Loading...
HomeMy WebLinkAboutSW6130703_Permit Renewal_20210914ROY'COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Camden Glen Development, LLC Attn: Harold Kidd, Member/Manager 6885 Cliffdale Road Fayetteville, NC 28314 NORTH CAROLINA Environmental Quality September 14, 2021 Subject: Permit Renewal State Stormwater Management Permit SW6130703 Peartree West Subdivision (formerly Camden Glen Subdivision) High Density Residential Development Cumberland County Dear Mr. Kidd: The Fayetteville Regional Office of the Division of. Energy, Mineral and Land Resources (DEMLR) received a complete State Stormwater: Permit Renewal Application Form for Peartree West Subdivision (formerly Camden GlenSubdivision) on August 18, 2021. We are hereby notifying you that permit SW6130703 has been renewed on September 14, 2021 and shall be effective until August 13, 2029. For your records, please find enclosed a renewed, updated, and reissued permit. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous permit terms to provide you with a better understanding of your obligations under the permit. The renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on August 13, 2013 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 21­1 .1000 and Session Law 2006-246. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding Operation and Maintenance of the Stormwater Control Measures (SCMs), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes. Per NCGS 143-215(e), the petition must be filed with OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding, the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.ncoah.com. Unless such demands are made, this permit shall be final and binding. If you have any questions or concerns, please contact Mike Lawyer at (910) 433-3394 or via e-mail at mike.lawyer@ncdenr.gov. E�+ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street. Suite 7141 Fayetteville, North Carolina 28301 40R'H LeViC;Utl.. �� DeparlmeMatEmlronmenbl Uual �/""'� 910.433.3300 Sincerely, for Brian Wrenn, Director Division of Energy, Mineral and Land Resources ec: Cynthia M. Smith — Moorman, Kizer & Reitzel, Inc. DEMLR Stormwater Permit Laserfiche File cc: FRO - DEMLR, State Stormwater Files STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Camden Glen Development, LLC for Peartree West Subdivision (formerly Camden Glen Subdivision) Camden Road, Fayetteville, NC Cumberland County FOR THE construction, operation, and maintenance of the Stormwater Control Measures (SCMs) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting documents as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until August 13, 2029 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The SCMs have been approved for the management of stormwater runoff as described in the application documents and as shown on the approved plans. The SCMs have been designed to handle the runoff from 824,155 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area as indicated in the application documents and as shown on the approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon areas within the permitted drainage areas of this project must be directed into the permitted SCMs. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semi-annual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins, piping, and vegetated filter. g. A clear access path to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted SCM and made available to Division staff upon request. The reports will, indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division an annual summary report of the maintenance and inspection records for each SCM. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. The SCMs shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. 11 12 b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area.. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plans. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. A copy of the approved plans and specifications shall be maintained on file by the permittee for a minimum of eight years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the timeframe specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change in ownership, the appropriate form must be completed and submitted to the Division of Energy, Mineral and Land Resources accompanied by any applicable fee, documentation from both parties involved and other supporting materials as may be appropriate. The project must be in good standing with the Division of Energy, Mineral and Land Resources. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time, as the Division approves a request to formally transfer the permit. Neither the sale of the project area in whole or in part, nor the conveyance of common area to a third party, constitutes an approved permit transfer. 3. Any individual or entity found to be in non-compliance with the provisions of this stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143, Article 21. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and/or federal), which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall .take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. Permittee grants permission to Division staff to access the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management system. 7. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the SCMs must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating, the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 02H .1000, and NCGS 143-215.1 et. al. 11. The permittee. shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days of making any one or more of the following changes: a. A name change of the current permittee. b. A name change of the project. C. A mailing address change of the permittee. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H .1045(3). Permit renewed and reissued this the 14th day of September 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION fbi:-BTian Wrenn, Directo Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission State Stormwater Management Permit SW6130703 Peartree West Subdivision (formerly Camden Glen Subdivision) Page 1 of 2 Stormwater Management Permit SW6130703 Cumberland County Designer's Certification as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. Please submit this Designer's Certification to: NCDEQ Fayetteville Regional Office Division of Energy, Mineral and Land Resources 225 Green Street, Suite 714 Fayetteville, NC 28301