acres % Impervious Area (total) 90% 90% 90% IMPERVIOUS SURFACE AREA DRAINAGE AREA 3 DRAINAGE AREA 4 DRAINAGE AREA 5 On -site Buildings N/A N/A N/A On -site Streets N/A NIA N/A On -site Parking N/A N/A N/A On -site Sidewalks NIA N/A N/A Other on -site 148,735 166,700 62,289 Off -site N/A N/A N/A Total: 148,735 166,700 62,289 7. Eow was the off -site impervious area listed above derived?. TV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and projective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. I. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modifuation prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under thew that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from. the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement foxm(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Pennits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU 105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWi 1-109 Innovative Rest Management Practice Supplement form SWU-101 Version 3.99 Page 3 of 4 7.rI., SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (D WQ}. A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Original and one copy of the Stormwater Management permit Application Form Initials One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) Detailed narrative description; of stormwater treatment/management • TWO copies of plans and specifications, including- - W f7. Development/Project name . - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Desipated agent (individual or firm:_ H )t4SY OAT * W0451pj .E.gING Co. Mailing Address:_ P.O. ;gy, 1503(o City: W i L. NJ t r4f= KI state: NC. Phone: �- 9 1 O ) S 0 — 0iD -zip: 40 1 Fax:SO-0 (off vHL APPLICANT'S cERT mCAMON I, (print or type name of person listed in General Fnformation, item 2) C H A Q L_SS WE LU S certify that the informati uded on this permit application form is, to the best of my knowledge, correct and that the project will be cted in c Ve�th the approved plans, that the required deed restrictions NCAC2I I.100rotective ts record, anQproposed project complies with the requirements of ISA Tfl and Date-__:�Ito FOnrin SWU-101 Version 3,99 Page 4 of 4 DETENTION POND ANALYSIS FILE NAME: G:IDATAIWPDATAIWQSIPOND1990462-5.WK1 PROJECT #: SW8 990462-5 REVIEWER: L. Lewis PROJECT NAME: Rocky Point Commercial Subdivision Pond 5 DATE: 11-Jul-03 Receiving Stream: UT Pike Creek Class: C Sw Drainage Basin: Cape Fear Index No. 18-74-46 Site Area 53.77 acres Drainage Area ",square feet Area = 1.59 acres Offsite= 0.00 acres IMPERVIOUS AREAS Rational C Lot D 62289.00 square feet 1:00 square feet 1.00 square feet 1.00 square feet 1.00 square feet square feet TOTAL square feet Rational Cc= 0.93 SURFACE AREA CALCULATION % IMPERVIOUS 90.00% Des. Depth 5 TSS: 90 SA/DA Ratio 6.50% Req. SA 4499 sf Prov. SA Iv sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* 1 Des. Storm :::<4}Ya? inches Rv= 0.86 Bottom 23.5 msl Perm. Pool> : { msl Design Pool 30.5 msl Design SA 6732 sf Req. VolumeX,cf Prov. Volume > cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 0.98 ft 0.031 cfs 0.012 cfs weir H x W <' fi ° days FOREBAY Perm. Pool Volume= 8036 Req. Forebay Volume= 1607.2 Provided Volume= 1609.00 Percent= ><><Q(l Elev. Area 30.5 6732 30 6192 Q2 Area = Q5 Area = Orifice Area Q= r, 0.94 sq. in. 0.38 sq. in. 0.79 sq. in. 0.026 cfs x t<,»: COMMENTS Surface Area and Volume are within Design Guidelines. Orifice is too large. in HONEYCUTT ENGINEERING CO. CONSULTING ENGINEERS 61-0 HIDDEN VALLEY ROAD WILMINGTON, NC 28409 910-350-0631 July 8, 2003 State of North Carolina Department of Environment And Natural Resources Division of Water Quality Re: Rocky Point Commercial Park Stormwater Project Number SW8 990462 Dear Mrs. Lewis: EIVED J U L 0 8 2003 We received your letter on the above referenced project and have addressed your comments as follows: 1. The orifice size on Pond 1 was changed to 3". 2. The orifice size on Pond 5 was changed to 1 ". We have enclosed the revised calculations for the above mentioned changes and have enclosed the revised detail sheet C2 showing those changes. Please call if you have any questions. Sincerely, .P� James R. Honeycutt, Jr., P.E. r 1 Project Number 8022 Pond 5 Alots106134 43560 _ 36924 wetland — 43560 Apond2 A1oU - Awetland 0 Aoffsite '= 43560 Atotal = AOond2 + Aoffsite Rocky Point, NC Pond 5 `lots = 2.44 Awetland = 0.85 acres 5/8/02 - Revised 12/2/02 Revised 717/03 Apond2 = 1.59 acres ...._area on site draining to pond 5 Aoffsite ` 0 acres .....offske area draining to pond 5 AIOW = 1.5888 acres ...total area draining to pond 5 Aimp:= SiAtOW) ...assume 90% of unsold lots Amp = 1.43 acres ...impervious areas Aother ;= ``,total - Aimp Air = 0.16 Cpre := 0.3 ...pre -development C Limp := 1.00 ...paved area C AOther Aimp CCU : Cpre + Cp Atotal (AQ CCOM = 093 ...composite C (post -dew opment) L:= 521 it ...hydraulic length H := 8 ft ...heicht acres ...total area not impervious RECEIVED JUL 0 0 2003 DWQ P90i# 5 9�U4_0z 385 385 L3 L3. +�1�1 �r�lj�i�i 3/p oy s AA0 &ESgo TC.= , H28 <595, H28 -* SEAL'7r 9624 Tc = 5 ...time of concentration Intensity -Duration -Frequency Relationships: 9IN , �,.► Values of G and H" R G H 2 182 26 10 268 32 25 326 35 50 364 36 100 403 37 R= Return Period *Source: New Hanover County Storm Water Design Manual 4 R10vo1== RIO&Vth•(AtOtal)-43560. 1 12 T10p R10dep1hiAtotal) 1 43560. 1 1.39.010) (12) 60 TIOp = 23.93 ...time to freak flow Rocky Point, NC Pond 5 R10vo1= 21357 cubic feet ... runoff volume T10 AT1O 10p AT1O = 2.39 -time increment for routing 10 year storm Now compute runoff depth and time to peak for 25 yr. storm: R25 T R25 = 4.56 in. ...runoff depth dep P25 + .8•S p R25vol:= R25depth-(`4total} 43560. 1 12 T25p := R25dep0i-(Atotal)-43560. 1 1.39•(Q25) (12) 60 R25vol = 26321 cubic feet ... runoff volume 125p = 26.21 ...time to peak flow T25 AT25 := 10p AT25 = 2.62 ...time increment for routing 25 year storm Now compute runoff depth and time to peak for 100 yr. storm: (P100 - 0.2•S)2 R100 .= P100 + .8•S R100dep th = 5.82 in. ...runoff depth RIOOvoI := R100depth-(Atotal)-43560. 1 { 12 T100p := R100p `A�) 1-43560. 1 1.39.0100) (12) 60 T100p = 28.4 -time to peak flow RI OOvoI = 33585 cubic feet ... runoff volume T100 ATI00 := 10 p AT10O = 2.94 ..time increment for routing 100 year storm Determine size of pond without vegetative filter: depth := 5 ft Aim IMP% := p B4Pofo = 0.9 i := 0 ..1 Atotal Ir Rocky Point, NC Pond 5 II1P01690 := .065 �/0100 •073 xi := vyi :— 90 IIV11'•�'90 100 lOQ AD := linterp(vx, vy, IlVIP%-100) W = 0.065 DA - (Atotal)-43560 SAreq:= (EW)-DA SAS = 4499 sq.ft. ...Required surface area slopel := 6 ...min. slope of shelf slope2 2.5 ...min. slope of pond below shelf shelf 2 ft. ...depth of shelf w := (depth — shelf)-siope2.2 + shelf•slopel•2 w = 39 ...minimum width of permanent pool w = 39 ft. - width chosen 1.— 3-w 1= 117 ft ...min. length of permanent pool 1 = 120 ft. - length chosen SAprov I-WSApmv = 4680 ...sq.ft of surface area provided must be >= SAS = 4499 Determine volume of permanent pool in order to size forebay: j := 0.. 5 k := L. 5 Aj 680-ft' 916.1 1440-ft2 910-ft2 43040 0 ft2 ...area of contours Dj = 0 1-ft1 1-fti 1.1t1 1•ft1 1 •ftl corresponding depth from contour above 6 Rocky Point, NC Pond 5 Vk := 2+-Dk ...incremental volume Vpond := I V —total volume equals the sum of the incremental volumes Vpond = 90361 ...total volume in permanent pool Vrequired := .20.Vpond Jorebay volume equals 20% of total pool volume V"uued = 1607ft3 ...cu.fit. required in forebay Determine volume in forebay: m := 0.. 5 n= L. 5 area 0-ft2 ...area of Contours 25-ft2 fi00-ft2 225-ft2 635-1 1248-W corresponding depth from contour below v . U 1 + area n depn ...incremental volume men 2 Vforebay '= Evinc ...total volume in forebay equals the sum of the incremental volumes Vforebay = 1609 ft3 ..total volume in fombay must be x Vrequired = 1607 $3 fombay = V�orebay • 100 forebay = 20.02 per cent forebay volume is of total pond volumeP°� Develop stage -storage function: m := 0.. 6 n := L. 6 contour0 := 28.5 increment := .5 ...ft conto n := contour_1 + increment contour = ...contours of proposed pond m am = ...area of contours of proposed 28 5 pond contours (sq.fk) 680 29 5166 29-5 670 30 6192 30.5 6732 31 7290 81.5 7866 7 Rocky Point, -NC Pond 5 n n := 2+ n -(contour -contour 1) ...Incremental volume (cubic ft.) SO:= 0 ...initial storage Sn'= Sn-i n ...cumulative storage (cubic ft.) stage n:= contour - contour Inzn .- + n) Inn n -0.6931 0 0.4055 0_6931 0.9163 1.0986 men = 0.5 1 1.5 2 113 ...natural tog of stage Sm 0 2461.5 5170.5 8136 a his := nI of InS n 7.8086 8.5507 9.0041 9.3385 9.6073 9.8342 Im 0 2461.5 2709 2965.5 3231 3505.5 3789 .natural log of storage 8 x:= submatrixQnZ,2,6,0,0) y:= submatrix(inS,2,6,0,0) slope := slope(x,y) slope = 1.17 b := intercept(x,y) b = 8.54 Ks := eb Ks = 5117.71 1 S Slope :=(-Z) m Zest — m- 0 0.53, 1.01 1.49 198 2.5 3.03 ..stage -storage function Should compare closely with: Rocky Point, NC Pond 5 stage, _ 0 0.5 1 1.5 2 2.5 3 Determine storage volume required for treatment of first inch of runoff: Ccomp = 093 V-L(A,)-43560-C, 12 V = 5364 cubic feet of storage required Solve for depth "d" to provide required storage for first inch of runoff: d:= 1.5 ...guess value 1-w + (1 + 6-d)-(w + 6-d) f(d) = 2 •d ...function of d for rectangular pond w/3:1 side slopes g(d) = V d = root[(f(d) — g(d)),dl d = 1.03 ft. - depth required to provide required storage for 1 inch iWdh site fully developed Q2d.y 2.24 60.60 Q2day - 0.031 cfs ...Max discharge for 2 day drawdown 9 Rocky Point, NC Pond 5 Q5day • 5 24 60 60 Q5day = 0.0124 cfs ...Max discharge for 5 day drawdown g := 32.2 Cdo := .6 ...orifice coefficient h = 2 h = 0.52 ft ...avg. head Q2d y `` erilice'= Aorifice = 0.009 Square ft. o Cd(2-g-h).5 .5 D2 :=(4-V4ce) .12 D2 = 118 in. - for 2 daydrawdown Q5day = 0.0124 cfs Q5dayAm-&e := Cd. Aorifice = 0.004 Square ft. (2 g h).5 .5 Aonfiee D5 :=(4. 12 3.14 D5 = 0$1 in - for 5 day drawdown Select drawdown orifice size: Do := 1 in. Stage Discharas for Riser/Barrel Spillway with Emergency Weir: g = 321 ...acceleration due to gravity dia _ 2.5 ...diameter of riser (ft.) (enter 0 if rectangular) len := 0 ...length of opening if rectangular (ft) (enter 0 if circular) wid = 0 ...width of opening if rectangular (ft.) (enter 0 if circular) grate 0 ...area of openings in grate if rectangular (enter 0 for circular) L:= if[dia 0,n-dia,2-(len + wid)] ...perimeter of riser (ft.) 2 A := idia 0, 7C• (�) , if(grate # O, grate, len•wid) A = 4.91 ...area of riser as orifice (sq.ft) Etop := .cantm ro + d Etop = 29.53 ...minimum elevation of top of riser (ft.) 10 Rocky Point, NC Pond 5 Etop = 30.5 _chosen elevation for top of riser Cvvr = 3.33 ...weir coefficient for riser C& = 0.60 ...Orifice coefficient of discharge for riser Nb :_ 1 ...Number of barrels Values for Orifice Coefficient of discharge: Db _ 15 ...diameter of barrel (in.) Entrance Condition CA Typical default value 0.60 Ebmv := 29.5 ...invert elevation of barrel must be 4-- contour, = 28.5 Square -edged entrance 0.59 0 Concrete -pipe, grooved and 0.65 Cdb:= 0.60 ...Orifice coefficient of discharge for barrel Corr mtl pipe, mitred to slope 0.52 Corr mtl pipe projecting from fill 0.51 Check drawdown time when water level is at top of discharge structure: Eoinv := contour0 D$ Eocl = contour0 + 2 Eocl = 28.54 ...elevation of center line of orifice — h Et�c1) h = 0.979 2 D do := 12 ft. -diameter of orifice do 2 Aorifice 3.14 2 ) 1 q2-:= Cdo-Aorifice-(2-g-h) 2 ..avg. head Aorfficc = 0.0055 ...sq. ft. q2 = 0.03 cfs Vtop := Ks.