Loading...
HomeMy WebLinkAboutSW6110702_Rescission Request_20210826DEMLR USE ONLY Date Received BIMS Rescission Date Permit Number �7 RECEIVED EU NC DEQ Division of Energy, Mineral and Land Resources .#IERMIT RESCISSION REQUEST FORM ONLY for when the permittee of record wishes to rescind an existing State Stormwater Management Per ii uetoOffice one of the options below. The permittee must complete, sign and submit this original formtofv 11®in►�II DEMLR Regional Office, which can be determined by locating the project on the interactive online map at: htt .//de .nc. ov/contactlre ional-offices. 1. State Stormwater Permit Number: SW6110702 2. Project name: WedQefield Phase III 3. ® I am the current permittee of the permit to be rescinded. (if you are not the current permittee, either the current permittee must complete this form or you must apply to transfer the permit and receive approval before you can apply to rescind the permit). 4. Rescission options (select only one response below) ® a. This project has been or will be replaced by a separate permit issued by the Division. ® If the new permit number has been assigned: SW6100902 ❑ If a new permit number has not been assigned, the proposed facility name: ❑ b. This project has not been constructed and there are no future plans to do so under this approval. I understand that any vested rights or prior authorizations are forfeited based on this request. ❑ c. This project has received approval from the City of Wilmington under their post -construction ordinance which includes and covers both the previously approved construction under the State permit, and all subsequent new construction. A copy of the new permit issued by the City of Wilmington must be submitted along with this form. ❑ The permit / approval number issued by the City of Wilmington: ❑ I acknowledge and understand that this delegated local government may impose stricter design requirements for the existing part of the project. ❑ I acknowledge that this delegated local government may assess annual fees for its stormwater permits. For comparison, the State charges $505.00 to transfer a permit or to modify a permit, and $505.00 every 8 years to renew a high -density permit. Signature requirements for the named signing official representing the current permit holder must meet the requirements listed in NCAC 02H.1040(1). I, Raymond C. Thomas , the current permittee, am submitting this request to rescind the above -listed stormwater permit. I attest that this request for a permit rescission is made with the full knowledge and understanding of the above -listed facts. I understand that the subject state stormwater permit will not be rescinded until a copy of the permit issued by the delegated local government is submitted to DEMLR, or the replaceme4pert is issued, or it is con me that the project has not been construct d. Signature: Date: - D I, E avSta(eary Public for the of 4dr+ , rai2Q L'ne, County of &I do hereby certify that personally appeared before me this the day of __AAA , c 20��, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, tary Seal) n ,,OTAi i, Notary Signature: 141JBOr- My commission expires 00-",Pr a`9, �i�o °�,� �G Stormwater Permit Rescission Request Form Page 1 of 1 March 14, 2019