(Etop — Eomv)slope ,3 V = 11489 ft3 - volume of storage when water level is at top of toP discharge structure - from stage -storage function q2 := g2•cfs q2 = 0.03cfs drawdown := V-f } q2 dmwdown = 2-39 day Must be greater than or equal to 2 days and less than or equal to 5 days "'d'K' * * * COMMUNICATION RESULT REPORT ( MAY.30.2003 1:01PM, ) P. 1 FILE MODE 805 MEMORY TX OPTION REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER B TTI NCDENR WIRO ADDRESS (GROUP) RESULT PAGE - --------------------------------------------------- 9-3500631 OK P. 1/1 E-2) BUSY E-4) NO FACSIMILE CONNECTION Michael R Easley, Governor William G. Ross Jr,, Secretary North Carolina Department of EnvironMent and Natural Resource.9 Alan W. Klimek, P.E.,Director Division of Water Qyallty May 27, 2003 Charles Wells, Managing Partner 1640 NC Highway 53-West Burgaw, NC 29425 Subject: Request for Additional Information Stormwater Project No. SW8 990462 Rocky Point Commercial Park Pender County Dear Mr. Wells; The Wilmington Regional Office received a Stormwater Management Permit Application for Rocky Poinl Commercial Park on May 21, 2003. A preliminary review of that information has determined that the application is not complete. The IbIlowing Information is needed to continue the stormulater review. 1. The head on the orifice is measured under static conditions, assuming that the pond is full up to the elevation. of the first outlet available above the orifice. Yes, part of the 1" volume is leaving the pond during the storm event, but please ignore that. There is no outlet provided at the 1" storage elevation, it an outlet had been provided at elevation 29.35 then the 1.T7' average headcould be accepted. Please either revise the orifice calculation using the 1.55' average head, or provide an outlet at elevation 29.35. �QG !1 7 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Charles Wells, Managing Partner 1640 NC Highway 53 West Burgaw, NC 28425 Dear Mr. Wells: Alan W. Klimek, P.E.,Director Division of Water Quality May 27, 2003 Subject: Request for Additional Information Stormwater Project No. SW8 990462 Rocky Point Commercial Park Pender County The Wilmington Regional Office received a Stormwater Management Permit Application for Rocky Point Commercial Park on May 21, 2003. A preliminary review of that Information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The head on the orifice is measured under static conditions, assuming that the pond is full up to the elevation of the first outlet available above the orifice. Yes, part of the 1" volume is leaving the pond during the storm event, but please ignore that. There is no outlet provided at the 1" storage elevation. If an outlet had been provided at elevation 29.35, then the 1 J7' average head could be accepted. Please either revise the orifice calculation using the 1.65' average head, or provide an outlet at elevation 29.35. 2. The same information as in item #1 above applies to the orifice calculation for Pond 5. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 27, 2003, or the appplication will be returned as incomplete. The return of a project will necessitate resubmlttal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of Phis letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143- 215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 ARIA Mr. Wells May 27, 2003 Stormwater Application No. SW8 990462 Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\2003\990462-2.may03 cc: Jim Honeycutt, P.E. Linda Lewis 2 HONEYCUTT ENGINEERING CO. RECEIVE CONSULTING ENGINEERS MAY 21 Z003 610 HIDDEN VALLEY ROAD WILMINGTON, NC 28409 BY: 910-350-W31 May 20, 2003 State of North Carolina Department of Environment And Natural Resources Division of Water Quality Re: Rocky Point Commercial Park Stormwater Project Number SW8 990462 Dear Mrs. Lewis: I am addressing your 5/14/03 comments as follows: 1. The correct supplement for Pond 1 was apparently not included in the package. We have included it with the resubmitted package. 2. The temporary pool elevation was incorrect because the correct supplement was not included in the package. We have included it with the resubmitted package. 3. The calculations you attached to your comments do not use the correct elevation for determining the average head on the 4" orifice. The depth in the pond required to store the first inch of runoff (84806 cu. ft.) is 2.345 feet (elevation 29.35 — not 30.30) resulting in an average head of 1.17 feet — not the 1.65 feet shown on your calculations. The calculations that I previously submitted usinc the 1.17' average head demonstrate that the 4" orifice is adequate for discharging the required storage volume within the required time restraints. Those calculations also check the performance of the 4" orifice when the water level is at the top of the discharge structure using a storage volume of 125143 cu. ft. (elevation 30.30) with an average head of 1.567'. As the calculations demonstrate, the draw down time for this higher than required storage volume is also within the required time restraints. I took the liberty to mark up your calculations to show where our calculations differ. 4. 1 checked my calculations for Pond 5 and found no errors. Since the calculations for pond 5 use the same mathematical model as Pond 1, 1 believe my calculations to be correct. Sincerely, 9V /' P� 42 (4 7i?E James R. Honeycutt, Jr., P.E. OF WATER \Ota PG Michael F. Easley, Governor v� 7 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 7. Alan W. Klimek, P.E.,Director ' Division of Water Quality May 14, 2003 Mr. Charles Wells, Managing Partner 1640 NC Hwy. 53 West Burgaw, NC 28425 Subject: Request for Additional Information Stormwater Project No. SW8 990462 Mod. Rocky Point Commercial Park Pender County Dear Mr. Wells: The Wilmington Regional Office received a Stormwater Management Permit Application for Rocky Point Commercial Park on May 7, 2003. A preliminary review of that information has determined that the application Is not complete. The following information is needed to continue the stormwater review: 1. The permanent pool volume, forebay volume and temporary pool volume are inconsistent between the revised calculations and the supplement form submitted for Pond 1. The calculations use, in cubic feet, 143,418; 29,826; and 119,961, respectively, while the supplement uses 115,642; 23,408; and 90,207, respectively. The calculations appear correct, so please revise page 1 of the supplement to match up with the revised calculations. 2. The supplement reports that the temporary pool elevation for Pond 1 is 30.2, but the plans indicate that the top of the.riser is 30.3. Additionally, the reported temporary pool volume should be the volume provided in the pond at the temporary pool elevation (either 30.2 or 30.3). Please revise as needed. 3. The 4" orifice for Pond 1 is still too large. Please resize the orifice The 2 da drawdown average flowrate is simply 84,806 cubic feet divided by 17,800 seconds in 4 hours, or 0.49 cfs. The 5 day drawdown average flowrate is 84,8061432,000, or 0.196 cfs. Using the average head from the temporary pool elevation 30.2 or 30.3) to the permanent pool (27), and ignoring the orifice diameter for the moment, calculate the orifice area and corresponding diameter for each flowrate, then select a diameter in between the two extremes. Go back and check the selected orifice diameter usin the average head from the top of the riser (the temporary pool elevation to the centerline of the orifice. Based on this, the 4 diameter will raw the 1" volume down in 1.9 days. 4. The 1.25" orifice for Pond 5 is also too large. Please follow the same steps as outlined above to size the orifice for that pond. N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 Mr. Wells May 14, 2003 Stormwater Application No. SW8 990462 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 14, 2003, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your re uest for a time extension to the Division at the address and fax number at the bottom oflhis letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143- 215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSSlarl: S:IWQSISTORMWATIADDINFO120031990462.may03 cc: Jim Honeycutt, P.E. Linda Lewis Rocky Point Commercial Park Allowable Built Upon Area Calculations LOT TOTAL USEABLE PER IMPERVIOUS NUMBER LOT AREA AREA IMPERVIOUS AREA ALLOWED 1 75907 75907 100 75907 2 77899 77899 100 77899 3 89299 89299 100 89299 4 77899 77899 100 77899 5 77899 77899 100 77899 6 77899 66499 80 59849 7 47321 47321 0 0 A 77551 77551 100 77551 B 64753 58741 90 52867 C 72038 66040 .90 59436 D 106134 69210 90 62289 E 160774 92297 90 83087 F 167698 92926 90 83633 G 288952 185261 90 148735 H 286078 87056 90 78350 1 183758 81934 90 73741 j 88402 71439 90 64295 K 77665 70464 90 63418 L 49402 38Q11 90 35020 M 67850 59912 0 0 TOTAL 2192976 1544465 1341154 NOTES: 1. ALL NUMBERS IN SQUARE -FEET 2_ USEABLE AREA DEFINED AS TOTAL LOT AREA MINUS AREA OF WETLANDS AND EASEMENTS WHERE APPLICABLE RECEIVED MAY 0 7 2003 DW PROD #v G 2 +,���. � _. � F i'.r'S .w,..'i M1 Sa:Ytl•�GYF' .. �.�r.�'f W�'+'k.i N�'.--)n .. ��- 3 n 38 17 F � i . { -, s, } '*.. � 4A�; F� 1 r Y { � Y .fE:. '�} k•p .� `Jb' 1' . 9. . i ` ��' � � c .BPS rt �y �T t.. • rs ` � - _ � _ {'{a t . � � _�. . tigj27' 30 xr .. - 4 � r ', �'` > ��' o ` � * � �i Tti " J ti w••TTr�' ,�x� � � r r,i ` � 4 ��,. ��, - t � ��3 s t• 3's /; ti-, .'2x , � k. 'x1`•'¢;�Q .iz-`�'�iA;�"��ra -�`'. i ..� � s 'r` as"" � ` 5. �f - �°�' •� �`. s ,�, ��'� � , { �, .a 3316 j Y v p 91-t� :�+� a1 a.$vy'�� .�,�� x .�,•"� �M ?L4 - .�, �V a r IY rCIA .Jk • L A % '� '' ��` >•�'"�. /j ti .�.y 0 * ry'' _ ti ➢� Al ✓e- .t < S (' q • 2 r.3r -•a•c +} a'kti q� i 4 m { a .#-.r.. ti• * *`�'4 - yx a e +p:$ d e W by Ir -44 ax ' ,v _ �i%''• Al W 3 + .q� 1 +cad •4 ' � +� g� h •� rt Y �J 4� ; k 5 \'tip\y` { V� • 4' r W },� f t '� .. F$ -- f - 4. �-•4. t i �/Vflf , h: } ; I "`WSJ 3813 if35 A. 3812 HONEYCUTT ENGINEERING CO. CONSULTING ENGINEERS RECEIVED 610 HIDDEN VALLEY ROAD WILMINGTON, NC 28409 MAY 0 7 2003 910-360-0631 $Y� May 4, 2003 State of North Carolina Department of Environment And Natural Resources Division of Water Quality Re: Rocky Point Commercial Park Stormwater Project Number SW8 990462 Dear Mrs. Lewis: I am addressing your comments as follows: 1. Please see attached USGS map for drainage area delineation. 2. Lot 7 will remain undeveloped. The area for Lot 7 has been removed from the area draining to Pond 1. The impervious area for the deed restrictions has been revised to allow no impervious area. 3. The SA/DA calculation has been revised. As part of this revision, the size of lot L was reduced due to a portion being used for the pond. This in turn reduced the amount of impervious area on Lot L. Since all of Lot M will be used for Pond 1, the impervious area for Lot M was revised to allow no impervious area. 4. Built -upon area totals have been revised. 5. The calculations that you referred to for the orifice size on Pond 5 are located on page 8 of the calculations. Those calculations are for preliminary sizing of the orifice. Once the elevation of the top of the riser has been established the preliminary orifice size is verified using the head calculated from the top of the riser. See page 10 of the calculations. 6. The owner is drawing up deed restrictions this week. We will submit a copy as soon as it is complete. Sincerely, Lk" e��a4do� Wendy Ri ardson n vol = 143419 F vo l 2 9 8 z Co �+p. It ! d �rw, f (1��e( far�Se��, .3 qo 2o7 .� 3012 4 c) i -►- ('ce 2 h�� teased oh 3v, 2 i s 1, S Z j, Z S'' or,, �t cp n► s) I 's sX11 Izv bi�. Fr-- pry= 3oI S, ajw Alocl 5 o, �7 Q2.6 C .3I d-s C�5 = ,cYZ cfs �, /. 05,, e , q7` 2h� C{=,CS¢cfs- -7 30 I<<3V ]I � q,3r��' �480 r ' 3o.Z w W 31 1544 q(� = 43 o� cwz� 0.-,5,zlq b Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality Wilmington Regional Office February 6, 2003 Mr. Charles Wells, Managing Partner c/o Charles Wells Realty 1640 NC Highway 53 West Burgaw, NC 28425 Subject: REQUEST FORADDITIONAL INFORMATION Stormwater Project No. SW8 990462 Modification Rocky Point Commercial Site Pender County Dear Mr. Wells: The Wilmington Regional Office received previously requested information regarding the modified Stormwater Management Permit Application for Rocky Point Commercial Site on December 11, 2002. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide a map of the offsite drainage area to Pond 1. The drainage area delineation provided on sheet C1 of 3 leaves it open-ended. 2. Lot 7 has not been included in the delineated drainage area for Pond 1 on Sheet C1, but it appears to be included in the calculations as part of the drainage area, and in the deed restrictions. Additionally, the revised calculations for Pond 1 indicate that the impervious area on Lot 7 is to be left out of the pond sizing calculations since it will remain undeveloped, but the deed restrictions assign a BUA limit of 42,589 W. rm very confused. Please clarify. 3. There is an error in the SA/DA ratio calculation for Pond 1, resulting in a deficient surface area. For a 7.5' depth, at 80% impervious, the ratio is 2.8%, and at 90% impervious, the ratio is 3.3%. Your consultant has used 2.3% and 2.8% respectively. Please revise the interpolation and provide sufficient surface area in Pond 1. 4. The built -upon area totals listed for all the ponds at the bottom of page 2 of the application are incorrect. Based on the proposed BUA per lot listing, please revise as follows: Pond 1 1,011,524 ft2 Pond 2 152,091 ft2 (Lot H @78,350 + Lot I @73,741) Pond 3 148,735 ft2 (Lot G @148,735) . Pond 4 166,700 ft2 (Lot E @83,067 + Lot F @83,633 ft2) Pond 5 62,289 ft2 (Lot D @62,289 ft2) AN N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-623-7748 V Mr. Wells February 6, 2003 Stormwater Project No. SW8 990462 Modification 5. The 1.25" orifice for Pond 5 is too large. The calculations indicate that the depth needed to provide sufficient storage of the 1" volume is 1.03'. The application indicates that T has been provided, therefore, the average head on the orifice t would be 0.97', not 0.52'. Please either provide an outlet at 29.53 i.e., revise the temporary storage elevation to 29.53, or revise the orifice calculation using the larger head. 6. Please provide a copy of the proposed deed restrictions to include all required . conditions and limitations as found in Sections I and VI of the attached document. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to March 6, 2003, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, 4;X�u Linda Lewis Environmental Engineer RSS/arl: S:1WQS\STORMWATIADDINFO\20031990462.FEB03 cc: Linda Lewis Jim Honeycutt, P.E. DETENTION POND ANALYSIS FILE NAME: G:\DATA\WPDATA\WQS\POND\990462-2.WK1 PROJECT#: SW8 990462-2 REVIEWER: L. Lewis PROJECT NAME: Rocky Point Commercial Subdivision Pond 2 DATE: 06-Feb-03 Receiving Stream: UT Pike Creek Class: C Sw Drainage Basin: Cape Fear Index No. 18-74-46 Site Area 53.77 acres Drainage Area square feet Area = 3.88 acres Offsite= 0.00 acres IMPERVIOUS AREAS Rational C Lots @90% Lot H 78350.00 square feet 1.00 Lot 1 73741.00 square feet 1.00 square feet 1.00 square feet 1.00 square feet square feet TOTAL F-11717, 711115--r'—Isquare feet Rational Cc= 0.93 SURFACE AREA CALCULATION % IMPERVIOUS 90.00% SA/DA Ratio 4.60% Des. Depth 6.5 Req. SA 7774 sf TSS: 90 Prov. SA L*,§N.""" MMI s VOLUME CALCULATION * place a "ll" in the box if Rational is used Rational ?* Des. Storm - --------- Q� inches Rv= 0.86 Bottom 21.7msI Perm. Pool ... 1 msI Design Pool 30.2 ms I Design SA 10502 sf Req. Volume cf f Prov. Volume c ORIFICE CALCULATION FOREBAY Perm. Pool Volume- 18045 Req. Forebay Volume= 3609 Provided Volume= 3750.00 Percent= Elev. Area 30.2 10502 29.7 9800 Avg. Head = 0.97 ft Q2 Area = 2.30 sq. in. Flow Q2, cfs 0.076 cfs Q5 Area = 0.92 sq. in. Flow Q5, cfs 0.030 cfs Orifice Area 1.77 sq. in. No. of Orifices Q= 0.058 cfs Diameter, inches.-.: . . . . . . . . . . .n weir H X W x in Drawdown x: days COMMENTS Surface Area, Volume and Orifice are within Design Guidelines DETENTION POND ANALYSIS FILE NAME: G:\DATA\WPDATA\WQS\POND1990462-3.WK1 PROJECT#: SW8 990462-3 REVIEWER: L. Lewis PROJECT NAME: Rocky Point Commercial Subdivision Pond 3 DATE: 06-Feb-03 Receiving Stream: UT Pike Creek Class: C Sw Drainage Basin: Cape Fear Index No. 18-74-46 Site Area 53.77 acres Drainage Area X ...... Is. gp� square feet Area = 3.79 acres Offsite= 0.00 acres IMPERVIOUS AREAS Lot G @90% TOTAL SURFACE AREA CALCULATION % IMPERVIOUS 90.00% Des. Depth 7 TSS: 90 Rational C 148735.00 square feet 1.00 square feet 1.00 square feet 1.00 square feet 1.00 square feet square feet square feet Rational Cc= 0.93 SA/DA Ratio 3.90% Req. SA 6445 sf Prov. SA sf VOLUME CALCULATION * place a "'I" in the box if Rational is used Rational ?* Des. Storm inches Rv= 0.86 Bottom 19.5 rnsl Perm. Pool rnsl Design Pool 28.5 msl Design SA 9699 sf Req. Volume cf Prov. Volume E, ..1 Cf Ox ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = FOREBAY Perm. Pool Volume= 17322 Req. Forebay Volume= 3464.4 Provided Volume= 3644.00 Percent= Elev. Area 28 9046 28.5 9699 0.97 ft Q2 Area = 0.074 cfs Q5 Area = 0.030 cfs Orifice Area Q= weir H x W days COMMENTS Surface Area, Volume and Orifice are within Design Guideline in 2.25 sq. in. 0.90 sq. in. 1.77 sq. in. 0.058 cfs x Fm in Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 2 DATE 5/8/02 Revised 12/02/02 Project Number 8022 Pond 2 _ 183758 + 286078 -lots Alots = 10.79 43560 _ 101824 + 199022 Avr'etland 43560 Apond2 Alots — wetland 0 Aoffsite 43560 `total Apond2 + Aoffsite Aimp := .9•(Atotal) Aimp = 3.49 Aother Atotal — Aimp wetland = 6.91 acres RECEIVED DEC 1 1 2002 DWQ PROJ # .5e ctcU ¢&Z Apond2 = 3.88 acres .....area on site draining to pond 2 Aoffsite = 0 acres .....offsite area draining to pond 2 Atoms = 3.8795 assume 90% of unsold lots es ...impervious areas Aother = 0.39 Cpre := 0.3 ... pre -development C Cimp := 1.00 ...paved area C C _ C (-other + C Aimp comp ' PreAtotal unp Atotal Ccomp = 0.93 ...composite C (post -development) L := 553 ft ...hydraulic length H:= 10.5 ft ...height L3 .385 L3 .385 _ H H Tc .— i 128 5' S' 128 Tc = 5 ...time of concentration acres ...total area draining to pond 2 acres ...total area not impervious 1 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 2 T25p = 26.21 ...time to peak flow T25 AT25 := p AT25 = 2.62 ...tir�re increment for routing 25 year storm 10 Now compute runoff depth and time to peak for 100 yr. storm: R100 R100 = 5.82 in. ...runoff depth depth P100 + .8•S depth p R100vo1 := RIOOdepth-(Atotal).43560. 1 12 TWO p := R100 dep th'(Atotal) 1 .43560. 1 1.39•(Q100 ( 12) 60 TWO = 28.4 ...time to peak flow R100vo1 = 82005 cubic feet ... runoff volume TWOAT100 := 10 p AT100 = 2.84 ...time increment for routing 100 year storm Determine size of pond without vegetative filter: depth:= 6.5 ft 1MP% = Aimp 0.9 Atotal 1MP%90:= .046 1MP%100 := .051 xi := vyi := 90 1MP90 q'V'1'01001 vx. = X. i i IW := linterp(vk,vy,1MP%• 100) IMP = 0.046 DA := (Atota,)•43560 SA,q := (H%dP)•DA SAS = 7774 sq.ft. ...Required surface area slope, := 6 ...min. slope of shelf i 0..1 5 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 2 slope2 := 2.5 ...min. slope of pond below shelf shelf := 2 ft. ...depth of shelf w (depth - shelf)-slope2.2 + shelf slopel-2 w = 46.5 ...minimum width of permanent pool w := 47 ft. - width chosen 1:= 3.w 1 = 141 ft. ...min. length of permanent pool 1 := 166 ft. - length chosen SAprov :=1-w SAprov = 7802 ...sq.ft. of surface area provided must be >= SAmq = 7774 Determine volume of permanent pool in order to size forebay: j := 0.. 7 k := 1.. 7 A. := i .area of contours D := corresponding depth from contour above 0 1-ftI 1-ftl 1-ftl 1-ftl i•ftl 1-ft1 .5-ft1 Vk:= 1 + 2 x•Dk ...incremental volume Vpond YV •••total volume equals the sum of the incremental volumes Vpond = 18045 ft' ...total volume in permanent pool Vrequired .20-Vpond Jorebay volume equals 20% of total pool volume Vrequired = 3609ft3 ...cu.ft. required in forebay 6 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 2 Determine volume in forebay: m:=0..7 n:= L.7 arealn 3 •ft2 24-W 104•ft2 234•ft2 414-ft2 644•ft2 1278•ft2 2115•ft2 ...area of contours depm 0•ftl .5-ftl 1•ftl 1 •ftl 1 •ft1 1 •ftl 1 •ftl 1•ftl corresponding depth from contour below area 1 + area vinc depn incremental volume n 2 Vforebay:= Dim ...total volume in forebay equals the sum of the incremental volumes uforebay = 3750W ...total volume in forebay must be >= Vrequired = 3609ft3 uforebay forebay:= • 100 forebay 20.8 Vpond Develop siage-storage functiom m 0.. 6 n := L. 6 contour0 := 28.20 increment = .5 ...n contour := contour n_ 1 + increment contour In = ...contours of proposed pond 28.2 28.7 29.2 29.7 30.2 30.7 31.2 per cent forebay volume is of total pond volume an, ...area of contours of proposed pond contours (sq.ft.) 7802 8450 9116 9800 10502 11222 11960 7 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 2 n := an 2+ an •(contour - contour n_11 incremental volume (cubic ft.) nz = `` /1 0 4063 4391.5 4729 5075.5 5431 5795.5 SO := 0 ...initial storage Sn'- Sn-i + n ...cumulative storage (cubic ft.) S = In 0 4063 8454.5 13183.5 18259 23690 29485.5 stage, := contour - contour0 stagen = 0.5 1 1.5 2 2.6 3 1nZn .- ln(stagen) ...natural log of stage 1nSn := In(Sn) ...natural log of storage InZn = Ins, = -0.6931 8.3097 0 9.0425 0.4055 9.4867 0.6931 9.8124 0.9163 10.0728 1.0986 10.2917 8 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 2 x:= submatrix(1nZ,2,6,0,0) y := submatrix(1nS, 2, 6, 0, 0) slope := slope(x,y) slope = 1.14 b := intercept(x,y) b = 9.03 Ks- eb Ks = 8383.32 1 S slope m Zest m— Ks .stage -storage function Zest = Should compare closely with : stagem = 0 0 0.53 0.5 1.01 1 1.49 1.5 1.98 2 2.5 2.5 3.03 3 Determine storage volume required for treatment of first inch of runoff: Ccomp = 0.93 V:- ;2 •(Attal)•43560•Ccomp V = 13097 cubic feet of storage required Solve for depth "d" to provide required storage for first inch of runoff: d :=1.5 ...guess value 1•w+ (1 + 6•d)•(w+ 6•d) f(d) := 2 d ...function of d for rectangular pond w/3:1 side slopes g(d) := V d := root[(f(d) - g(d)),d] d = 1.49 ft. - depth required to provide required storage for 1 inch with site fully developed V Q2day: 2.24.60.60 Q2day = 0.0758 cfs ...Max discharge for 2 day drawdown 9 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 2 V Q5day 5.24.60.60 QSday = 0.0303 cfs ...Max discharge for 5 day drawdown g := 32.2 Cdo := .6 ...orifice coefficient h := 2 h = 0.74 ft ...avg. head Q2day Aorifice Cdo (2 g h).5 .5 D 4• Aorifice 12 2 3.14 Q5day = 0.0303 cfs Q5day Aorifice Cdo (2 g h).5 5 D (4- -12 53.14 Aorifice = 0.018 Square ft. D2 = 1.83 in. - for 2 day drawdown Aorifice = 0.007 Square ft. D5 = 1.16 in - for 5 day drawdown Select drawdown orifice size: Do := 1.5 in. Stage Discharge fibir riiser/Barrei Spillway with Emergency Weir: g:= 32.2 ...acceleration due to gravity dia := 3 ...diameter of riser (ft.) (enter 0 if rectangular) len := 0 ...length of opening if rectangular (ft.) (enter 0 if circular) wid := 0 ...width of opening if rectangular (ft.) (enter 0 if circular) grate := 0 ...area of openings in grate if rectangular (enter 0 for circular) L := if[dia t- 0,n-dia,2•(len + wid)] ...perimeter of riser (ft.) 2 A:= 4dia # 0,7r• (�a) ,if(grate # 0,grate, len-wid) L ' 4 A = 7.07 ...area of riser as orifice (sq.ft.) Etop := contour0 + d Etop = 29.69 ...minimum elevation of top of riser (ft.) 10 Project Number 8022 Pond 3 266952 Alots 43560 101691 Awetland:= 43560 Apond2 Alots - Awetland 0 Aoiisite '= 43560 Atotal Apond2 + Aoffsite Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 3 5/8/02 (Revised 12/2/02) Alots = 6.1 Awetland = 2.3 acres Apond2 = 3.8 acres .....area on site draining to pond 3 Aoffsite = 0 acres .....offsite area draining to pond 3 Atotal = 3.7939 acres ...total area draining to pond 3 Aimp .9•(Atotal) ...assume 90% of unsold lots Aimp = 3.41 acres ...impervious areas Aother := Atotal - Aimp Aother = 0.38 Cpre =0.3 ...prerdevelopment C Cimp:=1.00 ...paved area C Aother Aimp Ccomp Cpre' Atotal + Camp Atotal Ccomp = 0.93 .••composite C (post -development) L := 586 ft ...hydraulic length H = 6 ft ...height L3)'385 .385 L3 .385 _ H H T° :-1 128 < 5' S' 128 TC = 6.17 ...time of concentration acres ...total area not impervious RECEIVED DEC 1 12002 DWQ PROD # SWQqo ¢(02 Aq 4.61 s* S AL y �C... 9624 ate " o. ` ti ��•`' � s��® `( a agt � 1 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 3 Now compute runoff depth and time to peak for 100 yr. storm: R100d tli - R100d th = 5.8 in. ...runoff depth P100 + -8-S R100v01 R100depth-(Atota,)-43560.12 TWO p ;= R100 depth'(Atotal) 1 .43560. 1 1.39-(Q100) (12) 60 T100p = 29.19 ...time to peak flow R100vo1 = 80195 cubic feet ... runoff volume TWOAT100 := p AT100 = 2.9 ...time increment for routing 100 year storm 10 Determine size of pond without vegetative filter: depth := 7 ft FVIP% := Aimp IMP% = 0.9 Atotal 1MP°/'90 = .039 A4P%100 .043 xi := VYi := 90 IMP°J°90 100 IMF./ 100 vx. = x IlvIP := linterp(vx, vy, IMP%• 100) IMP = 0.039 DA := (Atota,)•43560 SAreq:= (Be)-DA SAreq = 6445 sq.ft. ...Required surface area slope, := 6 ...min. slope of shelf slope2 := 2.5 ...min. slope of pond below shelf shelf := 2 ft. ...depth of shelf w := (depth - shelf)•slope2.2 + shelf -slope, •2 i 0.. 1 5 Drainage Calculations for Rocky Point Commercial Park 6 Highway 117 N Rocky Point, NC Pond 3 w = 49 ...minimum width of permanent pool w := 49 ft. - width chosen 1:= 3•w 1 = 147 ft. ...min. length of permanent pool 1:=147 ft. - length chosen SAprov I-W SAprov = 7203 ...sq.ft. of surface area provided must be >= SAreq = 6445 Determine volume of permanent pool in order to size forebay: j := 0.. 7 k:= L. 7 A.:= Dj:= corresponding depth from contour above .area of contours 0 l.ftI 1 •ft1 1-ft I 1-ftI 1 •ft1 1-ft1 1 •ft1 Vk := A 2 c-1 +`•Dk ...incremental volume Vpond IV .•.total volume equals the sum of the incremental volumes Vpond = 17322 ft3 ...total volume in permanent pool Vrequired •20•Vpond ...forebay volume equals 20% of total pool volume Vrequired = 3464ft3 ...cu.ft. required in forebay Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 3 Determine volume in forebay: m := 0.. 7 n := L. 7 area In:= deem:= corresponding depth from contour below 0•ft2 25•ft2 100•ft2 225•ft2 400•ft2 625 • ft2 1240•ft2 2058•ft2 ..area of contours area + area vincn n 1 n 2 n•dep ...incremental volume Vforebay Ivinc ...total volume in forebay equals the sum of the incremental volumes Vforebay = 3644W ...total volume in forebay must be >= Vrequired = 3464ft3 Vforebay forebay := 100 forebay = 21 Vpond Develop stage -storage function: m:=0..6 n:=1..6 contour0 = 26.5 increment := .5 ...ft contourn := contours 1 + increment contour In = ...contours of proposed pond 26.5 27 27.5 28 28.5 29 29.5 ..per cent forebay volume is of total pond volume an, ...area of contours of proposed pond contours (sq.ft.) 7203 7800 8415 9048 [9699 368055 7 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 3 n := an 2+ a ­(contourn — contour SO := 0 ...initial storage incremental volume (cubic ft.) Sn '— Sn-1 + n ...cumulative storage (cubic ft.) stage := contour contourO 1nZn In(stagen) InZ n -0.6931 0 0.4055 0.6931 0.9163 1.0986 stage = 0.5 1 1.5 2 2.5 3 ...natural log of stage x := submatrix(InZ, 2, 6, 0, 0) y := submat dx(1nS, 2, 6, 0 , 0) slope slope(x, y) slope = 1.14 b = intercept(x,y) b = 8.95 Ks := eb Ks = 7738.3 S In 0 3750.75 7804.5 12170.25 16857 21873.75 27229.5 Ins n. In(Sn) Ins n 8.2297 8.9625 9.4067 9.7325 9.993 10.2121 v m 0' 3750.75 4053.75 4365.75 4686.75 5016.75 5355.75 ..natural log of storage 8 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 3 I S slope Zest m ...stage -storage function Ks Zest = Should compare closely with : stem = 0 0 0.53 0.5 1.01 1 1.49 1.5 1.98 2 2.5 2.5 3.03 3 Determine storage volume required for treatment of first inch of runoff: Coomp = 0.9 V •(Atotal)•43560•Ccomp 12 V = 12808 cubic feet of storage required Solve for depth "d" to provide required storage for first inch of runoff: d =1.5 ...guess value I•w + (1 + 6•d)•(w + 6•d) f(d) := 2 d ...function of d for rectangular pond w/3:1 side slopes g(d) := V d := root[(f(d) - g(d)),d] d = 1.57 ft. - depth required to provide required storage for 1 inch with site fully developed V Q2d y _ 2.24.60.60 V QSday 5.24.60.60 g := 32.2 h: d 2 Q2day = 0.0741 Q5day = 0.0296 Cdo := .6 h 0.8 ft cfs ...Max discharge for 2 day drawdown cfs ...Max discharge for 5 day drawdown ...orifice coefficient ...avg. head 9 Drainage Calculations for Rocky Point Commercial Park Highway 117 N Rocky Point, NC Pond 3 Aorifice Q2day 5 Aorifice = 0.017 Square ft. Cdo (2•g•h) .5 D2 (4. Aorifice 12 D2 = 1.79 in. - for 2 day drawdown 3.14 Q5day = 0.0296 cfs Aorifice:= Q5day 5 Aorifice = 0.007 Square ft. Cdo (2-g•h) .5 D5 (4. Aorifice 12 D5 = 1.13 in - for 5 day drawdown 3.14 Select drawdown orifice size: Do := 1.5 in. Stage Discharge for Kiser/Barrel Spillway with Emergency Weir: g := 32.2 ...acceleration due to gravity dia := 3 ...diameter of riser (ft.) (enter 0 if rectangular) len := 0 ...length of opening if rectangular (ft.) (enter 0 if circular) wid := 0 ...width of opening if rectangular (ft.) (enter 0 if circular) grate := 0 ...area of openings in grate if rectangular (enter 0 for circular) L := if[dia * 0,n•dia,2•(len + wid)] ...perimeter of riser (ft.) 2 A:=i dia o 0,n-(�a) ,if(grate *- 0,grate, len•wid) 4 A = 7.1 ...area of riser as orifice (sq.ft.) Etop := contour0 + d Etop = 28.1 ...minimum elevation of top of riser (ft.) 10 IIn ROCKY POINT COMMERCIAL PARK DEC 11200 ROCKY POINT, N.C. BY: NARRATIVE ON STORMWATER MANAGEMENT This development is a 53.77 acre site along Highway 117 in Rocky Point, N.C. It consists of two paved roads and 18 lots. Six of these lots (1,2,3,4,5,and A) were subdivided and sold before the various required permits were obtained. An application for a Stormwater Discharge Permit for the lots fronting Highway 117 was previously submitted under the Low Density option but was rejected. Application for a Stormwater Discharge Permit is hereby being made under the High Density option. Due to the topography of the site, five separate detention ponds were designed to handle the storm water. Pond one treats the first two rows of lots, offsite drainage up highway 117, and all roads on site. Ponds two through five treat the stormwater for the lots to the east of North Trade Way and South Way. All of the sold lots drain to Pond 1. In an effort to compensate for the fact that these lots have no built upon restrictions, it was assumed that these lots are 100% impervious. The impervious area on the remaining lots draining to Pond 1 was determined by subtracting easements and wetlands from the total lot area and assuming the remaining area as 90% impervious. The offsite area on the west side of Highway 117 is piped through the site and is assumed to be 90% impervious. Approximately 2 acres east of highway 117 is draining to pond 1 and was also assumed to be 90% impervious. The impervious area for the remaining ponds was determined by assuming the drainage area for each pond as 90% impervious. All of the ponds have been sized to handle the ten year storm. It is intended that these ponds serve as sediment basins during construction. Runoff from the site will be collected by swales and Dined systems and routed to the appropriate ponds. Lot 7 was not originally included in the drainage area because the owner didn't plan on developing that lot. On the revision being submitted Lot 7 has been included in the drainage area but we are in the process of getting the wetlands flagged and surveyed. We will submit that information to you as soon as we get it. The disturbed area has been labeled and totals 28.71 acres. It covers lot 6 at Highway 117, the entire second row of lots, the road with cul-de-sacs on each end, and the third row of lots to a point 5' away from the wetlands. HONEYCUTT ENGINEERING CO. CONSULTING ENGINEERS 610 HIDDEN VALLEY ROAD WILMINGTON, NC 28409 910-350-0631 December 06, 2002 State of North Carolina Department of Environment And Natural Resources Division of Water Quality Re: Rocky Point Commercial Park Stormwater Project Number SW8 990462 Dear Mrs. Lewis: I am addressing your comments as follows: RECEIVED DEC 1 12002 DWQ PROJ # SW I 17q0 4-& Z- 1. The drainage area for each pond has been outlined by marker on a copy of the plans. 2. The runoff from the west side of highway 117 will be piped through the site. The impervious potential of this offsite area was changed to 90%. The water from the east side of highway 117 (right of way and ditch) are routed to pond 1 via a swale. 3. The registered name of the partnership is Eagle Investments. The tax ID number is 56-1608933. We did not receive that particular page back from you to write it in ourselves. 4. The proposed built -upon area for Pond 1 has been split up on the application. 5. The name of the client was printed and dated on the application. 6. The BUA totals in section II, part 6 have been changed. 7. Pages 2 and 3 of the supplements have been cnmpleted. Item "rid" has been initialed. The cleanout depths have been shown. 8. The Riser Top Elevations have been reported on the supplement. The calculations have been revised along with any associated details. 9. The deed restrictions are being done as this revision is being submitted. It should be attached to this package by the time you actually review it. 10. The pond access easements have been shown and dimensioned. 11. The names of the wetlands species to be planted are on the pond details on sheet C2. 12. The forebay is as deep as the pond. 13. Lot 7 is included with this project and has been accounted for. Please review calculations. Sin rely, Wendy Ric rdson 0 Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources July 22, 2002 Mr. Charles Wells, Managing Partner 1640 NC Hwy 53 West Burgaw, NC 28457 Dear Mr. Wells: Alan W. Klimek, P.E., Director Division of Water Quality Wilmington Regional Office Subject: REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 990462 Rocky Point Commercial Park Pender County The Wilmington Regional Office received a Stormwater Management Permit Application for Rocky Point Commercial Park on May 16, 2002. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please delineate the drainage area for each pond, including the 53.54 acres of offsite area. 2. Please indicate how you plan to make sure that the offsite development maintains a 30% density limit. If you don't own the property, you really have no way of making those property owners stay at 30%. There is no guarantee that the State will get to issue a permit for development plans,in the offsite area. Additionally, the rules require that offsite development be accounted for at the full build -out potential. Unless you can demonstrate otherwise, you must either change the potential to 90% impervious, or redirect the offsite runoff around the pond. 3. Please provide the registered name of the partnership on the application. 4. Please split up the proposed built -upon area for Pond 1 into road, lots, and offsite on the application. 5. Please print your name and the date you signed the application on page 4. 6. Please correct the BUA totals reported in the lower chart of Section II, Part 6 on the application to correspond to those used in the calculations. The BUA totals shown on the application assume that the drainage area is 100% impervious. 7. Please complete pages 2 and 3 of the supplements. Item "m" on page 2 must be initialed- a portable pump can be used as the emergency drain. The cleanout depths must be reported in the blanks on page 3. 8. For Ponds 2 and 3, please report the Riser Top Elevation reported in the Discharge Structure table detail as the temporary storage elevation on the supplements. Please revise calculations, pond details, storage elevation and volume provided for Ponds 2and 3. N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-623-7748 Mr. Wells July 22, 2002 Stormwater Project No. SW8 990462 9. Please provide a copy of the proposed deed restrictions to include all required conditions and limitations under Sections I and V, as shown on the enclosed sheet. Per comment #13, an additional statement to limit the development on Lot 7 to zero may be needed. _ 10. Please show and dimension all drainage, access and pond easements on the affected lots. Adequate access to the ponds for maintenance is mandatory in order to comply with the permit conditions. 11. Please specify by name the wetland species to be planted on the 6:1 shelf. 12. Unless the forebay is as deep as the pond, please reduce the forebay volumes so that they fall in the range of 18%-22% of the permanent pool volume. Excess forebay volume reduces the amount of surface area that is at the design depth, which reduces the TSS removal efficiency. 13. Lot 7 was not part of :this subdivision in 1999, when the original low density application was submitted. Why is Lot 7 now shown? If you now own Lot 7, you must account for it in the pond design, or you must restrict the development to zero built -upon area through a deed restriction (see comment 9). Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 22, 2002, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. , If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, A�0 Linda Lewis Environmental Engineer RSS/arl: S:IWQSISTORMWAT\ADDINF0120021990462.JUL cc: Linda Lewis Jim Honeycutt, P.E. ROCKY POINT COMMERCIAL PARK ROCKY POINT, N.C. NARRATIVE ON STORMWATER MANAGEMENT AOL je �tia This development is a 53.77 acre site along Highway 117 in Rocky Point, N.C. It consists of two paved roads and 18 lots. Six of these lots (1,2,3,4,5,and A) were subdivided and sold before the various required permits were obtained. An application for a Stormwater Discharge Permit for the lots fronting Highway 117 was previously submitted under the Low Density option but was rejected. Application for a Stormwater Discharge Permit is hereby being made under the High Density option. - Due to the topography of the site, five separate detention ponds were designed to handle the storm water. Pond one treats the first two rows of lots, offsite drainage up highway 117, and all roads on site. Ponds two through five treat the stormwater for the lots to the east of North Trade Way and South Way. All of the sold lots drain to Pond 1. In an effort to compensate for the fact that these lots have no built upon restrictions, it was assumed that these lots are 100% impervious. The impervious area on the remaining lots draining to Pond 1 was determined by subtracting easements and wetlands from the total lot area and assuming the remaining area as 90% impervious. Approximately 53.5 offsite acres on the west side of Highway 117 also drain to Pond 1. This offsite area was assumed to be 30% impervious. The impervious area for the remaining ponds was determined by assuming the drainage area for each pond as 90% impervious. All of the ponds have been sized to handle the ten year storm. It is intended that these ponds serve as sediment basins during construction. Runoff from the site will be collected by swales and piped systems and routed to the appropriate ponds. The disturbed area has been labeled and totals 28.71 acres. It covers lot 6 at Highway 117, the entire second row of lots, the road with cul-de-sacs op each end, and the third row of lots to a point 6 away from the wetlands. RECEIVED MAY 16 2002 BY:— �A —1 3792 EAGLE INVESTMENTS P. O. BOX 453 ROCKY POINT. NO 28457 Apr 29-02 03:35p Jim Honeycutt ■ IFAX TO: Linda Lewis Division of Water Quality Phone (910) 395-3900 Fax Phone (910) 350-2nu RE: Rocky Point Commercial ark [910]350-0631 p.1 Date 4129102 Number of Pages including cover sheet 3 FROM Wendy Richardson Honeycutt Engineering Company P.Q. Box 15036 Wilmington, N.C. 28408 Phone 910-350-0631 Fax Phone 910-350-0631 Apr 29 �02 03:36p Jim Honeycutt (9101350-0631 p.3 HONEYCUTT ENGINEERING CO. CONSULTING ENGINEERS 610 HIDDEN VALLEY ROAD WILMINGTON, NC 28409 910-350-0631 April 29, 2002 State of North Carolina Department of Environment And Natural Resources Wilmington Regional Offices Re: Trailers Unlimited Site Stormwater Project Number SW8 990107 Pender County Dear Ms. Lewis: We received a copy of the Notice of Violation on this project 4/26/02. We are submitting a plan for review no later than 5/8/02. We are proposing a single pond to handle the first two rows of lots closest to highway 117 which will include the site for Trailers Unlimited. We will be submitting a modification to the permit so they will able to fill in the existing pond on their site after approval. Sincerely, -����--� WendyRich dson Apr 2S->02 03:36p Jim Honeycutt (910)350-0631 p.2 HONEYCUTT ENGINEERING CO. CONSULTING ENGINEERS 610 HIDDEN VALLEY ROAD WILMINGTON, NC 28409 910-350-0631 Apri 129, 2002 State of North Carolina Department of Environment And Natural Resources Wilmington Regional Offices Re: Rocky Point Commercial Park Stormwater Project Number SW8 990462 Pender County Dear Ms. Lewis: We received a copy of the Notice of Violation on this project 4/26/02. We are submitting a plan for review no later than 5/8/02. We are proposing a single pond to handle the first two rows of lots closest to highway 117 and four separate ponds to handle the lots in the rear of the property. Sincerely, Wendy Riche dson * * * COMMUNICATION RESULT REPORT ( FEB. 9.2001 4:03PM ) P. 1 FILE -MODE ------------OPTION 236 MEMORY T). REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER North Carolina TTI NCDENR WIRO ADDRESS (GROUP) RESULT PAGE 89102593050 OK P. 1/1 E-2) BUSY E-4) NO FACSIMILE CONNECTION Department of Environment and Natural Resources Michael F. Easley, Governor William C. Ross, Jr., Secretary a CDENRDivision of Water ate eaDr#,, o 4'� NORTH CAROWNA PvAmTmEw of Wilmington Regional Oiiice ENVIRONMENTANG NAUPAI, Reeouptcm FAX COVER SHEET Date: February 9, 2001 No. of Pages: 1 To: Charles Wells From: Linda Lewis Company: Charles Wells Realty Water Quality Section - Stormrwater FAX #: 910-259-3050 FAX 0 910450-2004 Phone # 910-395-3900 DWQ Stormwater Project Number: SW8 990462 Project Name: Rocky Point Commercial Park MESSAGE: Dear Mr. Wells; I located the file and found that no permit for the project has been issued. My last conversation with you and Jinn Honeycutt centered on the possibility of putting in a dingle pond to serve all lots in the subdivision. We also discussed the possibility of requiring each lot to provide it's own stormwater system, regardless of whether or not it met low density. As stated to you previously, you must decide Up front if the subdivision will be high or low den.6ty The. nnnlir.mAnn ume r seo,. l %%% 1,.,1A --A.-- - .i.........e 'r d .e_ — ---r_..... 7 A 9 . . r , , North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor William G. Ross, Jr., Secretary Division of Water Quality Wilmington Regional Office FAX COVER SHEET Date: February 9, 2001 To: Charles Wells Company: Charles Wells Realty FAX #: 910-259-3050 DWQ Stormwater Project Number: SW8 990462 Project Name: Rocky Point Commercial Park MESSAGE: Dear Mr. Wells: AgAi7PA Aid NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES No. of Pages: 1 From: Linda Lewis Water Quality Section - Stormwater FAX # 910-350-2004 Phone # 910-395-3900 I located the file and found that no permit for the project has been issued. My last conversation with you and Jim Honeycutt centered on the possibility of putting in a single pond to serve all lots in the subdivision. We also discussed the possibility of requiring each lot to provide it's own stormwater system, regardless of whether or not it met low density. As stated to you previously, you must decide up front if the subdivision will be high or low density. The application was placed on hold pending a decision. I was not informed that any decision had been made. In the meantime, it appears that the scope of the project has been significantly expanded. The permit for the entire subdivision needs to be issued before you sell off any more lots. The deed restrictions given to you by Jim will not be sufficient to satisfy the requirements. I already have a completed application, but the plans you provided today do not match up with the plans submitted last year. Only 6 lots were shown on last year's plans, while it appears that additional lots and a road are now to be permitted. Please provide l additional copy of the plans and a cover letter indicating how this commercial park will meet the stormwater regulations. Please reference the project number above on all correspondence. Unfortunately, I cannot guarantee that the project will be reviewed in time to meet your sale date. Please submit the requested information prior to March 9, 2001. S:\WQS\STORMWAT\ADDINFO\990462.FEB 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of North Carolina r7:3 11:99:9 Department of Environment and Natural Resources Division of Water Quality r. STORMWATER MANAGEMENT PERMIT APPLICATION F This fora may be photocopied fir use as an original L. GENERAL INFORMAMN i. Applicants name (specify the name of the corporation, individual, etc. who owns the project): EAGLE ►WES-rAICA 'S 2. Print Owner/Signing Official's name and title (the person who is legally responsible for the facility and its compliance): CHARLES WELLS 3. Mailing Address for person listed in item 2 above: P.O. BOX 453 Cir AOGK-Y Po I N —I state: N' C • zip; Z NS7 TeleplmneNmber: E 9 ►o 7(v 3- 5000 4. Project blame (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): AOCKY Polar COMMERCIgL PA2.K. 5. Location of Facility (street address): Ca.. ADC-ky POINT _ PtNPE✓R 6. Directions to facility (from nearest major intersection): EXIT 2- 40 oa HWY 210 W EST , -MV.6 OGHT AT in71t.SEC-rvN OF H W%J S17E A SOurr Y4 MILE DO 2.16 HT i. gAifu& 3 i 0 Z 7 � 0 O " % -7 ° 5 3 ' Do " of facility g. Contact person who can answer questions about the facility: Nw e �Ti rn Ho N EY C-o T T Telephone Number. (q l ) 35 a - N> 31 IL. PERMIT INFORMA7ITON: �. 1. Specify whether protect as (check one): New Renewal ---___Modification 2. If dais application is being submitted as the result of a renewal or modification to an existinp permit, list tore pem*m "l h and its issue date (if known) Am Form SWU-101 April 1998 Page 1 of 4 3. Sp�jfy theZity of project (check one): L,ow High Density Redevelop .General Permit Other 4. Additional Project Requi ents (check applicable blanlo): LAMA Major 7Sedimentation/Erosion Control 111. PROJECT INFORMATION --Pere-it 3. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . ^1!A OVA A 2GCc5s ;-a ,S /a ke bt;j'/fI;ou 2. Stormwater runoff from this project drains to the CAPE F E A R River basin. 3. Total Project Area: j 2 3? acres 4. Project Basalt Upon Area: _ :� ?-? -% 5. How many drainage basins does the project have?--L_ 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. �, :: � a M W Receiv!n& Stream Name E E K Receiving Stream Class C S W Drains a Basin Area 17• 3 -7 cQE S Existing Impervious* Area • ►J A Proposed Im rvioueArea . Z(? ACi2E5 % Inr ervious* Area (total) UV 4Z44-% -Y •. G n; - e m5za�:-. - h,vA y7yar,�azc,a '7� Syr 5,, On -site Buildings On -site Streets g ACASS On -site Par - --- NIA On -site Sidewalks WI Other on -site ft Off -site IJ Total: Aetesg= * Impervious area is defined as the built upon g, area iucIudin but not limited to bu7d" ad t trigs, ro s, parking areas, sidewalks, gravel areas, etc. 7. How was the off -site impervious area listed above derived?__41A 1V. DEED RESTRICTIONS AND PROTEC17VE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density ;projects and a!1 subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. Form SWU-101 April 1998 Page 2 of 4 By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will rust with the land, that the required covenants cannot be chaanged or deleted without concurrence from the State, and that they Willbe recorded prior to the sale of any lot. V. AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or first so that they may provide information on your behalf, please complete this section: . DesignatEd%Mnt(k%2YiduW0r&m). HonlEYC.UTT EIJ6iNEK9.1n4G COMPANY MaillrgAddmss P. 00X 150 3(0 wILMId6Tor► Phone L o n ) 3 50 - 0 (o 3l _ Fc910 i 350 - 0 (o 3 I VI. SUBNIITTAL REQUHUWe rS This application package will not be accepted by the Division of Water Quality gutless all Of &he applicable items are included with the submittal. 1. Please indicate that you have provided the following required information by sighing your initials in the space provided next to each item. o Original and one copy of the Stormwater Management Permit APn Form• One copy of the applicable Supplement Font(s) for each BMP (see Attachment A) Permit application processing fee (see Attachment A) Two copies of plans and specifications including: o Detailed narrative description of stormwater treatment/management m Two copies of plans and specifications, including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project bounda-y - Location snap with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, parking, cul-de-sacs, sidewalks, and curb and gutter - Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage basins delineated - Vegetated buffers (where required) VIL APPLICANTS CERTMCAT10N I, (priHt or type Mw of listed in General inform frm, item 2) C KM iZ LES E , W E LL-S certify that the information included on this permit application form is correct, that the project will be constructed in conformance ith the approved Plans, that the deed restrictions in accordance with Attachment A of this form will be ed with all required permit conditions, and that to the best of my knowledge the proposed project c . w* the req9ar"ty6f45A NCAC 2H .10W. Form SWU-101 April 199S Pale 3 of 4 KrFACHMENT A 1. Deed Restriction language The following statements must be recorded for all Iow density projects and for all projects that involve the subdivision and selling of lots or outparcels: 1. No more than square feet of any lot, including that portion of the right-of-way betuven the edge of pavement and the front lot line, shall be covered�by impervious structures including asphalt, gravel, concrete, brick, stone, state or similar materiel but not including wood decking or the surface of swimming pools. This covenant is intended to insure continued compliance with the stormwater permit issued by the State of North Carolina. The covenant may not be changed or deleted without the consent of the State. 2. No one may fill in, pipe, or alter any roadside swale grcept as necessary to provide a minimum driveway crossing. NOTE: If lot sizes vary significantly, the owner/developer must provide an attachment listing each lot number, size and the allowable built -upon area for each lot. For commercial projects that have outparcels or feature development the following statements must also be recorded: 3. The connection from the outpand or future area into the stormwater system must be made into the forebay such that short-circuiting of the system does not occur. 4. All built -upon area from the outparcel or future development must be directed into the permitted stormwater control system. 5. Built -upon area in excess of the permitted amount will require a permit modification prior to construction. For curls outlet systems, the following statement in addition to items 1 and 2 above mint be recorded; 6. No one may pipe, fill in or alter any designated 100 foot long grassed swale used to meet the requirements of NCAC 2H .I008(g). 2. Supplene mt Forms The applicable supplement form(s) listed below must be submitted for each BMP specified for this project: Form SWILL-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Nutrient Management Strategy Supplement 3. Permit Application gees (check made payable to NCDENR and submitted to the appropriate Regional Office) Type of Permit Low Density High Density Other Director's Certification General Permit New, Modification, or Late Renewal $225 $385 $225 $350 $50 Form SWU-101 April 1998 page 4 of 4 Timely Renewal Without Modification n/a $225 n/a n/a n/a Drainage Calculations Page I for Rocky Point Commercial Park, Highway 117, Rocky Point, NC Project 8022 1/4/99 revised 2/3/99 Check velocity in (relocated swale (#1) on southwest side of site: (dote: Swale 91 extends from the southwest corner of site north to easement and then east along the easement to the rear of lots 1 and 2. Detennine amount of water from existing 24" pipe: d:=2 ft. headwater : = 5.47 ft. hwd :- headwater hwd a 2.736 d q pipe : = 35 cfs - From "Hydraulic Design of Highway Culverts", a 24" pipe with headwater depth of 5.47' Using this flow, calculate velocity of water exiting pipe: D:=2 ft z• Dz A piles 4 V outlet = q pipe A pipe q pipe = 35 A pipe = 3.142 V outlet ® 11,14 fps cfs ...max discharge Determine outlet apron dimensions and riprap size for outlet protection: From Figure 8.06.b.1 and Figure 8.06.b.2 choose Zone 2. L a : = 6• D L a = 12 ft - minimum length of apron from figure 8.06b2 W : = 3• D W = 6 ft - minimum width of apron from figure 8.06b2 dia : = 0 diernaier of stone in inches d max := 1.5•dia d max = 9 max, stone diameter t := 18 in. min. thickness of apron in inches 51483 ...roadside area north of existing pipe draining to Swale 4356.0 A 2 := A 1. ...roadside area south of euisiing pipe draining to Swale A total A l+ A 2 A total = 2.36 acres _ 9917 A roadl 43560 A road2 : = A roadl A road A roadl + A road2 ...total area draining to Swale A road = 0.455 acres ...total paved area draining to pipe qqoq�2 ? SEAL `" 9524 • �3% Page 2 Drainage Calculations for Rocky Point Commercial Park, Highway i 17, Rocky Point, NC C .pre .30 ...pre -development C C imp := .95 ...paved area C Atotal + C - � road �' road C comp �= C pre' A total �p A total C comp = 0.425 L := 6W ft ...hydraulic length H := 3.5 ft ...height (H) 0.3W T c 128 T c = 7.8 ..lime of concentration Intensity -Duration -Frequency Relationships: Values of G and H* R G H 10 252 30 50 338 33 R= Return Period *Source: Master Drainage Plan for City of Wilmington T := T c Time of duration G 10 : = 252 H 10 30 l 10 G 10 110 = 6.67 Mr ...10 year storm intensity (H 10+T) G 50 := $38 H 50 33 150 1350 150 - 8.284 inlhr ...50 year storm (H 50 + T) q ditchl C comp'11().A total q ditchl = 6.701 ..flow from ditches in oft Q 1 q dKohl + q pipe Q 1 - 41.701 ..total flow in channel in cfs 13 := 0 ...bottom width of channel (ft) M : = 3 ...side slopes 1 := 884 ft. - length of new channel elev upper 31.47 ft. ...elev at upper end of channel elev lower 29.61 ft. ...elev at lower end of new channel fall := elev upper - elev lower fall _ 1.86 fL Page 3 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC fall s = 0.0021 ...Channel slope n := 0.053 ...roughness coeff. for retardance factor "C" (must be consistent with depth of flow) Z req := Q 1 n Z req m 32.337 ...Z required (from R.Malcolm) 1.49• y 1 : 2.94 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 1 :- 13• y 1 + M. (y 1)2 A 1 = 25.931 ...Cross -sectional area of flow (sq.ft.) at depth y P 1 - 0 t 2• y 1 • 1 + M2 P 1 - 18.594 ...Wetted perimeter (ft.) at depth y A R 1 :_ 1 R 1 = 1.395 ...Hydraulic radius (ft.) at depth y 1 2 Z av : = A 1 • (R 1) 3 Z av - 32.367 ...Z available Now compute velocity at this depth: 2 1 1.49 s 2 V1:= n •R1 •s V1=1.61 fps V 1 R 1 = 2.245 Using this value, choose n from Figure 8.05c page 8.05.7 and adjust n above until consistent From Table 8.05a page 8.05A V p : = 4.5 fps •- Permissible Velocity for channels lined with specified grass with slopes 0-4.5% in easily erodible non -plastic soils Since VtVP. Permanent channel lining OX Now check velocity in bane soil to determine it a temporary channel liner M vequired: Q 1 = 41.701 cfs s = 0.002 n := 0.02 ...roughness coeff. for bare soil from Table 8.05b Using normal depth procedure, calculate depth of flow: Z req Q 1 n Z req =12.203 ...Z required (from R.Malcolm) 1.49•,fa y 1 : = 2.04 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 1 : = 8-y 1 + M• (y 1)2 A 1 = 12.485 ...Cross -sectional area of flow (sq.ft) at depth y Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC P1 8+2•y1. 1+MI2 P1=12.902 Al P 2 Zav=A.1•(R1)3 R 1 = 0.968 ...Wetted perimeter (ft.) at depth y ..Hydraulic radius (ft.) at depth y Z av = 12.214 ...Z available Now compute velocity at this dgrth: 2 1 V 1 1.49 A l i•s2 V 1= 3.343 fps From Table 8.05d page 8.05.90 V p := 2.5 fps - Permissible Velocity for unprotected soils (fine sand) in channels Sind a temporary channel lining is required Compute, velocity in swale again assuming a curled wood mat as the temporary liner: n := 0.028 ...roughness coefF. from Table 8.05e Using normal depth procedure, calculate depth of flow: Q 1 Z := n Z 97.084 ...Z required (from R.Malcolrr) 1.49•� req y 1 := 2.31 ...depth of flow (ft.) . vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth Al 8•y1+M-(y1`2 Al=16.000 P1:-8+2•y1. 1+M2 P1=14.61 R1:=1 �1 R1=1.096 ... Cross -sectional area of flow (sqA) at depth y ...Wetted perimeter (ft.) at depth y ...Hydraulic radius (ft.) at depth y 2 Z av := A 1• (R 1)' Zav = 17.014 ...Z available Now compute velocity at this depth: 2 1 V 1 1.49 A, -3.s -2 V 1= 2.594 fps n Calculate shear stress for this velocity: T allow := 1.55 lb per sq.ft allowable shear stress y : = 62.4 ...unit weight of water T := yy 1•s T = 0.303 ...shear stress -Since TSTallgw, temporary channel Unina is O.K. Page 4 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC Check velocity in roadside ditch on north side of easement (awale #1A): A ditch 17655 A ditch - 0.405 43560 q ditch C comp 110'A ditch q ditch = 1.149 B : = 0 ...bottom width of channel (fit) M : = 3 ...side slopes 1 := 200 ft. - length of new channel elev upper 35.0 it. ...elev at upper end of channel .flow from ditches in cfs elev lower: - 30.51 ft. ...elev at lower and of new channel fall : = elev upper - elev lower fall = 4.49 ft. s := fall s = 0.0224 ...channel slope n : = 0.25 ...roughness coeff. for retardance factor "C" (must be consistent with depth of flow) req -= q ditch'n z req - i.287 ..2required (from R.Malcolm) 1.49•� y := .878 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.raq (above) - may also have to vary n above to be consistent with this depth A := B-y + M-(y)2 ...Cross -sectional area of flow (sq.ft.) at depth y P := 8 + 2•y 1 + M2 ..-Wetted perimeter (ft.) at depth y R := P ...Hydraulic radius (ft.) at depth y 2 z av : = A. (R) 3 Z av - 1.29 ...Z available Now compute velocity at this depth: 2 9 V := 1.49 R� s` V = 0.498 fps n V. R = 0.207 using this value, choow n from Figure 8.05c page 8.05.7 and adjust n above until consistent Page 5 From Table 8.05a page 8.05.4a Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC V p := 4.5 fps - Permissible Velocity for channels lined with specified grass with slopes 0-4.5% in easily erodible non -plastic soils Since VaVp. pe Went channel lining O.K. Now check velocity in bare soil to determine 9 a temporary channel liner is required q ditch = 1.149 cfs s = 0.0224 n := 0.02 ...roughness coeff. for bare soil from Table 8.05b Using normal depth procedure, calculate depth of flow: n Z req :_ ditch Z req = 0.103 ...Z required (from R.Malcolm) 1.4&� y := .357 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A := B-y + M-(y)2 A = 0.382 ...Cross -sectional area of flow (sq.ft.) at depth y P := B + 2-y- 1 + M2 P = 2.258 ...Wetted perimeter (ft.) at depth y R : = P R = 0.169 ...Hydraulic radius (ft.) at depth y 2 Z av A- (R ) 3 Z av = 0.117 ...Z available Now compute velocity at this depth- 2 1 V := 1.49 R3 s2 V - 3.417 fps n From Table 8.05d page 8.05.6e V p := 2.5 fps - Permissible Velocity for unprotected! soils (fine sand) in channels Since V>Vo, a temporary channel lining is required Compute velocity in swale again assuming a curled wood mat as the temporary 9inero n := 0.066 ...roughness coeff. from Table 8.05e Using normal depth procedure, calculate depth of flow: Z req q ditch n Z req = 0.34 ...Z required (from R.Malcolm) 1.49-,�s y .535 ...depth of flow (ft.) - vary this number until Zav (below) is appron, equal to Z.req (above) - may also have to vary n above to be consistent with this depth A B-Y + M-M2 A - 0.859 ...Cross sectional area of flow (sq.ft.) at depth y Page 6 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC P B 2• y 1+ M2 P= 3.384 R P R = 0.264 ...Wetted perimeter (ft.) at depth y ...Hydraulic radius (ft.) at depth y 2 Z av : = A-(R) 3 Z av = 0.344 ...Z available NOW compute velocity at this depth: 2 1 V 1.49 Rs sz V = 1.356 fna n Calculate shear stress for this velocity: T allow 1.55 lb per sq.ft allowable shear stress Y : = 82.4 ...unit weight of water T := ry-s T = 0.749 ...shear stress Sing2 T<Tallow, temRRM annel i, iniro4 is O.K. Check velocity in swalo(#2) at the rear of lots 1 and 2: LOT1 ; = 75925 43560 LOT2 : = 77901 43560 A 2 : = LOT1 + LOT2 A 2 = 3.531 A2 imp - •75•A 2 ...assume 75% Impervious C2 pre .30 ...pre -development C C2 imp := .95 ...paved area C C2 comp C2 pre" A2_ A2imp A 2 + C2 imp A 2 C2 comp = 0.787 Q 2 C2 comp-1 10-A 2 Q 2 = 18.54 ..flow in channel in cfs 13 := 0 ...bottom width of channel (ft) M := 3 ...side slopes 12 := 400 ft. - length of new channel e1ev2 upper := 34.0 ft. ...elev at upper end of channel Page 7 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC elev2 lower 29•61 ft. ••.elev at lower end of new channel fail 2 : = elev2 upper elev2 lower fall 2 = 4.39 ft. f s 2:=all 2I s 2= 0.01098 ...channel slope 2 n 0.060 ...roughness coeff. for Retardance factor "C" (must be consistent with depth of flow) - Z req C 2 n Z req = 7.126 ...Z required (from R.Malcolm) 1.49. Ts 22 y 2 1.667 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 2 B•y 2 + M• (y 2) 2 ...Cross -sectional area of flow (sq.it.) at depth y P 2 B + 2'y 2• 1 + M2 ...Wetted perimeter (ft.) at depth y R 2 := 2 ...hydraulic radius (ft.) at depth y 2 2 Z aV := A 2• (R 2)' Zav = 7.129 ...Z available Now compute velocity at this depth: 2 1 V2:= 1.49 R2 s2z V2=2.225 fps n V 2-R 2 - 1.759 Using this value, choose n from Figure O.05c page 8.05.7 and adjust n above until consistent From Table 8.08a page 8.05A V p := 4.5 fps - Permissible Velocity for channels lined with specified grass with slopes 0-4.5% in easily erodible non -plastic soils Since V<V germanent channel lining O.K. Now check velocity In bare soft to determine it a temporary channel liner is required: Q 2 = 18.54 cis s 2 - 0.011 n := 0.02 ...roughness coeff. for bare soil from Table 8.05b Using normal depth procedure, calculate depth of flow: Z req := C 2 n Z feq = 2.375 ...Z required (from R.Malcolm) 1.49.Js2 y 2 : = 1.294 ...depth of flow (ft.) -vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth Page 8 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC A2:=B-y2+M•(y2)2 A2=5.023 P2:= B+2•b2• 1 +M2 P2=8.184 R2:= 2A2 R2=0.614 ..Cross -sectional area of flow (sq.ft.) at depth y ..Wetted perimeter (ft.) at depth y ..Hydraulic radius (ft.) at depth y 2 Z av : = A 2' (R 2) s Z av - 3.628 ...Z available Now compute velocity at this depth: 2 1 V 2 : = 1.49R 23 s 22 V 2 = 5.637 fps n From Table 5.05d page 5.05.0: V p := 2.5 fps - Permissible Velocity for unprotected soils (fine sand) in channels Since IL>V a tempo cannel linipg is re uireei Compute velocity In swab again assuming a curled wood mat as the temporary liner: n := 0.035 ...roughness coeff. from Table 8.05e Using normal depth procedure, calculate depth of flow: Z req = C 2 (n� 2 req = 4.157 ...Z required (from R.Malcotm) i.49•,�" 2 y 2 : = 1.361 ...depth of flow (it.) -vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 2 B•y 2 + M • (y 2) z A 2 - 5.557 ...Cross -sectional area of flow (sq.ft.) at depth y P 2 8 + 2•y 2 1 + M2 P 2 = 8.608 ...!Netted perimeter (ft.) at depth y R 2 P 2 R 2= 0.646 ...Hydraulic radius (ft.) at depth y 2 2 Z av := A 2• (R 2) S Z av 4.151 ...Z available Now compute velocity at this depth: 2 1 1.49.R s z V2:= 2 •s2 VZ=3.331 fly n Calculate shear stress for this velocity: T allow 1.55 lb per sq.ft allowable shear stress Page 9 Drainage Calculations Page 10 for Rocky Point Commercial Park Highway 117, Rocky Point, NC y : = 62.4 ...unit weight of water T := y12-s2 T = 0.932 —shear stress Iinae T<Tahow,,Mpomm channel lining it o K, Check velocity in swaie (#3) at the near of lot 3: LCT3 : = 77901 43560 A 3 := LOT3 A 3 = 1.788 A3 imp .75-A 3 ...assume 75% impeMous C3 pPe .30 ...pr"evelopment C C3 imp := .95 ...paved area C A 3 - A3 Imp A3 imp C3 comp C3 pre' A 3 + C3 Imp A3 C3 comp = 0.787 Q 3 := C3 comp -I 10-A 3 + Q 1 + Q 2 C 3 = 69.629 ..flow in channel in cis 8 := 0 ...bottom width of channel (ft) M : = 3 ...side slopes t 3 := 222 ft. - length of new channel elev3 P.:pper 29.61 ft. ...elev at upper and of channel elev3 lower 29.13 ft. ...elev at lower end of new channel fall 3 := elev3 upper elev3 lower fall 3 = 0.48 ft. fall 3 s 3 I s 3= 0.00216 ...channel slope 3 n 0.045 ...roughness coeff. for Retardance factor T* (must be consistent with depth of flow) - Z req Q 3 n Z req = 45.225 ...Z required (from R.Malcolm) 1.r49-4G 3 y 3 : = 3.333 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 3: e y 3 + M- (y 3)2 ...Cross -sectional area of low (sq.ft) at depth y P 3 ®+ 2-y 3 1 + M2 ...Wetted perimeter (ft.) at depth y Drainage Calculations for Rocky Point Commercial Parts, Highway 117, Rocky Point, NC A R 3 := 3 ...Hydraulic radius (ft.) at depth y 3 2 Z av ' = A 3- (R 3) 3 Z av = 45.228 ...Z available Now compute velocity at this depth: 2 1 V 3 1.49 R 33-s 32 V 3= 2.089 fps n V 3• R 3 - 3.303 Using this value, choose n from Figure 8.05c page 8.05.7 and adjust n above until consistent From Table 8.05a page 8.05A V p := 4.5 fps - Permissible Velocity for channels lined with specified grass with slopes 0-4.5% in easily erodible non-plestic soils Since V<VD, cermanept channel lining ©. K. Now check velocity in bane soil to determine N a tePnporapy channel liner is required: Q 3 = 69.629 cfs s 3 = 0.002 n := 0.02 ...roughness coeff. for bare soil from Table 8.05b Using normal depth procedure, calculate depth of flow: Z req := Q 3 n Z req * 20.1 ...Z required (from R.Malcolm) 1.49•,� 3 2.46 ...depth of tio°w (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A3,=B-y3+M•(y3)2 A3-18.155 P 3 B+ 2-y 3• 1+ M2 P 3= 15.558 A R3:=3 R3=1.167 P 3 ..Gross -sectional area of flow (sq.ft.) at depth y ...Wetted perimeter (ft.) at depth y ..hydraulic radius (ft.) at depth y 2 Z av := A 3" `R 3)' Z av = 20.122 ...Z available Now compute velocity at this depth: 2 1 V3:= in 1.49 •R3 •s32 V3=3.84 fps From Table 8.05d page 8.05.90 V p := 2.5 fps - Permissible Velocity for unprotected soils (fine sand) in channels Since V>Vo, a temporary channel lining Is required Page 11 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC Compute velocity in swage again assuming a curled wood mat as the temporary liner: n := 0.028 ...roughness coeff. from Table 8.05e Using normal depth procedure, calculate depth of flow: Z req Q 3 n Z r - 2814 ...Z required (from R.Malcolm) 1.49-js , y 3 2.79 ...depth of flow (ft.) - vary this number. until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A3:=B-y3+M•(y3)2 A3=23.352 P3:=B+2-y3 1+M-2 P3=17.646 R3 F3 R3-1.323 3 ...Cross -sectional area of flow (sq.ft.) at depth y ...Wetted perimeter (ft.) at depth y .Hydraulic radius (ft.) at depth y 2 Z av A 3- (R 3)" Z av = 28.149 ...Z available Now ",mpute velocity at this depth: 2 1 V3.= 1.49-R33S32 V3=2.983 fps n Calculate shear stress for this velocity: T alloy, : = 1.55 lb per sq.ft allowable shear stress y : = 62.4 ...unit weight of water T:=r-y3•s3 T = 0.376 ...shear stress Since T<Tal10w, temporary channel lining is O.K. Check velocity in swale (") along south sick of Commerce Dr.: A ditch 147585 A ditch = 0.339 acres ...area draining to ditch along Commerce Dr. 43 A road := 4616 A road = 0.106 acres ...paved portion of area draining to ditch 43560 A total := A ditch + A road A total A road A road C comp C pre- + C A total imp A total C comp = 0.455 q ditch := C comp.I 10'A ditch q ditch = 1.029 ..flow from ditches in cfs Page 12 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC 04 q ditch + 0 3 a 4= 70.658 cfs ...flow in Swale 13 0 ...bottom width of channel (ft) M : = 3 ...side slopes 1 119 ft. - length of new channel elev upper 29.13 ft. ...elev at upper end of channel elev lower := 28.87 ft. ...elev at lower and of new channel where if intersects old ditch fall ;= elev upper elev lower fall = 0.26 ft. s 4 fall s - 0.0224 ...channel slope n 0.046 ...roughness coeff. for retardance factor "C' (must be consistent with depth of flow) Q 4n Z req := Z req = 46.668 ...Z required (from R.Malcolm) 1.49•FS y 4 : = 3.367 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 4: = 13-y 4 + M- (y 4) 2 ...Cross-secctional area of flow (sq.ft.) at depth y P 4: = 6 + 2•y 4 1 + M2 ...Wetted perimeter (ft.) at depth y A R 4 := 4 ...Hydraulic radius (ft.) at depth y P 4 2 Z av : = A 4- (R 4) 3 Z av = 46A69 ...Z available Now compute velocity at this depth: 2 1 1.n 49 2 V4:= -R4 s4 V4=2.069 fps V 4-R A = 3.304 Using this value, choose n from Figure 8,05c gage 8.05.7 and adjust n above until consistent From Table 8,05a page &05A V p := 4.5 fps - Permissible Velocity for channels lined with specified grass with slopes 0-4.5% in easily erodible non -plastic soils Since VEVo. permanent channel lining O Page 13 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC Now check velocity in bare soil to determine if a temporary channel liner is required: 0 4 = 70.658 oft s 4 g 0.002 n : = 0.02 ...roughness coeff. for bare soil from Table 8.05b Using normal depth procedure, calculate depth of flow: Z req := 0 4 n Z req = 20.29 ...Z required (from R.Malcolm) 1.49•Fs y 4 := 2.468 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 4 = B' Y 4 + M• (y 4) 2 A 4 = 18.273 ...Cross -sectional area of flow (sq.ti.) at depth y P 4 B + 2-y 441 -+ he P 4 = 15.609 ...Wetted perimeter (ft.) at depth y A R 4 P 4 R 4= 1.171 ...Hyydraulic radius (ft.) at depth y 2 Zav A 4- (R 4) 3 Z av = 20.297 ...Z available NOW Compute velocity at this depth: 2 1 V 4 1.49 R 3.$ 2 V 4= 3.668 fps n From Table 8.06d page 8.05.9: V p := 2.5 fps - Permissible Velocity for unprotected soils (fine sand) in channels Since V>V2. a ternporary channel lining is reguft Compute velocity in Swale again assuming a curled wood rnat as the temporary liner: n := 0.028 ...roughness coeff. from Table 8.05e Using normal depth procedure, calculate depth of flow: Z req := Q 4 n Z req = 28.407 ...Z required (from R.Malcolm) 1.49•Fr- y 4 : = 2. 799 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.re4 (above) - may also have to vary n above to be consistent with the depth A 4: = B-y 4 + M• (y 4) 2 A 4 = 23.503 ...Cross -sectional area of flow (sq.ft.) at depth y P 4 := 8 + 2-y 4• 1 + M2 P 4 - 17.702 ...Wetted perimeter (ft.) at depth y Page '14 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC A R 4 : = P 4 R 4 = 1.32E ...Hydraulic radius (ft.) at depth y 2 Z av : = A 4• (R 4)' Z av - 28.392 ...Z available Now compete velocity at this depth: 2 1 1.49 3 2 V 4 := R 4 •s 4 V 4 m 3.005 fps n Calculate shear stress for this velocity: T allow : = 1.55 lb per sq.ft allowable shear stress y : = 62.4 ...unit weight of water T := ry4•s4 T - 0.382 ...shear stress Since T<-Tallow. ternponry�chappel linen is O.K. Check velocity in $wale (#5) at the rear of lots 4,5, and 5: L OT4 : = 77900 43560 LOTS: = 77901 43560 LOTS 77897 43560 A w : = LOT4 + LOT5 r LOTS A 5 = 5.365 acres A5 imp - .75•A 5 ...assume 76% impervious CS pre - .30 ...pre -development C C5 imp : _ .95 ...paved area C C5 comp C5 pre -A 5 - A5 imp A5 imp A S + C5 imp A 5 C5 comp ' 0.787 Q 5 := C5 comp•I 1Q•A s Q 2 = 18.54 ..flow in channel in cfe B := 0 ...bottom width of channel (ft) M : = 3 ...side slopes 15 := 620 ft. - length of new channel elev5 upper := $5.09 ft. ...elev at upper end of channel Page 15 ol ' lower : ` 31.00 % ...elev at lower end of new channel Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC fail 5 := elev5 upper elevv lower fall 5 = 4.09 #t. s 5 := fall 5s 5= 0.0066 ...channel slope 15 n 0.056 ...roughness coeff. for Retardance factor "Ca (must be consistent with depth of flow) - Z req Q 5 n Z req = 13.034 ...Z required (from R.Malcolm) 1.49•F y 5 : = 2.203 ...depth of flow (ft.) - vary this number until Zav (below) is approu, equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 5: = B•y 5 + M. (y 5)2 ...Cross-secitional area of flow (sq.it.) at depth y P 5 := B + 2•y 5 1 + M2 ...Wetted perimeter (ft.) at depth Y R 5 := A 5 ...Hydraulic radius (ft.) at depth y P 5 2 Z av := A S. (R 5) 3 Z av = 14.993 ...Z available Now compute velocity at this depth: 2 1 1.49 3 2 V5:= •R5 s V5=2.225 fps n V 5• R 5 - 2.325 Using this value, choose n from Figure 8.05c page 8.05.7 and adjust n above until consistent From Fable 8.05a Page 8a05A V p := 4.5 fps - Permissible Velocity for channels lined with specified grass with slopes 0-4.5% in easily erodible non -plastic soils Since V<Vp, permanent channel lining OX Now check velocity in bare soil to determine 9 a temporary channel liner Is required: Q 5 = 28.166 cfs s 5 = 0.007 n : = 0.02 ...roughness coeff. for bare soil from Table 8.05b Using normal depth procedure, calculate depth of flow. Z req := C 5 n Z req = 4.655 ...Z required (from R.Malcolm) 1.49•�- Rage Is Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC y 5 := 1.497 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 5 . B-y 5 + M• (y 5)2 A 5 - 6.723 ...Cross -sectional area of flow (sq.ft.) at depth y P 5 B + 2•y 5 1 + M2 P 5 = 9.468 ...Wetted perimeter (ft.) at depth y A R 5 := P 5 R 5= 0.71 ...Hydraulic radius (ft.) at depth y 2 Z av A 5- {R 5} 3 Z av - 5.351 ...Z available Now compute velocity at this depth: 2 1 V5:= 1.49 R53,s52 V5=4.816 fps n From Table 0.05d page &05.0: V p := 2.5 fps - Permissible Velocity for unprotected soils (fine sand) in channels Since WV®, a k=ora� annel lining Is required Compute velocity In Swale again assuming a curled) wood mat as the temporary liner: n := 0.035 ...roughness coeff. from "Fable 8.05e Using normal depth procedure, calculate depth of flow: Z req C S-n Z req = 8.146 ...Z required (from R.Malcotm) 1.49- s5 y 5 : = 1.847 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 5 := B-y 5 + M. (y 5)2 A 6 - 10.234 ...Crosss-sectional area of flow (sq.ft.) at depth y P 5 := B + 2•y 5 1 + M2 P 5 = 11.681 ...Wetted perimeter (ft.) at depth y A R 5 : = 5 R 5 = 0.876 ...Hydraulic radius (ft.) at depth y 2 Z av : = A S. (R 5) 3 Z av, - 9.37 ..2 available Now compute velocity at this depth: 2 1 V .R 5s s 6 V 6 = 3.166 fps Page 17 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC Calculate shear stress for this velocity: T allow : = 1.55 lb per sq.ft allowable shear stress Y : = 62.4 ...unit weight of water T := ry 5•s 5 T = 0.76 ...shear stress Since T<Tattow, terr4potary channef fining is O.K. Check velocity in swale (#6) on the north side of Commerce Dr lot4 : = 77900 loM = 1.788 acres ...area of lot 4 all of which is assumed impervious 43560 C6 imp : _ .95 ...paved area C q lot4 = C6 imp- 110- lot4 q lot4 = 11.326 Q6:=05+gditch +glot4 Q6=40.521 8 := 0 ...bottom width of channel (ft) M = 3 ...side slopes cfs ...runoff from lot 4 16 := 170 ft. - length of new channel elev6 upper := 31.00 ft. ...elev at upper end of channel cfs ...total flow in Swale elev$ lower 28.70 I ...elev at lower end of new channel fail 6 := elev0 upper - eiev6 lower fail 6 = 2.3 ft. fall 6 s 6:= I s 6= 0.01353 ...channel slope 6 n := 0.046 ...roughness coeff. for Retardence factor "C" (must be consistent with depth of flow) - Z req Q 6 n Z req = 10.755 ...Z required (from R.Maicoim) 1.49•,Fs 6 y 6 : = 1.945 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depih h 6 : = 8.7 6 + M. (y 6) z Cross -sectional area of flow (sq.ft) at depth y P 6 := 6 + 2-ye 1 + M2 ...Wetted perimeter (ft.) at depth y R 6 :_ 6 ...Hydraulic radius (ft.) at depth y 6 Page 18 Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC 2 Z av A 6• (R 6) 3 Z ev = 10.756 ...Z available Now compute velocity at this depth: 2 1 V 6 := 1.49 R 63s62 V 6= 3.571 fps n V 8-R 6 = 3.294 Using this value, choose n from Figure 8.05c page 8.05.7 and adjust n above until consistent From Table 8.06a page 8.05A V p := 4.5 fps - Permissible Velocity for channels lined with specified grass with slopes U.5% in easily erodible non -plastic soils Since V<_Vg. 2ermanVnt channel lining . Now check velocity in bare soil to determine if a temporary channel liner is required: Q 6 = 40.521 cfs sr) = 0.014 n := 0.02 ...roughness coeff. for bare soil from Table 8.05b Using normal depth procedure, calculate depth of flow: Z req 0 6 n Z req = 4.676 ...Z required (from R.Malcoim) 1.49•,Fs,5 y 6 : = 1.423 ...depth of flow (it) - vary this number until Zav (below) is approx equal to Z.req (above) - may also have to vary n above to W eonssaartt with this depth A 6 a•y 6 + M. (y 6)2 A 6 = 6.075 ...Cross -sectional area of flow (sq.ft.) at depth y P6'=6+2-y6 1+NI2 P6=9 A R6 6 R6-0.675 P 6 ...Wetted perimeter (ft.) at depth y ...Hydraulic radius (ft.) at depth y 2 Z av := A 6• (R 6) 3 Z av = 4,674 ...Z available Now compute velocity at this depth: 2 1 V 6 1.49 R es 6` V 6- 6.668 1.03 n From Table 8.05d page 8.05.9a V p := 2.5 fps - Permissible !Velocity for unprotected soils (fine sand) in channels Page 19 Since WV% a temporary channel lining is required Drainage Calculations Page 20 for Rocky Point Commercial Park, Highway 117, Rocky Point, NC Compute velocity in swale again assuming a curled wood mat as the temporary liner: n := 0.035 ...roughness coeff. from Table 8.05e Using normal depth procedure, calculate depth of flow: Z req := Q 6 n Z req = 8.183 ...Z required (from R.i alcolm) 1.49•Vs 6 y 6 : = 1.756 ...depth of flow (ft.) - vary this number untie Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A 6 : B. y 6 + M. (y 6) 2 AO = 9.251 ...Cross -sectional area of flow (sq.ft.) at depth y PO B + 2-y 6• 1 + M2 P 6 = 11.106 ...Wetted perimeter (it.) at depth y A R 6 : = P R 6 = 0.833 ...Hydraulic radius (ft.) at depth y 2 Z av := A e. (R 6) 3 Z av = 8.189 ...Z available Now compute velocity at this depth: 2 1 V 6 1.49 -Re 3.s 62 V 6= 4.384 fps n Calculate shear stress for this velocity: Tallow : = 1.55 lb per sq.ft allowable shear stress Y : = 62.4 ...urllf weighti Qo water T ry6•s6 T = 1.482 ...shear stress Since T-cIgligg, temgorary ghannel llnin„l it O.Kj Size pipe under southern driveway entrance for Hots 1 & 2: q ditchl q:=Q1- q=38.35 2 headwater 6.03 ft. d := 2 ft. hwd := headwater hwd = 3.015 d q pip1 := 40 cfs - the capacity of a 24" pipe with headwater depth of 6.03' from "Hydraulic Design of Highway Culverts", Using this flow, calculate velocity of wager exiting pipe: -Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, NC D : = 2 ft q q pipe, q - 40 cfs ...max discharge z A pipe :_ 4 A pipe = 3.142 outlet . = A q V outlet = 12.73 fps pipe Determine outlet apron dimensions and riprap size for outlet protection: From Figure 8.06.b.1 and Figure 8.06.b.2 choose Zone 2. L a:- 8•C La = 12 ft - minimum length of apron from lure 8.0%2 W : = 3• D W = 6 ft - minimum width of apron from figure 8.06b2 dia : = 6 diameter of stone in inches d max := 1.5•dia d max = 9 max. stone diameter t := 18 in. min. thickness of apron in inches Design sediment basin: Page 21 Since the flow in each Swale was computed for the individual area draining to the Swale the total flow Is conservative (high) due to the short time of concentration. Recompute total flow from the site as a whole for determining the size of the sediment basin: 142 A dev 738738 A dev = 3.383 43560 A imp .75•A dev A dev = 3.383 A 718159 disturbed 43560 A disturbed = 16.487 A total := A dev + A disturbed A total - 19.8701 A other A total A disturbed A imp ...disturbed area draining to sediment basin acres ...total drainage area A other = 0.846 C pre := .20 ... pre -development C C disturbed .3 C imp := .95 ...paved area C A other A imp A disturbed C comp �= C pre' A total + C imp A total + C disturbed' A total C comp = 0.38 ...composite C (post -development) L 1150 ft H 38.55 - 28.5 { 3 3' T� 128 ..hydraulic length It ...height T c = 11.02 ...time of concentration Drainage Calculations for Rocky Point Commercial Park, Highway 117, Rocky Point, iC Intensity -Duration -Frequency Relationships: Values of G and H" R G H 10 252 30 50 338 33 R= Return Period Source: (Master Drainage Plan for City of Wilmington T : = T c Time of duration G10:=252 H10:=30 110 G 10 I t o= 6.14 in/hr (H10+T) G 50 : = 338 H 50 33 150 := G 50 150 = 7.679 in/hr H 50 T ) Compute runoff rates: Q pre : = C pre- 110- (A total) Q pre = 24.42 Q := C comp'I 10- (A total) Q = 46.24 Now add in the offsite water: ...10 year storm intensity ..50 year storm Page 22 cfs ...pre -development runoff from 10 yr, storm cfs ...post -development discharge rate to basin from 10 yr. sty q pipe = 35 ...flow from pipe under highway 117 q ditch1 = 6.701 ... flow from ditches along highway 117 Q 10 Q + q pipe + q ditch1 Q 10 = 87.938 ..total flow entering basin 8 : = A disturbed-1800 S = 29876 ...cu.ft. of storage required Determine volume in basin: m.=0..3 n =1..3 am := dm := 4004- f ...area of exist. contour 31.00 .04 j 10801-f? ...area of exist. contour 32.00 1.0-fe 5433•i? ...area of exist. contour 32.50 •5.6' 9383• f? ...area of exist. contour 33.00 0.54 corresponding depth from contour above Drainage Calculations for Rocky Point Commercial Park, Highway 117, pocky Point, NC +a " v: = 2 " d" ...Incremental volume V basin Iv ...total volume in forebay equals the sum of the incremental volumes V basin = 32660 - fib ...total volume in forebay must be >= S = 29676 cu.ft. O.K. A regd :_ .Q1-Q 10•acre A regd = 38306^ft ...required surface area for basin surfacearea a3 surfacearea = 39363^fie > A regd = 38306•ft O.K. Determine cleanout level In basin: 0 7403 V basin 3 v = a #� V half 2 V half = 16330•ft 9059 16199 Try volume at elev. 32.5: v cleanout vo + vi + v2 v cleanout = 16461 -ft3 should be less than V half = 16330-ft3 Page 23 Since elev. 32.5 results in slightly more than desired, set clean out elevation at 32.40'. Size spillway to pass 10 year peak flow: L := 16 ft ...Length of weir H 12 ft ...Driving head C w 3.0 ...Weir coefficient 0 : = C VV L. H "O ...Weir capacity Q = 88.18 must be => O 10 = 87.94 O.K. (Vote: References to chart nos., table nos., and page nos. refer to Erosion and Sediment Control Planning and Design Manuel unless noted otherwise Drainage Calculations for Rocky Point Commercial Park, Highway I 17, Rocky Point, NC ds _ ft3 sec acre = 43560• ft Assuming depth of 4.5` and length has to be two times width, compute minimum length and width; depth : = 4.5 area : _ S area = 6595 depth 9 width (area s width = 57.422 ...minimum width width 55 ft ...use this width length := 2-width length - 110 ... length area length -width ratio width-ft•length- ft a 10• cfs area = 6050 ratio = 0.0016-ft . acre cfs Page 24 ALLa'WABLE BUILT UPON LOT NO. AREA (SQ.FT) AREA (SQ.FT) 1 75925 14418 2 77901 14418 3 77901 14418 4 77900 77900 5 77901 14418 6 77897 14418 RECEIVED ROCKY POINT COMMERCIAL PARK JAN O 6 1998 ROCKY POINT, N.C. NARRATIVE ON STORMWATER MANAGEME Y: This development consists of a 53.76 acre site along Highway 117 in Rocky Point, N.C. Phase one of this development consists of 12.37 acres that includes a paved road, six lots, and various drainage and utility easements. The average size of the lots is 1.76 acres. Application for a Stormwater Discharge Permit will be made under the Low Density option. This will be done by restricting the amount of area that the lots can build upon. Since Lot 4 was sold and been built upon without any stormwater restrictions, the amount of area that the remaining lots can build upon will be reduced accordingly. The discharge from an existing 24" pipe across Highway 117 along with the drainage from the roadside ditches currently drain across lots 1, 2 and 3. This drainage will be rerouted to flow between lots 2 and 3 and then behind lot 3 to Commerce Drive. From that point it will flow along the Commerce Drive right of way until it intersects the existing ditch again. A swale located in a 30' drainage easement behind all the lots will collect drainage from these lots and route it to the roadside ditches on Commerce Drive. A check dam will be installed downstream in the existing ditch to prevent sediment from leaving the site.